{"feed_info":{"update_date":"2026-05-13T15:13:20.0836006+00:00","publisher":"Arcadis","version":"4.1","data_sources":[{"data_source_id":"TRANSCOM","organization_name":"TRANSCOM","update_date":"2026-05-13T15:13:20Z"}]},"type":"FeatureCollection","features":[{"id":"nfx4RJKrzGECSOacOc5n2I6CYGk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Northeast Corridor Line"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, Northeast Corridor Line at Metropark (Woodbridge Twp) the sidewalk leading to Wood Avenue will be closed due to the enhancement of Metropark Station, including the installation of a new shared pedestrian and bicycle path. During this time, we ask that customers be aware of the construction activity and follow all posted signage. The pedestrian tunnel will remain open to access the southbound platform and all points north of Metropark Station, as well as sidewalks along Middlesex Turnpike, Wood Avenue, and Lincoln Highway. Please allow for extra travel time. We appreciate your patience during this adjustment., Continuous Monday May 19th, 2025 09:00 AM thru Monday November 30th, 2026 11:59 PM","update_date":"2025-05-13T14:10:51Z"},"road_event_id":"nfx4RJKrzGECSOacOc5n2I6CYGk=","beginning_cross_street":"Metropark","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.329394,40.56864]]}},{"id":"UGbUUMXd+l68AoS2hyn32KfNFCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATERSIDE DR"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on WATERSIDE DR both directions between US-6 (Farmington) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:37:22Z"},"road_event_id":"UGbUUMXd+l68AoS2hyn32KfNFCc=","beginning_cross_street":"US-6","ending_cross_street":"US-6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.814566,41.707049]]}},{"id":"159xyXBkPQIPF3XKS2qZD/loMS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHURCH ST N"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on CHURCH ST N both directions between CENTRAL AVE (New Hartford) and BRIDGE ST at CENTRAL AVE (New Hartford) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:37:50Z"},"road_event_id":"159xyXBkPQIPF3XKS2qZD/loMS4=","beginning_cross_street":"CENTRAL AVE","ending_cross_street":"CENTRAL AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.980474,41.878083]]}},{"id":"eFHqYrRFxhVeweu6cEiGP1R/1ZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAIL RD"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on VAIL RD both directions between GARELLA RD (Bethel) and US-6 (Bethel) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:36:09Z"},"road_event_id":"eFHqYrRFxhVeweu6cEiGP1R/1ZA=","beginning_cross_street":"GARELLA RD","ending_cross_street":"US-6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.393217,41.420046]]}},{"id":"8K06YoYvfS8EhCMcXEpVzGoC0pE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SEYMOUR RD"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on SEYMOUR RD both directions between HATCHETT HILL RD (East Granby) and INTERNATIONAL DR (East Granby) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:36:39Z"},"road_event_id":"8K06YoYvfS8EhCMcXEpVzGoC0pE=","beginning_cross_street":"HATCHETT HILL RD","ending_cross_street":"INTERNATIONAL DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.73938,41.917057]]}},{"id":"ITaHqCu9Iwj3n1tGj9S641fbpNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bwaqOV5v22T9L/46yB+9H9xumXQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"ITaHqCu9Iwj3n1tGj9S641fbpNg=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"bwaqOV5v22T9L/46yB+9H9xumXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"6J+FsnY+xErwEinGd3uoW0gJ4eg="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"bwaqOV5v22T9L/46yB+9H9xumXQ=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"6J+FsnY+xErwEinGd3uoW0gJ4eg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"dN5jz+61pIyCLqNwa8VJnuXU2pg="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"6J+FsnY+xErwEinGd3uoW0gJ4eg=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"dN5jz+61pIyCLqNwa8VJnuXU2pg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"TPjGuMn3IOIzW/fmd8l7e22Tqx0="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"dN5jz+61pIyCLqNwa8VJnuXU2pg=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"TPjGuMn3IOIzW/fmd8l7e22Tqx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"22xz6TrJSSv+OWI440WfdQVaApU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"TPjGuMn3IOIzW/fmd8l7e22Tqx0=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"22xz6TrJSSv+OWI440WfdQVaApU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"o4D2cL/FFumBYkgf2MOCQt+e85E="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"22xz6TrJSSv+OWI440WfdQVaApU=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"o4D2cL/FFumBYkgf2MOCQt+e85E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"5cklFKGDCn+RRE7+QB2sqS81lNo="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"o4D2cL/FFumBYkgf2MOCQt+e85E=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"5cklFKGDCn+RRE7+QB2sqS81lNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"lTSqVQlCzkfQQej6Jkrqvkpilyk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"5cklFKGDCn+RRE7+QB2sqS81lNo=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"lTSqVQlCzkfQQej6Jkrqvkpilyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"b48oLh7LjU2hcV6jGY3h3QGvvyE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"lTSqVQlCzkfQQej6Jkrqvkpilyk=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"b48oLh7LjU2hcV6jGY3h3QGvvyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"av2I12o8e4LWWKEPvlm4hgSx7QQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"b48oLh7LjU2hcV6jGY3h3QGvvyE=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"av2I12o8e4LWWKEPvlm4hgSx7QQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"qqDrmoh6EWSFb9DCvfUZGJkDRCs="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"av2I12o8e4LWWKEPvlm4hgSx7QQ=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"qqDrmoh6EWSFb9DCvfUZGJkDRCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"rMdoSQ4N1rR2MllWSL8VBbycEew="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"qqDrmoh6EWSFb9DCvfUZGJkDRCs=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"rMdoSQ4N1rR2MllWSL8VBbycEew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"MSLkaLoyT0TGylGcNoZtQpURe3w="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"rMdoSQ4N1rR2MllWSL8VBbycEew=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"MSLkaLoyT0TGylGcNoZtQpURe3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"uIGMkElctTK55+axFB6QlX/z8WI="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"MSLkaLoyT0TGylGcNoZtQpURe3w=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"uIGMkElctTK55+axFB6QlX/z8WI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"20ZKrqxKwKeaNOumgsdZ33nOvBU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"uIGMkElctTK55+axFB6QlX/z8WI=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"20ZKrqxKwKeaNOumgsdZ33nOvBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"b9EIph/8kShbx2t/o+QAOKVHwVE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"20ZKrqxKwKeaNOumgsdZ33nOvBU=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T23:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"b9EIph/8kShbx2t/o+QAOKVHwVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"eT9dvNtahRL5dJwPN9EKje1utNw="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"b9EIph/8kShbx2t/o+QAOKVHwVE=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"eT9dvNtahRL5dJwPN9EKje1utNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"pBZySN6VuDb5vuNyH1+YB/NsRG4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"eT9dvNtahRL5dJwPN9EKje1utNw=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T23:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"pBZySN6VuDb5vuNyH1+YB/NsRG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"72uY6Tplna8Z7Mc7HM/sqVyZ1wY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"pBZySN6VuDb5vuNyH1+YB/NsRG4=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"72uY6Tplna8Z7Mc7HM/sqVyZ1wY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"Ie2fHn9ETM9ugwf001v6viF5oNs="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"72uY6Tplna8Z7Mc7HM/sqVyZ1wY=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T23:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"Ie2fHn9ETM9ugwf001v6viF5oNs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="},{"type":"next-occurrence","id":"KEFp1NSlW2QYBISgGtZpDSinaAU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"Ie2fHn9ETM9ugwf001v6viF5oNs=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"KEFp1NSlW2QYBISgGtZpDSinaAU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ITaHqCu9Iwj3n1tGj9S641fbpNg="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"KEFp1NSlW2QYBISgGtZpDSinaAU=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"ORC300447958","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","description":"Roadwork on US 9 Northbound between North of CR 571/Indian Head Rd (Toms River Twp) and CR 620/Church Rd (Toms River Twp) Monday June 9, 2025 09:00 PM thru Saturday June 14, 2025 05:00 AM, All lanes closed and detoured","update_date":"2025-06-14T09:00:01Z"},"road_event_id":"ORC300447958","beginning_cross_street":"North of CR 571/Indian Head Rd","ending_cross_street":"CR 620/Church Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-06T20:39:28Z","end_date":"2025-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.211662,39.99551]]}},{"id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wVsJUN/kXZXgzRH4jm3zoyHzp30="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:01:00Z","end_date":"2026-05-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"wVsJUN/kXZXgzRH4jm3zoyHzp30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8="},{"type":"next-occurrence","id":"G8AFlvDm6ZhPVIdkpZ5aLTUtX78="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"wVsJUN/kXZXgzRH4jm3zoyHzp30=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"G8AFlvDm6ZhPVIdkpZ5aLTUtX78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8="},{"type":"next-occurrence","id":"BPDA2IzlKlLruj3d176M4krKErg="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"G8AFlvDm6ZhPVIdkpZ5aLTUtX78=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"BPDA2IzlKlLruj3d176M4krKErg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8="},{"type":"next-occurrence","id":"bz9i12gfo0bFEJjZthtXsBsLSsE="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"BPDA2IzlKlLruj3d176M4krKErg=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T04:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"bz9i12gfo0bFEJjZthtXsBsLSsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8="},{"type":"next-occurrence","id":"QNdGF43EzyZ+5Oy7fREQO75m8Uo="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"bz9i12gfo0bFEJjZthtXsBsLSsE=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:10:00Z","end_date":"2026-05-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"QNdGF43EzyZ+5Oy7fREQO75m8Uo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8="},{"type":"next-occurrence","id":"WnZqqPP1yFqzgs298Biz4+W5beM="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"QNdGF43EzyZ+5Oy7fREQO75m8Uo=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T04:10:00Z","end_date":"2026-05-17T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"WnZqqPP1yFqzgs298Biz4+W5beM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8="},{"type":"next-occurrence","id":"a/zRzbtRbaxBrjyHYEMDpas26BM="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"WnZqqPP1yFqzgs298Biz4+W5beM=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T02:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"a/zRzbtRbaxBrjyHYEMDpas26BM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8="},{"type":"next-occurrence","id":"ZTbIfX20MpgAxEqIVfkAZ5BmXnw="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"a/zRzbtRbaxBrjyHYEMDpas26BM=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T02:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"ZTbIfX20MpgAxEqIVfkAZ5BmXnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8="},{"type":"next-occurrence","id":"8aYTJHyN6F+e1KQDYlW+4i5XOQc="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"ZTbIfX20MpgAxEqIVfkAZ5BmXnw=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T02:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"8aYTJHyN6F+e1KQDYlW+4i5XOQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8="},{"type":"next-occurrence","id":"btPDNOYxeNkcsEK/axYyfMegwLw="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"8aYTJHyN6F+e1KQDYlW+4i5XOQc=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T02:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"btPDNOYxeNkcsEK/axYyfMegwLw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8="},{"type":"next-occurrence","id":"ec6sM25VBIOM58R3aVQetFGp0qA="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"btPDNOYxeNkcsEK/axYyfMegwLw=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T02:00:00Z","end_date":"2026-05-23T04:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"ec6sM25VBIOM58R3aVQetFGp0qA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8="},{"type":"next-occurrence","id":"ZgqA67gV2x/rcS/9Cnlq9UCRims="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"ec6sM25VBIOM58R3aVQetFGp0qA=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T04:10:00Z","end_date":"2026-05-23T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"ZgqA67gV2x/rcS/9Cnlq9UCRims=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8="},{"type":"next-occurrence","id":"jyZvRN7Uhl6uQ22WfRLA3zyBbXk="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"ZgqA67gV2x/rcS/9Cnlq9UCRims=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T04:10:00Z","end_date":"2026-05-24T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"jyZvRN7Uhl6uQ22WfRLA3zyBbXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8="},{"type":"next-occurrence","id":"RYF+4XG6sV0zF8Qcf2pvoD9j7zc="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"jyZvRN7Uhl6uQ22WfRLA3zyBbXk=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T02:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"RYF+4XG6sV0zF8Qcf2pvoD9j7zc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8="},{"type":"next-occurrence","id":"3UN6RLOUxNaxlUKlgBwCQUK+SHs="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"RYF+4XG6sV0zF8Qcf2pvoD9j7zc=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T02:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"3UN6RLOUxNaxlUKlgBwCQUK+SHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZvlZO2vvyJDHKl0Lj3tqVxA3m8="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"3UN6RLOUxNaxlUKlgBwCQUK+SHs=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T02:00:00Z","end_date":"2026-05-28T04:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"LIS4UneQsfcs2Z6ikbqgjO3A0WQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q1cR1ho+ERAUzh50FVZrVHP8BWg="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"LIS4UneQsfcs2Z6ikbqgjO3A0WQ=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T05:00:00Z","end_date":"2026-05-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"q1cR1ho+ERAUzh50FVZrVHP8BWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LIS4UneQsfcs2Z6ikbqgjO3A0WQ="},{"type":"next-occurrence","id":"0nUh4JUFcaleol6mjlZoAR3oU+0="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"q1cR1ho+ERAUzh50FVZrVHP8BWg=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"0nUh4JUFcaleol6mjlZoAR3oU+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LIS4UneQsfcs2Z6ikbqgjO3A0WQ="},{"type":"next-occurrence","id":"1HwWKv8d5TUkVP38wYOdQoGO5E4="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"0nUh4JUFcaleol6mjlZoAR3oU+0=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"1HwWKv8d5TUkVP38wYOdQoGO5E4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LIS4UneQsfcs2Z6ikbqgjO3A0WQ="},{"type":"next-occurrence","id":"NXvThee732/kbx2ymMFaKw1y7Xo="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"1HwWKv8d5TUkVP38wYOdQoGO5E4=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"NXvThee732/kbx2ymMFaKw1y7Xo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LIS4UneQsfcs2Z6ikbqgjO3A0WQ="},{"type":"next-occurrence","id":"72/ROyz5mh7QJhLbfUdxTN/dBoE="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"NXvThee732/kbx2ymMFaKw1y7Xo=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T04:10:00Z","end_date":"2026-05-17T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"72/ROyz5mh7QJhLbfUdxTN/dBoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LIS4UneQsfcs2Z6ikbqgjO3A0WQ="},{"type":"next-occurrence","id":"cg30rwCzkM9MjNCpDq/Oi1S7JbY="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"72/ROyz5mh7QJhLbfUdxTN/dBoE=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T02:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"cg30rwCzkM9MjNCpDq/Oi1S7JbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LIS4UneQsfcs2Z6ikbqgjO3A0WQ="},{"type":"next-occurrence","id":"v3xtyEzFoPILR+48B9AaFyIgCzI="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"cg30rwCzkM9MjNCpDq/Oi1S7JbY=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T02:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"v3xtyEzFoPILR+48B9AaFyIgCzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LIS4UneQsfcs2Z6ikbqgjO3A0WQ="},{"type":"next-occurrence","id":"WaRgoQYrslRUROy5fbp30XK/KpA="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"v3xtyEzFoPILR+48B9AaFyIgCzI=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T02:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"WaRgoQYrslRUROy5fbp30XK/KpA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LIS4UneQsfcs2Z6ikbqgjO3A0WQ="},{"type":"next-occurrence","id":"5HKEjH9DzV7lFt9I39qdbdY5t0c="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"WaRgoQYrslRUROy5fbp30XK/KpA=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T02:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"5HKEjH9DzV7lFt9I39qdbdY5t0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LIS4UneQsfcs2Z6ikbqgjO3A0WQ="},{"type":"next-occurrence","id":"0g5qrI+HY8DGqOoASq/xasxa0mE="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"5HKEjH9DzV7lFt9I39qdbdY5t0c=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T02:00:00Z","end_date":"2026-05-23T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"0g5qrI+HY8DGqOoASq/xasxa0mE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LIS4UneQsfcs2Z6ikbqgjO3A0WQ="},{"type":"next-occurrence","id":"Ur3hMcAeOVUE4x16uEjPPVW7feQ="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"0g5qrI+HY8DGqOoASq/xasxa0mE=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T04:10:00Z","end_date":"2026-05-24T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"Ur3hMcAeOVUE4x16uEjPPVW7feQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LIS4UneQsfcs2Z6ikbqgjO3A0WQ="},{"type":"next-occurrence","id":"+tMDXCmtB5Gw+wmecsZ+gzYukv8="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"Ur3hMcAeOVUE4x16uEjPPVW7feQ=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T02:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"+tMDXCmtB5Gw+wmecsZ+gzYukv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LIS4UneQsfcs2Z6ikbqgjO3A0WQ="},{"type":"next-occurrence","id":"BrXdtLrE7ZFdBUZ2PGIOVo0+F/8="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"+tMDXCmtB5Gw+wmecsZ+gzYukv8=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T02:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"BrXdtLrE7ZFdBUZ2PGIOVo0+F/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LIS4UneQsfcs2Z6ikbqgjO3A0WQ="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"BrXdtLrE7ZFdBUZ2PGIOVo0+F/8=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T02:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"Z7eF/898R3RxobIA9DvV5uXNjyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on US 9W both directions between Hickory Circle and Pictuay Rd (Bethlehem) one lane open in both directions, NB lane shift in place, Continuous Tuesday August 5th, 2025 04:00 PM thru Friday July 3rd, 2026 05:00 PM All lanes open","update_date":"2025-08-06T13:45:02Z"},"road_event_id":"Z7eF/898R3RxobIA9DvV5uXNjyY=","beginning_cross_street":"between Hickory Circle and Pictuay Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805826,42.534051]]}},{"id":"JBsvbrmDjlFcUlklHxot3oc/Nu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["South Ave"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation and longterm construction on South Ave southbound ramp to I-490 Eastbound (Rochester) RAMP CLOSED, Continuous Thursday August 15th, 2024 12:00 AM thru Thursday December 31st, 2026 11:59 PM All lanes closed and detoured","update_date":"2026-01-27T12:13:56Z"},"road_event_id":"JBsvbrmDjlFcUlklHxot3oc/Nu4=","beginning_cross_street":"I-490 Eastbound","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607328,43.152443]]}},{"id":"fdpSnnTVG/3zWllxgK2f769TlPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-99"],"direction":"unknown","related_road_events":[],"description":"Traffic signal repairs on CT-99 southbound between CT-314 (Wethersfield) and PARSONAGE ST (Rocky Hill) Intermittent lane closures may be expected, Thursday January 30th, 2025 thru Friday November 20th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2025-01-30T17:52:30Z"},"road_event_id":"fdpSnnTVG/3zWllxgK2f769TlPo=","beginning_cross_street":"CT-314","ending_cross_street":"PARSONAGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.668152,41.723666]]}},{"id":"WadB8XtydpbfXz8xUwAeahTGq7c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-99"],"direction":"unknown","related_road_events":[],"description":"Traffic signal repairs on CT-99 northbound between PARSONAGE ST (Rocky Hill) and CT-314 (Wethersfield), Thursday January 30th, 2025 thru Friday November 20th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2025-01-30T17:50:20Z"},"road_event_id":"WadB8XtydpbfXz8xUwAeahTGq7c=","beginning_cross_street":"PARSONAGE ST","ending_cross_street":"CT-314","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.645502,41.672583]]}},{"id":"ORC300365075","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","description":"Bridge work and roadwork on I-86 both directions Exit 25 - NY 953E Buffalo Street; Ramp (Olean) to Exit 27 - NY 16 (Hinsdale) Not currently Scheduled","update_date":"2024-11-23T22:00:00Z"},"road_event_id":"ORC300365075","beginning_cross_street":"Exit 25 - NY 953E Buffalo Street; Ramp","ending_cross_street":"Exit 27 - NY 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2024-04-25T11:13:40Z","end_date":"2024-11-24T04:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-78.458461,42.088168]]}},{"id":"u/zWcEZ9+aZ/jwmT0Vw8YY+srr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on US-44 both directions between ASHPOHTAG RD (Norfolk) and RIVER PL (Norfolk) There will be a temporary signal installed to coordinate one-way alternating traffic on Route 44 in Norfolk , Continuous Monday December 2nd, 2024 12:00 AM thru Wednesday September 16th, 2026 11:59 PM All lanes open","update_date":"2024-12-10T21:01:50Z"},"road_event_id":"u/zWcEZ9+aZ/jwmT0Vw8YY+srr0=","beginning_cross_street":"ASHPOHTAG RD","ending_cross_street":"RIVER PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220881,42.001768]]}},{"id":"WMPAK/SgfW+Aq6N310nJ7IuQgQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[],"description":"Longterm construction on I-87 Major Deegan Expressway northbound at East 138th Street; Ramp (New York), Continuous Monday April 25th, 2022 12:00 AM thru Friday June 26th, 2026 11:59 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-15T16:31:28Z"},"road_event_id":"WMPAK/SgfW+Aq6N310nJ7IuQgQA=","beginning_cross_street":"East 138th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931267,40.813337]]}},{"id":"0Kb3m2qCM8iupjyEm1jUt28ftUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[],"description":"Longterm construction on I-87 Major Deegan Expressway southbound at East 138th Street (New York), Continuous Monday April 25th, 2022 12:00 AM thru Friday June 26th, 2026 11:59 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-15T16:32:29Z"},"road_event_id":"0Kb3m2qCM8iupjyEm1jUt28ftUs=","beginning_cross_street":"East 138th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931187,40.813903]]}},{"id":"m2JXNHXVG9iliu0kwcBY4fViGA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-86 eastbound ramp to Exit 9 closed. Use Exit 10. (Ellery), Continuous Wednesday April 3rd, 2024 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes closed","update_date":"2024-04-11T14:09:59Z"},"road_event_id":"m2JXNHXVG9iliu0kwcBY4fViGA4=","beginning_cross_street":"ramp to Exit 9 closed.  Use Exit 10.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.382971,42.152015]]}},{"id":"rATnSP3OtoTr66lpMyRB/TtjqIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mo0CXEwsIqzNNBz1IKQ0DIbJML0="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"rATnSP3OtoTr66lpMyRB/TtjqIo=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"mo0CXEwsIqzNNBz1IKQ0DIbJML0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rATnSP3OtoTr66lpMyRB/TtjqIo="},{"type":"next-occurrence","id":"bSOtBhVFpG/6mSAAIF9CDTiNYAs="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"mo0CXEwsIqzNNBz1IKQ0DIbJML0=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"bSOtBhVFpG/6mSAAIF9CDTiNYAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rATnSP3OtoTr66lpMyRB/TtjqIo="},{"type":"next-occurrence","id":"pITdxz4NfiolhlzMwlJwZkEwFZY="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"bSOtBhVFpG/6mSAAIF9CDTiNYAs=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"pITdxz4NfiolhlzMwlJwZkEwFZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rATnSP3OtoTr66lpMyRB/TtjqIo="},{"type":"next-occurrence","id":"V6qVb3nfX2psTq4s3Ex3fyMd8g8="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"pITdxz4NfiolhlzMwlJwZkEwFZY=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T01:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"V6qVb3nfX2psTq4s3Ex3fyMd8g8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rATnSP3OtoTr66lpMyRB/TtjqIo="},{"type":"next-occurrence","id":"iPjDYe86y4hsRqh32ZXbFVq7j7s="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"V6qVb3nfX2psTq4s3Ex3fyMd8g8=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"iPjDYe86y4hsRqh32ZXbFVq7j7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rATnSP3OtoTr66lpMyRB/TtjqIo="},{"type":"next-occurrence","id":"X/Cg9lrFtVhmU18k1RHs82cbDAQ="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"iPjDYe86y4hsRqh32ZXbFVq7j7s=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T01:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"X/Cg9lrFtVhmU18k1RHs82cbDAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rATnSP3OtoTr66lpMyRB/TtjqIo="},{"type":"next-occurrence","id":"qVzbrYkjYheokk4m7HL2Eiq9NCU="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"X/Cg9lrFtVhmU18k1RHs82cbDAQ=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T01:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"qVzbrYkjYheokk4m7HL2Eiq9NCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rATnSP3OtoTr66lpMyRB/TtjqIo="},{"type":"next-occurrence","id":"wqn4qwQOF74Tc0SU7x3+pcBMFIU="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"qVzbrYkjYheokk4m7HL2Eiq9NCU=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T01:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"wqn4qwQOF74Tc0SU7x3+pcBMFIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rATnSP3OtoTr66lpMyRB/TtjqIo="},{"type":"next-occurrence","id":"TjMqjn8Ue/HdWtk4kNlgKzQi+xk="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"wqn4qwQOF74Tc0SU7x3+pcBMFIU=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T01:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"TjMqjn8Ue/HdWtk4kNlgKzQi+xk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rATnSP3OtoTr66lpMyRB/TtjqIo="},{"type":"next-occurrence","id":"yD4qccCq08FzjbKpXvNlIgBYRkE="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"TjMqjn8Ue/HdWtk4kNlgKzQi+xk=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T01:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"yD4qccCq08FzjbKpXvNlIgBYRkE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rATnSP3OtoTr66lpMyRB/TtjqIo="},{"type":"next-occurrence","id":"W2+3zATgVBwWSGcT/TJSxhgmR8Y="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"yD4qccCq08FzjbKpXvNlIgBYRkE=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"W2+3zATgVBwWSGcT/TJSxhgmR8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rATnSP3OtoTr66lpMyRB/TtjqIo="},{"type":"next-occurrence","id":"YjZNkSJsMz58W8BUd1aPVQUTq04="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"W2+3zATgVBwWSGcT/TJSxhgmR8Y=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T01:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"YjZNkSJsMz58W8BUd1aPVQUTq04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rATnSP3OtoTr66lpMyRB/TtjqIo="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"YjZNkSJsMz58W8BUd1aPVQUTq04=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T01:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"N4mockvJHLDzBKLiSAkL2qyo0qU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CblPqMv1nHO66XMvnYmlXxn9u9s="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"N4mockvJHLDzBKLiSAkL2qyo0qU=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"CblPqMv1nHO66XMvnYmlXxn9u9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"gXGdq6dHKRnfDM6c2VBGger095E="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"CblPqMv1nHO66XMvnYmlXxn9u9s=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"gXGdq6dHKRnfDM6c2VBGger095E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"xNA005WoW3OS35hy5sL3fIJKwJ0="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"gXGdq6dHKRnfDM6c2VBGger095E=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"xNA005WoW3OS35hy5sL3fIJKwJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"XvnT/K7baEAzMwdYEUqF1dDKjfY="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"xNA005WoW3OS35hy5sL3fIJKwJ0=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"XvnT/K7baEAzMwdYEUqF1dDKjfY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"gLS3hwlR8wgtPMOB60W7XFnO3Cg="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"XvnT/K7baEAzMwdYEUqF1dDKjfY=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"gLS3hwlR8wgtPMOB60W7XFnO3Cg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"28ICh0D9iowowsNV0RuhF59JDuY="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"gLS3hwlR8wgtPMOB60W7XFnO3Cg=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"28ICh0D9iowowsNV0RuhF59JDuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"ivM35hfCznrjn0QA9xFLsnbPeDI="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"28ICh0D9iowowsNV0RuhF59JDuY=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"ivM35hfCznrjn0QA9xFLsnbPeDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"BnjVEBUzHK95+QqPT52/9cFxvfY="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"ivM35hfCznrjn0QA9xFLsnbPeDI=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"BnjVEBUzHK95+QqPT52/9cFxvfY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"deYPNoQjXj9tOl59oxOa/H4C6Pw="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"BnjVEBUzHK95+QqPT52/9cFxvfY=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"deYPNoQjXj9tOl59oxOa/H4C6Pw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"ubKmC0xDiTQPFXCRzmWgx7zSPc0="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"deYPNoQjXj9tOl59oxOa/H4C6Pw=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"ubKmC0xDiTQPFXCRzmWgx7zSPc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"erRdTvoCH+4M2htQ7zRLFWnaY7w="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"ubKmC0xDiTQPFXCRzmWgx7zSPc0=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"erRdTvoCH+4M2htQ7zRLFWnaY7w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"hkjM9YPkV7UATkWaoUnjG2O04oQ="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"erRdTvoCH+4M2htQ7zRLFWnaY7w=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"hkjM9YPkV7UATkWaoUnjG2O04oQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"bWcvBQ2XbxlRpf8vDgbO95BIJL4="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"hkjM9YPkV7UATkWaoUnjG2O04oQ=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"bWcvBQ2XbxlRpf8vDgbO95BIJL4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"gARJjHQVJ2M59QYMhoPMLkfznig="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"bWcvBQ2XbxlRpf8vDgbO95BIJL4=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"gARJjHQVJ2M59QYMhoPMLkfznig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"11wbf6F819qvKjjMWKriXMnTs+4="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"gARJjHQVJ2M59QYMhoPMLkfznig=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"11wbf6F819qvKjjMWKriXMnTs+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"u1zdulYETz1PCN5odzsrY7kw9ls="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"11wbf6F819qvKjjMWKriXMnTs+4=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"u1zdulYETz1PCN5odzsrY7kw9ls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"XZzC9esyyd+VsJhEsddG5bStxsE="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"u1zdulYETz1PCN5odzsrY7kw9ls=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"XZzC9esyyd+VsJhEsddG5bStxsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"uU5YyWof7B1Q4q7pkI0te4FyrZo="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"XZzC9esyyd+VsJhEsddG5bStxsE=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"uU5YyWof7B1Q4q7pkI0te4FyrZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"Zhl5svRpGytqcjN6lLgCnfXja5I="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"uU5YyWof7B1Q4q7pkI0te4FyrZo=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"Zhl5svRpGytqcjN6lLgCnfXja5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"9SDtl2eDxa7kZ01NlYMG1i2AoI0="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"Zhl5svRpGytqcjN6lLgCnfXja5I=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"9SDtl2eDxa7kZ01NlYMG1i2AoI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="},{"type":"next-occurrence","id":"sIiC0hK+AcFMZGUA56vQiefRpSg="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"9SDtl2eDxa7kZ01NlYMG1i2AoI0=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"sIiC0hK+AcFMZGUA56vQiefRpSg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4mockvJHLDzBKLiSAkL2qyo0qU="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"sIiC0hK+AcFMZGUA56vQiefRpSg=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"ZNVK2+7YBHAU3ZXXZQnnJTmZzls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"79XIkBIgocBDX3UKEv1Or78S4u4="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"ZNVK2+7YBHAU3ZXXZQnnJTmZzls=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"79XIkBIgocBDX3UKEv1Or78S4u4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNVK2+7YBHAU3ZXXZQnnJTmZzls="},{"type":"next-occurrence","id":"Nja5yuTCl/cS4SzvWBGtRLZ0aZo="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"79XIkBIgocBDX3UKEv1Or78S4u4=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"Nja5yuTCl/cS4SzvWBGtRLZ0aZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNVK2+7YBHAU3ZXXZQnnJTmZzls="},{"type":"next-occurrence","id":"KgRGXuToS7yfvLcny3/Z6htcovI="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"Nja5yuTCl/cS4SzvWBGtRLZ0aZo=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"KgRGXuToS7yfvLcny3/Z6htcovI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNVK2+7YBHAU3ZXXZQnnJTmZzls="},{"type":"next-occurrence","id":"rHds5/8jeFO002Xufh8BG74HXvM="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"KgRGXuToS7yfvLcny3/Z6htcovI=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T01:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"rHds5/8jeFO002Xufh8BG74HXvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNVK2+7YBHAU3ZXXZQnnJTmZzls="},{"type":"next-occurrence","id":"LSVZWQmvtJFLAIsHMBcHRC03Xdc="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"rHds5/8jeFO002Xufh8BG74HXvM=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"LSVZWQmvtJFLAIsHMBcHRC03Xdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNVK2+7YBHAU3ZXXZQnnJTmZzls="},{"type":"next-occurrence","id":"YbxL7Zk+mR/k7G/OoroqhzzSN1A="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"LSVZWQmvtJFLAIsHMBcHRC03Xdc=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"YbxL7Zk+mR/k7G/OoroqhzzSN1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNVK2+7YBHAU3ZXXZQnnJTmZzls="},{"type":"next-occurrence","id":"F8YtaYm0VuWylr+D8mz9vqKASU8="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"YbxL7Zk+mR/k7G/OoroqhzzSN1A=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"F8YtaYm0VuWylr+D8mz9vqKASU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNVK2+7YBHAU3ZXXZQnnJTmZzls="},{"type":"next-occurrence","id":"PhkAFbcOq0swJUEWJRCXyoTQzyA="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"F8YtaYm0VuWylr+D8mz9vqKASU8=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"PhkAFbcOq0swJUEWJRCXyoTQzyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNVK2+7YBHAU3ZXXZQnnJTmZzls="},{"type":"next-occurrence","id":"h79I0u1qpskHseY5zBAN5iLGTZ8="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"PhkAFbcOq0swJUEWJRCXyoTQzyA=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"h79I0u1qpskHseY5zBAN5iLGTZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNVK2+7YBHAU3ZXXZQnnJTmZzls="},{"type":"next-occurrence","id":"bBb7FcjIqC+hhPQgIHsLdynL8Rw="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"h79I0u1qpskHseY5zBAN5iLGTZ8=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"bBb7FcjIqC+hhPQgIHsLdynL8Rw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNVK2+7YBHAU3ZXXZQnnJTmZzls="},{"type":"next-occurrence","id":"+uzqUX2LWkfDFAyTm2re4d9WytE="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"bBb7FcjIqC+hhPQgIHsLdynL8Rw=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T01:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"+uzqUX2LWkfDFAyTm2re4d9WytE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNVK2+7YBHAU3ZXXZQnnJTmZzls="},{"type":"next-occurrence","id":"+D1G6Z21tqJjeLLoicSw3/E6Tok="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"+uzqUX2LWkfDFAyTm2re4d9WytE=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"+D1G6Z21tqJjeLLoicSw3/E6Tok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNVK2+7YBHAU3ZXXZQnnJTmZzls="},{"type":"next-occurrence","id":"NHP8e8KAI6IBVWzAWl6LMo830Ps="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"+D1G6Z21tqJjeLLoicSw3/E6Tok=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"NHP8e8KAI6IBVWzAWl6LMo830Ps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNVK2+7YBHAU3ZXXZQnnJTmZzls="},{"type":"next-occurrence","id":"8V+FwVnRPH8iA4ZeDW5X+uiDPgo="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"NHP8e8KAI6IBVWzAWl6LMo830Ps=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"8V+FwVnRPH8iA4ZeDW5X+uiDPgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNVK2+7YBHAU3ZXXZQnnJTmZzls="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"8V+FwVnRPH8iA4ZeDW5X+uiDPgo=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vqUU/ueEtcflNoBmR8SFVZtTXWg="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"vqUU/ueEtcflNoBmR8SFVZtTXWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"u2TTvYeOVFvit7SUMSoYIKqWeiI="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"vqUU/ueEtcflNoBmR8SFVZtTXWg=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"u2TTvYeOVFvit7SUMSoYIKqWeiI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"/ns74AGBKrBXpQ3a4QpyVo4pJJg="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"u2TTvYeOVFvit7SUMSoYIKqWeiI=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"/ns74AGBKrBXpQ3a4QpyVo4pJJg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"3fWoH1JUmg3pdMxjDtFWW0ylvYg="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"/ns74AGBKrBXpQ3a4QpyVo4pJJg=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"3fWoH1JUmg3pdMxjDtFWW0ylvYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"YTYl4lto8OGm18r0lI8W6XMPaHg="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"3fWoH1JUmg3pdMxjDtFWW0ylvYg=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"YTYl4lto8OGm18r0lI8W6XMPaHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"mHRDtF0fF5b4E2M9JFBU/FJEYtE="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"YTYl4lto8OGm18r0lI8W6XMPaHg=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"mHRDtF0fF5b4E2M9JFBU/FJEYtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"K6gBBK1SDh0ysat7ozb/NP48xEM="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"mHRDtF0fF5b4E2M9JFBU/FJEYtE=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"K6gBBK1SDh0ysat7ozb/NP48xEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"qs60+g3GCZH4NxnkDweoKiTLCS4="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"K6gBBK1SDh0ysat7ozb/NP48xEM=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"qs60+g3GCZH4NxnkDweoKiTLCS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"Srb0+/4H9ntgg1CdohJ85kklkYs="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"qs60+g3GCZH4NxnkDweoKiTLCS4=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"Srb0+/4H9ntgg1CdohJ85kklkYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"nPujqsa8s0OJHhWu39Nb5dGVRBM="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"Srb0+/4H9ntgg1CdohJ85kklkYs=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"nPujqsa8s0OJHhWu39Nb5dGVRBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"khTHKFNS4+wQFSaGyesLFaWrfnA="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"nPujqsa8s0OJHhWu39Nb5dGVRBM=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"khTHKFNS4+wQFSaGyesLFaWrfnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"ZtPdq0wCQrmInoK9rbU8MV3PyTg="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"khTHKFNS4+wQFSaGyesLFaWrfnA=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"ZtPdq0wCQrmInoK9rbU8MV3PyTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"ZpPWaO4owP4wGs0QC4Z25Czv4Bg="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"ZtPdq0wCQrmInoK9rbU8MV3PyTg=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"ZpPWaO4owP4wGs0QC4Z25Czv4Bg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"SrkQqUANiTBgDkbiZa6rHzMhCuk="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"ZpPWaO4owP4wGs0QC4Z25Czv4Bg=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"SrkQqUANiTBgDkbiZa6rHzMhCuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"g3Ppuy/PXUVozjSKjYY+ADz5D2o="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"SrkQqUANiTBgDkbiZa6rHzMhCuk=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"g3Ppuy/PXUVozjSKjYY+ADz5D2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"88F7Mj0rGc9bCsCYcmtnb7nHdzo="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"g3Ppuy/PXUVozjSKjYY+ADz5D2o=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"88F7Mj0rGc9bCsCYcmtnb7nHdzo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"ENgH8kZAXXqtI32N39LfEiZMk5Y="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"88F7Mj0rGc9bCsCYcmtnb7nHdzo=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"ENgH8kZAXXqtI32N39LfEiZMk5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"SGMGc3R+4GLsgVMMy1+sd95SO7k="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"ENgH8kZAXXqtI32N39LfEiZMk5Y=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"SGMGc3R+4GLsgVMMy1+sd95SO7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"Ip8Ryx1QPMvcMYz8uSn0MXRKoOs="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"SGMGc3R+4GLsgVMMy1+sd95SO7k=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"Ip8Ryx1QPMvcMYz8uSn0MXRKoOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"w39LwLAVKlOZrKp+aQ6aJufP9g4="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"Ip8Ryx1QPMvcMYz8uSn0MXRKoOs=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"w39LwLAVKlOZrKp+aQ6aJufP9g4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="},{"type":"next-occurrence","id":"wXDEGjnwDnSfEruHzsJlAWzKFuw="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"w39LwLAVKlOZrKp+aQ6aJufP9g4=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"wXDEGjnwDnSfEruHzsJlAWzKFuw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7TKU2Ttb0xz+x+cAhvlUbiphMA="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"wXDEGjnwDnSfEruHzsJlAWzKFuw=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"lezr+dlT97KQKmXFPgUKrHkCtWc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HqxxApDeJ09DKeurSX7JeX0svU8="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"lezr+dlT97KQKmXFPgUKrHkCtWc=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"HqxxApDeJ09DKeurSX7JeX0svU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"1I9lMY8pq7r4mCD7D0/YSQiWDzk="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"HqxxApDeJ09DKeurSX7JeX0svU8=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"1I9lMY8pq7r4mCD7D0/YSQiWDzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"xAT68LtdllpWNQid11Tb66W/ebU="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"1I9lMY8pq7r4mCD7D0/YSQiWDzk=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"xAT68LtdllpWNQid11Tb66W/ebU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"qrefbEeahR9H17O1vyn23HETygg="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"xAT68LtdllpWNQid11Tb66W/ebU=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"qrefbEeahR9H17O1vyn23HETygg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"l/a3ixrG15IL9JrZk7kbb8f9b/w="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"qrefbEeahR9H17O1vyn23HETygg=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"l/a3ixrG15IL9JrZk7kbb8f9b/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"Kue0n7EkYYjqsrLMuX2j5rXltco="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"l/a3ixrG15IL9JrZk7kbb8f9b/w=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"Kue0n7EkYYjqsrLMuX2j5rXltco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"RldsmSGQwJLtIE2bLMnHGE5Zaw0="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"Kue0n7EkYYjqsrLMuX2j5rXltco=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"RldsmSGQwJLtIE2bLMnHGE5Zaw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"l0q1JGHDNd82q7AjpTgdGalRvSY="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"RldsmSGQwJLtIE2bLMnHGE5Zaw0=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"l0q1JGHDNd82q7AjpTgdGalRvSY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"1kTqPXCqRkd15SkxD2KCLhw8ylE="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"l0q1JGHDNd82q7AjpTgdGalRvSY=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"1kTqPXCqRkd15SkxD2KCLhw8ylE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"+6122M3FOT8otVSLmzh6tsPSDB8="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"1kTqPXCqRkd15SkxD2KCLhw8ylE=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"+6122M3FOT8otVSLmzh6tsPSDB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"qsQf+bypL1Kf3RKif62KHe1A0w0="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"+6122M3FOT8otVSLmzh6tsPSDB8=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"qsQf+bypL1Kf3RKif62KHe1A0w0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"OkXRnyES+Q2Gs5sERCI+ataGmp0="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"qsQf+bypL1Kf3RKif62KHe1A0w0=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"OkXRnyES+Q2Gs5sERCI+ataGmp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"+dEgj3VYOcOSssEABsADBsMQ7cA="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"OkXRnyES+Q2Gs5sERCI+ataGmp0=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"+dEgj3VYOcOSssEABsADBsMQ7cA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"lSuuJFpE2WEMT/CiAqcT9BdiVXA="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"+dEgj3VYOcOSssEABsADBsMQ7cA=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"lSuuJFpE2WEMT/CiAqcT9BdiVXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"V/scrd7nsIbAplUUrrXCzvCK6s8="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"lSuuJFpE2WEMT/CiAqcT9BdiVXA=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"V/scrd7nsIbAplUUrrXCzvCK6s8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"iSUpxwFJeWhNBRTURCEyBqQgteI="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"V/scrd7nsIbAplUUrrXCzvCK6s8=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"iSUpxwFJeWhNBRTURCEyBqQgteI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"8jXCxXzNWWT78m4Xo0YGNlQukBc="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"iSUpxwFJeWhNBRTURCEyBqQgteI=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"8jXCxXzNWWT78m4Xo0YGNlQukBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"0/dpmFmVGYs4otDCQ/TTvrDBlZQ="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"8jXCxXzNWWT78m4Xo0YGNlQukBc=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"0/dpmFmVGYs4otDCQ/TTvrDBlZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"CEX3QvWujxuOl/tp/gqIsBRaBMc="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"0/dpmFmVGYs4otDCQ/TTvrDBlZQ=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"CEX3QvWujxuOl/tp/gqIsBRaBMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"oFhLL7N0pTFy0Atdwy7LisoBNTE="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"CEX3QvWujxuOl/tp/gqIsBRaBMc=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"oFhLL7N0pTFy0Atdwy7LisoBNTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="},{"type":"next-occurrence","id":"zkWStN7pdKIDhCBIzV3GdaK71uQ="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"oFhLL7N0pTFy0Atdwy7LisoBNTE=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"zkWStN7pdKIDhCBIzV3GdaK71uQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lezr+dlT97KQKmXFPgUKrHkCtWc="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"zkWStN7pdKIDhCBIzV3GdaK71uQ=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"gaS7rwr6LNARGlPKQmJDuIbHIGo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ws+tpIt88nonzAojKFMAmoQE87E="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"gaS7rwr6LNARGlPKQmJDuIbHIGo=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"ws+tpIt88nonzAojKFMAmoQE87E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gaS7rwr6LNARGlPKQmJDuIbHIGo="},{"type":"next-occurrence","id":"z0cvrjdfWE/fQ+1X4qAQC1+WQTI="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"ws+tpIt88nonzAojKFMAmoQE87E=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"z0cvrjdfWE/fQ+1X4qAQC1+WQTI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gaS7rwr6LNARGlPKQmJDuIbHIGo="},{"type":"next-occurrence","id":"QkFiau/Qw6EdXRkSac+H4PDazV4="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"z0cvrjdfWE/fQ+1X4qAQC1+WQTI=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"QkFiau/Qw6EdXRkSac+H4PDazV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gaS7rwr6LNARGlPKQmJDuIbHIGo="},{"type":"next-occurrence","id":"zhSnfDYkxWE1IVdzF9k+gXVgQBs="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"QkFiau/Qw6EdXRkSac+H4PDazV4=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"zhSnfDYkxWE1IVdzF9k+gXVgQBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gaS7rwr6LNARGlPKQmJDuIbHIGo="},{"type":"next-occurrence","id":"dUIfJ8qtaR6SLpdM6qD3WMiWO5I="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"zhSnfDYkxWE1IVdzF9k+gXVgQBs=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"dUIfJ8qtaR6SLpdM6qD3WMiWO5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gaS7rwr6LNARGlPKQmJDuIbHIGo="},{"type":"next-occurrence","id":"u21jl+nfIFuJhrPqIs40JZsUBWE="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"dUIfJ8qtaR6SLpdM6qD3WMiWO5I=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"u21jl+nfIFuJhrPqIs40JZsUBWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gaS7rwr6LNARGlPKQmJDuIbHIGo="},{"type":"next-occurrence","id":"XYt9M58NO43kZ2plqez30VNbTUo="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"u21jl+nfIFuJhrPqIs40JZsUBWE=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"XYt9M58NO43kZ2plqez30VNbTUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gaS7rwr6LNARGlPKQmJDuIbHIGo="},{"type":"next-occurrence","id":"/pQ6TwEB4eE/08BeGyuVo46mp+k="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"XYt9M58NO43kZ2plqez30VNbTUo=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"/pQ6TwEB4eE/08BeGyuVo46mp+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gaS7rwr6LNARGlPKQmJDuIbHIGo="},{"type":"next-occurrence","id":"bOvTN+eh85epSvnkP6qDtH2rlDI="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"/pQ6TwEB4eE/08BeGyuVo46mp+k=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"bOvTN+eh85epSvnkP6qDtH2rlDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gaS7rwr6LNARGlPKQmJDuIbHIGo="},{"type":"next-occurrence","id":"pxhRt7xRvsEtGvrdSsHRx+xXjzc="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"bOvTN+eh85epSvnkP6qDtH2rlDI=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"pxhRt7xRvsEtGvrdSsHRx+xXjzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gaS7rwr6LNARGlPKQmJDuIbHIGo="},{"type":"next-occurrence","id":"SimyIagxIiI7p1DPVp9uQkCeZDU="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"pxhRt7xRvsEtGvrdSsHRx+xXjzc=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"SimyIagxIiI7p1DPVp9uQkCeZDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gaS7rwr6LNARGlPKQmJDuIbHIGo="},{"type":"next-occurrence","id":"fLDxPfhU3QH5m4XqJCUgLRNeBn4="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"SimyIagxIiI7p1DPVp9uQkCeZDU=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"fLDxPfhU3QH5m4XqJCUgLRNeBn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gaS7rwr6LNARGlPKQmJDuIbHIGo="},{"type":"next-occurrence","id":"yoiypRgAzCZ0Crgzya1h/rgYdR4="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"fLDxPfhU3QH5m4XqJCUgLRNeBn4=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"yoiypRgAzCZ0Crgzya1h/rgYdR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gaS7rwr6LNARGlPKQmJDuIbHIGo="},{"type":"next-occurrence","id":"pSNT4sXoYSLu7lsnhXfHzXf5KGk="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"yoiypRgAzCZ0Crgzya1h/rgYdR4=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"pSNT4sXoYSLu7lsnhXfHzXf5KGk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gaS7rwr6LNARGlPKQmJDuIbHIGo="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"pSNT4sXoYSLu7lsnhXfHzXf5KGk=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"cG8KIfL+XLucE4RDe1bszGopTXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"afZg2KZ0/FcjwLjRcx65J+Z31t4="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"cG8KIfL+XLucE4RDe1bszGopTXY=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"afZg2KZ0/FcjwLjRcx65J+Z31t4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"nx8KKoM2I+oC/GHIiARAozVbBXw="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"afZg2KZ0/FcjwLjRcx65J+Z31t4=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"nx8KKoM2I+oC/GHIiARAozVbBXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"aipnnDvmn4yYZOnh89JZCX6bkSk="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"nx8KKoM2I+oC/GHIiARAozVbBXw=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"aipnnDvmn4yYZOnh89JZCX6bkSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"CIQvw6Yoc9cTFdrLMooJuqGCXqo="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"aipnnDvmn4yYZOnh89JZCX6bkSk=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"CIQvw6Yoc9cTFdrLMooJuqGCXqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"A493iRsgObSZTLOPFLCakCBrSpM="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"CIQvw6Yoc9cTFdrLMooJuqGCXqo=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"A493iRsgObSZTLOPFLCakCBrSpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"GubyciVem9OyOFkWo/UDD6Kmj4g="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"A493iRsgObSZTLOPFLCakCBrSpM=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"GubyciVem9OyOFkWo/UDD6Kmj4g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"bY+6CpSnoV6GEXz8Fp3PnqKXJiM="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"GubyciVem9OyOFkWo/UDD6Kmj4g=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T23:00:00Z","end_date":"2026-05-17T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"bY+6CpSnoV6GEXz8Fp3PnqKXJiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"hxJx8N9Vjw0m5uyc36s7Wtk27NY="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"bY+6CpSnoV6GEXz8Fp3PnqKXJiM=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"hxJx8N9Vjw0m5uyc36s7Wtk27NY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"dx0X8hrEA72qoYnfp13XX7kPZr8="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"hxJx8N9Vjw0m5uyc36s7Wtk27NY=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"dx0X8hrEA72qoYnfp13XX7kPZr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"plkEGbirDcfwnxFuNf1otAcYAgE="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"dx0X8hrEA72qoYnfp13XX7kPZr8=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"plkEGbirDcfwnxFuNf1otAcYAgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"TCjfZAHuBSZUpHb3bfM8Y9oz2Ow="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"plkEGbirDcfwnxFuNf1otAcYAgE=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"TCjfZAHuBSZUpHb3bfM8Y9oz2Ow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"U5z/pyUAk1MOMljAnUI8OIwvz8U="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"TCjfZAHuBSZUpHb3bfM8Y9oz2Ow=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"U5z/pyUAk1MOMljAnUI8OIwvz8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"1G4lGDEg9zRSqy9DIOtOF4Y+pRI="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"U5z/pyUAk1MOMljAnUI8OIwvz8U=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"1G4lGDEg9zRSqy9DIOtOF4Y+pRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"dlkTGvok8M2NG7y41/BeoPxHNo0="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"1G4lGDEg9zRSqy9DIOtOF4Y+pRI=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"dlkTGvok8M2NG7y41/BeoPxHNo0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"8zODNNRdLpPMUi0Y4pEJzHZOKvk="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"dlkTGvok8M2NG7y41/BeoPxHNo0=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"8zODNNRdLpPMUi0Y4pEJzHZOKvk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"v2cwIDdm5O3hPI+xbG4w8tAvVS8="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"8zODNNRdLpPMUi0Y4pEJzHZOKvk=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"v2cwIDdm5O3hPI+xbG4w8tAvVS8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"zyWxZCMvj2abwsIrT/Uk3yTzDbQ="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"v2cwIDdm5O3hPI+xbG4w8tAvVS8=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T23:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"zyWxZCMvj2abwsIrT/Uk3yTzDbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"cHA1ZhO1jgsHsb1pGhcC77jENXc="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"zyWxZCMvj2abwsIrT/Uk3yTzDbQ=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T23:00:00Z","end_date":"2026-05-24T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"cHA1ZhO1jgsHsb1pGhcC77jENXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"zw3ryVvPH7n87Baym0FegjyUupA="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"cHA1ZhO1jgsHsb1pGhcC77jENXc=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"zw3ryVvPH7n87Baym0FegjyUupA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"wPwD0d08DH7J0JHKY3WhVPPVJAQ="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"zw3ryVvPH7n87Baym0FegjyUupA=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T23:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"wPwD0d08DH7J0JHKY3WhVPPVJAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"TxTO5WhQJ39khe1Ug1hVcm8KnhE="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"wPwD0d08DH7J0JHKY3WhVPPVJAQ=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"TxTO5WhQJ39khe1Ug1hVcm8KnhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"sV2us52sTJxEgxcLxQebgfTaLHE="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"TxTO5WhQJ39khe1Ug1hVcm8KnhE=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T23:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"sV2us52sTJxEgxcLxQebgfTaLHE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="},{"type":"next-occurrence","id":"BDV/hbEqeOFxWZPvH13z6U4KZRo="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"sV2us52sTJxEgxcLxQebgfTaLHE=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"BDV/hbEqeOFxWZPvH13z6U4KZRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cG8KIfL+XLucE4RDe1bszGopTXY="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"BDV/hbEqeOFxWZPvH13z6U4KZRo=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"ORC300447034","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","description":"Construction on NJ 70 Westbound between East of CR 674/Greentree Rd (Cherry Hill Twp) and East of New Jersey Turnpike (Cherry Hill Twp) Wednesday June 4, 2025 07:00 AM thru 03:30 PM, 1 right lane of 4 lanes closed","update_date":"2025-06-04T19:30:01Z"},"road_event_id":"ORC300447034","beginning_cross_street":"East of CR 674/Greentree Rd","ending_cross_street":"East of New Jersey Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-03T19:06:31Z","end_date":"2025-06-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.971145,39.90459]]}},{"id":"YOQRBHInpIgEiHpGmRmwwsaA9M0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BxM11 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction southbound, BxM11 Bus between Bronx River Pky/Boston Rd (New York) and Madison Av/E 99 St (New York) are detouring from E 177th St at Bronx River Parkway to Bruckner Blvd at Bruckner Expy - no stops will be missed. , Continuous Saturday May 24th, 2025 12:00 AM thru Friday December 31st, 2027 11:59 PM","update_date":"2025-05-23T18:34:58Z"},"road_event_id":"YOQRBHInpIgEiHpGmRmwwsaA9M0=","beginning_cross_street":"Bronx River Pky/Boston Rd","ending_cross_street":"Madison Av/E 99 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.872369,40.853637]]}},{"id":"NVtHmei3rV0kfpbh7M8Wbx2Mwxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6rXdZgpfFnL4u7Q4uso3Tl+E0L0="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"NVtHmei3rV0kfpbh7M8Wbx2Mwxs=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"6rXdZgpfFnL4u7Q4uso3Tl+E0L0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NVtHmei3rV0kfpbh7M8Wbx2Mwxs="},{"type":"next-occurrence","id":"0kOAZYX/Dsi5GWy5eovwozHUtJU="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"6rXdZgpfFnL4u7Q4uso3Tl+E0L0=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"0kOAZYX/Dsi5GWy5eovwozHUtJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NVtHmei3rV0kfpbh7M8Wbx2Mwxs="},{"type":"next-occurrence","id":"Lw4UQUVlKv26GqegyD8TDy67Ojo="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"0kOAZYX/Dsi5GWy5eovwozHUtJU=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"Lw4UQUVlKv26GqegyD8TDy67Ojo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NVtHmei3rV0kfpbh7M8Wbx2Mwxs="},{"type":"next-occurrence","id":"r5KOeI7bSOYCiSo41H6Fyg+AfNo="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"Lw4UQUVlKv26GqegyD8TDy67Ojo=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"r5KOeI7bSOYCiSo41H6Fyg+AfNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NVtHmei3rV0kfpbh7M8Wbx2Mwxs="},{"type":"next-occurrence","id":"iYtLiBBxGZJlCV2ktch1IfBfeJc="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"r5KOeI7bSOYCiSo41H6Fyg+AfNo=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"iYtLiBBxGZJlCV2ktch1IfBfeJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NVtHmei3rV0kfpbh7M8Wbx2Mwxs="},{"type":"next-occurrence","id":"zzfV2+O7jGyLVCNgdo99Ovtmr2Q="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"iYtLiBBxGZJlCV2ktch1IfBfeJc=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"zzfV2+O7jGyLVCNgdo99Ovtmr2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NVtHmei3rV0kfpbh7M8Wbx2Mwxs="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"zzfV2+O7jGyLVCNgdo99Ovtmr2Q=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"3Ll3dTStizWZuUJvugwGT6wi6pA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lXFhBRSWuTwSRFon3zmbE2/P4tg="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"3Ll3dTStizWZuUJvugwGT6wi6pA=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"lXFhBRSWuTwSRFon3zmbE2/P4tg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3Ll3dTStizWZuUJvugwGT6wi6pA="},{"type":"next-occurrence","id":"YoMA/X4d+w1Q3um0hR5EW97zkVE="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"lXFhBRSWuTwSRFon3zmbE2/P4tg=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"YoMA/X4d+w1Q3um0hR5EW97zkVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3Ll3dTStizWZuUJvugwGT6wi6pA="},{"type":"next-occurrence","id":"tFJREQV1J0W30jHhNHLLX1MGu9E="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"YoMA/X4d+w1Q3um0hR5EW97zkVE=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"tFJREQV1J0W30jHhNHLLX1MGu9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3Ll3dTStizWZuUJvugwGT6wi6pA="},{"type":"next-occurrence","id":"tBzB0xFap+CySk6OlRGIzJ+gfGQ="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"tFJREQV1J0W30jHhNHLLX1MGu9E=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"tBzB0xFap+CySk6OlRGIzJ+gfGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3Ll3dTStizWZuUJvugwGT6wi6pA="},{"type":"next-occurrence","id":"udMy61hzQrYsJIJLwzj3zC+2W3U="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"tBzB0xFap+CySk6OlRGIzJ+gfGQ=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"udMy61hzQrYsJIJLwzj3zC+2W3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3Ll3dTStizWZuUJvugwGT6wi6pA="},{"type":"next-occurrence","id":"42xW40mRiCVLjCFqrujV7obEPxE="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"udMy61hzQrYsJIJLwzj3zC+2W3U=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"42xW40mRiCVLjCFqrujV7obEPxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3Ll3dTStizWZuUJvugwGT6wi6pA="},{"type":"next-occurrence","id":"VZzh3CwA2WZjiDRaEB9PdT/CYk4="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"42xW40mRiCVLjCFqrujV7obEPxE=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"VZzh3CwA2WZjiDRaEB9PdT/CYk4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3Ll3dTStizWZuUJvugwGT6wi6pA="},{"type":"next-occurrence","id":"2TltpKEtH43xmvypBgyos/sCu+U="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"VZzh3CwA2WZjiDRaEB9PdT/CYk4=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"2TltpKEtH43xmvypBgyos/sCu+U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3Ll3dTStizWZuUJvugwGT6wi6pA="},{"type":"next-occurrence","id":"WgiyG9S2+FPCFLcYP57WMAbm8H8="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"2TltpKEtH43xmvypBgyos/sCu+U=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"WgiyG9S2+FPCFLcYP57WMAbm8H8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3Ll3dTStizWZuUJvugwGT6wi6pA="},{"type":"next-occurrence","id":"bGNUtFwW4eKfdHhcQPGdk6CfhBk="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"WgiyG9S2+FPCFLcYP57WMAbm8H8=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"bGNUtFwW4eKfdHhcQPGdk6CfhBk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3Ll3dTStizWZuUJvugwGT6wi6pA="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"bGNUtFwW4eKfdHhcQPGdk6CfhBk=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"BXeWyzabtrvdQ+gLZbCMfcJyvDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Traffic shift on I-95 northbound between Exit 73 - Society Road (East Lyme), Continuous Monday December 9th, 2024 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes shift","update_date":"2024-11-26T21:04:12Z"},"road_event_id":"BXeWyzabtrvdQ+gLZbCMfcJyvDQ=","beginning_cross_street":"Exit 73 - Society Road","ending_cross_street":"Exit 73 - Society Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.214689,41.356571]]}},{"id":"ORC300428891","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONROE AVE"],"direction":"unknown","description":"Crane operations on MONROE AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Not currently Scheduled","update_date":"2025-02-24T19:00:02Z"},"road_event_id":"ORC300428891","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-02-17T19:56:48Z","end_date":"2025-02-25T04:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.906672,40.844662]]}},{"id":"Cy63aOF5yvSLkHzoa2OIFAdmP98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Construction on I-95 northbound Entrance ramp Exit 43 - CT 122/First Avenue (West Haven) The Exit 43 on-ramp to I-95 northbound which is located on First Avenue in West Haven will be closed on July 21, 2025, until November 2027. Motorists traveling to I-95 northbound may take the detour route to Interchange 44 via First Avenue southbound, Route 122 (Kimberly Avenue), and Ella T. Grasso Boulevard in New Haven. Alternatively, motorists traveling to I-95 northbound may take the detour route to Interchange 44 via Campbell Avenue northbound, Boston Post Road, and Ella T. Grasso Boulevard in New Haven., Continuous Monday July 21st, 2025 12:00 AM thru Monday November 1st, 2027 11:59 PM All lanes closed","update_date":"2025-07-23T15:56:14Z"},"road_event_id":"Cy63aOF5yvSLkHzoa2OIFAdmP98=","beginning_cross_street":"Exit 43 - CT 122/First Avenue","ending_cross_street":"Exit 43 - CT 122/First Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.950021,41.283375]]}},{"id":"KkBsraS4sW8HRc7z0hwPIenw7GA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qgOezX1BZ8PsZmTAKGH27cqQC0w="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"KkBsraS4sW8HRc7z0hwPIenw7GA=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"qgOezX1BZ8PsZmTAKGH27cqQC0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KkBsraS4sW8HRc7z0hwPIenw7GA="},{"type":"next-occurrence","id":"IL9iOGuZZydpFHIh106qYDibwXY="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"qgOezX1BZ8PsZmTAKGH27cqQC0w=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"IL9iOGuZZydpFHIh106qYDibwXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KkBsraS4sW8HRc7z0hwPIenw7GA="},{"type":"next-occurrence","id":"UqbnDChAu731xxL8jgdldyPYr3Y="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"IL9iOGuZZydpFHIh106qYDibwXY=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"UqbnDChAu731xxL8jgdldyPYr3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KkBsraS4sW8HRc7z0hwPIenw7GA="},{"type":"next-occurrence","id":"7N0RSakrRWopZVl17q5kz1q3yFY="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"UqbnDChAu731xxL8jgdldyPYr3Y=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"7N0RSakrRWopZVl17q5kz1q3yFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KkBsraS4sW8HRc7z0hwPIenw7GA="},{"type":"next-occurrence","id":"4WACScsN8T+xXLXfXJ7i4LcPy24="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"7N0RSakrRWopZVl17q5kz1q3yFY=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"4WACScsN8T+xXLXfXJ7i4LcPy24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KkBsraS4sW8HRc7z0hwPIenw7GA="},{"type":"next-occurrence","id":"hi6CKoctICb9ru9aC4aX1+dDJOM="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"4WACScsN8T+xXLXfXJ7i4LcPy24=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"hi6CKoctICb9ru9aC4aX1+dDJOM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KkBsraS4sW8HRc7z0hwPIenw7GA="},{"type":"next-occurrence","id":"azEe3cDuolS6gYBXw6Jx9Mcotcg="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"hi6CKoctICb9ru9aC4aX1+dDJOM=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"azEe3cDuolS6gYBXw6Jx9Mcotcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KkBsraS4sW8HRc7z0hwPIenw7GA="},{"type":"next-occurrence","id":"cp4fpVTCOrcN7snZHhDCOG0674I="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"azEe3cDuolS6gYBXw6Jx9Mcotcg=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"cp4fpVTCOrcN7snZHhDCOG0674I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KkBsraS4sW8HRc7z0hwPIenw7GA="},{"type":"next-occurrence","id":"ASSs6tvXu+A2vSm41ImmtuMT4Z4="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"cp4fpVTCOrcN7snZHhDCOG0674I=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"ASSs6tvXu+A2vSm41ImmtuMT4Z4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KkBsraS4sW8HRc7z0hwPIenw7GA="},{"type":"next-occurrence","id":"uqPtZpBOKNeU8/hJDHPtrQjixCg="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"ASSs6tvXu+A2vSm41ImmtuMT4Z4=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"uqPtZpBOKNeU8/hJDHPtrQjixCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KkBsraS4sW8HRc7z0hwPIenw7GA="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"uqPtZpBOKNeU8/hJDHPtrQjixCg=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"ORC300448420","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","description":"Roadwork on NJ 18 Northbound between South of Exit 19 - NJ 34 (Colts Neck Twp) and South of Exit 29 - Tennent Rd/CR 3/CR 520 (Marlboro Twp), Thursday June 12, 2025 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2025-06-12T19:00:12Z"},"road_event_id":"ORC300448420","beginning_cross_street":"South of Exit 19 - NJ 34","ending_cross_street":"South of Exit 29 - Tennent Rd/CR 3/CR 520","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-09T20:06:10Z","end_date":"2025-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.134445,40.281414]]}},{"id":"ORC300448421","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","description":"Roadwork on NJ 18 Southbound between South of Exit 29 - Tennent Rd/CR 3/CR 520 (Marlboro Twp) and South of Exit 19 - NJ 34 (Colts Neck Twp), left shoulder","update_date":"2025-06-12T19:00:12Z"},"road_event_id":"ORC300448421","beginning_cross_street":"South of Exit 29 - Tennent Rd/CR 3/CR 520","ending_cross_street":"South of Exit 19 - NJ 34","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-09T20:06:09Z","end_date":"2025-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.280418,40.341743]]}},{"id":"eeNof5tg4Mt6yjHTUUiIThQuvFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q29lpgO7IuUHPR3UBeWmaOsLmsY="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"eeNof5tg4Mt6yjHTUUiIThQuvFA=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T05:00:00Z","end_date":"2026-05-13T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"q29lpgO7IuUHPR3UBeWmaOsLmsY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eeNof5tg4Mt6yjHTUUiIThQuvFA="},{"type":"next-occurrence","id":"DcdMIoWXnAEP0FSuIBOGCUIr7u8="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"q29lpgO7IuUHPR3UBeWmaOsLmsY=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"DcdMIoWXnAEP0FSuIBOGCUIr7u8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eeNof5tg4Mt6yjHTUUiIThQuvFA="},{"type":"next-occurrence","id":"dPNp8VcO6WvK3JKcUupb4wtNB+4="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"DcdMIoWXnAEP0FSuIBOGCUIr7u8=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"dPNp8VcO6WvK3JKcUupb4wtNB+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eeNof5tg4Mt6yjHTUUiIThQuvFA="},{"type":"next-occurrence","id":"NXwEe3oyeSccuN1U94Jnj7Vf0Ys="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"dPNp8VcO6WvK3JKcUupb4wtNB+4=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"NXwEe3oyeSccuN1U94Jnj7Vf0Ys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eeNof5tg4Mt6yjHTUUiIThQuvFA="},{"type":"next-occurrence","id":"PZCqSLT/eEGD6cQIr8NS0gHqOVk="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"NXwEe3oyeSccuN1U94Jnj7Vf0Ys=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T05:00:00Z","end_date":"2026-05-17T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"PZCqSLT/eEGD6cQIr8NS0gHqOVk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eeNof5tg4Mt6yjHTUUiIThQuvFA="},{"type":"next-occurrence","id":"6+/AGzGs3mafiegSpDDbS70gLRA="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"PZCqSLT/eEGD6cQIr8NS0gHqOVk=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T05:00:00Z","end_date":"2026-05-18T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"6+/AGzGs3mafiegSpDDbS70gLRA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eeNof5tg4Mt6yjHTUUiIThQuvFA="},{"type":"next-occurrence","id":"w70fWL8yPx5zYOlAJa2g5gan7O0="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"6+/AGzGs3mafiegSpDDbS70gLRA=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T02:00:00Z","end_date":"2026-05-19T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"w70fWL8yPx5zYOlAJa2g5gan7O0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eeNof5tg4Mt6yjHTUUiIThQuvFA="},{"type":"next-occurrence","id":"XCrDWLs/YuWU+a/i5mDrOz9yXSs="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"w70fWL8yPx5zYOlAJa2g5gan7O0=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T02:00:00Z","end_date":"2026-05-20T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"XCrDWLs/YuWU+a/i5mDrOz9yXSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eeNof5tg4Mt6yjHTUUiIThQuvFA="},{"type":"next-occurrence","id":"GG/7etN6CUXkxxb/wr0LwxZk0go="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"XCrDWLs/YuWU+a/i5mDrOz9yXSs=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T02:00:00Z","end_date":"2026-05-21T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"GG/7etN6CUXkxxb/wr0LwxZk0go=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eeNof5tg4Mt6yjHTUUiIThQuvFA="},{"type":"next-occurrence","id":"xqWesTb+12LHwyyJGRQPTu3Oy+4="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"GG/7etN6CUXkxxb/wr0LwxZk0go=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T02:00:00Z","end_date":"2026-05-22T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"xqWesTb+12LHwyyJGRQPTu3Oy+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eeNof5tg4Mt6yjHTUUiIThQuvFA="},{"type":"next-occurrence","id":"hXSUv2UqprvwimXiO2m2uUkEXB4="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"xqWesTb+12LHwyyJGRQPTu3Oy+4=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T02:00:00Z","end_date":"2026-05-23T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"hXSUv2UqprvwimXiO2m2uUkEXB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eeNof5tg4Mt6yjHTUUiIThQuvFA="},{"type":"next-occurrence","id":"NkTpS+AOkRoPARzYq9VzqauQX7k="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"hXSUv2UqprvwimXiO2m2uUkEXB4=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T05:00:00Z","end_date":"2026-05-24T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"NkTpS+AOkRoPARzYq9VzqauQX7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eeNof5tg4Mt6yjHTUUiIThQuvFA="},{"type":"next-occurrence","id":"Qd/BaEZjeqN0B7L/RQ4ZYf/Nu/Y="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"NkTpS+AOkRoPARzYq9VzqauQX7k=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T05:00:00Z","end_date":"2026-05-25T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"Qd/BaEZjeqN0B7L/RQ4ZYf/Nu/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eeNof5tg4Mt6yjHTUUiIThQuvFA="},{"type":"next-occurrence","id":"sPKX7+de0F5vzQjr+PHcauJMaJ4="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"Qd/BaEZjeqN0B7L/RQ4ZYf/Nu/Y=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T02:00:00Z","end_date":"2026-05-26T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"sPKX7+de0F5vzQjr+PHcauJMaJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eeNof5tg4Mt6yjHTUUiIThQuvFA="},{"type":"next-occurrence","id":"ZKdYCLW9twUJvIZaM4Hlcs8mJFg="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"sPKX7+de0F5vzQjr+PHcauJMaJ4=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T02:00:00Z","end_date":"2026-05-27T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"ZKdYCLW9twUJvIZaM4Hlcs8mJFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eeNof5tg4Mt6yjHTUUiIThQuvFA="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"ZKdYCLW9twUJvIZaM4Hlcs8mJFg=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T02:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"S0+lA8C2IxjMTP5IpjpcQIDIMko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZX2fCybAtCZzi0TYDZfCeXPfjbU="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"S0+lA8C2IxjMTP5IpjpcQIDIMko=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T05:00:00Z","end_date":"2026-05-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"ZX2fCybAtCZzi0TYDZfCeXPfjbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S0+lA8C2IxjMTP5IpjpcQIDIMko="},{"type":"next-occurrence","id":"bXnWIaJJqIkLpD8Z7YOVJwxEUgc="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"ZX2fCybAtCZzi0TYDZfCeXPfjbU=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"bXnWIaJJqIkLpD8Z7YOVJwxEUgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S0+lA8C2IxjMTP5IpjpcQIDIMko="},{"type":"next-occurrence","id":"+cc91unww0qal6aJFhjin9/hmxc="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"bXnWIaJJqIkLpD8Z7YOVJwxEUgc=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"+cc91unww0qal6aJFhjin9/hmxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S0+lA8C2IxjMTP5IpjpcQIDIMko="},{"type":"next-occurrence","id":"cyUBaS2NH0qjO5WBtW4rbJV2BD0="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"+cc91unww0qal6aJFhjin9/hmxc=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"cyUBaS2NH0qjO5WBtW4rbJV2BD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S0+lA8C2IxjMTP5IpjpcQIDIMko="},{"type":"next-occurrence","id":"VPOBsGJQWea8XLXyKYAseUugXVQ="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"cyUBaS2NH0qjO5WBtW4rbJV2BD0=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T05:00:00Z","end_date":"2026-05-17T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"VPOBsGJQWea8XLXyKYAseUugXVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S0+lA8C2IxjMTP5IpjpcQIDIMko="},{"type":"next-occurrence","id":"8RCebGDmMZedfWVgvqY+lGl28pg="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"VPOBsGJQWea8XLXyKYAseUugXVQ=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T05:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"8RCebGDmMZedfWVgvqY+lGl28pg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S0+lA8C2IxjMTP5IpjpcQIDIMko="},{"type":"next-occurrence","id":"pXzRzn+AsqvO7GUwKvg89plL6Lo="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"8RCebGDmMZedfWVgvqY+lGl28pg=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T02:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"pXzRzn+AsqvO7GUwKvg89plL6Lo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S0+lA8C2IxjMTP5IpjpcQIDIMko="},{"type":"next-occurrence","id":"UySmfr5qABRFfIFaGafYnbP964k="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"pXzRzn+AsqvO7GUwKvg89plL6Lo=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T02:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"UySmfr5qABRFfIFaGafYnbP964k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S0+lA8C2IxjMTP5IpjpcQIDIMko="},{"type":"next-occurrence","id":"XqkYE1DkFlXPmboprjrPK4N7sUI="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"UySmfr5qABRFfIFaGafYnbP964k=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T02:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"XqkYE1DkFlXPmboprjrPK4N7sUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S0+lA8C2IxjMTP5IpjpcQIDIMko="},{"type":"next-occurrence","id":"FLxklrzC8dvZskmkgXZ1R+vAwFY="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"XqkYE1DkFlXPmboprjrPK4N7sUI=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T02:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"FLxklrzC8dvZskmkgXZ1R+vAwFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S0+lA8C2IxjMTP5IpjpcQIDIMko="},{"type":"next-occurrence","id":"MZksbhpZ5bWSPLOaF3T30Dy31Hw="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"FLxklrzC8dvZskmkgXZ1R+vAwFY=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T02:00:00Z","end_date":"2026-05-23T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"MZksbhpZ5bWSPLOaF3T30Dy31Hw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S0+lA8C2IxjMTP5IpjpcQIDIMko="},{"type":"next-occurrence","id":"kZZrrGgwDhEsbG2PunoChvNe/Xw="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"MZksbhpZ5bWSPLOaF3T30Dy31Hw=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T05:00:00Z","end_date":"2026-05-24T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"kZZrrGgwDhEsbG2PunoChvNe/Xw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S0+lA8C2IxjMTP5IpjpcQIDIMko="},{"type":"next-occurrence","id":"2MR8I0zMWNpn+ioAC1Yx3pc3I5g="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"kZZrrGgwDhEsbG2PunoChvNe/Xw=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T05:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"2MR8I0zMWNpn+ioAC1Yx3pc3I5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S0+lA8C2IxjMTP5IpjpcQIDIMko="},{"type":"next-occurrence","id":"2DOllqI3EZCxDG6LyHZTHVhQkPA="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"2MR8I0zMWNpn+ioAC1Yx3pc3I5g=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T02:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"2DOllqI3EZCxDG6LyHZTHVhQkPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S0+lA8C2IxjMTP5IpjpcQIDIMko="},{"type":"next-occurrence","id":"+eQYZTqLVGAQTajgj7wPCZ+hNUk="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"2DOllqI3EZCxDG6LyHZTHVhQkPA=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T02:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"+eQYZTqLVGAQTajgj7wPCZ+hNUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S0+lA8C2IxjMTP5IpjpcQIDIMko="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"+eQYZTqLVGAQTajgj7wPCZ+hNUk=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T02:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"XVlJQLixNWE+N4W7/FvYfU7HnI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4lL8zsBxr02zicknB0dIsGPIkQY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"XVlJQLixNWE+N4W7/FvYfU7HnI0=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"4lL8zsBxr02zicknB0dIsGPIkQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XVlJQLixNWE+N4W7/FvYfU7HnI0="},{"type":"next-occurrence","id":"LzWA+keUZaD9vwtScLrwCcp+TII="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"4lL8zsBxr02zicknB0dIsGPIkQY=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"LzWA+keUZaD9vwtScLrwCcp+TII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XVlJQLixNWE+N4W7/FvYfU7HnI0="},{"type":"next-occurrence","id":"iX+9Pu1hESfOyBZHM9BZp1DYiN8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"LzWA+keUZaD9vwtScLrwCcp+TII=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"iX+9Pu1hESfOyBZHM9BZp1DYiN8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XVlJQLixNWE+N4W7/FvYfU7HnI0="},{"type":"next-occurrence","id":"SFDe2fHAntSpG1Nqg7UZ2hUMg2g="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"iX+9Pu1hESfOyBZHM9BZp1DYiN8=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"SFDe2fHAntSpG1Nqg7UZ2hUMg2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XVlJQLixNWE+N4W7/FvYfU7HnI0="},{"type":"next-occurrence","id":"aRDGYJ4DxCEJEXZzHbJ5mTZRjH0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"SFDe2fHAntSpG1Nqg7UZ2hUMg2g=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"aRDGYJ4DxCEJEXZzHbJ5mTZRjH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XVlJQLixNWE+N4W7/FvYfU7HnI0="},{"type":"next-occurrence","id":"EYRqyNQCd2yZe4gbizDxA+fdYJQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"aRDGYJ4DxCEJEXZzHbJ5mTZRjH0=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"EYRqyNQCd2yZe4gbizDxA+fdYJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XVlJQLixNWE+N4W7/FvYfU7HnI0="},{"type":"next-occurrence","id":"iHHgZVJp9ta7NP7D5DR9syxGcFg="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"EYRqyNQCd2yZe4gbizDxA+fdYJQ=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"iHHgZVJp9ta7NP7D5DR9syxGcFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XVlJQLixNWE+N4W7/FvYfU7HnI0="},{"type":"next-occurrence","id":"PBYvXzlp3etFaTU4eLWKURs6A3E="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"iHHgZVJp9ta7NP7D5DR9syxGcFg=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"PBYvXzlp3etFaTU4eLWKURs6A3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XVlJQLixNWE+N4W7/FvYfU7HnI0="},{"type":"next-occurrence","id":"+jtRHdAseIx/X4f9yLgKocj57vg="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"PBYvXzlp3etFaTU4eLWKURs6A3E=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"+jtRHdAseIx/X4f9yLgKocj57vg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XVlJQLixNWE+N4W7/FvYfU7HnI0="},{"type":"next-occurrence","id":"tKq3AALwm/r8fgZ38j5AAc4X6Uw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"+jtRHdAseIx/X4f9yLgKocj57vg=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"tKq3AALwm/r8fgZ38j5AAc4X6Uw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XVlJQLixNWE+N4W7/FvYfU7HnI0="},{"type":"next-occurrence","id":"l6OWfMlkLSX3Y9h2uomjAQpn7Kw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"tKq3AALwm/r8fgZ38j5AAc4X6Uw=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"l6OWfMlkLSX3Y9h2uomjAQpn7Kw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XVlJQLixNWE+N4W7/FvYfU7HnI0="},{"type":"next-occurrence","id":"LpeRtrBudpfobocUQBUBsL14ORM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"l6OWfMlkLSX3Y9h2uomjAQpn7Kw=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"LpeRtrBudpfobocUQBUBsL14ORM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XVlJQLixNWE+N4W7/FvYfU7HnI0="},{"type":"next-occurrence","id":"uEgj+kLNwDz4Zpjs9vPOYapQb84="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"LpeRtrBudpfobocUQBUBsL14ORM=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"uEgj+kLNwDz4Zpjs9vPOYapQb84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XVlJQLixNWE+N4W7/FvYfU7HnI0="},{"type":"next-occurrence","id":"DaFjIFpNmZaQm2glNie5f5T+WMA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"uEgj+kLNwDz4Zpjs9vPOYapQb84=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"DaFjIFpNmZaQm2glNie5f5T+WMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XVlJQLixNWE+N4W7/FvYfU7HnI0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"DaFjIFpNmZaQm2glNie5f5T+WMA=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"aJfVzmUvqE9WRZqEsePgUEmG5UQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rG530YxCjl6lOw1NUXLgLv0Et60="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"aJfVzmUvqE9WRZqEsePgUEmG5UQ=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"rG530YxCjl6lOw1NUXLgLv0Et60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aJfVzmUvqE9WRZqEsePgUEmG5UQ="},{"type":"next-occurrence","id":"Gy2X2JXBONNAtXyJmroWzK8bwRs="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"rG530YxCjl6lOw1NUXLgLv0Et60=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"Gy2X2JXBONNAtXyJmroWzK8bwRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aJfVzmUvqE9WRZqEsePgUEmG5UQ="},{"type":"next-occurrence","id":"EQzlFFNGpBzkGeVjtk/pCXLkMhU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"Gy2X2JXBONNAtXyJmroWzK8bwRs=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"EQzlFFNGpBzkGeVjtk/pCXLkMhU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aJfVzmUvqE9WRZqEsePgUEmG5UQ="},{"type":"next-occurrence","id":"beTbUzuD841c3CTOLry9/2Uq+Xc="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"EQzlFFNGpBzkGeVjtk/pCXLkMhU=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T21:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"beTbUzuD841c3CTOLry9/2Uq+Xc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aJfVzmUvqE9WRZqEsePgUEmG5UQ="},{"type":"next-occurrence","id":"rZSNZkwLnqKF6ybpE1aqNHlvZaE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"beTbUzuD841c3CTOLry9/2Uq+Xc=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T20:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"rZSNZkwLnqKF6ybpE1aqNHlvZaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aJfVzmUvqE9WRZqEsePgUEmG5UQ="},{"type":"next-occurrence","id":"uM4GIqYXG+VCz9O+UtGj/KbSG0Q="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"rZSNZkwLnqKF6ybpE1aqNHlvZaE=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"uM4GIqYXG+VCz9O+UtGj/KbSG0Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aJfVzmUvqE9WRZqEsePgUEmG5UQ="},{"type":"next-occurrence","id":"zWPr3vtdKm2pQ6eqEFzySiCPBJs="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"uM4GIqYXG+VCz9O+UtGj/KbSG0Q=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"zWPr3vtdKm2pQ6eqEFzySiCPBJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aJfVzmUvqE9WRZqEsePgUEmG5UQ="},{"type":"next-occurrence","id":"KmkG3fiZq98isivCQRS9/vnA7HA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"zWPr3vtdKm2pQ6eqEFzySiCPBJs=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"KmkG3fiZq98isivCQRS9/vnA7HA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aJfVzmUvqE9WRZqEsePgUEmG5UQ="},{"type":"next-occurrence","id":"xuJc+jz0PrT86/pKs2ZvGRP9u+w="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"KmkG3fiZq98isivCQRS9/vnA7HA=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"xuJc+jz0PrT86/pKs2ZvGRP9u+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aJfVzmUvqE9WRZqEsePgUEmG5UQ="},{"type":"next-occurrence","id":"qBbmISPmuWYSOvvGxO47JKXzXtc="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"xuJc+jz0PrT86/pKs2ZvGRP9u+w=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"qBbmISPmuWYSOvvGxO47JKXzXtc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aJfVzmUvqE9WRZqEsePgUEmG5UQ="},{"type":"next-occurrence","id":"t0S9SQiWSR11bPIVfehZDxUlDy4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"qBbmISPmuWYSOvvGxO47JKXzXtc=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T21:00:00Z","end_date":"2026-05-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"t0S9SQiWSR11bPIVfehZDxUlDy4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aJfVzmUvqE9WRZqEsePgUEmG5UQ="},{"type":"next-occurrence","id":"Vbc3BzR+pQ9lI9UCn+raHZraruM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"t0S9SQiWSR11bPIVfehZDxUlDy4=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T20:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"Vbc3BzR+pQ9lI9UCn+raHZraruM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aJfVzmUvqE9WRZqEsePgUEmG5UQ="},{"type":"next-occurrence","id":"mN/1w/9w4jFHUDNpsvhiwa0PvvU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"Vbc3BzR+pQ9lI9UCn+raHZraruM=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"mN/1w/9w4jFHUDNpsvhiwa0PvvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aJfVzmUvqE9WRZqEsePgUEmG5UQ="},{"type":"next-occurrence","id":"d8+kqW65NmtPWWJplTugVzwDu/I="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"mN/1w/9w4jFHUDNpsvhiwa0PvvU=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"d8+kqW65NmtPWWJplTugVzwDu/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aJfVzmUvqE9WRZqEsePgUEmG5UQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"d8+kqW65NmtPWWJplTugVzwDu/I=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"3GUMnu44gTj7271rdDXahLHWQ7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VWcowbqJN3bMCJgN1KYQSVQHNqE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"3GUMnu44gTj7271rdDXahLHWQ7U=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"VWcowbqJN3bMCJgN1KYQSVQHNqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3GUMnu44gTj7271rdDXahLHWQ7U="},{"type":"next-occurrence","id":"QvxmGGnWlWvi8HXe/D3LSFpDCUI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"VWcowbqJN3bMCJgN1KYQSVQHNqE=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"QvxmGGnWlWvi8HXe/D3LSFpDCUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3GUMnu44gTj7271rdDXahLHWQ7U="},{"type":"next-occurrence","id":"SSsgFZWTzaT4so9GyHRjVS1xsAM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"QvxmGGnWlWvi8HXe/D3LSFpDCUI=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"SSsgFZWTzaT4so9GyHRjVS1xsAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3GUMnu44gTj7271rdDXahLHWQ7U="},{"type":"next-occurrence","id":"A1AB6NIMPz3cUJNn1ejn9gJtHUc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"SSsgFZWTzaT4so9GyHRjVS1xsAM=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T21:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"A1AB6NIMPz3cUJNn1ejn9gJtHUc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3GUMnu44gTj7271rdDXahLHWQ7U="},{"type":"next-occurrence","id":"SfjLL7SYbIIxr74g6rF82M0BH7U="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"A1AB6NIMPz3cUJNn1ejn9gJtHUc=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"SfjLL7SYbIIxr74g6rF82M0BH7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3GUMnu44gTj7271rdDXahLHWQ7U="},{"type":"next-occurrence","id":"3lLeE6vbXdzu5zgQo0v8bWesp7Q="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"SfjLL7SYbIIxr74g6rF82M0BH7U=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"3lLeE6vbXdzu5zgQo0v8bWesp7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3GUMnu44gTj7271rdDXahLHWQ7U="},{"type":"next-occurrence","id":"OpJRwKS9ooNR11vfLRT1OHxqcmg="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"3lLeE6vbXdzu5zgQo0v8bWesp7Q=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"OpJRwKS9ooNR11vfLRT1OHxqcmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3GUMnu44gTj7271rdDXahLHWQ7U="},{"type":"next-occurrence","id":"RD67m6v7a0nYN7mkKv/80keTclg="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"OpJRwKS9ooNR11vfLRT1OHxqcmg=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"RD67m6v7a0nYN7mkKv/80keTclg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3GUMnu44gTj7271rdDXahLHWQ7U="},{"type":"next-occurrence","id":"vae7Z/KlvXex+2d9TSp8E1Fgmv8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"RD67m6v7a0nYN7mkKv/80keTclg=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"vae7Z/KlvXex+2d9TSp8E1Fgmv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3GUMnu44gTj7271rdDXahLHWQ7U="},{"type":"next-occurrence","id":"72kwDKseyJU7rn3jfJsp0dm+pE0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"vae7Z/KlvXex+2d9TSp8E1Fgmv8=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"72kwDKseyJU7rn3jfJsp0dm+pE0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3GUMnu44gTj7271rdDXahLHWQ7U="},{"type":"next-occurrence","id":"ArpRIGgBLMoffUasEYSwxRTdNYs="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"72kwDKseyJU7rn3jfJsp0dm+pE0=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T21:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"ArpRIGgBLMoffUasEYSwxRTdNYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3GUMnu44gTj7271rdDXahLHWQ7U="},{"type":"next-occurrence","id":"gzCGJqh65eue0a8jGLz4mbWVgPQ="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"ArpRIGgBLMoffUasEYSwxRTdNYs=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T23:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"gzCGJqh65eue0a8jGLz4mbWVgPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3GUMnu44gTj7271rdDXahLHWQ7U="},{"type":"next-occurrence","id":"kMwDAOyVStOVweqp0cT1Y38NsdI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"gzCGJqh65eue0a8jGLz4mbWVgPQ=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"kMwDAOyVStOVweqp0cT1Y38NsdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3GUMnu44gTj7271rdDXahLHWQ7U="},{"type":"next-occurrence","id":"CNVBo8KgQKXAD/6EnCtdsIunw/8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"kMwDAOyVStOVweqp0cT1Y38NsdI=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"CNVBo8KgQKXAD/6EnCtdsIunw/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3GUMnu44gTj7271rdDXahLHWQ7U="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"CNVBo8KgQKXAD/6EnCtdsIunw/8=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"X2PKpR0AOi2c+fZjWJxe8vpENBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MxunZXEDXMpwAhni0S//kmlk00g="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"X2PKpR0AOi2c+fZjWJxe8vpENBw=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"MxunZXEDXMpwAhni0S//kmlk00g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2PKpR0AOi2c+fZjWJxe8vpENBw="},{"type":"next-occurrence","id":"VPyyZ7kM/Vubn3JE2em9j93j8TE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"MxunZXEDXMpwAhni0S//kmlk00g=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"VPyyZ7kM/Vubn3JE2em9j93j8TE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2PKpR0AOi2c+fZjWJxe8vpENBw="},{"type":"next-occurrence","id":"L/giNp8dmgYOFAFNCjJHr6yDHIY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"VPyyZ7kM/Vubn3JE2em9j93j8TE=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"L/giNp8dmgYOFAFNCjJHr6yDHIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2PKpR0AOi2c+fZjWJxe8vpENBw="},{"type":"next-occurrence","id":"PL5n8s/6Og8EpZigFY4W3UNVK9c="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"L/giNp8dmgYOFAFNCjJHr6yDHIY=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T21:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"PL5n8s/6Og8EpZigFY4W3UNVK9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2PKpR0AOi2c+fZjWJxe8vpENBw="},{"type":"next-occurrence","id":"GAS09//y9Bb8LrlTyX3i69QCvJ8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"PL5n8s/6Og8EpZigFY4W3UNVK9c=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"GAS09//y9Bb8LrlTyX3i69QCvJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2PKpR0AOi2c+fZjWJxe8vpENBw="},{"type":"next-occurrence","id":"X9rOCMsrq0ym+6Ina9VMDt/v7bc="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"GAS09//y9Bb8LrlTyX3i69QCvJ8=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"X9rOCMsrq0ym+6Ina9VMDt/v7bc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2PKpR0AOi2c+fZjWJxe8vpENBw="},{"type":"next-occurrence","id":"6YljqHww4glTW/A61610SXrPZQY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"X9rOCMsrq0ym+6Ina9VMDt/v7bc=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"6YljqHww4glTW/A61610SXrPZQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2PKpR0AOi2c+fZjWJxe8vpENBw="},{"type":"next-occurrence","id":"3wHKiPzF9fQmc06fdKJtDwSTdfA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"6YljqHww4glTW/A61610SXrPZQY=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"3wHKiPzF9fQmc06fdKJtDwSTdfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2PKpR0AOi2c+fZjWJxe8vpENBw="},{"type":"next-occurrence","id":"XH/7YYl+StiQfCgJbhZ0pPyGYxE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"3wHKiPzF9fQmc06fdKJtDwSTdfA=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T22:00:00Z","end_date":"2026-05-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"XH/7YYl+StiQfCgJbhZ0pPyGYxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2PKpR0AOi2c+fZjWJxe8vpENBw="},{"type":"next-occurrence","id":"8jsWVvSqlYKUjo9EaLrPRBF9aoE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"XH/7YYl+StiQfCgJbhZ0pPyGYxE=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T21:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"8jsWVvSqlYKUjo9EaLrPRBF9aoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2PKpR0AOi2c+fZjWJxe8vpENBw="},{"type":"next-occurrence","id":"cwoltG4z3IAXZO4CD8NqA0g4cHI="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"8jsWVvSqlYKUjo9EaLrPRBF9aoE=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"cwoltG4z3IAXZO4CD8NqA0g4cHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2PKpR0AOi2c+fZjWJxe8vpENBw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"cwoltG4z3IAXZO4CD8NqA0g4cHI=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"3MGzvXSlb8u+n3ZOTwrfk9xvYr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cAjD0Lm6GDiQYOB7c/luXipYs/o="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"3MGzvXSlb8u+n3ZOTwrfk9xvYr8=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"cAjD0Lm6GDiQYOB7c/luXipYs/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MGzvXSlb8u+n3ZOTwrfk9xvYr8="},{"type":"next-occurrence","id":"Touy3aKl+i9UerDPNO7XUHLG89k="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"cAjD0Lm6GDiQYOB7c/luXipYs/o=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"Touy3aKl+i9UerDPNO7XUHLG89k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MGzvXSlb8u+n3ZOTwrfk9xvYr8="},{"type":"next-occurrence","id":"tcjy9UIXWc0H+2aAjBuTSjmVcCE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"Touy3aKl+i9UerDPNO7XUHLG89k=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"tcjy9UIXWc0H+2aAjBuTSjmVcCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MGzvXSlb8u+n3ZOTwrfk9xvYr8="},{"type":"next-occurrence","id":"wCfUDzuz+tBn9rIlFUB+bygTHi4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"tcjy9UIXWc0H+2aAjBuTSjmVcCE=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T21:00:00Z","end_date":"2026-05-17T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"wCfUDzuz+tBn9rIlFUB+bygTHi4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MGzvXSlb8u+n3ZOTwrfk9xvYr8="},{"type":"next-occurrence","id":"zDBHmWbvIYh8GCMrVufuchEghjU="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"wCfUDzuz+tBn9rIlFUB+bygTHi4=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"zDBHmWbvIYh8GCMrVufuchEghjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MGzvXSlb8u+n3ZOTwrfk9xvYr8="},{"type":"next-occurrence","id":"2WAigLEB4XDJjQNgF5/Wvh1RaSI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"zDBHmWbvIYh8GCMrVufuchEghjU=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"2WAigLEB4XDJjQNgF5/Wvh1RaSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MGzvXSlb8u+n3ZOTwrfk9xvYr8="},{"type":"next-occurrence","id":"uWA7vbk3UZhMOua6n3cVLhmE2AQ="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"2WAigLEB4XDJjQNgF5/Wvh1RaSI=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"uWA7vbk3UZhMOua6n3cVLhmE2AQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MGzvXSlb8u+n3ZOTwrfk9xvYr8="},{"type":"next-occurrence","id":"Bzf5zyBBeOYiSvwalU7MGvVCKXA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"uWA7vbk3UZhMOua6n3cVLhmE2AQ=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"Bzf5zyBBeOYiSvwalU7MGvVCKXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MGzvXSlb8u+n3ZOTwrfk9xvYr8="},{"type":"next-occurrence","id":"BGCMflg9EMZ6wFgfs3PyxzutpcA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"Bzf5zyBBeOYiSvwalU7MGvVCKXA=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"BGCMflg9EMZ6wFgfs3PyxzutpcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MGzvXSlb8u+n3ZOTwrfk9xvYr8="},{"type":"next-occurrence","id":"5pOcKlPQhpjhlF48lcTrd+P+MhE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"BGCMflg9EMZ6wFgfs3PyxzutpcA=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"5pOcKlPQhpjhlF48lcTrd+P+MhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MGzvXSlb8u+n3ZOTwrfk9xvYr8="},{"type":"next-occurrence","id":"4c1NzHXKWtD3KdPYXuLiGn/VC9g="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"5pOcKlPQhpjhlF48lcTrd+P+MhE=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T21:00:00Z","end_date":"2026-05-24T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"4c1NzHXKWtD3KdPYXuLiGn/VC9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MGzvXSlb8u+n3ZOTwrfk9xvYr8="},{"type":"next-occurrence","id":"yEG2xtRj3d/BTfKO8NN0Ijh73KQ="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"4c1NzHXKWtD3KdPYXuLiGn/VC9g=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T23:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"yEG2xtRj3d/BTfKO8NN0Ijh73KQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MGzvXSlb8u+n3ZOTwrfk9xvYr8="},{"type":"next-occurrence","id":"b6KQ5F2nywLPH1J1OPb2RPq5nV8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"yEG2xtRj3d/BTfKO8NN0Ijh73KQ=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"b6KQ5F2nywLPH1J1OPb2RPq5nV8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MGzvXSlb8u+n3ZOTwrfk9xvYr8="},{"type":"next-occurrence","id":"xar4tqlZs/LHAq1GhoX5gLwH1pc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"b6KQ5F2nywLPH1J1OPb2RPq5nV8=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"xar4tqlZs/LHAq1GhoX5gLwH1pc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MGzvXSlb8u+n3ZOTwrfk9xvYr8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"xar4tqlZs/LHAq1GhoX5gLwH1pc=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"9EokhGJ2bcsfnBZH0cHSBjvyVYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"I6x6ZpW/kFlUSYeV9o5NzW7UoRo="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"9EokhGJ2bcsfnBZH0cHSBjvyVYQ=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"I6x6ZpW/kFlUSYeV9o5NzW7UoRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EokhGJ2bcsfnBZH0cHSBjvyVYQ="},{"type":"next-occurrence","id":"oq06CZIVuN3Cl0x2BThgDRAhMN8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"I6x6ZpW/kFlUSYeV9o5NzW7UoRo=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"oq06CZIVuN3Cl0x2BThgDRAhMN8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EokhGJ2bcsfnBZH0cHSBjvyVYQ="},{"type":"next-occurrence","id":"oecsTMBxMiONCxTLnScuKwWjjwI="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"oq06CZIVuN3Cl0x2BThgDRAhMN8=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"oecsTMBxMiONCxTLnScuKwWjjwI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EokhGJ2bcsfnBZH0cHSBjvyVYQ="},{"type":"next-occurrence","id":"xoue9G3Zbx6pfPRYAE4ZEQnigWI="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"oecsTMBxMiONCxTLnScuKwWjjwI=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"xoue9G3Zbx6pfPRYAE4ZEQnigWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EokhGJ2bcsfnBZH0cHSBjvyVYQ="},{"type":"next-occurrence","id":"1OT2iv+50cDSMDwAnzCQohc3IAw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"xoue9G3Zbx6pfPRYAE4ZEQnigWI=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T02:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"1OT2iv+50cDSMDwAnzCQohc3IAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EokhGJ2bcsfnBZH0cHSBjvyVYQ="},{"type":"next-occurrence","id":"KOAGxjfZ+xKOyLNChUeSrN5egtM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"1OT2iv+50cDSMDwAnzCQohc3IAw=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"KOAGxjfZ+xKOyLNChUeSrN5egtM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EokhGJ2bcsfnBZH0cHSBjvyVYQ="},{"type":"next-occurrence","id":"sd9L8QPaFQLWs7lCj1rPLAlka7M="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"KOAGxjfZ+xKOyLNChUeSrN5egtM=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T01:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"sd9L8QPaFQLWs7lCj1rPLAlka7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EokhGJ2bcsfnBZH0cHSBjvyVYQ="},{"type":"next-occurrence","id":"J5j6M9WE+gheAO6Xp1d17Ku1wUs="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"sd9L8QPaFQLWs7lCj1rPLAlka7M=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T01:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"J5j6M9WE+gheAO6Xp1d17Ku1wUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EokhGJ2bcsfnBZH0cHSBjvyVYQ="},{"type":"next-occurrence","id":"U42kvT0y+YZjj0bvjEX7bKfINnU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"J5j6M9WE+gheAO6Xp1d17Ku1wUs=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T02:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"U42kvT0y+YZjj0bvjEX7bKfINnU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EokhGJ2bcsfnBZH0cHSBjvyVYQ="},{"type":"next-occurrence","id":"jxYoXweWKmQTSNV0v5U1ijKcJkM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"U42kvT0y+YZjj0bvjEX7bKfINnU=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T02:00:00Z","end_date":"2026-05-23T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"jxYoXweWKmQTSNV0v5U1ijKcJkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EokhGJ2bcsfnBZH0cHSBjvyVYQ="},{"type":"next-occurrence","id":"iEwFZAEF6iy5tVGG7hZwykTL1dw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"jxYoXweWKmQTSNV0v5U1ijKcJkM=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T02:00:00Z","end_date":"2026-05-24T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"iEwFZAEF6iy5tVGG7hZwykTL1dw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EokhGJ2bcsfnBZH0cHSBjvyVYQ="},{"type":"next-occurrence","id":"OFD9RJC63Z7KVhTcNTlwSug7zc8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"iEwFZAEF6iy5tVGG7hZwykTL1dw=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T02:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"OFD9RJC63Z7KVhTcNTlwSug7zc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EokhGJ2bcsfnBZH0cHSBjvyVYQ="},{"type":"next-occurrence","id":"GsjCCrr4FtBhyB8raPxqh/8X4cY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"OFD9RJC63Z7KVhTcNTlwSug7zc8=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"GsjCCrr4FtBhyB8raPxqh/8X4cY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EokhGJ2bcsfnBZH0cHSBjvyVYQ="},{"type":"next-occurrence","id":"7o2bQsg9ZqJU8joudYcuooezJzo="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"GsjCCrr4FtBhyB8raPxqh/8X4cY=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T01:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"7o2bQsg9ZqJU8joudYcuooezJzo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EokhGJ2bcsfnBZH0cHSBjvyVYQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"7o2bQsg9ZqJU8joudYcuooezJzo=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T01:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"sm1U6MMLXL994fww4rgWlggXHj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yumzr+wP8Dnq4L/VFVVHYCPmYlI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"sm1U6MMLXL994fww4rgWlggXHj0=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"yumzr+wP8Dnq4L/VFVVHYCPmYlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sm1U6MMLXL994fww4rgWlggXHj0="},{"type":"next-occurrence","id":"CFsz/QYpaXPhbG0fBQox1p4QQyU="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"yumzr+wP8Dnq4L/VFVVHYCPmYlI=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"CFsz/QYpaXPhbG0fBQox1p4QQyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sm1U6MMLXL994fww4rgWlggXHj0="},{"type":"next-occurrence","id":"HBQYmPGikXDjXcLIE+oVsZhcuKQ="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"CFsz/QYpaXPhbG0fBQox1p4QQyU=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"HBQYmPGikXDjXcLIE+oVsZhcuKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sm1U6MMLXL994fww4rgWlggXHj0="},{"type":"next-occurrence","id":"dNtrMyhE7O1nqdh4DY9sSUIlIB8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"HBQYmPGikXDjXcLIE+oVsZhcuKQ=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"dNtrMyhE7O1nqdh4DY9sSUIlIB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sm1U6MMLXL994fww4rgWlggXHj0="},{"type":"next-occurrence","id":"xQo0kkpaK/YMT0rOJ1IK8lzyUlE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"dNtrMyhE7O1nqdh4DY9sSUIlIB8=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"xQo0kkpaK/YMT0rOJ1IK8lzyUlE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sm1U6MMLXL994fww4rgWlggXHj0="},{"type":"next-occurrence","id":"Ij551VvV8Kx+7e4GmiSeD9s2zKw="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"xQo0kkpaK/YMT0rOJ1IK8lzyUlE=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"Ij551VvV8Kx+7e4GmiSeD9s2zKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sm1U6MMLXL994fww4rgWlggXHj0="},{"type":"next-occurrence","id":"iS5q6o5gzWbJSOQXlpdZ0K5wQxk="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"Ij551VvV8Kx+7e4GmiSeD9s2zKw=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"iS5q6o5gzWbJSOQXlpdZ0K5wQxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sm1U6MMLXL994fww4rgWlggXHj0="},{"type":"next-occurrence","id":"7+SGjNjF9WxfcKby9mSmxXlwzns="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"iS5q6o5gzWbJSOQXlpdZ0K5wQxk=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"7+SGjNjF9WxfcKby9mSmxXlwzns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sm1U6MMLXL994fww4rgWlggXHj0="},{"type":"next-occurrence","id":"nystFdwQhuse/OW1O79vZ8JznxI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"7+SGjNjF9WxfcKby9mSmxXlwzns=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"nystFdwQhuse/OW1O79vZ8JznxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sm1U6MMLXL994fww4rgWlggXHj0="},{"type":"next-occurrence","id":"vCrm46ROJJB4VAoyakb8b0eyg8o="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"nystFdwQhuse/OW1O79vZ8JznxI=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"vCrm46ROJJB4VAoyakb8b0eyg8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sm1U6MMLXL994fww4rgWlggXHj0="},{"type":"next-occurrence","id":"zVRQusaTN6JJ5cQOeKRCMmkO1Eo="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"vCrm46ROJJB4VAoyakb8b0eyg8o=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"zVRQusaTN6JJ5cQOeKRCMmkO1Eo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sm1U6MMLXL994fww4rgWlggXHj0="},{"type":"next-occurrence","id":"NN9QhcsXCpMsbjQPmSUuz/zqAlc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"zVRQusaTN6JJ5cQOeKRCMmkO1Eo=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"NN9QhcsXCpMsbjQPmSUuz/zqAlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sm1U6MMLXL994fww4rgWlggXHj0="},{"type":"next-occurrence","id":"Ic7UNlvkkfjlJWxLkWBhcHu5YW0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"NN9QhcsXCpMsbjQPmSUuz/zqAlc=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"Ic7UNlvkkfjlJWxLkWBhcHu5YW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sm1U6MMLXL994fww4rgWlggXHj0="},{"type":"next-occurrence","id":"+fSNpVm49XaoNKASMGsbevAP/Nk="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"Ic7UNlvkkfjlJWxLkWBhcHu5YW0=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"+fSNpVm49XaoNKASMGsbevAP/Nk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sm1U6MMLXL994fww4rgWlggXHj0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"+fSNpVm49XaoNKASMGsbevAP/Nk=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"BBIOr28OYUyRLbpHalxZDc5IDwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5jzZz/sptXhopCPh0uuvNBEJYIo="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"BBIOr28OYUyRLbpHalxZDc5IDwc=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"5jzZz/sptXhopCPh0uuvNBEJYIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BBIOr28OYUyRLbpHalxZDc5IDwc="},{"type":"next-occurrence","id":"3oMSHSXzZqy+83tR0byvvc2/iS0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"5jzZz/sptXhopCPh0uuvNBEJYIo=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"3oMSHSXzZqy+83tR0byvvc2/iS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BBIOr28OYUyRLbpHalxZDc5IDwc="},{"type":"next-occurrence","id":"le/xWFMQ1CZsCbqOEZ4sMj0wpJI="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"3oMSHSXzZqy+83tR0byvvc2/iS0=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"le/xWFMQ1CZsCbqOEZ4sMj0wpJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BBIOr28OYUyRLbpHalxZDc5IDwc="},{"type":"next-occurrence","id":"b7TFJL6a9KidBc/hHarf4UT1TVk="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"le/xWFMQ1CZsCbqOEZ4sMj0wpJI=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"b7TFJL6a9KidBc/hHarf4UT1TVk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BBIOr28OYUyRLbpHalxZDc5IDwc="},{"type":"next-occurrence","id":"BAKC2dFjWhX/6TwlUxyYARnLpyw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"b7TFJL6a9KidBc/hHarf4UT1TVk=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"BAKC2dFjWhX/6TwlUxyYARnLpyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BBIOr28OYUyRLbpHalxZDc5IDwc="},{"type":"next-occurrence","id":"w7p86xus24QDuyxvLd1ItDIgYKQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"BAKC2dFjWhX/6TwlUxyYARnLpyw=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"w7p86xus24QDuyxvLd1ItDIgYKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BBIOr28OYUyRLbpHalxZDc5IDwc="},{"type":"next-occurrence","id":"c79HegVG++KpBtOu/qZcGsLL8PM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"w7p86xus24QDuyxvLd1ItDIgYKQ=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"c79HegVG++KpBtOu/qZcGsLL8PM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BBIOr28OYUyRLbpHalxZDc5IDwc="},{"type":"next-occurrence","id":"/lgg1LWRVWZsw2pNcHqnCvaS8sY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"c79HegVG++KpBtOu/qZcGsLL8PM=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"/lgg1LWRVWZsw2pNcHqnCvaS8sY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BBIOr28OYUyRLbpHalxZDc5IDwc="},{"type":"next-occurrence","id":"TnoBiZ1P9etDWCcm+ky/kjU5Ve4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"/lgg1LWRVWZsw2pNcHqnCvaS8sY=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"TnoBiZ1P9etDWCcm+ky/kjU5Ve4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BBIOr28OYUyRLbpHalxZDc5IDwc="},{"type":"next-occurrence","id":"Pe24vUyYMSpplGsOgbVxTkqURUE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"TnoBiZ1P9etDWCcm+ky/kjU5Ve4=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"Pe24vUyYMSpplGsOgbVxTkqURUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BBIOr28OYUyRLbpHalxZDc5IDwc="},{"type":"next-occurrence","id":"LJ13dlz50liSBVhJW4Tic/0WCH8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"Pe24vUyYMSpplGsOgbVxTkqURUE=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"LJ13dlz50liSBVhJW4Tic/0WCH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BBIOr28OYUyRLbpHalxZDc5IDwc="},{"type":"next-occurrence","id":"BSnxeLAjbDVWOS5a359CEexNz8w="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"LJ13dlz50liSBVhJW4Tic/0WCH8=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T23:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"BSnxeLAjbDVWOS5a359CEexNz8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BBIOr28OYUyRLbpHalxZDc5IDwc="},{"type":"next-occurrence","id":"RFa09jRP63a06W1PYsB4yZ/OK+4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"BSnxeLAjbDVWOS5a359CEexNz8w=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"RFa09jRP63a06W1PYsB4yZ/OK+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BBIOr28OYUyRLbpHalxZDc5IDwc="},{"type":"next-occurrence","id":"HQ83miH+b7qyL0GIuD57LhNU878="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"RFa09jRP63a06W1PYsB4yZ/OK+4=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"HQ83miH+b7qyL0GIuD57LhNU878=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BBIOr28OYUyRLbpHalxZDc5IDwc="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"HQ83miH+b7qyL0GIuD57LhNU878=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"2aXLz6U5YWNZq0rt0iJ5BoGEmSo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"78/ZC8gaJOxHE2vcHi7mKZBBR8o="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"2aXLz6U5YWNZq0rt0iJ5BoGEmSo=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"78/ZC8gaJOxHE2vcHi7mKZBBR8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2aXLz6U5YWNZq0rt0iJ5BoGEmSo="},{"type":"next-occurrence","id":"mbeRQ0PnjDdY/TDB835QRfrVae0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"78/ZC8gaJOxHE2vcHi7mKZBBR8o=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"mbeRQ0PnjDdY/TDB835QRfrVae0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2aXLz6U5YWNZq0rt0iJ5BoGEmSo="},{"type":"next-occurrence","id":"OFX/zwFV4+ZzXXsSFJLtWxQHP5w="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"mbeRQ0PnjDdY/TDB835QRfrVae0=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"OFX/zwFV4+ZzXXsSFJLtWxQHP5w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2aXLz6U5YWNZq0rt0iJ5BoGEmSo="},{"type":"next-occurrence","id":"ipJl7fckKlmhNLfr9rP44zne4rM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"OFX/zwFV4+ZzXXsSFJLtWxQHP5w=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"ipJl7fckKlmhNLfr9rP44zne4rM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2aXLz6U5YWNZq0rt0iJ5BoGEmSo="},{"type":"next-occurrence","id":"y87swH14vIWKJR1sByekR95TGq4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"ipJl7fckKlmhNLfr9rP44zne4rM=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T21:00:00Z","end_date":"2026-05-18T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"y87swH14vIWKJR1sByekR95TGq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2aXLz6U5YWNZq0rt0iJ5BoGEmSo="},{"type":"next-occurrence","id":"FxVtiUs9nBMyI1yM+Fs8OM3+738="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"y87swH14vIWKJR1sByekR95TGq4=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"FxVtiUs9nBMyI1yM+Fs8OM3+738=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2aXLz6U5YWNZq0rt0iJ5BoGEmSo="},{"type":"next-occurrence","id":"8KuPHXl1hqiCCMIDeIr4hKeIuI8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"FxVtiUs9nBMyI1yM+Fs8OM3+738=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"8KuPHXl1hqiCCMIDeIr4hKeIuI8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2aXLz6U5YWNZq0rt0iJ5BoGEmSo="},{"type":"next-occurrence","id":"OUuP2OphJh9uNgiX5hfXGke+9vo="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"8KuPHXl1hqiCCMIDeIr4hKeIuI8=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"OUuP2OphJh9uNgiX5hfXGke+9vo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2aXLz6U5YWNZq0rt0iJ5BoGEmSo="},{"type":"next-occurrence","id":"DxxpPmWEmna/TI1pIi73VtqAcx8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"OUuP2OphJh9uNgiX5hfXGke+9vo=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"DxxpPmWEmna/TI1pIi73VtqAcx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2aXLz6U5YWNZq0rt0iJ5BoGEmSo="},{"type":"next-occurrence","id":"efvQAw3JMOG7Eyp8YjhJDwj+Eiw="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"DxxpPmWEmna/TI1pIi73VtqAcx8=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"efvQAw3JMOG7Eyp8YjhJDwj+Eiw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2aXLz6U5YWNZq0rt0iJ5BoGEmSo="},{"type":"next-occurrence","id":"uMEbkMh3jYo3Ipr/GAva1BvGzUg="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"efvQAw3JMOG7Eyp8YjhJDwj+Eiw=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T20:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"uMEbkMh3jYo3Ipr/GAva1BvGzUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2aXLz6U5YWNZq0rt0iJ5BoGEmSo="},{"type":"next-occurrence","id":"wNTeoE85CncfJbQN6czkx4LcYlk="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"uMEbkMh3jYo3Ipr/GAva1BvGzUg=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T21:00:00Z","end_date":"2026-05-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"wNTeoE85CncfJbQN6czkx4LcYlk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2aXLz6U5YWNZq0rt0iJ5BoGEmSo="},{"type":"next-occurrence","id":"wSdPPKQaQ/E76C4qHeDOzX4nOyY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"wNTeoE85CncfJbQN6czkx4LcYlk=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"wSdPPKQaQ/E76C4qHeDOzX4nOyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2aXLz6U5YWNZq0rt0iJ5BoGEmSo="},{"type":"next-occurrence","id":"T2e3CZAo6KQSM7QzBwNYsZlMOz0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"wSdPPKQaQ/E76C4qHeDOzX4nOyY=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"T2e3CZAo6KQSM7QzBwNYsZlMOz0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2aXLz6U5YWNZq0rt0iJ5BoGEmSo="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"T2e3CZAo6KQSM7QzBwNYsZlMOz0=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"VP8P/7DvXolpiK01J4FqA+9Xp0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WKR+WAR+/DJROVsSJCD54vEDIIM="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"VP8P/7DvXolpiK01J4FqA+9Xp0Y=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"WKR+WAR+/DJROVsSJCD54vEDIIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VP8P/7DvXolpiK01J4FqA+9Xp0Y="},{"type":"next-occurrence","id":"udOyJK5NWoEDswF8iCIznC/uG9Y="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"WKR+WAR+/DJROVsSJCD54vEDIIM=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"udOyJK5NWoEDswF8iCIznC/uG9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VP8P/7DvXolpiK01J4FqA+9Xp0Y="},{"type":"next-occurrence","id":"Jm9UhCcdQ/b6q0+Buw2fAI7YxDw="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"udOyJK5NWoEDswF8iCIznC/uG9Y=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:00:00Z","end_date":"2026-05-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"Jm9UhCcdQ/b6q0+Buw2fAI7YxDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VP8P/7DvXolpiK01J4FqA+9Xp0Y="},{"type":"next-occurrence","id":"9JPTIxNIyXTQw4j4YVP+X4VrDCg="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"Jm9UhCcdQ/b6q0+Buw2fAI7YxDw=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T03:00:00Z","end_date":"2026-05-17T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"9JPTIxNIyXTQw4j4YVP+X4VrDCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VP8P/7DvXolpiK01J4FqA+9Xp0Y="},{"type":"next-occurrence","id":"178LKEvGys2DEJhK7VCpf+ysNY4="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"9JPTIxNIyXTQw4j4YVP+X4VrDCg=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T03:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"178LKEvGys2DEJhK7VCpf+ysNY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VP8P/7DvXolpiK01J4FqA+9Xp0Y="},{"type":"next-occurrence","id":"YMpVM2HsQHXOxyqt7T+udSO31mk="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"178LKEvGys2DEJhK7VCpf+ysNY4=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"YMpVM2HsQHXOxyqt7T+udSO31mk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VP8P/7DvXolpiK01J4FqA+9Xp0Y="},{"type":"next-occurrence","id":"snCh8JEfxtLYeHXCXBixHIf663I="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"YMpVM2HsQHXOxyqt7T+udSO31mk=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T01:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"snCh8JEfxtLYeHXCXBixHIf663I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VP8P/7DvXolpiK01J4FqA+9Xp0Y="},{"type":"next-occurrence","id":"NBGUFyN2iQMgJw622PExZO9957Y="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"snCh8JEfxtLYeHXCXBixHIf663I=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T01:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"NBGUFyN2iQMgJw622PExZO9957Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VP8P/7DvXolpiK01J4FqA+9Xp0Y="},{"type":"next-occurrence","id":"7nZGsSuVFGJrczGxykmlk35G/n4="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"NBGUFyN2iQMgJw622PExZO9957Y=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T01:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"7nZGsSuVFGJrczGxykmlk35G/n4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VP8P/7DvXolpiK01J4FqA+9Xp0Y="},{"type":"next-occurrence","id":"iaEqpBi5uSf9SLQRhf8UNxa0eSw="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"7nZGsSuVFGJrczGxykmlk35G/n4=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T03:00:00Z","end_date":"2026-05-23T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"iaEqpBi5uSf9SLQRhf8UNxa0eSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VP8P/7DvXolpiK01J4FqA+9Xp0Y="},{"type":"next-occurrence","id":"4m5bPi5PD70QXQbrQaVbE3RRGrE="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"iaEqpBi5uSf9SLQRhf8UNxa0eSw=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T03:00:00Z","end_date":"2026-05-24T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"4m5bPi5PD70QXQbrQaVbE3RRGrE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VP8P/7DvXolpiK01J4FqA+9Xp0Y="},{"type":"next-occurrence","id":"je3Nogv3J/XwATb8AWfiPmYKWBw="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"4m5bPi5PD70QXQbrQaVbE3RRGrE=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T03:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"je3Nogv3J/XwATb8AWfiPmYKWBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VP8P/7DvXolpiK01J4FqA+9Xp0Y="},{"type":"next-occurrence","id":"uiQpF+HcC7lHCtdohCLtc6q8hPk="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"je3Nogv3J/XwATb8AWfiPmYKWBw=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"uiQpF+HcC7lHCtdohCLtc6q8hPk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VP8P/7DvXolpiK01J4FqA+9Xp0Y="},{"type":"next-occurrence","id":"IXs4zH+mayFdY87fRedr2y08dhU="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"uiQpF+HcC7lHCtdohCLtc6q8hPk=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T01:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"IXs4zH+mayFdY87fRedr2y08dhU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VP8P/7DvXolpiK01J4FqA+9Xp0Y="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"IXs4zH+mayFdY87fRedr2y08dhU=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T01:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"32pOUKCA1Bu1mWVx7J7iIvNoBz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"L7EgDOXAbawDcKkwphNyYuzH7sg="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"32pOUKCA1Bu1mWVx7J7iIvNoBz4=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"L7EgDOXAbawDcKkwphNyYuzH7sg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32pOUKCA1Bu1mWVx7J7iIvNoBz4="},{"type":"next-occurrence","id":"hMaZ4BuQ8IToTGjt20DtJo4L88s="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"L7EgDOXAbawDcKkwphNyYuzH7sg=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"hMaZ4BuQ8IToTGjt20DtJo4L88s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32pOUKCA1Bu1mWVx7J7iIvNoBz4="},{"type":"next-occurrence","id":"DidS+AcIMIV1Pr9mFgPSFR2qhQg="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"hMaZ4BuQ8IToTGjt20DtJo4L88s=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:00:00Z","end_date":"2026-05-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"DidS+AcIMIV1Pr9mFgPSFR2qhQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32pOUKCA1Bu1mWVx7J7iIvNoBz4="},{"type":"next-occurrence","id":"/O2vJvSIPJzXb9YiDVCtFfKUp3k="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"DidS+AcIMIV1Pr9mFgPSFR2qhQg=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T03:00:00Z","end_date":"2026-05-17T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"/O2vJvSIPJzXb9YiDVCtFfKUp3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32pOUKCA1Bu1mWVx7J7iIvNoBz4="},{"type":"next-occurrence","id":"uIeEacSRkiPMgI0oNOmnIlOgl+Q="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"/O2vJvSIPJzXb9YiDVCtFfKUp3k=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T03:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"uIeEacSRkiPMgI0oNOmnIlOgl+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32pOUKCA1Bu1mWVx7J7iIvNoBz4="},{"type":"next-occurrence","id":"EdcIhCoXz3DEkJ7CIQL4Y3b32E4="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"uIeEacSRkiPMgI0oNOmnIlOgl+Q=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"EdcIhCoXz3DEkJ7CIQL4Y3b32E4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32pOUKCA1Bu1mWVx7J7iIvNoBz4="},{"type":"next-occurrence","id":"aIpT8WDXWMdgMPXIqSPZdmOcr44="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"EdcIhCoXz3DEkJ7CIQL4Y3b32E4=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"aIpT8WDXWMdgMPXIqSPZdmOcr44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32pOUKCA1Bu1mWVx7J7iIvNoBz4="},{"type":"next-occurrence","id":"m5Lbtg4fN0P5WUj3H74HR2qT/iU="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"aIpT8WDXWMdgMPXIqSPZdmOcr44=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"m5Lbtg4fN0P5WUj3H74HR2qT/iU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32pOUKCA1Bu1mWVx7J7iIvNoBz4="},{"type":"next-occurrence","id":"HFDEh8IuBfRMU86pvN5inqDOlmI="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"m5Lbtg4fN0P5WUj3H74HR2qT/iU=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"HFDEh8IuBfRMU86pvN5inqDOlmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32pOUKCA1Bu1mWVx7J7iIvNoBz4="},{"type":"next-occurrence","id":"9IOiJCA/V1FJT7lM9CzxJCho7P8="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"HFDEh8IuBfRMU86pvN5inqDOlmI=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T03:00:00Z","end_date":"2026-05-23T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"9IOiJCA/V1FJT7lM9CzxJCho7P8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32pOUKCA1Bu1mWVx7J7iIvNoBz4="},{"type":"next-occurrence","id":"UmvnU3mBm7uYv1pCVXkKnx8gDpE="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"9IOiJCA/V1FJT7lM9CzxJCho7P8=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T03:00:00Z","end_date":"2026-05-24T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"UmvnU3mBm7uYv1pCVXkKnx8gDpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32pOUKCA1Bu1mWVx7J7iIvNoBz4="},{"type":"next-occurrence","id":"UOREPsX7Wjfa3kwUT3eW4w9b4f4="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"UmvnU3mBm7uYv1pCVXkKnx8gDpE=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T03:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"UOREPsX7Wjfa3kwUT3eW4w9b4f4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32pOUKCA1Bu1mWVx7J7iIvNoBz4="},{"type":"next-occurrence","id":"SUebdOXRpZOokubyjLgZ9ZHgNC8="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"UOREPsX7Wjfa3kwUT3eW4w9b4f4=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"SUebdOXRpZOokubyjLgZ9ZHgNC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32pOUKCA1Bu1mWVx7J7iIvNoBz4="},{"type":"next-occurrence","id":"pHOewHTqNn6anbpK47GMQSgswoo="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"SUebdOXRpZOokubyjLgZ9ZHgNC8=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"pHOewHTqNn6anbpK47GMQSgswoo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32pOUKCA1Bu1mWVx7J7iIvNoBz4="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"pHOewHTqNn6anbpK47GMQSgswoo=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"YF49yFFLpmUn/rie0x9J+cTz8oA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/hJF765H4DUIoRb3/P3DftsLioQ="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"YF49yFFLpmUn/rie0x9J+cTz8oA=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"/hJF765H4DUIoRb3/P3DftsLioQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YF49yFFLpmUn/rie0x9J+cTz8oA="},{"type":"next-occurrence","id":"ewLLaD8JfxysmT2pK6YlFq632wI="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"/hJF765H4DUIoRb3/P3DftsLioQ=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"ewLLaD8JfxysmT2pK6YlFq632wI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YF49yFFLpmUn/rie0x9J+cTz8oA="},{"type":"next-occurrence","id":"dimCF1+xUP7PY3t/pC1dWKE2IPw="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"ewLLaD8JfxysmT2pK6YlFq632wI=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:00:00Z","end_date":"2026-05-16T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"dimCF1+xUP7PY3t/pC1dWKE2IPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YF49yFFLpmUn/rie0x9J+cTz8oA="},{"type":"next-occurrence","id":"P36NUI7wyuvrCvZkoQUKqE97KDQ="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"dimCF1+xUP7PY3t/pC1dWKE2IPw=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T03:00:00Z","end_date":"2026-05-17T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"P36NUI7wyuvrCvZkoQUKqE97KDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YF49yFFLpmUn/rie0x9J+cTz8oA="},{"type":"next-occurrence","id":"SDbEwhq0UlSWSk7sG7wOJTDQN+U="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"P36NUI7wyuvrCvZkoQUKqE97KDQ=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T03:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"SDbEwhq0UlSWSk7sG7wOJTDQN+U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YF49yFFLpmUn/rie0x9J+cTz8oA="},{"type":"next-occurrence","id":"JD1n+8G6bBY3jvpApZyCw9YbqqY="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"SDbEwhq0UlSWSk7sG7wOJTDQN+U=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"JD1n+8G6bBY3jvpApZyCw9YbqqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YF49yFFLpmUn/rie0x9J+cTz8oA="},{"type":"next-occurrence","id":"9MHN67GrKmTrV1/H9gd9w9dl0fg="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"JD1n+8G6bBY3jvpApZyCw9YbqqY=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T01:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"9MHN67GrKmTrV1/H9gd9w9dl0fg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YF49yFFLpmUn/rie0x9J+cTz8oA="},{"type":"next-occurrence","id":"9tHh4YoEm2VQ0jzi6o9ODGJHDsE="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"9MHN67GrKmTrV1/H9gd9w9dl0fg=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T01:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"9tHh4YoEm2VQ0jzi6o9ODGJHDsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YF49yFFLpmUn/rie0x9J+cTz8oA="},{"type":"next-occurrence","id":"5mlyCPaREgjvstFCRbhsDPV285M="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"9tHh4YoEm2VQ0jzi6o9ODGJHDsE=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T01:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"5mlyCPaREgjvstFCRbhsDPV285M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YF49yFFLpmUn/rie0x9J+cTz8oA="},{"type":"next-occurrence","id":"AJS1mW2pZBkr4HxZMNl+eGlYApc="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"5mlyCPaREgjvstFCRbhsDPV285M=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T03:00:00Z","end_date":"2026-05-23T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"AJS1mW2pZBkr4HxZMNl+eGlYApc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YF49yFFLpmUn/rie0x9J+cTz8oA="},{"type":"next-occurrence","id":"zJOWIsLsw8XsBVE3+S1neplR/Fs="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"AJS1mW2pZBkr4HxZMNl+eGlYApc=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T03:00:00Z","end_date":"2026-05-24T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"zJOWIsLsw8XsBVE3+S1neplR/Fs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YF49yFFLpmUn/rie0x9J+cTz8oA="},{"type":"next-occurrence","id":"VGIwWxlqmDnNqrQwjU102LP9Ujo="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"zJOWIsLsw8XsBVE3+S1neplR/Fs=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T03:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"VGIwWxlqmDnNqrQwjU102LP9Ujo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YF49yFFLpmUn/rie0x9J+cTz8oA="},{"type":"next-occurrence","id":"33eZ0XZynXrugt3QZAxINbWBE3I="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"VGIwWxlqmDnNqrQwjU102LP9Ujo=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"33eZ0XZynXrugt3QZAxINbWBE3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YF49yFFLpmUn/rie0x9J+cTz8oA="},{"type":"next-occurrence","id":"fnA280ARWWYOY8HmcdmHT7XPa6g="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"33eZ0XZynXrugt3QZAxINbWBE3I=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T01:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"fnA280ARWWYOY8HmcdmHT7XPa6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YF49yFFLpmUn/rie0x9J+cTz8oA="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"fnA280ARWWYOY8HmcdmHT7XPa6g=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T01:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"NgwMIHIyWBFuizp0k3pX5Pls9as=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7UqK9Ue7DukM9leOgI6hNqRLNAQ="}],"description":"Bridge rehabilitation and longterm construction on BRIDGE ST eastbound CHAMPION ST (West Carthage) to NY 126 at Town of Wilna; Town of Champion Line (Wilna) All lanes and shoulders are open to traffic. Motorists can expect occasional lane/shoulder closures on weekdays , Monday April 21st, 2025 thru Saturday May 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-05-08T18:11:52Z"},"road_event_id":"NgwMIHIyWBFuizp0k3pX5Pls9as=","beginning_cross_street":"CHAMPION ST","ending_cross_street":"Town of Wilna; Town of Champion Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.614861,43.974362]]}},{"id":"7UqK9Ue7DukM9leOgI6hNqRLNAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NgwMIHIyWBFuizp0k3pX5Pls9as="},{"type":"next-occurrence","id":"c6nAwbw0bJ2yXbJtK8FETtKeCt4="}],"description":"Bridge rehabilitation and longterm construction on BRIDGE ST eastbound CHAMPION ST (West Carthage) to NY 126 at Town of Wilna; Town of Champion Line (Wilna) All lanes and shoulders are open to traffic. Motorists can expect occasional lane/shoulder closures on weekdays , Monday April 21st, 2025 thru Saturday May 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-05-08T18:11:52Z"},"road_event_id":"7UqK9Ue7DukM9leOgI6hNqRLNAQ=","beginning_cross_street":"CHAMPION ST","ending_cross_street":"Town of Wilna; Town of Champion Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T04:00:00Z","end_date":"2026-05-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.614861,43.974362]]}},{"id":"c6nAwbw0bJ2yXbJtK8FETtKeCt4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NgwMIHIyWBFuizp0k3pX5Pls9as="}],"description":"Bridge rehabilitation and longterm construction on BRIDGE ST eastbound CHAMPION ST (West Carthage) to NY 126 at Town of Wilna; Town of Champion Line (Wilna) All lanes and shoulders are open to traffic. Motorists can expect occasional lane/shoulder closures on weekdays , Monday April 21st, 2025 thru Saturday May 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-05-08T18:11:52Z"},"road_event_id":"c6nAwbw0bJ2yXbJtK8FETtKeCt4=","beginning_cross_street":"CHAMPION ST","ending_cross_street":"Town of Wilna; Town of Champion Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.614861,43.974362]]}},{"id":"TD77PJhILvJaJfc6YMJSKici9EE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sp686aYL8PICyPVgDkvYVwqYQ18="}],"description":"Drainage improvements and longterm construction and road rehabilitation on NY 3 both directions (Piercefield) No active work at this time. All lanes and shoulders open to traffic, Wednesday April 2nd, 2025 thru Tuesday June 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:19:05Z"},"road_event_id":"TD77PJhILvJaJfc6YMJSKici9EE=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.593809,44.24]]}},{"id":"sp686aYL8PICyPVgDkvYVwqYQ18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TD77PJhILvJaJfc6YMJSKici9EE="},{"type":"next-occurrence","id":"EJbrM1fcceILOlKeyEeHebGvyGk="}],"description":"Drainage improvements and longterm construction and road rehabilitation on NY 3 both directions (Piercefield) No active work at this time. All lanes and shoulders open to traffic, Wednesday April 2nd, 2025 thru Tuesday June 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:19:05Z"},"road_event_id":"sp686aYL8PICyPVgDkvYVwqYQ18=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T04:00:00Z","end_date":"2026-05-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.593809,44.24]]}},{"id":"EJbrM1fcceILOlKeyEeHebGvyGk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TD77PJhILvJaJfc6YMJSKici9EE="}],"description":"Drainage improvements and longterm construction and road rehabilitation on NY 3 both directions (Piercefield) No active work at this time. All lanes and shoulders open to traffic, Wednesday April 2nd, 2025 thru Tuesday June 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:19:05Z"},"road_event_id":"EJbrM1fcceILOlKeyEeHebGvyGk=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.593809,44.24]]}},{"id":"N1I882IexQFO+OuLOkLFaRC69xs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"oFbFMKyonMGHH9InfJdEWgIvISI="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"N1I882IexQFO+OuLOkLFaRC69xs=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T05:00:00Z","end_date":"2026-05-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"oFbFMKyonMGHH9InfJdEWgIvISI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N1I882IexQFO+OuLOkLFaRC69xs="},{"type":"next-occurrence","id":"ByEGmfvtHCHw7ucwsf+PE4QgGPE="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"oFbFMKyonMGHH9InfJdEWgIvISI=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"ByEGmfvtHCHw7ucwsf+PE4QgGPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N1I882IexQFO+OuLOkLFaRC69xs="},{"type":"next-occurrence","id":"KiDeqNbSqvP9LO3wSdTvC1Udkfk="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"ByEGmfvtHCHw7ucwsf+PE4QgGPE=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"KiDeqNbSqvP9LO3wSdTvC1Udkfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N1I882IexQFO+OuLOkLFaRC69xs="},{"type":"next-occurrence","id":"WllB4h6naXuZgrz8+PuK76roAW0="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"KiDeqNbSqvP9LO3wSdTvC1Udkfk=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"WllB4h6naXuZgrz8+PuK76roAW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N1I882IexQFO+OuLOkLFaRC69xs="},{"type":"next-occurrence","id":"epN2eDJbojNg0Lo5VjgAbEV72Eo="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"WllB4h6naXuZgrz8+PuK76roAW0=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T05:00:00Z","end_date":"2026-05-17T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"epN2eDJbojNg0Lo5VjgAbEV72Eo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N1I882IexQFO+OuLOkLFaRC69xs="},{"type":"next-occurrence","id":"6QgQ/JtXpCs32bblOWSs5Ph8FD8="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"epN2eDJbojNg0Lo5VjgAbEV72Eo=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T02:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"6QgQ/JtXpCs32bblOWSs5Ph8FD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N1I882IexQFO+OuLOkLFaRC69xs="},{"type":"next-occurrence","id":"fGMeuUUml/q3WRjgKzvoiykrpt8="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"6QgQ/JtXpCs32bblOWSs5Ph8FD8=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T02:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"fGMeuUUml/q3WRjgKzvoiykrpt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N1I882IexQFO+OuLOkLFaRC69xs="},{"type":"next-occurrence","id":"B/pJoMEKAQr5sqQqk60n0gc6Ubw="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"fGMeuUUml/q3WRjgKzvoiykrpt8=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T02:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"B/pJoMEKAQr5sqQqk60n0gc6Ubw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N1I882IexQFO+OuLOkLFaRC69xs="},{"type":"next-occurrence","id":"qehw/d+02h6LQ+2oFTcALB4V6jE="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"B/pJoMEKAQr5sqQqk60n0gc6Ubw=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T02:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"qehw/d+02h6LQ+2oFTcALB4V6jE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N1I882IexQFO+OuLOkLFaRC69xs="},{"type":"next-occurrence","id":"9F1WzqUrAIFaSDKuAP9DKcZZABg="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"qehw/d+02h6LQ+2oFTcALB4V6jE=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T02:00:00Z","end_date":"2026-05-23T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"9F1WzqUrAIFaSDKuAP9DKcZZABg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N1I882IexQFO+OuLOkLFaRC69xs="},{"type":"next-occurrence","id":"VqEq78xZyEYLeOCwC8yrsI5GQeA="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"9F1WzqUrAIFaSDKuAP9DKcZZABg=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T05:00:00Z","end_date":"2026-05-24T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"VqEq78xZyEYLeOCwC8yrsI5GQeA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N1I882IexQFO+OuLOkLFaRC69xs="},{"type":"next-occurrence","id":"jvH3x72bXBLvi3yINtQiTvNRkVo="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"VqEq78xZyEYLeOCwC8yrsI5GQeA=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T02:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"jvH3x72bXBLvi3yINtQiTvNRkVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N1I882IexQFO+OuLOkLFaRC69xs="},{"type":"next-occurrence","id":"OZyN+07Q3gpufYCW/P7I/hBkDwI="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"jvH3x72bXBLvi3yINtQiTvNRkVo=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T02:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"OZyN+07Q3gpufYCW/P7I/hBkDwI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N1I882IexQFO+OuLOkLFaRC69xs="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"OZyN+07Q3gpufYCW/P7I/hBkDwI=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T02:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"s+C99mwR3C/dtCiv/LDgQO9wvm4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PQwHy5RnUTaQluoERAM8f5d62Sw="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"s+C99mwR3C/dtCiv/LDgQO9wvm4=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T05:00:00Z","end_date":"2026-05-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"PQwHy5RnUTaQluoERAM8f5d62Sw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s+C99mwR3C/dtCiv/LDgQO9wvm4="},{"type":"next-occurrence","id":"SkiMTklkbTrjENXX1ojPyjPu7oI="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"PQwHy5RnUTaQluoERAM8f5d62Sw=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T05:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"SkiMTklkbTrjENXX1ojPyjPu7oI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s+C99mwR3C/dtCiv/LDgQO9wvm4="},{"type":"next-occurrence","id":"A1YDTWzbPmbhkgHr2gc3Yo4UOC4="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"SkiMTklkbTrjENXX1ojPyjPu7oI=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T05:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"A1YDTWzbPmbhkgHr2gc3Yo4UOC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s+C99mwR3C/dtCiv/LDgQO9wvm4="},{"type":"next-occurrence","id":"DcyCZ4vyoQBcaTjdrD0Gjip4VAE="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"A1YDTWzbPmbhkgHr2gc3Yo4UOC4=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:00:00Z","end_date":"2026-05-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"DcyCZ4vyoQBcaTjdrD0Gjip4VAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s+C99mwR3C/dtCiv/LDgQO9wvm4="},{"type":"next-occurrence","id":"qLfGvJxQ3GHNxwwqCWgRNc8xjj0="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"DcyCZ4vyoQBcaTjdrD0Gjip4VAE=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T05:00:00Z","end_date":"2026-05-17T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"qLfGvJxQ3GHNxwwqCWgRNc8xjj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s+C99mwR3C/dtCiv/LDgQO9wvm4="},{"type":"next-occurrence","id":"+RuNQpYypaw6CwqED3mqDQsSjuo="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"qLfGvJxQ3GHNxwwqCWgRNc8xjj0=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T03:00:00Z","end_date":"2026-05-18T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"+RuNQpYypaw6CwqED3mqDQsSjuo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s+C99mwR3C/dtCiv/LDgQO9wvm4="},{"type":"next-occurrence","id":"86ndANs1r0+CELCwcCDR+lY+X+E="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"+RuNQpYypaw6CwqED3mqDQsSjuo=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T05:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"86ndANs1r0+CELCwcCDR+lY+X+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s+C99mwR3C/dtCiv/LDgQO9wvm4="},{"type":"next-occurrence","id":"/6741slefPhhJ9ahnVEIYBax08g="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"86ndANs1r0+CELCwcCDR+lY+X+E=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T05:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"/6741slefPhhJ9ahnVEIYBax08g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s+C99mwR3C/dtCiv/LDgQO9wvm4="},{"type":"next-occurrence","id":"sDIGRtmvgwrVevPtXa+kmlcwckU="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"/6741slefPhhJ9ahnVEIYBax08g=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T05:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"sDIGRtmvgwrVevPtXa+kmlcwckU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s+C99mwR3C/dtCiv/LDgQO9wvm4="},{"type":"next-occurrence","id":"C5nB/uUJR29p62os9P8BTi4tRUk="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"sDIGRtmvgwrVevPtXa+kmlcwckU=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T05:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"C5nB/uUJR29p62os9P8BTi4tRUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s+C99mwR3C/dtCiv/LDgQO9wvm4="},{"type":"next-occurrence","id":"1RWj0IsYguARHuI9JWHfinIJEyg="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"C5nB/uUJR29p62os9P8BTi4tRUk=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T03:00:00Z","end_date":"2026-05-23T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"1RWj0IsYguARHuI9JWHfinIJEyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s+C99mwR3C/dtCiv/LDgQO9wvm4="},{"type":"next-occurrence","id":"cD5aNt6kX/bHSsMD5Z/qBa2N+vQ="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"1RWj0IsYguARHuI9JWHfinIJEyg=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T05:00:00Z","end_date":"2026-05-24T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"cD5aNt6kX/bHSsMD5Z/qBa2N+vQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s+C99mwR3C/dtCiv/LDgQO9wvm4="},{"type":"next-occurrence","id":"8ERug9p0c+uEuY+gZr8iRyxqQDQ="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"cD5aNt6kX/bHSsMD5Z/qBa2N+vQ=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T03:00:00Z","end_date":"2026-05-25T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"8ERug9p0c+uEuY+gZr8iRyxqQDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s+C99mwR3C/dtCiv/LDgQO9wvm4="},{"type":"next-occurrence","id":"vpetY/1NLyqaZcirrtKa47SV2uI="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"8ERug9p0c+uEuY+gZr8iRyxqQDQ=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T05:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"vpetY/1NLyqaZcirrtKa47SV2uI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s+C99mwR3C/dtCiv/LDgQO9wvm4="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"vpetY/1NLyqaZcirrtKa47SV2uI=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T05:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"Wth1JDCUE078WKwHqOB/JPBylR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"d04z8FeAHbTmQcyLd7S6f++YHz8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"Wth1JDCUE078WKwHqOB/JPBylR0=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"d04z8FeAHbTmQcyLd7S6f++YHz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wth1JDCUE078WKwHqOB/JPBylR0="},{"type":"next-occurrence","id":"s2xkFpF/FKnrsR28rFNTk1yB4Y0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"d04z8FeAHbTmQcyLd7S6f++YHz8=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"s2xkFpF/FKnrsR28rFNTk1yB4Y0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wth1JDCUE078WKwHqOB/JPBylR0="},{"type":"next-occurrence","id":"Q50FIRdPqUH++c/dgm95bHtNuHQ="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"s2xkFpF/FKnrsR28rFNTk1yB4Y0=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"Q50FIRdPqUH++c/dgm95bHtNuHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wth1JDCUE078WKwHqOB/JPBylR0="},{"type":"next-occurrence","id":"sK4PSOEUJkM0yHw3p9Ey9pO4vjY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"Q50FIRdPqUH++c/dgm95bHtNuHQ=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"sK4PSOEUJkM0yHw3p9Ey9pO4vjY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wth1JDCUE078WKwHqOB/JPBylR0="},{"type":"next-occurrence","id":"5UToN7kDtkRRtmWQ/ZZA9tVlNHU="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"sK4PSOEUJkM0yHw3p9Ey9pO4vjY=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T21:00:00Z","end_date":"2026-05-18T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"5UToN7kDtkRRtmWQ/ZZA9tVlNHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wth1JDCUE078WKwHqOB/JPBylR0="},{"type":"next-occurrence","id":"ukKPEIn80O5DsBJkvldFj62u3jQ="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"5UToN7kDtkRRtmWQ/ZZA9tVlNHU=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"ukKPEIn80O5DsBJkvldFj62u3jQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wth1JDCUE078WKwHqOB/JPBylR0="},{"type":"next-occurrence","id":"utzuDlD3WKt0fI6wQNwrctWEWv8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"ukKPEIn80O5DsBJkvldFj62u3jQ=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"utzuDlD3WKt0fI6wQNwrctWEWv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wth1JDCUE078WKwHqOB/JPBylR0="},{"type":"next-occurrence","id":"8GqESWnrWBUQLUy2aYNWOS/NFRI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"utzuDlD3WKt0fI6wQNwrctWEWv8=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"8GqESWnrWBUQLUy2aYNWOS/NFRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wth1JDCUE078WKwHqOB/JPBylR0="},{"type":"next-occurrence","id":"R8r5XUegV2ls76ZOJiKKebul+D0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"8GqESWnrWBUQLUy2aYNWOS/NFRI=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"R8r5XUegV2ls76ZOJiKKebul+D0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wth1JDCUE078WKwHqOB/JPBylR0="},{"type":"next-occurrence","id":"eNPKyejpOEsBFPr4SU0/SzDvcqE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"R8r5XUegV2ls76ZOJiKKebul+D0=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"eNPKyejpOEsBFPr4SU0/SzDvcqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wth1JDCUE078WKwHqOB/JPBylR0="},{"type":"next-occurrence","id":"s3ib1d09xYlZqlCuJZd3RA3JyEA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"eNPKyejpOEsBFPr4SU0/SzDvcqE=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T20:00:00Z","end_date":"2026-05-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"s3ib1d09xYlZqlCuJZd3RA3JyEA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wth1JDCUE078WKwHqOB/JPBylR0="},{"type":"next-occurrence","id":"BaucdcUATkMb4vXjc+3WBqji5TE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"s3ib1d09xYlZqlCuJZd3RA3JyEA=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T21:00:00Z","end_date":"2026-05-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"BaucdcUATkMb4vXjc+3WBqji5TE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wth1JDCUE078WKwHqOB/JPBylR0="},{"type":"next-occurrence","id":"vNmzY8uFWR53s+i+2bUWNhvjN9U="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"BaucdcUATkMb4vXjc+3WBqji5TE=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"vNmzY8uFWR53s+i+2bUWNhvjN9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wth1JDCUE078WKwHqOB/JPBylR0="},{"type":"next-occurrence","id":"mktCO6dpQoyxxXg9MdBcojhEeu0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"vNmzY8uFWR53s+i+2bUWNhvjN9U=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"mktCO6dpQoyxxXg9MdBcojhEeu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wth1JDCUE078WKwHqOB/JPBylR0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"mktCO6dpQoyxxXg9MdBcojhEeu0=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"aCqyXAUhTy5M1AWMGNRra02PFJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MFK9wAZJDezKzJWC2X38bwTdPhM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"aCqyXAUhTy5M1AWMGNRra02PFJ0=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"MFK9wAZJDezKzJWC2X38bwTdPhM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aCqyXAUhTy5M1AWMGNRra02PFJ0="},{"type":"next-occurrence","id":"EQ4DMktTPKdkYoofxj+j0ffVrsU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"MFK9wAZJDezKzJWC2X38bwTdPhM=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"EQ4DMktTPKdkYoofxj+j0ffVrsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aCqyXAUhTy5M1AWMGNRra02PFJ0="},{"type":"next-occurrence","id":"mNtZIXfnhWg1csQotFGUQ/5uEMs="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"EQ4DMktTPKdkYoofxj+j0ffVrsU=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"mNtZIXfnhWg1csQotFGUQ/5uEMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aCqyXAUhTy5M1AWMGNRra02PFJ0="},{"type":"next-occurrence","id":"UZ7VHWPgP3XnLhSvZeQwO74ei6s="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"mNtZIXfnhWg1csQotFGUQ/5uEMs=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T23:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"UZ7VHWPgP3XnLhSvZeQwO74ei6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aCqyXAUhTy5M1AWMGNRra02PFJ0="},{"type":"next-occurrence","id":"gXvkeArqw8udvFIlnlCbif+S5R4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"UZ7VHWPgP3XnLhSvZeQwO74ei6s=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T21:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"gXvkeArqw8udvFIlnlCbif+S5R4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aCqyXAUhTy5M1AWMGNRra02PFJ0="},{"type":"next-occurrence","id":"hiDS9uL4qvzGFZY4LNVn2iPgSc0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"gXvkeArqw8udvFIlnlCbif+S5R4=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"hiDS9uL4qvzGFZY4LNVn2iPgSc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aCqyXAUhTy5M1AWMGNRra02PFJ0="},{"type":"next-occurrence","id":"kVpsq8ESptnMW9kaHe+HJBn65+s="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"hiDS9uL4qvzGFZY4LNVn2iPgSc0=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"kVpsq8ESptnMW9kaHe+HJBn65+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aCqyXAUhTy5M1AWMGNRra02PFJ0="},{"type":"next-occurrence","id":"SVYETtHYTts09knj+evhZ5a3Fp8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"kVpsq8ESptnMW9kaHe+HJBn65+s=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"SVYETtHYTts09knj+evhZ5a3Fp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aCqyXAUhTy5M1AWMGNRra02PFJ0="},{"type":"next-occurrence","id":"p97XTcMMYVRBlxqgI8s9m8jwghg="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"SVYETtHYTts09knj+evhZ5a3Fp8=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"p97XTcMMYVRBlxqgI8s9m8jwghg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aCqyXAUhTy5M1AWMGNRra02PFJ0="},{"type":"next-occurrence","id":"lZezC5aku3nqmItKF1tEk7OtHHM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"p97XTcMMYVRBlxqgI8s9m8jwghg=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"lZezC5aku3nqmItKF1tEk7OtHHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aCqyXAUhTy5M1AWMGNRra02PFJ0="},{"type":"next-occurrence","id":"JsNc31dvJmj5jFMczbzUsP2PAZU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"lZezC5aku3nqmItKF1tEk7OtHHM=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T23:00:00Z","end_date":"2026-05-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"JsNc31dvJmj5jFMczbzUsP2PAZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aCqyXAUhTy5M1AWMGNRra02PFJ0="},{"type":"next-occurrence","id":"D7k59H8JtVwxjRkTJAXyRe58amw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"JsNc31dvJmj5jFMczbzUsP2PAZU=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T21:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"D7k59H8JtVwxjRkTJAXyRe58amw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aCqyXAUhTy5M1AWMGNRra02PFJ0="},{"type":"next-occurrence","id":"rWtSQJ6xJk2hICDH6IhK1q4LANQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"D7k59H8JtVwxjRkTJAXyRe58amw=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"rWtSQJ6xJk2hICDH6IhK1q4LANQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aCqyXAUhTy5M1AWMGNRra02PFJ0="},{"type":"next-occurrence","id":"h2p6I/QJmRBXeC5vu+mOmUlptwo="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"rWtSQJ6xJk2hICDH6IhK1q4LANQ=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"h2p6I/QJmRBXeC5vu+mOmUlptwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aCqyXAUhTy5M1AWMGNRra02PFJ0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"h2p6I/QJmRBXeC5vu+mOmUlptwo=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"AqjzhL4FxkS8xk6vCfGET98rF9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fYQnZtZyQP8wViNvXngMTGKlbNw="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"AqjzhL4FxkS8xk6vCfGET98rF9o=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"fYQnZtZyQP8wViNvXngMTGKlbNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqjzhL4FxkS8xk6vCfGET98rF9o="},{"type":"next-occurrence","id":"romwRf3/iinUJR4/CKh8sCCocMs="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"fYQnZtZyQP8wViNvXngMTGKlbNw=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"romwRf3/iinUJR4/CKh8sCCocMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqjzhL4FxkS8xk6vCfGET98rF9o="},{"type":"next-occurrence","id":"pxPg+FEDxWZbqI+5jXQL5aYaHPs="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"romwRf3/iinUJR4/CKh8sCCocMs=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"pxPg+FEDxWZbqI+5jXQL5aYaHPs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqjzhL4FxkS8xk6vCfGET98rF9o="},{"type":"next-occurrence","id":"gfrdr+JEGhFJpt8KrHxz3UtSyf8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"pxPg+FEDxWZbqI+5jXQL5aYaHPs=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"gfrdr+JEGhFJpt8KrHxz3UtSyf8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqjzhL4FxkS8xk6vCfGET98rF9o="},{"type":"next-occurrence","id":"2FfC3sgPthj4aYX54WMFU49rOdI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"gfrdr+JEGhFJpt8KrHxz3UtSyf8=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"2FfC3sgPthj4aYX54WMFU49rOdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqjzhL4FxkS8xk6vCfGET98rF9o="},{"type":"next-occurrence","id":"SIO6ePu8iRc27Qgo7tt8Mjgfv1c="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"2FfC3sgPthj4aYX54WMFU49rOdI=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"SIO6ePu8iRc27Qgo7tt8Mjgfv1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqjzhL4FxkS8xk6vCfGET98rF9o="},{"type":"next-occurrence","id":"QJsBWNCBENp5czcl+U7UAYYWU30="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"SIO6ePu8iRc27Qgo7tt8Mjgfv1c=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"QJsBWNCBENp5czcl+U7UAYYWU30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqjzhL4FxkS8xk6vCfGET98rF9o="},{"type":"next-occurrence","id":"B0BBvVs9yCsz0ytuEfbw1TUQGls="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"QJsBWNCBENp5czcl+U7UAYYWU30=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"B0BBvVs9yCsz0ytuEfbw1TUQGls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqjzhL4FxkS8xk6vCfGET98rF9o="},{"type":"next-occurrence","id":"CO2YrHcrbpruOS6Gn2tJdVqCiOg="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"B0BBvVs9yCsz0ytuEfbw1TUQGls=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"CO2YrHcrbpruOS6Gn2tJdVqCiOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqjzhL4FxkS8xk6vCfGET98rF9o="},{"type":"next-occurrence","id":"l+MqElq3/8VqR8vsIu3+6IbTjvo="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"CO2YrHcrbpruOS6Gn2tJdVqCiOg=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"l+MqElq3/8VqR8vsIu3+6IbTjvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqjzhL4FxkS8xk6vCfGET98rF9o="},{"type":"next-occurrence","id":"HGdzEp8xPbn0jPMcZcnpaMzuFW4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"l+MqElq3/8VqR8vsIu3+6IbTjvo=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T22:00:00Z","end_date":"2026-05-24T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"HGdzEp8xPbn0jPMcZcnpaMzuFW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqjzhL4FxkS8xk6vCfGET98rF9o="},{"type":"next-occurrence","id":"oEnceR1knnL2vu6Hly81iIqckUA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"HGdzEp8xPbn0jPMcZcnpaMzuFW4=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T23:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"oEnceR1knnL2vu6Hly81iIqckUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqjzhL4FxkS8xk6vCfGET98rF9o="},{"type":"next-occurrence","id":"An8hcqsLUSd8dDEy+mp4gIeke6U="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"oEnceR1knnL2vu6Hly81iIqckUA=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"An8hcqsLUSd8dDEy+mp4gIeke6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqjzhL4FxkS8xk6vCfGET98rF9o="},{"type":"next-occurrence","id":"oBA5kx+mV3fs2RPxA5CekOmqLvU="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"An8hcqsLUSd8dDEy+mp4gIeke6U=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"oBA5kx+mV3fs2RPxA5CekOmqLvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqjzhL4FxkS8xk6vCfGET98rF9o="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"oBA5kx+mV3fs2RPxA5CekOmqLvU=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"CvnBWSgtSnWVT0xlUmSwc25c57M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IgBmxUsdcIrnbb387Kz0ytoNNeY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"CvnBWSgtSnWVT0xlUmSwc25c57M=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"IgBmxUsdcIrnbb387Kz0ytoNNeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CvnBWSgtSnWVT0xlUmSwc25c57M="},{"type":"next-occurrence","id":"w2okxKYSXS5EHsr0+dV5bCaKPuU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"IgBmxUsdcIrnbb387Kz0ytoNNeY=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"w2okxKYSXS5EHsr0+dV5bCaKPuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CvnBWSgtSnWVT0xlUmSwc25c57M="},{"type":"next-occurrence","id":"8nhf/ZQrd+nPNUFftoCUa4uWbXk="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"w2okxKYSXS5EHsr0+dV5bCaKPuU=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"8nhf/ZQrd+nPNUFftoCUa4uWbXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CvnBWSgtSnWVT0xlUmSwc25c57M="},{"type":"next-occurrence","id":"5Sc0ExwowNwEOzXevRXbpPZml7Y="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"8nhf/ZQrd+nPNUFftoCUa4uWbXk=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"5Sc0ExwowNwEOzXevRXbpPZml7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CvnBWSgtSnWVT0xlUmSwc25c57M="},{"type":"next-occurrence","id":"iwUQAwY64SyBCf1bFWbaNAX6+K0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"5Sc0ExwowNwEOzXevRXbpPZml7Y=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T21:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"iwUQAwY64SyBCf1bFWbaNAX6+K0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CvnBWSgtSnWVT0xlUmSwc25c57M="},{"type":"next-occurrence","id":"W3sOnnbfkqx6Wu8nrylj8Kv1TSs="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"iwUQAwY64SyBCf1bFWbaNAX6+K0=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"W3sOnnbfkqx6Wu8nrylj8Kv1TSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CvnBWSgtSnWVT0xlUmSwc25c57M="},{"type":"next-occurrence","id":"8PEC0rvzu7jJjsI2Igf7GbuNxDU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"W3sOnnbfkqx6Wu8nrylj8Kv1TSs=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"8PEC0rvzu7jJjsI2Igf7GbuNxDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CvnBWSgtSnWVT0xlUmSwc25c57M="},{"type":"next-occurrence","id":"HdL3LhZBabD+PugAUYf0grePVgU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"8PEC0rvzu7jJjsI2Igf7GbuNxDU=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"HdL3LhZBabD+PugAUYf0grePVgU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CvnBWSgtSnWVT0xlUmSwc25c57M="},{"type":"next-occurrence","id":"a1gtKBlv0bctEn/zNWBgC4nBwiA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"HdL3LhZBabD+PugAUYf0grePVgU=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"a1gtKBlv0bctEn/zNWBgC4nBwiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CvnBWSgtSnWVT0xlUmSwc25c57M="},{"type":"next-occurrence","id":"D7ZXseMZ4fI5DNrytQEc5Mp0DgE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"a1gtKBlv0bctEn/zNWBgC4nBwiA=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"D7ZXseMZ4fI5DNrytQEc5Mp0DgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CvnBWSgtSnWVT0xlUmSwc25c57M="},{"type":"next-occurrence","id":"Lp3e/LhgWHCCwY9ZGdGoLZNF3zU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"D7ZXseMZ4fI5DNrytQEc5Mp0DgE=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T22:00:00Z","end_date":"2026-05-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"Lp3e/LhgWHCCwY9ZGdGoLZNF3zU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CvnBWSgtSnWVT0xlUmSwc25c57M="},{"type":"next-occurrence","id":"lBoKEcU7NJ3/ze+ZURS2Q7Veo2Q="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"Lp3e/LhgWHCCwY9ZGdGoLZNF3zU=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T21:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"lBoKEcU7NJ3/ze+ZURS2Q7Veo2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CvnBWSgtSnWVT0xlUmSwc25c57M="},{"type":"next-occurrence","id":"YhpZ0oAOtQVKNrNViD3okRRtKpw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"lBoKEcU7NJ3/ze+ZURS2Q7Veo2Q=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"YhpZ0oAOtQVKNrNViD3okRRtKpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CvnBWSgtSnWVT0xlUmSwc25c57M="},{"type":"next-occurrence","id":"dl15dZxphrUds5zzwqEZZbIHKjk="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"YhpZ0oAOtQVKNrNViD3okRRtKpw=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"dl15dZxphrUds5zzwqEZZbIHKjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CvnBWSgtSnWVT0xlUmSwc25c57M="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"dl15dZxphrUds5zzwqEZZbIHKjk=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"l/GFtUTfkD/r8Vrh66TdoXjQioo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"eYHjJQqB3Ye2VapSv3FEf79tpxw="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"l/GFtUTfkD/r8Vrh66TdoXjQioo=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"eYHjJQqB3Ye2VapSv3FEf79tpxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l/GFtUTfkD/r8Vrh66TdoXjQioo="},{"type":"next-occurrence","id":"EPBGAY/GD2OLecgwfbElipMYkbY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"eYHjJQqB3Ye2VapSv3FEf79tpxw=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"EPBGAY/GD2OLecgwfbElipMYkbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l/GFtUTfkD/r8Vrh66TdoXjQioo="},{"type":"next-occurrence","id":"INM4pENnw9OZiiVPWw6r0ox/gQg="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"EPBGAY/GD2OLecgwfbElipMYkbY=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"INM4pENnw9OZiiVPWw6r0ox/gQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l/GFtUTfkD/r8Vrh66TdoXjQioo="},{"type":"next-occurrence","id":"b3sSOUz12bKyCRylSVUi9Qqf8T8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"INM4pENnw9OZiiVPWw6r0ox/gQg=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T23:00:00Z","end_date":"2026-05-17T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"b3sSOUz12bKyCRylSVUi9Qqf8T8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l/GFtUTfkD/r8Vrh66TdoXjQioo="},{"type":"next-occurrence","id":"H9YTFcptWvG6Wc29tOBjfzhSr80="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"b3sSOUz12bKyCRylSVUi9Qqf8T8=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"H9YTFcptWvG6Wc29tOBjfzhSr80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l/GFtUTfkD/r8Vrh66TdoXjQioo="},{"type":"next-occurrence","id":"k/o+7BZFoXEX6oMQCqSdkt7uzOw="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"H9YTFcptWvG6Wc29tOBjfzhSr80=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"k/o+7BZFoXEX6oMQCqSdkt7uzOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l/GFtUTfkD/r8Vrh66TdoXjQioo="},{"type":"next-occurrence","id":"DylnhYp8v8RBURMgDY7AjzLVzhc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"k/o+7BZFoXEX6oMQCqSdkt7uzOw=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"DylnhYp8v8RBURMgDY7AjzLVzhc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l/GFtUTfkD/r8Vrh66TdoXjQioo="},{"type":"next-occurrence","id":"5943IeuBDGKu6Sq6UJGnKK4WOyI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"DylnhYp8v8RBURMgDY7AjzLVzhc=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"5943IeuBDGKu6Sq6UJGnKK4WOyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l/GFtUTfkD/r8Vrh66TdoXjQioo="},{"type":"next-occurrence","id":"Sw/HkigCuVx/PxE7KQ3goqLQeIA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"5943IeuBDGKu6Sq6UJGnKK4WOyI=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"Sw/HkigCuVx/PxE7KQ3goqLQeIA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l/GFtUTfkD/r8Vrh66TdoXjQioo="},{"type":"next-occurrence","id":"yhBWtXLaTKKgDvqBXdDmDdAHxd4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"Sw/HkigCuVx/PxE7KQ3goqLQeIA=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T23:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"yhBWtXLaTKKgDvqBXdDmDdAHxd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l/GFtUTfkD/r8Vrh66TdoXjQioo="},{"type":"next-occurrence","id":"FN8xO+jKesp4fnJ48bmTREBU2NQ="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"yhBWtXLaTKKgDvqBXdDmDdAHxd4=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T23:00:00Z","end_date":"2026-05-24T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"FN8xO+jKesp4fnJ48bmTREBU2NQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l/GFtUTfkD/r8Vrh66TdoXjQioo="},{"type":"next-occurrence","id":"JMKDZhjg2MdlZjyf34UNaLeClK8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"FN8xO+jKesp4fnJ48bmTREBU2NQ=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T23:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"JMKDZhjg2MdlZjyf34UNaLeClK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l/GFtUTfkD/r8Vrh66TdoXjQioo="},{"type":"next-occurrence","id":"mHZTtAlTa3G5+juOMKXKD1imXhM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"JMKDZhjg2MdlZjyf34UNaLeClK8=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T23:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"mHZTtAlTa3G5+juOMKXKD1imXhM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l/GFtUTfkD/r8Vrh66TdoXjQioo="},{"type":"next-occurrence","id":"EJKC7KK3UeK8GrUYmY7kkAMhOxQ="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"mHZTtAlTa3G5+juOMKXKD1imXhM=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T23:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"EJKC7KK3UeK8GrUYmY7kkAMhOxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l/GFtUTfkD/r8Vrh66TdoXjQioo="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"EJKC7KK3UeK8GrUYmY7kkAMhOxQ=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"on4qSZB68ruoV7AwhDlYJrybBqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"axSibJbIdVNhJvYHUcJSQkdeM9g="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"on4qSZB68ruoV7AwhDlYJrybBqQ=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"axSibJbIdVNhJvYHUcJSQkdeM9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"on4qSZB68ruoV7AwhDlYJrybBqQ="},{"type":"next-occurrence","id":"Zjg6C7kwc5VFfWBzYK3GklLu2a0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"axSibJbIdVNhJvYHUcJSQkdeM9g=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"Zjg6C7kwc5VFfWBzYK3GklLu2a0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"on4qSZB68ruoV7AwhDlYJrybBqQ="},{"type":"next-occurrence","id":"r4ryUSgaiXenL/tGRny/EdgW+GY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"Zjg6C7kwc5VFfWBzYK3GklLu2a0=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"r4ryUSgaiXenL/tGRny/EdgW+GY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"on4qSZB68ruoV7AwhDlYJrybBqQ="},{"type":"next-occurrence","id":"amhW4LjoqLO/zzEspBNHNMwfItE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"r4ryUSgaiXenL/tGRny/EdgW+GY=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"amhW4LjoqLO/zzEspBNHNMwfItE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"on4qSZB68ruoV7AwhDlYJrybBqQ="},{"type":"next-occurrence","id":"qG0WCnucHntKjTH1yGE45xPjSVE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"amhW4LjoqLO/zzEspBNHNMwfItE=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T21:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"qG0WCnucHntKjTH1yGE45xPjSVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"on4qSZB68ruoV7AwhDlYJrybBqQ="},{"type":"next-occurrence","id":"4mhq9k24h3SJMsbAi7/oDDmKga4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"qG0WCnucHntKjTH1yGE45xPjSVE=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"4mhq9k24h3SJMsbAi7/oDDmKga4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"on4qSZB68ruoV7AwhDlYJrybBqQ="},{"type":"next-occurrence","id":"bh7V2/YiqzWYBUTvLoowoJnMOtI="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"4mhq9k24h3SJMsbAi7/oDDmKga4=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"bh7V2/YiqzWYBUTvLoowoJnMOtI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"on4qSZB68ruoV7AwhDlYJrybBqQ="},{"type":"next-occurrence","id":"HXgkp1VU71pzgXJfQl/tkyCJk4k="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"bh7V2/YiqzWYBUTvLoowoJnMOtI=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"HXgkp1VU71pzgXJfQl/tkyCJk4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"on4qSZB68ruoV7AwhDlYJrybBqQ="},{"type":"next-occurrence","id":"w7iAdz5CnY3qU+Ks6peTycGB3aM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"HXgkp1VU71pzgXJfQl/tkyCJk4k=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"w7iAdz5CnY3qU+Ks6peTycGB3aM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"on4qSZB68ruoV7AwhDlYJrybBqQ="},{"type":"next-occurrence","id":"iwO7rEf1zEwID3hTrP60vsvoM+o="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"w7iAdz5CnY3qU+Ks6peTycGB3aM=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"iwO7rEf1zEwID3hTrP60vsvoM+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"on4qSZB68ruoV7AwhDlYJrybBqQ="},{"type":"next-occurrence","id":"QRiLBRNiWhnfo85qq/w49duQtjw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"iwO7rEf1zEwID3hTrP60vsvoM+o=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T22:00:00Z","end_date":"2026-05-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"QRiLBRNiWhnfo85qq/w49duQtjw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"on4qSZB68ruoV7AwhDlYJrybBqQ="},{"type":"next-occurrence","id":"CEVRknStQwIozfk/CY/W1g+Eo6Q="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"QRiLBRNiWhnfo85qq/w49duQtjw=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T21:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"CEVRknStQwIozfk/CY/W1g+Eo6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"on4qSZB68ruoV7AwhDlYJrybBqQ="},{"type":"next-occurrence","id":"qJieMeT2NeZc8NixcfKc0oAF5RY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"CEVRknStQwIozfk/CY/W1g+Eo6Q=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"qJieMeT2NeZc8NixcfKc0oAF5RY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"on4qSZB68ruoV7AwhDlYJrybBqQ="},{"type":"next-occurrence","id":"UD3he3uX1Fwrq47ZADZVbtLFApE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"qJieMeT2NeZc8NixcfKc0oAF5RY=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"UD3he3uX1Fwrq47ZADZVbtLFApE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"on4qSZB68ruoV7AwhDlYJrybBqQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"UD3he3uX1Fwrq47ZADZVbtLFApE=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"ik9r5Mi1D2KD1rVgnhdhyVvOzMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KnnXmmAVLTnJKzoyHmJ4DwnD4ko="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"ik9r5Mi1D2KD1rVgnhdhyVvOzMQ=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"KnnXmmAVLTnJKzoyHmJ4DwnD4ko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ik9r5Mi1D2KD1rVgnhdhyVvOzMQ="},{"type":"next-occurrence","id":"3EDR1+AFX709LJYP7vNBbLq18z8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"KnnXmmAVLTnJKzoyHmJ4DwnD4ko=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"3EDR1+AFX709LJYP7vNBbLq18z8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ik9r5Mi1D2KD1rVgnhdhyVvOzMQ="},{"type":"next-occurrence","id":"QM7zySx3w9n6Dyx9f94i+P6Xj8U="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"3EDR1+AFX709LJYP7vNBbLq18z8=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"QM7zySx3w9n6Dyx9f94i+P6Xj8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ik9r5Mi1D2KD1rVgnhdhyVvOzMQ="},{"type":"next-occurrence","id":"3PWCGK3q9HmLBDZkEMyVPOFN/jk="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"QM7zySx3w9n6Dyx9f94i+P6Xj8U=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T21:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"3PWCGK3q9HmLBDZkEMyVPOFN/jk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ik9r5Mi1D2KD1rVgnhdhyVvOzMQ="},{"type":"next-occurrence","id":"WwoJ/P3mJE9Pn+i0x8XJZ8z5Ygs="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"3PWCGK3q9HmLBDZkEMyVPOFN/jk=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T21:00:00Z","end_date":"2026-05-18T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"WwoJ/P3mJE9Pn+i0x8XJZ8z5Ygs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ik9r5Mi1D2KD1rVgnhdhyVvOzMQ="},{"type":"next-occurrence","id":"1DD0TMii4WRWFNMs4JvAWDNfGcI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"WwoJ/P3mJE9Pn+i0x8XJZ8z5Ygs=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"1DD0TMii4WRWFNMs4JvAWDNfGcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ik9r5Mi1D2KD1rVgnhdhyVvOzMQ="},{"type":"next-occurrence","id":"Ev2Vo5GQiG9kn8cCTdw/MAjYnCE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"1DD0TMii4WRWFNMs4JvAWDNfGcI=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"Ev2Vo5GQiG9kn8cCTdw/MAjYnCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ik9r5Mi1D2KD1rVgnhdhyVvOzMQ="},{"type":"next-occurrence","id":"tDj/JDFUuuADWB/3NoR+sA5F8L4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"Ev2Vo5GQiG9kn8cCTdw/MAjYnCE=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"tDj/JDFUuuADWB/3NoR+sA5F8L4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ik9r5Mi1D2KD1rVgnhdhyVvOzMQ="},{"type":"next-occurrence","id":"Fu/TlxFy/PjKxrb1o0LY3ibD2hw="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"tDj/JDFUuuADWB/3NoR+sA5F8L4=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"Fu/TlxFy/PjKxrb1o0LY3ibD2hw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ik9r5Mi1D2KD1rVgnhdhyVvOzMQ="},{"type":"next-occurrence","id":"xXaNBUr+vpQnm6XebOe+1FCjr3k="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"Fu/TlxFy/PjKxrb1o0LY3ibD2hw=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"xXaNBUr+vpQnm6XebOe+1FCjr3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ik9r5Mi1D2KD1rVgnhdhyVvOzMQ="},{"type":"next-occurrence","id":"j4R8efgWhNUantLx4PB9IbzEDEI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"xXaNBUr+vpQnm6XebOe+1FCjr3k=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T21:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"j4R8efgWhNUantLx4PB9IbzEDEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ik9r5Mi1D2KD1rVgnhdhyVvOzMQ="},{"type":"next-occurrence","id":"KaS5dktl+BRelQjmBlhZ7fYL+jw="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"j4R8efgWhNUantLx4PB9IbzEDEI=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T21:00:00Z","end_date":"2026-05-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"KaS5dktl+BRelQjmBlhZ7fYL+jw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ik9r5Mi1D2KD1rVgnhdhyVvOzMQ="},{"type":"next-occurrence","id":"QAJhEFfsJXv5cUERmy47EOYu3UY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"KaS5dktl+BRelQjmBlhZ7fYL+jw=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"QAJhEFfsJXv5cUERmy47EOYu3UY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ik9r5Mi1D2KD1rVgnhdhyVvOzMQ="},{"type":"next-occurrence","id":"3iQdusPmpC+WxR83sLhM6sjPgjE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"QAJhEFfsJXv5cUERmy47EOYu3UY=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"3iQdusPmpC+WxR83sLhM6sjPgjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ik9r5Mi1D2KD1rVgnhdhyVvOzMQ="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"3iQdusPmpC+WxR83sLhM6sjPgjE=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"fqe/BlZfAW3KKG2vprAZaseVo9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Z4zJWV2vtiLi4Cy/aWNvEfwMXvM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"fqe/BlZfAW3KKG2vprAZaseVo9s=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"Z4zJWV2vtiLi4Cy/aWNvEfwMXvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fqe/BlZfAW3KKG2vprAZaseVo9s="},{"type":"next-occurrence","id":"tPNNnMIWP6oCzi/BxvDswpoHtIw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"Z4zJWV2vtiLi4Cy/aWNvEfwMXvM=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"tPNNnMIWP6oCzi/BxvDswpoHtIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fqe/BlZfAW3KKG2vprAZaseVo9s="},{"type":"next-occurrence","id":"s+nn9n6FaObGhFWyLuv6etsGgFE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"tPNNnMIWP6oCzi/BxvDswpoHtIw=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"s+nn9n6FaObGhFWyLuv6etsGgFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fqe/BlZfAW3KKG2vprAZaseVo9s="},{"type":"next-occurrence","id":"X6YzZEn+DIm++f51FRDgLeg4z8I="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"s+nn9n6FaObGhFWyLuv6etsGgFE=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"X6YzZEn+DIm++f51FRDgLeg4z8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fqe/BlZfAW3KKG2vprAZaseVo9s="},{"type":"next-occurrence","id":"CUl85eNlodEctvbrXNaKsr8T5qE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"X6YzZEn+DIm++f51FRDgLeg4z8I=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T21:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"CUl85eNlodEctvbrXNaKsr8T5qE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fqe/BlZfAW3KKG2vprAZaseVo9s="},{"type":"next-occurrence","id":"C6teJlai0Z7SGAk4S0StgqUJNdA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"CUl85eNlodEctvbrXNaKsr8T5qE=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"C6teJlai0Z7SGAk4S0StgqUJNdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fqe/BlZfAW3KKG2vprAZaseVo9s="},{"type":"next-occurrence","id":"YMhk8mCamZ4MFv2Fytlt67myjDs="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"C6teJlai0Z7SGAk4S0StgqUJNdA=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"YMhk8mCamZ4MFv2Fytlt67myjDs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fqe/BlZfAW3KKG2vprAZaseVo9s="},{"type":"next-occurrence","id":"uvUXUH92UMmQ78XBxNbsIcUamhE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"YMhk8mCamZ4MFv2Fytlt67myjDs=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"uvUXUH92UMmQ78XBxNbsIcUamhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fqe/BlZfAW3KKG2vprAZaseVo9s="},{"type":"next-occurrence","id":"AChuggeDCSKUbfPQh5abEX4Nn2o="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"uvUXUH92UMmQ78XBxNbsIcUamhE=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"AChuggeDCSKUbfPQh5abEX4Nn2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fqe/BlZfAW3KKG2vprAZaseVo9s="},{"type":"next-occurrence","id":"oslOxbOH+1fC4DtcI6easQMGv3o="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"AChuggeDCSKUbfPQh5abEX4Nn2o=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"oslOxbOH+1fC4DtcI6easQMGv3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fqe/BlZfAW3KKG2vprAZaseVo9s="},{"type":"next-occurrence","id":"0UVDOikM/vmjmyXvorUKCqYAuxs="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"oslOxbOH+1fC4DtcI6easQMGv3o=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T22:00:00Z","end_date":"2026-05-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"0UVDOikM/vmjmyXvorUKCqYAuxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fqe/BlZfAW3KKG2vprAZaseVo9s="},{"type":"next-occurrence","id":"Hg/bVY85b485wqxK+kO3J5yTruo="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"0UVDOikM/vmjmyXvorUKCqYAuxs=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T21:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"Hg/bVY85b485wqxK+kO3J5yTruo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fqe/BlZfAW3KKG2vprAZaseVo9s="},{"type":"next-occurrence","id":"D+0lnklK3qJ6BnJpB1UbHqkmN9U="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"Hg/bVY85b485wqxK+kO3J5yTruo=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"D+0lnklK3qJ6BnJpB1UbHqkmN9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fqe/BlZfAW3KKG2vprAZaseVo9s="},{"type":"next-occurrence","id":"LUHMRgaGvJcaFilY0GBlUywZIoU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"D+0lnklK3qJ6BnJpB1UbHqkmN9U=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"LUHMRgaGvJcaFilY0GBlUywZIoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fqe/BlZfAW3KKG2vprAZaseVo9s="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"LUHMRgaGvJcaFilY0GBlUywZIoU=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"uMkG3vMxPXCHvpz4xrFESQvTjEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WNeSPet+gkCUTPKr7XEVCDuS63Y="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"uMkG3vMxPXCHvpz4xrFESQvTjEc=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T05:00:00Z","end_date":"2026-05-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"WNeSPet+gkCUTPKr7XEVCDuS63Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMkG3vMxPXCHvpz4xrFESQvTjEc="},{"type":"next-occurrence","id":"zP2CVqH4udwKdJ1CAzGxMT96QcE="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"WNeSPet+gkCUTPKr7XEVCDuS63Y=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"zP2CVqH4udwKdJ1CAzGxMT96QcE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMkG3vMxPXCHvpz4xrFESQvTjEc="},{"type":"next-occurrence","id":"26OHOlew04Gh708HLAbUh1Ze/P0="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"zP2CVqH4udwKdJ1CAzGxMT96QcE=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"26OHOlew04Gh708HLAbUh1Ze/P0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMkG3vMxPXCHvpz4xrFESQvTjEc="},{"type":"next-occurrence","id":"WrIzLOcC7Vaz/WETjpcazKo6SC0="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"26OHOlew04Gh708HLAbUh1Ze/P0=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"WrIzLOcC7Vaz/WETjpcazKo6SC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMkG3vMxPXCHvpz4xrFESQvTjEc="},{"type":"next-occurrence","id":"yFpir8nAaQxiEqmlx2RVuCmLcnU="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"WrIzLOcC7Vaz/WETjpcazKo6SC0=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T05:00:00Z","end_date":"2026-05-17T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"yFpir8nAaQxiEqmlx2RVuCmLcnU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMkG3vMxPXCHvpz4xrFESQvTjEc="},{"type":"next-occurrence","id":"llPb+mrp8E08vnuj6h6iGxizjL8="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"yFpir8nAaQxiEqmlx2RVuCmLcnU=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T05:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"llPb+mrp8E08vnuj6h6iGxizjL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMkG3vMxPXCHvpz4xrFESQvTjEc="},{"type":"next-occurrence","id":"t5vJ7C6R144a5M7177mHqYR8Gh8="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"llPb+mrp8E08vnuj6h6iGxizjL8=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T02:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"t5vJ7C6R144a5M7177mHqYR8Gh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMkG3vMxPXCHvpz4xrFESQvTjEc="},{"type":"next-occurrence","id":"cLjLX8eKCmARhOza6AcdGu5YxhY="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"t5vJ7C6R144a5M7177mHqYR8Gh8=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T02:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"cLjLX8eKCmARhOza6AcdGu5YxhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMkG3vMxPXCHvpz4xrFESQvTjEc="},{"type":"next-occurrence","id":"KOv927NMImflIJKA3uvjTSyR5jc="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"cLjLX8eKCmARhOza6AcdGu5YxhY=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T02:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"KOv927NMImflIJKA3uvjTSyR5jc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMkG3vMxPXCHvpz4xrFESQvTjEc="},{"type":"next-occurrence","id":"IZ+fFUNWYhdAVEHVWAXjKaOoujQ="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"KOv927NMImflIJKA3uvjTSyR5jc=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T02:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"IZ+fFUNWYhdAVEHVWAXjKaOoujQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMkG3vMxPXCHvpz4xrFESQvTjEc="},{"type":"next-occurrence","id":"6SNavHrnTyLlENT7KVA0JHLFNh4="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"IZ+fFUNWYhdAVEHVWAXjKaOoujQ=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T02:00:00Z","end_date":"2026-05-23T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"6SNavHrnTyLlENT7KVA0JHLFNh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMkG3vMxPXCHvpz4xrFESQvTjEc="},{"type":"next-occurrence","id":"5td02Hut1OvRXrYqR4k3yytopvI="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"6SNavHrnTyLlENT7KVA0JHLFNh4=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T05:00:00Z","end_date":"2026-05-24T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"5td02Hut1OvRXrYqR4k3yytopvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMkG3vMxPXCHvpz4xrFESQvTjEc="},{"type":"next-occurrence","id":"+BuuI7XyqszyVph3V2Lcz1ncD74="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"5td02Hut1OvRXrYqR4k3yytopvI=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T05:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"+BuuI7XyqszyVph3V2Lcz1ncD74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMkG3vMxPXCHvpz4xrFESQvTjEc="},{"type":"next-occurrence","id":"7GdK+kfYPo/CbeAyMLuMcV1Q7vw="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"+BuuI7XyqszyVph3V2Lcz1ncD74=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T02:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"7GdK+kfYPo/CbeAyMLuMcV1Q7vw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMkG3vMxPXCHvpz4xrFESQvTjEc="},{"type":"next-occurrence","id":"TRTtTq4I5ZdZnd2b/Y1vNC0xWWw="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"7GdK+kfYPo/CbeAyMLuMcV1Q7vw=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T02:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"TRTtTq4I5ZdZnd2b/Y1vNC0xWWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMkG3vMxPXCHvpz4xrFESQvTjEc="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"TRTtTq4I5ZdZnd2b/Y1vNC0xWWw=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T02:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"ldfAQ7ridAarQR/9L7AcYRDvePI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HOLABIRD AVE"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on HOLABIRD AVE both directions between WHITING ST (Winchester) and CT-8 (Winchester) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T02:07:15Z"},"road_event_id":"ldfAQ7ridAarQR/9L7AcYRDvePI=","beginning_cross_street":"WHITING ST","ending_cross_street":"CT-8","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.059289,41.923719]]}},{"id":"rIDBwQI0MqdQjFB+zvTixAo56Rw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLAY ST"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on CLAY ST both directions between RANDOLPH AVE (Thomaston) and UNION ST at ELM ST (Thomaston) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:50:21Z"},"road_event_id":"rIDBwQI0MqdQjFB+zvTixAo56Rw=","beginning_cross_street":"RANDOLPH AVE","ending_cross_street":"ELM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.077,41.677265]]}},{"id":"VVA2HgwE2NpSiA4j4RHrwzydbzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-262"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on CT-262 eastbound between FERN HILL RD (Watertown) and CT-262 (Watertown) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T02:02:58Z"},"road_event_id":"VVA2HgwE2NpSiA4j4RHrwzydbzQ=","beginning_cross_street":"FERN HILL RD","ending_cross_street":"CT-262","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107738,41.621755]]}},{"id":"dckMpdd8IlxOsMGCorBmn8og6hk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ELM ST"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on ELM ST both directions between UNION ST (Thomaston) and MEADOW ST at CENTER ST (Thomaston) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:48:12Z"},"road_event_id":"dckMpdd8IlxOsMGCorBmn8og6hk=","beginning_cross_street":"UNION ST","ending_cross_street":"CENTER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.07382,41.671079]]}},{"id":"ORC300447549","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","description":"Roadwork on NJ 38 Eastbound At Cherry Hill Mall (Cherry Hill Twp) Friday June 6, 2025 09:00 AM thru 03:00 PM, 1 left lane of 3 lanes closed","update_date":"2025-06-06T19:00:18Z"},"road_event_id":"ORC300447549","beginning_cross_street":"Cherry Hill Mall","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-05T21:01:14Z","end_date":"2025-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-75.022666,39.939041]]}},{"id":"F/SI2vE6HAT0ajKde6UJDCtuxF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MOUNTAIN RD"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on MOUNTAIN RD both directions between CT-189 (Simsbury) and CT-189 (Bloomfield) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:35:42Z"},"road_event_id":"F/SI2vE6HAT0ajKde6UJDCtuxF4=","beginning_cross_street":"CT-189","ending_cross_street":"CT-189","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.761415,41.908119]]}},{"id":"OVqPiZWkXSrh5LIeTBTOKkFpo9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q32 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction eastbound, Q32 Bus at Roosevelt Av/61 St (New York) stop has been relocated through September 2026. Buses are making a temporary stop on Roosevelt Ave at 61st St before the intersection., Continuous Friday September 15th, 2023 11:45 AM thru Wednesday September 30th, 2026 11:59 PM","update_date":"2026-01-07T13:19:57Z"},"road_event_id":"OVqPiZWkXSrh5LIeTBTOKkFpo9s=","beginning_cross_street":"Roosevelt Av/61 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903548,40.745562]]}},{"id":"21ZQurR6z9aliosciwA9JFToITM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M20 Bus and M55 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, M20 Bus and M55 Bus at State St/Bridge St (New York) stop is closed. Use the temporary stop on State St before the intersection instead., Continuous Monday April 14th, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM","update_date":"2025-04-13T22:07:57Z"},"road_event_id":"21ZQurR6z9aliosciwA9JFToITM=","beginning_cross_street":"State St/Bridge St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.014524,40.70335]]}},{"id":"ifvboS46fpUYRtwj2O7Pveev37M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"p5Q0hq/BLkb/yLGprDfH4cvX4ZY="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for East Side Coast Resiliency., Saturday March 8th,2025 thru Saturday April 1st,2028, Saturday, 08:00 AM thru 04:00 PM All lanes closed eastbound,","update_date":"2025-03-28T20:00:04Z"},"road_event_id":"ifvboS46fpUYRtwj2O7Pveev37M=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975417,40.73297]]}},{"id":"p5Q0hq/BLkb/yLGprDfH4cvX4ZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ifvboS46fpUYRtwj2O7Pveev37M="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for East Side Coast Resiliency., Saturday March 8th,2025 thru Saturday April 1st,2028, Saturday, 08:00 AM thru 04:00 PM All lanes closed eastbound,","update_date":"2025-03-28T20:00:04Z"},"road_event_id":"p5Q0hq/BLkb/yLGprDfH4cvX4ZY=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975417,40.73297]]}},{"id":"p85zlI0i8G6ZGnjQ9NqTuCUmyAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, Hudson bypassing Breakneck Ridge (Fishkill), Continuous Monday April 21st, 2025 12:00 AM thru Wednesday April 21st, 2027 11:59 PM bypassing","update_date":"2025-04-14T15:42:22Z"},"road_event_id":"p85zlI0i8G6ZGnjQ9NqTuCUmyAo=","beginning_cross_street":"Breakneck Ridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982449,41.450181]]}},{"id":"doEW2C5StMUaiNf8uE74DUy9Ezs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 126"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JGpXwTl00Asz4TV6zgoNl2mGR2Y="}],"description":"Intersection improvements on NY 126 both directions (Wilna) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open to traffic","update_date":"2026-04-17T19:19:24Z"},"road_event_id":"doEW2C5StMUaiNf8uE74DUy9Ezs=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.609625,43.977898]]}},{"id":"JGpXwTl00Asz4TV6zgoNl2mGR2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 126"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"doEW2C5StMUaiNf8uE74DUy9Ezs="},{"type":"next-occurrence","id":"dSbfJEtLynq3r6MANdvSA6nLw6o="}],"description":"Intersection improvements on NY 126 both directions (Wilna) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open to traffic","update_date":"2026-04-17T19:19:24Z"},"road_event_id":"JGpXwTl00Asz4TV6zgoNl2mGR2Y=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T04:00:00Z","end_date":"2026-05-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.609625,43.977898]]}},{"id":"dSbfJEtLynq3r6MANdvSA6nLw6o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 126"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"doEW2C5StMUaiNf8uE74DUy9Ezs="}],"description":"Intersection improvements on NY 126 both directions (Wilna) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open to traffic","update_date":"2026-04-17T19:19:24Z"},"road_event_id":"dSbfJEtLynq3r6MANdvSA6nLw6o=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.609625,43.977898]]}},{"id":"I9No0XXJGPtAqrmmkG+YcQiHkI4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/Ijbw47ejdtSjkdZQ2OMn8oSeoY="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"I9No0XXJGPtAqrmmkG+YcQiHkI4=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"/Ijbw47ejdtSjkdZQ2OMn8oSeoY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I9No0XXJGPtAqrmmkG+YcQiHkI4="},{"type":"next-occurrence","id":"VJePtN2Jg52ZLcNM5l7d+1LV+L0="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"/Ijbw47ejdtSjkdZQ2OMn8oSeoY=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"VJePtN2Jg52ZLcNM5l7d+1LV+L0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I9No0XXJGPtAqrmmkG+YcQiHkI4="},{"type":"next-occurrence","id":"KiIdBMI4bWwJTgq0kqcr0TTenos="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"VJePtN2Jg52ZLcNM5l7d+1LV+L0=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"KiIdBMI4bWwJTgq0kqcr0TTenos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I9No0XXJGPtAqrmmkG+YcQiHkI4="},{"type":"next-occurrence","id":"JdLvKHaGI67+4tXw3Jg+u4IrNWk="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"KiIdBMI4bWwJTgq0kqcr0TTenos=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"JdLvKHaGI67+4tXw3Jg+u4IrNWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I9No0XXJGPtAqrmmkG+YcQiHkI4="},{"type":"next-occurrence","id":"TEYhCIl/8AxgbuT0AEltkaOP7VM="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"JdLvKHaGI67+4tXw3Jg+u4IrNWk=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"TEYhCIl/8AxgbuT0AEltkaOP7VM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I9No0XXJGPtAqrmmkG+YcQiHkI4="},{"type":"next-occurrence","id":"30501EaouG0pm2gkxAlchW/3HzM="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"TEYhCIl/8AxgbuT0AEltkaOP7VM=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"30501EaouG0pm2gkxAlchW/3HzM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I9No0XXJGPtAqrmmkG+YcQiHkI4="},{"type":"next-occurrence","id":"Mo1RjHYJTYEV4Hqz/EnxhWA6rjA="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"30501EaouG0pm2gkxAlchW/3HzM=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"Mo1RjHYJTYEV4Hqz/EnxhWA6rjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I9No0XXJGPtAqrmmkG+YcQiHkI4="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"Mo1RjHYJTYEV4Hqz/EnxhWA6rjA=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"6gp/hoV6+afXgYXF0rQh9dQVOL4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LJCrq+cyNcnRMcvcfivKndAPsnY="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"6gp/hoV6+afXgYXF0rQh9dQVOL4=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"LJCrq+cyNcnRMcvcfivKndAPsnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6gp/hoV6+afXgYXF0rQh9dQVOL4="},{"type":"next-occurrence","id":"7g9Dccmy4QteL4VIBpXanqI5Q5I="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"LJCrq+cyNcnRMcvcfivKndAPsnY=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"7g9Dccmy4QteL4VIBpXanqI5Q5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6gp/hoV6+afXgYXF0rQh9dQVOL4="},{"type":"next-occurrence","id":"qOGSoTcnfHAPEYeJ8hfFIhHWmDo="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"7g9Dccmy4QteL4VIBpXanqI5Q5I=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"qOGSoTcnfHAPEYeJ8hfFIhHWmDo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6gp/hoV6+afXgYXF0rQh9dQVOL4="},{"type":"next-occurrence","id":"TIgiXnPWxHJ57O+NEaQVr2ln93M="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"qOGSoTcnfHAPEYeJ8hfFIhHWmDo=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"TIgiXnPWxHJ57O+NEaQVr2ln93M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6gp/hoV6+afXgYXF0rQh9dQVOL4="},{"type":"next-occurrence","id":"1B5GJNx6rruW1FpPu45z/nmMMP8="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"TIgiXnPWxHJ57O+NEaQVr2ln93M=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"1B5GJNx6rruW1FpPu45z/nmMMP8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6gp/hoV6+afXgYXF0rQh9dQVOL4="},{"type":"next-occurrence","id":"ElFTb4C8pfdOiTc0M96ACu2IM68="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"1B5GJNx6rruW1FpPu45z/nmMMP8=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"ElFTb4C8pfdOiTc0M96ACu2IM68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6gp/hoV6+afXgYXF0rQh9dQVOL4="},{"type":"next-occurrence","id":"WNDYrKb5JcLY3B7QVE3FEbCrxhk="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"ElFTb4C8pfdOiTc0M96ACu2IM68=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"WNDYrKb5JcLY3B7QVE3FEbCrxhk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6gp/hoV6+afXgYXF0rQh9dQVOL4="},{"type":"next-occurrence","id":"natdZqRNA7NMr8tOJwWi/voEoVc="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"WNDYrKb5JcLY3B7QVE3FEbCrxhk=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"natdZqRNA7NMr8tOJwWi/voEoVc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6gp/hoV6+afXgYXF0rQh9dQVOL4="},{"type":"next-occurrence","id":"qmIWjSojTd5a56KI94DgjVs7qGY="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"natdZqRNA7NMr8tOJwWi/voEoVc=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"qmIWjSojTd5a56KI94DgjVs7qGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6gp/hoV6+afXgYXF0rQh9dQVOL4="},{"type":"next-occurrence","id":"EyxrYAW669qKK+NAQe+78Pmm5ms="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"qmIWjSojTd5a56KI94DgjVs7qGY=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"EyxrYAW669qKK+NAQe+78Pmm5ms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6gp/hoV6+afXgYXF0rQh9dQVOL4="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"EyxrYAW669qKK+NAQe+78Pmm5ms=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"905GJQJvHJkE4k4crBo7efllBVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gZ1Ouaur3ZSz89IGqJpj8z65IHo="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"905GJQJvHJkE4k4crBo7efllBVA=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"gZ1Ouaur3ZSz89IGqJpj8z65IHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"905GJQJvHJkE4k4crBo7efllBVA="},{"type":"next-occurrence","id":"vtmTY4aiB4te2GWkpSuZ0oWlC5E="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"gZ1Ouaur3ZSz89IGqJpj8z65IHo=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"vtmTY4aiB4te2GWkpSuZ0oWlC5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"905GJQJvHJkE4k4crBo7efllBVA="},{"type":"next-occurrence","id":"JGb5mngl+tCQI/MqUmGMRgGwfs0="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"vtmTY4aiB4te2GWkpSuZ0oWlC5E=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"JGb5mngl+tCQI/MqUmGMRgGwfs0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"905GJQJvHJkE4k4crBo7efllBVA="},{"type":"next-occurrence","id":"G7oLVvsTqkMJAth3Lej0HmVy+7g="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"JGb5mngl+tCQI/MqUmGMRgGwfs0=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"G7oLVvsTqkMJAth3Lej0HmVy+7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"905GJQJvHJkE4k4crBo7efllBVA="},{"type":"next-occurrence","id":"APoBnvlH25iLw8CGXI+3ZyLdSHQ="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"G7oLVvsTqkMJAth3Lej0HmVy+7g=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"APoBnvlH25iLw8CGXI+3ZyLdSHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"905GJQJvHJkE4k4crBo7efllBVA="},{"type":"next-occurrence","id":"6iZABMTUwqmNrjxK/d7bedB8Btc="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"APoBnvlH25iLw8CGXI+3ZyLdSHQ=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"6iZABMTUwqmNrjxK/d7bedB8Btc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"905GJQJvHJkE4k4crBo7efllBVA="},{"type":"next-occurrence","id":"feQbQmrRQBEHIWkrY79NKsNYFJs="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"6iZABMTUwqmNrjxK/d7bedB8Btc=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"feQbQmrRQBEHIWkrY79NKsNYFJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"905GJQJvHJkE4k4crBo7efllBVA="},{"type":"next-occurrence","id":"TaI4s1BHakktUaACi7lUIBa013U="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"feQbQmrRQBEHIWkrY79NKsNYFJs=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"TaI4s1BHakktUaACi7lUIBa013U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"905GJQJvHJkE4k4crBo7efllBVA="},{"type":"next-occurrence","id":"ohg9L0NXCSbwA8LySnaEH1BmkLg="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"TaI4s1BHakktUaACi7lUIBa013U=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"ohg9L0NXCSbwA8LySnaEH1BmkLg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"905GJQJvHJkE4k4crBo7efllBVA="},{"type":"next-occurrence","id":"FSSKzHXcVZ+WoMpqsEKcWjInMkc="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"ohg9L0NXCSbwA8LySnaEH1BmkLg=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"FSSKzHXcVZ+WoMpqsEKcWjInMkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"905GJQJvHJkE4k4crBo7efllBVA="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"FSSKzHXcVZ+WoMpqsEKcWjInMkc=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"UwJKNxMDo3pb1+htQBVctTiR6q0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"skDm5IxQymhJ8Jvs8qfc+Tb8hxw="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"UwJKNxMDo3pb1+htQBVctTiR6q0=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"skDm5IxQymhJ8Jvs8qfc+Tb8hxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwJKNxMDo3pb1+htQBVctTiR6q0="},{"type":"next-occurrence","id":"vZP1ugBCBAIroePEEf07JgFM3eI="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"skDm5IxQymhJ8Jvs8qfc+Tb8hxw=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"vZP1ugBCBAIroePEEf07JgFM3eI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwJKNxMDo3pb1+htQBVctTiR6q0="},{"type":"next-occurrence","id":"kPAVkN178HO6HI/K8+91vOyMyNo="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"vZP1ugBCBAIroePEEf07JgFM3eI=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"kPAVkN178HO6HI/K8+91vOyMyNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwJKNxMDo3pb1+htQBVctTiR6q0="},{"type":"next-occurrence","id":"OKdNsT23X4x77bHbS6DjT/Zy0lw="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"kPAVkN178HO6HI/K8+91vOyMyNo=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"OKdNsT23X4x77bHbS6DjT/Zy0lw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwJKNxMDo3pb1+htQBVctTiR6q0="},{"type":"next-occurrence","id":"9vtvVeyo9Ke0lkf53mcMhYydwTY="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"OKdNsT23X4x77bHbS6DjT/Zy0lw=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"9vtvVeyo9Ke0lkf53mcMhYydwTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwJKNxMDo3pb1+htQBVctTiR6q0="},{"type":"next-occurrence","id":"Bb0JoLtR+BXo15GhvzH6K9Gj9hc="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"9vtvVeyo9Ke0lkf53mcMhYydwTY=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"Bb0JoLtR+BXo15GhvzH6K9Gj9hc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwJKNxMDo3pb1+htQBVctTiR6q0="},{"type":"next-occurrence","id":"D/LWFcxc9k+O7K6au/13ov1XFXw="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"Bb0JoLtR+BXo15GhvzH6K9Gj9hc=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"D/LWFcxc9k+O7K6au/13ov1XFXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwJKNxMDo3pb1+htQBVctTiR6q0="},{"type":"next-occurrence","id":"GQ0RKml5NjEol3Ij5h4x/fEiGn4="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"D/LWFcxc9k+O7K6au/13ov1XFXw=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"GQ0RKml5NjEol3Ij5h4x/fEiGn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwJKNxMDo3pb1+htQBVctTiR6q0="},{"type":"next-occurrence","id":"wbe0S2sxNe+sMmdf4cpa3mdwET4="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"GQ0RKml5NjEol3Ij5h4x/fEiGn4=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"wbe0S2sxNe+sMmdf4cpa3mdwET4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwJKNxMDo3pb1+htQBVctTiR6q0="},{"type":"next-occurrence","id":"ryGKtCfB25V/x6gc9Lpzq8lUIUg="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"wbe0S2sxNe+sMmdf4cpa3mdwET4=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"ryGKtCfB25V/x6gc9Lpzq8lUIUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwJKNxMDo3pb1+htQBVctTiR6q0="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"ryGKtCfB25V/x6gc9Lpzq8lUIUg=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"rWYDABN45ZwgKxQH6tmgsRNZu3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ygOns+U/li8/Az0LEn5XCCl2grI="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"rWYDABN45ZwgKxQH6tmgsRNZu3A=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"ygOns+U/li8/Az0LEn5XCCl2grI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rWYDABN45ZwgKxQH6tmgsRNZu3A="},{"type":"next-occurrence","id":"CkVMSuYY+rDCfQR16JKwNB2Ie3k="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"ygOns+U/li8/Az0LEn5XCCl2grI=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"CkVMSuYY+rDCfQR16JKwNB2Ie3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rWYDABN45ZwgKxQH6tmgsRNZu3A="},{"type":"next-occurrence","id":"40rbtmleMckrrh8uU081n/vG60g="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"CkVMSuYY+rDCfQR16JKwNB2Ie3k=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"40rbtmleMckrrh8uU081n/vG60g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rWYDABN45ZwgKxQH6tmgsRNZu3A="},{"type":"next-occurrence","id":"ZjQHSbljkWJIyqXaDtws8Viu5mc="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"40rbtmleMckrrh8uU081n/vG60g=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"ZjQHSbljkWJIyqXaDtws8Viu5mc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rWYDABN45ZwgKxQH6tmgsRNZu3A="},{"type":"next-occurrence","id":"5TbT/FwVKHvAOgd0Oe7Vep0aC5w="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"ZjQHSbljkWJIyqXaDtws8Viu5mc=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"5TbT/FwVKHvAOgd0Oe7Vep0aC5w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rWYDABN45ZwgKxQH6tmgsRNZu3A="},{"type":"next-occurrence","id":"0CT97cms14V8S/QJNc/TUn9dyo4="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"5TbT/FwVKHvAOgd0Oe7Vep0aC5w=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"0CT97cms14V8S/QJNc/TUn9dyo4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rWYDABN45ZwgKxQH6tmgsRNZu3A="},{"type":"next-occurrence","id":"WcD5YNZTkDF/bhIVeeMeswr0uo4="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"0CT97cms14V8S/QJNc/TUn9dyo4=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"WcD5YNZTkDF/bhIVeeMeswr0uo4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rWYDABN45ZwgKxQH6tmgsRNZu3A="},{"type":"next-occurrence","id":"dYUQ9iu7VIicq4ZDKs5jtkddEgc="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"WcD5YNZTkDF/bhIVeeMeswr0uo4=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"dYUQ9iu7VIicq4ZDKs5jtkddEgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rWYDABN45ZwgKxQH6tmgsRNZu3A="},{"type":"next-occurrence","id":"D2wHBCyAL/g/Je4PO+YYiy26B68="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"dYUQ9iu7VIicq4ZDKs5jtkddEgc=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"D2wHBCyAL/g/Je4PO+YYiy26B68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rWYDABN45ZwgKxQH6tmgsRNZu3A="},{"type":"next-occurrence","id":"svo0sComLoDWBykBChgqSvWF4U0="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"D2wHBCyAL/g/Je4PO+YYiy26B68=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"svo0sComLoDWBykBChgqSvWF4U0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rWYDABN45ZwgKxQH6tmgsRNZu3A="},{"type":"next-occurrence","id":"bVqJSA8legloPcCM9Jyi1GVtQ1Q="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"svo0sComLoDWBykBChgqSvWF4U0=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"bVqJSA8legloPcCM9Jyi1GVtQ1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rWYDABN45ZwgKxQH6tmgsRNZu3A="},{"type":"next-occurrence","id":"fdIDM4cwaUGUGn3L0Y3MRk3AzOY="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"bVqJSA8legloPcCM9Jyi1GVtQ1Q=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T11:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"fdIDM4cwaUGUGn3L0Y3MRk3AzOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rWYDABN45ZwgKxQH6tmgsRNZu3A="},{"type":"next-occurrence","id":"zEoOkVdv8Q/i/LFIvdsPsK9zoSY="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"fdIDM4cwaUGUGn3L0Y3MRk3AzOY=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"zEoOkVdv8Q/i/LFIvdsPsK9zoSY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rWYDABN45ZwgKxQH6tmgsRNZu3A="},{"type":"next-occurrence","id":"4eMWhOIjSEtG0IrOJYuziY5iU5Q="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"zEoOkVdv8Q/i/LFIvdsPsK9zoSY=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"4eMWhOIjSEtG0IrOJYuziY5iU5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rWYDABN45ZwgKxQH6tmgsRNZu3A="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"4eMWhOIjSEtG0IrOJYuziY5iU5Q=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"uIOlVkWftq/whr/5zU1REkzS5WE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uKvIy+iw9VFZ1mG8N22Pvb5Razk="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-04T12:47:31Z"},"road_event_id":"uIOlVkWftq/whr/5zU1REkzS5WE=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"uKvIy+iw9VFZ1mG8N22Pvb5Razk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uIOlVkWftq/whr/5zU1REkzS5WE="},{"type":"next-occurrence","id":"3tWRs16pFYeNMyWjlIgoaa97CaA="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-04T12:47:31Z"},"road_event_id":"uKvIy+iw9VFZ1mG8N22Pvb5Razk=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"3tWRs16pFYeNMyWjlIgoaa97CaA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uIOlVkWftq/whr/5zU1REkzS5WE="},{"type":"next-occurrence","id":"StOfR9E6RNe06MMk7ZjnmXl15QY="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-04T12:47:31Z"},"road_event_id":"3tWRs16pFYeNMyWjlIgoaa97CaA=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"StOfR9E6RNe06MMk7ZjnmXl15QY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uIOlVkWftq/whr/5zU1REkzS5WE="},{"type":"next-occurrence","id":"aUFP69VTbIKRc7da8NhKOA1eRiU="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-04T12:47:31Z"},"road_event_id":"StOfR9E6RNe06MMk7ZjnmXl15QY=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"aUFP69VTbIKRc7da8NhKOA1eRiU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uIOlVkWftq/whr/5zU1REkzS5WE="},{"type":"next-occurrence","id":"WFU895dCq8CxA3s4Bl9WmSHztd8="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-04T12:47:31Z"},"road_event_id":"aUFP69VTbIKRc7da8NhKOA1eRiU=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"WFU895dCq8CxA3s4Bl9WmSHztd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uIOlVkWftq/whr/5zU1REkzS5WE="},{"type":"next-occurrence","id":"lwpj9JYPTBglQ3kX4OD3pn3jbmU="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-04T12:47:31Z"},"road_event_id":"WFU895dCq8CxA3s4Bl9WmSHztd8=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"lwpj9JYPTBglQ3kX4OD3pn3jbmU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uIOlVkWftq/whr/5zU1REkzS5WE="},{"type":"next-occurrence","id":"YFDvBe60ztmUgXzHD3D+kkGO8GY="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-04T12:47:31Z"},"road_event_id":"lwpj9JYPTBglQ3kX4OD3pn3jbmU=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"YFDvBe60ztmUgXzHD3D+kkGO8GY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uIOlVkWftq/whr/5zU1REkzS5WE="},{"type":"next-occurrence","id":"lCyLmSCK1e1Z9yhEuD91SEwM4zo="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-04T12:47:31Z"},"road_event_id":"YFDvBe60ztmUgXzHD3D+kkGO8GY=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"lCyLmSCK1e1Z9yhEuD91SEwM4zo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uIOlVkWftq/whr/5zU1REkzS5WE="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-04T12:47:31Z"},"road_event_id":"lCyLmSCK1e1Z9yhEuD91SEwM4zo=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"T63/+P1u5eJwDBqBVSboh0mPyx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"F03DUSKY1c8dyuV2gSfCJzjjpC8="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"T63/+P1u5eJwDBqBVSboh0mPyx0=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"F03DUSKY1c8dyuV2gSfCJzjjpC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T63/+P1u5eJwDBqBVSboh0mPyx0="},{"type":"next-occurrence","id":"A9ZIFdGNwWnn4q8hjTv+l+U03dE="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"F03DUSKY1c8dyuV2gSfCJzjjpC8=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"A9ZIFdGNwWnn4q8hjTv+l+U03dE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T63/+P1u5eJwDBqBVSboh0mPyx0="},{"type":"next-occurrence","id":"D0NGIiH7P9pX6zLefhchLgDCDkw="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"A9ZIFdGNwWnn4q8hjTv+l+U03dE=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"D0NGIiH7P9pX6zLefhchLgDCDkw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T63/+P1u5eJwDBqBVSboh0mPyx0="},{"type":"next-occurrence","id":"s9S9MVXll+korDwc4huA2oWoTVU="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"D0NGIiH7P9pX6zLefhchLgDCDkw=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"s9S9MVXll+korDwc4huA2oWoTVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T63/+P1u5eJwDBqBVSboh0mPyx0="},{"type":"next-occurrence","id":"5t6YmnlwDDVfUDL8VWRnXb45oSQ="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"s9S9MVXll+korDwc4huA2oWoTVU=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"5t6YmnlwDDVfUDL8VWRnXb45oSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T63/+P1u5eJwDBqBVSboh0mPyx0="},{"type":"next-occurrence","id":"WlVZa44UAUJWlb6hAODW6i2qLfE="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"5t6YmnlwDDVfUDL8VWRnXb45oSQ=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"WlVZa44UAUJWlb6hAODW6i2qLfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T63/+P1u5eJwDBqBVSboh0mPyx0="},{"type":"next-occurrence","id":"j+WJfPShM4q9LQdSLqd3YtzMIMI="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"WlVZa44UAUJWlb6hAODW6i2qLfE=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"j+WJfPShM4q9LQdSLqd3YtzMIMI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T63/+P1u5eJwDBqBVSboh0mPyx0="},{"type":"next-occurrence","id":"ehrLkQuhKDbq/K2FzMlzneOXrLU="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"j+WJfPShM4q9LQdSLqd3YtzMIMI=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"ehrLkQuhKDbq/K2FzMlzneOXrLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T63/+P1u5eJwDBqBVSboh0mPyx0="},{"type":"next-occurrence","id":"el6LNY3RepkTXfjmGqX95fxlgWc="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"ehrLkQuhKDbq/K2FzMlzneOXrLU=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"el6LNY3RepkTXfjmGqX95fxlgWc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T63/+P1u5eJwDBqBVSboh0mPyx0="},{"type":"next-occurrence","id":"R5yoVQ/xSQC3rZNpkCbEdDthLmo="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"el6LNY3RepkTXfjmGqX95fxlgWc=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"R5yoVQ/xSQC3rZNpkCbEdDthLmo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T63/+P1u5eJwDBqBVSboh0mPyx0="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"R5yoVQ/xSQC3rZNpkCbEdDthLmo=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"hM1SAz7Itvjtn5PzcSyUvDrxGQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qQKyaEdb4RIosz/XGEFmUuQ53p8="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"hM1SAz7Itvjtn5PzcSyUvDrxGQk=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"qQKyaEdb4RIosz/XGEFmUuQ53p8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hM1SAz7Itvjtn5PzcSyUvDrxGQk="},{"type":"next-occurrence","id":"NT03x25ZptrF+vkZ5Yhvice2gz8="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"qQKyaEdb4RIosz/XGEFmUuQ53p8=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"NT03x25ZptrF+vkZ5Yhvice2gz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hM1SAz7Itvjtn5PzcSyUvDrxGQk="},{"type":"next-occurrence","id":"NEgcRKZN9HYuXOiPrlRqLzJos/U="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"NT03x25ZptrF+vkZ5Yhvice2gz8=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"NEgcRKZN9HYuXOiPrlRqLzJos/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hM1SAz7Itvjtn5PzcSyUvDrxGQk="},{"type":"next-occurrence","id":"ie9gJSDYuBosjD7wvmO5VWXFn5s="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"NEgcRKZN9HYuXOiPrlRqLzJos/U=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"ie9gJSDYuBosjD7wvmO5VWXFn5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hM1SAz7Itvjtn5PzcSyUvDrxGQk="},{"type":"next-occurrence","id":"C0atoRSFQeKVg2UEc1fI48stpHs="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"ie9gJSDYuBosjD7wvmO5VWXFn5s=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"C0atoRSFQeKVg2UEc1fI48stpHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hM1SAz7Itvjtn5PzcSyUvDrxGQk="},{"type":"next-occurrence","id":"C5t/VPJGfHdCShubeU/11SOisBU="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"C0atoRSFQeKVg2UEc1fI48stpHs=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"C5t/VPJGfHdCShubeU/11SOisBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hM1SAz7Itvjtn5PzcSyUvDrxGQk="},{"type":"next-occurrence","id":"ny5bV4g4NjKvwFwFKnC4gV3ky9I="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"C5t/VPJGfHdCShubeU/11SOisBU=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"ny5bV4g4NjKvwFwFKnC4gV3ky9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hM1SAz7Itvjtn5PzcSyUvDrxGQk="},{"type":"next-occurrence","id":"6UE13NbxZ+4osfZm489KvCY+10w="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"ny5bV4g4NjKvwFwFKnC4gV3ky9I=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"6UE13NbxZ+4osfZm489KvCY+10w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hM1SAz7Itvjtn5PzcSyUvDrxGQk="},{"type":"next-occurrence","id":"YLC4RkcTY3ra0fhWzwcayTgrqYg="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"6UE13NbxZ+4osfZm489KvCY+10w=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"YLC4RkcTY3ra0fhWzwcayTgrqYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hM1SAz7Itvjtn5PzcSyUvDrxGQk="},{"type":"next-occurrence","id":"mtH7QpYKFg5ppLiFxEgntXy9zKc="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"YLC4RkcTY3ra0fhWzwcayTgrqYg=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"mtH7QpYKFg5ppLiFxEgntXy9zKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hM1SAz7Itvjtn5PzcSyUvDrxGQk="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"mtH7QpYKFg5ppLiFxEgntXy9zKc=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"N1ZupWKK2EjGVKG4UpwK4Qdut2k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1RtDNt1v0bteeW8gERu2uT6RjOM="}],"description":"Intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:13:26Z"},"road_event_id":"N1ZupWKK2EjGVKG4UpwK4Qdut2k=","beginning_cross_street":"Route 26 at Trinity Ave and Parkway Drive","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.493499,43.788297]]}},{"id":"1RtDNt1v0bteeW8gERu2uT6RjOM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N1ZupWKK2EjGVKG4UpwK4Qdut2k="},{"type":"next-occurrence","id":"0TXPSEc7KaVkX6PKoMB7GkRWa+A="}],"description":"Intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:13:26Z"},"road_event_id":"1RtDNt1v0bteeW8gERu2uT6RjOM=","beginning_cross_street":"Route 26 at Trinity Ave and Parkway Drive","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T04:00:00Z","end_date":"2026-05-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.493499,43.788297]]}},{"id":"0TXPSEc7KaVkX6PKoMB7GkRWa+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N1ZupWKK2EjGVKG4UpwK4Qdut2k="}],"description":"Intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:13:26Z"},"road_event_id":"0TXPSEc7KaVkX6PKoMB7GkRWa+A=","beginning_cross_street":"Route 26 at Trinity Ave and Parkway Drive","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.493499,43.788297]]}},{"id":"OMJA1vs+gjlJeev9732bSN2/IEA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qLjqXMFf/nAm0CiE/JK6d+hV8BA="}],"description":"Intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open to traffic","update_date":"2026-04-17T19:13:20Z"},"road_event_id":"OMJA1vs+gjlJeev9732bSN2/IEA=","beginning_cross_street":"Route 3 - Arsenal Street at North Meadow Street","ending_cross_street":"Route 3 - Arsenal Street at North Meadow Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.920656,43.97639]]}},{"id":"qLjqXMFf/nAm0CiE/JK6d+hV8BA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OMJA1vs+gjlJeev9732bSN2/IEA="},{"type":"next-occurrence","id":"ZozHqyEgU9IUb0yiDMKUJRcbBMQ="}],"description":"Intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open to traffic","update_date":"2026-04-17T19:13:20Z"},"road_event_id":"qLjqXMFf/nAm0CiE/JK6d+hV8BA=","beginning_cross_street":"Route 3 - Arsenal Street at North Meadow Street","ending_cross_street":"Route 3 - Arsenal Street at North Meadow Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T04:00:00Z","end_date":"2026-05-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.920656,43.97639]]}},{"id":"ZozHqyEgU9IUb0yiDMKUJRcbBMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OMJA1vs+gjlJeev9732bSN2/IEA="}],"description":"Intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open to traffic","update_date":"2026-04-17T19:13:20Z"},"road_event_id":"ZozHqyEgU9IUb0yiDMKUJRcbBMQ=","beginning_cross_street":"Route 3 - Arsenal Street at North Meadow Street","ending_cross_street":"Route 3 - Arsenal Street at North Meadow Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.920656,43.97639]]}},{"id":"xEe/PYBLUuAiEJTnhNwveEREcmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9W6dFq7QWg+dQJU29SlXsHNjDyM="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"xEe/PYBLUuAiEJTnhNwveEREcmc=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"9W6dFq7QWg+dQJU29SlXsHNjDyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xEe/PYBLUuAiEJTnhNwveEREcmc="},{"type":"next-occurrence","id":"61sIPDWVhvegSOliG1aufhjVUyY="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"9W6dFq7QWg+dQJU29SlXsHNjDyM=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"61sIPDWVhvegSOliG1aufhjVUyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xEe/PYBLUuAiEJTnhNwveEREcmc="},{"type":"next-occurrence","id":"1J5t13oqVUCYIoajBdCLocqoNro="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"61sIPDWVhvegSOliG1aufhjVUyY=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"1J5t13oqVUCYIoajBdCLocqoNro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xEe/PYBLUuAiEJTnhNwveEREcmc="},{"type":"next-occurrence","id":"J0GlDGLaA2f3FdWdnfTEhLTWPng="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"1J5t13oqVUCYIoajBdCLocqoNro=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"J0GlDGLaA2f3FdWdnfTEhLTWPng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xEe/PYBLUuAiEJTnhNwveEREcmc="},{"type":"next-occurrence","id":"bWJ1unpYDB7tgswypLGFQh9VkWI="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"J0GlDGLaA2f3FdWdnfTEhLTWPng=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"bWJ1unpYDB7tgswypLGFQh9VkWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xEe/PYBLUuAiEJTnhNwveEREcmc="},{"type":"next-occurrence","id":"7uH+pRtHoaryR/QGotk4Zm2sVyI="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"bWJ1unpYDB7tgswypLGFQh9VkWI=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"7uH+pRtHoaryR/QGotk4Zm2sVyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xEe/PYBLUuAiEJTnhNwveEREcmc="},{"type":"next-occurrence","id":"FtfInH2CMyUEJHUU/G3jLy8mCp8="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"7uH+pRtHoaryR/QGotk4Zm2sVyI=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"FtfInH2CMyUEJHUU/G3jLy8mCp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xEe/PYBLUuAiEJTnhNwveEREcmc="},{"type":"next-occurrence","id":"irIP6kC+3jaQrxwLt48ugwfCU2Y="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"FtfInH2CMyUEJHUU/G3jLy8mCp8=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"irIP6kC+3jaQrxwLt48ugwfCU2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xEe/PYBLUuAiEJTnhNwveEREcmc="},{"type":"next-occurrence","id":"NrE1l6TVX8u3DgFovNmQ8MmFhKA="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"irIP6kC+3jaQrxwLt48ugwfCU2Y=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"NrE1l6TVX8u3DgFovNmQ8MmFhKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xEe/PYBLUuAiEJTnhNwveEREcmc="},{"type":"next-occurrence","id":"LEs0d+SEaUFvBtS1NNdraZ6XtYY="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"NrE1l6TVX8u3DgFovNmQ8MmFhKA=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"LEs0d+SEaUFvBtS1NNdraZ6XtYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xEe/PYBLUuAiEJTnhNwveEREcmc="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"LEs0d+SEaUFvBtS1NNdraZ6XtYY=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"gUTtuln7/Wf4JFEuGFw///4QpX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WeHzqOZ6cASc8G8NX9mxFscNjuo="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"gUTtuln7/Wf4JFEuGFw///4QpX0=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"WeHzqOZ6cASc8G8NX9mxFscNjuo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gUTtuln7/Wf4JFEuGFw///4QpX0="},{"type":"next-occurrence","id":"8x3r7jDKdaoFzcdwGkfJgys4GWg="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"WeHzqOZ6cASc8G8NX9mxFscNjuo=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"8x3r7jDKdaoFzcdwGkfJgys4GWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gUTtuln7/Wf4JFEuGFw///4QpX0="},{"type":"next-occurrence","id":"RGSBtZyxE0jd9CdrKcCz196YlL8="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"8x3r7jDKdaoFzcdwGkfJgys4GWg=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"RGSBtZyxE0jd9CdrKcCz196YlL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gUTtuln7/Wf4JFEuGFw///4QpX0="},{"type":"next-occurrence","id":"5xedXYlmOlDORR8013ckfwUVIcY="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"RGSBtZyxE0jd9CdrKcCz196YlL8=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"5xedXYlmOlDORR8013ckfwUVIcY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gUTtuln7/Wf4JFEuGFw///4QpX0="},{"type":"next-occurrence","id":"ROe4H4CceWOKW0p4WarIEiw0BPI="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"5xedXYlmOlDORR8013ckfwUVIcY=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"ROe4H4CceWOKW0p4WarIEiw0BPI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gUTtuln7/Wf4JFEuGFw///4QpX0="},{"type":"next-occurrence","id":"obsbBbVKf/DOL0mIFnC1VSwvVDQ="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"ROe4H4CceWOKW0p4WarIEiw0BPI=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"obsbBbVKf/DOL0mIFnC1VSwvVDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gUTtuln7/Wf4JFEuGFw///4QpX0="},{"type":"next-occurrence","id":"GUsw/vYBOZWwkX0N6rZpHY3ffDI="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"obsbBbVKf/DOL0mIFnC1VSwvVDQ=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"GUsw/vYBOZWwkX0N6rZpHY3ffDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gUTtuln7/Wf4JFEuGFw///4QpX0="},{"type":"next-occurrence","id":"/yP09rUC4qKpTUZUMU6sZNPUvQo="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"GUsw/vYBOZWwkX0N6rZpHY3ffDI=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"/yP09rUC4qKpTUZUMU6sZNPUvQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gUTtuln7/Wf4JFEuGFw///4QpX0="},{"type":"next-occurrence","id":"+/o1NM9hUGIhuXNL/Yy9rb6DJrQ="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"/yP09rUC4qKpTUZUMU6sZNPUvQo=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"+/o1NM9hUGIhuXNL/Yy9rb6DJrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gUTtuln7/Wf4JFEuGFw///4QpX0="},{"type":"next-occurrence","id":"0tgPTIc+pAzR/hOXXPRepmfvF0o="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"+/o1NM9hUGIhuXNL/Yy9rb6DJrQ=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"0tgPTIc+pAzR/hOXXPRepmfvF0o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gUTtuln7/Wf4JFEuGFw///4QpX0="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"0tgPTIc+pAzR/hOXXPRepmfvF0o=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"HfKt79c4Z2iNr62wZQtM02HEsn0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5C8hl8StLZFSWh7qqmL7VK0uZWQ="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"HfKt79c4Z2iNr62wZQtM02HEsn0=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"5C8hl8StLZFSWh7qqmL7VK0uZWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfKt79c4Z2iNr62wZQtM02HEsn0="},{"type":"next-occurrence","id":"IlxRcRdsSOngUhayTQJFgSMCajA="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"5C8hl8StLZFSWh7qqmL7VK0uZWQ=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"IlxRcRdsSOngUhayTQJFgSMCajA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfKt79c4Z2iNr62wZQtM02HEsn0="},{"type":"next-occurrence","id":"1X75RSqaQgSyFrGsbyj84WpZe6Y="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"IlxRcRdsSOngUhayTQJFgSMCajA=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"1X75RSqaQgSyFrGsbyj84WpZe6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfKt79c4Z2iNr62wZQtM02HEsn0="},{"type":"next-occurrence","id":"67aQoG+Aju5Y+hrvVrBDh1BsiTk="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"1X75RSqaQgSyFrGsbyj84WpZe6Y=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"67aQoG+Aju5Y+hrvVrBDh1BsiTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfKt79c4Z2iNr62wZQtM02HEsn0="},{"type":"next-occurrence","id":"/AFwTGSKrfje62kr2J8Ko6AUv3U="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"67aQoG+Aju5Y+hrvVrBDh1BsiTk=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"/AFwTGSKrfje62kr2J8Ko6AUv3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfKt79c4Z2iNr62wZQtM02HEsn0="},{"type":"next-occurrence","id":"9zSaNVH7w89cn4t8rtbxyknbMIY="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"/AFwTGSKrfje62kr2J8Ko6AUv3U=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"9zSaNVH7w89cn4t8rtbxyknbMIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfKt79c4Z2iNr62wZQtM02HEsn0="},{"type":"next-occurrence","id":"NWte7X5c1Oc4Z7W+gjcXPWp+Jos="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"9zSaNVH7w89cn4t8rtbxyknbMIY=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"NWte7X5c1Oc4Z7W+gjcXPWp+Jos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfKt79c4Z2iNr62wZQtM02HEsn0="},{"type":"next-occurrence","id":"i2LoncqjAa1IXTQ72huoX11sC78="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"NWte7X5c1Oc4Z7W+gjcXPWp+Jos=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"i2LoncqjAa1IXTQ72huoX11sC78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfKt79c4Z2iNr62wZQtM02HEsn0="},{"type":"next-occurrence","id":"lTidlqQSwmikwfZwF1AmPYPnakE="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"i2LoncqjAa1IXTQ72huoX11sC78=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"lTidlqQSwmikwfZwF1AmPYPnakE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfKt79c4Z2iNr62wZQtM02HEsn0="},{"type":"next-occurrence","id":"RHTyhi4cFWFqZnMlHTeJEWf54Og="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"lTidlqQSwmikwfZwF1AmPYPnakE=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"RHTyhi4cFWFqZnMlHTeJEWf54Og=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfKt79c4Z2iNr62wZQtM02HEsn0="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"RHTyhi4cFWFqZnMlHTeJEWf54Og=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"XMWl2Z1Tp0s+4bypt/bvgOM++U0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AaZKxDza3CWieM9b8yKgQijicMQ="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"XMWl2Z1Tp0s+4bypt/bvgOM++U0=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"AaZKxDza3CWieM9b8yKgQijicMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XMWl2Z1Tp0s+4bypt/bvgOM++U0="},{"type":"next-occurrence","id":"GhEmmKwmkTmo073pWB60YYJM1xk="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"AaZKxDza3CWieM9b8yKgQijicMQ=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"GhEmmKwmkTmo073pWB60YYJM1xk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XMWl2Z1Tp0s+4bypt/bvgOM++U0="},{"type":"next-occurrence","id":"sQvp8xVhbasbHqOGyvgdzqQxFUA="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"GhEmmKwmkTmo073pWB60YYJM1xk=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"sQvp8xVhbasbHqOGyvgdzqQxFUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XMWl2Z1Tp0s+4bypt/bvgOM++U0="},{"type":"next-occurrence","id":"r/3O8Xgp5pZxsk+MVahkNUPm1Zk="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"sQvp8xVhbasbHqOGyvgdzqQxFUA=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"r/3O8Xgp5pZxsk+MVahkNUPm1Zk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XMWl2Z1Tp0s+4bypt/bvgOM++U0="},{"type":"next-occurrence","id":"1/hdjI/r30xyFqCXZLdsZtdcV8U="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"r/3O8Xgp5pZxsk+MVahkNUPm1Zk=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"1/hdjI/r30xyFqCXZLdsZtdcV8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XMWl2Z1Tp0s+4bypt/bvgOM++U0="},{"type":"next-occurrence","id":"I5WelYaWo7ZTDaPGyZnmI1nDAWs="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"1/hdjI/r30xyFqCXZLdsZtdcV8U=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"I5WelYaWo7ZTDaPGyZnmI1nDAWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XMWl2Z1Tp0s+4bypt/bvgOM++U0="},{"type":"next-occurrence","id":"toX7Rgo2iHCnHg45ivlTDzGREJE="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"I5WelYaWo7ZTDaPGyZnmI1nDAWs=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"toX7Rgo2iHCnHg45ivlTDzGREJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XMWl2Z1Tp0s+4bypt/bvgOM++U0="},{"type":"next-occurrence","id":"mmxBu5hYoZMsIfSfpvVWDuL2lzU="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"toX7Rgo2iHCnHg45ivlTDzGREJE=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"mmxBu5hYoZMsIfSfpvVWDuL2lzU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XMWl2Z1Tp0s+4bypt/bvgOM++U0="},{"type":"next-occurrence","id":"m7cG8HQXTr0PZHDF6P12Fo7CaZU="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"mmxBu5hYoZMsIfSfpvVWDuL2lzU=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"m7cG8HQXTr0PZHDF6P12Fo7CaZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XMWl2Z1Tp0s+4bypt/bvgOM++U0="},{"type":"next-occurrence","id":"mucSBjq/BPCfqGcOn4FK1DgyWL0="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"m7cG8HQXTr0PZHDF6P12Fo7CaZU=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"mucSBjq/BPCfqGcOn4FK1DgyWL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XMWl2Z1Tp0s+4bypt/bvgOM++U0="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"mucSBjq/BPCfqGcOn4FK1DgyWL0=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"4uEp765nzZRICMzeVUJThcsTCIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[],"description":"Bridge work and traffic shift on PADDOCK AVE both directions between OVERLOOK RD (Meriden) Motorists can expect the continuation of alternating one-way traffic (on the Paddock Avenue Bridge in Meriden, however, traffic will shift to the newly constructed side of the bridge. The shift is anticipated to take place on Thursday night, September 18, 2025, and continue for a year and a half. Traffic signal control will be in place to guide motorists through the work zone. Note that the temporary sidewalk will shift as well on the outside of the bridge., Continuous Thursday September 18th, 2025 09:00 PM thru Thursday March 18th, 2027 11:59 PM All lanes open","update_date":"2025-09-17T14:00:53Z"},"road_event_id":"4uEp765nzZRICMzeVUJThcsTCIg=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776113,41.516559]]}},{"id":"gDwNOjDbECvozBBVLjWTeAlV6mY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction southbound, SIM15 Bus, SIM35 Bus and SIM5 Bus at State St/Bridge St (New York) is closed. Use the temporary stop on State St closer to Bridge St instead., Continuous Friday May 2nd, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM","update_date":"2025-05-01T21:11:26Z"},"road_event_id":"gDwNOjDbECvozBBVLjWTeAlV6mY=","beginning_cross_street":"State St/Bridge St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.014192,40.704209]]}},{"id":"LgK5gw5v0mOzQmAYrcuPqFP/EHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["City Zone"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations both directions, City Zone at Forest Hills (New York) You must be in the first four cars to exit westbound trains., Continuous Saturday May 3rd, 2025 01:29 AM thru Friday December 31st, 2027 11:59 PM","update_date":"2025-06-11T13:41:12Z"},"road_event_id":"LgK5gw5v0mOzQmAYrcuPqFP/EHI=","beginning_cross_street":"Forest Hills","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.844814,40.719575]]}},{"id":"DqpOpdC8tqKPpOvw2n3t/0137/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on I-91 southbound Entrance ramp Exit 31 - Founders Bridge/Asylum Avenue (Hartford) The State Street on-ramp to I-91 southbound at the Founders Bridge will be closed for the duration of the project to facilitate the temporary traffic patterns on I-91 southbound during staged construction. Detours will be posted to direct motorists seeking I-91 southbound to use either the South Morgan Street on-ramp to I-91 southbound at Columbus Boulevard, or the Sheldon Street on-ramp to the Whitehead Highway at Columbus Boulevard where they can access I-91 southbound. Motorists on I-84 eastbound seeking I-91 southbound will be required to merge with I-91 southbound traffic due to the temporary traffic patterns on I-91 southbound during staged construction. Currently, I-84 eastbound motorists entering I-91 southbound traffic have a dedicated lane provided., Continuous Monday March 10th, 2025 12:00 AM thru Wednesday September 30th, 2026 11:59 PM All lanes closed","update_date":"2025-02-26T21:18:30Z"},"road_event_id":"DqpOpdC8tqKPpOvw2n3t/0137/M=","beginning_cross_street":"Exit 31 - Founders Bridge/Asylum Avenue","ending_cross_street":"Exit 31 - Founders Bridge/Asylum Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66881,41.765463]]}},{"id":"St7Uv7VfeIZLYk7FbyS7Ow2Jf4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OF/mvX5rGo0/FfwCfD08hnu4eBM="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"St7Uv7VfeIZLYk7FbyS7Ow2Jf4Q=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"OF/mvX5rGo0/FfwCfD08hnu4eBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"St7Uv7VfeIZLYk7FbyS7Ow2Jf4Q="},{"type":"next-occurrence","id":"j9Lbrbr1GGDlILcm5VWxkghc5iw="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"OF/mvX5rGo0/FfwCfD08hnu4eBM=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"j9Lbrbr1GGDlILcm5VWxkghc5iw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"St7Uv7VfeIZLYk7FbyS7Ow2Jf4Q="},{"type":"next-occurrence","id":"jSyBWuOcTt0DAKtFcG0sRx/zuD4="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"j9Lbrbr1GGDlILcm5VWxkghc5iw=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"jSyBWuOcTt0DAKtFcG0sRx/zuD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"St7Uv7VfeIZLYk7FbyS7Ow2Jf4Q="},{"type":"next-occurrence","id":"J3Gbczp/xjQq9AJ6dUpveCFfVZw="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"jSyBWuOcTt0DAKtFcG0sRx/zuD4=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T23:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"J3Gbczp/xjQq9AJ6dUpveCFfVZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"St7Uv7VfeIZLYk7FbyS7Ow2Jf4Q="},{"type":"next-occurrence","id":"wqrNH4y2rxcuJ8WOQ4CogHjuWfw="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"J3Gbczp/xjQq9AJ6dUpveCFfVZw=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"wqrNH4y2rxcuJ8WOQ4CogHjuWfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"St7Uv7VfeIZLYk7FbyS7Ow2Jf4Q="},{"type":"next-occurrence","id":"H3pW8Ink7GxWr4GWyy0msULYy0E="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"wqrNH4y2rxcuJ8WOQ4CogHjuWfw=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"H3pW8Ink7GxWr4GWyy0msULYy0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"St7Uv7VfeIZLYk7FbyS7Ow2Jf4Q="},{"type":"next-occurrence","id":"qey+7GzVNcDB/wO120wjqA4KoX8="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"H3pW8Ink7GxWr4GWyy0msULYy0E=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"qey+7GzVNcDB/wO120wjqA4KoX8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"St7Uv7VfeIZLYk7FbyS7Ow2Jf4Q="},{"type":"next-occurrence","id":"EzlW87K807mcRCwshQ2qJvQFAHc="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"qey+7GzVNcDB/wO120wjqA4KoX8=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"EzlW87K807mcRCwshQ2qJvQFAHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"St7Uv7VfeIZLYk7FbyS7Ow2Jf4Q="},{"type":"next-occurrence","id":"DAmiMEBfE8iU/FmIdeIOlCpodkw="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"EzlW87K807mcRCwshQ2qJvQFAHc=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"DAmiMEBfE8iU/FmIdeIOlCpodkw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"St7Uv7VfeIZLYk7FbyS7Ow2Jf4Q="},{"type":"next-occurrence","id":"VlUe0nDBXfC/bcK74a5JJF7Y42M="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"DAmiMEBfE8iU/FmIdeIOlCpodkw=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T23:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"VlUe0nDBXfC/bcK74a5JJF7Y42M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"St7Uv7VfeIZLYk7FbyS7Ow2Jf4Q="},{"type":"next-occurrence","id":"5+zrJnw8mUvPXvE8xRWAxEGAQWk="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"VlUe0nDBXfC/bcK74a5JJF7Y42M=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T23:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"5+zrJnw8mUvPXvE8xRWAxEGAQWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"St7Uv7VfeIZLYk7FbyS7Ow2Jf4Q="},{"type":"next-occurrence","id":"84ugVr25aZt3Vi1ktLuBRWGYUy0="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"5+zrJnw8mUvPXvE8xRWAxEGAQWk=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T23:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"84ugVr25aZt3Vi1ktLuBRWGYUy0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"St7Uv7VfeIZLYk7FbyS7Ow2Jf4Q="},{"type":"next-occurrence","id":"oG5Wfu9mv0O0dnTpwQ2PyojmPLo="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"84ugVr25aZt3Vi1ktLuBRWGYUy0=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T23:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"oG5Wfu9mv0O0dnTpwQ2PyojmPLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"St7Uv7VfeIZLYk7FbyS7Ow2Jf4Q="},{"type":"next-occurrence","id":"ldrJ5BuFmUMfvifWVMVv1L0z+HM="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"oG5Wfu9mv0O0dnTpwQ2PyojmPLo=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T23:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"ldrJ5BuFmUMfvifWVMVv1L0z+HM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"St7Uv7VfeIZLYk7FbyS7Ow2Jf4Q="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"ldrJ5BuFmUMfvifWVMVv1L0z+HM=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"haU8Cw65P4/ER0yrwpXxRJr3EHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-86 both directions Exit 7 - CR 33 Panama-Stedman Road (North Harmony) to Strunk Road (Ellicott), Tuesday February 27th, 2024 thru Monday November 30th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-10T11:04:59Z"},"road_event_id":"haU8Cw65P4/ER0yrwpXxRJr3EHw=","beginning_cross_street":"Exit 7 - CR 33 Panama-Stedman Road","ending_cross_street":"Strunk Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.475119,42.157516]]}},{"id":"Ufpo+013raYZXi6Rh4hU6LwditA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation and longterm construction on NY 31 ramp to I-490 Eastbound (Rochester) RAMP CLOSED, Continuous Thursday August 15th, 2024 12:00 AM thru Thursday December 31st, 2026 11:59 PM All lanes closed and detoured","update_date":"2026-01-27T12:14:30Z"},"road_event_id":"Ufpo+013raYZXi6Rh4hU6LwditA=","beginning_cross_street":"I-490 Eastbound","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607298,43.151186]]}},{"id":"ORC300451805","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 126"],"direction":"unknown","description":"Construction on NY 126 both directions Town of New Bremen; Village of Croghan (New Bremen) to Town of New Bremen; Village of Croghan (New Bremen) Route 126 now open to two way traffic. Not currently Scheduled","update_date":"2026-05-01T03:59:00Z"},"road_event_id":"ORC300451805","beginning_cross_street":"Town of New Bremen; Village of Croghan","ending_cross_street":"Town of New Bremen; Village of Croghan","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-25T18:11:57Z","end_date":"2026-05-01T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-75.402784,43.889413]]}},{"id":"ORC300488454","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bruckner Boulevard"],"direction":"unknown","description":"Construction on Bruckner Boulevard eastbound between Cypress Avenue (New York) and East 138th Street (New York) Subject to change without notice. Bridge Washing. Not currently Scheduled","update_date":"2025-10-02T07:00:01Z"},"road_event_id":"ORC300488454","beginning_cross_street":"Cypress Avenue","ending_cross_street":"East 138th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-09-30T14:50:51Z","end_date":"2025-10-03T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.91664,40.803178]]}},{"id":"4JsbCfd1KmJbJpwtvTpUo3W4L34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[],"description":"Construction on VAN WYCK EXPY northbound from 107TH AVE (New York) to LIBERTY AVE (New York) Subject to change without notice., Continuous Wednesday October 1st, 2025 12:00 AM thru Tuesday June 30th, 2026 11:59 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-02-27T18:35:06Z"},"road_event_id":"4JsbCfd1KmJbJpwtvTpUo3W4L34=","beginning_cross_street":"107TH AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.808397,40.688858]]}},{"id":"lR5AyNd/dHm/Wt3JY5kjw5YAPZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[],"description":"Construction on VAN WYCK EXPY northbound from 130TH AVE (New York) to ROCKAWAY BLVD (New York) Subject to change without notice., Continuous Wednesday October 1st, 2025 12:00 AM thru Tuesday June 30th, 2026 11:59 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-02-27T18:35:54Z"},"road_event_id":"lR5AyNd/dHm/Wt3JY5kjw5YAPZk=","beginning_cross_street":"130TH AVE","ending_cross_street":"ROCKAWAY BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.800682,40.671532]]}},{"id":"tPja/J5SK5X1381fyzHH9DhM4Lc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Construction on I-678 southbound ramp to Exit 1B-2 - North Conduit Avenue; NY 27 (New York) Subject to change without notice., Continuous Wednesday October 1st, 2025 12:00 AM thru Tuesday June 30th, 2026 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-02-27T18:44:40Z"},"road_event_id":"tPja/J5SK5X1381fyzHH9DhM4Lc=","beginning_cross_street":"Exit 1B-2 - North Conduit Avenue; NY 27","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801971,40.667921]]}},{"id":"eFkpPw+2ebYs0XTnu3/GTZwCZSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[],"description":"Bridge work on CT 9 northbound Exit ramp Exit 28 - CT 72 (New Britain) There will be a lane closure for the duration of the project on the Route 9 northbound off-ramp to Route 72 westbound, from April 28, 2025, to Fall/Winter of 2025, Continuous Monday April 28th, 2025 12:00 AM thru Thursday August 27th, 2026 11:59 PM All lanes open","update_date":"2025-10-15T16:00:31Z"},"road_event_id":"eFkpPw+2ebYs0XTnu3/GTZwCZSA=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 28 - CT 72","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773132,41.66795]]}},{"id":"dGr3+NNGw2am1O9xRTeSlDIGDj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["13 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, 13 Bus Clinton Ave At Bergen St (Newark) The following bus stop will be temporarily deactivated until April 2027: Deactivated Bus Stop: Route 99 Only: Bergen Street, northbound, at Clinton Avenue, Far Side (MyBus #18263) Route 13 Only: Clinton Avenue, westbound, at Bergen Street, Near Side (MyBus #18474) Alternate Bus Stop: Route 99 Only: Bergen Street, northbound, at West Bigelow Street, Near Side (MyBus #18261) Route 13 Only: Clinton Avenue, westbound at Peshine Avenue, Near Side (MyBus #18475), Continuous Thursday October 9th, 2025 12:00 AM thru Thursday April 1st, 2027 11:59 PM","update_date":"2025-10-24T18:25:02Z"},"road_event_id":"dGr3+NNGw2am1O9xRTeSlDIGDj8=","beginning_cross_street":"Clinton Ave At Bergen St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.20033,40.721459]]}},{"id":"pX2KDDI320IafOgMW6xCYZeK9ek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["99 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction westbound, 99 Bus at Bergen St At Clinton Ave (Newark) The following bus stop will be temporarily deactivated until April 2027: Deactivated Bus Stop: Route 99 Only: Bergen Street, northbound, at Clinton Avenue, Far Side (MyBus #18263) Route 13 Only: Clinton Avenue, westbound, at Bergen Street, Near Side (MyBus #18474) Alternate Bus Stop: Route 99 Only: Bergen Street, northbound, at West Bigelow Street, Near Side (MyBus #18261) Route 13 Only: Clinton Avenue, westbound at Peshine Avenue, Near Side (MyBus #18475), Continuous Sunday November 9th, 2025 12:00 AM thru Thursday April 1st, 2027 11:59 PM","update_date":"2025-10-24T18:26:15Z"},"road_event_id":"pX2KDDI320IafOgMW6xCYZeK9ek=","beginning_cross_street":"Bergen St At Clinton Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.200231,40.721588]]}},{"id":"E8LXavbV55cE9HqrIz7bNpBL2wM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nfjyOhwaCAmPs2JycWTH/OurXwg="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"E8LXavbV55cE9HqrIz7bNpBL2wM=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"nfjyOhwaCAmPs2JycWTH/OurXwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E8LXavbV55cE9HqrIz7bNpBL2wM="},{"type":"next-occurrence","id":"Y3imOOur0/IrZP27rWigk7Xcoes="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"nfjyOhwaCAmPs2JycWTH/OurXwg=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"Y3imOOur0/IrZP27rWigk7Xcoes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E8LXavbV55cE9HqrIz7bNpBL2wM="},{"type":"next-occurrence","id":"XnBgw/n7WWFhfUIG1G93lAEGB0M="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"Y3imOOur0/IrZP27rWigk7Xcoes=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"XnBgw/n7WWFhfUIG1G93lAEGB0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E8LXavbV55cE9HqrIz7bNpBL2wM="},{"type":"next-occurrence","id":"PTgDP8YruyDK6Q3jchnTAZDev0E="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"XnBgw/n7WWFhfUIG1G93lAEGB0M=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"PTgDP8YruyDK6Q3jchnTAZDev0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E8LXavbV55cE9HqrIz7bNpBL2wM="},{"type":"next-occurrence","id":"EMmw3T7Xld5diL748MLGV6SP4nc="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"PTgDP8YruyDK6Q3jchnTAZDev0E=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"EMmw3T7Xld5diL748MLGV6SP4nc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E8LXavbV55cE9HqrIz7bNpBL2wM="},{"type":"next-occurrence","id":"hwktZhypEMt9+Vhwz9QZeJ7PAbo="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"EMmw3T7Xld5diL748MLGV6SP4nc=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"hwktZhypEMt9+Vhwz9QZeJ7PAbo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E8LXavbV55cE9HqrIz7bNpBL2wM="},{"type":"next-occurrence","id":"337iUBBsd9NzHqyQ13tC7WXtZ2U="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"hwktZhypEMt9+Vhwz9QZeJ7PAbo=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"337iUBBsd9NzHqyQ13tC7WXtZ2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E8LXavbV55cE9HqrIz7bNpBL2wM="},{"type":"next-occurrence","id":"ehOvDK9R6C/bieqaKU7es2IuZDg="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"337iUBBsd9NzHqyQ13tC7WXtZ2U=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"ehOvDK9R6C/bieqaKU7es2IuZDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E8LXavbV55cE9HqrIz7bNpBL2wM="},{"type":"next-occurrence","id":"GPlAMfCg0LLNe70X48e7bzSNQrk="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"ehOvDK9R6C/bieqaKU7es2IuZDg=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"GPlAMfCg0LLNe70X48e7bzSNQrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E8LXavbV55cE9HqrIz7bNpBL2wM="},{"type":"next-occurrence","id":"FYu5rPwXIbB5nwASP69+yGOQscQ="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"GPlAMfCg0LLNe70X48e7bzSNQrk=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"FYu5rPwXIbB5nwASP69+yGOQscQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E8LXavbV55cE9HqrIz7bNpBL2wM="},{"type":"next-occurrence","id":"H+RNt+jXKWZ2wD+RKpK28Ky042k="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"FYu5rPwXIbB5nwASP69+yGOQscQ=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"H+RNt+jXKWZ2wD+RKpK28Ky042k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E8LXavbV55cE9HqrIz7bNpBL2wM="},{"type":"next-occurrence","id":"/Q8Lgqdnr6mWOXKbF+Klu1eEmFM="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"H+RNt+jXKWZ2wD+RKpK28Ky042k=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"/Q8Lgqdnr6mWOXKbF+Klu1eEmFM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E8LXavbV55cE9HqrIz7bNpBL2wM="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"/Q8Lgqdnr6mWOXKbF+Klu1eEmFM=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"zaUURKzMdJ8tx6urdp867Yxyq4M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements and safety improvements on CT 2 westbound between Exit 20 - CT 354/Parum Road (Colchester) and Exit 21 - CT 11 (Colchester), Continuous Monday October 27th, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM 1 Right lane of 2 lanes closed","update_date":"2025-11-07T20:51:45Z"},"road_event_id":"zaUURKzMdJ8tx6urdp867Yxyq4M=","beginning_cross_street":"Exit 20 - CT 354/Parum Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.311926,41.56519]]}},{"id":"eSfGiDFqM9KfnmqaDXViLCBGSf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/yYd/bVjj20sV4Oppi/2ENMzERE="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-24T19:00:50Z"},"road_event_id":"eSfGiDFqM9KfnmqaDXViLCBGSf4=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"/yYd/bVjj20sV4Oppi/2ENMzERE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eSfGiDFqM9KfnmqaDXViLCBGSf4="},{"type":"next-occurrence","id":"TmnC9dWoAD9Gb0auvQ7LAu8z/Xc="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-24T19:00:50Z"},"road_event_id":"/yYd/bVjj20sV4Oppi/2ENMzERE=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"TmnC9dWoAD9Gb0auvQ7LAu8z/Xc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eSfGiDFqM9KfnmqaDXViLCBGSf4="},{"type":"next-occurrence","id":"YcVk7xBFSDMnHxSiADAak1p/7Mw="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-24T19:00:50Z"},"road_event_id":"TmnC9dWoAD9Gb0auvQ7LAu8z/Xc=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"YcVk7xBFSDMnHxSiADAak1p/7Mw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eSfGiDFqM9KfnmqaDXViLCBGSf4="},{"type":"next-occurrence","id":"gQ/gA/lyDf6M/FGI+6qzskQYdtI="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-24T19:00:50Z"},"road_event_id":"YcVk7xBFSDMnHxSiADAak1p/7Mw=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"gQ/gA/lyDf6M/FGI+6qzskQYdtI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eSfGiDFqM9KfnmqaDXViLCBGSf4="},{"type":"next-occurrence","id":"EggaqmwOh4M6oS/KVSNJ/1R2aUo="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-24T19:00:50Z"},"road_event_id":"gQ/gA/lyDf6M/FGI+6qzskQYdtI=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"EggaqmwOh4M6oS/KVSNJ/1R2aUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eSfGiDFqM9KfnmqaDXViLCBGSf4="},{"type":"next-occurrence","id":"5jNNw9OhrUIZGUHaCuDkL1GAYs8="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-24T19:00:50Z"},"road_event_id":"EggaqmwOh4M6oS/KVSNJ/1R2aUo=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"5jNNw9OhrUIZGUHaCuDkL1GAYs8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eSfGiDFqM9KfnmqaDXViLCBGSf4="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-24T19:00:50Z"},"road_event_id":"5jNNw9OhrUIZGUHaCuDkL1GAYs8=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"2gS3hlb0jjEs6vt5gSgpN9Lq6zQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on NY 304 northbound between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/32646509 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Monday November 17th, 2025 12:00 AM thru Friday May 22nd, 2026 12:00 AM left lane closed to traffic","update_date":"2026-04-16T17:26:52Z"},"road_event_id":"2gS3hlb0jjEs6vt5gSgpN9Lq6zQ=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99742,41.102213]]}},{"id":"zM1qQVhlPtmWChNXSaOEYZtHMhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Monday November 17th, 2025 12:00 AM thru Friday May 22nd, 2026 12:00 AM right lane closed to traffic","update_date":"2026-04-16T17:29:44Z"},"road_event_id":"zM1qQVhlPtmWChNXSaOEYZtHMhY=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"U8E0Kvrn9EzEDaFpoOSaH6xCa+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Construction on I-80 eastbound Exit ramp Exit 56 - Squirrelwood Rd (Woodland Park) Exit 56B ramp., Continuous Monday November 24th, 2025 10:48 AM thru Monday June 1st, 2026 03:00 PM All lanes closed","update_date":"2025-12-01T14:21:01Z"},"road_event_id":"U8E0Kvrn9EzEDaFpoOSaH6xCa+k=","beginning_cross_street":"Exit 56 - Squirrelwood Rd","ending_cross_street":"Exit 56 - Squirrelwood Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.19329,40.904046]]}},{"id":"QrDLPD0ltP/53CNEpvH7SiVJiP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-636"],"direction":"unknown","related_road_events":[],"description":"Construction on CR-636 northbound between JACKSON AVE (Woodland Park) and CR-636 (Woodland Park), Continuous Monday November 24th, 2025 10:49 AM thru Monday June 1st, 2026 03:00 PM All lanes closed","update_date":"2025-11-24T15:51:01Z"},"road_event_id":"QrDLPD0ltP/53CNEpvH7SiVJiP4=","beginning_cross_street":"JACKSON AVE","ending_cross_street":"CR-636","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192236,40.902586]]}},{"id":"l+PxPZa3qD7gdjmvJm0dtc9dR+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-636"],"direction":"unknown","related_road_events":[],"description":"Bridge construction on CR-636 northbound between 56A (Woodland Park) and CR-636 (Woodland Park) Southbound traffic operate in the Northbound lane. Northbound traffic is detoured., Continuous Monday December 1st, 2025 12:00 AM thru Monday June 1st, 2026 11:59 PM All lanes closed","update_date":"2025-12-01T14:28:11Z"},"road_event_id":"l+PxPZa3qD7gdjmvJm0dtc9dR+0=","beginning_cross_street":"56A","ending_cross_street":"CR-636","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192553,40.902987]]}},{"id":"QFcD3pZhl/6QaWnMFZheK4z+lJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PUqN6Dy7jvlnPlh8875tJduQbOM="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"QFcD3pZhl/6QaWnMFZheK4z+lJ4=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-14T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"PUqN6Dy7jvlnPlh8875tJduQbOM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QFcD3pZhl/6QaWnMFZheK4z+lJ4="},{"type":"next-occurrence","id":"1c5pxSYHjuSxSZmeypj7zHMdikg="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"PUqN6Dy7jvlnPlh8875tJduQbOM=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-15T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"1c5pxSYHjuSxSZmeypj7zHMdikg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QFcD3pZhl/6QaWnMFZheK4z+lJ4="},{"type":"next-occurrence","id":"K1saNF2NE1kS4yx6fYxbeqYmi9s="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"1c5pxSYHjuSxSZmeypj7zHMdikg=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-16T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"K1saNF2NE1kS4yx6fYxbeqYmi9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QFcD3pZhl/6QaWnMFZheK4z+lJ4="},{"type":"next-occurrence","id":"63NX4D+5wMnWI9BFnlap5/xmwU0="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"K1saNF2NE1kS4yx6fYxbeqYmi9s=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T10:00:00Z","end_date":"2026-05-17T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"63NX4D+5wMnWI9BFnlap5/xmwU0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QFcD3pZhl/6QaWnMFZheK4z+lJ4="},{"type":"next-occurrence","id":"LGrTfS3Yh9FBumOg7lMzm/7Iwx8="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"63NX4D+5wMnWI9BFnlap5/xmwU0=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T10:00:00Z","end_date":"2026-05-18T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"LGrTfS3Yh9FBumOg7lMzm/7Iwx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QFcD3pZhl/6QaWnMFZheK4z+lJ4="},{"type":"next-occurrence","id":"0+p+jlbFFdsq+l5j7GMod+ta9c4="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"LGrTfS3Yh9FBumOg7lMzm/7Iwx8=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-19T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"0+p+jlbFFdsq+l5j7GMod+ta9c4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QFcD3pZhl/6QaWnMFZheK4z+lJ4="},{"type":"next-occurrence","id":"ysJ2TPQQ0ZpPdHUqZbDentYE4ds="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"0+p+jlbFFdsq+l5j7GMod+ta9c4=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-20T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"ysJ2TPQQ0ZpPdHUqZbDentYE4ds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QFcD3pZhl/6QaWnMFZheK4z+lJ4="},{"type":"next-occurrence","id":"kJDDvuJtoduH9ThZ2x1UgK8Q0eY="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"ysJ2TPQQ0ZpPdHUqZbDentYE4ds=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-21T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"kJDDvuJtoduH9ThZ2x1UgK8Q0eY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QFcD3pZhl/6QaWnMFZheK4z+lJ4="},{"type":"next-occurrence","id":"O4pYewUQRgPnRwxhdFLolqTfmCM="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"kJDDvuJtoduH9ThZ2x1UgK8Q0eY=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-22T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"O4pYewUQRgPnRwxhdFLolqTfmCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QFcD3pZhl/6QaWnMFZheK4z+lJ4="},{"type":"next-occurrence","id":"Z6U1Sbh/ny//PI6y1lvPlGaqNmA="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"O4pYewUQRgPnRwxhdFLolqTfmCM=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-23T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"Z6U1Sbh/ny//PI6y1lvPlGaqNmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QFcD3pZhl/6QaWnMFZheK4z+lJ4="},{"type":"next-occurrence","id":"b882eDX3uBM9tEcsAo+qaRhqsGM="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"Z6U1Sbh/ny//PI6y1lvPlGaqNmA=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T10:00:00Z","end_date":"2026-05-24T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"b882eDX3uBM9tEcsAo+qaRhqsGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QFcD3pZhl/6QaWnMFZheK4z+lJ4="},{"type":"next-occurrence","id":"USLmzCkUEWdn5YQxSWV/h9TzWK4="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"b882eDX3uBM9tEcsAo+qaRhqsGM=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T10:00:00Z","end_date":"2026-05-25T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"USLmzCkUEWdn5YQxSWV/h9TzWK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QFcD3pZhl/6QaWnMFZheK4z+lJ4="},{"type":"next-occurrence","id":"DRIDVAVHxeU/G6xS0EQXifjBsg0="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"USLmzCkUEWdn5YQxSWV/h9TzWK4=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-26T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"DRIDVAVHxeU/G6xS0EQXifjBsg0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QFcD3pZhl/6QaWnMFZheK4z+lJ4="},{"type":"next-occurrence","id":"AN8FBWtLXwg+UxKApZWxlSKI0GE="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"DRIDVAVHxeU/G6xS0EQXifjBsg0=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-27T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"AN8FBWtLXwg+UxKApZWxlSKI0GE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QFcD3pZhl/6QaWnMFZheK4z+lJ4="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"AN8FBWtLXwg+UxKApZWxlSKI0GE=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-28T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"vNLxYu/LyA6gDJHHWUD/5yI8pCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12F"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"B4ma6A+GBetZFzPOkYcEx/9Y09I="}],"description":"Bridge demolition on NY 12F both directions NY 971H; Paddy Hill Road (Hounsfield) Motorists may experience minor disruptions on Rte. 12F near the Bridge St. intersection due to equipment and/or material movements, Friday December 5th, 2025 thru Saturday May 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:13:13Z"},"road_event_id":"vNLxYu/LyA6gDJHHWUD/5yI8pCE=","beginning_cross_street":"NY 971H; Paddy Hill Road","ending_cross_street":"NY 971H; Paddy Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.983093,43.999423]]}},{"id":"B4ma6A+GBetZFzPOkYcEx/9Y09I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12F"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vNLxYu/LyA6gDJHHWUD/5yI8pCE="},{"type":"next-occurrence","id":"w8MObVncMArfxzaxGFRekeAf2Lw="}],"description":"Bridge demolition on NY 12F both directions NY 971H; Paddy Hill Road (Hounsfield) Motorists may experience minor disruptions on Rte. 12F near the Bridge St. intersection due to equipment and/or material movements, Friday December 5th, 2025 thru Saturday May 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:13:13Z"},"road_event_id":"B4ma6A+GBetZFzPOkYcEx/9Y09I=","beginning_cross_street":"NY 971H; Paddy Hill Road","ending_cross_street":"NY 971H; Paddy Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T04:00:00Z","end_date":"2026-05-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.983093,43.999423]]}},{"id":"w8MObVncMArfxzaxGFRekeAf2Lw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12F"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vNLxYu/LyA6gDJHHWUD/5yI8pCE="}],"description":"Bridge demolition on NY 12F both directions NY 971H; Paddy Hill Road (Hounsfield) Motorists may experience minor disruptions on Rte. 12F near the Bridge St. intersection due to equipment and/or material movements, Friday December 5th, 2025 thru Saturday May 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:13:13Z"},"road_event_id":"w8MObVncMArfxzaxGFRekeAf2Lw=","beginning_cross_street":"NY 971H; Paddy Hill Road","ending_cross_street":"NY 971H; Paddy Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.983093,43.999423]]}},{"id":"50RcizpT2brDErcZ/FReZBZmTvc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"v2HD5Md1anDHJL6Em3HaVQ4Jfpg="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"50RcizpT2brDErcZ/FReZBZmTvc=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"v2HD5Md1anDHJL6Em3HaVQ4Jfpg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"50RcizpT2brDErcZ/FReZBZmTvc="},{"type":"next-occurrence","id":"1A16kNDEnWGAAoCRb8RPykYfZLs="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"v2HD5Md1anDHJL6Em3HaVQ4Jfpg=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"1A16kNDEnWGAAoCRb8RPykYfZLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"50RcizpT2brDErcZ/FReZBZmTvc="},{"type":"next-occurrence","id":"/0U80QlvsxbNYYZ6C3wF2D9Otww="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"1A16kNDEnWGAAoCRb8RPykYfZLs=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"/0U80QlvsxbNYYZ6C3wF2D9Otww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"50RcizpT2brDErcZ/FReZBZmTvc="},{"type":"next-occurrence","id":"0AraaSfeqsG6Afu/g3/UtYHelm0="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"/0U80QlvsxbNYYZ6C3wF2D9Otww=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T23:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"0AraaSfeqsG6Afu/g3/UtYHelm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"50RcizpT2brDErcZ/FReZBZmTvc="},{"type":"next-occurrence","id":"rh8Hz2Rlt94ZL+ksYyhQIDkmLLY="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"0AraaSfeqsG6Afu/g3/UtYHelm0=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"rh8Hz2Rlt94ZL+ksYyhQIDkmLLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"50RcizpT2brDErcZ/FReZBZmTvc="},{"type":"next-occurrence","id":"O9HpZuUoxG9tuHzB2jMDZb6R8VY="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"rh8Hz2Rlt94ZL+ksYyhQIDkmLLY=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"O9HpZuUoxG9tuHzB2jMDZb6R8VY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"50RcizpT2brDErcZ/FReZBZmTvc="},{"type":"next-occurrence","id":"+jDKn7J8EGlBOb4KfSNyuK5itQ0="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"O9HpZuUoxG9tuHzB2jMDZb6R8VY=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"+jDKn7J8EGlBOb4KfSNyuK5itQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"50RcizpT2brDErcZ/FReZBZmTvc="},{"type":"next-occurrence","id":"ehrMy/tefBWNxPYCeP73BGhHEmM="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"+jDKn7J8EGlBOb4KfSNyuK5itQ0=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"ehrMy/tefBWNxPYCeP73BGhHEmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"50RcizpT2brDErcZ/FReZBZmTvc="},{"type":"next-occurrence","id":"bjYtMun895G3OuhdRUkwVgl3kXc="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"ehrMy/tefBWNxPYCeP73BGhHEmM=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T23:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"bjYtMun895G3OuhdRUkwVgl3kXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"50RcizpT2brDErcZ/FReZBZmTvc="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"bjYtMun895G3OuhdRUkwVgl3kXc=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T18:00:00Z","end_date":"2026-05-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"ODLFSUObAP9jo+0h73jRjRDzwFo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zWmS9dukP8/Lass+uuL4qQBxdy4="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"ODLFSUObAP9jo+0h73jRjRDzwFo=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"zWmS9dukP8/Lass+uuL4qQBxdy4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODLFSUObAP9jo+0h73jRjRDzwFo="},{"type":"next-occurrence","id":"DGSDnLNy6knjCw49xSpoj5KZCUc="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"zWmS9dukP8/Lass+uuL4qQBxdy4=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"DGSDnLNy6knjCw49xSpoj5KZCUc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODLFSUObAP9jo+0h73jRjRDzwFo="},{"type":"next-occurrence","id":"80aFgjqIRfvZqnFiHTCa9vfh5VI="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"DGSDnLNy6knjCw49xSpoj5KZCUc=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"80aFgjqIRfvZqnFiHTCa9vfh5VI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODLFSUObAP9jo+0h73jRjRDzwFo="},{"type":"next-occurrence","id":"bVPywefPAYWbrEGBAFXSxUc1yUM="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"80aFgjqIRfvZqnFiHTCa9vfh5VI=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"bVPywefPAYWbrEGBAFXSxUc1yUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODLFSUObAP9jo+0h73jRjRDzwFo="},{"type":"next-occurrence","id":"LrKFF0gHTftFvrUx7iYKVK9IUpo="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"bVPywefPAYWbrEGBAFXSxUc1yUM=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"LrKFF0gHTftFvrUx7iYKVK9IUpo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODLFSUObAP9jo+0h73jRjRDzwFo="},{"type":"next-occurrence","id":"nEj8p1lgr3uUW4m9hWXNdzMogoo="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"LrKFF0gHTftFvrUx7iYKVK9IUpo=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"nEj8p1lgr3uUW4m9hWXNdzMogoo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODLFSUObAP9jo+0h73jRjRDzwFo="},{"type":"next-occurrence","id":"T7B+Cv+H5U+EQ8kbtUb0Yco3TAM="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"nEj8p1lgr3uUW4m9hWXNdzMogoo=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"T7B+Cv+H5U+EQ8kbtUb0Yco3TAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODLFSUObAP9jo+0h73jRjRDzwFo="},{"type":"next-occurrence","id":"YUn7hgAw0nsCtNj1oO5yqO3lO7M="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"T7B+Cv+H5U+EQ8kbtUb0Yco3TAM=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"YUn7hgAw0nsCtNj1oO5yqO3lO7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODLFSUObAP9jo+0h73jRjRDzwFo="},{"type":"next-occurrence","id":"yLSfatzgQc/xvMNsF49OZi3ukzI="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"YUn7hgAw0nsCtNj1oO5yqO3lO7M=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"yLSfatzgQc/xvMNsF49OZi3ukzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODLFSUObAP9jo+0h73jRjRDzwFo="},{"type":"next-occurrence","id":"3FWi/kVoKCPxq+DmR9607vV4+2g="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"yLSfatzgQc/xvMNsF49OZi3ukzI=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"3FWi/kVoKCPxq+DmR9607vV4+2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODLFSUObAP9jo+0h73jRjRDzwFo="},{"type":"next-occurrence","id":"7d7U0Fr73iPGCc3qtSBfPWjVGlQ="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"3FWi/kVoKCPxq+DmR9607vV4+2g=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"7d7U0Fr73iPGCc3qtSBfPWjVGlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODLFSUObAP9jo+0h73jRjRDzwFo="},{"type":"next-occurrence","id":"09ygVwqwLONGXz35I8nVb4T1m7Q="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"7d7U0Fr73iPGCc3qtSBfPWjVGlQ=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"09ygVwqwLONGXz35I8nVb4T1m7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODLFSUObAP9jo+0h73jRjRDzwFo="},{"type":"next-occurrence","id":"sfQ9nkb9jczwGoaLkwHm4TVO4D8="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"09ygVwqwLONGXz35I8nVb4T1m7Q=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"sfQ9nkb9jczwGoaLkwHm4TVO4D8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODLFSUObAP9jo+0h73jRjRDzwFo="},{"type":"next-occurrence","id":"o3fRck4k/gA3jO13m2P/mU7J4lY="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"sfQ9nkb9jczwGoaLkwHm4TVO4D8=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"o3fRck4k/gA3jO13m2P/mU7J4lY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODLFSUObAP9jo+0h73jRjRDzwFo="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"o3fRck4k/gA3jO13m2P/mU7J4lY=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"w/DSPjBj91qbndr1Ii3taB26OKE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wdaAWW/6kBA4G64IKHFCr+O9Ao0="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"w/DSPjBj91qbndr1Ii3taB26OKE=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"wdaAWW/6kBA4G64IKHFCr+O9Ao0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/DSPjBj91qbndr1Ii3taB26OKE="},{"type":"next-occurrence","id":"b5u618kJHaeFRGHawLel4jdPHN4="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"wdaAWW/6kBA4G64IKHFCr+O9Ao0=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"b5u618kJHaeFRGHawLel4jdPHN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/DSPjBj91qbndr1Ii3taB26OKE="},{"type":"next-occurrence","id":"KE4sjZxhly/b+Mda+2hwNo4WTxY="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"b5u618kJHaeFRGHawLel4jdPHN4=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"KE4sjZxhly/b+Mda+2hwNo4WTxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/DSPjBj91qbndr1Ii3taB26OKE="},{"type":"next-occurrence","id":"Ov+Oe8O7zwIKHEW+lHT0oJec2DY="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"KE4sjZxhly/b+Mda+2hwNo4WTxY=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"Ov+Oe8O7zwIKHEW+lHT0oJec2DY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/DSPjBj91qbndr1Ii3taB26OKE="},{"type":"next-occurrence","id":"Gh4Ty3F2ZYVkI/Yzguz2lKJYcsk="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"Ov+Oe8O7zwIKHEW+lHT0oJec2DY=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"Gh4Ty3F2ZYVkI/Yzguz2lKJYcsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/DSPjBj91qbndr1Ii3taB26OKE="},{"type":"next-occurrence","id":"cYuPSF6qh8J8PpIUxQpU0naFvl4="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"Gh4Ty3F2ZYVkI/Yzguz2lKJYcsk=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"cYuPSF6qh8J8PpIUxQpU0naFvl4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/DSPjBj91qbndr1Ii3taB26OKE="},{"type":"next-occurrence","id":"fCXjhS5ReP5L/diDOyw1hW4Udfs="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"cYuPSF6qh8J8PpIUxQpU0naFvl4=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"fCXjhS5ReP5L/diDOyw1hW4Udfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/DSPjBj91qbndr1Ii3taB26OKE="},{"type":"next-occurrence","id":"DuEbBaUi9/PzJc37nmezHpeDuzY="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"fCXjhS5ReP5L/diDOyw1hW4Udfs=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"DuEbBaUi9/PzJc37nmezHpeDuzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/DSPjBj91qbndr1Ii3taB26OKE="},{"type":"next-occurrence","id":"M/pkR1H6Kxl0Q7Zn7qbdhZfaTBo="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"DuEbBaUi9/PzJc37nmezHpeDuzY=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"M/pkR1H6Kxl0Q7Zn7qbdhZfaTBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/DSPjBj91qbndr1Ii3taB26OKE="},{"type":"next-occurrence","id":"0q+gCsAbQbrhw6spGtsUGi5TjQc="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"M/pkR1H6Kxl0Q7Zn7qbdhZfaTBo=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"0q+gCsAbQbrhw6spGtsUGi5TjQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/DSPjBj91qbndr1Ii3taB26OKE="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"0q+gCsAbQbrhw6spGtsUGi5TjQc=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"e4LL5oXW4kT50hu1I4vRqdpHz1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 5 both directions between Almond Street (Syracuse) and University Ave (Syracuse), Continuous Thursday January 1st, 2026 07:00 AM thru Wednesday July 1st, 2026 03:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-27T17:43:45Z"},"road_event_id":"e4LL5oXW4kT50hu1I4vRqdpHz1g=","beginning_cross_street":"Almond Street","ending_cross_street":"University Ave ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.141945,43.050785]]}},{"id":"DD9Ajayri5HFOG0g65rlhS6IKTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"h76qGEuExBVxfVld/2qeC2c7alg="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"DD9Ajayri5HFOG0g65rlhS6IKTs=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"h76qGEuExBVxfVld/2qeC2c7alg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DD9Ajayri5HFOG0g65rlhS6IKTs="},{"type":"next-occurrence","id":"ysyxpbyR3zU+gI73UKGbTd+mmgo="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"h76qGEuExBVxfVld/2qeC2c7alg=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"ysyxpbyR3zU+gI73UKGbTd+mmgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DD9Ajayri5HFOG0g65rlhS6IKTs="},{"type":"next-occurrence","id":"CT9e5ExNPLhvMUV6ycglCUZU8Ug="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"ysyxpbyR3zU+gI73UKGbTd+mmgo=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"CT9e5ExNPLhvMUV6ycglCUZU8Ug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DD9Ajayri5HFOG0g65rlhS6IKTs="},{"type":"next-occurrence","id":"tkcTVWMjy3MmNC7aZMlmfc/XfX8="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"CT9e5ExNPLhvMUV6ycglCUZU8Ug=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T10:30:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"tkcTVWMjy3MmNC7aZMlmfc/XfX8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DD9Ajayri5HFOG0g65rlhS6IKTs="},{"type":"next-occurrence","id":"dZQV3PERUUndjMTC9Lbar6O3Mk8="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"tkcTVWMjy3MmNC7aZMlmfc/XfX8=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"dZQV3PERUUndjMTC9Lbar6O3Mk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DD9Ajayri5HFOG0g65rlhS6IKTs="},{"type":"next-occurrence","id":"OBAwqCX+NL0+nZgjRDQlQK96x6c="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"dZQV3PERUUndjMTC9Lbar6O3Mk8=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"OBAwqCX+NL0+nZgjRDQlQK96x6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DD9Ajayri5HFOG0g65rlhS6IKTs="},{"type":"next-occurrence","id":"qF8VUDWLrVBZoGGgnyiAvHrdMVs="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"OBAwqCX+NL0+nZgjRDQlQK96x6c=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"qF8VUDWLrVBZoGGgnyiAvHrdMVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DD9Ajayri5HFOG0g65rlhS6IKTs="},{"type":"next-occurrence","id":"P4GMuoRMLM/Ht0vMIfZj5JbIcrU="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"qF8VUDWLrVBZoGGgnyiAvHrdMVs=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"P4GMuoRMLM/Ht0vMIfZj5JbIcrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DD9Ajayri5HFOG0g65rlhS6IKTs="},{"type":"next-occurrence","id":"131R8wj3/4HS8PCtZwrT2IHyuqM="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"P4GMuoRMLM/Ht0vMIfZj5JbIcrU=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"131R8wj3/4HS8PCtZwrT2IHyuqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DD9Ajayri5HFOG0g65rlhS6IKTs="},{"type":"next-occurrence","id":"QPUTLNsvwedACUIuWC9qiTDN5Nc="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"131R8wj3/4HS8PCtZwrT2IHyuqM=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T10:30:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"QPUTLNsvwedACUIuWC9qiTDN5Nc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DD9Ajayri5HFOG0g65rlhS6IKTs="},{"type":"next-occurrence","id":"Lq1rkPUXRnWMxMkqUjlo49vEY4s="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"QPUTLNsvwedACUIuWC9qiTDN5Nc=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"Lq1rkPUXRnWMxMkqUjlo49vEY4s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DD9Ajayri5HFOG0g65rlhS6IKTs="},{"type":"next-occurrence","id":"seiT/UhIGmYRQUpm3axJKbIXfQ4="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"Lq1rkPUXRnWMxMkqUjlo49vEY4s=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"seiT/UhIGmYRQUpm3axJKbIXfQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DD9Ajayri5HFOG0g65rlhS6IKTs="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"seiT/UhIGmYRQUpm3axJKbIXfQ4=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"F5w5vL7T50KN/0e4Q1/I+H2uU9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) NB lane shift to SB side for 81 project, Continuous Thursday January 1st, 2026 09:00 AM thru Sunday May 31st, 2026 03:30 PM All lanes open","update_date":"2026-03-12T10:52:11Z"},"road_event_id":"F5w5vL7T50KN/0e4Q1/I+H2uU9Y=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140383,43.019988]]}},{"id":"nyLL+I18+EjRXi5at7eq8+E9CIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Cv9nM0biYMzK/rVtWKCJUJ7ZzCM="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"nyLL+I18+EjRXi5at7eq8+E9CIQ=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"Cv9nM0biYMzK/rVtWKCJUJ7ZzCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nyLL+I18+EjRXi5at7eq8+E9CIQ="},{"type":"next-occurrence","id":"ZkW8IIP6sBojkizNhfkEMo96s68="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"Cv9nM0biYMzK/rVtWKCJUJ7ZzCM=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"ZkW8IIP6sBojkizNhfkEMo96s68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nyLL+I18+EjRXi5at7eq8+E9CIQ="},{"type":"next-occurrence","id":"CW59qPUNqm/6DlbWi2LEmgG5Dmw="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"ZkW8IIP6sBojkizNhfkEMo96s68=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"CW59qPUNqm/6DlbWi2LEmgG5Dmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nyLL+I18+EjRXi5at7eq8+E9CIQ="},{"type":"next-occurrence","id":"Nt2rlQkgXoa0kh2nGQNNsLVIx+M="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"CW59qPUNqm/6DlbWi2LEmgG5Dmw=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T10:30:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"Nt2rlQkgXoa0kh2nGQNNsLVIx+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nyLL+I18+EjRXi5at7eq8+E9CIQ="},{"type":"next-occurrence","id":"25zzQaFL+j4ZKh1xbuOX36u+vMo="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"Nt2rlQkgXoa0kh2nGQNNsLVIx+M=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"25zzQaFL+j4ZKh1xbuOX36u+vMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nyLL+I18+EjRXi5at7eq8+E9CIQ="},{"type":"next-occurrence","id":"COPz+i4rQDcpHfaSuqWu9jWjTSM="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"25zzQaFL+j4ZKh1xbuOX36u+vMo=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"COPz+i4rQDcpHfaSuqWu9jWjTSM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nyLL+I18+EjRXi5at7eq8+E9CIQ="},{"type":"next-occurrence","id":"uksL2Gs/bxK010on3wTIlR9Ofp8="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"COPz+i4rQDcpHfaSuqWu9jWjTSM=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"uksL2Gs/bxK010on3wTIlR9Ofp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nyLL+I18+EjRXi5at7eq8+E9CIQ="},{"type":"next-occurrence","id":"HVg1mkl6FxHYGsPXkkqV6ZDTByE="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"uksL2Gs/bxK010on3wTIlR9Ofp8=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"HVg1mkl6FxHYGsPXkkqV6ZDTByE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nyLL+I18+EjRXi5at7eq8+E9CIQ="},{"type":"next-occurrence","id":"piTp96PYboESr715oMKQ8AkBVXY="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"HVg1mkl6FxHYGsPXkkqV6ZDTByE=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"piTp96PYboESr715oMKQ8AkBVXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nyLL+I18+EjRXi5at7eq8+E9CIQ="},{"type":"next-occurrence","id":"ztAwggIyDrTbDp9Tcl7SbNSCORk="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"piTp96PYboESr715oMKQ8AkBVXY=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T10:30:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"ztAwggIyDrTbDp9Tcl7SbNSCORk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nyLL+I18+EjRXi5at7eq8+E9CIQ="},{"type":"next-occurrence","id":"MuncMRk32jaOcKpqbgbtuNFkMHM="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"ztAwggIyDrTbDp9Tcl7SbNSCORk=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"MuncMRk32jaOcKpqbgbtuNFkMHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nyLL+I18+EjRXi5at7eq8+E9CIQ="},{"type":"next-occurrence","id":"miJEi5GUH/J4lxZT2eNxltQODyk="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"MuncMRk32jaOcKpqbgbtuNFkMHM=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"miJEi5GUH/J4lxZT2eNxltQODyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nyLL+I18+EjRXi5at7eq8+E9CIQ="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"miJEi5GUH/J4lxZT2eNxltQODyk=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"yI8LBd9JRn8AYMnI3y/A0ZREGrs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Y1o/0WmupZrQ0t25Hugkx/77wec="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"yI8LBd9JRn8AYMnI3y/A0ZREGrs=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"Y1o/0WmupZrQ0t25Hugkx/77wec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yI8LBd9JRn8AYMnI3y/A0ZREGrs="},{"type":"next-occurrence","id":"Tw5whUuNg/5seYe45H3XRcsY5r0="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"Y1o/0WmupZrQ0t25Hugkx/77wec=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"Tw5whUuNg/5seYe45H3XRcsY5r0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yI8LBd9JRn8AYMnI3y/A0ZREGrs="},{"type":"next-occurrence","id":"9TBTd+EW8a5y/RQ9UMeePBApFL8="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"Tw5whUuNg/5seYe45H3XRcsY5r0=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"9TBTd+EW8a5y/RQ9UMeePBApFL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yI8LBd9JRn8AYMnI3y/A0ZREGrs="},{"type":"next-occurrence","id":"O5Zhw2rUnl/FsxL1/HyXg7NQ0Gg="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"9TBTd+EW8a5y/RQ9UMeePBApFL8=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"O5Zhw2rUnl/FsxL1/HyXg7NQ0Gg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yI8LBd9JRn8AYMnI3y/A0ZREGrs="},{"type":"next-occurrence","id":"iwLC3vhaWSlA8F3EkPIHEamZhcU="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"O5Zhw2rUnl/FsxL1/HyXg7NQ0Gg=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"iwLC3vhaWSlA8F3EkPIHEamZhcU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yI8LBd9JRn8AYMnI3y/A0ZREGrs="},{"type":"next-occurrence","id":"JAVN7aJm7pQGAsKjd2gKq8+v4tc="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"iwLC3vhaWSlA8F3EkPIHEamZhcU=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"JAVN7aJm7pQGAsKjd2gKq8+v4tc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yI8LBd9JRn8AYMnI3y/A0ZREGrs="},{"type":"next-occurrence","id":"PfecToiTSKPMNqCL1+gDrPK6rZI="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"JAVN7aJm7pQGAsKjd2gKq8+v4tc=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"PfecToiTSKPMNqCL1+gDrPK6rZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yI8LBd9JRn8AYMnI3y/A0ZREGrs="},{"type":"next-occurrence","id":"DjmDP6drBd0JMzPN/nR/TIvzCjg="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"PfecToiTSKPMNqCL1+gDrPK6rZI=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"DjmDP6drBd0JMzPN/nR/TIvzCjg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yI8LBd9JRn8AYMnI3y/A0ZREGrs="},{"type":"next-occurrence","id":"WlsdAueoEr0MNT1mjIJS1v6BSfA="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"DjmDP6drBd0JMzPN/nR/TIvzCjg=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"WlsdAueoEr0MNT1mjIJS1v6BSfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yI8LBd9JRn8AYMnI3y/A0ZREGrs="},{"type":"next-occurrence","id":"b9/wL/lLYQzTFxDVLoT5unS06fg="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"WlsdAueoEr0MNT1mjIJS1v6BSfA=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"b9/wL/lLYQzTFxDVLoT5unS06fg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yI8LBd9JRn8AYMnI3y/A0ZREGrs="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"b9/wL/lLYQzTFxDVLoT5unS06fg=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"Ye2jUrTKhSdb3k8LwhzvT1m4gSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"05QihVyJFLcrfm417+Gd6esvTgc="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"Ye2jUrTKhSdb3k8LwhzvT1m4gSU=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"05QihVyJFLcrfm417+Gd6esvTgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ye2jUrTKhSdb3k8LwhzvT1m4gSU="},{"type":"next-occurrence","id":"suj4cdo2U6JGx0UnnKpcBwm7dmg="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"05QihVyJFLcrfm417+Gd6esvTgc=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"suj4cdo2U6JGx0UnnKpcBwm7dmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ye2jUrTKhSdb3k8LwhzvT1m4gSU="},{"type":"next-occurrence","id":"BcphR6s+RNmGvpFza8RKCHr3agY="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"suj4cdo2U6JGx0UnnKpcBwm7dmg=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"BcphR6s+RNmGvpFza8RKCHr3agY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ye2jUrTKhSdb3k8LwhzvT1m4gSU="},{"type":"next-occurrence","id":"k2ViBcguNbEMRLq+tpKNaPec/kg="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"BcphR6s+RNmGvpFza8RKCHr3agY=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"k2ViBcguNbEMRLq+tpKNaPec/kg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ye2jUrTKhSdb3k8LwhzvT1m4gSU="},{"type":"next-occurrence","id":"ENYXN1Pkm7FHAG0ZKiye20xBDHM="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"k2ViBcguNbEMRLq+tpKNaPec/kg=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"ENYXN1Pkm7FHAG0ZKiye20xBDHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ye2jUrTKhSdb3k8LwhzvT1m4gSU="},{"type":"next-occurrence","id":"0asBxkT6KLamyejXahXwHm+5VpI="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"ENYXN1Pkm7FHAG0ZKiye20xBDHM=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"0asBxkT6KLamyejXahXwHm+5VpI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ye2jUrTKhSdb3k8LwhzvT1m4gSU="},{"type":"next-occurrence","id":"HCMBClP5YEM+uyL0oNkpndy0O9k="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"0asBxkT6KLamyejXahXwHm+5VpI=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"HCMBClP5YEM+uyL0oNkpndy0O9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ye2jUrTKhSdb3k8LwhzvT1m4gSU="},{"type":"next-occurrence","id":"LKkMQ0S7+poNAir0EUI9ob6ruuU="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"HCMBClP5YEM+uyL0oNkpndy0O9k=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"LKkMQ0S7+poNAir0EUI9ob6ruuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ye2jUrTKhSdb3k8LwhzvT1m4gSU="},{"type":"next-occurrence","id":"WSzAQhKN/dFJVHvrHbCGMHy/MvI="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"LKkMQ0S7+poNAir0EUI9ob6ruuU=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"WSzAQhKN/dFJVHvrHbCGMHy/MvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ye2jUrTKhSdb3k8LwhzvT1m4gSU="},{"type":"next-occurrence","id":"B1ftMDuZrEFw9R/w2BZxp5M3Fdk="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"WSzAQhKN/dFJVHvrHbCGMHy/MvI=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"B1ftMDuZrEFw9R/w2BZxp5M3Fdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ye2jUrTKhSdb3k8LwhzvT1m4gSU="},{"type":"next-occurrence","id":"5wb8u2TizU39wRK+RjzqrZKJVVA="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"B1ftMDuZrEFw9R/w2BZxp5M3Fdk=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"5wb8u2TizU39wRK+RjzqrZKJVVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ye2jUrTKhSdb3k8LwhzvT1m4gSU="},{"type":"next-occurrence","id":"NzrBQw6ZjzWcCJQ/NJmd665WNgs="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"5wb8u2TizU39wRK+RjzqrZKJVVA=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"NzrBQw6ZjzWcCJQ/NJmd665WNgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ye2jUrTKhSdb3k8LwhzvT1m4gSU="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"NzrBQw6ZjzWcCJQ/NJmd665WNgs=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"1fgg923659Fk1N4PLemEtqq2Y60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sfMqH4xJJTqXXFe9nxNWpYs9R6w="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"1fgg923659Fk1N4PLemEtqq2Y60=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"sfMqH4xJJTqXXFe9nxNWpYs9R6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1fgg923659Fk1N4PLemEtqq2Y60="},{"type":"next-occurrence","id":"YZIzwFthSkW70TLrx04zlF5Jymg="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"sfMqH4xJJTqXXFe9nxNWpYs9R6w=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"YZIzwFthSkW70TLrx04zlF5Jymg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1fgg923659Fk1N4PLemEtqq2Y60="},{"type":"next-occurrence","id":"iNiBhf06ionTP5U7lMYpd96T+aY="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"YZIzwFthSkW70TLrx04zlF5Jymg=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"iNiBhf06ionTP5U7lMYpd96T+aY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1fgg923659Fk1N4PLemEtqq2Y60="},{"type":"next-occurrence","id":"EwLi0z9DOhS+mS5P+/csDlgLAeo="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"iNiBhf06ionTP5U7lMYpd96T+aY=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"EwLi0z9DOhS+mS5P+/csDlgLAeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1fgg923659Fk1N4PLemEtqq2Y60="},{"type":"next-occurrence","id":"7w6tGuzHl7dq2E5t9vRhvqxIRxo="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"EwLi0z9DOhS+mS5P+/csDlgLAeo=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"7w6tGuzHl7dq2E5t9vRhvqxIRxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1fgg923659Fk1N4PLemEtqq2Y60="},{"type":"next-occurrence","id":"V/31nvrUOLq5OY4sdCVKqHPP58o="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"7w6tGuzHl7dq2E5t9vRhvqxIRxo=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"V/31nvrUOLq5OY4sdCVKqHPP58o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1fgg923659Fk1N4PLemEtqq2Y60="},{"type":"next-occurrence","id":"Ejyzf7iEwDzqp2XEi83WIP7iWNU="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"V/31nvrUOLq5OY4sdCVKqHPP58o=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"Ejyzf7iEwDzqp2XEi83WIP7iWNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1fgg923659Fk1N4PLemEtqq2Y60="},{"type":"next-occurrence","id":"JwUU8h6t7Vd3ObXqsG/e54cS7Ns="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"Ejyzf7iEwDzqp2XEi83WIP7iWNU=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"JwUU8h6t7Vd3ObXqsG/e54cS7Ns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1fgg923659Fk1N4PLemEtqq2Y60="},{"type":"next-occurrence","id":"pO7g2kGmeH9ARsiPhMaFzPOHnjw="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"JwUU8h6t7Vd3ObXqsG/e54cS7Ns=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"pO7g2kGmeH9ARsiPhMaFzPOHnjw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1fgg923659Fk1N4PLemEtqq2Y60="},{"type":"next-occurrence","id":"0NFIWQCUcpgpfLPREM66N0GKOuk="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"pO7g2kGmeH9ARsiPhMaFzPOHnjw=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"0NFIWQCUcpgpfLPREM66N0GKOuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1fgg923659Fk1N4PLemEtqq2Y60="},{"type":"next-occurrence","id":"Mx22I/TLWrNumqp/ydKEUy05uY8="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"0NFIWQCUcpgpfLPREM66N0GKOuk=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"Mx22I/TLWrNumqp/ydKEUy05uY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1fgg923659Fk1N4PLemEtqq2Y60="},{"type":"next-occurrence","id":"rp+DR/rbPZAIWcu6TqR48DLBFJE="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"Mx22I/TLWrNumqp/ydKEUy05uY8=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"rp+DR/rbPZAIWcu6TqR48DLBFJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1fgg923659Fk1N4PLemEtqq2Y60="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"rp+DR/rbPZAIWcu6TqR48DLBFJE=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"/x8LIbDUPxsgbV4EAjZ8RO5HoxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"O50NpLOiW1nPB3xMvHeHvTw74ow="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"/x8LIbDUPxsgbV4EAjZ8RO5HoxE=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"O50NpLOiW1nPB3xMvHeHvTw74ow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/x8LIbDUPxsgbV4EAjZ8RO5HoxE="},{"type":"next-occurrence","id":"Ej5HHmnHrVMWmXmNtf86AGmqFl4="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"O50NpLOiW1nPB3xMvHeHvTw74ow=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"Ej5HHmnHrVMWmXmNtf86AGmqFl4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/x8LIbDUPxsgbV4EAjZ8RO5HoxE="},{"type":"next-occurrence","id":"amooU4fiWleNH+EgNTuWEdmnNhE="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"Ej5HHmnHrVMWmXmNtf86AGmqFl4=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"amooU4fiWleNH+EgNTuWEdmnNhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/x8LIbDUPxsgbV4EAjZ8RO5HoxE="},{"type":"next-occurrence","id":"Nxw+uIe2vsbySlxZmUr316mWqCs="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"amooU4fiWleNH+EgNTuWEdmnNhE=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"Nxw+uIe2vsbySlxZmUr316mWqCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/x8LIbDUPxsgbV4EAjZ8RO5HoxE="},{"type":"next-occurrence","id":"47NktzcXetYhmMZAgPFB2cxMnnM="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"Nxw+uIe2vsbySlxZmUr316mWqCs=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"47NktzcXetYhmMZAgPFB2cxMnnM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/x8LIbDUPxsgbV4EAjZ8RO5HoxE="},{"type":"next-occurrence","id":"7SMUR96IPqAYrvU/Io3l8/aw4+k="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"47NktzcXetYhmMZAgPFB2cxMnnM=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"7SMUR96IPqAYrvU/Io3l8/aw4+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/x8LIbDUPxsgbV4EAjZ8RO5HoxE="},{"type":"next-occurrence","id":"ayBRLRWwjPtvAZRPc5ULG4b47cU="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"7SMUR96IPqAYrvU/Io3l8/aw4+k=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"ayBRLRWwjPtvAZRPc5ULG4b47cU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/x8LIbDUPxsgbV4EAjZ8RO5HoxE="},{"type":"next-occurrence","id":"SDlQ7oEBzBgGEcus5T9jdFMmMBo="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"ayBRLRWwjPtvAZRPc5ULG4b47cU=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"SDlQ7oEBzBgGEcus5T9jdFMmMBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/x8LIbDUPxsgbV4EAjZ8RO5HoxE="},{"type":"next-occurrence","id":"OnxVkIOsNRFTca3A9pg0KVhTfKI="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"SDlQ7oEBzBgGEcus5T9jdFMmMBo=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"OnxVkIOsNRFTca3A9pg0KVhTfKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/x8LIbDUPxsgbV4EAjZ8RO5HoxE="},{"type":"next-occurrence","id":"HKvwgSy/g/jwmLitXWv78wJ71ZE="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"OnxVkIOsNRFTca3A9pg0KVhTfKI=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"HKvwgSy/g/jwmLitXWv78wJ71ZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/x8LIbDUPxsgbV4EAjZ8RO5HoxE="},{"type":"next-occurrence","id":"yrlufMoMRc9XALeMns14BxmO/0I="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"HKvwgSy/g/jwmLitXWv78wJ71ZE=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"yrlufMoMRc9XALeMns14BxmO/0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/x8LIbDUPxsgbV4EAjZ8RO5HoxE="},{"type":"next-occurrence","id":"SAitz52y5PHSBY+vlagBwF25zsI="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"yrlufMoMRc9XALeMns14BxmO/0I=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"SAitz52y5PHSBY+vlagBwF25zsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/x8LIbDUPxsgbV4EAjZ8RO5HoxE="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"SAitz52y5PHSBY+vlagBwF25zsI=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"VBCHliD8ixQ82Sk0b9617z+Jzos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sKyzCz3L4AuRi68dxiRZYrz9pD4="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"VBCHliD8ixQ82Sk0b9617z+Jzos=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"sKyzCz3L4AuRi68dxiRZYrz9pD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VBCHliD8ixQ82Sk0b9617z+Jzos="},{"type":"next-occurrence","id":"/sbmoU3tDV7M/ax6jvSGHk0KgdM="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"sKyzCz3L4AuRi68dxiRZYrz9pD4=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"/sbmoU3tDV7M/ax6jvSGHk0KgdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VBCHliD8ixQ82Sk0b9617z+Jzos="},{"type":"next-occurrence","id":"Yy6byrxjUHUaMn/U8O3jR2qbUvI="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"/sbmoU3tDV7M/ax6jvSGHk0KgdM=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"Yy6byrxjUHUaMn/U8O3jR2qbUvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VBCHliD8ixQ82Sk0b9617z+Jzos="},{"type":"next-occurrence","id":"6wPq+tDO2LmbjnWhkYSg2xA6ht4="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"Yy6byrxjUHUaMn/U8O3jR2qbUvI=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"6wPq+tDO2LmbjnWhkYSg2xA6ht4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VBCHliD8ixQ82Sk0b9617z+Jzos="},{"type":"next-occurrence","id":"aeu0CKzPCc6hEbTP09dAN6eREUs="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"6wPq+tDO2LmbjnWhkYSg2xA6ht4=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"aeu0CKzPCc6hEbTP09dAN6eREUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VBCHliD8ixQ82Sk0b9617z+Jzos="},{"type":"next-occurrence","id":"TpfPOTGsXSou+PZFeH04ssNozwQ="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"aeu0CKzPCc6hEbTP09dAN6eREUs=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"TpfPOTGsXSou+PZFeH04ssNozwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VBCHliD8ixQ82Sk0b9617z+Jzos="},{"type":"next-occurrence","id":"64yGVjTWDeZuO7YvD5EvUlZfoKQ="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"TpfPOTGsXSou+PZFeH04ssNozwQ=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"64yGVjTWDeZuO7YvD5EvUlZfoKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VBCHliD8ixQ82Sk0b9617z+Jzos="},{"type":"next-occurrence","id":"sLWO4gf44+/Hvzc2lM01LDRqBOU="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"64yGVjTWDeZuO7YvD5EvUlZfoKQ=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"sLWO4gf44+/Hvzc2lM01LDRqBOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VBCHliD8ixQ82Sk0b9617z+Jzos="},{"type":"next-occurrence","id":"ocyHuG2oHfUyjs0Wqn6xGj6yc64="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"sLWO4gf44+/Hvzc2lM01LDRqBOU=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"ocyHuG2oHfUyjs0Wqn6xGj6yc64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VBCHliD8ixQ82Sk0b9617z+Jzos="},{"type":"next-occurrence","id":"XcM5o6ORzaWyUqsaomZWa/NeYjM="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"ocyHuG2oHfUyjs0Wqn6xGj6yc64=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"XcM5o6ORzaWyUqsaomZWa/NeYjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VBCHliD8ixQ82Sk0b9617z+Jzos="},{"type":"next-occurrence","id":"nOu3GhE5Yisdv5+R/vi3pu9bRLA="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"XcM5o6ORzaWyUqsaomZWa/NeYjM=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"nOu3GhE5Yisdv5+R/vi3pu9bRLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VBCHliD8ixQ82Sk0b9617z+Jzos="},{"type":"next-occurrence","id":"43LvMJAHU1pCu1gJ13YNhin+D00="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"nOu3GhE5Yisdv5+R/vi3pu9bRLA=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"43LvMJAHU1pCu1gJ13YNhin+D00=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VBCHliD8ixQ82Sk0b9617z+Jzos="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"43LvMJAHU1pCu1gJ13YNhin+D00=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"N0WKLjImei0u2qcjGznRUA/bD3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-81 southbound ramp to Exit 1A (Old Exit 16A) - I-481 (Syracuse) ; follow detour, Continuous Thursday January 1st, 2026 12:00 AM thru Friday September 4th, 2026 03:00 PM All lanes closed","update_date":"2026-03-12T11:03:11Z"},"road_event_id":"N0WKLjImei0u2qcjGznRUA/bD3k=","beginning_cross_street":"Exit 1A (Old Exit 16A) - I-481  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.135376,43.00864]]}},{"id":"vn9lnz19HuHyXQ8PQfX6cB1kLwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iG2lGLbXwyRAPeBSSqTQDeaxeQY="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"vn9lnz19HuHyXQ8PQfX6cB1kLwg=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"iG2lGLbXwyRAPeBSSqTQDeaxeQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vn9lnz19HuHyXQ8PQfX6cB1kLwg="},{"type":"next-occurrence","id":"Pz+X8aR++Ng4vtNuvaEaWKZxcvs="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"iG2lGLbXwyRAPeBSSqTQDeaxeQY=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"Pz+X8aR++Ng4vtNuvaEaWKZxcvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vn9lnz19HuHyXQ8PQfX6cB1kLwg="},{"type":"next-occurrence","id":"5eorz7i2aEj5IraWsKZPBfoxyNo="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"Pz+X8aR++Ng4vtNuvaEaWKZxcvs=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"5eorz7i2aEj5IraWsKZPBfoxyNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vn9lnz19HuHyXQ8PQfX6cB1kLwg="},{"type":"next-occurrence","id":"3l5daHo65y1lUlEyLzNNogKYX98="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"5eorz7i2aEj5IraWsKZPBfoxyNo=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"3l5daHo65y1lUlEyLzNNogKYX98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vn9lnz19HuHyXQ8PQfX6cB1kLwg="},{"type":"next-occurrence","id":"ohDagF/dI6GLdkNJhGXikwu5BuI="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"3l5daHo65y1lUlEyLzNNogKYX98=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"ohDagF/dI6GLdkNJhGXikwu5BuI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vn9lnz19HuHyXQ8PQfX6cB1kLwg="},{"type":"next-occurrence","id":"2RlNWB2LL+N+jpkEr2Ugvas0BOc="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"ohDagF/dI6GLdkNJhGXikwu5BuI=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"2RlNWB2LL+N+jpkEr2Ugvas0BOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vn9lnz19HuHyXQ8PQfX6cB1kLwg="},{"type":"next-occurrence","id":"5lWDzNnLNIsPDbIfRyF6makC0xA="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"2RlNWB2LL+N+jpkEr2Ugvas0BOc=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"5lWDzNnLNIsPDbIfRyF6makC0xA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vn9lnz19HuHyXQ8PQfX6cB1kLwg="},{"type":"next-occurrence","id":"3GY7DAOefy9MAcB/SWxlMCLumY0="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"5lWDzNnLNIsPDbIfRyF6makC0xA=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"3GY7DAOefy9MAcB/SWxlMCLumY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vn9lnz19HuHyXQ8PQfX6cB1kLwg="},{"type":"next-occurrence","id":"kz1UUGEm3LldEO1TEhvINga7liQ="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"3GY7DAOefy9MAcB/SWxlMCLumY0=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"kz1UUGEm3LldEO1TEhvINga7liQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vn9lnz19HuHyXQ8PQfX6cB1kLwg="},{"type":"next-occurrence","id":"/h0RU7hkewpe9qt7Ii6lz+kYpcA="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"kz1UUGEm3LldEO1TEhvINga7liQ=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"/h0RU7hkewpe9qt7Ii6lz+kYpcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vn9lnz19HuHyXQ8PQfX6cB1kLwg="},{"type":"next-occurrence","id":"GyZ9mkL1uvpjgLCAetRVAHA5PtY="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"/h0RU7hkewpe9qt7Ii6lz+kYpcA=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"GyZ9mkL1uvpjgLCAetRVAHA5PtY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vn9lnz19HuHyXQ8PQfX6cB1kLwg="},{"type":"next-occurrence","id":"XawLOOX1j2Ws/IjbcM7VCoI5qC4="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"GyZ9mkL1uvpjgLCAetRVAHA5PtY=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"XawLOOX1j2Ws/IjbcM7VCoI5qC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vn9lnz19HuHyXQ8PQfX6cB1kLwg="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"XawLOOX1j2Ws/IjbcM7VCoI5qC4=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"cciDUInH+plGRmI6DXexdsmUH0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JjSXw71JYPhX51hDq1zf5IBvdN4="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"cciDUInH+plGRmI6DXexdsmUH0A=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"JjSXw71JYPhX51hDq1zf5IBvdN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cciDUInH+plGRmI6DXexdsmUH0A="},{"type":"next-occurrence","id":"0iP4KWwyUfkgFNE5/F68UXyGDdc="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"JjSXw71JYPhX51hDq1zf5IBvdN4=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"0iP4KWwyUfkgFNE5/F68UXyGDdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cciDUInH+plGRmI6DXexdsmUH0A="},{"type":"next-occurrence","id":"h/Bc/R9Iu587BKG2yBjBZ/PJghY="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"0iP4KWwyUfkgFNE5/F68UXyGDdc=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"h/Bc/R9Iu587BKG2yBjBZ/PJghY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cciDUInH+plGRmI6DXexdsmUH0A="},{"type":"next-occurrence","id":"Mjpokul3Wsjtg9Aowg0SXPnT7cU="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"h/Bc/R9Iu587BKG2yBjBZ/PJghY=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"Mjpokul3Wsjtg9Aowg0SXPnT7cU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cciDUInH+plGRmI6DXexdsmUH0A="},{"type":"next-occurrence","id":"V0hSJqCcSh7q7UGHGqLXEeDv15M="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"Mjpokul3Wsjtg9Aowg0SXPnT7cU=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"V0hSJqCcSh7q7UGHGqLXEeDv15M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cciDUInH+plGRmI6DXexdsmUH0A="},{"type":"next-occurrence","id":"QSNRR5GQyRi6EGMFvUPdzLC9ENg="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"V0hSJqCcSh7q7UGHGqLXEeDv15M=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"QSNRR5GQyRi6EGMFvUPdzLC9ENg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cciDUInH+plGRmI6DXexdsmUH0A="},{"type":"next-occurrence","id":"1Fwzkg0yKgmn5YasPhvKp7+gj6A="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"QSNRR5GQyRi6EGMFvUPdzLC9ENg=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"1Fwzkg0yKgmn5YasPhvKp7+gj6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cciDUInH+plGRmI6DXexdsmUH0A="},{"type":"next-occurrence","id":"aDERuMuatO1X46u/QEvMXaLJOmI="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"1Fwzkg0yKgmn5YasPhvKp7+gj6A=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"aDERuMuatO1X46u/QEvMXaLJOmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cciDUInH+plGRmI6DXexdsmUH0A="},{"type":"next-occurrence","id":"95Wci76eSCJBLmPqPLMU0DFvlgA="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"aDERuMuatO1X46u/QEvMXaLJOmI=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"95Wci76eSCJBLmPqPLMU0DFvlgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cciDUInH+plGRmI6DXexdsmUH0A="},{"type":"next-occurrence","id":"M4Gr4LYzsx4YbjoOlUUR9p6z5Js="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"95Wci76eSCJBLmPqPLMU0DFvlgA=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"M4Gr4LYzsx4YbjoOlUUR9p6z5Js=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cciDUInH+plGRmI6DXexdsmUH0A="},{"type":"next-occurrence","id":"HYhx/i8wFCN3O8O35UbM1xvqfNc="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"M4Gr4LYzsx4YbjoOlUUR9p6z5Js=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"HYhx/i8wFCN3O8O35UbM1xvqfNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cciDUInH+plGRmI6DXexdsmUH0A="},{"type":"next-occurrence","id":"lNZDlJQwsVTkr7kee9r4HadFIq0="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"HYhx/i8wFCN3O8O35UbM1xvqfNc=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"lNZDlJQwsVTkr7kee9r4HadFIq0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cciDUInH+plGRmI6DXexdsmUH0A="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"lNZDlJQwsVTkr7kee9r4HadFIq0=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"2020iDb3hq2ZFCDz0tC7LqnNufE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 88 (Old Exit 4) - I-690 (De Witt) ; Lane Shift, Continuous Thursday January 1st, 2026 09:00 AM thru Friday September 11th, 2026 06:00 PM All lanes open","update_date":"2026-03-16T12:59:23Z"},"road_event_id":"2020iDb3hq2ZFCDz0tC7LqnNufE=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 88 (Old Exit 4) - I-690     ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053712,43.083097]]}},{"id":"H1WahhrV52tG341zIvUtB6nMLgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; follow detour, Continuous Thursday January 1st,2026 09:00 AM thru Friday September 11th,2026 06:00 PM All lanes closed ,","update_date":"2026-04-11T21:30:01Z"},"road_event_id":"H1WahhrV52tG341zIvUtB6nMLgo=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055974,43.076862]]}},{"id":"CD7iscIiLPjxWoduc/BHpvlvh0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[],"description":"Bridge work on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Continuous Wednesday December 31st, 2025 12:00 AM thru Thursday August 27th, 2026 11:59 PM All lanes closed","update_date":"2025-12-31T15:12:21Z"},"road_event_id":"CD7iscIiLPjxWoduc/BHpvlvh0M=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855797,41.675278]]}},{"id":"x3oScJmSHM87HWtAUh2Vef4m+lw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on US 11 both directions between Bennett St (Cicero) and River Rd (Hastings) ; Alternating one-way traffic with temporary signals, Continuous Monday January 12th, 2026 09:00 AM thru Thursday December 31st, 2026 03:30 PM All lanes open","update_date":"2026-04-09T17:20:27Z"},"road_event_id":"x3oScJmSHM87HWtAUh2Vef4m+lw=","beginning_cross_street":"Bennett St","ending_cross_street":"River Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140613,43.239408]]}},{"id":"+uIgfxFIZ8ncFSB7cC7SBOy0L+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 34 both directions between Trombley Rd (Brutus) and Emerson Rd (Cato) ; follow detour, Continuous Thursday January 1st, 2026 07:00 AM thru Sunday November 1st, 2026 06:00 AM All lanes closed","update_date":"2026-03-12T10:52:38Z"},"road_event_id":"+uIgfxFIZ8ncFSB7cC7SBOy0L+8=","beginning_cross_street":"Trombley Rd","ending_cross_street":"Emerson Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.559128,43.06476]]}},{"id":"CBtlFGZb7R4iQB/9p915dP6RLgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"M0579m5PxIkhKQ7k+18u8cqYKJY="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"CBtlFGZb7R4iQB/9p915dP6RLgA=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T17:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"M0579m5PxIkhKQ7k+18u8cqYKJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CBtlFGZb7R4iQB/9p915dP6RLgA="},{"type":"next-occurrence","id":"Yk2+W7Ec1NFkUlSVu+K+IGk5rlc="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"M0579m5PxIkhKQ7k+18u8cqYKJY=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T17:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"Yk2+W7Ec1NFkUlSVu+K+IGk5rlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CBtlFGZb7R4iQB/9p915dP6RLgA="},{"type":"next-occurrence","id":"CaaQaVATGB9FSi5nQP5AbdK58hk="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"Yk2+W7Ec1NFkUlSVu+K+IGk5rlc=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T17:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"CaaQaVATGB9FSi5nQP5AbdK58hk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CBtlFGZb7R4iQB/9p915dP6RLgA="},{"type":"next-occurrence","id":"+BNBv1RHFqBbOMJ3Fncwpes9WX0="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"CaaQaVATGB9FSi5nQP5AbdK58hk=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T17:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"+BNBv1RHFqBbOMJ3Fncwpes9WX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CBtlFGZb7R4iQB/9p915dP6RLgA="},{"type":"next-occurrence","id":"QGHpPj9eDnxYDRIFTtJcN/Br/Gs="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"+BNBv1RHFqBbOMJ3Fncwpes9WX0=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T17:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"QGHpPj9eDnxYDRIFTtJcN/Br/Gs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CBtlFGZb7R4iQB/9p915dP6RLgA="},{"type":"next-occurrence","id":"+2jvRAq5BoLvfcW1Ke4z/ZqLxZc="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"QGHpPj9eDnxYDRIFTtJcN/Br/Gs=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T17:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"+2jvRAq5BoLvfcW1Ke4z/ZqLxZc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CBtlFGZb7R4iQB/9p915dP6RLgA="},{"type":"next-occurrence","id":"VqTJcd0UxrJRkXzMjsQEHha40dY="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"+2jvRAq5BoLvfcW1Ke4z/ZqLxZc=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T17:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"VqTJcd0UxrJRkXzMjsQEHha40dY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CBtlFGZb7R4iQB/9p915dP6RLgA="},{"type":"next-occurrence","id":"NgDjChVU3V+uOlCapYskt166TYI="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"VqTJcd0UxrJRkXzMjsQEHha40dY=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T17:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"NgDjChVU3V+uOlCapYskt166TYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CBtlFGZb7R4iQB/9p915dP6RLgA="},{"type":"next-occurrence","id":"WK2McLGz7cx3mZ6A++9Z2upXTI8="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"NgDjChVU3V+uOlCapYskt166TYI=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T17:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"WK2McLGz7cx3mZ6A++9Z2upXTI8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CBtlFGZb7R4iQB/9p915dP6RLgA="},{"type":"next-occurrence","id":"qRvqPZWMQi9igtxCDBPBrzfhgEs="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"WK2McLGz7cx3mZ6A++9Z2upXTI8=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T17:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"qRvqPZWMQi9igtxCDBPBrzfhgEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CBtlFGZb7R4iQB/9p915dP6RLgA="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"qRvqPZWMQi9igtxCDBPBrzfhgEs=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T17:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"Dzd5UqnuXoeEXMkndQyUxpz2DMI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 28 both directions area of South Inlet Raquette Lake (Raquette Lake) Motorists will encounter lane closures in both directions with the use of temporary signals, Continuous Thursday January 2nd, 2025 6:00 AM thru Wednesday September 30th, 2026 6:00 PM","update_date":"2026-02-13T10:49:56Z"},"road_event_id":"Dzd5UqnuXoeEXMkndQyUxpz2DMI=","beginning_cross_street":"South Inlet Raquette Lake","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.609983,43.807112]]}},{"id":"QZvtt3yI4C3mFx2ivE75kvaVGHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B12 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, B12 Bus area of East New York Av/Rockaway Av (New York) Eastbound buses operate via Pitkin Ave, Rockaway Ave, Eastern Parkway and Dean St. Westbound buses operate via Pacific St, Eastern Pkwy, Rockaway Ave and Pitkin Ave, Continuous Monday January 5th, 2026 12:00 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-01-05T16:22:49Z"},"road_event_id":"QZvtt3yI4C3mFx2ivE75kvaVGHQ=","beginning_cross_street":"East New York Av/Rockaway Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911737,40.671959]]}},{"id":"pTJtrTXfJ/F3SZ/ZQCrBnpm8vRg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-317"],"direction":"unknown","related_road_events":[],"description":"Bridge construction on CT-317 both directions between BEAR HILL RD (Woodbury) and HOLLOW RD (Woodbury), Continuous Monday January 12th, 2026 12:00 AM thru Friday May 15th, 2026 11:59 PM All lanes closed","update_date":"2026-01-06T19:42:10Z"},"road_event_id":"pTJtrTXfJ/F3SZ/ZQCrBnpm8vRg=","beginning_cross_street":"BEAR HILL RD","ending_cross_street":"HOLLOW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.216396,41.540584]]}},{"id":"AWJcZmUMX2YlKIRKkvAekcS7egQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EO7uMw7B/NKmQktISeXbZ8h7ens="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"AWJcZmUMX2YlKIRKkvAekcS7egQ=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:54:00Z","end_date":"2026-05-14T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"EO7uMw7B/NKmQktISeXbZ8h7ens=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AWJcZmUMX2YlKIRKkvAekcS7egQ="},{"type":"next-occurrence","id":"sfnVQuZrVSBISiTI4KV9F/61BaU="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"EO7uMw7B/NKmQktISeXbZ8h7ens=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:54:00Z","end_date":"2026-05-15T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"sfnVQuZrVSBISiTI4KV9F/61BaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AWJcZmUMX2YlKIRKkvAekcS7egQ="},{"type":"next-occurrence","id":"ofLvdQgJhB0eyvmvLLLU9nSJQBM="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"sfnVQuZrVSBISiTI4KV9F/61BaU=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:54:00Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"ofLvdQgJhB0eyvmvLLLU9nSJQBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AWJcZmUMX2YlKIRKkvAekcS7egQ="},{"type":"next-occurrence","id":"whNHqA5uQvYWefGgnISNu9B2TTw="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"ofLvdQgJhB0eyvmvLLLU9nSJQBM=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:54:00Z","end_date":"2026-05-17T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"whNHqA5uQvYWefGgnISNu9B2TTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AWJcZmUMX2YlKIRKkvAekcS7egQ="},{"type":"next-occurrence","id":"5KXVrs6QlXro/ypdWtXP2t/Jgpw="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"whNHqA5uQvYWefGgnISNu9B2TTw=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T12:54:00Z","end_date":"2026-05-18T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"5KXVrs6QlXro/ypdWtXP2t/Jgpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AWJcZmUMX2YlKIRKkvAekcS7egQ="},{"type":"next-occurrence","id":"rWOOfBpagYNC9Lg32oPpuPoiGmA="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"5KXVrs6QlXro/ypdWtXP2t/Jgpw=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T12:54:00Z","end_date":"2026-05-19T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"rWOOfBpagYNC9Lg32oPpuPoiGmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AWJcZmUMX2YlKIRKkvAekcS7egQ="},{"type":"next-occurrence","id":"fYUbsMdg6EFa2F3/BPNf30mtzfQ="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"rWOOfBpagYNC9Lg32oPpuPoiGmA=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T12:54:00Z","end_date":"2026-05-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"fYUbsMdg6EFa2F3/BPNf30mtzfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AWJcZmUMX2YlKIRKkvAekcS7egQ="},{"type":"next-occurrence","id":"CcuZ7E53JYT+V/yLxvw4U+tY8e4="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"fYUbsMdg6EFa2F3/BPNf30mtzfQ=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T12:54:00Z","end_date":"2026-05-21T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"CcuZ7E53JYT+V/yLxvw4U+tY8e4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AWJcZmUMX2YlKIRKkvAekcS7egQ="},{"type":"next-occurrence","id":"JwEPQ7uHUSRDBZ/VdhHOSU+jqOU="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"CcuZ7E53JYT+V/yLxvw4U+tY8e4=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T12:54:00Z","end_date":"2026-05-22T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"JwEPQ7uHUSRDBZ/VdhHOSU+jqOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AWJcZmUMX2YlKIRKkvAekcS7egQ="},{"type":"next-occurrence","id":"fItaEY8o6bSMSIGe/rWGVCr68Dw="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"JwEPQ7uHUSRDBZ/VdhHOSU+jqOU=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T12:54:00Z","end_date":"2026-05-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"fItaEY8o6bSMSIGe/rWGVCr68Dw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AWJcZmUMX2YlKIRKkvAekcS7egQ="},{"type":"next-occurrence","id":"8U7My31WY5HXov/wIYBl9pzADRw="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"fItaEY8o6bSMSIGe/rWGVCr68Dw=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:54:00Z","end_date":"2026-05-24T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"8U7My31WY5HXov/wIYBl9pzADRw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AWJcZmUMX2YlKIRKkvAekcS7egQ="},{"type":"next-occurrence","id":"uL9iAoka+SUrsJVOJGuZCRG7mMk="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"8U7My31WY5HXov/wIYBl9pzADRw=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T12:54:00Z","end_date":"2026-05-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"uL9iAoka+SUrsJVOJGuZCRG7mMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AWJcZmUMX2YlKIRKkvAekcS7egQ="},{"type":"next-occurrence","id":"zcKHAtdx6Zc7Fm5CC7DYihzq0VQ="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"uL9iAoka+SUrsJVOJGuZCRG7mMk=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T12:54:00Z","end_date":"2026-05-26T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"zcKHAtdx6Zc7Fm5CC7DYihzq0VQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AWJcZmUMX2YlKIRKkvAekcS7egQ="},{"type":"next-occurrence","id":"F4P4i3QKQ47DM86BJUw3kRQRmj0="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"zcKHAtdx6Zc7Fm5CC7DYihzq0VQ=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T12:54:00Z","end_date":"2026-05-27T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"F4P4i3QKQ47DM86BJUw3kRQRmj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AWJcZmUMX2YlKIRKkvAekcS7egQ="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"F4P4i3QKQ47DM86BJUw3kRQRmj0=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T12:54:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"53sHbK8qg2hHeUrz8mPkkREELNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B63 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, B63 Bus between 5 Av/64 St (New York) and 5 Av/65 St (New York) may experience delays and will wait out any temporary closures. Please allow additional travel time, Continuous Wednesday January 7th, 2026 09:15 AM thru Friday June 19th, 2026 11:59 PM","update_date":"2026-01-07T14:15:57Z"},"road_event_id":"53sHbK8qg2hHeUrz8mPkkREELNw=","beginning_cross_street":"5 Av/64 St","ending_cross_street":"5 Av/65 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018242,40.637578]]}},{"id":"ghxePGW8lgGyXFnN3LyNXM4ZIb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M5 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, M5 Bus at 6 Av/W 31 St (New York) stop is closed; for service, consider the southbound stop on 5th Ave at W 33rd St or the northbound stop on 6th Ave at W 31st St. Buses detour via 23rd S, Continuous Friday January 9th, 2026 08:35 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-01-09T13:35:35Z"},"road_event_id":"ghxePGW8lgGyXFnN3LyNXM4ZIb0=","beginning_cross_street":"6 Av/W 31 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988957,40.748042]]}},{"id":"7yH8fJaUQs0yJzxcziyBxDM6Bt4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M8 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, M8 Bus at Av D/Loop (New York) stop is closed until further notice. The first and last stops will be made on E 10th St at Avenue D in both directions, Continuous Friday January 9th, 2026 08:51 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-03-09T12:27:19Z"},"road_event_id":"7yH8fJaUQs0yJzxcziyBxDM6Bt4=","beginning_cross_street":"Av D/Loop","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974548,40.724689]]}},{"id":"RPURpKXYjrbdxLw0Foi3QA2w8a0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M35 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, M35 Bus at Main Roadway/ Manhattan Psyc Ctr (New York) stop is closed until further notice. For service, use the stop on Main Roadway at Manhattan Psych Center instead, Continuous Friday January 9th, 2026 08:57 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-03-09T12:27:01Z"},"road_event_id":"RPURpKXYjrbdxLw0Foi3QA2w8a0=","beginning_cross_street":"Main Roadway/ Manhattan Psyc Ctr","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926839,40.789168]]}},{"id":"5jbQctIN37ZPQD9xzrzKfqSSXqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jW8/HgoVxTvzVICwjKQI3YfHDJc="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"5jbQctIN37ZPQD9xzrzKfqSSXqI=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:10:00Z","end_date":"2026-05-14T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"jW8/HgoVxTvzVICwjKQI3YfHDJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5jbQctIN37ZPQD9xzrzKfqSSXqI="},{"type":"next-occurrence","id":"1yC+WNAowe9d9Y1SAirOzql2aMo="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"jW8/HgoVxTvzVICwjKQI3YfHDJc=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:10:00Z","end_date":"2026-05-15T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"1yC+WNAowe9d9Y1SAirOzql2aMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5jbQctIN37ZPQD9xzrzKfqSSXqI="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"1yC+WNAowe9d9Y1SAirOzql2aMo=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:10:00Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"NvwWiX7YF08yYyLZHFZTpO6KS+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q33 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, Q33 Bus at Roosevelt Av/82 St (New York) stop is closed until further notice; please use the temporary stop on 83rd St at Roosevelt Ave for service instead, Continuous Friday January 9th, 2026 09:27 AM thru Friday May 15th, 2026 11:59 PM","update_date":"2026-01-09T14:28:51Z"},"road_event_id":"NvwWiX7YF08yYyLZHFZTpO6KS+Y=","beginning_cross_street":"Roosevelt Av/82 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883784,40.747602]]}},{"id":"73ca7ybanPmXqtAM0y/ZWijw4gU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q38 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction eastbound, Q38 Bus at 63 Dr/Austin St (New York) stop on 63rd Dr at Austin St has been temporarily relocated north between Wetherole St and Austin St through the Fall of 2027, Continuous Friday January 9th, 2026 09:33 AM thru Friday October 1st, 2027 11:59 PM","update_date":"2026-03-09T12:26:03Z"},"road_event_id":"73ca7ybanPmXqtAM0y/ZWijw4gU=","beginning_cross_street":"63 Dr/Austin St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.863947,40.727478]]}},{"id":"YRRSRDtZVe+Kv/Zhmyzb/bgy9jE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kK2auwW53B55mscnidFhkK1sWr8="}],"description":"Due to Station Rehabilitation both directions, Newark AirTrain between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak. , Thursday January 15th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-05-08T12:02:10Z"},"road_event_id":"YRRSRDtZVe+Kv/Zhmyzb/bgy9jE=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T09:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"kK2auwW53B55mscnidFhkK1sWr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YRRSRDtZVe+Kv/Zhmyzb/bgy9jE="},{"type":"next-occurrence","id":"NQPCq5T2hFuxCWZQN7vYeWcjxhc="}],"description":"Due to Station Rehabilitation both directions, Newark AirTrain between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak. , Thursday January 15th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-05-08T12:02:10Z"},"road_event_id":"kK2auwW53B55mscnidFhkK1sWr8=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T09:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"NQPCq5T2hFuxCWZQN7vYeWcjxhc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YRRSRDtZVe+Kv/Zhmyzb/bgy9jE="},{"type":"next-occurrence","id":"1kOQDn1rYAVpoCBnPI54C73bWQI="}],"description":"Due to Station Rehabilitation both directions, Newark AirTrain between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak. , Thursday January 15th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-05-08T12:02:10Z"},"road_event_id":"NQPCq5T2hFuxCWZQN7vYeWcjxhc=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T09:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"1kOQDn1rYAVpoCBnPI54C73bWQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YRRSRDtZVe+Kv/Zhmyzb/bgy9jE="},{"type":"next-occurrence","id":"1ykyPFovL+6N6UHzSKdJhrNv5vQ="}],"description":"Due to Station Rehabilitation both directions, Newark AirTrain between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak. , Thursday January 15th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-05-08T12:02:10Z"},"road_event_id":"1kOQDn1rYAVpoCBnPI54C73bWQI=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T09:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"1ykyPFovL+6N6UHzSKdJhrNv5vQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YRRSRDtZVe+Kv/Zhmyzb/bgy9jE="},{"type":"next-occurrence","id":"XOc85RV0L5gfM1RYEH1XW1pi0vA="}],"description":"Due to Station Rehabilitation both directions, Newark AirTrain between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak. , Thursday January 15th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-05-08T12:02:10Z"},"road_event_id":"1ykyPFovL+6N6UHzSKdJhrNv5vQ=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T09:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"XOc85RV0L5gfM1RYEH1XW1pi0vA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YRRSRDtZVe+Kv/Zhmyzb/bgy9jE="},{"type":"next-occurrence","id":"0QMeiwiojFg7btaEPxpjIzC3UHg="}],"description":"Due to Station Rehabilitation both directions, Newark AirTrain between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak. , Thursday January 15th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-05-08T12:02:10Z"},"road_event_id":"XOc85RV0L5gfM1RYEH1XW1pi0vA=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T09:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"0QMeiwiojFg7btaEPxpjIzC3UHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YRRSRDtZVe+Kv/Zhmyzb/bgy9jE="},{"type":"next-occurrence","id":"tng0EnYCGGFmTFRPbbLH6eLN/Vs="}],"description":"Due to Station Rehabilitation both directions, Newark AirTrain between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak. , Thursday January 15th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-05-08T12:02:10Z"},"road_event_id":"0QMeiwiojFg7btaEPxpjIzC3UHg=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T09:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"tng0EnYCGGFmTFRPbbLH6eLN/Vs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YRRSRDtZVe+Kv/Zhmyzb/bgy9jE="},{"type":"next-occurrence","id":"YU2p/BZySSzR/kdmawgevv8lAso="}],"description":"Due to Station Rehabilitation both directions, Newark AirTrain between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak. , Thursday January 15th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-05-08T12:02:10Z"},"road_event_id":"tng0EnYCGGFmTFRPbbLH6eLN/Vs=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T09:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"YU2p/BZySSzR/kdmawgevv8lAso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YRRSRDtZVe+Kv/Zhmyzb/bgy9jE="},{"type":"next-occurrence","id":"CAwvf4980A466XUlVlSCjQBjwlk="}],"description":"Due to Station Rehabilitation both directions, Newark AirTrain between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak. , Thursday January 15th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-05-08T12:02:10Z"},"road_event_id":"YU2p/BZySSzR/kdmawgevv8lAso=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T09:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"CAwvf4980A466XUlVlSCjQBjwlk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YRRSRDtZVe+Kv/Zhmyzb/bgy9jE="},{"type":"next-occurrence","id":"ekeNWlp0KCih4WBhHurhMW8kX9o="}],"description":"Due to Station Rehabilitation both directions, Newark AirTrain between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak. , Thursday January 15th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-05-08T12:02:10Z"},"road_event_id":"CAwvf4980A466XUlVlSCjQBjwlk=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T09:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"ekeNWlp0KCih4WBhHurhMW8kX9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YRRSRDtZVe+Kv/Zhmyzb/bgy9jE="}],"description":"Due to Station Rehabilitation both directions, Newark AirTrain between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak. , Thursday January 15th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-05-08T12:02:10Z"},"road_event_id":"ekeNWlp0KCih4WBhHurhMW8kX9o=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T09:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"AcdCl8kjT+k+Aj31pR5OT8I6ujw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"c8H+2E390WCpw+iTAfWfh8YPLhM="}],"description":"Drainage improvements on WEST AVE both directions between N WATER ST (Norwalk) and CONNECTICUT AVE (Norwalk) West Avenue will have various daytime and nighttime lane closures Monday-Friday. Traffic control personnel and signing patterns will guide motorists through the work zone., Sunday February 8th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-01-14T16:09:13Z"},"road_event_id":"AcdCl8kjT+k+Aj31pR5OT8I6ujw=","beginning_cross_street":"N WATER ST","ending_cross_street":"CONNECTICUT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.419777,41.104532]]}},{"id":"c8H+2E390WCpw+iTAfWfh8YPLhM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcdCl8kjT+k+Aj31pR5OT8I6ujw="},{"type":"next-occurrence","id":"AKyj9hF3pCO3gNLLWZGeAxfoZw8="}],"description":"Drainage improvements on WEST AVE both directions between N WATER ST (Norwalk) and CONNECTICUT AVE (Norwalk) West Avenue will have various daytime and nighttime lane closures Monday-Friday. Traffic control personnel and signing patterns will guide motorists through the work zone., Sunday February 8th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-01-14T16:09:13Z"},"road_event_id":"c8H+2E390WCpw+iTAfWfh8YPLhM=","beginning_cross_street":"N WATER ST","ending_cross_street":"CONNECTICUT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T04:00:00Z","end_date":"2026-05-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.419777,41.104532]]}},{"id":"AKyj9hF3pCO3gNLLWZGeAxfoZw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcdCl8kjT+k+Aj31pR5OT8I6ujw="}],"description":"Drainage improvements on WEST AVE both directions between N WATER ST (Norwalk) and CONNECTICUT AVE (Norwalk) West Avenue will have various daytime and nighttime lane closures Monday-Friday. Traffic control personnel and signing patterns will guide motorists through the work zone., Sunday February 8th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-01-14T16:09:13Z"},"road_event_id":"AKyj9hF3pCO3gNLLWZGeAxfoZw8=","beginning_cross_street":"N WATER ST","ending_cross_street":"CONNECTICUT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.419777,41.104532]]}},{"id":"XQVjjSDGEu01e+ZLPwpCKufW6pA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CROOKED ST"],"direction":"unknown","related_road_events":[],"description":"Construction on CROOKED ST both directions between CT-372 (Plainville) and 34 (Plainville) Traffic on the Crooked Street bridge in Plainville will be restricted to one lane in each direction, Continuous Wednesday January 14th, 2026 12:00 AM thru Thursday July 30th, 2026 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-01-14T16:18:30Z"},"road_event_id":"XQVjjSDGEu01e+ZLPwpCKufW6pA=","beginning_cross_street":"CT-372","ending_cross_street":"34","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.838354,41.671495]]}},{"id":"AusChcgnIw0oIZ+mCD7PrzjEYd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kTwe0erYsYJ+Rm6myV//4jmPDow="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"AusChcgnIw0oIZ+mCD7PrzjEYd4=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:15:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"kTwe0erYsYJ+Rm6myV//4jmPDow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AusChcgnIw0oIZ+mCD7PrzjEYd4="},{"type":"next-occurrence","id":"Q/ObjDm2uovWqxcZv0xeKhwNWxc="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"kTwe0erYsYJ+Rm6myV//4jmPDow=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:15:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"Q/ObjDm2uovWqxcZv0xeKhwNWxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AusChcgnIw0oIZ+mCD7PrzjEYd4="},{"type":"next-occurrence","id":"UwWDa3J6GyDdCgD/UgJWwrvlXlg="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"Q/ObjDm2uovWqxcZv0xeKhwNWxc=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:15:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"UwWDa3J6GyDdCgD/UgJWwrvlXlg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AusChcgnIw0oIZ+mCD7PrzjEYd4="},{"type":"next-occurrence","id":"oPi+mLVY2BSuIu1Kxiay0wqRuT0="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"UwWDa3J6GyDdCgD/UgJWwrvlXlg=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:30:00Z","end_date":"2026-05-20T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"oPi+mLVY2BSuIu1Kxiay0wqRuT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AusChcgnIw0oIZ+mCD7PrzjEYd4="},{"type":"next-occurrence","id":"QI3cSwWLM2+CmsPhn0aLbKk6gXY="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"oPi+mLVY2BSuIu1Kxiay0wqRuT0=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:30:00Z","end_date":"2026-05-21T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"QI3cSwWLM2+CmsPhn0aLbKk6gXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AusChcgnIw0oIZ+mCD7PrzjEYd4="},{"type":"next-occurrence","id":"MHbMcmGTES+nI53l56BmCh1mNmg="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"QI3cSwWLM2+CmsPhn0aLbKk6gXY=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:30:00Z","end_date":"2026-05-22T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"MHbMcmGTES+nI53l56BmCh1mNmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AusChcgnIw0oIZ+mCD7PrzjEYd4="},{"type":"next-occurrence","id":"7TevRr4ir04ocd7qIEf0NMPUiUI="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"MHbMcmGTES+nI53l56BmCh1mNmg=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:30:00Z","end_date":"2026-05-23T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"7TevRr4ir04ocd7qIEf0NMPUiUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AusChcgnIw0oIZ+mCD7PrzjEYd4="},{"type":"next-occurrence","id":"II7hK1I6/Oks0ebVDG/xCaYdFlk="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"7TevRr4ir04ocd7qIEf0NMPUiUI=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:30:00Z","end_date":"2026-05-27T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"II7hK1I6/Oks0ebVDG/xCaYdFlk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AusChcgnIw0oIZ+mCD7PrzjEYd4="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"II7hK1I6/Oks0ebVDG/xCaYdFlk=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:30:00Z","end_date":"2026-05-28T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"3tgTrh/RRZnQRdtKQdM+OHNidXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8pX5LGyjlhMFUEKnVYxonCt1FlQ="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"3tgTrh/RRZnQRdtKQdM+OHNidXs=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:15:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"8pX5LGyjlhMFUEKnVYxonCt1FlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3tgTrh/RRZnQRdtKQdM+OHNidXs="},{"type":"next-occurrence","id":"k+TqSgkF5YNDNyn3E5fFwr4MCVY="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"8pX5LGyjlhMFUEKnVYxonCt1FlQ=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:15:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"k+TqSgkF5YNDNyn3E5fFwr4MCVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3tgTrh/RRZnQRdtKQdM+OHNidXs="},{"type":"next-occurrence","id":"904V4qY5sQPoZm3nDNaMdP7/1Es="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"k+TqSgkF5YNDNyn3E5fFwr4MCVY=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:15:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"904V4qY5sQPoZm3nDNaMdP7/1Es=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3tgTrh/RRZnQRdtKQdM+OHNidXs="},{"type":"next-occurrence","id":"QFXWQOZZVYbtFH3qiQwuKT6RnLI="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"904V4qY5sQPoZm3nDNaMdP7/1Es=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:30:00Z","end_date":"2026-05-20T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"QFXWQOZZVYbtFH3qiQwuKT6RnLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3tgTrh/RRZnQRdtKQdM+OHNidXs="},{"type":"next-occurrence","id":"Ge2Lgcmj3npdQUfejeuD7sUzEFM="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"QFXWQOZZVYbtFH3qiQwuKT6RnLI=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:30:00Z","end_date":"2026-05-21T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"Ge2Lgcmj3npdQUfejeuD7sUzEFM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3tgTrh/RRZnQRdtKQdM+OHNidXs="},{"type":"next-occurrence","id":"smgfxNx4+m30aFRKjPaJNjv797o="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"Ge2Lgcmj3npdQUfejeuD7sUzEFM=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:30:00Z","end_date":"2026-05-22T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"smgfxNx4+m30aFRKjPaJNjv797o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3tgTrh/RRZnQRdtKQdM+OHNidXs="},{"type":"next-occurrence","id":"UR0gbcZdNmzVdYXnb9t1QY+pRrA="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"smgfxNx4+m30aFRKjPaJNjv797o=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:30:00Z","end_date":"2026-05-23T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"UR0gbcZdNmzVdYXnb9t1QY+pRrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3tgTrh/RRZnQRdtKQdM+OHNidXs="},{"type":"next-occurrence","id":"OymubZSFxvtU7+AvuJJi7bSVVcU="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"UR0gbcZdNmzVdYXnb9t1QY+pRrA=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:30:00Z","end_date":"2026-05-27T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"OymubZSFxvtU7+AvuJJi7bSVVcU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3tgTrh/RRZnQRdtKQdM+OHNidXs="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 2nd,2026 thru Friday June 5th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-05-08T19:30:20Z"},"road_event_id":"OymubZSFxvtU7+AvuJJi7bSVVcU=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:30:00Z","end_date":"2026-05-28T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"LoRaGwVMxTcNQbSGM+v6fH7Lzm4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"n2nyhf5UhJrZORRlBnpt3wyTw4k="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"LoRaGwVMxTcNQbSGM+v6fH7Lzm4=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"n2nyhf5UhJrZORRlBnpt3wyTw4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LoRaGwVMxTcNQbSGM+v6fH7Lzm4="},{"type":"next-occurrence","id":"SB2sLi5c9TKSmLgnHTTz1Y6o0U4="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"n2nyhf5UhJrZORRlBnpt3wyTw4k=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"SB2sLi5c9TKSmLgnHTTz1Y6o0U4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LoRaGwVMxTcNQbSGM+v6fH7Lzm4="},{"type":"next-occurrence","id":"XOU8w2Xd1qrP+sGp67JCxp1ycuo="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"SB2sLi5c9TKSmLgnHTTz1Y6o0U4=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"XOU8w2Xd1qrP+sGp67JCxp1ycuo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LoRaGwVMxTcNQbSGM+v6fH7Lzm4="},{"type":"next-occurrence","id":"CybxFeKlF7XFiHDylNX+C77MqGY="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"XOU8w2Xd1qrP+sGp67JCxp1ycuo=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"CybxFeKlF7XFiHDylNX+C77MqGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LoRaGwVMxTcNQbSGM+v6fH7Lzm4="},{"type":"next-occurrence","id":"w/ol84DeX8/AjTTtgUXiHWQ+/sc="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"CybxFeKlF7XFiHDylNX+C77MqGY=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"w/ol84DeX8/AjTTtgUXiHWQ+/sc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LoRaGwVMxTcNQbSGM+v6fH7Lzm4="},{"type":"next-occurrence","id":"k0QsUnqYndB5kj2El0KkR8xON9I="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"w/ol84DeX8/AjTTtgUXiHWQ+/sc=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"k0QsUnqYndB5kj2El0KkR8xON9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LoRaGwVMxTcNQbSGM+v6fH7Lzm4="},{"type":"next-occurrence","id":"v9cQmRsChtGi7IcRocvFgKQPCvk="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"k0QsUnqYndB5kj2El0KkR8xON9I=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"v9cQmRsChtGi7IcRocvFgKQPCvk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LoRaGwVMxTcNQbSGM+v6fH7Lzm4="},{"type":"next-occurrence","id":"2razxRheRsRhobQKsGiG/cIBvHo="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"v9cQmRsChtGi7IcRocvFgKQPCvk=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"2razxRheRsRhobQKsGiG/cIBvHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LoRaGwVMxTcNQbSGM+v6fH7Lzm4="},{"type":"next-occurrence","id":"j7jjWGZCUJX3jJGCPdzat7Hdu64="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"2razxRheRsRhobQKsGiG/cIBvHo=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"j7jjWGZCUJX3jJGCPdzat7Hdu64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LoRaGwVMxTcNQbSGM+v6fH7Lzm4="},{"type":"next-occurrence","id":"G6msJrrxVRkTKu2wtQsB/rM+6zM="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"j7jjWGZCUJX3jJGCPdzat7Hdu64=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"G6msJrrxVRkTKu2wtQsB/rM+6zM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LoRaGwVMxTcNQbSGM+v6fH7Lzm4="},{"type":"next-occurrence","id":"kRZCEWYUgIZDPquyyaru7Escqu0="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"G6msJrrxVRkTKu2wtQsB/rM+6zM=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"kRZCEWYUgIZDPquyyaru7Escqu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LoRaGwVMxTcNQbSGM+v6fH7Lzm4="},{"type":"next-occurrence","id":"qETYJHnS8zh7wxAOKRe4/uCIrUc="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"kRZCEWYUgIZDPquyyaru7Escqu0=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"qETYJHnS8zh7wxAOKRe4/uCIrUc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LoRaGwVMxTcNQbSGM+v6fH7Lzm4="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"qETYJHnS8zh7wxAOKRe4/uCIrUc=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"oOo65Rdr8IOUtSnStoWasyKkd68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BxM3 Bus and BxM4 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, BxM3 Bus and BxM4 Bus at Madison Av/E 46 St (New York) stop is closed. Please use the M3 bus stop on Madison Ave at E 45th St instead. Through 2028., Continuous Thursday January 22nd, 2026 12:00 AM thru Saturday December 30th, 2028 11:59 PM","update_date":"2026-01-22T18:55:38Z"},"road_event_id":"oOo65Rdr8IOUtSnStoWasyKkd68=","beginning_cross_street":"Madison Av/E 46 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97695,40.755797]]}},{"id":"ORC300517002","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Jackie Robinson Parkway"],"direction":"unknown","description":"Construction on Jackie Robinson Parkway westbound between Queens-Kings County Line (New York) and Highland Boulevard; Ramp (New York) Subject to change without notice. Not currently Scheduled","update_date":"2026-04-03T19:00:32Z"},"road_event_id":"ORC300517002","beginning_cross_street":"Queens-Kings County Line","ending_cross_street":"Highland Boulevard; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-01-29T17:06:30Z","end_date":"2026-04-04T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.894927,40.684589]]}},{"id":"IYLFijqRCZxMUeRUAfW7MGufk5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M15-SBS Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, M15-SBS Bus at Water St/Wall St (New York) The M15 and M15-SBS stop has been temporarily moved to the far side of Pine St., Continuous Thursday February 5th, 2026 07:27 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-04-17T16:54:16Z"},"road_event_id":"IYLFijqRCZxMUeRUAfW7MGufk5g=","beginning_cross_street":"Water St/Wall St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.007109,40.705287]]}},{"id":"vtVvNhhezGWIlWE8i95f6uzwx1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Installation of sign structure and noise wall construction and roadwork on I-690 westbound between Exit 15 - Midler Avenue (Syracuse) and Exit 14 - Teall Avenue (Syracuse), Continuous Tuesday February 3rd, 2026 09:00 AM thru Monday June 1st, 2026 03:00 PM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-03-12T11:07:45Z"},"road_event_id":"vtVvNhhezGWIlWE8i95f6uzwx1A=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"Exit 14 - Teall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098535,43.058932]]}},{"id":"5zlYOSzE/LGN4/ms2XHClZCQRf8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Bridge work and roadwork on I-690 westbound between Exit 14 - Teall Avenue (Syracuse) and Exit 13 - Townsend Street (Syracuse), Continuous Tuesday February 3rd, 2026 09:00 AM thru Monday June 1st, 2026 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-03-12T11:05:57Z"},"road_event_id":"5zlYOSzE/LGN4/ms2XHClZCQRf8=","beginning_cross_street":"Exit 14 - Teall Avenue","ending_cross_street":"Exit 13 - Townsend Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.117594,43.054455]]}},{"id":"HUrpius+TWcWAUSkMvt069TfEQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, 40 Bus area of Kellogg St 290' E Of Corbin St (Newark) Kellogg Street and Marlin Street will be closed between Corbin Street and Distribution Street due to construction. During this time, NJ TRANSIT Bus Route No. 40 in Newark will operate on a detour as follows: Buses traveling toward Jersey Garden Mall will travel from Doremus Avenue and Distribution Street, continue on Distribution Street, make a right on Marlin Street, left on Port Street, bear right on Corbin Street, and then continue the regular route. Pick-up and drop-off are only permitted at the bus stop on Distribution Street during the detour., Continuous Friday February 6th, 2026 12:00 AM thru Thursday August 6th, 2026 11:59 PM","update_date":"2026-02-06T22:05:15Z"},"road_event_id":"HUrpius+TWcWAUSkMvt069TfEQ0=","beginning_cross_street":"Kellogg St 290' E Of Corbin St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.15065,40.702269]]}},{"id":"YnVYlqUIObuoUVDf37aTzXvmST8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"etN/1Tkdl4hEuU4CUQTJ83xF+C8="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-09T18:01:06Z"},"road_event_id":"YnVYlqUIObuoUVDf37aTzXvmST8=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"etN/1Tkdl4hEuU4CUQTJ83xF+C8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YnVYlqUIObuoUVDf37aTzXvmST8="},{"type":"next-occurrence","id":"fXZpS+VpvU/WOIpZSAfFBNVuHwk="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-09T18:01:06Z"},"road_event_id":"etN/1Tkdl4hEuU4CUQTJ83xF+C8=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"fXZpS+VpvU/WOIpZSAfFBNVuHwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YnVYlqUIObuoUVDf37aTzXvmST8="},{"type":"next-occurrence","id":"ZZ+niIP+jcAsFNFlq/8qS4YaR/A="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-09T18:01:06Z"},"road_event_id":"fXZpS+VpvU/WOIpZSAfFBNVuHwk=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"ZZ+niIP+jcAsFNFlq/8qS4YaR/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YnVYlqUIObuoUVDf37aTzXvmST8="},{"type":"next-occurrence","id":"OC56yiJ8m06NkxHptDlYQ9CARpw="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-09T18:01:06Z"},"road_event_id":"ZZ+niIP+jcAsFNFlq/8qS4YaR/A=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"OC56yiJ8m06NkxHptDlYQ9CARpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YnVYlqUIObuoUVDf37aTzXvmST8="},{"type":"next-occurrence","id":"eNi3KT9ZkMHKn9tm64a+qh3tgVs="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-09T18:01:06Z"},"road_event_id":"OC56yiJ8m06NkxHptDlYQ9CARpw=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"eNi3KT9ZkMHKn9tm64a+qh3tgVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YnVYlqUIObuoUVDf37aTzXvmST8="},{"type":"next-occurrence","id":"6IHmd89mXZKkdvj4X3yBzdwfDgI="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-09T18:01:06Z"},"road_event_id":"eNi3KT9ZkMHKn9tm64a+qh3tgVs=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"6IHmd89mXZKkdvj4X3yBzdwfDgI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YnVYlqUIObuoUVDf37aTzXvmST8="},{"type":"next-occurrence","id":"fJqGuqbh0yPoJuAAlIHZ7aEng/I="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-09T18:01:06Z"},"road_event_id":"6IHmd89mXZKkdvj4X3yBzdwfDgI=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"fJqGuqbh0yPoJuAAlIHZ7aEng/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YnVYlqUIObuoUVDf37aTzXvmST8="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-09T18:01:06Z"},"road_event_id":"fJqGuqbh0yPoJuAAlIHZ7aEng/I=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"edIN5qdjRtXKXBNdG+fOn+ljnGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nqPe1GVCPckznbV4W94Xy+K1f2U="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"edIN5qdjRtXKXBNdG+fOn+ljnGs=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"nqPe1GVCPckznbV4W94Xy+K1f2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"edIN5qdjRtXKXBNdG+fOn+ljnGs="},{"type":"next-occurrence","id":"K/HG8hmD7rArkKjzNFP0LVHSyoE="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"nqPe1GVCPckznbV4W94Xy+K1f2U=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"K/HG8hmD7rArkKjzNFP0LVHSyoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"edIN5qdjRtXKXBNdG+fOn+ljnGs="},{"type":"next-occurrence","id":"rE0djIb2XkPfblt4wrXGvrIAJmg="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"K/HG8hmD7rArkKjzNFP0LVHSyoE=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"rE0djIb2XkPfblt4wrXGvrIAJmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"edIN5qdjRtXKXBNdG+fOn+ljnGs="},{"type":"next-occurrence","id":"YwxaslGLx0vThsA6Ox9x4BbZN6g="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"rE0djIb2XkPfblt4wrXGvrIAJmg=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"YwxaslGLx0vThsA6Ox9x4BbZN6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"edIN5qdjRtXKXBNdG+fOn+ljnGs="},{"type":"next-occurrence","id":"WhhEvkfLo2rne/7cgA59Na5m0Uw="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"YwxaslGLx0vThsA6Ox9x4BbZN6g=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"WhhEvkfLo2rne/7cgA59Na5m0Uw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"edIN5qdjRtXKXBNdG+fOn+ljnGs="},{"type":"next-occurrence","id":"hYsIx90sDOLvIMw67rrfeiN+7Lg="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"WhhEvkfLo2rne/7cgA59Na5m0Uw=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"hYsIx90sDOLvIMw67rrfeiN+7Lg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"edIN5qdjRtXKXBNdG+fOn+ljnGs="},{"type":"next-occurrence","id":"ESVU8YBPW/oqfMwrjr4sMDMJd/E="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"hYsIx90sDOLvIMw67rrfeiN+7Lg=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"ESVU8YBPW/oqfMwrjr4sMDMJd/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"edIN5qdjRtXKXBNdG+fOn+ljnGs="},{"type":"next-occurrence","id":"H4RTTu2Nl949NvKg/nqKaaavF2U="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"ESVU8YBPW/oqfMwrjr4sMDMJd/E=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"H4RTTu2Nl949NvKg/nqKaaavF2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"edIN5qdjRtXKXBNdG+fOn+ljnGs="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"H4RTTu2Nl949NvKg/nqKaaavF2U=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"3esA6k8LCE9gWx9G1gbQqwYqMUw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/6xnqsFtKe9isS4QReiW/72hup8="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T18:01:08Z"},"road_event_id":"3esA6k8LCE9gWx9G1gbQqwYqMUw=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"/6xnqsFtKe9isS4QReiW/72hup8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3esA6k8LCE9gWx9G1gbQqwYqMUw="},{"type":"next-occurrence","id":"QN1YYO9D1NZSxf2QfRjbdtAEvt4="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T18:01:08Z"},"road_event_id":"/6xnqsFtKe9isS4QReiW/72hup8=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"QN1YYO9D1NZSxf2QfRjbdtAEvt4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3esA6k8LCE9gWx9G1gbQqwYqMUw="},{"type":"next-occurrence","id":"eZ1eA/RWwWRkuIdxysd2K5JSVsw="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T18:01:08Z"},"road_event_id":"QN1YYO9D1NZSxf2QfRjbdtAEvt4=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"eZ1eA/RWwWRkuIdxysd2K5JSVsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3esA6k8LCE9gWx9G1gbQqwYqMUw="},{"type":"next-occurrence","id":"cCe8OR4BotgK8vn4+n3GH3nXVg8="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T18:01:08Z"},"road_event_id":"eZ1eA/RWwWRkuIdxysd2K5JSVsw=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"cCe8OR4BotgK8vn4+n3GH3nXVg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3esA6k8LCE9gWx9G1gbQqwYqMUw="},{"type":"next-occurrence","id":"61LeIvTOJOrFGQGf6V941TmcrfE="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T18:01:08Z"},"road_event_id":"cCe8OR4BotgK8vn4+n3GH3nXVg8=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"61LeIvTOJOrFGQGf6V941TmcrfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3esA6k8LCE9gWx9G1gbQqwYqMUw="},{"type":"next-occurrence","id":"QYlvuc97JEq0wdWorw7adQ0ao3g="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T18:01:08Z"},"road_event_id":"61LeIvTOJOrFGQGf6V941TmcrfE=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"QYlvuc97JEq0wdWorw7adQ0ao3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3esA6k8LCE9gWx9G1gbQqwYqMUw="},{"type":"next-occurrence","id":"QrEKF0DT+DyGRPWf8fejSRhMgQE="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T18:01:08Z"},"road_event_id":"QYlvuc97JEq0wdWorw7adQ0ao3g=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"QrEKF0DT+DyGRPWf8fejSRhMgQE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3esA6k8LCE9gWx9G1gbQqwYqMUw="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T18:01:08Z"},"road_event_id":"QrEKF0DT+DyGRPWf8fejSRhMgQE=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"yb4aB0aSwqjqzIsNGHemxn+SURw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2tqDK8qqGHX/szR/azCt2gZlnEs="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"yb4aB0aSwqjqzIsNGHemxn+SURw=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"2tqDK8qqGHX/szR/azCt2gZlnEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yb4aB0aSwqjqzIsNGHemxn+SURw="},{"type":"next-occurrence","id":"Vx/Dczo06I+q8Cp10ejchWtX558="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"2tqDK8qqGHX/szR/azCt2gZlnEs=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"Vx/Dczo06I+q8Cp10ejchWtX558=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yb4aB0aSwqjqzIsNGHemxn+SURw="},{"type":"next-occurrence","id":"UNCLxEs25yde/in0YeNO3GQ6aGM="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"Vx/Dczo06I+q8Cp10ejchWtX558=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"UNCLxEs25yde/in0YeNO3GQ6aGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yb4aB0aSwqjqzIsNGHemxn+SURw="},{"type":"next-occurrence","id":"JtK2HA9aMScjsoLb5RHSRcBWxR0="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"UNCLxEs25yde/in0YeNO3GQ6aGM=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"JtK2HA9aMScjsoLb5RHSRcBWxR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yb4aB0aSwqjqzIsNGHemxn+SURw="},{"type":"next-occurrence","id":"HQCIyZDmXB1iUclXZTSEcKNgSgs="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"JtK2HA9aMScjsoLb5RHSRcBWxR0=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"HQCIyZDmXB1iUclXZTSEcKNgSgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yb4aB0aSwqjqzIsNGHemxn+SURw="},{"type":"next-occurrence","id":"C7w8LoxZutX1UCeMEiKGxgb5Ut8="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"HQCIyZDmXB1iUclXZTSEcKNgSgs=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"C7w8LoxZutX1UCeMEiKGxgb5Ut8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yb4aB0aSwqjqzIsNGHemxn+SURw="},{"type":"next-occurrence","id":"7AJqKZdttPNYQMfWVnPS91DUpNc="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"C7w8LoxZutX1UCeMEiKGxgb5Ut8=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"7AJqKZdttPNYQMfWVnPS91DUpNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yb4aB0aSwqjqzIsNGHemxn+SURw="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"7AJqKZdttPNYQMfWVnPS91DUpNc=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"JffGtd85HHkEBkDiZXoFNfWRbNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hJTup9zXJFbNFYzI2kaRN3Q+u1c="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-09T18:01:05Z"},"road_event_id":"JffGtd85HHkEBkDiZXoFNfWRbNI=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"hJTup9zXJFbNFYzI2kaRN3Q+u1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JffGtd85HHkEBkDiZXoFNfWRbNI="},{"type":"next-occurrence","id":"JB0GPsy7uPoG1iSRK8Pb+HYhXGU="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-09T18:01:05Z"},"road_event_id":"hJTup9zXJFbNFYzI2kaRN3Q+u1c=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"JB0GPsy7uPoG1iSRK8Pb+HYhXGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JffGtd85HHkEBkDiZXoFNfWRbNI="},{"type":"next-occurrence","id":"QOoXcs3ruY9deWBY3nxrcnmlfsk="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-09T18:01:05Z"},"road_event_id":"JB0GPsy7uPoG1iSRK8Pb+HYhXGU=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"QOoXcs3ruY9deWBY3nxrcnmlfsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JffGtd85HHkEBkDiZXoFNfWRbNI="},{"type":"next-occurrence","id":"hMMQ5vVwZBpbCTmlSEdCvGzm/RU="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-09T18:01:05Z"},"road_event_id":"QOoXcs3ruY9deWBY3nxrcnmlfsk=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"hMMQ5vVwZBpbCTmlSEdCvGzm/RU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JffGtd85HHkEBkDiZXoFNfWRbNI="},{"type":"next-occurrence","id":"z2V2TeLRmz/e5fnFqaj2nurP3XA="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-09T18:01:05Z"},"road_event_id":"hMMQ5vVwZBpbCTmlSEdCvGzm/RU=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"z2V2TeLRmz/e5fnFqaj2nurP3XA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JffGtd85HHkEBkDiZXoFNfWRbNI="},{"type":"next-occurrence","id":"0FjPapAqlwt7S9o1gR3YC4+JBZ8="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-09T18:01:05Z"},"road_event_id":"z2V2TeLRmz/e5fnFqaj2nurP3XA=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"0FjPapAqlwt7S9o1gR3YC4+JBZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JffGtd85HHkEBkDiZXoFNfWRbNI="},{"type":"next-occurrence","id":"BDgm+YkQb4wCKabeOxL7lZM+vdI="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-09T18:01:05Z"},"road_event_id":"0FjPapAqlwt7S9o1gR3YC4+JBZ8=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"BDgm+YkQb4wCKabeOxL7lZM+vdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JffGtd85HHkEBkDiZXoFNfWRbNI="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-09T18:01:05Z"},"road_event_id":"BDgm+YkQb4wCKabeOxL7lZM+vdI=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"5PUKIs+EqXRkAYX2q9UNVqQ7Ojo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gmFNY4ToXzg6BzETbO86Q3q4bsk="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"5PUKIs+EqXRkAYX2q9UNVqQ7Ojo=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"gmFNY4ToXzg6BzETbO86Q3q4bsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5PUKIs+EqXRkAYX2q9UNVqQ7Ojo="},{"type":"next-occurrence","id":"EPyk4m8esG01sqwymr9Ymsfvh4Y="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"gmFNY4ToXzg6BzETbO86Q3q4bsk=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"EPyk4m8esG01sqwymr9Ymsfvh4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5PUKIs+EqXRkAYX2q9UNVqQ7Ojo="},{"type":"next-occurrence","id":"avf4VKBD+7KDxVOUc/Fq3/0ed70="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"EPyk4m8esG01sqwymr9Ymsfvh4Y=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"avf4VKBD+7KDxVOUc/Fq3/0ed70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5PUKIs+EqXRkAYX2q9UNVqQ7Ojo="},{"type":"next-occurrence","id":"YwM2Qv5dtqGSiFFVc9vEBdCxtss="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"avf4VKBD+7KDxVOUc/Fq3/0ed70=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"YwM2Qv5dtqGSiFFVc9vEBdCxtss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5PUKIs+EqXRkAYX2q9UNVqQ7Ojo="},{"type":"next-occurrence","id":"8fICDfafeVWQ+tfP1Ns86s+GODM="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"YwM2Qv5dtqGSiFFVc9vEBdCxtss=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"8fICDfafeVWQ+tfP1Ns86s+GODM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5PUKIs+EqXRkAYX2q9UNVqQ7Ojo="},{"type":"next-occurrence","id":"eFwm0pVuyAgPOHziu2jNlA3X8Ac="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"8fICDfafeVWQ+tfP1Ns86s+GODM=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"eFwm0pVuyAgPOHziu2jNlA3X8Ac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5PUKIs+EqXRkAYX2q9UNVqQ7Ojo="},{"type":"next-occurrence","id":"DnXP9IBDQWEaLTRyJYAmsFOJeow="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"eFwm0pVuyAgPOHziu2jNlA3X8Ac=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"DnXP9IBDQWEaLTRyJYAmsFOJeow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5PUKIs+EqXRkAYX2q9UNVqQ7Ojo="},{"type":"next-occurrence","id":"BC6YqkShNsNJLSJ+mxpvPjzHDB8="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"DnXP9IBDQWEaLTRyJYAmsFOJeow=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"BC6YqkShNsNJLSJ+mxpvPjzHDB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5PUKIs+EqXRkAYX2q9UNVqQ7Ojo="},{"type":"next-occurrence","id":"osSJ4/BlnX1q+3ZZ/Z80nzmBZyI="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"BC6YqkShNsNJLSJ+mxpvPjzHDB8=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"osSJ4/BlnX1q+3ZZ/Z80nzmBZyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5PUKIs+EqXRkAYX2q9UNVqQ7Ojo="},{"type":"next-occurrence","id":"ocvQ8+mIGXFA1qWLRzK7ICBEClg="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"osSJ4/BlnX1q+3ZZ/Z80nzmBZyI=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"ocvQ8+mIGXFA1qWLRzK7ICBEClg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5PUKIs+EqXRkAYX2q9UNVqQ7Ojo="},{"type":"next-occurrence","id":"EDBAuBi0TEQFAT/XXTXPE5QCwRQ="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"ocvQ8+mIGXFA1qWLRzK7ICBEClg=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"EDBAuBi0TEQFAT/XXTXPE5QCwRQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5PUKIs+EqXRkAYX2q9UNVqQ7Ojo="},{"type":"next-occurrence","id":"W7hgvAeIocf6Z9Wsxon2Exz5euE="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"EDBAuBi0TEQFAT/XXTXPE5QCwRQ=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"W7hgvAeIocf6Z9Wsxon2Exz5euE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5PUKIs+EqXRkAYX2q9UNVqQ7Ojo="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"W7hgvAeIocf6Z9Wsxon2Exz5euE=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"yvniE1HqgA1Wk6gCcXYnlWVOByU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Construction on I-678 southbound ramp to Exit 1B-2 - North Conduit Avenue; NY 27 (New York) Subject to change without notice., Continuous Thursday January 1st, 2026 12:00 AM thru Tuesday June 30th, 2026 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-26T17:35:40Z"},"road_event_id":"yvniE1HqgA1Wk6gCcXYnlWVOByU=","beginning_cross_street":"Exit 1B-2 - North Conduit Avenue; NY 27","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801918,40.667966]]}},{"id":"yhDvB0X5Fhjyt5byMkE5inMs7Yc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ecO4eg8tgG9zHV5lxG8BlD+hrvs="}],"description":"Construction on I-87 Major Deegan Expressway both directions in the vicinity of East 138th Street; Ramp (New York) Subject to change without notice., Monday April 13th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed northbound, southbound, Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed northbound, southbound","update_date":"2026-05-09T12:00:02Z"},"road_event_id":"yhDvB0X5Fhjyt5byMkE5inMs7Yc=","beginning_cross_street":"East 138th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931203,40.813506]]}},{"id":"ecO4eg8tgG9zHV5lxG8BlD+hrvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yhDvB0X5Fhjyt5byMkE5inMs7Yc="},{"type":"next-occurrence","id":"nHwX/GEpZN4adb6q1TDpIL7fX2c="}],"description":"Construction on I-87 Major Deegan Expressway both directions in the vicinity of East 138th Street; Ramp (New York) Subject to change without notice., Monday April 13th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed northbound, southbound, Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed northbound, southbound","update_date":"2026-05-09T12:00:02Z"},"road_event_id":"ecO4eg8tgG9zHV5lxG8BlD+hrvs=","beginning_cross_street":"East 138th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931203,40.813506]]}},{"id":"nHwX/GEpZN4adb6q1TDpIL7fX2c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yhDvB0X5Fhjyt5byMkE5inMs7Yc="}],"description":"Construction on I-87 Major Deegan Expressway both directions in the vicinity of East 138th Street; Ramp (New York) Subject to change without notice., Monday April 13th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed northbound, southbound, Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed northbound, southbound","update_date":"2026-05-09T12:00:02Z"},"road_event_id":"nHwX/GEpZN4adb6q1TDpIL7fX2c=","beginning_cross_street":"East 138th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931203,40.813506]]}},{"id":"chrmvBZOtFsSn379MqvumXiSbKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Qb8g6l/rpEhE7VQ8gv8qAkFalSM="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-09T18:01:11Z"},"road_event_id":"chrmvBZOtFsSn379MqvumXiSbKg=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"Qb8g6l/rpEhE7VQ8gv8qAkFalSM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"chrmvBZOtFsSn379MqvumXiSbKg="},{"type":"next-occurrence","id":"sPEROxeljk//JuDnojSUtY8SgFo="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-09T18:01:11Z"},"road_event_id":"Qb8g6l/rpEhE7VQ8gv8qAkFalSM=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"sPEROxeljk//JuDnojSUtY8SgFo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"chrmvBZOtFsSn379MqvumXiSbKg="},{"type":"next-occurrence","id":"Tl8/8pRfBFZtDC9shjkkT1VDALQ="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-09T18:01:11Z"},"road_event_id":"sPEROxeljk//JuDnojSUtY8SgFo=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"Tl8/8pRfBFZtDC9shjkkT1VDALQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"chrmvBZOtFsSn379MqvumXiSbKg="},{"type":"next-occurrence","id":"B3siw1fSsVFQ+eStT8Bnv4hoovk="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-09T18:01:11Z"},"road_event_id":"Tl8/8pRfBFZtDC9shjkkT1VDALQ=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"B3siw1fSsVFQ+eStT8Bnv4hoovk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"chrmvBZOtFsSn379MqvumXiSbKg="},{"type":"next-occurrence","id":"WFmCyLH6yLyKYx4BtjDFlg7nkGs="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-09T18:01:11Z"},"road_event_id":"B3siw1fSsVFQ+eStT8Bnv4hoovk=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"WFmCyLH6yLyKYx4BtjDFlg7nkGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"chrmvBZOtFsSn379MqvumXiSbKg="},{"type":"next-occurrence","id":"fWEzXGZZxZ9HRW9Fa7X4w5EVwUA="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-09T18:01:11Z"},"road_event_id":"WFmCyLH6yLyKYx4BtjDFlg7nkGs=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"fWEzXGZZxZ9HRW9Fa7X4w5EVwUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"chrmvBZOtFsSn379MqvumXiSbKg="},{"type":"next-occurrence","id":"+oo1/wHZonkxSr/qJ30Go+DR+jE="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-09T18:01:11Z"},"road_event_id":"fWEzXGZZxZ9HRW9Fa7X4w5EVwUA=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"+oo1/wHZonkxSr/qJ30Go+DR+jE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"chrmvBZOtFsSn379MqvumXiSbKg="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-09T18:01:11Z"},"road_event_id":"+oo1/wHZonkxSr/qJ30Go+DR+jE=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"KFz3S89I7KMnGDAboM4srIIcOUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ugf1xwmuf3DedEGhqBku/g6XGnQ="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"KFz3S89I7KMnGDAboM4srIIcOUk=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"ugf1xwmuf3DedEGhqBku/g6XGnQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KFz3S89I7KMnGDAboM4srIIcOUk="},{"type":"next-occurrence","id":"45eRMIF6M02Shy+oF23sc9Ff2pU="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"ugf1xwmuf3DedEGhqBku/g6XGnQ=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"45eRMIF6M02Shy+oF23sc9Ff2pU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KFz3S89I7KMnGDAboM4srIIcOUk="},{"type":"next-occurrence","id":"gnL1vtK533BhhhlNquyD1T78N/Y="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"45eRMIF6M02Shy+oF23sc9Ff2pU=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"gnL1vtK533BhhhlNquyD1T78N/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KFz3S89I7KMnGDAboM4srIIcOUk="},{"type":"next-occurrence","id":"9XfaD5gqqkjmAKATHjSUeTjHMtE="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"gnL1vtK533BhhhlNquyD1T78N/Y=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"9XfaD5gqqkjmAKATHjSUeTjHMtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KFz3S89I7KMnGDAboM4srIIcOUk="},{"type":"next-occurrence","id":"BH4ul8BKCF2gFqBB36Pqsh+JcXc="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"9XfaD5gqqkjmAKATHjSUeTjHMtE=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"BH4ul8BKCF2gFqBB36Pqsh+JcXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KFz3S89I7KMnGDAboM4srIIcOUk="},{"type":"next-occurrence","id":"fL7fWM+Q3R5rSaqurvo79ZrZTGQ="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"BH4ul8BKCF2gFqBB36Pqsh+JcXc=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"fL7fWM+Q3R5rSaqurvo79ZrZTGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KFz3S89I7KMnGDAboM4srIIcOUk="},{"type":"next-occurrence","id":"KadZ3KClEG9tCFOQJT1UMqRIqMk="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"fL7fWM+Q3R5rSaqurvo79ZrZTGQ=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"KadZ3KClEG9tCFOQJT1UMqRIqMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KFz3S89I7KMnGDAboM4srIIcOUk="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"KadZ3KClEG9tCFOQJT1UMqRIqMk=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"tP8em9JM4mHBb0tjycDoRgrN8s8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GYmg26XOW23j/rEIs51gW8PAhAY="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"tP8em9JM4mHBb0tjycDoRgrN8s8=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"GYmg26XOW23j/rEIs51gW8PAhAY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tP8em9JM4mHBb0tjycDoRgrN8s8="},{"type":"next-occurrence","id":"+MypF5BoC6jiEo/TPcLpsK09TAw="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"GYmg26XOW23j/rEIs51gW8PAhAY=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"+MypF5BoC6jiEo/TPcLpsK09TAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tP8em9JM4mHBb0tjycDoRgrN8s8="},{"type":"next-occurrence","id":"vLOGkOOnWvTDx34h7EcN5TLdgwY="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"+MypF5BoC6jiEo/TPcLpsK09TAw=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"vLOGkOOnWvTDx34h7EcN5TLdgwY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tP8em9JM4mHBb0tjycDoRgrN8s8="},{"type":"next-occurrence","id":"GX/TpcllCWNBECKCxqb03JZucPk="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"vLOGkOOnWvTDx34h7EcN5TLdgwY=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"GX/TpcllCWNBECKCxqb03JZucPk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tP8em9JM4mHBb0tjycDoRgrN8s8="},{"type":"next-occurrence","id":"I8BEpwLT5RKV9F8BCAmiaqt7VRA="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"GX/TpcllCWNBECKCxqb03JZucPk=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T12:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"I8BEpwLT5RKV9F8BCAmiaqt7VRA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tP8em9JM4mHBb0tjycDoRgrN8s8="},{"type":"next-occurrence","id":"tcheaLSV2TlKutro7kVtqbqSA0g="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"I8BEpwLT5RKV9F8BCAmiaqt7VRA=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T12:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"tcheaLSV2TlKutro7kVtqbqSA0g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tP8em9JM4mHBb0tjycDoRgrN8s8="},{"type":"next-occurrence","id":"5pH9Q2RxTBWrrJLrRlfedhegwv0="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"tcheaLSV2TlKutro7kVtqbqSA0g=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T12:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"5pH9Q2RxTBWrrJLrRlfedhegwv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tP8em9JM4mHBb0tjycDoRgrN8s8="},{"type":"next-occurrence","id":"IoH+pofD3f8Dd3EVSTRQnc5B1jM="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"5pH9Q2RxTBWrrJLrRlfedhegwv0=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T12:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"IoH+pofD3f8Dd3EVSTRQnc5B1jM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tP8em9JM4mHBb0tjycDoRgrN8s8="},{"type":"next-occurrence","id":"Kw35DOIiMAgyoniqjxDt+21JYso="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"IoH+pofD3f8Dd3EVSTRQnc5B1jM=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T12:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"Kw35DOIiMAgyoniqjxDt+21JYso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tP8em9JM4mHBb0tjycDoRgrN8s8="},{"type":"next-occurrence","id":"RAvs75evGjgZKYqEaxujCpE1kfk="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"Kw35DOIiMAgyoniqjxDt+21JYso=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T12:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"RAvs75evGjgZKYqEaxujCpE1kfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tP8em9JM4mHBb0tjycDoRgrN8s8="},{"type":"next-occurrence","id":"TM0UBUDZL/Ynt0ev6bdAl/CNYkk="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"RAvs75evGjgZKYqEaxujCpE1kfk=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"TM0UBUDZL/Ynt0ev6bdAl/CNYkk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tP8em9JM4mHBb0tjycDoRgrN8s8="},{"type":"next-occurrence","id":"zzXRaUszl8ptMeGa/IU1EJOxHXU="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"TM0UBUDZL/Ynt0ev6bdAl/CNYkk=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T12:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"zzXRaUszl8ptMeGa/IU1EJOxHXU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tP8em9JM4mHBb0tjycDoRgrN8s8="},{"type":"next-occurrence","id":"+V/QZQpFURwUi51CUa/CwPtJYmE="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"zzXRaUszl8ptMeGa/IU1EJOxHXU=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T12:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"+V/QZQpFURwUi51CUa/CwPtJYmE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tP8em9JM4mHBb0tjycDoRgrN8s8="},{"type":"next-occurrence","id":"AJhNNgka3ik8hX9DAzGnF2+3flU="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"+V/QZQpFURwUi51CUa/CwPtJYmE=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T12:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"AJhNNgka3ik8hX9DAzGnF2+3flU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tP8em9JM4mHBb0tjycDoRgrN8s8="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"AJhNNgka3ik8hX9DAzGnF2+3flU=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T12:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"ORC300519661","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Van Wyck Expressway"],"direction":"unknown","description":"Scheduled roadwork on Van Wyck Expressway southbound ramp to Exit C - Federal Circle (New York) Not currently Scheduled","update_date":"2026-04-09T03:59:00Z"},"road_event_id":"ORC300519661","beginning_cross_street":"Exit C - Federal Circle ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-02-20T22:57:15Z","end_date":"2026-04-09T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.805964,40.66074]]}},{"id":"xXJnutLtT7CWswIkeM8zHKnLygM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Babylon and Montauk"],"direction":"unknown","related_road_events":[],"description":"Due to Platform Repairs eastbound, Babylon and Montauk at Babylon (Babylon) You must be in the last six cars to exit eastbound trains at Babylon The eastern half of both platforms are closed for replacement. Use the stairs by North Carll Ave or the elevator to reach the platforms. Customers on Montauk Branch diesel trains with six or more cars, listen for announcements or ask a crew member to see if your car will open at Babylon., Continuous Sunday February 22nd, 2026 02:30 AM thru Sunday May 31st, 2026 11:59 PM","update_date":"2026-02-21T22:32:24Z"},"road_event_id":"xXJnutLtT7CWswIkeM8zHKnLygM=","beginning_cross_street":"Babylon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.324055,40.700689]]}},{"id":"JpexU5Jlrk0XpbdvjzLAHkUqitw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1pcl8tJZQgDMdLdGK0sBPdmDEfM="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"JpexU5Jlrk0XpbdvjzLAHkUqitw=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"1pcl8tJZQgDMdLdGK0sBPdmDEfM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpexU5Jlrk0XpbdvjzLAHkUqitw="},{"type":"next-occurrence","id":"uGVLQOiAAcPkmGeoiA9x15vjzJs="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"1pcl8tJZQgDMdLdGK0sBPdmDEfM=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"uGVLQOiAAcPkmGeoiA9x15vjzJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpexU5Jlrk0XpbdvjzLAHkUqitw="},{"type":"next-occurrence","id":"hr10MKjegwO+25HE5HytkzqYEGU="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"uGVLQOiAAcPkmGeoiA9x15vjzJs=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"hr10MKjegwO+25HE5HytkzqYEGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpexU5Jlrk0XpbdvjzLAHkUqitw="},{"type":"next-occurrence","id":"zSRo3h9haUiz75mLwgIEe4E/D+Q="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"hr10MKjegwO+25HE5HytkzqYEGU=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"zSRo3h9haUiz75mLwgIEe4E/D+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpexU5Jlrk0XpbdvjzLAHkUqitw="},{"type":"next-occurrence","id":"8opMdr0I29rLvJzUP86MyGVxaVM="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"zSRo3h9haUiz75mLwgIEe4E/D+Q=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"8opMdr0I29rLvJzUP86MyGVxaVM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpexU5Jlrk0XpbdvjzLAHkUqitw="},{"type":"next-occurrence","id":"rTobuRoI8BV0pasy1UBbQrFrdas="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"8opMdr0I29rLvJzUP86MyGVxaVM=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"rTobuRoI8BV0pasy1UBbQrFrdas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpexU5Jlrk0XpbdvjzLAHkUqitw="},{"type":"next-occurrence","id":"OQX+si5WW5UvKfIyBkYQWEMOAbM="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"rTobuRoI8BV0pasy1UBbQrFrdas=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"OQX+si5WW5UvKfIyBkYQWEMOAbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpexU5Jlrk0XpbdvjzLAHkUqitw="},{"type":"next-occurrence","id":"jViRGwcLH4HmqZou4kT+CcIP6Ho="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"OQX+si5WW5UvKfIyBkYQWEMOAbM=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"jViRGwcLH4HmqZou4kT+CcIP6Ho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpexU5Jlrk0XpbdvjzLAHkUqitw="},{"type":"next-occurrence","id":"H3PejsG8LwjyOnJd1Hz+bIPno3A="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"jViRGwcLH4HmqZou4kT+CcIP6Ho=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"H3PejsG8LwjyOnJd1Hz+bIPno3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpexU5Jlrk0XpbdvjzLAHkUqitw="},{"type":"next-occurrence","id":"Tox+WisEgQBFyFAksdRylBm4kCA="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"H3PejsG8LwjyOnJd1Hz+bIPno3A=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"Tox+WisEgQBFyFAksdRylBm4kCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpexU5Jlrk0XpbdvjzLAHkUqitw="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"Tox+WisEgQBFyFAksdRylBm4kCA=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"rUyVBKt87iMz2kLrJf6ZoEjyRLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OtNVvpdHH8gvb9iVXcRgksZ9eNc="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"rUyVBKt87iMz2kLrJf6ZoEjyRLs=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"OtNVvpdHH8gvb9iVXcRgksZ9eNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rUyVBKt87iMz2kLrJf6ZoEjyRLs="},{"type":"next-occurrence","id":"9XYz4YIdyq1vM4n0+chiEISkci8="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"OtNVvpdHH8gvb9iVXcRgksZ9eNc=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"9XYz4YIdyq1vM4n0+chiEISkci8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rUyVBKt87iMz2kLrJf6ZoEjyRLs="},{"type":"next-occurrence","id":"ELGl9afUEON9h80wvo3Yh06Wiqk="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"9XYz4YIdyq1vM4n0+chiEISkci8=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"ELGl9afUEON9h80wvo3Yh06Wiqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rUyVBKt87iMz2kLrJf6ZoEjyRLs="},{"type":"next-occurrence","id":"nHmKpEcS+/nyAyyAO1qh4sn4z88="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"ELGl9afUEON9h80wvo3Yh06Wiqk=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"nHmKpEcS+/nyAyyAO1qh4sn4z88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rUyVBKt87iMz2kLrJf6ZoEjyRLs="},{"type":"next-occurrence","id":"Enyy/vojaw3rcpBuGsdHwKB7Svw="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"nHmKpEcS+/nyAyyAO1qh4sn4z88=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"Enyy/vojaw3rcpBuGsdHwKB7Svw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rUyVBKt87iMz2kLrJf6ZoEjyRLs="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"Enyy/vojaw3rcpBuGsdHwKB7Svw=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"IkQHZA+E9nFMH/KY6mFpjNhb+4U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 298"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on NY 298 both directions between Pulaski St (Syracuse) and Solar St (Syracuse), Continuous Monday March 2nd,2026 07:00 AM thru Friday May 22nd,2026 03:00 PM 1 Right lane of 2 lanes closed eastbound, westbound","update_date":"2026-04-30T19:00:14Z"},"road_event_id":"IkQHZA+E9nFMH/KY6mFpjNhb+4U=","beginning_cross_street":"Pulaski St","ending_cross_street":"Solar St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172551,43.059463]]}},{"id":"nLjumI9FJJOv4PMgBkT0UIUJO1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs and drainage improvements on NY 284 both directions between Langlitz Road (Minisink) and CR 1 Pine Island Turnpike (Minisink) D265386/32597309 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Monday March 16th, 2026 12:00 AM thru Tuesday June 30th, 2026 12:00 AM all lanes closed and detoured","update_date":"2026-03-27T17:25:36Z"},"road_event_id":"nLjumI9FJJOv4PMgBkT0UIUJO1I=","beginning_cross_street":"Langlitz Road","ending_cross_street":"CR 1 - Pine Island Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552716,41.328515]]}},{"id":"syRL9U7EhqL6zAYamJCnzgKsUCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sayr6dZxhjv2ZXJRTPKMOhcpz6k="}],"description":"Roadwork on NY 240 both directions NY 400; Aurora Expressway (West Seneca) to Mineral Springs Road (West Seneca), Monday March 16th, 2026 thru Friday December 4th, 2026, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-26T16:13:00Z"},"road_event_id":"syRL9U7EhqL6zAYamJCnzgKsUCs=","beginning_cross_street":"NY 400; Aurora Expressway","ending_cross_street":"Mineral Springs Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.787995,42.849281]]}},{"id":"sayr6dZxhjv2ZXJRTPKMOhcpz6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"syRL9U7EhqL6zAYamJCnzgKsUCs="}],"description":"Roadwork on NY 240 both directions NY 400; Aurora Expressway (West Seneca) to Mineral Springs Road (West Seneca), Monday March 16th, 2026 thru Friday December 4th, 2026, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-26T16:13:00Z"},"road_event_id":"sayr6dZxhjv2ZXJRTPKMOhcpz6k=","beginning_cross_street":"NY 400; Aurora Expressway","ending_cross_street":"Mineral Springs Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.787995,42.849281]]}},{"id":"a7INOV0p3DPrVDzc+FKJN7BbBD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1mk1E8FCs14QudQynfPVqn3ynFo="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"a7INOV0p3DPrVDzc+FKJN7BbBD0=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"1mk1E8FCs14QudQynfPVqn3ynFo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a7INOV0p3DPrVDzc+FKJN7BbBD0="},{"type":"next-occurrence","id":"0zGWInF8qXTvZ8P7DI8RmQTYAKA="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"1mk1E8FCs14QudQynfPVqn3ynFo=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"0zGWInF8qXTvZ8P7DI8RmQTYAKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a7INOV0p3DPrVDzc+FKJN7BbBD0="},{"type":"next-occurrence","id":"fiO3vKj3qCN6PalLN0rM8XMmqMM="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"0zGWInF8qXTvZ8P7DI8RmQTYAKA=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"fiO3vKj3qCN6PalLN0rM8XMmqMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a7INOV0p3DPrVDzc+FKJN7BbBD0="},{"type":"next-occurrence","id":"XtMhshthSgw0FLVHsmWZrA1jzSs="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"fiO3vKj3qCN6PalLN0rM8XMmqMM=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"XtMhshthSgw0FLVHsmWZrA1jzSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a7INOV0p3DPrVDzc+FKJN7BbBD0="},{"type":"next-occurrence","id":"7VjdotSgYWsJmLWEuIo7+CUrHR8="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"XtMhshthSgw0FLVHsmWZrA1jzSs=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"7VjdotSgYWsJmLWEuIo7+CUrHR8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a7INOV0p3DPrVDzc+FKJN7BbBD0="},{"type":"next-occurrence","id":"TkV4xtfiqeRSzcIzfBRiwREW+ww="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"7VjdotSgYWsJmLWEuIo7+CUrHR8=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"TkV4xtfiqeRSzcIzfBRiwREW+ww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a7INOV0p3DPrVDzc+FKJN7BbBD0="},{"type":"next-occurrence","id":"8mlmSv3+eXG/PfTdUe5/E5wxwqY="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"TkV4xtfiqeRSzcIzfBRiwREW+ww=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"8mlmSv3+eXG/PfTdUe5/E5wxwqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a7INOV0p3DPrVDzc+FKJN7BbBD0="},{"type":"next-occurrence","id":"5czQqawmL7rtSyVPq+rOjA2FJyA="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"8mlmSv3+eXG/PfTdUe5/E5wxwqY=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"5czQqawmL7rtSyVPq+rOjA2FJyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a7INOV0p3DPrVDzc+FKJN7BbBD0="},{"type":"next-occurrence","id":"QYvbrtl11gO2/EQPjYPB7ZkPmXw="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"5czQqawmL7rtSyVPq+rOjA2FJyA=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"QYvbrtl11gO2/EQPjYPB7ZkPmXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a7INOV0p3DPrVDzc+FKJN7BbBD0="},{"type":"next-occurrence","id":"woEzW4DbgQhEnrQKQePg6jDWjWY="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"QYvbrtl11gO2/EQPjYPB7ZkPmXw=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"woEzW4DbgQhEnrQKQePg6jDWjWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a7INOV0p3DPrVDzc+FKJN7BbBD0="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"woEzW4DbgQhEnrQKQePg6jDWjWY=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"vzlBViEUi3rHqfIe0pyGNwoMi6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gmQTk8iTNJlT7Us+JlIYCFeMKkc="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"vzlBViEUi3rHqfIe0pyGNwoMi6g=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"gmQTk8iTNJlT7Us+JlIYCFeMKkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vzlBViEUi3rHqfIe0pyGNwoMi6g="},{"type":"next-occurrence","id":"lrripjcrfG5cJfzDZaLjrC2WCx4="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"gmQTk8iTNJlT7Us+JlIYCFeMKkc=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"lrripjcrfG5cJfzDZaLjrC2WCx4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vzlBViEUi3rHqfIe0pyGNwoMi6g="},{"type":"next-occurrence","id":"GqNdLRklzIBzws973p4itrZfmdk="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"lrripjcrfG5cJfzDZaLjrC2WCx4=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"GqNdLRklzIBzws973p4itrZfmdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vzlBViEUi3rHqfIe0pyGNwoMi6g="},{"type":"next-occurrence","id":"716vlBCq5jvQTfB+x87DUEUmJEA="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"GqNdLRklzIBzws973p4itrZfmdk=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"716vlBCq5jvQTfB+x87DUEUmJEA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vzlBViEUi3rHqfIe0pyGNwoMi6g="},{"type":"next-occurrence","id":"vHA+QTTSQKPoKeoMc72hNUuVoT4="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"716vlBCq5jvQTfB+x87DUEUmJEA=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"vHA+QTTSQKPoKeoMc72hNUuVoT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vzlBViEUi3rHqfIe0pyGNwoMi6g="},{"type":"next-occurrence","id":"ikjk0aI1gJB5xKvb5TvDPdkPP+s="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"vHA+QTTSQKPoKeoMc72hNUuVoT4=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"ikjk0aI1gJB5xKvb5TvDPdkPP+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vzlBViEUi3rHqfIe0pyGNwoMi6g="},{"type":"next-occurrence","id":"d8/8/oKY+06NDiFktzKNdbd8rmQ="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"ikjk0aI1gJB5xKvb5TvDPdkPP+s=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"d8/8/oKY+06NDiFktzKNdbd8rmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vzlBViEUi3rHqfIe0pyGNwoMi6g="},{"type":"next-occurrence","id":"149XvY0DZRrQeS9qeap7/NJBRkQ="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"d8/8/oKY+06NDiFktzKNdbd8rmQ=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"149XvY0DZRrQeS9qeap7/NJBRkQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vzlBViEUi3rHqfIe0pyGNwoMi6g="},{"type":"next-occurrence","id":"Shlnu+lzWlcqKnVN4rztcfTnMaU="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"149XvY0DZRrQeS9qeap7/NJBRkQ=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"Shlnu+lzWlcqKnVN4rztcfTnMaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vzlBViEUi3rHqfIe0pyGNwoMi6g="},{"type":"next-occurrence","id":"wNOAhtUM1IwAEXxqvXiOwoI/BUE="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"Shlnu+lzWlcqKnVN4rztcfTnMaU=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"wNOAhtUM1IwAEXxqvXiOwoI/BUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vzlBViEUi3rHqfIe0pyGNwoMi6g="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"wNOAhtUM1IwAEXxqvXiOwoI/BUE=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"PHoFRbb/8E2jwohwV81uRXEWVF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YxV0D6dzct/xn5RQNljdwPfXbLM="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"PHoFRbb/8E2jwohwV81uRXEWVF4=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"YxV0D6dzct/xn5RQNljdwPfXbLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PHoFRbb/8E2jwohwV81uRXEWVF4="},{"type":"next-occurrence","id":"1LvyJ+MSx/vRONvfS3xGxk7+YsE="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"YxV0D6dzct/xn5RQNljdwPfXbLM=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"1LvyJ+MSx/vRONvfS3xGxk7+YsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PHoFRbb/8E2jwohwV81uRXEWVF4="},{"type":"next-occurrence","id":"/NLnWLaxKb2ny+f5FAnhxc2mHLw="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"1LvyJ+MSx/vRONvfS3xGxk7+YsE=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"/NLnWLaxKb2ny+f5FAnhxc2mHLw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PHoFRbb/8E2jwohwV81uRXEWVF4="},{"type":"next-occurrence","id":"7HnOOD4bnec9RYVMDs3NMWcSRyU="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"/NLnWLaxKb2ny+f5FAnhxc2mHLw=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"7HnOOD4bnec9RYVMDs3NMWcSRyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PHoFRbb/8E2jwohwV81uRXEWVF4="},{"type":"next-occurrence","id":"PwKvd4UEhLY4GmCBsW05Zqml5oo="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"7HnOOD4bnec9RYVMDs3NMWcSRyU=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"PwKvd4UEhLY4GmCBsW05Zqml5oo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PHoFRbb/8E2jwohwV81uRXEWVF4="},{"type":"next-occurrence","id":"wZgb4TZ54o++ZyRdMzlqjUbtQZM="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"PwKvd4UEhLY4GmCBsW05Zqml5oo=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"wZgb4TZ54o++ZyRdMzlqjUbtQZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PHoFRbb/8E2jwohwV81uRXEWVF4="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"wZgb4TZ54o++ZyRdMzlqjUbtQZM=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"ocJhjGe6Y67ovbEF4RdjN7KDpg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/bXUK331oBNwwbEG0B6Aq3YOLwA="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"ocJhjGe6Y67ovbEF4RdjN7KDpg4=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"/bXUK331oBNwwbEG0B6Aq3YOLwA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ocJhjGe6Y67ovbEF4RdjN7KDpg4="},{"type":"next-occurrence","id":"ecq5PkQz9fHLOBVdFy5O4BU0zVE="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"/bXUK331oBNwwbEG0B6Aq3YOLwA=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"ecq5PkQz9fHLOBVdFy5O4BU0zVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ocJhjGe6Y67ovbEF4RdjN7KDpg4="},{"type":"next-occurrence","id":"iC5ohiI3ZKXXq5aSGX8y72b6jxo="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"ecq5PkQz9fHLOBVdFy5O4BU0zVE=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"iC5ohiI3ZKXXq5aSGX8y72b6jxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ocJhjGe6Y67ovbEF4RdjN7KDpg4="},{"type":"next-occurrence","id":"7ZU3OE8pGHI6TwMPRPIJv4+PNCU="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"iC5ohiI3ZKXXq5aSGX8y72b6jxo=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"7ZU3OE8pGHI6TwMPRPIJv4+PNCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ocJhjGe6Y67ovbEF4RdjN7KDpg4="},{"type":"next-occurrence","id":"33MbnSVDfE3KgonsxCGa0GtCD1o="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"7ZU3OE8pGHI6TwMPRPIJv4+PNCU=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"33MbnSVDfE3KgonsxCGa0GtCD1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ocJhjGe6Y67ovbEF4RdjN7KDpg4="},{"type":"next-occurrence","id":"m8jjKmX5TGMsv/Qm7VuGJohrJqM="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"33MbnSVDfE3KgonsxCGa0GtCD1o=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"m8jjKmX5TGMsv/Qm7VuGJohrJqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ocJhjGe6Y67ovbEF4RdjN7KDpg4="},{"type":"next-occurrence","id":"Lg4Es+lFBv+HSNdr56yq7nFjbro="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"m8jjKmX5TGMsv/Qm7VuGJohrJqM=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"Lg4Es+lFBv+HSNdr56yq7nFjbro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ocJhjGe6Y67ovbEF4RdjN7KDpg4="},{"type":"next-occurrence","id":"sJbxx+slrBbywS06nIonBwN+mHE="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"Lg4Es+lFBv+HSNdr56yq7nFjbro=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"sJbxx+slrBbywS06nIonBwN+mHE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ocJhjGe6Y67ovbEF4RdjN7KDpg4="},{"type":"next-occurrence","id":"J316HUgejjqX1VKVtGippX0w9Ck="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"sJbxx+slrBbywS06nIonBwN+mHE=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"J316HUgejjqX1VKVtGippX0w9Ck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ocJhjGe6Y67ovbEF4RdjN7KDpg4="},{"type":"next-occurrence","id":"8ceCgBBpic1a1zrAsCZMOGicN40="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"J316HUgejjqX1VKVtGippX0w9Ck=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"8ceCgBBpic1a1zrAsCZMOGicN40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ocJhjGe6Y67ovbEF4RdjN7KDpg4="},{"type":"next-occurrence","id":"So9degOWKscr6kTi3cSyILwE1jM="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"8ceCgBBpic1a1zrAsCZMOGicN40=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"So9degOWKscr6kTi3cSyILwE1jM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ocJhjGe6Y67ovbEF4RdjN7KDpg4="},{"type":"next-occurrence","id":"yAu+xruOQ0ODghOqQJ7sOkrYlz0="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"So9degOWKscr6kTi3cSyILwE1jM=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"yAu+xruOQ0ODghOqQJ7sOkrYlz0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ocJhjGe6Y67ovbEF4RdjN7KDpg4="},{"type":"next-occurrence","id":"ZlIrhnEZSMofxtr1NFjUYw/qOUU="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"yAu+xruOQ0ODghOqQJ7sOkrYlz0=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"ZlIrhnEZSMofxtr1NFjUYw/qOUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ocJhjGe6Y67ovbEF4RdjN7KDpg4="},{"type":"next-occurrence","id":"m9Sh3ajkIt0bnUbgi1K2ofoqAgs="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"ZlIrhnEZSMofxtr1NFjUYw/qOUU=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"m9Sh3ajkIt0bnUbgi1K2ofoqAgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ocJhjGe6Y67ovbEF4RdjN7KDpg4="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"m9Sh3ajkIt0bnUbgi1K2ofoqAgs=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"t7BaurYPUnmPW4K7QWQ/paz3CnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Nl4Q0r8HY+z9msTkgR8c2dYxdWE="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"t7BaurYPUnmPW4K7QWQ/paz3CnA=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"Nl4Q0r8HY+z9msTkgR8c2dYxdWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t7BaurYPUnmPW4K7QWQ/paz3CnA="},{"type":"next-occurrence","id":"cyU/wJalsRqmD5/P9cNGeEGHiQ4="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"Nl4Q0r8HY+z9msTkgR8c2dYxdWE=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"cyU/wJalsRqmD5/P9cNGeEGHiQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t7BaurYPUnmPW4K7QWQ/paz3CnA="},{"type":"next-occurrence","id":"asNOHYEL2oaevQVaPIPOni+ZY5c="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"cyU/wJalsRqmD5/P9cNGeEGHiQ4=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"asNOHYEL2oaevQVaPIPOni+ZY5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t7BaurYPUnmPW4K7QWQ/paz3CnA="},{"type":"next-occurrence","id":"scgsVLowd3onp7y6lIYA3q3TZIo="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"asNOHYEL2oaevQVaPIPOni+ZY5c=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"scgsVLowd3onp7y6lIYA3q3TZIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t7BaurYPUnmPW4K7QWQ/paz3CnA="},{"type":"next-occurrence","id":"cb9SNETLnQmVMN7zjqTP62Awkqk="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"scgsVLowd3onp7y6lIYA3q3TZIo=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"cb9SNETLnQmVMN7zjqTP62Awkqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t7BaurYPUnmPW4K7QWQ/paz3CnA="},{"type":"next-occurrence","id":"65S5xn/bBh9NTkNs4Jz/mujDzpU="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"cb9SNETLnQmVMN7zjqTP62Awkqk=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"65S5xn/bBh9NTkNs4Jz/mujDzpU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t7BaurYPUnmPW4K7QWQ/paz3CnA="},{"type":"next-occurrence","id":"BAULGjduIqP3yBPm8q1CeinZtnM="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"65S5xn/bBh9NTkNs4Jz/mujDzpU=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"BAULGjduIqP3yBPm8q1CeinZtnM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t7BaurYPUnmPW4K7QWQ/paz3CnA="},{"type":"next-occurrence","id":"5Le6ynjmouHm3VKJi0i+1j0ibZ4="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"BAULGjduIqP3yBPm8q1CeinZtnM=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"5Le6ynjmouHm3VKJi0i+1j0ibZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t7BaurYPUnmPW4K7QWQ/paz3CnA="},{"type":"next-occurrence","id":"lwCmAHlt7Ixng843Q09zx3PBHsA="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"5Le6ynjmouHm3VKJi0i+1j0ibZ4=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"lwCmAHlt7Ixng843Q09zx3PBHsA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t7BaurYPUnmPW4K7QWQ/paz3CnA="},{"type":"next-occurrence","id":"AnkBTtk/Fc9H1TceGaY0WwbHYqQ="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"lwCmAHlt7Ixng843Q09zx3PBHsA=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"AnkBTtk/Fc9H1TceGaY0WwbHYqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t7BaurYPUnmPW4K7QWQ/paz3CnA="},{"type":"next-occurrence","id":"P5knr5uRkGAZw2FLUQOrwWQHCD8="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"AnkBTtk/Fc9H1TceGaY0WwbHYqQ=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"P5knr5uRkGAZw2FLUQOrwWQHCD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t7BaurYPUnmPW4K7QWQ/paz3CnA="},{"type":"next-occurrence","id":"RYgNWgJoiZg6FkDcBbcdcIWeuzM="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"P5knr5uRkGAZw2FLUQOrwWQHCD8=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"RYgNWgJoiZg6FkDcBbcdcIWeuzM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t7BaurYPUnmPW4K7QWQ/paz3CnA="},{"type":"next-occurrence","id":"Z/iMl7Ih1L10d2f19HkfWoNHy0E="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"RYgNWgJoiZg6FkDcBbcdcIWeuzM=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"Z/iMl7Ih1L10d2f19HkfWoNHy0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t7BaurYPUnmPW4K7QWQ/paz3CnA="},{"type":"next-occurrence","id":"rxYp3W3yP1RuAejqNOFGueRrqJg="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"Z/iMl7Ih1L10d2f19HkfWoNHy0E=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"rxYp3W3yP1RuAejqNOFGueRrqJg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t7BaurYPUnmPW4K7QWQ/paz3CnA="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"rxYp3W3yP1RuAejqNOFGueRrqJg=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"10JqxoCmUqI9KbwsZMZHwtNP4u4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vQzGhUsW5e0h6rUQnRN9oaXmyU0="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"10JqxoCmUqI9KbwsZMZHwtNP4u4=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"vQzGhUsW5e0h6rUQnRN9oaXmyU0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"10JqxoCmUqI9KbwsZMZHwtNP4u4="},{"type":"next-occurrence","id":"46aBm7gU5EyRbWjl3mOn3puDDJc="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"vQzGhUsW5e0h6rUQnRN9oaXmyU0=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"46aBm7gU5EyRbWjl3mOn3puDDJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"10JqxoCmUqI9KbwsZMZHwtNP4u4="},{"type":"next-occurrence","id":"LfvRJZNnHsXzby3rkchep7zOp+A="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"46aBm7gU5EyRbWjl3mOn3puDDJc=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"LfvRJZNnHsXzby3rkchep7zOp+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"10JqxoCmUqI9KbwsZMZHwtNP4u4="},{"type":"next-occurrence","id":"ajB7NgOLq9IkWxGZ6/wlCtwrTyg="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"LfvRJZNnHsXzby3rkchep7zOp+A=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"ajB7NgOLq9IkWxGZ6/wlCtwrTyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"10JqxoCmUqI9KbwsZMZHwtNP4u4="},{"type":"next-occurrence","id":"C/hfvmkP4mSmgphyOLoYzBibEIw="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"ajB7NgOLq9IkWxGZ6/wlCtwrTyg=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"C/hfvmkP4mSmgphyOLoYzBibEIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"10JqxoCmUqI9KbwsZMZHwtNP4u4="},{"type":"next-occurrence","id":"WjrK7FS3t7Cs0QoD7HhjheWrcus="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"C/hfvmkP4mSmgphyOLoYzBibEIw=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"WjrK7FS3t7Cs0QoD7HhjheWrcus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"10JqxoCmUqI9KbwsZMZHwtNP4u4="},{"type":"next-occurrence","id":"3kDTNbrUvP2Y5C1R2bt1y7Nw5Lc="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"WjrK7FS3t7Cs0QoD7HhjheWrcus=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"3kDTNbrUvP2Y5C1R2bt1y7Nw5Lc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"10JqxoCmUqI9KbwsZMZHwtNP4u4="},{"type":"next-occurrence","id":"AxnFxIZVZ18Hpv5CAcPlPHLTkSE="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"3kDTNbrUvP2Y5C1R2bt1y7Nw5Lc=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"AxnFxIZVZ18Hpv5CAcPlPHLTkSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"10JqxoCmUqI9KbwsZMZHwtNP4u4="},{"type":"next-occurrence","id":"n09B/hfUM6Yl4EQhZJXiJLxpjcY="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"AxnFxIZVZ18Hpv5CAcPlPHLTkSE=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"n09B/hfUM6Yl4EQhZJXiJLxpjcY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"10JqxoCmUqI9KbwsZMZHwtNP4u4="},{"type":"next-occurrence","id":"DVm1J3GdzQO4KjwQuul/cSyrbhY="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"n09B/hfUM6Yl4EQhZJXiJLxpjcY=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"DVm1J3GdzQO4KjwQuul/cSyrbhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"10JqxoCmUqI9KbwsZMZHwtNP4u4="},{"type":"next-occurrence","id":"zBu1Ny5RdLfK1fQBq8TyiXJCReU="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"DVm1J3GdzQO4KjwQuul/cSyrbhY=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"zBu1Ny5RdLfK1fQBq8TyiXJCReU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"10JqxoCmUqI9KbwsZMZHwtNP4u4="},{"type":"next-occurrence","id":"RBHuoGYbBsZgT86Q/D6pLdt4hW0="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"zBu1Ny5RdLfK1fQBq8TyiXJCReU=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"RBHuoGYbBsZgT86Q/D6pLdt4hW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"10JqxoCmUqI9KbwsZMZHwtNP4u4="},{"type":"next-occurrence","id":"Qu8S7fs2ql/RZeJCS0DQGSMnFVE="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"RBHuoGYbBsZgT86Q/D6pLdt4hW0=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"Qu8S7fs2ql/RZeJCS0DQGSMnFVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"10JqxoCmUqI9KbwsZMZHwtNP4u4="},{"type":"next-occurrence","id":"6ZE4ZyrgaRpFIN6/wbIaJd+fM80="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"Qu8S7fs2ql/RZeJCS0DQGSMnFVE=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"6ZE4ZyrgaRpFIN6/wbIaJd+fM80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"10JqxoCmUqI9KbwsZMZHwtNP4u4="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"6ZE4ZyrgaRpFIN6/wbIaJd+fM80=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"Lgj+ciX42KVJ2B0679z7f2zFjpA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SOUTH ST"],"direction":"unknown","related_road_events":[],"description":"Bridge work on SOUTH ST both directions between DWYER RD (Middlebury) and SANDY HILL RD (Middlebury), Continuous Monday March 2nd, 2026 12:00 AM thru Friday September 10th, 2027 11:59 PM All lanes closed","update_date":"2026-03-03T18:06:13Z"},"road_event_id":"Lgj+ciX42KVJ2B0679z7f2zFjpA=","beginning_cross_street":"DWYER RD","ending_cross_street":"SANDY HILL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.122891,41.516388]]}},{"id":"WfqIIa/n1xGln1PKjjTHiwzsxeM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kkB7Ou8bKp42aECjoj2M8KxWyJE="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"WfqIIa/n1xGln1PKjjTHiwzsxeM=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"kkB7Ou8bKp42aECjoj2M8KxWyJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfqIIa/n1xGln1PKjjTHiwzsxeM="},{"type":"next-occurrence","id":"vGT/DeA2RbqoflMCveRiZRiqs1w="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"kkB7Ou8bKp42aECjoj2M8KxWyJE=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"vGT/DeA2RbqoflMCveRiZRiqs1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfqIIa/n1xGln1PKjjTHiwzsxeM="},{"type":"next-occurrence","id":"1hhI1fudbM8t3/0uKnzFSKIRTrA="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"vGT/DeA2RbqoflMCveRiZRiqs1w=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"1hhI1fudbM8t3/0uKnzFSKIRTrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfqIIa/n1xGln1PKjjTHiwzsxeM="},{"type":"next-occurrence","id":"4M+FWoV2kR3VetI77nTNyi4ge24="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"1hhI1fudbM8t3/0uKnzFSKIRTrA=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"4M+FWoV2kR3VetI77nTNyi4ge24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfqIIa/n1xGln1PKjjTHiwzsxeM="},{"type":"next-occurrence","id":"k2mkHC4q9dEeHrojoDMJxB0oE0o="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"4M+FWoV2kR3VetI77nTNyi4ge24=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"k2mkHC4q9dEeHrojoDMJxB0oE0o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfqIIa/n1xGln1PKjjTHiwzsxeM="},{"type":"next-occurrence","id":"ayHyYWeRUNmz5SgfcIYsipu92vc="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"k2mkHC4q9dEeHrojoDMJxB0oE0o=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"ayHyYWeRUNmz5SgfcIYsipu92vc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfqIIa/n1xGln1PKjjTHiwzsxeM="},{"type":"next-occurrence","id":"hIbZekKGHjEacqikSyLMEjyqT4g="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"ayHyYWeRUNmz5SgfcIYsipu92vc=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"hIbZekKGHjEacqikSyLMEjyqT4g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfqIIa/n1xGln1PKjjTHiwzsxeM="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"hIbZekKGHjEacqikSyLMEjyqT4g=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"w6rAlSFJ9mIVZyYREgAyuCnG4qg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FulRdZSqFgNeeznfTLkqAKvoH64="}],"description":"Roadwork on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-08T21:00:23Z"},"road_event_id":"w6rAlSFJ9mIVZyYREgAyuCnG4qg=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"FulRdZSqFgNeeznfTLkqAKvoH64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w6rAlSFJ9mIVZyYREgAyuCnG4qg="},{"type":"next-occurrence","id":"MYUdreT6tMH2rhqi76XU85YibVA="}],"description":"Roadwork on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-08T21:00:23Z"},"road_event_id":"FulRdZSqFgNeeznfTLkqAKvoH64=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"MYUdreT6tMH2rhqi76XU85YibVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w6rAlSFJ9mIVZyYREgAyuCnG4qg="}],"description":"Roadwork on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-08T21:00:23Z"},"road_event_id":"MYUdreT6tMH2rhqi76XU85YibVA=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"yYvaxSS+V9txb/Wy1EvFU/MJIno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"arqAlNH7Lzlh7WxrV9JnerEimQQ="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"yYvaxSS+V9txb/Wy1EvFU/MJIno=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"arqAlNH7Lzlh7WxrV9JnerEimQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yYvaxSS+V9txb/Wy1EvFU/MJIno="},{"type":"next-occurrence","id":"f4u5YwCH2r4/07QV9heZ5a4suiA="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"arqAlNH7Lzlh7WxrV9JnerEimQQ=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"f4u5YwCH2r4/07QV9heZ5a4suiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yYvaxSS+V9txb/Wy1EvFU/MJIno="},{"type":"next-occurrence","id":"VZmwVj80VfXJsbADnQVfdWUbh80="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"f4u5YwCH2r4/07QV9heZ5a4suiA=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"VZmwVj80VfXJsbADnQVfdWUbh80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yYvaxSS+V9txb/Wy1EvFU/MJIno="},{"type":"next-occurrence","id":"TsFM0lYmMa5UgbPwOjb6YH9xOnE="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"VZmwVj80VfXJsbADnQVfdWUbh80=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"TsFM0lYmMa5UgbPwOjb6YH9xOnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yYvaxSS+V9txb/Wy1EvFU/MJIno="},{"type":"next-occurrence","id":"6aAZtF0t9MEd1sNgOjx5XO94N1k="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"TsFM0lYmMa5UgbPwOjb6YH9xOnE=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"6aAZtF0t9MEd1sNgOjx5XO94N1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yYvaxSS+V9txb/Wy1EvFU/MJIno="},{"type":"next-occurrence","id":"KV/jW6yQSMfky4Ll+hW5iTRCYpE="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"6aAZtF0t9MEd1sNgOjx5XO94N1k=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"KV/jW6yQSMfky4Ll+hW5iTRCYpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yYvaxSS+V9txb/Wy1EvFU/MJIno="},{"type":"next-occurrence","id":"ODwMKJSvgzMXiwfhzTo1nhDX9jo="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"KV/jW6yQSMfky4Ll+hW5iTRCYpE=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"ODwMKJSvgzMXiwfhzTo1nhDX9jo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yYvaxSS+V9txb/Wy1EvFU/MJIno="},{"type":"next-occurrence","id":"ENHFq6I0H0kC6sXnXissu1Wzsh8="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"ODwMKJSvgzMXiwfhzTo1nhDX9jo=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"ENHFq6I0H0kC6sXnXissu1Wzsh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yYvaxSS+V9txb/Wy1EvFU/MJIno="},{"type":"next-occurrence","id":"a2QBrtq5VRvNucjvftIHaUBUqBA="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"ENHFq6I0H0kC6sXnXissu1Wzsh8=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"a2QBrtq5VRvNucjvftIHaUBUqBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yYvaxSS+V9txb/Wy1EvFU/MJIno="},{"type":"next-occurrence","id":"iauHHw4Bv8klygKVQNbYBLOfCsQ="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"a2QBrtq5VRvNucjvftIHaUBUqBA=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"iauHHw4Bv8klygKVQNbYBLOfCsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yYvaxSS+V9txb/Wy1EvFU/MJIno="},{"type":"next-occurrence","id":"1eqnkCSoo6WvVtha3DoHhvM82WE="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"iauHHw4Bv8klygKVQNbYBLOfCsQ=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"1eqnkCSoo6WvVtha3DoHhvM82WE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yYvaxSS+V9txb/Wy1EvFU/MJIno="},{"type":"next-occurrence","id":"fvV7QNPbIJXEugI6kA8Alk2S4pc="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"1eqnkCSoo6WvVtha3DoHhvM82WE=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T11:00:00Z","end_date":"2026-05-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"fvV7QNPbIJXEugI6kA8Alk2S4pc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yYvaxSS+V9txb/Wy1EvFU/MJIno="},{"type":"next-occurrence","id":"+wWg+dVvk74OSvw5Dto+g0NOg4o="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"fvV7QNPbIJXEugI6kA8Alk2S4pc=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"+wWg+dVvk74OSvw5Dto+g0NOg4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yYvaxSS+V9txb/Wy1EvFU/MJIno="},{"type":"next-occurrence","id":"QyG5KLS8pdFejXM2xQ22J+5hghM="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"+wWg+dVvk74OSvw5Dto+g0NOg4o=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"QyG5KLS8pdFejXM2xQ22J+5hghM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yYvaxSS+V9txb/Wy1EvFU/MJIno="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"QyG5KLS8pdFejXM2xQ22J+5hghM=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"/vRvrmRhY+C90+Wyc30OPKa/euI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mXzfmK+sPH8oXJFk+h0RXT66IDA="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"/vRvrmRhY+C90+Wyc30OPKa/euI=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:30:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"mXzfmK+sPH8oXJFk+h0RXT66IDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/vRvrmRhY+C90+Wyc30OPKa/euI="},{"type":"next-occurrence","id":"zZTbgMf+nQm33KcKm0oHcxOCYec="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"mXzfmK+sPH8oXJFk+h0RXT66IDA=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:30:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"zZTbgMf+nQm33KcKm0oHcxOCYec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/vRvrmRhY+C90+Wyc30OPKa/euI="},{"type":"next-occurrence","id":"QKqFrsdz3ZuRNzoX8UbY0Wu3zW0="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"zZTbgMf+nQm33KcKm0oHcxOCYec=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:30:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"QKqFrsdz3ZuRNzoX8UbY0Wu3zW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/vRvrmRhY+C90+Wyc30OPKa/euI="},{"type":"next-occurrence","id":"oO4iv4UfleJWB3CObaxNBUy2enk="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"QKqFrsdz3ZuRNzoX8UbY0Wu3zW0=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T12:30:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"oO4iv4UfleJWB3CObaxNBUy2enk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/vRvrmRhY+C90+Wyc30OPKa/euI="},{"type":"next-occurrence","id":"eKUJaF+zt9DEZgyivvJUXj83njA="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"oO4iv4UfleJWB3CObaxNBUy2enk=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T12:30:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"eKUJaF+zt9DEZgyivvJUXj83njA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/vRvrmRhY+C90+Wyc30OPKa/euI="},{"type":"next-occurrence","id":"h6Nl7Z/LgJ5+lVznRZb2XGxWS3A="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"eKUJaF+zt9DEZgyivvJUXj83njA=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T12:30:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"h6Nl7Z/LgJ5+lVznRZb2XGxWS3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/vRvrmRhY+C90+Wyc30OPKa/euI="},{"type":"next-occurrence","id":"6vD0TRh60njQE8binnH+GJKTcEw="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"h6Nl7Z/LgJ5+lVznRZb2XGxWS3A=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T12:30:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"6vD0TRh60njQE8binnH+GJKTcEw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/vRvrmRhY+C90+Wyc30OPKa/euI="},{"type":"next-occurrence","id":"b5ABABvWIn7ZKyfoWsVDxQ5EU/c="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"6vD0TRh60njQE8binnH+GJKTcEw=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"b5ABABvWIn7ZKyfoWsVDxQ5EU/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/vRvrmRhY+C90+Wyc30OPKa/euI="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"b5ABABvWIn7ZKyfoWsVDxQ5EU/c=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T21:00:00Z","end_date":"2026-05-28T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"fMy/vh94Pw4qNj8sQZJJvf5N7pk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"InH9iuzQVqnBRnewqyPscqsLchc="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T19:31:20Z"},"road_event_id":"fMy/vh94Pw4qNj8sQZJJvf5N7pk=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"InH9iuzQVqnBRnewqyPscqsLchc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fMy/vh94Pw4qNj8sQZJJvf5N7pk="},{"type":"next-occurrence","id":"aypRqKoBIG4DZf2gIJJOeEEvyXU="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T19:31:20Z"},"road_event_id":"InH9iuzQVqnBRnewqyPscqsLchc=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"aypRqKoBIG4DZf2gIJJOeEEvyXU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fMy/vh94Pw4qNj8sQZJJvf5N7pk="},{"type":"next-occurrence","id":"CKibRHX5x0jRrmCiObZnlrbgIX0="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T19:31:20Z"},"road_event_id":"aypRqKoBIG4DZf2gIJJOeEEvyXU=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"CKibRHX5x0jRrmCiObZnlrbgIX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fMy/vh94Pw4qNj8sQZJJvf5N7pk="},{"type":"next-occurrence","id":"PZL4x+2koHOTRxTTMoN8Fdj+CCs="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T19:31:20Z"},"road_event_id":"CKibRHX5x0jRrmCiObZnlrbgIX0=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"PZL4x+2koHOTRxTTMoN8Fdj+CCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fMy/vh94Pw4qNj8sQZJJvf5N7pk="},{"type":"next-occurrence","id":"ZSLxpKXB95D+xmbsQ3NTK7wd5mo="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T19:31:20Z"},"road_event_id":"PZL4x+2koHOTRxTTMoN8Fdj+CCs=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"ZSLxpKXB95D+xmbsQ3NTK7wd5mo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fMy/vh94Pw4qNj8sQZJJvf5N7pk="},{"type":"next-occurrence","id":"5y2HvICC1kLDMwcdwnxH0erw8HQ="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T19:31:20Z"},"road_event_id":"ZSLxpKXB95D+xmbsQ3NTK7wd5mo=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"5y2HvICC1kLDMwcdwnxH0erw8HQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fMy/vh94Pw4qNj8sQZJJvf5N7pk="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T19:31:20Z"},"road_event_id":"5y2HvICC1kLDMwcdwnxH0erw8HQ=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"4Fu1qy1BCrPHKj069/jofOzuaq0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QiCoRoo/E+0opJcEGoiWr/J7dSk="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32563709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-01T19:30:55Z"},"road_event_id":"4Fu1qy1BCrPHKj069/jofOzuaq0=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"QiCoRoo/E+0opJcEGoiWr/J7dSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Fu1qy1BCrPHKj069/jofOzuaq0="},{"type":"next-occurrence","id":"S4XYjsMvAuc3U0wqusBcD93EsmM="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32563709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-01T19:30:55Z"},"road_event_id":"QiCoRoo/E+0opJcEGoiWr/J7dSk=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"S4XYjsMvAuc3U0wqusBcD93EsmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Fu1qy1BCrPHKj069/jofOzuaq0="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32563709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-01T19:30:55Z"},"road_event_id":"S4XYjsMvAuc3U0wqusBcD93EsmM=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"ORC300521385","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","description":"Construction on George Washington Bridge Upper Level southbound ramp from Palisades Interstate Parkway (Fort Lee) to Palisades Interstate Parkway (Fort Lee) Not currently Scheduled","update_date":"2026-03-22T12:00:01Z"},"road_event_id":"ORC300521385","beginning_cross_street":"Palisades Interstate Parkway","ending_cross_street":"Palisades Interstate Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-08T22:41:00Z","end_date":"2026-03-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.962982,40.854543]]}},{"id":"DzajmPyYxlSNKkQnglfIkr8WU4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KN4aDb6jfuTQNzWIYjuUA6rbW8Y="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"DzajmPyYxlSNKkQnglfIkr8WU4k=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"KN4aDb6jfuTQNzWIYjuUA6rbW8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DzajmPyYxlSNKkQnglfIkr8WU4k="},{"type":"next-occurrence","id":"v6lDcN0BPGLptSarEDPgt7cU8o4="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"KN4aDb6jfuTQNzWIYjuUA6rbW8Y=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"v6lDcN0BPGLptSarEDPgt7cU8o4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DzajmPyYxlSNKkQnglfIkr8WU4k="},{"type":"next-occurrence","id":"rhu4u851uClpiTMg2QmwXoVbuXE="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"v6lDcN0BPGLptSarEDPgt7cU8o4=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"rhu4u851uClpiTMg2QmwXoVbuXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DzajmPyYxlSNKkQnglfIkr8WU4k="},{"type":"next-occurrence","id":"HK/Ljnq2u3pB5rJmBivkDjtHxlI="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"rhu4u851uClpiTMg2QmwXoVbuXE=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"HK/Ljnq2u3pB5rJmBivkDjtHxlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DzajmPyYxlSNKkQnglfIkr8WU4k="},{"type":"next-occurrence","id":"YQe/gTT6Fj9YZnpyzNU6Vlph6RA="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"HK/Ljnq2u3pB5rJmBivkDjtHxlI=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"YQe/gTT6Fj9YZnpyzNU6Vlph6RA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DzajmPyYxlSNKkQnglfIkr8WU4k="},{"type":"next-occurrence","id":"xnK14zMrYf4BbEUHTtNy7UO0GXY="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"YQe/gTT6Fj9YZnpyzNU6Vlph6RA=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"xnK14zMrYf4BbEUHTtNy7UO0GXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DzajmPyYxlSNKkQnglfIkr8WU4k="},{"type":"next-occurrence","id":"nDfJ3uewZkm2WxqkEwTRCYy5j7I="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"xnK14zMrYf4BbEUHTtNy7UO0GXY=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"nDfJ3uewZkm2WxqkEwTRCYy5j7I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DzajmPyYxlSNKkQnglfIkr8WU4k="},{"type":"next-occurrence","id":"RPul8pCZqTC37y385d62GJm/7/8="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"nDfJ3uewZkm2WxqkEwTRCYy5j7I=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"RPul8pCZqTC37y385d62GJm/7/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DzajmPyYxlSNKkQnglfIkr8WU4k="},{"type":"next-occurrence","id":"Zq20E6X1/KJb3TNP7zJepf8gL3k="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"RPul8pCZqTC37y385d62GJm/7/8=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"Zq20E6X1/KJb3TNP7zJepf8gL3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DzajmPyYxlSNKkQnglfIkr8WU4k="},{"type":"next-occurrence","id":"ueKU090bv4/xD1JvamMdrQPJhas="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"Zq20E6X1/KJb3TNP7zJepf8gL3k=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"ueKU090bv4/xD1JvamMdrQPJhas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DzajmPyYxlSNKkQnglfIkr8WU4k="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"ueKU090bv4/xD1JvamMdrQPJhas=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"U0o720nIUpCsamejYR/VZ1eiY6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SKNrFa+YxageGM2dX4b47W1myXg="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"U0o720nIUpCsamejYR/VZ1eiY6M=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"SKNrFa+YxageGM2dX4b47W1myXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U0o720nIUpCsamejYR/VZ1eiY6M="},{"type":"next-occurrence","id":"5PGWVPsdu78eWa/UlkY3d3pt77s="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"SKNrFa+YxageGM2dX4b47W1myXg=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"5PGWVPsdu78eWa/UlkY3d3pt77s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U0o720nIUpCsamejYR/VZ1eiY6M="},{"type":"next-occurrence","id":"DqCHSLpYeMxGpZZmJ64dFdlLquU="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"5PGWVPsdu78eWa/UlkY3d3pt77s=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"DqCHSLpYeMxGpZZmJ64dFdlLquU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U0o720nIUpCsamejYR/VZ1eiY6M="},{"type":"next-occurrence","id":"Du3F+hbPSdYE8IiBAZg+lGfPArI="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"DqCHSLpYeMxGpZZmJ64dFdlLquU=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"Du3F+hbPSdYE8IiBAZg+lGfPArI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U0o720nIUpCsamejYR/VZ1eiY6M="},{"type":"next-occurrence","id":"Syw3GiSqa6FPorXhLZ5aEbamemM="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"Du3F+hbPSdYE8IiBAZg+lGfPArI=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"Syw3GiSqa6FPorXhLZ5aEbamemM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U0o720nIUpCsamejYR/VZ1eiY6M="},{"type":"next-occurrence","id":"hiVSN5RIbIUEB612sbOc0t4GVf0="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"Syw3GiSqa6FPorXhLZ5aEbamemM=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"hiVSN5RIbIUEB612sbOc0t4GVf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U0o720nIUpCsamejYR/VZ1eiY6M="},{"type":"next-occurrence","id":"5JMizpGPvSuIcW4MHopdYxYRhho="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"hiVSN5RIbIUEB612sbOc0t4GVf0=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"5JMizpGPvSuIcW4MHopdYxYRhho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U0o720nIUpCsamejYR/VZ1eiY6M="},{"type":"next-occurrence","id":"fNMl4pdW/VKpB577SpTvTbDvYJI="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"5JMizpGPvSuIcW4MHopdYxYRhho=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"fNMl4pdW/VKpB577SpTvTbDvYJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U0o720nIUpCsamejYR/VZ1eiY6M="},{"type":"next-occurrence","id":"CzTnbn7rSEJEdDgQMIWWOdZ5Wns="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"fNMl4pdW/VKpB577SpTvTbDvYJI=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"CzTnbn7rSEJEdDgQMIWWOdZ5Wns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U0o720nIUpCsamejYR/VZ1eiY6M="},{"type":"next-occurrence","id":"vWeZt/1Fyt9qhu9mM2zIo4CJsXQ="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"CzTnbn7rSEJEdDgQMIWWOdZ5Wns=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"vWeZt/1Fyt9qhu9mM2zIo4CJsXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U0o720nIUpCsamejYR/VZ1eiY6M="},{"type":"next-occurrence","id":"6iJh55dx/cvQ4E6W0puxrnqBVWg="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"vWeZt/1Fyt9qhu9mM2zIo4CJsXQ=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"6iJh55dx/cvQ4E6W0puxrnqBVWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U0o720nIUpCsamejYR/VZ1eiY6M="},{"type":"next-occurrence","id":"jmSCNdjMjiDvOnSUOtS9DpAd2GM="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"6iJh55dx/cvQ4E6W0puxrnqBVWg=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T11:00:00Z","end_date":"2026-05-24T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"jmSCNdjMjiDvOnSUOtS9DpAd2GM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U0o720nIUpCsamejYR/VZ1eiY6M="},{"type":"next-occurrence","id":"0bemsXIl79Qt2VAsNz9FcfpLYZg="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"jmSCNdjMjiDvOnSUOtS9DpAd2GM=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"0bemsXIl79Qt2VAsNz9FcfpLYZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U0o720nIUpCsamejYR/VZ1eiY6M="},{"type":"next-occurrence","id":"C7Hxxrsz3WirDYk+2B4UF9xL+Lo="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"0bemsXIl79Qt2VAsNz9FcfpLYZg=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"C7Hxxrsz3WirDYk+2B4UF9xL+Lo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U0o720nIUpCsamejYR/VZ1eiY6M="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"C7Hxxrsz3WirDYk+2B4UF9xL+Lo=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"0kbg7Z/4bb60jqotdeYGQ7esC28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FPFcld1zyE9VJmdozacdSfqiMIU="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"0kbg7Z/4bb60jqotdeYGQ7esC28=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"FPFcld1zyE9VJmdozacdSfqiMIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0kbg7Z/4bb60jqotdeYGQ7esC28="},{"type":"next-occurrence","id":"mSvtYcQ97Vm0VQhHuQMn9OuPEuc="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"FPFcld1zyE9VJmdozacdSfqiMIU=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"mSvtYcQ97Vm0VQhHuQMn9OuPEuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0kbg7Z/4bb60jqotdeYGQ7esC28="},{"type":"next-occurrence","id":"RxI3SbZs/msRPVdlW3WEhm382Uk="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"mSvtYcQ97Vm0VQhHuQMn9OuPEuc=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"RxI3SbZs/msRPVdlW3WEhm382Uk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0kbg7Z/4bb60jqotdeYGQ7esC28="},{"type":"next-occurrence","id":"uB6lnsOhwQma5OZ/yQHRAIoBCDE="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"RxI3SbZs/msRPVdlW3WEhm382Uk=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"uB6lnsOhwQma5OZ/yQHRAIoBCDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0kbg7Z/4bb60jqotdeYGQ7esC28="},{"type":"next-occurrence","id":"T9B+6eqq7hgO91k5EBBCcX9ptCM="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"uB6lnsOhwQma5OZ/yQHRAIoBCDE=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"T9B+6eqq7hgO91k5EBBCcX9ptCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0kbg7Z/4bb60jqotdeYGQ7esC28="},{"type":"next-occurrence","id":"CHK16+xamE5O5hqmDhggKjmbSFs="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"T9B+6eqq7hgO91k5EBBCcX9ptCM=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"CHK16+xamE5O5hqmDhggKjmbSFs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0kbg7Z/4bb60jqotdeYGQ7esC28="},{"type":"next-occurrence","id":"Qmd+hXy/yNGZKIBb9nBvuyiVEAg="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"CHK16+xamE5O5hqmDhggKjmbSFs=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"Qmd+hXy/yNGZKIBb9nBvuyiVEAg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0kbg7Z/4bb60jqotdeYGQ7esC28="},{"type":"next-occurrence","id":"zcNtpPhOIAt8cp/tRcYNBJ+8/EU="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"Qmd+hXy/yNGZKIBb9nBvuyiVEAg=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"zcNtpPhOIAt8cp/tRcYNBJ+8/EU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0kbg7Z/4bb60jqotdeYGQ7esC28="},{"type":"next-occurrence","id":"hLWCcHjSlDZU6DCqq5f+6voOv3s="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"zcNtpPhOIAt8cp/tRcYNBJ+8/EU=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"hLWCcHjSlDZU6DCqq5f+6voOv3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0kbg7Z/4bb60jqotdeYGQ7esC28="},{"type":"next-occurrence","id":"r9oEeM5+yA/K9w+/OaDFooz3gRA="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"hLWCcHjSlDZU6DCqq5f+6voOv3s=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"r9oEeM5+yA/K9w+/OaDFooz3gRA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0kbg7Z/4bb60jqotdeYGQ7esC28="},{"type":"next-occurrence","id":"37gey/PHOleFyioX96zp8JAAjvw="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"r9oEeM5+yA/K9w+/OaDFooz3gRA=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"37gey/PHOleFyioX96zp8JAAjvw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0kbg7Z/4bb60jqotdeYGQ7esC28="},{"type":"next-occurrence","id":"OZ4UxxkGJXFlKzaS40LjtsY5VJM="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"37gey/PHOleFyioX96zp8JAAjvw=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T11:00:00Z","end_date":"2026-05-24T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"OZ4UxxkGJXFlKzaS40LjtsY5VJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0kbg7Z/4bb60jqotdeYGQ7esC28="},{"type":"next-occurrence","id":"c9YiIWLgzdSkVOiibpgQ3YKoPgE="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"OZ4UxxkGJXFlKzaS40LjtsY5VJM=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"c9YiIWLgzdSkVOiibpgQ3YKoPgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0kbg7Z/4bb60jqotdeYGQ7esC28="},{"type":"next-occurrence","id":"BbhusTG6Yzt/a6o4A7YnV1FOqO0="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"c9YiIWLgzdSkVOiibpgQ3YKoPgE=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"BbhusTG6Yzt/a6o4A7YnV1FOqO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0kbg7Z/4bb60jqotdeYGQ7esC28="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"BbhusTG6Yzt/a6o4A7YnV1FOqO0=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"7L2p/ftzDPefZDHhNCu8Gn+dTXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tCOTLMie/SiO+7XA/14bADKdUaw="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:57Z"},"road_event_id":"7L2p/ftzDPefZDHhNCu8Gn+dTXw=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"tCOTLMie/SiO+7XA/14bADKdUaw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7L2p/ftzDPefZDHhNCu8Gn+dTXw="},{"type":"next-occurrence","id":"g0S7mtR8gOZWjpsgu3osWSkl+f0="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:57Z"},"road_event_id":"tCOTLMie/SiO+7XA/14bADKdUaw=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"g0S7mtR8gOZWjpsgu3osWSkl+f0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7L2p/ftzDPefZDHhNCu8Gn+dTXw="},{"type":"next-occurrence","id":"q+y6OEEkxbNQPB6MbpypruO663E="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:57Z"},"road_event_id":"g0S7mtR8gOZWjpsgu3osWSkl+f0=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"q+y6OEEkxbNQPB6MbpypruO663E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7L2p/ftzDPefZDHhNCu8Gn+dTXw="},{"type":"next-occurrence","id":"RaZYfPprQB+BYPsEEJHbjCq2T2c="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:57Z"},"road_event_id":"q+y6OEEkxbNQPB6MbpypruO663E=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"RaZYfPprQB+BYPsEEJHbjCq2T2c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7L2p/ftzDPefZDHhNCu8Gn+dTXw="},{"type":"next-occurrence","id":"8o+NAQPfBaYIJ3O+KF+D+iy5K58="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:57Z"},"road_event_id":"RaZYfPprQB+BYPsEEJHbjCq2T2c=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"8o+NAQPfBaYIJ3O+KF+D+iy5K58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7L2p/ftzDPefZDHhNCu8Gn+dTXw="},{"type":"next-occurrence","id":"VwdY25YGF+74xHFH5Tt7DIJr76Y="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:57Z"},"road_event_id":"8o+NAQPfBaYIJ3O+KF+D+iy5K58=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"VwdY25YGF+74xHFH5Tt7DIJr76Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7L2p/ftzDPefZDHhNCu8Gn+dTXw="},{"type":"next-occurrence","id":"hinEMQeloYhrqSP6KIZRmPz+vdE="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:57Z"},"road_event_id":"VwdY25YGF+74xHFH5Tt7DIJr76Y=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"hinEMQeloYhrqSP6KIZRmPz+vdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7L2p/ftzDPefZDHhNCu8Gn+dTXw="},{"type":"next-occurrence","id":"5zYpeF8Fe0x871GMl2rWsAF4cro="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:57Z"},"road_event_id":"hinEMQeloYhrqSP6KIZRmPz+vdE=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"5zYpeF8Fe0x871GMl2rWsAF4cro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7L2p/ftzDPefZDHhNCu8Gn+dTXw="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:57Z"},"road_event_id":"5zYpeF8Fe0x871GMl2rWsAF4cro=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"G3RScSe9MfynSYMhztj5mZTDNfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NnTv7Sw5JWsOqa9bKCDm5pLwwmo="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:01Z"},"road_event_id":"G3RScSe9MfynSYMhztj5mZTDNfg=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"NnTv7Sw5JWsOqa9bKCDm5pLwwmo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G3RScSe9MfynSYMhztj5mZTDNfg="},{"type":"next-occurrence","id":"G7WKsP57yOSEQIqSyq/D1xvGZe4="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:01Z"},"road_event_id":"NnTv7Sw5JWsOqa9bKCDm5pLwwmo=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"G7WKsP57yOSEQIqSyq/D1xvGZe4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G3RScSe9MfynSYMhztj5mZTDNfg="},{"type":"next-occurrence","id":"4seLhr9uEWN9zaIjeFNR1hgYTMM="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:01Z"},"road_event_id":"G7WKsP57yOSEQIqSyq/D1xvGZe4=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"4seLhr9uEWN9zaIjeFNR1hgYTMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G3RScSe9MfynSYMhztj5mZTDNfg="},{"type":"next-occurrence","id":"Uo6XjfVb8CYPlYEfnrdwTxmQiV4="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:01Z"},"road_event_id":"4seLhr9uEWN9zaIjeFNR1hgYTMM=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T14:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"Uo6XjfVb8CYPlYEfnrdwTxmQiV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G3RScSe9MfynSYMhztj5mZTDNfg="},{"type":"next-occurrence","id":"frOHnAxYHXMJM/JyKoR2p6iBabk="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:01Z"},"road_event_id":"Uo6XjfVb8CYPlYEfnrdwTxmQiV4=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T14:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"frOHnAxYHXMJM/JyKoR2p6iBabk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G3RScSe9MfynSYMhztj5mZTDNfg="},{"type":"next-occurrence","id":"tX+LJpHfzoX8Y5LeV1LxtheqEqA="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:01Z"},"road_event_id":"frOHnAxYHXMJM/JyKoR2p6iBabk=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T14:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"tX+LJpHfzoX8Y5LeV1LxtheqEqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G3RScSe9MfynSYMhztj5mZTDNfg="},{"type":"next-occurrence","id":"JEOl4qmCoFb9I+oQ2lZqUFvbxJU="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:01Z"},"road_event_id":"tX+LJpHfzoX8Y5LeV1LxtheqEqA=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T14:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"JEOl4qmCoFb9I+oQ2lZqUFvbxJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G3RScSe9MfynSYMhztj5mZTDNfg="},{"type":"next-occurrence","id":"P0nKdDHVuakQYmqzwPFkgoJOWwU="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:01Z"},"road_event_id":"JEOl4qmCoFb9I+oQ2lZqUFvbxJU=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"P0nKdDHVuakQYmqzwPFkgoJOWwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G3RScSe9MfynSYMhztj5mZTDNfg="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-05T11:52:01Z"},"road_event_id":"P0nKdDHVuakQYmqzwPFkgoJOWwU=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"/kzFeqtu8XLiCOb6QgBzeSZBxuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NTfcI4IylV6vj5uKBf5KUPqxtPk="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York), Tuesday March 10th, 2026 thru Tuesday June 2nd, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:53:18Z"},"road_event_id":"/kzFeqtu8XLiCOb6QgBzeSZBxuc=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965224,40.714302]]}},{"id":"NTfcI4IylV6vj5uKBf5KUPqxtPk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/kzFeqtu8XLiCOb6QgBzeSZBxuc="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York), Tuesday March 10th, 2026 thru Tuesday June 2nd, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:53:18Z"},"road_event_id":"NTfcI4IylV6vj5uKBf5KUPqxtPk=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965224,40.714302]]}},{"id":"H8VOFS4qVVT+BrydJnYQPYkZfsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9lxDWnrEOX0LYqRFyvqRXeGfVhc="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"H8VOFS4qVVT+BrydJnYQPYkZfsw=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"9lxDWnrEOX0LYqRFyvqRXeGfVhc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H8VOFS4qVVT+BrydJnYQPYkZfsw="},{"type":"next-occurrence","id":"NvLpU6r01p6vqpGBsqQHGXvWPvo="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"9lxDWnrEOX0LYqRFyvqRXeGfVhc=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"NvLpU6r01p6vqpGBsqQHGXvWPvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H8VOFS4qVVT+BrydJnYQPYkZfsw="},{"type":"next-occurrence","id":"84igv6kTlfS6qiRe1qKtSQD0csY="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"NvLpU6r01p6vqpGBsqQHGXvWPvo=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"84igv6kTlfS6qiRe1qKtSQD0csY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H8VOFS4qVVT+BrydJnYQPYkZfsw="},{"type":"next-occurrence","id":"vf4TAvuyJvoRHidRfgMBj2pWUig="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"84igv6kTlfS6qiRe1qKtSQD0csY=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"vf4TAvuyJvoRHidRfgMBj2pWUig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H8VOFS4qVVT+BrydJnYQPYkZfsw="},{"type":"next-occurrence","id":"o2OXXU4nC4lu61Zv7jrbjU8jlLM="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"vf4TAvuyJvoRHidRfgMBj2pWUig=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"o2OXXU4nC4lu61Zv7jrbjU8jlLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H8VOFS4qVVT+BrydJnYQPYkZfsw="},{"type":"next-occurrence","id":"Q5EifDcNKwqwf/P1LfZ6dCJqs9I="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"o2OXXU4nC4lu61Zv7jrbjU8jlLM=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"Q5EifDcNKwqwf/P1LfZ6dCJqs9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H8VOFS4qVVT+BrydJnYQPYkZfsw="},{"type":"next-occurrence","id":"irUUUBMPc0pMZr2D4Dlv1L50T0I="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"Q5EifDcNKwqwf/P1LfZ6dCJqs9I=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"irUUUBMPc0pMZr2D4Dlv1L50T0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H8VOFS4qVVT+BrydJnYQPYkZfsw="},{"type":"next-occurrence","id":"BubOUHAkSKoYMHrx67Z5jMKvaIE="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"irUUUBMPc0pMZr2D4Dlv1L50T0I=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"BubOUHAkSKoYMHrx67Z5jMKvaIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H8VOFS4qVVT+BrydJnYQPYkZfsw="},{"type":"next-occurrence","id":"yk34BtwuepafqCMLaAdXyiaaeFQ="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"BubOUHAkSKoYMHrx67Z5jMKvaIE=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"yk34BtwuepafqCMLaAdXyiaaeFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H8VOFS4qVVT+BrydJnYQPYkZfsw="},{"type":"next-occurrence","id":"DnJDTnYUmj2EWGKKyg33t83VWXw="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"yk34BtwuepafqCMLaAdXyiaaeFQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"DnJDTnYUmj2EWGKKyg33t83VWXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H8VOFS4qVVT+BrydJnYQPYkZfsw="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"DnJDTnYUmj2EWGKKyg33t83VWXw=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"sEoSNoaJjP1xJU+HTmqh+vnhLG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PgcHvDtECU14umFmXd/aOHVDYSc="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"sEoSNoaJjP1xJU+HTmqh+vnhLG0=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"PgcHvDtECU14umFmXd/aOHVDYSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEoSNoaJjP1xJU+HTmqh+vnhLG0="},{"type":"next-occurrence","id":"CJIny2ZSEQskofAZDzdZBrkLiCs="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"PgcHvDtECU14umFmXd/aOHVDYSc=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"CJIny2ZSEQskofAZDzdZBrkLiCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEoSNoaJjP1xJU+HTmqh+vnhLG0="},{"type":"next-occurrence","id":"NbYf05XheX61t9jNLy38UF621H4="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"CJIny2ZSEQskofAZDzdZBrkLiCs=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"NbYf05XheX61t9jNLy38UF621H4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEoSNoaJjP1xJU+HTmqh+vnhLG0="},{"type":"next-occurrence","id":"pUp/4RYb87OAWZhqOLRdfpFnOTk="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"NbYf05XheX61t9jNLy38UF621H4=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"pUp/4RYb87OAWZhqOLRdfpFnOTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEoSNoaJjP1xJU+HTmqh+vnhLG0="},{"type":"next-occurrence","id":"T4F53pgpCOAjAN7XO8xPsw/noVU="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"pUp/4RYb87OAWZhqOLRdfpFnOTk=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"T4F53pgpCOAjAN7XO8xPsw/noVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEoSNoaJjP1xJU+HTmqh+vnhLG0="},{"type":"next-occurrence","id":"+FZoQd45LJPV6Cg4LOJWee7mhzA="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"T4F53pgpCOAjAN7XO8xPsw/noVU=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"+FZoQd45LJPV6Cg4LOJWee7mhzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEoSNoaJjP1xJU+HTmqh+vnhLG0="},{"type":"next-occurrence","id":"vNXS0xPjzHceVuXfIA43HuAcLkM="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"+FZoQd45LJPV6Cg4LOJWee7mhzA=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"vNXS0xPjzHceVuXfIA43HuAcLkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEoSNoaJjP1xJU+HTmqh+vnhLG0="},{"type":"next-occurrence","id":"W2OLeDVYImca+E0omH5tkqM0/18="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"vNXS0xPjzHceVuXfIA43HuAcLkM=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"W2OLeDVYImca+E0omH5tkqM0/18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEoSNoaJjP1xJU+HTmqh+vnhLG0="},{"type":"next-occurrence","id":"Dk5PawOyfEo7HlZgn+HPhTLxZwk="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"W2OLeDVYImca+E0omH5tkqM0/18=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"Dk5PawOyfEo7HlZgn+HPhTLxZwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEoSNoaJjP1xJU+HTmqh+vnhLG0="},{"type":"next-occurrence","id":"r+xDf7W3eADr4NPEuQvxDUif/O0="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"Dk5PawOyfEo7HlZgn+HPhTLxZwk=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"r+xDf7W3eADr4NPEuQvxDUif/O0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEoSNoaJjP1xJU+HTmqh+vnhLG0="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"r+xDf7W3eADr4NPEuQvxDUif/O0=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"+RftbHJlAOgZur6SCPh2IYdgVVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"flZiPbCFxNMZ5K2zd1oiADqC2vE="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"+RftbHJlAOgZur6SCPh2IYdgVVo=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"flZiPbCFxNMZ5K2zd1oiADqC2vE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+RftbHJlAOgZur6SCPh2IYdgVVo="},{"type":"next-occurrence","id":"dAhV59cqp7sZmNqpZXICSGdka6Q="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"flZiPbCFxNMZ5K2zd1oiADqC2vE=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"dAhV59cqp7sZmNqpZXICSGdka6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+RftbHJlAOgZur6SCPh2IYdgVVo="},{"type":"next-occurrence","id":"6b6eXXIM1LfPg1aHO90V8nLg69s="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"dAhV59cqp7sZmNqpZXICSGdka6Q=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"6b6eXXIM1LfPg1aHO90V8nLg69s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+RftbHJlAOgZur6SCPh2IYdgVVo="},{"type":"next-occurrence","id":"ZfVKlb463gtymymGloQXqdIeif8="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"6b6eXXIM1LfPg1aHO90V8nLg69s=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"ZfVKlb463gtymymGloQXqdIeif8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+RftbHJlAOgZur6SCPh2IYdgVVo="},{"type":"next-occurrence","id":"qY/fwaTfehpvSx6DutBuuDCwLtc="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"ZfVKlb463gtymymGloQXqdIeif8=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"qY/fwaTfehpvSx6DutBuuDCwLtc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+RftbHJlAOgZur6SCPh2IYdgVVo="},{"type":"next-occurrence","id":"RkNutgWNzPn65bJtIQfwlySR6GE="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"qY/fwaTfehpvSx6DutBuuDCwLtc=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"RkNutgWNzPn65bJtIQfwlySR6GE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+RftbHJlAOgZur6SCPh2IYdgVVo="},{"type":"next-occurrence","id":"BfAoEPmG3PkDcg4ePG+G3x0/Rqk="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"RkNutgWNzPn65bJtIQfwlySR6GE=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"BfAoEPmG3PkDcg4ePG+G3x0/Rqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+RftbHJlAOgZur6SCPh2IYdgVVo="},{"type":"next-occurrence","id":"ww84o4xHWeVV0EPk815uYRYp774="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"BfAoEPmG3PkDcg4ePG+G3x0/Rqk=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"ww84o4xHWeVV0EPk815uYRYp774=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+RftbHJlAOgZur6SCPh2IYdgVVo="},{"type":"next-occurrence","id":"dQhFctHyiwP4+diVgwvGStPzqtU="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"ww84o4xHWeVV0EPk815uYRYp774=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"dQhFctHyiwP4+diVgwvGStPzqtU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+RftbHJlAOgZur6SCPh2IYdgVVo="},{"type":"next-occurrence","id":"qojDjhLoW1Wu1KsSR4PjYOlehQc="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"dQhFctHyiwP4+diVgwvGStPzqtU=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"qojDjhLoW1Wu1KsSR4PjYOlehQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+RftbHJlAOgZur6SCPh2IYdgVVo="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"qojDjhLoW1Wu1KsSR4PjYOlehQc=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"7BFrTOcTf+w2myBW5XTBGRYI54E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gzNBDBc8B6HU/GcxgdF4S+rp9cA="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"7BFrTOcTf+w2myBW5XTBGRYI54E=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"gzNBDBc8B6HU/GcxgdF4S+rp9cA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BFrTOcTf+w2myBW5XTBGRYI54E="},{"type":"next-occurrence","id":"80u3TrWZThmYjvXAuVgletfS2pI="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"gzNBDBc8B6HU/GcxgdF4S+rp9cA=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"80u3TrWZThmYjvXAuVgletfS2pI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BFrTOcTf+w2myBW5XTBGRYI54E="},{"type":"next-occurrence","id":"1FMs1hYl9Vq3hIYrRswc8jS6fyM="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"80u3TrWZThmYjvXAuVgletfS2pI=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"1FMs1hYl9Vq3hIYrRswc8jS6fyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BFrTOcTf+w2myBW5XTBGRYI54E="},{"type":"next-occurrence","id":"KhFZcjjdEelpnLYHCil9WssViTo="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"1FMs1hYl9Vq3hIYrRswc8jS6fyM=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"KhFZcjjdEelpnLYHCil9WssViTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BFrTOcTf+w2myBW5XTBGRYI54E="},{"type":"next-occurrence","id":"N/NA6Y1eilyTwyWCDsLC9X2hLvs="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"KhFZcjjdEelpnLYHCil9WssViTo=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"N/NA6Y1eilyTwyWCDsLC9X2hLvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BFrTOcTf+w2myBW5XTBGRYI54E="},{"type":"next-occurrence","id":"vY5x4XvCReTM3PKnuMyQIaQAvvc="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"N/NA6Y1eilyTwyWCDsLC9X2hLvs=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"vY5x4XvCReTM3PKnuMyQIaQAvvc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BFrTOcTf+w2myBW5XTBGRYI54E="},{"type":"next-occurrence","id":"0oJK9GqJ4fE3/hQEEcK9I7+ThnE="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"vY5x4XvCReTM3PKnuMyQIaQAvvc=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"0oJK9GqJ4fE3/hQEEcK9I7+ThnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BFrTOcTf+w2myBW5XTBGRYI54E="},{"type":"next-occurrence","id":"pf7E+j0BqZZcHiuv81RKBJA3f6A="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"0oJK9GqJ4fE3/hQEEcK9I7+ThnE=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"pf7E+j0BqZZcHiuv81RKBJA3f6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BFrTOcTf+w2myBW5XTBGRYI54E="},{"type":"next-occurrence","id":"m2ALT0STBsnxtYAXWEG4tIODGeI="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"pf7E+j0BqZZcHiuv81RKBJA3f6A=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"m2ALT0STBsnxtYAXWEG4tIODGeI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BFrTOcTf+w2myBW5XTBGRYI54E="},{"type":"next-occurrence","id":"BdEMiKndOuM4SRb1PrTPHCq4wQk="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"m2ALT0STBsnxtYAXWEG4tIODGeI=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"BdEMiKndOuM4SRb1PrTPHCq4wQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BFrTOcTf+w2myBW5XTBGRYI54E="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"BdEMiKndOuM4SRb1PrTPHCq4wQk=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"boJpheXEbO1E7wPg2xvToZDrlrw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XTIG9zTLDDl+xxBBdXlzK1kTQC4="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"boJpheXEbO1E7wPg2xvToZDrlrw=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"XTIG9zTLDDl+xxBBdXlzK1kTQC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boJpheXEbO1E7wPg2xvToZDrlrw="},{"type":"next-occurrence","id":"M5mtHY7S8mjK0LN4O98EOWFNHRI="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"XTIG9zTLDDl+xxBBdXlzK1kTQC4=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"M5mtHY7S8mjK0LN4O98EOWFNHRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boJpheXEbO1E7wPg2xvToZDrlrw="},{"type":"next-occurrence","id":"WBzeTA4jDq85V8UQFqvUeLYxPbU="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"M5mtHY7S8mjK0LN4O98EOWFNHRI=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"WBzeTA4jDq85V8UQFqvUeLYxPbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boJpheXEbO1E7wPg2xvToZDrlrw="},{"type":"next-occurrence","id":"XDcKHpjumbqdUFaP7fgP1tV9qdI="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"WBzeTA4jDq85V8UQFqvUeLYxPbU=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T10:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"XDcKHpjumbqdUFaP7fgP1tV9qdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boJpheXEbO1E7wPg2xvToZDrlrw="},{"type":"next-occurrence","id":"YAY2DmzCe6Gcy7mpV4ePopF/Xsg="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"XDcKHpjumbqdUFaP7fgP1tV9qdI=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T10:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"YAY2DmzCe6Gcy7mpV4ePopF/Xsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boJpheXEbO1E7wPg2xvToZDrlrw="},{"type":"next-occurrence","id":"bkvB/sQmiRnwgokVIEaoek7ehkg="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"YAY2DmzCe6Gcy7mpV4ePopF/Xsg=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"bkvB/sQmiRnwgokVIEaoek7ehkg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boJpheXEbO1E7wPg2xvToZDrlrw="},{"type":"next-occurrence","id":"fjPETr0yVG/+y4JqZmU668VpmlQ="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"bkvB/sQmiRnwgokVIEaoek7ehkg=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"fjPETr0yVG/+y4JqZmU668VpmlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boJpheXEbO1E7wPg2xvToZDrlrw="},{"type":"next-occurrence","id":"vmtoPS/JsHetJbkKxNQsn16qYEY="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"fjPETr0yVG/+y4JqZmU668VpmlQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"vmtoPS/JsHetJbkKxNQsn16qYEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boJpheXEbO1E7wPg2xvToZDrlrw="},{"type":"next-occurrence","id":"bnUQ4KlAv2YpQcWPGUWCUC1iEL8="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"vmtoPS/JsHetJbkKxNQsn16qYEY=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"bnUQ4KlAv2YpQcWPGUWCUC1iEL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boJpheXEbO1E7wPg2xvToZDrlrw="},{"type":"next-occurrence","id":"scq4wzF8CvBk6YQ9nX7/IKssU30="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"bnUQ4KlAv2YpQcWPGUWCUC1iEL8=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"scq4wzF8CvBk6YQ9nX7/IKssU30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boJpheXEbO1E7wPg2xvToZDrlrw="},{"type":"next-occurrence","id":"6zZ+ZaxZD+wq9O/uI/7aQxOpsc0="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"scq4wzF8CvBk6YQ9nX7/IKssU30=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T10:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"6zZ+ZaxZD+wq9O/uI/7aQxOpsc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boJpheXEbO1E7wPg2xvToZDrlrw="},{"type":"next-occurrence","id":"OegJbCZgs8woLKbFt6aioxxVTbM="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"6zZ+ZaxZD+wq9O/uI/7aQxOpsc0=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T10:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"OegJbCZgs8woLKbFt6aioxxVTbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boJpheXEbO1E7wPg2xvToZDrlrw="},{"type":"next-occurrence","id":"3UWOtwENswEHlQLDrczSYAAXjrU="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"OegJbCZgs8woLKbFt6aioxxVTbM=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"3UWOtwENswEHlQLDrczSYAAXjrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boJpheXEbO1E7wPg2xvToZDrlrw="},{"type":"next-occurrence","id":"k3ylOR0agNYIxAUGifbLBNBVLCc="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"3UWOtwENswEHlQLDrczSYAAXjrU=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"k3ylOR0agNYIxAUGifbLBNBVLCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boJpheXEbO1E7wPg2xvToZDrlrw="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"k3ylOR0agNYIxAUGifbLBNBVLCc=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"j8ALwBzfkzNvSXK8aXKSee8fu/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PrzaBsbLXOdNPED8CgG4J9hpyNU="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"j8ALwBzfkzNvSXK8aXKSee8fu/c=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"PrzaBsbLXOdNPED8CgG4J9hpyNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j8ALwBzfkzNvSXK8aXKSee8fu/c="},{"type":"next-occurrence","id":"5seizXxKeq9p0Wtmjj/RaWbwErw="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"PrzaBsbLXOdNPED8CgG4J9hpyNU=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"5seizXxKeq9p0Wtmjj/RaWbwErw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j8ALwBzfkzNvSXK8aXKSee8fu/c="},{"type":"next-occurrence","id":"KDSaf7c/twLW1Rp2LGI9PybDB58="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"5seizXxKeq9p0Wtmjj/RaWbwErw=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"KDSaf7c/twLW1Rp2LGI9PybDB58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j8ALwBzfkzNvSXK8aXKSee8fu/c="},{"type":"next-occurrence","id":"179QGlK95Kpg1bY9OWLZiT/lFIo="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"KDSaf7c/twLW1Rp2LGI9PybDB58=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"179QGlK95Kpg1bY9OWLZiT/lFIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j8ALwBzfkzNvSXK8aXKSee8fu/c="},{"type":"next-occurrence","id":"div+rKm7H6+WK2eRLc0ehegHCBg="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"179QGlK95Kpg1bY9OWLZiT/lFIo=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"div+rKm7H6+WK2eRLc0ehegHCBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j8ALwBzfkzNvSXK8aXKSee8fu/c="},{"type":"next-occurrence","id":"pEEXpGdV/9l3SZnfaTDAo+/CxAg="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"div+rKm7H6+WK2eRLc0ehegHCBg=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"pEEXpGdV/9l3SZnfaTDAo+/CxAg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j8ALwBzfkzNvSXK8aXKSee8fu/c="},{"type":"next-occurrence","id":"JwDSIT58LUMYXJ6Z1bBiL6e0c6A="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"pEEXpGdV/9l3SZnfaTDAo+/CxAg=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"JwDSIT58LUMYXJ6Z1bBiL6e0c6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j8ALwBzfkzNvSXK8aXKSee8fu/c="},{"type":"next-occurrence","id":"Nu45o+pB8NUZx7zxZIG2t0A+X/Q="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"JwDSIT58LUMYXJ6Z1bBiL6e0c6A=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"Nu45o+pB8NUZx7zxZIG2t0A+X/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j8ALwBzfkzNvSXK8aXKSee8fu/c="},{"type":"next-occurrence","id":"/sOWXRz+GMG7JiJ516PHHPbQbJs="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"Nu45o+pB8NUZx7zxZIG2t0A+X/Q=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"/sOWXRz+GMG7JiJ516PHHPbQbJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j8ALwBzfkzNvSXK8aXKSee8fu/c="},{"type":"next-occurrence","id":"cVw+guq7+4mumNT3SE6V+JSc6zI="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"/sOWXRz+GMG7JiJ516PHHPbQbJs=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"cVw+guq7+4mumNT3SE6V+JSc6zI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j8ALwBzfkzNvSXK8aXKSee8fu/c="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"cVw+guq7+4mumNT3SE6V+JSc6zI=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"bVkrDdWc4W6XQAU2o3nE2sB6J2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sa7/pKD+BCyXPA/eoMfcXIHnNno="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"bVkrDdWc4W6XQAU2o3nE2sB6J2g=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"sa7/pKD+BCyXPA/eoMfcXIHnNno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bVkrDdWc4W6XQAU2o3nE2sB6J2g="},{"type":"next-occurrence","id":"lLsmWmQmPQn+TbcsH5Ape3xue/Y="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"sa7/pKD+BCyXPA/eoMfcXIHnNno=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"lLsmWmQmPQn+TbcsH5Ape3xue/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bVkrDdWc4W6XQAU2o3nE2sB6J2g="},{"type":"next-occurrence","id":"6SEABhWMB62C0yO/gh5AEjHLn/8="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"lLsmWmQmPQn+TbcsH5Ape3xue/Y=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"6SEABhWMB62C0yO/gh5AEjHLn/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bVkrDdWc4W6XQAU2o3nE2sB6J2g="},{"type":"next-occurrence","id":"DOfhhyH6TbfSX0RhhLM83kFURxU="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"6SEABhWMB62C0yO/gh5AEjHLn/8=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:30:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"DOfhhyH6TbfSX0RhhLM83kFURxU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bVkrDdWc4W6XQAU2o3nE2sB6J2g="},{"type":"next-occurrence","id":"u8+eeU+oEf6MPZT4L/RXynO98zg="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"DOfhhyH6TbfSX0RhhLM83kFURxU=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:30:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"u8+eeU+oEf6MPZT4L/RXynO98zg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bVkrDdWc4W6XQAU2o3nE2sB6J2g="},{"type":"next-occurrence","id":"LixlmnLVbnO4fC0J6O4Gx5d3JIo="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"u8+eeU+oEf6MPZT4L/RXynO98zg=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:30:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"LixlmnLVbnO4fC0J6O4Gx5d3JIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bVkrDdWc4W6XQAU2o3nE2sB6J2g="},{"type":"next-occurrence","id":"vt26CXCKwkF8BqcE5+8Dbcpn+k4="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"LixlmnLVbnO4fC0J6O4Gx5d3JIo=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:30:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"vt26CXCKwkF8BqcE5+8Dbcpn+k4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bVkrDdWc4W6XQAU2o3nE2sB6J2g="},{"type":"next-occurrence","id":"A82qE00NrdonIoW38zlF2L6LGys="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"vt26CXCKwkF8BqcE5+8Dbcpn+k4=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"A82qE00NrdonIoW38zlF2L6LGys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bVkrDdWc4W6XQAU2o3nE2sB6J2g="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"A82qE00NrdonIoW38zlF2L6LGys=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"Z7vEU+/TftfXAmc3IszVWTc2Ph8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"M6+sFdl6w5hPdJKJyars/2obp7g="}],"description":"Road maintenance operations on I-84 eastbound between Exit 41 - NY 9D (Fishkill) and Exit 68A/B - I-684 (Southeast) Res 8-3 RW/30136709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-05-08T18:30:08Z"},"road_event_id":"Z7vEU+/TftfXAmc3IszVWTc2Ph8=","beginning_cross_street":"Exit 41 - NY 9D","ending_cross_street":"Exit 68A/B - I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968373,41.518969]]}},{"id":"M6+sFdl6w5hPdJKJyars/2obp7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z7vEU+/TftfXAmc3IszVWTc2Ph8="},{"type":"next-occurrence","id":"zuhtlHhjBEbAyU7+6z6pb7MouOw="}],"description":"Road maintenance operations on I-84 eastbound between Exit 41 - NY 9D (Fishkill) and Exit 68A/B - I-684 (Southeast) Res 8-3 RW/30136709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-05-08T18:30:08Z"},"road_event_id":"M6+sFdl6w5hPdJKJyars/2obp7g=","beginning_cross_street":"Exit 41 - NY 9D","ending_cross_street":"Exit 68A/B - I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968373,41.518969]]}},{"id":"zuhtlHhjBEbAyU7+6z6pb7MouOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z7vEU+/TftfXAmc3IszVWTc2Ph8="}],"description":"Road maintenance operations on I-84 eastbound between Exit 41 - NY 9D (Fishkill) and Exit 68A/B - I-684 (Southeast) Res 8-3 RW/30136709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-05-08T18:30:08Z"},"road_event_id":"zuhtlHhjBEbAyU7+6z6pb7MouOw=","beginning_cross_street":"Exit 41 - NY 9D","ending_cross_street":"Exit 68A/B - I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968373,41.518969]]}},{"id":"DIwPnG79PeAIHOWz597N6OvXINE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TXYqhxdV3mj0PwKMg2cCqtknZac="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"DIwPnG79PeAIHOWz597N6OvXINE=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"TXYqhxdV3mj0PwKMg2cCqtknZac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DIwPnG79PeAIHOWz597N6OvXINE="},{"type":"next-occurrence","id":"U3oPbtb5WAt1JR7zWLZ3HZB75KY="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"TXYqhxdV3mj0PwKMg2cCqtknZac=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"U3oPbtb5WAt1JR7zWLZ3HZB75KY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DIwPnG79PeAIHOWz597N6OvXINE="},{"type":"next-occurrence","id":"98+yl1GqHL6sx57F8zzEo1sr/Dc="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"U3oPbtb5WAt1JR7zWLZ3HZB75KY=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"98+yl1GqHL6sx57F8zzEo1sr/Dc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DIwPnG79PeAIHOWz597N6OvXINE="},{"type":"next-occurrence","id":"kPzV5COgnI8yQLXCzl35QeA+1AA="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"98+yl1GqHL6sx57F8zzEo1sr/Dc=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"kPzV5COgnI8yQLXCzl35QeA+1AA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DIwPnG79PeAIHOWz597N6OvXINE="},{"type":"next-occurrence","id":"vYUlznLnm0IMkdk6sDsNaaCHNDw="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"kPzV5COgnI8yQLXCzl35QeA+1AA=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"vYUlznLnm0IMkdk6sDsNaaCHNDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DIwPnG79PeAIHOWz597N6OvXINE="},{"type":"next-occurrence","id":"Zz4Ym3vX+qbNMUn+TIQ8/zq12hA="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"vYUlznLnm0IMkdk6sDsNaaCHNDw=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"Zz4Ym3vX+qbNMUn+TIQ8/zq12hA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DIwPnG79PeAIHOWz597N6OvXINE="},{"type":"next-occurrence","id":"kPHXFh71lRLSUUaGlelhWaBy0Ac="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"Zz4Ym3vX+qbNMUn+TIQ8/zq12hA=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"kPHXFh71lRLSUUaGlelhWaBy0Ac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DIwPnG79PeAIHOWz597N6OvXINE="},{"type":"next-occurrence","id":"6e6jIOiW8pU/cRUVdqmSYsZVB/c="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"kPHXFh71lRLSUUaGlelhWaBy0Ac=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"6e6jIOiW8pU/cRUVdqmSYsZVB/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DIwPnG79PeAIHOWz597N6OvXINE="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"6e6jIOiW8pU/cRUVdqmSYsZVB/c=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"q/u0xt/mgWzdsnCS0TTr34HWBKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on Palisades Interstate Parkway southbound ramp to Exit 9W - I-87 - I-287 (Clarkstown) D265160/32254709 - EXIT RAMP CLOSED TO TRAFFIC - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Tuesday March 25th, 2025 12:00 AM thru Monday November 16th, 2026 12:00 AM ramp closed and detoured","update_date":"2026-03-16T10:25:02Z"},"road_event_id":"q/u0xt/mgWzdsnCS0TTr34HWBKU=","beginning_cross_street":"Exit 9W - I-87 - I-287","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995487,41.104079]]}},{"id":"ORC300521951","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 66TH ST"],"direction":"unknown","description":"Construction on W 66TH ST westbound at 65TH ST (New York) Not currently Scheduled","update_date":"2026-03-18T07:00:01Z"},"road_event_id":"ORC300521951","beginning_cross_street":"65TH ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-12T16:42:46Z","end_date":"2026-03-19T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.978875,40.772473]]}},{"id":"tKD1/ZF7x40IRfST9jip/lQvhsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Ub2i3UbmEgLyLgaZcqzOG1HjO/A="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"tKD1/ZF7x40IRfST9jip/lQvhsQ=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"Ub2i3UbmEgLyLgaZcqzOG1HjO/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tKD1/ZF7x40IRfST9jip/lQvhsQ="},{"type":"next-occurrence","id":"T0BRysJxuv2auXj8vmuANkGTXDw="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"Ub2i3UbmEgLyLgaZcqzOG1HjO/A=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"T0BRysJxuv2auXj8vmuANkGTXDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tKD1/ZF7x40IRfST9jip/lQvhsQ="},{"type":"next-occurrence","id":"KI2rOiHGMqA7cIVDiyROvwneqbI="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"T0BRysJxuv2auXj8vmuANkGTXDw=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"KI2rOiHGMqA7cIVDiyROvwneqbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tKD1/ZF7x40IRfST9jip/lQvhsQ="},{"type":"next-occurrence","id":"Uw8clqRK2pG4jG0BGvdfcQzmLek="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"KI2rOiHGMqA7cIVDiyROvwneqbI=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"Uw8clqRK2pG4jG0BGvdfcQzmLek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tKD1/ZF7x40IRfST9jip/lQvhsQ="},{"type":"next-occurrence","id":"W8pGmn0nlENeLWB7jCcEheYQtE8="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"Uw8clqRK2pG4jG0BGvdfcQzmLek=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"W8pGmn0nlENeLWB7jCcEheYQtE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tKD1/ZF7x40IRfST9jip/lQvhsQ="},{"type":"next-occurrence","id":"xO/lYDocjx+KLQe2Sd1iGRiWslI="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"W8pGmn0nlENeLWB7jCcEheYQtE8=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"xO/lYDocjx+KLQe2Sd1iGRiWslI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tKD1/ZF7x40IRfST9jip/lQvhsQ="},{"type":"next-occurrence","id":"MEg/cKwG+YXvb2xX4Q0Ccq1wfVc="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"xO/lYDocjx+KLQe2Sd1iGRiWslI=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"MEg/cKwG+YXvb2xX4Q0Ccq1wfVc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tKD1/ZF7x40IRfST9jip/lQvhsQ="},{"type":"next-occurrence","id":"kgyvVL8TfZ8yhAihsR4q09l4btI="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"MEg/cKwG+YXvb2xX4Q0Ccq1wfVc=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"kgyvVL8TfZ8yhAihsR4q09l4btI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tKD1/ZF7x40IRfST9jip/lQvhsQ="},{"type":"next-occurrence","id":"+y3CcvO6yPYrIl64RdEtwhgLON8="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"kgyvVL8TfZ8yhAihsR4q09l4btI=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"+y3CcvO6yPYrIl64RdEtwhgLON8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tKD1/ZF7x40IRfST9jip/lQvhsQ="},{"type":"next-occurrence","id":"2fQV/FK0QirH0EpIghYHu1BFR1U="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"+y3CcvO6yPYrIl64RdEtwhgLON8=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"2fQV/FK0QirH0EpIghYHu1BFR1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tKD1/ZF7x40IRfST9jip/lQvhsQ="},{"type":"next-occurrence","id":"tKD8Br+pApCCH+kUvfPx2+DKb/o="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"2fQV/FK0QirH0EpIghYHu1BFR1U=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"tKD8Br+pApCCH+kUvfPx2+DKb/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tKD1/ZF7x40IRfST9jip/lQvhsQ="},{"type":"next-occurrence","id":"3vUBHjXSx7es7/QD+i4IJoVPxdo="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"tKD8Br+pApCCH+kUvfPx2+DKb/o=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T11:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"3vUBHjXSx7es7/QD+i4IJoVPxdo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tKD1/ZF7x40IRfST9jip/lQvhsQ="},{"type":"next-occurrence","id":"B8ACMugLPievFzn3Jy88zNh02jk="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"3vUBHjXSx7es7/QD+i4IJoVPxdo=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"B8ACMugLPievFzn3Jy88zNh02jk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tKD1/ZF7x40IRfST9jip/lQvhsQ="},{"type":"next-occurrence","id":"WCfWfjOkQoU9SEPGOav3CrMbO5s="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"B8ACMugLPievFzn3Jy88zNh02jk=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"WCfWfjOkQoU9SEPGOav3CrMbO5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tKD1/ZF7x40IRfST9jip/lQvhsQ="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"WCfWfjOkQoU9SEPGOav3CrMbO5s=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"q2+2PQmSBQWMrjDhpiDIG1v4Zao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BEX998DMK2trzNCsJijw996HddM="}],"description":"Road rehabilitation on US 219 both directions Route 219; Sunnyside Drive (Carrollton) to Cattaraugus County Line (Carrollton), Friday March 13th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-13T19:33:22Z"},"road_event_id":"q2+2PQmSBQWMrjDhpiDIG1v4Zao=","beginning_cross_street":"Route 219; Sunnyside Drive","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.635989,42.072287]]}},{"id":"BEX998DMK2trzNCsJijw996HddM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q2+2PQmSBQWMrjDhpiDIG1v4Zao="},{"type":"next-occurrence","id":"hIHJYgnMf3fjcr4451YHZih/YGI="}],"description":"Road rehabilitation on US 219 both directions Route 219; Sunnyside Drive (Carrollton) to Cattaraugus County Line (Carrollton), Friday March 13th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-13T19:33:22Z"},"road_event_id":"BEX998DMK2trzNCsJijw996HddM=","beginning_cross_street":"Route 219; Sunnyside Drive","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T04:00:00Z","end_date":"2026-05-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.635989,42.072287]]}},{"id":"hIHJYgnMf3fjcr4451YHZih/YGI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q2+2PQmSBQWMrjDhpiDIG1v4Zao="}],"description":"Road rehabilitation on US 219 both directions Route 219; Sunnyside Drive (Carrollton) to Cattaraugus County Line (Carrollton), Friday March 13th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-13T19:33:22Z"},"road_event_id":"hIHJYgnMf3fjcr4451YHZih/YGI=","beginning_cross_street":"Route 219; Sunnyside Drive","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.635989,42.072287]]}},{"id":"L6tNz+5qfsle3p224LC3S6pZB5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+7h+UfwD7RD96XpeHYvSeUtd7iI="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"L6tNz+5qfsle3p224LC3S6pZB5A=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"+7h+UfwD7RD96XpeHYvSeUtd7iI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L6tNz+5qfsle3p224LC3S6pZB5A="},{"type":"next-occurrence","id":"MUG3vP6ETgAc9/gNmVPoa1GJL0M="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"+7h+UfwD7RD96XpeHYvSeUtd7iI=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"MUG3vP6ETgAc9/gNmVPoa1GJL0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L6tNz+5qfsle3p224LC3S6pZB5A="},{"type":"next-occurrence","id":"c8P7Sau7lUBDFbmWY3tHikIH3I4="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"MUG3vP6ETgAc9/gNmVPoa1GJL0M=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"c8P7Sau7lUBDFbmWY3tHikIH3I4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L6tNz+5qfsle3p224LC3S6pZB5A="},{"type":"next-occurrence","id":"7V4CJ/NrLUhEKyqpDLGTYq0lZt8="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"c8P7Sau7lUBDFbmWY3tHikIH3I4=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"7V4CJ/NrLUhEKyqpDLGTYq0lZt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L6tNz+5qfsle3p224LC3S6pZB5A="},{"type":"next-occurrence","id":"DGzERdZ2OTPoGGIMrfhWR2qx+YA="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"7V4CJ/NrLUhEKyqpDLGTYq0lZt8=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T01:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"DGzERdZ2OTPoGGIMrfhWR2qx+YA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L6tNz+5qfsle3p224LC3S6pZB5A="},{"type":"next-occurrence","id":"M2Ph0b5MoEn6UiP+aJL2/uylD+0="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"DGzERdZ2OTPoGGIMrfhWR2qx+YA=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T01:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"M2Ph0b5MoEn6UiP+aJL2/uylD+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L6tNz+5qfsle3p224LC3S6pZB5A="},{"type":"next-occurrence","id":"T8Y4QTaZ3hN7rukm9VgibM2WyhA="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"M2Ph0b5MoEn6UiP+aJL2/uylD+0=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T01:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"T8Y4QTaZ3hN7rukm9VgibM2WyhA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L6tNz+5qfsle3p224LC3S6pZB5A="},{"type":"next-occurrence","id":"6oJN8fXns5z+4e8gA6bd9YrCFNI="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"T8Y4QTaZ3hN7rukm9VgibM2WyhA=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T01:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"6oJN8fXns5z+4e8gA6bd9YrCFNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L6tNz+5qfsle3p224LC3S6pZB5A="},{"type":"next-occurrence","id":"PfMVMEFl9X8eK6Hk9/6WdyWEdUg="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"6oJN8fXns5z+4e8gA6bd9YrCFNI=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"PfMVMEFl9X8eK6Hk9/6WdyWEdUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L6tNz+5qfsle3p224LC3S6pZB5A="},{"type":"next-occurrence","id":"0CG73oGHkCT5HkwcIXJwzC2hKSE="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"PfMVMEFl9X8eK6Hk9/6WdyWEdUg=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T01:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"0CG73oGHkCT5HkwcIXJwzC2hKSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L6tNz+5qfsle3p224LC3S6pZB5A="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"0CG73oGHkCT5HkwcIXJwzC2hKSE=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T01:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"uBe6UgU1iQwFW/SCiymWcdGsH9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/mBX0fOROSMdfodWfHD5xP3SoQU="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"uBe6UgU1iQwFW/SCiymWcdGsH9I=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"/mBX0fOROSMdfodWfHD5xP3SoQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uBe6UgU1iQwFW/SCiymWcdGsH9I="},{"type":"next-occurrence","id":"9LpR63jcY4B8IL2rrBxNOJpXEdo="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"/mBX0fOROSMdfodWfHD5xP3SoQU=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"9LpR63jcY4B8IL2rrBxNOJpXEdo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uBe6UgU1iQwFW/SCiymWcdGsH9I="},{"type":"next-occurrence","id":"EB6NG3m9N+w4U7dPw40yrSGS37U="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"9LpR63jcY4B8IL2rrBxNOJpXEdo=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"EB6NG3m9N+w4U7dPw40yrSGS37U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uBe6UgU1iQwFW/SCiymWcdGsH9I="},{"type":"next-occurrence","id":"1M54bXFhBzBzuI1/lsPKyCZAUOE="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"EB6NG3m9N+w4U7dPw40yrSGS37U=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T23:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"1M54bXFhBzBzuI1/lsPKyCZAUOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uBe6UgU1iQwFW/SCiymWcdGsH9I="},{"type":"next-occurrence","id":"Xw/hjJ9MyVgF16LaT+btuZujfDE="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"1M54bXFhBzBzuI1/lsPKyCZAUOE=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"Xw/hjJ9MyVgF16LaT+btuZujfDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uBe6UgU1iQwFW/SCiymWcdGsH9I="},{"type":"next-occurrence","id":"3xCv67gsO9JiJX2NyTaA/+YByGs="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"Xw/hjJ9MyVgF16LaT+btuZujfDE=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"3xCv67gsO9JiJX2NyTaA/+YByGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uBe6UgU1iQwFW/SCiymWcdGsH9I="},{"type":"next-occurrence","id":"sWlg+DvR0vf7Zjo+lzVwnGm6GTQ="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"3xCv67gsO9JiJX2NyTaA/+YByGs=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"sWlg+DvR0vf7Zjo+lzVwnGm6GTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uBe6UgU1iQwFW/SCiymWcdGsH9I="},{"type":"next-occurrence","id":"FAJOhHQv4TfPVr9xyjwWIlCqB0M="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"sWlg+DvR0vf7Zjo+lzVwnGm6GTQ=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"FAJOhHQv4TfPVr9xyjwWIlCqB0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uBe6UgU1iQwFW/SCiymWcdGsH9I="},{"type":"next-occurrence","id":"s80wsGG2xn3vocW42+vAKiq/fuU="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"FAJOhHQv4TfPVr9xyjwWIlCqB0M=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"s80wsGG2xn3vocW42+vAKiq/fuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uBe6UgU1iQwFW/SCiymWcdGsH9I="},{"type":"next-occurrence","id":"Xen2aeFDE4IXBPCeXOJiV+ZX7Dk="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"s80wsGG2xn3vocW42+vAKiq/fuU=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T23:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"Xen2aeFDE4IXBPCeXOJiV+ZX7Dk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uBe6UgU1iQwFW/SCiymWcdGsH9I="},{"type":"next-occurrence","id":"Fu17bDbcQmSyI2vOpryqreYhVHg="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"Xen2aeFDE4IXBPCeXOJiV+ZX7Dk=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T23:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"Fu17bDbcQmSyI2vOpryqreYhVHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uBe6UgU1iQwFW/SCiymWcdGsH9I="},{"type":"next-occurrence","id":"1Cr1qM6vbPZ3MFu27AWzyvarq20="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"Fu17bDbcQmSyI2vOpryqreYhVHg=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T23:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"1Cr1qM6vbPZ3MFu27AWzyvarq20=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uBe6UgU1iQwFW/SCiymWcdGsH9I="},{"type":"next-occurrence","id":"7uEhu/3IzY++3nZVbDn7MTcZ6Pc="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"1Cr1qM6vbPZ3MFu27AWzyvarq20=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T23:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"7uEhu/3IzY++3nZVbDn7MTcZ6Pc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uBe6UgU1iQwFW/SCiymWcdGsH9I="},{"type":"next-occurrence","id":"r2quQo5AZA7QNAb53+IA6TXGhfo="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"7uEhu/3IzY++3nZVbDn7MTcZ6Pc=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T23:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"r2quQo5AZA7QNAb53+IA6TXGhfo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uBe6UgU1iQwFW/SCiymWcdGsH9I="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"r2quQo5AZA7QNAb53+IA6TXGhfo=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"nWfOwn/Iwb7auyB1u3zKHR/++8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1WYSyRSG+2JaGe1OuiYsxuxbxwQ="}],"description":"Bridge demolition on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Monday March 16th,2026 thru Friday May 22nd,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-04-30T19:00:07Z"},"road_event_id":"nWfOwn/Iwb7auyB1u3zKHR/++8s=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172633,43.082423]]}},{"id":"1WYSyRSG+2JaGe1OuiYsxuxbxwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nWfOwn/Iwb7auyB1u3zKHR/++8s="},{"type":"next-occurrence","id":"2YD5zYcO80nDdUFfziPcJp9vNTc="}],"description":"Bridge demolition on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Monday March 16th,2026 thru Friday May 22nd,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-04-30T19:00:07Z"},"road_event_id":"1WYSyRSG+2JaGe1OuiYsxuxbxwQ=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172633,43.082423]]}},{"id":"2YD5zYcO80nDdUFfziPcJp9vNTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nWfOwn/Iwb7auyB1u3zKHR/++8s="},{"type":"next-occurrence","id":"3Dv50Y3DIVXbGkfMO4ZHPkh/AkA="}],"description":"Bridge demolition on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Monday March 16th,2026 thru Friday May 22nd,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-04-30T19:00:07Z"},"road_event_id":"2YD5zYcO80nDdUFfziPcJp9vNTc=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172633,43.082423]]}},{"id":"3Dv50Y3DIVXbGkfMO4ZHPkh/AkA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nWfOwn/Iwb7auyB1u3zKHR/++8s="},{"type":"next-occurrence","id":"Tpnr34vuOjgEVjzf6qC0GEZQOZE="}],"description":"Bridge demolition on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Monday March 16th,2026 thru Friday May 22nd,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-04-30T19:00:07Z"},"road_event_id":"3Dv50Y3DIVXbGkfMO4ZHPkh/AkA=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172633,43.082423]]}},{"id":"Tpnr34vuOjgEVjzf6qC0GEZQOZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nWfOwn/Iwb7auyB1u3zKHR/++8s="},{"type":"next-occurrence","id":"IF5zw4rVDAlZ4EP3R8/Yyw3vSYk="}],"description":"Bridge demolition on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Monday March 16th,2026 thru Friday May 22nd,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-04-30T19:00:07Z"},"road_event_id":"Tpnr34vuOjgEVjzf6qC0GEZQOZE=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172633,43.082423]]}},{"id":"IF5zw4rVDAlZ4EP3R8/Yyw3vSYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nWfOwn/Iwb7auyB1u3zKHR/++8s="},{"type":"next-occurrence","id":"qZfk/PLHPHsKaK1kdo0blJRQ0fA="}],"description":"Bridge demolition on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Monday March 16th,2026 thru Friday May 22nd,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-04-30T19:00:07Z"},"road_event_id":"IF5zw4rVDAlZ4EP3R8/Yyw3vSYk=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172633,43.082423]]}},{"id":"qZfk/PLHPHsKaK1kdo0blJRQ0fA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nWfOwn/Iwb7auyB1u3zKHR/++8s="},{"type":"next-occurrence","id":"hPd3i37MywfPPPl1gZ7YerkPiUg="}],"description":"Bridge demolition on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Monday March 16th,2026 thru Friday May 22nd,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-04-30T19:00:07Z"},"road_event_id":"qZfk/PLHPHsKaK1kdo0blJRQ0fA=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172633,43.082423]]}},{"id":"hPd3i37MywfPPPl1gZ7YerkPiUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nWfOwn/Iwb7auyB1u3zKHR/++8s="}],"description":"Bridge demolition on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Monday March 16th,2026 thru Friday May 22nd,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-04-30T19:00:07Z"},"road_event_id":"hPd3i37MywfPPPl1gZ7YerkPiUg=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172633,43.082423]]}},{"id":"gLld7cozVqAxeK0uN4M2Q2RqrIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound ramp from W/B I-287 (Greenburgh) D265281/32709309 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Sunday March 1st, 2026 12:00 AM thru Tuesday June 30th, 2026 12:00 PM ramp closed and detoured","update_date":"2026-03-16T14:26:41Z"},"road_event_id":"gLld7cozVqAxeK0uN4M2Q2RqrIE=","beginning_cross_street":"W/B I-287","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.809031,41.056626]]}},{"id":"Fw9GGLKOI27X4YQz7CSLefyqdz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on US 9W both directions between NY 218 (Highlands) and Mountain Road (Cornwall) D265262/32427409 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Sunday March 30th, 2025 12:00 AM thru Friday September 4th, 2026 12:00 AM right lane closed to traffic","update_date":"2026-03-16T13:43:22Z"},"road_event_id":"Fw9GGLKOI27X4YQz7CSLefyqdz4=","beginning_cross_street":"NY 218","ending_cross_street":"Mountain Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983618,41.37714]]}},{"id":"ORC300522700","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JFK Expressway"],"direction":"unknown","description":"Scheduled roadwork on JFK Expressway southbound ramp to Terminal 8 Arrivals (New York) Not currently Scheduled","update_date":"2026-03-19T12:30:00Z"},"road_event_id":"ORC300522700","beginning_cross_street":"Terminal 8 Arrivals ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-16T16:13:52Z","end_date":"2026-03-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.786656,40.647841]]}},{"id":"ORC300522702","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Van Wyck Expressway"],"direction":"unknown","description":"Scheduled roadwork on Van Wyck Expressway southbound ramp to Exit C - Federal Circle (New York) Not currently Scheduled","update_date":"2026-04-09T03:59:01Z"},"road_event_id":"ORC300522702","beginning_cross_street":"Exit C - Federal Circle ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-16T16:19:32Z","end_date":"2026-04-09T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.805984,40.660718]]}},{"id":"pCV2fQPP43kAVKRtSOeL0/AW8b8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bNa7Zx6KBfQy1mjRDyEAZ9qysqs="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"pCV2fQPP43kAVKRtSOeL0/AW8b8=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"bNa7Zx6KBfQy1mjRDyEAZ9qysqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pCV2fQPP43kAVKRtSOeL0/AW8b8="},{"type":"next-occurrence","id":"gy/dl9gn+phJWepBHBVE71QNJto="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"bNa7Zx6KBfQy1mjRDyEAZ9qysqs=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"gy/dl9gn+phJWepBHBVE71QNJto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pCV2fQPP43kAVKRtSOeL0/AW8b8="},{"type":"next-occurrence","id":"9kEjcSzL1GAdan74RQPeLoai71Q="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"gy/dl9gn+phJWepBHBVE71QNJto=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"9kEjcSzL1GAdan74RQPeLoai71Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pCV2fQPP43kAVKRtSOeL0/AW8b8="},{"type":"next-occurrence","id":"z/9KVNvg1O6rKEaR7YQd78kvpyU="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"9kEjcSzL1GAdan74RQPeLoai71Q=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"z/9KVNvg1O6rKEaR7YQd78kvpyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pCV2fQPP43kAVKRtSOeL0/AW8b8="},{"type":"next-occurrence","id":"7xHUogx41uBLVjpKDY8lrSXJtvo="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"z/9KVNvg1O6rKEaR7YQd78kvpyU=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"7xHUogx41uBLVjpKDY8lrSXJtvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pCV2fQPP43kAVKRtSOeL0/AW8b8="},{"type":"next-occurrence","id":"qw5BhRDjgkpKaqLa07ztA9pIJKQ="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"7xHUogx41uBLVjpKDY8lrSXJtvo=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"qw5BhRDjgkpKaqLa07ztA9pIJKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pCV2fQPP43kAVKRtSOeL0/AW8b8="},{"type":"next-occurrence","id":"gt2YJ9Q6KLy+Nx70aMGZcux5lOI="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"qw5BhRDjgkpKaqLa07ztA9pIJKQ=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"gt2YJ9Q6KLy+Nx70aMGZcux5lOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pCV2fQPP43kAVKRtSOeL0/AW8b8="},{"type":"next-occurrence","id":"MF2FsLK7Jab7sMGwQZpCCUX4EsE="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"gt2YJ9Q6KLy+Nx70aMGZcux5lOI=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"MF2FsLK7Jab7sMGwQZpCCUX4EsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pCV2fQPP43kAVKRtSOeL0/AW8b8="},{"type":"next-occurrence","id":"3kJKeYznTJ4B/5AsY9q7U+HGzk8="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"MF2FsLK7Jab7sMGwQZpCCUX4EsE=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"3kJKeYznTJ4B/5AsY9q7U+HGzk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pCV2fQPP43kAVKRtSOeL0/AW8b8="},{"type":"next-occurrence","id":"CC52hO3wCy1x7XvqUgAL0gNP3mY="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"3kJKeYznTJ4B/5AsY9q7U+HGzk8=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"CC52hO3wCy1x7XvqUgAL0gNP3mY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pCV2fQPP43kAVKRtSOeL0/AW8b8="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"CC52hO3wCy1x7XvqUgAL0gNP3mY=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"PBh31t19QjR1+CV06f/lpEryoWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CODY AVE"],"direction":"unknown","related_road_events":[],"description":"Crane operations on CODY AVE both directions between WYCKOFF AVE (New York) and CYPRESS AVE (New York), Friday March 20th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-17T18:41:29Z"},"road_event_id":"PBh31t19QjR1+CV06f/lpEryoWw=","beginning_cross_street":"WYCKOFF AVE","ending_cross_street":"CYPRESS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901116,40.693914]]}},{"id":"rbyYGfx1gQ4oT9fSO9ESWo6Qt+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6A7lpde/mcwCZBnS38WpYDDzRlA="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"rbyYGfx1gQ4oT9fSO9ESWo6Qt+A=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"6A7lpde/mcwCZBnS38WpYDDzRlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbyYGfx1gQ4oT9fSO9ESWo6Qt+A="},{"type":"next-occurrence","id":"jjpnqBsomBdNnKmlFzmr3+TpN6E="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"6A7lpde/mcwCZBnS38WpYDDzRlA=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"jjpnqBsomBdNnKmlFzmr3+TpN6E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbyYGfx1gQ4oT9fSO9ESWo6Qt+A="},{"type":"next-occurrence","id":"ZKp6LnOr/XB7P5fvkvIqbHosxMM="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"jjpnqBsomBdNnKmlFzmr3+TpN6E=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"ZKp6LnOr/XB7P5fvkvIqbHosxMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbyYGfx1gQ4oT9fSO9ESWo6Qt+A="},{"type":"next-occurrence","id":"9/DVAGOpNIe91D/TQRJ1X1hzPDc="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"ZKp6LnOr/XB7P5fvkvIqbHosxMM=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"9/DVAGOpNIe91D/TQRJ1X1hzPDc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbyYGfx1gQ4oT9fSO9ESWo6Qt+A="},{"type":"next-occurrence","id":"1HuKdS2WhpBeT6s1agvbkYkrlYo="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"9/DVAGOpNIe91D/TQRJ1X1hzPDc=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"1HuKdS2WhpBeT6s1agvbkYkrlYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbyYGfx1gQ4oT9fSO9ESWo6Qt+A="},{"type":"next-occurrence","id":"5+XD4xE2iEFYVCh8zOJr6qT+JLA="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"1HuKdS2WhpBeT6s1agvbkYkrlYo=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"5+XD4xE2iEFYVCh8zOJr6qT+JLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbyYGfx1gQ4oT9fSO9ESWo6Qt+A="},{"type":"next-occurrence","id":"DE68ma+sh9M9rHjjyU2Qc4bYUFA="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"5+XD4xE2iEFYVCh8zOJr6qT+JLA=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"DE68ma+sh9M9rHjjyU2Qc4bYUFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbyYGfx1gQ4oT9fSO9ESWo6Qt+A="},{"type":"next-occurrence","id":"Jxyd3UaUQKNgkI1AvfvuGmR7Puc="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"DE68ma+sh9M9rHjjyU2Qc4bYUFA=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"Jxyd3UaUQKNgkI1AvfvuGmR7Puc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbyYGfx1gQ4oT9fSO9ESWo6Qt+A="},{"type":"next-occurrence","id":"esYsjFBta8F8j7zzExkruntX5Gw="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"Jxyd3UaUQKNgkI1AvfvuGmR7Puc=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"esYsjFBta8F8j7zzExkruntX5Gw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbyYGfx1gQ4oT9fSO9ESWo6Qt+A="},{"type":"next-occurrence","id":"LwLKTIUiTRg4qZGCwih6pT4u+h4="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"esYsjFBta8F8j7zzExkruntX5Gw=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"LwLKTIUiTRg4qZGCwih6pT4u+h4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbyYGfx1gQ4oT9fSO9ESWo6Qt+A="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"LwLKTIUiTRg4qZGCwih6pT4u+h4=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"fAi7Ot4WXn63Dm9+cdx2PWe4Jso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YP14B+/wlYbv01TNopMkedEcFGg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"fAi7Ot4WXn63Dm9+cdx2PWe4Jso=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"YP14B+/wlYbv01TNopMkedEcFGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fAi7Ot4WXn63Dm9+cdx2PWe4Jso="},{"type":"next-occurrence","id":"8YO0F2IFyKlZgzXRLinhMnIVYFg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"YP14B+/wlYbv01TNopMkedEcFGg=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"8YO0F2IFyKlZgzXRLinhMnIVYFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fAi7Ot4WXn63Dm9+cdx2PWe4Jso="},{"type":"next-occurrence","id":"6ZiUyNqCPXagIoehxBmU854sik8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"8YO0F2IFyKlZgzXRLinhMnIVYFg=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"6ZiUyNqCPXagIoehxBmU854sik8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fAi7Ot4WXn63Dm9+cdx2PWe4Jso="},{"type":"next-occurrence","id":"dZXLSDeIrUKvHRTt4JVu1gTekw0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"6ZiUyNqCPXagIoehxBmU854sik8=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"dZXLSDeIrUKvHRTt4JVu1gTekw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fAi7Ot4WXn63Dm9+cdx2PWe4Jso="},{"type":"next-occurrence","id":"YWIGuDxodmaW55duUBqgeV6YLAc="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"dZXLSDeIrUKvHRTt4JVu1gTekw0=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"YWIGuDxodmaW55duUBqgeV6YLAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fAi7Ot4WXn63Dm9+cdx2PWe4Jso="},{"type":"next-occurrence","id":"EHJ3hrdh19mkdKXujdzetCEiIHU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"YWIGuDxodmaW55duUBqgeV6YLAc=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"EHJ3hrdh19mkdKXujdzetCEiIHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fAi7Ot4WXn63Dm9+cdx2PWe4Jso="},{"type":"next-occurrence","id":"5SPq7tExMcrMfm7ljQSw5zLatek="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"EHJ3hrdh19mkdKXujdzetCEiIHU=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"5SPq7tExMcrMfm7ljQSw5zLatek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fAi7Ot4WXn63Dm9+cdx2PWe4Jso="},{"type":"next-occurrence","id":"GR0gn5Nnx/oLpyHko/c1b0B2rUI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"5SPq7tExMcrMfm7ljQSw5zLatek=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"GR0gn5Nnx/oLpyHko/c1b0B2rUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fAi7Ot4WXn63Dm9+cdx2PWe4Jso="},{"type":"next-occurrence","id":"kfsd9DS2NnvE5Z+nzv4Zbsgqs/I="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"GR0gn5Nnx/oLpyHko/c1b0B2rUI=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"kfsd9DS2NnvE5Z+nzv4Zbsgqs/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fAi7Ot4WXn63Dm9+cdx2PWe4Jso="},{"type":"next-occurrence","id":"5/WIvXBzmJ3Gh4PdqJ6s72Wgrgc="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"kfsd9DS2NnvE5Z+nzv4Zbsgqs/I=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"5/WIvXBzmJ3Gh4PdqJ6s72Wgrgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fAi7Ot4WXn63Dm9+cdx2PWe4Jso="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"5/WIvXBzmJ3Gh4PdqJ6s72Wgrgc=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"xXIKKyucMQ5FPtTyPjHu1ddAx2s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"f+ibl1onDR0WlbCeyeNLv6xhO4w="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"xXIKKyucMQ5FPtTyPjHu1ddAx2s=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"f+ibl1onDR0WlbCeyeNLv6xhO4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xXIKKyucMQ5FPtTyPjHu1ddAx2s="},{"type":"next-occurrence","id":"98J+dqEAmE1hsbewB92qFiAnQOI="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"f+ibl1onDR0WlbCeyeNLv6xhO4w=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"98J+dqEAmE1hsbewB92qFiAnQOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xXIKKyucMQ5FPtTyPjHu1ddAx2s="},{"type":"next-occurrence","id":"V5WEao905OUxPj6EAgyFivqYqqc="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"98J+dqEAmE1hsbewB92qFiAnQOI=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"V5WEao905OUxPj6EAgyFivqYqqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xXIKKyucMQ5FPtTyPjHu1ddAx2s="},{"type":"next-occurrence","id":"9tET73/+Ma/P72w2oMfi+9YfGTI="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"V5WEao905OUxPj6EAgyFivqYqqc=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"9tET73/+Ma/P72w2oMfi+9YfGTI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xXIKKyucMQ5FPtTyPjHu1ddAx2s="},{"type":"next-occurrence","id":"cU9gS7dxKqTqfV5EX17dKzxsnsg="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"9tET73/+Ma/P72w2oMfi+9YfGTI=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"cU9gS7dxKqTqfV5EX17dKzxsnsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xXIKKyucMQ5FPtTyPjHu1ddAx2s="},{"type":"next-occurrence","id":"hXpeB1vpmaQokub/39KmhNYESuQ="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"cU9gS7dxKqTqfV5EX17dKzxsnsg=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"hXpeB1vpmaQokub/39KmhNYESuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xXIKKyucMQ5FPtTyPjHu1ddAx2s="},{"type":"next-occurrence","id":"uVabv6OgVG8MFRpH4RmMGXuP28A="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"hXpeB1vpmaQokub/39KmhNYESuQ=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"uVabv6OgVG8MFRpH4RmMGXuP28A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xXIKKyucMQ5FPtTyPjHu1ddAx2s="},{"type":"next-occurrence","id":"0rYAR701/EIKelNfaEOtFJES7KQ="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"uVabv6OgVG8MFRpH4RmMGXuP28A=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"0rYAR701/EIKelNfaEOtFJES7KQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xXIKKyucMQ5FPtTyPjHu1ddAx2s="},{"type":"next-occurrence","id":"EdfvWFlhu2nZmJ21UJO+BBBm42o="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"0rYAR701/EIKelNfaEOtFJES7KQ=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"EdfvWFlhu2nZmJ21UJO+BBBm42o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xXIKKyucMQ5FPtTyPjHu1ddAx2s="},{"type":"next-occurrence","id":"1WLPaMyJMbpvsPyYXOOFqwJSWLs="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"EdfvWFlhu2nZmJ21UJO+BBBm42o=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"1WLPaMyJMbpvsPyYXOOFqwJSWLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xXIKKyucMQ5FPtTyPjHu1ddAx2s="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"1WLPaMyJMbpvsPyYXOOFqwJSWLs=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"Cytait9c2pojVxdDNny8UJ2MMzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"J/sRx6FdyURGHtWhCahCkG3iBUU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"Cytait9c2pojVxdDNny8UJ2MMzY=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"J/sRx6FdyURGHtWhCahCkG3iBUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cytait9c2pojVxdDNny8UJ2MMzY="},{"type":"next-occurrence","id":"VL7gIb2uH6K1ZCgT8JsaCp6dN9M="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"J/sRx6FdyURGHtWhCahCkG3iBUU=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"VL7gIb2uH6K1ZCgT8JsaCp6dN9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cytait9c2pojVxdDNny8UJ2MMzY="},{"type":"next-occurrence","id":"dcL/vDhTJrsrZkwUXMMZPHKJ/L4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"VL7gIb2uH6K1ZCgT8JsaCp6dN9M=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"dcL/vDhTJrsrZkwUXMMZPHKJ/L4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cytait9c2pojVxdDNny8UJ2MMzY="},{"type":"next-occurrence","id":"xCNsD+ksLLO4EMc/1kSr6bXuU5s="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"dcL/vDhTJrsrZkwUXMMZPHKJ/L4=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"xCNsD+ksLLO4EMc/1kSr6bXuU5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cytait9c2pojVxdDNny8UJ2MMzY="},{"type":"next-occurrence","id":"ugMbB+U68j+Mqn3hap4s0zvADd8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"xCNsD+ksLLO4EMc/1kSr6bXuU5s=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"ugMbB+U68j+Mqn3hap4s0zvADd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cytait9c2pojVxdDNny8UJ2MMzY="},{"type":"next-occurrence","id":"6rI/hQWkEcWRGI7I3j0LY4VzM5A="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"ugMbB+U68j+Mqn3hap4s0zvADd8=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"6rI/hQWkEcWRGI7I3j0LY4VzM5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cytait9c2pojVxdDNny8UJ2MMzY="},{"type":"next-occurrence","id":"o5iy6ZY4p82gaN2AhIjQ68hS7eg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"6rI/hQWkEcWRGI7I3j0LY4VzM5A=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"o5iy6ZY4p82gaN2AhIjQ68hS7eg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cytait9c2pojVxdDNny8UJ2MMzY="},{"type":"next-occurrence","id":"djnvG4tZ47JxaPgXYxXmN/zRU/4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"o5iy6ZY4p82gaN2AhIjQ68hS7eg=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"djnvG4tZ47JxaPgXYxXmN/zRU/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cytait9c2pojVxdDNny8UJ2MMzY="},{"type":"next-occurrence","id":"x7qASBZAt71RCFIBb9R65aT8Dfs="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"djnvG4tZ47JxaPgXYxXmN/zRU/4=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"x7qASBZAt71RCFIBb9R65aT8Dfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cytait9c2pojVxdDNny8UJ2MMzY="},{"type":"next-occurrence","id":"jsSdkkQq2blYL9Vm3hW98dLgqKM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"x7qASBZAt71RCFIBb9R65aT8Dfs=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"jsSdkkQq2blYL9Vm3hW98dLgqKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cytait9c2pojVxdDNny8UJ2MMzY="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"jsSdkkQq2blYL9Vm3hW98dLgqKM=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"1n8GwvkFFl2+ikVTOy5UilPZUCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"n4m7aNMjTZxSmYkkoeWTrqsqDpM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"1n8GwvkFFl2+ikVTOy5UilPZUCQ=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"n4m7aNMjTZxSmYkkoeWTrqsqDpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1n8GwvkFFl2+ikVTOy5UilPZUCQ="},{"type":"next-occurrence","id":"ahWDtZdy4eaUBSQgVKtsxUI5tTA="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"n4m7aNMjTZxSmYkkoeWTrqsqDpM=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"ahWDtZdy4eaUBSQgVKtsxUI5tTA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1n8GwvkFFl2+ikVTOy5UilPZUCQ="},{"type":"next-occurrence","id":"ukuRRxprxDSNfLdiJFE8SA7QznU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"ahWDtZdy4eaUBSQgVKtsxUI5tTA=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"ukuRRxprxDSNfLdiJFE8SA7QznU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1n8GwvkFFl2+ikVTOy5UilPZUCQ="},{"type":"next-occurrence","id":"91a73KCiIEZdtjul4uZAkfGxxzU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"ukuRRxprxDSNfLdiJFE8SA7QznU=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"91a73KCiIEZdtjul4uZAkfGxxzU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1n8GwvkFFl2+ikVTOy5UilPZUCQ="},{"type":"next-occurrence","id":"Kl2kUaxC2n9FB+ltDvZRbQGRgqk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"91a73KCiIEZdtjul4uZAkfGxxzU=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"Kl2kUaxC2n9FB+ltDvZRbQGRgqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1n8GwvkFFl2+ikVTOy5UilPZUCQ="},{"type":"next-occurrence","id":"ZN8AQgBSNaAlzeAY4VfQ2cXTSWA="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"Kl2kUaxC2n9FB+ltDvZRbQGRgqk=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"ZN8AQgBSNaAlzeAY4VfQ2cXTSWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1n8GwvkFFl2+ikVTOy5UilPZUCQ="},{"type":"next-occurrence","id":"bs8KQg2378Dl0RJeIULqmIPm1CI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"ZN8AQgBSNaAlzeAY4VfQ2cXTSWA=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"bs8KQg2378Dl0RJeIULqmIPm1CI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1n8GwvkFFl2+ikVTOy5UilPZUCQ="},{"type":"next-occurrence","id":"wlF02vWVTBrPi6prOD1CiQ5ZKeI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"bs8KQg2378Dl0RJeIULqmIPm1CI=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"wlF02vWVTBrPi6prOD1CiQ5ZKeI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1n8GwvkFFl2+ikVTOy5UilPZUCQ="},{"type":"next-occurrence","id":"DgdNJMUEHUCr6WZPwTc1TxyqQxo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"wlF02vWVTBrPi6prOD1CiQ5ZKeI=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"DgdNJMUEHUCr6WZPwTc1TxyqQxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1n8GwvkFFl2+ikVTOy5UilPZUCQ="},{"type":"next-occurrence","id":"N1+AfmpLKcmBICxDHjrzbq6a2+8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"DgdNJMUEHUCr6WZPwTc1TxyqQxo=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"N1+AfmpLKcmBICxDHjrzbq6a2+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1n8GwvkFFl2+ikVTOy5UilPZUCQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"N1+AfmpLKcmBICxDHjrzbq6a2+8=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"U+a3u1EM6spo8DLri4LC1D+cwxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YD9swnMHTTw39ZjvXbhvApxOLOg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"U+a3u1EM6spo8DLri4LC1D+cwxs=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"YD9swnMHTTw39ZjvXbhvApxOLOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+a3u1EM6spo8DLri4LC1D+cwxs="},{"type":"next-occurrence","id":"nGLL9JcQDPD6CIc6ZJ89RIV5+I8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"YD9swnMHTTw39ZjvXbhvApxOLOg=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"nGLL9JcQDPD6CIc6ZJ89RIV5+I8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+a3u1EM6spo8DLri4LC1D+cwxs="},{"type":"next-occurrence","id":"FMTAgvV5GsnwYsEXfAxpEfWyPDU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"nGLL9JcQDPD6CIc6ZJ89RIV5+I8=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"FMTAgvV5GsnwYsEXfAxpEfWyPDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+a3u1EM6spo8DLri4LC1D+cwxs="},{"type":"next-occurrence","id":"+FBQx52v7rrcXkp+RZu8YKjjgYo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"FMTAgvV5GsnwYsEXfAxpEfWyPDU=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"+FBQx52v7rrcXkp+RZu8YKjjgYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+a3u1EM6spo8DLri4LC1D+cwxs="},{"type":"next-occurrence","id":"hbbkaUcKEYSp8xhmLfLb2R319qU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"+FBQx52v7rrcXkp+RZu8YKjjgYo=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"hbbkaUcKEYSp8xhmLfLb2R319qU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+a3u1EM6spo8DLri4LC1D+cwxs="},{"type":"next-occurrence","id":"2CMR7JFzDxZllHjTxwcMzejNoG0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"hbbkaUcKEYSp8xhmLfLb2R319qU=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"2CMR7JFzDxZllHjTxwcMzejNoG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+a3u1EM6spo8DLri4LC1D+cwxs="},{"type":"next-occurrence","id":"vxBCgQlb/cy4a4xiUcbFrOrqylI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"2CMR7JFzDxZllHjTxwcMzejNoG0=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"vxBCgQlb/cy4a4xiUcbFrOrqylI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+a3u1EM6spo8DLri4LC1D+cwxs="},{"type":"next-occurrence","id":"pakuy3+RqMw8UH96HVhrNyXVgyM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"vxBCgQlb/cy4a4xiUcbFrOrqylI=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"pakuy3+RqMw8UH96HVhrNyXVgyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+a3u1EM6spo8DLri4LC1D+cwxs="},{"type":"next-occurrence","id":"it0nafhC8O/ZyyFKee6PzpX3qnU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"pakuy3+RqMw8UH96HVhrNyXVgyM=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"it0nafhC8O/ZyyFKee6PzpX3qnU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+a3u1EM6spo8DLri4LC1D+cwxs="},{"type":"next-occurrence","id":"0Jjml8tejvYhLy1XsMqy9ljNmNc="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"it0nafhC8O/ZyyFKee6PzpX3qnU=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"0Jjml8tejvYhLy1XsMqy9ljNmNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+a3u1EM6spo8DLri4LC1D+cwxs="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"0Jjml8tejvYhLy1XsMqy9ljNmNc=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"eXok8ETs+w6By/iG/RYhFK1Glr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JAH0UBLRpjV1Kjellf4smHl2VXk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"eXok8ETs+w6By/iG/RYhFK1Glr8=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"JAH0UBLRpjV1Kjellf4smHl2VXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eXok8ETs+w6By/iG/RYhFK1Glr8="},{"type":"next-occurrence","id":"04smhpu2Xm4+si6cEKCkr4YUc5I="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"JAH0UBLRpjV1Kjellf4smHl2VXk=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"04smhpu2Xm4+si6cEKCkr4YUc5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eXok8ETs+w6By/iG/RYhFK1Glr8="},{"type":"next-occurrence","id":"jtbVyju7+hYz3TQeUdbnt62kEUc="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"04smhpu2Xm4+si6cEKCkr4YUc5I=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"jtbVyju7+hYz3TQeUdbnt62kEUc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eXok8ETs+w6By/iG/RYhFK1Glr8="},{"type":"next-occurrence","id":"V4+l2Tj/Ad9+WJl0j1tIeac/Wzo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"jtbVyju7+hYz3TQeUdbnt62kEUc=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"V4+l2Tj/Ad9+WJl0j1tIeac/Wzo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eXok8ETs+w6By/iG/RYhFK1Glr8="},{"type":"next-occurrence","id":"KkXDED6nQy5yBNCoFc7Hn/qfPH4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"V4+l2Tj/Ad9+WJl0j1tIeac/Wzo=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"KkXDED6nQy5yBNCoFc7Hn/qfPH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eXok8ETs+w6By/iG/RYhFK1Glr8="},{"type":"next-occurrence","id":"yGNDRzxPR+dk9xYyDSRzl/ecnFY="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"KkXDED6nQy5yBNCoFc7Hn/qfPH4=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"yGNDRzxPR+dk9xYyDSRzl/ecnFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eXok8ETs+w6By/iG/RYhFK1Glr8="},{"type":"next-occurrence","id":"MhGSGhrnAhjOvO8ODlrfADCMiIc="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"yGNDRzxPR+dk9xYyDSRzl/ecnFY=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"MhGSGhrnAhjOvO8ODlrfADCMiIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eXok8ETs+w6By/iG/RYhFK1Glr8="},{"type":"next-occurrence","id":"5ccTCy0y/Lo49wTqPW9aXIKT0ZE="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"MhGSGhrnAhjOvO8ODlrfADCMiIc=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"5ccTCy0y/Lo49wTqPW9aXIKT0ZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eXok8ETs+w6By/iG/RYhFK1Glr8="},{"type":"next-occurrence","id":"uErSuQ/3PCTDY5ztspTBXkm6RO8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"5ccTCy0y/Lo49wTqPW9aXIKT0ZE=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"uErSuQ/3PCTDY5ztspTBXkm6RO8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eXok8ETs+w6By/iG/RYhFK1Glr8="},{"type":"next-occurrence","id":"nq5LE6YTSJpQAH8CJ1FVnLOAzmg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"uErSuQ/3PCTDY5ztspTBXkm6RO8=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"nq5LE6YTSJpQAH8CJ1FVnLOAzmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eXok8ETs+w6By/iG/RYhFK1Glr8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"nq5LE6YTSJpQAH8CJ1FVnLOAzmg=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"1YXGSc6sMbjC4pBtWbWCjwwFZ20=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Z/pxQ1XQmarmzHEpfMszyZjcQm0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"1YXGSc6sMbjC4pBtWbWCjwwFZ20=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"Z/pxQ1XQmarmzHEpfMszyZjcQm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YXGSc6sMbjC4pBtWbWCjwwFZ20="},{"type":"next-occurrence","id":"4dMn0OAIcwQXC2J+cm+W6t6XnfQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"Z/pxQ1XQmarmzHEpfMszyZjcQm0=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"4dMn0OAIcwQXC2J+cm+W6t6XnfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YXGSc6sMbjC4pBtWbWCjwwFZ20="},{"type":"next-occurrence","id":"1jKJvOwqoigVBDyXk8MAzcjv3Do="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"4dMn0OAIcwQXC2J+cm+W6t6XnfQ=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"1jKJvOwqoigVBDyXk8MAzcjv3Do=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YXGSc6sMbjC4pBtWbWCjwwFZ20="},{"type":"next-occurrence","id":"6Skg/zuxriLjD1rRjesAL8Osr5w="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"1jKJvOwqoigVBDyXk8MAzcjv3Do=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"6Skg/zuxriLjD1rRjesAL8Osr5w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YXGSc6sMbjC4pBtWbWCjwwFZ20="},{"type":"next-occurrence","id":"Z4TFjf1cZ+mgR08SnagYT5lY/n8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"6Skg/zuxriLjD1rRjesAL8Osr5w=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"Z4TFjf1cZ+mgR08SnagYT5lY/n8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YXGSc6sMbjC4pBtWbWCjwwFZ20="},{"type":"next-occurrence","id":"Mom3Ukt8zsday0wE9XItaA9AnJc="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"Z4TFjf1cZ+mgR08SnagYT5lY/n8=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"Mom3Ukt8zsday0wE9XItaA9AnJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YXGSc6sMbjC4pBtWbWCjwwFZ20="},{"type":"next-occurrence","id":"QcMr4VK9h0V8eDC8VFaUEiFhMdU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"Mom3Ukt8zsday0wE9XItaA9AnJc=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"QcMr4VK9h0V8eDC8VFaUEiFhMdU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YXGSc6sMbjC4pBtWbWCjwwFZ20="},{"type":"next-occurrence","id":"ciWTJUoO2YVLZEJjeBedmu5CPGQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"QcMr4VK9h0V8eDC8VFaUEiFhMdU=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"ciWTJUoO2YVLZEJjeBedmu5CPGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YXGSc6sMbjC4pBtWbWCjwwFZ20="},{"type":"next-occurrence","id":"a5GK4icNjtbUCM96PvgRC5szOrQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"ciWTJUoO2YVLZEJjeBedmu5CPGQ=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"a5GK4icNjtbUCM96PvgRC5szOrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YXGSc6sMbjC4pBtWbWCjwwFZ20="},{"type":"next-occurrence","id":"SguAqK7s6K6eLXH9yoWwyXM8eYs="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"a5GK4icNjtbUCM96PvgRC5szOrQ=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"SguAqK7s6K6eLXH9yoWwyXM8eYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YXGSc6sMbjC4pBtWbWCjwwFZ20="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"SguAqK7s6K6eLXH9yoWwyXM8eYs=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"GdZMZlufmhG5z3hbtEnfMgfvup8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 142ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"K2tCvZmve+yjWPVADrD1wBv9Ypc="}],"description":"Construction on E 142ND ST eastbound between WALES AVE (New York) and SOUTHERN BLVD (New York) for concrete pump., Tuesday March 17th, 2026 thru Friday May 15th, 2026, 09:00 AM thru 04:00 PM All lanes closed, Tuesday March 17th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:33:08Z"},"road_event_id":"GdZMZlufmhG5z3hbtEnfMgfvup8=","beginning_cross_street":"WALES AVE","ending_cross_street":"SOUTHERN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909131,40.807434]]}},{"id":"K2tCvZmve+yjWPVADrD1wBv9Ypc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 142ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GdZMZlufmhG5z3hbtEnfMgfvup8="}],"description":"Construction on E 142ND ST eastbound between WALES AVE (New York) and SOUTHERN BLVD (New York) for concrete pump., Tuesday March 17th, 2026 thru Friday May 15th, 2026, 09:00 AM thru 04:00 PM All lanes closed, Tuesday March 17th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:33:08Z"},"road_event_id":"K2tCvZmve+yjWPVADrD1wBv9Ypc=","beginning_cross_street":"WALES AVE","ending_cross_street":"SOUTHERN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909131,40.807434]]}},{"id":"gOYU0/6nPwvHSA8fwxg47h9UHYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SHAKESPEARE AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2hFOELIeMKXFWWNOF7ebEIWQZFY="}],"description":"Crane operations on SHAKESPEARE AVE northbound between W 169TH ST (New York) and W 170TH ST (New York), Tuesday March 17th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday March 17th, 2026 thru Friday May 15th, 2026, 09:00 AM thru 04:00 PM All lanes closed, Tuesday March 17th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:37:03Z"},"road_event_id":"gOYU0/6nPwvHSA8fwxg47h9UHYo=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922556,40.839284]]}},{"id":"2hFOELIeMKXFWWNOF7ebEIWQZFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SHAKESPEARE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gOYU0/6nPwvHSA8fwxg47h9UHYo="},{"type":"next-occurrence","id":"HYZ8HTuBtcuproL+ppmSmIldq9E="}],"description":"Crane operations on SHAKESPEARE AVE northbound between W 169TH ST (New York) and W 170TH ST (New York), Tuesday March 17th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday March 17th, 2026 thru Friday May 15th, 2026, 09:00 AM thru 04:00 PM All lanes closed, Tuesday March 17th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:37:03Z"},"road_event_id":"2hFOELIeMKXFWWNOF7ebEIWQZFY=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922556,40.839284]]}},{"id":"HYZ8HTuBtcuproL+ppmSmIldq9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SHAKESPEARE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gOYU0/6nPwvHSA8fwxg47h9UHYo="}],"description":"Crane operations on SHAKESPEARE AVE northbound between W 169TH ST (New York) and W 170TH ST (New York), Tuesday March 17th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday March 17th, 2026 thru Friday May 15th, 2026, 09:00 AM thru 04:00 PM All lanes closed, Tuesday March 17th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:37:03Z"},"road_event_id":"HYZ8HTuBtcuproL+ppmSmIldq9E=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922556,40.839284]]}},{"id":"SguaDQA9e+ZzKHi5ktS4Po3Q1/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pPI1SHab87xZR5CQGVd6h06Nzxw="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"SguaDQA9e+ZzKHi5ktS4Po3Q1/o=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"pPI1SHab87xZR5CQGVd6h06Nzxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SguaDQA9e+ZzKHi5ktS4Po3Q1/o="},{"type":"next-occurrence","id":"6Ku5jNejKxYcK0eqnizfe7hdLzg="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"pPI1SHab87xZR5CQGVd6h06Nzxw=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"6Ku5jNejKxYcK0eqnizfe7hdLzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SguaDQA9e+ZzKHi5ktS4Po3Q1/o="},{"type":"next-occurrence","id":"7KRqEWM3e+lDo1tHECu5pi246D8="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"6Ku5jNejKxYcK0eqnizfe7hdLzg=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"7KRqEWM3e+lDo1tHECu5pi246D8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SguaDQA9e+ZzKHi5ktS4Po3Q1/o="},{"type":"next-occurrence","id":"GJKO8t3I0xWUvjDLXPdVOsatmtk="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"7KRqEWM3e+lDo1tHECu5pi246D8=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"GJKO8t3I0xWUvjDLXPdVOsatmtk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SguaDQA9e+ZzKHi5ktS4Po3Q1/o="},{"type":"next-occurrence","id":"D3yKzV+zu6QKiSFFSDrLXeEOAh8="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"GJKO8t3I0xWUvjDLXPdVOsatmtk=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"D3yKzV+zu6QKiSFFSDrLXeEOAh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SguaDQA9e+ZzKHi5ktS4Po3Q1/o="},{"type":"next-occurrence","id":"No+1dMrqN2YeXgfqzMb34bI/LgU="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"D3yKzV+zu6QKiSFFSDrLXeEOAh8=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"No+1dMrqN2YeXgfqzMb34bI/LgU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SguaDQA9e+ZzKHi5ktS4Po3Q1/o="},{"type":"next-occurrence","id":"Ey1IqQFz6DSu55t9tPPsjSGyOQM="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"No+1dMrqN2YeXgfqzMb34bI/LgU=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"Ey1IqQFz6DSu55t9tPPsjSGyOQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SguaDQA9e+ZzKHi5ktS4Po3Q1/o="},{"type":"next-occurrence","id":"Fp7DNQtX/I4F/E5fJWY/QEaeBCo="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"Ey1IqQFz6DSu55t9tPPsjSGyOQM=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"Fp7DNQtX/I4F/E5fJWY/QEaeBCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SguaDQA9e+ZzKHi5ktS4Po3Q1/o="},{"type":"next-occurrence","id":"zThfCwHLck3AWCCFABDnFtHTRes="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"Fp7DNQtX/I4F/E5fJWY/QEaeBCo=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"zThfCwHLck3AWCCFABDnFtHTRes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SguaDQA9e+ZzKHi5ktS4Po3Q1/o="},{"type":"next-occurrence","id":"4KJPoaH9XLbXy/gknQcBw7jl0Io="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"zThfCwHLck3AWCCFABDnFtHTRes=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"4KJPoaH9XLbXy/gknQcBw7jl0Io=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SguaDQA9e+ZzKHi5ktS4Po3Q1/o="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"4KJPoaH9XLbXy/gknQcBw7jl0Io=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"mFR22bOp3yGSCNDYGdVuN942ePI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FHH57HjXznxNBGT+mSkLlh5wZ3o="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"mFR22bOp3yGSCNDYGdVuN942ePI=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"FHH57HjXznxNBGT+mSkLlh5wZ3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mFR22bOp3yGSCNDYGdVuN942ePI="},{"type":"next-occurrence","id":"wzDBV52DWW/9oGr/dc0UfswAIFU="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"FHH57HjXznxNBGT+mSkLlh5wZ3o=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"wzDBV52DWW/9oGr/dc0UfswAIFU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mFR22bOp3yGSCNDYGdVuN942ePI="},{"type":"next-occurrence","id":"NKXIbGibxKIxZl2u2EtGx7zw9RE="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"wzDBV52DWW/9oGr/dc0UfswAIFU=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"NKXIbGibxKIxZl2u2EtGx7zw9RE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mFR22bOp3yGSCNDYGdVuN942ePI="},{"type":"next-occurrence","id":"vG315i3W+UjlT0JQyvkLEMQcvBY="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"NKXIbGibxKIxZl2u2EtGx7zw9RE=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"vG315i3W+UjlT0JQyvkLEMQcvBY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mFR22bOp3yGSCNDYGdVuN942ePI="},{"type":"next-occurrence","id":"R2pl1WbSKklbkbBocaqMRm8F9vA="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"vG315i3W+UjlT0JQyvkLEMQcvBY=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"R2pl1WbSKklbkbBocaqMRm8F9vA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mFR22bOp3yGSCNDYGdVuN942ePI="},{"type":"next-occurrence","id":"buqq5bosahs5jv19HgRy4q7ieiQ="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"R2pl1WbSKklbkbBocaqMRm8F9vA=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"buqq5bosahs5jv19HgRy4q7ieiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mFR22bOp3yGSCNDYGdVuN942ePI="},{"type":"next-occurrence","id":"QIMUb8RV1PrWtzSnfueK6de7yVY="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"buqq5bosahs5jv19HgRy4q7ieiQ=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"QIMUb8RV1PrWtzSnfueK6de7yVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mFR22bOp3yGSCNDYGdVuN942ePI="},{"type":"next-occurrence","id":"pDcu+fUoYrhFFTvK9zXbEYrPS50="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"QIMUb8RV1PrWtzSnfueK6de7yVY=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"pDcu+fUoYrhFFTvK9zXbEYrPS50=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mFR22bOp3yGSCNDYGdVuN942ePI="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"pDcu+fUoYrhFFTvK9zXbEYrPS50=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"Uzo/bdrq7nAj5mJyfyFApWQzX4I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aoXUfiy1EP2TD/estmIzkU3FbKA="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"Uzo/bdrq7nAj5mJyfyFApWQzX4I=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"aoXUfiy1EP2TD/estmIzkU3FbKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uzo/bdrq7nAj5mJyfyFApWQzX4I="},{"type":"next-occurrence","id":"Fuod2mvBaeuArrBkUWOaG4tKIAE="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"aoXUfiy1EP2TD/estmIzkU3FbKA=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"Fuod2mvBaeuArrBkUWOaG4tKIAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uzo/bdrq7nAj5mJyfyFApWQzX4I="},{"type":"next-occurrence","id":"NCSyDUimip9ELj/BwrX0mTOH6DQ="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"Fuod2mvBaeuArrBkUWOaG4tKIAE=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"NCSyDUimip9ELj/BwrX0mTOH6DQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uzo/bdrq7nAj5mJyfyFApWQzX4I="},{"type":"next-occurrence","id":"YWAz4dEgJH4ojq/aGE9v2CUVhkQ="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"NCSyDUimip9ELj/BwrX0mTOH6DQ=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"YWAz4dEgJH4ojq/aGE9v2CUVhkQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uzo/bdrq7nAj5mJyfyFApWQzX4I="},{"type":"next-occurrence","id":"H/208arjIZ0PA63HlsLOYsLdOlI="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"YWAz4dEgJH4ojq/aGE9v2CUVhkQ=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"H/208arjIZ0PA63HlsLOYsLdOlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uzo/bdrq7nAj5mJyfyFApWQzX4I="},{"type":"next-occurrence","id":"O2LFT9B0cQBKFbQdb/bHRpnzWLs="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"H/208arjIZ0PA63HlsLOYsLdOlI=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"O2LFT9B0cQBKFbQdb/bHRpnzWLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uzo/bdrq7nAj5mJyfyFApWQzX4I="},{"type":"next-occurrence","id":"XbjLJd7zYtRMvT9zi4zpBrvJa68="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"O2LFT9B0cQBKFbQdb/bHRpnzWLs=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"XbjLJd7zYtRMvT9zi4zpBrvJa68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uzo/bdrq7nAj5mJyfyFApWQzX4I="},{"type":"next-occurrence","id":"rKYcXXFh+v8HrGH4a/c6pjzcHew="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"XbjLJd7zYtRMvT9zi4zpBrvJa68=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"rKYcXXFh+v8HrGH4a/c6pjzcHew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uzo/bdrq7nAj5mJyfyFApWQzX4I="},{"type":"next-occurrence","id":"R5Gon5XwitdAuPVjnSB6Sw8mjhQ="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"rKYcXXFh+v8HrGH4a/c6pjzcHew=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"R5Gon5XwitdAuPVjnSB6Sw8mjhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uzo/bdrq7nAj5mJyfyFApWQzX4I="},{"type":"next-occurrence","id":"pxbXoHiMfELDjG+Mj3fHsind60U="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"R5Gon5XwitdAuPVjnSB6Sw8mjhQ=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"pxbXoHiMfELDjG+Mj3fHsind60U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uzo/bdrq7nAj5mJyfyFApWQzX4I="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"pxbXoHiMfELDjG+Mj3fHsind60U=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"vwW3P0r8RDg6zE8TSwfgBGooxPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ehgw/mTzrQOHzllFSIkEMifGgvs="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"vwW3P0r8RDg6zE8TSwfgBGooxPc=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"ehgw/mTzrQOHzllFSIkEMifGgvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vwW3P0r8RDg6zE8TSwfgBGooxPc="},{"type":"next-occurrence","id":"QocQpYduqVSBMtmWIjl/t1ykfT4="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"ehgw/mTzrQOHzllFSIkEMifGgvs=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"QocQpYduqVSBMtmWIjl/t1ykfT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vwW3P0r8RDg6zE8TSwfgBGooxPc="},{"type":"next-occurrence","id":"YkRoEMS+1jgWk8S3hXfWlg7EjIg="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"QocQpYduqVSBMtmWIjl/t1ykfT4=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"YkRoEMS+1jgWk8S3hXfWlg7EjIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vwW3P0r8RDg6zE8TSwfgBGooxPc="},{"type":"next-occurrence","id":"FUn7EikJx3HIDxPh3ydyttqvZks="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"YkRoEMS+1jgWk8S3hXfWlg7EjIg=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"FUn7EikJx3HIDxPh3ydyttqvZks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vwW3P0r8RDg6zE8TSwfgBGooxPc="},{"type":"next-occurrence","id":"tIE7gAeUA/IxDK8wELf5I92Zcz0="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"FUn7EikJx3HIDxPh3ydyttqvZks=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"tIE7gAeUA/IxDK8wELf5I92Zcz0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vwW3P0r8RDg6zE8TSwfgBGooxPc="},{"type":"next-occurrence","id":"MXd+Z33zzYFcIzZUVV0hdyqxcNU="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"tIE7gAeUA/IxDK8wELf5I92Zcz0=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"MXd+Z33zzYFcIzZUVV0hdyqxcNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vwW3P0r8RDg6zE8TSwfgBGooxPc="},{"type":"next-occurrence","id":"pa7Vv9qAEK+Yl547c488mxZ20qM="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"MXd+Z33zzYFcIzZUVV0hdyqxcNU=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"pa7Vv9qAEK+Yl547c488mxZ20qM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vwW3P0r8RDg6zE8TSwfgBGooxPc="},{"type":"next-occurrence","id":"zt54aIdDembHEfYkriADeUzM47E="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"pa7Vv9qAEK+Yl547c488mxZ20qM=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"zt54aIdDembHEfYkriADeUzM47E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vwW3P0r8RDg6zE8TSwfgBGooxPc="},{"type":"next-occurrence","id":"ZG5/aulkMGbyLUbNkUIrMPzcJiA="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"zt54aIdDembHEfYkriADeUzM47E=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"ZG5/aulkMGbyLUbNkUIrMPzcJiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vwW3P0r8RDg6zE8TSwfgBGooxPc="},{"type":"next-occurrence","id":"VMuMYhQIX1JN0TeJx9+IhXgYXkQ="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"ZG5/aulkMGbyLUbNkUIrMPzcJiA=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"VMuMYhQIX1JN0TeJx9+IhXgYXkQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vwW3P0r8RDg6zE8TSwfgBGooxPc="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"VMuMYhQIX1JN0TeJx9+IhXgYXkQ=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"cX0R7JKyHKJ6+BisKTDyQBjlmBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OMZbvK2EupAVasvFpxg3DtnkoYI="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"cX0R7JKyHKJ6+BisKTDyQBjlmBA=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"OMZbvK2EupAVasvFpxg3DtnkoYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cX0R7JKyHKJ6+BisKTDyQBjlmBA="},{"type":"next-occurrence","id":"sKJxwTrtaX8pl+29GfYIxkkQ51w="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"OMZbvK2EupAVasvFpxg3DtnkoYI=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"sKJxwTrtaX8pl+29GfYIxkkQ51w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cX0R7JKyHKJ6+BisKTDyQBjlmBA="},{"type":"next-occurrence","id":"Ko4NVBoo6xxCgOlKZWlD02Z/Ed8="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"sKJxwTrtaX8pl+29GfYIxkkQ51w=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"Ko4NVBoo6xxCgOlKZWlD02Z/Ed8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cX0R7JKyHKJ6+BisKTDyQBjlmBA="},{"type":"next-occurrence","id":"wu2IHwbODp0OcxXbBiHpFD++pE8="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"Ko4NVBoo6xxCgOlKZWlD02Z/Ed8=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"wu2IHwbODp0OcxXbBiHpFD++pE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cX0R7JKyHKJ6+BisKTDyQBjlmBA="},{"type":"next-occurrence","id":"Cze5M28wA8mKSjokTg4VM2ujlmQ="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"wu2IHwbODp0OcxXbBiHpFD++pE8=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"Cze5M28wA8mKSjokTg4VM2ujlmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cX0R7JKyHKJ6+BisKTDyQBjlmBA="},{"type":"next-occurrence","id":"Ib2WMl2/DutvwMBXk6P5zm7iZ1w="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"Cze5M28wA8mKSjokTg4VM2ujlmQ=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"Ib2WMl2/DutvwMBXk6P5zm7iZ1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cX0R7JKyHKJ6+BisKTDyQBjlmBA="},{"type":"next-occurrence","id":"Hgoqg9oA9crJrddx2HraEb1g+aM="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"Ib2WMl2/DutvwMBXk6P5zm7iZ1w=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"Hgoqg9oA9crJrddx2HraEb1g+aM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cX0R7JKyHKJ6+BisKTDyQBjlmBA="},{"type":"next-occurrence","id":"yTuAiYa0qM44954Xhgc3c93/Gxk="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"Hgoqg9oA9crJrddx2HraEb1g+aM=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"yTuAiYa0qM44954Xhgc3c93/Gxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cX0R7JKyHKJ6+BisKTDyQBjlmBA="},{"type":"next-occurrence","id":"VDHfKPULQQU5aS5ogmBPmLkiVtM="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"yTuAiYa0qM44954Xhgc3c93/Gxk=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"VDHfKPULQQU5aS5ogmBPmLkiVtM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cX0R7JKyHKJ6+BisKTDyQBjlmBA="},{"type":"next-occurrence","id":"9hOCMltnCpR49mMmmGOBlh/KelQ="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"VDHfKPULQQU5aS5ogmBPmLkiVtM=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"9hOCMltnCpR49mMmmGOBlh/KelQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cX0R7JKyHKJ6+BisKTDyQBjlmBA="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"9hOCMltnCpR49mMmmGOBlh/KelQ=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"wANFlHw5MN/i0ovJYdgYG4pNzsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Ramp widening on I-690 westbound ramp from NY-298; Bear St (Syracuse) ; follow detour, Continuous Monday March 30th, 2026 07:00 AM thru Friday May 22nd, 2026 03:00 PM All lanes closed","update_date":"2026-04-24T18:52:55Z"},"road_event_id":"wANFlHw5MN/i0ovJYdgYG4pNzsE=","beginning_cross_street":"NY-298; Bear St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.17505,43.057607]]}},{"id":"e7h4r4F0pvNRZFMmR+XPSS/RE1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kxVYZi0xAakA5tifCFkqMNtcoLk="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"e7h4r4F0pvNRZFMmR+XPSS/RE1E=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"kxVYZi0xAakA5tifCFkqMNtcoLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e7h4r4F0pvNRZFMmR+XPSS/RE1E="},{"type":"next-occurrence","id":"7saHiq89BeNvFAtvLjkW09pu4FM="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"kxVYZi0xAakA5tifCFkqMNtcoLk=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"7saHiq89BeNvFAtvLjkW09pu4FM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e7h4r4F0pvNRZFMmR+XPSS/RE1E="},{"type":"next-occurrence","id":"ZNI5eU6JRDVLDk0eVnV+eniiYEM="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"7saHiq89BeNvFAtvLjkW09pu4FM=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"ZNI5eU6JRDVLDk0eVnV+eniiYEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e7h4r4F0pvNRZFMmR+XPSS/RE1E="},{"type":"next-occurrence","id":"1uH4quwcrBQ8IqngypGQpUWyfjc="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"ZNI5eU6JRDVLDk0eVnV+eniiYEM=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"1uH4quwcrBQ8IqngypGQpUWyfjc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e7h4r4F0pvNRZFMmR+XPSS/RE1E="},{"type":"next-occurrence","id":"gv0vzVrwaNcP84YjCiAzCpXluQw="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"1uH4quwcrBQ8IqngypGQpUWyfjc=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"gv0vzVrwaNcP84YjCiAzCpXluQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e7h4r4F0pvNRZFMmR+XPSS/RE1E="},{"type":"next-occurrence","id":"rEfYlCJWyXjyBf3D1Zp2ed3CmTw="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"gv0vzVrwaNcP84YjCiAzCpXluQw=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"rEfYlCJWyXjyBf3D1Zp2ed3CmTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e7h4r4F0pvNRZFMmR+XPSS/RE1E="},{"type":"next-occurrence","id":"reVL3VZoG2i6QLwZ+Ny5sWNBZD4="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"rEfYlCJWyXjyBf3D1Zp2ed3CmTw=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"reVL3VZoG2i6QLwZ+Ny5sWNBZD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e7h4r4F0pvNRZFMmR+XPSS/RE1E="},{"type":"next-occurrence","id":"6RyvkI1XBdm2eCNFxPKoGqWTqxQ="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"reVL3VZoG2i6QLwZ+Ny5sWNBZD4=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"6RyvkI1XBdm2eCNFxPKoGqWTqxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e7h4r4F0pvNRZFMmR+XPSS/RE1E="},{"type":"next-occurrence","id":"g1V7dYuYTtoXoJArULlXvxVH0fo="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"6RyvkI1XBdm2eCNFxPKoGqWTqxQ=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"g1V7dYuYTtoXoJArULlXvxVH0fo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e7h4r4F0pvNRZFMmR+XPSS/RE1E="},{"type":"next-occurrence","id":"aVd4WMqJYI19Cri254g1dbWnw0s="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"g1V7dYuYTtoXoJArULlXvxVH0fo=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"aVd4WMqJYI19Cri254g1dbWnw0s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e7h4r4F0pvNRZFMmR+XPSS/RE1E="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"aVd4WMqJYI19Cri254g1dbWnw0s=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"ORC300523224","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","description":"Construction on I-278 both directions between Drive Martin Luther King Expressway (Staten Island) and Richmond Avenue Exit (Staten Island) Not currently Scheduled","update_date":"2026-03-26T18:00:04Z"},"road_event_id":"ORC300523224","beginning_cross_street":"Drive Martin Luther King Expressway","ending_cross_street":"Richmond Avenue Exit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-19T16:53:31Z","end_date":"2026-03-27T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.153854,40.612474]]}},{"id":"OiY60uG7UUjYLgXFPodih06Fduo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 168"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 168 both directions between END ROUTE; NY 80; Hamlet of Stark (Stark) and CR 206; Lighthall Road Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 80 and Lighthall Road., Continuous Monday April 6th, 2026 7:00 AM thru Saturday June 27th, 2026 6:00 PM all lanes closed","update_date":"2026-04-24T11:13:28Z"},"road_event_id":"OiY60uG7UUjYLgXFPodih06Fduo=","beginning_cross_street":"END ROUTE; NY 80; Hamlet of Stark","ending_cross_street":"CR 206; Lighthall Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.793448,42.926459]]}},{"id":"wefx0GxJIxit1spaDrBH6jQmoRE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 69"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 69 both directions between NY 291 (Whitestown) and NY 922A; Clinton Street; CR 30 (Whitestown) Motorists will encounter lane closures in both directions for work on the I-90 bridge, Continuous Monday March 23rd, 2026 6:00 AM thru Saturday November 21st, 2026 6:00 PM","update_date":"2026-04-10T10:02:57Z"},"road_event_id":"wefx0GxJIxit1spaDrBH6jQmoRE=","beginning_cross_street":"NY 291","ending_cross_street":"NY 922A; Clinton Street; CR 30","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.300808,43.129911]]}},{"id":"62xT13aEuMFQcduYNrtLHyEnmUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 825"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7WulxgrsTgLpCq3Q9oM+u3e9zT0="}],"description":"Construction on NY 825 both directions at Perimeter Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Monday March 23rd, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-05-08T11:46:48Z"},"road_event_id":"62xT13aEuMFQcduYNrtLHyEnmUM=","beginning_cross_street":"Perimeter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.425299999999993,43.2258]]}},{"id":"7WulxgrsTgLpCq3Q9oM+u3e9zT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 825"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"62xT13aEuMFQcduYNrtLHyEnmUM="},{"type":"next-occurrence","id":"7HGrzJM6ZaCNp+9WlUuWY9GJeIU="}],"description":"Construction on NY 825 both directions at Perimeter Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Monday March 23rd, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-05-08T11:46:48Z"},"road_event_id":"7WulxgrsTgLpCq3Q9oM+u3e9zT0=","beginning_cross_street":"Perimeter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.425299999999993,43.2258]]}},{"id":"7HGrzJM6ZaCNp+9WlUuWY9GJeIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 825"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"62xT13aEuMFQcduYNrtLHyEnmUM="}],"description":"Construction on NY 825 both directions at Perimeter Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Monday March 23rd, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-05-08T11:46:48Z"},"road_event_id":"7HGrzJM6ZaCNp+9WlUuWY9GJeIU=","beginning_cross_street":"Perimeter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.425299999999993,43.2258]]}},{"id":"QebnpmABdziEY1WUAZrZlQmnWsc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Westbound near West of US 130/Collingswood Circle (Collingswood), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 08:00 PM, right lane closed","update_date":"2026-05-07T22:48:26Z"},"road_event_id":"QebnpmABdziEY1WUAZrZlQmnWsc=","beginning_cross_street":"West of US 130/Collingswood Circle","ending_cross_street":"CR 628/North Park Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.08757,39.920494]]}},{"id":"psAmz9S1r047SuWudYCRyR3ce5w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-149"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on CT-149 both directions between JOHNSONVILLE RD (East Haddam) and CT-196 (East Haddam), Continuous Monday April 20th, 2026 12:00 AM thru Monday August 17th, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T11:54:08Z"},"road_event_id":"psAmz9S1r047SuWudYCRyR3ce5w=","beginning_cross_street":"JOHNSONVILLE RD","ending_cross_street":"CT-196","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.465625,41.489618]]}},{"id":"/6hy8yp6oamsSxNdTJPpU/1IPZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WINTHROP ST"],"direction":"unknown","related_road_events":[],"description":"Bridge work on WINTHROP ST both directions between DALTON ST (Torrington) and KINNEY ST (Torrington) a lane closure will occur switching traffic from two lane to one lane alternating traffic , Continuous Wednesday April 1st, 2026 12:00 AM thru Friday July 31st, 2026 11:59 PM All lanes open","update_date":"2026-03-24T11:57:35Z"},"road_event_id":"/6hy8yp6oamsSxNdTJPpU/1IPZA=","beginning_cross_street":"DALTON ST","ending_cross_street":"KINNEY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.113072,41.812442]]}},{"id":"1Vpyb19mIQkxlmqP3DWVSEHzNoc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINNEY ST"],"direction":"unknown","related_road_events":[],"description":"Bridge work on KINNEY ST both directions between CALHOUN ST (Torrington) and JONES ST (Torrington) traffic will be detoured to Brightwood Ave., Continuous Wednesday April 1st, 2026 12:00 AM thru Friday July 31st, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T12:00:55Z"},"road_event_id":"1Vpyb19mIQkxlmqP3DWVSEHzNoc=","beginning_cross_street":"CALHOUN ST","ending_cross_street":"JONES ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.114324,41.813821]]}},{"id":"AEM6u46Q+BdAByKM8g8NYcr7Fk4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rDTKNI4NsSDlOJTtHrvhz7AxJZk="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"AEM6u46Q+BdAByKM8g8NYcr7Fk4=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"rDTKNI4NsSDlOJTtHrvhz7AxJZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AEM6u46Q+BdAByKM8g8NYcr7Fk4="},{"type":"next-occurrence","id":"aj06ZZmnvbN0aqWBqTJ3ecb7tGA="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"rDTKNI4NsSDlOJTtHrvhz7AxJZk=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"aj06ZZmnvbN0aqWBqTJ3ecb7tGA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AEM6u46Q+BdAByKM8g8NYcr7Fk4="},{"type":"next-occurrence","id":"VMTwXQPWfG33EGxyewE1FROxcTE="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"aj06ZZmnvbN0aqWBqTJ3ecb7tGA=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"VMTwXQPWfG33EGxyewE1FROxcTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AEM6u46Q+BdAByKM8g8NYcr7Fk4="},{"type":"next-occurrence","id":"RGG2qE20XO5Yl5toiij2mXNBIBM="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"VMTwXQPWfG33EGxyewE1FROxcTE=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"RGG2qE20XO5Yl5toiij2mXNBIBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AEM6u46Q+BdAByKM8g8NYcr7Fk4="},{"type":"next-occurrence","id":"sHbR1OdZgSmQ+ogfRU8Qq7HTZD8="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"RGG2qE20XO5Yl5toiij2mXNBIBM=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T22:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"sHbR1OdZgSmQ+ogfRU8Qq7HTZD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AEM6u46Q+BdAByKM8g8NYcr7Fk4="},{"type":"next-occurrence","id":"WIdOezrP8OW2CRxdOpZ3RVPUpHM="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"sHbR1OdZgSmQ+ogfRU8Qq7HTZD8=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"WIdOezrP8OW2CRxdOpZ3RVPUpHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AEM6u46Q+BdAByKM8g8NYcr7Fk4="},{"type":"next-occurrence","id":"1WUTCN59An8h7eCqoKXgsXm4Gmg="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"WIdOezrP8OW2CRxdOpZ3RVPUpHM=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"1WUTCN59An8h7eCqoKXgsXm4Gmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AEM6u46Q+BdAByKM8g8NYcr7Fk4="},{"type":"next-occurrence","id":"71wfqD881FujYD5GLjOEPAGCx8Y="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"1WUTCN59An8h7eCqoKXgsXm4Gmg=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"71wfqD881FujYD5GLjOEPAGCx8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AEM6u46Q+BdAByKM8g8NYcr7Fk4="},{"type":"next-occurrence","id":"MD3qrvvXhkCcbEr09ah92Co24vc="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"71wfqD881FujYD5GLjOEPAGCx8Y=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"MD3qrvvXhkCcbEr09ah92Co24vc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AEM6u46Q+BdAByKM8g8NYcr7Fk4="},{"type":"next-occurrence","id":"iWdiWAsFrlTI5h6ocD6b79OuR8g="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"MD3qrvvXhkCcbEr09ah92Co24vc=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"iWdiWAsFrlTI5h6ocD6b79OuR8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AEM6u46Q+BdAByKM8g8NYcr7Fk4="},{"type":"next-occurrence","id":"sboR5TkARfYGswmuUaSdkJgLlBI="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"iWdiWAsFrlTI5h6ocD6b79OuR8g=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T22:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"sboR5TkARfYGswmuUaSdkJgLlBI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AEM6u46Q+BdAByKM8g8NYcr7Fk4="},{"type":"next-occurrence","id":"Wtmd9VSg52xOz6xCJ+eDIlpdaOg="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"sboR5TkARfYGswmuUaSdkJgLlBI=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T22:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"Wtmd9VSg52xOz6xCJ+eDIlpdaOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AEM6u46Q+BdAByKM8g8NYcr7Fk4="},{"type":"next-occurrence","id":"OAETspxfekgAm23bl52gDpdoIYY="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"Wtmd9VSg52xOz6xCJ+eDIlpdaOg=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"OAETspxfekgAm23bl52gDpdoIYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AEM6u46Q+BdAByKM8g8NYcr7Fk4="},{"type":"next-occurrence","id":"cdLY66ATdhce3IVilUJvAbwJQQ8="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"OAETspxfekgAm23bl52gDpdoIYY=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"cdLY66ATdhce3IVilUJvAbwJQQ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AEM6u46Q+BdAByKM8g8NYcr7Fk4="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"cdLY66ATdhce3IVilUJvAbwJQQ8=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"7ZG5uyajh+QJqc5JGVu0GjrOauI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yaeeBzFCgWZm7R8V/6m89cez2KE="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"7ZG5uyajh+QJqc5JGVu0GjrOauI=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"yaeeBzFCgWZm7R8V/6m89cez2KE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ZG5uyajh+QJqc5JGVu0GjrOauI="},{"type":"next-occurrence","id":"dQfhUTOUZtyEsmCxCqKqbXsgB2c="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"yaeeBzFCgWZm7R8V/6m89cez2KE=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"dQfhUTOUZtyEsmCxCqKqbXsgB2c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ZG5uyajh+QJqc5JGVu0GjrOauI="},{"type":"next-occurrence","id":"GO12biLewsrn1gEjTGhup1vWyqk="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"dQfhUTOUZtyEsmCxCqKqbXsgB2c=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"GO12biLewsrn1gEjTGhup1vWyqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ZG5uyajh+QJqc5JGVu0GjrOauI="},{"type":"next-occurrence","id":"ITtDj5asaz5i0MHbDtgkatk6Yuc="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"GO12biLewsrn1gEjTGhup1vWyqk=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T01:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"ITtDj5asaz5i0MHbDtgkatk6Yuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ZG5uyajh+QJqc5JGVu0GjrOauI="},{"type":"next-occurrence","id":"BC7RYg1SfB4PNTdQq1bHixaCNp4="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"ITtDj5asaz5i0MHbDtgkatk6Yuc=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T01:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"BC7RYg1SfB4PNTdQq1bHixaCNp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ZG5uyajh+QJqc5JGVu0GjrOauI="},{"type":"next-occurrence","id":"cN9rXlXVMERFdRsr8Y73Bf7IytA="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"BC7RYg1SfB4PNTdQq1bHixaCNp4=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"cN9rXlXVMERFdRsr8Y73Bf7IytA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ZG5uyajh+QJqc5JGVu0GjrOauI="},{"type":"next-occurrence","id":"aed+RBwKUBlErlVhKN4+SCq3WSI="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"cN9rXlXVMERFdRsr8Y73Bf7IytA=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T01:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"aed+RBwKUBlErlVhKN4+SCq3WSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ZG5uyajh+QJqc5JGVu0GjrOauI="},{"type":"next-occurrence","id":"qIE6mNFFXxiinsVl0pWjQOMnwG4="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"aed+RBwKUBlErlVhKN4+SCq3WSI=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T01:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"qIE6mNFFXxiinsVl0pWjQOMnwG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ZG5uyajh+QJqc5JGVu0GjrOauI="},{"type":"next-occurrence","id":"9wLLDuGKCxWzFnCGviRTQTXfmlM="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"qIE6mNFFXxiinsVl0pWjQOMnwG4=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T01:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"9wLLDuGKCxWzFnCGviRTQTXfmlM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ZG5uyajh+QJqc5JGVu0GjrOauI="},{"type":"next-occurrence","id":"HA554l/fL86/l4+TWLHh9LUg02w="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"9wLLDuGKCxWzFnCGviRTQTXfmlM=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T01:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"HA554l/fL86/l4+TWLHh9LUg02w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ZG5uyajh+QJqc5JGVu0GjrOauI="},{"type":"next-occurrence","id":"7RBSyCpQ5kuw8db9AHl0Qz0p1vk="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"HA554l/fL86/l4+TWLHh9LUg02w=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T01:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"7RBSyCpQ5kuw8db9AHl0Qz0p1vk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ZG5uyajh+QJqc5JGVu0GjrOauI="},{"type":"next-occurrence","id":"srm+PZFTwwq9OvZ2nQoG7m+3BK0="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"7RBSyCpQ5kuw8db9AHl0Qz0p1vk=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T01:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"srm+PZFTwwq9OvZ2nQoG7m+3BK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ZG5uyajh+QJqc5JGVu0GjrOauI="},{"type":"next-occurrence","id":"0ZCHBoxnSA6YXirdqM0+q4c7V/s="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"srm+PZFTwwq9OvZ2nQoG7m+3BK0=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"0ZCHBoxnSA6YXirdqM0+q4c7V/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ZG5uyajh+QJqc5JGVu0GjrOauI="},{"type":"next-occurrence","id":"H3GcAw1/0PhmZA+WQ8XzqQLLRA4="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"0ZCHBoxnSA6YXirdqM0+q4c7V/s=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T01:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"H3GcAw1/0PhmZA+WQ8XzqQLLRA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ZG5uyajh+QJqc5JGVu0GjrOauI="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"H3GcAw1/0PhmZA+WQ8XzqQLLRA4=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T01:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"D6pfbaBVhXfetOHl2ZlB4w6irCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BQj9W79Z5PnpMaTlvT7vinuZtwk="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"D6pfbaBVhXfetOHl2ZlB4w6irCc=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"BQj9W79Z5PnpMaTlvT7vinuZtwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D6pfbaBVhXfetOHl2ZlB4w6irCc="},{"type":"next-occurrence","id":"0WRmNs9Hk0hDnN5160QQX37Kpdw="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"BQj9W79Z5PnpMaTlvT7vinuZtwk=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"0WRmNs9Hk0hDnN5160QQX37Kpdw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D6pfbaBVhXfetOHl2ZlB4w6irCc="},{"type":"next-occurrence","id":"MXJpiD5VC/f9TT6Nnn3Fw99TNgY="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"0WRmNs9Hk0hDnN5160QQX37Kpdw=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"MXJpiD5VC/f9TT6Nnn3Fw99TNgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D6pfbaBVhXfetOHl2ZlB4w6irCc="},{"type":"next-occurrence","id":"EmX4wHFDgTC/SVMbPukD7tcsGzU="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"MXJpiD5VC/f9TT6Nnn3Fw99TNgY=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T01:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"EmX4wHFDgTC/SVMbPukD7tcsGzU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D6pfbaBVhXfetOHl2ZlB4w6irCc="},{"type":"next-occurrence","id":"1EgvivQ7rM5NqvT+JcySxBzgoZY="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"EmX4wHFDgTC/SVMbPukD7tcsGzU=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T01:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"1EgvivQ7rM5NqvT+JcySxBzgoZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D6pfbaBVhXfetOHl2ZlB4w6irCc="},{"type":"next-occurrence","id":"tqbnPAD/XiBP1dEd62uZIEjPFGU="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"1EgvivQ7rM5NqvT+JcySxBzgoZY=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"tqbnPAD/XiBP1dEd62uZIEjPFGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D6pfbaBVhXfetOHl2ZlB4w6irCc="},{"type":"next-occurrence","id":"ZMhhv04zZJ6GdTqlxpPBsw1Jj2Q="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"tqbnPAD/XiBP1dEd62uZIEjPFGU=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T01:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"ZMhhv04zZJ6GdTqlxpPBsw1Jj2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D6pfbaBVhXfetOHl2ZlB4w6irCc="},{"type":"next-occurrence","id":"Ld8KLkgasY965ikj/3xFSfZ3Zck="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"ZMhhv04zZJ6GdTqlxpPBsw1Jj2Q=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T01:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"Ld8KLkgasY965ikj/3xFSfZ3Zck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D6pfbaBVhXfetOHl2ZlB4w6irCc="},{"type":"next-occurrence","id":"nduhVM92atyytYUobo83lPxAUo4="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"Ld8KLkgasY965ikj/3xFSfZ3Zck=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T01:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"nduhVM92atyytYUobo83lPxAUo4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D6pfbaBVhXfetOHl2ZlB4w6irCc="},{"type":"next-occurrence","id":"p5Yrk3kyour4ErKPH7gEMYTDCd8="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"nduhVM92atyytYUobo83lPxAUo4=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T01:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"p5Yrk3kyour4ErKPH7gEMYTDCd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D6pfbaBVhXfetOHl2ZlB4w6irCc="},{"type":"next-occurrence","id":"YUfNf+T4l0z88I8tqRIfaQ0aks8="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"p5Yrk3kyour4ErKPH7gEMYTDCd8=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T01:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"YUfNf+T4l0z88I8tqRIfaQ0aks8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D6pfbaBVhXfetOHl2ZlB4w6irCc="},{"type":"next-occurrence","id":"9Uapev2U2QVHIzq1U2yChbPPkuk="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"YUfNf+T4l0z88I8tqRIfaQ0aks8=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T01:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"9Uapev2U2QVHIzq1U2yChbPPkuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D6pfbaBVhXfetOHl2ZlB4w6irCc="},{"type":"next-occurrence","id":"P5qzpxZmWgbw4sm+8lGoqqZXuns="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"9Uapev2U2QVHIzq1U2yChbPPkuk=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"P5qzpxZmWgbw4sm+8lGoqqZXuns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D6pfbaBVhXfetOHl2ZlB4w6irCc="},{"type":"next-occurrence","id":"t2cTrH+PRvmebelpLqPKK6Gb8Ts="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"P5qzpxZmWgbw4sm+8lGoqqZXuns=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T01:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"t2cTrH+PRvmebelpLqPKK6Gb8Ts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D6pfbaBVhXfetOHl2ZlB4w6irCc="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"t2cTrH+PRvmebelpLqPKK6Gb8Ts=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T01:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"Q/fFUlBZm1u30v+QuJRPF05ZPWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"e7VTFK7u6FVUR4ooXKHMuvSeJuE="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"Q/fFUlBZm1u30v+QuJRPF05ZPWw=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"e7VTFK7u6FVUR4ooXKHMuvSeJuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q/fFUlBZm1u30v+QuJRPF05ZPWw="},{"type":"next-occurrence","id":"tsDWigHh4O/nCSl/PIWaLUcduSA="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"e7VTFK7u6FVUR4ooXKHMuvSeJuE=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"tsDWigHh4O/nCSl/PIWaLUcduSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q/fFUlBZm1u30v+QuJRPF05ZPWw="},{"type":"next-occurrence","id":"a7lYON2ZyKboNkfM863BmOhlnSc="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"tsDWigHh4O/nCSl/PIWaLUcduSA=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"a7lYON2ZyKboNkfM863BmOhlnSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q/fFUlBZm1u30v+QuJRPF05ZPWw="},{"type":"next-occurrence","id":"1Z0ZMGkp2si0F0Cy+qLjaaHT6s0="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"a7lYON2ZyKboNkfM863BmOhlnSc=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"1Z0ZMGkp2si0F0Cy+qLjaaHT6s0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q/fFUlBZm1u30v+QuJRPF05ZPWw="},{"type":"next-occurrence","id":"O4Gsc2oZweZKeSF5NzcnKSfGGbA="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"1Z0ZMGkp2si0F0Cy+qLjaaHT6s0=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"O4Gsc2oZweZKeSF5NzcnKSfGGbA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q/fFUlBZm1u30v+QuJRPF05ZPWw="},{"type":"next-occurrence","id":"+IEh2OMMYHp39DFIWW5iKIosFKg="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"O4Gsc2oZweZKeSF5NzcnKSfGGbA=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"+IEh2OMMYHp39DFIWW5iKIosFKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q/fFUlBZm1u30v+QuJRPF05ZPWw="},{"type":"next-occurrence","id":"BmyMwsVaq4Wk372cu+QhiV1CFtc="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"+IEh2OMMYHp39DFIWW5iKIosFKg=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"BmyMwsVaq4Wk372cu+QhiV1CFtc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q/fFUlBZm1u30v+QuJRPF05ZPWw="},{"type":"next-occurrence","id":"2bWLoBW616IoPAmHFKOGKjl2EJM="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"BmyMwsVaq4Wk372cu+QhiV1CFtc=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"2bWLoBW616IoPAmHFKOGKjl2EJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q/fFUlBZm1u30v+QuJRPF05ZPWw="},{"type":"next-occurrence","id":"a+RPbOCgK+UPjgWTFHrvEf5Srwo="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"2bWLoBW616IoPAmHFKOGKjl2EJM=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"a+RPbOCgK+UPjgWTFHrvEf5Srwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q/fFUlBZm1u30v+QuJRPF05ZPWw="},{"type":"next-occurrence","id":"I3nGxBTZlbjBhJqxepvAbyAs400="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"a+RPbOCgK+UPjgWTFHrvEf5Srwo=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"I3nGxBTZlbjBhJqxepvAbyAs400=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q/fFUlBZm1u30v+QuJRPF05ZPWw="},{"type":"next-occurrence","id":"s94kgavVHML0AWQxb0i6EHzMCQI="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"I3nGxBTZlbjBhJqxepvAbyAs400=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"s94kgavVHML0AWQxb0i6EHzMCQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q/fFUlBZm1u30v+QuJRPF05ZPWw="},{"type":"next-occurrence","id":"aEmNAg+/D191ZAUfZwkQHlU4t7A="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"s94kgavVHML0AWQxb0i6EHzMCQI=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"aEmNAg+/D191ZAUfZwkQHlU4t7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q/fFUlBZm1u30v+QuJRPF05ZPWw="},{"type":"next-occurrence","id":"qPCsVnXRnsIJEwan0S0IFmEntBM="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"aEmNAg+/D191ZAUfZwkQHlU4t7A=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"qPCsVnXRnsIJEwan0S0IFmEntBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q/fFUlBZm1u30v+QuJRPF05ZPWw="},{"type":"next-occurrence","id":"2aL1S8y0ELYw3Y3LKfntreaTs10="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"qPCsVnXRnsIJEwan0S0IFmEntBM=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"2aL1S8y0ELYw3Y3LKfntreaTs10=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q/fFUlBZm1u30v+QuJRPF05ZPWw="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"2aL1S8y0ELYw3Y3LKfntreaTs10=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"Tvo2j5Ioo2z4ibkHsJOJcxJATY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nAzejKdbS1FdhVV5xCy8GfvXD+A="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"Tvo2j5Ioo2z4ibkHsJOJcxJATY4=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"nAzejKdbS1FdhVV5xCy8GfvXD+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tvo2j5Ioo2z4ibkHsJOJcxJATY4="},{"type":"next-occurrence","id":"M/sSB9HY8XRJoPGdtXw0byOc45U="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"nAzejKdbS1FdhVV5xCy8GfvXD+A=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"M/sSB9HY8XRJoPGdtXw0byOc45U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tvo2j5Ioo2z4ibkHsJOJcxJATY4="},{"type":"next-occurrence","id":"cs50qAgMnY3UlBKwrfDwAEAiwJ8="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"M/sSB9HY8XRJoPGdtXw0byOc45U=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"cs50qAgMnY3UlBKwrfDwAEAiwJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tvo2j5Ioo2z4ibkHsJOJcxJATY4="},{"type":"next-occurrence","id":"HoZIwiz3IoogmsJkZqyJ9a3DJbU="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"cs50qAgMnY3UlBKwrfDwAEAiwJ8=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"HoZIwiz3IoogmsJkZqyJ9a3DJbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tvo2j5Ioo2z4ibkHsJOJcxJATY4="},{"type":"next-occurrence","id":"ivwB5NRZcToYEx/2OQvQpuLPm18="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"HoZIwiz3IoogmsJkZqyJ9a3DJbU=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"ivwB5NRZcToYEx/2OQvQpuLPm18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tvo2j5Ioo2z4ibkHsJOJcxJATY4="},{"type":"next-occurrence","id":"NiMcOflKvV8vD3ubKWh/A9XwamE="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"ivwB5NRZcToYEx/2OQvQpuLPm18=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"NiMcOflKvV8vD3ubKWh/A9XwamE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tvo2j5Ioo2z4ibkHsJOJcxJATY4="},{"type":"next-occurrence","id":"GNYdLnxcD76zpnBajEV4PbSkTVI="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"NiMcOflKvV8vD3ubKWh/A9XwamE=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"GNYdLnxcD76zpnBajEV4PbSkTVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tvo2j5Ioo2z4ibkHsJOJcxJATY4="},{"type":"next-occurrence","id":"7U8BSX+FdunLmYNBJg8blpWQOVE="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"GNYdLnxcD76zpnBajEV4PbSkTVI=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"7U8BSX+FdunLmYNBJg8blpWQOVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tvo2j5Ioo2z4ibkHsJOJcxJATY4="},{"type":"next-occurrence","id":"lYdMQYG7+UEhzPluKNKS1d5JZQw="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"7U8BSX+FdunLmYNBJg8blpWQOVE=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"lYdMQYG7+UEhzPluKNKS1d5JZQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tvo2j5Ioo2z4ibkHsJOJcxJATY4="},{"type":"next-occurrence","id":"Oz0RbWsKovz32qhJUltdOTit0/8="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"lYdMQYG7+UEhzPluKNKS1d5JZQw=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"Oz0RbWsKovz32qhJUltdOTit0/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tvo2j5Ioo2z4ibkHsJOJcxJATY4="},{"type":"next-occurrence","id":"wBn1abm8maiQXLaEVoa0lzD9kAg="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"Oz0RbWsKovz32qhJUltdOTit0/8=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"wBn1abm8maiQXLaEVoa0lzD9kAg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tvo2j5Ioo2z4ibkHsJOJcxJATY4="},{"type":"next-occurrence","id":"VHGKyjyxZGqERTdvUKVl/E4W7ws="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"wBn1abm8maiQXLaEVoa0lzD9kAg=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"VHGKyjyxZGqERTdvUKVl/E4W7ws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tvo2j5Ioo2z4ibkHsJOJcxJATY4="},{"type":"next-occurrence","id":"f7MIcnaOB81MAuE5tZtKxdQx9qg="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"VHGKyjyxZGqERTdvUKVl/E4W7ws=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"f7MIcnaOB81MAuE5tZtKxdQx9qg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tvo2j5Ioo2z4ibkHsJOJcxJATY4="},{"type":"next-occurrence","id":"gcTFdifk0P3r1egRN5dIzOcj2A8="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"f7MIcnaOB81MAuE5tZtKxdQx9qg=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"gcTFdifk0P3r1egRN5dIzOcj2A8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tvo2j5Ioo2z4ibkHsJOJcxJATY4="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"gcTFdifk0P3r1egRN5dIzOcj2A8=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"i39N8lKRm+Z+VxHIl3YRMe8b3KU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"geStkHxK5Oor1nDPBcZPHXqmAn8="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"i39N8lKRm+Z+VxHIl3YRMe8b3KU=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"geStkHxK5Oor1nDPBcZPHXqmAn8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i39N8lKRm+Z+VxHIl3YRMe8b3KU="},{"type":"next-occurrence","id":"cefDHdjCe2rxBw8zub5TPihIP/4="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"geStkHxK5Oor1nDPBcZPHXqmAn8=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"cefDHdjCe2rxBw8zub5TPihIP/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i39N8lKRm+Z+VxHIl3YRMe8b3KU="},{"type":"next-occurrence","id":"58A7NjGEYqM9tqOSF1apuxsintI="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"cefDHdjCe2rxBw8zub5TPihIP/4=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"58A7NjGEYqM9tqOSF1apuxsintI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i39N8lKRm+Z+VxHIl3YRMe8b3KU="},{"type":"next-occurrence","id":"n5dLSQNDYLqcGg2uQ/MOeDYiOpw="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"58A7NjGEYqM9tqOSF1apuxsintI=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"n5dLSQNDYLqcGg2uQ/MOeDYiOpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i39N8lKRm+Z+VxHIl3YRMe8b3KU="},{"type":"next-occurrence","id":"CSlS+Ztu7vH1tycRHKIaIQxRNxM="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"n5dLSQNDYLqcGg2uQ/MOeDYiOpw=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"CSlS+Ztu7vH1tycRHKIaIQxRNxM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i39N8lKRm+Z+VxHIl3YRMe8b3KU="},{"type":"next-occurrence","id":"x3uH+4tnwLuL8SHF6UwYFkZgcrI="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"CSlS+Ztu7vH1tycRHKIaIQxRNxM=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"x3uH+4tnwLuL8SHF6UwYFkZgcrI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i39N8lKRm+Z+VxHIl3YRMe8b3KU="},{"type":"next-occurrence","id":"gTCWak2gs4Nq2FtveprxWVXp6MI="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"x3uH+4tnwLuL8SHF6UwYFkZgcrI=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"gTCWak2gs4Nq2FtveprxWVXp6MI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i39N8lKRm+Z+VxHIl3YRMe8b3KU="},{"type":"next-occurrence","id":"s53AEFJVgIUNG85OmvJ1Ox3P3K0="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"gTCWak2gs4Nq2FtveprxWVXp6MI=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"s53AEFJVgIUNG85OmvJ1Ox3P3K0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i39N8lKRm+Z+VxHIl3YRMe8b3KU="},{"type":"next-occurrence","id":"BV/L9IpOmqaiOGhsaP6Nt/XaaHs="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"s53AEFJVgIUNG85OmvJ1Ox3P3K0=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"BV/L9IpOmqaiOGhsaP6Nt/XaaHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i39N8lKRm+Z+VxHIl3YRMe8b3KU="},{"type":"next-occurrence","id":"Jo+z4opFLGuwPN5DsrMaoWdnw+A="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"BV/L9IpOmqaiOGhsaP6Nt/XaaHs=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"Jo+z4opFLGuwPN5DsrMaoWdnw+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i39N8lKRm+Z+VxHIl3YRMe8b3KU="},{"type":"next-occurrence","id":"lpag1bB91oCsZ76cMtwedygQd3s="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"Jo+z4opFLGuwPN5DsrMaoWdnw+A=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"lpag1bB91oCsZ76cMtwedygQd3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i39N8lKRm+Z+VxHIl3YRMe8b3KU="},{"type":"next-occurrence","id":"FONX1uQUKRNo1zw95M3WxBY+TDM="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"lpag1bB91oCsZ76cMtwedygQd3s=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"FONX1uQUKRNo1zw95M3WxBY+TDM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i39N8lKRm+Z+VxHIl3YRMe8b3KU="},{"type":"next-occurrence","id":"io7ZrRqTMK8Zbisp1CxA67Q7ecs="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"FONX1uQUKRNo1zw95M3WxBY+TDM=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"io7ZrRqTMK8Zbisp1CxA67Q7ecs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i39N8lKRm+Z+VxHIl3YRMe8b3KU="},{"type":"next-occurrence","id":"oT1ayU/zW4BJ+jP2pl55LnWQaj4="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"io7ZrRqTMK8Zbisp1CxA67Q7ecs=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"oT1ayU/zW4BJ+jP2pl55LnWQaj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i39N8lKRm+Z+VxHIl3YRMe8b3KU="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"oT1ayU/zW4BJ+jP2pl55LnWQaj4=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"FxX49IjexvXmkPaEReC4bz8/Qm4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hqXHEf14DZzTPbg7nehWAH7tdoA="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"FxX49IjexvXmkPaEReC4bz8/Qm4=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"hqXHEf14DZzTPbg7nehWAH7tdoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FxX49IjexvXmkPaEReC4bz8/Qm4="},{"type":"next-occurrence","id":"pM7r5jCt9bmqpubcvYjPwQRDQ4E="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"hqXHEf14DZzTPbg7nehWAH7tdoA=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"pM7r5jCt9bmqpubcvYjPwQRDQ4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FxX49IjexvXmkPaEReC4bz8/Qm4="},{"type":"next-occurrence","id":"q2EnMb1IjkND9GHazKhZsaf9gVA="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"pM7r5jCt9bmqpubcvYjPwQRDQ4E=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"q2EnMb1IjkND9GHazKhZsaf9gVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FxX49IjexvXmkPaEReC4bz8/Qm4="},{"type":"next-occurrence","id":"hsAONJAqDGYNNzR7dUwzxAINuRc="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"q2EnMb1IjkND9GHazKhZsaf9gVA=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"hsAONJAqDGYNNzR7dUwzxAINuRc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FxX49IjexvXmkPaEReC4bz8/Qm4="},{"type":"next-occurrence","id":"HEG4+VLueA7uNQlqcgf9IrCRPxA="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"hsAONJAqDGYNNzR7dUwzxAINuRc=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"HEG4+VLueA7uNQlqcgf9IrCRPxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FxX49IjexvXmkPaEReC4bz8/Qm4="},{"type":"next-occurrence","id":"pDMALD5yLkLKdjCt9CdKhmIVcT8="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"HEG4+VLueA7uNQlqcgf9IrCRPxA=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"pDMALD5yLkLKdjCt9CdKhmIVcT8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FxX49IjexvXmkPaEReC4bz8/Qm4="},{"type":"next-occurrence","id":"rXSrYimwDelAdl6sPUx7fhYlEfo="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"pDMALD5yLkLKdjCt9CdKhmIVcT8=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"rXSrYimwDelAdl6sPUx7fhYlEfo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FxX49IjexvXmkPaEReC4bz8/Qm4="},{"type":"next-occurrence","id":"vvb4rW403qsOkwVNdqyvLj6Kk+Q="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"rXSrYimwDelAdl6sPUx7fhYlEfo=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"vvb4rW403qsOkwVNdqyvLj6Kk+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FxX49IjexvXmkPaEReC4bz8/Qm4="},{"type":"next-occurrence","id":"+oxka/zCD2he9EwPsjLM7LSn/RM="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"vvb4rW403qsOkwVNdqyvLj6Kk+Q=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"+oxka/zCD2he9EwPsjLM7LSn/RM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FxX49IjexvXmkPaEReC4bz8/Qm4="},{"type":"next-occurrence","id":"mkf1F3cjHmXBDWiC5tpaaQwMbAc="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"+oxka/zCD2he9EwPsjLM7LSn/RM=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"mkf1F3cjHmXBDWiC5tpaaQwMbAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FxX49IjexvXmkPaEReC4bz8/Qm4="},{"type":"next-occurrence","id":"j5ABRIFhbY1sbRDg34Xu5FjxP/o="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"mkf1F3cjHmXBDWiC5tpaaQwMbAc=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"j5ABRIFhbY1sbRDg34Xu5FjxP/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FxX49IjexvXmkPaEReC4bz8/Qm4="},{"type":"next-occurrence","id":"H54AnJNE0ZBDu8dlGqb3B8CEgWw="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"j5ABRIFhbY1sbRDg34Xu5FjxP/o=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"H54AnJNE0ZBDu8dlGqb3B8CEgWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FxX49IjexvXmkPaEReC4bz8/Qm4="},{"type":"next-occurrence","id":"35jhOw9Wuu6w1DDHQw9FawWMZ08="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"H54AnJNE0ZBDu8dlGqb3B8CEgWw=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"35jhOw9Wuu6w1DDHQw9FawWMZ08=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FxX49IjexvXmkPaEReC4bz8/Qm4="},{"type":"next-occurrence","id":"E5k3doptA7zvABsaU93PHJvdLEg="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"35jhOw9Wuu6w1DDHQw9FawWMZ08=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"E5k3doptA7zvABsaU93PHJvdLEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FxX49IjexvXmkPaEReC4bz8/Qm4="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"E5k3doptA7zvABsaU93PHJvdLEg=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"GjUCoCzauZ1w2ZU+eI5dzX5B/ts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8Z1BsuUGEoLAIc7BZbTjtypS11E="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"GjUCoCzauZ1w2ZU+eI5dzX5B/ts=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"8Z1BsuUGEoLAIc7BZbTjtypS11E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjUCoCzauZ1w2ZU+eI5dzX5B/ts="},{"type":"next-occurrence","id":"kECafx8xoXbFF/hMGyBPvFgykIg="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"8Z1BsuUGEoLAIc7BZbTjtypS11E=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"kECafx8xoXbFF/hMGyBPvFgykIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjUCoCzauZ1w2ZU+eI5dzX5B/ts="},{"type":"next-occurrence","id":"IFoI8eaXDuhqQJ/GmX4+iP7LeZI="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"kECafx8xoXbFF/hMGyBPvFgykIg=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"IFoI8eaXDuhqQJ/GmX4+iP7LeZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjUCoCzauZ1w2ZU+eI5dzX5B/ts="},{"type":"next-occurrence","id":"VTvgn/zuBBifYst/97J9FKkNuDM="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"IFoI8eaXDuhqQJ/GmX4+iP7LeZI=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"VTvgn/zuBBifYst/97J9FKkNuDM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjUCoCzauZ1w2ZU+eI5dzX5B/ts="},{"type":"next-occurrence","id":"8bwUDrD+qNaYPSKWp+ObJb9+7tI="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"VTvgn/zuBBifYst/97J9FKkNuDM=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"8bwUDrD+qNaYPSKWp+ObJb9+7tI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjUCoCzauZ1w2ZU+eI5dzX5B/ts="},{"type":"next-occurrence","id":"coUzlArR1i83XnN/LqyIkAV958k="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"8bwUDrD+qNaYPSKWp+ObJb9+7tI=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"coUzlArR1i83XnN/LqyIkAV958k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjUCoCzauZ1w2ZU+eI5dzX5B/ts="},{"type":"next-occurrence","id":"4a29sH0c332+XxA2F55txruJraA="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"coUzlArR1i83XnN/LqyIkAV958k=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"4a29sH0c332+XxA2F55txruJraA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjUCoCzauZ1w2ZU+eI5dzX5B/ts="},{"type":"next-occurrence","id":"C4VdTQu1k7SjhPUnpRS08kvEqKk="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"4a29sH0c332+XxA2F55txruJraA=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"C4VdTQu1k7SjhPUnpRS08kvEqKk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjUCoCzauZ1w2ZU+eI5dzX5B/ts="},{"type":"next-occurrence","id":"vTwxkE12t5adTuhOYCLRB2W3usk="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"C4VdTQu1k7SjhPUnpRS08kvEqKk=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"vTwxkE12t5adTuhOYCLRB2W3usk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjUCoCzauZ1w2ZU+eI5dzX5B/ts="},{"type":"next-occurrence","id":"EEm3pzrcud5ivPfH32eT3/f0TTs="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"vTwxkE12t5adTuhOYCLRB2W3usk=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"EEm3pzrcud5ivPfH32eT3/f0TTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjUCoCzauZ1w2ZU+eI5dzX5B/ts="},{"type":"next-occurrence","id":"Ug+2/OwnEA3KVodmAVpIrO4JLZk="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"EEm3pzrcud5ivPfH32eT3/f0TTs=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"Ug+2/OwnEA3KVodmAVpIrO4JLZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjUCoCzauZ1w2ZU+eI5dzX5B/ts="},{"type":"next-occurrence","id":"EM15SN8xOR9j9iUrAXIMYpYfm3s="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"Ug+2/OwnEA3KVodmAVpIrO4JLZk=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"EM15SN8xOR9j9iUrAXIMYpYfm3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjUCoCzauZ1w2ZU+eI5dzX5B/ts="},{"type":"next-occurrence","id":"hKVNdtxaWIH2vISC34GvNkFZ/zs="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"EM15SN8xOR9j9iUrAXIMYpYfm3s=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"hKVNdtxaWIH2vISC34GvNkFZ/zs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjUCoCzauZ1w2ZU+eI5dzX5B/ts="},{"type":"next-occurrence","id":"kSXYlkGZVFMTDbxDzgha5Nsm+n8="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"hKVNdtxaWIH2vISC34GvNkFZ/zs=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"kSXYlkGZVFMTDbxDzgha5Nsm+n8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjUCoCzauZ1w2ZU+eI5dzX5B/ts="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"kSXYlkGZVFMTDbxDzgha5Nsm+n8=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"loN1GIULksubuDu+z+m+Dyd9ByI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Nctvsw/p1LbgY6UDLPC5U1dGXE8="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"loN1GIULksubuDu+z+m+Dyd9ByI=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"Nctvsw/p1LbgY6UDLPC5U1dGXE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"loN1GIULksubuDu+z+m+Dyd9ByI="},{"type":"next-occurrence","id":"0J1G4XXl3NO7kNkFcMZUMZ8oSXg="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"Nctvsw/p1LbgY6UDLPC5U1dGXE8=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"0J1G4XXl3NO7kNkFcMZUMZ8oSXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"loN1GIULksubuDu+z+m+Dyd9ByI="},{"type":"next-occurrence","id":"Wbrml1epSBlJ0+o8En18X6gGO5M="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"0J1G4XXl3NO7kNkFcMZUMZ8oSXg=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"Wbrml1epSBlJ0+o8En18X6gGO5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"loN1GIULksubuDu+z+m+Dyd9ByI="},{"type":"next-occurrence","id":"cWJmHY91+s2Bgh+dvWPUN016vgM="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"Wbrml1epSBlJ0+o8En18X6gGO5M=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"cWJmHY91+s2Bgh+dvWPUN016vgM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"loN1GIULksubuDu+z+m+Dyd9ByI="},{"type":"next-occurrence","id":"IHW/FZRDBvwzO3bnZ+CW7LAmzuI="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"cWJmHY91+s2Bgh+dvWPUN016vgM=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"IHW/FZRDBvwzO3bnZ+CW7LAmzuI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"loN1GIULksubuDu+z+m+Dyd9ByI="},{"type":"next-occurrence","id":"kic6dyywIkm7ORltKvdFFVOL8/c="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"IHW/FZRDBvwzO3bnZ+CW7LAmzuI=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"kic6dyywIkm7ORltKvdFFVOL8/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"loN1GIULksubuDu+z+m+Dyd9ByI="},{"type":"next-occurrence","id":"u2A7gbLwYqqNsH7GBQcYPtnQuBE="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"kic6dyywIkm7ORltKvdFFVOL8/c=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"u2A7gbLwYqqNsH7GBQcYPtnQuBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"loN1GIULksubuDu+z+m+Dyd9ByI="},{"type":"next-occurrence","id":"staYg72dE3GKv8dch15iVrvpaUw="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"u2A7gbLwYqqNsH7GBQcYPtnQuBE=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"staYg72dE3GKv8dch15iVrvpaUw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"loN1GIULksubuDu+z+m+Dyd9ByI="},{"type":"next-occurrence","id":"Qojhd9xc4epzvyRxZ2Iw0Vj6/RQ="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"staYg72dE3GKv8dch15iVrvpaUw=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"Qojhd9xc4epzvyRxZ2Iw0Vj6/RQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"loN1GIULksubuDu+z+m+Dyd9ByI="},{"type":"next-occurrence","id":"A88lOIRzKhHL+PIKKXSUVgMtBEY="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"Qojhd9xc4epzvyRxZ2Iw0Vj6/RQ=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"A88lOIRzKhHL+PIKKXSUVgMtBEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"loN1GIULksubuDu+z+m+Dyd9ByI="},{"type":"next-occurrence","id":"tfgma24EEZ6b25SNl2bgLUf4NEs="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"A88lOIRzKhHL+PIKKXSUVgMtBEY=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"tfgma24EEZ6b25SNl2bgLUf4NEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"loN1GIULksubuDu+z+m+Dyd9ByI="},{"type":"next-occurrence","id":"GFWYDNDr14q+hVleXQiAMIV9BK8="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"tfgma24EEZ6b25SNl2bgLUf4NEs=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"GFWYDNDr14q+hVleXQiAMIV9BK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"loN1GIULksubuDu+z+m+Dyd9ByI="},{"type":"next-occurrence","id":"hGFpfG/DnS7hkSWEeVYIniKLyCc="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"GFWYDNDr14q+hVleXQiAMIV9BK8=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"hGFpfG/DnS7hkSWEeVYIniKLyCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"loN1GIULksubuDu+z+m+Dyd9ByI="},{"type":"next-occurrence","id":"szQwvAFxNqQx46jef3+4Ztj46tQ="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"hGFpfG/DnS7hkSWEeVYIniKLyCc=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"szQwvAFxNqQx46jef3+4Ztj46tQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"loN1GIULksubuDu+z+m+Dyd9ByI="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"szQwvAFxNqQx46jef3+4Ztj46tQ=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"P9LYuyXqfaLq+JLb9ZmmFXEGXpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"f0FfOsOo9+CYe2zTrVsZm3hvZ8U="}],"description":"Tree trimming on Merritt Parkway/CT 15 both directions between Exit 27 - King Street (Greenwich) and Exit 34 - CT 104/Long Ridge Road (Stamford), Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-24T13:08:14Z"},"road_event_id":"P9LYuyXqfaLq+JLb9ZmmFXEGXpw=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 34 - CT 104/Long Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.675358,41.036941]]}},{"id":"f0FfOsOo9+CYe2zTrVsZm3hvZ8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"P9LYuyXqfaLq+JLb9ZmmFXEGXpw="},{"type":"next-occurrence","id":"vmFfiJxhzesynm0WAj7cqCrjDbE="}],"description":"Tree trimming on Merritt Parkway/CT 15 both directions between Exit 27 - King Street (Greenwich) and Exit 34 - CT 104/Long Ridge Road (Stamford), Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-24T13:08:14Z"},"road_event_id":"f0FfOsOo9+CYe2zTrVsZm3hvZ8U=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 34 - CT 104/Long Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.675358,41.036941]]}},{"id":"vmFfiJxhzesynm0WAj7cqCrjDbE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"P9LYuyXqfaLq+JLb9ZmmFXEGXpw="}],"description":"Tree trimming on Merritt Parkway/CT 15 both directions between Exit 27 - King Street (Greenwich) and Exit 34 - CT 104/Long Ridge Road (Stamford), Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-24T13:08:14Z"},"road_event_id":"vmFfiJxhzesynm0WAj7cqCrjDbE=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 34 - CT 104/Long Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.675358,41.036941]]}},{"id":"maYyUAEWEEfsQyzei7978pQUhIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VMvlId6nNZEEHfu9WOW3urLuTJ8="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"maYyUAEWEEfsQyzei7978pQUhIc=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"VMvlId6nNZEEHfu9WOW3urLuTJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"7SkMmSG8poerNAaf2t6yNh7Q7t8="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"VMvlId6nNZEEHfu9WOW3urLuTJ8=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"7SkMmSG8poerNAaf2t6yNh7Q7t8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"CHI6IUgfYi24BbaLZzozxgnnj5M="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"7SkMmSG8poerNAaf2t6yNh7Q7t8=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"CHI6IUgfYi24BbaLZzozxgnnj5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"iX8wx2xEQ+QpMn0Kc44cQT1wjeY="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"CHI6IUgfYi24BbaLZzozxgnnj5M=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"iX8wx2xEQ+QpMn0Kc44cQT1wjeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"H21jdgW2D/XiModt+EscpR7tluc="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"iX8wx2xEQ+QpMn0Kc44cQT1wjeY=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"H21jdgW2D/XiModt+EscpR7tluc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"T4eGP4UCqTud8kYLMLp0Hc3jpw8="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"H21jdgW2D/XiModt+EscpR7tluc=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"T4eGP4UCqTud8kYLMLp0Hc3jpw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"r8dcQNSPMKiusxZLSW+6lM5qT/Q="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"T4eGP4UCqTud8kYLMLp0Hc3jpw8=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"r8dcQNSPMKiusxZLSW+6lM5qT/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"rqWIFj27K97byibYCyk8uEwtvdE="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"r8dcQNSPMKiusxZLSW+6lM5qT/Q=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T23:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"rqWIFj27K97byibYCyk8uEwtvdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"dQgt4s/Ih+jSC1bAjRZ/8fJ+3Kg="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"rqWIFj27K97byibYCyk8uEwtvdE=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"dQgt4s/Ih+jSC1bAjRZ/8fJ+3Kg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"ILozWao6Q8hfNiR+Ul3BGwvx4/E="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"dQgt4s/Ih+jSC1bAjRZ/8fJ+3Kg=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"ILozWao6Q8hfNiR+Ul3BGwvx4/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"sHqvQBGGnBebSTIaGDnVSEnTbeM="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"ILozWao6Q8hfNiR+Ul3BGwvx4/E=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"sHqvQBGGnBebSTIaGDnVSEnTbeM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"WwfXBrXEM2VAHG0ya6/IgkQwDos="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"sHqvQBGGnBebSTIaGDnVSEnTbeM=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"WwfXBrXEM2VAHG0ya6/IgkQwDos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"cg8JkPrTk3cxD/IHbsUgrWfhUf0="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"WwfXBrXEM2VAHG0ya6/IgkQwDos=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"cg8JkPrTk3cxD/IHbsUgrWfhUf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"trs3ytpkRllObh4ZIHuSkD98AWE="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"cg8JkPrTk3cxD/IHbsUgrWfhUf0=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"trs3ytpkRllObh4ZIHuSkD98AWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"WzE9oYtoav24h8+AljVUjdM4Zb0="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"trs3ytpkRllObh4ZIHuSkD98AWE=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"WzE9oYtoav24h8+AljVUjdM4Zb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"pzVpeSiEULytUmIDHqsD6IuBwxg="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"WzE9oYtoav24h8+AljVUjdM4Zb0=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"pzVpeSiEULytUmIDHqsD6IuBwxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"W8zmyuFgCRR3ON/CAn0eVtseXGM="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"pzVpeSiEULytUmIDHqsD6IuBwxg=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"W8zmyuFgCRR3ON/CAn0eVtseXGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"yGl6Md27aTpf6R9DJoTjWyIpIL0="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"W8zmyuFgCRR3ON/CAn0eVtseXGM=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"yGl6Md27aTpf6R9DJoTjWyIpIL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"ADVjw7OjayLCT7VcNTeT6w2aVyA="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"yGl6Md27aTpf6R9DJoTjWyIpIL0=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"ADVjw7OjayLCT7VcNTeT6w2aVyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"VKQ0ZPq4ZhJcof4jKsjvHUvA+C4="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"ADVjw7OjayLCT7VcNTeT6w2aVyA=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T23:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"VKQ0ZPq4ZhJcof4jKsjvHUvA+C4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"9JKN/9HBfB9wsasviWbUhXTa6/E="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"VKQ0ZPq4ZhJcof4jKsjvHUvA+C4=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"9JKN/9HBfB9wsasviWbUhXTa6/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"btDcnqMxCDGCQnuZI0q1q1SeM+s="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"9JKN/9HBfB9wsasviWbUhXTa6/E=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T23:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"btDcnqMxCDGCQnuZI0q1q1SeM+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"FGrB/PUXzOfX18vmTz30aoDm+Y0="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"btDcnqMxCDGCQnuZI0q1q1SeM+s=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"FGrB/PUXzOfX18vmTz30aoDm+Y0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"OYu8r9Xat07eBpKQCX1i21RPpvw="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"FGrB/PUXzOfX18vmTz30aoDm+Y0=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T23:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"OYu8r9Xat07eBpKQCX1i21RPpvw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"obr/lwHHHCvHdQtZnYx7dvkZTe0="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"OYu8r9Xat07eBpKQCX1i21RPpvw=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"obr/lwHHHCvHdQtZnYx7dvkZTe0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"/DgQijQMSSl4qhHajEZmjpvZdvw="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"obr/lwHHHCvHdQtZnYx7dvkZTe0=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T23:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"/DgQijQMSSl4qhHajEZmjpvZdvw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"Oa8x73wKy21c8O5OiCZom7k0SUA="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"/DgQijQMSSl4qhHajEZmjpvZdvw=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"Oa8x73wKy21c8O5OiCZom7k0SUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"o+5+feT5r+lBbQVq/MfuohWr/To="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"Oa8x73wKy21c8O5OiCZom7k0SUA=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T23:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"o+5+feT5r+lBbQVq/MfuohWr/To=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="},{"type":"next-occurrence","id":"CJLKWRoW73WIRonIpxKs0/LIpmY="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"o+5+feT5r+lBbQVq/MfuohWr/To=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"CJLKWRoW73WIRonIpxKs0/LIpmY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"maYyUAEWEEfsQyzei7978pQUhIc="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"CJLKWRoW73WIRonIpxKs0/LIpmY=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"59kVi9QpUIo+qy2rb6ZdT+qaboI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"I9B75MPoo5EutG+tltX1YaJnuos="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"59kVi9QpUIo+qy2rb6ZdT+qaboI=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"I9B75MPoo5EutG+tltX1YaJnuos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"ueO8eR4+r0nxhGyhV4P3g8FRXzo="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"I9B75MPoo5EutG+tltX1YaJnuos=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"ueO8eR4+r0nxhGyhV4P3g8FRXzo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"B3o8xS+vlCjYAczdfcsZ0T3FFtE="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"ueO8eR4+r0nxhGyhV4P3g8FRXzo=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"B3o8xS+vlCjYAczdfcsZ0T3FFtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"pCpworHlh6KBitT4kdgy4ih8xjc="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"B3o8xS+vlCjYAczdfcsZ0T3FFtE=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"pCpworHlh6KBitT4kdgy4ih8xjc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"XN0sMH39hJKh2tUlZTowfneNJik="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"pCpworHlh6KBitT4kdgy4ih8xjc=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"XN0sMH39hJKh2tUlZTowfneNJik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"fM77SvH7/xgz2976aaFVpNEWUFA="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"XN0sMH39hJKh2tUlZTowfneNJik=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"fM77SvH7/xgz2976aaFVpNEWUFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"TWTWSCiztvoz6j45S77C0u6Bvfw="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"fM77SvH7/xgz2976aaFVpNEWUFA=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"TWTWSCiztvoz6j45S77C0u6Bvfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"XwmvS8v4J/ygdL/SP9I5/SyOYqg="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"TWTWSCiztvoz6j45S77C0u6Bvfw=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T23:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"XwmvS8v4J/ygdL/SP9I5/SyOYqg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"JztIy/3CGo5TH0dI3mZ9X9ZmjxU="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"XwmvS8v4J/ygdL/SP9I5/SyOYqg=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"JztIy/3CGo5TH0dI3mZ9X9ZmjxU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"IdgIFb9ZEPz25wYaW9Cs6Ybw2qw="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"JztIy/3CGo5TH0dI3mZ9X9ZmjxU=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"IdgIFb9ZEPz25wYaW9Cs6Ybw2qw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"2GD/GdEjPItvYS990xbHau0y2Uk="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"IdgIFb9ZEPz25wYaW9Cs6Ybw2qw=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"2GD/GdEjPItvYS990xbHau0y2Uk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"pw5fc5DqpfA0clEE+PGGbCA1ZrQ="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"2GD/GdEjPItvYS990xbHau0y2Uk=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"pw5fc5DqpfA0clEE+PGGbCA1ZrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"zqPzR2Yv0+LAMMXH3wqjQ4Jp2/s="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"pw5fc5DqpfA0clEE+PGGbCA1ZrQ=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"zqPzR2Yv0+LAMMXH3wqjQ4Jp2/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"fFFEkz+GC+XI65bXPT3ycpQqHxo="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"zqPzR2Yv0+LAMMXH3wqjQ4Jp2/s=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"fFFEkz+GC+XI65bXPT3ycpQqHxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"e3gxujXOy0l6WH3wixlVVFAfU1k="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"fFFEkz+GC+XI65bXPT3ycpQqHxo=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"e3gxujXOy0l6WH3wixlVVFAfU1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"RsL7MjP/HlHxVkrH3/0LxFMi15c="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"e3gxujXOy0l6WH3wixlVVFAfU1k=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"RsL7MjP/HlHxVkrH3/0LxFMi15c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"iMGmp043MaV6Sb30vNPi8QWA2So="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"RsL7MjP/HlHxVkrH3/0LxFMi15c=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"iMGmp043MaV6Sb30vNPi8QWA2So=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"VuBD3ipLJF3VhhDJnVxcLz9cPNA="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"iMGmp043MaV6Sb30vNPi8QWA2So=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"VuBD3ipLJF3VhhDJnVxcLz9cPNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"kTEUHaUGrZKqIftdm9W89c25/JY="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"VuBD3ipLJF3VhhDJnVxcLz9cPNA=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"kTEUHaUGrZKqIftdm9W89c25/JY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"wx8hprzRPqJlM7U5FzasL7imwFQ="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"kTEUHaUGrZKqIftdm9W89c25/JY=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T23:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"wx8hprzRPqJlM7U5FzasL7imwFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"co5i4UsS/wUeF+oTnPzOg3ikiQE="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"wx8hprzRPqJlM7U5FzasL7imwFQ=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"co5i4UsS/wUeF+oTnPzOg3ikiQE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"O/TNiyAPmG+IbQfDU8ACZXXOKA0="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"co5i4UsS/wUeF+oTnPzOg3ikiQE=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T23:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"O/TNiyAPmG+IbQfDU8ACZXXOKA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"VD6nehdvfe9mf79xstZWHbBielM="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"O/TNiyAPmG+IbQfDU8ACZXXOKA0=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"VD6nehdvfe9mf79xstZWHbBielM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"A0qw4EtdhTsNsN/sQusgOwoFeO4="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"VD6nehdvfe9mf79xstZWHbBielM=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T23:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"A0qw4EtdhTsNsN/sQusgOwoFeO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"dvLNZ9Xj6GbBy/98+hHbtKsSo2M="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"A0qw4EtdhTsNsN/sQusgOwoFeO4=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"dvLNZ9Xj6GbBy/98+hHbtKsSo2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"jKD0RCqFVqjZWtjo5k0rob5vwoA="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"dvLNZ9Xj6GbBy/98+hHbtKsSo2M=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T23:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"jKD0RCqFVqjZWtjo5k0rob5vwoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"KV79yL8NE0sVDk0nVkivXH8nJRk="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"jKD0RCqFVqjZWtjo5k0rob5vwoA=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"KV79yL8NE0sVDk0nVkivXH8nJRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"80WwwE1sMuZ/gP6j+VdG0cCUFAc="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"KV79yL8NE0sVDk0nVkivXH8nJRk=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T23:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"80WwwE1sMuZ/gP6j+VdG0cCUFAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="},{"type":"next-occurrence","id":"1lodgR7KrGNNT41V++PhqQAwZI4="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"80WwwE1sMuZ/gP6j+VdG0cCUFAc=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"1lodgR7KrGNNT41V++PhqQAwZI4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"59kVi9QpUIo+qy2rb6ZdT+qaboI="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"1lodgR7KrGNNT41V++PhqQAwZI4=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"G22tbeG1GO6xq/vGtCK+TulRIYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"N+8Xf1pAgcay7DZFbxn0Gg9TwB8="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"G22tbeG1GO6xq/vGtCK+TulRIYI=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"N+8Xf1pAgcay7DZFbxn0Gg9TwB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G22tbeG1GO6xq/vGtCK+TulRIYI="},{"type":"next-occurrence","id":"zCEbjrUwxtfRpPEKunsrtuQi60E="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"N+8Xf1pAgcay7DZFbxn0Gg9TwB8=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"zCEbjrUwxtfRpPEKunsrtuQi60E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G22tbeG1GO6xq/vGtCK+TulRIYI="},{"type":"next-occurrence","id":"/H23hga4GkI9NvVJDVXbN/H/OVA="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"zCEbjrUwxtfRpPEKunsrtuQi60E=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"/H23hga4GkI9NvVJDVXbN/H/OVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G22tbeG1GO6xq/vGtCK+TulRIYI="},{"type":"next-occurrence","id":"9GFuWoHRQgp78RoqzUE3xjxIj4s="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"/H23hga4GkI9NvVJDVXbN/H/OVA=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"9GFuWoHRQgp78RoqzUE3xjxIj4s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G22tbeG1GO6xq/vGtCK+TulRIYI="},{"type":"next-occurrence","id":"Bl3mlpRycw5E2ax8AcSFHr0ZyhE="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"9GFuWoHRQgp78RoqzUE3xjxIj4s=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"Bl3mlpRycw5E2ax8AcSFHr0ZyhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G22tbeG1GO6xq/vGtCK+TulRIYI="},{"type":"next-occurrence","id":"BIf94ccTAU9jpbA3h4zURsrt9vg="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"Bl3mlpRycw5E2ax8AcSFHr0ZyhE=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"BIf94ccTAU9jpbA3h4zURsrt9vg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G22tbeG1GO6xq/vGtCK+TulRIYI="},{"type":"next-occurrence","id":"609UQEslry9rRoG6sJC9yYAq4tY="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"BIf94ccTAU9jpbA3h4zURsrt9vg=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T23:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"609UQEslry9rRoG6sJC9yYAq4tY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G22tbeG1GO6xq/vGtCK+TulRIYI="},{"type":"next-occurrence","id":"VwyxGhRAGQ3ukmI8IHLBSR2+uP4="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"609UQEslry9rRoG6sJC9yYAq4tY=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T23:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"VwyxGhRAGQ3ukmI8IHLBSR2+uP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G22tbeG1GO6xq/vGtCK+TulRIYI="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"VwyxGhRAGQ3ukmI8IHLBSR2+uP4=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"a0tTcthaBRKO13A3r5qvKtjRmj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XNCamPg+0UkKmkiWU6y1ljpa/cM="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"a0tTcthaBRKO13A3r5qvKtjRmj0=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"XNCamPg+0UkKmkiWU6y1ljpa/cM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a0tTcthaBRKO13A3r5qvKtjRmj0="},{"type":"next-occurrence","id":"5pyB7rQTCf/IR5WW69ZQ0UTAWrA="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"XNCamPg+0UkKmkiWU6y1ljpa/cM=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"5pyB7rQTCf/IR5WW69ZQ0UTAWrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a0tTcthaBRKO13A3r5qvKtjRmj0="},{"type":"next-occurrence","id":"gV/1HrVdOgv2J5R9utfcexZlijw="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"5pyB7rQTCf/IR5WW69ZQ0UTAWrA=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"gV/1HrVdOgv2J5R9utfcexZlijw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a0tTcthaBRKO13A3r5qvKtjRmj0="},{"type":"next-occurrence","id":"u9lwEoF1vdoRcpZFr/b1Y1i9yM8="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"gV/1HrVdOgv2J5R9utfcexZlijw=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"u9lwEoF1vdoRcpZFr/b1Y1i9yM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a0tTcthaBRKO13A3r5qvKtjRmj0="},{"type":"next-occurrence","id":"E9x5wdrdXYurQ8rHS6vfGYSt6u8="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"u9lwEoF1vdoRcpZFr/b1Y1i9yM8=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"E9x5wdrdXYurQ8rHS6vfGYSt6u8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a0tTcthaBRKO13A3r5qvKtjRmj0="},{"type":"next-occurrence","id":"pA+QW2q6LuZapqh4GU1GTSKRf8I="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"E9x5wdrdXYurQ8rHS6vfGYSt6u8=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"pA+QW2q6LuZapqh4GU1GTSKRf8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a0tTcthaBRKO13A3r5qvKtjRmj0="},{"type":"next-occurrence","id":"JQSqk4rQvDJlUn6tBBi2zuR+4MQ="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"pA+QW2q6LuZapqh4GU1GTSKRf8I=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"JQSqk4rQvDJlUn6tBBi2zuR+4MQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a0tTcthaBRKO13A3r5qvKtjRmj0="},{"type":"next-occurrence","id":"tzaC6rS4YVW5VqwgYh97i5KKVq0="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"JQSqk4rQvDJlUn6tBBi2zuR+4MQ=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"tzaC6rS4YVW5VqwgYh97i5KKVq0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a0tTcthaBRKO13A3r5qvKtjRmj0="},{"type":"next-occurrence","id":"0ivp9LdCuMVuJmI6XNNI7RkmxJ0="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"tzaC6rS4YVW5VqwgYh97i5KKVq0=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"0ivp9LdCuMVuJmI6XNNI7RkmxJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a0tTcthaBRKO13A3r5qvKtjRmj0="},{"type":"next-occurrence","id":"7ALonQc6N7tjv2fA0EhHIwhpvc0="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"0ivp9LdCuMVuJmI6XNNI7RkmxJ0=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"7ALonQc6N7tjv2fA0EhHIwhpvc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a0tTcthaBRKO13A3r5qvKtjRmj0="},{"type":"next-occurrence","id":"A+3Id0cYyBEC5JYysdDWUA/x+0o="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"7ALonQc6N7tjv2fA0EhHIwhpvc0=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"A+3Id0cYyBEC5JYysdDWUA/x+0o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a0tTcthaBRKO13A3r5qvKtjRmj0="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"A+3Id0cYyBEC5JYysdDWUA/x+0o=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"YDwK51Ksk9WvVrmx5Bhi+2W64pc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XDMRkVEc35bA0xCiU3bwYRWITqc="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"YDwK51Ksk9WvVrmx5Bhi+2W64pc=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"XDMRkVEc35bA0xCiU3bwYRWITqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDwK51Ksk9WvVrmx5Bhi+2W64pc="},{"type":"next-occurrence","id":"SV/Dl23TfxR3A/cRElky6mAz4FA="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"XDMRkVEc35bA0xCiU3bwYRWITqc=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"SV/Dl23TfxR3A/cRElky6mAz4FA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDwK51Ksk9WvVrmx5Bhi+2W64pc="},{"type":"next-occurrence","id":"ZvFqOTKaY/T6NTcIIisO6rGVGiQ="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"SV/Dl23TfxR3A/cRElky6mAz4FA=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"ZvFqOTKaY/T6NTcIIisO6rGVGiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDwK51Ksk9WvVrmx5Bhi+2W64pc="},{"type":"next-occurrence","id":"hdyImgV4GrspH2Ot/0Osjhd3md4="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"ZvFqOTKaY/T6NTcIIisO6rGVGiQ=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T01:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"hdyImgV4GrspH2Ot/0Osjhd3md4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDwK51Ksk9WvVrmx5Bhi+2W64pc="},{"type":"next-occurrence","id":"eceux5DYI9RpYHO9yRxB1P/9dPg="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"hdyImgV4GrspH2Ot/0Osjhd3md4=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T01:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"eceux5DYI9RpYHO9yRxB1P/9dPg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDwK51Ksk9WvVrmx5Bhi+2W64pc="},{"type":"next-occurrence","id":"UntaiFnFUsgd8UdeMF61eUGviDI="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"eceux5DYI9RpYHO9yRxB1P/9dPg=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"UntaiFnFUsgd8UdeMF61eUGviDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDwK51Ksk9WvVrmx5Bhi+2W64pc="},{"type":"next-occurrence","id":"y54VPqr8edDcPTbOuBxK/CYJxDc="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"UntaiFnFUsgd8UdeMF61eUGviDI=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T01:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"y54VPqr8edDcPTbOuBxK/CYJxDc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDwK51Ksk9WvVrmx5Bhi+2W64pc="},{"type":"next-occurrence","id":"Ku0QQQ9jEPXLbRL0RBJ11jjqENM="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"y54VPqr8edDcPTbOuBxK/CYJxDc=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T01:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"Ku0QQQ9jEPXLbRL0RBJ11jjqENM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDwK51Ksk9WvVrmx5Bhi+2W64pc="},{"type":"next-occurrence","id":"u0sYG60b6Ip2ZXJ9ODdOus3wkS8="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"Ku0QQQ9jEPXLbRL0RBJ11jjqENM=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T01:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"u0sYG60b6Ip2ZXJ9ODdOus3wkS8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDwK51Ksk9WvVrmx5Bhi+2W64pc="},{"type":"next-occurrence","id":"eARJxo2j0Jx5ZAAOfgbJTyjMLsI="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"u0sYG60b6Ip2ZXJ9ODdOus3wkS8=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T01:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"eARJxo2j0Jx5ZAAOfgbJTyjMLsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDwK51Ksk9WvVrmx5Bhi+2W64pc="},{"type":"next-occurrence","id":"Jzb4GmunJQbugw/MFZEARR+m/4E="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"eARJxo2j0Jx5ZAAOfgbJTyjMLsI=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T01:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"Jzb4GmunJQbugw/MFZEARR+m/4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDwK51Ksk9WvVrmx5Bhi+2W64pc="},{"type":"next-occurrence","id":"wf43MdVIyMAlL9wpvZxZj4zPvWI="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"Jzb4GmunJQbugw/MFZEARR+m/4E=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T01:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"wf43MdVIyMAlL9wpvZxZj4zPvWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDwK51Ksk9WvVrmx5Bhi+2W64pc="},{"type":"next-occurrence","id":"18Iyu7v+bFSKnCnP14i3eySy0pk="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"wf43MdVIyMAlL9wpvZxZj4zPvWI=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"18Iyu7v+bFSKnCnP14i3eySy0pk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDwK51Ksk9WvVrmx5Bhi+2W64pc="},{"type":"next-occurrence","id":"sJ+EykJjzl+5MI8zgBFyOnDapa4="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"18Iyu7v+bFSKnCnP14i3eySy0pk=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T01:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"sJ+EykJjzl+5MI8zgBFyOnDapa4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDwK51Ksk9WvVrmx5Bhi+2W64pc="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"sJ+EykJjzl+5MI8zgBFyOnDapa4=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T01:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"rwyE5sbDKUeVZZJxFoygRJFM/Js=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+BwHbYuyIiGWTqaON2gmeGiq85g="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"rwyE5sbDKUeVZZJxFoygRJFM/Js=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"+BwHbYuyIiGWTqaON2gmeGiq85g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rwyE5sbDKUeVZZJxFoygRJFM/Js="},{"type":"next-occurrence","id":"OZYqCkMIdi079L+A+lx+2YltLeE="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"+BwHbYuyIiGWTqaON2gmeGiq85g=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"OZYqCkMIdi079L+A+lx+2YltLeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rwyE5sbDKUeVZZJxFoygRJFM/Js="},{"type":"next-occurrence","id":"m+RPZbjw4xYfxJm7eYuKd4xJD8E="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"OZYqCkMIdi079L+A+lx+2YltLeE=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"m+RPZbjw4xYfxJm7eYuKd4xJD8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rwyE5sbDKUeVZZJxFoygRJFM/Js="},{"type":"next-occurrence","id":"RNVz9GltoKM4l0MxuzBqxtOHMSk="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"m+RPZbjw4xYfxJm7eYuKd4xJD8E=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T01:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"RNVz9GltoKM4l0MxuzBqxtOHMSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rwyE5sbDKUeVZZJxFoygRJFM/Js="},{"type":"next-occurrence","id":"0m7EgJiPQbGLDldWeIRVn9LQXeg="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"RNVz9GltoKM4l0MxuzBqxtOHMSk=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T01:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"0m7EgJiPQbGLDldWeIRVn9LQXeg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rwyE5sbDKUeVZZJxFoygRJFM/Js="},{"type":"next-occurrence","id":"iWX1IZABOIkLadBHXkFNdLoShBw="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"0m7EgJiPQbGLDldWeIRVn9LQXeg=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"iWX1IZABOIkLadBHXkFNdLoShBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rwyE5sbDKUeVZZJxFoygRJFM/Js="},{"type":"next-occurrence","id":"d/fpubku/VnVWZ49FV6/sqn+U1s="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"iWX1IZABOIkLadBHXkFNdLoShBw=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T01:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"d/fpubku/VnVWZ49FV6/sqn+U1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rwyE5sbDKUeVZZJxFoygRJFM/Js="},{"type":"next-occurrence","id":"9+MieSY6j91I2jprb/LyvaBzykM="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"d/fpubku/VnVWZ49FV6/sqn+U1s=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T01:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"9+MieSY6j91I2jprb/LyvaBzykM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rwyE5sbDKUeVZZJxFoygRJFM/Js="},{"type":"next-occurrence","id":"MCKdI2ccQQ7eYCsAOebU9LlUI54="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"9+MieSY6j91I2jprb/LyvaBzykM=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T01:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"MCKdI2ccQQ7eYCsAOebU9LlUI54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rwyE5sbDKUeVZZJxFoygRJFM/Js="},{"type":"next-occurrence","id":"TETGUkC/LrRoOWScz7CULk3GB8A="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"MCKdI2ccQQ7eYCsAOebU9LlUI54=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T01:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"TETGUkC/LrRoOWScz7CULk3GB8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rwyE5sbDKUeVZZJxFoygRJFM/Js="},{"type":"next-occurrence","id":"dRjf/Ur6izdFzZ+bYtyfN5QAgi4="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"TETGUkC/LrRoOWScz7CULk3GB8A=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T01:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"dRjf/Ur6izdFzZ+bYtyfN5QAgi4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rwyE5sbDKUeVZZJxFoygRJFM/Js="},{"type":"next-occurrence","id":"B3llFEd25NOuZpVt1ohsDx7kb3Y="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"dRjf/Ur6izdFzZ+bYtyfN5QAgi4=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T01:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"B3llFEd25NOuZpVt1ohsDx7kb3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rwyE5sbDKUeVZZJxFoygRJFM/Js="},{"type":"next-occurrence","id":"Stx0KKFpUnf+feLQUqt55WdeXME="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"B3llFEd25NOuZpVt1ohsDx7kb3Y=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"Stx0KKFpUnf+feLQUqt55WdeXME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rwyE5sbDKUeVZZJxFoygRJFM/Js="},{"type":"next-occurrence","id":"Gnd+SptTRSEzAkmSQQnD3jRVmg8="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"Stx0KKFpUnf+feLQUqt55WdeXME=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T01:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"Gnd+SptTRSEzAkmSQQnD3jRVmg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rwyE5sbDKUeVZZJxFoygRJFM/Js="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"Gnd+SptTRSEzAkmSQQnD3jRVmg8=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T01:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"ODB9tVEQzMkaqUvTDJ8jlP8zvVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CSibMStsuUYx2DDhWtrQrkjlnfU="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"ODB9tVEQzMkaqUvTDJ8jlP8zvVE=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"CSibMStsuUYx2DDhWtrQrkjlnfU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODB9tVEQzMkaqUvTDJ8jlP8zvVE="},{"type":"next-occurrence","id":"CaJ5qPLRlWXUM9Dq1xfeoMBHwPg="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"CSibMStsuUYx2DDhWtrQrkjlnfU=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"CaJ5qPLRlWXUM9Dq1xfeoMBHwPg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODB9tVEQzMkaqUvTDJ8jlP8zvVE="},{"type":"next-occurrence","id":"SNC94njf2YXkjFwbcPxSLsuQqgg="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"CaJ5qPLRlWXUM9Dq1xfeoMBHwPg=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"SNC94njf2YXkjFwbcPxSLsuQqgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODB9tVEQzMkaqUvTDJ8jlP8zvVE="},{"type":"next-occurrence","id":"o+gtBqNNL2ifMahgcaCQdOy3d2s="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"SNC94njf2YXkjFwbcPxSLsuQqgg=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T01:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"o+gtBqNNL2ifMahgcaCQdOy3d2s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODB9tVEQzMkaqUvTDJ8jlP8zvVE="},{"type":"next-occurrence","id":"HJQiv9RS1KX459O8jbjT157JCsg="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"o+gtBqNNL2ifMahgcaCQdOy3d2s=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T01:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"HJQiv9RS1KX459O8jbjT157JCsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODB9tVEQzMkaqUvTDJ8jlP8zvVE="},{"type":"next-occurrence","id":"JwXHeRzwnZv48GyTXxXhEoa+7Fg="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"HJQiv9RS1KX459O8jbjT157JCsg=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"JwXHeRzwnZv48GyTXxXhEoa+7Fg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODB9tVEQzMkaqUvTDJ8jlP8zvVE="},{"type":"next-occurrence","id":"AaLi0ncKmhAWdPKxxGy/3Nde1iQ="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"JwXHeRzwnZv48GyTXxXhEoa+7Fg=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T01:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"AaLi0ncKmhAWdPKxxGy/3Nde1iQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODB9tVEQzMkaqUvTDJ8jlP8zvVE="},{"type":"next-occurrence","id":"52fjB9GMmUiBTGYa2oI+PQKJ4Do="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"AaLi0ncKmhAWdPKxxGy/3Nde1iQ=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T01:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"52fjB9GMmUiBTGYa2oI+PQKJ4Do=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODB9tVEQzMkaqUvTDJ8jlP8zvVE="},{"type":"next-occurrence","id":"LG4e7oIs3lYkUCW5L5MTLn7ehBM="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"52fjB9GMmUiBTGYa2oI+PQKJ4Do=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T01:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"LG4e7oIs3lYkUCW5L5MTLn7ehBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODB9tVEQzMkaqUvTDJ8jlP8zvVE="},{"type":"next-occurrence","id":"pXqvQbc76VkxCzodJVukKXC0WsE="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"LG4e7oIs3lYkUCW5L5MTLn7ehBM=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T01:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"pXqvQbc76VkxCzodJVukKXC0WsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODB9tVEQzMkaqUvTDJ8jlP8zvVE="},{"type":"next-occurrence","id":"YsFTRoqH4KKwG4ZRyr1IDKW9SHY="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"pXqvQbc76VkxCzodJVukKXC0WsE=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T01:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"YsFTRoqH4KKwG4ZRyr1IDKW9SHY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODB9tVEQzMkaqUvTDJ8jlP8zvVE="},{"type":"next-occurrence","id":"vfVRifH5ke10AflkUjnIRrGqLlY="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"YsFTRoqH4KKwG4ZRyr1IDKW9SHY=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T01:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"vfVRifH5ke10AflkUjnIRrGqLlY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODB9tVEQzMkaqUvTDJ8jlP8zvVE="},{"type":"next-occurrence","id":"yB600nYTf3UGgK6otqPkm+JOXyY="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"vfVRifH5ke10AflkUjnIRrGqLlY=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"yB600nYTf3UGgK6otqPkm+JOXyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODB9tVEQzMkaqUvTDJ8jlP8zvVE="},{"type":"next-occurrence","id":"U54Qzv2oLdiAHGvK09dpPJE+2Tw="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"yB600nYTf3UGgK6otqPkm+JOXyY=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T01:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"U54Qzv2oLdiAHGvK09dpPJE+2Tw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ODB9tVEQzMkaqUvTDJ8jlP8zvVE="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"U54Qzv2oLdiAHGvK09dpPJE+2Tw=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T01:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"z6TFsVDi+DnnCozMstubPjNpD8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on I-490 westbound at Bushnells Basin on ramp (Perinton) Exit 27 - I490 WB on ramp will be closed to all traffic beginning Monday March 30th. Detour will be posted Closure scheduled to be in place for the 2026 construction season. , Continuous Monday March 30th, 2026 07:00 AM thru Friday December 18th, 2026 05:00 PM All lanes closed ramp","update_date":"2026-04-13T14:42:36Z"},"road_event_id":"z6TFsVDi+DnnCozMstubPjNpD8o=","beginning_cross_street":"Bushnells Basin on ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.47116,43.057699]]}},{"id":"Ie/xbIk4mXIcjnLJO6nLZehKcX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on I-490 eastbound from Pittsford Palmyra Road; NY 31 (Perinton) to Bushnells Basin (Perinton) The I490 EB between Exit 26 to Exit 27. Both the EB lanes will be shifted to the right but staying in the EB travel direction beginning Monday March 30th. Lanes Shifts scheduled to be in place for the 2026 construction season., Continuous Monday March 30th, 2026 07:00 AM thru Friday December 18th, 2026 05:00 PM All lanes","update_date":"2026-04-13T14:40:48Z"},"road_event_id":"Ie/xbIk4mXIcjnLJO6nLZehKcX4=","beginning_cross_street":"Pittsford Palmyra Road; NY 31","ending_cross_street":"Bushnells Basin ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.485802,43.079325]]}},{"id":"zxemg3Ne+eXRkd2IDrpRZzzLnyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"arEMkTR8D0mTMFxOs/ffvopyPNg="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"zxemg3Ne+eXRkd2IDrpRZzzLnyM=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"arEMkTR8D0mTMFxOs/ffvopyPNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zxemg3Ne+eXRkd2IDrpRZzzLnyM="},{"type":"next-occurrence","id":"9wqwcCnMdjyv8E7V0/KU/FDWA9U="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"arEMkTR8D0mTMFxOs/ffvopyPNg=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:00:00Z","end_date":"2026-05-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"9wqwcCnMdjyv8E7V0/KU/FDWA9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zxemg3Ne+eXRkd2IDrpRZzzLnyM="},{"type":"next-occurrence","id":"yYtqngbhVmhHcZGe6DyJhZzmUso="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"9wqwcCnMdjyv8E7V0/KU/FDWA9U=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T04:00:00Z","end_date":"2026-05-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"yYtqngbhVmhHcZGe6DyJhZzmUso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zxemg3Ne+eXRkd2IDrpRZzzLnyM="},{"type":"next-occurrence","id":"BobEuoEC6EnNo661wcujj68jjYY="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"yYtqngbhVmhHcZGe6DyJhZzmUso=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:00:00Z","end_date":"2026-05-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"BobEuoEC6EnNo661wcujj68jjYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zxemg3Ne+eXRkd2IDrpRZzzLnyM="},{"type":"next-occurrence","id":"zZsryo+QJNwTIBSnGWDiNuHSSJ8="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"BobEuoEC6EnNo661wcujj68jjYY=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T04:00:00Z","end_date":"2026-05-17T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"zZsryo+QJNwTIBSnGWDiNuHSSJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zxemg3Ne+eXRkd2IDrpRZzzLnyM="},{"type":"next-occurrence","id":"Je8p0oSOpB13mRx4qgOJQtSjMWw="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"zZsryo+QJNwTIBSnGWDiNuHSSJ8=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T04:00:00Z","end_date":"2026-05-18T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"Je8p0oSOpB13mRx4qgOJQtSjMWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zxemg3Ne+eXRkd2IDrpRZzzLnyM="},{"type":"next-occurrence","id":"p4J8nfghXthcgCXddI5lk80ush0="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"Je8p0oSOpB13mRx4qgOJQtSjMWw=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T04:00:00Z","end_date":"2026-05-19T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"p4J8nfghXthcgCXddI5lk80ush0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zxemg3Ne+eXRkd2IDrpRZzzLnyM="},{"type":"next-occurrence","id":"cGwjqT2KpS82i+ffR/5Kkh+4adM="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"p4J8nfghXthcgCXddI5lk80ush0=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T04:00:00Z","end_date":"2026-05-20T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"cGwjqT2KpS82i+ffR/5Kkh+4adM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zxemg3Ne+eXRkd2IDrpRZzzLnyM="},{"type":"next-occurrence","id":"+RbvaSq5PKIakULaZvgYUhgh10I="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"cGwjqT2KpS82i+ffR/5Kkh+4adM=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T04:00:00Z","end_date":"2026-05-21T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"+RbvaSq5PKIakULaZvgYUhgh10I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zxemg3Ne+eXRkd2IDrpRZzzLnyM="},{"type":"next-occurrence","id":"rnIv1MwicHAH2E4xSRteZcNLeyU="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"+RbvaSq5PKIakULaZvgYUhgh10I=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T04:00:00Z","end_date":"2026-05-22T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"rnIv1MwicHAH2E4xSRteZcNLeyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zxemg3Ne+eXRkd2IDrpRZzzLnyM="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"rnIv1MwicHAH2E4xSRteZcNLeyU=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T04:00:00Z","end_date":"2026-05-23T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"efSj/KyT7QuWqLpgr2oJME4JuFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on PARK AVE northbound between E 128TH ST (New York) and E 129TH ST (New York) to erect the gantries for the Park Avenue Viaduct-northbound., Continuous Tuesday March 24th, 2026 12:00 AM thru Sunday June 21st, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T19:40:05Z"},"road_event_id":"efSj/KyT7QuWqLpgr2oJME4JuFA=","beginning_cross_street":"E 128TH ST","ending_cross_street":"E 129TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937448,40.807004]]}},{"id":"V5fbJ/ZOt0NZ88Ts2thXifVfVus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on PARK AVE northbound between E 129TH ST (New York) and E 130TH ST (New York) to erect the gantries for the Park Avenue Viaduct-northbound., Continuous Tuesday March 24th, 2026 12:00 AM thru Sunday June 21st, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T19:42:48Z"},"road_event_id":"V5fbJ/ZOt0NZ88Ts2thXifVfVus=","beginning_cross_street":"E 129TH ST","ending_cross_street":"E 130TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937017,40.807596]]}},{"id":"zFwbVG8R9NQK9LqrTfpT2upkNV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on PARK AVE northbound between E 130TH ST (New York) and E 131ST ST (New York) to erect the gantries for the Park Avenue Viaduct-northbound., Continuous Tuesday March 24th, 2026 12:00 AM thru Sunday June 21st, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T19:44:22Z"},"road_event_id":"zFwbVG8R9NQK9LqrTfpT2upkNV0=","beginning_cross_street":"E 130TH ST","ending_cross_street":"E 131ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936571,40.808209]]}},{"id":"n26hizFCxaQjJT/78P9GN/L/k88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OsPmcTftArF+x+BZfC+w2dofCw0="}],"description":"Bridge demolition on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Friday March 27th,2026 thru Friday May 22nd,2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-04-30T19:00:14Z"},"road_event_id":"n26hizFCxaQjJT/78P9GN/L/k88=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"OsPmcTftArF+x+BZfC+w2dofCw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n26hizFCxaQjJT/78P9GN/L/k88="},{"type":"next-occurrence","id":"FxSh2BnjaMv+mvq3936JhjQCa6M="}],"description":"Bridge demolition on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Friday March 27th,2026 thru Friday May 22nd,2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-04-30T19:00:14Z"},"road_event_id":"OsPmcTftArF+x+BZfC+w2dofCw0=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"FxSh2BnjaMv+mvq3936JhjQCa6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n26hizFCxaQjJT/78P9GN/L/k88="},{"type":"next-occurrence","id":"wL09j+yCiKKtl/Oc3C9dWsRB9kk="}],"description":"Bridge demolition on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Friday March 27th,2026 thru Friday May 22nd,2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-04-30T19:00:14Z"},"road_event_id":"FxSh2BnjaMv+mvq3936JhjQCa6M=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"wL09j+yCiKKtl/Oc3C9dWsRB9kk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n26hizFCxaQjJT/78P9GN/L/k88="},{"type":"next-occurrence","id":"RdeFXI0QhpRBzPE6Oh27A9xJL90="}],"description":"Bridge demolition on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Friday March 27th,2026 thru Friday May 22nd,2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-04-30T19:00:14Z"},"road_event_id":"wL09j+yCiKKtl/Oc3C9dWsRB9kk=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"RdeFXI0QhpRBzPE6Oh27A9xJL90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n26hizFCxaQjJT/78P9GN/L/k88="},{"type":"next-occurrence","id":"E3o3Q0+4NXbCzRQnZpVOwuYe31c="}],"description":"Bridge demolition on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Friday March 27th,2026 thru Friday May 22nd,2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-04-30T19:00:14Z"},"road_event_id":"RdeFXI0QhpRBzPE6Oh27A9xJL90=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"E3o3Q0+4NXbCzRQnZpVOwuYe31c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n26hizFCxaQjJT/78P9GN/L/k88="},{"type":"next-occurrence","id":"B1v5LoRIEYKCCSKONNe+dvLhu2o="}],"description":"Bridge demolition on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Friday March 27th,2026 thru Friday May 22nd,2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-04-30T19:00:14Z"},"road_event_id":"E3o3Q0+4NXbCzRQnZpVOwuYe31c=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"B1v5LoRIEYKCCSKONNe+dvLhu2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n26hizFCxaQjJT/78P9GN/L/k88="},{"type":"next-occurrence","id":"cu28kN4kTqDBAGiZD5TEyBdjF6Q="}],"description":"Bridge demolition on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Friday March 27th,2026 thru Friday May 22nd,2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-04-30T19:00:14Z"},"road_event_id":"B1v5LoRIEYKCCSKONNe+dvLhu2o=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"cu28kN4kTqDBAGiZD5TEyBdjF6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n26hizFCxaQjJT/78P9GN/L/k88="}],"description":"Bridge demolition on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Friday March 27th,2026 thru Friday May 22nd,2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-04-30T19:00:14Z"},"road_event_id":"cu28kN4kTqDBAGiZD5TEyBdjF6Q=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"ORO500046927","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark - World Trade Center"],"direction":"unknown","description":"Repairs on Newark - World Trade Center both directions between Harrison (Harrison) and Journal Square (Jersey City) There will be no service between Harrison & Journal Square stations, Shuttle bus service will be provided. Not currently Scheduled","update_date":"2026-04-27T09:00:21Z"},"road_event_id":"ORO500046927","beginning_cross_street":"Harrison","ending_cross_street":"Journal Square","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-25T17:18:21Z","end_date":"2026-04-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.1559,40.7394]]}},{"id":"BOvasWFsHh0YsiZrwlODu+Q6rkY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on WATER ST southbound between COLONIE ST (Albany) and ORANGE ST (Albany) left lane closure with temporary concrete barrier, Continuous Tuesday March 31st, 2026 12:00 AM thru Wednesday September 30th, 2026 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-22T19:17:53Z"},"road_event_id":"BOvasWFsHh0YsiZrwlODu+Q6rkY=","beginning_cross_street":"COLONIE ST","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.744117,42.656052]]}},{"id":"NoK9EeIB4XIgEe+WbuK6NdB1f6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DiHezHjdhH6q2/ppxF9NrrqGJT0="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:18Z"},"road_event_id":"NoK9EeIB4XIgEe+WbuK6NdB1f6M=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"DiHezHjdhH6q2/ppxF9NrrqGJT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NoK9EeIB4XIgEe+WbuK6NdB1f6M="},{"type":"next-occurrence","id":"rlTbVmR6zDHv13qkxW9mJ+/kW/o="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:18Z"},"road_event_id":"DiHezHjdhH6q2/ppxF9NrrqGJT0=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"rlTbVmR6zDHv13qkxW9mJ+/kW/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NoK9EeIB4XIgEe+WbuK6NdB1f6M="},{"type":"next-occurrence","id":"EI/ANhPPcQRm74x+RbI3vK9p/Xs="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:18Z"},"road_event_id":"rlTbVmR6zDHv13qkxW9mJ+/kW/o=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"EI/ANhPPcQRm74x+RbI3vK9p/Xs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NoK9EeIB4XIgEe+WbuK6NdB1f6M="},{"type":"next-occurrence","id":"etJ1IguBqVdNPY8BeLR/h8mAPFg="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:18Z"},"road_event_id":"EI/ANhPPcQRm74x+RbI3vK9p/Xs=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"etJ1IguBqVdNPY8BeLR/h8mAPFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NoK9EeIB4XIgEe+WbuK6NdB1f6M="},{"type":"next-occurrence","id":"PzWDdfD0DQW1m2OEAtFN2f5WWLA="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:18Z"},"road_event_id":"etJ1IguBqVdNPY8BeLR/h8mAPFg=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"PzWDdfD0DQW1m2OEAtFN2f5WWLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NoK9EeIB4XIgEe+WbuK6NdB1f6M="},{"type":"next-occurrence","id":"cctoAYaYx4Eo5howmH1ZxPkjCso="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:18Z"},"road_event_id":"PzWDdfD0DQW1m2OEAtFN2f5WWLA=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"cctoAYaYx4Eo5howmH1ZxPkjCso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NoK9EeIB4XIgEe+WbuK6NdB1f6M="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:18Z"},"road_event_id":"cctoAYaYx4Eo5howmH1ZxPkjCso=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"U2JDd/QM4/8xYZZl4udCL2fjUl8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Mid Hudson Bridge"],"direction":"unknown","related_road_events":[],"description":"Overnight roadwork on Mid Hudson Bridge both directions area of Dutchess County Side (Poughkeepsie) 6PM-6AM, Thursday March 26th, 2026 thru Monday August 31st, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-06T19:30:36Z"},"road_event_id":"U2JDd/QM4/8xYZZl4udCL2fjUl8=","beginning_cross_street":"Dutchess County Side","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.941247,41.702365]]}},{"id":"jn6u2j31iEljHovdkvo9SdkndZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"duXdVgzQVgZsLbACARcy4Q36yY0="}],"description":"Construction on NY 12B both directions between Harding Road; NY 233; Hamlet of Franklin Springs (Kirkland) and CR 15; Brimfield Street (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place between Furnace Street and Taylor Ave., Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:37:33Z"},"road_event_id":"jn6u2j31iEljHovdkvo9SdkndZ8=","beginning_cross_street":"Harding Road; NY 233; Hamlet of Franklin Springs","ending_cross_street":"CR 15; Brimfield Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.404403,43.032398]]}},{"id":"duXdVgzQVgZsLbACARcy4Q36yY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jn6u2j31iEljHovdkvo9SdkndZ8="},{"type":"next-occurrence","id":"BMWgS/2aYFUm37IoXqF75+Awqpk="}],"description":"Construction on NY 12B both directions between Harding Road; NY 233; Hamlet of Franklin Springs (Kirkland) and CR 15; Brimfield Street (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place between Furnace Street and Taylor Ave., Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:37:33Z"},"road_event_id":"duXdVgzQVgZsLbACARcy4Q36yY0=","beginning_cross_street":"Harding Road; NY 233; Hamlet of Franklin Springs","ending_cross_street":"CR 15; Brimfield Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.404403,43.032398]]}},{"id":"BMWgS/2aYFUm37IoXqF75+Awqpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jn6u2j31iEljHovdkvo9SdkndZ8="}],"description":"Construction on NY 12B both directions between Harding Road; NY 233; Hamlet of Franklin Springs (Kirkland) and CR 15; Brimfield Street (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place between Furnace Street and Taylor Ave., Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:37:33Z"},"road_event_id":"BMWgS/2aYFUm37IoXqF75+Awqpk=","beginning_cross_street":"Harding Road; NY 233; Hamlet of Franklin Springs","ending_cross_street":"CR 15; Brimfield Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.404403,43.032398]]}},{"id":"Q+z4q5CiYpZep4q6/yghl3iToOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 169"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on NY 169 both directions between Rockwell Road (Little Falls) and Eatonville Road (Little Falls) Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 169, Route 170 and Route 29, Continuous Monday March 30th, 2026 6:30 AM thru Tuesday June 30th, 2026 4:30 PM all lanes closed","update_date":"2026-04-24T11:08:49Z"},"road_event_id":"Q+z4q5CiYpZep4q6/yghl3iToOc=","beginning_cross_street":"Rockwell Road","ending_cross_street":"Eatonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.91903,43.0729]]}},{"id":"qU2FHYMtOvcArlOedqXySiuu8VA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 46 both directions between Center Street (Oneida) and Cobb Street Motorists will encounter a full road closure with a signed detour in place for the replacement of the bridge over I-90. The detour will utilize Route 365A, Route 365 and Route31, Continuous Monday March 30th, 2026 6:00 AM thru Wednesday November 25th, 2026 6:00 PM all lanes closed","update_date":"2026-03-30T15:41:21Z"},"road_event_id":"qU2FHYMtOvcArlOedqXySiuu8VA=","beginning_cross_street":"Center Street","ending_cross_street":"Cobb Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.664703,43.110298]]}},{"id":"oQjT1khshXik1DWC0ooR04Kh9eg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"g9GA/4oJkz4FVjTrTBfX5g8CjWI="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"oQjT1khshXik1DWC0ooR04Kh9eg=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"g9GA/4oJkz4FVjTrTBfX5g8CjWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oQjT1khshXik1DWC0ooR04Kh9eg="},{"type":"next-occurrence","id":"+pP6eLqbbOOb4eS/R+s9wNDes0I="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"g9GA/4oJkz4FVjTrTBfX5g8CjWI=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"+pP6eLqbbOOb4eS/R+s9wNDes0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oQjT1khshXik1DWC0ooR04Kh9eg="},{"type":"next-occurrence","id":"vaDGw5VFRFy5vi8jSNXGMZyDCbI="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"+pP6eLqbbOOb4eS/R+s9wNDes0I=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"vaDGw5VFRFy5vi8jSNXGMZyDCbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oQjT1khshXik1DWC0ooR04Kh9eg="},{"type":"next-occurrence","id":"nrTPoMmZ3tv8sTZW3wpfRFfAQzk="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"vaDGw5VFRFy5vi8jSNXGMZyDCbI=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"nrTPoMmZ3tv8sTZW3wpfRFfAQzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oQjT1khshXik1DWC0ooR04Kh9eg="},{"type":"next-occurrence","id":"yFL4qVvLhcR3QOtH2ORY9a9EGTY="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"nrTPoMmZ3tv8sTZW3wpfRFfAQzk=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"yFL4qVvLhcR3QOtH2ORY9a9EGTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oQjT1khshXik1DWC0ooR04Kh9eg="},{"type":"next-occurrence","id":"QNxPk5f2O/vT88yIPkXx8bpu+Mo="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"yFL4qVvLhcR3QOtH2ORY9a9EGTY=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"QNxPk5f2O/vT88yIPkXx8bpu+Mo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oQjT1khshXik1DWC0ooR04Kh9eg="},{"type":"next-occurrence","id":"EQ+D4xMX1UjhJOa8lMgKXPJQQpc="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"QNxPk5f2O/vT88yIPkXx8bpu+Mo=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"EQ+D4xMX1UjhJOa8lMgKXPJQQpc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oQjT1khshXik1DWC0ooR04Kh9eg="},{"type":"next-occurrence","id":"ESEKGMdIx5rA67FDv2cxhHGuPR0="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"EQ+D4xMX1UjhJOa8lMgKXPJQQpc=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"ESEKGMdIx5rA67FDv2cxhHGuPR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oQjT1khshXik1DWC0ooR04Kh9eg="},{"type":"next-occurrence","id":"mkaCSE9OUY+7cZfSV+bhYkypMPQ="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"ESEKGMdIx5rA67FDv2cxhHGuPR0=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"mkaCSE9OUY+7cZfSV+bhYkypMPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oQjT1khshXik1DWC0ooR04Kh9eg="},{"type":"next-occurrence","id":"oJXqQQk63NE89y78XGasjvBA7oU="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"mkaCSE9OUY+7cZfSV+bhYkypMPQ=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"oJXqQQk63NE89y78XGasjvBA7oU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oQjT1khshXik1DWC0ooR04Kh9eg="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"oJXqQQk63NE89y78XGasjvBA7oU=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"BrvzupKvLLUGOJPdkgfui3+x41w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["922A"],"direction":"unknown","related_road_events":[],"description":"Bridge work on 922A both directions between Main Street; Village of Whitesboro (Whitesboro) and Cavanaugh Road; CR 30; END ROUTE; NY 49 (Marcy) Motorists will encounter lane closures in both directions with temporary signals in place, Continuous Monday April 6th, 2026 7:00 AM thru Friday May 22nd, 2026 4:00 PM","update_date":"2026-05-08T11:38:37Z"},"road_event_id":"BrvzupKvLLUGOJPdkgfui3+x41w=","beginning_cross_street":"Main Street; Village of Whitesboro","ending_cross_street":"Cavanaugh Road; CR 30; END ROUTE; NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.277704,43.134706]]}},{"id":"vqfpflGc3qbdLIxgxZzdVoebM0s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on NY 22 both directions between Bedford Center Road (Bedford) and Maple Avenue (Katonah) D265557/32720109 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Monday April 6th, 2026 9:30 AM thru Friday May 15th, 2026 4:30 PM all lanes closed and detoured","update_date":"2026-04-14T00:22:18Z"},"road_event_id":"vqfpflGc3qbdLIxgxZzdVoebM0s=","beginning_cross_street":"Bedford Center Road","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-15T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.657478,41.219306]]}},{"id":"rzlxEEXp7YSUi8FbzhBa8RefnHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tzLoOS0OLklZ+36BHYKK+oSZ21Y="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-30T19:31:16Z"},"road_event_id":"rzlxEEXp7YSUi8FbzhBa8RefnHQ=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"tzLoOS0OLklZ+36BHYKK+oSZ21Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rzlxEEXp7YSUi8FbzhBa8RefnHQ="},{"type":"next-occurrence","id":"rhP1i38Rh71mk8K26oo3tEJ31Wo="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-30T19:31:16Z"},"road_event_id":"tzLoOS0OLklZ+36BHYKK+oSZ21Y=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"rhP1i38Rh71mk8K26oo3tEJ31Wo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rzlxEEXp7YSUi8FbzhBa8RefnHQ="},{"type":"next-occurrence","id":"nRLpIH9Qbh5CVXxmPvXa0FqeslI="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-30T19:31:16Z"},"road_event_id":"rhP1i38Rh71mk8K26oo3tEJ31Wo=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"nRLpIH9Qbh5CVXxmPvXa0FqeslI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rzlxEEXp7YSUi8FbzhBa8RefnHQ="},{"type":"next-occurrence","id":"MZBF9Znzoo0GsHI6VlDyo5PTdCw="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-30T19:31:16Z"},"road_event_id":"nRLpIH9Qbh5CVXxmPvXa0FqeslI=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:30:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"MZBF9Znzoo0GsHI6VlDyo5PTdCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rzlxEEXp7YSUi8FbzhBa8RefnHQ="},{"type":"next-occurrence","id":"s6aCEM33ARzCLeeOKVqqQTVxgV4="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-30T19:31:16Z"},"road_event_id":"MZBF9Znzoo0GsHI6VlDyo5PTdCw=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:30:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"s6aCEM33ARzCLeeOKVqqQTVxgV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rzlxEEXp7YSUi8FbzhBa8RefnHQ="},{"type":"next-occurrence","id":"AZBFdXTs1I+FEh0A4ALFynJU71o="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-30T19:31:16Z"},"road_event_id":"s6aCEM33ARzCLeeOKVqqQTVxgV4=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:30:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"AZBFdXTs1I+FEh0A4ALFynJU71o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rzlxEEXp7YSUi8FbzhBa8RefnHQ="},{"type":"next-occurrence","id":"oemGafVEdL3emng3NWAv3dOE6ss="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-30T19:31:16Z"},"road_event_id":"AZBFdXTs1I+FEh0A4ALFynJU71o=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:30:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"oemGafVEdL3emng3NWAv3dOE6ss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rzlxEEXp7YSUi8FbzhBa8RefnHQ="},{"type":"next-occurrence","id":"fpSDMGVlhxaqoTXb4LnfAaM9zkw="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-30T19:31:16Z"},"road_event_id":"oemGafVEdL3emng3NWAv3dOE6ss=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:30:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"fpSDMGVlhxaqoTXb4LnfAaM9zkw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rzlxEEXp7YSUi8FbzhBa8RefnHQ="},{"type":"next-occurrence","id":"p21Up11Z51mKbYunu7Z+4KNf1zo="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-30T19:31:16Z"},"road_event_id":"fpSDMGVlhxaqoTXb4LnfAaM9zkw=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:30:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"p21Up11Z51mKbYunu7Z+4KNf1zo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rzlxEEXp7YSUi8FbzhBa8RefnHQ="},{"type":"next-occurrence","id":"wd0BwUuEjT6cDlr/GHK47ARZCpk="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-30T19:31:16Z"},"road_event_id":"p21Up11Z51mKbYunu7Z+4KNf1zo=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:30:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"wd0BwUuEjT6cDlr/GHK47ARZCpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rzlxEEXp7YSUi8FbzhBa8RefnHQ="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-30T19:31:16Z"},"road_event_id":"wd0BwUuEjT6cDlr/GHK47ARZCpk=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:30:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"uaZe5a5tv2GgNsp0HlpTCwb8zfU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mlPTR11SSFj/kSepFhKPHKI9E/A="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"uaZe5a5tv2GgNsp0HlpTCwb8zfU=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715238,41.019747]]}},{"id":"mlPTR11SSFj/kSepFhKPHKI9E/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uaZe5a5tv2GgNsp0HlpTCwb8zfU="},{"type":"next-occurrence","id":"8fuv/9kJK8D1qVa1cw2m2wQOTls="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"mlPTR11SSFj/kSepFhKPHKI9E/A=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715238,41.019747]]}},{"id":"8fuv/9kJK8D1qVa1cw2m2wQOTls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uaZe5a5tv2GgNsp0HlpTCwb8zfU="},{"type":"next-occurrence","id":"gboQ7ffx96cqZACf1ji97QBw5yk="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"8fuv/9kJK8D1qVa1cw2m2wQOTls=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715238,41.019747]]}},{"id":"gboQ7ffx96cqZACf1ji97QBw5yk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uaZe5a5tv2GgNsp0HlpTCwb8zfU="},{"type":"next-occurrence","id":"8Z81H4SVH28MNrSQBZPfDjU63EM="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"gboQ7ffx96cqZACf1ji97QBw5yk=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T14:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715238,41.019747]]}},{"id":"8Z81H4SVH28MNrSQBZPfDjU63EM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uaZe5a5tv2GgNsp0HlpTCwb8zfU="},{"type":"next-occurrence","id":"I2J+Q5OvZ4uPI6IQ2RT9J1rdC6Y="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"8Z81H4SVH28MNrSQBZPfDjU63EM=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T14:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715238,41.019747]]}},{"id":"I2J+Q5OvZ4uPI6IQ2RT9J1rdC6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uaZe5a5tv2GgNsp0HlpTCwb8zfU="},{"type":"next-occurrence","id":"GC4NfL96zF4BK3YT/BDD2dgBN+M="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"I2J+Q5OvZ4uPI6IQ2RT9J1rdC6Y=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T14:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715238,41.019747]]}},{"id":"GC4NfL96zF4BK3YT/BDD2dgBN+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uaZe5a5tv2GgNsp0HlpTCwb8zfU="},{"type":"next-occurrence","id":"juTd+B8ag59qUibxZiVqC5TD2pU="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"GC4NfL96zF4BK3YT/BDD2dgBN+M=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T14:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715238,41.019747]]}},{"id":"juTd+B8ag59qUibxZiVqC5TD2pU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uaZe5a5tv2GgNsp0HlpTCwb8zfU="},{"type":"next-occurrence","id":"AOD5SCeSw2klnCtWf215UOb8Q5M="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"juTd+B8ag59qUibxZiVqC5TD2pU=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715238,41.019747]]}},{"id":"AOD5SCeSw2klnCtWf215UOb8Q5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uaZe5a5tv2GgNsp0HlpTCwb8zfU="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"AOD5SCeSw2klnCtWf215UOb8Q5M=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715238,41.019747]]}},{"id":"+8FV5QmFOM2ATMXzX51RPydqbRg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6uW7SF3QOTkPfww1V0kIjptpVTs="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, right lane closure","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"+8FV5QmFOM2ATMXzX51RPydqbRg=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653387,41.344676]]}},{"id":"6uW7SF3QOTkPfww1V0kIjptpVTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+8FV5QmFOM2ATMXzX51RPydqbRg="},{"type":"next-occurrence","id":"x4iuD6MiwO2i69ZcMHydMdMiXfU="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, right lane closure","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"6uW7SF3QOTkPfww1V0kIjptpVTs=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653387,41.344676]]}},{"id":"x4iuD6MiwO2i69ZcMHydMdMiXfU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+8FV5QmFOM2ATMXzX51RPydqbRg="},{"type":"next-occurrence","id":"u6hWk2IAZpgDT0obo7MNs3KdoLo="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, right lane closure","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"x4iuD6MiwO2i69ZcMHydMdMiXfU=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653387,41.344676]]}},{"id":"u6hWk2IAZpgDT0obo7MNs3KdoLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+8FV5QmFOM2ATMXzX51RPydqbRg="},{"type":"next-occurrence","id":"0FGp/PLh96M1OnSRGjTXgY5EId0="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, right lane closure","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"u6hWk2IAZpgDT0obo7MNs3KdoLo=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T14:00:00Z","end_date":"2026-05-18T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653387,41.344676]]}},{"id":"0FGp/PLh96M1OnSRGjTXgY5EId0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+8FV5QmFOM2ATMXzX51RPydqbRg="},{"type":"next-occurrence","id":"lxRL9j9nzdNoeNg5aDDTZDOqs3I="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, right lane closure","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"0FGp/PLh96M1OnSRGjTXgY5EId0=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T14:00:00Z","end_date":"2026-05-19T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653387,41.344676]]}},{"id":"lxRL9j9nzdNoeNg5aDDTZDOqs3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+8FV5QmFOM2ATMXzX51RPydqbRg="},{"type":"next-occurrence","id":"pvX6Dk4j1nKnoQp8zbqo2Ud77j0="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, right lane closure","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"lxRL9j9nzdNoeNg5aDDTZDOqs3I=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T14:00:00Z","end_date":"2026-05-20T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653387,41.344676]]}},{"id":"pvX6Dk4j1nKnoQp8zbqo2Ud77j0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+8FV5QmFOM2ATMXzX51RPydqbRg="},{"type":"next-occurrence","id":"nBcOhXNhIgoS62w4xLxOiOf9slo="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, right lane closure","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"pvX6Dk4j1nKnoQp8zbqo2Ud77j0=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T14:00:00Z","end_date":"2026-05-21T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653387,41.344676]]}},{"id":"nBcOhXNhIgoS62w4xLxOiOf9slo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+8FV5QmFOM2ATMXzX51RPydqbRg="},{"type":"next-occurrence","id":"dvBZv5FkcIEGwjlZJfEuQBM1z8E="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, right lane closure","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"nBcOhXNhIgoS62w4xLxOiOf9slo=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653387,41.344676]]}},{"id":"dvBZv5FkcIEGwjlZJfEuQBM1z8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+8FV5QmFOM2ATMXzX51RPydqbRg="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, right lane closure","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"dvBZv5FkcIEGwjlZJfEuQBM1z8E=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653387,41.344676]]}},{"id":"AW7HOLpxwVeJLCQ8dRq/yzMGv/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9zInZt2p5ldls7xrzNMHpzq7z2U="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"AW7HOLpxwVeJLCQ8dRq/yzMGv/4=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - Railroad Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677339,41.249824]]}},{"id":"9zInZt2p5ldls7xrzNMHpzq7z2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AW7HOLpxwVeJLCQ8dRq/yzMGv/4="},{"type":"next-occurrence","id":"YNyMbCwBnPE7d0kXtJMkS/M7ddw="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"9zInZt2p5ldls7xrzNMHpzq7z2U=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - Railroad Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677339,41.249824]]}},{"id":"YNyMbCwBnPE7d0kXtJMkS/M7ddw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AW7HOLpxwVeJLCQ8dRq/yzMGv/4="},{"type":"next-occurrence","id":"H6jEGWYEBTi8SMYXPqe8+7Zf55Y="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"YNyMbCwBnPE7d0kXtJMkS/M7ddw=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - Railroad Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677339,41.249824]]}},{"id":"H6jEGWYEBTi8SMYXPqe8+7Zf55Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AW7HOLpxwVeJLCQ8dRq/yzMGv/4="},{"type":"next-occurrence","id":"OBLZ1IMZPWQ6e7V+5FOpl+icl2U="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"H6jEGWYEBTi8SMYXPqe8+7Zf55Y=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - Railroad Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T14:00:00Z","end_date":"2026-05-18T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677339,41.249824]]}},{"id":"OBLZ1IMZPWQ6e7V+5FOpl+icl2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AW7HOLpxwVeJLCQ8dRq/yzMGv/4="},{"type":"next-occurrence","id":"q6lzF0FOkfebA1snEJn7f9Ju/BQ="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"OBLZ1IMZPWQ6e7V+5FOpl+icl2U=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - Railroad Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T14:00:00Z","end_date":"2026-05-19T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677339,41.249824]]}},{"id":"q6lzF0FOkfebA1snEJn7f9Ju/BQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AW7HOLpxwVeJLCQ8dRq/yzMGv/4="},{"type":"next-occurrence","id":"PTNaA3UZCu/cHyNO/kXVR6bk1kg="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"q6lzF0FOkfebA1snEJn7f9Ju/BQ=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - Railroad Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T14:00:00Z","end_date":"2026-05-20T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677339,41.249824]]}},{"id":"PTNaA3UZCu/cHyNO/kXVR6bk1kg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AW7HOLpxwVeJLCQ8dRq/yzMGv/4="},{"type":"next-occurrence","id":"mwSMsnHpUSG2xn2rVxEfDgtZlnE="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"PTNaA3UZCu/cHyNO/kXVR6bk1kg=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - Railroad Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T14:00:00Z","end_date":"2026-05-21T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677339,41.249824]]}},{"id":"mwSMsnHpUSG2xn2rVxEfDgtZlnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AW7HOLpxwVeJLCQ8dRq/yzMGv/4="},{"type":"next-occurrence","id":"KpYtKImUH8GJL+3H481U9EPMJqk="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"mwSMsnHpUSG2xn2rVxEfDgtZlnE=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - Railroad Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677339,41.249824]]}},{"id":"KpYtKImUH8GJL+3H481U9EPMJqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AW7HOLpxwVeJLCQ8dRq/yzMGv/4="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-04-30T23:00:46Z"},"road_event_id":"KpYtKImUH8GJL+3H481U9EPMJqk=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - Railroad Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677339,41.249824]]}},{"id":"6MShs1LjS03x0A7Ha78psLyjMWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on I-87 Northway northbound Off-ramp Exit 32 -Garvey Mill Road (Lewis) Exit 32 off-ramp closed as well as a left lane closure on the ramp bridge over Spruce Mill Brook. Traffic re-routing through the rest area on to right lane of the bridge over Spruce Mill Brook., Continuous Monday April 13th, 2026 08:00 AM thru Friday November 13th, 2026 04:00 PM All lanes closed","update_date":"2026-03-31T17:55:20Z"},"road_event_id":"6MShs1LjS03x0A7Ha78psLyjMWs=","beginning_cross_street":"Exit 32 -Garvey Mill Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.530483,44.281811]]}},{"id":"aXcpNaebFQ7Yp+fuv0Dv+zrZDVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vQh9cFjn4HQ+HZ3f5pyzTe+vxG0="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"aXcpNaebFQ7Yp+fuv0Dv+zrZDVo=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"vQh9cFjn4HQ+HZ3f5pyzTe+vxG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aXcpNaebFQ7Yp+fuv0Dv+zrZDVo="},{"type":"next-occurrence","id":"pOc9LeKBOB+LVRf0FTU5MyNFbjA="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"vQh9cFjn4HQ+HZ3f5pyzTe+vxG0=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"pOc9LeKBOB+LVRf0FTU5MyNFbjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aXcpNaebFQ7Yp+fuv0Dv+zrZDVo="},{"type":"next-occurrence","id":"v0nS6C5J59dtRoGhg06OgQuCbYc="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"pOc9LeKBOB+LVRf0FTU5MyNFbjA=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:00:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"v0nS6C5J59dtRoGhg06OgQuCbYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aXcpNaebFQ7Yp+fuv0Dv+zrZDVo="},{"type":"next-occurrence","id":"80zEWJtkKdCpaz1ZoiLSagwwbgg="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"v0nS6C5J59dtRoGhg06OgQuCbYc=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T03:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"80zEWJtkKdCpaz1ZoiLSagwwbgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aXcpNaebFQ7Yp+fuv0Dv+zrZDVo="},{"type":"next-occurrence","id":"cL6OrkfLTvpAabfjnPjkeEta9Wo="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"80zEWJtkKdCpaz1ZoiLSagwwbgg=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T03:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"cL6OrkfLTvpAabfjnPjkeEta9Wo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aXcpNaebFQ7Yp+fuv0Dv+zrZDVo="},{"type":"next-occurrence","id":"a+CPgfkDaITF9DtADEr/1zfMU2s="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"cL6OrkfLTvpAabfjnPjkeEta9Wo=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T03:00:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"a+CPgfkDaITF9DtADEr/1zfMU2s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aXcpNaebFQ7Yp+fuv0Dv+zrZDVo="},{"type":"next-occurrence","id":"Yqaj+Z7F5+Hmix6Qn+qaIbjsVeg="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"a+CPgfkDaITF9DtADEr/1zfMU2s=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T03:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"Yqaj+Z7F5+Hmix6Qn+qaIbjsVeg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aXcpNaebFQ7Yp+fuv0Dv+zrZDVo="},{"type":"next-occurrence","id":"xnoHpy5OigxefgcFG2lTCyTrN/U="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"Yqaj+Z7F5+Hmix6Qn+qaIbjsVeg=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T03:00:00Z","end_date":"2026-05-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"xnoHpy5OigxefgcFG2lTCyTrN/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aXcpNaebFQ7Yp+fuv0Dv+zrZDVo="},{"type":"next-occurrence","id":"mz/ll+1YNYA8lhJ7maNSEe/ib5Y="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"xnoHpy5OigxefgcFG2lTCyTrN/U=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T03:00:00Z","end_date":"2026-05-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"mz/ll+1YNYA8lhJ7maNSEe/ib5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aXcpNaebFQ7Yp+fuv0Dv+zrZDVo="},{"type":"next-occurrence","id":"HxnNp9oiMDTkTliwo+iiip8KaYU="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"mz/ll+1YNYA8lhJ7maNSEe/ib5Y=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T03:00:00Z","end_date":"2026-05-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"HxnNp9oiMDTkTliwo+iiip8KaYU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aXcpNaebFQ7Yp+fuv0Dv+zrZDVo="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"HxnNp9oiMDTkTliwo+iiip8KaYU=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T03:00:00Z","end_date":"2026-05-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"s8CSeQHcFc+v5FBnqIsUBOd7cBY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8m6ekDafBeyKXW+G+zBvP0pCZG0="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"s8CSeQHcFc+v5FBnqIsUBOd7cBY=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"8m6ekDafBeyKXW+G+zBvP0pCZG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s8CSeQHcFc+v5FBnqIsUBOd7cBY="},{"type":"next-occurrence","id":"VUU9cwYSGLXtSK99FZbqmyhMOGM="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"8m6ekDafBeyKXW+G+zBvP0pCZG0=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"VUU9cwYSGLXtSK99FZbqmyhMOGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s8CSeQHcFc+v5FBnqIsUBOd7cBY="},{"type":"next-occurrence","id":"6kC1tIr6ySOKK7QlEG3nlxpQ/zs="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"VUU9cwYSGLXtSK99FZbqmyhMOGM=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"6kC1tIr6ySOKK7QlEG3nlxpQ/zs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s8CSeQHcFc+v5FBnqIsUBOd7cBY="},{"type":"next-occurrence","id":"078C3jYxJnckvsmAxUbC5fU+3sc="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"6kC1tIr6ySOKK7QlEG3nlxpQ/zs=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:30:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"078C3jYxJnckvsmAxUbC5fU+3sc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s8CSeQHcFc+v5FBnqIsUBOd7cBY="},{"type":"next-occurrence","id":"HbIHirr2c2WvzVDnhyAsRjZTwzY="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"078C3jYxJnckvsmAxUbC5fU+3sc=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:30:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"HbIHirr2c2WvzVDnhyAsRjZTwzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s8CSeQHcFc+v5FBnqIsUBOd7cBY="},{"type":"next-occurrence","id":"QtDUSb698Y2145AzMlbOANhbG9c="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"HbIHirr2c2WvzVDnhyAsRjZTwzY=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:30:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"QtDUSb698Y2145AzMlbOANhbG9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s8CSeQHcFc+v5FBnqIsUBOd7cBY="},{"type":"next-occurrence","id":"veO3xgWQB1Rx8Mei0zhysIBmWfI="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"QtDUSb698Y2145AzMlbOANhbG9c=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:30:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"veO3xgWQB1Rx8Mei0zhysIBmWfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s8CSeQHcFc+v5FBnqIsUBOd7cBY="},{"type":"next-occurrence","id":"e0XZNh9MdLBXkcB9P9V8He1Eqwo="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"veO3xgWQB1Rx8Mei0zhysIBmWfI=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:30:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"e0XZNh9MdLBXkcB9P9V8He1Eqwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s8CSeQHcFc+v5FBnqIsUBOd7cBY="},{"type":"next-occurrence","id":"rHyuS+GhMHnaBDZOwnBJuR4jmA8="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"e0XZNh9MdLBXkcB9P9V8He1Eqwo=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:30:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"rHyuS+GhMHnaBDZOwnBJuR4jmA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s8CSeQHcFc+v5FBnqIsUBOd7cBY="},{"type":"next-occurrence","id":"7CcDu6PPRrMrc8lN79PwxYX5o2E="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"rHyuS+GhMHnaBDZOwnBJuR4jmA8=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:30:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"7CcDu6PPRrMrc8lN79PwxYX5o2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s8CSeQHcFc+v5FBnqIsUBOd7cBY="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"7CcDu6PPRrMrc8lN79PwxYX5o2E=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:30:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"oOKlc3u183PDk5VAlDL9T9MBeGw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 84TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"soIRdBw5q3cweh/DpeuYj+3LJaY="}],"description":"Construction on W 84TH ST eastbound between AMSTERDAM AVE (New York) and COLUMBUS AVE (New York) for system upgrade., Saturday April 4th, 2026 thru Saturday August 29th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday August 30th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:30:31Z"},"road_event_id":"oOKlc3u183PDk5VAlDL9T9MBeGw=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97584,40.78631]]}},{"id":"soIRdBw5q3cweh/DpeuYj+3LJaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oOKlc3u183PDk5VAlDL9T9MBeGw="},{"type":"next-occurrence","id":"97JTU9DNkD0+vkYzg4ABg8/WzZ0="}],"description":"Construction on W 84TH ST eastbound between AMSTERDAM AVE (New York) and COLUMBUS AVE (New York) for system upgrade., Saturday April 4th, 2026 thru Saturday August 29th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday August 30th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:30:31Z"},"road_event_id":"soIRdBw5q3cweh/DpeuYj+3LJaY=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97584,40.78631]]}},{"id":"97JTU9DNkD0+vkYzg4ABg8/WzZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oOKlc3u183PDk5VAlDL9T9MBeGw="},{"type":"next-occurrence","id":"h1/6CPRQ7WdSpL8BpfjfFYWdLpI="}],"description":"Construction on W 84TH ST eastbound between AMSTERDAM AVE (New York) and COLUMBUS AVE (New York) for system upgrade., Saturday April 4th, 2026 thru Saturday August 29th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday August 30th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:30:31Z"},"road_event_id":"97JTU9DNkD0+vkYzg4ABg8/WzZ0=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97584,40.78631]]}},{"id":"h1/6CPRQ7WdSpL8BpfjfFYWdLpI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oOKlc3u183PDk5VAlDL9T9MBeGw="}],"description":"Construction on W 84TH ST eastbound between AMSTERDAM AVE (New York) and COLUMBUS AVE (New York) for system upgrade., Saturday April 4th, 2026 thru Saturday August 29th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday August 30th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:30:31Z"},"road_event_id":"h1/6CPRQ7WdSpL8BpfjfFYWdLpI=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97584,40.78631]]}},{"id":"aCA4VJWdqVatSC7X22hAaKTTfTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Longterm construction on I-490 westbound between Exit 27 - NY 96 (Perinton) and Exit 26 - NY 31 (Pittsford), Continuous Saturday April 4th, 2026 07:00 AM thru Friday December 18th, 2026 05:00 PM All lanes shift","update_date":"2026-03-31T17:42:31Z"},"road_event_id":"aCA4VJWdqVatSC7X22hAaKTTfTY=","beginning_cross_street":"Exit 27 - NY 96","ending_cross_street":"Exit 26 - NY 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.471156,43.057095]]}},{"id":"r3dAcCH6OyXurPeklxgBgEApMvc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RECTOR ST"],"direction":"unknown","related_road_events":[],"description":"Construction on RECTOR ST eastbound between TRINITY PL (New York) and BROADWAY (New York) for DDC reconstruction project utility installation., Continuous Tuesday March 31st, 2026 12:00 AM thru Sunday May 31st, 2026 11:59 PM All lanes closed","update_date":"2026-04-29T19:26:12Z"},"road_event_id":"r3dAcCH6OyXurPeklxgBgEApMvc=","beginning_cross_street":"TRINITY PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.012918,40.707751]]}},{"id":"tPvLNLHtPtszEcnEhI1RLshnwZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JkLWSCAJCzkhgyeO1xQKxtWwnlM="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:28:04Z"},"road_event_id":"tPvLNLHtPtszEcnEhI1RLshnwZY=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"JkLWSCAJCzkhgyeO1xQKxtWwnlM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPvLNLHtPtszEcnEhI1RLshnwZY="},{"type":"next-occurrence","id":"sPyAgpq/59q3Rne1pkRA2vQ9nVQ="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:28:04Z"},"road_event_id":"JkLWSCAJCzkhgyeO1xQKxtWwnlM=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"sPyAgpq/59q3Rne1pkRA2vQ9nVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPvLNLHtPtszEcnEhI1RLshnwZY="},{"type":"next-occurrence","id":"agazsLjJLm6cpvOAm0ApB8gXZNQ="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:28:04Z"},"road_event_id":"sPyAgpq/59q3Rne1pkRA2vQ9nVQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"agazsLjJLm6cpvOAm0ApB8gXZNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPvLNLHtPtszEcnEhI1RLshnwZY="},{"type":"next-occurrence","id":"WCxUuVGr/Iy3uEQVc9LtBUL1oqU="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:28:04Z"},"road_event_id":"agazsLjJLm6cpvOAm0ApB8gXZNQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"WCxUuVGr/Iy3uEQVc9LtBUL1oqU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPvLNLHtPtszEcnEhI1RLshnwZY="},{"type":"next-occurrence","id":"qqT86rpzkvKysnMLoalzH44YFi8="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:28:04Z"},"road_event_id":"WCxUuVGr/Iy3uEQVc9LtBUL1oqU=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"qqT86rpzkvKysnMLoalzH44YFi8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPvLNLHtPtszEcnEhI1RLshnwZY="},{"type":"next-occurrence","id":"Jc94Sqx1+rySu+l+ePAbOq3enLA="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:28:04Z"},"road_event_id":"qqT86rpzkvKysnMLoalzH44YFi8=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"Jc94Sqx1+rySu+l+ePAbOq3enLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPvLNLHtPtszEcnEhI1RLshnwZY="},{"type":"next-occurrence","id":"9kxN8W0B8jYP7dTTqzpQBH6ltWg="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:28:04Z"},"road_event_id":"Jc94Sqx1+rySu+l+ePAbOq3enLA=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"9kxN8W0B8jYP7dTTqzpQBH6ltWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPvLNLHtPtszEcnEhI1RLshnwZY="},{"type":"next-occurrence","id":"67GWdfY/0RUQHC0AGV0rZZBH+O0="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:28:04Z"},"road_event_id":"9kxN8W0B8jYP7dTTqzpQBH6ltWg=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"67GWdfY/0RUQHC0AGV0rZZBH+O0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPvLNLHtPtszEcnEhI1RLshnwZY="},{"type":"next-occurrence","id":"JY0nKSmaKt0fIc41I916c/m+UcY="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:28:04Z"},"road_event_id":"67GWdfY/0RUQHC0AGV0rZZBH+O0=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"JY0nKSmaKt0fIc41I916c/m+UcY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPvLNLHtPtszEcnEhI1RLshnwZY="},{"type":"next-occurrence","id":"qM/v25hkQCvLDsMlBDttSpe5GoU="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:28:04Z"},"road_event_id":"JY0nKSmaKt0fIc41I916c/m+UcY=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"qM/v25hkQCvLDsMlBDttSpe5GoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPvLNLHtPtszEcnEhI1RLshnwZY="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:28:04Z"},"road_event_id":"qM/v25hkQCvLDsMlBDttSpe5GoU=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"1omRc4zreJE9KGdhCnw1niO27Ps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"azWPihyZf9FsLu53kxD6XbkgmMw="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"1omRc4zreJE9KGdhCnw1niO27Ps=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"azWPihyZf9FsLu53kxD6XbkgmMw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1omRc4zreJE9KGdhCnw1niO27Ps="},{"type":"next-occurrence","id":"an3yw0PR/Ygf0AJLViD9XvOCWaU="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"azWPihyZf9FsLu53kxD6XbkgmMw=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"an3yw0PR/Ygf0AJLViD9XvOCWaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1omRc4zreJE9KGdhCnw1niO27Ps="},{"type":"next-occurrence","id":"o5BjPfipHASA0rTlOiY+xt1LjzI="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"an3yw0PR/Ygf0AJLViD9XvOCWaU=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"o5BjPfipHASA0rTlOiY+xt1LjzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1omRc4zreJE9KGdhCnw1niO27Ps="},{"type":"next-occurrence","id":"SmHiVbOfCcHPRSVh6KmkIP8rF4s="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"o5BjPfipHASA0rTlOiY+xt1LjzI=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"SmHiVbOfCcHPRSVh6KmkIP8rF4s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1omRc4zreJE9KGdhCnw1niO27Ps="},{"type":"next-occurrence","id":"sjGRKTjgeRzNPfWWpwVR1wZnbOk="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"SmHiVbOfCcHPRSVh6KmkIP8rF4s=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"sjGRKTjgeRzNPfWWpwVR1wZnbOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1omRc4zreJE9KGdhCnw1niO27Ps="},{"type":"next-occurrence","id":"LiY7fZrWzcXg7lpCcT+UEWsjGT4="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"sjGRKTjgeRzNPfWWpwVR1wZnbOk=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"LiY7fZrWzcXg7lpCcT+UEWsjGT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1omRc4zreJE9KGdhCnw1niO27Ps="},{"type":"next-occurrence","id":"D3cNsnVSkONbFzVF9rhiA6GJRuk="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"LiY7fZrWzcXg7lpCcT+UEWsjGT4=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"D3cNsnVSkONbFzVF9rhiA6GJRuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1omRc4zreJE9KGdhCnw1niO27Ps="},{"type":"next-occurrence","id":"kpcXKbeNvyeYi8EfOFBQciMQEPo="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"D3cNsnVSkONbFzVF9rhiA6GJRuk=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"kpcXKbeNvyeYi8EfOFBQciMQEPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1omRc4zreJE9KGdhCnw1niO27Ps="},{"type":"next-occurrence","id":"EalxCWSo48Axw4YdUeeSLviIuwM="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"kpcXKbeNvyeYi8EfOFBQciMQEPo=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"EalxCWSo48Axw4YdUeeSLviIuwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1omRc4zreJE9KGdhCnw1niO27Ps="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"EalxCWSo48Axw4YdUeeSLviIuwM=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"p/tHzZX3GJfDgIAo085+8NNTpD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"m6lPWklRWOLUQgbIeH2MxASQlAs="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"p/tHzZX3GJfDgIAo085+8NNTpD8=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"m6lPWklRWOLUQgbIeH2MxASQlAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p/tHzZX3GJfDgIAo085+8NNTpD8="},{"type":"next-occurrence","id":"XhF87VdDjJP5GBUVbvuy1SYt3lo="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"m6lPWklRWOLUQgbIeH2MxASQlAs=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"XhF87VdDjJP5GBUVbvuy1SYt3lo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p/tHzZX3GJfDgIAo085+8NNTpD8="},{"type":"next-occurrence","id":"BJsBNQgv9y7I17gB3UhaC9nHezA="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"XhF87VdDjJP5GBUVbvuy1SYt3lo=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"BJsBNQgv9y7I17gB3UhaC9nHezA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p/tHzZX3GJfDgIAo085+8NNTpD8="},{"type":"next-occurrence","id":"oPVsG6zrwEWCgnmTKoUenxLOw9k="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"BJsBNQgv9y7I17gB3UhaC9nHezA=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"oPVsG6zrwEWCgnmTKoUenxLOw9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p/tHzZX3GJfDgIAo085+8NNTpD8="},{"type":"next-occurrence","id":"JuJUC97MdcgpbMbhdi0UwZUcAQY="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"oPVsG6zrwEWCgnmTKoUenxLOw9k=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"JuJUC97MdcgpbMbhdi0UwZUcAQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p/tHzZX3GJfDgIAo085+8NNTpD8="},{"type":"next-occurrence","id":"t+HE5JO6lAUik2v4v7+mQlKbGlQ="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"JuJUC97MdcgpbMbhdi0UwZUcAQY=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"t+HE5JO6lAUik2v4v7+mQlKbGlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p/tHzZX3GJfDgIAo085+8NNTpD8="},{"type":"next-occurrence","id":"32xDRWD5Fdko6R5U/rJcp9mC3i4="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"t+HE5JO6lAUik2v4v7+mQlKbGlQ=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"32xDRWD5Fdko6R5U/rJcp9mC3i4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p/tHzZX3GJfDgIAo085+8NNTpD8="},{"type":"next-occurrence","id":"b0ie+Mp4JG4rkG6ZXR5l73ZpKq0="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"32xDRWD5Fdko6R5U/rJcp9mC3i4=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"b0ie+Mp4JG4rkG6ZXR5l73ZpKq0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p/tHzZX3GJfDgIAo085+8NNTpD8="},{"type":"next-occurrence","id":"lpcVuoCWoQQjYJ4bTAaGLgU18Lg="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"b0ie+Mp4JG4rkG6ZXR5l73ZpKq0=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"lpcVuoCWoQQjYJ4bTAaGLgU18Lg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p/tHzZX3GJfDgIAo085+8NNTpD8="},{"type":"next-occurrence","id":"UkhYdxRLASjAfMNOOP7mXEfafcs="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"lpcVuoCWoQQjYJ4bTAaGLgU18Lg=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"UkhYdxRLASjAfMNOOP7mXEfafcs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p/tHzZX3GJfDgIAo085+8NNTpD8="},{"type":"next-occurrence","id":"MScpCOC0+pNLm2L1U1g+8VMo5vw="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"UkhYdxRLASjAfMNOOP7mXEfafcs=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"MScpCOC0+pNLm2L1U1g+8VMo5vw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p/tHzZX3GJfDgIAo085+8NNTpD8="},{"type":"next-occurrence","id":"4i7ejVFoG9kbxRKMtoY984WpSPA="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"MScpCOC0+pNLm2L1U1g+8VMo5vw=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"4i7ejVFoG9kbxRKMtoY984WpSPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p/tHzZX3GJfDgIAo085+8NNTpD8="},{"type":"next-occurrence","id":"O+9u0veMVwuPauAnkQzoJIswpeg="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"4i7ejVFoG9kbxRKMtoY984WpSPA=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"O+9u0veMVwuPauAnkQzoJIswpeg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p/tHzZX3GJfDgIAo085+8NNTpD8="},{"type":"next-occurrence","id":"qcEaCKIenuHff3O7M3TkZ5eZIrU="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"O+9u0veMVwuPauAnkQzoJIswpeg=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"qcEaCKIenuHff3O7M3TkZ5eZIrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p/tHzZX3GJfDgIAo085+8NNTpD8="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"qcEaCKIenuHff3O7M3TkZ5eZIrU=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"DxvG0dl4eumneIo5hTytJtohzDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"S64iFntwJZHlAVL3As3kzoMtnUM="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"DxvG0dl4eumneIo5hTytJtohzDQ=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"S64iFntwJZHlAVL3As3kzoMtnUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DxvG0dl4eumneIo5hTytJtohzDQ="},{"type":"next-occurrence","id":"PEA1IPxo9x1CLoUAIeyDazp1+6k="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"S64iFntwJZHlAVL3As3kzoMtnUM=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"PEA1IPxo9x1CLoUAIeyDazp1+6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DxvG0dl4eumneIo5hTytJtohzDQ="},{"type":"next-occurrence","id":"+48iF0RCqYbBCyR5iGSyqJsH9PQ="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"PEA1IPxo9x1CLoUAIeyDazp1+6k=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"+48iF0RCqYbBCyR5iGSyqJsH9PQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DxvG0dl4eumneIo5hTytJtohzDQ="},{"type":"next-occurrence","id":"0ZJxVoVbOs3IpdKTXy29DSrwa3Q="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"+48iF0RCqYbBCyR5iGSyqJsH9PQ=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"0ZJxVoVbOs3IpdKTXy29DSrwa3Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DxvG0dl4eumneIo5hTytJtohzDQ="},{"type":"next-occurrence","id":"LCHhD8ZHwoHc8BM+h+9473sLNlg="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"0ZJxVoVbOs3IpdKTXy29DSrwa3Q=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"LCHhD8ZHwoHc8BM+h+9473sLNlg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DxvG0dl4eumneIo5hTytJtohzDQ="},{"type":"next-occurrence","id":"liT8FRoyTUW+79Bx0V/vVRAx2lY="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"LCHhD8ZHwoHc8BM+h+9473sLNlg=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"liT8FRoyTUW+79Bx0V/vVRAx2lY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DxvG0dl4eumneIo5hTytJtohzDQ="},{"type":"next-occurrence","id":"OiiI6Un2u0BjkzD6x1xVt5Oa+vs="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"liT8FRoyTUW+79Bx0V/vVRAx2lY=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"OiiI6Un2u0BjkzD6x1xVt5Oa+vs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DxvG0dl4eumneIo5hTytJtohzDQ="},{"type":"next-occurrence","id":"M2kRYljIJViw/wpHZxVtBD30d6M="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"OiiI6Un2u0BjkzD6x1xVt5Oa+vs=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"M2kRYljIJViw/wpHZxVtBD30d6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DxvG0dl4eumneIo5hTytJtohzDQ="},{"type":"next-occurrence","id":"efRIII9KgZbKr5O59GJsbEDchA0="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"M2kRYljIJViw/wpHZxVtBD30d6M=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"efRIII9KgZbKr5O59GJsbEDchA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DxvG0dl4eumneIo5hTytJtohzDQ="},{"type":"next-occurrence","id":"LyTV8ZjV0V18EL91w2RHvVhbNYU="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"efRIII9KgZbKr5O59GJsbEDchA0=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"LyTV8ZjV0V18EL91w2RHvVhbNYU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DxvG0dl4eumneIo5hTytJtohzDQ="},{"type":"next-occurrence","id":"3XWHjc2MxNaQJcCoKuKx11JxXZE="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"LyTV8ZjV0V18EL91w2RHvVhbNYU=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"3XWHjc2MxNaQJcCoKuKx11JxXZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DxvG0dl4eumneIo5hTytJtohzDQ="},{"type":"next-occurrence","id":"unVNT/iETUDwfYXVYYwPRefKXVY="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"3XWHjc2MxNaQJcCoKuKx11JxXZE=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"unVNT/iETUDwfYXVYYwPRefKXVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DxvG0dl4eumneIo5hTytJtohzDQ="},{"type":"next-occurrence","id":"T/3YvI8/lH/3OvaubNW2BZQ+slU="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"unVNT/iETUDwfYXVYYwPRefKXVY=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"T/3YvI8/lH/3OvaubNW2BZQ+slU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DxvG0dl4eumneIo5hTytJtohzDQ="},{"type":"next-occurrence","id":"N6kO8EJ3n+uG4QDaTkpv7jaGOb0="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"T/3YvI8/lH/3OvaubNW2BZQ+slU=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"N6kO8EJ3n+uG4QDaTkpv7jaGOb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DxvG0dl4eumneIo5hTytJtohzDQ="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"N6kO8EJ3n+uG4QDaTkpv7jaGOb0=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"yPmc8UoIVKq5udgdDB1oVB3M9tc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gJQ+KSEre8gfnVtYQk/fxhZnqL4="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"yPmc8UoIVKq5udgdDB1oVB3M9tc=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"gJQ+KSEre8gfnVtYQk/fxhZnqL4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yPmc8UoIVKq5udgdDB1oVB3M9tc="},{"type":"next-occurrence","id":"qf1x/USM9/ZX+7x7eazQvbfPgJY="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"gJQ+KSEre8gfnVtYQk/fxhZnqL4=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"qf1x/USM9/ZX+7x7eazQvbfPgJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yPmc8UoIVKq5udgdDB1oVB3M9tc="},{"type":"next-occurrence","id":"6J0DoctLxOP2QBfcqIxUM2Vu+vM="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"qf1x/USM9/ZX+7x7eazQvbfPgJY=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"6J0DoctLxOP2QBfcqIxUM2Vu+vM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yPmc8UoIVKq5udgdDB1oVB3M9tc="},{"type":"next-occurrence","id":"G83d0y+LGb6cKbg1f8tBlMfiO5c="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"6J0DoctLxOP2QBfcqIxUM2Vu+vM=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"G83d0y+LGb6cKbg1f8tBlMfiO5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yPmc8UoIVKq5udgdDB1oVB3M9tc="},{"type":"next-occurrence","id":"Ov+fQDJejh2OelwkiXCx49oC11U="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"G83d0y+LGb6cKbg1f8tBlMfiO5c=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"Ov+fQDJejh2OelwkiXCx49oC11U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yPmc8UoIVKq5udgdDB1oVB3M9tc="},{"type":"next-occurrence","id":"fkhdStIhm+EBnWXdwDIu1EJZFBc="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"Ov+fQDJejh2OelwkiXCx49oC11U=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"fkhdStIhm+EBnWXdwDIu1EJZFBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yPmc8UoIVKq5udgdDB1oVB3M9tc="},{"type":"next-occurrence","id":"LFLqB2N/QDi4iHXk00VtshsFvpw="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"fkhdStIhm+EBnWXdwDIu1EJZFBc=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"LFLqB2N/QDi4iHXk00VtshsFvpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yPmc8UoIVKq5udgdDB1oVB3M9tc="},{"type":"next-occurrence","id":"2MI67CM3dpuKSvsP9g31raVWzEU="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"LFLqB2N/QDi4iHXk00VtshsFvpw=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"2MI67CM3dpuKSvsP9g31raVWzEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yPmc8UoIVKq5udgdDB1oVB3M9tc="},{"type":"next-occurrence","id":"9pTPWBwG9kI67M2+3bBbxHw0KLY="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"2MI67CM3dpuKSvsP9g31raVWzEU=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"9pTPWBwG9kI67M2+3bBbxHw0KLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yPmc8UoIVKq5udgdDB1oVB3M9tc="},{"type":"next-occurrence","id":"b2fY4BxVs94oT9O1ucxomhWDQjk="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"9pTPWBwG9kI67M2+3bBbxHw0KLY=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"b2fY4BxVs94oT9O1ucxomhWDQjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yPmc8UoIVKq5udgdDB1oVB3M9tc="},{"type":"next-occurrence","id":"l26wriI+NiRZdkm5z5lEZYXGBwo="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"b2fY4BxVs94oT9O1ucxomhWDQjk=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"l26wriI+NiRZdkm5z5lEZYXGBwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yPmc8UoIVKq5udgdDB1oVB3M9tc="},{"type":"next-occurrence","id":"ynDN4jwGjiLQoLRPlxLPqhHw050="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"l26wriI+NiRZdkm5z5lEZYXGBwo=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"ynDN4jwGjiLQoLRPlxLPqhHw050=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yPmc8UoIVKq5udgdDB1oVB3M9tc="},{"type":"next-occurrence","id":"3EMBmcRDY4IVbyF+PRK0IpapZQU="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"ynDN4jwGjiLQoLRPlxLPqhHw050=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"3EMBmcRDY4IVbyF+PRK0IpapZQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yPmc8UoIVKq5udgdDB1oVB3M9tc="},{"type":"next-occurrence","id":"M1OSR68Z35K6MYx/fojxu9oD13A="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"3EMBmcRDY4IVbyF+PRK0IpapZQU=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"M1OSR68Z35K6MYx/fojxu9oD13A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yPmc8UoIVKq5udgdDB1oVB3M9tc="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"M1OSR68Z35K6MYx/fojxu9oD13A=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"AaJv1EsM7jpdA87APwaH1O7Cz9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"n3TYqZXnl4UhPccNDcwYFsjYyuA="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"AaJv1EsM7jpdA87APwaH1O7Cz9k=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"n3TYqZXnl4UhPccNDcwYFsjYyuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AaJv1EsM7jpdA87APwaH1O7Cz9k="},{"type":"next-occurrence","id":"7sure1J+jbz5YhyTX+IPKCxeUDY="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"n3TYqZXnl4UhPccNDcwYFsjYyuA=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"7sure1J+jbz5YhyTX+IPKCxeUDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AaJv1EsM7jpdA87APwaH1O7Cz9k="},{"type":"next-occurrence","id":"MQAS79EImtrfqIGEJxC/pldbxGw="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"7sure1J+jbz5YhyTX+IPKCxeUDY=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"MQAS79EImtrfqIGEJxC/pldbxGw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AaJv1EsM7jpdA87APwaH1O7Cz9k="},{"type":"next-occurrence","id":"kgfUu1SpKTWIwzHvWlYt77jlhjE="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"MQAS79EImtrfqIGEJxC/pldbxGw=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"kgfUu1SpKTWIwzHvWlYt77jlhjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AaJv1EsM7jpdA87APwaH1O7Cz9k="},{"type":"next-occurrence","id":"xy6BMs7OD54Zu+Lu4t2UvzqaZCg="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"kgfUu1SpKTWIwzHvWlYt77jlhjE=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"xy6BMs7OD54Zu+Lu4t2UvzqaZCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AaJv1EsM7jpdA87APwaH1O7Cz9k="},{"type":"next-occurrence","id":"Oks18J5ofSP7FvWfrN8OKwxCY6M="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"xy6BMs7OD54Zu+Lu4t2UvzqaZCg=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"Oks18J5ofSP7FvWfrN8OKwxCY6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AaJv1EsM7jpdA87APwaH1O7Cz9k="},{"type":"next-occurrence","id":"tQA3xbl1PN4QCNGKsDB5nZvolEE="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"Oks18J5ofSP7FvWfrN8OKwxCY6M=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"tQA3xbl1PN4QCNGKsDB5nZvolEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AaJv1EsM7jpdA87APwaH1O7Cz9k="},{"type":"next-occurrence","id":"GdwugWgbQbnGnffvwc76BY9l3QI="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"tQA3xbl1PN4QCNGKsDB5nZvolEE=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"GdwugWgbQbnGnffvwc76BY9l3QI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AaJv1EsM7jpdA87APwaH1O7Cz9k="},{"type":"next-occurrence","id":"/aVlE9EvbDW7nTHyysCkLtOcnFQ="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"GdwugWgbQbnGnffvwc76BY9l3QI=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"/aVlE9EvbDW7nTHyysCkLtOcnFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AaJv1EsM7jpdA87APwaH1O7Cz9k="},{"type":"next-occurrence","id":"6Nbi0Vvd5z9uRzVNZDGXE3g1pZA="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"/aVlE9EvbDW7nTHyysCkLtOcnFQ=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"6Nbi0Vvd5z9uRzVNZDGXE3g1pZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AaJv1EsM7jpdA87APwaH1O7Cz9k="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"6Nbi0Vvd5z9uRzVNZDGXE3g1pZA=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"uYNU1nkWVj+pxiQf5vJ88ADSAL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xnENUnX3mBYmbnZzR5aNVOF0ozo="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"uYNU1nkWVj+pxiQf5vJ88ADSAL8=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"xnENUnX3mBYmbnZzR5aNVOF0ozo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uYNU1nkWVj+pxiQf5vJ88ADSAL8="},{"type":"next-occurrence","id":"1ilAbNEgBPzHVoyZImVjHvcxrlA="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"xnENUnX3mBYmbnZzR5aNVOF0ozo=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"1ilAbNEgBPzHVoyZImVjHvcxrlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uYNU1nkWVj+pxiQf5vJ88ADSAL8="},{"type":"next-occurrence","id":"3wmBggm4f1OmF9BEwgf93NZLxbY="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"1ilAbNEgBPzHVoyZImVjHvcxrlA=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"3wmBggm4f1OmF9BEwgf93NZLxbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uYNU1nkWVj+pxiQf5vJ88ADSAL8="},{"type":"next-occurrence","id":"sqEWeQf6d0THU51DcQ0nvXgKLoE="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"3wmBggm4f1OmF9BEwgf93NZLxbY=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T12:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"sqEWeQf6d0THU51DcQ0nvXgKLoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uYNU1nkWVj+pxiQf5vJ88ADSAL8="},{"type":"next-occurrence","id":"rpFQhI+nKRJB5ybyBliFhDKHY4Q="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"sqEWeQf6d0THU51DcQ0nvXgKLoE=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T12:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"rpFQhI+nKRJB5ybyBliFhDKHY4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uYNU1nkWVj+pxiQf5vJ88ADSAL8="},{"type":"next-occurrence","id":"Ifrg9JTUylAd7X+Wpqz2bv1p1sQ="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"rpFQhI+nKRJB5ybyBliFhDKHY4Q=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T12:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"Ifrg9JTUylAd7X+Wpqz2bv1p1sQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uYNU1nkWVj+pxiQf5vJ88ADSAL8="},{"type":"next-occurrence","id":"tOHWhF6e97T5Ow0AO7Pkbktks7c="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"Ifrg9JTUylAd7X+Wpqz2bv1p1sQ=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T12:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"tOHWhF6e97T5Ow0AO7Pkbktks7c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uYNU1nkWVj+pxiQf5vJ88ADSAL8="},{"type":"next-occurrence","id":"QXX4P5WAQZYpMPgvP4+gKluMdxQ="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"tOHWhF6e97T5Ow0AO7Pkbktks7c=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T12:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"QXX4P5WAQZYpMPgvP4+gKluMdxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uYNU1nkWVj+pxiQf5vJ88ADSAL8="},{"type":"next-occurrence","id":"5zveUrTj9jS4OvaN6pus7/LbyLc="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"QXX4P5WAQZYpMPgvP4+gKluMdxQ=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T12:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"5zveUrTj9jS4OvaN6pus7/LbyLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uYNU1nkWVj+pxiQf5vJ88ADSAL8="},{"type":"next-occurrence","id":"YVq06I8UriTKSSrd4/iKGYvivyA="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"5zveUrTj9jS4OvaN6pus7/LbyLc=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T12:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"YVq06I8UriTKSSrd4/iKGYvivyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uYNU1nkWVj+pxiQf5vJ88ADSAL8="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"YVq06I8UriTKSSrd4/iKGYvivyA=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T12:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"bKr0+JXpHLmqeUeRhksvUa+6CeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LYmp1Sh5I1lHRH7KeMi+cb5gnXA="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"bKr0+JXpHLmqeUeRhksvUa+6CeY=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"LYmp1Sh5I1lHRH7KeMi+cb5gnXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bKr0+JXpHLmqeUeRhksvUa+6CeY="},{"type":"next-occurrence","id":"0vpjO2TZ6IrDPkQJfsxWjGVkvV0="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"LYmp1Sh5I1lHRH7KeMi+cb5gnXA=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"0vpjO2TZ6IrDPkQJfsxWjGVkvV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bKr0+JXpHLmqeUeRhksvUa+6CeY="},{"type":"next-occurrence","id":"/PUgfaNjYBcve+B9RVZiFCdMr88="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"0vpjO2TZ6IrDPkQJfsxWjGVkvV0=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"/PUgfaNjYBcve+B9RVZiFCdMr88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bKr0+JXpHLmqeUeRhksvUa+6CeY="},{"type":"next-occurrence","id":"Rn+7Wzi/7q0dKVU87pjttKhJYiY="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"/PUgfaNjYBcve+B9RVZiFCdMr88=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"Rn+7Wzi/7q0dKVU87pjttKhJYiY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bKr0+JXpHLmqeUeRhksvUa+6CeY="},{"type":"next-occurrence","id":"oi5OSdUtwN7NItWPAQbrL48dMOs="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"Rn+7Wzi/7q0dKVU87pjttKhJYiY=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"oi5OSdUtwN7NItWPAQbrL48dMOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bKr0+JXpHLmqeUeRhksvUa+6CeY="},{"type":"next-occurrence","id":"eVhauNqiwhf2FiVVRb5RdlsIxHU="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"oi5OSdUtwN7NItWPAQbrL48dMOs=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"eVhauNqiwhf2FiVVRb5RdlsIxHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bKr0+JXpHLmqeUeRhksvUa+6CeY="},{"type":"next-occurrence","id":"aI55ZY62jJS/kYrRhlfZRbjcrdk="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"eVhauNqiwhf2FiVVRb5RdlsIxHU=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"aI55ZY62jJS/kYrRhlfZRbjcrdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bKr0+JXpHLmqeUeRhksvUa+6CeY="},{"type":"next-occurrence","id":"r1rS+1sk8b5dv7G+IKagWWNHC1Q="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"aI55ZY62jJS/kYrRhlfZRbjcrdk=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"r1rS+1sk8b5dv7G+IKagWWNHC1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bKr0+JXpHLmqeUeRhksvUa+6CeY="},{"type":"next-occurrence","id":"PkA+6iGThwT3n8CB9I0I8N1CEbs="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"r1rS+1sk8b5dv7G+IKagWWNHC1Q=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"PkA+6iGThwT3n8CB9I0I8N1CEbs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bKr0+JXpHLmqeUeRhksvUa+6CeY="},{"type":"next-occurrence","id":"vv4zWwNRvJAcjZQ+T7H8EVDnVr0="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"PkA+6iGThwT3n8CB9I0I8N1CEbs=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"vv4zWwNRvJAcjZQ+T7H8EVDnVr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bKr0+JXpHLmqeUeRhksvUa+6CeY="},{"type":"next-occurrence","id":"Rxc9nJInOgLqHIs4nYDiMwaQ+6U="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"vv4zWwNRvJAcjZQ+T7H8EVDnVr0=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"Rxc9nJInOgLqHIs4nYDiMwaQ+6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bKr0+JXpHLmqeUeRhksvUa+6CeY="},{"type":"next-occurrence","id":"dmgbADDhcyv7Us8fNNveW1bTpG0="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"Rxc9nJInOgLqHIs4nYDiMwaQ+6U=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"dmgbADDhcyv7Us8fNNveW1bTpG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bKr0+JXpHLmqeUeRhksvUa+6CeY="},{"type":"next-occurrence","id":"hfMJWeeS0QNZ+rB2uEzxm+c/2v8="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"dmgbADDhcyv7Us8fNNveW1bTpG0=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"hfMJWeeS0QNZ+rB2uEzxm+c/2v8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bKr0+JXpHLmqeUeRhksvUa+6CeY="},{"type":"next-occurrence","id":"LaqGwz12fEg8XYk01ld8eb2bOus="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"hfMJWeeS0QNZ+rB2uEzxm+c/2v8=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"LaqGwz12fEg8XYk01ld8eb2bOus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bKr0+JXpHLmqeUeRhksvUa+6CeY="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"LaqGwz12fEg8XYk01ld8eb2bOus=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"DZ8UV/3oqCmDTnqadkf0yLuXekY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Y+JuN+ztPQPQ9O/zoP6r+z6GihE="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"DZ8UV/3oqCmDTnqadkf0yLuXekY=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"Y+JuN+ztPQPQ9O/zoP6r+z6GihE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DZ8UV/3oqCmDTnqadkf0yLuXekY="},{"type":"next-occurrence","id":"IW+PXGaToNaXcEH5ewXfX1whEu8="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"Y+JuN+ztPQPQ9O/zoP6r+z6GihE=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"IW+PXGaToNaXcEH5ewXfX1whEu8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DZ8UV/3oqCmDTnqadkf0yLuXekY="},{"type":"next-occurrence","id":"qj7XMzr9QSqEIZOq/2OFu6kTsFw="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"IW+PXGaToNaXcEH5ewXfX1whEu8=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"qj7XMzr9QSqEIZOq/2OFu6kTsFw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DZ8UV/3oqCmDTnqadkf0yLuXekY="},{"type":"next-occurrence","id":"L2kXV0eM5YNqhRy5mkjQY2MBxmg="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"qj7XMzr9QSqEIZOq/2OFu6kTsFw=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"L2kXV0eM5YNqhRy5mkjQY2MBxmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DZ8UV/3oqCmDTnqadkf0yLuXekY="},{"type":"next-occurrence","id":"fh9/BM20RY171gtiph0lmvmeS/w="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"L2kXV0eM5YNqhRy5mkjQY2MBxmg=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"fh9/BM20RY171gtiph0lmvmeS/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DZ8UV/3oqCmDTnqadkf0yLuXekY="},{"type":"next-occurrence","id":"O7m1PXxGF0+Bw0qwcjeePFTxQkU="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"fh9/BM20RY171gtiph0lmvmeS/w=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"O7m1PXxGF0+Bw0qwcjeePFTxQkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DZ8UV/3oqCmDTnqadkf0yLuXekY="},{"type":"next-occurrence","id":"u4qiaW9+LL/S13wdaKMrCBAP+gQ="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"O7m1PXxGF0+Bw0qwcjeePFTxQkU=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"u4qiaW9+LL/S13wdaKMrCBAP+gQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DZ8UV/3oqCmDTnqadkf0yLuXekY="},{"type":"next-occurrence","id":"50UvBzizHrKGR/W2JLEFBncvZRk="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"u4qiaW9+LL/S13wdaKMrCBAP+gQ=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"50UvBzizHrKGR/W2JLEFBncvZRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DZ8UV/3oqCmDTnqadkf0yLuXekY="},{"type":"next-occurrence","id":"URDmhr2P/pQOYxLB/TFr5cuUmic="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"50UvBzizHrKGR/W2JLEFBncvZRk=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"URDmhr2P/pQOYxLB/TFr5cuUmic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DZ8UV/3oqCmDTnqadkf0yLuXekY="},{"type":"next-occurrence","id":"uaViimyRIHvJAsgUjeivodHCws0="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"URDmhr2P/pQOYxLB/TFr5cuUmic=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"uaViimyRIHvJAsgUjeivodHCws0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DZ8UV/3oqCmDTnqadkf0yLuXekY="},{"type":"next-occurrence","id":"p6RAuOEilTcPLae+EkB8j4vol8I="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"uaViimyRIHvJAsgUjeivodHCws0=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"p6RAuOEilTcPLae+EkB8j4vol8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DZ8UV/3oqCmDTnqadkf0yLuXekY="},{"type":"next-occurrence","id":"/diU88zQ06V2UyKqdOFP8TJ5Y9w="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"p6RAuOEilTcPLae+EkB8j4vol8I=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"/diU88zQ06V2UyKqdOFP8TJ5Y9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DZ8UV/3oqCmDTnqadkf0yLuXekY="},{"type":"next-occurrence","id":"9fvrEvLnc+mM9zQNBE5FkiQ5UdM="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"/diU88zQ06V2UyKqdOFP8TJ5Y9w=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"9fvrEvLnc+mM9zQNBE5FkiQ5UdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DZ8UV/3oqCmDTnqadkf0yLuXekY="},{"type":"next-occurrence","id":"qNqa1lb1eSg3pzdI5Z0cvypg+8M="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"9fvrEvLnc+mM9zQNBE5FkiQ5UdM=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"qNqa1lb1eSg3pzdI5Z0cvypg+8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DZ8UV/3oqCmDTnqadkf0yLuXekY="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"qNqa1lb1eSg3pzdI5Z0cvypg+8M=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"HfNkLmKP+ZBKv+wgUPnCyhJaUpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9A2SQN/gBCePQAgm1GC7jxNnOp0="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"HfNkLmKP+ZBKv+wgUPnCyhJaUpM=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"9A2SQN/gBCePQAgm1GC7jxNnOp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfNkLmKP+ZBKv+wgUPnCyhJaUpM="},{"type":"next-occurrence","id":"O+Jz0XmslXLhjuoMVJkhXUrmJhI="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"9A2SQN/gBCePQAgm1GC7jxNnOp0=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"O+Jz0XmslXLhjuoMVJkhXUrmJhI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfNkLmKP+ZBKv+wgUPnCyhJaUpM="},{"type":"next-occurrence","id":"CyMSVVky9IKU3PxdEiXqscGOzmU="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"O+Jz0XmslXLhjuoMVJkhXUrmJhI=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"CyMSVVky9IKU3PxdEiXqscGOzmU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfNkLmKP+ZBKv+wgUPnCyhJaUpM="},{"type":"next-occurrence","id":"LiKRPk3VpHdyKGJRKlr6XkoR3NY="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"CyMSVVky9IKU3PxdEiXqscGOzmU=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"LiKRPk3VpHdyKGJRKlr6XkoR3NY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfNkLmKP+ZBKv+wgUPnCyhJaUpM="},{"type":"next-occurrence","id":"jNm1sQvD3pQR4AyrNSdNGQbjCi4="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"LiKRPk3VpHdyKGJRKlr6XkoR3NY=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"jNm1sQvD3pQR4AyrNSdNGQbjCi4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfNkLmKP+ZBKv+wgUPnCyhJaUpM="},{"type":"next-occurrence","id":"5OwD0G/V/TExZALMudJlnRZ0ZUA="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"jNm1sQvD3pQR4AyrNSdNGQbjCi4=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"5OwD0G/V/TExZALMudJlnRZ0ZUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfNkLmKP+ZBKv+wgUPnCyhJaUpM="},{"type":"next-occurrence","id":"HByAPdF3fz+xcBqUAG3JU6RfkWM="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"5OwD0G/V/TExZALMudJlnRZ0ZUA=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"HByAPdF3fz+xcBqUAG3JU6RfkWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfNkLmKP+ZBKv+wgUPnCyhJaUpM="},{"type":"next-occurrence","id":"giYAC/r5kWKZbQGibPTBbolJ7OQ="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"HByAPdF3fz+xcBqUAG3JU6RfkWM=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"giYAC/r5kWKZbQGibPTBbolJ7OQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfNkLmKP+ZBKv+wgUPnCyhJaUpM="},{"type":"next-occurrence","id":"2/iLJObVgVPCk8t0F17u7f0n4s0="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"giYAC/r5kWKZbQGibPTBbolJ7OQ=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"2/iLJObVgVPCk8t0F17u7f0n4s0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfNkLmKP+ZBKv+wgUPnCyhJaUpM="},{"type":"next-occurrence","id":"1vyWN9LryK4YavyNEWPtLpuy7dE="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"2/iLJObVgVPCk8t0F17u7f0n4s0=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"1vyWN9LryK4YavyNEWPtLpuy7dE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfNkLmKP+ZBKv+wgUPnCyhJaUpM="},{"type":"next-occurrence","id":"F1P/Sk0K3V0SqONmG3McQljX0SI="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"1vyWN9LryK4YavyNEWPtLpuy7dE=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"F1P/Sk0K3V0SqONmG3McQljX0SI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfNkLmKP+ZBKv+wgUPnCyhJaUpM="},{"type":"next-occurrence","id":"XKTKgaCRjMbDgwSH01inljlrUT8="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"F1P/Sk0K3V0SqONmG3McQljX0SI=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"XKTKgaCRjMbDgwSH01inljlrUT8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfNkLmKP+ZBKv+wgUPnCyhJaUpM="},{"type":"next-occurrence","id":"RqkqzJUNaRCCpHsaJzVnJYIqlI8="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"XKTKgaCRjMbDgwSH01inljlrUT8=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"RqkqzJUNaRCCpHsaJzVnJYIqlI8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfNkLmKP+ZBKv+wgUPnCyhJaUpM="},{"type":"next-occurrence","id":"tVtlxw2iajT+vnpjaaNOn+EWfgs="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"RqkqzJUNaRCCpHsaJzVnJYIqlI8=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"tVtlxw2iajT+vnpjaaNOn+EWfgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HfNkLmKP+ZBKv+wgUPnCyhJaUpM="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"tVtlxw2iajT+vnpjaaNOn+EWfgs=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"jj4F2XF+bc9wwmL00Uaa9qa4dXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"glWptLPfiXr20dA///EDazYOyz4="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"jj4F2XF+bc9wwmL00Uaa9qa4dXY=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"glWptLPfiXr20dA///EDazYOyz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jj4F2XF+bc9wwmL00Uaa9qa4dXY="},{"type":"next-occurrence","id":"CHgaoZ0JMvJFcQqaQKB/xVt54oY="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"glWptLPfiXr20dA///EDazYOyz4=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"CHgaoZ0JMvJFcQqaQKB/xVt54oY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jj4F2XF+bc9wwmL00Uaa9qa4dXY="},{"type":"next-occurrence","id":"4o6tqAWuc7Ajlv2W6/DqY0beznM="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"CHgaoZ0JMvJFcQqaQKB/xVt54oY=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"4o6tqAWuc7Ajlv2W6/DqY0beznM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jj4F2XF+bc9wwmL00Uaa9qa4dXY="},{"type":"next-occurrence","id":"YUvPS5YlWNYdnMAw0uitl17fmm8="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"4o6tqAWuc7Ajlv2W6/DqY0beznM=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"YUvPS5YlWNYdnMAw0uitl17fmm8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jj4F2XF+bc9wwmL00Uaa9qa4dXY="},{"type":"next-occurrence","id":"SPkrmNyrIidDTDLKFtNco4k36kA="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"YUvPS5YlWNYdnMAw0uitl17fmm8=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"SPkrmNyrIidDTDLKFtNco4k36kA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jj4F2XF+bc9wwmL00Uaa9qa4dXY="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"SPkrmNyrIidDTDLKFtNco4k36kA=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"XJry646osxCUaTtZJGHz8WUbPhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zotXJAj1mCqA9/TKNBUGIR9Hg9c="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"XJry646osxCUaTtZJGHz8WUbPhY=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"zotXJAj1mCqA9/TKNBUGIR9Hg9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJry646osxCUaTtZJGHz8WUbPhY="},{"type":"next-occurrence","id":"g1vCbcPc7S80fTtyKo1wxDe0ZYA="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"zotXJAj1mCqA9/TKNBUGIR9Hg9c=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"g1vCbcPc7S80fTtyKo1wxDe0ZYA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJry646osxCUaTtZJGHz8WUbPhY="},{"type":"next-occurrence","id":"TOnC6Aj0RXpKEffT6so9c7yyd3Y="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"g1vCbcPc7S80fTtyKo1wxDe0ZYA=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"TOnC6Aj0RXpKEffT6so9c7yyd3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJry646osxCUaTtZJGHz8WUbPhY="},{"type":"next-occurrence","id":"r79uQ+FOL1y58TbGAOQ6Z7N5mK0="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"TOnC6Aj0RXpKEffT6so9c7yyd3Y=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"r79uQ+FOL1y58TbGAOQ6Z7N5mK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJry646osxCUaTtZJGHz8WUbPhY="},{"type":"next-occurrence","id":"98IsJCM3qgH6RJQ+gBN4SBNtYiM="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"r79uQ+FOL1y58TbGAOQ6Z7N5mK0=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"98IsJCM3qgH6RJQ+gBN4SBNtYiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJry646osxCUaTtZJGHz8WUbPhY="},{"type":"next-occurrence","id":"v2cAt94xXvqdDaNSjbSpMylX5ak="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"98IsJCM3qgH6RJQ+gBN4SBNtYiM=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"v2cAt94xXvqdDaNSjbSpMylX5ak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJry646osxCUaTtZJGHz8WUbPhY="},{"type":"next-occurrence","id":"c/ChuzoC9jhWa47lAQbOzHMe8BM="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"v2cAt94xXvqdDaNSjbSpMylX5ak=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"c/ChuzoC9jhWa47lAQbOzHMe8BM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJry646osxCUaTtZJGHz8WUbPhY="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"c/ChuzoC9jhWa47lAQbOzHMe8BM=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"icty4wHESG2jDbEJbJQeQt5Izg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"P0NgqB2SZ1hvYe7cZhJHlD9BEhQ="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"icty4wHESG2jDbEJbJQeQt5Izg8=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"P0NgqB2SZ1hvYe7cZhJHlD9BEhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"icty4wHESG2jDbEJbJQeQt5Izg8="},{"type":"next-occurrence","id":"NJjfvzs+b8+Rix5Oree+LOg7c3Q="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"P0NgqB2SZ1hvYe7cZhJHlD9BEhQ=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"NJjfvzs+b8+Rix5Oree+LOg7c3Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"icty4wHESG2jDbEJbJQeQt5Izg8="},{"type":"next-occurrence","id":"ggfQqFa6CfIV26MbDEmWv2d09R4="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"NJjfvzs+b8+Rix5Oree+LOg7c3Q=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"ggfQqFa6CfIV26MbDEmWv2d09R4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"icty4wHESG2jDbEJbJQeQt5Izg8="},{"type":"next-occurrence","id":"twpC3S7PR0R4Vq3oebEdbi3ioss="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"ggfQqFa6CfIV26MbDEmWv2d09R4=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"twpC3S7PR0R4Vq3oebEdbi3ioss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"icty4wHESG2jDbEJbJQeQt5Izg8="},{"type":"next-occurrence","id":"w5y0kqReg/puk85enrSRVicboZE="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"twpC3S7PR0R4Vq3oebEdbi3ioss=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"w5y0kqReg/puk85enrSRVicboZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"icty4wHESG2jDbEJbJQeQt5Izg8="},{"type":"next-occurrence","id":"H8BzKzOlKGyG9FtbKDd5Be8Ek6A="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"w5y0kqReg/puk85enrSRVicboZE=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"H8BzKzOlKGyG9FtbKDd5Be8Ek6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"icty4wHESG2jDbEJbJQeQt5Izg8="},{"type":"next-occurrence","id":"K/mwM5hSGhtR5SrzOdNg+rR0htw="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"H8BzKzOlKGyG9FtbKDd5Be8Ek6A=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"K/mwM5hSGhtR5SrzOdNg+rR0htw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"icty4wHESG2jDbEJbJQeQt5Izg8="},{"type":"next-occurrence","id":"WQmmNeWouTXNOIA5iMJUOjokwyw="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"K/mwM5hSGhtR5SrzOdNg+rR0htw=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"WQmmNeWouTXNOIA5iMJUOjokwyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"icty4wHESG2jDbEJbJQeQt5Izg8="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"WQmmNeWouTXNOIA5iMJUOjokwyw=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T20:00:00Z","end_date":"2026-05-28T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"zPB2KzSrTOoFk38F3q+d6VUu43M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xuPZsMYqfG/FwtuegdqFhskZ1/Y="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"zPB2KzSrTOoFk38F3q+d6VUu43M=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"xuPZsMYqfG/FwtuegdqFhskZ1/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPB2KzSrTOoFk38F3q+d6VUu43M="},{"type":"next-occurrence","id":"QK5YSdTneOc1QZi3Rzf5fy97kJ8="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"xuPZsMYqfG/FwtuegdqFhskZ1/Y=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"QK5YSdTneOc1QZi3Rzf5fy97kJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPB2KzSrTOoFk38F3q+d6VUu43M="},{"type":"next-occurrence","id":"+r3Sobo4/wPqOdvD4F4pS+XOaaE="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"QK5YSdTneOc1QZi3Rzf5fy97kJ8=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"+r3Sobo4/wPqOdvD4F4pS+XOaaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPB2KzSrTOoFk38F3q+d6VUu43M="},{"type":"next-occurrence","id":"jvr9NR5KxjTieaFA4pIB55DDQkY="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"+r3Sobo4/wPqOdvD4F4pS+XOaaE=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"jvr9NR5KxjTieaFA4pIB55DDQkY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPB2KzSrTOoFk38F3q+d6VUu43M="},{"type":"next-occurrence","id":"KRWY5F33/NAevQENNeGD3yVNMng="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"jvr9NR5KxjTieaFA4pIB55DDQkY=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"KRWY5F33/NAevQENNeGD3yVNMng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPB2KzSrTOoFk38F3q+d6VUu43M="},{"type":"next-occurrence","id":"4HZxn3tuJonE/wKvuoCIfSTXANc="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"KRWY5F33/NAevQENNeGD3yVNMng=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"4HZxn3tuJonE/wKvuoCIfSTXANc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPB2KzSrTOoFk38F3q+d6VUu43M="},{"type":"next-occurrence","id":"gttL3XeSLMHGH2vURK8rpbRKsR4="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"4HZxn3tuJonE/wKvuoCIfSTXANc=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"gttL3XeSLMHGH2vURK8rpbRKsR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPB2KzSrTOoFk38F3q+d6VUu43M="},{"type":"next-occurrence","id":"fG9lH2EjpyF2fNeBEerzCk+imCQ="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"gttL3XeSLMHGH2vURK8rpbRKsR4=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"fG9lH2EjpyF2fNeBEerzCk+imCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPB2KzSrTOoFk38F3q+d6VUu43M="},{"type":"next-occurrence","id":"t0knyp6sEJnxjQGcoZ+qTYYz67g="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"fG9lH2EjpyF2fNeBEerzCk+imCQ=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"t0knyp6sEJnxjQGcoZ+qTYYz67g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPB2KzSrTOoFk38F3q+d6VUu43M="},{"type":"next-occurrence","id":"6OSPXnbufK754UO23ly3Akg9D44="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"t0knyp6sEJnxjQGcoZ+qTYYz67g=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"6OSPXnbufK754UO23ly3Akg9D44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPB2KzSrTOoFk38F3q+d6VUu43M="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"6OSPXnbufK754UO23ly3Akg9D44=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"3uCbUFwPo43w/UNTxoE2U0E6OKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SgX++K+Cec7Cv9tAevXwt4U4Qkw="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"3uCbUFwPo43w/UNTxoE2U0E6OKM=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"SgX++K+Cec7Cv9tAevXwt4U4Qkw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3uCbUFwPo43w/UNTxoE2U0E6OKM="},{"type":"next-occurrence","id":"oAUCkWfVmgdq5/lGTk9qHHxe8Nc="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"SgX++K+Cec7Cv9tAevXwt4U4Qkw=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"oAUCkWfVmgdq5/lGTk9qHHxe8Nc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3uCbUFwPo43w/UNTxoE2U0E6OKM="},{"type":"next-occurrence","id":"GbLpHE4phmx949dfgBQ2fBzktmY="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"oAUCkWfVmgdq5/lGTk9qHHxe8Nc=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"GbLpHE4phmx949dfgBQ2fBzktmY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3uCbUFwPo43w/UNTxoE2U0E6OKM="},{"type":"next-occurrence","id":"CXxbR2voyQDP95EeUHfqAicEoqU="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"GbLpHE4phmx949dfgBQ2fBzktmY=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"CXxbR2voyQDP95EeUHfqAicEoqU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3uCbUFwPo43w/UNTxoE2U0E6OKM="},{"type":"next-occurrence","id":"vHG2C96/Zm+BgmOonL18uO3AJhI="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"CXxbR2voyQDP95EeUHfqAicEoqU=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"vHG2C96/Zm+BgmOonL18uO3AJhI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3uCbUFwPo43w/UNTxoE2U0E6OKM="},{"type":"next-occurrence","id":"fnFcuBQwYY5HVvhf9TDA6RR1It8="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"vHG2C96/Zm+BgmOonL18uO3AJhI=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"fnFcuBQwYY5HVvhf9TDA6RR1It8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3uCbUFwPo43w/UNTxoE2U0E6OKM="},{"type":"next-occurrence","id":"7IV5Qm6llOeMXEoP2UeXoJ+YQYs="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"fnFcuBQwYY5HVvhf9TDA6RR1It8=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"7IV5Qm6llOeMXEoP2UeXoJ+YQYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3uCbUFwPo43w/UNTxoE2U0E6OKM="},{"type":"next-occurrence","id":"gxfm33imRMD3Z5dgIW8ed0N3gxQ="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"7IV5Qm6llOeMXEoP2UeXoJ+YQYs=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"gxfm33imRMD3Z5dgIW8ed0N3gxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3uCbUFwPo43w/UNTxoE2U0E6OKM="},{"type":"next-occurrence","id":"mgENrRcPvagGIIJMJ2nvDlQ2rrM="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"gxfm33imRMD3Z5dgIW8ed0N3gxQ=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"mgENrRcPvagGIIJMJ2nvDlQ2rrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3uCbUFwPo43w/UNTxoE2U0E6OKM="},{"type":"next-occurrence","id":"raqsR5suyoV+YdC/6xlyNAiKEZY="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"mgENrRcPvagGIIJMJ2nvDlQ2rrM=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"raqsR5suyoV+YdC/6xlyNAiKEZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3uCbUFwPo43w/UNTxoE2U0E6OKM="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"raqsR5suyoV+YdC/6xlyNAiKEZY=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"+L8+IIAbHHv/zsxwO5kgpSaH+q8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"P8is70JxMROpEmkLacvRqWxM2h8="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"+L8+IIAbHHv/zsxwO5kgpSaH+q8=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"P8is70JxMROpEmkLacvRqWxM2h8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+L8+IIAbHHv/zsxwO5kgpSaH+q8="},{"type":"next-occurrence","id":"m57TZIyjT8eHhLvQ5LLa734Dlsk="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"P8is70JxMROpEmkLacvRqWxM2h8=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"m57TZIyjT8eHhLvQ5LLa734Dlsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+L8+IIAbHHv/zsxwO5kgpSaH+q8="},{"type":"next-occurrence","id":"7dk+BaLlUMb0owKTle/euV8lQXI="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"m57TZIyjT8eHhLvQ5LLa734Dlsk=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"7dk+BaLlUMb0owKTle/euV8lQXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+L8+IIAbHHv/zsxwO5kgpSaH+q8="},{"type":"next-occurrence","id":"jY2OKF0yAUQOr7mhlprqAcrwChI="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"7dk+BaLlUMb0owKTle/euV8lQXI=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"jY2OKF0yAUQOr7mhlprqAcrwChI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+L8+IIAbHHv/zsxwO5kgpSaH+q8="},{"type":"next-occurrence","id":"4K9Oj5czIxcC22RF2vUY8lt1TO0="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"jY2OKF0yAUQOr7mhlprqAcrwChI=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"4K9Oj5czIxcC22RF2vUY8lt1TO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+L8+IIAbHHv/zsxwO5kgpSaH+q8="},{"type":"next-occurrence","id":"nEZqTY/ZycDK12WX2MMP4GC1lR4="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"4K9Oj5czIxcC22RF2vUY8lt1TO0=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"nEZqTY/ZycDK12WX2MMP4GC1lR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+L8+IIAbHHv/zsxwO5kgpSaH+q8="},{"type":"next-occurrence","id":"Jdy5nQz+w/NBF4uSiYa3sEeQzoA="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"nEZqTY/ZycDK12WX2MMP4GC1lR4=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"Jdy5nQz+w/NBF4uSiYa3sEeQzoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+L8+IIAbHHv/zsxwO5kgpSaH+q8="},{"type":"next-occurrence","id":"2i4kf6mnZuH3UQlK5cLVLPtt11Y="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"Jdy5nQz+w/NBF4uSiYa3sEeQzoA=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"2i4kf6mnZuH3UQlK5cLVLPtt11Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+L8+IIAbHHv/zsxwO5kgpSaH+q8="},{"type":"next-occurrence","id":"HS6DyI480Xf5S6WBbrP6aY9P01w="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"2i4kf6mnZuH3UQlK5cLVLPtt11Y=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"HS6DyI480Xf5S6WBbrP6aY9P01w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+L8+IIAbHHv/zsxwO5kgpSaH+q8="},{"type":"next-occurrence","id":"xBRM90jNukN1UQ8TMD1h1OPH9yk="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"HS6DyI480Xf5S6WBbrP6aY9P01w=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"xBRM90jNukN1UQ8TMD1h1OPH9yk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+L8+IIAbHHv/zsxwO5kgpSaH+q8="},{"type":"next-occurrence","id":"s545jUXuwwLWslo2DgpXTzaPwZo="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"xBRM90jNukN1UQ8TMD1h1OPH9yk=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"s545jUXuwwLWslo2DgpXTzaPwZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+L8+IIAbHHv/zsxwO5kgpSaH+q8="},{"type":"next-occurrence","id":"q2U7RuJT5HlV0X4W4wueKQO+7Mw="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"s545jUXuwwLWslo2DgpXTzaPwZo=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"q2U7RuJT5HlV0X4W4wueKQO+7Mw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+L8+IIAbHHv/zsxwO5kgpSaH+q8="},{"type":"next-occurrence","id":"3ZsL70Q6KgUDmRS6k9REk/IguGU="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"q2U7RuJT5HlV0X4W4wueKQO+7Mw=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"3ZsL70Q6KgUDmRS6k9REk/IguGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+L8+IIAbHHv/zsxwO5kgpSaH+q8="},{"type":"next-occurrence","id":"XVSQBOff0QufkHBfYNlHAdc1a0U="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"3ZsL70Q6KgUDmRS6k9REk/IguGU=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"XVSQBOff0QufkHBfYNlHAdc1a0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+L8+IIAbHHv/zsxwO5kgpSaH+q8="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"XVSQBOff0QufkHBfYNlHAdc1a0U=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"XAXVBflHy5rdrvbqXFcWOowZdNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tzNttMAfNL6vJSLXGx9vfd88udc="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"XAXVBflHy5rdrvbqXFcWOowZdNg=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"tzNttMAfNL6vJSLXGx9vfd88udc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XAXVBflHy5rdrvbqXFcWOowZdNg="},{"type":"next-occurrence","id":"etoHRJHUsxgovy/J+YwyXE7aHN4="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"tzNttMAfNL6vJSLXGx9vfd88udc=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"etoHRJHUsxgovy/J+YwyXE7aHN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XAXVBflHy5rdrvbqXFcWOowZdNg="},{"type":"next-occurrence","id":"Rtc6yD/LYh700v2ucegyT8Ji1VA="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"etoHRJHUsxgovy/J+YwyXE7aHN4=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"Rtc6yD/LYh700v2ucegyT8Ji1VA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XAXVBflHy5rdrvbqXFcWOowZdNg="},{"type":"next-occurrence","id":"HTcKG6diS0O4pO0nNlZ5XsHjJ6w="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"Rtc6yD/LYh700v2ucegyT8Ji1VA=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"HTcKG6diS0O4pO0nNlZ5XsHjJ6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XAXVBflHy5rdrvbqXFcWOowZdNg="},{"type":"next-occurrence","id":"xJVLyDMBAf0thWjZDQKuEnOXOrs="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"HTcKG6diS0O4pO0nNlZ5XsHjJ6w=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"xJVLyDMBAf0thWjZDQKuEnOXOrs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XAXVBflHy5rdrvbqXFcWOowZdNg="},{"type":"next-occurrence","id":"cbbVDCUvayF0x8QUhSJlWANLNZw="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"xJVLyDMBAf0thWjZDQKuEnOXOrs=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"cbbVDCUvayF0x8QUhSJlWANLNZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XAXVBflHy5rdrvbqXFcWOowZdNg="},{"type":"next-occurrence","id":"D49PjOrQyeUTK0azgVU/Wngm8UM="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"cbbVDCUvayF0x8QUhSJlWANLNZw=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"D49PjOrQyeUTK0azgVU/Wngm8UM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XAXVBflHy5rdrvbqXFcWOowZdNg="},{"type":"next-occurrence","id":"doJahvw+/E7cOZduPokeKNexOn0="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"D49PjOrQyeUTK0azgVU/Wngm8UM=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"doJahvw+/E7cOZduPokeKNexOn0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XAXVBflHy5rdrvbqXFcWOowZdNg="},{"type":"next-occurrence","id":"moTyMH5inttyDlcBz7jRTKDuW1s="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"doJahvw+/E7cOZduPokeKNexOn0=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"moTyMH5inttyDlcBz7jRTKDuW1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XAXVBflHy5rdrvbqXFcWOowZdNg="},{"type":"next-occurrence","id":"OGvZEDlWW4YpViiCGHN8xR4kRro="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"moTyMH5inttyDlcBz7jRTKDuW1s=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"OGvZEDlWW4YpViiCGHN8xR4kRro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XAXVBflHy5rdrvbqXFcWOowZdNg="},{"type":"next-occurrence","id":"GF+HEyUZD6nPNQRnLZo952A4if4="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"OGvZEDlWW4YpViiCGHN8xR4kRro=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"GF+HEyUZD6nPNQRnLZo952A4if4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XAXVBflHy5rdrvbqXFcWOowZdNg="},{"type":"next-occurrence","id":"nmATdipMjeBZ+Tk1PubqJ6mOPnY="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"GF+HEyUZD6nPNQRnLZo952A4if4=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"nmATdipMjeBZ+Tk1PubqJ6mOPnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XAXVBflHy5rdrvbqXFcWOowZdNg="},{"type":"next-occurrence","id":"a9YGvdW/r3e0h6pw0Dh2NRoBCZQ="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"nmATdipMjeBZ+Tk1PubqJ6mOPnY=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"a9YGvdW/r3e0h6pw0Dh2NRoBCZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XAXVBflHy5rdrvbqXFcWOowZdNg="},{"type":"next-occurrence","id":"zHUVADIoQFUF1YjhfkftF9JF+Mw="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"a9YGvdW/r3e0h6pw0Dh2NRoBCZQ=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"zHUVADIoQFUF1YjhfkftF9JF+Mw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XAXVBflHy5rdrvbqXFcWOowZdNg="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"zHUVADIoQFUF1YjhfkftF9JF+Mw=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"LYxO6ivzk58RIqYTE8OqcsRRrdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"E1TcU4sMUQBJt4iU7lnYrnTvVkk="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:29:37Z"},"road_event_id":"LYxO6ivzk58RIqYTE8OqcsRRrdI=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"E1TcU4sMUQBJt4iU7lnYrnTvVkk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LYxO6ivzk58RIqYTE8OqcsRRrdI="},{"type":"next-occurrence","id":"6poCyM4v4iWRlhuP5TbMz+pWAv8="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:29:37Z"},"road_event_id":"E1TcU4sMUQBJt4iU7lnYrnTvVkk=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"6poCyM4v4iWRlhuP5TbMz+pWAv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LYxO6ivzk58RIqYTE8OqcsRRrdI="},{"type":"next-occurrence","id":"9VkNG2PrW0svDDx/RwYKfQeRQyY="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:29:37Z"},"road_event_id":"6poCyM4v4iWRlhuP5TbMz+pWAv8=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"9VkNG2PrW0svDDx/RwYKfQeRQyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LYxO6ivzk58RIqYTE8OqcsRRrdI="},{"type":"next-occurrence","id":"kG51g0u/dugICmZV8bSDNzZ2sVE="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:29:37Z"},"road_event_id":"9VkNG2PrW0svDDx/RwYKfQeRQyY=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"kG51g0u/dugICmZV8bSDNzZ2sVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LYxO6ivzk58RIqYTE8OqcsRRrdI="},{"type":"next-occurrence","id":"Kfmck6MUwo7sbVSFDZUasp/eV3o="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:29:37Z"},"road_event_id":"kG51g0u/dugICmZV8bSDNzZ2sVE=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"Kfmck6MUwo7sbVSFDZUasp/eV3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LYxO6ivzk58RIqYTE8OqcsRRrdI="},{"type":"next-occurrence","id":"z049tozMPjrh+i5zn2UwW/w/PTU="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:29:37Z"},"road_event_id":"Kfmck6MUwo7sbVSFDZUasp/eV3o=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"z049tozMPjrh+i5zn2UwW/w/PTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LYxO6ivzk58RIqYTE8OqcsRRrdI="},{"type":"next-occurrence","id":"3UkQHzt62LEURuBQTbC54dhruPo="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:29:37Z"},"road_event_id":"z049tozMPjrh+i5zn2UwW/w/PTU=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"3UkQHzt62LEURuBQTbC54dhruPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LYxO6ivzk58RIqYTE8OqcsRRrdI="},{"type":"next-occurrence","id":"719I2dq52ubmMSfjdKtU3PehmyQ="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:29:37Z"},"road_event_id":"3UkQHzt62LEURuBQTbC54dhruPo=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"719I2dq52ubmMSfjdKtU3PehmyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LYxO6ivzk58RIqYTE8OqcsRRrdI="},{"type":"next-occurrence","id":"eWWJMfWQTk6BI3QzztB98M9BDZA="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:29:37Z"},"road_event_id":"719I2dq52ubmMSfjdKtU3PehmyQ=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"eWWJMfWQTk6BI3QzztB98M9BDZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LYxO6ivzk58RIqYTE8OqcsRRrdI="},{"type":"next-occurrence","id":"C82xLFs7Y+Kl4xa1n7x6qEzMrGg="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:29:37Z"},"road_event_id":"eWWJMfWQTk6BI3QzztB98M9BDZA=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"C82xLFs7Y+Kl4xa1n7x6qEzMrGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LYxO6ivzk58RIqYTE8OqcsRRrdI="},{"type":"next-occurrence","id":"zC2C6wrRiYOCRLN5H2myZ9zL8Eo="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:29:37Z"},"road_event_id":"C82xLFs7Y+Kl4xa1n7x6qEzMrGg=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"zC2C6wrRiYOCRLN5H2myZ9zL8Eo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LYxO6ivzk58RIqYTE8OqcsRRrdI="},{"type":"next-occurrence","id":"+ILyTaTauJcSkzaHJYBPZv8iqn0="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:29:37Z"},"road_event_id":"zC2C6wrRiYOCRLN5H2myZ9zL8Eo=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"+ILyTaTauJcSkzaHJYBPZv8iqn0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LYxO6ivzk58RIqYTE8OqcsRRrdI="},{"type":"next-occurrence","id":"wYYpZkpNlVKrLWSPo909tCGyE8I="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:29:37Z"},"road_event_id":"+ILyTaTauJcSkzaHJYBPZv8iqn0=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"wYYpZkpNlVKrLWSPo909tCGyE8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LYxO6ivzk58RIqYTE8OqcsRRrdI="},{"type":"next-occurrence","id":"GkR/B7gGKl5bG9OB69ozpBSy3C4="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:29:37Z"},"road_event_id":"wYYpZkpNlVKrLWSPo909tCGyE8I=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"GkR/B7gGKl5bG9OB69ozpBSy3C4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LYxO6ivzk58RIqYTE8OqcsRRrdI="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:29:37Z"},"road_event_id":"GkR/B7gGKl5bG9OB69ozpBSy3C4=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"QgqD2y/l3/+MDrHGVaGlTkiLMXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TOLeyX4Ch0MO+rTCHo4VHHLGJs8="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"QgqD2y/l3/+MDrHGVaGlTkiLMXQ=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"TOLeyX4Ch0MO+rTCHo4VHHLGJs8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QgqD2y/l3/+MDrHGVaGlTkiLMXQ="},{"type":"next-occurrence","id":"rJYAGiWdCdHMHE6SpTGyRBIeVVA="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"TOLeyX4Ch0MO+rTCHo4VHHLGJs8=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"rJYAGiWdCdHMHE6SpTGyRBIeVVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QgqD2y/l3/+MDrHGVaGlTkiLMXQ="},{"type":"next-occurrence","id":"6jFhSG3kOVAD2c0JXVBkufBU6cQ="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"rJYAGiWdCdHMHE6SpTGyRBIeVVA=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"6jFhSG3kOVAD2c0JXVBkufBU6cQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QgqD2y/l3/+MDrHGVaGlTkiLMXQ="},{"type":"next-occurrence","id":"6f2/vYwy3ve0CK9jaIEMg5fhvQA="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"6jFhSG3kOVAD2c0JXVBkufBU6cQ=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"6f2/vYwy3ve0CK9jaIEMg5fhvQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QgqD2y/l3/+MDrHGVaGlTkiLMXQ="},{"type":"next-occurrence","id":"9QNFitgKSWLCCUO2TYOI6mBcpSA="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"6f2/vYwy3ve0CK9jaIEMg5fhvQA=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"9QNFitgKSWLCCUO2TYOI6mBcpSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QgqD2y/l3/+MDrHGVaGlTkiLMXQ="},{"type":"next-occurrence","id":"Cwwtbnqi8YR0KHUwkZM/UbAhKI4="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"9QNFitgKSWLCCUO2TYOI6mBcpSA=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"Cwwtbnqi8YR0KHUwkZM/UbAhKI4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QgqD2y/l3/+MDrHGVaGlTkiLMXQ="},{"type":"next-occurrence","id":"t1nZiK9XiZFe0lU8ze2qZyIoR5o="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"Cwwtbnqi8YR0KHUwkZM/UbAhKI4=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"t1nZiK9XiZFe0lU8ze2qZyIoR5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QgqD2y/l3/+MDrHGVaGlTkiLMXQ="},{"type":"next-occurrence","id":"uFamMo/Puna0NA7kc13EsyXVb7Q="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"t1nZiK9XiZFe0lU8ze2qZyIoR5o=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"uFamMo/Puna0NA7kc13EsyXVb7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QgqD2y/l3/+MDrHGVaGlTkiLMXQ="},{"type":"next-occurrence","id":"v+I1RUvy5RObp7RA2iHH4b5dUwc="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"uFamMo/Puna0NA7kc13EsyXVb7Q=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"v+I1RUvy5RObp7RA2iHH4b5dUwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QgqD2y/l3/+MDrHGVaGlTkiLMXQ="},{"type":"next-occurrence","id":"FiZSzANGkyzqN2Cnawu/F2NU45o="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"v+I1RUvy5RObp7RA2iHH4b5dUwc=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"FiZSzANGkyzqN2Cnawu/F2NU45o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QgqD2y/l3/+MDrHGVaGlTkiLMXQ="},{"type":"next-occurrence","id":"FmJe7rLDPz1amFGMXvETmveILLU="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"FiZSzANGkyzqN2Cnawu/F2NU45o=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"FmJe7rLDPz1amFGMXvETmveILLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QgqD2y/l3/+MDrHGVaGlTkiLMXQ="},{"type":"next-occurrence","id":"4JRCGBhTWq4+QsMEJ1ssmZ3u3tI="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"FmJe7rLDPz1amFGMXvETmveILLU=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"4JRCGBhTWq4+QsMEJ1ssmZ3u3tI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QgqD2y/l3/+MDrHGVaGlTkiLMXQ="},{"type":"next-occurrence","id":"mz/OW5Qwj2FGeUyWsYM8MgLwU9E="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"4JRCGBhTWq4+QsMEJ1ssmZ3u3tI=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"mz/OW5Qwj2FGeUyWsYM8MgLwU9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QgqD2y/l3/+MDrHGVaGlTkiLMXQ="},{"type":"next-occurrence","id":"ekGAPwg2UMTycjwfh0TjuGJ8ioI="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"mz/OW5Qwj2FGeUyWsYM8MgLwU9E=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"ekGAPwg2UMTycjwfh0TjuGJ8ioI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QgqD2y/l3/+MDrHGVaGlTkiLMXQ="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"ekGAPwg2UMTycjwfh0TjuGJ8ioI=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"cdX0zRbypAI+K+mhkoLDpuKOeWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RozlkABGc9sMbAsVro6gbacgFVY="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"cdX0zRbypAI+K+mhkoLDpuKOeWk=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"RozlkABGc9sMbAsVro6gbacgFVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cdX0zRbypAI+K+mhkoLDpuKOeWk="},{"type":"next-occurrence","id":"SQYUCaFTL2dFNgQ/YZ3LqRRreSE="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"RozlkABGc9sMbAsVro6gbacgFVY=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"SQYUCaFTL2dFNgQ/YZ3LqRRreSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cdX0zRbypAI+K+mhkoLDpuKOeWk="},{"type":"next-occurrence","id":"p3EHA9SHzetlzojXQjtHG1lcFUc="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"SQYUCaFTL2dFNgQ/YZ3LqRRreSE=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"p3EHA9SHzetlzojXQjtHG1lcFUc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cdX0zRbypAI+K+mhkoLDpuKOeWk="},{"type":"next-occurrence","id":"szbxh67tl0QKj2o3zplil2IlmuQ="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"p3EHA9SHzetlzojXQjtHG1lcFUc=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"szbxh67tl0QKj2o3zplil2IlmuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cdX0zRbypAI+K+mhkoLDpuKOeWk="},{"type":"next-occurrence","id":"55lbv470YWCEjeKdymGL66K2mZ0="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"szbxh67tl0QKj2o3zplil2IlmuQ=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"55lbv470YWCEjeKdymGL66K2mZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cdX0zRbypAI+K+mhkoLDpuKOeWk="},{"type":"next-occurrence","id":"5knfZ1TTSdTXXGubMi2i1PIZ4fM="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"55lbv470YWCEjeKdymGL66K2mZ0=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"5knfZ1TTSdTXXGubMi2i1PIZ4fM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cdX0zRbypAI+K+mhkoLDpuKOeWk="},{"type":"next-occurrence","id":"VPjR4unN7GDVnHfM+zkNL0ChsI4="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"5knfZ1TTSdTXXGubMi2i1PIZ4fM=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"VPjR4unN7GDVnHfM+zkNL0ChsI4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cdX0zRbypAI+K+mhkoLDpuKOeWk="},{"type":"next-occurrence","id":"XWjcQQb6duE02bNqkrwH6oeUhDw="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"VPjR4unN7GDVnHfM+zkNL0ChsI4=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"XWjcQQb6duE02bNqkrwH6oeUhDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cdX0zRbypAI+K+mhkoLDpuKOeWk="},{"type":"next-occurrence","id":"tX0u8S+JsKPEa5oiuBwiIhWe0eI="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"XWjcQQb6duE02bNqkrwH6oeUhDw=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"tX0u8S+JsKPEa5oiuBwiIhWe0eI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cdX0zRbypAI+K+mhkoLDpuKOeWk="},{"type":"next-occurrence","id":"2G6Lz5nLz/91HBK6c1hAX9q61Co="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"tX0u8S+JsKPEa5oiuBwiIhWe0eI=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"2G6Lz5nLz/91HBK6c1hAX9q61Co=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cdX0zRbypAI+K+mhkoLDpuKOeWk="},{"type":"next-occurrence","id":"o1JlJW+sfLsI/nh3TmzfT33ENgY="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"2G6Lz5nLz/91HBK6c1hAX9q61Co=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"o1JlJW+sfLsI/nh3TmzfT33ENgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cdX0zRbypAI+K+mhkoLDpuKOeWk="},{"type":"next-occurrence","id":"8zcmSRzo8SsIGENl8bS6rWCQGhk="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"o1JlJW+sfLsI/nh3TmzfT33ENgY=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"8zcmSRzo8SsIGENl8bS6rWCQGhk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cdX0zRbypAI+K+mhkoLDpuKOeWk="},{"type":"next-occurrence","id":"AkHYuVMrGDzeuHcd/Lnbhhkx4C8="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"8zcmSRzo8SsIGENl8bS6rWCQGhk=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"AkHYuVMrGDzeuHcd/Lnbhhkx4C8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cdX0zRbypAI+K+mhkoLDpuKOeWk="},{"type":"next-occurrence","id":"+OdIkXCNfqdnxUWnSfM69A3HLyg="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"AkHYuVMrGDzeuHcd/Lnbhhkx4C8=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"+OdIkXCNfqdnxUWnSfM69A3HLyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cdX0zRbypAI+K+mhkoLDpuKOeWk="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"+OdIkXCNfqdnxUWnSfM69A3HLyg=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"Rqj/+6fHqlyxooFMzGyqWBLQoXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yCHIdRZ7cYty3LBY9tky+yrthHo="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"Rqj/+6fHqlyxooFMzGyqWBLQoXk=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"yCHIdRZ7cYty3LBY9tky+yrthHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rqj/+6fHqlyxooFMzGyqWBLQoXk="},{"type":"next-occurrence","id":"jOCeJPOQVd2foPPuHSXZR5qkXt4="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"yCHIdRZ7cYty3LBY9tky+yrthHo=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"jOCeJPOQVd2foPPuHSXZR5qkXt4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rqj/+6fHqlyxooFMzGyqWBLQoXk="},{"type":"next-occurrence","id":"cadG2agxHI+tQs4u7A/MjFWf9yE="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"jOCeJPOQVd2foPPuHSXZR5qkXt4=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"cadG2agxHI+tQs4u7A/MjFWf9yE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rqj/+6fHqlyxooFMzGyqWBLQoXk="},{"type":"next-occurrence","id":"3lJ0MddHPrduM7ZHjfjh5ggvOp8="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"cadG2agxHI+tQs4u7A/MjFWf9yE=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"3lJ0MddHPrduM7ZHjfjh5ggvOp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rqj/+6fHqlyxooFMzGyqWBLQoXk="},{"type":"next-occurrence","id":"BSyGwYur1TAUUAc6C/m/taNcLW8="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"3lJ0MddHPrduM7ZHjfjh5ggvOp8=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"BSyGwYur1TAUUAc6C/m/taNcLW8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rqj/+6fHqlyxooFMzGyqWBLQoXk="},{"type":"next-occurrence","id":"EdByGeNu+JF0MliB1/BNXpO8EPs="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"BSyGwYur1TAUUAc6C/m/taNcLW8=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"EdByGeNu+JF0MliB1/BNXpO8EPs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rqj/+6fHqlyxooFMzGyqWBLQoXk="},{"type":"next-occurrence","id":"eF9WH+LVQoA0wVyiyTHLTejNrC4="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"EdByGeNu+JF0MliB1/BNXpO8EPs=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"eF9WH+LVQoA0wVyiyTHLTejNrC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rqj/+6fHqlyxooFMzGyqWBLQoXk="},{"type":"next-occurrence","id":"UX9ZZm/9+dPi4xczQ5mTcPKMYxk="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"eF9WH+LVQoA0wVyiyTHLTejNrC4=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"UX9ZZm/9+dPi4xczQ5mTcPKMYxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rqj/+6fHqlyxooFMzGyqWBLQoXk="},{"type":"next-occurrence","id":"f5v6cW+RNk+qCtLISUcugLlymWU="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"UX9ZZm/9+dPi4xczQ5mTcPKMYxk=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"f5v6cW+RNk+qCtLISUcugLlymWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rqj/+6fHqlyxooFMzGyqWBLQoXk="},{"type":"next-occurrence","id":"UegaV9K2r38z64ResDqkWSxa8UI="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"f5v6cW+RNk+qCtLISUcugLlymWU=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"UegaV9K2r38z64ResDqkWSxa8UI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rqj/+6fHqlyxooFMzGyqWBLQoXk="},{"type":"next-occurrence","id":"M4DeppyVe3PcrzKvQpQu0qc2R/8="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"UegaV9K2r38z64ResDqkWSxa8UI=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"M4DeppyVe3PcrzKvQpQu0qc2R/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rqj/+6fHqlyxooFMzGyqWBLQoXk="},{"type":"next-occurrence","id":"QxD27k4gQ6Gn98odq3A8GFoJzsU="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"M4DeppyVe3PcrzKvQpQu0qc2R/8=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"QxD27k4gQ6Gn98odq3A8GFoJzsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rqj/+6fHqlyxooFMzGyqWBLQoXk="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"QxD27k4gQ6Gn98odq3A8GFoJzsU=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"wxRiLvtk/tJJpXB0WsLS+Cz+yTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2ZAUSpXuWpdsnb75T7oNvIy3X+E="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"wxRiLvtk/tJJpXB0WsLS+Cz+yTQ=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"2ZAUSpXuWpdsnb75T7oNvIy3X+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wxRiLvtk/tJJpXB0WsLS+Cz+yTQ="},{"type":"next-occurrence","id":"2TtQTroV1bN5Fvg0QDg7vBmYaJk="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"2ZAUSpXuWpdsnb75T7oNvIy3X+E=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"2TtQTroV1bN5Fvg0QDg7vBmYaJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wxRiLvtk/tJJpXB0WsLS+Cz+yTQ="},{"type":"next-occurrence","id":"9yrz+qJfQE4lXW5oseCc2EQ59ag="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"2TtQTroV1bN5Fvg0QDg7vBmYaJk=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"9yrz+qJfQE4lXW5oseCc2EQ59ag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wxRiLvtk/tJJpXB0WsLS+Cz+yTQ="},{"type":"next-occurrence","id":"6O1InTdmxsXpMsM87doAsMeP/2E="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"9yrz+qJfQE4lXW5oseCc2EQ59ag=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"6O1InTdmxsXpMsM87doAsMeP/2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wxRiLvtk/tJJpXB0WsLS+Cz+yTQ="},{"type":"next-occurrence","id":"n0kXUDxRqcuVSngiVfZmpjMk6dU="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"6O1InTdmxsXpMsM87doAsMeP/2E=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"n0kXUDxRqcuVSngiVfZmpjMk6dU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wxRiLvtk/tJJpXB0WsLS+Cz+yTQ="},{"type":"next-occurrence","id":"TdTTuldGtJmGs2UI2cTwsvShuBk="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"n0kXUDxRqcuVSngiVfZmpjMk6dU=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"TdTTuldGtJmGs2UI2cTwsvShuBk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wxRiLvtk/tJJpXB0WsLS+Cz+yTQ="},{"type":"next-occurrence","id":"PkMyc84bFhjfsW+Q4wjjJBkmVuY="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"TdTTuldGtJmGs2UI2cTwsvShuBk=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"PkMyc84bFhjfsW+Q4wjjJBkmVuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wxRiLvtk/tJJpXB0WsLS+Cz+yTQ="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"PkMyc84bFhjfsW+Q4wjjJBkmVuY=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"3a84NZ9PUUWWXruG6ZSTPEYHZng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JcbhGVwstMRjzCOyiJn32fzb+yQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"3a84NZ9PUUWWXruG6ZSTPEYHZng=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"JcbhGVwstMRjzCOyiJn32fzb+yQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3a84NZ9PUUWWXruG6ZSTPEYHZng="},{"type":"next-occurrence","id":"lXHiKXaCjhjWHU7k9njfRrNgp6s="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"JcbhGVwstMRjzCOyiJn32fzb+yQ=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"lXHiKXaCjhjWHU7k9njfRrNgp6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3a84NZ9PUUWWXruG6ZSTPEYHZng="},{"type":"next-occurrence","id":"undndlNfJS5vW5wemRC9aRU3Pcg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"lXHiKXaCjhjWHU7k9njfRrNgp6s=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"undndlNfJS5vW5wemRC9aRU3Pcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3a84NZ9PUUWWXruG6ZSTPEYHZng="},{"type":"next-occurrence","id":"n4sCOhbmoEb8IzsbPug4v5yUvs0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"undndlNfJS5vW5wemRC9aRU3Pcg=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"n4sCOhbmoEb8IzsbPug4v5yUvs0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3a84NZ9PUUWWXruG6ZSTPEYHZng="},{"type":"next-occurrence","id":"FvGeGfuI14agDoBYRCJ60gMrcHk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"n4sCOhbmoEb8IzsbPug4v5yUvs0=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"FvGeGfuI14agDoBYRCJ60gMrcHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3a84NZ9PUUWWXruG6ZSTPEYHZng="},{"type":"next-occurrence","id":"oeydbdplCyAsjXar0taZ24EVpWw="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"FvGeGfuI14agDoBYRCJ60gMrcHk=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"oeydbdplCyAsjXar0taZ24EVpWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3a84NZ9PUUWWXruG6ZSTPEYHZng="},{"type":"next-occurrence","id":"OnvEBVd5eMtjzlTdV49wm0+rhNs="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"oeydbdplCyAsjXar0taZ24EVpWw=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"OnvEBVd5eMtjzlTdV49wm0+rhNs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3a84NZ9PUUWWXruG6ZSTPEYHZng="},{"type":"next-occurrence","id":"peL/IHmlSyLpdK1FwgkL9BpMaL4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"OnvEBVd5eMtjzlTdV49wm0+rhNs=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"peL/IHmlSyLpdK1FwgkL9BpMaL4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3a84NZ9PUUWWXruG6ZSTPEYHZng="},{"type":"next-occurrence","id":"LrGz+R3UfgltsrDIINFRkEg07CA="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"peL/IHmlSyLpdK1FwgkL9BpMaL4=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"LrGz+R3UfgltsrDIINFRkEg07CA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3a84NZ9PUUWWXruG6ZSTPEYHZng="},{"type":"next-occurrence","id":"oLX3xQ+mKOBWr4Bz7UbDKdg6JV0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"LrGz+R3UfgltsrDIINFRkEg07CA=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"oLX3xQ+mKOBWr4Bz7UbDKdg6JV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3a84NZ9PUUWWXruG6ZSTPEYHZng="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"oLX3xQ+mKOBWr4Bz7UbDKdg6JV0=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"gxBEFbF8RsiNGCJz0nOKsQKH8F8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Fz7/PKGq3vPNV5zdnw1ZAF4C1UU="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"gxBEFbF8RsiNGCJz0nOKsQKH8F8=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"Fz7/PKGq3vPNV5zdnw1ZAF4C1UU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gxBEFbF8RsiNGCJz0nOKsQKH8F8="},{"type":"next-occurrence","id":"U/CETbpPjzsULoV24zl4tBKyZr4="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"Fz7/PKGq3vPNV5zdnw1ZAF4C1UU=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"U/CETbpPjzsULoV24zl4tBKyZr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gxBEFbF8RsiNGCJz0nOKsQKH8F8="},{"type":"next-occurrence","id":"AQFamWJ5JA8cag0ZWLWSVMXxGOE="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"U/CETbpPjzsULoV24zl4tBKyZr4=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"AQFamWJ5JA8cag0ZWLWSVMXxGOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gxBEFbF8RsiNGCJz0nOKsQKH8F8="},{"type":"next-occurrence","id":"/ME9AfvttTygebQFOnjR7bQLFks="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"AQFamWJ5JA8cag0ZWLWSVMXxGOE=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"/ME9AfvttTygebQFOnjR7bQLFks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gxBEFbF8RsiNGCJz0nOKsQKH8F8="},{"type":"next-occurrence","id":"X/kGm6ho8C9Lg6cIWxHEOqE38So="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"/ME9AfvttTygebQFOnjR7bQLFks=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"X/kGm6ho8C9Lg6cIWxHEOqE38So=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gxBEFbF8RsiNGCJz0nOKsQKH8F8="},{"type":"next-occurrence","id":"IiAkYl//ZQu5X3zY5imParUCljM="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"X/kGm6ho8C9Lg6cIWxHEOqE38So=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"IiAkYl//ZQu5X3zY5imParUCljM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gxBEFbF8RsiNGCJz0nOKsQKH8F8="},{"type":"next-occurrence","id":"o9m9T4f+/qO6aNJ53VGE5MqsAzE="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"IiAkYl//ZQu5X3zY5imParUCljM=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"o9m9T4f+/qO6aNJ53VGE5MqsAzE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gxBEFbF8RsiNGCJz0nOKsQKH8F8="},{"type":"next-occurrence","id":"QA9QIV00zY6Z5F6o41QN7phnZVk="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"o9m9T4f+/qO6aNJ53VGE5MqsAzE=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"QA9QIV00zY6Z5F6o41QN7phnZVk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gxBEFbF8RsiNGCJz0nOKsQKH8F8="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"QA9QIV00zY6Z5F6o41QN7phnZVk=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T20:00:00Z","end_date":"2026-05-28T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"QM1r4ao5SxgClcGRehDbTlqy5JE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aSQwTisq2q1hZ+Kh+TM2uZh1Boc="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"QM1r4ao5SxgClcGRehDbTlqy5JE=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"aSQwTisq2q1hZ+Kh+TM2uZh1Boc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QM1r4ao5SxgClcGRehDbTlqy5JE="},{"type":"next-occurrence","id":"LIZkoG1ARMVvSPejftjRj8bJ8+8="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"aSQwTisq2q1hZ+Kh+TM2uZh1Boc=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"LIZkoG1ARMVvSPejftjRj8bJ8+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QM1r4ao5SxgClcGRehDbTlqy5JE="},{"type":"next-occurrence","id":"pRRpUqtn2ZXPmuI0SCu7bbI0yfI="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"LIZkoG1ARMVvSPejftjRj8bJ8+8=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"pRRpUqtn2ZXPmuI0SCu7bbI0yfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QM1r4ao5SxgClcGRehDbTlqy5JE="},{"type":"next-occurrence","id":"40/OWna0izz2xOqWsrWjnYv54Dc="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"pRRpUqtn2ZXPmuI0SCu7bbI0yfI=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"40/OWna0izz2xOqWsrWjnYv54Dc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QM1r4ao5SxgClcGRehDbTlqy5JE="},{"type":"next-occurrence","id":"CoANXpEO8vHxDTR7L4ZgrL6nHc8="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"40/OWna0izz2xOqWsrWjnYv54Dc=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"CoANXpEO8vHxDTR7L4ZgrL6nHc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QM1r4ao5SxgClcGRehDbTlqy5JE="},{"type":"next-occurrence","id":"j4Vbza6Vhbeqmd2UZEP+flE1xo8="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"CoANXpEO8vHxDTR7L4ZgrL6nHc8=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"j4Vbza6Vhbeqmd2UZEP+flE1xo8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QM1r4ao5SxgClcGRehDbTlqy5JE="},{"type":"next-occurrence","id":"ThdixeOgIU7DtJJpfYy9TKuLFRA="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"j4Vbza6Vhbeqmd2UZEP+flE1xo8=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"ThdixeOgIU7DtJJpfYy9TKuLFRA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QM1r4ao5SxgClcGRehDbTlqy5JE="},{"type":"next-occurrence","id":"ILp5dAzHgOa+Wv5iBm5DJLiyWys="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"ThdixeOgIU7DtJJpfYy9TKuLFRA=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"ILp5dAzHgOa+Wv5iBm5DJLiyWys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QM1r4ao5SxgClcGRehDbTlqy5JE="},{"type":"next-occurrence","id":"IDitEPYcH8HzTFGIylLbttY/fxo="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"ILp5dAzHgOa+Wv5iBm5DJLiyWys=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"IDitEPYcH8HzTFGIylLbttY/fxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QM1r4ao5SxgClcGRehDbTlqy5JE="},{"type":"next-occurrence","id":"dYxCEMSVyzdBBXl29rTqtZt5CH4="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"IDitEPYcH8HzTFGIylLbttY/fxo=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"dYxCEMSVyzdBBXl29rTqtZt5CH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QM1r4ao5SxgClcGRehDbTlqy5JE="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"dYxCEMSVyzdBBXl29rTqtZt5CH4=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"hnsda1j2/W7oIESnYORWta5u5YU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vjp3KQQy7oy10we4qp4Z/1tWSNI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"hnsda1j2/W7oIESnYORWta5u5YU=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"vjp3KQQy7oy10we4qp4Z/1tWSNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hnsda1j2/W7oIESnYORWta5u5YU="},{"type":"next-occurrence","id":"4wj1B4DB48gg8b30zS5LKr7rDDU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"vjp3KQQy7oy10we4qp4Z/1tWSNI=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"4wj1B4DB48gg8b30zS5LKr7rDDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hnsda1j2/W7oIESnYORWta5u5YU="},{"type":"next-occurrence","id":"HqXXfIOZQNfpBka6xywiGOWcP2o="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"4wj1B4DB48gg8b30zS5LKr7rDDU=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"HqXXfIOZQNfpBka6xywiGOWcP2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hnsda1j2/W7oIESnYORWta5u5YU="},{"type":"next-occurrence","id":"TqJbK2bybOSer6Ismq21rvYkcxc="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"HqXXfIOZQNfpBka6xywiGOWcP2o=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"TqJbK2bybOSer6Ismq21rvYkcxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hnsda1j2/W7oIESnYORWta5u5YU="},{"type":"next-occurrence","id":"5hjipoo7bmF5QnXG6Ge57MZWir0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"TqJbK2bybOSer6Ismq21rvYkcxc=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"5hjipoo7bmF5QnXG6Ge57MZWir0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hnsda1j2/W7oIESnYORWta5u5YU="},{"type":"next-occurrence","id":"N2khLpm+O4uZ3xK+xRKwyoHtpYY="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"5hjipoo7bmF5QnXG6Ge57MZWir0=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"N2khLpm+O4uZ3xK+xRKwyoHtpYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hnsda1j2/W7oIESnYORWta5u5YU="},{"type":"next-occurrence","id":"CVlLbPaQZJnCau8MHFyEA2zBzpA="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"N2khLpm+O4uZ3xK+xRKwyoHtpYY=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"CVlLbPaQZJnCau8MHFyEA2zBzpA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hnsda1j2/W7oIESnYORWta5u5YU="},{"type":"next-occurrence","id":"3o8Pe8nnmBYCX+bcEbQA17oSeq8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"CVlLbPaQZJnCau8MHFyEA2zBzpA=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"3o8Pe8nnmBYCX+bcEbQA17oSeq8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hnsda1j2/W7oIESnYORWta5u5YU="},{"type":"next-occurrence","id":"CdH5OjKEWlBSHTvZGcBwuVxBvP4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"3o8Pe8nnmBYCX+bcEbQA17oSeq8=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"CdH5OjKEWlBSHTvZGcBwuVxBvP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hnsda1j2/W7oIESnYORWta5u5YU="},{"type":"next-occurrence","id":"ItKbo7xj9slxjM3yayvy5L+twvU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"CdH5OjKEWlBSHTvZGcBwuVxBvP4=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"ItKbo7xj9slxjM3yayvy5L+twvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hnsda1j2/W7oIESnYORWta5u5YU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"ItKbo7xj9slxjM3yayvy5L+twvU=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"OpoUXLSEWU2fWMRb+ua2mhdG/V8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WjGt7TzV/MLcxh4yANOCQirEnNA="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"OpoUXLSEWU2fWMRb+ua2mhdG/V8=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"WjGt7TzV/MLcxh4yANOCQirEnNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OpoUXLSEWU2fWMRb+ua2mhdG/V8="},{"type":"next-occurrence","id":"opNW4ELVKkQLH8FrToymv5y8cBg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"WjGt7TzV/MLcxh4yANOCQirEnNA=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"opNW4ELVKkQLH8FrToymv5y8cBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OpoUXLSEWU2fWMRb+ua2mhdG/V8="},{"type":"next-occurrence","id":"WQSOyzBwk1cNIq4+WsaPc0UFSSI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"opNW4ELVKkQLH8FrToymv5y8cBg=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"WQSOyzBwk1cNIq4+WsaPc0UFSSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OpoUXLSEWU2fWMRb+ua2mhdG/V8="},{"type":"next-occurrence","id":"MRNd4QwOa5iGG02HMW6DeGZ9jJQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"WQSOyzBwk1cNIq4+WsaPc0UFSSI=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"MRNd4QwOa5iGG02HMW6DeGZ9jJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OpoUXLSEWU2fWMRb+ua2mhdG/V8="},{"type":"next-occurrence","id":"iz11RAossSS0amxdf8iPp16PVBc="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"MRNd4QwOa5iGG02HMW6DeGZ9jJQ=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"iz11RAossSS0amxdf8iPp16PVBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OpoUXLSEWU2fWMRb+ua2mhdG/V8="},{"type":"next-occurrence","id":"bIeqiwE7AurpbtIyCFt7iriry0c="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"iz11RAossSS0amxdf8iPp16PVBc=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"bIeqiwE7AurpbtIyCFt7iriry0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OpoUXLSEWU2fWMRb+ua2mhdG/V8="},{"type":"next-occurrence","id":"EPn5F9E2RurTz7vAS2kyCPpgeR0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"bIeqiwE7AurpbtIyCFt7iriry0c=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"EPn5F9E2RurTz7vAS2kyCPpgeR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OpoUXLSEWU2fWMRb+ua2mhdG/V8="},{"type":"next-occurrence","id":"D2VDlzt4UVWc6EZyPns1mprdvTw="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"EPn5F9E2RurTz7vAS2kyCPpgeR0=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"D2VDlzt4UVWc6EZyPns1mprdvTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OpoUXLSEWU2fWMRb+ua2mhdG/V8="},{"type":"next-occurrence","id":"ZOP0NNkLDeNou0QJekjlKAJiyqM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"D2VDlzt4UVWc6EZyPns1mprdvTw=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"ZOP0NNkLDeNou0QJekjlKAJiyqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OpoUXLSEWU2fWMRb+ua2mhdG/V8="},{"type":"next-occurrence","id":"L6kd0PIdkb5Rbs+mpZ4HDwtBCNs="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"ZOP0NNkLDeNou0QJekjlKAJiyqM=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"L6kd0PIdkb5Rbs+mpZ4HDwtBCNs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OpoUXLSEWU2fWMRb+ua2mhdG/V8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"L6kd0PIdkb5Rbs+mpZ4HDwtBCNs=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"ERnJeVaID0M7zCfWY2yqHwGRz4U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iQUz17qGGeHTlOrZxmkPEaZmtIU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"ERnJeVaID0M7zCfWY2yqHwGRz4U=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"iQUz17qGGeHTlOrZxmkPEaZmtIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ERnJeVaID0M7zCfWY2yqHwGRz4U="},{"type":"next-occurrence","id":"1+4JBFzXXwKmB0NTYXOTXnhAC8Y="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"iQUz17qGGeHTlOrZxmkPEaZmtIU=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"1+4JBFzXXwKmB0NTYXOTXnhAC8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ERnJeVaID0M7zCfWY2yqHwGRz4U="},{"type":"next-occurrence","id":"q5yysF7y8HncWqntpVi/V60uHdg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"1+4JBFzXXwKmB0NTYXOTXnhAC8Y=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"q5yysF7y8HncWqntpVi/V60uHdg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ERnJeVaID0M7zCfWY2yqHwGRz4U="},{"type":"next-occurrence","id":"QfBG7R3I1If1WS8t1Gfp7AV0CZI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"q5yysF7y8HncWqntpVi/V60uHdg=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"QfBG7R3I1If1WS8t1Gfp7AV0CZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ERnJeVaID0M7zCfWY2yqHwGRz4U="},{"type":"next-occurrence","id":"0am96j7fJtJlwOjr3FffXP/3azE="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"QfBG7R3I1If1WS8t1Gfp7AV0CZI=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"0am96j7fJtJlwOjr3FffXP/3azE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ERnJeVaID0M7zCfWY2yqHwGRz4U="},{"type":"next-occurrence","id":"n1m8K46rfRw4RMzRIKI0rhVIY/g="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"0am96j7fJtJlwOjr3FffXP/3azE=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"n1m8K46rfRw4RMzRIKI0rhVIY/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ERnJeVaID0M7zCfWY2yqHwGRz4U="},{"type":"next-occurrence","id":"XVn3C9nLBNZiXSLPj7gQu2MWhc4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"n1m8K46rfRw4RMzRIKI0rhVIY/g=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"XVn3C9nLBNZiXSLPj7gQu2MWhc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ERnJeVaID0M7zCfWY2yqHwGRz4U="},{"type":"next-occurrence","id":"O/rnkbDFeJaLApJshO/0m55+huk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"XVn3C9nLBNZiXSLPj7gQu2MWhc4=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"O/rnkbDFeJaLApJshO/0m55+huk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ERnJeVaID0M7zCfWY2yqHwGRz4U="},{"type":"next-occurrence","id":"GCcJgIV9xaoXKiLEBfxLNYvnp1o="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"O/rnkbDFeJaLApJshO/0m55+huk=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"GCcJgIV9xaoXKiLEBfxLNYvnp1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ERnJeVaID0M7zCfWY2yqHwGRz4U="},{"type":"next-occurrence","id":"mEY6XQ4HD+1oAcBGCeZ1dQshq5E="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"GCcJgIV9xaoXKiLEBfxLNYvnp1o=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"mEY6XQ4HD+1oAcBGCeZ1dQshq5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ERnJeVaID0M7zCfWY2yqHwGRz4U="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"mEY6XQ4HD+1oAcBGCeZ1dQshq5E=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"6bvfzAJBcw1kDyzntiJzKnGng/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7Wfbz56JAAHVYHEThE5X732ndmA="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"6bvfzAJBcw1kDyzntiJzKnGng/Y=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"7Wfbz56JAAHVYHEThE5X732ndmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6bvfzAJBcw1kDyzntiJzKnGng/Y="},{"type":"next-occurrence","id":"khekFpcCCOpWsbYbiw0FLuOceYk="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"7Wfbz56JAAHVYHEThE5X732ndmA=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"khekFpcCCOpWsbYbiw0FLuOceYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6bvfzAJBcw1kDyzntiJzKnGng/Y="},{"type":"next-occurrence","id":"+GXJBVlVrw66W2lNwgMLuuf23iQ="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"khekFpcCCOpWsbYbiw0FLuOceYk=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"+GXJBVlVrw66W2lNwgMLuuf23iQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6bvfzAJBcw1kDyzntiJzKnGng/Y="},{"type":"next-occurrence","id":"xBSGVhA2VuMTUJktbA3qcCSzA1g="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"+GXJBVlVrw66W2lNwgMLuuf23iQ=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"xBSGVhA2VuMTUJktbA3qcCSzA1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6bvfzAJBcw1kDyzntiJzKnGng/Y="},{"type":"next-occurrence","id":"mQbRuLDMWuG4m9/O8Ls0QVE8sQU="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"xBSGVhA2VuMTUJktbA3qcCSzA1g=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"mQbRuLDMWuG4m9/O8Ls0QVE8sQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6bvfzAJBcw1kDyzntiJzKnGng/Y="},{"type":"next-occurrence","id":"RK+xrUcQxeiaJozQ3XnkgU3iP34="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"mQbRuLDMWuG4m9/O8Ls0QVE8sQU=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"RK+xrUcQxeiaJozQ3XnkgU3iP34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6bvfzAJBcw1kDyzntiJzKnGng/Y="},{"type":"next-occurrence","id":"aWE4sCSbBJed0czN2uPzhzW8wDE="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"RK+xrUcQxeiaJozQ3XnkgU3iP34=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"aWE4sCSbBJed0czN2uPzhzW8wDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6bvfzAJBcw1kDyzntiJzKnGng/Y="},{"type":"next-occurrence","id":"4wjgSrpOKMYfxz1/C2i6OPI80EA="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"aWE4sCSbBJed0czN2uPzhzW8wDE=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"4wjgSrpOKMYfxz1/C2i6OPI80EA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6bvfzAJBcw1kDyzntiJzKnGng/Y="},{"type":"next-occurrence","id":"+OPE/tXdeP9ULX8L0mD3OHyg45k="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"4wjgSrpOKMYfxz1/C2i6OPI80EA=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"+OPE/tXdeP9ULX8L0mD3OHyg45k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6bvfzAJBcw1kDyzntiJzKnGng/Y="},{"type":"next-occurrence","id":"+f3Cr/9StLJGRz/VSOi+Uw3mAog="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"+OPE/tXdeP9ULX8L0mD3OHyg45k=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"+f3Cr/9StLJGRz/VSOi+Uw3mAog=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6bvfzAJBcw1kDyzntiJzKnGng/Y="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"+f3Cr/9StLJGRz/VSOi+Uw3mAog=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"8/dBGgwYJPkAHEMy4v7qf7u7Grg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"r61BspcUSaDUWQmQ5GZvLDBQlYc="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"8/dBGgwYJPkAHEMy4v7qf7u7Grg=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"r61BspcUSaDUWQmQ5GZvLDBQlYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8/dBGgwYJPkAHEMy4v7qf7u7Grg="},{"type":"next-occurrence","id":"vJA/FvGiUwfuvjOdfviu9Ehx8pI="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"r61BspcUSaDUWQmQ5GZvLDBQlYc=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"vJA/FvGiUwfuvjOdfviu9Ehx8pI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8/dBGgwYJPkAHEMy4v7qf7u7Grg="},{"type":"next-occurrence","id":"GKXQcp4e24LoK0NYglLwtpw69OI="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"vJA/FvGiUwfuvjOdfviu9Ehx8pI=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"GKXQcp4e24LoK0NYglLwtpw69OI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8/dBGgwYJPkAHEMy4v7qf7u7Grg="},{"type":"next-occurrence","id":"OYmKrOD5YPmhs/79MQNkaET38+U="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"GKXQcp4e24LoK0NYglLwtpw69OI=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"OYmKrOD5YPmhs/79MQNkaET38+U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8/dBGgwYJPkAHEMy4v7qf7u7Grg="},{"type":"next-occurrence","id":"L8lILtYvn0wWEnBVjJRt+KpxnAk="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"OYmKrOD5YPmhs/79MQNkaET38+U=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"L8lILtYvn0wWEnBVjJRt+KpxnAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8/dBGgwYJPkAHEMy4v7qf7u7Grg="},{"type":"next-occurrence","id":"sNTsCzKdb43LLoKh6EkYX9iV7F0="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"L8lILtYvn0wWEnBVjJRt+KpxnAk=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"sNTsCzKdb43LLoKh6EkYX9iV7F0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8/dBGgwYJPkAHEMy4v7qf7u7Grg="},{"type":"next-occurrence","id":"YTEdtYWeE4jAQLt9lwzkYyWdGlg="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"sNTsCzKdb43LLoKh6EkYX9iV7F0=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"YTEdtYWeE4jAQLt9lwzkYyWdGlg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8/dBGgwYJPkAHEMy4v7qf7u7Grg="},{"type":"next-occurrence","id":"Bx9heBMJGx0bElW+uxUkgSR/zaM="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"YTEdtYWeE4jAQLt9lwzkYyWdGlg=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"Bx9heBMJGx0bElW+uxUkgSR/zaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8/dBGgwYJPkAHEMy4v7qf7u7Grg="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"Bx9heBMJGx0bElW+uxUkgSR/zaM=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T20:00:00Z","end_date":"2026-05-28T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"zhpXmWo352ibECvqK7mLehx8DXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bFVAjNEB3IP9msozbM4CwuP30xU="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"zhpXmWo352ibECvqK7mLehx8DXE=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"bFVAjNEB3IP9msozbM4CwuP30xU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zhpXmWo352ibECvqK7mLehx8DXE="},{"type":"next-occurrence","id":"FOcBaXjvg6AEW9le21/Yy6iGq10="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"bFVAjNEB3IP9msozbM4CwuP30xU=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"FOcBaXjvg6AEW9le21/Yy6iGq10=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zhpXmWo352ibECvqK7mLehx8DXE="},{"type":"next-occurrence","id":"bRnO2fXYE2fz5NGrhY4c7bsV4c0="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"FOcBaXjvg6AEW9le21/Yy6iGq10=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"bRnO2fXYE2fz5NGrhY4c7bsV4c0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zhpXmWo352ibECvqK7mLehx8DXE="},{"type":"next-occurrence","id":"Iy3axAncOZMNaoIkEdGnJOXYgxU="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"bRnO2fXYE2fz5NGrhY4c7bsV4c0=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"Iy3axAncOZMNaoIkEdGnJOXYgxU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zhpXmWo352ibECvqK7mLehx8DXE="},{"type":"next-occurrence","id":"HuFpEtzCGNfk73xx0GYQi+k7+E8="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"Iy3axAncOZMNaoIkEdGnJOXYgxU=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"HuFpEtzCGNfk73xx0GYQi+k7+E8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zhpXmWo352ibECvqK7mLehx8DXE="},{"type":"next-occurrence","id":"2HqePt2baTLKtaeX/qqfXUwrwbY="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"HuFpEtzCGNfk73xx0GYQi+k7+E8=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"2HqePt2baTLKtaeX/qqfXUwrwbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zhpXmWo352ibECvqK7mLehx8DXE="},{"type":"next-occurrence","id":"sjoamj0giq9TAELuCgSbslIlfNk="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"2HqePt2baTLKtaeX/qqfXUwrwbY=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"sjoamj0giq9TAELuCgSbslIlfNk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zhpXmWo352ibECvqK7mLehx8DXE="},{"type":"next-occurrence","id":"l56yAPCUydY6vII3MmS/Ry5MLfE="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"sjoamj0giq9TAELuCgSbslIlfNk=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"l56yAPCUydY6vII3MmS/Ry5MLfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zhpXmWo352ibECvqK7mLehx8DXE="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"l56yAPCUydY6vII3MmS/Ry5MLfE=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T20:00:00Z","end_date":"2026-05-28T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"LhXsVtYpnSmj+R3eKL11lcqMmhU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AzXax1mbwwQUzgSPUnJdRbjZQ/k="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"LhXsVtYpnSmj+R3eKL11lcqMmhU=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"AzXax1mbwwQUzgSPUnJdRbjZQ/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LhXsVtYpnSmj+R3eKL11lcqMmhU="},{"type":"next-occurrence","id":"g7vSbmF3uASAX1i70693LSCOxtE="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"AzXax1mbwwQUzgSPUnJdRbjZQ/k=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"g7vSbmF3uASAX1i70693LSCOxtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LhXsVtYpnSmj+R3eKL11lcqMmhU="},{"type":"next-occurrence","id":"fkJP/N5WiTZHdlv8akKMFAtZ4aI="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"g7vSbmF3uASAX1i70693LSCOxtE=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"fkJP/N5WiTZHdlv8akKMFAtZ4aI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LhXsVtYpnSmj+R3eKL11lcqMmhU="},{"type":"next-occurrence","id":"CsILV+W7BSlqVM6cAWQ8R/75sDA="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"fkJP/N5WiTZHdlv8akKMFAtZ4aI=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"CsILV+W7BSlqVM6cAWQ8R/75sDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LhXsVtYpnSmj+R3eKL11lcqMmhU="},{"type":"next-occurrence","id":"hXnYsw+kUWAaACi9uOztk9RefUE="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"CsILV+W7BSlqVM6cAWQ8R/75sDA=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"hXnYsw+kUWAaACi9uOztk9RefUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LhXsVtYpnSmj+R3eKL11lcqMmhU="},{"type":"next-occurrence","id":"pSfkTsDoBl+cxYhZz8WRBfB28tI="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"hXnYsw+kUWAaACi9uOztk9RefUE=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"pSfkTsDoBl+cxYhZz8WRBfB28tI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LhXsVtYpnSmj+R3eKL11lcqMmhU="},{"type":"next-occurrence","id":"6k6ur3V0g5IE1t3U0IvfZ8Vla+w="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"pSfkTsDoBl+cxYhZz8WRBfB28tI=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"6k6ur3V0g5IE1t3U0IvfZ8Vla+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LhXsVtYpnSmj+R3eKL11lcqMmhU="},{"type":"next-occurrence","id":"NvDfQoboMkVtOO1pmrldQTBVOFk="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"6k6ur3V0g5IE1t3U0IvfZ8Vla+w=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"NvDfQoboMkVtOO1pmrldQTBVOFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LhXsVtYpnSmj+R3eKL11lcqMmhU="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"NvDfQoboMkVtOO1pmrldQTBVOFk=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T20:00:00Z","end_date":"2026-05-28T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"zZIzGcUYUFQAy6f8MSd02YaSnqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"s4tVK2v2wYcWywoBXdhrV757k/s="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"zZIzGcUYUFQAy6f8MSd02YaSnqQ=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"s4tVK2v2wYcWywoBXdhrV757k/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZIzGcUYUFQAy6f8MSd02YaSnqQ="},{"type":"next-occurrence","id":"iP3ToIX9EzZ3yhNCXkwd6UZT6/A="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"s4tVK2v2wYcWywoBXdhrV757k/s=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"iP3ToIX9EzZ3yhNCXkwd6UZT6/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZIzGcUYUFQAy6f8MSd02YaSnqQ="},{"type":"next-occurrence","id":"Y21+Q9tuxH36e2YuC/da2aC4Dg8="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"iP3ToIX9EzZ3yhNCXkwd6UZT6/A=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"Y21+Q9tuxH36e2YuC/da2aC4Dg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZIzGcUYUFQAy6f8MSd02YaSnqQ="},{"type":"next-occurrence","id":"kx9vSEyyOwAb+PY/bZnTtE+KdwE="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"Y21+Q9tuxH36e2YuC/da2aC4Dg8=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"kx9vSEyyOwAb+PY/bZnTtE+KdwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZIzGcUYUFQAy6f8MSd02YaSnqQ="},{"type":"next-occurrence","id":"0Eld78ht8SI5fjShJLmgC2S8eaY="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"kx9vSEyyOwAb+PY/bZnTtE+KdwE=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"0Eld78ht8SI5fjShJLmgC2S8eaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZIzGcUYUFQAy6f8MSd02YaSnqQ="},{"type":"next-occurrence","id":"9NWwhHUpqCroiejaZsjMBWO7VsM="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"0Eld78ht8SI5fjShJLmgC2S8eaY=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"9NWwhHUpqCroiejaZsjMBWO7VsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZIzGcUYUFQAy6f8MSd02YaSnqQ="},{"type":"next-occurrence","id":"qYVy6fPv5sBImC0epyJhHcSxduk="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"9NWwhHUpqCroiejaZsjMBWO7VsM=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"qYVy6fPv5sBImC0epyJhHcSxduk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZIzGcUYUFQAy6f8MSd02YaSnqQ="},{"type":"next-occurrence","id":"gauXUDCv9r3wuYANZFa47l5AM9E="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"qYVy6fPv5sBImC0epyJhHcSxduk=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"gauXUDCv9r3wuYANZFa47l5AM9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZIzGcUYUFQAy6f8MSd02YaSnqQ="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"gauXUDCv9r3wuYANZFa47l5AM9E=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T20:00:00Z","end_date":"2026-05-28T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"Iwdj4+93Wms/X9W7n3TMRdu2MrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on I-84 HOV Lane eastbound Exit 60 - US 44/Middle Turnpike West (Manchester), Continuous Monday April 6th, 2026 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes closed","update_date":"2026-03-31T20:03:23Z"},"road_event_id":"Iwdj4+93Wms/X9W7n3TMRdu2MrY=","beginning_cross_street":"Exit 60 - US 44/Middle Turnpike West","ending_cross_street":"Exit 60 - US 44/Middle Turnpike West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.589968,41.773015]]}},{"id":"pzX0XLs44q6fOSeYxm54YcY3CWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2HCRxVICPTeEP214t2n/C9eBMGE="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"pzX0XLs44q6fOSeYxm54YcY3CWk=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"2HCRxVICPTeEP214t2n/C9eBMGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"0/y7lNd0XxH+FIS3KVz34+Ton/4="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"2HCRxVICPTeEP214t2n/C9eBMGE=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"0/y7lNd0XxH+FIS3KVz34+Ton/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"YlmDaoodNDbXKfuvqY4vbC6vpic="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"0/y7lNd0XxH+FIS3KVz34+Ton/4=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"YlmDaoodNDbXKfuvqY4vbC6vpic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"JpyDug0A/ZVGLoy2QKjaaw0aF8k="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"YlmDaoodNDbXKfuvqY4vbC6vpic=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"JpyDug0A/ZVGLoy2QKjaaw0aF8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"zvvyD3YWN+1bKBr6Yy5fE16I9zw="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"JpyDug0A/ZVGLoy2QKjaaw0aF8k=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"zvvyD3YWN+1bKBr6Yy5fE16I9zw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"ch5IQEPw6nX9syGrcPA7lqf2RC4="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"zvvyD3YWN+1bKBr6Yy5fE16I9zw=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"ch5IQEPw6nX9syGrcPA7lqf2RC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"Y0oAy3OscGI6y+UGJeVC0RV3INE="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"ch5IQEPw6nX9syGrcPA7lqf2RC4=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T22:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"Y0oAy3OscGI6y+UGJeVC0RV3INE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"+qScXHwrlBbyOVGF7nxAn8JT5u0="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"Y0oAy3OscGI6y+UGJeVC0RV3INE=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"+qScXHwrlBbyOVGF7nxAn8JT5u0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"Q1siE5aKCPemrUASQn6I4inRgME="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"+qScXHwrlBbyOVGF7nxAn8JT5u0=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"Q1siE5aKCPemrUASQn6I4inRgME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"C0474TjzX+IxNMXqqlC1GDeiu70="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"Q1siE5aKCPemrUASQn6I4inRgME=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"C0474TjzX+IxNMXqqlC1GDeiu70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"ariBIFOyWan+rmyVo46LR3kIQtQ="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"C0474TjzX+IxNMXqqlC1GDeiu70=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"ariBIFOyWan+rmyVo46LR3kIQtQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"LWoYWuc7mTLh/2lmCtCrqKdQYVY="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"ariBIFOyWan+rmyVo46LR3kIQtQ=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"LWoYWuc7mTLh/2lmCtCrqKdQYVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"GLILw0TzvUZm4xn/e9Y+NC+zgfM="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"LWoYWuc7mTLh/2lmCtCrqKdQYVY=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"GLILw0TzvUZm4xn/e9Y+NC+zgfM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"HYq2fOqEVy3V7QEO2T23DOKjjyU="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"GLILw0TzvUZm4xn/e9Y+NC+zgfM=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"HYq2fOqEVy3V7QEO2T23DOKjjyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"ibk3nE+RGYKsKtNn1gBZ+uwzaKE="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"HYq2fOqEVy3V7QEO2T23DOKjjyU=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"ibk3nE+RGYKsKtNn1gBZ+uwzaKE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"SDTaAmrzCb6zhnVA/zwNUdCQm6I="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"ibk3nE+RGYKsKtNn1gBZ+uwzaKE=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"SDTaAmrzCb6zhnVA/zwNUdCQm6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"wlyIVIOoZCrKSJoBJnUL5dBAqKE="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"SDTaAmrzCb6zhnVA/zwNUdCQm6I=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"wlyIVIOoZCrKSJoBJnUL5dBAqKE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"qUSC6I/YTAvy5xqVxeIOVhr84+I="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"wlyIVIOoZCrKSJoBJnUL5dBAqKE=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T22:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"qUSC6I/YTAvy5xqVxeIOVhr84+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"VJW1QSIs7BZ9t23JKuv+kZtRJrw="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"qUSC6I/YTAvy5xqVxeIOVhr84+I=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"VJW1QSIs7BZ9t23JKuv+kZtRJrw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"19nYq4ytGDPah5QKvhSdFJkrL0M="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"VJW1QSIs7BZ9t23JKuv+kZtRJrw=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"19nYq4ytGDPah5QKvhSdFJkrL0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"8EV4M46lqBpUgflKITIwmeSLYvk="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"19nYq4ytGDPah5QKvhSdFJkrL0M=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"8EV4M46lqBpUgflKITIwmeSLYvk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"MoNMTq/DjZrz1BZsHWkpZCsYxJY="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"8EV4M46lqBpUgflKITIwmeSLYvk=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"MoNMTq/DjZrz1BZsHWkpZCsYxJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="},{"type":"next-occurrence","id":"pW+GOQlYcQLZiSHHxK8d5Zk9HvA="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"MoNMTq/DjZrz1BZsHWkpZCsYxJY=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"pW+GOQlYcQLZiSHHxK8d5Zk9HvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pzX0XLs44q6fOSeYxm54YcY3CWk="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"pW+GOQlYcQLZiSHHxK8d5Zk9HvA=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"D/I4M2N71ckJpLitBi8vpeXg6TM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GzHVCzGkTUvz4nYA/HYXND1ARMU="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"D/I4M2N71ckJpLitBi8vpeXg6TM=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"GzHVCzGkTUvz4nYA/HYXND1ARMU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D/I4M2N71ckJpLitBi8vpeXg6TM="},{"type":"next-occurrence","id":"sS8KWehVf7FDiOsDY9/yxrSpvLo="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"GzHVCzGkTUvz4nYA/HYXND1ARMU=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"sS8KWehVf7FDiOsDY9/yxrSpvLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D/I4M2N71ckJpLitBi8vpeXg6TM="},{"type":"next-occurrence","id":"fHIgWtNzaKVHmKiGG8u+o2MNs5g="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"sS8KWehVf7FDiOsDY9/yxrSpvLo=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"fHIgWtNzaKVHmKiGG8u+o2MNs5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D/I4M2N71ckJpLitBi8vpeXg6TM="},{"type":"next-occurrence","id":"BsmcXCgvR+H+k13pI0Dwmtm9D7I="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"fHIgWtNzaKVHmKiGG8u+o2MNs5g=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"BsmcXCgvR+H+k13pI0Dwmtm9D7I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D/I4M2N71ckJpLitBi8vpeXg6TM="},{"type":"next-occurrence","id":"/3lQpgjFNHk16CJ4MBxVN7JUl9E="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"BsmcXCgvR+H+k13pI0Dwmtm9D7I=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"/3lQpgjFNHk16CJ4MBxVN7JUl9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D/I4M2N71ckJpLitBi8vpeXg6TM="},{"type":"next-occurrence","id":"mLUp/ISKFxhJqhPu9YxZV51RdRM="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"/3lQpgjFNHk16CJ4MBxVN7JUl9E=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"mLUp/ISKFxhJqhPu9YxZV51RdRM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D/I4M2N71ckJpLitBi8vpeXg6TM="},{"type":"next-occurrence","id":"trqgS9L2YTedFCWqH7R1v2n8wt8="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"mLUp/ISKFxhJqhPu9YxZV51RdRM=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"trqgS9L2YTedFCWqH7R1v2n8wt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D/I4M2N71ckJpLitBi8vpeXg6TM="},{"type":"next-occurrence","id":"sRiOP3rgXp5oNNIfDmQsLOg3GvE="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"trqgS9L2YTedFCWqH7R1v2n8wt8=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"sRiOP3rgXp5oNNIfDmQsLOg3GvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D/I4M2N71ckJpLitBi8vpeXg6TM="},{"type":"next-occurrence","id":"GQrqyjdIeSYH7ytaDgd8xKQsNpw="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"sRiOP3rgXp5oNNIfDmQsLOg3GvE=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"GQrqyjdIeSYH7ytaDgd8xKQsNpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D/I4M2N71ckJpLitBi8vpeXg6TM="},{"type":"next-occurrence","id":"XRucgrtgE/w92aL+7MtKnpwd6y0="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"GQrqyjdIeSYH7ytaDgd8xKQsNpw=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"XRucgrtgE/w92aL+7MtKnpwd6y0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D/I4M2N71ckJpLitBi8vpeXg6TM="},{"type":"next-occurrence","id":"i/QINpiP6x30B9eCwH22Bw8mlhY="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"XRucgrtgE/w92aL+7MtKnpwd6y0=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"i/QINpiP6x30B9eCwH22Bw8mlhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D/I4M2N71ckJpLitBi8vpeXg6TM="},{"type":"next-occurrence","id":"rm/q+J9fcvWtL4jn7gpnVrmwlp0="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"i/QINpiP6x30B9eCwH22Bw8mlhY=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"rm/q+J9fcvWtL4jn7gpnVrmwlp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D/I4M2N71ckJpLitBi8vpeXg6TM="},{"type":"next-occurrence","id":"SAzlM80yUlLeqyqL2WT0EMsl6ck="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"rm/q+J9fcvWtL4jn7gpnVrmwlp0=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"SAzlM80yUlLeqyqL2WT0EMsl6ck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D/I4M2N71ckJpLitBi8vpeXg6TM="},{"type":"next-occurrence","id":"gf56+CVyoJpq+POPrCpINPo3gyw="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"SAzlM80yUlLeqyqL2WT0EMsl6ck=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"gf56+CVyoJpq+POPrCpINPo3gyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D/I4M2N71ckJpLitBi8vpeXg6TM="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"gf56+CVyoJpq+POPrCpINPo3gyw=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"4lm4zRdVJhPcKGqv5FD0U/FIQj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yhREt4iEbGcyFK5pOIqK41Uz+Hs="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"4lm4zRdVJhPcKGqv5FD0U/FIQj0=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"yhREt4iEbGcyFK5pOIqK41Uz+Hs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lm4zRdVJhPcKGqv5FD0U/FIQj0="},{"type":"next-occurrence","id":"/c3acYQSiWROebGy0eS+OvI03go="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"yhREt4iEbGcyFK5pOIqK41Uz+Hs=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"/c3acYQSiWROebGy0eS+OvI03go=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lm4zRdVJhPcKGqv5FD0U/FIQj0="},{"type":"next-occurrence","id":"bsuTAsDPyLuU+zIkyUow7FLbDdw="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"/c3acYQSiWROebGy0eS+OvI03go=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"bsuTAsDPyLuU+zIkyUow7FLbDdw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lm4zRdVJhPcKGqv5FD0U/FIQj0="},{"type":"next-occurrence","id":"MhkK4+3fUVE5AUMM0kGqsfHVPiM="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"bsuTAsDPyLuU+zIkyUow7FLbDdw=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"MhkK4+3fUVE5AUMM0kGqsfHVPiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lm4zRdVJhPcKGqv5FD0U/FIQj0="},{"type":"next-occurrence","id":"UEAWC+kHd5AT+PilLF4sTyhHiE8="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"MhkK4+3fUVE5AUMM0kGqsfHVPiM=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"UEAWC+kHd5AT+PilLF4sTyhHiE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lm4zRdVJhPcKGqv5FD0U/FIQj0="},{"type":"next-occurrence","id":"uBKZzzYP9vIs1HaLcAG7f9Pi55M="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"UEAWC+kHd5AT+PilLF4sTyhHiE8=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"uBKZzzYP9vIs1HaLcAG7f9Pi55M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lm4zRdVJhPcKGqv5FD0U/FIQj0="},{"type":"next-occurrence","id":"DNiYj/u2TFWh/WYVoInUAygVTUE="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"uBKZzzYP9vIs1HaLcAG7f9Pi55M=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"DNiYj/u2TFWh/WYVoInUAygVTUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lm4zRdVJhPcKGqv5FD0U/FIQj0="},{"type":"next-occurrence","id":"UGKWfnORvXD/nNuv4kCB+Hw0ugc="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"DNiYj/u2TFWh/WYVoInUAygVTUE=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"UGKWfnORvXD/nNuv4kCB+Hw0ugc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lm4zRdVJhPcKGqv5FD0U/FIQj0="},{"type":"next-occurrence","id":"MgWu1LghnmxNcqtC0lM2mCYq0Bc="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"UGKWfnORvXD/nNuv4kCB+Hw0ugc=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"MgWu1LghnmxNcqtC0lM2mCYq0Bc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lm4zRdVJhPcKGqv5FD0U/FIQj0="},{"type":"next-occurrence","id":"BizXp2qveH3xxKgYZoRLK/C7Qq8="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"MgWu1LghnmxNcqtC0lM2mCYq0Bc=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"BizXp2qveH3xxKgYZoRLK/C7Qq8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lm4zRdVJhPcKGqv5FD0U/FIQj0="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"BizXp2qveH3xxKgYZoRLK/C7Qq8=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"sUOcpjlKAahNuk3Wbmm7lgFtHHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAHAM VILLAGE RD"],"direction":"unknown","related_road_events":[],"description":"Bridge work on GRAHAM VILLAGE RD both directions between NORTHSIDE DR (Torrington) and TERRACE DR (Torrington) Motorist can expect a lane closure with switching traffic from two lanes to one lane alternating traffic, Continuous Wednesday April 8th, 2026 12:00 AM thru Friday July 31st, 2026 11:59 PM All lanes open","update_date":"2026-03-31T20:19:26Z"},"road_event_id":"sUOcpjlKAahNuk3Wbmm7lgFtHHI=","beginning_cross_street":"NORTHSIDE DR","ending_cross_street":"TERRACE DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.112597,41.821571]]}},{"id":"d+qfQf4VVmkTjwI200CFWtFJDsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1+J1y/4H6MuQ5voaikRLNVwQKZ4="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Mon","update_date":"2026-05-09T18:01:12Z"},"road_event_id":"d+qfQf4VVmkTjwI200CFWtFJDsg=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"1+J1y/4H6MuQ5voaikRLNVwQKZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d+qfQf4VVmkTjwI200CFWtFJDsg="},{"type":"next-occurrence","id":"PrnM30Yb9ZxROtMiKHNG/bxVpU8="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Mon","update_date":"2026-05-09T18:01:12Z"},"road_event_id":"1+J1y/4H6MuQ5voaikRLNVwQKZ4=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"PrnM30Yb9ZxROtMiKHNG/bxVpU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d+qfQf4VVmkTjwI200CFWtFJDsg="},{"type":"next-occurrence","id":"VUIB+HZxNshDoXKVLXTWrTt+YDg="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Mon","update_date":"2026-05-09T18:01:12Z"},"road_event_id":"PrnM30Yb9ZxROtMiKHNG/bxVpU8=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"VUIB+HZxNshDoXKVLXTWrTt+YDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d+qfQf4VVmkTjwI200CFWtFJDsg="},{"type":"next-occurrence","id":"4T22uZvv7SC6o1wyuQ3LYbesGXM="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Mon","update_date":"2026-05-09T18:01:12Z"},"road_event_id":"VUIB+HZxNshDoXKVLXTWrTt+YDg=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"4T22uZvv7SC6o1wyuQ3LYbesGXM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d+qfQf4VVmkTjwI200CFWtFJDsg="},{"type":"next-occurrence","id":"321j2TAf6iPj5ZRTHG7VKO+ojHk="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Mon","update_date":"2026-05-09T18:01:12Z"},"road_event_id":"4T22uZvv7SC6o1wyuQ3LYbesGXM=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"321j2TAf6iPj5ZRTHG7VKO+ojHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d+qfQf4VVmkTjwI200CFWtFJDsg="},{"type":"next-occurrence","id":"Z8Gl/uFBnzXOEWFntcd+Us0/0ZY="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Mon","update_date":"2026-05-09T18:01:12Z"},"road_event_id":"321j2TAf6iPj5ZRTHG7VKO+ojHk=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"Z8Gl/uFBnzXOEWFntcd+Us0/0ZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d+qfQf4VVmkTjwI200CFWtFJDsg="},{"type":"next-occurrence","id":"Ckw/Nny4lS/S5JwXvs0JWmoq+5M="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Mon","update_date":"2026-05-09T18:01:12Z"},"road_event_id":"Z8Gl/uFBnzXOEWFntcd+Us0/0ZY=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"Ckw/Nny4lS/S5JwXvs0JWmoq+5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d+qfQf4VVmkTjwI200CFWtFJDsg="},{"type":"next-occurrence","id":"Qi91HnDq7ZD9ElTKZzm1ij2IWH4="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Mon","update_date":"2026-05-09T18:01:12Z"},"road_event_id":"Ckw/Nny4lS/S5JwXvs0JWmoq+5M=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"Qi91HnDq7ZD9ElTKZzm1ij2IWH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d+qfQf4VVmkTjwI200CFWtFJDsg="},{"type":"next-occurrence","id":"RqXB4z5Uq8K5Tv23LxIiCa+mMqE="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Mon","update_date":"2026-05-09T18:01:12Z"},"road_event_id":"Qi91HnDq7ZD9ElTKZzm1ij2IWH4=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"RqXB4z5Uq8K5Tv23LxIiCa+mMqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d+qfQf4VVmkTjwI200CFWtFJDsg="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Mon","update_date":"2026-05-09T18:01:12Z"},"road_event_id":"RqXB4z5Uq8K5Tv23LxIiCa+mMqE=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"iQbm/kUq7bxVBdAnSj/gKP+1ZRc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-95 southbound between Exit 85 - CT 184/US 1N (Groton) and Exit 84 - CT 32 (New London), Continuous Monday April 6th, 2026 08:00 PM thru Thursday October 31st, 2030 06:00 AM 2 Left lanes of 6 lanes closed","update_date":"2026-04-01T17:31:56Z"},"road_event_id":"iQbm/kUq7bxVBdAnSj/gKP+1ZRc=","beginning_cross_street":"Exit 85 - CT 184/US 1N","ending_cross_street":"Exit 84 - CT 32","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.080515,41.364692]]}},{"id":"KExx3PpmpYCbc/Sis3gnpViszYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Bridge work and traffic shift on I-95 northbound between Exit 84 - CT 32 (New London) and Exit 85 - CT 184/US 1N (Groton) Only two (2) lanes of traffic will be allowed on the northbound bridge. All other northbound traffic will be required to use the crossover onto the southbound bridge to travel north., Continuous Saturday May 9th, 2026 08:00 PM thru Thursday October 31st, 2030 06:00 AM 3 Left lanes of 5 lanes closed","update_date":"2026-04-01T17:36:33Z"},"road_event_id":"KExx3PpmpYCbc/Sis3gnpViszYk=","beginning_cross_street":"Exit 84 - CT 32","ending_cross_street":"Exit 85 - CT 184/US 1N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.094974,41.363528]]}},{"id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tF2S8RxUrWVCPcilacn3F0Zmdk0="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"tF2S8RxUrWVCPcilacn3F0Zmdk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"QkIYb/IdKbCUJmvGAAPq+GL2psk="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"tF2S8RxUrWVCPcilacn3F0Zmdk0=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"QkIYb/IdKbCUJmvGAAPq+GL2psk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"/vokIgCT4o9IbNVQM2Ti2iIeIaU="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"QkIYb/IdKbCUJmvGAAPq+GL2psk=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"/vokIgCT4o9IbNVQM2Ti2iIeIaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"VJNUvLCgn2p5MkLQp4pteIFXHLM="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"/vokIgCT4o9IbNVQM2Ti2iIeIaU=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"VJNUvLCgn2p5MkLQp4pteIFXHLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"Oj/EQkX5mw1DsZUXtlyd0SWWbes="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"VJNUvLCgn2p5MkLQp4pteIFXHLM=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"Oj/EQkX5mw1DsZUXtlyd0SWWbes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"ipFMv8fK3vFAxH9a/M9QAFjkxww="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"Oj/EQkX5mw1DsZUXtlyd0SWWbes=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"ipFMv8fK3vFAxH9a/M9QAFjkxww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"CRjXSCD9iczm8P8F7XQDwxSZAYk="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"ipFMv8fK3vFAxH9a/M9QAFjkxww=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T14:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"CRjXSCD9iczm8P8F7XQDwxSZAYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"Acej9fWMf8iX3E6puhXXOAUQauw="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"CRjXSCD9iczm8P8F7XQDwxSZAYk=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T14:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"Acej9fWMf8iX3E6puhXXOAUQauw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"sHw2n/oBGMfFG2VAmZMUeAL2Ti8="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"Acej9fWMf8iX3E6puhXXOAUQauw=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"sHw2n/oBGMfFG2VAmZMUeAL2Ti8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"AQu4PAFfkpVT/k6IRHwJVDsUd14="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"sHw2n/oBGMfFG2VAmZMUeAL2Ti8=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"AQu4PAFfkpVT/k6IRHwJVDsUd14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"IQdWtdedUoLVSlQScerzP49xPdE="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"AQu4PAFfkpVT/k6IRHwJVDsUd14=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"IQdWtdedUoLVSlQScerzP49xPdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"uMCIxsTlzhXL9N582CxH0k/599M="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"IQdWtdedUoLVSlQScerzP49xPdE=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"uMCIxsTlzhXL9N582CxH0k/599M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"wwoLCLYWJKx1iBk8I+7uzOfFB2Y="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"uMCIxsTlzhXL9N582CxH0k/599M=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"wwoLCLYWJKx1iBk8I+7uzOfFB2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"sVMC84No4LT7+CCwxrsDvHLSD2E="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"wwoLCLYWJKx1iBk8I+7uzOfFB2Y=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"sVMC84No4LT7+CCwxrsDvHLSD2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"9Fdj2qMnt92H7QqV8rDYHBYjN1I="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"sVMC84No4LT7+CCwxrsDvHLSD2E=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"9Fdj2qMnt92H7QqV8rDYHBYjN1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"mucC0Zn/UgA0V3QKow4FT24GUPw="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"9Fdj2qMnt92H7QqV8rDYHBYjN1I=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"mucC0Zn/UgA0V3QKow4FT24GUPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"4ikhwJAcRVVwM9ot/z4HsglsWPc="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"mucC0Zn/UgA0V3QKow4FT24GUPw=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"4ikhwJAcRVVwM9ot/z4HsglsWPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"v2vxQZfOJIeqBphBcCjQmaKBog0="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"4ikhwJAcRVVwM9ot/z4HsglsWPc=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"v2vxQZfOJIeqBphBcCjQmaKBog0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"TZ4sp6R/I7PLVccli3nGQTsRZEE="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"v2vxQZfOJIeqBphBcCjQmaKBog0=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T14:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"TZ4sp6R/I7PLVccli3nGQTsRZEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"oUzmVneNhplbRf2JVAjSoNASvW0="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"TZ4sp6R/I7PLVccli3nGQTsRZEE=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T14:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"oUzmVneNhplbRf2JVAjSoNASvW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"9dVR0AXtNZT9El9/xefsClUDPaI="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"oUzmVneNhplbRf2JVAjSoNASvW0=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"9dVR0AXtNZT9El9/xefsClUDPaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"+9yvhHrj8GthZOrEnppqb+xSPYQ="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"9dVR0AXtNZT9El9/xefsClUDPaI=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"+9yvhHrj8GthZOrEnppqb+xSPYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"Y3fgoFx0I+NbW2y29LAgskjp5Ek="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"+9yvhHrj8GthZOrEnppqb+xSPYQ=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"Y3fgoFx0I+NbW2y29LAgskjp5Ek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"3QzbdHTIshA5KXzLryISdkFhAkk="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"Y3fgoFx0I+NbW2y29LAgskjp5Ek=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"3QzbdHTIshA5KXzLryISdkFhAkk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="},{"type":"next-occurrence","id":"2ov/cNKpl7NSwWHe0JI9ZZUqFUA="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"3QzbdHTIshA5KXzLryISdkFhAkk=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"2ov/cNKpl7NSwWHe0JI9ZZUqFUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AjzxZGpAy8aOS6UxIBQjBi6kD4g="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"2ov/cNKpl7NSwWHe0JI9ZZUqFUA=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rMs3sFkUX67+iXshQIyD2vdJLGU="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"rMs3sFkUX67+iXshQIyD2vdJLGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"pNe7LXXdJbL3Z1lZyzkymzhYNCs="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"rMs3sFkUX67+iXshQIyD2vdJLGU=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"pNe7LXXdJbL3Z1lZyzkymzhYNCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"e7JeuExKODCqVatFei0X4mZkzIY="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"pNe7LXXdJbL3Z1lZyzkymzhYNCs=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"e7JeuExKODCqVatFei0X4mZkzIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"CNrR/1XcgjylHA3VrFgTVybG2Pc="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"e7JeuExKODCqVatFei0X4mZkzIY=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"CNrR/1XcgjylHA3VrFgTVybG2Pc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"DDAXF2qW/CoGGnXs+YVUDu3Kf/M="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"CNrR/1XcgjylHA3VrFgTVybG2Pc=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"DDAXF2qW/CoGGnXs+YVUDu3Kf/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"PNrwmfoC7GbV1P0Kn0wgCeaIxD0="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"DDAXF2qW/CoGGnXs+YVUDu3Kf/M=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"PNrwmfoC7GbV1P0Kn0wgCeaIxD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"ALek02gk/ccM6zy5SN1YiRLDvcw="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"PNrwmfoC7GbV1P0Kn0wgCeaIxD0=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T14:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"ALek02gk/ccM6zy5SN1YiRLDvcw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"iE+4tlxkDzpK+uvLnGjc/+mh4Mk="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"ALek02gk/ccM6zy5SN1YiRLDvcw=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T14:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"iE+4tlxkDzpK+uvLnGjc/+mh4Mk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"9GLcR4U7z/vwfkKV+BGCkkuAD50="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"iE+4tlxkDzpK+uvLnGjc/+mh4Mk=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"9GLcR4U7z/vwfkKV+BGCkkuAD50=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"4t/v88WT4aDYXYeipRjJP0joMp4="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"9GLcR4U7z/vwfkKV+BGCkkuAD50=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"4t/v88WT4aDYXYeipRjJP0joMp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"T8DJvmLF5FNw6niLIc2U/JyP99c="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"4t/v88WT4aDYXYeipRjJP0joMp4=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"T8DJvmLF5FNw6niLIc2U/JyP99c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"OwGm+jwRbbQL+gScBR7nczaPJzY="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"T8DJvmLF5FNw6niLIc2U/JyP99c=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"OwGm+jwRbbQL+gScBR7nczaPJzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"oG/WsdhiYOP6h5Bvnsqc7fPMimE="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"OwGm+jwRbbQL+gScBR7nczaPJzY=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"oG/WsdhiYOP6h5Bvnsqc7fPMimE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"y5tu1I1bKcgH5RyfVTMIJKEVQKw="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"oG/WsdhiYOP6h5Bvnsqc7fPMimE=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"y5tu1I1bKcgH5RyfVTMIJKEVQKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"Tz10vHnQkJ/gaq+XgB64BMfBbrE="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"y5tu1I1bKcgH5RyfVTMIJKEVQKw=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"Tz10vHnQkJ/gaq+XgB64BMfBbrE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"pyQxEpf1wdmGDv6o6iVERoAj7cc="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"Tz10vHnQkJ/gaq+XgB64BMfBbrE=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"pyQxEpf1wdmGDv6o6iVERoAj7cc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"F00C5UeHI1Hodej+C+8mSFx7EMU="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"pyQxEpf1wdmGDv6o6iVERoAj7cc=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"F00C5UeHI1Hodej+C+8mSFx7EMU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"Eao2tuddfTH+jbQ4PbbtVcYjPik="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"F00C5UeHI1Hodej+C+8mSFx7EMU=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"Eao2tuddfTH+jbQ4PbbtVcYjPik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"Mw8X57VDoJGjlQl8YY14kCuxw40="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"Eao2tuddfTH+jbQ4PbbtVcYjPik=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T14:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"Mw8X57VDoJGjlQl8YY14kCuxw40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"lvzGDL5+tNu788dA2E15Y9FzIvo="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"Mw8X57VDoJGjlQl8YY14kCuxw40=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T14:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"lvzGDL5+tNu788dA2E15Y9FzIvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"1hB/bENWrQExzDKLtpHFgYQI4nQ="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"lvzGDL5+tNu788dA2E15Y9FzIvo=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"1hB/bENWrQExzDKLtpHFgYQI4nQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"LHLLp45/mBMg2A8DO9p8vINPUm0="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"1hB/bENWrQExzDKLtpHFgYQI4nQ=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"LHLLp45/mBMg2A8DO9p8vINPUm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"2pYksii0+7dq03j4vNyLHjHi3uo="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"LHLLp45/mBMg2A8DO9p8vINPUm0=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"2pYksii0+7dq03j4vNyLHjHi3uo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"8UADrP5omZr3cCiLiFQdeuD0XOU="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"2pYksii0+7dq03j4vNyLHjHi3uo=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"8UADrP5omZr3cCiLiFQdeuD0XOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="},{"type":"next-occurrence","id":"tKRtNtzTmje6Y2haqdeEuRd+KBs="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"8UADrP5omZr3cCiLiFQdeuD0XOU=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"tKRtNtzTmje6Y2haqdeEuRd+KBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSExcAtECEn1RQ3Sxo9IdVpuC/o="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"tKRtNtzTmje6Y2haqdeEuRd+KBs=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"YMF15//A3t+Vk+c1ck3HOR3LDQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RSgi9lX+L1M47xO07Tg9D7OaqOQ="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"YMF15//A3t+Vk+c1ck3HOR3LDQc=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"RSgi9lX+L1M47xO07Tg9D7OaqOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"S4NLd5EMPt8tRan0AxNrgFU655s="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"RSgi9lX+L1M47xO07Tg9D7OaqOQ=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"S4NLd5EMPt8tRan0AxNrgFU655s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"Q2sUluA3e9+GWhV6t0y711kj1hA="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"S4NLd5EMPt8tRan0AxNrgFU655s=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"Q2sUluA3e9+GWhV6t0y711kj1hA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"HAeSCjNCZcspr2ki3yPE0hwt3nA="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"Q2sUluA3e9+GWhV6t0y711kj1hA=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"HAeSCjNCZcspr2ki3yPE0hwt3nA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"Jzx+Te2m9CY2G/SEp7UOB9eyAm0="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"HAeSCjNCZcspr2ki3yPE0hwt3nA=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"Jzx+Te2m9CY2G/SEp7UOB9eyAm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"V+G0qmuKhWikyL4F41we1QYJNuY="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"Jzx+Te2m9CY2G/SEp7UOB9eyAm0=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"V+G0qmuKhWikyL4F41we1QYJNuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"TKjYVXK3t3IQSkxVycTmk6Vho+4="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"V+G0qmuKhWikyL4F41we1QYJNuY=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T14:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"TKjYVXK3t3IQSkxVycTmk6Vho+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"OAyd3VHmdRe0GlkhYvgPcGI50zI="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"TKjYVXK3t3IQSkxVycTmk6Vho+4=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T14:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"OAyd3VHmdRe0GlkhYvgPcGI50zI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"jkJGTTksCNkIRMwo5WbQ9wyQez8="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"OAyd3VHmdRe0GlkhYvgPcGI50zI=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"jkJGTTksCNkIRMwo5WbQ9wyQez8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"LzvUVNI4G+s2CmVhGbh3YH8NQEs="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"jkJGTTksCNkIRMwo5WbQ9wyQez8=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"LzvUVNI4G+s2CmVhGbh3YH8NQEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"uTme8pnvJFDJp5/Jmz5Nxm5mQ9w="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"LzvUVNI4G+s2CmVhGbh3YH8NQEs=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"uTme8pnvJFDJp5/Jmz5Nxm5mQ9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"oRhFiORm3XoTJUQYUofgkZl4U9Y="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"uTme8pnvJFDJp5/Jmz5Nxm5mQ9w=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"oRhFiORm3XoTJUQYUofgkZl4U9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"mLhErb2DalLxlDAtvroXgVsjgA8="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"oRhFiORm3XoTJUQYUofgkZl4U9Y=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"mLhErb2DalLxlDAtvroXgVsjgA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"419W7grwDVLeXCIlq54l2PB7Dug="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"mLhErb2DalLxlDAtvroXgVsjgA8=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"419W7grwDVLeXCIlq54l2PB7Dug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"bw/8TA5nIA0Z4Dy1tloEeR4PCxY="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"419W7grwDVLeXCIlq54l2PB7Dug=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"bw/8TA5nIA0Z4Dy1tloEeR4PCxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"WHjp7hEATrgLGl1NYn4UkQsSRvQ="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"bw/8TA5nIA0Z4Dy1tloEeR4PCxY=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"WHjp7hEATrgLGl1NYn4UkQsSRvQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"5f5dEFlqgQtqnMmElciaiMtGTmQ="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"WHjp7hEATrgLGl1NYn4UkQsSRvQ=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"5f5dEFlqgQtqnMmElciaiMtGTmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"Cu4lBxS3sJqhQcx8famBe8IJIPU="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"5f5dEFlqgQtqnMmElciaiMtGTmQ=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"Cu4lBxS3sJqhQcx8famBe8IJIPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"OsfLL9gKEWW4ErThOKwM0DjF268="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"Cu4lBxS3sJqhQcx8famBe8IJIPU=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T14:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"OsfLL9gKEWW4ErThOKwM0DjF268=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"4F8IAuOeQdKLWo7+HE8eO3X1oXE="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"OsfLL9gKEWW4ErThOKwM0DjF268=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T14:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"4F8IAuOeQdKLWo7+HE8eO3X1oXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"d4jiCNoXn3x7lyUuLPg8luiNVck="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"4F8IAuOeQdKLWo7+HE8eO3X1oXE=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"d4jiCNoXn3x7lyUuLPg8luiNVck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"3OzpR+xhGriG/t7a6WFpeAWx0bI="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"d4jiCNoXn3x7lyUuLPg8luiNVck=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"3OzpR+xhGriG/t7a6WFpeAWx0bI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"ECb2fjoq44L9OcPYSV5WH3RnvAc="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"3OzpR+xhGriG/t7a6WFpeAWx0bI=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"ECb2fjoq44L9OcPYSV5WH3RnvAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"Y137+ulMSqCpSU0Fhf+6b7TtX9M="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"ECb2fjoq44L9OcPYSV5WH3RnvAc=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"Y137+ulMSqCpSU0Fhf+6b7TtX9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="},{"type":"next-occurrence","id":"Q1wZbrcS2T9WLePbHXkH6JzyTWE="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"Y137+ulMSqCpSU0Fhf+6b7TtX9M=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"Q1wZbrcS2T9WLePbHXkH6JzyTWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YMF15//A3t+Vk+c1ck3HOR3LDQc="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"Q1wZbrcS2T9WLePbHXkH6JzyTWE=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"Y42madAN46CxncuGN6u31hP2nbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"eQyawzFZ9yXxr92lW2g2QGaiNqA="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"Y42madAN46CxncuGN6u31hP2nbM=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"eQyawzFZ9yXxr92lW2g2QGaiNqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"uYMLOxXBBKQubRKlJB+K6z887FI="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"eQyawzFZ9yXxr92lW2g2QGaiNqA=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"uYMLOxXBBKQubRKlJB+K6z887FI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"93ew5qM6eGN/X3nlxmQH1WxwruY="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"uYMLOxXBBKQubRKlJB+K6z887FI=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"93ew5qM6eGN/X3nlxmQH1WxwruY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"PqWnR+Evkk2VewtA/kYZDmrBY/c="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"93ew5qM6eGN/X3nlxmQH1WxwruY=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"PqWnR+Evkk2VewtA/kYZDmrBY/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"ABCUMMhZJQsZp9IFBF6CHc9yOIY="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"PqWnR+Evkk2VewtA/kYZDmrBY/c=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"ABCUMMhZJQsZp9IFBF6CHc9yOIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"cVIMdx5vdJ1nIqCUn0zEKYXztuA="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"ABCUMMhZJQsZp9IFBF6CHc9yOIY=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"cVIMdx5vdJ1nIqCUn0zEKYXztuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"pH0h+hUBH41hx0V2mslSrOOtGZI="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"cVIMdx5vdJ1nIqCUn0zEKYXztuA=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T14:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"pH0h+hUBH41hx0V2mslSrOOtGZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"i8PBBgtSiSeppEeaByBDrHJvBWw="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"pH0h+hUBH41hx0V2mslSrOOtGZI=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T14:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"i8PBBgtSiSeppEeaByBDrHJvBWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"u/L7Jyt9Zdf6EC+NJLRmfOv98b4="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"i8PBBgtSiSeppEeaByBDrHJvBWw=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"u/L7Jyt9Zdf6EC+NJLRmfOv98b4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"EM0S7IeguwNAr6VPABxGwMeCfGw="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"u/L7Jyt9Zdf6EC+NJLRmfOv98b4=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"EM0S7IeguwNAr6VPABxGwMeCfGw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"6ui8A7X7skIkKZzEwidteW5pwx8="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"EM0S7IeguwNAr6VPABxGwMeCfGw=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"6ui8A7X7skIkKZzEwidteW5pwx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"+3XapyzsVMIoY1e6Ya5UJI+kzZY="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"6ui8A7X7skIkKZzEwidteW5pwx8=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"+3XapyzsVMIoY1e6Ya5UJI+kzZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"NBDUbVr3X9eVSZxqFm14iAqAx9M="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"+3XapyzsVMIoY1e6Ya5UJI+kzZY=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"NBDUbVr3X9eVSZxqFm14iAqAx9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"T5uY1NPG9HaLWqPt2k9uSSaSd/U="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"NBDUbVr3X9eVSZxqFm14iAqAx9M=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"T5uY1NPG9HaLWqPt2k9uSSaSd/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"AAN/KquLR6IKIYOQZ7rLsbXQhn8="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"T5uY1NPG9HaLWqPt2k9uSSaSd/U=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"AAN/KquLR6IKIYOQZ7rLsbXQhn8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"fiHLTjZGtRuvo7DMwX6exg0xLrc="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"AAN/KquLR6IKIYOQZ7rLsbXQhn8=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"fiHLTjZGtRuvo7DMwX6exg0xLrc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"+lax+axzcMA2+hg51/+aw0d/DIA="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"fiHLTjZGtRuvo7DMwX6exg0xLrc=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"+lax+axzcMA2+hg51/+aw0d/DIA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"uGFhpxbaWxHE83/pBGvTFT+tqQg="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"+lax+axzcMA2+hg51/+aw0d/DIA=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"uGFhpxbaWxHE83/pBGvTFT+tqQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"ZYtU7HXiAS8rApas7VNanCq4GWc="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"uGFhpxbaWxHE83/pBGvTFT+tqQg=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T14:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"ZYtU7HXiAS8rApas7VNanCq4GWc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"/E3XJpfQWL7U9jBN/Y3tMAnX4dM="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"ZYtU7HXiAS8rApas7VNanCq4GWc=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T14:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"/E3XJpfQWL7U9jBN/Y3tMAnX4dM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"/CEKKSOMWzKTyWlDoQC+DXgB1m8="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"/E3XJpfQWL7U9jBN/Y3tMAnX4dM=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"/CEKKSOMWzKTyWlDoQC+DXgB1m8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"p1qJygW/1701h7Z5QIOLBO3H5Xw="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"/CEKKSOMWzKTyWlDoQC+DXgB1m8=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"p1qJygW/1701h7Z5QIOLBO3H5Xw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"mbPakwPxvaOpRMCYFubRZIXODQc="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"p1qJygW/1701h7Z5QIOLBO3H5Xw=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"mbPakwPxvaOpRMCYFubRZIXODQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"Fee+YW5X5njsHsoDXq95tHre8Bk="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"mbPakwPxvaOpRMCYFubRZIXODQc=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"Fee+YW5X5njsHsoDXq95tHre8Bk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="},{"type":"next-occurrence","id":"agnuhpihD+yixUtlSsFbxdE5gDc="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"Fee+YW5X5njsHsoDXq95tHre8Bk=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"agnuhpihD+yixUtlSsFbxdE5gDc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y42madAN46CxncuGN6u31hP2nbM="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"agnuhpihD+yixUtlSsFbxdE5gDc=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"uNOFjEN1FlsKoSbL9wh6e22Ql+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near West of Exit 53 - NJ 23/US 46 (Wayne Twp), Continuous Tuesday April 7, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-02T12:49:28Z"},"road_event_id":"uNOFjEN1FlsKoSbL9wh6e22Ql+s=","beginning_cross_street":"West of Exit 53 - NJ 23/US 46","ending_cross_street":"East of Exit 52 - CR 613/Passaic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.263801,40.894535]]}},{"id":"jorf99101w4BHxOUz4THBcbNOxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near East of Exit 53 - NJ 23/US 46 (Wayne Twp), Continuous Monday April 6, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-02T12:49:41Z"},"road_event_id":"jorf99101w4BHxOUz4THBcbNOxw=","beginning_cross_street":"East of Exit 53 - NJ 23/US 46","ending_cross_street":"West of Exit 54 - Minnisink Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.243606,40.898761]]}},{"id":"oEPF44gYPHMA25c9jKA6pI2mzOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"D5wq1E1baWSd4ROZ/reuHdUVHEU="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 03:30 PM, left lane closure","update_date":"2026-05-11T17:23:57Z"},"road_event_id":"oEPF44gYPHMA25c9jKA6pI2mzOg=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"D5wq1E1baWSd4ROZ/reuHdUVHEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oEPF44gYPHMA25c9jKA6pI2mzOg="},{"type":"next-occurrence","id":"FdxkKbGS4o5TYWICosb+iIR4WNs="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 03:30 PM, left lane closure","update_date":"2026-05-11T17:23:57Z"},"road_event_id":"D5wq1E1baWSd4ROZ/reuHdUVHEU=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"FdxkKbGS4o5TYWICosb+iIR4WNs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oEPF44gYPHMA25c9jKA6pI2mzOg="},{"type":"next-occurrence","id":"vjGKEBqHbasAJvgra2tN4R2GG4w="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 03:30 PM, left lane closure","update_date":"2026-05-11T17:23:57Z"},"road_event_id":"FdxkKbGS4o5TYWICosb+iIR4WNs=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"vjGKEBqHbasAJvgra2tN4R2GG4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oEPF44gYPHMA25c9jKA6pI2mzOg="},{"type":"next-occurrence","id":"wNqgxosJPP5WnXQXTw+kd9WWL5Y="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 03:30 PM, left lane closure","update_date":"2026-05-11T17:23:57Z"},"road_event_id":"vjGKEBqHbasAJvgra2tN4R2GG4w=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T20:00:00Z","end_date":"2026-05-19T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"wNqgxosJPP5WnXQXTw+kd9WWL5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oEPF44gYPHMA25c9jKA6pI2mzOg="},{"type":"next-occurrence","id":"H3tQt3zwNLAQEmGOqu0k378XM2g="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 03:30 PM, left lane closure","update_date":"2026-05-11T17:23:57Z"},"road_event_id":"wNqgxosJPP5WnXQXTw+kd9WWL5Y=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T20:00:00Z","end_date":"2026-05-20T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"H3tQt3zwNLAQEmGOqu0k378XM2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oEPF44gYPHMA25c9jKA6pI2mzOg="},{"type":"next-occurrence","id":"Xx0mBjgwy6mfBxhpf+PXBs57GlQ="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 03:30 PM, left lane closure","update_date":"2026-05-11T17:23:57Z"},"road_event_id":"H3tQt3zwNLAQEmGOqu0k378XM2g=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T20:00:00Z","end_date":"2026-05-21T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"Xx0mBjgwy6mfBxhpf+PXBs57GlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oEPF44gYPHMA25c9jKA6pI2mzOg="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 03:30 PM, left lane closure","update_date":"2026-05-11T17:23:57Z"},"road_event_id":"Xx0mBjgwy6mfBxhpf+PXBs57GlQ=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T20:00:00Z","end_date":"2026-05-22T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"LfLKLNTgfyhMjAKE4awLcOlpaTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NDmKOSwqdIOueaf/g5r17BDzbD0="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy northbound between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/DAY/B5501670/32494609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-08T18:00:59Z"},"road_event_id":"LfLKLNTgfyhMjAKE4awLcOlpaTU=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831593,40.999401]]}},{"id":"NDmKOSwqdIOueaf/g5r17BDzbD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LfLKLNTgfyhMjAKE4awLcOlpaTU="},{"type":"next-occurrence","id":"SdTP/RzYvGNAwpi0DTIo9apBrfI="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy northbound between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/DAY/B5501670/32494609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-08T18:00:59Z"},"road_event_id":"NDmKOSwqdIOueaf/g5r17BDzbD0=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831593,40.999401]]}},{"id":"SdTP/RzYvGNAwpi0DTIo9apBrfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LfLKLNTgfyhMjAKE4awLcOlpaTU="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy northbound between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/DAY/B5501670/32494609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-08T18:00:59Z"},"road_event_id":"SdTP/RzYvGNAwpi0DTIo9apBrfI=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831593,40.999401]]}},{"id":"qkLvPNRa+3VsqxYkho7Ct57Zs54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"owrHxDHoSnBvByYzqVRL6fnzaqg="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Dobbs Ferry Road - NY 100B (Greenburgh) and Jackson Avenue (Greenburgh) D264324/DAY/B5501670/32483909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-08T18:00:59Z"},"road_event_id":"qkLvPNRa+3VsqxYkho7Ct57Zs54=","beginning_cross_street":"Dobbs Ferry Road - NY 100B","ending_cross_street":"Jackson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831735,40.999721]]}},{"id":"owrHxDHoSnBvByYzqVRL6fnzaqg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qkLvPNRa+3VsqxYkho7Ct57Zs54="},{"type":"next-occurrence","id":"Qs0UfTKK/69jZXgrFJFBMgHMQY0="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Dobbs Ferry Road - NY 100B (Greenburgh) and Jackson Avenue (Greenburgh) D264324/DAY/B5501670/32483909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-08T18:00:59Z"},"road_event_id":"owrHxDHoSnBvByYzqVRL6fnzaqg=","beginning_cross_street":"Dobbs Ferry Road - NY 100B","ending_cross_street":"Jackson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831735,40.999721]]}},{"id":"Qs0UfTKK/69jZXgrFJFBMgHMQY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qkLvPNRa+3VsqxYkho7Ct57Zs54="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Dobbs Ferry Road - NY 100B (Greenburgh) and Jackson Avenue (Greenburgh) D264324/DAY/B5501670/32483909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-08T18:00:59Z"},"road_event_id":"Qs0UfTKK/69jZXgrFJFBMgHMQY0=","beginning_cross_street":"Dobbs Ferry Road - NY 100B","ending_cross_street":"Jackson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831735,40.999721]]}},{"id":"gqq87aRY9A3/lTCLkrVH5aDmJpo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["West Perimeter"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on West Perimeter both directions at Sawmill Rd (South Valley), Continuous Monday April 13th, 2026 12:00 AM thru Sunday May 31st, 2026 11:59 PM All lanes closed","update_date":"2026-04-02T17:31:50Z"},"road_event_id":"gqq87aRY9A3/lTCLkrVH5aDmJpo=","beginning_cross_street":"Sawmill Rd","ending_cross_street":"Pennsylvania Sate Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.973634,42.028929]]}},{"id":"ZVILXWSnz5M+djXv/ylsDfJdTbg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near West of Exit 45 - CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Continuous Thursday April 9, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed local lane","update_date":"2026-04-03T11:14:08Z"},"road_event_id":"ZVILXWSnz5M+djXv/ylsDfJdTbg=","beginning_cross_street":"West of Exit 45 - CR 637/Beverwyck Rd","ending_cross_street":"East of Exit 43 - I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.39772,40.860549]]}},{"id":"spuS6tu3gSQadiryLYDHNyU+2zI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near East of Exit 47A - I-280 (Fairfield Twp), Continuous Wednesday April 8, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-03T11:14:03Z"},"road_event_id":"spuS6tu3gSQadiryLYDHNyU+2zI=","beginning_cross_street":"East of Exit 47A - I-280","ending_cross_street":"East of Exit 47A - I-280","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.330825,40.868228]]}},{"id":"X4JfA6j5t0A5GtW4phO6W/sASCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 167"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aW6L0RLjrAwxpiRohwQPk2wUzHE="}],"description":"Construction on NY 167 both directions between Faville Ave (Dolgeville) and Slawson Street Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:39:03Z"},"road_event_id":"X4JfA6j5t0A5GtW4phO6W/sASCU=","beginning_cross_street":"Faville Ave","ending_cross_street":"Slawson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.774325,43.09938]]}},{"id":"aW6L0RLjrAwxpiRohwQPk2wUzHE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 167"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X4JfA6j5t0A5GtW4phO6W/sASCU="},{"type":"next-occurrence","id":"44VHA/gZAs7JXlcULl1EFm/ZCqw="}],"description":"Construction on NY 167 both directions between Faville Ave (Dolgeville) and Slawson Street Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:39:03Z"},"road_event_id":"aW6L0RLjrAwxpiRohwQPk2wUzHE=","beginning_cross_street":"Faville Ave","ending_cross_street":"Slawson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.774325,43.09938]]}},{"id":"44VHA/gZAs7JXlcULl1EFm/ZCqw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 167"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X4JfA6j5t0A5GtW4phO6W/sASCU="}],"description":"Construction on NY 167 both directions between Faville Ave (Dolgeville) and Slawson Street Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:39:03Z"},"road_event_id":"44VHA/gZAs7JXlcULl1EFm/ZCqw=","beginning_cross_street":"Faville Ave","ending_cross_street":"Slawson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.774325,43.09938]]}},{"id":"Plo3tyRoquC/9rphTk5eUEz0hz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/awhNQhAjTCVyd78TQmJcLBkaX0="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"Plo3tyRoquC/9rphTk5eUEz0hz8=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"/awhNQhAjTCVyd78TQmJcLBkaX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Plo3tyRoquC/9rphTk5eUEz0hz8="},{"type":"next-occurrence","id":"E96Vld+1GAtwl/2vIOOpNqT0Pvc="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"/awhNQhAjTCVyd78TQmJcLBkaX0=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"E96Vld+1GAtwl/2vIOOpNqT0Pvc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Plo3tyRoquC/9rphTk5eUEz0hz8="},{"type":"next-occurrence","id":"pXbCRMMOCaiFy2K7sOkLhnZRbHk="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"E96Vld+1GAtwl/2vIOOpNqT0Pvc=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"pXbCRMMOCaiFy2K7sOkLhnZRbHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Plo3tyRoquC/9rphTk5eUEz0hz8="},{"type":"next-occurrence","id":"r/CNTvrk7oSaFwpcOef2R12ABlo="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"pXbCRMMOCaiFy2K7sOkLhnZRbHk=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"r/CNTvrk7oSaFwpcOef2R12ABlo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Plo3tyRoquC/9rphTk5eUEz0hz8="},{"type":"next-occurrence","id":"Y3YjJ/lJH1jBuRX1A+/zawxzc7M="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"r/CNTvrk7oSaFwpcOef2R12ABlo=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"Y3YjJ/lJH1jBuRX1A+/zawxzc7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Plo3tyRoquC/9rphTk5eUEz0hz8="},{"type":"next-occurrence","id":"LmqTlrN2mqjfukcrT0PNIpTCT6Y="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"Y3YjJ/lJH1jBuRX1A+/zawxzc7M=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"LmqTlrN2mqjfukcrT0PNIpTCT6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Plo3tyRoquC/9rphTk5eUEz0hz8="},{"type":"next-occurrence","id":"P6jApUaxIY3VHwkGkc4KmPpnt9c="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"LmqTlrN2mqjfukcrT0PNIpTCT6Y=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"P6jApUaxIY3VHwkGkc4KmPpnt9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Plo3tyRoquC/9rphTk5eUEz0hz8="},{"type":"next-occurrence","id":"yfLVi9BpTV4sr+NJfcIKE6vvCwE="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"P6jApUaxIY3VHwkGkc4KmPpnt9c=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"yfLVi9BpTV4sr+NJfcIKE6vvCwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Plo3tyRoquC/9rphTk5eUEz0hz8="},{"type":"next-occurrence","id":"WElGNeiMaSi0zd97GEDRXvozoDQ="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"yfLVi9BpTV4sr+NJfcIKE6vvCwE=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"WElGNeiMaSi0zd97GEDRXvozoDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Plo3tyRoquC/9rphTk5eUEz0hz8="},{"type":"next-occurrence","id":"azXQVQz1BDoS7LOWXJw2io+rFO0="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"WElGNeiMaSi0zd97GEDRXvozoDQ=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"azXQVQz1BDoS7LOWXJw2io+rFO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Plo3tyRoquC/9rphTk5eUEz0hz8="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"azXQVQz1BDoS7LOWXJw2io+rFO0=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"1xf9kzR7DeEgjxwEVW/ueZXDqXM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLD RT-17"],"direction":"unknown","related_road_events":[],"description":"Bridge demolition on OLD RT-17 both directions RT-394 (Coldspring), Monday April 6th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes closed","update_date":"2026-04-03T14:11:55Z"},"road_event_id":"1xf9kzR7DeEgjxwEVW/ueZXDqXM=","beginning_cross_street":"RT-394","ending_cross_street":"RT-394","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.879125,42.106334]]}},{"id":"5Xv025snyk8ayp2c3QgSynEzTX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[],"description":"Tree trimming on NY 28 both directions between ONeil Flowage (Indian Lake) and Durant Road (Indian Lake) Motorists will encounter lane closures in both directions with temporary signals in place, Continuous Wednesday April 8th, 2026 7:00 AM thru Friday May 15th, 2026 5:00 PM","update_date":"2026-05-08T11:26:16Z"},"road_event_id":"5Xv025snyk8ayp2c3QgSynEzTX4=","beginning_cross_street":"ONeil Flowage","ending_cross_street":"Durant Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.346154,43.820343]]}},{"id":"ORC300526495","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","description":"Roadwork on NY 9N both directions CR 36 (Greenfield) to Saratoga; Warren County Line (Lake Luzerne) Various Short Term Closures Not currently Scheduled","update_date":"2026-04-10T21:30:01Z"},"road_event_id":"ORC300526495","beginning_cross_street":"CR 36","ending_cross_street":"Saratoga; Warren County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-03T16:31:23Z","end_date":"2026-04-11T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.846611,43.128423]]}},{"id":"RxPmggv9FPnpAMA6T+/POXnenXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 3"],"direction":"unknown","related_road_events":[],"description":"Bridge work on CT 3 both directions between I-91 (Wetherfield) a 20-ton weight restriction for Bridge No. 00417 (Putnam Memorial Bridge) over the Connecticut River, located in the towns of Wethersfield and Glastonbury, effective April 6, 2026. This restriction will remain in place until specific work under the associated project is completed,, Continuous Monday April 6th, 2026 12:00 AM thru Friday November 3rd, 2028 11:59 PM All lanes open","update_date":"2026-04-03T19:30:45Z"},"road_event_id":"RxPmggv9FPnpAMA6T+/POXnenXw=","beginning_cross_street":"I-91","ending_cross_street":"I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.641876,41.712963]]}},{"id":"a3lj5pZEPf4FnngsMVP0LVoUqbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ugeTce1jJJcqloURxh3wYNihXxg="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"a3lj5pZEPf4FnngsMVP0LVoUqbk=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"ugeTce1jJJcqloURxh3wYNihXxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3lj5pZEPf4FnngsMVP0LVoUqbk="},{"type":"next-occurrence","id":"nYQ8axSMV7ldW0rea3HT6JNRKCw="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"ugeTce1jJJcqloURxh3wYNihXxg=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"nYQ8axSMV7ldW0rea3HT6JNRKCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3lj5pZEPf4FnngsMVP0LVoUqbk="},{"type":"next-occurrence","id":"2H0GRy0ABiISGElnBngb8AsuPOU="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"nYQ8axSMV7ldW0rea3HT6JNRKCw=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"2H0GRy0ABiISGElnBngb8AsuPOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3lj5pZEPf4FnngsMVP0LVoUqbk="},{"type":"next-occurrence","id":"eNtrj4FhVXBZGHH8oI3fLcO0Yv4="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"2H0GRy0ABiISGElnBngb8AsuPOU=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"eNtrj4FhVXBZGHH8oI3fLcO0Yv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3lj5pZEPf4FnngsMVP0LVoUqbk="},{"type":"next-occurrence","id":"eG11CUcmUtupFBasltjuw2v2O6g="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"eNtrj4FhVXBZGHH8oI3fLcO0Yv4=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"eG11CUcmUtupFBasltjuw2v2O6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3lj5pZEPf4FnngsMVP0LVoUqbk="},{"type":"next-occurrence","id":"GPIAm9RUdAz+xOgKN1RmIdIQV1I="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"eG11CUcmUtupFBasltjuw2v2O6g=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"GPIAm9RUdAz+xOgKN1RmIdIQV1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3lj5pZEPf4FnngsMVP0LVoUqbk="},{"type":"next-occurrence","id":"aUgdvSJQSRekeXRWMIeVl3o7PEQ="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"GPIAm9RUdAz+xOgKN1RmIdIQV1I=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"aUgdvSJQSRekeXRWMIeVl3o7PEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3lj5pZEPf4FnngsMVP0LVoUqbk="},{"type":"next-occurrence","id":"Pjlfe2hDhqra5cWJF6GjPMqzyyk="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"aUgdvSJQSRekeXRWMIeVl3o7PEQ=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"Pjlfe2hDhqra5cWJF6GjPMqzyyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3lj5pZEPf4FnngsMVP0LVoUqbk="},{"type":"next-occurrence","id":"1JiF/FHZIiLgdwYnuyNHJpCrltA="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"Pjlfe2hDhqra5cWJF6GjPMqzyyk=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"1JiF/FHZIiLgdwYnuyNHJpCrltA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3lj5pZEPf4FnngsMVP0LVoUqbk="},{"type":"next-occurrence","id":"hTcaEKCSJfhXEl+68UKanYhwmmU="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"1JiF/FHZIiLgdwYnuyNHJpCrltA=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"hTcaEKCSJfhXEl+68UKanYhwmmU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3lj5pZEPf4FnngsMVP0LVoUqbk="},{"type":"next-occurrence","id":"BBjzHH3mn9swwvFuR4S7PZuItYY="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"hTcaEKCSJfhXEl+68UKanYhwmmU=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"BBjzHH3mn9swwvFuR4S7PZuItYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3lj5pZEPf4FnngsMVP0LVoUqbk="},{"type":"next-occurrence","id":"jFYy3UTjkg/4wZ0MjRpDAiqWrqc="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"BBjzHH3mn9swwvFuR4S7PZuItYY=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"jFYy3UTjkg/4wZ0MjRpDAiqWrqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3lj5pZEPf4FnngsMVP0LVoUqbk="},{"type":"next-occurrence","id":"U5AZOth1Fc5VmqCYhHPeHIU43WU="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"jFYy3UTjkg/4wZ0MjRpDAiqWrqc=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"U5AZOth1Fc5VmqCYhHPeHIU43WU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3lj5pZEPf4FnngsMVP0LVoUqbk="},{"type":"next-occurrence","id":"zsrSk/Jwk+wIlvnGGJtbhwP8a5M="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"U5AZOth1Fc5VmqCYhHPeHIU43WU=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"zsrSk/Jwk+wIlvnGGJtbhwP8a5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3lj5pZEPf4FnngsMVP0LVoUqbk="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"zsrSk/Jwk+wIlvnGGJtbhwP8a5M=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"ZdvsMKfdAnTWQOfcyp5kZarp0XI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8IXY+fEHpDpv6s2uSKjm0zFZzf0="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"ZdvsMKfdAnTWQOfcyp5kZarp0XI=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"8IXY+fEHpDpv6s2uSKjm0zFZzf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdvsMKfdAnTWQOfcyp5kZarp0XI="},{"type":"next-occurrence","id":"ZB/eoDNCIbFq4rD4UTSOW1bBTUE="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"8IXY+fEHpDpv6s2uSKjm0zFZzf0=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"ZB/eoDNCIbFq4rD4UTSOW1bBTUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdvsMKfdAnTWQOfcyp5kZarp0XI="},{"type":"next-occurrence","id":"2kW187vL1NK86avOUBDD5RN0Hv8="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"ZB/eoDNCIbFq4rD4UTSOW1bBTUE=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"2kW187vL1NK86avOUBDD5RN0Hv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdvsMKfdAnTWQOfcyp5kZarp0XI="},{"type":"next-occurrence","id":"SCM7UHXITEA3ZLc/jiCcjhZsYpE="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"2kW187vL1NK86avOUBDD5RN0Hv8=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"SCM7UHXITEA3ZLc/jiCcjhZsYpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdvsMKfdAnTWQOfcyp5kZarp0XI="},{"type":"next-occurrence","id":"iCzGmBU1v178aeCipyk7EoGHTUk="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"SCM7UHXITEA3ZLc/jiCcjhZsYpE=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"iCzGmBU1v178aeCipyk7EoGHTUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdvsMKfdAnTWQOfcyp5kZarp0XI="},{"type":"next-occurrence","id":"oWnsPZvz1+eB/1ivjI7dwHBIn/0="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"iCzGmBU1v178aeCipyk7EoGHTUk=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"oWnsPZvz1+eB/1ivjI7dwHBIn/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdvsMKfdAnTWQOfcyp5kZarp0XI="},{"type":"next-occurrence","id":"xi5bYsoydCyWYYNoFXmJrpDffeY="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"oWnsPZvz1+eB/1ivjI7dwHBIn/0=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"xi5bYsoydCyWYYNoFXmJrpDffeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdvsMKfdAnTWQOfcyp5kZarp0XI="},{"type":"next-occurrence","id":"eBwBLPQupB2ye81JNwAB25V0j8c="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"xi5bYsoydCyWYYNoFXmJrpDffeY=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"eBwBLPQupB2ye81JNwAB25V0j8c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdvsMKfdAnTWQOfcyp5kZarp0XI="},{"type":"next-occurrence","id":"t4wQU1TcE9S6h1ukD9tGEYjiYQs="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"eBwBLPQupB2ye81JNwAB25V0j8c=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"t4wQU1TcE9S6h1ukD9tGEYjiYQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdvsMKfdAnTWQOfcyp5kZarp0XI="},{"type":"next-occurrence","id":"o5E715rXqj3mZZJdif2ay+oS5f8="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"t4wQU1TcE9S6h1ukD9tGEYjiYQs=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"o5E715rXqj3mZZJdif2ay+oS5f8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdvsMKfdAnTWQOfcyp5kZarp0XI="},{"type":"next-occurrence","id":"JVWIEATw9U+Wv3su4jS7+3+yVlI="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"o5E715rXqj3mZZJdif2ay+oS5f8=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"JVWIEATw9U+Wv3su4jS7+3+yVlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdvsMKfdAnTWQOfcyp5kZarp0XI="},{"type":"next-occurrence","id":"WIV+kx/31EGVw6RYnOzFY68QBTE="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"JVWIEATw9U+Wv3su4jS7+3+yVlI=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"WIV+kx/31EGVw6RYnOzFY68QBTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdvsMKfdAnTWQOfcyp5kZarp0XI="},{"type":"next-occurrence","id":"Ea2SecDrTiqy7YQR8ybhw90HUm0="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"WIV+kx/31EGVw6RYnOzFY68QBTE=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"Ea2SecDrTiqy7YQR8ybhw90HUm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdvsMKfdAnTWQOfcyp5kZarp0XI="},{"type":"next-occurrence","id":"7dv157C5T0H/8xZvbd+93oWGopY="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"Ea2SecDrTiqy7YQR8ybhw90HUm0=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"7dv157C5T0H/8xZvbd+93oWGopY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdvsMKfdAnTWQOfcyp5kZarp0XI="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"7dv157C5T0H/8xZvbd+93oWGopY=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"M9ZsxmX8TmbyMWS6IVmvdCJyDi0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UWH63NcXYJQct0CxWLtbD06q3Sk="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"M9ZsxmX8TmbyMWS6IVmvdCJyDi0=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"UWH63NcXYJQct0CxWLtbD06q3Sk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M9ZsxmX8TmbyMWS6IVmvdCJyDi0="},{"type":"next-occurrence","id":"+mCVZwuH/VWkc/kcIKNoTcgKcu4="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"UWH63NcXYJQct0CxWLtbD06q3Sk=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"+mCVZwuH/VWkc/kcIKNoTcgKcu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M9ZsxmX8TmbyMWS6IVmvdCJyDi0="},{"type":"next-occurrence","id":"5NTSEcUUSmOEjjBy4P9/ILUkN7U="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"+mCVZwuH/VWkc/kcIKNoTcgKcu4=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"5NTSEcUUSmOEjjBy4P9/ILUkN7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M9ZsxmX8TmbyMWS6IVmvdCJyDi0="},{"type":"next-occurrence","id":"lgQAK3wxJ1yu8HmuPmkI91amc34="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"5NTSEcUUSmOEjjBy4P9/ILUkN7U=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"lgQAK3wxJ1yu8HmuPmkI91amc34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M9ZsxmX8TmbyMWS6IVmvdCJyDi0="},{"type":"next-occurrence","id":"Y4zLMw1k5sqhsGiYTMNND9JjK4E="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"lgQAK3wxJ1yu8HmuPmkI91amc34=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"Y4zLMw1k5sqhsGiYTMNND9JjK4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M9ZsxmX8TmbyMWS6IVmvdCJyDi0="},{"type":"next-occurrence","id":"5nEweQ50GzrlGLJqRWOYGtjq5RE="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"Y4zLMw1k5sqhsGiYTMNND9JjK4E=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"5nEweQ50GzrlGLJqRWOYGtjq5RE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M9ZsxmX8TmbyMWS6IVmvdCJyDi0="},{"type":"next-occurrence","id":"y/Ez6tbMgtjxmSSKbJ3K1/25K0Y="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"5nEweQ50GzrlGLJqRWOYGtjq5RE=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"y/Ez6tbMgtjxmSSKbJ3K1/25K0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M9ZsxmX8TmbyMWS6IVmvdCJyDi0="},{"type":"next-occurrence","id":"RNh7RBh6c6vVrQHoM51q63Q0xjA="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"y/Ez6tbMgtjxmSSKbJ3K1/25K0Y=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"RNh7RBh6c6vVrQHoM51q63Q0xjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M9ZsxmX8TmbyMWS6IVmvdCJyDi0="},{"type":"next-occurrence","id":"O3nIbrua7BcVGvPRkcjS/AYfVCg="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"RNh7RBh6c6vVrQHoM51q63Q0xjA=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"O3nIbrua7BcVGvPRkcjS/AYfVCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M9ZsxmX8TmbyMWS6IVmvdCJyDi0="},{"type":"next-occurrence","id":"9m+00ugZz74+VvLK2jfPar8+zXc="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"O3nIbrua7BcVGvPRkcjS/AYfVCg=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"9m+00ugZz74+VvLK2jfPar8+zXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M9ZsxmX8TmbyMWS6IVmvdCJyDi0="},{"type":"next-occurrence","id":"vC6N6G3GeennvdY9XRxVJ0RsKwQ="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"9m+00ugZz74+VvLK2jfPar8+zXc=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"vC6N6G3GeennvdY9XRxVJ0RsKwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M9ZsxmX8TmbyMWS6IVmvdCJyDi0="},{"type":"next-occurrence","id":"C/109OYK3OZtn8Au9OaoeD3GqXc="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"vC6N6G3GeennvdY9XRxVJ0RsKwQ=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"C/109OYK3OZtn8Au9OaoeD3GqXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M9ZsxmX8TmbyMWS6IVmvdCJyDi0="},{"type":"next-occurrence","id":"4w0NItsNF5lmpgRJIm3hssJf4qk="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"C/109OYK3OZtn8Au9OaoeD3GqXc=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"4w0NItsNF5lmpgRJIm3hssJf4qk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M9ZsxmX8TmbyMWS6IVmvdCJyDi0="},{"type":"next-occurrence","id":"ipkBy67jYca5DrSdwS1NYyLP5I8="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"4w0NItsNF5lmpgRJIm3hssJf4qk=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"ipkBy67jYca5DrSdwS1NYyLP5I8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M9ZsxmX8TmbyMWS6IVmvdCJyDi0="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"ipkBy67jYca5DrSdwS1NYyLP5I8=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"AuAjBFrzgCixFSNc4ulKyZXUL9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wfcxMjnXcqg1NZrzjnF3BJwj3sM="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"AuAjBFrzgCixFSNc4ulKyZXUL9A=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"wfcxMjnXcqg1NZrzjnF3BJwj3sM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AuAjBFrzgCixFSNc4ulKyZXUL9A="},{"type":"next-occurrence","id":"dZofNC1oLe2alnKqjeJSDGSoBIQ="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"wfcxMjnXcqg1NZrzjnF3BJwj3sM=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"dZofNC1oLe2alnKqjeJSDGSoBIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AuAjBFrzgCixFSNc4ulKyZXUL9A="},{"type":"next-occurrence","id":"OtSZGd6SzEoS7QOo82vbe99QisI="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"dZofNC1oLe2alnKqjeJSDGSoBIQ=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"OtSZGd6SzEoS7QOo82vbe99QisI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AuAjBFrzgCixFSNc4ulKyZXUL9A="},{"type":"next-occurrence","id":"UYc7LYR6tKVPN4YjlRWGvosN4iA="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"OtSZGd6SzEoS7QOo82vbe99QisI=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"UYc7LYR6tKVPN4YjlRWGvosN4iA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AuAjBFrzgCixFSNc4ulKyZXUL9A="},{"type":"next-occurrence","id":"CROBHn0WMMTbGrSxSuSVGXXo6L8="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"UYc7LYR6tKVPN4YjlRWGvosN4iA=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"CROBHn0WMMTbGrSxSuSVGXXo6L8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AuAjBFrzgCixFSNc4ulKyZXUL9A="},{"type":"next-occurrence","id":"8ZyLxdrKk/XQ0GhtjxBwsyxCC9w="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"CROBHn0WMMTbGrSxSuSVGXXo6L8=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"8ZyLxdrKk/XQ0GhtjxBwsyxCC9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AuAjBFrzgCixFSNc4ulKyZXUL9A="},{"type":"next-occurrence","id":"utdBrUU/rSZHrbsqD+G2EdXTKbw="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"8ZyLxdrKk/XQ0GhtjxBwsyxCC9w=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"utdBrUU/rSZHrbsqD+G2EdXTKbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AuAjBFrzgCixFSNc4ulKyZXUL9A="},{"type":"next-occurrence","id":"LZqonkq4HnDr/LbPPzmRGQ4BLsI="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"utdBrUU/rSZHrbsqD+G2EdXTKbw=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"LZqonkq4HnDr/LbPPzmRGQ4BLsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AuAjBFrzgCixFSNc4ulKyZXUL9A="},{"type":"next-occurrence","id":"gls+J1/jkMP3onYIEiqTWUkiMs0="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"LZqonkq4HnDr/LbPPzmRGQ4BLsI=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"gls+J1/jkMP3onYIEiqTWUkiMs0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AuAjBFrzgCixFSNc4ulKyZXUL9A="},{"type":"next-occurrence","id":"FhaHSJZCKqen2D1vDPAaOklxJy8="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"gls+J1/jkMP3onYIEiqTWUkiMs0=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"FhaHSJZCKqen2D1vDPAaOklxJy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AuAjBFrzgCixFSNc4ulKyZXUL9A="},{"type":"next-occurrence","id":"rZxEe6M+VxlyKwdOwflf1gqOves="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"FhaHSJZCKqen2D1vDPAaOklxJy8=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"rZxEe6M+VxlyKwdOwflf1gqOves=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AuAjBFrzgCixFSNc4ulKyZXUL9A="},{"type":"next-occurrence","id":"yEL9FI8FFmxHf2gJP6ccVGSfgYg="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"rZxEe6M+VxlyKwdOwflf1gqOves=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"yEL9FI8FFmxHf2gJP6ccVGSfgYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AuAjBFrzgCixFSNc4ulKyZXUL9A="},{"type":"next-occurrence","id":"5srk7MTSI9QRX8qs0jqheuQ3bXE="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"yEL9FI8FFmxHf2gJP6ccVGSfgYg=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"5srk7MTSI9QRX8qs0jqheuQ3bXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AuAjBFrzgCixFSNc4ulKyZXUL9A="},{"type":"next-occurrence","id":"gj0fKM38vzsGQrKdaoDafABEDNI="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"5srk7MTSI9QRX8qs0jqheuQ3bXE=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"gj0fKM38vzsGQrKdaoDafABEDNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AuAjBFrzgCixFSNc4ulKyZXUL9A="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"gj0fKM38vzsGQrKdaoDafABEDNI=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"F5tYox3VDPRAFMuEdCKwz7XlHrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EAHcSkg22FKqI9P1qgFHVlWXO9g="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"F5tYox3VDPRAFMuEdCKwz7XlHrA=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"EAHcSkg22FKqI9P1qgFHVlWXO9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F5tYox3VDPRAFMuEdCKwz7XlHrA="},{"type":"next-occurrence","id":"1TSad6Spp2OffjOCWNlQ2kJfOSw="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"EAHcSkg22FKqI9P1qgFHVlWXO9g=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"1TSad6Spp2OffjOCWNlQ2kJfOSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F5tYox3VDPRAFMuEdCKwz7XlHrA="},{"type":"next-occurrence","id":"uxXDzUo8nmt1whMSfwkDSfhthFc="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"1TSad6Spp2OffjOCWNlQ2kJfOSw=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"uxXDzUo8nmt1whMSfwkDSfhthFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F5tYox3VDPRAFMuEdCKwz7XlHrA="},{"type":"next-occurrence","id":"Jzf9vyG0U72cWqJKFfCHAh6ChRY="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"uxXDzUo8nmt1whMSfwkDSfhthFc=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"Jzf9vyG0U72cWqJKFfCHAh6ChRY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F5tYox3VDPRAFMuEdCKwz7XlHrA="},{"type":"next-occurrence","id":"LPFkryrtFriQ7BWU+88KTb5sJds="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"Jzf9vyG0U72cWqJKFfCHAh6ChRY=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"LPFkryrtFriQ7BWU+88KTb5sJds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F5tYox3VDPRAFMuEdCKwz7XlHrA="},{"type":"next-occurrence","id":"kUCXTc9ga+rPHIli0hrtxqiGQDk="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"LPFkryrtFriQ7BWU+88KTb5sJds=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"kUCXTc9ga+rPHIli0hrtxqiGQDk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F5tYox3VDPRAFMuEdCKwz7XlHrA="},{"type":"next-occurrence","id":"yzdMwpAsDSiqyIxjF1uPY0bl96Q="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"kUCXTc9ga+rPHIli0hrtxqiGQDk=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"yzdMwpAsDSiqyIxjF1uPY0bl96Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F5tYox3VDPRAFMuEdCKwz7XlHrA="},{"type":"next-occurrence","id":"82nBc+HY5nbb0ip43sTm/5Bqq6Q="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"yzdMwpAsDSiqyIxjF1uPY0bl96Q=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"82nBc+HY5nbb0ip43sTm/5Bqq6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F5tYox3VDPRAFMuEdCKwz7XlHrA="},{"type":"next-occurrence","id":"0C0aSOc7dcGCyLxj4Dx+I03UfzQ="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"82nBc+HY5nbb0ip43sTm/5Bqq6Q=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"0C0aSOc7dcGCyLxj4Dx+I03UfzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F5tYox3VDPRAFMuEdCKwz7XlHrA="},{"type":"next-occurrence","id":"/04svImDkX/7YQLbq86ewENqTFA="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"0C0aSOc7dcGCyLxj4Dx+I03UfzQ=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"/04svImDkX/7YQLbq86ewENqTFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F5tYox3VDPRAFMuEdCKwz7XlHrA="},{"type":"next-occurrence","id":"sLoPl+XUN/jFpVtz0k3cttXNB5o="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"/04svImDkX/7YQLbq86ewENqTFA=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"sLoPl+XUN/jFpVtz0k3cttXNB5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F5tYox3VDPRAFMuEdCKwz7XlHrA="},{"type":"next-occurrence","id":"s44Bp1lYtCPPZGg6td3wPTM0FJM="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"sLoPl+XUN/jFpVtz0k3cttXNB5o=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"s44Bp1lYtCPPZGg6td3wPTM0FJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F5tYox3VDPRAFMuEdCKwz7XlHrA="},{"type":"next-occurrence","id":"v9v8o603YkOptyTu0QkTjO8WkXE="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"s44Bp1lYtCPPZGg6td3wPTM0FJM=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"v9v8o603YkOptyTu0QkTjO8WkXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F5tYox3VDPRAFMuEdCKwz7XlHrA="},{"type":"next-occurrence","id":"3TTw1BXwLBHfJwIs837zRdHkry4="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"v9v8o603YkOptyTu0QkTjO8WkXE=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"3TTw1BXwLBHfJwIs837zRdHkry4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F5tYox3VDPRAFMuEdCKwz7XlHrA="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"3TTw1BXwLBHfJwIs837zRdHkry4=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"dIPho8uSkAXZk7OF1F4Tu8lwiqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"o187069mNZqbVKaBcBzOCbTKhTM="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"dIPho8uSkAXZk7OF1F4Tu8lwiqQ=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"o187069mNZqbVKaBcBzOCbTKhTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIPho8uSkAXZk7OF1F4Tu8lwiqQ="},{"type":"next-occurrence","id":"W031KpbTxTLDA2Q5UnkHYatQOtI="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"o187069mNZqbVKaBcBzOCbTKhTM=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"W031KpbTxTLDA2Q5UnkHYatQOtI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIPho8uSkAXZk7OF1F4Tu8lwiqQ="},{"type":"next-occurrence","id":"uBA1ZGlJa2JDMafOu38WiUVBFE0="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"W031KpbTxTLDA2Q5UnkHYatQOtI=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"uBA1ZGlJa2JDMafOu38WiUVBFE0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIPho8uSkAXZk7OF1F4Tu8lwiqQ="},{"type":"next-occurrence","id":"M1Iy7v0J5vYeoA/zLZFhwF75A+g="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"uBA1ZGlJa2JDMafOu38WiUVBFE0=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"M1Iy7v0J5vYeoA/zLZFhwF75A+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIPho8uSkAXZk7OF1F4Tu8lwiqQ="},{"type":"next-occurrence","id":"qyR4R/zGuaQyCkyfIfp/pOBzqj0="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"M1Iy7v0J5vYeoA/zLZFhwF75A+g=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"qyR4R/zGuaQyCkyfIfp/pOBzqj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIPho8uSkAXZk7OF1F4Tu8lwiqQ="},{"type":"next-occurrence","id":"Ja5Vb7SGRBKn+GxCAT+YDy3R9Wc="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"qyR4R/zGuaQyCkyfIfp/pOBzqj0=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"Ja5Vb7SGRBKn+GxCAT+YDy3R9Wc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIPho8uSkAXZk7OF1F4Tu8lwiqQ="},{"type":"next-occurrence","id":"1pkoj1QN0Dzny3r+aMLXBP+SMqA="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"Ja5Vb7SGRBKn+GxCAT+YDy3R9Wc=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"1pkoj1QN0Dzny3r+aMLXBP+SMqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIPho8uSkAXZk7OF1F4Tu8lwiqQ="},{"type":"next-occurrence","id":"gW5JwmcaKxycTrsUN6DlP1+y5C8="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"1pkoj1QN0Dzny3r+aMLXBP+SMqA=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"gW5JwmcaKxycTrsUN6DlP1+y5C8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIPho8uSkAXZk7OF1F4Tu8lwiqQ="},{"type":"next-occurrence","id":"AYNypam1i4njDZ7+q74c1VeVGYk="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"gW5JwmcaKxycTrsUN6DlP1+y5C8=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"AYNypam1i4njDZ7+q74c1VeVGYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIPho8uSkAXZk7OF1F4Tu8lwiqQ="},{"type":"next-occurrence","id":"a8O6CauBFpuMql2tCehAiemXdKQ="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"AYNypam1i4njDZ7+q74c1VeVGYk=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"a8O6CauBFpuMql2tCehAiemXdKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIPho8uSkAXZk7OF1F4Tu8lwiqQ="},{"type":"next-occurrence","id":"N9X5XT4kJ2IZVmNXJuGCAO3orPY="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"a8O6CauBFpuMql2tCehAiemXdKQ=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"N9X5XT4kJ2IZVmNXJuGCAO3orPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIPho8uSkAXZk7OF1F4Tu8lwiqQ="},{"type":"next-occurrence","id":"ipIpVSgQEP8FJXzx1/ri0G/0jIQ="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"N9X5XT4kJ2IZVmNXJuGCAO3orPY=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"ipIpVSgQEP8FJXzx1/ri0G/0jIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIPho8uSkAXZk7OF1F4Tu8lwiqQ="},{"type":"next-occurrence","id":"C8uWD4LSN7MudScq7RNMWTCwjGk="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"ipIpVSgQEP8FJXzx1/ri0G/0jIQ=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"C8uWD4LSN7MudScq7RNMWTCwjGk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIPho8uSkAXZk7OF1F4Tu8lwiqQ="},{"type":"next-occurrence","id":"l+zoJKFM0uo5lo/8MztTcJhtbdw="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"C8uWD4LSN7MudScq7RNMWTCwjGk=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"l+zoJKFM0uo5lo/8MztTcJhtbdw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIPho8uSkAXZk7OF1F4Tu8lwiqQ="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"l+zoJKFM0uo5lo/8MztTcJhtbdw=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"n8Wd5w+1gpmIGd2aYGkVC3nJqIA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CTTys+VFm7kiWCVqRyF3BGCCV1A="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"n8Wd5w+1gpmIGd2aYGkVC3nJqIA=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"CTTys+VFm7kiWCVqRyF3BGCCV1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n8Wd5w+1gpmIGd2aYGkVC3nJqIA="},{"type":"next-occurrence","id":"XJkKrnr1OJd+A64S0w+h1jSLZFw="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"CTTys+VFm7kiWCVqRyF3BGCCV1A=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"XJkKrnr1OJd+A64S0w+h1jSLZFw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n8Wd5w+1gpmIGd2aYGkVC3nJqIA="},{"type":"next-occurrence","id":"Xh6vkaPvzHIQI1YaY0MppCTQlqY="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"XJkKrnr1OJd+A64S0w+h1jSLZFw=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"Xh6vkaPvzHIQI1YaY0MppCTQlqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n8Wd5w+1gpmIGd2aYGkVC3nJqIA="},{"type":"next-occurrence","id":"kDgyFzgykrJl9eVpHlia7iBquuQ="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"Xh6vkaPvzHIQI1YaY0MppCTQlqY=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"kDgyFzgykrJl9eVpHlia7iBquuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n8Wd5w+1gpmIGd2aYGkVC3nJqIA="},{"type":"next-occurrence","id":"QKmflx5sRGVtgcWXQ8F5QVcBe8k="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"kDgyFzgykrJl9eVpHlia7iBquuQ=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"QKmflx5sRGVtgcWXQ8F5QVcBe8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n8Wd5w+1gpmIGd2aYGkVC3nJqIA="},{"type":"next-occurrence","id":"82ml7jZpn3nocBChKiT5bhQxvLk="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"QKmflx5sRGVtgcWXQ8F5QVcBe8k=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"82ml7jZpn3nocBChKiT5bhQxvLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n8Wd5w+1gpmIGd2aYGkVC3nJqIA="},{"type":"next-occurrence","id":"NtdBQYTh0A6gjMT20frDkKhC/fs="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"82ml7jZpn3nocBChKiT5bhQxvLk=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"NtdBQYTh0A6gjMT20frDkKhC/fs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n8Wd5w+1gpmIGd2aYGkVC3nJqIA="},{"type":"next-occurrence","id":"X0d0gzdfJK4+cF+UJMBMcTj4IM8="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"NtdBQYTh0A6gjMT20frDkKhC/fs=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"X0d0gzdfJK4+cF+UJMBMcTj4IM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n8Wd5w+1gpmIGd2aYGkVC3nJqIA="},{"type":"next-occurrence","id":"sHjYjpVtv66vIr3EIk6q5C4fld8="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"X0d0gzdfJK4+cF+UJMBMcTj4IM8=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"sHjYjpVtv66vIr3EIk6q5C4fld8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n8Wd5w+1gpmIGd2aYGkVC3nJqIA="},{"type":"next-occurrence","id":"lj3kwvwORSNVX4oVu9NTYLYsGZs="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"sHjYjpVtv66vIr3EIk6q5C4fld8=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"lj3kwvwORSNVX4oVu9NTYLYsGZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n8Wd5w+1gpmIGd2aYGkVC3nJqIA="},{"type":"next-occurrence","id":"LmDhOr0grMZqY/8AxcjgCkNTDhA="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"lj3kwvwORSNVX4oVu9NTYLYsGZs=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"LmDhOr0grMZqY/8AxcjgCkNTDhA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n8Wd5w+1gpmIGd2aYGkVC3nJqIA="},{"type":"next-occurrence","id":"833CcodBgnDfNLtbsCY5J+2rN5g="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"LmDhOr0grMZqY/8AxcjgCkNTDhA=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"833CcodBgnDfNLtbsCY5J+2rN5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n8Wd5w+1gpmIGd2aYGkVC3nJqIA="},{"type":"next-occurrence","id":"vb3fOsuvE89Z3gPe4tYu2SBh/5w="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"833CcodBgnDfNLtbsCY5J+2rN5g=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"vb3fOsuvE89Z3gPe4tYu2SBh/5w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n8Wd5w+1gpmIGd2aYGkVC3nJqIA="},{"type":"next-occurrence","id":"Y9V39d2C6LbSEDT3mQePA/gR45o="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"vb3fOsuvE89Z3gPe4tYu2SBh/5w=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"Y9V39d2C6LbSEDT3mQePA/gR45o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n8Wd5w+1gpmIGd2aYGkVC3nJqIA="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"Y9V39d2C6LbSEDT3mQePA/gR45o=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"cJJy0XUgjeHiUQ6bcv/I1kdFarw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tAQlAb2PsiDvkZrO3gA0ju6g0KI="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"cJJy0XUgjeHiUQ6bcv/I1kdFarw=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"tAQlAb2PsiDvkZrO3gA0ju6g0KI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJJy0XUgjeHiUQ6bcv/I1kdFarw="},{"type":"next-occurrence","id":"R8/x/Tp+IgY6nxknvM8F5A4JYnI="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"tAQlAb2PsiDvkZrO3gA0ju6g0KI=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"R8/x/Tp+IgY6nxknvM8F5A4JYnI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJJy0XUgjeHiUQ6bcv/I1kdFarw="},{"type":"next-occurrence","id":"9xyquWa5eVCCKduZXkoFpYPGuTo="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"R8/x/Tp+IgY6nxknvM8F5A4JYnI=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"9xyquWa5eVCCKduZXkoFpYPGuTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJJy0XUgjeHiUQ6bcv/I1kdFarw="},{"type":"next-occurrence","id":"taztP8enr4sjG2n0P792yBryc7o="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"9xyquWa5eVCCKduZXkoFpYPGuTo=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"taztP8enr4sjG2n0P792yBryc7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJJy0XUgjeHiUQ6bcv/I1kdFarw="},{"type":"next-occurrence","id":"FAFMz6R9YawO/IYyUHRtcpsBR3U="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"taztP8enr4sjG2n0P792yBryc7o=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"FAFMz6R9YawO/IYyUHRtcpsBR3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJJy0XUgjeHiUQ6bcv/I1kdFarw="},{"type":"next-occurrence","id":"agJ7eBIjD5/WX2Sp+YwAysZltcI="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"FAFMz6R9YawO/IYyUHRtcpsBR3U=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"agJ7eBIjD5/WX2Sp+YwAysZltcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJJy0XUgjeHiUQ6bcv/I1kdFarw="},{"type":"next-occurrence","id":"03LFQp5RmE6ug/K8g/hDjeNrKs0="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"agJ7eBIjD5/WX2Sp+YwAysZltcI=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"03LFQp5RmE6ug/K8g/hDjeNrKs0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJJy0XUgjeHiUQ6bcv/I1kdFarw="},{"type":"next-occurrence","id":"tkPvP4E55zjaZO//t6erR25aeus="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"03LFQp5RmE6ug/K8g/hDjeNrKs0=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"tkPvP4E55zjaZO//t6erR25aeus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJJy0XUgjeHiUQ6bcv/I1kdFarw="},{"type":"next-occurrence","id":"ghXnEx3j+GCIrkOBsbDIcmEX4co="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"tkPvP4E55zjaZO//t6erR25aeus=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"ghXnEx3j+GCIrkOBsbDIcmEX4co=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJJy0XUgjeHiUQ6bcv/I1kdFarw="},{"type":"next-occurrence","id":"kRNMrHYetljP5ERPNKsSPNsTThY="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"ghXnEx3j+GCIrkOBsbDIcmEX4co=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"kRNMrHYetljP5ERPNKsSPNsTThY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJJy0XUgjeHiUQ6bcv/I1kdFarw="},{"type":"next-occurrence","id":"GGWRP6JPwIpjEa7HFDzb7DeED4Y="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"kRNMrHYetljP5ERPNKsSPNsTThY=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"GGWRP6JPwIpjEa7HFDzb7DeED4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJJy0XUgjeHiUQ6bcv/I1kdFarw="},{"type":"next-occurrence","id":"N+p/sY4b9bxpWVe1yafWKLs6y9w="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"GGWRP6JPwIpjEa7HFDzb7DeED4Y=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"N+p/sY4b9bxpWVe1yafWKLs6y9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJJy0XUgjeHiUQ6bcv/I1kdFarw="},{"type":"next-occurrence","id":"R2NQhS6dMK26ydFyyeDqOSy3Dgg="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"N+p/sY4b9bxpWVe1yafWKLs6y9w=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"R2NQhS6dMK26ydFyyeDqOSy3Dgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJJy0XUgjeHiUQ6bcv/I1kdFarw="},{"type":"next-occurrence","id":"xlDkSa+6+nsKG1WBQOksyhbgHow="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"R2NQhS6dMK26ydFyyeDqOSy3Dgg=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"xlDkSa+6+nsKG1WBQOksyhbgHow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJJy0XUgjeHiUQ6bcv/I1kdFarw="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"xlDkSa+6+nsKG1WBQOksyhbgHow=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"Zmm4kf9CW1XTcmRWgfwmHBpCx14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HBapbKp5mID4ls9KS8fcjQEVHio="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"Zmm4kf9CW1XTcmRWgfwmHBpCx14=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"HBapbKp5mID4ls9KS8fcjQEVHio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zmm4kf9CW1XTcmRWgfwmHBpCx14="},{"type":"next-occurrence","id":"VgpPDumAjV784lSJy6yfUj/aqoQ="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"HBapbKp5mID4ls9KS8fcjQEVHio=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"VgpPDumAjV784lSJy6yfUj/aqoQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zmm4kf9CW1XTcmRWgfwmHBpCx14="},{"type":"next-occurrence","id":"79S+qsOq8qCyHQOQsf1BEc0gVhw="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"VgpPDumAjV784lSJy6yfUj/aqoQ=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"79S+qsOq8qCyHQOQsf1BEc0gVhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zmm4kf9CW1XTcmRWgfwmHBpCx14="},{"type":"next-occurrence","id":"rLQfwsQJLwUCTPSyCirzRXjeYsQ="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"79S+qsOq8qCyHQOQsf1BEc0gVhw=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"rLQfwsQJLwUCTPSyCirzRXjeYsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zmm4kf9CW1XTcmRWgfwmHBpCx14="},{"type":"next-occurrence","id":"/Q2NRl3o7aH7rdMFwjuPfJHHAn0="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"rLQfwsQJLwUCTPSyCirzRXjeYsQ=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"/Q2NRl3o7aH7rdMFwjuPfJHHAn0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zmm4kf9CW1XTcmRWgfwmHBpCx14="},{"type":"next-occurrence","id":"HiMByVGh2zY80p7q9/qZiMgvXfY="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"/Q2NRl3o7aH7rdMFwjuPfJHHAn0=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"HiMByVGh2zY80p7q9/qZiMgvXfY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zmm4kf9CW1XTcmRWgfwmHBpCx14="},{"type":"next-occurrence","id":"Y8Dtx8wRnwaL/xrHtaDq9v46e04="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"HiMByVGh2zY80p7q9/qZiMgvXfY=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"Y8Dtx8wRnwaL/xrHtaDq9v46e04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zmm4kf9CW1XTcmRWgfwmHBpCx14="},{"type":"next-occurrence","id":"NfVxQWqybHVEVNR3YYHpvb5UdPM="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"Y8Dtx8wRnwaL/xrHtaDq9v46e04=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"NfVxQWqybHVEVNR3YYHpvb5UdPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zmm4kf9CW1XTcmRWgfwmHBpCx14="},{"type":"next-occurrence","id":"oH72V5AUwbvMvDMFaWwp04QzdeY="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"NfVxQWqybHVEVNR3YYHpvb5UdPM=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"oH72V5AUwbvMvDMFaWwp04QzdeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zmm4kf9CW1XTcmRWgfwmHBpCx14="},{"type":"next-occurrence","id":"vE1NT3Yp5SDa2+J6Law8oh+7wcw="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"oH72V5AUwbvMvDMFaWwp04QzdeY=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"vE1NT3Yp5SDa2+J6Law8oh+7wcw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zmm4kf9CW1XTcmRWgfwmHBpCx14="},{"type":"next-occurrence","id":"TJsGRMzmT/j+wGNm1U2YLn7ZKkc="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"vE1NT3Yp5SDa2+J6Law8oh+7wcw=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"TJsGRMzmT/j+wGNm1U2YLn7ZKkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zmm4kf9CW1XTcmRWgfwmHBpCx14="},{"type":"next-occurrence","id":"FqKiBfEeLrj7ja0K980EnvqAGM8="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"TJsGRMzmT/j+wGNm1U2YLn7ZKkc=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"FqKiBfEeLrj7ja0K980EnvqAGM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zmm4kf9CW1XTcmRWgfwmHBpCx14="},{"type":"next-occurrence","id":"cech7W8f0MZo2gfC8ZeLTkj9Dqg="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"FqKiBfEeLrj7ja0K980EnvqAGM8=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"cech7W8f0MZo2gfC8ZeLTkj9Dqg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zmm4kf9CW1XTcmRWgfwmHBpCx14="},{"type":"next-occurrence","id":"4KyqubAKa/Ryqp0yYR5x5dBXbqg="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"cech7W8f0MZo2gfC8ZeLTkj9Dqg=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"4KyqubAKa/Ryqp0yYR5x5dBXbqg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zmm4kf9CW1XTcmRWgfwmHBpCx14="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"4KyqubAKa/Ryqp0yYR5x5dBXbqg=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"JLF8X9ZpP2E8Rxs1+MDF5Dolzlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ronkonkoma"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qaYhvnqf9hL1erRD9S55GrX1S+k="}],"description":"Track repairs on Ronkonkoma both directions between Ronkonkoma (Islip) and Greenport (Greenport) buses replace trains., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM","update_date":"2026-05-08T22:30:20Z"},"road_event_id":"JLF8X9ZpP2E8Rxs1+MDF5Dolzlc=","beginning_cross_street":"Ronkonkoma","ending_cross_street":"Greenport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T22:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10594,40.808086]]}},{"id":"qaYhvnqf9hL1erRD9S55GrX1S+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ronkonkoma"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JLF8X9ZpP2E8Rxs1+MDF5Dolzlc="},{"type":"next-occurrence","id":"d0SNcntwV7fKgiMznjtR9TE8G/Q="}],"description":"Track repairs on Ronkonkoma both directions between Ronkonkoma (Islip) and Greenport (Greenport) buses replace trains., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM","update_date":"2026-05-08T22:30:20Z"},"road_event_id":"qaYhvnqf9hL1erRD9S55GrX1S+k=","beginning_cross_street":"Ronkonkoma","ending_cross_street":"Greenport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T22:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10594,40.808086]]}},{"id":"d0SNcntwV7fKgiMznjtR9TE8G/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ronkonkoma"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JLF8X9ZpP2E8Rxs1+MDF5Dolzlc="}],"description":"Track repairs on Ronkonkoma both directions between Ronkonkoma (Islip) and Greenport (Greenport) buses replace trains., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM","update_date":"2026-05-08T22:30:20Z"},"road_event_id":"d0SNcntwV7fKgiMznjtR9TE8G/Q=","beginning_cross_street":"Ronkonkoma","ending_cross_street":"Greenport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T22:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10594,40.808086]]}},{"id":"Hx1KvvT1+B6eMTuLX1LdqSFkFFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near West of Exit 38 - US 46 (Denville Twp), Continuous Friday April 10, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-05T08:13:49Z"},"road_event_id":"Hx1KvvT1+B6eMTuLX1LdqSFkFFY=","beginning_cross_street":"West of Exit 38 - US 46","ending_cross_street":"East of Exit 37 - CR 513/Hibernia Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.496742,40.90538]]}},{"id":"a4N2YbVGKsCMQ6CRtKu/+/exaaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OELeJMdIVkqmYYxjT0LjGkmZ6BY="}],"description":"Roadwork on S CROUSE AVE northbound between E ADAMS ST (Syracuse) and E Genesee St; RT-92 (Syracuse), Monday April 6th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-29T20:40:06Z"},"road_event_id":"a4N2YbVGKsCMQ6CRtKu/+/exaaY=","beginning_cross_street":"E ADAMS ST","ending_cross_street":"E Genesee St; RT-92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136619,43.042799]]}},{"id":"OELeJMdIVkqmYYxjT0LjGkmZ6BY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a4N2YbVGKsCMQ6CRtKu/+/exaaY="},{"type":"next-occurrence","id":"HdtBIy2oEKQIROO+XDcEOeODdUM="}],"description":"Roadwork on S CROUSE AVE northbound between E ADAMS ST (Syracuse) and E Genesee St; RT-92 (Syracuse), Monday April 6th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-29T20:40:06Z"},"road_event_id":"OELeJMdIVkqmYYxjT0LjGkmZ6BY=","beginning_cross_street":"E ADAMS ST","ending_cross_street":"E Genesee St; RT-92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136619,43.042799]]}},{"id":"HdtBIy2oEKQIROO+XDcEOeODdUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a4N2YbVGKsCMQ6CRtKu/+/exaaY="},{"type":"next-occurrence","id":"UJTF6napHLa+iO5ii9wZkCr7zbo="}],"description":"Roadwork on S CROUSE AVE northbound between E ADAMS ST (Syracuse) and E Genesee St; RT-92 (Syracuse), Monday April 6th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-29T20:40:06Z"},"road_event_id":"HdtBIy2oEKQIROO+XDcEOeODdUM=","beginning_cross_street":"E ADAMS ST","ending_cross_street":"E Genesee St; RT-92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136619,43.042799]]}},{"id":"UJTF6napHLa+iO5ii9wZkCr7zbo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a4N2YbVGKsCMQ6CRtKu/+/exaaY="},{"type":"next-occurrence","id":"hLZMEeJnIvIkzPvAINrZKK2UZu0="}],"description":"Roadwork on S CROUSE AVE northbound between E ADAMS ST (Syracuse) and E Genesee St; RT-92 (Syracuse), Monday April 6th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-29T20:40:06Z"},"road_event_id":"UJTF6napHLa+iO5ii9wZkCr7zbo=","beginning_cross_street":"E ADAMS ST","ending_cross_street":"E Genesee St; RT-92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136619,43.042799]]}},{"id":"hLZMEeJnIvIkzPvAINrZKK2UZu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a4N2YbVGKsCMQ6CRtKu/+/exaaY="},{"type":"next-occurrence","id":"xNAhyWx0k2i3HVTOXlofyi4Rlwo="}],"description":"Roadwork on S CROUSE AVE northbound between E ADAMS ST (Syracuse) and E Genesee St; RT-92 (Syracuse), Monday April 6th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-29T20:40:06Z"},"road_event_id":"hLZMEeJnIvIkzPvAINrZKK2UZu0=","beginning_cross_street":"E ADAMS ST","ending_cross_street":"E Genesee St; RT-92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136619,43.042799]]}},{"id":"xNAhyWx0k2i3HVTOXlofyi4Rlwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a4N2YbVGKsCMQ6CRtKu/+/exaaY="},{"type":"next-occurrence","id":"TzKhfYwCksT0w0HOz7B0oOCXMSM="}],"description":"Roadwork on S CROUSE AVE northbound between E ADAMS ST (Syracuse) and E Genesee St; RT-92 (Syracuse), Monday April 6th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-29T20:40:06Z"},"road_event_id":"xNAhyWx0k2i3HVTOXlofyi4Rlwo=","beginning_cross_street":"E ADAMS ST","ending_cross_street":"E Genesee St; RT-92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136619,43.042799]]}},{"id":"TzKhfYwCksT0w0HOz7B0oOCXMSM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a4N2YbVGKsCMQ6CRtKu/+/exaaY="},{"type":"next-occurrence","id":"iSV/RN+kC0dY1YMGIzumy9wxaW4="}],"description":"Roadwork on S CROUSE AVE northbound between E ADAMS ST (Syracuse) and E Genesee St; RT-92 (Syracuse), Monday April 6th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-29T20:40:06Z"},"road_event_id":"TzKhfYwCksT0w0HOz7B0oOCXMSM=","beginning_cross_street":"E ADAMS ST","ending_cross_street":"E Genesee St; RT-92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136619,43.042799]]}},{"id":"iSV/RN+kC0dY1YMGIzumy9wxaW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a4N2YbVGKsCMQ6CRtKu/+/exaaY="}],"description":"Roadwork on S CROUSE AVE northbound between E ADAMS ST (Syracuse) and E Genesee St; RT-92 (Syracuse), Monday April 6th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-29T20:40:06Z"},"road_event_id":"iSV/RN+kC0dY1YMGIzumy9wxaW4=","beginning_cross_street":"E ADAMS ST","ending_cross_street":"E Genesee St; RT-92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136619,43.042799]]}},{"id":"Fnps8k3j8w94wjamZK/E2rWHxjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/lqYa7TVoFhesQEfbfZUGhNPiJU="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"Fnps8k3j8w94wjamZK/E2rWHxjU=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"/lqYa7TVoFhesQEfbfZUGhNPiJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fnps8k3j8w94wjamZK/E2rWHxjU="},{"type":"next-occurrence","id":"ZfSViXnIxJBLdgl0SUgO4dI8DYw="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"/lqYa7TVoFhesQEfbfZUGhNPiJU=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"ZfSViXnIxJBLdgl0SUgO4dI8DYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fnps8k3j8w94wjamZK/E2rWHxjU="},{"type":"next-occurrence","id":"9gDabNhSVSqZL/+CXLH5QqctIcY="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"ZfSViXnIxJBLdgl0SUgO4dI8DYw=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"9gDabNhSVSqZL/+CXLH5QqctIcY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fnps8k3j8w94wjamZK/E2rWHxjU="},{"type":"next-occurrence","id":"OwH5rZJe3G+pGSJQr7uL06NDI3Q="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"9gDabNhSVSqZL/+CXLH5QqctIcY=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"OwH5rZJe3G+pGSJQr7uL06NDI3Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fnps8k3j8w94wjamZK/E2rWHxjU="},{"type":"next-occurrence","id":"vRVwwzIhPW49SSiycw0ppB2nCuA="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"OwH5rZJe3G+pGSJQr7uL06NDI3Q=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"vRVwwzIhPW49SSiycw0ppB2nCuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fnps8k3j8w94wjamZK/E2rWHxjU="},{"type":"next-occurrence","id":"v5cii210DUNstIRkefDd0HZPZbM="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"vRVwwzIhPW49SSiycw0ppB2nCuA=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"v5cii210DUNstIRkefDd0HZPZbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fnps8k3j8w94wjamZK/E2rWHxjU="},{"type":"next-occurrence","id":"mrthtX2epnDKXo6xoMuST2LfxSU="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"v5cii210DUNstIRkefDd0HZPZbM=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"mrthtX2epnDKXo6xoMuST2LfxSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fnps8k3j8w94wjamZK/E2rWHxjU="},{"type":"next-occurrence","id":"kXqQn9sECMKHl79+V22Jnwc29R4="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"mrthtX2epnDKXo6xoMuST2LfxSU=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"kXqQn9sECMKHl79+V22Jnwc29R4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fnps8k3j8w94wjamZK/E2rWHxjU="},{"type":"next-occurrence","id":"llASOhT1OoE+kjJgDX9BovTxR5Q="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"kXqQn9sECMKHl79+V22Jnwc29R4=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"llASOhT1OoE+kjJgDX9BovTxR5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fnps8k3j8w94wjamZK/E2rWHxjU="},{"type":"next-occurrence","id":"OLxQJcO09BuVtSYr8CRjFV6H0e4="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"llASOhT1OoE+kjJgDX9BovTxR5Q=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"OLxQJcO09BuVtSYr8CRjFV6H0e4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fnps8k3j8w94wjamZK/E2rWHxjU="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"OLxQJcO09BuVtSYr8CRjFV6H0e4=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"OGsgF51Hgj3QYg83Nkd5OWFDbiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on NY 33 both directions between CR 161; Bromley Rd (Riga) and Percy Rd. (Riga), Continuous Monday April 6th, 2026 12:00 AM thru Saturday May 23rd, 2026 05:00 PM All lanes closed and detoured","update_date":"2026-04-06T15:24:29Z"},"road_event_id":"OGsgF51Hgj3QYg83Nkd5OWFDbiA=","beginning_cross_street":"CR 161; Bromley Rd","ending_cross_street":"Percy Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.864952,43.110284]]}},{"id":"3OrZy0kobLznNLGombnPI57+sio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"x7mkjmde0FOry0JkxlguHij/n90="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"3OrZy0kobLznNLGombnPI57+sio=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"x7mkjmde0FOry0JkxlguHij/n90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OrZy0kobLznNLGombnPI57+sio="},{"type":"next-occurrence","id":"W7DMzIxdtqiO/wfz9HK8wcyjg3k="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"x7mkjmde0FOry0JkxlguHij/n90=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"W7DMzIxdtqiO/wfz9HK8wcyjg3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OrZy0kobLznNLGombnPI57+sio="},{"type":"next-occurrence","id":"f3zcGTrQUXelPNnCRVhGQ0ZYZQQ="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"W7DMzIxdtqiO/wfz9HK8wcyjg3k=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"f3zcGTrQUXelPNnCRVhGQ0ZYZQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OrZy0kobLznNLGombnPI57+sio="},{"type":"next-occurrence","id":"3USZkJGbQD5dY+XpC3TjtX8FJUQ="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"f3zcGTrQUXelPNnCRVhGQ0ZYZQQ=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"3USZkJGbQD5dY+XpC3TjtX8FJUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OrZy0kobLznNLGombnPI57+sio="},{"type":"next-occurrence","id":"Kgx7H0GhoBEPj5+VmzQk4HvUWhk="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"3USZkJGbQD5dY+XpC3TjtX8FJUQ=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"Kgx7H0GhoBEPj5+VmzQk4HvUWhk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OrZy0kobLznNLGombnPI57+sio="},{"type":"next-occurrence","id":"k36ykuencvkB3Fm35+6OOiqEhY0="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"Kgx7H0GhoBEPj5+VmzQk4HvUWhk=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"k36ykuencvkB3Fm35+6OOiqEhY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OrZy0kobLznNLGombnPI57+sio="},{"type":"next-occurrence","id":"sgC+Ehcrp+fA0iYpPQKMiQqIfA4="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"k36ykuencvkB3Fm35+6OOiqEhY0=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"sgC+Ehcrp+fA0iYpPQKMiQqIfA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OrZy0kobLznNLGombnPI57+sio="},{"type":"next-occurrence","id":"f9bt/GvrJApKNuPK43JwnPs2gJA="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"sgC+Ehcrp+fA0iYpPQKMiQqIfA4=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"f9bt/GvrJApKNuPK43JwnPs2gJA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OrZy0kobLznNLGombnPI57+sio="},{"type":"next-occurrence","id":"OSAyERxzbpngVTMvC8T9thapE2Y="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"f9bt/GvrJApKNuPK43JwnPs2gJA=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"OSAyERxzbpngVTMvC8T9thapE2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OrZy0kobLznNLGombnPI57+sio="},{"type":"next-occurrence","id":"k7SLF+RIdG9vYQneU1nBRB1JNcU="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"OSAyERxzbpngVTMvC8T9thapE2Y=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"k7SLF+RIdG9vYQneU1nBRB1JNcU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OrZy0kobLznNLGombnPI57+sio="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"k7SLF+RIdG9vYQneU1nBRB1JNcU=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"qj68MQRvXF8P50arvjbHPNB5vRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"N0LVTuuZCO1SqsbfI0WfZxymWRQ="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"qj68MQRvXF8P50arvjbHPNB5vRI=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"N0LVTuuZCO1SqsbfI0WfZxymWRQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qj68MQRvXF8P50arvjbHPNB5vRI="},{"type":"next-occurrence","id":"AhJg3IHl7eVrAAtHh0NBxXcEVHc="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"N0LVTuuZCO1SqsbfI0WfZxymWRQ=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"AhJg3IHl7eVrAAtHh0NBxXcEVHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qj68MQRvXF8P50arvjbHPNB5vRI="},{"type":"next-occurrence","id":"319H91GY8NxR3mK0381UlLXSCd8="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"AhJg3IHl7eVrAAtHh0NBxXcEVHc=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"319H91GY8NxR3mK0381UlLXSCd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qj68MQRvXF8P50arvjbHPNB5vRI="},{"type":"next-occurrence","id":"KIfy09GG/he+pvD2aeuPMDh3Kjk="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"319H91GY8NxR3mK0381UlLXSCd8=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"KIfy09GG/he+pvD2aeuPMDh3Kjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qj68MQRvXF8P50arvjbHPNB5vRI="},{"type":"next-occurrence","id":"PApNkYSnseVFZ/r2vpa3HMPuReg="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"KIfy09GG/he+pvD2aeuPMDh3Kjk=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"PApNkYSnseVFZ/r2vpa3HMPuReg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qj68MQRvXF8P50arvjbHPNB5vRI="},{"type":"next-occurrence","id":"Pu6dXya095PoQj1mgGvrlZgK1Wk="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"PApNkYSnseVFZ/r2vpa3HMPuReg=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"Pu6dXya095PoQj1mgGvrlZgK1Wk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qj68MQRvXF8P50arvjbHPNB5vRI="},{"type":"next-occurrence","id":"HzO7HUt/FntM512gmPi3A/Qa6t0="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"Pu6dXya095PoQj1mgGvrlZgK1Wk=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"HzO7HUt/FntM512gmPi3A/Qa6t0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qj68MQRvXF8P50arvjbHPNB5vRI="},{"type":"next-occurrence","id":"GTdXEGRPRlahX4etX2sP6ZfvFaU="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"HzO7HUt/FntM512gmPi3A/Qa6t0=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"GTdXEGRPRlahX4etX2sP6ZfvFaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qj68MQRvXF8P50arvjbHPNB5vRI="},{"type":"next-occurrence","id":"CWwfUoo51DhUYZLkzayFvns6518="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"GTdXEGRPRlahX4etX2sP6ZfvFaU=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"CWwfUoo51DhUYZLkzayFvns6518=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qj68MQRvXF8P50arvjbHPNB5vRI="},{"type":"next-occurrence","id":"7USnjXN5xkMox1Z3KK6XbWK+ing="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"CWwfUoo51DhUYZLkzayFvns6518=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"7USnjXN5xkMox1Z3KK6XbWK+ing=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qj68MQRvXF8P50arvjbHPNB5vRI="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"7USnjXN5xkMox1Z3KK6XbWK+ing=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"Z/x5HTRKW13t8qKXnTobl7NfCww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lpuEd1EDmJvlgbTK/ifNFMulXSk="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"Z/x5HTRKW13t8qKXnTobl7NfCww=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"lpuEd1EDmJvlgbTK/ifNFMulXSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z/x5HTRKW13t8qKXnTobl7NfCww="},{"type":"next-occurrence","id":"7DEqSdIVMNSygl3IROxLCta4lIA="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"lpuEd1EDmJvlgbTK/ifNFMulXSk=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"7DEqSdIVMNSygl3IROxLCta4lIA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z/x5HTRKW13t8qKXnTobl7NfCww="},{"type":"next-occurrence","id":"u2/ToDV7kIswTMNL32Sx0rbIQhM="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"7DEqSdIVMNSygl3IROxLCta4lIA=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"u2/ToDV7kIswTMNL32Sx0rbIQhM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z/x5HTRKW13t8qKXnTobl7NfCww="},{"type":"next-occurrence","id":"Hm3THUSiFy4YZXqlRzuNlbugef0="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"u2/ToDV7kIswTMNL32Sx0rbIQhM=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"Hm3THUSiFy4YZXqlRzuNlbugef0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z/x5HTRKW13t8qKXnTobl7NfCww="},{"type":"next-occurrence","id":"gd0/JXEIBm/zTvhbKsHw39pRwKA="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"Hm3THUSiFy4YZXqlRzuNlbugef0=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"gd0/JXEIBm/zTvhbKsHw39pRwKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z/x5HTRKW13t8qKXnTobl7NfCww="},{"type":"next-occurrence","id":"MjPfshavaUrBuWPXxTRIbT+z3bA="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"gd0/JXEIBm/zTvhbKsHw39pRwKA=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"MjPfshavaUrBuWPXxTRIbT+z3bA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z/x5HTRKW13t8qKXnTobl7NfCww="},{"type":"next-occurrence","id":"LuNVPxQutelw9cYXt2Ilfm8sBSM="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"MjPfshavaUrBuWPXxTRIbT+z3bA=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"LuNVPxQutelw9cYXt2Ilfm8sBSM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z/x5HTRKW13t8qKXnTobl7NfCww="},{"type":"next-occurrence","id":"VDGRtoSZlYm71aoJtrm45dT2huc="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"LuNVPxQutelw9cYXt2Ilfm8sBSM=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"VDGRtoSZlYm71aoJtrm45dT2huc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z/x5HTRKW13t8qKXnTobl7NfCww="},{"type":"next-occurrence","id":"1z41ZILfNLf3Np7Z4cdiUAZbAlU="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"VDGRtoSZlYm71aoJtrm45dT2huc=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"1z41ZILfNLf3Np7Z4cdiUAZbAlU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z/x5HTRKW13t8qKXnTobl7NfCww="},{"type":"next-occurrence","id":"sJEzc9gkqOefd45G63sfxgHaRoE="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"1z41ZILfNLf3Np7Z4cdiUAZbAlU=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"sJEzc9gkqOefd45G63sfxgHaRoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z/x5HTRKW13t8qKXnTobl7NfCww="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"sJEzc9gkqOefd45G63sfxgHaRoE=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"aGmLhQmjeZxS3nHulfMAfeyrdIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WZLEo/SXUjqtJ+PdKAw/hI8L4r4="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"aGmLhQmjeZxS3nHulfMAfeyrdIs=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"WZLEo/SXUjqtJ+PdKAw/hI8L4r4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aGmLhQmjeZxS3nHulfMAfeyrdIs="},{"type":"next-occurrence","id":"yEZ4IAjev8q7eXFIuU6mYpXyBic="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"WZLEo/SXUjqtJ+PdKAw/hI8L4r4=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"yEZ4IAjev8q7eXFIuU6mYpXyBic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aGmLhQmjeZxS3nHulfMAfeyrdIs="},{"type":"next-occurrence","id":"XL4BSyNmlxoNnXq7OkGBTbQw8uo="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"yEZ4IAjev8q7eXFIuU6mYpXyBic=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"XL4BSyNmlxoNnXq7OkGBTbQw8uo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aGmLhQmjeZxS3nHulfMAfeyrdIs="},{"type":"next-occurrence","id":"b8SJkpg5Ypa8UttZh4qfi8ndhqc="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"XL4BSyNmlxoNnXq7OkGBTbQw8uo=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"b8SJkpg5Ypa8UttZh4qfi8ndhqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aGmLhQmjeZxS3nHulfMAfeyrdIs="},{"type":"next-occurrence","id":"YFedKv/88DbxZaFFIzWoLRPwxX0="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"b8SJkpg5Ypa8UttZh4qfi8ndhqc=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"YFedKv/88DbxZaFFIzWoLRPwxX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aGmLhQmjeZxS3nHulfMAfeyrdIs="},{"type":"next-occurrence","id":"kXNqGVP9bW9yW2dcQ98cp2u6nUg="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"YFedKv/88DbxZaFFIzWoLRPwxX0=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"kXNqGVP9bW9yW2dcQ98cp2u6nUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aGmLhQmjeZxS3nHulfMAfeyrdIs="},{"type":"next-occurrence","id":"eTzWiH71mA7AtNAwTGbVPvSUam0="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"kXNqGVP9bW9yW2dcQ98cp2u6nUg=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"eTzWiH71mA7AtNAwTGbVPvSUam0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aGmLhQmjeZxS3nHulfMAfeyrdIs="},{"type":"next-occurrence","id":"xGxW8JbjkaYop7OQQFyIPFd2M20="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"eTzWiH71mA7AtNAwTGbVPvSUam0=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"xGxW8JbjkaYop7OQQFyIPFd2M20=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aGmLhQmjeZxS3nHulfMAfeyrdIs="},{"type":"next-occurrence","id":"PHtJF8lFg4uYh9gsv7lzgNzMhl8="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"xGxW8JbjkaYop7OQQFyIPFd2M20=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"PHtJF8lFg4uYh9gsv7lzgNzMhl8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aGmLhQmjeZxS3nHulfMAfeyrdIs="},{"type":"next-occurrence","id":"Cdm6gNmnD82h/H7jjFcD1pC0txk="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"PHtJF8lFg4uYh9gsv7lzgNzMhl8=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"Cdm6gNmnD82h/H7jjFcD1pC0txk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aGmLhQmjeZxS3nHulfMAfeyrdIs="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"Cdm6gNmnD82h/H7jjFcD1pC0txk=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"+89myFOAFzt/fEz6Fi6jDxG0iZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lMNO16I1CIeSWbRkD+rskDPWRE8="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"+89myFOAFzt/fEz6Fi6jDxG0iZM=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"lMNO16I1CIeSWbRkD+rskDPWRE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+89myFOAFzt/fEz6Fi6jDxG0iZM="},{"type":"next-occurrence","id":"+KZzvMZXMFlxYQeaMUNCycaDZtk="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"lMNO16I1CIeSWbRkD+rskDPWRE8=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"+KZzvMZXMFlxYQeaMUNCycaDZtk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+89myFOAFzt/fEz6Fi6jDxG0iZM="},{"type":"next-occurrence","id":"NYZ/clGw/fzlUFKhmAdfOws1LKk="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"+KZzvMZXMFlxYQeaMUNCycaDZtk=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"NYZ/clGw/fzlUFKhmAdfOws1LKk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+89myFOAFzt/fEz6Fi6jDxG0iZM="},{"type":"next-occurrence","id":"13YQlw9rY5l7CaeOXmTO61234ko="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"NYZ/clGw/fzlUFKhmAdfOws1LKk=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"13YQlw9rY5l7CaeOXmTO61234ko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+89myFOAFzt/fEz6Fi6jDxG0iZM="},{"type":"next-occurrence","id":"/0ES3hpIobgiTu9j9NWYc85iTCk="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"13YQlw9rY5l7CaeOXmTO61234ko=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"/0ES3hpIobgiTu9j9NWYc85iTCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+89myFOAFzt/fEz6Fi6jDxG0iZM="},{"type":"next-occurrence","id":"Bkl7sSKDVg3slwNH4ZwS32yrUdA="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"/0ES3hpIobgiTu9j9NWYc85iTCk=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"Bkl7sSKDVg3slwNH4ZwS32yrUdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+89myFOAFzt/fEz6Fi6jDxG0iZM="},{"type":"next-occurrence","id":"Eeypyg5XnvlIMw5rbvDyAdEpSTM="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"Bkl7sSKDVg3slwNH4ZwS32yrUdA=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"Eeypyg5XnvlIMw5rbvDyAdEpSTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+89myFOAFzt/fEz6Fi6jDxG0iZM="},{"type":"next-occurrence","id":"pvZVZeOGv37FQfpbU5mmXCLmlt8="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"Eeypyg5XnvlIMw5rbvDyAdEpSTM=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"pvZVZeOGv37FQfpbU5mmXCLmlt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+89myFOAFzt/fEz6Fi6jDxG0iZM="},{"type":"next-occurrence","id":"6AhegfWSkZ4bHWD07hGNiFjxLB4="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"pvZVZeOGv37FQfpbU5mmXCLmlt8=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"6AhegfWSkZ4bHWD07hGNiFjxLB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+89myFOAFzt/fEz6Fi6jDxG0iZM="},{"type":"next-occurrence","id":"8d/JP9HsEwpnyvU4vj3msMlUtq8="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"6AhegfWSkZ4bHWD07hGNiFjxLB4=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"8d/JP9HsEwpnyvU4vj3msMlUtq8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+89myFOAFzt/fEz6Fi6jDxG0iZM="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"8d/JP9HsEwpnyvU4vj3msMlUtq8=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"tEk+gGK9S0lH/03+3DpnXpKj93k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EwqUWv4AuJXl+DmZ5B/8ACddems="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"tEk+gGK9S0lH/03+3DpnXpKj93k=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"EwqUWv4AuJXl+DmZ5B/8ACddems=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tEk+gGK9S0lH/03+3DpnXpKj93k="},{"type":"next-occurrence","id":"FjpoN0teQIPzyh4M5jL09VL7chY="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"EwqUWv4AuJXl+DmZ5B/8ACddems=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"FjpoN0teQIPzyh4M5jL09VL7chY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tEk+gGK9S0lH/03+3DpnXpKj93k="},{"type":"next-occurrence","id":"TPPXgsQQ3nYLaRJWehP2EFeKzJI="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"FjpoN0teQIPzyh4M5jL09VL7chY=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"TPPXgsQQ3nYLaRJWehP2EFeKzJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tEk+gGK9S0lH/03+3DpnXpKj93k="},{"type":"next-occurrence","id":"tLMH2lVTUHH0XjRnx8ncyVi9cAw="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"TPPXgsQQ3nYLaRJWehP2EFeKzJI=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"tLMH2lVTUHH0XjRnx8ncyVi9cAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tEk+gGK9S0lH/03+3DpnXpKj93k="},{"type":"next-occurrence","id":"EQd+fsaoDRXkrYTG5OBk/WSVFl0="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"tLMH2lVTUHH0XjRnx8ncyVi9cAw=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"EQd+fsaoDRXkrYTG5OBk/WSVFl0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tEk+gGK9S0lH/03+3DpnXpKj93k="},{"type":"next-occurrence","id":"SB22caBo6nfMD4PeEl3gA9ftSGs="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"EQd+fsaoDRXkrYTG5OBk/WSVFl0=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"SB22caBo6nfMD4PeEl3gA9ftSGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tEk+gGK9S0lH/03+3DpnXpKj93k="},{"type":"next-occurrence","id":"mehVTT9XF+uYGemZwmi3kQGyUHc="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"SB22caBo6nfMD4PeEl3gA9ftSGs=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"mehVTT9XF+uYGemZwmi3kQGyUHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tEk+gGK9S0lH/03+3DpnXpKj93k="},{"type":"next-occurrence","id":"Wgi04qwREwFLqoZScrswj/rF6l8="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"mehVTT9XF+uYGemZwmi3kQGyUHc=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"Wgi04qwREwFLqoZScrswj/rF6l8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tEk+gGK9S0lH/03+3DpnXpKj93k="},{"type":"next-occurrence","id":"DOmYzkLV1I62YQnYKfp7bWVN/nw="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"Wgi04qwREwFLqoZScrswj/rF6l8=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"DOmYzkLV1I62YQnYKfp7bWVN/nw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tEk+gGK9S0lH/03+3DpnXpKj93k="},{"type":"next-occurrence","id":"+fHgmMNdMCQ8x5DYUCYsO4OawGE="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"DOmYzkLV1I62YQnYKfp7bWVN/nw=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"+fHgmMNdMCQ8x5DYUCYsO4OawGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tEk+gGK9S0lH/03+3DpnXpKj93k="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"+fHgmMNdMCQ8x5DYUCYsO4OawGE=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"w5IucqTexIu7h5b0n54AXMOWvNE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"I0MNUJosI/AySG/mvYfNUCACuB8="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"w5IucqTexIu7h5b0n54AXMOWvNE=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"I0MNUJosI/AySG/mvYfNUCACuB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5IucqTexIu7h5b0n54AXMOWvNE="},{"type":"next-occurrence","id":"BLyjOBPMHSAOAR9De1+XfLi3TQI="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"I0MNUJosI/AySG/mvYfNUCACuB8=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"BLyjOBPMHSAOAR9De1+XfLi3TQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5IucqTexIu7h5b0n54AXMOWvNE="},{"type":"next-occurrence","id":"04JXVUWuAWLlELLVhbL/vVhEixA="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"BLyjOBPMHSAOAR9De1+XfLi3TQI=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"04JXVUWuAWLlELLVhbL/vVhEixA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5IucqTexIu7h5b0n54AXMOWvNE="},{"type":"next-occurrence","id":"nPGNCni+fReLx6R6A4dFvglv7XY="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"04JXVUWuAWLlELLVhbL/vVhEixA=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"nPGNCni+fReLx6R6A4dFvglv7XY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5IucqTexIu7h5b0n54AXMOWvNE="},{"type":"next-occurrence","id":"76WTcplTk4azmnP1uHkVk3Vb5Qo="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"nPGNCni+fReLx6R6A4dFvglv7XY=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"76WTcplTk4azmnP1uHkVk3Vb5Qo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5IucqTexIu7h5b0n54AXMOWvNE="},{"type":"next-occurrence","id":"pGcpA0CWuMOpCEZ2tG4/2ggvTeQ="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"76WTcplTk4azmnP1uHkVk3Vb5Qo=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"pGcpA0CWuMOpCEZ2tG4/2ggvTeQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5IucqTexIu7h5b0n54AXMOWvNE="},{"type":"next-occurrence","id":"0kkPamYXdzFa2RJvCsqCPgIa+xI="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"pGcpA0CWuMOpCEZ2tG4/2ggvTeQ=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"0kkPamYXdzFa2RJvCsqCPgIa+xI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5IucqTexIu7h5b0n54AXMOWvNE="},{"type":"next-occurrence","id":"j5NQGetlKmQSbEOt87dMcxY/lm8="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"0kkPamYXdzFa2RJvCsqCPgIa+xI=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"j5NQGetlKmQSbEOt87dMcxY/lm8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5IucqTexIu7h5b0n54AXMOWvNE="},{"type":"next-occurrence","id":"bUg0FbgVjTTAaV+JHiLOhTUNDu8="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"j5NQGetlKmQSbEOt87dMcxY/lm8=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"bUg0FbgVjTTAaV+JHiLOhTUNDu8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5IucqTexIu7h5b0n54AXMOWvNE="},{"type":"next-occurrence","id":"kfp4b7te/jj/cb6ldvHSHeON2Ow="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"bUg0FbgVjTTAaV+JHiLOhTUNDu8=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"kfp4b7te/jj/cb6ldvHSHeON2Ow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5IucqTexIu7h5b0n54AXMOWvNE="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"kfp4b7te/jj/cb6ldvHSHeON2Ow=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"I6FN9W8HMGH/zcK7YIgyKO0t25A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 3 both directions NY 178 (Henderson) NYS Rte. 3 closed in both directions at the bridge over Stoney Creek. Traffic is directed to follow the signed detour, Continuous Monday April 6th, 2026 12:00 AM thru Sunday November 15th, 2026 11:59 PM All lanes closed","update_date":"2026-04-07T18:21:51Z"},"road_event_id":"I6FN9W8HMGH/zcK7YIgyKO0t25A=","beginning_cross_street":"NY 178","ending_cross_street":"NY 178","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.199127,43.841085]]}},{"id":"ByAfDNRhZzyawYpvUblEOphQBM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on I-87 Northway both directions E. Schroon River Rd just north of Exit 23 (Bolton) 11' lane width restriction, Continuous Wednesday April 8th, 2026 12:00 AM thru Wednesday September 30th, 2026 11:59 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-04-10T18:40:16Z"},"road_event_id":"ByAfDNRhZzyawYpvUblEOphQBM4=","beginning_cross_street":"E. Schroon River Rd just north of Exit 23","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.746835,43.499729]]}},{"id":"rKaV7EgO2vG0SzEpbOi5Zko9QBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"eTSyCrvuyId2/id7OjwUjuX2Mk8="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"rKaV7EgO2vG0SzEpbOi5Zko9QBw=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"eTSyCrvuyId2/id7OjwUjuX2Mk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rKaV7EgO2vG0SzEpbOi5Zko9QBw="},{"type":"next-occurrence","id":"Op3xv0vYJbsnZ9v08pWK2t5yVmg="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"eTSyCrvuyId2/id7OjwUjuX2Mk8=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"Op3xv0vYJbsnZ9v08pWK2t5yVmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rKaV7EgO2vG0SzEpbOi5Zko9QBw="},{"type":"next-occurrence","id":"3rBHnZ+OfvHInKWSKOBaN/LdMI8="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"Op3xv0vYJbsnZ9v08pWK2t5yVmg=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"3rBHnZ+OfvHInKWSKOBaN/LdMI8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rKaV7EgO2vG0SzEpbOi5Zko9QBw="},{"type":"next-occurrence","id":"v/MTrhMywWz7BfVCMBNgQSYzuM4="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"3rBHnZ+OfvHInKWSKOBaN/LdMI8=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"v/MTrhMywWz7BfVCMBNgQSYzuM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rKaV7EgO2vG0SzEpbOi5Zko9QBw="},{"type":"next-occurrence","id":"Bd7Y+p2wUOKTSQj9gaKOry4RPQo="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"v/MTrhMywWz7BfVCMBNgQSYzuM4=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"Bd7Y+p2wUOKTSQj9gaKOry4RPQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rKaV7EgO2vG0SzEpbOi5Zko9QBw="},{"type":"next-occurrence","id":"QZEYG4vhptEjBNc6LmfUzoJFwQU="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"Bd7Y+p2wUOKTSQj9gaKOry4RPQo=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"QZEYG4vhptEjBNc6LmfUzoJFwQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rKaV7EgO2vG0SzEpbOi5Zko9QBw="},{"type":"next-occurrence","id":"/jt4xPSSZcIO2rc2UbHB6KJneKQ="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"QZEYG4vhptEjBNc6LmfUzoJFwQU=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"/jt4xPSSZcIO2rc2UbHB6KJneKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rKaV7EgO2vG0SzEpbOi5Zko9QBw="},{"type":"next-occurrence","id":"UB1AEIorpTgKT3kEzph3f03JESs="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"/jt4xPSSZcIO2rc2UbHB6KJneKQ=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"UB1AEIorpTgKT3kEzph3f03JESs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rKaV7EgO2vG0SzEpbOi5Zko9QBw="},{"type":"next-occurrence","id":"DWbx22//FARuoDJogyQ7K3u0Qjo="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"UB1AEIorpTgKT3kEzph3f03JESs=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"DWbx22//FARuoDJogyQ7K3u0Qjo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rKaV7EgO2vG0SzEpbOi5Zko9QBw="},{"type":"next-occurrence","id":"hbEYaRqU2ZmkbOWQ6j/UZoBOSxo="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"DWbx22//FARuoDJogyQ7K3u0Qjo=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"hbEYaRqU2ZmkbOWQ6j/UZoBOSxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rKaV7EgO2vG0SzEpbOi5Zko9QBw="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"hbEYaRqU2ZmkbOWQ6j/UZoBOSxo=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"RDijC5jMYQEIpBKfwWyGccaEbqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Ymu00gs8h1XLGQ3p1OaEAASd57w="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"RDijC5jMYQEIpBKfwWyGccaEbqY=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"Ymu00gs8h1XLGQ3p1OaEAASd57w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RDijC5jMYQEIpBKfwWyGccaEbqY="},{"type":"next-occurrence","id":"Ax4xaxnfxeGptPyI+CpTmqEARcQ="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"Ymu00gs8h1XLGQ3p1OaEAASd57w=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"Ax4xaxnfxeGptPyI+CpTmqEARcQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RDijC5jMYQEIpBKfwWyGccaEbqY="},{"type":"next-occurrence","id":"cctge1CmLirNU87qC8So3doj7zY="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"Ax4xaxnfxeGptPyI+CpTmqEARcQ=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"cctge1CmLirNU87qC8So3doj7zY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RDijC5jMYQEIpBKfwWyGccaEbqY="},{"type":"next-occurrence","id":"wrjd+svyS3QbkEPNugCLQBLABlw="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"cctge1CmLirNU87qC8So3doj7zY=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"wrjd+svyS3QbkEPNugCLQBLABlw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RDijC5jMYQEIpBKfwWyGccaEbqY="},{"type":"next-occurrence","id":"8sv1IxwYhHWuhySbg6RO4QqV9rA="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"wrjd+svyS3QbkEPNugCLQBLABlw=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"8sv1IxwYhHWuhySbg6RO4QqV9rA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RDijC5jMYQEIpBKfwWyGccaEbqY="},{"type":"next-occurrence","id":"JrVl9JvevIvY89VwojX2HpHrDvA="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"8sv1IxwYhHWuhySbg6RO4QqV9rA=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"JrVl9JvevIvY89VwojX2HpHrDvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RDijC5jMYQEIpBKfwWyGccaEbqY="},{"type":"next-occurrence","id":"oWWtcsg1oGr/20N6YPc3gIOm80k="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"JrVl9JvevIvY89VwojX2HpHrDvA=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"oWWtcsg1oGr/20N6YPc3gIOm80k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RDijC5jMYQEIpBKfwWyGccaEbqY="},{"type":"next-occurrence","id":"3irwJX01Rzddus794TbyRmYUiDw="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"oWWtcsg1oGr/20N6YPc3gIOm80k=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"3irwJX01Rzddus794TbyRmYUiDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RDijC5jMYQEIpBKfwWyGccaEbqY="},{"type":"next-occurrence","id":"UyPl1kRkOC7YoKKJSiNzMhubmqI="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"3irwJX01Rzddus794TbyRmYUiDw=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"UyPl1kRkOC7YoKKJSiNzMhubmqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RDijC5jMYQEIpBKfwWyGccaEbqY="},{"type":"next-occurrence","id":"aCdtkgocNbwsN/QCdRVEPfT1nPs="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"UyPl1kRkOC7YoKKJSiNzMhubmqI=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"aCdtkgocNbwsN/QCdRVEPfT1nPs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RDijC5jMYQEIpBKfwWyGccaEbqY="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"aCdtkgocNbwsN/QCdRVEPfT1nPs=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"dJhRGYJr24qBrZrJDSK7ivIqbds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yP8zYjei+XN/iQQePov1BV/XhOY="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"dJhRGYJr24qBrZrJDSK7ivIqbds=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"yP8zYjei+XN/iQQePov1BV/XhOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dJhRGYJr24qBrZrJDSK7ivIqbds="},{"type":"next-occurrence","id":"W2R9/clJGYct2+BxkQh93wjdEQk="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"yP8zYjei+XN/iQQePov1BV/XhOY=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"W2R9/clJGYct2+BxkQh93wjdEQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dJhRGYJr24qBrZrJDSK7ivIqbds="},{"type":"next-occurrence","id":"lakX4xr4Dbvh41CzcOsn5ueNQH8="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"W2R9/clJGYct2+BxkQh93wjdEQk=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"lakX4xr4Dbvh41CzcOsn5ueNQH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dJhRGYJr24qBrZrJDSK7ivIqbds="},{"type":"next-occurrence","id":"MjaJRVGee/kcuLvmSpkrbRdmbiE="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"lakX4xr4Dbvh41CzcOsn5ueNQH8=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"MjaJRVGee/kcuLvmSpkrbRdmbiE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dJhRGYJr24qBrZrJDSK7ivIqbds="},{"type":"next-occurrence","id":"qS0isdCCN9fENwXjIiD4Wrd+fbk="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"MjaJRVGee/kcuLvmSpkrbRdmbiE=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"qS0isdCCN9fENwXjIiD4Wrd+fbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dJhRGYJr24qBrZrJDSK7ivIqbds="},{"type":"next-occurrence","id":"BUrL2Qlb5Fx4HQhbpKmMxE8IR1Y="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"qS0isdCCN9fENwXjIiD4Wrd+fbk=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"BUrL2Qlb5Fx4HQhbpKmMxE8IR1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dJhRGYJr24qBrZrJDSK7ivIqbds="},{"type":"next-occurrence","id":"8K6+G0lw42+TuAeWH0bsaYgCMQQ="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"BUrL2Qlb5Fx4HQhbpKmMxE8IR1Y=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"8K6+G0lw42+TuAeWH0bsaYgCMQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dJhRGYJr24qBrZrJDSK7ivIqbds="},{"type":"next-occurrence","id":"lFyIvd8Jf0BGVNdcy9M1LJEML0U="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"8K6+G0lw42+TuAeWH0bsaYgCMQQ=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"lFyIvd8Jf0BGVNdcy9M1LJEML0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dJhRGYJr24qBrZrJDSK7ivIqbds="},{"type":"next-occurrence","id":"0x5qs78Eko5MV1i1Y023+/4vWYc="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"lFyIvd8Jf0BGVNdcy9M1LJEML0U=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"0x5qs78Eko5MV1i1Y023+/4vWYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dJhRGYJr24qBrZrJDSK7ivIqbds="},{"type":"next-occurrence","id":"n22krzTvFxG4xPAgwabIJy8o9bA="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"0x5qs78Eko5MV1i1Y023+/4vWYc=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"n22krzTvFxG4xPAgwabIJy8o9bA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dJhRGYJr24qBrZrJDSK7ivIqbds="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"n22krzTvFxG4xPAgwabIJy8o9bA=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"KmNPjwkQ+0+r86312HB9H85dzfM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[],"description":"Construction on US 11 both directions between Brewster Street (Malone) and Pearl Street (Malone) 2 way traffic maintained on narrow travel lanes - one travel lane per direction for Building Demolition Work, Continuous Tuesday April 7th, 2026 07:55 PM thru Friday May 29th, 2026 05:00 PM 1 Left lane of 2 lanes closed northbound; 1 Right lane of 2 lanes closed southbound","update_date":"2026-04-08T00:03:56Z"},"road_event_id":"KmNPjwkQ+0+r86312HB9H85dzfM=","beginning_cross_street":"Brewster Street","ending_cross_street":"Pearl Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.295645,44.8488]]}},{"id":"9Wm8hNUAww5lS78OWhRNeQFb2dY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/Ku4VXEZ1amNfZfWLDtqJzYPbTc="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"9Wm8hNUAww5lS78OWhRNeQFb2dY=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"/Ku4VXEZ1amNfZfWLDtqJzYPbTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Wm8hNUAww5lS78OWhRNeQFb2dY="},{"type":"next-occurrence","id":"23yR7ULPsyW1+kstUcQQKIQRlZ4="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"/Ku4VXEZ1amNfZfWLDtqJzYPbTc=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"23yR7ULPsyW1+kstUcQQKIQRlZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Wm8hNUAww5lS78OWhRNeQFb2dY="},{"type":"next-occurrence","id":"i65zKTXI5nPMzzF+OUp/Vrn692g="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"23yR7ULPsyW1+kstUcQQKIQRlZ4=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"i65zKTXI5nPMzzF+OUp/Vrn692g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Wm8hNUAww5lS78OWhRNeQFb2dY="},{"type":"next-occurrence","id":"w31VTmKIkn3jCum/G5a4ofcFB8s="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"i65zKTXI5nPMzzF+OUp/Vrn692g=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"w31VTmKIkn3jCum/G5a4ofcFB8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Wm8hNUAww5lS78OWhRNeQFb2dY="},{"type":"next-occurrence","id":"Fgo0ny5LwkFuSq5p3GF8cDipcsg="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"w31VTmKIkn3jCum/G5a4ofcFB8s=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"Fgo0ny5LwkFuSq5p3GF8cDipcsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Wm8hNUAww5lS78OWhRNeQFb2dY="},{"type":"next-occurrence","id":"wM/2vM2yZr6+ArOKKAW9bRmgbEI="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"Fgo0ny5LwkFuSq5p3GF8cDipcsg=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"wM/2vM2yZr6+ArOKKAW9bRmgbEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Wm8hNUAww5lS78OWhRNeQFb2dY="},{"type":"next-occurrence","id":"o/nYIj+eMFeqnR+w42xXVKOiwzc="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"wM/2vM2yZr6+ArOKKAW9bRmgbEI=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"o/nYIj+eMFeqnR+w42xXVKOiwzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Wm8hNUAww5lS78OWhRNeQFb2dY="},{"type":"next-occurrence","id":"DY8+8Pm0Ybh7mE/snXzyLQ9tFuA="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"o/nYIj+eMFeqnR+w42xXVKOiwzc=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"DY8+8Pm0Ybh7mE/snXzyLQ9tFuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Wm8hNUAww5lS78OWhRNeQFb2dY="},{"type":"next-occurrence","id":"RCHE0NOjJ2BVn+Gv28JM9gtfWgo="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"DY8+8Pm0Ybh7mE/snXzyLQ9tFuA=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"RCHE0NOjJ2BVn+Gv28JM9gtfWgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Wm8hNUAww5lS78OWhRNeQFb2dY="},{"type":"next-occurrence","id":"M9QyKoNL43IoqzenYl+NvD53XJQ="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"RCHE0NOjJ2BVn+Gv28JM9gtfWgo=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"M9QyKoNL43IoqzenYl+NvD53XJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Wm8hNUAww5lS78OWhRNeQFb2dY="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"M9QyKoNL43IoqzenYl+NvD53XJQ=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"9C0/no1/8n+M76VsMC5rn9+PwUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVERVIEW RD"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on RIVERVIEW RD both directions over I-87 (Halfmoon) alternating lanes closed, Continuous Wednesday April 8th, 2026 12:00 AM thru Thursday December 31st, 2026 11:59 PM All lanes","update_date":"2026-04-08T12:51:07Z"},"road_event_id":"9C0/no1/8n+M76VsMC5rn9+PwUs=","beginning_cross_street":"over I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764915,42.800434]]}},{"id":"BqMWD2cMgU8HCumlikrcTzjHlGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"e+dWqGeGJyrLEmnFzGBVC27uO2c="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"BqMWD2cMgU8HCumlikrcTzjHlGE=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"e+dWqGeGJyrLEmnFzGBVC27uO2c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqMWD2cMgU8HCumlikrcTzjHlGE="},{"type":"next-occurrence","id":"WRVVJHyL7xekBBV3tShJLwJjIuo="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"e+dWqGeGJyrLEmnFzGBVC27uO2c=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"WRVVJHyL7xekBBV3tShJLwJjIuo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqMWD2cMgU8HCumlikrcTzjHlGE="},{"type":"next-occurrence","id":"m1ZxV1vvfsF30XXoVQm040fDkBg="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"WRVVJHyL7xekBBV3tShJLwJjIuo=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"m1ZxV1vvfsF30XXoVQm040fDkBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqMWD2cMgU8HCumlikrcTzjHlGE="},{"type":"next-occurrence","id":"GYDml2hgH1lr+9lJuzYbbY69fMc="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"m1ZxV1vvfsF30XXoVQm040fDkBg=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"GYDml2hgH1lr+9lJuzYbbY69fMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqMWD2cMgU8HCumlikrcTzjHlGE="},{"type":"next-occurrence","id":"6u/U9LRP9LHMbrvvV84IOOthotY="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"GYDml2hgH1lr+9lJuzYbbY69fMc=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"6u/U9LRP9LHMbrvvV84IOOthotY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqMWD2cMgU8HCumlikrcTzjHlGE="},{"type":"next-occurrence","id":"r5ZvZUFqzeIuWJ1ZSDfxnQBz3E8="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"6u/U9LRP9LHMbrvvV84IOOthotY=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"r5ZvZUFqzeIuWJ1ZSDfxnQBz3E8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqMWD2cMgU8HCumlikrcTzjHlGE="},{"type":"next-occurrence","id":"B50s9ESCB8TKDoFxElHqVRDA100="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"r5ZvZUFqzeIuWJ1ZSDfxnQBz3E8=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"B50s9ESCB8TKDoFxElHqVRDA100=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqMWD2cMgU8HCumlikrcTzjHlGE="},{"type":"next-occurrence","id":"6lfY+IqugyuN4c+GdMKmQUnwYes="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"B50s9ESCB8TKDoFxElHqVRDA100=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"6lfY+IqugyuN4c+GdMKmQUnwYes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqMWD2cMgU8HCumlikrcTzjHlGE="},{"type":"next-occurrence","id":"i1YH2nDLa4ZP0X7QeTHovyHsRKo="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"6lfY+IqugyuN4c+GdMKmQUnwYes=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"i1YH2nDLa4ZP0X7QeTHovyHsRKo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqMWD2cMgU8HCumlikrcTzjHlGE="},{"type":"next-occurrence","id":"IbdY6hzCrP5APGkKwOCWr0/ziPo="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"i1YH2nDLa4ZP0X7QeTHovyHsRKo=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"IbdY6hzCrP5APGkKwOCWr0/ziPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqMWD2cMgU8HCumlikrcTzjHlGE="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"IbdY6hzCrP5APGkKwOCWr0/ziPo=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"AvLcuYVA5940CMr/EId8d28+0EQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rq7yHcow+UDacvy2uK6zZ7rYS98="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"AvLcuYVA5940CMr/EId8d28+0EQ=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"rq7yHcow+UDacvy2uK6zZ7rYS98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AvLcuYVA5940CMr/EId8d28+0EQ="},{"type":"next-occurrence","id":"JnUL2cJnqfLb9E989K6M9fQYABg="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"rq7yHcow+UDacvy2uK6zZ7rYS98=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"JnUL2cJnqfLb9E989K6M9fQYABg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AvLcuYVA5940CMr/EId8d28+0EQ="},{"type":"next-occurrence","id":"Yk+iU6ad2kSTfSSQePaaQiuYEhA="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"JnUL2cJnqfLb9E989K6M9fQYABg=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"Yk+iU6ad2kSTfSSQePaaQiuYEhA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AvLcuYVA5940CMr/EId8d28+0EQ="},{"type":"next-occurrence","id":"PTZwz3s7gLQzAkAUHSQ4KgLRT6w="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"Yk+iU6ad2kSTfSSQePaaQiuYEhA=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"PTZwz3s7gLQzAkAUHSQ4KgLRT6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AvLcuYVA5940CMr/EId8d28+0EQ="},{"type":"next-occurrence","id":"lRMWPrhHWUtucqVxI+Hgb82kJtE="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"PTZwz3s7gLQzAkAUHSQ4KgLRT6w=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"lRMWPrhHWUtucqVxI+Hgb82kJtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AvLcuYVA5940CMr/EId8d28+0EQ="},{"type":"next-occurrence","id":"sydX8YzjJxkeV/HsUeVlBo6+hhk="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"lRMWPrhHWUtucqVxI+Hgb82kJtE=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"sydX8YzjJxkeV/HsUeVlBo6+hhk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AvLcuYVA5940CMr/EId8d28+0EQ="},{"type":"next-occurrence","id":"DQURqkYiMvLrGJIBw1goij3pBF8="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"sydX8YzjJxkeV/HsUeVlBo6+hhk=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"DQURqkYiMvLrGJIBw1goij3pBF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AvLcuYVA5940CMr/EId8d28+0EQ="},{"type":"next-occurrence","id":"4NWakgTi7qa8L8waAqHILcRVj+I="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"DQURqkYiMvLrGJIBw1goij3pBF8=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"4NWakgTi7qa8L8waAqHILcRVj+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AvLcuYVA5940CMr/EId8d28+0EQ="},{"type":"next-occurrence","id":"cHUYDL6/8PbRc/wRaa098WnRw3s="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"4NWakgTi7qa8L8waAqHILcRVj+I=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"cHUYDL6/8PbRc/wRaa098WnRw3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AvLcuYVA5940CMr/EId8d28+0EQ="},{"type":"next-occurrence","id":"RehujfO/O6U70TTXozmBf7dDJ6g="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"cHUYDL6/8PbRc/wRaa098WnRw3s=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"RehujfO/O6U70TTXozmBf7dDJ6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AvLcuYVA5940CMr/EId8d28+0EQ="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"RehujfO/O6U70TTXozmBf7dDJ6g=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"Tx++Vhg+awpmntOF5/g72cj8WtQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Ry0QsM45d89nuuB4Jqy0LQ2PPPg="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"Tx++Vhg+awpmntOF5/g72cj8WtQ=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"Ry0QsM45d89nuuB4Jqy0LQ2PPPg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tx++Vhg+awpmntOF5/g72cj8WtQ="},{"type":"next-occurrence","id":"Hp2uq2fv86kDXwMYWP0HT5YKsOA="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"Ry0QsM45d89nuuB4Jqy0LQ2PPPg=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"Hp2uq2fv86kDXwMYWP0HT5YKsOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tx++Vhg+awpmntOF5/g72cj8WtQ="},{"type":"next-occurrence","id":"eXQzaiBnRcbPRzT6W0r314KqS/w="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"Hp2uq2fv86kDXwMYWP0HT5YKsOA=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"eXQzaiBnRcbPRzT6W0r314KqS/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tx++Vhg+awpmntOF5/g72cj8WtQ="},{"type":"next-occurrence","id":"oG92o2eidJfjNJyJ90T+O/msPdw="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"eXQzaiBnRcbPRzT6W0r314KqS/w=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"oG92o2eidJfjNJyJ90T+O/msPdw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tx++Vhg+awpmntOF5/g72cj8WtQ="},{"type":"next-occurrence","id":"F4CNRFD5EwrexmKhF1hkpTJeBCw="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"oG92o2eidJfjNJyJ90T+O/msPdw=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"F4CNRFD5EwrexmKhF1hkpTJeBCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tx++Vhg+awpmntOF5/g72cj8WtQ="},{"type":"next-occurrence","id":"DoLJFq8F7S7fdCbXDlJd6t80oTY="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"F4CNRFD5EwrexmKhF1hkpTJeBCw=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"DoLJFq8F7S7fdCbXDlJd6t80oTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tx++Vhg+awpmntOF5/g72cj8WtQ="},{"type":"next-occurrence","id":"Unq+F7EhVlr+j1ecsxYu/PiaF+k="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"DoLJFq8F7S7fdCbXDlJd6t80oTY=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"Unq+F7EhVlr+j1ecsxYu/PiaF+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tx++Vhg+awpmntOF5/g72cj8WtQ="},{"type":"next-occurrence","id":"IIKvQBBoxqYqyPFge+E7SYrVIWQ="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"Unq+F7EhVlr+j1ecsxYu/PiaF+k=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"IIKvQBBoxqYqyPFge+E7SYrVIWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tx++Vhg+awpmntOF5/g72cj8WtQ="},{"type":"next-occurrence","id":"dXOna4fo+sjfhRFxWl+CKTnXui8="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"IIKvQBBoxqYqyPFge+E7SYrVIWQ=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"dXOna4fo+sjfhRFxWl+CKTnXui8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tx++Vhg+awpmntOF5/g72cj8WtQ="},{"type":"next-occurrence","id":"AeQ0jFIV3V0mdxwByYPK42sfoZI="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"dXOna4fo+sjfhRFxWl+CKTnXui8=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"AeQ0jFIV3V0mdxwByYPK42sfoZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tx++Vhg+awpmntOF5/g72cj8WtQ="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"AeQ0jFIV3V0mdxwByYPK42sfoZI=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"Eaf7tY5zCTeQTXDuMGVuUg5hfaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JuqZC37XL40PWOhdtna3hNfRcww="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"Eaf7tY5zCTeQTXDuMGVuUg5hfaU=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"JuqZC37XL40PWOhdtna3hNfRcww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Eaf7tY5zCTeQTXDuMGVuUg5hfaU="},{"type":"next-occurrence","id":"LEJe82McmAKYhiP3jbp0vC3wLCU="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"JuqZC37XL40PWOhdtna3hNfRcww=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"LEJe82McmAKYhiP3jbp0vC3wLCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Eaf7tY5zCTeQTXDuMGVuUg5hfaU="},{"type":"next-occurrence","id":"rXpSR3WguILjDptAUWMKTU+QQZ0="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"LEJe82McmAKYhiP3jbp0vC3wLCU=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"rXpSR3WguILjDptAUWMKTU+QQZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Eaf7tY5zCTeQTXDuMGVuUg5hfaU="},{"type":"next-occurrence","id":"kKljX/vhrvg8415Hz5qhg4JEdrA="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"rXpSR3WguILjDptAUWMKTU+QQZ0=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"kKljX/vhrvg8415Hz5qhg4JEdrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Eaf7tY5zCTeQTXDuMGVuUg5hfaU="},{"type":"next-occurrence","id":"Vz7qqVD0tBi76yBKCsk8DDhfR5U="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"kKljX/vhrvg8415Hz5qhg4JEdrA=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"Vz7qqVD0tBi76yBKCsk8DDhfR5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Eaf7tY5zCTeQTXDuMGVuUg5hfaU="},{"type":"next-occurrence","id":"Xn2oR8r+5Wh6To35PuLAZzMk6ZI="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"Vz7qqVD0tBi76yBKCsk8DDhfR5U=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"Xn2oR8r+5Wh6To35PuLAZzMk6ZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Eaf7tY5zCTeQTXDuMGVuUg5hfaU="},{"type":"next-occurrence","id":"yivY3/TThmEmxNQMKF+vQfRm1fU="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"Xn2oR8r+5Wh6To35PuLAZzMk6ZI=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"yivY3/TThmEmxNQMKF+vQfRm1fU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Eaf7tY5zCTeQTXDuMGVuUg5hfaU="},{"type":"next-occurrence","id":"z9LRz0hLeQFhXOKOcrTSERfPUWA="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"yivY3/TThmEmxNQMKF+vQfRm1fU=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"z9LRz0hLeQFhXOKOcrTSERfPUWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Eaf7tY5zCTeQTXDuMGVuUg5hfaU="},{"type":"next-occurrence","id":"eALNgZj3cHKI59LYcmFAVn9kvtA="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"z9LRz0hLeQFhXOKOcrTSERfPUWA=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"eALNgZj3cHKI59LYcmFAVn9kvtA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Eaf7tY5zCTeQTXDuMGVuUg5hfaU="},{"type":"next-occurrence","id":"iRIFZUft8ZZnBzbw4d5vKdX4mHI="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"eALNgZj3cHKI59LYcmFAVn9kvtA=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"iRIFZUft8ZZnBzbw4d5vKdX4mHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Eaf7tY5zCTeQTXDuMGVuUg5hfaU="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"iRIFZUft8ZZnBzbw4d5vKdX4mHI=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"T5zcv/pePQeaLH/M0vlauhvbxCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PM0QWgu9cvzgZPYuPQc5wvcVAyA="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"T5zcv/pePQeaLH/M0vlauhvbxCQ=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"PM0QWgu9cvzgZPYuPQc5wvcVAyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T5zcv/pePQeaLH/M0vlauhvbxCQ="},{"type":"next-occurrence","id":"wM9n0PonoP3tavlYZiWX0Msne8c="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"PM0QWgu9cvzgZPYuPQc5wvcVAyA=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"wM9n0PonoP3tavlYZiWX0Msne8c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T5zcv/pePQeaLH/M0vlauhvbxCQ="},{"type":"next-occurrence","id":"bThybzlkLLhZ3aMalEyP2mhMYg0="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"wM9n0PonoP3tavlYZiWX0Msne8c=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"bThybzlkLLhZ3aMalEyP2mhMYg0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T5zcv/pePQeaLH/M0vlauhvbxCQ="},{"type":"next-occurrence","id":"nlqJoVZDFVNNI9VJHtZUVqStK6g="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"bThybzlkLLhZ3aMalEyP2mhMYg0=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"nlqJoVZDFVNNI9VJHtZUVqStK6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T5zcv/pePQeaLH/M0vlauhvbxCQ="},{"type":"next-occurrence","id":"GTGteefXleqjadPHeFkmHvNQ8g0="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"nlqJoVZDFVNNI9VJHtZUVqStK6g=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"GTGteefXleqjadPHeFkmHvNQ8g0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T5zcv/pePQeaLH/M0vlauhvbxCQ="},{"type":"next-occurrence","id":"BjZkJY7V+Qy5Brq2GIe+6RC3K1U="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"GTGteefXleqjadPHeFkmHvNQ8g0=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"BjZkJY7V+Qy5Brq2GIe+6RC3K1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T5zcv/pePQeaLH/M0vlauhvbxCQ="},{"type":"next-occurrence","id":"6KESZaFf8ik8+wzQiKdEJj7M3aM="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"BjZkJY7V+Qy5Brq2GIe+6RC3K1U=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"6KESZaFf8ik8+wzQiKdEJj7M3aM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T5zcv/pePQeaLH/M0vlauhvbxCQ="},{"type":"next-occurrence","id":"5zx+184zR+/kIhXkzxzQ4BKQPiU="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"6KESZaFf8ik8+wzQiKdEJj7M3aM=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"5zx+184zR+/kIhXkzxzQ4BKQPiU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T5zcv/pePQeaLH/M0vlauhvbxCQ="},{"type":"next-occurrence","id":"mvZ55SwwgkF/7dyivxPwMQIUvTk="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"5zx+184zR+/kIhXkzxzQ4BKQPiU=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"mvZ55SwwgkF/7dyivxPwMQIUvTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T5zcv/pePQeaLH/M0vlauhvbxCQ="},{"type":"next-occurrence","id":"wV7p7p2KVttEGPQeSHPFXMlxlO8="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"mvZ55SwwgkF/7dyivxPwMQIUvTk=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"wV7p7p2KVttEGPQeSHPFXMlxlO8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T5zcv/pePQeaLH/M0vlauhvbxCQ="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"wV7p7p2KVttEGPQeSHPFXMlxlO8=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"3KWou0cSJZHrl+eLPNJiSpa/h2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 54A"],"direction":"unknown","related_road_events":[],"description":"Safety improvements on NY 54A northbound Town of Pulteney; Town of Urbana Line (Pulteney) 2 lanes reduced to 1, Continuous Wednesday April 8th, 2026 12:00 AM thru Friday May 29th, 2026 11:59 PM All lanes closed","update_date":"2026-04-08T17:54:54Z"},"road_event_id":"3KWou0cSJZHrl+eLPNJiSpa/h2A=","beginning_cross_street":"Town of Pulteney; Town of Urbana Line","ending_cross_street":"Town of Pulteney; Town of Urbana Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.172096,42.475378]]}},{"id":"ApclrthRXiLHCwOAEfTh781R7aU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["North Avenue Bridge"],"direction":"unknown","related_road_events":[],"description":"Scheduled roadwork on North Avenue Bridge eastbound east of Earhart Drive (Elizabeth), Continuous Friday April 10th, 2026 08:00 PM thru Saturday June 6th, 2026 08:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-12T12:21:30Z"},"road_event_id":"ApclrthRXiLHCwOAEfTh781R7aU=","beginning_cross_street":"Earhart Drive","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.178241,40.669786]]}},{"id":"gn9XLKdNclwy6G6gJFnO52XihaQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Safety improvements on US 9 northbound between Pulcher Avenue (Hudson) and Joslen Blvd (Hudson) 202508114400/32642009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-09T11:54:21Z"},"road_event_id":"gn9XLKdNclwy6G6gJFnO52XihaQ=","beginning_cross_street":"Pulcher Avenue","ending_cross_street":"Joslen Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758114,42.277099]]}},{"id":"rNTAniPLj6lBDSkF/OGaF5JLKps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"V7F4cbEoaxivXyNR/3tbiYEZg54="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"rNTAniPLj6lBDSkF/OGaF5JLKps=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"V7F4cbEoaxivXyNR/3tbiYEZg54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rNTAniPLj6lBDSkF/OGaF5JLKps="},{"type":"next-occurrence","id":"ubF6OAeGf4qqdZlm7ocD7QS1B4Q="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"V7F4cbEoaxivXyNR/3tbiYEZg54=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"ubF6OAeGf4qqdZlm7ocD7QS1B4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rNTAniPLj6lBDSkF/OGaF5JLKps="},{"type":"next-occurrence","id":"H2VGj1D8AJotjqArKKPzNukcWQM="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"ubF6OAeGf4qqdZlm7ocD7QS1B4Q=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"H2VGj1D8AJotjqArKKPzNukcWQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rNTAniPLj6lBDSkF/OGaF5JLKps="},{"type":"next-occurrence","id":"pnx1tflIEWj2RocGMCEQKMomAas="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"H2VGj1D8AJotjqArKKPzNukcWQM=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"pnx1tflIEWj2RocGMCEQKMomAas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rNTAniPLj6lBDSkF/OGaF5JLKps="},{"type":"next-occurrence","id":"y7Gcu6CpnNilzK8UxxavfPxm2tw="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"pnx1tflIEWj2RocGMCEQKMomAas=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"y7Gcu6CpnNilzK8UxxavfPxm2tw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rNTAniPLj6lBDSkF/OGaF5JLKps="},{"type":"next-occurrence","id":"1FqRWJskejcAc39i4FGkanCgwM4="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"y7Gcu6CpnNilzK8UxxavfPxm2tw=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"1FqRWJskejcAc39i4FGkanCgwM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rNTAniPLj6lBDSkF/OGaF5JLKps="},{"type":"next-occurrence","id":"AeD2ME5x8Ljlbrt1d9p5ZSqXeP4="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"1FqRWJskejcAc39i4FGkanCgwM4=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"AeD2ME5x8Ljlbrt1d9p5ZSqXeP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rNTAniPLj6lBDSkF/OGaF5JLKps="},{"type":"next-occurrence","id":"LX/acuMPurB9kEtQxK7fiPm0+94="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"AeD2ME5x8Ljlbrt1d9p5ZSqXeP4=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"LX/acuMPurB9kEtQxK7fiPm0+94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rNTAniPLj6lBDSkF/OGaF5JLKps="},{"type":"next-occurrence","id":"jS44CAdKLrYqr5W4f6JWu8KUcFA="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"LX/acuMPurB9kEtQxK7fiPm0+94=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"jS44CAdKLrYqr5W4f6JWu8KUcFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rNTAniPLj6lBDSkF/OGaF5JLKps="},{"type":"next-occurrence","id":"HXO9NpQJlfQl88yIRqVKh3iC+5U="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"jS44CAdKLrYqr5W4f6JWu8KUcFA=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"HXO9NpQJlfQl88yIRqVKh3iC+5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rNTAniPLj6lBDSkF/OGaF5JLKps="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"HXO9NpQJlfQl88yIRqVKh3iC+5U=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"Ia2Hoafx1I1Nd4Uv9EKH1+BjuAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aNcyD0H8u61zjr2kcf16hN4mgug="}],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and NY 49 (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:30 AM thru 05:00 PM,, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:23:35Z"},"road_event_id":"Ia2Hoafx1I1Nd4Uv9EKH1+BjuAk=","beginning_cross_street":"Center Street","ending_cross_street":"NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.659386,43.164185]]}},{"id":"aNcyD0H8u61zjr2kcf16hN4mgug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ia2Hoafx1I1Nd4Uv9EKH1+BjuAk="},{"type":"next-occurrence","id":"ae80gR+ZEHHjDVCOa0d5RxzO3yA="}],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and NY 49 (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:30 AM thru 05:00 PM,, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:23:35Z"},"road_event_id":"aNcyD0H8u61zjr2kcf16hN4mgug=","beginning_cross_street":"Center Street","ending_cross_street":"NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.659386,43.164185]]}},{"id":"ae80gR+ZEHHjDVCOa0d5RxzO3yA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ia2Hoafx1I1Nd4Uv9EKH1+BjuAk="},{"type":"next-occurrence","id":"aSil6yzTDIaas5fft1YK0AA8pLE="}],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and NY 49 (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:30 AM thru 05:00 PM,, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:23:35Z"},"road_event_id":"ae80gR+ZEHHjDVCOa0d5RxzO3yA=","beginning_cross_street":"Center Street","ending_cross_street":"NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.659386,43.164185]]}},{"id":"aSil6yzTDIaas5fft1YK0AA8pLE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ia2Hoafx1I1Nd4Uv9EKH1+BjuAk="},{"type":"next-occurrence","id":"2qy1CKrF1kAsmHqM6yWIsvz8IEg="}],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and NY 49 (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:30 AM thru 05:00 PM,, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:23:35Z"},"road_event_id":"aSil6yzTDIaas5fft1YK0AA8pLE=","beginning_cross_street":"Center Street","ending_cross_street":"NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T10:30:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.659386,43.164185]]}},{"id":"2qy1CKrF1kAsmHqM6yWIsvz8IEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ia2Hoafx1I1Nd4Uv9EKH1+BjuAk="},{"type":"next-occurrence","id":"hZAhhZwBmyG5kAhSCJMdlQfUvP8="}],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and NY 49 (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:30 AM thru 05:00 PM,, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:23:35Z"},"road_event_id":"2qy1CKrF1kAsmHqM6yWIsvz8IEg=","beginning_cross_street":"Center Street","ending_cross_street":"NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.659386,43.164185]]}},{"id":"hZAhhZwBmyG5kAhSCJMdlQfUvP8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ia2Hoafx1I1Nd4Uv9EKH1+BjuAk="},{"type":"next-occurrence","id":"hCr0vuSen9KuYVlzBDZ4vDv+a+I="}],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and NY 49 (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:30 AM thru 05:00 PM,, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:23:35Z"},"road_event_id":"hZAhhZwBmyG5kAhSCJMdlQfUvP8=","beginning_cross_street":"Center Street","ending_cross_street":"NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.659386,43.164185]]}},{"id":"hCr0vuSen9KuYVlzBDZ4vDv+a+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ia2Hoafx1I1Nd4Uv9EKH1+BjuAk="},{"type":"next-occurrence","id":"b8qMqCDDwarZ2eJd1aIlgVnjTYE="}],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and NY 49 (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:30 AM thru 05:00 PM,, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:23:35Z"},"road_event_id":"hCr0vuSen9KuYVlzBDZ4vDv+a+I=","beginning_cross_street":"Center Street","ending_cross_street":"NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.659386,43.164185]]}},{"id":"b8qMqCDDwarZ2eJd1aIlgVnjTYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ia2Hoafx1I1Nd4Uv9EKH1+BjuAk="},{"type":"next-occurrence","id":"OH8c0gH6YUHBaICz6KcGEqPL2JE="}],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and NY 49 (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:30 AM thru 05:00 PM,, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:23:35Z"},"road_event_id":"b8qMqCDDwarZ2eJd1aIlgVnjTYE=","beginning_cross_street":"Center Street","ending_cross_street":"NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.659386,43.164185]]}},{"id":"OH8c0gH6YUHBaICz6KcGEqPL2JE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ia2Hoafx1I1Nd4Uv9EKH1+BjuAk="},{"type":"next-occurrence","id":"iYD6VtMchFPt8DdQbKIV7CUAmp0="}],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and NY 49 (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:30 AM thru 05:00 PM,, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:23:35Z"},"road_event_id":"OH8c0gH6YUHBaICz6KcGEqPL2JE=","beginning_cross_street":"Center Street","ending_cross_street":"NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T17:00:00Z","end_date":"2026-05-27T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.659386,43.164185]]}},{"id":"iYD6VtMchFPt8DdQbKIV7CUAmp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ia2Hoafx1I1Nd4Uv9EKH1+BjuAk="}],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and NY 49 (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:30 AM thru 05:00 PM,, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:23:35Z"},"road_event_id":"iYD6VtMchFPt8DdQbKIV7CUAmp0=","beginning_cross_street":"Center Street","ending_cross_street":"NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T17:00:00Z","end_date":"2026-05-28T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.659386,43.164185]]}},{"id":"YHRQqaN5agHmgyJERdLiUg7jR64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"z22Fjnarl9ktlue6He4/+alA7Xg="}],"description":"Construction on NY 46 both directions between Hillside Road (Boonville) and Holmes Road (Boonville) Motorists will encounter lane closures in both directions with flaggers in place, Thursday April 3rd, 2025 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 05:30 PM,","update_date":"2026-05-08T11:48:46Z"},"road_event_id":"YHRQqaN5agHmgyJERdLiUg7jR64=","beginning_cross_street":"Hillside Road","ending_cross_street":"Holmes Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.341465,43.41094]]}},{"id":"z22Fjnarl9ktlue6He4/+alA7Xg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YHRQqaN5agHmgyJERdLiUg7jR64="},{"type":"next-occurrence","id":"FARvx8rQwB/f2OQj/99ubSkLTyI="}],"description":"Construction on NY 46 both directions between Hillside Road (Boonville) and Holmes Road (Boonville) Motorists will encounter lane closures in both directions with flaggers in place, Thursday April 3rd, 2025 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 05:30 PM,","update_date":"2026-05-08T11:48:46Z"},"road_event_id":"z22Fjnarl9ktlue6He4/+alA7Xg=","beginning_cross_street":"Hillside Road","ending_cross_street":"Holmes Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.341465,43.41094]]}},{"id":"FARvx8rQwB/f2OQj/99ubSkLTyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YHRQqaN5agHmgyJERdLiUg7jR64="}],"description":"Construction on NY 46 both directions between Hillside Road (Boonville) and Holmes Road (Boonville) Motorists will encounter lane closures in both directions with flaggers in place, Thursday April 3rd, 2025 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 05:30 PM,","update_date":"2026-05-08T11:48:46Z"},"road_event_id":"FARvx8rQwB/f2OQj/99ubSkLTyI=","beginning_cross_street":"Hillside Road","ending_cross_street":"Holmes Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.341465,43.41094]]}},{"id":"KDkNWKULkl/ZKbeJr+aHjAA00JU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 28 both directions between Exit - Mohawk Street; I-90; Steele Street (Herkimer) and Marginal Road (Herkimer) All work will be on I-90. Any work under the bridge will occur off roadway with no impact to traffic, Continuous Monday April 13th, 2026 6:00 AM thru Monday November 30th, 2026 6:00 PM","update_date":"2026-05-08T11:53:07Z"},"road_event_id":"KDkNWKULkl/ZKbeJr+aHjAA00JU=","beginning_cross_street":"Exit   - Mohawk Street; I-90; Steele Street","ending_cross_street":"Marginal Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.993552,43.017647]]}},{"id":"5aCyIEfckKf5GZ4OvtgUCx5+emQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 30 both directions between Salmon Pond Road (Indian Lake) and Salmon River Road (Indian Lake) motorists will encounter lane closures in both direcitons with temporary signals in place, Continuous Monday April 13th, 2026 7:00 AM thru Saturday May 16th, 2026 5:00 PM","update_date":"2026-05-08T11:54:12Z"},"road_event_id":"5aCyIEfckKf5GZ4OvtgUCx5+emQ=","beginning_cross_street":"Salmon Pond Road","ending_cross_street":"Salmon River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.433521,43.898152]]}},{"id":"Y0wK+m/75vVaBarV0alOngliSHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp), Continuous Friday April 10, 2026 09:00 PM thru Saturday September 26, 2026 05:00 AM, right shoulder closed","update_date":"2026-04-09T19:22:43Z"},"road_event_id":"Y0wK+m/75vVaBarV0alOngliSHI=","beginning_cross_street":"West of Exit 42 - US 202/Littleton Rd","ending_cross_street":"West of Exit 42 - US 202/Littleton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.452018,40.8679]]}},{"id":"DltrTyBNX1hdyGCOknkXZcG0A8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Tog7fC9HoZlyar708XG2l6L/Hl0="}],"description":"Construction on NY 80 both directions between Muller Hill Road (Georgetown) and Chapin Road (Georgetown) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:44:14Z"},"road_event_id":"DltrTyBNX1hdyGCOknkXZcG0A8E=","beginning_cross_street":"Muller Hill Road","ending_cross_street":"Chapin Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.753676,42.784731]]}},{"id":"Tog7fC9HoZlyar708XG2l6L/Hl0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DltrTyBNX1hdyGCOknkXZcG0A8E="},{"type":"next-occurrence","id":"QsZUCzIxq68CAArUbu5lAGCtSN4="}],"description":"Construction on NY 80 both directions between Muller Hill Road (Georgetown) and Chapin Road (Georgetown) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:44:14Z"},"road_event_id":"Tog7fC9HoZlyar708XG2l6L/Hl0=","beginning_cross_street":"Muller Hill Road","ending_cross_street":"Chapin Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.753676,42.784731]]}},{"id":"QsZUCzIxq68CAArUbu5lAGCtSN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DltrTyBNX1hdyGCOknkXZcG0A8E="}],"description":"Construction on NY 80 both directions between Muller Hill Road (Georgetown) and Chapin Road (Georgetown) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:44:14Z"},"road_event_id":"QsZUCzIxq68CAArUbu5lAGCtSN4=","beginning_cross_street":"Muller Hill Road","ending_cross_street":"Chapin Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.753676,42.784731]]}},{"id":"WRu7Ni0CFBI7n+0sRB4WOr78wkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qUL+BIb0vVRoLglPAasCuzHCTCE="}],"description":"Utility work on NY 332 both directions between Farmbrook Dr (Farmington) and END ROUTE (Farmington) Alternating lane closures with flaggers as needed, Monday April 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T13:46:25Z"},"road_event_id":"WRu7Ni0CFBI7n+0sRB4WOr78wkU=","beginning_cross_street":"Farmbrook Dr","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.341287,42.954896]]}},{"id":"qUL+BIb0vVRoLglPAasCuzHCTCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WRu7Ni0CFBI7n+0sRB4WOr78wkU="},{"type":"next-occurrence","id":"exYGqNk5QxGjXbBBEigef1hZbug="}],"description":"Utility work on NY 332 both directions between Farmbrook Dr (Farmington) and END ROUTE (Farmington) Alternating lane closures with flaggers as needed, Monday April 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T13:46:25Z"},"road_event_id":"qUL+BIb0vVRoLglPAasCuzHCTCE=","beginning_cross_street":"Farmbrook Dr","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.341287,42.954896]]}},{"id":"exYGqNk5QxGjXbBBEigef1hZbug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WRu7Ni0CFBI7n+0sRB4WOr78wkU="}],"description":"Utility work on NY 332 both directions between Farmbrook Dr (Farmington) and END ROUTE (Farmington) Alternating lane closures with flaggers as needed, Monday April 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T13:46:25Z"},"road_event_id":"exYGqNk5QxGjXbBBEigef1hZbug=","beginning_cross_street":"Farmbrook Dr","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.341287,42.954896]]}},{"id":"AHzE5bpIFpBnwf+Bwdg+6Kh/k9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+BRyH/rwfDPzxy4LtU/VqQ5b7Jc="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy both directions between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/B5501670/NIGHT/29333209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-09T10:00:23Z"},"road_event_id":"AHzE5bpIFpBnwf+Bwdg+6Kh/k9U=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.82966,41.004654]]}},{"id":"+BRyH/rwfDPzxy4LtU/VqQ5b7Jc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AHzE5bpIFpBnwf+Bwdg+6Kh/k9U="},{"type":"next-occurrence","id":"Y5yZScaJI4Ug2BYhkZePpfb4iFE="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy both directions between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/B5501670/NIGHT/29333209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-09T10:00:23Z"},"road_event_id":"+BRyH/rwfDPzxy4LtU/VqQ5b7Jc=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.82966,41.004654]]}},{"id":"Y5yZScaJI4Ug2BYhkZePpfb4iFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AHzE5bpIFpBnwf+Bwdg+6Kh/k9U="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy both directions between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/B5501670/NIGHT/29333209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-09T10:00:23Z"},"road_event_id":"Y5yZScaJI4Ug2BYhkZePpfb4iFE=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.82966,41.004654]]}},{"id":"+e1ooZKm0D+AUj2lWL+7OZUwo9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QTtexMDIjbEjMty4nYxmsFZ/Dyk="}],"description":"Bridge maintenance operations on NY 119 both directions between Undercliff Avenue (Elmsford) and Vreeland Avenue (Elmsford) D264324/DAY/B5500749/32337809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, various lane closures","update_date":"2026-05-08T19:01:20Z"},"road_event_id":"+e1ooZKm0D+AUj2lWL+7OZUwo9k=","beginning_cross_street":"Undercliff Avenue","ending_cross_street":"Vreeland Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821292,41.055576]]}},{"id":"QTtexMDIjbEjMty4nYxmsFZ/Dyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+e1ooZKm0D+AUj2lWL+7OZUwo9k="},{"type":"next-occurrence","id":"zvQ98QrrH62i6n5Vi4VBo78kqDw="}],"description":"Bridge maintenance operations on NY 119 both directions between Undercliff Avenue (Elmsford) and Vreeland Avenue (Elmsford) D264324/DAY/B5500749/32337809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, various lane closures","update_date":"2026-05-08T19:01:20Z"},"road_event_id":"QTtexMDIjbEjMty4nYxmsFZ/Dyk=","beginning_cross_street":"Undercliff Avenue","ending_cross_street":"Vreeland Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821292,41.055576]]}},{"id":"zvQ98QrrH62i6n5Vi4VBo78kqDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+e1ooZKm0D+AUj2lWL+7OZUwo9k="}],"description":"Bridge maintenance operations on NY 119 both directions between Undercliff Avenue (Elmsford) and Vreeland Avenue (Elmsford) D264324/DAY/B5500749/32337809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, various lane closures","update_date":"2026-05-08T19:01:20Z"},"road_event_id":"zvQ98QrrH62i6n5Vi4VBo78kqDw=","beginning_cross_street":"Undercliff Avenue","ending_cross_street":"Vreeland Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821292,41.055576]]}},{"id":"+yRrDVesqtO+WnJ0EZcDJHPu9oI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"u51+Orslt+8uDbO2C5VC/ojWbm4="}],"description":"Bridge maintenance operations on Saw Mill River Parkway northbound between Exit 20 - I-87 (Greenburgh) and Exit 23 - Old Saw Mill Road - CR 303 (Greenburgh) D264324/DAY/B5500749/32387409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-05-08T18:00:58Z"},"road_event_id":"+yRrDVesqtO+WnJ0EZcDJHPu9oI=","beginning_cross_street":"Exit 20 - I-87","ending_cross_street":"Exit 23 - Old Saw Mill Road - CR 303","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821132,41.055486]]}},{"id":"u51+Orslt+8uDbO2C5VC/ojWbm4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+yRrDVesqtO+WnJ0EZcDJHPu9oI="},{"type":"next-occurrence","id":"qtm9AuobAVcPvZ3PuEF4d3C/7ec="}],"description":"Bridge maintenance operations on Saw Mill River Parkway northbound between Exit 20 - I-87 (Greenburgh) and Exit 23 - Old Saw Mill Road - CR 303 (Greenburgh) D264324/DAY/B5500749/32387409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-05-08T18:00:58Z"},"road_event_id":"u51+Orslt+8uDbO2C5VC/ojWbm4=","beginning_cross_street":"Exit 20 - I-87","ending_cross_street":"Exit 23 - Old Saw Mill Road - CR 303","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821132,41.055486]]}},{"id":"qtm9AuobAVcPvZ3PuEF4d3C/7ec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+yRrDVesqtO+WnJ0EZcDJHPu9oI="}],"description":"Bridge maintenance operations on Saw Mill River Parkway northbound between Exit 20 - I-87 (Greenburgh) and Exit 23 - Old Saw Mill Road - CR 303 (Greenburgh) D264324/DAY/B5500749/32387409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-05-08T18:00:58Z"},"road_event_id":"qtm9AuobAVcPvZ3PuEF4d3C/7ec=","beginning_cross_street":"Exit 20 - I-87","ending_cross_street":"Exit 23 - Old Saw Mill Road - CR 303","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821132,41.055486]]}},{"id":"ceCreK7YGXi1b3c4CGbQQ/mRfhU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement and longterm construction on I-590 both directions between Edgewood Ave (Brighton) and Elmwood Avenue; CR 87 (Brighton), Continuous Saturday March 28th, 2026 09:00 AM thru Wednesday September 30th, 2026 05:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-10T15:33:15Z"},"road_event_id":"ceCreK7YGXi1b3c4CGbQQ/mRfhU=","beginning_cross_street":"Edgewood Ave","ending_cross_street":"Elmwood Avenue; CR 87","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.560936,43.108454]]}},{"id":"XvIiXdOAqYqHQ8pM7D+eUixh8Lo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LaSalle Expressway"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on LaSalle Expressway both directions Exit - 77th Street (Niagara Falls) to City of Niagara Falls; Town of Wheatfield Line (Wheatfield), Continuous Friday April 10th, 2026 12:00 AM thru Friday July 31st, 2026 11:59 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-10T15:42:44Z"},"road_event_id":"XvIiXdOAqYqHQ8pM7D+eUixh8Lo=","beginning_cross_street":"Exit   - 77th Street","ending_cross_street":"City of Niagara Falls; Town of Wheatfield Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.981487,43.079962]]}},{"id":"59LiED+E7LPjfZsTBWflC1HEUa4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation and longterm construction on I-590 southbound Exit ramp Exit 2B to NY 31; Monroe Ave. (Brighton) RAMP CLOSED, Continuous Saturday April 11th, 2026 05:00 AM thru Monday November 30th, 2026 12:00 PM All lanes closed and detoured ramp","update_date":"2026-04-10T17:42:08Z"},"road_event_id":"59LiED+E7LPjfZsTBWflC1HEUa4=","beginning_cross_street":"Exit 2B to NY 31; Monroe Ave.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.552248,43.11434]]}},{"id":"G0VTsZc6/n2+B81CJFuc9Q/j+yQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement and longterm construction on NY 31 westbound Entrance ramp I-590 SB (Brighton) RAMP CLOSED, Continuous Saturday April 11th, 2026 05:00 AM thru Monday November 30th, 2026 12:00 PM All lanes closed and detoured ramp","update_date":"2026-04-10T17:46:35Z"},"road_event_id":"G0VTsZc6/n2+B81CJFuc9Q/j+yQ=","beginning_cross_street":"I-590 SB","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.553968,43.117]]}},{"id":"fAMqhR2b/ntOIObTG2IX3hLeYG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation and longterm construction on I-590 southbound Elmwood Avenue; CR 87 (Brighton) to EXIT 2A to NY 31; Monroe Ave (Brighton) RIGHT LANE IS EXIT ONLY AT EXIT 2A, Continuous Saturday April 11th, 2026 05:00 AM thru Monday November 30th, 2026 12:00 PM 1 Right lane of 3 lanes diverted","update_date":"2026-04-10T17:54:37Z"},"road_event_id":"fAMqhR2b/ntOIObTG2IX3hLeYG0=","beginning_cross_street":"Elmwood Avenue; CR 87","ending_cross_street":"EXIT 2A to NY 31; Monroe Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.553512,43.126751]]}},{"id":"WuR8snLFfRgsI+/faOsl3DRAuEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 253"],"direction":"unknown","related_road_events":[],"description":"Structure repairs on NY 253 eastbound at I-390 (Henrietta), Continuous Monday April 13th, 2026 07:00 AM thru Monday August 31st, 2026 04:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-10T18:05:35Z"},"road_event_id":"WuR8snLFfRgsI+/faOsl3DRAuEE=","beginning_cross_street":"I-390","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.641599,43.058834]]}},{"id":"UldJeAjFIOYEK0D8YKAIe7TQsE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fkP8tlgBqKJFTaZbLU0vTqR4Qpg="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"UldJeAjFIOYEK0D8YKAIe7TQsE4=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"fkP8tlgBqKJFTaZbLU0vTqR4Qpg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UldJeAjFIOYEK0D8YKAIe7TQsE4="},{"type":"next-occurrence","id":"T5/ly6m6ksLDxt5n1jW5rYIbZS0="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"fkP8tlgBqKJFTaZbLU0vTqR4Qpg=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"T5/ly6m6ksLDxt5n1jW5rYIbZS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UldJeAjFIOYEK0D8YKAIe7TQsE4="},{"type":"next-occurrence","id":"m1fZGHFjH1AZJkS5FaDjXzpjLtU="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"T5/ly6m6ksLDxt5n1jW5rYIbZS0=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"m1fZGHFjH1AZJkS5FaDjXzpjLtU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UldJeAjFIOYEK0D8YKAIe7TQsE4="},{"type":"next-occurrence","id":"lQa/kVAqGadRPM6M4nzORF8aCsI="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"m1fZGHFjH1AZJkS5FaDjXzpjLtU=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"lQa/kVAqGadRPM6M4nzORF8aCsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UldJeAjFIOYEK0D8YKAIe7TQsE4="},{"type":"next-occurrence","id":"LVv/o0CWqV/KLWRoKwuwWyjanD8="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"lQa/kVAqGadRPM6M4nzORF8aCsI=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"LVv/o0CWqV/KLWRoKwuwWyjanD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UldJeAjFIOYEK0D8YKAIe7TQsE4="},{"type":"next-occurrence","id":"8AtMRB3Y8i871nhg0bDWKVlaZSw="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"LVv/o0CWqV/KLWRoKwuwWyjanD8=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"8AtMRB3Y8i871nhg0bDWKVlaZSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UldJeAjFIOYEK0D8YKAIe7TQsE4="},{"type":"next-occurrence","id":"v8Wq1Zwm6G0UiE71LziIRRNyxBk="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"8AtMRB3Y8i871nhg0bDWKVlaZSw=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"v8Wq1Zwm6G0UiE71LziIRRNyxBk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UldJeAjFIOYEK0D8YKAIe7TQsE4="},{"type":"next-occurrence","id":"VB7zpgp6+kpmmufmWgKNgX8Uqr4="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"v8Wq1Zwm6G0UiE71LziIRRNyxBk=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"VB7zpgp6+kpmmufmWgKNgX8Uqr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UldJeAjFIOYEK0D8YKAIe7TQsE4="},{"type":"next-occurrence","id":"fle9FlWBRezRpTNkKGRfixsd7EI="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"VB7zpgp6+kpmmufmWgKNgX8Uqr4=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"fle9FlWBRezRpTNkKGRfixsd7EI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UldJeAjFIOYEK0D8YKAIe7TQsE4="},{"type":"next-occurrence","id":"DDLoL/LO+jOEozZuVtlhUD9SE/M="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"fle9FlWBRezRpTNkKGRfixsd7EI=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"DDLoL/LO+jOEozZuVtlhUD9SE/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UldJeAjFIOYEK0D8YKAIe7TQsE4="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"DDLoL/LO+jOEozZuVtlhUD9SE/M=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"XIQO2C2bO9sa6NMImyERJ5qOFJg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FI8oEYc6sOxuaD9OjCn7lm4xxpQ="}],"description":"Construction on I-495 both directions between Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only (New York) and Exit 29 - Springfield Boulevard (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed eastbound, westbound, Monday May 11th,2026 thru Saturday May 16th,2026, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound, westbound","update_date":"2026-05-09T09:00:17Z"},"road_event_id":"XIQO2C2bO9sa6NMImyERJ5qOFJg=","beginning_cross_street":"Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only","ending_cross_street":"Exit 29 - Springfield Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.771162,40.744269]]}},{"id":"FI8oEYc6sOxuaD9OjCn7lm4xxpQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XIQO2C2bO9sa6NMImyERJ5qOFJg="},{"type":"next-occurrence","id":"MNU2/pnj/Qcy391sUZrfarjgklQ="}],"description":"Construction on I-495 both directions between Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only (New York) and Exit 29 - Springfield Boulevard (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed eastbound, westbound, Monday May 11th,2026 thru Saturday May 16th,2026, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound, westbound","update_date":"2026-05-09T09:00:17Z"},"road_event_id":"FI8oEYc6sOxuaD9OjCn7lm4xxpQ=","beginning_cross_street":"Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only","ending_cross_street":"Exit 29 - Springfield Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.771162,40.744269]]}},{"id":"MNU2/pnj/Qcy391sUZrfarjgklQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XIQO2C2bO9sa6NMImyERJ5qOFJg="},{"type":"next-occurrence","id":"9gaD+prXgWmAccLrB/4IcNB53/A="}],"description":"Construction on I-495 both directions between Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only (New York) and Exit 29 - Springfield Boulevard (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed eastbound, westbound, Monday May 11th,2026 thru Saturday May 16th,2026, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound, westbound","update_date":"2026-05-09T09:00:17Z"},"road_event_id":"MNU2/pnj/Qcy391sUZrfarjgklQ=","beginning_cross_street":"Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only","ending_cross_street":"Exit 29 - Springfield Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.771162,40.744269]]}},{"id":"9gaD+prXgWmAccLrB/4IcNB53/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XIQO2C2bO9sa6NMImyERJ5qOFJg="},{"type":"next-occurrence","id":"FOFmi0iZvqdTa0f3ynlTrjI+Vec="}],"description":"Construction on I-495 both directions between Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only (New York) and Exit 29 - Springfield Boulevard (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed eastbound, westbound, Monday May 11th,2026 thru Saturday May 16th,2026, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound, westbound","update_date":"2026-05-09T09:00:17Z"},"road_event_id":"9gaD+prXgWmAccLrB/4IcNB53/A=","beginning_cross_street":"Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only","ending_cross_street":"Exit 29 - Springfield Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.771162,40.744269]]}},{"id":"FOFmi0iZvqdTa0f3ynlTrjI+Vec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XIQO2C2bO9sa6NMImyERJ5qOFJg="},{"type":"next-occurrence","id":"GyfbN9DJU2mkcL4btnFlt+fxjBU="}],"description":"Construction on I-495 both directions between Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only (New York) and Exit 29 - Springfield Boulevard (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed eastbound, westbound, Monday May 11th,2026 thru Saturday May 16th,2026, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound, westbound","update_date":"2026-05-09T09:00:17Z"},"road_event_id":"FOFmi0iZvqdTa0f3ynlTrjI+Vec=","beginning_cross_street":"Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only","ending_cross_street":"Exit 29 - Springfield Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.771162,40.744269]]}},{"id":"GyfbN9DJU2mkcL4btnFlt+fxjBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XIQO2C2bO9sa6NMImyERJ5qOFJg="}],"description":"Construction on I-495 both directions between Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only (New York) and Exit 29 - Springfield Boulevard (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed eastbound, westbound, Monday May 11th,2026 thru Saturday May 16th,2026, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound, westbound","update_date":"2026-05-09T09:00:17Z"},"road_event_id":"GyfbN9DJU2mkcL4btnFlt+fxjBU=","beginning_cross_street":"Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only","ending_cross_street":"Exit 29 - Springfield Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.771162,40.744269]]}},{"id":"9vT3Soq5I256Oe75s0jVUYXCqCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6QQ4APxCPt0JJBg+kxdeYqNsm0M="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"9vT3Soq5I256Oe75s0jVUYXCqCk=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"6QQ4APxCPt0JJBg+kxdeYqNsm0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vT3Soq5I256Oe75s0jVUYXCqCk="},{"type":"next-occurrence","id":"tS07qj+yQvh0aCMOiPUHrVrqHFk="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"6QQ4APxCPt0JJBg+kxdeYqNsm0M=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"tS07qj+yQvh0aCMOiPUHrVrqHFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vT3Soq5I256Oe75s0jVUYXCqCk="},{"type":"next-occurrence","id":"xYagwRVed6SaoA4kUGoX8G6SIjM="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"tS07qj+yQvh0aCMOiPUHrVrqHFk=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"xYagwRVed6SaoA4kUGoX8G6SIjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vT3Soq5I256Oe75s0jVUYXCqCk="},{"type":"next-occurrence","id":"OZXUPnZ0mrK7jkuIgBWIM9n2TDw="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"xYagwRVed6SaoA4kUGoX8G6SIjM=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"OZXUPnZ0mrK7jkuIgBWIM9n2TDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vT3Soq5I256Oe75s0jVUYXCqCk="},{"type":"next-occurrence","id":"x+z9TlhhMaloiD6ZjcPgA5xo5CU="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"OZXUPnZ0mrK7jkuIgBWIM9n2TDw=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"x+z9TlhhMaloiD6ZjcPgA5xo5CU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vT3Soq5I256Oe75s0jVUYXCqCk="},{"type":"next-occurrence","id":"e1BADuHMyD7MUNR69/Wc4SkwR24="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"x+z9TlhhMaloiD6ZjcPgA5xo5CU=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"e1BADuHMyD7MUNR69/Wc4SkwR24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vT3Soq5I256Oe75s0jVUYXCqCk="},{"type":"next-occurrence","id":"TpRgxUV5wimaJfZ7H0gD6/XnDwE="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"e1BADuHMyD7MUNR69/Wc4SkwR24=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"TpRgxUV5wimaJfZ7H0gD6/XnDwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vT3Soq5I256Oe75s0jVUYXCqCk="},{"type":"next-occurrence","id":"9+NiP5JsAVhXPsW47w/lSbYJP6E="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"TpRgxUV5wimaJfZ7H0gD6/XnDwE=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"9+NiP5JsAVhXPsW47w/lSbYJP6E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vT3Soq5I256Oe75s0jVUYXCqCk="},{"type":"next-occurrence","id":"m5xYKGVFBzWOpZCGt2OCx6sTC5k="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"9+NiP5JsAVhXPsW47w/lSbYJP6E=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"m5xYKGVFBzWOpZCGt2OCx6sTC5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vT3Soq5I256Oe75s0jVUYXCqCk="},{"type":"next-occurrence","id":"gAGyWNwtRb7B4g/tkPSTiy7Pl/U="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"m5xYKGVFBzWOpZCGt2OCx6sTC5k=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"gAGyWNwtRb7B4g/tkPSTiy7Pl/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vT3Soq5I256Oe75s0jVUYXCqCk="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"gAGyWNwtRb7B4g/tkPSTiy7Pl/U=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"xzO6pvZqFgIiAG+V5vPIAvriBiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"z+L1gpeUFVCq2E+Z3hzGqKoeLUg="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32727009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:19Z"},"road_event_id":"xzO6pvZqFgIiAG+V5vPIAvriBiM=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"z+L1gpeUFVCq2E+Z3hzGqKoeLUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xzO6pvZqFgIiAG+V5vPIAvriBiM="},{"type":"next-occurrence","id":"jPktDUpN7d9wbtoVmzzi5r0JMnI="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32727009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:19Z"},"road_event_id":"z+L1gpeUFVCq2E+Z3hzGqKoeLUg=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"jPktDUpN7d9wbtoVmzzi5r0JMnI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xzO6pvZqFgIiAG+V5vPIAvriBiM="},{"type":"next-occurrence","id":"Rfkh4y0KFVVNQgRXlOgygUtUX/w="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32727009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:19Z"},"road_event_id":"jPktDUpN7d9wbtoVmzzi5r0JMnI=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"Rfkh4y0KFVVNQgRXlOgygUtUX/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xzO6pvZqFgIiAG+V5vPIAvriBiM="},{"type":"next-occurrence","id":"k0G5u/8aBCLUu2NEF3tnr4QdLL0="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32727009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:19Z"},"road_event_id":"Rfkh4y0KFVVNQgRXlOgygUtUX/w=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"k0G5u/8aBCLUu2NEF3tnr4QdLL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xzO6pvZqFgIiAG+V5vPIAvriBiM="},{"type":"next-occurrence","id":"Ln+0cV+sBC43pY+6dvcLtl/iNyc="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32727009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:19Z"},"road_event_id":"k0G5u/8aBCLUu2NEF3tnr4QdLL0=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"Ln+0cV+sBC43pY+6dvcLtl/iNyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xzO6pvZqFgIiAG+V5vPIAvriBiM="},{"type":"next-occurrence","id":"DU4kvP9dyuF500zPV8/0Se8DsZw="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32727009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:19Z"},"road_event_id":"Ln+0cV+sBC43pY+6dvcLtl/iNyc=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"DU4kvP9dyuF500zPV8/0Se8DsZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xzO6pvZqFgIiAG+V5vPIAvriBiM="},{"type":"next-occurrence","id":"kr6N4l6pNSLpUR4dpf8CFIs/ANY="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32727009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:19Z"},"road_event_id":"DU4kvP9dyuF500zPV8/0Se8DsZw=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"kr6N4l6pNSLpUR4dpf8CFIs/ANY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xzO6pvZqFgIiAG+V5vPIAvriBiM="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32727009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:19Z"},"road_event_id":"kr6N4l6pNSLpUR4dpf8CFIs/ANY=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"wQXBTrhpSFCPu345btWglY7yi34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fGngmAMj4ZJZbnFSNVfjaqnBdnY="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"wQXBTrhpSFCPu345btWglY7yi34=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"fGngmAMj4ZJZbnFSNVfjaqnBdnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wQXBTrhpSFCPu345btWglY7yi34="},{"type":"next-occurrence","id":"rbGffUDjQagC7VsM+fGXV6Wfrx8="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"fGngmAMj4ZJZbnFSNVfjaqnBdnY=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"rbGffUDjQagC7VsM+fGXV6Wfrx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wQXBTrhpSFCPu345btWglY7yi34="},{"type":"next-occurrence","id":"ft1UOipTwYGxwGOK63l36tpxRr0="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"rbGffUDjQagC7VsM+fGXV6Wfrx8=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"ft1UOipTwYGxwGOK63l36tpxRr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wQXBTrhpSFCPu345btWglY7yi34="},{"type":"next-occurrence","id":"UHeOOQSmTbkNYFg1Kbkybpx58Q4="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"ft1UOipTwYGxwGOK63l36tpxRr0=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"UHeOOQSmTbkNYFg1Kbkybpx58Q4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wQXBTrhpSFCPu345btWglY7yi34="},{"type":"next-occurrence","id":"/j/hDlrrILskVe6qzO9zExWFWa0="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"UHeOOQSmTbkNYFg1Kbkybpx58Q4=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"/j/hDlrrILskVe6qzO9zExWFWa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wQXBTrhpSFCPu345btWglY7yi34="},{"type":"next-occurrence","id":"DuIs2Y883ye1K/byM2fcH3bvx/M="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"/j/hDlrrILskVe6qzO9zExWFWa0=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"DuIs2Y883ye1K/byM2fcH3bvx/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wQXBTrhpSFCPu345btWglY7yi34="},{"type":"next-occurrence","id":"OqXr8X+QyPifjkCBs2hUZx8+pow="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"DuIs2Y883ye1K/byM2fcH3bvx/M=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"OqXr8X+QyPifjkCBs2hUZx8+pow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wQXBTrhpSFCPu345btWglY7yi34="},{"type":"next-occurrence","id":"MplbwQeoPepdfiBzViTy+b9B25A="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"OqXr8X+QyPifjkCBs2hUZx8+pow=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"MplbwQeoPepdfiBzViTy+b9B25A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wQXBTrhpSFCPu345btWglY7yi34="},{"type":"next-occurrence","id":"P99INdn60R9dU6m9dKilhdTZZXw="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"MplbwQeoPepdfiBzViTy+b9B25A=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"P99INdn60R9dU6m9dKilhdTZZXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wQXBTrhpSFCPu345btWglY7yi34="},{"type":"next-occurrence","id":"i+M6YLeIB0ePs3KxNPmtvelYfPE="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"P99INdn60R9dU6m9dKilhdTZZXw=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"i+M6YLeIB0ePs3KxNPmtvelYfPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wQXBTrhpSFCPu345btWglY7yi34="},{"type":"next-occurrence","id":"7WhJr8ouKRGibdEs+XmHqy94njY="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"i+M6YLeIB0ePs3KxNPmtvelYfPE=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"7WhJr8ouKRGibdEs+XmHqy94njY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wQXBTrhpSFCPu345btWglY7yi34="},{"type":"next-occurrence","id":"kILYUyzvIWVnl1Tff48ytf95Ovk="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"7WhJr8ouKRGibdEs+XmHqy94njY=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"kILYUyzvIWVnl1Tff48ytf95Ovk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wQXBTrhpSFCPu345btWglY7yi34="},{"type":"next-occurrence","id":"dZU5yWLAO5/l40ns0j77hG+GllI="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"kILYUyzvIWVnl1Tff48ytf95Ovk=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"dZU5yWLAO5/l40ns0j77hG+GllI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wQXBTrhpSFCPu345btWglY7yi34="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"dZU5yWLAO5/l40ns0j77hG+GllI=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"AAhljpAuCWjfmkiuh5EbZqpJBUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VRLYjx+C9k6flazSzoU2UvolyEs="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"AAhljpAuCWjfmkiuh5EbZqpJBUA=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"VRLYjx+C9k6flazSzoU2UvolyEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AAhljpAuCWjfmkiuh5EbZqpJBUA="},{"type":"next-occurrence","id":"bUKF3UYOYuu7La5KN+rqLejge+c="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"VRLYjx+C9k6flazSzoU2UvolyEs=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"bUKF3UYOYuu7La5KN+rqLejge+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AAhljpAuCWjfmkiuh5EbZqpJBUA="},{"type":"next-occurrence","id":"eIC2D9kN5rt3jLvE3+lE46lh0bo="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"bUKF3UYOYuu7La5KN+rqLejge+c=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"eIC2D9kN5rt3jLvE3+lE46lh0bo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AAhljpAuCWjfmkiuh5EbZqpJBUA="},{"type":"next-occurrence","id":"ryrvqWjjxSJpigkKpUqSa1w1t/s="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"eIC2D9kN5rt3jLvE3+lE46lh0bo=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"ryrvqWjjxSJpigkKpUqSa1w1t/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AAhljpAuCWjfmkiuh5EbZqpJBUA="},{"type":"next-occurrence","id":"ymsNCCBR513f3XHZTr7xdWCWnaE="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"ryrvqWjjxSJpigkKpUqSa1w1t/s=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"ymsNCCBR513f3XHZTr7xdWCWnaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AAhljpAuCWjfmkiuh5EbZqpJBUA="},{"type":"next-occurrence","id":"MosF6AFSWZRZwl1ShMgnqmpCXkQ="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"ymsNCCBR513f3XHZTr7xdWCWnaE=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"MosF6AFSWZRZwl1ShMgnqmpCXkQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AAhljpAuCWjfmkiuh5EbZqpJBUA="},{"type":"next-occurrence","id":"unNv/E3sLR9B7h2gmq8trt23FQo="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"MosF6AFSWZRZwl1ShMgnqmpCXkQ=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"unNv/E3sLR9B7h2gmq8trt23FQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AAhljpAuCWjfmkiuh5EbZqpJBUA="},{"type":"next-occurrence","id":"k9ZeKFNzqSHMI1c8QOe66dJ/xZI="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"unNv/E3sLR9B7h2gmq8trt23FQo=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"k9ZeKFNzqSHMI1c8QOe66dJ/xZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AAhljpAuCWjfmkiuh5EbZqpJBUA="},{"type":"next-occurrence","id":"xub1HHwpucJfLRbeskEB5wuUoXk="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"k9ZeKFNzqSHMI1c8QOe66dJ/xZI=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"xub1HHwpucJfLRbeskEB5wuUoXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AAhljpAuCWjfmkiuh5EbZqpJBUA="},{"type":"next-occurrence","id":"EfDfGTFcB0ba3Ek6OLL3My6lV2Y="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"xub1HHwpucJfLRbeskEB5wuUoXk=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"EfDfGTFcB0ba3Ek6OLL3My6lV2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AAhljpAuCWjfmkiuh5EbZqpJBUA="},{"type":"next-occurrence","id":"hBeZsGUE3U/YEqtHJMOhvIC3PE8="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"EfDfGTFcB0ba3Ek6OLL3My6lV2Y=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"hBeZsGUE3U/YEqtHJMOhvIC3PE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AAhljpAuCWjfmkiuh5EbZqpJBUA="},{"type":"next-occurrence","id":"hEysQXES0GgNqxC+Qrw/Hk0vmf4="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"hBeZsGUE3U/YEqtHJMOhvIC3PE8=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"hEysQXES0GgNqxC+Qrw/Hk0vmf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AAhljpAuCWjfmkiuh5EbZqpJBUA="},{"type":"next-occurrence","id":"NKlBx+Y10Eb2Mtu5ZKXeD2TuIqM="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"hEysQXES0GgNqxC+Qrw/Hk0vmf4=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"NKlBx+Y10Eb2Mtu5ZKXeD2TuIqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AAhljpAuCWjfmkiuh5EbZqpJBUA="},{"type":"next-occurrence","id":"UvWtq5vMGwMGiQS0SvtYET6NVPM="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"NKlBx+Y10Eb2Mtu5ZKXeD2TuIqM=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"UvWtq5vMGwMGiQS0SvtYET6NVPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AAhljpAuCWjfmkiuh5EbZqpJBUA="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"UvWtq5vMGwMGiQS0SvtYET6NVPM=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"6583oLWUeAVa1itj0qtRMlDfsnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0LY7mtEcAuX+hRKvO2OkQCmSYec="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"6583oLWUeAVa1itj0qtRMlDfsnE=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"0LY7mtEcAuX+hRKvO2OkQCmSYec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6583oLWUeAVa1itj0qtRMlDfsnE="},{"type":"next-occurrence","id":"OcCnOxBMoIHc/TGoMjD18TUgKU0="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"0LY7mtEcAuX+hRKvO2OkQCmSYec=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"OcCnOxBMoIHc/TGoMjD18TUgKU0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6583oLWUeAVa1itj0qtRMlDfsnE="},{"type":"next-occurrence","id":"GcTyS5/KoyXl0g9bIXteWroC+TU="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"OcCnOxBMoIHc/TGoMjD18TUgKU0=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"GcTyS5/KoyXl0g9bIXteWroC+TU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6583oLWUeAVa1itj0qtRMlDfsnE="},{"type":"next-occurrence","id":"cyhyJIloODNxnDTky7A/Cavnewk="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"GcTyS5/KoyXl0g9bIXteWroC+TU=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"cyhyJIloODNxnDTky7A/Cavnewk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6583oLWUeAVa1itj0qtRMlDfsnE="},{"type":"next-occurrence","id":"iV9KMUGYa6Gk+VIO+c1Jgy6NXLU="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"cyhyJIloODNxnDTky7A/Cavnewk=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"iV9KMUGYa6Gk+VIO+c1Jgy6NXLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6583oLWUeAVa1itj0qtRMlDfsnE="},{"type":"next-occurrence","id":"vNitgF6ph2kHILcytOIOFluQWOo="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"iV9KMUGYa6Gk+VIO+c1Jgy6NXLU=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"vNitgF6ph2kHILcytOIOFluQWOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6583oLWUeAVa1itj0qtRMlDfsnE="},{"type":"next-occurrence","id":"A6Uz3H26CS2gWpRC9GWDx4HmKs4="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"vNitgF6ph2kHILcytOIOFluQWOo=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"A6Uz3H26CS2gWpRC9GWDx4HmKs4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6583oLWUeAVa1itj0qtRMlDfsnE="},{"type":"next-occurrence","id":"zVZT1mlPG3tKudeyOzwmJ+eaBzA="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"A6Uz3H26CS2gWpRC9GWDx4HmKs4=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"zVZT1mlPG3tKudeyOzwmJ+eaBzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6583oLWUeAVa1itj0qtRMlDfsnE="},{"type":"next-occurrence","id":"Uzqk1yNa10J2NP7sDRtt9o5GnLk="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"zVZT1mlPG3tKudeyOzwmJ+eaBzA=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"Uzqk1yNa10J2NP7sDRtt9o5GnLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6583oLWUeAVa1itj0qtRMlDfsnE="},{"type":"next-occurrence","id":"4QndAdey7/tg+sJzTgDtNvePBaQ="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"Uzqk1yNa10J2NP7sDRtt9o5GnLk=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"4QndAdey7/tg+sJzTgDtNvePBaQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6583oLWUeAVa1itj0qtRMlDfsnE="},{"type":"next-occurrence","id":"ENdVUb2ZFe49pCh3h9jLTeZJfb8="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"4QndAdey7/tg+sJzTgDtNvePBaQ=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"ENdVUb2ZFe49pCh3h9jLTeZJfb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6583oLWUeAVa1itj0qtRMlDfsnE="},{"type":"next-occurrence","id":"l3Olr3U74gWzJ4aeXLWOJOZcwNw="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"ENdVUb2ZFe49pCh3h9jLTeZJfb8=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"l3Olr3U74gWzJ4aeXLWOJOZcwNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6583oLWUeAVa1itj0qtRMlDfsnE="},{"type":"next-occurrence","id":"FI1yjogBplqLetZBo89/uzLegAo="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"l3Olr3U74gWzJ4aeXLWOJOZcwNw=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"FI1yjogBplqLetZBo89/uzLegAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6583oLWUeAVa1itj0qtRMlDfsnE="},{"type":"next-occurrence","id":"Q6MWsoh379vP2/EXNQI4A16d1cE="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"FI1yjogBplqLetZBo89/uzLegAo=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"Q6MWsoh379vP2/EXNQI4A16d1cE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6583oLWUeAVa1itj0qtRMlDfsnE="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"Q6MWsoh379vP2/EXNQI4A16d1cE=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"Ey2khN6HwdXWTMuPpyHyqPyBzUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uah9ueGSssjD8iHDj1eYRvzKQwo="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"Ey2khN6HwdXWTMuPpyHyqPyBzUM=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"uah9ueGSssjD8iHDj1eYRvzKQwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ey2khN6HwdXWTMuPpyHyqPyBzUM="},{"type":"next-occurrence","id":"W7h1yGhDCzS4l20q58xNrpJ7og4="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"uah9ueGSssjD8iHDj1eYRvzKQwo=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"W7h1yGhDCzS4l20q58xNrpJ7og4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ey2khN6HwdXWTMuPpyHyqPyBzUM="},{"type":"next-occurrence","id":"l/WQLcqlDJWerONI5dF+TyAXqvo="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"W7h1yGhDCzS4l20q58xNrpJ7og4=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"l/WQLcqlDJWerONI5dF+TyAXqvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ey2khN6HwdXWTMuPpyHyqPyBzUM="},{"type":"next-occurrence","id":"8/faDXGSSAYlKmYJc0fuiM2mE40="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"l/WQLcqlDJWerONI5dF+TyAXqvo=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"8/faDXGSSAYlKmYJc0fuiM2mE40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ey2khN6HwdXWTMuPpyHyqPyBzUM="},{"type":"next-occurrence","id":"Vbwwk3Hkn98uiK8df5ZM1sluXMk="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"8/faDXGSSAYlKmYJc0fuiM2mE40=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"Vbwwk3Hkn98uiK8df5ZM1sluXMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ey2khN6HwdXWTMuPpyHyqPyBzUM="},{"type":"next-occurrence","id":"DZ6+Qt3SYy/A8+0VUuQF9Qe73lw="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"Vbwwk3Hkn98uiK8df5ZM1sluXMk=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"DZ6+Qt3SYy/A8+0VUuQF9Qe73lw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ey2khN6HwdXWTMuPpyHyqPyBzUM="},{"type":"next-occurrence","id":"6lHiGdmWRcruwAdYNUbFSIGnPo8="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"DZ6+Qt3SYy/A8+0VUuQF9Qe73lw=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"6lHiGdmWRcruwAdYNUbFSIGnPo8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ey2khN6HwdXWTMuPpyHyqPyBzUM="},{"type":"next-occurrence","id":"Gu0AOZHPPG0tQdtv+JdqH7uZGWI="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"6lHiGdmWRcruwAdYNUbFSIGnPo8=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"Gu0AOZHPPG0tQdtv+JdqH7uZGWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ey2khN6HwdXWTMuPpyHyqPyBzUM="},{"type":"next-occurrence","id":"qk+5KwZqoBkQrYsfKTAniolMeJY="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"Gu0AOZHPPG0tQdtv+JdqH7uZGWI=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"qk+5KwZqoBkQrYsfKTAniolMeJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ey2khN6HwdXWTMuPpyHyqPyBzUM="},{"type":"next-occurrence","id":"2x7hFSBoZoE3C2MSkNDHV2q8jTs="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"qk+5KwZqoBkQrYsfKTAniolMeJY=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"2x7hFSBoZoE3C2MSkNDHV2q8jTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ey2khN6HwdXWTMuPpyHyqPyBzUM="},{"type":"next-occurrence","id":"BuYyl9P3Rttb+6ZcEgNFU/GTCgA="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"2x7hFSBoZoE3C2MSkNDHV2q8jTs=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"BuYyl9P3Rttb+6ZcEgNFU/GTCgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ey2khN6HwdXWTMuPpyHyqPyBzUM="},{"type":"next-occurrence","id":"qqOme9ivUJNb8PQG85cA/3e/uhg="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"BuYyl9P3Rttb+6ZcEgNFU/GTCgA=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T11:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"qqOme9ivUJNb8PQG85cA/3e/uhg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ey2khN6HwdXWTMuPpyHyqPyBzUM="},{"type":"next-occurrence","id":"PJqT5oRR0LKnPfenfQBJO5DtY+M="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"qqOme9ivUJNb8PQG85cA/3e/uhg=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"PJqT5oRR0LKnPfenfQBJO5DtY+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ey2khN6HwdXWTMuPpyHyqPyBzUM="},{"type":"next-occurrence","id":"A+gFEwmBzPhaitjUFnqLvo+f15Q="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"PJqT5oRR0LKnPfenfQBJO5DtY+M=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"A+gFEwmBzPhaitjUFnqLvo+f15Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ey2khN6HwdXWTMuPpyHyqPyBzUM="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"A+gFEwmBzPhaitjUFnqLvo+f15Q=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"Nd7cpQI2u1sdCUsIaM+Mlb+tAj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on LIVONIA AVE both directions between JEROME ST (New York) and WARWICK ST (New York) for MTA contract A-37758 package 5 ADA upgrades/elevator replacement., Continuous Tuesday April 14th, 2026 12:00 AM thru Sunday May 24th, 2026 11:59 PM All lanes closed","update_date":"2026-04-29T19:30:55Z"},"road_event_id":"Nd7cpQI2u1sdCUsIaM+Mlb+tAj4=","beginning_cross_street":"JEROME ST","ending_cross_street":"WARWICK ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88486,40.666106]]}},{"id":"jkT2yJSKpFlTwvuG5zTbE+I4NpA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zjuozr0p6s/ylKTsBYy4kCKPu9Y="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"jkT2yJSKpFlTwvuG5zTbE+I4NpA=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"zjuozr0p6s/ylKTsBYy4kCKPu9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkT2yJSKpFlTwvuG5zTbE+I4NpA="},{"type":"next-occurrence","id":"NAIXPuv/P+YXTNpNPuqDl7y6A0Y="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"zjuozr0p6s/ylKTsBYy4kCKPu9Y=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"NAIXPuv/P+YXTNpNPuqDl7y6A0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkT2yJSKpFlTwvuG5zTbE+I4NpA="},{"type":"next-occurrence","id":"G7G+Z2eeBLlow/4gWUNzYvOye8U="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"NAIXPuv/P+YXTNpNPuqDl7y6A0Y=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"G7G+Z2eeBLlow/4gWUNzYvOye8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkT2yJSKpFlTwvuG5zTbE+I4NpA="},{"type":"next-occurrence","id":"53uEF6giTQVsUHmShyU09eb7ogo="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"G7G+Z2eeBLlow/4gWUNzYvOye8U=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"53uEF6giTQVsUHmShyU09eb7ogo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkT2yJSKpFlTwvuG5zTbE+I4NpA="},{"type":"next-occurrence","id":"8NkvyPLzUHg9dOWEZhjeNr+9yZs="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"53uEF6giTQVsUHmShyU09eb7ogo=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"8NkvyPLzUHg9dOWEZhjeNr+9yZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkT2yJSKpFlTwvuG5zTbE+I4NpA="},{"type":"next-occurrence","id":"46OKDzybQG2ztj07LIBrUMOBLjo="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"8NkvyPLzUHg9dOWEZhjeNr+9yZs=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"46OKDzybQG2ztj07LIBrUMOBLjo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkT2yJSKpFlTwvuG5zTbE+I4NpA="},{"type":"next-occurrence","id":"lbYrW70X2JHedSYfv+TfxTn7Y+o="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"46OKDzybQG2ztj07LIBrUMOBLjo=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"lbYrW70X2JHedSYfv+TfxTn7Y+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkT2yJSKpFlTwvuG5zTbE+I4NpA="},{"type":"next-occurrence","id":"lC0ciLz+oMUulZg2ZfgHzxurMbI="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"lbYrW70X2JHedSYfv+TfxTn7Y+o=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"lC0ciLz+oMUulZg2ZfgHzxurMbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkT2yJSKpFlTwvuG5zTbE+I4NpA="},{"type":"next-occurrence","id":"WQ/z9jOpWF79kqZcMynI+QZAVo4="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"lC0ciLz+oMUulZg2ZfgHzxurMbI=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"WQ/z9jOpWF79kqZcMynI+QZAVo4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkT2yJSKpFlTwvuG5zTbE+I4NpA="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"WQ/z9jOpWF79kqZcMynI+QZAVo4=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"qW+AIe8ny9TNePyWLgrLYiwzjW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ikrGsDUIloUd6eOSJJIsUDe0bl8="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-05-04T19:01:03Z"},"road_event_id":"qW+AIe8ny9TNePyWLgrLYiwzjW4=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"ikrGsDUIloUd6eOSJJIsUDe0bl8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qW+AIe8ny9TNePyWLgrLYiwzjW4="},{"type":"next-occurrence","id":"28XSym3BXa0TldyFkkC8HUbXYj8="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-05-04T19:01:03Z"},"road_event_id":"ikrGsDUIloUd6eOSJJIsUDe0bl8=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"28XSym3BXa0TldyFkkC8HUbXYj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qW+AIe8ny9TNePyWLgrLYiwzjW4="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-05-04T19:01:03Z"},"road_event_id":"28XSym3BXa0TldyFkkC8HUbXYj8=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"fb98KQyKSe0g4PxtI511/MS2aEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XsbKLR87GlTe/1UG6Ilo2OHGNLQ="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"fb98KQyKSe0g4PxtI511/MS2aEI=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"XsbKLR87GlTe/1UG6Ilo2OHGNLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fb98KQyKSe0g4PxtI511/MS2aEI="},{"type":"next-occurrence","id":"wSN+oYF5bgyKujXiHr8cmp/cRzc="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"XsbKLR87GlTe/1UG6Ilo2OHGNLQ=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"wSN+oYF5bgyKujXiHr8cmp/cRzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fb98KQyKSe0g4PxtI511/MS2aEI="},{"type":"next-occurrence","id":"c/3rBgdGcwI0RFAmwpZ2P+FwQLA="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"wSN+oYF5bgyKujXiHr8cmp/cRzc=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"c/3rBgdGcwI0RFAmwpZ2P+FwQLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fb98KQyKSe0g4PxtI511/MS2aEI="},{"type":"next-occurrence","id":"tHjGbh+d8AqXt1SEy1p5jashqts="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"c/3rBgdGcwI0RFAmwpZ2P+FwQLA=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"tHjGbh+d8AqXt1SEy1p5jashqts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fb98KQyKSe0g4PxtI511/MS2aEI="},{"type":"next-occurrence","id":"9vhk8j3LQVhkIDkVLGY+9Lw+e0s="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"tHjGbh+d8AqXt1SEy1p5jashqts=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"9vhk8j3LQVhkIDkVLGY+9Lw+e0s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fb98KQyKSe0g4PxtI511/MS2aEI="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"9vhk8j3LQVhkIDkVLGY+9Lw+e0s=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"4kvS3FbPWcKE8qyWEQZ+JLhpqQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kvqvOwRgLujDkNAJ2AdzR+jJHhA="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"4kvS3FbPWcKE8qyWEQZ+JLhpqQU=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"kvqvOwRgLujDkNAJ2AdzR+jJHhA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4kvS3FbPWcKE8qyWEQZ+JLhpqQU="},{"type":"next-occurrence","id":"J5dALheCCGjjiEks4Yw96/3AUxY="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"kvqvOwRgLujDkNAJ2AdzR+jJHhA=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"J5dALheCCGjjiEks4Yw96/3AUxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4kvS3FbPWcKE8qyWEQZ+JLhpqQU="},{"type":"next-occurrence","id":"x+OD0I1hnOfb19DFlAtnx9vkbkY="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"J5dALheCCGjjiEks4Yw96/3AUxY=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"x+OD0I1hnOfb19DFlAtnx9vkbkY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4kvS3FbPWcKE8qyWEQZ+JLhpqQU="},{"type":"next-occurrence","id":"VNlh90A52TmVpywF5Iv19355pxg="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"x+OD0I1hnOfb19DFlAtnx9vkbkY=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"VNlh90A52TmVpywF5Iv19355pxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4kvS3FbPWcKE8qyWEQZ+JLhpqQU="},{"type":"next-occurrence","id":"8dB1Qp8NTBxNHY8vgrKNBHDSfB0="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"VNlh90A52TmVpywF5Iv19355pxg=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"8dB1Qp8NTBxNHY8vgrKNBHDSfB0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4kvS3FbPWcKE8qyWEQZ+JLhpqQU="},{"type":"next-occurrence","id":"xKQknO1uB1u4MwyuGIsmJQXSZWE="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"8dB1Qp8NTBxNHY8vgrKNBHDSfB0=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"xKQknO1uB1u4MwyuGIsmJQXSZWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4kvS3FbPWcKE8qyWEQZ+JLhpqQU="},{"type":"next-occurrence","id":"sqZvggnptkfqF3NZ0YFaAaczgUY="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"xKQknO1uB1u4MwyuGIsmJQXSZWE=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"sqZvggnptkfqF3NZ0YFaAaczgUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4kvS3FbPWcKE8qyWEQZ+JLhpqQU="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"sqZvggnptkfqF3NZ0YFaAaczgUY=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"D56y1uaRkiG+RHqUDwP9WEy9VQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on NY 52 both directions between Brookside Farms Road (Newburgh) and 5th Avenue (Newburgh) D265160/B1026780/32112309 - 24/7 RIGHT LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Monday December 16th, 2024 12:00 AM thru Friday May 22nd, 2026 12:00 AM right lane and shoulder closed to traffic","update_date":"2026-04-17T11:03:31Z"},"road_event_id":"D56y1uaRkiG+RHqUDwP9WEy9VQo=","beginning_cross_street":"Brookside Farms Road","ending_cross_street":"5th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049278,41.513025]]}},{"id":"DJLozw7+bq0dkh7jruM47R+goeI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-190"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on I-190 southbound US 62; Niagara Falls Boulevard (Niagara Falls) to Buffalo Avenue; NY 384 (Niagara Falls), Thursday April 16th, 2026 thru Wednesday March 31st, 2027, Sunday thru Saturday, 12:00 AM thru 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-28T13:56:03Z"},"road_event_id":"DJLozw7+bq0dkh7jruM47R+goeI=","beginning_cross_street":"US 62; Niagara Falls Boulevard","ending_cross_street":"Buffalo Avenue; NY 384","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.990228,43.090367]]}},{"id":"tD7CJK0UrAFz6YyycBLxc5sLasU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 62"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 62 southbound Builders Way (Niagara Falls) to I-190 Niagara Expressway (Niagara Falls), Monday April 20th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-28T13:56:31Z"},"road_event_id":"tD7CJK0UrAFz6YyycBLxc5sLasU=","beginning_cross_street":"Builders Way","ending_cross_street":"I-190 Niagara Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.991402,43.089752]]}},{"id":"aE50x1orPRO+SmoNXa1x93gUDL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XQi1vrdO22FD6l0XhJiUHyZnkK8="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-08T19:31:22Z"},"road_event_id":"aE50x1orPRO+SmoNXa1x93gUDL8=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"XQi1vrdO22FD6l0XhJiUHyZnkK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aE50x1orPRO+SmoNXa1x93gUDL8="},{"type":"next-occurrence","id":"V2OAtJlc7no4IStw4vEXG9Tw+e8="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-08T19:31:22Z"},"road_event_id":"XQi1vrdO22FD6l0XhJiUHyZnkK8=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"V2OAtJlc7no4IStw4vEXG9Tw+e8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aE50x1orPRO+SmoNXa1x93gUDL8="},{"type":"next-occurrence","id":"KJJcNRuqvjBZUV3ErmJLxh6DoCw="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-08T19:31:22Z"},"road_event_id":"V2OAtJlc7no4IStw4vEXG9Tw+e8=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"KJJcNRuqvjBZUV3ErmJLxh6DoCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aE50x1orPRO+SmoNXa1x93gUDL8="},{"type":"next-occurrence","id":"9Lqud3oAJbNW1e64/kMmX00g2tE="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-08T19:31:22Z"},"road_event_id":"KJJcNRuqvjBZUV3ErmJLxh6DoCw=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T12:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"9Lqud3oAJbNW1e64/kMmX00g2tE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aE50x1orPRO+SmoNXa1x93gUDL8="},{"type":"next-occurrence","id":"s4qm8REqjtjkMiJgjnecW68kPDQ="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-08T19:31:22Z"},"road_event_id":"9Lqud3oAJbNW1e64/kMmX00g2tE=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T12:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"s4qm8REqjtjkMiJgjnecW68kPDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aE50x1orPRO+SmoNXa1x93gUDL8="},{"type":"next-occurrence","id":"x7teMvay17l45Ws79VCfd2UfplU="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-08T19:31:22Z"},"road_event_id":"s4qm8REqjtjkMiJgjnecW68kPDQ=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T12:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"x7teMvay17l45Ws79VCfd2UfplU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aE50x1orPRO+SmoNXa1x93gUDL8="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-08T19:31:22Z"},"road_event_id":"x7teMvay17l45Ws79VCfd2UfplU=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T12:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"9JRc6irR+kZn8Xt8fWZaJL7fN8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xgJLfeGwGKq2t/TFJhndMcHVFns="}],"description":"Construction on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/29145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-01T20:00:22Z"},"road_event_id":"9JRc6irR+kZn8Xt8fWZaJL7fN8w=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"xgJLfeGwGKq2t/TFJhndMcHVFns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9JRc6irR+kZn8Xt8fWZaJL7fN8w="},{"type":"next-occurrence","id":"RzWq4q9us8fujYcLjIzW7dr9itk="}],"description":"Construction on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/29145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-01T20:00:22Z"},"road_event_id":"xgJLfeGwGKq2t/TFJhndMcHVFns=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"RzWq4q9us8fujYcLjIzW7dr9itk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9JRc6irR+kZn8Xt8fWZaJL7fN8w="}],"description":"Construction on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/29145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-01T20:00:22Z"},"road_event_id":"RzWq4q9us8fujYcLjIzW7dr9itk=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"D7LY9wIl9SDPYGWVYyPqnQFzME4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 20 westbound between Pine Ridge Rd (Sennett) and Walker Rd (Sennett), Continuous Monday April 20th, 2026 07:00 AM thru Tuesday July 21st, 2026 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T16:21:27Z"},"road_event_id":"D7LY9wIl9SDPYGWVYyPqnQFzME4=","beginning_cross_street":"Pine Ridge Rd ","ending_cross_street":"Walker Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.506805,42.938441]]}},{"id":"34S4xpULuNRpgimUYgytWT8angg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1svMvfOVgdvPz7pCDr4mCis7sO8="}],"description":"Utility work on NY 64 both directions between Parrish Rd (West Bloomfield) and Taylor Rd. (Mendon) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T16:36:35Z"},"road_event_id":"34S4xpULuNRpgimUYgytWT8angg=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.494477,42.953967]]}},{"id":"1svMvfOVgdvPz7pCDr4mCis7sO8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"34S4xpULuNRpgimUYgytWT8angg="},{"type":"next-occurrence","id":"A+z9rKpTceTJxhetL8Y84Nwtgxw="}],"description":"Utility work on NY 64 both directions between Parrish Rd (West Bloomfield) and Taylor Rd. (Mendon) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T16:36:35Z"},"road_event_id":"1svMvfOVgdvPz7pCDr4mCis7sO8=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.494477,42.953967]]}},{"id":"A+z9rKpTceTJxhetL8Y84Nwtgxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"34S4xpULuNRpgimUYgytWT8angg="}],"description":"Utility work on NY 64 both directions between Parrish Rd (West Bloomfield) and Taylor Rd. (Mendon) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T16:36:35Z"},"road_event_id":"A+z9rKpTceTJxhetL8Y84Nwtgxw=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.494477,42.953967]]}},{"id":"KggjcwNrWV0dGnKqDrqKLf45PUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yZiiuw+7HMjKKFdLatjcUhmQihI="}],"description":"Construction on Grand Central Parkway both directions from Roosevelt Avenue (New York) to 69th Road (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed eastbound, westbound, Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed eastbound, westbound, Monday May 11th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 2 Left lanes of 4 lanes closed eastbound, westbound","update_date":"2026-05-08T18:00:05Z"},"road_event_id":"KggjcwNrWV0dGnKqDrqKLf45PUs=","beginning_cross_street":"Roosevelt Avenue","ending_cross_street":"69th Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852194,40.752603]]}},{"id":"yZiiuw+7HMjKKFdLatjcUhmQihI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KggjcwNrWV0dGnKqDrqKLf45PUs="},{"type":"next-occurrence","id":"fcKv/115M6vbtrUyCSDDWWUZpek="}],"description":"Construction on Grand Central Parkway both directions from Roosevelt Avenue (New York) to 69th Road (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed eastbound, westbound, Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed eastbound, westbound, Monday May 11th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 2 Left lanes of 4 lanes closed eastbound, westbound","update_date":"2026-05-08T18:00:05Z"},"road_event_id":"yZiiuw+7HMjKKFdLatjcUhmQihI=","beginning_cross_street":"Roosevelt Avenue","ending_cross_street":"69th Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852194,40.752603]]}},{"id":"fcKv/115M6vbtrUyCSDDWWUZpek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KggjcwNrWV0dGnKqDrqKLf45PUs="},{"type":"next-occurrence","id":"9qBso98cy8c1efpVh47WsgIX/pY="}],"description":"Construction on Grand Central Parkway both directions from Roosevelt Avenue (New York) to 69th Road (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed eastbound, westbound, Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed eastbound, westbound, Monday May 11th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 2 Left lanes of 4 lanes closed eastbound, westbound","update_date":"2026-05-08T18:00:05Z"},"road_event_id":"fcKv/115M6vbtrUyCSDDWWUZpek=","beginning_cross_street":"Roosevelt Avenue","ending_cross_street":"69th Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852194,40.752603]]}},{"id":"9qBso98cy8c1efpVh47WsgIX/pY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KggjcwNrWV0dGnKqDrqKLf45PUs="},{"type":"next-occurrence","id":"pw82xjgnv75oCqMP+oGjCVsH4fI="}],"description":"Construction on Grand Central Parkway both directions from Roosevelt Avenue (New York) to 69th Road (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed eastbound, westbound, Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed eastbound, westbound, Monday May 11th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 2 Left lanes of 4 lanes closed eastbound, westbound","update_date":"2026-05-08T18:00:05Z"},"road_event_id":"9qBso98cy8c1efpVh47WsgIX/pY=","beginning_cross_street":"Roosevelt Avenue","ending_cross_street":"69th Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852194,40.752603]]}},{"id":"pw82xjgnv75oCqMP+oGjCVsH4fI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KggjcwNrWV0dGnKqDrqKLf45PUs="}],"description":"Construction on Grand Central Parkway both directions from Roosevelt Avenue (New York) to 69th Road (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed eastbound, westbound, Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed eastbound, westbound, Monday May 11th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 2 Left lanes of 4 lanes closed eastbound, westbound","update_date":"2026-05-08T18:00:05Z"},"road_event_id":"pw82xjgnv75oCqMP+oGjCVsH4fI=","beginning_cross_street":"Roosevelt Avenue","ending_cross_street":"69th Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852194,40.752603]]}},{"id":"9ltRgCxECRgiG3LgKvHNKdPYjJA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GNJRP1Ipq5DMA15jogzv6Slk3hI="}],"description":"Utility work on NY 332 northbound between Howell St (Canandaigua) and Buffalo Rd (Canandaigua) We will be removing/placing/splicing aerial/underground fiber/copper. Work will be beyond shoulder. , Thursday April 16th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T13:54:35Z"},"road_event_id":"9ltRgCxECRgiG3LgKvHNKdPYjJA=","beginning_cross_street":"Howell St","ending_cross_street":"Buffalo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.284888,42.892666]]}},{"id":"GNJRP1Ipq5DMA15jogzv6Slk3hI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ltRgCxECRgiG3LgKvHNKdPYjJA="},{"type":"next-occurrence","id":"qlULYi0B2MCTJVxyadLH4r6d6ew="}],"description":"Utility work on NY 332 northbound between Howell St (Canandaigua) and Buffalo Rd (Canandaigua) We will be removing/placing/splicing aerial/underground fiber/copper. Work will be beyond shoulder. , Thursday April 16th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T13:54:35Z"},"road_event_id":"GNJRP1Ipq5DMA15jogzv6Slk3hI=","beginning_cross_street":"Howell St","ending_cross_street":"Buffalo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.284888,42.892666]]}},{"id":"qlULYi0B2MCTJVxyadLH4r6d6ew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ltRgCxECRgiG3LgKvHNKdPYjJA="}],"description":"Utility work on NY 332 northbound between Howell St (Canandaigua) and Buffalo Rd (Canandaigua) We will be removing/placing/splicing aerial/underground fiber/copper. Work will be beyond shoulder. , Thursday April 16th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T13:54:35Z"},"road_event_id":"qlULYi0B2MCTJVxyadLH4r6d6ew=","beginning_cross_street":"Howell St","ending_cross_street":"Buffalo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.284888,42.892666]]}},{"id":"BLcpkPOeoVHoIc9ILl+78tlq0Og=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/9GBo83HVkPGc9XbQXWz8JWwSrM="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"BLcpkPOeoVHoIc9ILl+78tlq0Og=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"/9GBo83HVkPGc9XbQXWz8JWwSrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BLcpkPOeoVHoIc9ILl+78tlq0Og="},{"type":"next-occurrence","id":"FqktK7JZk93cIGIPMs7WcUlp6u4="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"/9GBo83HVkPGc9XbQXWz8JWwSrM=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"FqktK7JZk93cIGIPMs7WcUlp6u4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BLcpkPOeoVHoIc9ILl+78tlq0Og="},{"type":"next-occurrence","id":"XgFy4BcGVv3pZbemxiQqQY8YnnY="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"FqktK7JZk93cIGIPMs7WcUlp6u4=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"XgFy4BcGVv3pZbemxiQqQY8YnnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BLcpkPOeoVHoIc9ILl+78tlq0Og="},{"type":"next-occurrence","id":"PlddOGxB5YI+xIUfkIVe7q1qw9k="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"XgFy4BcGVv3pZbemxiQqQY8YnnY=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T12:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"PlddOGxB5YI+xIUfkIVe7q1qw9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BLcpkPOeoVHoIc9ILl+78tlq0Og="},{"type":"next-occurrence","id":"WsjWecRlQeK+R5CILDVdFn16Q18="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"PlddOGxB5YI+xIUfkIVe7q1qw9k=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T12:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"WsjWecRlQeK+R5CILDVdFn16Q18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BLcpkPOeoVHoIc9ILl+78tlq0Og="},{"type":"next-occurrence","id":"0ZzzzXO6L80eXo9sgR/27C35pjU="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"WsjWecRlQeK+R5CILDVdFn16Q18=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T12:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"0ZzzzXO6L80eXo9sgR/27C35pjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BLcpkPOeoVHoIc9ILl+78tlq0Og="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"0ZzzzXO6L80eXo9sgR/27C35pjU=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T12:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"83Z0jUju5vErQDYsIu6o7bGyBUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CZxkYfwMCOuGVBI1ZIAjN89xwjA="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"83Z0jUju5vErQDYsIu6o7bGyBUs=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"CZxkYfwMCOuGVBI1ZIAjN89xwjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"83Z0jUju5vErQDYsIu6o7bGyBUs="},{"type":"next-occurrence","id":"/fLQ/tSLkUaObg+3tDW7z272IzY="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"CZxkYfwMCOuGVBI1ZIAjN89xwjA=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"/fLQ/tSLkUaObg+3tDW7z272IzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"83Z0jUju5vErQDYsIu6o7bGyBUs="},{"type":"next-occurrence","id":"QnDJ3cNEzLSsaCdh+UIx+P4AnJ0="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"/fLQ/tSLkUaObg+3tDW7z272IzY=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"QnDJ3cNEzLSsaCdh+UIx+P4AnJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"83Z0jUju5vErQDYsIu6o7bGyBUs="},{"type":"next-occurrence","id":"glPEUVu4vNvxusQkQxO07xKGkYc="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"QnDJ3cNEzLSsaCdh+UIx+P4AnJ0=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T12:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"glPEUVu4vNvxusQkQxO07xKGkYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"83Z0jUju5vErQDYsIu6o7bGyBUs="},{"type":"next-occurrence","id":"CJwYMMJUNyB0PIPfwZk3M9YyBMA="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"glPEUVu4vNvxusQkQxO07xKGkYc=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T12:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"CJwYMMJUNyB0PIPfwZk3M9YyBMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"83Z0jUju5vErQDYsIu6o7bGyBUs="},{"type":"next-occurrence","id":"89XQCKWVJoJcNmNClTIo0PvoPpE="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"CJwYMMJUNyB0PIPfwZk3M9YyBMA=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T12:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"89XQCKWVJoJcNmNClTIo0PvoPpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"83Z0jUju5vErQDYsIu6o7bGyBUs="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"89XQCKWVJoJcNmNClTIo0PvoPpE=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T12:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"EgI0pBlM3sCBaibDFlVGI7y8R+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kXYuLn3t24tkt75P0MJb8YSUtHU="}],"description":"Roadwork on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 PM, alternating traffic","update_date":"2026-05-08T13:42:47Z"},"road_event_id":"EgI0pBlM3sCBaibDFlVGI7y8R+o=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027706]]}},{"id":"kXYuLn3t24tkt75P0MJb8YSUtHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EgI0pBlM3sCBaibDFlVGI7y8R+o="},{"type":"next-occurrence","id":"/L5ch0LiV2ce0BYLkWasQYgAAqY="}],"description":"Roadwork on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 PM, alternating traffic","update_date":"2026-05-08T13:42:47Z"},"road_event_id":"kXYuLn3t24tkt75P0MJb8YSUtHU=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027706]]}},{"id":"/L5ch0LiV2ce0BYLkWasQYgAAqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EgI0pBlM3sCBaibDFlVGI7y8R+o="},{"type":"next-occurrence","id":"LFKa5LFTHyF3eqHhg/xmIQrrfhE="}],"description":"Roadwork on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 PM, alternating traffic","update_date":"2026-05-08T13:42:47Z"},"road_event_id":"/L5ch0LiV2ce0BYLkWasQYgAAqY=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027706]]}},{"id":"LFKa5LFTHyF3eqHhg/xmIQrrfhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EgI0pBlM3sCBaibDFlVGI7y8R+o="},{"type":"next-occurrence","id":"sirjW40heU6Gu7ibzvv1KEbci48="}],"description":"Roadwork on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 PM, alternating traffic","update_date":"2026-05-08T13:42:47Z"},"road_event_id":"LFKa5LFTHyF3eqHhg/xmIQrrfhE=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027706]]}},{"id":"sirjW40heU6Gu7ibzvv1KEbci48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EgI0pBlM3sCBaibDFlVGI7y8R+o="},{"type":"next-occurrence","id":"QqmcYI3bC8HaxNgOu/rDqSoPTLE="}],"description":"Roadwork on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 PM, alternating traffic","update_date":"2026-05-08T13:42:47Z"},"road_event_id":"sirjW40heU6Gu7ibzvv1KEbci48=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027706]]}},{"id":"QqmcYI3bC8HaxNgOu/rDqSoPTLE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EgI0pBlM3sCBaibDFlVGI7y8R+o="},{"type":"next-occurrence","id":"HbbZ/IIIoDl7cBwmkgRPNcvCVZw="}],"description":"Roadwork on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 PM, alternating traffic","update_date":"2026-05-08T13:42:47Z"},"road_event_id":"QqmcYI3bC8HaxNgOu/rDqSoPTLE=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027706]]}},{"id":"HbbZ/IIIoDl7cBwmkgRPNcvCVZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EgI0pBlM3sCBaibDFlVGI7y8R+o="}],"description":"Roadwork on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 PM, alternating traffic","update_date":"2026-05-08T13:42:47Z"},"road_event_id":"HbbZ/IIIoDl7cBwmkgRPNcvCVZw=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027706]]}},{"id":"dH8I0FhPLlI1ej7hU2uOfxQKHpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"j2XK1Uhrf7v2mSlAsC/nZL7sAx4="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/32730309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-08T13:36:52Z"},"road_event_id":"dH8I0FhPLlI1ej7hU2uOfxQKHpE=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"j2XK1Uhrf7v2mSlAsC/nZL7sAx4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dH8I0FhPLlI1ej7hU2uOfxQKHpE="},{"type":"next-occurrence","id":"t9zJAqpMsL9Je7Z99AMRIewCQFQ="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/32730309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-08T13:36:52Z"},"road_event_id":"j2XK1Uhrf7v2mSlAsC/nZL7sAx4=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"t9zJAqpMsL9Je7Z99AMRIewCQFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dH8I0FhPLlI1ej7hU2uOfxQKHpE="},{"type":"next-occurrence","id":"gc/TjVjozsuUP81WHy1J3AgyWMw="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/32730309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-08T13:36:52Z"},"road_event_id":"t9zJAqpMsL9Je7Z99AMRIewCQFQ=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"gc/TjVjozsuUP81WHy1J3AgyWMw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dH8I0FhPLlI1ej7hU2uOfxQKHpE="},{"type":"next-occurrence","id":"Mc66PZ5uFjhwE1ydlR4hBgPEMpQ="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/32730309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-08T13:36:52Z"},"road_event_id":"gc/TjVjozsuUP81WHy1J3AgyWMw=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"Mc66PZ5uFjhwE1ydlR4hBgPEMpQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dH8I0FhPLlI1ej7hU2uOfxQKHpE="},{"type":"next-occurrence","id":"xZ+mQyYyfE3DMEqMx0AcixRbvgg="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/32730309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-08T13:36:52Z"},"road_event_id":"Mc66PZ5uFjhwE1ydlR4hBgPEMpQ=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"xZ+mQyYyfE3DMEqMx0AcixRbvgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dH8I0FhPLlI1ej7hU2uOfxQKHpE="},{"type":"next-occurrence","id":"tPwQqoAvMgcfrCd4hFn+X5EJXDw="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/32730309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-08T13:36:52Z"},"road_event_id":"xZ+mQyYyfE3DMEqMx0AcixRbvgg=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"tPwQqoAvMgcfrCd4hFn+X5EJXDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dH8I0FhPLlI1ej7hU2uOfxQKHpE="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/32730309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-08T13:36:52Z"},"road_event_id":"tPwQqoAvMgcfrCd4hFn+X5EJXDw=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"Z2T5uloPxdDwib9d0+q/xqwANPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BxM1 Bus, Bxm2 Bus, and BxM18 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, BxM1 Bus, Bxm2 Bus, and BxM18 Bus between 3 Av/E 33 St (New York) and Riverdale Av/W 263 St (New York) stops on Henry Hudson Pkwy West at W 246th St and W 239th St will be closed. Buses operate via w 246th St, Arlington Ave, W 246th St, Independence Ave and W 237th St., Continuous Saturday April 18th, 2026 06:00 AM thru Saturday May 30th, 2026 11:59 PM","update_date":"2026-04-17T14:19:27Z"},"road_event_id":"Z2T5uloPxdDwib9d0+q/xqwANPw=","beginning_cross_street":"3 Av/E 33 St","ending_cross_street":"Riverdale Av/W 263 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.978601,40.744963]]}},{"id":"vLir1FwhX/+IYk0xiKemxWwwxqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"B5ocnSbOy71vMsOn1A2jmn798dk="}],"description":"Installation of traffic management systems on NY 100 northbound between Heights Drive (Greenburgh) and Fountain Lane (Greenburgh) D265523/32730709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:26Z"},"road_event_id":"vLir1FwhX/+IYk0xiKemxWwwxqs=","beginning_cross_street":"Heights Drive","ending_cross_street":"Fountain Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.829886,40.980414]]}},{"id":"B5ocnSbOy71vMsOn1A2jmn798dk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vLir1FwhX/+IYk0xiKemxWwwxqs="},{"type":"next-occurrence","id":"zQB/wW3HPAMPuNojVSxAGvFX8YA="}],"description":"Installation of traffic management systems on NY 100 northbound between Heights Drive (Greenburgh) and Fountain Lane (Greenburgh) D265523/32730709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:26Z"},"road_event_id":"B5ocnSbOy71vMsOn1A2jmn798dk=","beginning_cross_street":"Heights Drive","ending_cross_street":"Fountain Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.829886,40.980414]]}},{"id":"zQB/wW3HPAMPuNojVSxAGvFX8YA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vLir1FwhX/+IYk0xiKemxWwwxqs="},{"type":"next-occurrence","id":"4cNLNL/HRp4J6RpLgz9GYGHUg34="}],"description":"Installation of traffic management systems on NY 100 northbound between Heights Drive (Greenburgh) and Fountain Lane (Greenburgh) D265523/32730709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:26Z"},"road_event_id":"zQB/wW3HPAMPuNojVSxAGvFX8YA=","beginning_cross_street":"Heights Drive","ending_cross_street":"Fountain Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.829886,40.980414]]}},{"id":"4cNLNL/HRp4J6RpLgz9GYGHUg34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vLir1FwhX/+IYk0xiKemxWwwxqs="}],"description":"Installation of traffic management systems on NY 100 northbound between Heights Drive (Greenburgh) and Fountain Lane (Greenburgh) D265523/32730709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:26Z"},"road_event_id":"4cNLNL/HRp4J6RpLgz9GYGHUg34=","beginning_cross_street":"Heights Drive","ending_cross_street":"Fountain Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.829886,40.980414]]}},{"id":"3qQnu89tq1e7o1oziOs07p6Z68Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M20 Bus and M7 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction southbound, M20 Bus and M7 Bus bypassing 7 Av/W 28 St (New York) Use the stop on 7th Ave at W 25th St due to Water Main Replacement., Continuous Saturday April 18th, 2026 12:00 AM thru Friday July 10th, 2026 11:59 PM","update_date":"2026-04-17T16:59:33Z"},"road_event_id":"3qQnu89tq1e7o1oziOs07p6Z68Y=","beginning_cross_street":"7 Av/W 28 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.993637,40.747035]]}},{"id":"efPxEBo/5csaA/L+2+HDz3QWKhI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M15 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, M15 Bus bypassing South St/Whitehall St (New York) The first and last stops will be made on Water St at Whitehall St. , Continuous Saturday April 18th, 2026 12:00 AM thru Friday July 31st, 2026 11:59 PM","update_date":"2026-04-17T16:57:57Z"},"road_event_id":"efPxEBo/5csaA/L+2+HDz3QWKhI=","beginning_cross_street":"South St/Whitehall St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.012226,40.701609]]}},{"id":"yvDYtDcqh+qJLKY+f8rNoSXFuKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ndNtytkoXXzRVx8/LgUHHtT4/AE="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Bradhurst Avenue - NY 100 (Mount Pleasant) and Grasslands Road - NY 100C (Greenburgh) D264324/DAY/B1070500/32429709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-08T19:01:22Z"},"road_event_id":"yvDYtDcqh+qJLKY+f8rNoSXFuKc=","beginning_cross_street":"Bradhurst Avenue - NY 100","ending_cross_street":"Grasslands Road - NY 100C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80348,41.090234]]}},{"id":"ndNtytkoXXzRVx8/LgUHHtT4/AE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yvDYtDcqh+qJLKY+f8rNoSXFuKc="},{"type":"next-occurrence","id":"FEhoe5BAO/rsWOFKdk71mZ2RVs0="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Bradhurst Avenue - NY 100 (Mount Pleasant) and Grasslands Road - NY 100C (Greenburgh) D264324/DAY/B1070500/32429709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-08T19:01:22Z"},"road_event_id":"ndNtytkoXXzRVx8/LgUHHtT4/AE=","beginning_cross_street":"Bradhurst Avenue - NY 100","ending_cross_street":"Grasslands Road - NY 100C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80348,41.090234]]}},{"id":"FEhoe5BAO/rsWOFKdk71mZ2RVs0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yvDYtDcqh+qJLKY+f8rNoSXFuKc="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Bradhurst Avenue - NY 100 (Mount Pleasant) and Grasslands Road - NY 100C (Greenburgh) D264324/DAY/B1070500/32429709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-08T19:01:22Z"},"road_event_id":"FEhoe5BAO/rsWOFKdk71mZ2RVs0=","beginning_cross_street":"Bradhurst Avenue - NY 100","ending_cross_street":"Grasslands Road - NY 100C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80348,41.090234]]}},{"id":"8SAGVwpyUhzBTXZpgoqP69rRq1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"or2TXiyA8h7EMTM0NwX3tSezleA="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy northbound between Grasslands Road - NY 100C (Greenburgh) and Bradhurst Avenue - NY 100 (Mount Pleasant) D264324/DAY/B1070500/32429809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-08T19:01:22Z"},"road_event_id":"8SAGVwpyUhzBTXZpgoqP69rRq1Q=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Bradhurst Avenue - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803218,41.09032]]}},{"id":"or2TXiyA8h7EMTM0NwX3tSezleA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8SAGVwpyUhzBTXZpgoqP69rRq1Q="},{"type":"next-occurrence","id":"9lPfvhY1EgUT1iKJZkg6EZ890fI="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy northbound between Grasslands Road - NY 100C (Greenburgh) and Bradhurst Avenue - NY 100 (Mount Pleasant) D264324/DAY/B1070500/32429809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-08T19:01:22Z"},"road_event_id":"or2TXiyA8h7EMTM0NwX3tSezleA=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Bradhurst Avenue - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803218,41.09032]]}},{"id":"9lPfvhY1EgUT1iKJZkg6EZ890fI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8SAGVwpyUhzBTXZpgoqP69rRq1Q="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy northbound between Grasslands Road - NY 100C (Greenburgh) and Bradhurst Avenue - NY 100 (Mount Pleasant) D264324/DAY/B1070500/32429809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-08T19:01:22Z"},"road_event_id":"9lPfvhY1EgUT1iKJZkg6EZ890fI=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Bradhurst Avenue - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803218,41.09032]]}},{"id":"8Yr4Wgy5U+7wNaWJu+nqcAauzT8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"X1I+nZv2FZrDpjctHXRpcseqCNI="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy both directions between Grasslands Road - NY 100C (Greenburgh) and Bradhurst Avenue - NY 100 (Mount Pleasant) D264324/NIGHT/B1070500/32289909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-12T17:57:56Z"},"road_event_id":"8Yr4Wgy5U+7wNaWJu+nqcAauzT8=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Bradhurst Avenue - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803204,41.090313]]}},{"id":"X1I+nZv2FZrDpjctHXRpcseqCNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Yr4Wgy5U+7wNaWJu+nqcAauzT8="},{"type":"next-occurrence","id":"XyCztwmQfFadL4OIkuCvVGEJ3z8="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy both directions between Grasslands Road - NY 100C (Greenburgh) and Bradhurst Avenue - NY 100 (Mount Pleasant) D264324/NIGHT/B1070500/32289909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-12T17:57:56Z"},"road_event_id":"X1I+nZv2FZrDpjctHXRpcseqCNI=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Bradhurst Avenue - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803204,41.090313]]}},{"id":"XyCztwmQfFadL4OIkuCvVGEJ3z8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Yr4Wgy5U+7wNaWJu+nqcAauzT8="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy both directions between Grasslands Road - NY 100C (Greenburgh) and Bradhurst Avenue - NY 100 (Mount Pleasant) D264324/NIGHT/B1070500/32289909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-12T17:57:56Z"},"road_event_id":"XyCztwmQfFadL4OIkuCvVGEJ3z8=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Bradhurst Avenue - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803204,41.090313]]}},{"id":"2sQrm48XUJl1V7Cx8BJcoNezQVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["107 Bus and 37 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, 107 Bus and 37 Bus at Frelinghuysen Ave At Noble St (Newark) relinghuysen Avenue, northbound, at Noble Street, Far Side (MyBus #18611), Continuous Monday April 27th, 2026 12:00 AM thru Tuesday June 16th, 2026 11:59 PM","update_date":"2026-04-17T18:16:22Z"},"road_event_id":"2sQrm48XUJl1V7Cx8BJcoNezQVI=","beginning_cross_street":"Frelinghuysen Ave At Noble St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.193813,40.704979]]}},{"id":"K66woM1Y+rkb+BHi7xQLlYR6qn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qhR4j9DHpT23JXveIqOLgNfNCgc="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"K66woM1Y+rkb+BHi7xQLlYR6qn4=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"qhR4j9DHpT23JXveIqOLgNfNCgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K66woM1Y+rkb+BHi7xQLlYR6qn4="},{"type":"next-occurrence","id":"lOKlrz/V4p3SuoBP1XqafIN50ew="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"qhR4j9DHpT23JXveIqOLgNfNCgc=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"lOKlrz/V4p3SuoBP1XqafIN50ew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K66woM1Y+rkb+BHi7xQLlYR6qn4="},{"type":"next-occurrence","id":"KKee0OKeL3/yuERIibKYrO2nuMg="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"lOKlrz/V4p3SuoBP1XqafIN50ew=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"KKee0OKeL3/yuERIibKYrO2nuMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K66woM1Y+rkb+BHi7xQLlYR6qn4="},{"type":"next-occurrence","id":"A0VpzxYuyvfCfhZQqZXMARtI76U="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"KKee0OKeL3/yuERIibKYrO2nuMg=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"A0VpzxYuyvfCfhZQqZXMARtI76U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K66woM1Y+rkb+BHi7xQLlYR6qn4="},{"type":"next-occurrence","id":"GNy0jmxovtXlu+6zYjgfxUC6FGM="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"A0VpzxYuyvfCfhZQqZXMARtI76U=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"GNy0jmxovtXlu+6zYjgfxUC6FGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K66woM1Y+rkb+BHi7xQLlYR6qn4="},{"type":"next-occurrence","id":"VJS72sP96P2smv+ktAWtDv6inDg="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"GNy0jmxovtXlu+6zYjgfxUC6FGM=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"VJS72sP96P2smv+ktAWtDv6inDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K66woM1Y+rkb+BHi7xQLlYR6qn4="},{"type":"next-occurrence","id":"/8d4tcSx9tYA9vwFDUGsIYZ652E="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"VJS72sP96P2smv+ktAWtDv6inDg=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"/8d4tcSx9tYA9vwFDUGsIYZ652E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K66woM1Y+rkb+BHi7xQLlYR6qn4="},{"type":"next-occurrence","id":"CNKulvCSduTD8iUy3i0Ys67ydPY="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"/8d4tcSx9tYA9vwFDUGsIYZ652E=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"CNKulvCSduTD8iUy3i0Ys67ydPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K66woM1Y+rkb+BHi7xQLlYR6qn4="},{"type":"next-occurrence","id":"UdgkGw3cUFgB5mUePGL6dCK0Hfg="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"CNKulvCSduTD8iUy3i0Ys67ydPY=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"UdgkGw3cUFgB5mUePGL6dCK0Hfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K66woM1Y+rkb+BHi7xQLlYR6qn4="},{"type":"next-occurrence","id":"4QnqMa/DUyKr3uqZP3lYnGLrG2Y="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"UdgkGw3cUFgB5mUePGL6dCK0Hfg=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"4QnqMa/DUyKr3uqZP3lYnGLrG2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K66woM1Y+rkb+BHi7xQLlYR6qn4="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"4QnqMa/DUyKr3uqZP3lYnGLrG2Y=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"dRjNNpgyZduLiJ4T0enBpx6QKmY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q55 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Track repairs westbound, Q55 Bus at MYRTLE AV/PALMETTO AV (New York) stop is closed. The last stop before detour will be made on Myrtle Ave at Cypress Ave., Continuous Tuesday April 21st, 2026 05:00 AM thru Sunday May 31st, 2026 11:00 PM","update_date":"2026-04-20T01:33:21Z"},"road_event_id":"dRjNNpgyZduLiJ4T0enBpx6QKmY=","beginning_cross_street":"MYRTLE AV/PALMETTO AV","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911851,40.699516]]}},{"id":"bej+K+F14yivEF3/Mz3NWbkV0bQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q58 Bus and Q98 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Track repairs westbound, Q58 Bus and Q98 Bus between PUTNAM AV/MYRTLE AV (New York) and PALMETTO ST/MYRTLE AV (New York) stops will be closed. The last stop before detour will be made on Myrtle Ave at Cypress Ave., Continuous Tuesday April 21st, 2026 06:00 AM thru Wednesday May 20th, 2026 06:00 AM","update_date":"2026-04-20T01:40:58Z"},"road_event_id":"bej+K+F14yivEF3/Mz3NWbkV0bQ=","beginning_cross_street":"PUTNAM AV/MYRTLE AV","ending_cross_street":"PALMETTO ST/MYRTLE AV","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907354,40.699716]]}},{"id":"sNcEL9gKRqWEJQJz8PF/RTQVqOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"K9HbCHouuRfchi87B2VSBQR20HM="}],"description":"Construction on SIM15 Bus, SIM35 Bus and SIM5 Bus southbound at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th,2026 thru Friday May 22nd,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th,2026 thru Friday May 29th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-05-08T23:00:21Z"},"road_event_id":"sNcEL9gKRqWEJQJz8PF/RTQVqOA=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T19:00:00Z","end_date":"2026-05-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"K9HbCHouuRfchi87B2VSBQR20HM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNcEL9gKRqWEJQJz8PF/RTQVqOA="},{"type":"next-occurrence","id":"M5qSJt41LgBzVKNLPT6RC5UgyBA="}],"description":"Construction on SIM15 Bus, SIM35 Bus and SIM5 Bus southbound at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th,2026 thru Friday May 22nd,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th,2026 thru Friday May 29th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-05-08T23:00:21Z"},"road_event_id":"K9HbCHouuRfchi87B2VSBQR20HM=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T19:00:00Z","end_date":"2026-05-14T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"M5qSJt41LgBzVKNLPT6RC5UgyBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNcEL9gKRqWEJQJz8PF/RTQVqOA="},{"type":"next-occurrence","id":"P6eVV1igbguYcCq5ORl0NC5tkms="}],"description":"Construction on SIM15 Bus, SIM35 Bus and SIM5 Bus southbound at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th,2026 thru Friday May 22nd,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th,2026 thru Friday May 29th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-05-08T23:00:21Z"},"road_event_id":"M5qSJt41LgBzVKNLPT6RC5UgyBA=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T19:00:00Z","end_date":"2026-05-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"P6eVV1igbguYcCq5ORl0NC5tkms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNcEL9gKRqWEJQJz8PF/RTQVqOA="},{"type":"next-occurrence","id":"Dvvc+7VZtHChfXXZFqUhK1VEr9w="}],"description":"Construction on SIM15 Bus, SIM35 Bus and SIM5 Bus southbound at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th,2026 thru Friday May 22nd,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th,2026 thru Friday May 29th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-05-08T23:00:21Z"},"road_event_id":"P6eVV1igbguYcCq5ORl0NC5tkms=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"Dvvc+7VZtHChfXXZFqUhK1VEr9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNcEL9gKRqWEJQJz8PF/RTQVqOA="},{"type":"next-occurrence","id":"7tRlZH9KEJZOx7C4SGUI5qtEie8="}],"description":"Construction on SIM15 Bus, SIM35 Bus and SIM5 Bus southbound at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th,2026 thru Friday May 22nd,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th,2026 thru Friday May 29th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-05-08T23:00:21Z"},"road_event_id":"Dvvc+7VZtHChfXXZFqUhK1VEr9w=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"7tRlZH9KEJZOx7C4SGUI5qtEie8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNcEL9gKRqWEJQJz8PF/RTQVqOA="},{"type":"next-occurrence","id":"lmFI+4bdc2P7oYT8TKsKePV5S2E="}],"description":"Construction on SIM15 Bus, SIM35 Bus and SIM5 Bus southbound at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th,2026 thru Friday May 22nd,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th,2026 thru Friday May 29th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-05-08T23:00:21Z"},"road_event_id":"7tRlZH9KEJZOx7C4SGUI5qtEie8=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"lmFI+4bdc2P7oYT8TKsKePV5S2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNcEL9gKRqWEJQJz8PF/RTQVqOA="},{"type":"next-occurrence","id":"dc2Jn95V6J0VBYsaFH14dVB21G8="}],"description":"Construction on SIM15 Bus, SIM35 Bus and SIM5 Bus southbound at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th,2026 thru Friday May 22nd,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th,2026 thru Friday May 29th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-05-08T23:00:21Z"},"road_event_id":"lmFI+4bdc2P7oYT8TKsKePV5S2E=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"dc2Jn95V6J0VBYsaFH14dVB21G8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNcEL9gKRqWEJQJz8PF/RTQVqOA="},{"type":"next-occurrence","id":"9a4MC5Tc0Ql/HkndeTp+fnXM44A="}],"description":"Construction on SIM15 Bus, SIM35 Bus and SIM5 Bus southbound at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th,2026 thru Friday May 22nd,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th,2026 thru Friday May 29th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-05-08T23:00:21Z"},"road_event_id":"dc2Jn95V6J0VBYsaFH14dVB21G8=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T10:00:00Z","end_date":"2026-05-23T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"9a4MC5Tc0Ql/HkndeTp+fnXM44A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNcEL9gKRqWEJQJz8PF/RTQVqOA="},{"type":"next-occurrence","id":"R4n3e+IbLWVYoSy0TPyog0kfsF4="}],"description":"Construction on SIM15 Bus, SIM35 Bus and SIM5 Bus southbound at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th,2026 thru Friday May 22nd,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th,2026 thru Friday May 29th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-05-08T23:00:21Z"},"road_event_id":"9a4MC5Tc0Ql/HkndeTp+fnXM44A=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"R4n3e+IbLWVYoSy0TPyog0kfsF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNcEL9gKRqWEJQJz8PF/RTQVqOA="}],"description":"Construction on SIM15 Bus, SIM35 Bus and SIM5 Bus southbound at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th,2026 thru Friday May 22nd,2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th,2026 thru Friday May 29th,2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-05-08T23:00:21Z"},"road_event_id":"R4n3e+IbLWVYoSy0TPyog0kfsF4=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"ydwkZxuTNrZ5i7VqDrOpQd/tXXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F line"],"direction":"unknown","related_road_events":[],"description":"Due to Escalator Work both directions, E Line and F line at 5 Av/53 St (New York) Enter at 5 Av only. Madison Av entrance will be exit only., Continuous Monday April 20th, 2026 12:00 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-04-20T01:55:24Z"},"road_event_id":"ydwkZxuTNrZ5i7VqDrOpQd/tXXI=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"0EWYRofuzrTKIZ/+/zPlXQg1UUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0DIR7brCtuWodw9FHV/3j04XNEM="}],"description":"Escalator Work on E Line and F Line both directions at 5 Av/53 St (New York) is exit only during the weekday AM rush hours. Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only�the Madison Av side will remain closed at all times., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-05-08T14:30:20Z"},"road_event_id":"0EWYRofuzrTKIZ/+/zPlXQg1UUg=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"0DIR7brCtuWodw9FHV/3j04XNEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EWYRofuzrTKIZ/+/zPlXQg1UUg="},{"type":"next-occurrence","id":"CvNdW+rJKd1JB9JrI0MhAfGsdyQ="}],"description":"Escalator Work on E Line and F Line both directions at 5 Av/53 St (New York) is exit only during the weekday AM rush hours. Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only�the Madison Av side will remain closed at all times., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-05-08T14:30:20Z"},"road_event_id":"0DIR7brCtuWodw9FHV/3j04XNEM=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"CvNdW+rJKd1JB9JrI0MhAfGsdyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EWYRofuzrTKIZ/+/zPlXQg1UUg="}],"description":"Escalator Work on E Line and F Line both directions at 5 Av/53 St (New York) is exit only during the weekday AM rush hours. Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only�the Madison Av side will remain closed at all times., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-05-08T14:30:20Z"},"road_event_id":"CvNdW+rJKd1JB9JrI0MhAfGsdyQ=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"CVU4xbhC6X9j96p7CVUAikW4VLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"L93CWCY7P2YpLTDAQQKArkflBeA="}],"description":"Bridge maintenance operations on I-84 westbound between Exit 69 - US 6 - US 202 - NY121 (Southeast) and Exit 61 - NY 311 (Patterson) DOT BM/B1032611-1052791-1052831-1052811/32462009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 14th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-11T13:31:39Z"},"road_event_id":"CVU4xbhC6X9j96p7CVUAikW4VLI=","beginning_cross_street":"Exit 69 - US 6 - US 202 - NY121","ending_cross_street":"Exit 61 - NY 311","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.582563,41.383862]]}},{"id":"L93CWCY7P2YpLTDAQQKArkflBeA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CVU4xbhC6X9j96p7CVUAikW4VLI="}],"description":"Bridge maintenance operations on I-84 westbound between Exit 69 - US 6 - US 202 - NY121 (Southeast) and Exit 61 - NY 311 (Patterson) DOT BM/B1032611-1052791-1052831-1052811/32462009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 14th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-11T13:31:39Z"},"road_event_id":"L93CWCY7P2YpLTDAQQKArkflBeA=","beginning_cross_street":"Exit 69 - US 6 - US 202 - NY121","ending_cross_street":"Exit 61 - NY 311","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.582563,41.383862]]}},{"id":"MrTKl2pUz0e+TyyhTrWSTccG2D4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PIFsjZ3ELMAIDoJnABmfEmZfRGc="}],"description":"Utility work on US 20A both directions between I-390 Exit 8 (Geneseo) and Pebble Beach Rd. (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T23:36:40Z"},"road_event_id":"MrTKl2pUz0e+TyyhTrWSTccG2D4=","beginning_cross_street":"I-390 Exit 8","ending_cross_street":"Pebble Beach Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.736422,42.826154]]}},{"id":"PIFsjZ3ELMAIDoJnABmfEmZfRGc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MrTKl2pUz0e+TyyhTrWSTccG2D4="},{"type":"next-occurrence","id":"Hlg9kTBbLI45emLJRWnS3eFBTVs="}],"description":"Utility work on US 20A both directions between I-390 Exit 8 (Geneseo) and Pebble Beach Rd. (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T23:36:40Z"},"road_event_id":"PIFsjZ3ELMAIDoJnABmfEmZfRGc=","beginning_cross_street":"I-390 Exit 8","ending_cross_street":"Pebble Beach Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.736422,42.826154]]}},{"id":"Hlg9kTBbLI45emLJRWnS3eFBTVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MrTKl2pUz0e+TyyhTrWSTccG2D4="}],"description":"Utility work on US 20A both directions between I-390 Exit 8 (Geneseo) and Pebble Beach Rd. (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T23:36:40Z"},"road_event_id":"Hlg9kTBbLI45emLJRWnS3eFBTVs=","beginning_cross_street":"I-390 Exit 8","ending_cross_street":"Pebble Beach Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.736422,42.826154]]}},{"id":"/JILUkFOHDTlccqvoQyfXXme7Zg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Installation of sign structure on I-690 westbound between Exit 19N-19A; NY 635;Thompson Rd. (De Witt) and NY 635; Thompson Rd. overpass (Syracuse), Continuous Tuesday April 21st, 2026 09:00 AM thru Wednesday July 1st, 2026 03:00 PM right shoulder closed","update_date":"2026-05-12T13:10:10Z"},"road_event_id":"/JILUkFOHDTlccqvoQyfXXme7Zg=","beginning_cross_street":"Exit 19N-19A; NY 635;Thompson Rd. ","ending_cross_street":"NY 635; Thompson Rd. overpass","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.073934,43.05783]]}},{"id":"NOniELPx5aqNvW4zEfhCzZ7OYoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hO0ThZQ66pqqwufgzdBwbs0Z3XE="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road","update_date":"2026-05-12T20:40:42Z"},"road_event_id":"NOniELPx5aqNvW4zEfhCzZ7OYoU=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019622,40.624241]]}},{"id":"hO0ThZQ66pqqwufgzdBwbs0Z3XE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NOniELPx5aqNvW4zEfhCzZ7OYoU="},{"type":"next-occurrence","id":"cgdKDh7RjxbyIpVtRuA/7D5rGJE="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road","update_date":"2026-05-12T20:40:42Z"},"road_event_id":"hO0ThZQ66pqqwufgzdBwbs0Z3XE=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019622,40.624241]]}},{"id":"cgdKDh7RjxbyIpVtRuA/7D5rGJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NOniELPx5aqNvW4zEfhCzZ7OYoU="},{"type":"next-occurrence","id":"orDFy2l/GSHypvj5hASlinN1qBY="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road","update_date":"2026-05-12T20:40:42Z"},"road_event_id":"cgdKDh7RjxbyIpVtRuA/7D5rGJE=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019622,40.624241]]}},{"id":"orDFy2l/GSHypvj5hASlinN1qBY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NOniELPx5aqNvW4zEfhCzZ7OYoU="},{"type":"next-occurrence","id":"EXsnVbMF8F35sInqtAQebz6RsN8="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road","update_date":"2026-05-12T20:40:42Z"},"road_event_id":"orDFy2l/GSHypvj5hASlinN1qBY=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019622,40.624241]]}},{"id":"EXsnVbMF8F35sInqtAQebz6RsN8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NOniELPx5aqNvW4zEfhCzZ7OYoU="},{"type":"next-occurrence","id":"wRF1O1j8rjfyaFyvtUb44Ri2Gv4="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road","update_date":"2026-05-12T20:40:42Z"},"road_event_id":"EXsnVbMF8F35sInqtAQebz6RsN8=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019622,40.624241]]}},{"id":"wRF1O1j8rjfyaFyvtUb44Ri2Gv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NOniELPx5aqNvW4zEfhCzZ7OYoU="},{"type":"next-occurrence","id":"wGwzNkbbZPNbRaRXgBRxgLG6rdo="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road","update_date":"2026-05-12T20:40:42Z"},"road_event_id":"wRF1O1j8rjfyaFyvtUb44Ri2Gv4=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019622,40.624241]]}},{"id":"wGwzNkbbZPNbRaRXgBRxgLG6rdo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NOniELPx5aqNvW4zEfhCzZ7OYoU="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road","update_date":"2026-05-12T20:40:42Z"},"road_event_id":"wGwzNkbbZPNbRaRXgBRxgLG6rdo=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019622,40.624241]]}},{"id":"GdgAVARfdB9GjqM0HjOjdtlIOhA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6oQg2qHxvp3VMiqVHAgefv8C71U="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed northbound, , Tuesday April 28th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed northbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed northbound, , Saturday May 16th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed northbound, , Saturday May 16th,2026 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed northbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed northbound, , Sunday May 17th,2026 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed northbound, , Sunday May 17th,2026 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed northbound,","update_date":"2026-05-10T19:00:02Z"},"road_event_id":"GdgAVARfdB9GjqM0HjOjdtlIOhA=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T05:00:00Z","end_date":"2026-05-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"6oQg2qHxvp3VMiqVHAgefv8C71U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GdgAVARfdB9GjqM0HjOjdtlIOhA="},{"type":"next-occurrence","id":"5redZra9qXww2jAyJYhpyQn6n6M="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed northbound, , Tuesday April 28th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed northbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed northbound, , Saturday May 16th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed northbound, , Saturday May 16th,2026 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed northbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed northbound, , Sunday May 17th,2026 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed northbound, , Sunday May 17th,2026 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed northbound,","update_date":"2026-05-10T19:00:02Z"},"road_event_id":"6oQg2qHxvp3VMiqVHAgefv8C71U=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"5redZra9qXww2jAyJYhpyQn6n6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GdgAVARfdB9GjqM0HjOjdtlIOhA="},{"type":"next-occurrence","id":"JxHoyDzkC7ZZPQoQgYD/MezK6k8="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed northbound, , Tuesday April 28th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed northbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed northbound, , Saturday May 16th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed northbound, , Saturday May 16th,2026 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed northbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed northbound, , Sunday May 17th,2026 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed northbound, , Sunday May 17th,2026 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed northbound,","update_date":"2026-05-10T19:00:02Z"},"road_event_id":"5redZra9qXww2jAyJYhpyQn6n6M=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"JxHoyDzkC7ZZPQoQgYD/MezK6k8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GdgAVARfdB9GjqM0HjOjdtlIOhA="},{"type":"next-occurrence","id":"2QWo2JcSjA6L+hlpQ06KjnkRsEg="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed northbound, , Tuesday April 28th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed northbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed northbound, , Saturday May 16th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed northbound, , Saturday May 16th,2026 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed northbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed northbound, , Sunday May 17th,2026 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed northbound, , Sunday May 17th,2026 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed northbound,","update_date":"2026-05-10T19:00:02Z"},"road_event_id":"JxHoyDzkC7ZZPQoQgYD/MezK6k8=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T06:00:00Z","end_date":"2026-05-16T11:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"2QWo2JcSjA6L+hlpQ06KjnkRsEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GdgAVARfdB9GjqM0HjOjdtlIOhA="},{"type":"next-occurrence","id":"rRrvYCW1mcDgyWkvuKVxyvJUcJg="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed northbound, , Tuesday April 28th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed northbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed northbound, , Saturday May 16th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed northbound, , Saturday May 16th,2026 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed northbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed northbound, , Sunday May 17th,2026 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed northbound, , Sunday May 17th,2026 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed northbound,","update_date":"2026-05-10T19:00:02Z"},"road_event_id":"2QWo2JcSjA6L+hlpQ06KjnkRsEg=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T17:00:00Z","end_date":"2026-05-17T01:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"rRrvYCW1mcDgyWkvuKVxyvJUcJg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GdgAVARfdB9GjqM0HjOjdtlIOhA="},{"type":"next-occurrence","id":"bAPNuiSKjZA6ZM4DOBybJdRgCFI="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed northbound, , Tuesday April 28th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed northbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed northbound, , Saturday May 16th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed northbound, , Saturday May 16th,2026 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed northbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed northbound, , Sunday May 17th,2026 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed northbound, , Sunday May 17th,2026 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed northbound,","update_date":"2026-05-10T19:00:02Z"},"road_event_id":"rRrvYCW1mcDgyWkvuKVxyvJUcJg=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"bAPNuiSKjZA6ZM4DOBybJdRgCFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GdgAVARfdB9GjqM0HjOjdtlIOhA="},{"type":"next-occurrence","id":"1XxwoUoyqWoPgYWfegKt5iUIR7U="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed northbound, , Tuesday April 28th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed northbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed northbound, , Saturday May 16th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed northbound, , Saturday May 16th,2026 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed northbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed northbound, , Sunday May 17th,2026 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed northbound, , Sunday May 17th,2026 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed northbound,","update_date":"2026-05-10T19:00:02Z"},"road_event_id":"bAPNuiSKjZA6ZM4DOBybJdRgCFI=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T08:00:00Z","end_date":"2026-05-17T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"1XxwoUoyqWoPgYWfegKt5iUIR7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GdgAVARfdB9GjqM0HjOjdtlIOhA="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed northbound, , Tuesday April 28th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed northbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed northbound, , Saturday May 16th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed northbound, , Saturday May 16th,2026 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed northbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed northbound, , Sunday May 17th,2026 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed northbound, , Sunday May 17th,2026 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed northbound,","update_date":"2026-05-10T19:00:02Z"},"road_event_id":"1XxwoUoyqWoPgYWfegKt5iUIR7U=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T22:00:00Z","end_date":"2026-05-18T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"lzUwClzfzAeMIuwyLIUWzgHeUnk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nQvMABwmThKrVrApknpRVlFSe/s="}],"description":"Construction and bridge painting on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed southbound, , Tuesday April 28th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed southbound, , Saturday May 16th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed southbound, , Saturday May 16th,2026 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed southbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed southbound, , Sunday May 17th,2026 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed southbound, , Sunday May 17th,2026 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed southbound,","update_date":"2026-05-10T18:00:01Z"},"road_event_id":"lzUwClzfzAeMIuwyLIUWzgHeUnk=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T05:00:00Z","end_date":"2026-05-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"nQvMABwmThKrVrApknpRVlFSe/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lzUwClzfzAeMIuwyLIUWzgHeUnk="},{"type":"next-occurrence","id":"jbAVkpUj0hafRxNSVnyhTFA4zk4="}],"description":"Construction and bridge painting on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed southbound, , Tuesday April 28th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed southbound, , Saturday May 16th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed southbound, , Saturday May 16th,2026 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed southbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed southbound, , Sunday May 17th,2026 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed southbound, , Sunday May 17th,2026 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed southbound,","update_date":"2026-05-10T18:00:01Z"},"road_event_id":"nQvMABwmThKrVrApknpRVlFSe/s=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"jbAVkpUj0hafRxNSVnyhTFA4zk4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lzUwClzfzAeMIuwyLIUWzgHeUnk="},{"type":"next-occurrence","id":"G6HyjNemBS9GwTXSd6cubGNdXWg="}],"description":"Construction and bridge painting on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed southbound, , Tuesday April 28th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed southbound, , Saturday May 16th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed southbound, , Saturday May 16th,2026 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed southbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed southbound, , Sunday May 17th,2026 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed southbound, , Sunday May 17th,2026 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed southbound,","update_date":"2026-05-10T18:00:01Z"},"road_event_id":"jbAVkpUj0hafRxNSVnyhTFA4zk4=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"G6HyjNemBS9GwTXSd6cubGNdXWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lzUwClzfzAeMIuwyLIUWzgHeUnk="},{"type":"next-occurrence","id":"ZARGbtHc+qBoLwKPP6X2wOonBBQ="}],"description":"Construction and bridge painting on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed southbound, , Tuesday April 28th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed southbound, , Saturday May 16th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed southbound, , Saturday May 16th,2026 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed southbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed southbound, , Sunday May 17th,2026 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed southbound, , Sunday May 17th,2026 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed southbound,","update_date":"2026-05-10T18:00:01Z"},"road_event_id":"G6HyjNemBS9GwTXSd6cubGNdXWg=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T06:00:00Z","end_date":"2026-05-16T11:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"ZARGbtHc+qBoLwKPP6X2wOonBBQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lzUwClzfzAeMIuwyLIUWzgHeUnk="},{"type":"next-occurrence","id":"klXiE1KGLoEZJSSTkJSrIWORopU="}],"description":"Construction and bridge painting on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed southbound, , Tuesday April 28th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed southbound, , Saturday May 16th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed southbound, , Saturday May 16th,2026 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed southbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed southbound, , Sunday May 17th,2026 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed southbound, , Sunday May 17th,2026 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed southbound,","update_date":"2026-05-10T18:00:01Z"},"road_event_id":"ZARGbtHc+qBoLwKPP6X2wOonBBQ=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T17:00:00Z","end_date":"2026-05-17T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"klXiE1KGLoEZJSSTkJSrIWORopU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lzUwClzfzAeMIuwyLIUWzgHeUnk="},{"type":"next-occurrence","id":"rj0BdZN0CVys8UhyEPGrYqUu6/U="}],"description":"Construction and bridge painting on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed southbound, , Tuesday April 28th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed southbound, , Saturday May 16th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed southbound, , Saturday May 16th,2026 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed southbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed southbound, , Sunday May 17th,2026 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed southbound, , Sunday May 17th,2026 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed southbound,","update_date":"2026-05-10T18:00:01Z"},"road_event_id":"klXiE1KGLoEZJSSTkJSrIWORopU=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T08:00:00Z","end_date":"2026-05-17T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"rj0BdZN0CVys8UhyEPGrYqUu6/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lzUwClzfzAeMIuwyLIUWzgHeUnk="}],"description":"Construction and bridge painting on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed southbound, , Tuesday April 28th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed southbound, , Saturday May 16th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed southbound, , Saturday May 16th,2026 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed southbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed southbound, , Sunday May 17th,2026 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed southbound, , Sunday May 17th,2026 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed southbound,","update_date":"2026-05-10T18:00:01Z"},"road_event_id":"rj0BdZN0CVys8UhyEPGrYqUu6/U=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T22:00:00Z","end_date":"2026-05-18T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"J9UbLbteBOzeWEf0ox8z78FHfzU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yIf5VyECNk3wlU8/PbnfyCPNtW0="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"J9UbLbteBOzeWEf0ox8z78FHfzU=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"yIf5VyECNk3wlU8/PbnfyCPNtW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J9UbLbteBOzeWEf0ox8z78FHfzU="},{"type":"next-occurrence","id":"lqprqlGTUfjG11bcKj99VYGsIAA="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"yIf5VyECNk3wlU8/PbnfyCPNtW0=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"lqprqlGTUfjG11bcKj99VYGsIAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J9UbLbteBOzeWEf0ox8z78FHfzU="},{"type":"next-occurrence","id":"+vY0umu4IQN+zD5RSb+gtBd6/4I="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"lqprqlGTUfjG11bcKj99VYGsIAA=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"+vY0umu4IQN+zD5RSb+gtBd6/4I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J9UbLbteBOzeWEf0ox8z78FHfzU="},{"type":"next-occurrence","id":"QNwLpnwvcNCRHmTyX647W5sIa0g="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"+vY0umu4IQN+zD5RSb+gtBd6/4I=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"QNwLpnwvcNCRHmTyX647W5sIa0g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J9UbLbteBOzeWEf0ox8z78FHfzU="},{"type":"next-occurrence","id":"+YLC5t/2iF2jNDvRlEDcOCJw//o="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"QNwLpnwvcNCRHmTyX647W5sIa0g=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"+YLC5t/2iF2jNDvRlEDcOCJw//o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J9UbLbteBOzeWEf0ox8z78FHfzU="},{"type":"next-occurrence","id":"Gvh3a7ofUJha8I4aVMbYQ+etx2c="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"+YLC5t/2iF2jNDvRlEDcOCJw//o=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"Gvh3a7ofUJha8I4aVMbYQ+etx2c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J9UbLbteBOzeWEf0ox8z78FHfzU="},{"type":"next-occurrence","id":"4QT/N3y4wruBqql1CEycGzwug0I="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"Gvh3a7ofUJha8I4aVMbYQ+etx2c=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"4QT/N3y4wruBqql1CEycGzwug0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J9UbLbteBOzeWEf0ox8z78FHfzU="},{"type":"next-occurrence","id":"LJekx7hlOUfHZn7Fiy424WYMeYY="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"4QT/N3y4wruBqql1CEycGzwug0I=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T23:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"LJekx7hlOUfHZn7Fiy424WYMeYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J9UbLbteBOzeWEf0ox8z78FHfzU="},{"type":"next-occurrence","id":"m12vb37ye9uNu2WxyyH16pEuRCg="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"LJekx7hlOUfHZn7Fiy424WYMeYY=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T23:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"m12vb37ye9uNu2WxyyH16pEuRCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J9UbLbteBOzeWEf0ox8z78FHfzU="},{"type":"next-occurrence","id":"Ghba25eB/GHDdf1S5f6u0nFQq10="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"m12vb37ye9uNu2WxyyH16pEuRCg=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T23:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"Ghba25eB/GHDdf1S5f6u0nFQq10=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J9UbLbteBOzeWEf0ox8z78FHfzU="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"Ghba25eB/GHDdf1S5f6u0nFQq10=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"MuC5GqaqimXwf4BVj/sjdVIz54U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lF/n8qcvGUDVNSyguVMAryAn1Yo="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"MuC5GqaqimXwf4BVj/sjdVIz54U=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:30:00Z","end_date":"2026-05-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"lF/n8qcvGUDVNSyguVMAryAn1Yo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MuC5GqaqimXwf4BVj/sjdVIz54U="},{"type":"next-occurrence","id":"k/6jHF2vm01taVq5M7U9L94+c8g="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"lF/n8qcvGUDVNSyguVMAryAn1Yo=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:30:00Z","end_date":"2026-05-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"k/6jHF2vm01taVq5M7U9L94+c8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MuC5GqaqimXwf4BVj/sjdVIz54U="},{"type":"next-occurrence","id":"WahZ1R0D4AqyJTqb+6Eoq+6W/5k="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"k/6jHF2vm01taVq5M7U9L94+c8g=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:30:00Z","end_date":"2026-05-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"WahZ1R0D4AqyJTqb+6Eoq+6W/5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MuC5GqaqimXwf4BVj/sjdVIz54U="},{"type":"next-occurrence","id":"T+3de3Ly+NhA2R8bqf2kJOVQ62g="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"WahZ1R0D4AqyJTqb+6Eoq+6W/5k=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T03:30:00Z","end_date":"2026-05-17T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"T+3de3Ly+NhA2R8bqf2kJOVQ62g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MuC5GqaqimXwf4BVj/sjdVIz54U="},{"type":"next-occurrence","id":"gwJgQp/L/TXvWPvpJIo8dsFiOOM="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"T+3de3Ly+NhA2R8bqf2kJOVQ62g=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T03:30:00Z","end_date":"2026-05-18T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"gwJgQp/L/TXvWPvpJIo8dsFiOOM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MuC5GqaqimXwf4BVj/sjdVIz54U="},{"type":"next-occurrence","id":"6AAUXZocFb1kE7808JV1n6Cvkkc="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"gwJgQp/L/TXvWPvpJIo8dsFiOOM=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T03:30:00Z","end_date":"2026-05-19T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"6AAUXZocFb1kE7808JV1n6Cvkkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MuC5GqaqimXwf4BVj/sjdVIz54U="},{"type":"next-occurrence","id":"5i5s0dbD7HvYiMGhUbYvKYJlCds="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"6AAUXZocFb1kE7808JV1n6Cvkkc=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T03:30:00Z","end_date":"2026-05-20T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"5i5s0dbD7HvYiMGhUbYvKYJlCds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MuC5GqaqimXwf4BVj/sjdVIz54U="},{"type":"next-occurrence","id":"0BoV3ifD1eqrispAPr7kVmA8AyM="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"5i5s0dbD7HvYiMGhUbYvKYJlCds=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T03:30:00Z","end_date":"2026-05-21T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"0BoV3ifD1eqrispAPr7kVmA8AyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MuC5GqaqimXwf4BVj/sjdVIz54U="},{"type":"next-occurrence","id":"VEGgRdHy8tQ9tRs9AEra5OVYoOc="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"0BoV3ifD1eqrispAPr7kVmA8AyM=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T03:30:00Z","end_date":"2026-05-22T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"VEGgRdHy8tQ9tRs9AEra5OVYoOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MuC5GqaqimXwf4BVj/sjdVIz54U="},{"type":"next-occurrence","id":"d2VvmDU8il6NcSFMO3NiLkmWfAc="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"VEGgRdHy8tQ9tRs9AEra5OVYoOc=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T03:30:00Z","end_date":"2026-05-23T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"d2VvmDU8il6NcSFMO3NiLkmWfAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MuC5GqaqimXwf4BVj/sjdVIz54U="},{"type":"next-occurrence","id":"QFtsPF85zpHfwxJS1GTywu8727E="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"d2VvmDU8il6NcSFMO3NiLkmWfAc=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T03:30:00Z","end_date":"2026-05-24T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"QFtsPF85zpHfwxJS1GTywu8727E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MuC5GqaqimXwf4BVj/sjdVIz54U="},{"type":"next-occurrence","id":"3wrMskYRa+bZMVMCS6+Mo5X4bDA="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"QFtsPF85zpHfwxJS1GTywu8727E=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T03:30:00Z","end_date":"2026-05-25T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"3wrMskYRa+bZMVMCS6+Mo5X4bDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MuC5GqaqimXwf4BVj/sjdVIz54U="},{"type":"next-occurrence","id":"tx9hLXAZ1s1CtXn0vYZxjnJ0opY="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"3wrMskYRa+bZMVMCS6+Mo5X4bDA=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T03:30:00Z","end_date":"2026-05-26T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"tx9hLXAZ1s1CtXn0vYZxjnJ0opY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MuC5GqaqimXwf4BVj/sjdVIz54U="},{"type":"next-occurrence","id":"c2wn1JhFMTzuMklBMftJbMidEG8="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"tx9hLXAZ1s1CtXn0vYZxjnJ0opY=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T03:30:00Z","end_date":"2026-05-27T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"c2wn1JhFMTzuMklBMftJbMidEG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MuC5GqaqimXwf4BVj/sjdVIz54U="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"c2wn1JhFMTzuMklBMftJbMidEG8=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T03:30:00Z","end_date":"2026-05-28T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"/pWaE1yUVrgGpOtS4zemNxbHWLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QHxO6+UktMX1rfpPtFKoMxeXluo="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"/pWaE1yUVrgGpOtS4zemNxbHWLA=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:59:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"QHxO6+UktMX1rfpPtFKoMxeXluo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/pWaE1yUVrgGpOtS4zemNxbHWLA="},{"type":"next-occurrence","id":"lCAHtQrX13SUXEd0E+g6fIbASJQ="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"QHxO6+UktMX1rfpPtFKoMxeXluo=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:59:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"lCAHtQrX13SUXEd0E+g6fIbASJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/pWaE1yUVrgGpOtS4zemNxbHWLA="},{"type":"next-occurrence","id":"GP9bOL476ze9dXGl5AfulPUJn9o="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"lCAHtQrX13SUXEd0E+g6fIbASJQ=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:59:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"GP9bOL476ze9dXGl5AfulPUJn9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/pWaE1yUVrgGpOtS4zemNxbHWLA="},{"type":"next-occurrence","id":"AlODmQ/N+dVzdfoIVr9O6AVJsPk="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"GP9bOL476ze9dXGl5AfulPUJn9o=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T03:59:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"AlODmQ/N+dVzdfoIVr9O6AVJsPk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/pWaE1yUVrgGpOtS4zemNxbHWLA="},{"type":"next-occurrence","id":"rV3DfoGGsG5RkdXTcFMth1IGzFE="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"AlODmQ/N+dVzdfoIVr9O6AVJsPk=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T03:59:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"rV3DfoGGsG5RkdXTcFMth1IGzFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/pWaE1yUVrgGpOtS4zemNxbHWLA="},{"type":"next-occurrence","id":"fRVqsWn5xwxY85X9aurYLIwmS6Y="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"rV3DfoGGsG5RkdXTcFMth1IGzFE=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T03:59:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"fRVqsWn5xwxY85X9aurYLIwmS6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/pWaE1yUVrgGpOtS4zemNxbHWLA="},{"type":"next-occurrence","id":"2ZS67HmjzxK48sh/sXrk/JHizGY="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"fRVqsWn5xwxY85X9aurYLIwmS6Y=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T03:59:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"2ZS67HmjzxK48sh/sXrk/JHizGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/pWaE1yUVrgGpOtS4zemNxbHWLA="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"2ZS67HmjzxK48sh/sXrk/JHizGY=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T03:59:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"ON5hYkAl6PqkYcboQL2sAB2VPZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NjNKkyrFlmYlyHubx+tcYVm/vp8="}],"description":"Road rehabilitation on NY 303 southbound between Corporate Drive (Clarkstown) and US 9W (Clarkstown) D265648/NIGHT/32731809 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 06:00 AM, alternating traffic","update_date":"2026-05-13T14:00:02Z"},"road_event_id":"ON5hYkAl6PqkYcboQL2sAB2VPZQ=","beginning_cross_street":"Corporate Drive","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949702,41.079544]]}},{"id":"NjNKkyrFlmYlyHubx+tcYVm/vp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ON5hYkAl6PqkYcboQL2sAB2VPZQ="},{"type":"next-occurrence","id":"oANYflmj9ffwXEDYoSA6k1xb1n0="}],"description":"Road rehabilitation on NY 303 southbound between Corporate Drive (Clarkstown) and US 9W (Clarkstown) D265648/NIGHT/32731809 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 06:00 AM, alternating traffic","update_date":"2026-05-13T14:00:02Z"},"road_event_id":"NjNKkyrFlmYlyHubx+tcYVm/vp8=","beginning_cross_street":"Corporate Drive","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949702,41.079544]]}},{"id":"oANYflmj9ffwXEDYoSA6k1xb1n0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ON5hYkAl6PqkYcboQL2sAB2VPZQ="},{"type":"next-occurrence","id":"1iRtTNP2loT/n46l32XDu95V8FU="}],"description":"Road rehabilitation on NY 303 southbound between Corporate Drive (Clarkstown) and US 9W (Clarkstown) D265648/NIGHT/32731809 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 06:00 AM, alternating traffic","update_date":"2026-05-13T14:00:02Z"},"road_event_id":"oANYflmj9ffwXEDYoSA6k1xb1n0=","beginning_cross_street":"Corporate Drive","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T22:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949702,41.079544]]}},{"id":"1iRtTNP2loT/n46l32XDu95V8FU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ON5hYkAl6PqkYcboQL2sAB2VPZQ="},{"type":"next-occurrence","id":"SCo/1cfZcCU8vkEZb2nQK4rlfZg="}],"description":"Road rehabilitation on NY 303 southbound between Corporate Drive (Clarkstown) and US 9W (Clarkstown) D265648/NIGHT/32731809 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 06:00 AM, alternating traffic","update_date":"2026-05-13T14:00:02Z"},"road_event_id":"1iRtTNP2loT/n46l32XDu95V8FU=","beginning_cross_street":"Corporate Drive","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949702,41.079544]]}},{"id":"SCo/1cfZcCU8vkEZb2nQK4rlfZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ON5hYkAl6PqkYcboQL2sAB2VPZQ="},{"type":"next-occurrence","id":"yfP1xFLGYuzYEl0f1+ppm4gBBsM="}],"description":"Road rehabilitation on NY 303 southbound between Corporate Drive (Clarkstown) and US 9W (Clarkstown) D265648/NIGHT/32731809 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 06:00 AM, alternating traffic","update_date":"2026-05-13T14:00:02Z"},"road_event_id":"SCo/1cfZcCU8vkEZb2nQK4rlfZg=","beginning_cross_street":"Corporate Drive","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949702,41.079544]]}},{"id":"yfP1xFLGYuzYEl0f1+ppm4gBBsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ON5hYkAl6PqkYcboQL2sAB2VPZQ="},{"type":"next-occurrence","id":"Tx8VLM41s4dxZiUbKqesqLkx8AE="}],"description":"Road rehabilitation on NY 303 southbound between Corporate Drive (Clarkstown) and US 9W (Clarkstown) D265648/NIGHT/32731809 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 06:00 AM, alternating traffic","update_date":"2026-05-13T14:00:02Z"},"road_event_id":"yfP1xFLGYuzYEl0f1+ppm4gBBsM=","beginning_cross_street":"Corporate Drive","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949702,41.079544]]}},{"id":"Tx8VLM41s4dxZiUbKqesqLkx8AE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ON5hYkAl6PqkYcboQL2sAB2VPZQ="}],"description":"Road rehabilitation on NY 303 southbound between Corporate Drive (Clarkstown) and US 9W (Clarkstown) D265648/NIGHT/32731809 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 06:00 AM, alternating traffic","update_date":"2026-05-13T14:00:02Z"},"road_event_id":"Tx8VLM41s4dxZiUbKqesqLkx8AE=","beginning_cross_street":"Corporate Drive","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949702,41.079544]]}},{"id":"3dQ4sb6znitUs5t5o301Q7pbUco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PDjtKmt+z6ySdGCjyYtxBQrRXws="}],"description":"Bridge maintenance operations on I-84 eastbound between Exit 1- US Hwy 6 (Deerpark) and Exit 4 - Mountain Rd (Greenville) DOT BM/B1003082-1032452/30406809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 14th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-11T11:40:32Z"},"road_event_id":"3dQ4sb6znitUs5t5o301Q7pbUco=","beginning_cross_street":"Exit 1- US Hwy 6","ending_cross_street":"Exit 4 - Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.614049,41.373591]]}},{"id":"PDjtKmt+z6ySdGCjyYtxBQrRXws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3dQ4sb6znitUs5t5o301Q7pbUco="}],"description":"Bridge maintenance operations on I-84 eastbound between Exit 1- US Hwy 6 (Deerpark) and Exit 4 - Mountain Rd (Greenville) DOT BM/B1003082-1032452/30406809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 14th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-11T11:40:32Z"},"road_event_id":"PDjtKmt+z6ySdGCjyYtxBQrRXws=","beginning_cross_street":"Exit 1- US Hwy 6","ending_cross_street":"Exit 4 - Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.614049,41.373591]]}},{"id":"hSq1GdfaLloCV0ym9miIHlCSekg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on US-202 both directions between ANTOLINI RD (New Hartford) and CT-179 (Canton) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:39:41Z"},"road_event_id":"hSq1GdfaLloCV0ym9miIHlCSekg=","beginning_cross_street":"ANTOLINI RD","ending_cross_street":"CT-179","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.016571,41.830107]]}},{"id":"CZwel2EuSTJW2r4CoClvrCOvT8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COGWHEEL LN"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on COGWHEEL LN both directions CT-67 (Seymour) to SILVERMINE RD (Seymour) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:32:50Z"},"road_event_id":"CZwel2EuSTJW2r4CoClvrCOvT8k=","beginning_cross_street":"CT-67","ending_cross_street":"SILVERMINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.04822,41.396269]]}},{"id":"oPNM8Hut9cNUb2Om1uRBfLEfbcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HDgC6mgLNk4WxuN1zpLzDrZvqGE="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"oPNM8Hut9cNUb2Om1uRBfLEfbcA=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-14T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"HDgC6mgLNk4WxuN1zpLzDrZvqGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oPNM8Hut9cNUb2Om1uRBfLEfbcA="},{"type":"next-occurrence","id":"IdPLaX8Zvp1C5gkBrVThW+xoRXM="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"HDgC6mgLNk4WxuN1zpLzDrZvqGE=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"IdPLaX8Zvp1C5gkBrVThW+xoRXM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oPNM8Hut9cNUb2Om1uRBfLEfbcA="},{"type":"next-occurrence","id":"iKp6nSbLlKn04w0CaJ7CIFQ0uqM="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"IdPLaX8Zvp1C5gkBrVThW+xoRXM=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"iKp6nSbLlKn04w0CaJ7CIFQ0uqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oPNM8Hut9cNUb2Om1uRBfLEfbcA="},{"type":"next-occurrence","id":"qO5LwZe7FYFC5RB8+CvijdnVo/M="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"iKp6nSbLlKn04w0CaJ7CIFQ0uqM=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-19T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"qO5LwZe7FYFC5RB8+CvijdnVo/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oPNM8Hut9cNUb2Om1uRBfLEfbcA="},{"type":"next-occurrence","id":"d1ecxYvVRy5eZuvz1hBBOO6+Ze4="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"qO5LwZe7FYFC5RB8+CvijdnVo/M=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-20T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"d1ecxYvVRy5eZuvz1hBBOO6+Ze4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oPNM8Hut9cNUb2Om1uRBfLEfbcA="},{"type":"next-occurrence","id":"vZ7Te6gcRnRq5azrCy8jwV0UsrE="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"d1ecxYvVRy5eZuvz1hBBOO6+Ze4=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-21T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"vZ7Te6gcRnRq5azrCy8jwV0UsrE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oPNM8Hut9cNUb2Om1uRBfLEfbcA="},{"type":"next-occurrence","id":"yi7U/lWynX8G4C/MpU1Tuv8Q33g="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"vZ7Te6gcRnRq5azrCy8jwV0UsrE=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-22T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"yi7U/lWynX8G4C/MpU1Tuv8Q33g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oPNM8Hut9cNUb2Om1uRBfLEfbcA="},{"type":"next-occurrence","id":"WYO1f5xfXtIO16jLkv/aG45QGhg="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"yi7U/lWynX8G4C/MpU1Tuv8Q33g=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-23T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"WYO1f5xfXtIO16jLkv/aG45QGhg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oPNM8Hut9cNUb2Om1uRBfLEfbcA="},{"type":"next-occurrence","id":"PiIMuZScLSnEcPT66YXROtsWJh0="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"WYO1f5xfXtIO16jLkv/aG45QGhg=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-26T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"PiIMuZScLSnEcPT66YXROtsWJh0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oPNM8Hut9cNUb2Om1uRBfLEfbcA="},{"type":"next-occurrence","id":"+2If+vsJoNr3liWM/9RJw2zWbbU="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"PiIMuZScLSnEcPT66YXROtsWJh0=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-27T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"+2If+vsJoNr3liWM/9RJw2zWbbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oPNM8Hut9cNUb2Om1uRBfLEfbcA="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"+2If+vsJoNr3liWM/9RJw2zWbbU=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-28T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"GduMFYRHzgizrQU5MvO5exj/ZS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 6N"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs and drainage improvements on NY 6N both directions between Pine Tree Lane (Carmel) and Green Lane (Carmel) D265424/32701609 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Monday March 23rd, 2026 12:00 AM thru Saturday May 23rd, 2026 12:00 AM all lanes closed and detoured","update_date":"2026-03-03T11:17:21Z"},"road_event_id":"GduMFYRHzgizrQU5MvO5exj/ZS4=","beginning_cross_street":"Pine Tree Lane","ending_cross_street":"Green Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-23T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786249,41.343783]]}},{"id":"DZmX9J8OjXeMmzloP6m0rBwXYcw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, 4 Line bypassing Burnside Av (New York) through September 2026. Use nearby 176 St or 183 St stations, Continuous Wednesday March 4th, 2026 12:00 AM thru Friday September 4th, 2026 11:59 PM","update_date":"2026-03-04T15:00:05Z"},"road_event_id":"DZmX9J8OjXeMmzloP6m0rBwXYcw=","beginning_cross_street":"Burnside Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907684,40.853453]]}},{"id":"bW8VkBRrEkx9CkpU6KKV7lz4a8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+vqeZl89grvRFaZUb/C0/N+50l0="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Thursday March 26th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"bW8VkBRrEkx9CkpU6KKV7lz4a8A=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"+vqeZl89grvRFaZUb/C0/N+50l0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bW8VkBRrEkx9CkpU6KKV7lz4a8A="},{"type":"next-occurrence","id":"6rqh5we2D4FecE59eZfPjwJHXD8="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Thursday March 26th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"+vqeZl89grvRFaZUb/C0/N+50l0=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"6rqh5we2D4FecE59eZfPjwJHXD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bW8VkBRrEkx9CkpU6KKV7lz4a8A="},{"type":"next-occurrence","id":"MAio/OFcJRlF90JU/86DG0Z4Ih8="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Thursday March 26th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"6rqh5we2D4FecE59eZfPjwJHXD8=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"MAio/OFcJRlF90JU/86DG0Z4Ih8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bW8VkBRrEkx9CkpU6KKV7lz4a8A="},{"type":"next-occurrence","id":"uCW3JyPFZRmcXuS8aZgt6z4y4zk="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Thursday March 26th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"MAio/OFcJRlF90JU/86DG0Z4Ih8=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T14:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"uCW3JyPFZRmcXuS8aZgt6z4y4zk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bW8VkBRrEkx9CkpU6KKV7lz4a8A="},{"type":"next-occurrence","id":"MS28kIbD1Nmnml7BjM0UCEwEDc4="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Thursday March 26th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"uCW3JyPFZRmcXuS8aZgt6z4y4zk=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T14:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"MS28kIbD1Nmnml7BjM0UCEwEDc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bW8VkBRrEkx9CkpU6KKV7lz4a8A="},{"type":"next-occurrence","id":"CTtgnAooHOPCbyMavosR5JnO+M4="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Thursday March 26th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"MS28kIbD1Nmnml7BjM0UCEwEDc4=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T14:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"CTtgnAooHOPCbyMavosR5JnO+M4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bW8VkBRrEkx9CkpU6KKV7lz4a8A="},{"type":"next-occurrence","id":"T2V2r9MycBPZVKCJYwncun5gV0I="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Thursday March 26th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"CTtgnAooHOPCbyMavosR5JnO+M4=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T14:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"T2V2r9MycBPZVKCJYwncun5gV0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bW8VkBRrEkx9CkpU6KKV7lz4a8A="},{"type":"next-occurrence","id":"ZPLHDN/GSGc/kRxVDOWkd1eUCsA="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Thursday March 26th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"T2V2r9MycBPZVKCJYwncun5gV0I=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T14:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"ZPLHDN/GSGc/kRxVDOWkd1eUCsA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bW8VkBRrEkx9CkpU6KKV7lz4a8A="},{"type":"next-occurrence","id":"fK+EvU4xmPDoYom3wqM0SpvT3Gc="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Thursday March 26th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"ZPLHDN/GSGc/kRxVDOWkd1eUCsA=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T14:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"fK+EvU4xmPDoYom3wqM0SpvT3Gc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bW8VkBRrEkx9CkpU6KKV7lz4a8A="},{"type":"next-occurrence","id":"b1O5RgsbLbnAn8rTMNV+rAXWSBE="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Thursday March 26th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"fK+EvU4xmPDoYom3wqM0SpvT3Gc=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T14:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"b1O5RgsbLbnAn8rTMNV+rAXWSBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bW8VkBRrEkx9CkpU6KKV7lz4a8A="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Thursday March 26th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-30T20:01:13Z"},"road_event_id":"b1O5RgsbLbnAn8rTMNV+rAXWSBE=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T14:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"MQcj7+y1HmYmwZlrsxBv7QlHHYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 286 eastbound between NY 590 (Brighton) and Landing Road North (Brighton) 2 way traffic on southbound roadway, Continuous Monday April 27th, 2026 07:00 AM thru Tuesday May 26th, 2026 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-29T17:33:13Z"},"road_event_id":"MQcj7+y1HmYmwZlrsxBv7QlHHYI=","beginning_cross_street":"NY 590","ending_cross_street":"Landing Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.538201,43.157478]]}},{"id":"eDEbmPTWGNEWMyN6qwvLg+hGYo0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GvSa9bIfYWQMu9vIY042clGeB3Q="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"eDEbmPTWGNEWMyN6qwvLg+hGYo0=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"GvSa9bIfYWQMu9vIY042clGeB3Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eDEbmPTWGNEWMyN6qwvLg+hGYo0="},{"type":"next-occurrence","id":"ML4/Eg6xyN3Av1xP9KFGmCi63Cc="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"GvSa9bIfYWQMu9vIY042clGeB3Q=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"ML4/Eg6xyN3Av1xP9KFGmCi63Cc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eDEbmPTWGNEWMyN6qwvLg+hGYo0="},{"type":"next-occurrence","id":"L6haQ2M3aOQ4LFHSOFnfxO/LB1Y="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"ML4/Eg6xyN3Av1xP9KFGmCi63Cc=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"L6haQ2M3aOQ4LFHSOFnfxO/LB1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eDEbmPTWGNEWMyN6qwvLg+hGYo0="},{"type":"next-occurrence","id":"x/XOdqKTfXfrRYUvUSrj7vMAxfA="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"L6haQ2M3aOQ4LFHSOFnfxO/LB1Y=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"x/XOdqKTfXfrRYUvUSrj7vMAxfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eDEbmPTWGNEWMyN6qwvLg+hGYo0="},{"type":"next-occurrence","id":"i3pw5Bl3smcTDPV8YRiEcuMhnm0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"x/XOdqKTfXfrRYUvUSrj7vMAxfA=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"i3pw5Bl3smcTDPV8YRiEcuMhnm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eDEbmPTWGNEWMyN6qwvLg+hGYo0="},{"type":"next-occurrence","id":"i4nKu1puK0RYktG5rRT3YPoRxss="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"i3pw5Bl3smcTDPV8YRiEcuMhnm0=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"i4nKu1puK0RYktG5rRT3YPoRxss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eDEbmPTWGNEWMyN6qwvLg+hGYo0="},{"type":"next-occurrence","id":"Hh7ZmLXUITaR1HVPIo0vmmTcYVM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"i4nKu1puK0RYktG5rRT3YPoRxss=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"Hh7ZmLXUITaR1HVPIo0vmmTcYVM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eDEbmPTWGNEWMyN6qwvLg+hGYo0="},{"type":"next-occurrence","id":"cfm4lWG8BHhWwthk2oyZmUqycqU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"Hh7ZmLXUITaR1HVPIo0vmmTcYVM=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"cfm4lWG8BHhWwthk2oyZmUqycqU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eDEbmPTWGNEWMyN6qwvLg+hGYo0="},{"type":"next-occurrence","id":"L58Bf0h5h+qBYkckV3n2xoQrEIo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"cfm4lWG8BHhWwthk2oyZmUqycqU=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"L58Bf0h5h+qBYkckV3n2xoQrEIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eDEbmPTWGNEWMyN6qwvLg+hGYo0="},{"type":"next-occurrence","id":"3NFyt5dyAX4FVtW93A5jxvtcrZk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"L58Bf0h5h+qBYkckV3n2xoQrEIo=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"3NFyt5dyAX4FVtW93A5jxvtcrZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eDEbmPTWGNEWMyN6qwvLg+hGYo0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"3NFyt5dyAX4FVtW93A5jxvtcrZk=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"XJ/1Nu55ocDsBdBjste/uNGuXws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mJRz2iiwKW8YKy6wa2/6N8pidKI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"XJ/1Nu55ocDsBdBjste/uNGuXws=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"mJRz2iiwKW8YKy6wa2/6N8pidKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJ/1Nu55ocDsBdBjste/uNGuXws="},{"type":"next-occurrence","id":"MCULbvHHXkH0jumMKuJ5BA3P5Eg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"mJRz2iiwKW8YKy6wa2/6N8pidKI=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"MCULbvHHXkH0jumMKuJ5BA3P5Eg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJ/1Nu55ocDsBdBjste/uNGuXws="},{"type":"next-occurrence","id":"thXATzuffJIm52Qs1i/4C7B4Npw="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"MCULbvHHXkH0jumMKuJ5BA3P5Eg=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"thXATzuffJIm52Qs1i/4C7B4Npw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJ/1Nu55ocDsBdBjste/uNGuXws="},{"type":"next-occurrence","id":"QLE2zPNgQ4pktQpoIFu8YZmWN2Y="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"thXATzuffJIm52Qs1i/4C7B4Npw=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"QLE2zPNgQ4pktQpoIFu8YZmWN2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJ/1Nu55ocDsBdBjste/uNGuXws="},{"type":"next-occurrence","id":"UW8EapOwW163HPTwOYv81LxR4gg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"QLE2zPNgQ4pktQpoIFu8YZmWN2Y=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"UW8EapOwW163HPTwOYv81LxR4gg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJ/1Nu55ocDsBdBjste/uNGuXws="},{"type":"next-occurrence","id":"HTE3nmMvXGogKYv09Dr/NdDLmaw="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"UW8EapOwW163HPTwOYv81LxR4gg=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"HTE3nmMvXGogKYv09Dr/NdDLmaw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJ/1Nu55ocDsBdBjste/uNGuXws="},{"type":"next-occurrence","id":"B1K1oBc0Ub60zHK8KQz3SQo+5so="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"HTE3nmMvXGogKYv09Dr/NdDLmaw=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"B1K1oBc0Ub60zHK8KQz3SQo+5so=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJ/1Nu55ocDsBdBjste/uNGuXws="},{"type":"next-occurrence","id":"dCFIyYgj4a+0pH+wdVoSi0V4h4E="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"B1K1oBc0Ub60zHK8KQz3SQo+5so=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"dCFIyYgj4a+0pH+wdVoSi0V4h4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJ/1Nu55ocDsBdBjste/uNGuXws="},{"type":"next-occurrence","id":"6jmi3BSvnSCLNU3cQRZdAfKCCjU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"dCFIyYgj4a+0pH+wdVoSi0V4h4E=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"6jmi3BSvnSCLNU3cQRZdAfKCCjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJ/1Nu55ocDsBdBjste/uNGuXws="},{"type":"next-occurrence","id":"kqvD2eR4vkzIabQFkYpcIWrJ6tk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"6jmi3BSvnSCLNU3cQRZdAfKCCjU=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"kqvD2eR4vkzIabQFkYpcIWrJ6tk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJ/1Nu55ocDsBdBjste/uNGuXws="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"kqvD2eR4vkzIabQFkYpcIWrJ6tk=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"izgk37Ryi0xBDYnMzrF0zyBT99s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"B3LMVmMo93qQQvN63lETE7AqSTE="}],"description":"Utility work on NY 21 both directions between Coye Point Drive (South Bristol) and STEMPLE HILL RD (South Bristol) alternating lane closures, Friday April 24th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T16:19:58Z"},"road_event_id":"izgk37Ryi0xBDYnMzrF0zyBT99s=","beginning_cross_street":"Coye Point Drive","ending_cross_street":"STEMPLE HILL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.365122,42.682706]]}},{"id":"B3LMVmMo93qQQvN63lETE7AqSTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"izgk37Ryi0xBDYnMzrF0zyBT99s="},{"type":"next-occurrence","id":"cJt9d4ITNMa4TXzNwzOdmKrurF4="}],"description":"Utility work on NY 21 both directions between Coye Point Drive (South Bristol) and STEMPLE HILL RD (South Bristol) alternating lane closures, Friday April 24th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T16:19:58Z"},"road_event_id":"B3LMVmMo93qQQvN63lETE7AqSTE=","beginning_cross_street":"Coye Point Drive","ending_cross_street":"STEMPLE HILL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.365122,42.682706]]}},{"id":"cJt9d4ITNMa4TXzNwzOdmKrurF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"izgk37Ryi0xBDYnMzrF0zyBT99s="}],"description":"Utility work on NY 21 both directions between Coye Point Drive (South Bristol) and STEMPLE HILL RD (South Bristol) alternating lane closures, Friday April 24th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T16:19:58Z"},"road_event_id":"cJt9d4ITNMa4TXzNwzOdmKrurF4=","beginning_cross_street":"Coye Point Drive","ending_cross_street":"STEMPLE HILL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.365122,42.682706]]}},{"id":"w1tRc8qT3NhxxLnVqBTKV/Zzles=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KzH5ySIeIUrx5chsdwZlxZw/cu0="}],"description":"Crane operations on MASPETH AVE both directions between GRANDPARENTS AVE (New York) and OLIVE ST (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:16:43Z"},"road_event_id":"w1tRc8qT3NhxxLnVqBTKV/Zzles=","beginning_cross_street":"GRANDPARENTS AVE","ending_cross_street":"OLIVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93997,40.715814]]}},{"id":"KzH5ySIeIUrx5chsdwZlxZw/cu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w1tRc8qT3NhxxLnVqBTKV/Zzles="},{"type":"next-occurrence","id":"+B98xawk6uQBko1NWFZkzivBtWU="}],"description":"Crane operations on MASPETH AVE both directions between GRANDPARENTS AVE (New York) and OLIVE ST (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:16:43Z"},"road_event_id":"KzH5ySIeIUrx5chsdwZlxZw/cu0=","beginning_cross_street":"GRANDPARENTS AVE","ending_cross_street":"OLIVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93997,40.715814]]}},{"id":"+B98xawk6uQBko1NWFZkzivBtWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w1tRc8qT3NhxxLnVqBTKV/Zzles="},{"type":"next-occurrence","id":"KprCW9hYnUgPBWy5BMvmZUgweow="}],"description":"Crane operations on MASPETH AVE both directions between GRANDPARENTS AVE (New York) and OLIVE ST (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:16:43Z"},"road_event_id":"+B98xawk6uQBko1NWFZkzivBtWU=","beginning_cross_street":"GRANDPARENTS AVE","ending_cross_street":"OLIVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93997,40.715814]]}},{"id":"KprCW9hYnUgPBWy5BMvmZUgweow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w1tRc8qT3NhxxLnVqBTKV/Zzles="}],"description":"Crane operations on MASPETH AVE both directions between GRANDPARENTS AVE (New York) and OLIVE ST (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:16:43Z"},"road_event_id":"KprCW9hYnUgPBWy5BMvmZUgweow=","beginning_cross_street":"GRANDPARENTS AVE","ending_cross_street":"OLIVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93997,40.715814]]}},{"id":"a852B2xhhCGGiOYiM57bqJvmSeM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLIVE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cIpYoaKMeSxioF3TRs5yVQz+vJA="}],"description":"Crane operations on OLIVE ST northbound between ORIENT AVE (New York) and MASPETH AVE (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:21:21Z"},"road_event_id":"a852B2xhhCGGiOYiM57bqJvmSeM=","beginning_cross_street":"ORIENT AVE","ending_cross_street":"MASPETH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938727,40.715382]]}},{"id":"cIpYoaKMeSxioF3TRs5yVQz+vJA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLIVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a852B2xhhCGGiOYiM57bqJvmSeM="},{"type":"next-occurrence","id":"16Zo9baw7wZiC6TZdiLbI1b/39w="}],"description":"Crane operations on OLIVE ST northbound between ORIENT AVE (New York) and MASPETH AVE (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:21:21Z"},"road_event_id":"cIpYoaKMeSxioF3TRs5yVQz+vJA=","beginning_cross_street":"ORIENT AVE","ending_cross_street":"MASPETH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938727,40.715382]]}},{"id":"16Zo9baw7wZiC6TZdiLbI1b/39w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLIVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a852B2xhhCGGiOYiM57bqJvmSeM="},{"type":"next-occurrence","id":"Bfd4M+Q2vFhFLR+/iWJuIwGIjXk="}],"description":"Crane operations on OLIVE ST northbound between ORIENT AVE (New York) and MASPETH AVE (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:21:21Z"},"road_event_id":"16Zo9baw7wZiC6TZdiLbI1b/39w=","beginning_cross_street":"ORIENT AVE","ending_cross_street":"MASPETH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938727,40.715382]]}},{"id":"Bfd4M+Q2vFhFLR+/iWJuIwGIjXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLIVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a852B2xhhCGGiOYiM57bqJvmSeM="}],"description":"Crane operations on OLIVE ST northbound between ORIENT AVE (New York) and MASPETH AVE (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:21:21Z"},"road_event_id":"Bfd4M+Q2vFhFLR+/iWJuIwGIjXk=","beginning_cross_street":"ORIENT AVE","ending_cross_street":"MASPETH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938727,40.715382]]}},{"id":"9yqUUuEeBCnRZW7ivBdOobM3S50=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WhIwj05UsapUi0HnvLjyU4Wz9Kk="}],"description":"Crane operations on MASPETH AVE both directions between OLIVE ST (New York) and DEBEVOISE AVE (New York), Saturday March 21st, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 22nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:19:02Z"},"road_event_id":"9yqUUuEeBCnRZW7ivBdOobM3S50=","beginning_cross_street":"OLIVE ST","ending_cross_street":"DEBEVOISE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938928,40.716071]]}},{"id":"WhIwj05UsapUi0HnvLjyU4Wz9Kk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9yqUUuEeBCnRZW7ivBdOobM3S50="},{"type":"next-occurrence","id":"+ITZPB/GGeD+TYxDPI9Z3j4ak8c="}],"description":"Crane operations on MASPETH AVE both directions between OLIVE ST (New York) and DEBEVOISE AVE (New York), Saturday March 21st, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 22nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:19:02Z"},"road_event_id":"WhIwj05UsapUi0HnvLjyU4Wz9Kk=","beginning_cross_street":"OLIVE ST","ending_cross_street":"DEBEVOISE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938928,40.716071]]}},{"id":"+ITZPB/GGeD+TYxDPI9Z3j4ak8c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9yqUUuEeBCnRZW7ivBdOobM3S50="},{"type":"next-occurrence","id":"CR1P4f0LgCE+/J439pCHZK4K7Xg="}],"description":"Crane operations on MASPETH AVE both directions between OLIVE ST (New York) and DEBEVOISE AVE (New York), Saturday March 21st, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 22nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:19:02Z"},"road_event_id":"+ITZPB/GGeD+TYxDPI9Z3j4ak8c=","beginning_cross_street":"OLIVE ST","ending_cross_street":"DEBEVOISE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938928,40.716071]]}},{"id":"CR1P4f0LgCE+/J439pCHZK4K7Xg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9yqUUuEeBCnRZW7ivBdOobM3S50="}],"description":"Crane operations on MASPETH AVE both directions between OLIVE ST (New York) and DEBEVOISE AVE (New York), Saturday March 21st, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 22nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:19:02Z"},"road_event_id":"CR1P4f0LgCE+/J439pCHZK4K7Xg=","beginning_cross_street":"OLIVE ST","ending_cross_street":"DEBEVOISE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938928,40.716071]]}},{"id":"bMyn8RLDATZfjP1yPIsugGpBfFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEVINS RD"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation and deck work on BEVINS RD both directions FRENCH CREEK RD (Clayton) Bevins Road Bridge over French Creek is closed to all traffic until further notice, Continuous Wednesday November 19th, 2025 04:48 PM thru Monday November 30th, 2026 05:00 PM All lanes closed","update_date":"2025-11-19T21:53:47Z"},"road_event_id":"bMyn8RLDATZfjP1yPIsugGpBfFE=","beginning_cross_street":"FRENCH CREEK RD","ending_cross_street":"FRENCH CREEK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.134837,44.188614]]}},{"id":"7BiZMnAi2Mg+qwfYbtJcpp6z+Os=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9M10aVrfclsRBKbxJgAwl9Y835M="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"7BiZMnAi2Mg+qwfYbtJcpp6z+Os=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"9M10aVrfclsRBKbxJgAwl9Y835M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BiZMnAi2Mg+qwfYbtJcpp6z+Os="},{"type":"next-occurrence","id":"jEnRijcguUwSIrxYiyvuzUOZ2/U="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"9M10aVrfclsRBKbxJgAwl9Y835M=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"jEnRijcguUwSIrxYiyvuzUOZ2/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BiZMnAi2Mg+qwfYbtJcpp6z+Os="},{"type":"next-occurrence","id":"i+9SZ0NvOpT4oHj1MemcpVBRA0k="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"jEnRijcguUwSIrxYiyvuzUOZ2/U=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"i+9SZ0NvOpT4oHj1MemcpVBRA0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BiZMnAi2Mg+qwfYbtJcpp6z+Os="},{"type":"next-occurrence","id":"e+fncGfwFuvrIXVpVinF5oOg6dg="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"i+9SZ0NvOpT4oHj1MemcpVBRA0k=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"e+fncGfwFuvrIXVpVinF5oOg6dg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BiZMnAi2Mg+qwfYbtJcpp6z+Os="},{"type":"next-occurrence","id":"+oPAhqL40SGct3IwYdUscWL55/8="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"e+fncGfwFuvrIXVpVinF5oOg6dg=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"+oPAhqL40SGct3IwYdUscWL55/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BiZMnAi2Mg+qwfYbtJcpp6z+Os="},{"type":"next-occurrence","id":"6CoguNcwGJZpraIr7K+b0c87xSY="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"+oPAhqL40SGct3IwYdUscWL55/8=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"6CoguNcwGJZpraIr7K+b0c87xSY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BiZMnAi2Mg+qwfYbtJcpp6z+Os="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"6CoguNcwGJZpraIr7K+b0c87xSY=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"zi7xo75+hK94XBxzs+M3ZdtV4T4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"n2rda7JnzTBsicUGAgYbgg5Dx7Y="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-09T18:01:04Z"},"road_event_id":"zi7xo75+hK94XBxzs+M3ZdtV4T4=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"n2rda7JnzTBsicUGAgYbgg5Dx7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zi7xo75+hK94XBxzs+M3ZdtV4T4="},{"type":"next-occurrence","id":"+faHq8NiKCNrBmy52asSIhZV5Rw="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-09T18:01:04Z"},"road_event_id":"n2rda7JnzTBsicUGAgYbgg5Dx7Y=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"+faHq8NiKCNrBmy52asSIhZV5Rw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zi7xo75+hK94XBxzs+M3ZdtV4T4="},{"type":"next-occurrence","id":"+gaYz/HD9fZa8A5npFj2EL+vdbA="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-09T18:01:04Z"},"road_event_id":"+faHq8NiKCNrBmy52asSIhZV5Rw=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"+gaYz/HD9fZa8A5npFj2EL+vdbA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zi7xo75+hK94XBxzs+M3ZdtV4T4="},{"type":"next-occurrence","id":"8Arv4VTVOwCq8ll5mbiCQqah6Mw="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-09T18:01:04Z"},"road_event_id":"+gaYz/HD9fZa8A5npFj2EL+vdbA=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"8Arv4VTVOwCq8ll5mbiCQqah6Mw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zi7xo75+hK94XBxzs+M3ZdtV4T4="},{"type":"next-occurrence","id":"LgCmy3V5cj3ARSEorvzulhcs0fY="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-09T18:01:04Z"},"road_event_id":"8Arv4VTVOwCq8ll5mbiCQqah6Mw=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"LgCmy3V5cj3ARSEorvzulhcs0fY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zi7xo75+hK94XBxzs+M3ZdtV4T4="},{"type":"next-occurrence","id":"vjXdSOq/bwoRqi85ffhHswZW398="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-09T18:01:04Z"},"road_event_id":"LgCmy3V5cj3ARSEorvzulhcs0fY=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"vjXdSOq/bwoRqi85ffhHswZW398=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zi7xo75+hK94XBxzs+M3ZdtV4T4="},{"type":"next-occurrence","id":"+mIVutp1GtiV8kZSeY896h60RYs="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-09T18:01:04Z"},"road_event_id":"vjXdSOq/bwoRqi85ffhHswZW398=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"+mIVutp1GtiV8kZSeY896h60RYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zi7xo75+hK94XBxzs+M3ZdtV4T4="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-09T18:01:04Z"},"road_event_id":"+mIVutp1GtiV8kZSeY896h60RYs=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"8GBc1PU91cs1+I0A82XOSF76H+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRATFORD AVE"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on STRATFORD AVE both directions between FAIRFIELD AVE (Bridgeport) and KOSSUTH ST (Bridgeport) There will be lane shifts , Continuous Tuesday April 1st, 2025 09:00 AM thru Wednesday November 11th, 2026 11:59 PM All lanes open","update_date":"2025-01-23T15:49:57Z"},"road_event_id":"8GBc1PU91cs1+I0A82XOSF76H+Y=","beginning_cross_street":"FAIRFIELD AVE","ending_cross_street":"KOSSUTH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.187204,41.179664]]}},{"id":"5Mgp4ZDWoDtZJvpjjJEY9oZmAys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q0rS1DoFNkj5c6voOmCjIEaTNbY="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"5Mgp4ZDWoDtZJvpjjJEY9oZmAys=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"q0rS1DoFNkj5c6voOmCjIEaTNbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Mgp4ZDWoDtZJvpjjJEY9oZmAys="},{"type":"next-occurrence","id":"LddGfhkIgc695dfQsPgVUcgal9w="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"q0rS1DoFNkj5c6voOmCjIEaTNbY=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"LddGfhkIgc695dfQsPgVUcgal9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Mgp4ZDWoDtZJvpjjJEY9oZmAys="},{"type":"next-occurrence","id":"NxmEz6obFdF+PfncdVrELm/yeV0="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"LddGfhkIgc695dfQsPgVUcgal9w=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"NxmEz6obFdF+PfncdVrELm/yeV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Mgp4ZDWoDtZJvpjjJEY9oZmAys="},{"type":"next-occurrence","id":"T3TRIm3dPlv2v2HmL3AOYu1fUO0="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"NxmEz6obFdF+PfncdVrELm/yeV0=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T01:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"T3TRIm3dPlv2v2HmL3AOYu1fUO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Mgp4ZDWoDtZJvpjjJEY9oZmAys="},{"type":"next-occurrence","id":"foIKCpPo5AqIr3LdQc7LDQNi8k0="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"T3TRIm3dPlv2v2HmL3AOYu1fUO0=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T01:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"foIKCpPo5AqIr3LdQc7LDQNi8k0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Mgp4ZDWoDtZJvpjjJEY9oZmAys="},{"type":"next-occurrence","id":"aAvWy5gxs4RHauq6ZkARzOpKbxY="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"foIKCpPo5AqIr3LdQc7LDQNi8k0=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"aAvWy5gxs4RHauq6ZkARzOpKbxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Mgp4ZDWoDtZJvpjjJEY9oZmAys="},{"type":"next-occurrence","id":"cHJomRiZloa0znqj2N2vISHXyyU="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"aAvWy5gxs4RHauq6ZkARzOpKbxY=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T01:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"cHJomRiZloa0znqj2N2vISHXyyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Mgp4ZDWoDtZJvpjjJEY9oZmAys="},{"type":"next-occurrence","id":"cRj5fO90wLH3K/S0g+8GWbl5Hec="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"cHJomRiZloa0znqj2N2vISHXyyU=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T01:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"cRj5fO90wLH3K/S0g+8GWbl5Hec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Mgp4ZDWoDtZJvpjjJEY9oZmAys="},{"type":"next-occurrence","id":"w5yqU6i4ap3q6n7V7S2B6O1ZQWc="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"cRj5fO90wLH3K/S0g+8GWbl5Hec=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T01:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"w5yqU6i4ap3q6n7V7S2B6O1ZQWc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Mgp4ZDWoDtZJvpjjJEY9oZmAys="},{"type":"next-occurrence","id":"qww/i65nq4fyqgnlOK802MuXU30="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"w5yqU6i4ap3q6n7V7S2B6O1ZQWc=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T01:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"qww/i65nq4fyqgnlOK802MuXU30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Mgp4ZDWoDtZJvpjjJEY9oZmAys="},{"type":"next-occurrence","id":"T26Ec4lC9VbtyqNkxEXHyeVRFTc="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"qww/i65nq4fyqgnlOK802MuXU30=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T01:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"T26Ec4lC9VbtyqNkxEXHyeVRFTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Mgp4ZDWoDtZJvpjjJEY9oZmAys="},{"type":"next-occurrence","id":"BvWr/vcBwV736Nl9tckUug4vHCM="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"T26Ec4lC9VbtyqNkxEXHyeVRFTc=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T01:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"BvWr/vcBwV736Nl9tckUug4vHCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Mgp4ZDWoDtZJvpjjJEY9oZmAys="},{"type":"next-occurrence","id":"Lm0TGeCWKYongqBy+rhEzjgALVo="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"BvWr/vcBwV736Nl9tckUug4vHCM=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"Lm0TGeCWKYongqBy+rhEzjgALVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Mgp4ZDWoDtZJvpjjJEY9oZmAys="},{"type":"next-occurrence","id":"pAET1R6imbFUqR1BYbuFn7jDNDE="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"Lm0TGeCWKYongqBy+rhEzjgALVo=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T01:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"pAET1R6imbFUqR1BYbuFn7jDNDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Mgp4ZDWoDtZJvpjjJEY9oZmAys="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"pAET1R6imbFUqR1BYbuFn7jDNDE=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T01:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"WbBJQMg6HbrGWxh1eZkERGZ25tM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MLuddd8SGB0qSZQ3Cre/lx5O9II="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"WbBJQMg6HbrGWxh1eZkERGZ25tM=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"MLuddd8SGB0qSZQ3Cre/lx5O9II=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"9Gm7ZNPRME45KLfqOLSNkPFNDrE="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"MLuddd8SGB0qSZQ3Cre/lx5O9II=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"9Gm7ZNPRME45KLfqOLSNkPFNDrE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"4hEjrqp2hy+cL/5m0dad2UXWmUE="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"9Gm7ZNPRME45KLfqOLSNkPFNDrE=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"4hEjrqp2hy+cL/5m0dad2UXWmUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"iCyNI2b27Io6mJTH3cDWC6KMo0I="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"4hEjrqp2hy+cL/5m0dad2UXWmUE=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"iCyNI2b27Io6mJTH3cDWC6KMo0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"G0gMtOO++APXLKdaJevBJJNkWuY="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"iCyNI2b27Io6mJTH3cDWC6KMo0I=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"G0gMtOO++APXLKdaJevBJJNkWuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"mFbY4ko97t8wIX1Sq0XEhwD2L64="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"G0gMtOO++APXLKdaJevBJJNkWuY=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"mFbY4ko97t8wIX1Sq0XEhwD2L64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"fUn7c1aARMZw4KD79U354rX3KsQ="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"mFbY4ko97t8wIX1Sq0XEhwD2L64=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"fUn7c1aARMZw4KD79U354rX3KsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"6AaJOo70uixDD4sVNkL8/F2lFww="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"fUn7c1aARMZw4KD79U354rX3KsQ=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"6AaJOo70uixDD4sVNkL8/F2lFww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"qngcXyiS9/fmwyT0egQD2I3wa2I="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"6AaJOo70uixDD4sVNkL8/F2lFww=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"qngcXyiS9/fmwyT0egQD2I3wa2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"8whTlde09g2H7Iq9R2HELQRS0Tk="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"qngcXyiS9/fmwyT0egQD2I3wa2I=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"8whTlde09g2H7Iq9R2HELQRS0Tk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"76OirTBQRYYj+3KuWzeRQnNecQ8="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"8whTlde09g2H7Iq9R2HELQRS0Tk=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"76OirTBQRYYj+3KuWzeRQnNecQ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"S0bRvO0iE46PIoQOJ4+7G+aIUqM="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"76OirTBQRYYj+3KuWzeRQnNecQ8=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"S0bRvO0iE46PIoQOJ4+7G+aIUqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"S3ElHPKB4CknNjKhzb24T/UQmrc="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"S0bRvO0iE46PIoQOJ4+7G+aIUqM=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"S3ElHPKB4CknNjKhzb24T/UQmrc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"MKKbHRm4sE2TAvYcNEQKfKyuSV4="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"S3ElHPKB4CknNjKhzb24T/UQmrc=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"MKKbHRm4sE2TAvYcNEQKfKyuSV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"pbw70gc5EPTQp6LS4THfrgqzneA="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"MKKbHRm4sE2TAvYcNEQKfKyuSV4=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"pbw70gc5EPTQp6LS4THfrgqzneA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"gAmAK/0Eb8sgyq+Fp+FATTYfmOc="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"pbw70gc5EPTQp6LS4THfrgqzneA=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"gAmAK/0Eb8sgyq+Fp+FATTYfmOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"XsLmHJhZ07DGgmOnhRg/pUI3A5M="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"gAmAK/0Eb8sgyq+Fp+FATTYfmOc=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"XsLmHJhZ07DGgmOnhRg/pUI3A5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"pzVvmfY7KmTGmRF1Ev/4LVCovL4="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"XsLmHJhZ07DGgmOnhRg/pUI3A5M=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"pzVvmfY7KmTGmRF1Ev/4LVCovL4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"yVhUwIXuJTgpnbGXdCk5VSLLSak="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"pzVvmfY7KmTGmRF1Ev/4LVCovL4=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"yVhUwIXuJTgpnbGXdCk5VSLLSak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"KF778pKy2kPsPl1zqcHA2pB9irA="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"yVhUwIXuJTgpnbGXdCk5VSLLSak=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"KF778pKy2kPsPl1zqcHA2pB9irA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="},{"type":"next-occurrence","id":"2/F6TF5yR04DmrcgMXiHAuG6PF4="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"KF778pKy2kPsPl1zqcHA2pB9irA=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"2/F6TF5yR04DmrcgMXiHAuG6PF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WbBJQMg6HbrGWxh1eZkERGZ25tM="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"2/F6TF5yR04DmrcgMXiHAuG6PF4=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"uNWhV6IUryCysO3QU9d1akB2ZpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"76fmI5I0QDfDh5AtQ+Z7dUCfpQE="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"uNWhV6IUryCysO3QU9d1akB2ZpE=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"76fmI5I0QDfDh5AtQ+Z7dUCfpQE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"RKYcxb5x57D0ilKdSZZRQCkrNV4="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"76fmI5I0QDfDh5AtQ+Z7dUCfpQE=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"RKYcxb5x57D0ilKdSZZRQCkrNV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"ko6+9gyd5Lhrzj2bQLe4by1/VZE="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"RKYcxb5x57D0ilKdSZZRQCkrNV4=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"ko6+9gyd5Lhrzj2bQLe4by1/VZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"OjowbON/eEWonM9EeMSQcolRikE="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"ko6+9gyd5Lhrzj2bQLe4by1/VZE=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"OjowbON/eEWonM9EeMSQcolRikE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"2d32om0lRMEUlRxFhEU7cULn5c0="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"OjowbON/eEWonM9EeMSQcolRikE=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"2d32om0lRMEUlRxFhEU7cULn5c0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"4KsIjeGlB7RVxypblUV1mw3EuS0="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"2d32om0lRMEUlRxFhEU7cULn5c0=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"4KsIjeGlB7RVxypblUV1mw3EuS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"6eq26ZCEnuGcQQL0SXlS8FXtosM="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"4KsIjeGlB7RVxypblUV1mw3EuS0=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"6eq26ZCEnuGcQQL0SXlS8FXtosM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"gyzot2EHQSkhDczLsc6tTmm1gSo="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"6eq26ZCEnuGcQQL0SXlS8FXtosM=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"gyzot2EHQSkhDczLsc6tTmm1gSo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"KGZ3EZ4+/mcfYMk9djnRXlLRGYI="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"gyzot2EHQSkhDczLsc6tTmm1gSo=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"KGZ3EZ4+/mcfYMk9djnRXlLRGYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"aPV9kvCYAw2gIZ5GrpkvxVNwU+w="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"KGZ3EZ4+/mcfYMk9djnRXlLRGYI=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"aPV9kvCYAw2gIZ5GrpkvxVNwU+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"twwtgqDli4tO0jkV72fDoOmyV6s="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"aPV9kvCYAw2gIZ5GrpkvxVNwU+w=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"twwtgqDli4tO0jkV72fDoOmyV6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"enBhLH3JKP2r4LpiAPJOGyQb3t8="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"twwtgqDli4tO0jkV72fDoOmyV6s=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"enBhLH3JKP2r4LpiAPJOGyQb3t8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"Y8RIWC1ZwTLj4BO+483IaIPvZoA="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"enBhLH3JKP2r4LpiAPJOGyQb3t8=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"Y8RIWC1ZwTLj4BO+483IaIPvZoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"dxpfGfYZ3xScWhr2kIWdoN92Okw="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"Y8RIWC1ZwTLj4BO+483IaIPvZoA=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"dxpfGfYZ3xScWhr2kIWdoN92Okw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"FjQ0TllUgJl8ML/DVw+cZR9KNcU="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"dxpfGfYZ3xScWhr2kIWdoN92Okw=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"FjQ0TllUgJl8ML/DVw+cZR9KNcU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"UIOdCCnjCBuOtPxyqq+sEcjBnmM="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"FjQ0TllUgJl8ML/DVw+cZR9KNcU=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"UIOdCCnjCBuOtPxyqq+sEcjBnmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"N8A30xLiIssGCwq3qwmqDKoLJkQ="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"UIOdCCnjCBuOtPxyqq+sEcjBnmM=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"N8A30xLiIssGCwq3qwmqDKoLJkQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"sTDeXaRby6o0/Vrx+poUgIlSAWo="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"N8A30xLiIssGCwq3qwmqDKoLJkQ=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"sTDeXaRby6o0/Vrx+poUgIlSAWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"P7pFWDv/7XoClpXP1z7R9FoWil0="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"sTDeXaRby6o0/Vrx+poUgIlSAWo=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"P7pFWDv/7XoClpXP1z7R9FoWil0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"sAo707Xg2azjQ/QQD3lu2YPQtko="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"P7pFWDv/7XoClpXP1z7R9FoWil0=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"sAo707Xg2azjQ/QQD3lu2YPQtko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="},{"type":"next-occurrence","id":"2jV0gpMhp1yU3CE6HX5+H5+Pe+I="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"sAo707Xg2azjQ/QQD3lu2YPQtko=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"2jV0gpMhp1yU3CE6HX5+H5+Pe+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uNWhV6IUryCysO3QU9d1akB2ZpE="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"2jV0gpMhp1yU3CE6HX5+H5+Pe+I=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rZKL3o8XqedUtoqh96C4sjM2WNY="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"rZKL3o8XqedUtoqh96C4sjM2WNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"TtEWS7vILgntt0PrMCkRAOeToLc="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"rZKL3o8XqedUtoqh96C4sjM2WNY=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"TtEWS7vILgntt0PrMCkRAOeToLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"UowZ3cN/ujm1KLYRdlcrMHsfmDU="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"TtEWS7vILgntt0PrMCkRAOeToLc=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"UowZ3cN/ujm1KLYRdlcrMHsfmDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"g+XkmbVRsoYx03KRMJ/Tbh+6fmE="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"UowZ3cN/ujm1KLYRdlcrMHsfmDU=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"g+XkmbVRsoYx03KRMJ/Tbh+6fmE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"8HUGjwgqqTDKu2K86rEABgcyOpM="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"g+XkmbVRsoYx03KRMJ/Tbh+6fmE=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"8HUGjwgqqTDKu2K86rEABgcyOpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"H6eN7QWgb/D62GRcDpqxU9LQOqI="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"8HUGjwgqqTDKu2K86rEABgcyOpM=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"H6eN7QWgb/D62GRcDpqxU9LQOqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"IZQbNRTuwsBm5+sNi+2+pSqTgME="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"H6eN7QWgb/D62GRcDpqxU9LQOqI=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"IZQbNRTuwsBm5+sNi+2+pSqTgME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"O+8B7K+Q2N6/mkpQPZmx0m6YP1I="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"IZQbNRTuwsBm5+sNi+2+pSqTgME=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"O+8B7K+Q2N6/mkpQPZmx0m6YP1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"ndCouRpTnB5VR+SjMloV9MkUTWU="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"O+8B7K+Q2N6/mkpQPZmx0m6YP1I=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"ndCouRpTnB5VR+SjMloV9MkUTWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"bWbUPhC+Np2R5zTfhMq714J55WU="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"ndCouRpTnB5VR+SjMloV9MkUTWU=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"bWbUPhC+Np2R5zTfhMq714J55WU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"ulba27P6lWRZrYxS9MYMtzYkV4E="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"bWbUPhC+Np2R5zTfhMq714J55WU=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"ulba27P6lWRZrYxS9MYMtzYkV4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"ttLIwEA56XdvzPDyHUTwARrN/LM="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"ulba27P6lWRZrYxS9MYMtzYkV4E=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"ttLIwEA56XdvzPDyHUTwARrN/LM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"HgilzFTJ4hhQ4+JCC05oRHQfpWk="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"ttLIwEA56XdvzPDyHUTwARrN/LM=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"HgilzFTJ4hhQ4+JCC05oRHQfpWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"4hrcE33X7t+Z4wsjA289ZsqD43w="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"HgilzFTJ4hhQ4+JCC05oRHQfpWk=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"4hrcE33X7t+Z4wsjA289ZsqD43w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"xi8Jb/2fKTjNpa70xpaUcEOsyRs="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"4hrcE33X7t+Z4wsjA289ZsqD43w=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"xi8Jb/2fKTjNpa70xpaUcEOsyRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"pgr+SYnaoN2Uppt/aG5KkZLTjgs="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"xi8Jb/2fKTjNpa70xpaUcEOsyRs=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"pgr+SYnaoN2Uppt/aG5KkZLTjgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"nXKy6QHE+iAULdbjQyfLHz6GkGo="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"pgr+SYnaoN2Uppt/aG5KkZLTjgs=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"nXKy6QHE+iAULdbjQyfLHz6GkGo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"iJN5Jm+64fkow7Y5HZk31OSxHIw="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"nXKy6QHE+iAULdbjQyfLHz6GkGo=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"iJN5Jm+64fkow7Y5HZk31OSxHIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"ABUGTpr78eMqFvmnXsElRtg9IHw="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"iJN5Jm+64fkow7Y5HZk31OSxHIw=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"ABUGTpr78eMqFvmnXsElRtg9IHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"QFRdXcV560VO8M65aam/BL8Ln3E="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"ABUGTpr78eMqFvmnXsElRtg9IHw=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"QFRdXcV560VO8M65aam/BL8Ln3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="},{"type":"next-occurrence","id":"GlWxM+urdm9OWlpgW996m2sHjlM="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"QFRdXcV560VO8M65aam/BL8Ln3E=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"GlWxM+urdm9OWlpgW996m2sHjlM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZxuXxp7IuRs2Nv9sxaLIdnOuaXk="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"GlWxM+urdm9OWlpgW996m2sHjlM=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"U6jsNniog0aM4seVfbNyvjONup0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rlz4E4ggtrz6xxv2ChjrLDENVcs="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"U6jsNniog0aM4seVfbNyvjONup0=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"rlz4E4ggtrz6xxv2ChjrLDENVcs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6jsNniog0aM4seVfbNyvjONup0="},{"type":"next-occurrence","id":"2a+dHQYgBTORoPfpzsJxSeYf11I="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"rlz4E4ggtrz6xxv2ChjrLDENVcs=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"2a+dHQYgBTORoPfpzsJxSeYf11I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6jsNniog0aM4seVfbNyvjONup0="},{"type":"next-occurrence","id":"KNn4Gv8k0IP61M5GcQyI9o88WIU="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"2a+dHQYgBTORoPfpzsJxSeYf11I=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"KNn4Gv8k0IP61M5GcQyI9o88WIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6jsNniog0aM4seVfbNyvjONup0="},{"type":"next-occurrence","id":"r7vgW6IEhsLvcOxtau8qBILtwUI="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"KNn4Gv8k0IP61M5GcQyI9o88WIU=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T01:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"r7vgW6IEhsLvcOxtau8qBILtwUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6jsNniog0aM4seVfbNyvjONup0="},{"type":"next-occurrence","id":"Vpp3XlqFWFfHOIgUG45CU1+kMNQ="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"r7vgW6IEhsLvcOxtau8qBILtwUI=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T01:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"Vpp3XlqFWFfHOIgUG45CU1+kMNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6jsNniog0aM4seVfbNyvjONup0="},{"type":"next-occurrence","id":"c995B1FZ/RHBlUKjGZYcqMZqPks="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"Vpp3XlqFWFfHOIgUG45CU1+kMNQ=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"c995B1FZ/RHBlUKjGZYcqMZqPks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6jsNniog0aM4seVfbNyvjONup0="},{"type":"next-occurrence","id":"/TbGJgXLxlvfDvjgHSqnuH+wqJs="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"c995B1FZ/RHBlUKjGZYcqMZqPks=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T01:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"/TbGJgXLxlvfDvjgHSqnuH+wqJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6jsNniog0aM4seVfbNyvjONup0="},{"type":"next-occurrence","id":"AoXkexPvySWWzlyaECjSqOeavzw="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"/TbGJgXLxlvfDvjgHSqnuH+wqJs=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T01:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"AoXkexPvySWWzlyaECjSqOeavzw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6jsNniog0aM4seVfbNyvjONup0="},{"type":"next-occurrence","id":"C1SH66pAQvO50uTIObThfBh7xlI="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"AoXkexPvySWWzlyaECjSqOeavzw=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T01:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"C1SH66pAQvO50uTIObThfBh7xlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6jsNniog0aM4seVfbNyvjONup0="},{"type":"next-occurrence","id":"R4I6pG/77AyhbzirhY/4ui3juvE="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"C1SH66pAQvO50uTIObThfBh7xlI=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T01:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"R4I6pG/77AyhbzirhY/4ui3juvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6jsNniog0aM4seVfbNyvjONup0="},{"type":"next-occurrence","id":"FrOTJ/ROodw/SUHpGYQod7YwvAk="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"R4I6pG/77AyhbzirhY/4ui3juvE=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T01:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"FrOTJ/ROodw/SUHpGYQod7YwvAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6jsNniog0aM4seVfbNyvjONup0="},{"type":"next-occurrence","id":"GIg8WcoKzGiaKZCmZs+lqnb4psU="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"FrOTJ/ROodw/SUHpGYQod7YwvAk=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T01:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"GIg8WcoKzGiaKZCmZs+lqnb4psU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6jsNniog0aM4seVfbNyvjONup0="},{"type":"next-occurrence","id":"3H2zkYcxtbMrr/kP/RP5TPtYuys="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"GIg8WcoKzGiaKZCmZs+lqnb4psU=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"3H2zkYcxtbMrr/kP/RP5TPtYuys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6jsNniog0aM4seVfbNyvjONup0="},{"type":"next-occurrence","id":"AcOYiSaix8n0MLBmWqqUq4CZAcY="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"3H2zkYcxtbMrr/kP/RP5TPtYuys=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T01:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"AcOYiSaix8n0MLBmWqqUq4CZAcY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6jsNniog0aM4seVfbNyvjONup0="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"AcOYiSaix8n0MLBmWqqUq4CZAcY=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T01:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"QChBKIkSNkljEA3Lh0zJxMsaYf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5Ke2bnuXfywjSH9U7RTAlP8jKqk="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"QChBKIkSNkljEA3Lh0zJxMsaYf4=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"5Ke2bnuXfywjSH9U7RTAlP8jKqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QChBKIkSNkljEA3Lh0zJxMsaYf4="},{"type":"next-occurrence","id":"ZM9KYS+eqLbPUOkNPXkqvLe6btg="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"5Ke2bnuXfywjSH9U7RTAlP8jKqk=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"ZM9KYS+eqLbPUOkNPXkqvLe6btg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QChBKIkSNkljEA3Lh0zJxMsaYf4="},{"type":"next-occurrence","id":"d6PmXXrp3LcjjMoa/bXJ4HFYRzc="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"ZM9KYS+eqLbPUOkNPXkqvLe6btg=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"d6PmXXrp3LcjjMoa/bXJ4HFYRzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QChBKIkSNkljEA3Lh0zJxMsaYf4="},{"type":"next-occurrence","id":"6WHJalHMBFUYQCTazeFYloNLglk="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"d6PmXXrp3LcjjMoa/bXJ4HFYRzc=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T01:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"6WHJalHMBFUYQCTazeFYloNLglk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QChBKIkSNkljEA3Lh0zJxMsaYf4="},{"type":"next-occurrence","id":"xOgFS7i9zSerLwkQSPZyo1IFaGs="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"6WHJalHMBFUYQCTazeFYloNLglk=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T01:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"xOgFS7i9zSerLwkQSPZyo1IFaGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QChBKIkSNkljEA3Lh0zJxMsaYf4="},{"type":"next-occurrence","id":"I1BK5OiQup0Mj1gypaVb0EN/vTU="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"xOgFS7i9zSerLwkQSPZyo1IFaGs=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"I1BK5OiQup0Mj1gypaVb0EN/vTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QChBKIkSNkljEA3Lh0zJxMsaYf4="},{"type":"next-occurrence","id":"pIYH3zFG8TVmgMjzdYA3tGIzHEg="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"I1BK5OiQup0Mj1gypaVb0EN/vTU=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T01:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"pIYH3zFG8TVmgMjzdYA3tGIzHEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QChBKIkSNkljEA3Lh0zJxMsaYf4="},{"type":"next-occurrence","id":"+h1RT1y0MLuzj9XXMtKACKYdY8c="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"pIYH3zFG8TVmgMjzdYA3tGIzHEg=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T01:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"+h1RT1y0MLuzj9XXMtKACKYdY8c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QChBKIkSNkljEA3Lh0zJxMsaYf4="},{"type":"next-occurrence","id":"psnnCR8R3atydoQoBs56ISIifM8="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"+h1RT1y0MLuzj9XXMtKACKYdY8c=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T01:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"psnnCR8R3atydoQoBs56ISIifM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QChBKIkSNkljEA3Lh0zJxMsaYf4="},{"type":"next-occurrence","id":"UZMkrJ5W9Qk5+ILe4uGfS6aSDU8="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"psnnCR8R3atydoQoBs56ISIifM8=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T01:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"UZMkrJ5W9Qk5+ILe4uGfS6aSDU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QChBKIkSNkljEA3Lh0zJxMsaYf4="},{"type":"next-occurrence","id":"FZs1yY+TXxol0OyY2j/GLr5qBf4="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"UZMkrJ5W9Qk5+ILe4uGfS6aSDU8=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T01:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"FZs1yY+TXxol0OyY2j/GLr5qBf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QChBKIkSNkljEA3Lh0zJxMsaYf4="},{"type":"next-occurrence","id":"YVx/HwCwJGLMCMhnp+tbMujwuKU="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"FZs1yY+TXxol0OyY2j/GLr5qBf4=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T01:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"YVx/HwCwJGLMCMhnp+tbMujwuKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QChBKIkSNkljEA3Lh0zJxMsaYf4="},{"type":"next-occurrence","id":"PTD62hPKi9UHMGNJy6PMEh9TWBU="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"YVx/HwCwJGLMCMhnp+tbMujwuKU=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"PTD62hPKi9UHMGNJy6PMEh9TWBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QChBKIkSNkljEA3Lh0zJxMsaYf4="},{"type":"next-occurrence","id":"rPiGKfvALfLdHUvTExX3sTyUO0w="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"PTD62hPKi9UHMGNJy6PMEh9TWBU=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T01:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"rPiGKfvALfLdHUvTExX3sTyUO0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QChBKIkSNkljEA3Lh0zJxMsaYf4="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"rPiGKfvALfLdHUvTExX3sTyUO0w=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T01:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"GPZfSFr5vly/7YM473lzAfJkOew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iaPFcGxZBKdk/4VDNuTkkT7nfH4="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"GPZfSFr5vly/7YM473lzAfJkOew=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"iaPFcGxZBKdk/4VDNuTkkT7nfH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GPZfSFr5vly/7YM473lzAfJkOew="},{"type":"next-occurrence","id":"A/NiNs8ajoq5bSk/T7Z336Mc2/8="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"iaPFcGxZBKdk/4VDNuTkkT7nfH4=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"A/NiNs8ajoq5bSk/T7Z336Mc2/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GPZfSFr5vly/7YM473lzAfJkOew="},{"type":"next-occurrence","id":"kpHF3L44oLcwZ87Uw7C31ewohf8="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"A/NiNs8ajoq5bSk/T7Z336Mc2/8=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"kpHF3L44oLcwZ87Uw7C31ewohf8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GPZfSFr5vly/7YM473lzAfJkOew="},{"type":"next-occurrence","id":"qUdGIfaIEfMY8G5bF5PkLlxifVE="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"kpHF3L44oLcwZ87Uw7C31ewohf8=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T01:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"qUdGIfaIEfMY8G5bF5PkLlxifVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GPZfSFr5vly/7YM473lzAfJkOew="},{"type":"next-occurrence","id":"VKleaqUnvN2wCRX63tKqoL4iCuY="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"qUdGIfaIEfMY8G5bF5PkLlxifVE=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T01:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"VKleaqUnvN2wCRX63tKqoL4iCuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GPZfSFr5vly/7YM473lzAfJkOew="},{"type":"next-occurrence","id":"wgDt5cMGYAYc5wLRgb3W9753WRE="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"VKleaqUnvN2wCRX63tKqoL4iCuY=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"wgDt5cMGYAYc5wLRgb3W9753WRE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GPZfSFr5vly/7YM473lzAfJkOew="},{"type":"next-occurrence","id":"fl28U5A0PgV9oxbAXIDBLG+YLOM="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"wgDt5cMGYAYc5wLRgb3W9753WRE=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T01:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"fl28U5A0PgV9oxbAXIDBLG+YLOM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GPZfSFr5vly/7YM473lzAfJkOew="},{"type":"next-occurrence","id":"Z4PDEmNpwGIT+a/7lS22YWvyWPw="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"fl28U5A0PgV9oxbAXIDBLG+YLOM=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T01:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"Z4PDEmNpwGIT+a/7lS22YWvyWPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GPZfSFr5vly/7YM473lzAfJkOew="},{"type":"next-occurrence","id":"IszSvEdD9AGJdpKVjh3P/z9gGlY="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"Z4PDEmNpwGIT+a/7lS22YWvyWPw=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T01:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"IszSvEdD9AGJdpKVjh3P/z9gGlY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GPZfSFr5vly/7YM473lzAfJkOew="},{"type":"next-occurrence","id":"UUtnv23m2T3VqiqXlHwflB5JWNw="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"IszSvEdD9AGJdpKVjh3P/z9gGlY=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T01:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"UUtnv23m2T3VqiqXlHwflB5JWNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GPZfSFr5vly/7YM473lzAfJkOew="},{"type":"next-occurrence","id":"s08PwLkVMvY7Ff4SiFayMEXVZl0="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"UUtnv23m2T3VqiqXlHwflB5JWNw=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T01:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"s08PwLkVMvY7Ff4SiFayMEXVZl0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GPZfSFr5vly/7YM473lzAfJkOew="},{"type":"next-occurrence","id":"RxwnsZe6EZ7uEmUnyErw0CGVxd0="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"s08PwLkVMvY7Ff4SiFayMEXVZl0=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T01:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"RxwnsZe6EZ7uEmUnyErw0CGVxd0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GPZfSFr5vly/7YM473lzAfJkOew="},{"type":"next-occurrence","id":"RxxnnGWEl0XwMFsE/S/pd05KDK4="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"RxwnsZe6EZ7uEmUnyErw0CGVxd0=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"RxxnnGWEl0XwMFsE/S/pd05KDK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GPZfSFr5vly/7YM473lzAfJkOew="},{"type":"next-occurrence","id":"Y1GUdrcqcuT6MXyr/xYXxvSKjX8="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"RxxnnGWEl0XwMFsE/S/pd05KDK4=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T01:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"Y1GUdrcqcuT6MXyr/xYXxvSKjX8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GPZfSFr5vly/7YM473lzAfJkOew="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"Y1GUdrcqcuT6MXyr/xYXxvSKjX8=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T01:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"dC/laIevBYNtZYW8y1JeFPQaasM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 310"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs and reconstruction on NY 310 both directions Ellis Road (Canton) to Morley Potsdam Road (Canton) Rte. 310 over tributary to Nettle Creek is now open to alternating one-way traffic. Traffic is being controlled by a temporary signal. Additional work at the site will be completed once the weather is more favorable. , Continuous Monday November 10th, 2025 12:00 AM thru Friday May 29th, 2026 11:59 PM All lanes open","update_date":"2026-04-07T15:59:54Z"},"road_event_id":"dC/laIevBYNtZYW8y1JeFPQaasM=","beginning_cross_street":"Ellis Road","ending_cross_street":"Morley Potsdam Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.149518,44.659017]]}},{"id":"+3FV8zDoVYkbP62n28rJ9i+cgT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KRYvm2xBtiychDFylYN40jyMsjQ="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"+3FV8zDoVYkbP62n28rJ9i+cgT0=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"KRYvm2xBtiychDFylYN40jyMsjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+3FV8zDoVYkbP62n28rJ9i+cgT0="},{"type":"next-occurrence","id":"mgHz5CUwOdrMtUd6IS119+CsuaE="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"KRYvm2xBtiychDFylYN40jyMsjQ=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"mgHz5CUwOdrMtUd6IS119+CsuaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+3FV8zDoVYkbP62n28rJ9i+cgT0="},{"type":"next-occurrence","id":"fcGAWjurpH0652jI5MSrWHKM7U4="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"mgHz5CUwOdrMtUd6IS119+CsuaE=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"fcGAWjurpH0652jI5MSrWHKM7U4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+3FV8zDoVYkbP62n28rJ9i+cgT0="},{"type":"next-occurrence","id":"iv7p3jwHyUbUFXJO2qtkuAj7qcQ="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"fcGAWjurpH0652jI5MSrWHKM7U4=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"iv7p3jwHyUbUFXJO2qtkuAj7qcQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+3FV8zDoVYkbP62n28rJ9i+cgT0="},{"type":"next-occurrence","id":"c4Dpv/zY929tIlenvoKDppIALgo="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"iv7p3jwHyUbUFXJO2qtkuAj7qcQ=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"c4Dpv/zY929tIlenvoKDppIALgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+3FV8zDoVYkbP62n28rJ9i+cgT0="},{"type":"next-occurrence","id":"jeP4uz6IDp+6iSTiebuKQX44RWg="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"c4Dpv/zY929tIlenvoKDppIALgo=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"jeP4uz6IDp+6iSTiebuKQX44RWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+3FV8zDoVYkbP62n28rJ9i+cgT0="},{"type":"next-occurrence","id":"1Iasm40AWiglyHBROCE+kivgNIE="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"jeP4uz6IDp+6iSTiebuKQX44RWg=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"1Iasm40AWiglyHBROCE+kivgNIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+3FV8zDoVYkbP62n28rJ9i+cgT0="},{"type":"next-occurrence","id":"BdNjvGo3e85A/xmUyNarPdtf6Uc="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"1Iasm40AWiglyHBROCE+kivgNIE=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"BdNjvGo3e85A/xmUyNarPdtf6Uc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+3FV8zDoVYkbP62n28rJ9i+cgT0="},{"type":"next-occurrence","id":"U1/whvtB75RWRv8dy/bDlQ14kzM="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"BdNjvGo3e85A/xmUyNarPdtf6Uc=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"U1/whvtB75RWRv8dy/bDlQ14kzM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+3FV8zDoVYkbP62n28rJ9i+cgT0="},{"type":"next-occurrence","id":"mVa22/zjof2UolzCSCh9iGLmnJM="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"U1/whvtB75RWRv8dy/bDlQ14kzM=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T22:00:00Z","end_date":"2026-05-24T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"mVa22/zjof2UolzCSCh9iGLmnJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+3FV8zDoVYkbP62n28rJ9i+cgT0="},{"type":"next-occurrence","id":"rQSBHAk07DSwYPIHLZzCAKLgoXo="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"mVa22/zjof2UolzCSCh9iGLmnJM=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"rQSBHAk07DSwYPIHLZzCAKLgoXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+3FV8zDoVYkbP62n28rJ9i+cgT0="},{"type":"next-occurrence","id":"XsUZfVpPu7Rt4XKHlDxHJoDemb8="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"rQSBHAk07DSwYPIHLZzCAKLgoXo=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"XsUZfVpPu7Rt4XKHlDxHJoDemb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+3FV8zDoVYkbP62n28rJ9i+cgT0="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"XsUZfVpPu7Rt4XKHlDxHJoDemb8=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"B1Ndk5yu2sGR4XxJcX5CPivtorQ="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"B1Ndk5yu2sGR4XxJcX5CPivtorQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"RSSak9UuUa/KByhpSpUIpxujucc="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"B1Ndk5yu2sGR4XxJcX5CPivtorQ=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"RSSak9UuUa/KByhpSpUIpxujucc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"Q6fIdgLJ/48BEKeZSY1yD/Mc2OU="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"RSSak9UuUa/KByhpSpUIpxujucc=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"Q6fIdgLJ/48BEKeZSY1yD/Mc2OU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"gsVJPuarxwUD8MpkRW7jniayZg0="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"Q6fIdgLJ/48BEKeZSY1yD/Mc2OU=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"gsVJPuarxwUD8MpkRW7jniayZg0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"S10LRDZhPVTObtIPingmDPpMlLA="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"gsVJPuarxwUD8MpkRW7jniayZg0=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"S10LRDZhPVTObtIPingmDPpMlLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"ZpoANO+lDm5ol4i3ZmlTDfZWV0w="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"S10LRDZhPVTObtIPingmDPpMlLA=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"ZpoANO+lDm5ol4i3ZmlTDfZWV0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"5F6gtObVmbg+8Rucxao/jF09RQM="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"ZpoANO+lDm5ol4i3ZmlTDfZWV0w=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"5F6gtObVmbg+8Rucxao/jF09RQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"fPeLIvlgu+LvFP++b451NyE7/Ao="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"5F6gtObVmbg+8Rucxao/jF09RQM=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"fPeLIvlgu+LvFP++b451NyE7/Ao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"tNuRANoDmhltRurAsJFwwdry8VE="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"fPeLIvlgu+LvFP++b451NyE7/Ao=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"tNuRANoDmhltRurAsJFwwdry8VE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"Tq7ju0QcCiSuqp5ZLpYZwGVE1zo="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"tNuRANoDmhltRurAsJFwwdry8VE=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"Tq7ju0QcCiSuqp5ZLpYZwGVE1zo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"t/sTtK3UsfmlUE2GhqQF3ph5YI8="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"Tq7ju0QcCiSuqp5ZLpYZwGVE1zo=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"t/sTtK3UsfmlUE2GhqQF3ph5YI8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"mgeZcEa6EUQ9DbF3oqjNgH4F5Vc="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"t/sTtK3UsfmlUE2GhqQF3ph5YI8=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"mgeZcEa6EUQ9DbF3oqjNgH4F5Vc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"NJQJjc8NVkCB99OqcHVBWY6chuw="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"mgeZcEa6EUQ9DbF3oqjNgH4F5Vc=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"NJQJjc8NVkCB99OqcHVBWY6chuw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"Q920gfP1fbtM1zq0hczSfHPqXgA="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"NJQJjc8NVkCB99OqcHVBWY6chuw=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"Q920gfP1fbtM1zq0hczSfHPqXgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"hMGWU7D+T0eAF6o1vqTJr6gnWRk="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"Q920gfP1fbtM1zq0hczSfHPqXgA=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"hMGWU7D+T0eAF6o1vqTJr6gnWRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"8oTpkL0Ib4SK53vd9+SxMbumRKo="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"hMGWU7D+T0eAF6o1vqTJr6gnWRk=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"8oTpkL0Ib4SK53vd9+SxMbumRKo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"VFVOLz3pmmn0ezMZ7S2cn2QMhVw="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"8oTpkL0Ib4SK53vd9+SxMbumRKo=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"VFVOLz3pmmn0ezMZ7S2cn2QMhVw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"jKwh6vBZIvmvXpbp1WJBaKza2xA="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"VFVOLz3pmmn0ezMZ7S2cn2QMhVw=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T22:00:00Z","end_date":"2026-05-24T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"jKwh6vBZIvmvXpbp1WJBaKza2xA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"xzsNvJPnlQQNFiuu0orGrxTFkLw="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"jKwh6vBZIvmvXpbp1WJBaKza2xA=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"xzsNvJPnlQQNFiuu0orGrxTFkLw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"XcTvkDLX9jV0b2ZzBafu6gZWt8U="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"xzsNvJPnlQQNFiuu0orGrxTFkLw=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"XcTvkDLX9jV0b2ZzBafu6gZWt8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"/uk3Mvm9FsdYEaR8KU33/i8SkIc="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"XcTvkDLX9jV0b2ZzBafu6gZWt8U=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"/uk3Mvm9FsdYEaR8KU33/i8SkIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"sfrLTc77K5JMXs9XB1U+jB3vlnE="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"/uk3Mvm9FsdYEaR8KU33/i8SkIc=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"sfrLTc77K5JMXs9XB1U+jB3vlnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="},{"type":"next-occurrence","id":"IQL3RVMHqu45L5wh3v5tjm91JYg="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"sfrLTc77K5JMXs9XB1U+jB3vlnE=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"IQL3RVMHqu45L5wh3v5tjm91JYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iR7MYP6fyN6pu4ZOYfUNQxgFyzE="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"IQL3RVMHqu45L5wh3v5tjm91JYg=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bBlhY3pzmajPldexSGs2HpQDJXs="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"bBlhY3pzmajPldexSGs2HpQDJXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"xCVD2HzZh9BJ4+7XZDrizadUOKw="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"bBlhY3pzmajPldexSGs2HpQDJXs=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"xCVD2HzZh9BJ4+7XZDrizadUOKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"xx6+Bq1rVNDBA9/eYsHcN235cjU="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"xCVD2HzZh9BJ4+7XZDrizadUOKw=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"xx6+Bq1rVNDBA9/eYsHcN235cjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"X+ZsC49ucYlZ84KkRNFVMdN9+TQ="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"xx6+Bq1rVNDBA9/eYsHcN235cjU=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"X+ZsC49ucYlZ84KkRNFVMdN9+TQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"FgSq3N23+iryvHGCRnVcLe2r5oY="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"X+ZsC49ucYlZ84KkRNFVMdN9+TQ=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"FgSq3N23+iryvHGCRnVcLe2r5oY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"YAvWDvneCZ83G/ImQK8WAUhF8vA="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"FgSq3N23+iryvHGCRnVcLe2r5oY=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"YAvWDvneCZ83G/ImQK8WAUhF8vA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"FJa6mZuuz/qPcM1WGqU876fGuNA="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"YAvWDvneCZ83G/ImQK8WAUhF8vA=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T23:00:00Z","end_date":"2026-05-17T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"FJa6mZuuz/qPcM1WGqU876fGuNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"SjZYmuz4co8c/VvLCSzQq/ClAgA="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"FJa6mZuuz/qPcM1WGqU876fGuNA=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"SjZYmuz4co8c/VvLCSzQq/ClAgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"ykJSsy+jVSFFgQvk4VnehOlRY6Q="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"SjZYmuz4co8c/VvLCSzQq/ClAgA=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"ykJSsy+jVSFFgQvk4VnehOlRY6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"RKTkIa9y18aGxuHijIRcGFIBZk0="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"ykJSsy+jVSFFgQvk4VnehOlRY6Q=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"RKTkIa9y18aGxuHijIRcGFIBZk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"b/M4l/4ompP9fbRv2mQoBRWUCAg="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"RKTkIa9y18aGxuHijIRcGFIBZk0=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"b/M4l/4ompP9fbRv2mQoBRWUCAg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"6UlIPjUGnaoc75q61HKD4eB1fc0="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"b/M4l/4ompP9fbRv2mQoBRWUCAg=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"6UlIPjUGnaoc75q61HKD4eB1fc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"QG/f2auZIo1Nfi23jQIE0QNnN6Y="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"6UlIPjUGnaoc75q61HKD4eB1fc0=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"QG/f2auZIo1Nfi23jQIE0QNnN6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"w1oHrKINE+fR3AzOx31zYsT/eRw="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"QG/f2auZIo1Nfi23jQIE0QNnN6Y=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"w1oHrKINE+fR3AzOx31zYsT/eRw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"0oA4WOTUso1YgZri1QbadVPEeJc="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"w1oHrKINE+fR3AzOx31zYsT/eRw=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"0oA4WOTUso1YgZri1QbadVPEeJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"UvI81xg8vKD6MSDuVlEldhrFmxE="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"0oA4WOTUso1YgZri1QbadVPEeJc=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"UvI81xg8vKD6MSDuVlEldhrFmxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"dDKG2Lms8a6ZR7KXN3+HqSxFRII="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"UvI81xg8vKD6MSDuVlEldhrFmxE=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T23:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"dDKG2Lms8a6ZR7KXN3+HqSxFRII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"z95+KuaUyD6HnSjCJgztt5MkGmg="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"dDKG2Lms8a6ZR7KXN3+HqSxFRII=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T23:00:00Z","end_date":"2026-05-24T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"z95+KuaUyD6HnSjCJgztt5MkGmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"W/dyA5KeHW1QTB/k5NEkSHv0vZE="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"z95+KuaUyD6HnSjCJgztt5MkGmg=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"W/dyA5KeHW1QTB/k5NEkSHv0vZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"ShwC58Wy1fpXxjCxqT5TsxY7IBA="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"W/dyA5KeHW1QTB/k5NEkSHv0vZE=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T23:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"ShwC58Wy1fpXxjCxqT5TsxY7IBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"LdPH8Pyi7dqyyuyL79d4frXSKtU="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"ShwC58Wy1fpXxjCxqT5TsxY7IBA=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"LdPH8Pyi7dqyyuyL79d4frXSKtU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"IMoUr+wh3wQ3VqrKLnGWjf3dyBs="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"LdPH8Pyi7dqyyuyL79d4frXSKtU=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T23:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"IMoUr+wh3wQ3VqrKLnGWjf3dyBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="},{"type":"next-occurrence","id":"z+K92GJDADJvo/691ImtYX/wSDk="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"IMoUr+wh3wQ3VqrKLnGWjf3dyBs=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"z+K92GJDADJvo/691ImtYX/wSDk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RVABj2eHdnCQtrEWFuDZVF1g9Rc="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"z+K92GJDADJvo/691ImtYX/wSDk=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Tv8CrcUVt9/ctXEB6PB0m4639X8="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"Tv8CrcUVt9/ctXEB6PB0m4639X8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"TY98LYzSIjQBp7Ow5V49nwtHgjk="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"Tv8CrcUVt9/ctXEB6PB0m4639X8=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"TY98LYzSIjQBp7Ow5V49nwtHgjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"WeTONmGs8Mh1eLlpgULJ48DPQqM="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"TY98LYzSIjQBp7Ow5V49nwtHgjk=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"WeTONmGs8Mh1eLlpgULJ48DPQqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"n36iaX2eXAB/gvoycKXxhD/B2sM="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"WeTONmGs8Mh1eLlpgULJ48DPQqM=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"n36iaX2eXAB/gvoycKXxhD/B2sM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"7NHDuCDr0zs5sPMvD+2Oc/QqoNc="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"n36iaX2eXAB/gvoycKXxhD/B2sM=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"7NHDuCDr0zs5sPMvD+2Oc/QqoNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"nv77Mv8e+z/kENgJCsUMRtg4nH4="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"7NHDuCDr0zs5sPMvD+2Oc/QqoNc=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"nv77Mv8e+z/kENgJCsUMRtg4nH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"NV06kgzqgbDosBjIzxz6NRObAQA="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"nv77Mv8e+z/kENgJCsUMRtg4nH4=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"NV06kgzqgbDosBjIzxz6NRObAQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"KDadS9MTwVjQF+cI+iG24EE7nng="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"NV06kgzqgbDosBjIzxz6NRObAQA=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"KDadS9MTwVjQF+cI+iG24EE7nng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"1AvjF6kRsByUskiXEX7D4UAYadQ="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"KDadS9MTwVjQF+cI+iG24EE7nng=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"1AvjF6kRsByUskiXEX7D4UAYadQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"Ze1pka+GHLrdgsuVQvYq68jdGJM="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"1AvjF6kRsByUskiXEX7D4UAYadQ=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"Ze1pka+GHLrdgsuVQvYq68jdGJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"etFZv/37JJ9cFUUH5OKQyk7VETk="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"Ze1pka+GHLrdgsuVQvYq68jdGJM=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"etFZv/37JJ9cFUUH5OKQyk7VETk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"5FFyB29tfHKeiVhXDFsZnQ3id1Q="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"etFZv/37JJ9cFUUH5OKQyk7VETk=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"5FFyB29tfHKeiVhXDFsZnQ3id1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"5/WpizF0JEsUsZvMdYGAEbp7rSo="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"5FFyB29tfHKeiVhXDFsZnQ3id1Q=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"5/WpizF0JEsUsZvMdYGAEbp7rSo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"pHnSVEqit14JgprLQGOUV/a7m58="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"5/WpizF0JEsUsZvMdYGAEbp7rSo=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"pHnSVEqit14JgprLQGOUV/a7m58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"O2MXPKqNACRAfplm4FekXju3gXA="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"pHnSVEqit14JgprLQGOUV/a7m58=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"O2MXPKqNACRAfplm4FekXju3gXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"78C9A9WuBoLKcctbyeWO9oaEXxg="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"O2MXPKqNACRAfplm4FekXju3gXA=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"78C9A9WuBoLKcctbyeWO9oaEXxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"Nh28sZeD9NN/OUY9759NINQLzfk="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"78C9A9WuBoLKcctbyeWO9oaEXxg=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"Nh28sZeD9NN/OUY9759NINQLzfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"z8ugIA3IEZCC5/9juUGt5lyk/dY="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"Nh28sZeD9NN/OUY9759NINQLzfk=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"z8ugIA3IEZCC5/9juUGt5lyk/dY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"wwTlMzo9RWpCkFSy70yWfjsrisc="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"z8ugIA3IEZCC5/9juUGt5lyk/dY=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"wwTlMzo9RWpCkFSy70yWfjsrisc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"edc6z96oFgdTCQwmy6LuOFCUbXo="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"wwTlMzo9RWpCkFSy70yWfjsrisc=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"edc6z96oFgdTCQwmy6LuOFCUbXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="},{"type":"next-occurrence","id":"D6hGNoZY1tBU1uRVpCFiTUqeloo="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"edc6z96oFgdTCQwmy6LuOFCUbXo=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"D6hGNoZY1tBU1uRVpCFiTUqeloo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9LJX9ZX/5r40ALjlUYbsW+B10Dg="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"D6hGNoZY1tBU1uRVpCFiTUqeloo=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"91Wl1n9gJEKuKnV2hWbRG/HEm50=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PqsBk3A6dnX6ewpuQBWythkezUo="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"91Wl1n9gJEKuKnV2hWbRG/HEm50=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"PqsBk3A6dnX6ewpuQBWythkezUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"2BiyiH7wGXXavGlAfnxB2Razetk="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"PqsBk3A6dnX6ewpuQBWythkezUo=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"2BiyiH7wGXXavGlAfnxB2Razetk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"+dAcycxRqdZvZAHCxX3abjDctZo="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"2BiyiH7wGXXavGlAfnxB2Razetk=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"+dAcycxRqdZvZAHCxX3abjDctZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"Qtfu7+9RkwYn48W9jSH9cwV5Q/A="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"+dAcycxRqdZvZAHCxX3abjDctZo=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"Qtfu7+9RkwYn48W9jSH9cwV5Q/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"Por0142VnHbXtQaugBtO6iQScNA="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"Qtfu7+9RkwYn48W9jSH9cwV5Q/A=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"Por0142VnHbXtQaugBtO6iQScNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"cTCMy2RyI7ypz7x0CryYdK7HyFI="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"Por0142VnHbXtQaugBtO6iQScNA=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"cTCMy2RyI7ypz7x0CryYdK7HyFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"jmzr0PO6MfXrN22Q/uXCOwnjI4o="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"cTCMy2RyI7ypz7x0CryYdK7HyFI=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"jmzr0PO6MfXrN22Q/uXCOwnjI4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"MBaTfJdO7/4PWmKxmW2tANhyga8="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"jmzr0PO6MfXrN22Q/uXCOwnjI4o=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"MBaTfJdO7/4PWmKxmW2tANhyga8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"KkdtYqkG11lJWA7bTK48G3uHDMI="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"MBaTfJdO7/4PWmKxmW2tANhyga8=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"KkdtYqkG11lJWA7bTK48G3uHDMI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"eCkGAnWEustQEAK6aUqqd5BpXFE="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"KkdtYqkG11lJWA7bTK48G3uHDMI=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"eCkGAnWEustQEAK6aUqqd5BpXFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"XWz8SFKGeimtbunUia+0VfcUlNQ="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"eCkGAnWEustQEAK6aUqqd5BpXFE=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"XWz8SFKGeimtbunUia+0VfcUlNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"v39PYhaX/tnjuKHGTGQb8JIkulc="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"XWz8SFKGeimtbunUia+0VfcUlNQ=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"v39PYhaX/tnjuKHGTGQb8JIkulc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"ho7r3vpUAFbWiK0HNnOeUfjfj7A="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"v39PYhaX/tnjuKHGTGQb8JIkulc=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"ho7r3vpUAFbWiK0HNnOeUfjfj7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"ZoCZXu04lgdp0YlQlT9rslNPrSc="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"ho7r3vpUAFbWiK0HNnOeUfjfj7A=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"ZoCZXu04lgdp0YlQlT9rslNPrSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"pKd+P/1VynKnkMWOeh5p6aK4FU4="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"ZoCZXu04lgdp0YlQlT9rslNPrSc=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"pKd+P/1VynKnkMWOeh5p6aK4FU4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"e/3SUQDXfL7JRQmr6sFe7crqQ9w="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"pKd+P/1VynKnkMWOeh5p6aK4FU4=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"e/3SUQDXfL7JRQmr6sFe7crqQ9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"G0qHK4ZCDbPkbU5zBl4bQBFgvuk="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"e/3SUQDXfL7JRQmr6sFe7crqQ9w=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"G0qHK4ZCDbPkbU5zBl4bQBFgvuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"9yPi3PJRXIa3XXvyefh917IyZRo="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"G0qHK4ZCDbPkbU5zBl4bQBFgvuk=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"9yPi3PJRXIa3XXvyefh917IyZRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"xcyMiFhvrULBVQRE5IJr00I5/40="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"9yPi3PJRXIa3XXvyefh917IyZRo=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"xcyMiFhvrULBVQRE5IJr00I5/40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"nzKVrJ4pnNocN1rtbX2Y6Gsk/JY="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"xcyMiFhvrULBVQRE5IJr00I5/40=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"nzKVrJ4pnNocN1rtbX2Y6Gsk/JY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="},{"type":"next-occurrence","id":"v417XVlgdgnvMEazzOavCIQ9XCY="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"nzKVrJ4pnNocN1rtbX2Y6Gsk/JY=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"v417XVlgdgnvMEazzOavCIQ9XCY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"91Wl1n9gJEKuKnV2hWbRG/HEm50="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"v417XVlgdgnvMEazzOavCIQ9XCY=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"8u4S5gRDzOBVgKW4JwEXAGOOKBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VEFiL4GtJWOH5GaR4/zO4YeKvIk="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, left lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-30T19:01:27Z"},"road_event_id":"8u4S5gRDzOBVgKW4JwEXAGOOKBM=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682373,41.262104]]}},{"id":"VEFiL4GtJWOH5GaR4/zO4YeKvIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8u4S5gRDzOBVgKW4JwEXAGOOKBM="},{"type":"next-occurrence","id":"7C4TRCu/7MD+9E1yXQ7sofP6/J0="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, left lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-30T19:01:27Z"},"road_event_id":"VEFiL4GtJWOH5GaR4/zO4YeKvIk=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682373,41.262104]]}},{"id":"7C4TRCu/7MD+9E1yXQ7sofP6/J0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8u4S5gRDzOBVgKW4JwEXAGOOKBM="},{"type":"next-occurrence","id":"zWFCx3cTpnvB/pR92zlpL/mvSwY="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, left lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-30T19:01:27Z"},"road_event_id":"7C4TRCu/7MD+9E1yXQ7sofP6/J0=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682373,41.262104]]}},{"id":"zWFCx3cTpnvB/pR92zlpL/mvSwY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8u4S5gRDzOBVgKW4JwEXAGOOKBM="},{"type":"next-occurrence","id":"Yw6t09Ibb5aSINu92id9xvjhcVg="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, left lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-30T19:01:27Z"},"road_event_id":"zWFCx3cTpnvB/pR92zlpL/mvSwY=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682373,41.262104]]}},{"id":"Yw6t09Ibb5aSINu92id9xvjhcVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8u4S5gRDzOBVgKW4JwEXAGOOKBM="},{"type":"next-occurrence","id":"VFXlyx+0yo1cSJfKy7BVIVJ18eA="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, left lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-30T19:01:27Z"},"road_event_id":"Yw6t09Ibb5aSINu92id9xvjhcVg=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682373,41.262104]]}},{"id":"VFXlyx+0yo1cSJfKy7BVIVJ18eA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8u4S5gRDzOBVgKW4JwEXAGOOKBM="},{"type":"next-occurrence","id":"k5G7v+xgJDa6PruXdM6ZTLYr9/g="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, left lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-30T19:01:27Z"},"road_event_id":"VFXlyx+0yo1cSJfKy7BVIVJ18eA=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682373,41.262104]]}},{"id":"k5G7v+xgJDa6PruXdM6ZTLYr9/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8u4S5gRDzOBVgKW4JwEXAGOOKBM="},{"type":"next-occurrence","id":"Q64z8wUwtJwbOlZ4iDVe3d+VSmE="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, left lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-30T19:01:27Z"},"road_event_id":"k5G7v+xgJDa6PruXdM6ZTLYr9/g=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682373,41.262104]]}},{"id":"Q64z8wUwtJwbOlZ4iDVe3d+VSmE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8u4S5gRDzOBVgKW4JwEXAGOOKBM="},{"type":"next-occurrence","id":"VE12MuFqbWel2hRwWiT+xPmmvvA="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, left lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-30T19:01:27Z"},"road_event_id":"Q64z8wUwtJwbOlZ4iDVe3d+VSmE=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682373,41.262104]]}},{"id":"VE12MuFqbWel2hRwWiT+xPmmvvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8u4S5gRDzOBVgKW4JwEXAGOOKBM="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, left lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-30T19:01:27Z"},"road_event_id":"VE12MuFqbWel2hRwWiT+xPmmvvA=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682373,41.262104]]}},{"id":"Kt0zM6uAN5M93XAXpjHe6G4MCsY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZLImB/YTmDpvMgvlkcgxS/rcEHU="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) all trains at 3 Av and 1 Av board from the 8 Av-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line. , Tuesday March 10th, 2026 thru Thursday May 28th, 2026, Tuesday/Thursday, 01:30 AM thru 05:00 AM","update_date":"2026-04-10T18:28:19Z"},"road_event_id":"Kt0zM6uAN5M93XAXpjHe6G4MCsY=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T05:30:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"ZLImB/YTmDpvMgvlkcgxS/rcEHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Kt0zM6uAN5M93XAXpjHe6G4MCsY="},{"type":"next-occurrence","id":"y9rqMI05bufhRJBEZz6TtG6Tir8="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) all trains at 3 Av and 1 Av board from the 8 Av-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line. , Tuesday March 10th, 2026 thru Thursday May 28th, 2026, Tuesday/Thursday, 01:30 AM thru 05:00 AM","update_date":"2026-04-10T18:28:19Z"},"road_event_id":"ZLImB/YTmDpvMgvlkcgxS/rcEHU=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T05:30:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"y9rqMI05bufhRJBEZz6TtG6Tir8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Kt0zM6uAN5M93XAXpjHe6G4MCsY="},{"type":"next-occurrence","id":"h+M0c7WgpUJiD6O7iuMm+E8Ro3Y="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) all trains at 3 Av and 1 Av board from the 8 Av-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line. , Tuesday March 10th, 2026 thru Thursday May 28th, 2026, Tuesday/Thursday, 01:30 AM thru 05:00 AM","update_date":"2026-04-10T18:28:19Z"},"road_event_id":"y9rqMI05bufhRJBEZz6TtG6Tir8=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T05:30:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"h+M0c7WgpUJiD6O7iuMm+E8Ro3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Kt0zM6uAN5M93XAXpjHe6G4MCsY="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) all trains at 3 Av and 1 Av board from the 8 Av-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line. , Tuesday March 10th, 2026 thru Thursday May 28th, 2026, Tuesday/Thursday, 01:30 AM thru 05:00 AM","update_date":"2026-04-10T18:28:19Z"},"road_event_id":"h+M0c7WgpUJiD6O7iuMm+E8Ro3Y=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T05:30:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"9ocevgOlKsbuIbM14id/LOcQKpo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M11 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, M11 Bus at Amsterdam Av/W 62 St (New York) stop is being bypassed until 2028, use the stops on Amsterdam Ave at W 59th St or W 65th St, Continuous Thursday March 12th, 2026 07:43 AM thru Monday January 3rd, 2028 11:59 PM","update_date":"2026-03-12T11:43:37Z"},"road_event_id":"9ocevgOlKsbuIbM14id/LOcQKpo=","beginning_cross_street":"Amsterdam Av/W 62 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985836,40.772642]]}},{"id":"GCeLP/UAwOMEnwtf6Ea1IkPIEGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GARDEN RD"],"direction":"unknown","related_road_events":[],"description":"Bridge work on GARDEN RD both directions RT-26 (Philadelphia) to Sophia Street (Philadelphia) Garden Rd over Indian River Bridge #P021Closed to Traffic until further notice, Continuous Thursday November 2nd, 2023 12:00 AM thru Thursday December 31st, 2026 11:59 PM All lanes closed westbound; All lanes of 1 lanes closed eastbound, Continuous Thursday November 2nd, 2023 12:00 AM thru Thursday December 31st, 2026 11:59 PM All lanes closed","update_date":"2026-01-02T21:30:19Z"},"road_event_id":"GCeLP/UAwOMEnwtf6Ea1IkPIEGM=","beginning_cross_street":" RT-26","ending_cross_street":"Sophia Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.708586,44.158968]]}},{"id":"YbJ0f2rJfuBKn7Cp5QaXhGRVXuI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kIRHnxvxN7In0xAg/1E37poDN6U="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"YbJ0f2rJfuBKn7Cp5QaXhGRVXuI=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"kIRHnxvxN7In0xAg/1E37poDN6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbJ0f2rJfuBKn7Cp5QaXhGRVXuI="},{"type":"next-occurrence","id":"nqLZCV+LUgZlvdcDkOK8D2q7wrA="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"kIRHnxvxN7In0xAg/1E37poDN6U=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"nqLZCV+LUgZlvdcDkOK8D2q7wrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbJ0f2rJfuBKn7Cp5QaXhGRVXuI="},{"type":"next-occurrence","id":"vt8Hz8XabR3bdhCW/dflGgDuZfQ="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"nqLZCV+LUgZlvdcDkOK8D2q7wrA=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"vt8Hz8XabR3bdhCW/dflGgDuZfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbJ0f2rJfuBKn7Cp5QaXhGRVXuI="},{"type":"next-occurrence","id":"efQlYdODQi14Gok4+Zdr1Thx0Fs="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"vt8Hz8XabR3bdhCW/dflGgDuZfQ=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T10:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"efQlYdODQi14Gok4+Zdr1Thx0Fs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbJ0f2rJfuBKn7Cp5QaXhGRVXuI="},{"type":"next-occurrence","id":"sA5+hCnEHx6z78UDQKhQ/QR0mtU="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"efQlYdODQi14Gok4+Zdr1Thx0Fs=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T10:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"sA5+hCnEHx6z78UDQKhQ/QR0mtU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbJ0f2rJfuBKn7Cp5QaXhGRVXuI="},{"type":"next-occurrence","id":"C7Gd/lfYaKE1DJh3kQzTjF4OBOg="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"sA5+hCnEHx6z78UDQKhQ/QR0mtU=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"C7Gd/lfYaKE1DJh3kQzTjF4OBOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbJ0f2rJfuBKn7Cp5QaXhGRVXuI="},{"type":"next-occurrence","id":"OJrcByTuKqRJ93QykwtJM7YKJCU="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"C7Gd/lfYaKE1DJh3kQzTjF4OBOg=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"OJrcByTuKqRJ93QykwtJM7YKJCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbJ0f2rJfuBKn7Cp5QaXhGRVXuI="},{"type":"next-occurrence","id":"hFkkekxUJnRF4A/Ew8AiX1tKwDg="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"OJrcByTuKqRJ93QykwtJM7YKJCU=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"hFkkekxUJnRF4A/Ew8AiX1tKwDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbJ0f2rJfuBKn7Cp5QaXhGRVXuI="},{"type":"next-occurrence","id":"EH9ygQSBBZFKReldal1JmRi2Jp4="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"hFkkekxUJnRF4A/Ew8AiX1tKwDg=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"EH9ygQSBBZFKReldal1JmRi2Jp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbJ0f2rJfuBKn7Cp5QaXhGRVXuI="},{"type":"next-occurrence","id":"dFku22oP8bE06buehCvj5uCM6M0="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"EH9ygQSBBZFKReldal1JmRi2Jp4=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"dFku22oP8bE06buehCvj5uCM6M0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbJ0f2rJfuBKn7Cp5QaXhGRVXuI="},{"type":"next-occurrence","id":"+8vEkdKeAxhYb2Jq3+eXgLfMDOg="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"dFku22oP8bE06buehCvj5uCM6M0=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T10:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"+8vEkdKeAxhYb2Jq3+eXgLfMDOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbJ0f2rJfuBKn7Cp5QaXhGRVXuI="},{"type":"next-occurrence","id":"3ukN1wLN5VbMy6S0nWa7LdoddjI="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"+8vEkdKeAxhYb2Jq3+eXgLfMDOg=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T10:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"3ukN1wLN5VbMy6S0nWa7LdoddjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbJ0f2rJfuBKn7Cp5QaXhGRVXuI="},{"type":"next-occurrence","id":"80IUDAP+9ZtlZ88xpiJY8VsF6DY="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"3ukN1wLN5VbMy6S0nWa7LdoddjI=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"80IUDAP+9ZtlZ88xpiJY8VsF6DY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbJ0f2rJfuBKn7Cp5QaXhGRVXuI="},{"type":"next-occurrence","id":"+cWRBiRpUoI1SmQpmrP0wJTb9Fs="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"80IUDAP+9ZtlZ88xpiJY8VsF6DY=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"+cWRBiRpUoI1SmQpmrP0wJTb9Fs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbJ0f2rJfuBKn7Cp5QaXhGRVXuI="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"+cWRBiRpUoI1SmQpmrP0wJTb9Fs=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"BzZb9NK+IH0VrvemD+0AJyeouzU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mV5Rpt94WPagfK9UnPovyUQlW+8="}],"description":"Street sweeping on I-86 both directions Exit 43 - NY 415; Ramp (Erwin) to Exit 48 - NY 352; Ramp (Corning) left lane closed merge right., Monday April 27th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T18:18:58Z"},"road_event_id":"BzZb9NK+IH0VrvemD+0AJyeouzU=","beginning_cross_street":"Exit 43 - NY 415; Ramp","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.108935,42.175758]]}},{"id":"mV5Rpt94WPagfK9UnPovyUQlW+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BzZb9NK+IH0VrvemD+0AJyeouzU="},{"type":"next-occurrence","id":"TBv1EcP4l8PKQuecgJ8isgnLV6U="}],"description":"Street sweeping on I-86 both directions Exit 43 - NY 415; Ramp (Erwin) to Exit 48 - NY 352; Ramp (Corning) left lane closed merge right., Monday April 27th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T18:18:58Z"},"road_event_id":"mV5Rpt94WPagfK9UnPovyUQlW+8=","beginning_cross_street":"Exit 43 - NY 415; Ramp","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.108935,42.175758]]}},{"id":"TBv1EcP4l8PKQuecgJ8isgnLV6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BzZb9NK+IH0VrvemD+0AJyeouzU="}],"description":"Street sweeping on I-86 both directions Exit 43 - NY 415; Ramp (Erwin) to Exit 48 - NY 352; Ramp (Corning) left lane closed merge right., Monday April 27th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T18:18:58Z"},"road_event_id":"TBv1EcP4l8PKQuecgJ8isgnLV6U=","beginning_cross_street":"Exit 43 - NY 415; Ramp","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.108935,42.175758]]}},{"id":"yN5lzd/gFleO/mKD9op4vfwDUV8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VEzlmizpMphLV466qgrOC2J9Sss="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"yN5lzd/gFleO/mKD9op4vfwDUV8=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"VEzlmizpMphLV466qgrOC2J9Sss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yN5lzd/gFleO/mKD9op4vfwDUV8="},{"type":"next-occurrence","id":"54zs3IZLmI9cdOPS1hBh3Q63KE8="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"VEzlmizpMphLV466qgrOC2J9Sss=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"54zs3IZLmI9cdOPS1hBh3Q63KE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yN5lzd/gFleO/mKD9op4vfwDUV8="},{"type":"next-occurrence","id":"UP9JEdfY9y1aqotjD/s0crCcVPU="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"54zs3IZLmI9cdOPS1hBh3Q63KE8=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"UP9JEdfY9y1aqotjD/s0crCcVPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yN5lzd/gFleO/mKD9op4vfwDUV8="},{"type":"next-occurrence","id":"7cxE7gAI2yitGxI0BnxXSGKwGM8="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"UP9JEdfY9y1aqotjD/s0crCcVPU=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T10:00:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"7cxE7gAI2yitGxI0BnxXSGKwGM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yN5lzd/gFleO/mKD9op4vfwDUV8="},{"type":"next-occurrence","id":"QT82U2Gz4Xbeg0bDkCVZWSJq3gU="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"7cxE7gAI2yitGxI0BnxXSGKwGM8=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T10:00:00Z","end_date":"2026-05-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"QT82U2Gz4Xbeg0bDkCVZWSJq3gU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yN5lzd/gFleO/mKD9op4vfwDUV8="},{"type":"next-occurrence","id":"gpXu5zHKqw+SqV35ai5lY2EM88g="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"QT82U2Gz4Xbeg0bDkCVZWSJq3gU=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"gpXu5zHKqw+SqV35ai5lY2EM88g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yN5lzd/gFleO/mKD9op4vfwDUV8="},{"type":"next-occurrence","id":"cQ99G2VlSAG4iF1X/a3awd2LAIM="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"gpXu5zHKqw+SqV35ai5lY2EM88g=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"cQ99G2VlSAG4iF1X/a3awd2LAIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yN5lzd/gFleO/mKD9op4vfwDUV8="},{"type":"next-occurrence","id":"9Zcy8SzI1CsmYALbnuFiJcKj1ws="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"cQ99G2VlSAG4iF1X/a3awd2LAIM=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"9Zcy8SzI1CsmYALbnuFiJcKj1ws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yN5lzd/gFleO/mKD9op4vfwDUV8="},{"type":"next-occurrence","id":"h7ExyID0gb3hPQH7OfBg4tNDB6U="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"9Zcy8SzI1CsmYALbnuFiJcKj1ws=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"h7ExyID0gb3hPQH7OfBg4tNDB6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yN5lzd/gFleO/mKD9op4vfwDUV8="},{"type":"next-occurrence","id":"1cJCHwGHmWjpaETtN9hRl1NyuLo="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"h7ExyID0gb3hPQH7OfBg4tNDB6U=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"1cJCHwGHmWjpaETtN9hRl1NyuLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yN5lzd/gFleO/mKD9op4vfwDUV8="},{"type":"next-occurrence","id":"G49sLHyhLf9GahF1+L/eEJwMf/o="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"1cJCHwGHmWjpaETtN9hRl1NyuLo=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T10:00:00Z","end_date":"2026-05-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"G49sLHyhLf9GahF1+L/eEJwMf/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yN5lzd/gFleO/mKD9op4vfwDUV8="},{"type":"next-occurrence","id":"jOOldeNXcNb/d/FepWhJEU3pw90="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"G49sLHyhLf9GahF1+L/eEJwMf/o=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T10:00:00Z","end_date":"2026-05-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"jOOldeNXcNb/d/FepWhJEU3pw90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yN5lzd/gFleO/mKD9op4vfwDUV8="},{"type":"next-occurrence","id":"ejLTz0sJ6gYVm1fsVhBxouWGUng="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"jOOldeNXcNb/d/FepWhJEU3pw90=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"ejLTz0sJ6gYVm1fsVhBxouWGUng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yN5lzd/gFleO/mKD9op4vfwDUV8="},{"type":"next-occurrence","id":"ys9+Q6jCgIrWbDLxFF6u0UYW/w8="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"ejLTz0sJ6gYVm1fsVhBxouWGUng=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"ys9+Q6jCgIrWbDLxFF6u0UYW/w8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yN5lzd/gFleO/mKD9op4vfwDUV8="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"ys9+Q6jCgIrWbDLxFF6u0UYW/w8=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"ORC300522247","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 175TH ST"],"direction":"unknown","description":"Bridge inspection on E 175TH ST eastbound between WALTON AVE (New York) and GRAND CONCOURSE (New York) Not currently Scheduled","update_date":"2026-03-17T20:00:05Z"},"road_event_id":"ORC300522247","beginning_cross_street":"WALTON AVE","ending_cross_street":"GRAND CONCOURSE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-13T15:09:26Z","end_date":"2026-03-18T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.910592,40.846956]]}},{"id":"CGDT5jXWzr3ZUbE1ii3HbPTrspk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mDajoglirngel9bJ/KwnKphA05M="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"CGDT5jXWzr3ZUbE1ii3HbPTrspk=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"mDajoglirngel9bJ/KwnKphA05M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGDT5jXWzr3ZUbE1ii3HbPTrspk="},{"type":"next-occurrence","id":"3VAXubUpk7DxUB1jdd3TfI3lNs4="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"mDajoglirngel9bJ/KwnKphA05M=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"3VAXubUpk7DxUB1jdd3TfI3lNs4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGDT5jXWzr3ZUbE1ii3HbPTrspk="},{"type":"next-occurrence","id":"D/xdjHrp4b6p3Z9xE/p91t+ozmY="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"3VAXubUpk7DxUB1jdd3TfI3lNs4=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"D/xdjHrp4b6p3Z9xE/p91t+ozmY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGDT5jXWzr3ZUbE1ii3HbPTrspk="},{"type":"next-occurrence","id":"zpz3qy7eo+6M1hk5fn8zINcKyMQ="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"D/xdjHrp4b6p3Z9xE/p91t+ozmY=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T03:00:00Z","end_date":"2026-05-17T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"zpz3qy7eo+6M1hk5fn8zINcKyMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGDT5jXWzr3ZUbE1ii3HbPTrspk="},{"type":"next-occurrence","id":"veFfBgFwvYceHG+39K9dsI6LXng="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"zpz3qy7eo+6M1hk5fn8zINcKyMQ=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T03:00:00Z","end_date":"2026-05-18T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"veFfBgFwvYceHG+39K9dsI6LXng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGDT5jXWzr3ZUbE1ii3HbPTrspk="},{"type":"next-occurrence","id":"ikP8TLF5JU+mUbS9E5NAT24NNAM="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"veFfBgFwvYceHG+39K9dsI6LXng=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T02:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"ikP8TLF5JU+mUbS9E5NAT24NNAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGDT5jXWzr3ZUbE1ii3HbPTrspk="},{"type":"next-occurrence","id":"zrAdTSwO4kDDeEPAr3XscbAIGCw="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"ikP8TLF5JU+mUbS9E5NAT24NNAM=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T02:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"zrAdTSwO4kDDeEPAr3XscbAIGCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGDT5jXWzr3ZUbE1ii3HbPTrspk="},{"type":"next-occurrence","id":"HXWceVDBJqoC/dHMQGLITi05ZSI="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"zrAdTSwO4kDDeEPAr3XscbAIGCw=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T02:00:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"HXWceVDBJqoC/dHMQGLITi05ZSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGDT5jXWzr3ZUbE1ii3HbPTrspk="},{"type":"next-occurrence","id":"9Jb6zMp54DPIMmI/ElxYbdznebY="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"HXWceVDBJqoC/dHMQGLITi05ZSI=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T02:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"9Jb6zMp54DPIMmI/ElxYbdznebY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGDT5jXWzr3ZUbE1ii3HbPTrspk="},{"type":"next-occurrence","id":"9iaY7gE4Yh6V0UgeE7Y07LXDqoc="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"9Jb6zMp54DPIMmI/ElxYbdznebY=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T02:00:00Z","end_date":"2026-05-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"9iaY7gE4Yh6V0UgeE7Y07LXDqoc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGDT5jXWzr3ZUbE1ii3HbPTrspk="},{"type":"next-occurrence","id":"I3LHAUbcf1SHg3ARdg+e8FxIIQY="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"9iaY7gE4Yh6V0UgeE7Y07LXDqoc=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T03:00:00Z","end_date":"2026-05-24T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"I3LHAUbcf1SHg3ARdg+e8FxIIQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGDT5jXWzr3ZUbE1ii3HbPTrspk="},{"type":"next-occurrence","id":"FUnhy6mtraDJK+/jVgnaf1d1XN4="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"I3LHAUbcf1SHg3ARdg+e8FxIIQY=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T03:00:00Z","end_date":"2026-05-25T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"FUnhy6mtraDJK+/jVgnaf1d1XN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGDT5jXWzr3ZUbE1ii3HbPTrspk="},{"type":"next-occurrence","id":"9aVo6jCEQeglJ+knbDstR7I9ncg="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"FUnhy6mtraDJK+/jVgnaf1d1XN4=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T02:00:00Z","end_date":"2026-05-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"9aVo6jCEQeglJ+knbDstR7I9ncg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGDT5jXWzr3ZUbE1ii3HbPTrspk="},{"type":"next-occurrence","id":"rlPKC1OBu+ia537YF0EZZLtbKEE="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"9aVo6jCEQeglJ+knbDstR7I9ncg=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T02:00:00Z","end_date":"2026-05-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"rlPKC1OBu+ia537YF0EZZLtbKEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGDT5jXWzr3ZUbE1ii3HbPTrspk="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"rlPKC1OBu+ia537YF0EZZLtbKEE=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T02:00:00Z","end_date":"2026-05-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"4TjKTMxV2lkQs2Gfwb12aYjmtpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OFn5uCq/UxIu73BzOnsegrp/8r8="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"4TjKTMxV2lkQs2Gfwb12aYjmtpY=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"OFn5uCq/UxIu73BzOnsegrp/8r8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4TjKTMxV2lkQs2Gfwb12aYjmtpY="},{"type":"next-occurrence","id":"OgJdMl1+HEXgNjfrbCfhVb4tWHc="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"OFn5uCq/UxIu73BzOnsegrp/8r8=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"OgJdMl1+HEXgNjfrbCfhVb4tWHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4TjKTMxV2lkQs2Gfwb12aYjmtpY="},{"type":"next-occurrence","id":"I0bJYWosoMWgFmF/TKP0AvLD1x8="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"OgJdMl1+HEXgNjfrbCfhVb4tWHc=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"I0bJYWosoMWgFmF/TKP0AvLD1x8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4TjKTMxV2lkQs2Gfwb12aYjmtpY="},{"type":"next-occurrence","id":"pyrJYUgeufSTFYY4Nr3EC5A7zAg="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"I0bJYWosoMWgFmF/TKP0AvLD1x8=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T01:00:00Z","end_date":"2026-05-17T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"pyrJYUgeufSTFYY4Nr3EC5A7zAg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4TjKTMxV2lkQs2Gfwb12aYjmtpY="},{"type":"next-occurrence","id":"9sNK53JBeej5p7VFWzdz8VaKIMI="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"pyrJYUgeufSTFYY4Nr3EC5A7zAg=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T01:00:00Z","end_date":"2026-05-18T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"9sNK53JBeej5p7VFWzdz8VaKIMI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4TjKTMxV2lkQs2Gfwb12aYjmtpY="},{"type":"next-occurrence","id":"g0WYQ9Eil22d3qQpmJ5V3jfGfic="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"9sNK53JBeej5p7VFWzdz8VaKIMI=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T01:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"g0WYQ9Eil22d3qQpmJ5V3jfGfic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4TjKTMxV2lkQs2Gfwb12aYjmtpY="},{"type":"next-occurrence","id":"MJa+1edykCZr4YvvzM0X/SXKEEY="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"g0WYQ9Eil22d3qQpmJ5V3jfGfic=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T01:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"MJa+1edykCZr4YvvzM0X/SXKEEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4TjKTMxV2lkQs2Gfwb12aYjmtpY="},{"type":"next-occurrence","id":"8/MGXNgRTPehh+uuX5H2Yplf6CU="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"MJa+1edykCZr4YvvzM0X/SXKEEY=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T01:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"8/MGXNgRTPehh+uuX5H2Yplf6CU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4TjKTMxV2lkQs2Gfwb12aYjmtpY="},{"type":"next-occurrence","id":"RPiyVyXgwQh5rGpQA6085qPCmfU="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"8/MGXNgRTPehh+uuX5H2Yplf6CU=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T01:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"RPiyVyXgwQh5rGpQA6085qPCmfU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4TjKTMxV2lkQs2Gfwb12aYjmtpY="},{"type":"next-occurrence","id":"ZrknlSCtRUsoCi1MD0DVe/gFC68="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"RPiyVyXgwQh5rGpQA6085qPCmfU=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T01:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"ZrknlSCtRUsoCi1MD0DVe/gFC68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4TjKTMxV2lkQs2Gfwb12aYjmtpY="},{"type":"next-occurrence","id":"D24ZvVUfYUdlI7+964IXx+fcBWE="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"ZrknlSCtRUsoCi1MD0DVe/gFC68=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T01:00:00Z","end_date":"2026-05-24T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"D24ZvVUfYUdlI7+964IXx+fcBWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4TjKTMxV2lkQs2Gfwb12aYjmtpY="},{"type":"next-occurrence","id":"taEDxjPpEOxmQZ4q0TwoDvoBS4E="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"D24ZvVUfYUdlI7+964IXx+fcBWE=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T01:00:00Z","end_date":"2026-05-25T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"taEDxjPpEOxmQZ4q0TwoDvoBS4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4TjKTMxV2lkQs2Gfwb12aYjmtpY="},{"type":"next-occurrence","id":"szxxVhWk10XM7hpOuLX7JYRIrPs="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"taEDxjPpEOxmQZ4q0TwoDvoBS4E=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T01:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"szxxVhWk10XM7hpOuLX7JYRIrPs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4TjKTMxV2lkQs2Gfwb12aYjmtpY="},{"type":"next-occurrence","id":"3YstDEDqAbFT57wV8HGhkj7r2Vk="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"szxxVhWk10XM7hpOuLX7JYRIrPs=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T01:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"3YstDEDqAbFT57wV8HGhkj7r2Vk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4TjKTMxV2lkQs2Gfwb12aYjmtpY="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"3YstDEDqAbFT57wV8HGhkj7r2Vk=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T01:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"VQ80MC0XZjMSgm7/RdOZ5iXg2Eo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 221"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 221 both directions between Jennings Creek Rd (Lapeer) and Cooper Hill Rd (Lapeer) ; follow detour, Continuous Monday February 2nd, 2026 07:00 AM thru Monday September 21st, 2026 04:00 PM All lanes closed","update_date":"2026-03-12T11:08:21Z"},"road_event_id":"VQ80MC0XZjMSgm7/RdOZ5iXg2Eo=","beginning_cross_street":"Jennings Creek Rd","ending_cross_street":"Cooper Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.083494,42.425507]]}},{"id":"hNqTc+2kNK1QMJqNG0LJwUbRWAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Roadwork and toll plaza repairs on I-87 Northway northbound at END ROUTE I-87; US-Canadian Line (Champlain) Starting on 4/21/25, border crossing will be restricted to trailers over 16'4\" in height, 8'5\" in width and over 53' in length. , Monday April 21st, 2025 thru Sunday December 31st, 2028, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2025-04-15T16:28:14Z"},"road_event_id":"hNqTc+2kNK1QMJqNG0LJwUbRWAM=","beginning_cross_street":"END ROUTE I-87; US-Canadian Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.452066,45.008807]]}},{"id":"PLNvR9kM9UconKMNlxJv4c4+lKY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3K05A8O9oQN+nKa0ZORwtjXKSEE="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"PLNvR9kM9UconKMNlxJv4c4+lKY=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"3K05A8O9oQN+nKa0ZORwtjXKSEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLNvR9kM9UconKMNlxJv4c4+lKY="},{"type":"next-occurrence","id":"0u82oD+7SxDIuudAl44+meu59CE="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"3K05A8O9oQN+nKa0ZORwtjXKSEE=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"0u82oD+7SxDIuudAl44+meu59CE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLNvR9kM9UconKMNlxJv4c4+lKY="},{"type":"next-occurrence","id":"A0UX8EmdDbmQCIKWi4bsqUzqD4k="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"0u82oD+7SxDIuudAl44+meu59CE=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"A0UX8EmdDbmQCIKWi4bsqUzqD4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLNvR9kM9UconKMNlxJv4c4+lKY="},{"type":"next-occurrence","id":"bzNazKJ9hnQyaqkAc1nGO/N+F8A="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"A0UX8EmdDbmQCIKWi4bsqUzqD4k=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"bzNazKJ9hnQyaqkAc1nGO/N+F8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLNvR9kM9UconKMNlxJv4c4+lKY="},{"type":"next-occurrence","id":"eL0M2og19Jh/cWE0QncCFgSz41M="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"bzNazKJ9hnQyaqkAc1nGO/N+F8A=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"eL0M2og19Jh/cWE0QncCFgSz41M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLNvR9kM9UconKMNlxJv4c4+lKY="},{"type":"next-occurrence","id":"JuXnxlojUx3kH43UiYqQlDeglUI="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"eL0M2og19Jh/cWE0QncCFgSz41M=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"JuXnxlojUx3kH43UiYqQlDeglUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLNvR9kM9UconKMNlxJv4c4+lKY="},{"type":"next-occurrence","id":"J8GHPXVqzKNnIKlucUyIeMSnrF8="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"JuXnxlojUx3kH43UiYqQlDeglUI=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"J8GHPXVqzKNnIKlucUyIeMSnrF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLNvR9kM9UconKMNlxJv4c4+lKY="},{"type":"next-occurrence","id":"XP+78kD2evXVfK3oG8KKO/PzQuE="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"J8GHPXVqzKNnIKlucUyIeMSnrF8=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"XP+78kD2evXVfK3oG8KKO/PzQuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLNvR9kM9UconKMNlxJv4c4+lKY="},{"type":"next-occurrence","id":"Bmhyfg/PgAltKisxeUUND1itBNk="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"XP+78kD2evXVfK3oG8KKO/PzQuE=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"Bmhyfg/PgAltKisxeUUND1itBNk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLNvR9kM9UconKMNlxJv4c4+lKY="},{"type":"next-occurrence","id":"ws4XZ5YrO+hNxKtMCd+ei7IvZjE="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"Bmhyfg/PgAltKisxeUUND1itBNk=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"ws4XZ5YrO+hNxKtMCd+ei7IvZjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLNvR9kM9UconKMNlxJv4c4+lKY="},{"type":"next-occurrence","id":"ClMIhjKI5TaXctRLkp8xpZoYcuM="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"ws4XZ5YrO+hNxKtMCd+ei7IvZjE=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"ClMIhjKI5TaXctRLkp8xpZoYcuM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLNvR9kM9UconKMNlxJv4c4+lKY="},{"type":"next-occurrence","id":"KMTPO5zT65PSs1+vNv/6Iu/ptv0="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"ClMIhjKI5TaXctRLkp8xpZoYcuM=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"KMTPO5zT65PSs1+vNv/6Iu/ptv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLNvR9kM9UconKMNlxJv4c4+lKY="},{"type":"next-occurrence","id":"qiuhihSmXCwNB+jlIP60z/R/2K8="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"KMTPO5zT65PSs1+vNv/6Iu/ptv0=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"qiuhihSmXCwNB+jlIP60z/R/2K8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLNvR9kM9UconKMNlxJv4c4+lKY="},{"type":"next-occurrence","id":"oTCj4Kh2psfEF6zYvmErAP5paC0="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"qiuhihSmXCwNB+jlIP60z/R/2K8=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"oTCj4Kh2psfEF6zYvmErAP5paC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLNvR9kM9UconKMNlxJv4c4+lKY="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"oTCj4Kh2psfEF6zYvmErAP5paC0=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"8AtgR93YQfqClSC5HknwbWyzXvk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4Mt6Quy/B31YlYPRYZbGE5hM6mM="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Saturday April 11th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday April 7th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T15:55:43Z"},"road_event_id":"8AtgR93YQfqClSC5HknwbWyzXvk=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"4Mt6Quy/B31YlYPRYZbGE5hM6mM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8AtgR93YQfqClSC5HknwbWyzXvk="},{"type":"next-occurrence","id":"Hjyl/rczqHntQ5xKjFD/8qMyiZs="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Saturday April 11th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday April 7th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T15:55:43Z"},"road_event_id":"4Mt6Quy/B31YlYPRYZbGE5hM6mM=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"Hjyl/rczqHntQ5xKjFD/8qMyiZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8AtgR93YQfqClSC5HknwbWyzXvk="},{"type":"next-occurrence","id":"vbVdh5CmZRapsI8auL9nCVEL/yM="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Saturday April 11th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday April 7th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T15:55:43Z"},"road_event_id":"Hjyl/rczqHntQ5xKjFD/8qMyiZs=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"vbVdh5CmZRapsI8auL9nCVEL/yM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8AtgR93YQfqClSC5HknwbWyzXvk="},{"type":"next-occurrence","id":"/YTQZpzSG9a/kfSQnoEaMMYj0YY="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Saturday April 11th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday April 7th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T15:55:43Z"},"road_event_id":"vbVdh5CmZRapsI8auL9nCVEL/yM=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"/YTQZpzSG9a/kfSQnoEaMMYj0YY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8AtgR93YQfqClSC5HknwbWyzXvk="},{"type":"next-occurrence","id":"6AYHcG9ADPoTY8OPtU5ToUfWQTM="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Saturday April 11th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday April 7th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T15:55:43Z"},"road_event_id":"/YTQZpzSG9a/kfSQnoEaMMYj0YY=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"6AYHcG9ADPoTY8OPtU5ToUfWQTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8AtgR93YQfqClSC5HknwbWyzXvk="},{"type":"next-occurrence","id":"pLKLLfqPnZu0V3DC/KBmjMWSQWw="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Saturday April 11th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday April 7th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T15:55:43Z"},"road_event_id":"6AYHcG9ADPoTY8OPtU5ToUfWQTM=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"pLKLLfqPnZu0V3DC/KBmjMWSQWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8AtgR93YQfqClSC5HknwbWyzXvk="},{"type":"next-occurrence","id":"pes77P79Dj1KUnjrPrGDksUWJk8="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Saturday April 11th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday April 7th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T15:55:43Z"},"road_event_id":"pLKLLfqPnZu0V3DC/KBmjMWSQWw=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"pes77P79Dj1KUnjrPrGDksUWJk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8AtgR93YQfqClSC5HknwbWyzXvk="},{"type":"next-occurrence","id":"TOvI8xHCabvH66BaZX9zAjbkjFE="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Saturday April 11th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday April 7th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T15:55:43Z"},"road_event_id":"pes77P79Dj1KUnjrPrGDksUWJk8=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"TOvI8xHCabvH66BaZX9zAjbkjFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8AtgR93YQfqClSC5HknwbWyzXvk="},{"type":"next-occurrence","id":"WVu5FXLHpDyW0TfPC8keDHla9XE="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Saturday April 11th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday April 7th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T15:55:43Z"},"road_event_id":"TOvI8xHCabvH66BaZX9zAjbkjFE=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"WVu5FXLHpDyW0TfPC8keDHla9XE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8AtgR93YQfqClSC5HknwbWyzXvk="},{"type":"next-occurrence","id":"GfsVppjD63IojcrXiomUcQHv3rE="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Saturday April 11th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday April 7th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T15:55:43Z"},"road_event_id":"WVu5FXLHpDyW0TfPC8keDHla9XE=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"GfsVppjD63IojcrXiomUcQHv3rE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8AtgR93YQfqClSC5HknwbWyzXvk="},{"type":"next-occurrence","id":"2LZzJVlmSV/adTVqUkJN5rtrzlY="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Saturday April 11th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday April 7th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T15:55:43Z"},"road_event_id":"GfsVppjD63IojcrXiomUcQHv3rE=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"2LZzJVlmSV/adTVqUkJN5rtrzlY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8AtgR93YQfqClSC5HknwbWyzXvk="},{"type":"next-occurrence","id":"hWHDDkhYYuDN7tSOUk1Xbjszrtg="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Saturday April 11th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday April 7th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T15:55:43Z"},"road_event_id":"2LZzJVlmSV/adTVqUkJN5rtrzlY=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"hWHDDkhYYuDN7tSOUk1Xbjszrtg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8AtgR93YQfqClSC5HknwbWyzXvk="},{"type":"next-occurrence","id":"XNYthXo+yflUsz8tPMC3TdD08NE="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Saturday April 11th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday April 7th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T15:55:43Z"},"road_event_id":"hWHDDkhYYuDN7tSOUk1Xbjszrtg=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"XNYthXo+yflUsz8tPMC3TdD08NE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8AtgR93YQfqClSC5HknwbWyzXvk="},{"type":"next-occurrence","id":"Ww87T3LGH2TzBX1KhyMJ+oWygnc="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Saturday April 11th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday April 7th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T15:55:43Z"},"road_event_id":"XNYthXo+yflUsz8tPMC3TdD08NE=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"Ww87T3LGH2TzBX1KhyMJ+oWygnc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8AtgR93YQfqClSC5HknwbWyzXvk="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Saturday April 11th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday April 7th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T15:55:43Z"},"road_event_id":"Ww87T3LGH2TzBX1KhyMJ+oWygnc=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"dYeYiqgFu0J96buUyhvGPfhdp+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mKtrdD+Lajocsa3m4G04tkz7NYo="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"dYeYiqgFu0J96buUyhvGPfhdp+k=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"mKtrdD+Lajocsa3m4G04tkz7NYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYeYiqgFu0J96buUyhvGPfhdp+k="},{"type":"next-occurrence","id":"9cjLvxYFImYFHBu9oaRtaVaZTDI="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"mKtrdD+Lajocsa3m4G04tkz7NYo=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"9cjLvxYFImYFHBu9oaRtaVaZTDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYeYiqgFu0J96buUyhvGPfhdp+k="},{"type":"next-occurrence","id":"9yvIXnyefxgWVPMlHwkKcBd8Isw="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"9cjLvxYFImYFHBu9oaRtaVaZTDI=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"9yvIXnyefxgWVPMlHwkKcBd8Isw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYeYiqgFu0J96buUyhvGPfhdp+k="},{"type":"next-occurrence","id":"GDXUwPHVWLae+53m82IzcvRBKk4="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"9yvIXnyefxgWVPMlHwkKcBd8Isw=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"GDXUwPHVWLae+53m82IzcvRBKk4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYeYiqgFu0J96buUyhvGPfhdp+k="},{"type":"next-occurrence","id":"PBclu2HA8d1BUaUXOAvbzrx1AuA="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"GDXUwPHVWLae+53m82IzcvRBKk4=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"PBclu2HA8d1BUaUXOAvbzrx1AuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYeYiqgFu0J96buUyhvGPfhdp+k="},{"type":"next-occurrence","id":"6YCM6QXcRe9FdkrOzJXYwqrsVpw="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"PBclu2HA8d1BUaUXOAvbzrx1AuA=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"6YCM6QXcRe9FdkrOzJXYwqrsVpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYeYiqgFu0J96buUyhvGPfhdp+k="},{"type":"next-occurrence","id":"YASPKdgIgqb/9vYscIux/Fyq0vA="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"6YCM6QXcRe9FdkrOzJXYwqrsVpw=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"YASPKdgIgqb/9vYscIux/Fyq0vA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYeYiqgFu0J96buUyhvGPfhdp+k="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"YASPKdgIgqb/9vYscIux/Fyq0vA=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"0b/TGxM5nsqM6NFzbHaitJ+t8B4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xLLONg/C7u34iIKHmBL+PI4ZpFM="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"0b/TGxM5nsqM6NFzbHaitJ+t8B4=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"xLLONg/C7u34iIKHmBL+PI4ZpFM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0b/TGxM5nsqM6NFzbHaitJ+t8B4="},{"type":"next-occurrence","id":"b5P+MfS3UN2DN56i1V+nYsbIaXI="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"xLLONg/C7u34iIKHmBL+PI4ZpFM=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"b5P+MfS3UN2DN56i1V+nYsbIaXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0b/TGxM5nsqM6NFzbHaitJ+t8B4="},{"type":"next-occurrence","id":"jnqKf6CvGrTtWmRmjvRIGrRfUIs="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"b5P+MfS3UN2DN56i1V+nYsbIaXI=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"jnqKf6CvGrTtWmRmjvRIGrRfUIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0b/TGxM5nsqM6NFzbHaitJ+t8B4="},{"type":"next-occurrence","id":"eOACPzyCAiAdX37hF/GJp3Fgon0="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"jnqKf6CvGrTtWmRmjvRIGrRfUIs=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"eOACPzyCAiAdX37hF/GJp3Fgon0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0b/TGxM5nsqM6NFzbHaitJ+t8B4="},{"type":"next-occurrence","id":"/PKuL3AS+OPx8ocbPT4WS+CbQH8="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"eOACPzyCAiAdX37hF/GJp3Fgon0=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"/PKuL3AS+OPx8ocbPT4WS+CbQH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0b/TGxM5nsqM6NFzbHaitJ+t8B4="},{"type":"next-occurrence","id":"uo92a7DNRy3f+qArG/L+1qW+RAk="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"/PKuL3AS+OPx8ocbPT4WS+CbQH8=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"uo92a7DNRy3f+qArG/L+1qW+RAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0b/TGxM5nsqM6NFzbHaitJ+t8B4="},{"type":"next-occurrence","id":"iMSAk5+VwvcxIkvdg+X6WnR0paw="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"uo92a7DNRy3f+qArG/L+1qW+RAk=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"iMSAk5+VwvcxIkvdg+X6WnR0paw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0b/TGxM5nsqM6NFzbHaitJ+t8B4="},{"type":"next-occurrence","id":"HdayxIkpRFAiYvWwGxkGJbPxr6c="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"iMSAk5+VwvcxIkvdg+X6WnR0paw=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"HdayxIkpRFAiYvWwGxkGJbPxr6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0b/TGxM5nsqM6NFzbHaitJ+t8B4="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-26T10:00:55Z"},"road_event_id":"HdayxIkpRFAiYvWwGxkGJbPxr6c=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"p5Rda0NOeXs4IxXQjbNdrSESb+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KjPiOIkU5sGtfriafF7mDgXBVPs="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"p5Rda0NOeXs4IxXQjbNdrSESb+8=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"KjPiOIkU5sGtfriafF7mDgXBVPs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p5Rda0NOeXs4IxXQjbNdrSESb+8="},{"type":"next-occurrence","id":"Y32j7uyZbB9xedXrYtu1ttbDiZI="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"KjPiOIkU5sGtfriafF7mDgXBVPs=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"Y32j7uyZbB9xedXrYtu1ttbDiZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p5Rda0NOeXs4IxXQjbNdrSESb+8="},{"type":"next-occurrence","id":"Ag4zdwbJgMfuCjLwjcFAM3z51ok="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"Y32j7uyZbB9xedXrYtu1ttbDiZI=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"Ag4zdwbJgMfuCjLwjcFAM3z51ok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p5Rda0NOeXs4IxXQjbNdrSESb+8="},{"type":"next-occurrence","id":"UUkmr5HWjsI3+dp0DPDSaB8/4EA="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"Ag4zdwbJgMfuCjLwjcFAM3z51ok=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"UUkmr5HWjsI3+dp0DPDSaB8/4EA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p5Rda0NOeXs4IxXQjbNdrSESb+8="},{"type":"next-occurrence","id":"khtdSYEfrsn8IFmzp9IBgT4H2EY="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"UUkmr5HWjsI3+dp0DPDSaB8/4EA=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"khtdSYEfrsn8IFmzp9IBgT4H2EY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p5Rda0NOeXs4IxXQjbNdrSESb+8="},{"type":"next-occurrence","id":"/GeBL/hhxvWiD5NCeNrsW02LDRs="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"khtdSYEfrsn8IFmzp9IBgT4H2EY=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"/GeBL/hhxvWiD5NCeNrsW02LDRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p5Rda0NOeXs4IxXQjbNdrSESb+8="},{"type":"next-occurrence","id":"z1bhPotWpzeT7lqwnBIREzWGsaE="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"/GeBL/hhxvWiD5NCeNrsW02LDRs=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"z1bhPotWpzeT7lqwnBIREzWGsaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p5Rda0NOeXs4IxXQjbNdrSESb+8="},{"type":"next-occurrence","id":"EP9+UTegR5WzHP3rNDF5jcjlnzs="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"z1bhPotWpzeT7lqwnBIREzWGsaE=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"EP9+UTegR5WzHP3rNDF5jcjlnzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p5Rda0NOeXs4IxXQjbNdrSESb+8="},{"type":"next-occurrence","id":"4xr1coYn1MiSdbSBOV8gDcFeNzE="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"EP9+UTegR5WzHP3rNDF5jcjlnzs=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"4xr1coYn1MiSdbSBOV8gDcFeNzE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p5Rda0NOeXs4IxXQjbNdrSESb+8="},{"type":"next-occurrence","id":"zcoWQSdjxoDDrqQUQ+hWugVDMzk="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"4xr1coYn1MiSdbSBOV8gDcFeNzE=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"zcoWQSdjxoDDrqQUQ+hWugVDMzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p5Rda0NOeXs4IxXQjbNdrSESb+8="},{"type":"next-occurrence","id":"T7FJbnMyhXUIR8vS/aVWINu5I9Q="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"zcoWQSdjxoDDrqQUQ+hWugVDMzk=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"T7FJbnMyhXUIR8vS/aVWINu5I9Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p5Rda0NOeXs4IxXQjbNdrSESb+8="},{"type":"next-occurrence","id":"nwZ5hDjej2LMudy0qMVX8zAosnE="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"T7FJbnMyhXUIR8vS/aVWINu5I9Q=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T11:00:00Z","end_date":"2026-05-24T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"nwZ5hDjej2LMudy0qMVX8zAosnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p5Rda0NOeXs4IxXQjbNdrSESb+8="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"nwZ5hDjej2LMudy0qMVX8zAosnE=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"C8Pzo+yDk5dm2CjR/1vV9szSEY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEAR RD - NY-930J"],"direction":"unknown","related_road_events":[],"description":"Roadwork on BEAR RD - NY-930J westbound between South Bay Rd (North Syracuse) and I-481 (North Syracuse), Continuous Monday April 20th, 2026 07:00 AM thru Friday May 29th, 2026 04:00 PM right shoulder closed","update_date":"2026-04-17T15:05:49Z"},"road_event_id":"C8Pzo+yDk5dm2CjR/1vV9szSEY4=","beginning_cross_street":"South Bay Rd","ending_cross_street":"I-481 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.119734,43.141229]]}},{"id":"v6kXtGGIafqwYSHHCaiPuQdshIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 26TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Y287qw2KQrdqao2dGjJJz8MVu9g="}],"description":"Construction on E 26TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York) for system enhancement-gas., Saturday April 11th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-04-07T17:22:12Z"},"road_event_id":"v6kXtGGIafqwYSHHCaiPuQdshIU=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981521,40.740629]]}},{"id":"Y287qw2KQrdqao2dGjJJz8MVu9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 26TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6kXtGGIafqwYSHHCaiPuQdshIU="},{"type":"next-occurrence","id":"vawcEElECyzEqbg9K8WPh9fq+FY="}],"description":"Construction on E 26TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York) for system enhancement-gas., Saturday April 11th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-04-07T17:22:12Z"},"road_event_id":"Y287qw2KQrdqao2dGjJJz8MVu9g=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981521,40.740629]]}},{"id":"vawcEElECyzEqbg9K8WPh9fq+FY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 26TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6kXtGGIafqwYSHHCaiPuQdshIU="},{"type":"next-occurrence","id":"b3NS2sSlhBuiXwaOEST70Gt6VUU="}],"description":"Construction on E 26TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York) for system enhancement-gas., Saturday April 11th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-04-07T17:22:12Z"},"road_event_id":"vawcEElECyzEqbg9K8WPh9fq+FY=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981521,40.740629]]}},{"id":"b3NS2sSlhBuiXwaOEST70Gt6VUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 26TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6kXtGGIafqwYSHHCaiPuQdshIU="}],"description":"Construction on E 26TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York) for system enhancement-gas., Saturday April 11th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-04-07T17:22:12Z"},"road_event_id":"b3NS2sSlhBuiXwaOEST70Gt6VUU=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981521,40.740629]]}},{"id":"ORC300367575","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","description":"Bridge replacement on NJ 47 both directions CR 551/Broadway Av (Westville) to US 130 (Westville) Not currently Scheduled","update_date":"2026-01-01T04:59:00Z"},"road_event_id":"ORC300367575","beginning_cross_street":"CR 551/Broadway Av","ending_cross_street":"US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2024-05-10T17:48:01Z","end_date":"2026-01-01T04:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-75.125527,39.870341]]}},{"id":"m+azQZiKK2/hEcRFOZqDEd/pc38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[],"description":"Construction on GROVE ST eastbound between HUDSON ST (New York) and BEDFORD ST (New York) to lift and remove materials from roof., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T19:33:29Z"},"road_event_id":"m+azQZiKK2/hEcRFOZqDEd/pc38=","beginning_cross_street":"HUDSON ST","ending_cross_street":"BEDFORD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006423,40.732412]]}},{"id":"SHvsdgy2vnWVHuyQAKqgbTreeCY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 81ST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VFlrWfgUDS/grZeIGVKxhXWROqY="}],"description":"Construction on E 81ST ST westbound between MADISON AVE (New York) and 5TH AVE (New York) for use of knuckle boom to hoist dunnage and equipment., Saturday April 18th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:12:35Z"},"road_event_id":"SHvsdgy2vnWVHuyQAKqgbTreeCY=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.961304,40.777696]]}},{"id":"VFlrWfgUDS/grZeIGVKxhXWROqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 81ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SHvsdgy2vnWVHuyQAKqgbTreeCY="}],"description":"Construction on E 81ST ST westbound between MADISON AVE (New York) and 5TH AVE (New York) for use of knuckle boom to hoist dunnage and equipment., Saturday April 18th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:12:35Z"},"road_event_id":"VFlrWfgUDS/grZeIGVKxhXWROqY=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.961304,40.777696]]}},{"id":"28Ab+TY8aCTyPBZt3RlliMGMWWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pqmbCCy9H7QWHDdkDEg1URQ2GYg="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"28Ab+TY8aCTyPBZt3RlliMGMWWs=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"pqmbCCy9H7QWHDdkDEg1URQ2GYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"28Ab+TY8aCTyPBZt3RlliMGMWWs="},{"type":"next-occurrence","id":"KpI7o7cwmbsyBDW0UtsvmAFOup4="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"pqmbCCy9H7QWHDdkDEg1URQ2GYg=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"KpI7o7cwmbsyBDW0UtsvmAFOup4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"28Ab+TY8aCTyPBZt3RlliMGMWWs="},{"type":"next-occurrence","id":"nd9RWWX1w8E2H3u4w/jpH5FciRg="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"KpI7o7cwmbsyBDW0UtsvmAFOup4=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"nd9RWWX1w8E2H3u4w/jpH5FciRg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"28Ab+TY8aCTyPBZt3RlliMGMWWs="},{"type":"next-occurrence","id":"9ZhnRQHkj+jmeNI85DxCBxgzHdk="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"nd9RWWX1w8E2H3u4w/jpH5FciRg=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"9ZhnRQHkj+jmeNI85DxCBxgzHdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"28Ab+TY8aCTyPBZt3RlliMGMWWs="},{"type":"next-occurrence","id":"1a6a5vcM0MfuUbaeVxNvslh2kaM="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"9ZhnRQHkj+jmeNI85DxCBxgzHdk=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"1a6a5vcM0MfuUbaeVxNvslh2kaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"28Ab+TY8aCTyPBZt3RlliMGMWWs="},{"type":"next-occurrence","id":"v2NJgs6JXXSOR7Tze30qTO7PHfg="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"1a6a5vcM0MfuUbaeVxNvslh2kaM=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"v2NJgs6JXXSOR7Tze30qTO7PHfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"28Ab+TY8aCTyPBZt3RlliMGMWWs="},{"type":"next-occurrence","id":"91YHwWRUtjzDsP2oTarsgqZqDwU="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"v2NJgs6JXXSOR7Tze30qTO7PHfg=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"91YHwWRUtjzDsP2oTarsgqZqDwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"28Ab+TY8aCTyPBZt3RlliMGMWWs="},{"type":"next-occurrence","id":"wskpzJNCbX2BCvLbnawwIkyQyfM="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"91YHwWRUtjzDsP2oTarsgqZqDwU=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"wskpzJNCbX2BCvLbnawwIkyQyfM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"28Ab+TY8aCTyPBZt3RlliMGMWWs="},{"type":"next-occurrence","id":"scN0Tli4O+Q1osE2Z+8BztN5wA4="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"wskpzJNCbX2BCvLbnawwIkyQyfM=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"scN0Tli4O+Q1osE2Z+8BztN5wA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"28Ab+TY8aCTyPBZt3RlliMGMWWs="},{"type":"next-occurrence","id":"68X7S5mF4v5Zp0XrmiuXgq7hR4w="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"scN0Tli4O+Q1osE2Z+8BztN5wA4=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"68X7S5mF4v5Zp0XrmiuXgq7hR4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"28Ab+TY8aCTyPBZt3RlliMGMWWs="},{"type":"next-occurrence","id":"Erludu1ymqVdoM+dKc5j1jDtVCo="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"68X7S5mF4v5Zp0XrmiuXgq7hR4w=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"Erludu1ymqVdoM+dKc5j1jDtVCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"28Ab+TY8aCTyPBZt3RlliMGMWWs="},{"type":"next-occurrence","id":"TWFKMIamfYgo3nm6ZUbtTsx2igk="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"Erludu1ymqVdoM+dKc5j1jDtVCo=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"TWFKMIamfYgo3nm6ZUbtTsx2igk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"28Ab+TY8aCTyPBZt3RlliMGMWWs="},{"type":"next-occurrence","id":"ig3K9nxE/IBJ3z9PfLETZbvLzt0="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"TWFKMIamfYgo3nm6ZUbtTsx2igk=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"ig3K9nxE/IBJ3z9PfLETZbvLzt0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"28Ab+TY8aCTyPBZt3RlliMGMWWs="},{"type":"next-occurrence","id":"NQfGqP07VOjk177qNl3ngPo9qYk="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"ig3K9nxE/IBJ3z9PfLETZbvLzt0=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"NQfGqP07VOjk177qNl3ngPo9qYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"28Ab+TY8aCTyPBZt3RlliMGMWWs="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"NQfGqP07VOjk177qNl3ngPo9qYk=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"Uj6DnmG3vfdz+tSz/I8ZkG4llf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3d8NFtrjxjCrMU4PRvj4IuT+pTM="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"Uj6DnmG3vfdz+tSz/I8ZkG4llf0=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"3d8NFtrjxjCrMU4PRvj4IuT+pTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uj6DnmG3vfdz+tSz/I8ZkG4llf0="},{"type":"next-occurrence","id":"dvrNKnuvb8uSP1j1snd+6SQe9K4="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"3d8NFtrjxjCrMU4PRvj4IuT+pTM=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"dvrNKnuvb8uSP1j1snd+6SQe9K4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uj6DnmG3vfdz+tSz/I8ZkG4llf0="},{"type":"next-occurrence","id":"0tXPMDzV809vrM18bTeBlkDUd9M="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"dvrNKnuvb8uSP1j1snd+6SQe9K4=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"0tXPMDzV809vrM18bTeBlkDUd9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uj6DnmG3vfdz+tSz/I8ZkG4llf0="},{"type":"next-occurrence","id":"/Q86lAfiyl4xEXgHa18/irK/sbc="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"0tXPMDzV809vrM18bTeBlkDUd9M=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"/Q86lAfiyl4xEXgHa18/irK/sbc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uj6DnmG3vfdz+tSz/I8ZkG4llf0="},{"type":"next-occurrence","id":"R9+zAozv3i/w3OwIIaaLhP5/B8Y="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"/Q86lAfiyl4xEXgHa18/irK/sbc=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"R9+zAozv3i/w3OwIIaaLhP5/B8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uj6DnmG3vfdz+tSz/I8ZkG4llf0="},{"type":"next-occurrence","id":"I7Pq7/CHvsBgQ1+pqw4tno8gOtA="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"R9+zAozv3i/w3OwIIaaLhP5/B8Y=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"I7Pq7/CHvsBgQ1+pqw4tno8gOtA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uj6DnmG3vfdz+tSz/I8ZkG4llf0="},{"type":"next-occurrence","id":"MGH5lftpIw00jBFr6WE/Cbo35jM="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"I7Pq7/CHvsBgQ1+pqw4tno8gOtA=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"MGH5lftpIw00jBFr6WE/Cbo35jM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uj6DnmG3vfdz+tSz/I8ZkG4llf0="},{"type":"next-occurrence","id":"fAMTKq7ybrjp2WKiwEhVCGipVmA="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"MGH5lftpIw00jBFr6WE/Cbo35jM=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"fAMTKq7ybrjp2WKiwEhVCGipVmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uj6DnmG3vfdz+tSz/I8ZkG4llf0="},{"type":"next-occurrence","id":"3O4f2RBVFThdKUH0IBhJiMT6E8s="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"fAMTKq7ybrjp2WKiwEhVCGipVmA=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"3O4f2RBVFThdKUH0IBhJiMT6E8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uj6DnmG3vfdz+tSz/I8ZkG4llf0="},{"type":"next-occurrence","id":"LYfgsIBf0qb33bKCtBKAuElPL70="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"3O4f2RBVFThdKUH0IBhJiMT6E8s=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"LYfgsIBf0qb33bKCtBKAuElPL70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uj6DnmG3vfdz+tSz/I8ZkG4llf0="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"LYfgsIBf0qb33bKCtBKAuElPL70=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"FULzQJcTPcysWUGbohx3qpg+CYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/o6g8QTt13qlMC6z6ipsv8ntlcA="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"FULzQJcTPcysWUGbohx3qpg+CYc=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"/o6g8QTt13qlMC6z6ipsv8ntlcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FULzQJcTPcysWUGbohx3qpg+CYc="},{"type":"next-occurrence","id":"dY8uUnoYy1NgkKbjBetPuIRyeZk="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"/o6g8QTt13qlMC6z6ipsv8ntlcA=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"dY8uUnoYy1NgkKbjBetPuIRyeZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FULzQJcTPcysWUGbohx3qpg+CYc="},{"type":"next-occurrence","id":"402B3/zBukxZKPy8MSd83znzYJo="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"dY8uUnoYy1NgkKbjBetPuIRyeZk=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"402B3/zBukxZKPy8MSd83znzYJo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FULzQJcTPcysWUGbohx3qpg+CYc="},{"type":"next-occurrence","id":"UVxF1bSeANpWbnSY7eai6Hak66Q="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"402B3/zBukxZKPy8MSd83znzYJo=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"UVxF1bSeANpWbnSY7eai6Hak66Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FULzQJcTPcysWUGbohx3qpg+CYc="},{"type":"next-occurrence","id":"amJjaW8b+4gOIovvbuGLhrL0M7c="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"UVxF1bSeANpWbnSY7eai6Hak66Q=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"amJjaW8b+4gOIovvbuGLhrL0M7c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FULzQJcTPcysWUGbohx3qpg+CYc="},{"type":"next-occurrence","id":"K9Dv5crXLrnZJLH0t7xcL47qISI="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"amJjaW8b+4gOIovvbuGLhrL0M7c=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"K9Dv5crXLrnZJLH0t7xcL47qISI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FULzQJcTPcysWUGbohx3qpg+CYc="},{"type":"next-occurrence","id":"pPPlhhn4bKLa7j6FJMyF2Gn1JQw="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"K9Dv5crXLrnZJLH0t7xcL47qISI=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"pPPlhhn4bKLa7j6FJMyF2Gn1JQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FULzQJcTPcysWUGbohx3qpg+CYc="},{"type":"next-occurrence","id":"27Y9Vqf6Xyon2hXmhhBierqVlVQ="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"pPPlhhn4bKLa7j6FJMyF2Gn1JQw=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"27Y9Vqf6Xyon2hXmhhBierqVlVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FULzQJcTPcysWUGbohx3qpg+CYc="},{"type":"next-occurrence","id":"G46yp/kl7KdO1bS1uzdBi1b3bn0="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"27Y9Vqf6Xyon2hXmhhBierqVlVQ=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"G46yp/kl7KdO1bS1uzdBi1b3bn0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FULzQJcTPcysWUGbohx3qpg+CYc="},{"type":"next-occurrence","id":"Wfu2TtBwZcR5NFDH2PImpItC/K8="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"G46yp/kl7KdO1bS1uzdBi1b3bn0=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"Wfu2TtBwZcR5NFDH2PImpItC/K8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FULzQJcTPcysWUGbohx3qpg+CYc="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"Wfu2TtBwZcR5NFDH2PImpItC/K8=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"e+p+igWHKGOLglSqkX1PIMQ0GYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"W6gHDBmJcE6DNNgHX+veDqKvBO4="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"e+p+igWHKGOLglSqkX1PIMQ0GYY=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"W6gHDBmJcE6DNNgHX+veDqKvBO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+p+igWHKGOLglSqkX1PIMQ0GYY="},{"type":"next-occurrence","id":"qpjhfZ9HUE73g3hu6mYlPMIgrnU="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"W6gHDBmJcE6DNNgHX+veDqKvBO4=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"qpjhfZ9HUE73g3hu6mYlPMIgrnU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+p+igWHKGOLglSqkX1PIMQ0GYY="},{"type":"next-occurrence","id":"zWIyEs08Y93/ch9bPnAXbydrPj8="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"qpjhfZ9HUE73g3hu6mYlPMIgrnU=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"zWIyEs08Y93/ch9bPnAXbydrPj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+p+igWHKGOLglSqkX1PIMQ0GYY="},{"type":"next-occurrence","id":"MDN4ye43aijQNwSIuxOSie7awsA="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"zWIyEs08Y93/ch9bPnAXbydrPj8=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"MDN4ye43aijQNwSIuxOSie7awsA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+p+igWHKGOLglSqkX1PIMQ0GYY="},{"type":"next-occurrence","id":"tiyOcGpczwrzl5cRvY+6UglPh3U="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"MDN4ye43aijQNwSIuxOSie7awsA=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"tiyOcGpczwrzl5cRvY+6UglPh3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+p+igWHKGOLglSqkX1PIMQ0GYY="},{"type":"next-occurrence","id":"lTskpVhDZIbqbfcl9PkUmBAuj70="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"tiyOcGpczwrzl5cRvY+6UglPh3U=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"lTskpVhDZIbqbfcl9PkUmBAuj70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+p+igWHKGOLglSqkX1PIMQ0GYY="},{"type":"next-occurrence","id":"M2RB6TzvF5fIXyI/tjnc+NPMs9c="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"lTskpVhDZIbqbfcl9PkUmBAuj70=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"M2RB6TzvF5fIXyI/tjnc+NPMs9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+p+igWHKGOLglSqkX1PIMQ0GYY="},{"type":"next-occurrence","id":"4Y2dGGyM2IHQgcOQMWoqj+kYbDA="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"M2RB6TzvF5fIXyI/tjnc+NPMs9c=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"4Y2dGGyM2IHQgcOQMWoqj+kYbDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+p+igWHKGOLglSqkX1PIMQ0GYY="},{"type":"next-occurrence","id":"QdPeCUfKbgrMtsqqyG/2/PQqfyY="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"4Y2dGGyM2IHQgcOQMWoqj+kYbDA=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"QdPeCUfKbgrMtsqqyG/2/PQqfyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+p+igWHKGOLglSqkX1PIMQ0GYY="},{"type":"next-occurrence","id":"VhlBeBsSR2lQMdWqad5buuLJLTU="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"QdPeCUfKbgrMtsqqyG/2/PQqfyY=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"VhlBeBsSR2lQMdWqad5buuLJLTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+p+igWHKGOLglSqkX1PIMQ0GYY="},{"type":"next-occurrence","id":"YZQCfcnRCEvY4hJm49ydFs2N+0A="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"VhlBeBsSR2lQMdWqad5buuLJLTU=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"YZQCfcnRCEvY4hJm49ydFs2N+0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+p+igWHKGOLglSqkX1PIMQ0GYY="},{"type":"next-occurrence","id":"1g7q11/smPaMBj+wxDk9PR1umfk="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"YZQCfcnRCEvY4hJm49ydFs2N+0A=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"1g7q11/smPaMBj+wxDk9PR1umfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+p+igWHKGOLglSqkX1PIMQ0GYY="},{"type":"next-occurrence","id":"tByA/kuRk1omON/Jicv6hHb2bj8="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"1g7q11/smPaMBj+wxDk9PR1umfk=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"tByA/kuRk1omON/Jicv6hHb2bj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+p+igWHKGOLglSqkX1PIMQ0GYY="},{"type":"next-occurrence","id":"59pU7T72/nOZbYOFrQ3mbAaW6jk="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"tByA/kuRk1omON/Jicv6hHb2bj8=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"59pU7T72/nOZbYOFrQ3mbAaW6jk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+p+igWHKGOLglSqkX1PIMQ0GYY="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"59pU7T72/nOZbYOFrQ3mbAaW6jk=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"603jjNmQuiFZpY+y7ztbyT+0N3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CzzqP+71EtEqwPE7FgGKndNiJaY="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"603jjNmQuiFZpY+y7ztbyT+0N3w=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"CzzqP+71EtEqwPE7FgGKndNiJaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"603jjNmQuiFZpY+y7ztbyT+0N3w="},{"type":"next-occurrence","id":"xiT+YSQzBBc5Z5woa7nBEUTsdTY="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"CzzqP+71EtEqwPE7FgGKndNiJaY=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"xiT+YSQzBBc5Z5woa7nBEUTsdTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"603jjNmQuiFZpY+y7ztbyT+0N3w="},{"type":"next-occurrence","id":"EYTfL6i2Aa81m4fEEWdP0eH9hZI="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"xiT+YSQzBBc5Z5woa7nBEUTsdTY=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"EYTfL6i2Aa81m4fEEWdP0eH9hZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"603jjNmQuiFZpY+y7ztbyT+0N3w="},{"type":"next-occurrence","id":"Aj5H5kwL9rg8VwS3dn/p+anEH8Y="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"EYTfL6i2Aa81m4fEEWdP0eH9hZI=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"Aj5H5kwL9rg8VwS3dn/p+anEH8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"603jjNmQuiFZpY+y7ztbyT+0N3w="},{"type":"next-occurrence","id":"rrQxytHpkLYVkQYOm+WRuqI8QmA="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"Aj5H5kwL9rg8VwS3dn/p+anEH8Y=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"rrQxytHpkLYVkQYOm+WRuqI8QmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"603jjNmQuiFZpY+y7ztbyT+0N3w="},{"type":"next-occurrence","id":"oQGE4zl8PKpZUurDZufuAexFN/Y="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"rrQxytHpkLYVkQYOm+WRuqI8QmA=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"oQGE4zl8PKpZUurDZufuAexFN/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"603jjNmQuiFZpY+y7ztbyT+0N3w="},{"type":"next-occurrence","id":"VI6wCLR1x05IuZ8S3wmHcdM5IP0="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"oQGE4zl8PKpZUurDZufuAexFN/Y=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"VI6wCLR1x05IuZ8S3wmHcdM5IP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"603jjNmQuiFZpY+y7ztbyT+0N3w="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"VI6wCLR1x05IuZ8S3wmHcdM5IP0=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"wsxB0CQvPUnbUfCx/pfauNeEPmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"A5NYpk5zxoL4IzG+ZpUP+RBtLeU="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"wsxB0CQvPUnbUfCx/pfauNeEPmA=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"A5NYpk5zxoL4IzG+ZpUP+RBtLeU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsxB0CQvPUnbUfCx/pfauNeEPmA="},{"type":"next-occurrence","id":"anB1cYDqpwvaHJRGskJEV9ttghY="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"A5NYpk5zxoL4IzG+ZpUP+RBtLeU=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"anB1cYDqpwvaHJRGskJEV9ttghY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsxB0CQvPUnbUfCx/pfauNeEPmA="},{"type":"next-occurrence","id":"H3J/3pm5yMf49ipFv4EuKxlOlNM="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"anB1cYDqpwvaHJRGskJEV9ttghY=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"H3J/3pm5yMf49ipFv4EuKxlOlNM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsxB0CQvPUnbUfCx/pfauNeEPmA="},{"type":"next-occurrence","id":"4LyFgJy73oRkg8v3LtMzbbVMiDc="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"H3J/3pm5yMf49ipFv4EuKxlOlNM=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"4LyFgJy73oRkg8v3LtMzbbVMiDc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsxB0CQvPUnbUfCx/pfauNeEPmA="},{"type":"next-occurrence","id":"oFKPoNWuUBcsnGTWMKm+9FtVZNQ="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"4LyFgJy73oRkg8v3LtMzbbVMiDc=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"oFKPoNWuUBcsnGTWMKm+9FtVZNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsxB0CQvPUnbUfCx/pfauNeEPmA="},{"type":"next-occurrence","id":"EGYKlix87z64XBiNzpWCYZUm2f4="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"oFKPoNWuUBcsnGTWMKm+9FtVZNQ=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"EGYKlix87z64XBiNzpWCYZUm2f4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsxB0CQvPUnbUfCx/pfauNeEPmA="},{"type":"next-occurrence","id":"1dcmYuhi8DrdSnMN8GlR6Cx2/xM="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"EGYKlix87z64XBiNzpWCYZUm2f4=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"1dcmYuhi8DrdSnMN8GlR6Cx2/xM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsxB0CQvPUnbUfCx/pfauNeEPmA="},{"type":"next-occurrence","id":"qAP0UFHCfiJBF4At/kPVjhCuwOw="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"1dcmYuhi8DrdSnMN8GlR6Cx2/xM=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"qAP0UFHCfiJBF4At/kPVjhCuwOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsxB0CQvPUnbUfCx/pfauNeEPmA="},{"type":"next-occurrence","id":"bdXRrjYNPcD6c8GZYWnhA4Uy8jc="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"qAP0UFHCfiJBF4At/kPVjhCuwOw=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"bdXRrjYNPcD6c8GZYWnhA4Uy8jc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsxB0CQvPUnbUfCx/pfauNeEPmA="},{"type":"next-occurrence","id":"TaymEmo01SDwGb2ze9Ka8rhAUX4="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"bdXRrjYNPcD6c8GZYWnhA4Uy8jc=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"TaymEmo01SDwGb2ze9Ka8rhAUX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsxB0CQvPUnbUfCx/pfauNeEPmA="},{"type":"next-occurrence","id":"f4IRCcezxo3R0LbDZSPsO1IaqIQ="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"TaymEmo01SDwGb2ze9Ka8rhAUX4=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"f4IRCcezxo3R0LbDZSPsO1IaqIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsxB0CQvPUnbUfCx/pfauNeEPmA="},{"type":"next-occurrence","id":"mLPGC3TGlDLacWQC1zSwwKqXhD4="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"f4IRCcezxo3R0LbDZSPsO1IaqIQ=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"mLPGC3TGlDLacWQC1zSwwKqXhD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsxB0CQvPUnbUfCx/pfauNeEPmA="},{"type":"next-occurrence","id":"GXl2K2ShOyvEjgIpwBzhyn/0y/E="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"mLPGC3TGlDLacWQC1zSwwKqXhD4=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"GXl2K2ShOyvEjgIpwBzhyn/0y/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsxB0CQvPUnbUfCx/pfauNeEPmA="},{"type":"next-occurrence","id":"Y3c9hd4trG2lonG0MJyQBpWFieQ="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"GXl2K2ShOyvEjgIpwBzhyn/0y/E=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"Y3c9hd4trG2lonG0MJyQBpWFieQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsxB0CQvPUnbUfCx/pfauNeEPmA="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"Y3c9hd4trG2lonG0MJyQBpWFieQ=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"ORC300435275","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for Sandrespc-East side coastal resiliency. Not currently Scheduled","update_date":"2025-05-30T20:00:02Z"},"road_event_id":"ORC300435275","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-04-01T20:13:26Z","end_date":"2025-05-31T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.977725,40.733945]]}},{"id":"BLLTMcD8CMq9GRJnKvKDIQPsNQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 176TH ST"],"direction":"unknown","related_road_events":[],"description":"Construction on E 176TH ST eastbound between MARMION AVE (New York) and MOHEGAN AVE (New York) for concrete pump and booming operations., Friday April 17th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:48:03Z"},"road_event_id":"BLLTMcD8CMq9GRJnKvKDIQPsNQc=","beginning_cross_street":"MARMION AVE","ending_cross_street":"MOHEGAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.888473,40.841447]]}},{"id":"vJGL83ohhmuXdp8eydIRdFkfmbc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IAbmuUC2LYi8ycQQ3RhBFwfq97g="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"vJGL83ohhmuXdp8eydIRdFkfmbc=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"IAbmuUC2LYi8ycQQ3RhBFwfq97g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vJGL83ohhmuXdp8eydIRdFkfmbc="},{"type":"next-occurrence","id":"mu0ssGiCGwx1FYsMcxfiD3Rlz9c="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"IAbmuUC2LYi8ycQQ3RhBFwfq97g=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"mu0ssGiCGwx1FYsMcxfiD3Rlz9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vJGL83ohhmuXdp8eydIRdFkfmbc="},{"type":"next-occurrence","id":"zJ75UAq4dm8GXzOPWWARlKmu6Bg="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"mu0ssGiCGwx1FYsMcxfiD3Rlz9c=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"zJ75UAq4dm8GXzOPWWARlKmu6Bg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vJGL83ohhmuXdp8eydIRdFkfmbc="},{"type":"next-occurrence","id":"BNE9C/nSh1qCQ0oqWZFqcoAWI6U="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"zJ75UAq4dm8GXzOPWWARlKmu6Bg=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"BNE9C/nSh1qCQ0oqWZFqcoAWI6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vJGL83ohhmuXdp8eydIRdFkfmbc="},{"type":"next-occurrence","id":"B1kRXARGYJJNpOseF3b3j1f3/IU="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"BNE9C/nSh1qCQ0oqWZFqcoAWI6U=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"B1kRXARGYJJNpOseF3b3j1f3/IU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vJGL83ohhmuXdp8eydIRdFkfmbc="},{"type":"next-occurrence","id":"Tgqo2M5+mo7jnkkiaDXpFHWtTpE="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"B1kRXARGYJJNpOseF3b3j1f3/IU=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"Tgqo2M5+mo7jnkkiaDXpFHWtTpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vJGL83ohhmuXdp8eydIRdFkfmbc="},{"type":"next-occurrence","id":"rM/8T/PXwMBaJOsNdJULqdzbxx8="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"Tgqo2M5+mo7jnkkiaDXpFHWtTpE=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"rM/8T/PXwMBaJOsNdJULqdzbxx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vJGL83ohhmuXdp8eydIRdFkfmbc="},{"type":"next-occurrence","id":"b3IzkWHc64lsW6p32RRM9XTjJmA="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"rM/8T/PXwMBaJOsNdJULqdzbxx8=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"b3IzkWHc64lsW6p32RRM9XTjJmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vJGL83ohhmuXdp8eydIRdFkfmbc="},{"type":"next-occurrence","id":"Ctd8B47Dxs778Af6yNy2hQw2yE8="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"b3IzkWHc64lsW6p32RRM9XTjJmA=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"Ctd8B47Dxs778Af6yNy2hQw2yE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vJGL83ohhmuXdp8eydIRdFkfmbc="},{"type":"next-occurrence","id":"ZPjbFfAMv52GRqmTEF2TPBlJGIc="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"Ctd8B47Dxs778Af6yNy2hQw2yE8=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"ZPjbFfAMv52GRqmTEF2TPBlJGIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vJGL83ohhmuXdp8eydIRdFkfmbc="},{"type":"next-occurrence","id":"Q57tKzpggLiGv7fBQzxcodGUY/U="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"ZPjbFfAMv52GRqmTEF2TPBlJGIc=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"Q57tKzpggLiGv7fBQzxcodGUY/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vJGL83ohhmuXdp8eydIRdFkfmbc="},{"type":"next-occurrence","id":"rBvRZAPW3Inis6g2pbtWmFOAbRk="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"Q57tKzpggLiGv7fBQzxcodGUY/U=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"rBvRZAPW3Inis6g2pbtWmFOAbRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vJGL83ohhmuXdp8eydIRdFkfmbc="},{"type":"next-occurrence","id":"3f43eXh2MCx19lpB/WY9zb4we04="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"rBvRZAPW3Inis6g2pbtWmFOAbRk=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"3f43eXh2MCx19lpB/WY9zb4we04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vJGL83ohhmuXdp8eydIRdFkfmbc="},{"type":"next-occurrence","id":"OGCpyCik296rShw4piYCseNwQEI="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"3f43eXh2MCx19lpB/WY9zb4we04=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"OGCpyCik296rShw4piYCseNwQEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vJGL83ohhmuXdp8eydIRdFkfmbc="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"OGCpyCik296rShw4piYCseNwQEI=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"d55nE9+bC86LRV8ThjEtDrkPYxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Qb6UxqTUzAb//IDOQUzt+kCxhl8="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"d55nE9+bC86LRV8ThjEtDrkPYxE=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"Qb6UxqTUzAb//IDOQUzt+kCxhl8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d55nE9+bC86LRV8ThjEtDrkPYxE="},{"type":"next-occurrence","id":"JvhlhFS58EgH1cMKoFZtdutCsuc="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"Qb6UxqTUzAb//IDOQUzt+kCxhl8=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"JvhlhFS58EgH1cMKoFZtdutCsuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d55nE9+bC86LRV8ThjEtDrkPYxE="},{"type":"next-occurrence","id":"L3YeBzF41GB6PioArMTG653LDhQ="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"JvhlhFS58EgH1cMKoFZtdutCsuc=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"L3YeBzF41GB6PioArMTG653LDhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d55nE9+bC86LRV8ThjEtDrkPYxE="},{"type":"next-occurrence","id":"62LdMvuPnmZNcxNxQYum9yzZQRE="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"L3YeBzF41GB6PioArMTG653LDhQ=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T12:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"62LdMvuPnmZNcxNxQYum9yzZQRE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d55nE9+bC86LRV8ThjEtDrkPYxE="},{"type":"next-occurrence","id":"FvET4d//1emrUrUGWJH/XVYjr9k="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"62LdMvuPnmZNcxNxQYum9yzZQRE=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T12:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"FvET4d//1emrUrUGWJH/XVYjr9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d55nE9+bC86LRV8ThjEtDrkPYxE="},{"type":"next-occurrence","id":"X9qUYB3BaH3joHxoR24tvn4WaOw="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"FvET4d//1emrUrUGWJH/XVYjr9k=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T12:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"X9qUYB3BaH3joHxoR24tvn4WaOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d55nE9+bC86LRV8ThjEtDrkPYxE="},{"type":"next-occurrence","id":"+5ldiOx8fAQkKldgjc7CYqlwSAg="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"X9qUYB3BaH3joHxoR24tvn4WaOw=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T12:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"+5ldiOx8fAQkKldgjc7CYqlwSAg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d55nE9+bC86LRV8ThjEtDrkPYxE="},{"type":"next-occurrence","id":"iKBod3ohVeKhHFskZK/lIGU0ctM="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"+5ldiOx8fAQkKldgjc7CYqlwSAg=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T12:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"iKBod3ohVeKhHFskZK/lIGU0ctM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d55nE9+bC86LRV8ThjEtDrkPYxE="},{"type":"next-occurrence","id":"F4tPbUR094kNpLCXn5nYqP2XtcE="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"iKBod3ohVeKhHFskZK/lIGU0ctM=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T12:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"F4tPbUR094kNpLCXn5nYqP2XtcE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d55nE9+bC86LRV8ThjEtDrkPYxE="},{"type":"next-occurrence","id":"W/AyhDzdZ0oIY7Bs6vAEN88MFts="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"F4tPbUR094kNpLCXn5nYqP2XtcE=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T12:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"W/AyhDzdZ0oIY7Bs6vAEN88MFts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"d55nE9+bC86LRV8ThjEtDrkPYxE="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"W/AyhDzdZ0oIY7Bs6vAEN88MFts=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T12:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"3ay15jBICzeJmNjQJbyl5LzQ9Rk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+CmkfKmy3EApm0Rsmha5OgEbqn4="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"3ay15jBICzeJmNjQJbyl5LzQ9Rk=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"+CmkfKmy3EApm0Rsmha5OgEbqn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3ay15jBICzeJmNjQJbyl5LzQ9Rk="},{"type":"next-occurrence","id":"JWtQyHiqxojqUyMqNtbhNMp8sXg="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"+CmkfKmy3EApm0Rsmha5OgEbqn4=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"JWtQyHiqxojqUyMqNtbhNMp8sXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3ay15jBICzeJmNjQJbyl5LzQ9Rk="},{"type":"next-occurrence","id":"m9kdtw4UyRDF9R4iLjX2jHcueAk="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"JWtQyHiqxojqUyMqNtbhNMp8sXg=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"m9kdtw4UyRDF9R4iLjX2jHcueAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3ay15jBICzeJmNjQJbyl5LzQ9Rk="},{"type":"next-occurrence","id":"Px2GpebTWx7cXBQI0fxuR+MIOo0="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"m9kdtw4UyRDF9R4iLjX2jHcueAk=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"Px2GpebTWx7cXBQI0fxuR+MIOo0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3ay15jBICzeJmNjQJbyl5LzQ9Rk="},{"type":"next-occurrence","id":"d6F3cBzOvFqkzWcphmGfEuqCdoE="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"Px2GpebTWx7cXBQI0fxuR+MIOo0=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"d6F3cBzOvFqkzWcphmGfEuqCdoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3ay15jBICzeJmNjQJbyl5LzQ9Rk="},{"type":"next-occurrence","id":"pdmSDi0qMKb+E9+f+uZhvsqhkQo="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"d6F3cBzOvFqkzWcphmGfEuqCdoE=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"pdmSDi0qMKb+E9+f+uZhvsqhkQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3ay15jBICzeJmNjQJbyl5LzQ9Rk="},{"type":"next-occurrence","id":"KCiZXKSF9yyKyPaplDMp1Q5wGtI="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"pdmSDi0qMKb+E9+f+uZhvsqhkQo=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"KCiZXKSF9yyKyPaplDMp1Q5wGtI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3ay15jBICzeJmNjQJbyl5LzQ9Rk="},{"type":"next-occurrence","id":"R8ZyLLc9sJuiiletwAwP0mbDjbI="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"KCiZXKSF9yyKyPaplDMp1Q5wGtI=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"R8ZyLLc9sJuiiletwAwP0mbDjbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3ay15jBICzeJmNjQJbyl5LzQ9Rk="},{"type":"next-occurrence","id":"Mix1YdH4ZT5UqAVSlT9doZCt0s8="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"R8ZyLLc9sJuiiletwAwP0mbDjbI=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"Mix1YdH4ZT5UqAVSlT9doZCt0s8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3ay15jBICzeJmNjQJbyl5LzQ9Rk="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"Mix1YdH4ZT5UqAVSlT9doZCt0s8=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"J7o275IbZ0LtfE4zRDykhlcwpNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qI5fBw5Euu6FyhTP2P0OP8ajAi4="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"J7o275IbZ0LtfE4zRDykhlcwpNo=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"qI5fBw5Euu6FyhTP2P0OP8ajAi4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7o275IbZ0LtfE4zRDykhlcwpNo="},{"type":"next-occurrence","id":"7IonRD4c43BAsLIh7xeNtuTflfU="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"qI5fBw5Euu6FyhTP2P0OP8ajAi4=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"7IonRD4c43BAsLIh7xeNtuTflfU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7o275IbZ0LtfE4zRDykhlcwpNo="},{"type":"next-occurrence","id":"DoSQEa19h1sBwnnXsVBfOdVMYrk="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"7IonRD4c43BAsLIh7xeNtuTflfU=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"DoSQEa19h1sBwnnXsVBfOdVMYrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7o275IbZ0LtfE4zRDykhlcwpNo="},{"type":"next-occurrence","id":"aGwL8LoJ0KD6K5cmkaw7gV2JYmg="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"DoSQEa19h1sBwnnXsVBfOdVMYrk=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"aGwL8LoJ0KD6K5cmkaw7gV2JYmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7o275IbZ0LtfE4zRDykhlcwpNo="},{"type":"next-occurrence","id":"WRhy1h4xn2SsVTgb0ztJMbI16Ek="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"aGwL8LoJ0KD6K5cmkaw7gV2JYmg=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"WRhy1h4xn2SsVTgb0ztJMbI16Ek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7o275IbZ0LtfE4zRDykhlcwpNo="},{"type":"next-occurrence","id":"vznbM2EehjjnR5y/frQKHc+tWgo="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"WRhy1h4xn2SsVTgb0ztJMbI16Ek=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"vznbM2EehjjnR5y/frQKHc+tWgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7o275IbZ0LtfE4zRDykhlcwpNo="},{"type":"next-occurrence","id":"vUKdBuqfTulJshz/IcR7wad9pR8="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"vznbM2EehjjnR5y/frQKHc+tWgo=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"vUKdBuqfTulJshz/IcR7wad9pR8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7o275IbZ0LtfE4zRDykhlcwpNo="},{"type":"next-occurrence","id":"Sb54fw32hSSy28c7uOTyTYOn0/Y="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"vUKdBuqfTulJshz/IcR7wad9pR8=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"Sb54fw32hSSy28c7uOTyTYOn0/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7o275IbZ0LtfE4zRDykhlcwpNo="},{"type":"next-occurrence","id":"KwSpHTtSVh3JgEmA83BBlPrYByM="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"Sb54fw32hSSy28c7uOTyTYOn0/Y=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"KwSpHTtSVh3JgEmA83BBlPrYByM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7o275IbZ0LtfE4zRDykhlcwpNo="},{"type":"next-occurrence","id":"XbnJptalWevAMpZreGjYPcKi/T0="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"KwSpHTtSVh3JgEmA83BBlPrYByM=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"XbnJptalWevAMpZreGjYPcKi/T0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7o275IbZ0LtfE4zRDykhlcwpNo="},{"type":"next-occurrence","id":"pEjx1rrULJ/BCgfNz25D9azxwZQ="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"XbnJptalWevAMpZreGjYPcKi/T0=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"pEjx1rrULJ/BCgfNz25D9azxwZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7o275IbZ0LtfE4zRDykhlcwpNo="},{"type":"next-occurrence","id":"Co+kzYRS4JSR+rzlaUtBk1hWGPU="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"pEjx1rrULJ/BCgfNz25D9azxwZQ=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"Co+kzYRS4JSR+rzlaUtBk1hWGPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7o275IbZ0LtfE4zRDykhlcwpNo="},{"type":"next-occurrence","id":"fUtUtGsUJFx6LNUeDLANH5lee6E="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"Co+kzYRS4JSR+rzlaUtBk1hWGPU=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"fUtUtGsUJFx6LNUeDLANH5lee6E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7o275IbZ0LtfE4zRDykhlcwpNo="},{"type":"next-occurrence","id":"8K/+u8GiAuA7BN6Wj7FMRhIo1Qo="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"fUtUtGsUJFx6LNUeDLANH5lee6E=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"8K/+u8GiAuA7BN6Wj7FMRhIo1Qo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7o275IbZ0LtfE4zRDykhlcwpNo="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"8K/+u8GiAuA7BN6Wj7FMRhIo1Qo=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"5YgGjNAR/wDGGEbNmXRKbVjm5yk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Krlatr6ypvvJk22za2IMWwZYSkQ="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"5YgGjNAR/wDGGEbNmXRKbVjm5yk=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"Krlatr6ypvvJk22za2IMWwZYSkQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5YgGjNAR/wDGGEbNmXRKbVjm5yk="},{"type":"next-occurrence","id":"VXkt05y7HdbsFN3EhJwKenD0XO8="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"Krlatr6ypvvJk22za2IMWwZYSkQ=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"VXkt05y7HdbsFN3EhJwKenD0XO8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5YgGjNAR/wDGGEbNmXRKbVjm5yk="},{"type":"next-occurrence","id":"JIByOA8IrxpoTJe3fMQHngxADh8="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"VXkt05y7HdbsFN3EhJwKenD0XO8=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"JIByOA8IrxpoTJe3fMQHngxADh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5YgGjNAR/wDGGEbNmXRKbVjm5yk="},{"type":"next-occurrence","id":"HdRElcfiNPgaI2FuI85of0eulYI="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"JIByOA8IrxpoTJe3fMQHngxADh8=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"HdRElcfiNPgaI2FuI85of0eulYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5YgGjNAR/wDGGEbNmXRKbVjm5yk="},{"type":"next-occurrence","id":"3l+qGPW317WsRYKOChAnfCCJbTk="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"HdRElcfiNPgaI2FuI85of0eulYI=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"3l+qGPW317WsRYKOChAnfCCJbTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5YgGjNAR/wDGGEbNmXRKbVjm5yk="},{"type":"next-occurrence","id":"+CUxpHfOEOnPx0Pm6nrYQS9dS1Q="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"3l+qGPW317WsRYKOChAnfCCJbTk=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"+CUxpHfOEOnPx0Pm6nrYQS9dS1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5YgGjNAR/wDGGEbNmXRKbVjm5yk="},{"type":"next-occurrence","id":"d7RixTl+wQmkQDo+73+Qi+o9MQ0="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"+CUxpHfOEOnPx0Pm6nrYQS9dS1Q=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"d7RixTl+wQmkQDo+73+Qi+o9MQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5YgGjNAR/wDGGEbNmXRKbVjm5yk="},{"type":"next-occurrence","id":"wnbDg9xtA4ZJlCY28w3EeAGBYaE="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"d7RixTl+wQmkQDo+73+Qi+o9MQ0=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"wnbDg9xtA4ZJlCY28w3EeAGBYaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5YgGjNAR/wDGGEbNmXRKbVjm5yk="},{"type":"next-occurrence","id":"WFZbd8mv+lxIDMPE6Tl9WYHfcms="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"wnbDg9xtA4ZJlCY28w3EeAGBYaE=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"WFZbd8mv+lxIDMPE6Tl9WYHfcms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5YgGjNAR/wDGGEbNmXRKbVjm5yk="},{"type":"next-occurrence","id":"prhkLfYMfmycCvVS+lidcpnXUEc="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"WFZbd8mv+lxIDMPE6Tl9WYHfcms=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"prhkLfYMfmycCvVS+lidcpnXUEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5YgGjNAR/wDGGEbNmXRKbVjm5yk="},{"type":"next-occurrence","id":"DVsYlWi+p7Q6O5wxSe8xfXsTOMg="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"prhkLfYMfmycCvVS+lidcpnXUEc=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"DVsYlWi+p7Q6O5wxSe8xfXsTOMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5YgGjNAR/wDGGEbNmXRKbVjm5yk="},{"type":"next-occurrence","id":"fTLFnSbVPZcal7etuLu8wcq1j7Q="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"DVsYlWi+p7Q6O5wxSe8xfXsTOMg=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"fTLFnSbVPZcal7etuLu8wcq1j7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5YgGjNAR/wDGGEbNmXRKbVjm5yk="},{"type":"next-occurrence","id":"Vtld/Hp4bhJqjO7+kKm5X6vtZkM="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"fTLFnSbVPZcal7etuLu8wcq1j7Q=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"Vtld/Hp4bhJqjO7+kKm5X6vtZkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5YgGjNAR/wDGGEbNmXRKbVjm5yk="},{"type":"next-occurrence","id":"7vjBYQJzEa0MlZEcxomDR4xFMKs="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"Vtld/Hp4bhJqjO7+kKm5X6vtZkM=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"7vjBYQJzEa0MlZEcxomDR4xFMKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5YgGjNAR/wDGGEbNmXRKbVjm5yk="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"7vjBYQJzEa0MlZEcxomDR4xFMKs=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"+cnbJJsl/TKl31WyFasqk3l5PXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"a9j35YWRBasLEHqtxHNayS4rZDA="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"+cnbJJsl/TKl31WyFasqk3l5PXE=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"a9j35YWRBasLEHqtxHNayS4rZDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cnbJJsl/TKl31WyFasqk3l5PXE="},{"type":"next-occurrence","id":"nq+rNfLNGuJBvmjczqhCyXaJ4Es="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"a9j35YWRBasLEHqtxHNayS4rZDA=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"nq+rNfLNGuJBvmjczqhCyXaJ4Es=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cnbJJsl/TKl31WyFasqk3l5PXE="},{"type":"next-occurrence","id":"OFXsTHgg6DMtr/2hokW3pHBJlt4="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"nq+rNfLNGuJBvmjczqhCyXaJ4Es=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"OFXsTHgg6DMtr/2hokW3pHBJlt4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cnbJJsl/TKl31WyFasqk3l5PXE="},{"type":"next-occurrence","id":"jSiyEE7hUTyGU04Yn0NlGKulXis="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"OFXsTHgg6DMtr/2hokW3pHBJlt4=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"jSiyEE7hUTyGU04Yn0NlGKulXis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cnbJJsl/TKl31WyFasqk3l5PXE="},{"type":"next-occurrence","id":"/LWXrD2sX0S4k1zdrAure7dkVas="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"jSiyEE7hUTyGU04Yn0NlGKulXis=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"/LWXrD2sX0S4k1zdrAure7dkVas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cnbJJsl/TKl31WyFasqk3l5PXE="},{"type":"next-occurrence","id":"Teflld/2E+8pjf6EQN+Hlc+U7a8="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"/LWXrD2sX0S4k1zdrAure7dkVas=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"Teflld/2E+8pjf6EQN+Hlc+U7a8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cnbJJsl/TKl31WyFasqk3l5PXE="},{"type":"next-occurrence","id":"ZR1c+36ThBM5gXI1kEp82wA5pQc="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"Teflld/2E+8pjf6EQN+Hlc+U7a8=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"ZR1c+36ThBM5gXI1kEp82wA5pQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cnbJJsl/TKl31WyFasqk3l5PXE="},{"type":"next-occurrence","id":"oyo5beEhS7k25inJlnmCXSYlu9s="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"ZR1c+36ThBM5gXI1kEp82wA5pQc=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"oyo5beEhS7k25inJlnmCXSYlu9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cnbJJsl/TKl31WyFasqk3l5PXE="},{"type":"next-occurrence","id":"OAGS8MYhLBQVv13QUqxBrdq6/L8="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"oyo5beEhS7k25inJlnmCXSYlu9s=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"OAGS8MYhLBQVv13QUqxBrdq6/L8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cnbJJsl/TKl31WyFasqk3l5PXE="},{"type":"next-occurrence","id":"I916+0htGkgtYEprNrrYscT+vi4="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"OAGS8MYhLBQVv13QUqxBrdq6/L8=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"I916+0htGkgtYEprNrrYscT+vi4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cnbJJsl/TKl31WyFasqk3l5PXE="},{"type":"next-occurrence","id":"B2ooKFVcrbkPFoVAh5+n8vrJuUI="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"I916+0htGkgtYEprNrrYscT+vi4=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"B2ooKFVcrbkPFoVAh5+n8vrJuUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cnbJJsl/TKl31WyFasqk3l5PXE="},{"type":"next-occurrence","id":"0MXTxjO4OCtFaGLNhmxnloi/570="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"B2ooKFVcrbkPFoVAh5+n8vrJuUI=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"0MXTxjO4OCtFaGLNhmxnloi/570=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cnbJJsl/TKl31WyFasqk3l5PXE="},{"type":"next-occurrence","id":"vb4OI+ltEpb3MHPVHrTH//fDdnE="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"0MXTxjO4OCtFaGLNhmxnloi/570=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"vb4OI+ltEpb3MHPVHrTH//fDdnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cnbJJsl/TKl31WyFasqk3l5PXE="},{"type":"next-occurrence","id":"6lDpm4pVujVktndsbpYby0ZI1vE="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"vb4OI+ltEpb3MHPVHrTH//fDdnE=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"6lDpm4pVujVktndsbpYby0ZI1vE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cnbJJsl/TKl31WyFasqk3l5PXE="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"6lDpm4pVujVktndsbpYby0ZI1vE=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"3j2P/Y6Bx8RZvd0LuJZ9QynAOpc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Bum/LBuaDXRL6DkuvMyF6a4balA="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"3j2P/Y6Bx8RZvd0LuJZ9QynAOpc=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"Bum/LBuaDXRL6DkuvMyF6a4balA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3j2P/Y6Bx8RZvd0LuJZ9QynAOpc="},{"type":"next-occurrence","id":"xuP0g4yFDOErBj6BZRur5YNbqcA="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"Bum/LBuaDXRL6DkuvMyF6a4balA=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"xuP0g4yFDOErBj6BZRur5YNbqcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3j2P/Y6Bx8RZvd0LuJZ9QynAOpc="},{"type":"next-occurrence","id":"ADo47qHhVh/H69DHsv/VrqEjJYk="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"xuP0g4yFDOErBj6BZRur5YNbqcA=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"ADo47qHhVh/H69DHsv/VrqEjJYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3j2P/Y6Bx8RZvd0LuJZ9QynAOpc="},{"type":"next-occurrence","id":"OvDWZMvksiQju3ZGzjoGLWHh3VI="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"ADo47qHhVh/H69DHsv/VrqEjJYk=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"OvDWZMvksiQju3ZGzjoGLWHh3VI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3j2P/Y6Bx8RZvd0LuJZ9QynAOpc="},{"type":"next-occurrence","id":"GItZ5yH6KKqFvGBp55VPpdHJuwA="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"OvDWZMvksiQju3ZGzjoGLWHh3VI=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"GItZ5yH6KKqFvGBp55VPpdHJuwA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3j2P/Y6Bx8RZvd0LuJZ9QynAOpc="},{"type":"next-occurrence","id":"ND8CVBSGRAvbcq16cFqOx2UDVUg="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"GItZ5yH6KKqFvGBp55VPpdHJuwA=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"ND8CVBSGRAvbcq16cFqOx2UDVUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3j2P/Y6Bx8RZvd0LuJZ9QynAOpc="},{"type":"next-occurrence","id":"xcJ5X2MAj+4U5Ai/aNA8SnnwbZ4="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"ND8CVBSGRAvbcq16cFqOx2UDVUg=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"xcJ5X2MAj+4U5Ai/aNA8SnnwbZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3j2P/Y6Bx8RZvd0LuJZ9QynAOpc="},{"type":"next-occurrence","id":"o4RGO7TRhCfrAo5WDUbkQn27Xcs="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"xcJ5X2MAj+4U5Ai/aNA8SnnwbZ4=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"o4RGO7TRhCfrAo5WDUbkQn27Xcs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3j2P/Y6Bx8RZvd0LuJZ9QynAOpc="},{"type":"next-occurrence","id":"C0xWm3IW3C8F2NjV7LYqqIjg+aI="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"o4RGO7TRhCfrAo5WDUbkQn27Xcs=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"C0xWm3IW3C8F2NjV7LYqqIjg+aI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3j2P/Y6Bx8RZvd0LuJZ9QynAOpc="},{"type":"next-occurrence","id":"18J+bBBCtgR2l96hx0S2PtaDmTw="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"C0xWm3IW3C8F2NjV7LYqqIjg+aI=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"18J+bBBCtgR2l96hx0S2PtaDmTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3j2P/Y6Bx8RZvd0LuJZ9QynAOpc="},{"type":"next-occurrence","id":"nmbRk0UxHZ5opDNhjDQaR4kKiIk="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"18J+bBBCtgR2l96hx0S2PtaDmTw=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"nmbRk0UxHZ5opDNhjDQaR4kKiIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3j2P/Y6Bx8RZvd0LuJZ9QynAOpc="},{"type":"next-occurrence","id":"oRZQFzJs/fIZKwO3zGiEG7JdsNY="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"nmbRk0UxHZ5opDNhjDQaR4kKiIk=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"oRZQFzJs/fIZKwO3zGiEG7JdsNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3j2P/Y6Bx8RZvd0LuJZ9QynAOpc="},{"type":"next-occurrence","id":"Pez0eZD41gepGUL+TmVc9c7EfVo="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"oRZQFzJs/fIZKwO3zGiEG7JdsNY=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"Pez0eZD41gepGUL+TmVc9c7EfVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3j2P/Y6Bx8RZvd0LuJZ9QynAOpc="},{"type":"next-occurrence","id":"AO5PgKpHz+kEQB78MImv08UFqMs="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"Pez0eZD41gepGUL+TmVc9c7EfVo=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"AO5PgKpHz+kEQB78MImv08UFqMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3j2P/Y6Bx8RZvd0LuJZ9QynAOpc="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"AO5PgKpHz+kEQB78MImv08UFqMs=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"5qYsmTU6nrgNFtQ2p3yZZPf4yxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NMYP1gCEUYyIZGshjUVSgHhl7gE="}],"description":"Substructure repairs on NY 120 northbound between Elm Street (New Castle) and Bedford Road - NY 117 (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:25:43Z"},"road_event_id":"5qYsmTU6nrgNFtQ2p3yZZPf4yxc=","beginning_cross_street":"","ending_cross_street":"Bedford Road - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764278,41.158352]]}},{"id":"NMYP1gCEUYyIZGshjUVSgHhl7gE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5qYsmTU6nrgNFtQ2p3yZZPf4yxc="},{"type":"next-occurrence","id":"PiQ3Vb+uWvMMCoUgnAjA6EXkGBA="}],"description":"Substructure repairs on NY 120 northbound between Elm Street (New Castle) and Bedford Road - NY 117 (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:25:43Z"},"road_event_id":"NMYP1gCEUYyIZGshjUVSgHhl7gE=","beginning_cross_street":"","ending_cross_street":"Bedford Road - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764278,41.158352]]}},{"id":"PiQ3Vb+uWvMMCoUgnAjA6EXkGBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5qYsmTU6nrgNFtQ2p3yZZPf4yxc="}],"description":"Substructure repairs on NY 120 northbound between Elm Street (New Castle) and Bedford Road - NY 117 (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:25:43Z"},"road_event_id":"PiQ3Vb+uWvMMCoUgnAjA6EXkGBA=","beginning_cross_street":"","ending_cross_street":"Bedford Road - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764278,41.158352]]}},{"id":"4rBUvOzUc8SWgGzAulGXxnF95I8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nGKegpOcHa5tkCZuaAiRTGcDC28="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-12T20:35:46Z"},"road_event_id":"4rBUvOzUc8SWgGzAulGXxnF95I8=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"nGKegpOcHa5tkCZuaAiRTGcDC28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rBUvOzUc8SWgGzAulGXxnF95I8="},{"type":"next-occurrence","id":"n446KxMtJ+vxnzAGG74lZ1Cfa78="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-12T20:35:46Z"},"road_event_id":"nGKegpOcHa5tkCZuaAiRTGcDC28=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"n446KxMtJ+vxnzAGG74lZ1Cfa78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rBUvOzUc8SWgGzAulGXxnF95I8="},{"type":"next-occurrence","id":"lpCyVzoq41YAdDNYaqPDBiFE+Ik="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-12T20:35:46Z"},"road_event_id":"n446KxMtJ+vxnzAGG74lZ1Cfa78=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"lpCyVzoq41YAdDNYaqPDBiFE+Ik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rBUvOzUc8SWgGzAulGXxnF95I8="},{"type":"next-occurrence","id":"k4up9M2yR6hDDTnZwPMa6fhHhMA="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-12T20:35:46Z"},"road_event_id":"lpCyVzoq41YAdDNYaqPDBiFE+Ik=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"k4up9M2yR6hDDTnZwPMa6fhHhMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rBUvOzUc8SWgGzAulGXxnF95I8="},{"type":"next-occurrence","id":"FTasuvu5qktkijevj6Q3jr3j5Pw="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-12T20:35:46Z"},"road_event_id":"k4up9M2yR6hDDTnZwPMa6fhHhMA=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"FTasuvu5qktkijevj6Q3jr3j5Pw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rBUvOzUc8SWgGzAulGXxnF95I8="},{"type":"next-occurrence","id":"9ndV6Jj90am8GPVFXhUJv58pymQ="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-12T20:35:46Z"},"road_event_id":"FTasuvu5qktkijevj6Q3jr3j5Pw=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"9ndV6Jj90am8GPVFXhUJv58pymQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rBUvOzUc8SWgGzAulGXxnF95I8="},{"type":"next-occurrence","id":"I2irayvwgeFGoPzdsNxxibhejZE="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-12T20:35:46Z"},"road_event_id":"9ndV6Jj90am8GPVFXhUJv58pymQ=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"I2irayvwgeFGoPzdsNxxibhejZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rBUvOzUc8SWgGzAulGXxnF95I8="},{"type":"next-occurrence","id":"LA88OAkgusUJF/rGaLlK0QKdX0E="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-12T20:35:46Z"},"road_event_id":"I2irayvwgeFGoPzdsNxxibhejZE=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"LA88OAkgusUJF/rGaLlK0QKdX0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rBUvOzUc8SWgGzAulGXxnF95I8="},{"type":"next-occurrence","id":"cMTUhN5fH4DIFN1Tq730YLTttxc="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-12T20:35:46Z"},"road_event_id":"LA88OAkgusUJF/rGaLlK0QKdX0E=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"cMTUhN5fH4DIFN1Tq730YLTttxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rBUvOzUc8SWgGzAulGXxnF95I8="},{"type":"next-occurrence","id":"3I/dvctSPW/8RIeYg8FvAQp03aY="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-12T20:35:46Z"},"road_event_id":"cMTUhN5fH4DIFN1Tq730YLTttxc=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"3I/dvctSPW/8RIeYg8FvAQp03aY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rBUvOzUc8SWgGzAulGXxnF95I8="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-12T20:35:46Z"},"road_event_id":"3I/dvctSPW/8RIeYg8FvAQp03aY=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"vfaOTu283l4XgUFUgvr/plR7M08=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ESnAJ5G9tJ9tEiuleDzgGuftiaw="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:49Z"},"road_event_id":"vfaOTu283l4XgUFUgvr/plR7M08=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"ESnAJ5G9tJ9tEiuleDzgGuftiaw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vfaOTu283l4XgUFUgvr/plR7M08="},{"type":"next-occurrence","id":"2IGD1WtMwP3Dy3oWr7xjx36FRhk="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:49Z"},"road_event_id":"ESnAJ5G9tJ9tEiuleDzgGuftiaw=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"2IGD1WtMwP3Dy3oWr7xjx36FRhk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vfaOTu283l4XgUFUgvr/plR7M08="},{"type":"next-occurrence","id":"wXzkChYlC2itcbtG1d33hi16q+I="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:49Z"},"road_event_id":"2IGD1WtMwP3Dy3oWr7xjx36FRhk=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T03:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"wXzkChYlC2itcbtG1d33hi16q+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vfaOTu283l4XgUFUgvr/plR7M08="},{"type":"next-occurrence","id":"yAHZRkzJESrd2gOrj2aHTFJLjOQ="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:49Z"},"road_event_id":"wXzkChYlC2itcbtG1d33hi16q+I=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T03:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"yAHZRkzJESrd2gOrj2aHTFJLjOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vfaOTu283l4XgUFUgvr/plR7M08="},{"type":"next-occurrence","id":"Z4Ko3VynsquEbHzl9BSOt8S2nik="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:49Z"},"road_event_id":"yAHZRkzJESrd2gOrj2aHTFJLjOQ=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T03:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"Z4Ko3VynsquEbHzl9BSOt8S2nik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vfaOTu283l4XgUFUgvr/plR7M08="},{"type":"next-occurrence","id":"zKLkq3PhvE1nse6EGHDmBkN2J8g="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:49Z"},"road_event_id":"Z4Ko3VynsquEbHzl9BSOt8S2nik=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T03:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"zKLkq3PhvE1nse6EGHDmBkN2J8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vfaOTu283l4XgUFUgvr/plR7M08="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:49Z"},"road_event_id":"zKLkq3PhvE1nse6EGHDmBkN2J8g=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T03:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"z2egYF77g1z5TC+ZR5ONHAcTXT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"teMveF49P/O2ZgCPKWyi94oP+zI="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"z2egYF77g1z5TC+ZR5ONHAcTXT4=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"teMveF49P/O2ZgCPKWyi94oP+zI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z2egYF77g1z5TC+ZR5ONHAcTXT4="},{"type":"next-occurrence","id":"IziZJBtKhiPXGoA5h7PH9zu0sxw="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"teMveF49P/O2ZgCPKWyi94oP+zI=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"IziZJBtKhiPXGoA5h7PH9zu0sxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z2egYF77g1z5TC+ZR5ONHAcTXT4="},{"type":"next-occurrence","id":"3odlAo+BLnobXdc312iLGiWAiGQ="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"IziZJBtKhiPXGoA5h7PH9zu0sxw=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"3odlAo+BLnobXdc312iLGiWAiGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z2egYF77g1z5TC+ZR5ONHAcTXT4="},{"type":"next-occurrence","id":"YT2RTyZiDZ5mOBPGjE5Eru+ZQgw="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"3odlAo+BLnobXdc312iLGiWAiGQ=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"YT2RTyZiDZ5mOBPGjE5Eru+ZQgw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z2egYF77g1z5TC+ZR5ONHAcTXT4="},{"type":"next-occurrence","id":"Lrwc2PXSj9zquf9sIhsejL4I5o8="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"YT2RTyZiDZ5mOBPGjE5Eru+ZQgw=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"Lrwc2PXSj9zquf9sIhsejL4I5o8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z2egYF77g1z5TC+ZR5ONHAcTXT4="},{"type":"next-occurrence","id":"WgUYR0X3/+HrZsOEVm6zVJQhjXY="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"Lrwc2PXSj9zquf9sIhsejL4I5o8=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"WgUYR0X3/+HrZsOEVm6zVJQhjXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z2egYF77g1z5TC+ZR5ONHAcTXT4="},{"type":"next-occurrence","id":"D/d4zlXHeC+5G+gDI5cxsrNKgdo="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"WgUYR0X3/+HrZsOEVm6zVJQhjXY=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"D/d4zlXHeC+5G+gDI5cxsrNKgdo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z2egYF77g1z5TC+ZR5ONHAcTXT4="},{"type":"next-occurrence","id":"tPkzlIt+eEe7SyqHUHQ34T7Mnws="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"D/d4zlXHeC+5G+gDI5cxsrNKgdo=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"tPkzlIt+eEe7SyqHUHQ34T7Mnws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z2egYF77g1z5TC+ZR5ONHAcTXT4="},{"type":"next-occurrence","id":"vBMhonDR3RB08Yoj0plHstpSeuA="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"tPkzlIt+eEe7SyqHUHQ34T7Mnws=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"vBMhonDR3RB08Yoj0plHstpSeuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z2egYF77g1z5TC+ZR5ONHAcTXT4="},{"type":"next-occurrence","id":"sByzaPA0SaghQBUSFsOAomF143Y="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"vBMhonDR3RB08Yoj0plHstpSeuA=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"sByzaPA0SaghQBUSFsOAomF143Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z2egYF77g1z5TC+ZR5ONHAcTXT4="},{"type":"next-occurrence","id":"KPSP27XNZrMjes1kAG7ufC4G1TQ="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"sByzaPA0SaghQBUSFsOAomF143Y=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"KPSP27XNZrMjes1kAG7ufC4G1TQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z2egYF77g1z5TC+ZR5ONHAcTXT4="},{"type":"next-occurrence","id":"qJW8HvdNsNeVIXYLBLPXKAGeoxo="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"KPSP27XNZrMjes1kAG7ufC4G1TQ=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T11:00:00Z","end_date":"2026-05-24T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"qJW8HvdNsNeVIXYLBLPXKAGeoxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z2egYF77g1z5TC+ZR5ONHAcTXT4="},{"type":"next-occurrence","id":"HkU/c7FnzCTwaEaECx3r+RhEVEI="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"qJW8HvdNsNeVIXYLBLPXKAGeoxo=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"HkU/c7FnzCTwaEaECx3r+RhEVEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z2egYF77g1z5TC+ZR5ONHAcTXT4="},{"type":"next-occurrence","id":"mIjWqoV4wWDtUmBElqW1PKeEg1s="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"HkU/c7FnzCTwaEaECx3r+RhEVEI=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"mIjWqoV4wWDtUmBElqW1PKeEg1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z2egYF77g1z5TC+ZR5ONHAcTXT4="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"mIjWqoV4wWDtUmBElqW1PKeEg1s=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"ORC300540115","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9L"],"direction":"unknown","description":"Installation of fiber optics on NY 9L both directions Quaker Road; NY 254 (Queensbury) to Meadowbrook Rd (Glens Falls) Alternating Not currently Scheduled","update_date":"2026-04-20T23:00:01Z"},"road_event_id":"ORC300540115","beginning_cross_street":"Quaker Road; NY 254","ending_cross_street":"Meadowbrook Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-17T17:21:27Z","end_date":"2026-04-21T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.636806,43.330989]]}},{"id":"dYTDpc9nejpWGLKUWscRlfWufHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MKbTH5d9xuZPW7bdcQI7Seo+Cg8="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:54Z"},"road_event_id":"dYTDpc9nejpWGLKUWscRlfWufHQ=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"MKbTH5d9xuZPW7bdcQI7Seo+Cg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYTDpc9nejpWGLKUWscRlfWufHQ="},{"type":"next-occurrence","id":"u33IBeL3p1sOP8Q4oKTd/7NEJ2g="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:54Z"},"road_event_id":"MKbTH5d9xuZPW7bdcQI7Seo+Cg8=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"u33IBeL3p1sOP8Q4oKTd/7NEJ2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYTDpc9nejpWGLKUWscRlfWufHQ="},{"type":"next-occurrence","id":"yMEM/YvSqaVcNtXATU3ScCqxGSs="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:54Z"},"road_event_id":"u33IBeL3p1sOP8Q4oKTd/7NEJ2g=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T03:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"yMEM/YvSqaVcNtXATU3ScCqxGSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYTDpc9nejpWGLKUWscRlfWufHQ="},{"type":"next-occurrence","id":"8d4bfUtDLHFJeDeFxit5KmgEpm0="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:54Z"},"road_event_id":"yMEM/YvSqaVcNtXATU3ScCqxGSs=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T03:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"8d4bfUtDLHFJeDeFxit5KmgEpm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYTDpc9nejpWGLKUWscRlfWufHQ="},{"type":"next-occurrence","id":"LjagI9SNmK7ceWHLPDLU5/WQRXA="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:54Z"},"road_event_id":"8d4bfUtDLHFJeDeFxit5KmgEpm0=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T03:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"LjagI9SNmK7ceWHLPDLU5/WQRXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYTDpc9nejpWGLKUWscRlfWufHQ="},{"type":"next-occurrence","id":"GoMsO/QGtXDoMtwQ+lZ+YOLAKXs="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:54Z"},"road_event_id":"LjagI9SNmK7ceWHLPDLU5/WQRXA=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T03:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"GoMsO/QGtXDoMtwQ+lZ+YOLAKXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYTDpc9nejpWGLKUWscRlfWufHQ="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:54Z"},"road_event_id":"GoMsO/QGtXDoMtwQ+lZ+YOLAKXs=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T03:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"NrAJT/Ec3JKZp8KpW9hVtvdPwrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 37TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q+HiV0y9Gib7w5SAD09jGq7OIz8="}],"description":"Construction on W 37TH ST westbound between BROADWAY (New York) for conduit installation for new services/service upgrade and new structure installation., Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 PM thru 03:00 AM All lanes closed","update_date":"2026-04-14T18:45:39Z"},"road_event_id":"NrAJT/Ec3JKZp8KpW9hVtvdPwrY=","beginning_cross_street":"BROADWAY","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987575,40.752201]]}},{"id":"q+HiV0y9Gib7w5SAD09jGq7OIz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 37TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NrAJT/Ec3JKZp8KpW9hVtvdPwrY="},{"type":"next-occurrence","id":"hdH7rBfRl04B/dnTX4h2Rr+DqA8="}],"description":"Construction on W 37TH ST westbound between BROADWAY (New York) for conduit installation for new services/service upgrade and new structure installation., Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 PM thru 03:00 AM All lanes closed","update_date":"2026-04-14T18:45:39Z"},"road_event_id":"q+HiV0y9Gib7w5SAD09jGq7OIz8=","beginning_cross_street":"BROADWAY","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987575,40.752201]]}},{"id":"hdH7rBfRl04B/dnTX4h2Rr+DqA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 37TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NrAJT/Ec3JKZp8KpW9hVtvdPwrY="}],"description":"Construction on W 37TH ST westbound between BROADWAY (New York) for conduit installation for new services/service upgrade and new structure installation., Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 PM thru 03:00 AM All lanes closed","update_date":"2026-04-14T18:45:39Z"},"road_event_id":"hdH7rBfRl04B/dnTX4h2Rr+DqA8=","beginning_cross_street":"BROADWAY","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987575,40.752201]]}},{"id":"6JteLzAfp8Y2PFzY8/OQt9yeYzM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4oHyiitJbkrdFm98muNgbo32Cdk="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"6JteLzAfp8Y2PFzY8/OQt9yeYzM=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"4oHyiitJbkrdFm98muNgbo32Cdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6JteLzAfp8Y2PFzY8/OQt9yeYzM="},{"type":"next-occurrence","id":"Qd+X+NXCT8DhcNxwVYjlK5UL/QU="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"4oHyiitJbkrdFm98muNgbo32Cdk=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"Qd+X+NXCT8DhcNxwVYjlK5UL/QU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6JteLzAfp8Y2PFzY8/OQt9yeYzM="},{"type":"next-occurrence","id":"A5z/krJqBf7nBinqJ3cVcroXzAE="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"Qd+X+NXCT8DhcNxwVYjlK5UL/QU=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"A5z/krJqBf7nBinqJ3cVcroXzAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6JteLzAfp8Y2PFzY8/OQt9yeYzM="},{"type":"next-occurrence","id":"lh1Kymcaw1gpkmVbvA4VBIJAmag="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"A5z/krJqBf7nBinqJ3cVcroXzAE=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"lh1Kymcaw1gpkmVbvA4VBIJAmag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6JteLzAfp8Y2PFzY8/OQt9yeYzM="},{"type":"next-occurrence","id":"JZOX3e4up/lYkk2gLTLaUDAzXpA="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"lh1Kymcaw1gpkmVbvA4VBIJAmag=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"JZOX3e4up/lYkk2gLTLaUDAzXpA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6JteLzAfp8Y2PFzY8/OQt9yeYzM="},{"type":"next-occurrence","id":"1ALpMfh6j3WvuPnU8vBWGwhBqH0="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"JZOX3e4up/lYkk2gLTLaUDAzXpA=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"1ALpMfh6j3WvuPnU8vBWGwhBqH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6JteLzAfp8Y2PFzY8/OQt9yeYzM="},{"type":"next-occurrence","id":"oTFVUAeQFB4RTr0Jn3lgyz8MW4A="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"1ALpMfh6j3WvuPnU8vBWGwhBqH0=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"oTFVUAeQFB4RTr0Jn3lgyz8MW4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6JteLzAfp8Y2PFzY8/OQt9yeYzM="},{"type":"next-occurrence","id":"SD8KpeiawLIz3qn+Z3YKwmlDK/Y="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"oTFVUAeQFB4RTr0Jn3lgyz8MW4A=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"SD8KpeiawLIz3qn+Z3YKwmlDK/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6JteLzAfp8Y2PFzY8/OQt9yeYzM="},{"type":"next-occurrence","id":"piWjXgEImJ6grOjzPaKCOsgRRLM="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"SD8KpeiawLIz3qn+Z3YKwmlDK/Y=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"piWjXgEImJ6grOjzPaKCOsgRRLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6JteLzAfp8Y2PFzY8/OQt9yeYzM="},{"type":"next-occurrence","id":"rMQemKC+A0WV1KT5JKHVwHnD1kY="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"piWjXgEImJ6grOjzPaKCOsgRRLM=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"rMQemKC+A0WV1KT5JKHVwHnD1kY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6JteLzAfp8Y2PFzY8/OQt9yeYzM="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"rMQemKC+A0WV1KT5JKHVwHnD1kY=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"WzgCk8/eswC/dQCrbLeSRYK5b2k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[],"description":"Construction on CHAMBERS ST both directions between N END AVE (New York) and N END AVE (New York) for water main work., Tuesday April 14th,2026 thru Wednesday May 13th,2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed westbound, eastbound","update_date":"2026-05-09T20:00:02Z"},"road_event_id":"WzgCk8/eswC/dQCrbLeSRYK5b2k=","beginning_cross_street":"N END AVE","ending_cross_street":"N END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013845,40.717626]]}},{"id":"SEqm9MdiGZ3gmmzZFTrf4pdZXsA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ShuIp518XuyLsNPGgd6DwUkHZek="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"SEqm9MdiGZ3gmmzZFTrf4pdZXsA=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:30:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"ShuIp518XuyLsNPGgd6DwUkHZek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SEqm9MdiGZ3gmmzZFTrf4pdZXsA="},{"type":"next-occurrence","id":"vrpUkS8bTO4IfOIJXJZrXdzlpvE="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"ShuIp518XuyLsNPGgd6DwUkHZek=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:30:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"vrpUkS8bTO4IfOIJXJZrXdzlpvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SEqm9MdiGZ3gmmzZFTrf4pdZXsA="},{"type":"next-occurrence","id":"eECf14AaOIQoxBZbDKf36wJ+Gkg="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"vrpUkS8bTO4IfOIJXJZrXdzlpvE=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:30:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"eECf14AaOIQoxBZbDKf36wJ+Gkg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SEqm9MdiGZ3gmmzZFTrf4pdZXsA="},{"type":"next-occurrence","id":"sFIfc26nxALOB/43VMwPYRBgNxg="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"eECf14AaOIQoxBZbDKf36wJ+Gkg=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T03:30:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"sFIfc26nxALOB/43VMwPYRBgNxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SEqm9MdiGZ3gmmzZFTrf4pdZXsA="},{"type":"next-occurrence","id":"iVprOz4AWKv4/2gUbnkeeVCiWHw="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"sFIfc26nxALOB/43VMwPYRBgNxg=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T03:30:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"iVprOz4AWKv4/2gUbnkeeVCiWHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SEqm9MdiGZ3gmmzZFTrf4pdZXsA="},{"type":"next-occurrence","id":"8sMv/nDDw72Zuu7sQhsCAtR7ebU="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"iVprOz4AWKv4/2gUbnkeeVCiWHw=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T03:30:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"8sMv/nDDw72Zuu7sQhsCAtR7ebU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SEqm9MdiGZ3gmmzZFTrf4pdZXsA="},{"type":"next-occurrence","id":"g9/juKRYkQSxRmjZZ3o/4gtREMk="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"8sMv/nDDw72Zuu7sQhsCAtR7ebU=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T03:30:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"g9/juKRYkQSxRmjZZ3o/4gtREMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SEqm9MdiGZ3gmmzZFTrf4pdZXsA="},{"type":"next-occurrence","id":"BgXxFU38fDIqD/+PKWhuZrJZpos="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"g9/juKRYkQSxRmjZZ3o/4gtREMk=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T03:30:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"BgXxFU38fDIqD/+PKWhuZrJZpos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SEqm9MdiGZ3gmmzZFTrf4pdZXsA="},{"type":"next-occurrence","id":"NrK4dUCvO84xBT6+NJYu4cGPV6k="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"BgXxFU38fDIqD/+PKWhuZrJZpos=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T03:30:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"NrK4dUCvO84xBT6+NJYu4cGPV6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SEqm9MdiGZ3gmmzZFTrf4pdZXsA="},{"type":"next-occurrence","id":"yoCzGjzJkik5qbUhXKiUjC4eJMo="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"NrK4dUCvO84xBT6+NJYu4cGPV6k=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T03:30:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"yoCzGjzJkik5qbUhXKiUjC4eJMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SEqm9MdiGZ3gmmzZFTrf4pdZXsA="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"yoCzGjzJkik5qbUhXKiUjC4eJMo=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T03:30:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"t1g+CPKgrwmO75fSBwAtj73gtdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MBtxhpunno0Ughhm8yeEWUWnyd0="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"t1g+CPKgrwmO75fSBwAtj73gtdk=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"MBtxhpunno0Ughhm8yeEWUWnyd0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t1g+CPKgrwmO75fSBwAtj73gtdk="},{"type":"next-occurrence","id":"fPSdpIkqchb4kLP1lw5ZpEfN3ek="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"MBtxhpunno0Ughhm8yeEWUWnyd0=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"fPSdpIkqchb4kLP1lw5ZpEfN3ek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t1g+CPKgrwmO75fSBwAtj73gtdk="},{"type":"next-occurrence","id":"mcGSeRp438qSUsJb5yunGZTCvVg="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"fPSdpIkqchb4kLP1lw5ZpEfN3ek=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"mcGSeRp438qSUsJb5yunGZTCvVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t1g+CPKgrwmO75fSBwAtj73gtdk="},{"type":"next-occurrence","id":"xeoR3GpCXwbl081jWWNvviX91Uc="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"mcGSeRp438qSUsJb5yunGZTCvVg=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"xeoR3GpCXwbl081jWWNvviX91Uc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t1g+CPKgrwmO75fSBwAtj73gtdk="},{"type":"next-occurrence","id":"HnYFQTrDqRZU9KOtzKOBJ/Cl9P0="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"xeoR3GpCXwbl081jWWNvviX91Uc=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T22:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"HnYFQTrDqRZU9KOtzKOBJ/Cl9P0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t1g+CPKgrwmO75fSBwAtj73gtdk="},{"type":"next-occurrence","id":"9HF2ZEGcnjYNbggYbAhbi04tOBc="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"HnYFQTrDqRZU9KOtzKOBJ/Cl9P0=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"9HF2ZEGcnjYNbggYbAhbi04tOBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t1g+CPKgrwmO75fSBwAtj73gtdk="},{"type":"next-occurrence","id":"x0YRzK4CeGzWR0BFT1pLnwP9ckc="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"9HF2ZEGcnjYNbggYbAhbi04tOBc=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"x0YRzK4CeGzWR0BFT1pLnwP9ckc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t1g+CPKgrwmO75fSBwAtj73gtdk="},{"type":"next-occurrence","id":"Cjb/LbRo1IPQXVR3B5JwJ1WalQw="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"x0YRzK4CeGzWR0BFT1pLnwP9ckc=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"Cjb/LbRo1IPQXVR3B5JwJ1WalQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t1g+CPKgrwmO75fSBwAtj73gtdk="},{"type":"next-occurrence","id":"oO1wPE+5s05YosemwarBCrMavN8="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"Cjb/LbRo1IPQXVR3B5JwJ1WalQw=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"oO1wPE+5s05YosemwarBCrMavN8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t1g+CPKgrwmO75fSBwAtj73gtdk="},{"type":"next-occurrence","id":"n7gVnsURWwIB4blzgD1UamSgDzQ="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"oO1wPE+5s05YosemwarBCrMavN8=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"n7gVnsURWwIB4blzgD1UamSgDzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t1g+CPKgrwmO75fSBwAtj73gtdk="},{"type":"next-occurrence","id":"lYg9LNKR/gSwqnrZeQcS5Pngaf0="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"n7gVnsURWwIB4blzgD1UamSgDzQ=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T22:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"lYg9LNKR/gSwqnrZeQcS5Pngaf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t1g+CPKgrwmO75fSBwAtj73gtdk="},{"type":"next-occurrence","id":"KgcEYZ8HNuI4WEKSKLiniJrVY2Y="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"lYg9LNKR/gSwqnrZeQcS5Pngaf0=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T22:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"KgcEYZ8HNuI4WEKSKLiniJrVY2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t1g+CPKgrwmO75fSBwAtj73gtdk="},{"type":"next-occurrence","id":"M9RU2eAprNrWZSoPQCbvUUq98w4="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"KgcEYZ8HNuI4WEKSKLiniJrVY2Y=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"M9RU2eAprNrWZSoPQCbvUUq98w4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t1g+CPKgrwmO75fSBwAtj73gtdk="},{"type":"next-occurrence","id":"SV6x2etaux9GXHRwMKdl240Pmh4="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"M9RU2eAprNrWZSoPQCbvUUq98w4=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"SV6x2etaux9GXHRwMKdl240Pmh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t1g+CPKgrwmO75fSBwAtj73gtdk="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"SV6x2etaux9GXHRwMKdl240Pmh4=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"OVaBwNVd6B68Dsd2l1VoPlq85/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on NY 21 both directions between Bristol Spring Rd; CR 12 (Naples) and NY 64 (South Bristol) Road closed , local traffic only, Follow posted detour, Continuous Monday April 27th, 2026 06:00 AM thru Thursday June 25th, 2026 05:00 PM All lanes closed and detoured","update_date":"2026-04-14T13:12:58Z"},"road_event_id":"OVaBwNVd6B68Dsd2l1VoPlq85/w=","beginning_cross_street":"Bristol Spring Rd; CR 12","ending_cross_street":"NY 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.391818,42.63093]]}},{"id":"ORC300539117","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","description":"Guard rail repairs on I-86 eastbound east of Exit 14 - NY 62 Frewsburg Road (Poland) Not currently Scheduled","update_date":"2026-04-16T19:00:15Z"},"road_event_id":"ORC300539117","beginning_cross_street":"Exit 14 - NY 62 Frewsburg Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-14T14:20:10Z","end_date":"2026-04-17T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-79.068253,42.149227]]}},{"id":"CUmaftwxgOb2t756vLIxbW4of/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"P6Jfg1izZlUrMthnIHnqpz4lLZk="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"CUmaftwxgOb2t756vLIxbW4of/Q=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"P6Jfg1izZlUrMthnIHnqpz4lLZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CUmaftwxgOb2t756vLIxbW4of/Q="},{"type":"next-occurrence","id":"MOlQ/TQrUIKwsyM2vhn9aIK3neY="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"P6Jfg1izZlUrMthnIHnqpz4lLZk=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"MOlQ/TQrUIKwsyM2vhn9aIK3neY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CUmaftwxgOb2t756vLIxbW4of/Q="},{"type":"next-occurrence","id":"y6hz43bKAoqJPLWefI96VAOTHEQ="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"MOlQ/TQrUIKwsyM2vhn9aIK3neY=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"y6hz43bKAoqJPLWefI96VAOTHEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CUmaftwxgOb2t756vLIxbW4of/Q="},{"type":"next-occurrence","id":"UM11JkyDXkw9vy82Hkb0dSTeJFg="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"y6hz43bKAoqJPLWefI96VAOTHEQ=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T22:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"UM11JkyDXkw9vy82Hkb0dSTeJFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CUmaftwxgOb2t756vLIxbW4of/Q="},{"type":"next-occurrence","id":"a/76hasfHQ1/O+71G6OB6JRfT3U="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"UM11JkyDXkw9vy82Hkb0dSTeJFg=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"a/76hasfHQ1/O+71G6OB6JRfT3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CUmaftwxgOb2t756vLIxbW4of/Q="},{"type":"next-occurrence","id":"76/rO9+E888V2VyqaQfZcFGUKU4="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"a/76hasfHQ1/O+71G6OB6JRfT3U=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"76/rO9+E888V2VyqaQfZcFGUKU4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CUmaftwxgOb2t756vLIxbW4of/Q="},{"type":"next-occurrence","id":"QuXypGT3bVxjNioVg/yLiNOSqdk="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"76/rO9+E888V2VyqaQfZcFGUKU4=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"QuXypGT3bVxjNioVg/yLiNOSqdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CUmaftwxgOb2t756vLIxbW4of/Q="},{"type":"next-occurrence","id":"RzIqMDsFDlRJMS76COkKPmUIHSo="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"QuXypGT3bVxjNioVg/yLiNOSqdk=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"RzIqMDsFDlRJMS76COkKPmUIHSo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CUmaftwxgOb2t756vLIxbW4of/Q="},{"type":"next-occurrence","id":"zx8n4p2N54BpSqOlvCWdahhLCwk="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"RzIqMDsFDlRJMS76COkKPmUIHSo=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"zx8n4p2N54BpSqOlvCWdahhLCwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CUmaftwxgOb2t756vLIxbW4of/Q="},{"type":"next-occurrence","id":"feiYvFUfFuzGb0QTu3mwqb5qMRE="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"zx8n4p2N54BpSqOlvCWdahhLCwk=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T22:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"feiYvFUfFuzGb0QTu3mwqb5qMRE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CUmaftwxgOb2t756vLIxbW4of/Q="},{"type":"next-occurrence","id":"u4CDlOQahJuOqZwF1IJKK/IP4F8="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"feiYvFUfFuzGb0QTu3mwqb5qMRE=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"u4CDlOQahJuOqZwF1IJKK/IP4F8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CUmaftwxgOb2t756vLIxbW4of/Q="},{"type":"next-occurrence","id":"6ynycgM2VHJislH8Y7UnB0JPWdU="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"u4CDlOQahJuOqZwF1IJKK/IP4F8=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"6ynycgM2VHJislH8Y7UnB0JPWdU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CUmaftwxgOb2t756vLIxbW4of/Q="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"6ynycgM2VHJislH8Y7UnB0JPWdU=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"chkTcOR3inqn0MzxtUqk+1c9pbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 412"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nTDIdwnmS+ni8rLZKf3wt1p4/Qo="}],"description":"Construction on NY 412 both directions between Bristol Road; NY 233; Harding Road; START ROUTE NY 412 (Kirkland) and Franklin Avenue; NY 12B; College Street; END ROUTE (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place., Monday April 20th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:37:51Z"},"road_event_id":"chkTcOR3inqn0MzxtUqk+1c9pbw=","beginning_cross_street":"Bristol Road; NY 233; Harding Road; START ROUTE NY 412","ending_cross_street":"Franklin Avenue; NY 12B; College Street; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.396003,43.0485]]}},{"id":"nTDIdwnmS+ni8rLZKf3wt1p4/Qo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 412"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"chkTcOR3inqn0MzxtUqk+1c9pbw="},{"type":"next-occurrence","id":"MwSCrazoKcPd0GECR2GV2gjtJOE="}],"description":"Construction on NY 412 both directions between Bristol Road; NY 233; Harding Road; START ROUTE NY 412 (Kirkland) and Franklin Avenue; NY 12B; College Street; END ROUTE (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place., Monday April 20th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:37:51Z"},"road_event_id":"nTDIdwnmS+ni8rLZKf3wt1p4/Qo=","beginning_cross_street":"Bristol Road; NY 233; Harding Road; START ROUTE NY 412","ending_cross_street":"Franklin Avenue; NY 12B; College Street; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.396003,43.0485]]}},{"id":"MwSCrazoKcPd0GECR2GV2gjtJOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 412"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"chkTcOR3inqn0MzxtUqk+1c9pbw="}],"description":"Construction on NY 412 both directions between Bristol Road; NY 233; Harding Road; START ROUTE NY 412 (Kirkland) and Franklin Avenue; NY 12B; College Street; END ROUTE (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place., Monday April 20th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:37:51Z"},"road_event_id":"MwSCrazoKcPd0GECR2GV2gjtJOE=","beginning_cross_street":"Bristol Road; NY 233; Harding Road; START ROUTE NY 412","ending_cross_street":"Franklin Avenue; NY 12B; College Street; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.396003,43.0485]]}},{"id":"ORC300448529","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 71"],"direction":"unknown","description":"Roadwork on NJ 71 Southbound At South of Shark River Bridge (Belmar) Thursday June 12, 2025 09:30 PM thru Friday June 13, 2025 05:00 AM, 2 left lanes of 3 lanes closed","update_date":"2025-06-13T09:00:03Z"},"road_event_id":"ORC300448529","beginning_cross_street":"South of Shark River Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-10T14:52:30Z","end_date":"2025-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.023712,40.184688]]}},{"id":"AzEZVPUzxe6JZ5LprkKEQR4EZUw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4DAQSgNXrS4tndKHC5ERRVe2U3k="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"AzEZVPUzxe6JZ5LprkKEQR4EZUw=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"4DAQSgNXrS4tndKHC5ERRVe2U3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzEZVPUzxe6JZ5LprkKEQR4EZUw="},{"type":"next-occurrence","id":"aPwI6MfAl2yqA2p8OuMKt2n2akA="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"4DAQSgNXrS4tndKHC5ERRVe2U3k=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"aPwI6MfAl2yqA2p8OuMKt2n2akA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzEZVPUzxe6JZ5LprkKEQR4EZUw="},{"type":"next-occurrence","id":"GYRckBOBJjbQWG/sIWrPARXgTcs="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"aPwI6MfAl2yqA2p8OuMKt2n2akA=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"GYRckBOBJjbQWG/sIWrPARXgTcs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzEZVPUzxe6JZ5LprkKEQR4EZUw="},{"type":"next-occurrence","id":"yaNa3ZnWXvLSQboiZ1ZNLhgl9Tc="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"GYRckBOBJjbQWG/sIWrPARXgTcs=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"yaNa3ZnWXvLSQboiZ1ZNLhgl9Tc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzEZVPUzxe6JZ5LprkKEQR4EZUw="},{"type":"next-occurrence","id":"iy26oFFh6JX+d4/oznuYglxhjEs="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"yaNa3ZnWXvLSQboiZ1ZNLhgl9Tc=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"iy26oFFh6JX+d4/oznuYglxhjEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzEZVPUzxe6JZ5LprkKEQR4EZUw="},{"type":"next-occurrence","id":"8zfZg67jUNFbOsV5dAW9W5UXGyU="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"iy26oFFh6JX+d4/oznuYglxhjEs=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"8zfZg67jUNFbOsV5dAW9W5UXGyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzEZVPUzxe6JZ5LprkKEQR4EZUw="},{"type":"next-occurrence","id":"AGZIJljzZCneMdn/7KoN4msZ2EU="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"8zfZg67jUNFbOsV5dAW9W5UXGyU=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"AGZIJljzZCneMdn/7KoN4msZ2EU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzEZVPUzxe6JZ5LprkKEQR4EZUw="},{"type":"next-occurrence","id":"PRoVaQ4QyO72lth9czECd5k4Wos="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"AGZIJljzZCneMdn/7KoN4msZ2EU=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"PRoVaQ4QyO72lth9czECd5k4Wos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzEZVPUzxe6JZ5LprkKEQR4EZUw="},{"type":"next-occurrence","id":"z1edOaswzt/8CzNkDFCh5TbV2Tc="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"PRoVaQ4QyO72lth9czECd5k4Wos=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"z1edOaswzt/8CzNkDFCh5TbV2Tc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzEZVPUzxe6JZ5LprkKEQR4EZUw="},{"type":"next-occurrence","id":"teI7Ch+pRu65RPyo0OKbSqi0YQk="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"z1edOaswzt/8CzNkDFCh5TbV2Tc=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"teI7Ch+pRu65RPyo0OKbSqi0YQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzEZVPUzxe6JZ5LprkKEQR4EZUw="},{"type":"next-occurrence","id":"KJtPPR8KwgfktKrBjHPG/jcKgcU="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"teI7Ch+pRu65RPyo0OKbSqi0YQk=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"KJtPPR8KwgfktKrBjHPG/jcKgcU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzEZVPUzxe6JZ5LprkKEQR4EZUw="},{"type":"next-occurrence","id":"aFhmEOceEfVN98z4O9zjGHyMtew="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"KJtPPR8KwgfktKrBjHPG/jcKgcU=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"aFhmEOceEfVN98z4O9zjGHyMtew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzEZVPUzxe6JZ5LprkKEQR4EZUw="},{"type":"next-occurrence","id":"5eiHT779Dem935N7R/lZmasU41E="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"aFhmEOceEfVN98z4O9zjGHyMtew=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"5eiHT779Dem935N7R/lZmasU41E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzEZVPUzxe6JZ5LprkKEQR4EZUw="},{"type":"next-occurrence","id":"Uf20Lx9MujUrFJ9rLT7tCEujGrw="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"5eiHT779Dem935N7R/lZmasU41E=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"Uf20Lx9MujUrFJ9rLT7tCEujGrw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzEZVPUzxe6JZ5LprkKEQR4EZUw="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"Uf20Lx9MujUrFJ9rLT7tCEujGrw=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"kyHDaz112UG67Dbk4rQUaKzdbkE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MBnX92j0dKjft5+JSXvSFuM0l4Y="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"kyHDaz112UG67Dbk4rQUaKzdbkE=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-14T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"MBnX92j0dKjft5+JSXvSFuM0l4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kyHDaz112UG67Dbk4rQUaKzdbkE="},{"type":"next-occurrence","id":"DPNrbMRSNVkhQA2nxT0/ICcq/1I="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"MBnX92j0dKjft5+JSXvSFuM0l4Y=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-15T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"DPNrbMRSNVkhQA2nxT0/ICcq/1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kyHDaz112UG67Dbk4rQUaKzdbkE="},{"type":"next-occurrence","id":"BIqsxt9gU4lUh/kTD4hoNwTdPr8="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"DPNrbMRSNVkhQA2nxT0/ICcq/1I=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-16T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"BIqsxt9gU4lUh/kTD4hoNwTdPr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kyHDaz112UG67Dbk4rQUaKzdbkE="},{"type":"next-occurrence","id":"th38rVwjeW74JtMB8EEOJgYoirk="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"BIqsxt9gU4lUh/kTD4hoNwTdPr8=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-17T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"th38rVwjeW74JtMB8EEOJgYoirk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kyHDaz112UG67Dbk4rQUaKzdbkE="},{"type":"next-occurrence","id":"AdsnVwCMXwoXtPthvE7LatsNOT4="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"th38rVwjeW74JtMB8EEOJgYoirk=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-18T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"AdsnVwCMXwoXtPthvE7LatsNOT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kyHDaz112UG67Dbk4rQUaKzdbkE="},{"type":"next-occurrence","id":"EeCOFle051VPbLnE1slfZo2b1TI="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"AdsnVwCMXwoXtPthvE7LatsNOT4=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-19T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"EeCOFle051VPbLnE1slfZo2b1TI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kyHDaz112UG67Dbk4rQUaKzdbkE="},{"type":"next-occurrence","id":"k4j05vk42EZYxhXGZkbZUyMGUyQ="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"EeCOFle051VPbLnE1slfZo2b1TI=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-20T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"k4j05vk42EZYxhXGZkbZUyMGUyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kyHDaz112UG67Dbk4rQUaKzdbkE="},{"type":"next-occurrence","id":"2HRbHiEl/UlNrdl5zEYVfwosZP0="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"k4j05vk42EZYxhXGZkbZUyMGUyQ=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-21T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"2HRbHiEl/UlNrdl5zEYVfwosZP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kyHDaz112UG67Dbk4rQUaKzdbkE="},{"type":"next-occurrence","id":"R6SO2WyJFqm0eyg58eRIx5sS0k0="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"2HRbHiEl/UlNrdl5zEYVfwosZP0=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-22T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"R6SO2WyJFqm0eyg58eRIx5sS0k0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kyHDaz112UG67Dbk4rQUaKzdbkE="},{"type":"next-occurrence","id":"DnklmS9kjgQt1NRdydQJJzJHWXU="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"R6SO2WyJFqm0eyg58eRIx5sS0k0=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-23T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"DnklmS9kjgQt1NRdydQJJzJHWXU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kyHDaz112UG67Dbk4rQUaKzdbkE="},{"type":"next-occurrence","id":"nH1oeVupxFbxWoQKRnNGUSVst/o="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"DnklmS9kjgQt1NRdydQJJzJHWXU=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-24T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"nH1oeVupxFbxWoQKRnNGUSVst/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kyHDaz112UG67Dbk4rQUaKzdbkE="},{"type":"next-occurrence","id":"8WU3/q2hrLhE1EeW2cqE2S3FGbs="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"nH1oeVupxFbxWoQKRnNGUSVst/o=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T11:00:00Z","end_date":"2026-05-25T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"8WU3/q2hrLhE1EeW2cqE2S3FGbs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kyHDaz112UG67Dbk4rQUaKzdbkE="},{"type":"next-occurrence","id":"05E7O4J6o6jf2BAfs6uPig0ToBE="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"8WU3/q2hrLhE1EeW2cqE2S3FGbs=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-26T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"05E7O4J6o6jf2BAfs6uPig0ToBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kyHDaz112UG67Dbk4rQUaKzdbkE="},{"type":"next-occurrence","id":"aHjZrLRaHQBhBs3zDquqijUknps="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"05E7O4J6o6jf2BAfs6uPig0ToBE=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-27T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"aHjZrLRaHQBhBs3zDquqijUknps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kyHDaz112UG67Dbk4rQUaKzdbkE="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"aHjZrLRaHQBhBs3zDquqijUknps=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-28T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"pDrLFZcj+03d4eYS0YJihfdROaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"esOhaBQ7QL/xFiUvfIQi30vU70E="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"pDrLFZcj+03d4eYS0YJihfdROaY=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"esOhaBQ7QL/xFiUvfIQi30vU70E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pDrLFZcj+03d4eYS0YJihfdROaY="},{"type":"next-occurrence","id":"WU0Sw+XMbZt0kr64URx6On1P5GU="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"esOhaBQ7QL/xFiUvfIQi30vU70E=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"WU0Sw+XMbZt0kr64URx6On1P5GU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pDrLFZcj+03d4eYS0YJihfdROaY="},{"type":"next-occurrence","id":"/zS8qklAvp2zcQER7TYBtor5i3A="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"WU0Sw+XMbZt0kr64URx6On1P5GU=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"/zS8qklAvp2zcQER7TYBtor5i3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pDrLFZcj+03d4eYS0YJihfdROaY="},{"type":"next-occurrence","id":"96Ah3j35B95R0+siI3OwiRc76BA="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"/zS8qklAvp2zcQER7TYBtor5i3A=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"96Ah3j35B95R0+siI3OwiRc76BA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pDrLFZcj+03d4eYS0YJihfdROaY="},{"type":"next-occurrence","id":"T4QqdB+R+dP2YkE6YFjMP+yliY0="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"96Ah3j35B95R0+siI3OwiRc76BA=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"T4QqdB+R+dP2YkE6YFjMP+yliY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pDrLFZcj+03d4eYS0YJihfdROaY="},{"type":"next-occurrence","id":"zXhUhR9VWMQ16JDeBmgiBhfx+5I="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"T4QqdB+R+dP2YkE6YFjMP+yliY0=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"zXhUhR9VWMQ16JDeBmgiBhfx+5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pDrLFZcj+03d4eYS0YJihfdROaY="},{"type":"next-occurrence","id":"RDdoNR+esQax+ySCbVZNpWkXctY="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"zXhUhR9VWMQ16JDeBmgiBhfx+5I=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"RDdoNR+esQax+ySCbVZNpWkXctY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pDrLFZcj+03d4eYS0YJihfdROaY="},{"type":"next-occurrence","id":"LwwwaYLx3xu06BK5CkaKYphDlZE="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"RDdoNR+esQax+ySCbVZNpWkXctY=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"LwwwaYLx3xu06BK5CkaKYphDlZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pDrLFZcj+03d4eYS0YJihfdROaY="},{"type":"next-occurrence","id":"XM1WBsvl++giysH4A/848sRdCus="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"LwwwaYLx3xu06BK5CkaKYphDlZE=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"XM1WBsvl++giysH4A/848sRdCus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pDrLFZcj+03d4eYS0YJihfdROaY="},{"type":"next-occurrence","id":"qBOWmT/0aj6NhzbqMSP0aRZiVK4="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"XM1WBsvl++giysH4A/848sRdCus=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"qBOWmT/0aj6NhzbqMSP0aRZiVK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pDrLFZcj+03d4eYS0YJihfdROaY="},{"type":"next-occurrence","id":"epTxZPuk7zlqpUSUNLkB0qHC8EQ="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"qBOWmT/0aj6NhzbqMSP0aRZiVK4=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"epTxZPuk7zlqpUSUNLkB0qHC8EQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pDrLFZcj+03d4eYS0YJihfdROaY="},{"type":"next-occurrence","id":"G2CKOkUSc+hQPKT21fSOQEQp/Jk="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"epTxZPuk7zlqpUSUNLkB0qHC8EQ=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T11:00:00Z","end_date":"2026-05-24T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"G2CKOkUSc+hQPKT21fSOQEQp/Jk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pDrLFZcj+03d4eYS0YJihfdROaY="},{"type":"next-occurrence","id":"YS34pXHHBobbA7nbOTi8gm8yzT8="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"G2CKOkUSc+hQPKT21fSOQEQp/Jk=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"YS34pXHHBobbA7nbOTi8gm8yzT8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pDrLFZcj+03d4eYS0YJihfdROaY="},{"type":"next-occurrence","id":"PFS6c6920ojuUpf5K5Mnj80FgxY="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"YS34pXHHBobbA7nbOTi8gm8yzT8=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"PFS6c6920ojuUpf5K5Mnj80FgxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pDrLFZcj+03d4eYS0YJihfdROaY="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"PFS6c6920ojuUpf5K5Mnj80FgxY=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"ORC300541294","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","description":"Roadwork on I-80 Eastbound near Exit 28 - CR 631/US 46 (Roxbury Twp), Wednesday May 13, 2026 10:00 AM thru 11:00 AM, right shoulder closed, moving operation","update_date":"2026-05-13T15:00:00Z"},"road_event_id":"ORC300541294","beginning_cross_street":"Exit 28 - CR 631/US 46","ending_cross_street":"East of Exit 28 - CR 631/US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:42:22Z","end_date":"2026-05-13T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.669227,40.892642]]}},{"id":"1/VKZZz8HxOXDSD+ExtjFLwGPgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Rr38qIle1Jb1X2ZYorRyNjQfdJ0="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-25T09:00:16Z"},"road_event_id":"1/VKZZz8HxOXDSD+ExtjFLwGPgg=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"Rr38qIle1Jb1X2ZYorRyNjQfdJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/VKZZz8HxOXDSD+ExtjFLwGPgg="},{"type":"next-occurrence","id":"exepLjDHzqYibJYjfENvzstkOQM="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-25T09:00:16Z"},"road_event_id":"Rr38qIle1Jb1X2ZYorRyNjQfdJ0=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"exepLjDHzqYibJYjfENvzstkOQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/VKZZz8HxOXDSD+ExtjFLwGPgg="},{"type":"next-occurrence","id":"fiXo1Ybs6Q4NAsGh5jGIEHF7d6Q="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-25T09:00:16Z"},"road_event_id":"exepLjDHzqYibJYjfENvzstkOQM=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"fiXo1Ybs6Q4NAsGh5jGIEHF7d6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/VKZZz8HxOXDSD+ExtjFLwGPgg="},{"type":"next-occurrence","id":"6n+UkV8x36fqp3SMaaZZxKCx0YA="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-25T09:00:16Z"},"road_event_id":"fiXo1Ybs6Q4NAsGh5jGIEHF7d6Q=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"6n+UkV8x36fqp3SMaaZZxKCx0YA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/VKZZz8HxOXDSD+ExtjFLwGPgg="},{"type":"next-occurrence","id":"577tGfpOimwND1tcrVxYav6TEGM="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-25T09:00:16Z"},"road_event_id":"6n+UkV8x36fqp3SMaaZZxKCx0YA=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"577tGfpOimwND1tcrVxYav6TEGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/VKZZz8HxOXDSD+ExtjFLwGPgg="},{"type":"next-occurrence","id":"z/YdEw8glqBb2wJ9NaB4RCf3LkM="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-25T09:00:16Z"},"road_event_id":"577tGfpOimwND1tcrVxYav6TEGM=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"z/YdEw8glqBb2wJ9NaB4RCf3LkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/VKZZz8HxOXDSD+ExtjFLwGPgg="},{"type":"next-occurrence","id":"mKrgoAsE/KlDM3F7Pv2agxMnloM="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-25T09:00:16Z"},"road_event_id":"z/YdEw8glqBb2wJ9NaB4RCf3LkM=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"mKrgoAsE/KlDM3F7Pv2agxMnloM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/VKZZz8HxOXDSD+ExtjFLwGPgg="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-25T09:00:16Z"},"road_event_id":"mKrgoAsE/KlDM3F7Pv2agxMnloM=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T23:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"YGFMpa03AkDRRbnxFhygd0RA0eA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound near South of Exit 28 - NJ 168/Black Horse Pike (Bellmawr), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-22T12:42:20Z"},"road_event_id":"YGFMpa03AkDRRbnxFhygd0RA0eA=","beginning_cross_street":"South of Exit 28 - NJ 168/Black Horse Pike","ending_cross_street":"Exit 26S - NJ 42/I-76/I-676","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.090003,39.872383]]}},{"id":"M+7GCkX8Q70If1I4aLEvOucCPh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Nb7o/iY0/ObKi8ajUCdjzaQDbfE="}],"description":"Construction on I-678 northbound ramp from Exit 4 - Liberty Avenue (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM All lanes closed , , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:59 PM thru 08:00 AM All lanes closed ,","update_date":"2026-05-09T12:00:03Z"},"road_event_id":"M+7GCkX8Q70If1I4aLEvOucCPh4=","beginning_cross_street":"Exit 4 -  Liberty Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810731,40.692675]]}},{"id":"Nb7o/iY0/ObKi8ajUCdjzaQDbfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M+7GCkX8Q70If1I4aLEvOucCPh4="},{"type":"next-occurrence","id":"L/awckWFH7uO2/S+sxBUIEixt7o="}],"description":"Construction on I-678 northbound ramp from Exit 4 - Liberty Avenue (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM All lanes closed , , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:59 PM thru 08:00 AM All lanes closed ,","update_date":"2026-05-09T12:00:03Z"},"road_event_id":"Nb7o/iY0/ObKi8ajUCdjzaQDbfE=","beginning_cross_street":"Exit 4 -  Liberty Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810731,40.692675]]}},{"id":"L/awckWFH7uO2/S+sxBUIEixt7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M+7GCkX8Q70If1I4aLEvOucCPh4="}],"description":"Construction on I-678 northbound ramp from Exit 4 - Liberty Avenue (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM All lanes closed , , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:59 PM thru 08:00 AM All lanes closed ,","update_date":"2026-05-09T12:00:03Z"},"road_event_id":"L/awckWFH7uO2/S+sxBUIEixt7o=","beginning_cross_street":"Exit 4 -  Liberty Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T03:58:00Z","end_date":"2026-05-17T11:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810731,40.692675]]}},{"id":"nnytYgOIqedHPboRjdrVr6CBUhA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on US-6 eastbound between MANSFIELD AVE (Mansfield) and CT-633 (Mansfield) Route 6 eastbound will be reduced from 2 lanes of travel to 1 lane , Continuous Wednesday September 10th, 2025 09:00 AM thru Thursday August 6th, 2026 11:59 PM All lanes open","update_date":"2025-08-28T20:45:01Z"},"road_event_id":"nnytYgOIqedHPboRjdrVr6CBUhA=","beginning_cross_street":"MANSFIELD AVE","ending_cross_street":"CT-633","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.227656,41.729046]]}},{"id":"ORC300536734","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JFK Expressway"],"direction":"unknown","description":"Scheduled roadwork on JFK Expressway southbound ramp to Terminal 8 Departures (New York) Not currently Scheduled","update_date":"2026-04-18T19:00:00Z"},"road_event_id":"ORC300536734","beginning_cross_street":"Terminal 8 Departures","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-05T17:18:19Z","end_date":"2026-04-19T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.786734,40.647794]]}},{"id":"ORC300536735","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Terminal 7 Arrivals"],"direction":"unknown","description":"Scheduled roadwork on Terminal 7 Arrivals eastbound at (New York) Not currently Scheduled","update_date":"2026-04-25T09:00:01Z"},"road_event_id":"ORC300536735","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-05T17:22:05Z","end_date":"2026-04-26T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.783261,40.648078]]}},{"id":"ORC300536736","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","description":"Scheduled roadwork on I-678 southbound Exit B - 130th Place (New York) to Exit A - South Service Road; North Service Road (New York) Not currently Scheduled","update_date":"2026-04-08T07:00:01Z"},"road_event_id":"ORC300536736","beginning_cross_street":"Exit B  - 130th Place","ending_cross_street":"Exit A - South Service Road; North Service Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-05T17:26:24Z","end_date":"2026-04-09T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.807534,40.655213]]}},{"id":"hHSrsH5EYZhNVphy7Pb/rZSTIkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cgxV69TIg9jdiojAbimVImKHeTc="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"hHSrsH5EYZhNVphy7Pb/rZSTIkM=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"cgxV69TIg9jdiojAbimVImKHeTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hHSrsH5EYZhNVphy7Pb/rZSTIkM="},{"type":"next-occurrence","id":"7aR4uN9ovwwSnzX0AxM3DjhY6/s="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"cgxV69TIg9jdiojAbimVImKHeTc=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"7aR4uN9ovwwSnzX0AxM3DjhY6/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hHSrsH5EYZhNVphy7Pb/rZSTIkM="},{"type":"next-occurrence","id":"YLaybKhmry27ZLO6lBgsHq/KjLI="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"7aR4uN9ovwwSnzX0AxM3DjhY6/s=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"YLaybKhmry27ZLO6lBgsHq/KjLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hHSrsH5EYZhNVphy7Pb/rZSTIkM="},{"type":"next-occurrence","id":"Atjbrxzs+01Hfaarr1iUQOTxWEk="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"YLaybKhmry27ZLO6lBgsHq/KjLI=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"Atjbrxzs+01Hfaarr1iUQOTxWEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hHSrsH5EYZhNVphy7Pb/rZSTIkM="},{"type":"next-occurrence","id":"tJJV5ssm/QugzS62jWhPHdzjokc="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"Atjbrxzs+01Hfaarr1iUQOTxWEk=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"tJJV5ssm/QugzS62jWhPHdzjokc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hHSrsH5EYZhNVphy7Pb/rZSTIkM="},{"type":"next-occurrence","id":"iuxFt3OgEAQPSdx3NimWQJTCUF8="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"tJJV5ssm/QugzS62jWhPHdzjokc=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"iuxFt3OgEAQPSdx3NimWQJTCUF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hHSrsH5EYZhNVphy7Pb/rZSTIkM="},{"type":"next-occurrence","id":"49yRQJNGesohcb5aCGiIoDA9gIw="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"iuxFt3OgEAQPSdx3NimWQJTCUF8=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"49yRQJNGesohcb5aCGiIoDA9gIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hHSrsH5EYZhNVphy7Pb/rZSTIkM="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"49yRQJNGesohcb5aCGiIoDA9gIw=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"d7IRzHethnaE67Y2Azdejv1J6pQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["QM11 Bus, QM25 Bus, QM7 Bus and QM8 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, QM11 Bus, QM25 Bus, QM7 Bus and QM8 Bus at State St/Battery Pl (New York) stop is closed. Use the temporary stop on State St at Bridge St instead. Through November 2026. , Continuous Saturday August 23rd, 2025 12:00 AM thru Sunday November 1st, 2026 11:59 PM","update_date":"2025-08-22T18:38:39Z"},"road_event_id":"d7IRzHethnaE67Y2Azdejv1J6pQ=","beginning_cross_street":"State St/Battery Pl","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.014174,40.704386]]}},{"id":"g+jYKUjUzTUbu3APyDBSfpjJ91s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7JHS1fcvCo4KLCxbtm563HM7QGU="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"g+jYKUjUzTUbu3APyDBSfpjJ91s=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"7JHS1fcvCo4KLCxbtm563HM7QGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g+jYKUjUzTUbu3APyDBSfpjJ91s="},{"type":"next-occurrence","id":"lxKqK2PPJvl8d0vyKIeavVfT+Pg="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"7JHS1fcvCo4KLCxbtm563HM7QGU=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"lxKqK2PPJvl8d0vyKIeavVfT+Pg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g+jYKUjUzTUbu3APyDBSfpjJ91s="},{"type":"next-occurrence","id":"Hcy1xExqUJR7bkZnnvryaXwJVBY="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"lxKqK2PPJvl8d0vyKIeavVfT+Pg=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"Hcy1xExqUJR7bkZnnvryaXwJVBY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g+jYKUjUzTUbu3APyDBSfpjJ91s="},{"type":"next-occurrence","id":"rUsEzJ1CaVzl/NQa0fk+fhD3Dfg="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"Hcy1xExqUJR7bkZnnvryaXwJVBY=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"rUsEzJ1CaVzl/NQa0fk+fhD3Dfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g+jYKUjUzTUbu3APyDBSfpjJ91s="},{"type":"next-occurrence","id":"UHDaXcxMY5pEjCfiz9j/P1SshFI="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"rUsEzJ1CaVzl/NQa0fk+fhD3Dfg=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"UHDaXcxMY5pEjCfiz9j/P1SshFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g+jYKUjUzTUbu3APyDBSfpjJ91s="},{"type":"next-occurrence","id":"VxP6InZpnalyyRnXtQOd+S/J0Ps="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"UHDaXcxMY5pEjCfiz9j/P1SshFI=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"VxP6InZpnalyyRnXtQOd+S/J0Ps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g+jYKUjUzTUbu3APyDBSfpjJ91s="},{"type":"next-occurrence","id":"P4YVnriO5a8Ic+hMGhUljtm1Fds="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"VxP6InZpnalyyRnXtQOd+S/J0Ps=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"P4YVnriO5a8Ic+hMGhUljtm1Fds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g+jYKUjUzTUbu3APyDBSfpjJ91s="},{"type":"next-occurrence","id":"in6YPBiv0bFfa6/FueOtTPaTRBQ="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"P4YVnriO5a8Ic+hMGhUljtm1Fds=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"in6YPBiv0bFfa6/FueOtTPaTRBQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g+jYKUjUzTUbu3APyDBSfpjJ91s="},{"type":"next-occurrence","id":"t8IXWPhCXx19bL2U1MdbHh/0WUk="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"in6YPBiv0bFfa6/FueOtTPaTRBQ=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"t8IXWPhCXx19bL2U1MdbHh/0WUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g+jYKUjUzTUbu3APyDBSfpjJ91s="},{"type":"next-occurrence","id":"kMSAnlKxF8wvs9BDlq1x/+Dc1ag="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"t8IXWPhCXx19bL2U1MdbHh/0WUk=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"kMSAnlKxF8wvs9BDlq1x/+Dc1ag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g+jYKUjUzTUbu3APyDBSfpjJ91s="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"kMSAnlKxF8wvs9BDlq1x/+Dc1ag=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"9AAQrqzsNNyFyufcEfaw3GBjf4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aEfxTO1cI0bdkwmtTdN1tUuIFEE="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-08T11:24:36Z"},"road_event_id":"9AAQrqzsNNyFyufcEfaw3GBjf4Q=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"aEfxTO1cI0bdkwmtTdN1tUuIFEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9AAQrqzsNNyFyufcEfaw3GBjf4Q="},{"type":"next-occurrence","id":"aKCvVirZtMu3fEHfpep8499owMc="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-08T11:24:36Z"},"road_event_id":"aEfxTO1cI0bdkwmtTdN1tUuIFEE=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"aKCvVirZtMu3fEHfpep8499owMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9AAQrqzsNNyFyufcEfaw3GBjf4Q="},{"type":"next-occurrence","id":"qZKeevWhAMeYJUg3vC83OdxUskU="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-08T11:24:36Z"},"road_event_id":"aKCvVirZtMu3fEHfpep8499owMc=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"qZKeevWhAMeYJUg3vC83OdxUskU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9AAQrqzsNNyFyufcEfaw3GBjf4Q="},{"type":"next-occurrence","id":"1eIxFoH+Ved4kJuuDJ4iFWiifvg="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-08T11:24:36Z"},"road_event_id":"qZKeevWhAMeYJUg3vC83OdxUskU=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"1eIxFoH+Ved4kJuuDJ4iFWiifvg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9AAQrqzsNNyFyufcEfaw3GBjf4Q="},{"type":"next-occurrence","id":"d9s6uA3Vlx6iAHtL06B+s9BxpTY="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-08T11:24:36Z"},"road_event_id":"1eIxFoH+Ved4kJuuDJ4iFWiifvg=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"d9s6uA3Vlx6iAHtL06B+s9BxpTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9AAQrqzsNNyFyufcEfaw3GBjf4Q="},{"type":"next-occurrence","id":"y7Kl7xzhGgyybOqrcBfhpEMnZdw="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-08T11:24:36Z"},"road_event_id":"d9s6uA3Vlx6iAHtL06B+s9BxpTY=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"y7Kl7xzhGgyybOqrcBfhpEMnZdw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9AAQrqzsNNyFyufcEfaw3GBjf4Q="},{"type":"next-occurrence","id":"grbrewccZ5/EX5QLHBQHhr/rc8E="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-08T11:24:36Z"},"road_event_id":"y7Kl7xzhGgyybOqrcBfhpEMnZdw=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"grbrewccZ5/EX5QLHBQHhr/rc8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9AAQrqzsNNyFyufcEfaw3GBjf4Q="},{"type":"next-occurrence","id":"CsdfEOZannRs4mwULYyW8KMHSGg="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-08T11:24:36Z"},"road_event_id":"grbrewccZ5/EX5QLHBQHhr/rc8E=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T18:00:00Z","end_date":"2026-05-27T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"CsdfEOZannRs4mwULYyW8KMHSGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9AAQrqzsNNyFyufcEfaw3GBjf4Q="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-08T11:24:36Z"},"road_event_id":"CsdfEOZannRs4mwULYyW8KMHSGg=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T18:00:00Z","end_date":"2026-05-28T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"KQG8VU9V6slsCE+XwRfWQ2+dwNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINDEN BLVD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"W5wqfigNdROJhAJ4QiSLR5ISvK0="}],"description":"Construction on LINDEN BLVD eastbound between LINCOLN AVE (New York) and ELDERT LN (New York), Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-10T18:35:39Z"},"road_event_id":"KQG8VU9V6slsCE+XwRfWQ2+dwNU=","beginning_cross_street":"LINCOLN AVE","ending_cross_street":"ELDERT LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865708,40.668891]]}},{"id":"W5wqfigNdROJhAJ4QiSLR5ISvK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINDEN BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KQG8VU9V6slsCE+XwRfWQ2+dwNU="},{"type":"next-occurrence","id":"ts+Msnd5I118S2UeoCJv8/pgxqE="}],"description":"Construction on LINDEN BLVD eastbound between LINCOLN AVE (New York) and ELDERT LN (New York), Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-10T18:35:39Z"},"road_event_id":"W5wqfigNdROJhAJ4QiSLR5ISvK0=","beginning_cross_street":"LINCOLN AVE","ending_cross_street":"ELDERT LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865708,40.668891]]}},{"id":"ts+Msnd5I118S2UeoCJv8/pgxqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINDEN BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KQG8VU9V6slsCE+XwRfWQ2+dwNU="},{"type":"next-occurrence","id":"qpK/lw4qXyuUneOD5FuFCPZ+WZ0="}],"description":"Construction on LINDEN BLVD eastbound between LINCOLN AVE (New York) and ELDERT LN (New York), Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-10T18:35:39Z"},"road_event_id":"ts+Msnd5I118S2UeoCJv8/pgxqE=","beginning_cross_street":"LINCOLN AVE","ending_cross_street":"ELDERT LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865708,40.668891]]}},{"id":"qpK/lw4qXyuUneOD5FuFCPZ+WZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINDEN BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KQG8VU9V6slsCE+XwRfWQ2+dwNU="}],"description":"Construction on LINDEN BLVD eastbound between LINCOLN AVE (New York) and ELDERT LN (New York), Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-10T18:35:39Z"},"road_event_id":"qpK/lw4qXyuUneOD5FuFCPZ+WZ0=","beginning_cross_street":"LINCOLN AVE","ending_cross_street":"ELDERT LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865708,40.668891]]}},{"id":"jxrmws3thZXQHGosMkcAn6Wa/Pw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iRF+doEAKxVP3/4a43EWmmES3s8="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Tuesday March 10th, 2026 thru Tuesday May 26th, 2026, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-10T18:50:44Z"},"road_event_id":"jxrmws3thZXQHGosMkcAn6Wa/Pw=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981779,40.692021]]}},{"id":"iRF+doEAKxVP3/4a43EWmmES3s8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jxrmws3thZXQHGosMkcAn6Wa/Pw="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Tuesday March 10th, 2026 thru Tuesday May 26th, 2026, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-10T18:50:44Z"},"road_event_id":"iRF+doEAKxVP3/4a43EWmmES3s8=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981779,40.692021]]}},{"id":"eQ3P2+1mZNN5mVcBnGb74w8xr0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9MeEfSa/xELOaA+eulkoOZGBB+w="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"eQ3P2+1mZNN5mVcBnGb74w8xr0I=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"9MeEfSa/xELOaA+eulkoOZGBB+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eQ3P2+1mZNN5mVcBnGb74w8xr0I="},{"type":"next-occurrence","id":"/nzztxFvKOkzXPJ9kYtnVAGARcQ="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"9MeEfSa/xELOaA+eulkoOZGBB+w=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"/nzztxFvKOkzXPJ9kYtnVAGARcQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eQ3P2+1mZNN5mVcBnGb74w8xr0I="},{"type":"next-occurrence","id":"DVpTWF1CK5zXhMAf/R2ZDeBcl6c="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"/nzztxFvKOkzXPJ9kYtnVAGARcQ=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"DVpTWF1CK5zXhMAf/R2ZDeBcl6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eQ3P2+1mZNN5mVcBnGb74w8xr0I="},{"type":"next-occurrence","id":"Cq/0t9zMM218p3JOXaDqhdO8KvI="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"DVpTWF1CK5zXhMAf/R2ZDeBcl6c=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"Cq/0t9zMM218p3JOXaDqhdO8KvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eQ3P2+1mZNN5mVcBnGb74w8xr0I="},{"type":"next-occurrence","id":"4pIDlE9l/HvN/gnDIBSn8StvIx0="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"Cq/0t9zMM218p3JOXaDqhdO8KvI=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"4pIDlE9l/HvN/gnDIBSn8StvIx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eQ3P2+1mZNN5mVcBnGb74w8xr0I="},{"type":"next-occurrence","id":"eLwvdLMT4TzWqow03mJzqtthqUs="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"4pIDlE9l/HvN/gnDIBSn8StvIx0=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"eLwvdLMT4TzWqow03mJzqtthqUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eQ3P2+1mZNN5mVcBnGb74w8xr0I="},{"type":"next-occurrence","id":"6raz5GQKXHpcbCK6M0cBkSQ9Jz4="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"eLwvdLMT4TzWqow03mJzqtthqUs=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"6raz5GQKXHpcbCK6M0cBkSQ9Jz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eQ3P2+1mZNN5mVcBnGb74w8xr0I="},{"type":"next-occurrence","id":"J7CP/L+V7lgoQ/H22PbWYkjhiE4="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"6raz5GQKXHpcbCK6M0cBkSQ9Jz4=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"J7CP/L+V7lgoQ/H22PbWYkjhiE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eQ3P2+1mZNN5mVcBnGb74w8xr0I="},{"type":"next-occurrence","id":"ZdLVuf5UxWdMylpeHO53JcAHqNQ="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"J7CP/L+V7lgoQ/H22PbWYkjhiE4=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"ZdLVuf5UxWdMylpeHO53JcAHqNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eQ3P2+1mZNN5mVcBnGb74w8xr0I="},{"type":"next-occurrence","id":"TC9hBRWiN/dm9J37L37gAz+dJXc="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"ZdLVuf5UxWdMylpeHO53JcAHqNQ=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"TC9hBRWiN/dm9J37L37gAz+dJXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eQ3P2+1mZNN5mVcBnGb74w8xr0I="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"TC9hBRWiN/dm9J37L37gAz+dJXc=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"t3G79tHWHmEFQnwr0fd+YlGrTng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FIiB3BkGrp+tdR2Q4czp2jiC1js="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"t3G79tHWHmEFQnwr0fd+YlGrTng=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"FIiB3BkGrp+tdR2Q4czp2jiC1js=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t3G79tHWHmEFQnwr0fd+YlGrTng="},{"type":"next-occurrence","id":"rOgMiPsXp8hOduvZuVq/D+90/JI="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"FIiB3BkGrp+tdR2Q4czp2jiC1js=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"rOgMiPsXp8hOduvZuVq/D+90/JI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t3G79tHWHmEFQnwr0fd+YlGrTng="},{"type":"next-occurrence","id":"99/zqfIf9KbQcKw95/tX6GUS2m0="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"rOgMiPsXp8hOduvZuVq/D+90/JI=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"99/zqfIf9KbQcKw95/tX6GUS2m0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t3G79tHWHmEFQnwr0fd+YlGrTng="},{"type":"next-occurrence","id":"sbwspTM3EXUm64tp57EGxN+/ueE="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"99/zqfIf9KbQcKw95/tX6GUS2m0=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"sbwspTM3EXUm64tp57EGxN+/ueE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t3G79tHWHmEFQnwr0fd+YlGrTng="},{"type":"next-occurrence","id":"blUlXpZMAHVFa2t/efoTyIwbBX4="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"sbwspTM3EXUm64tp57EGxN+/ueE=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"blUlXpZMAHVFa2t/efoTyIwbBX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t3G79tHWHmEFQnwr0fd+YlGrTng="},{"type":"next-occurrence","id":"YT42ZqtmgmyzB8LRcGVmUaHqsXg="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"blUlXpZMAHVFa2t/efoTyIwbBX4=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"YT42ZqtmgmyzB8LRcGVmUaHqsXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t3G79tHWHmEFQnwr0fd+YlGrTng="},{"type":"next-occurrence","id":"86SbYdjtcaIhtPfQCAmzUuzWoDw="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"YT42ZqtmgmyzB8LRcGVmUaHqsXg=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"86SbYdjtcaIhtPfQCAmzUuzWoDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t3G79tHWHmEFQnwr0fd+YlGrTng="},{"type":"next-occurrence","id":"8xM5UufAQKiVl5ICtUclJ2iLJu4="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"86SbYdjtcaIhtPfQCAmzUuzWoDw=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"8xM5UufAQKiVl5ICtUclJ2iLJu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t3G79tHWHmEFQnwr0fd+YlGrTng="},{"type":"next-occurrence","id":"juACrbaGc/UG698YfDDb2jGQiRI="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"8xM5UufAQKiVl5ICtUclJ2iLJu4=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"juACrbaGc/UG698YfDDb2jGQiRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t3G79tHWHmEFQnwr0fd+YlGrTng="},{"type":"next-occurrence","id":"sxbSUsrGV5pVan/acBMLadsigVg="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"juACrbaGc/UG698YfDDb2jGQiRI=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"sxbSUsrGV5pVan/acBMLadsigVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t3G79tHWHmEFQnwr0fd+YlGrTng="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"sxbSUsrGV5pVan/acBMLadsigVg=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"cEASGZD/A4/SPa3gY47bmCCXJjs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound between East of I-676/Ben Franklin Bridge (Camden) and West of CR 608/Baird Blvd (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-07T22:48:25Z"},"road_event_id":"cEASGZD/A4/SPa3gY47bmCCXJjs=","beginning_cross_street":"East of I-676/Ben Franklin Bridge","ending_cross_street":"West of CR 608/Baird Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.117393,39.947628]]}},{"id":"ONW6RmO6lfsyXRbJYGCrH4FAFNs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Westbound between West of CR 608/Baird Blvd (Camden) and East of I-676/Ben Franklin Bridge (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right lane closed","update_date":"2026-05-07T22:48:25Z"},"road_event_id":"ONW6RmO6lfsyXRbJYGCrH4FAFNs=","beginning_cross_street":"West of CR 608/Baird Blvd","ending_cross_street":"East of I-676/Ben Franklin Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.099777,39.940704]]}},{"id":"tJSshdzjXJ3gLlmk1mdhnJsJPQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gDqlnd5/57gE4eYw24I1tP5y3t8="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"tJSshdzjXJ3gLlmk1mdhnJsJPQM=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"gDqlnd5/57gE4eYw24I1tP5y3t8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tJSshdzjXJ3gLlmk1mdhnJsJPQM="},{"type":"next-occurrence","id":"0uYlEW41Q/79h6PfKgp0nJedKuY="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"gDqlnd5/57gE4eYw24I1tP5y3t8=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"0uYlEW41Q/79h6PfKgp0nJedKuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tJSshdzjXJ3gLlmk1mdhnJsJPQM="},{"type":"next-occurrence","id":"i0Nn8gEBcUgjH66/8Boksv3txZw="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"0uYlEW41Q/79h6PfKgp0nJedKuY=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"i0Nn8gEBcUgjH66/8Boksv3txZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tJSshdzjXJ3gLlmk1mdhnJsJPQM="},{"type":"next-occurrence","id":"TgPw1WtcHla0NNmFZTGyRulBwXo="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"i0Nn8gEBcUgjH66/8Boksv3txZw=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"TgPw1WtcHla0NNmFZTGyRulBwXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tJSshdzjXJ3gLlmk1mdhnJsJPQM="},{"type":"next-occurrence","id":"Dzu9uTWvXZOYj3snM1kNkwzv/Jc="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"TgPw1WtcHla0NNmFZTGyRulBwXo=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"Dzu9uTWvXZOYj3snM1kNkwzv/Jc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tJSshdzjXJ3gLlmk1mdhnJsJPQM="},{"type":"next-occurrence","id":"mamhSVVnU9bVeBBDD9c++WxDwuc="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"Dzu9uTWvXZOYj3snM1kNkwzv/Jc=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"mamhSVVnU9bVeBBDD9c++WxDwuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tJSshdzjXJ3gLlmk1mdhnJsJPQM="},{"type":"next-occurrence","id":"UQzgTlz5B+FHdAc/ftdpufPwbAI="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"mamhSVVnU9bVeBBDD9c++WxDwuc=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"UQzgTlz5B+FHdAc/ftdpufPwbAI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tJSshdzjXJ3gLlmk1mdhnJsJPQM="},{"type":"next-occurrence","id":"XcaSOfDWkHl0DhsO24eT2W047MA="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"UQzgTlz5B+FHdAc/ftdpufPwbAI=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"XcaSOfDWkHl0DhsO24eT2W047MA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tJSshdzjXJ3gLlmk1mdhnJsJPQM="},{"type":"next-occurrence","id":"MYTllmFHYc0R3ag5IoqE4Z/P4OU="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"XcaSOfDWkHl0DhsO24eT2W047MA=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:30:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"MYTllmFHYc0R3ag5IoqE4Z/P4OU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tJSshdzjXJ3gLlmk1mdhnJsJPQM="},{"type":"next-occurrence","id":"B+jmDjQlaNQQD5UQHKGdCm42l7E="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"MYTllmFHYc0R3ag5IoqE4Z/P4OU=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:30:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"B+jmDjQlaNQQD5UQHKGdCm42l7E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tJSshdzjXJ3gLlmk1mdhnJsJPQM="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"B+jmDjQlaNQQD5UQHKGdCm42l7E=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:30:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"zhIz8BHYSfDgIkAdMci94VcwXqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M66 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction eastbound, M66 Bus bypassing W 65 St/Columbus Av (New York) Use the stop on W 65th at Broadway instead. Through 2026. , Continuous Saturday August 23rd, 2025 12:00 AM thru Thursday December 31st, 2026 11:59 PM","update_date":"2026-04-17T17:48:21Z"},"road_event_id":"zhIz8BHYSfDgIkAdMci94VcwXqI=","beginning_cross_street":"W 65 St/Columbus Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981874,40.772835]]}},{"id":"lvVY04tllu5qU5M7Jdun1k8X4Co=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q32 Bus and Q60 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction eastbound, Q32 Bus and Q60 Bus at Queens Bl/44 St (New York) Stop is closed; please use the stops on Queens Blvd at 41st St or 46th St instead. Until September 2026. , Continuous Saturday August 23rd, 2025 12:00 AM thru Tuesday September 1st, 2026 11:59 PM","update_date":"2025-08-22T18:24:55Z"},"road_event_id":"lvVY04tllu5qU5M7Jdun1k8X4Co=","beginning_cross_street":"Queens Bl/44 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.920408,40.743115]]}},{"id":"lZUYDdVu5glUNuGnvAiQwwF5q3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YJs7ElvuFN0WuoXOnBT5TcOiaN0="}],"description":"Bridge maintenance operations on Saw Mill River Parkway southbound between Exit 22 - I-287 (Greenburgh) and Exit 21W - NY 119 (Greenburgh) D264324/DAY/B5500749/32234509 -This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-08T18:00:58Z"},"road_event_id":"lZUYDdVu5glUNuGnvAiQwwF5q3w=","beginning_cross_street":"","ending_cross_street":"Exit 21W - Frontage Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821302,41.055569]]}},{"id":"YJs7ElvuFN0WuoXOnBT5TcOiaN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lZUYDdVu5glUNuGnvAiQwwF5q3w="},{"type":"next-occurrence","id":"S+vS7puN/iWxjuobaexkBWj5gQk="}],"description":"Bridge maintenance operations on Saw Mill River Parkway southbound between Exit 22 - I-287 (Greenburgh) and Exit 21W - NY 119 (Greenburgh) D264324/DAY/B5500749/32234509 -This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-08T18:00:58Z"},"road_event_id":"YJs7ElvuFN0WuoXOnBT5TcOiaN0=","beginning_cross_street":"","ending_cross_street":"Exit 21W - Frontage Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821302,41.055569]]}},{"id":"S+vS7puN/iWxjuobaexkBWj5gQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lZUYDdVu5glUNuGnvAiQwwF5q3w="}],"description":"Bridge maintenance operations on Saw Mill River Parkway southbound between Exit 22 - I-287 (Greenburgh) and Exit 21W - NY 119 (Greenburgh) D264324/DAY/B5500749/32234509 -This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-08T18:00:58Z"},"road_event_id":"S+vS7puN/iWxjuobaexkBWj5gQk=","beginning_cross_street":"","ending_cross_street":"Exit 21W - Frontage Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821302,41.055569]]}},{"id":"Fw5Re9Z0P4DhL0Wul6Q4t4rfj+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FROST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"b4ebObUsmDNt/Cwf0YjCmAuAOok="}],"description":"Construction on FROST ST westbound between LORIMER ST (New York) and UNION AVE (New York), Tuesday March 10th, 2026 thru Saturday May 30th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T19:24:29Z"},"road_event_id":"Fw5Re9Z0P4DhL0Wul6Q4t4rfj+E=","beginning_cross_street":"LORIMER ST","ending_cross_street":"UNION AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949984,40.717567]]}},{"id":"b4ebObUsmDNt/Cwf0YjCmAuAOok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FROST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fw5Re9Z0P4DhL0Wul6Q4t4rfj+E="}],"description":"Construction on FROST ST westbound between LORIMER ST (New York) and UNION AVE (New York), Tuesday March 10th, 2026 thru Saturday May 30th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T19:24:29Z"},"road_event_id":"b4ebObUsmDNt/Cwf0YjCmAuAOok=","beginning_cross_street":"LORIMER ST","ending_cross_street":"UNION AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949984,40.717567]]}},{"id":"O0eFk58d7lcKSGNqpoiMiAWXe9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mcgT0N4PvUDeF1cHi/ZkW9Cp1T0="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-08T19:31:23Z"},"road_event_id":"O0eFk58d7lcKSGNqpoiMiAWXe9M=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"mcgT0N4PvUDeF1cHi/ZkW9Cp1T0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O0eFk58d7lcKSGNqpoiMiAWXe9M="},{"type":"next-occurrence","id":"C4oPwlLJcl7E+Q9QBH4DM9NpEQc="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-08T19:31:23Z"},"road_event_id":"mcgT0N4PvUDeF1cHi/ZkW9Cp1T0=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"C4oPwlLJcl7E+Q9QBH4DM9NpEQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O0eFk58d7lcKSGNqpoiMiAWXe9M="},{"type":"next-occurrence","id":"/ORtD9VexX2lVDemzuSZDC90xmg="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-08T19:31:23Z"},"road_event_id":"C4oPwlLJcl7E+Q9QBH4DM9NpEQc=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"/ORtD9VexX2lVDemzuSZDC90xmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O0eFk58d7lcKSGNqpoiMiAWXe9M="},{"type":"next-occurrence","id":"O0tQDNUi9SoclMAKEUnPl7txd9I="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-08T19:31:23Z"},"road_event_id":"/ORtD9VexX2lVDemzuSZDC90xmg=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T12:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"O0tQDNUi9SoclMAKEUnPl7txd9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O0eFk58d7lcKSGNqpoiMiAWXe9M="},{"type":"next-occurrence","id":"FznPkrbyEJGSDO4iVzAertsetWo="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-08T19:31:23Z"},"road_event_id":"O0tQDNUi9SoclMAKEUnPl7txd9I=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T12:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"FznPkrbyEJGSDO4iVzAertsetWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O0eFk58d7lcKSGNqpoiMiAWXe9M="},{"type":"next-occurrence","id":"HNHheNJaXHo+/CzrZMNoJP3hLc8="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-08T19:31:23Z"},"road_event_id":"FznPkrbyEJGSDO4iVzAertsetWo=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T12:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"HNHheNJaXHo+/CzrZMNoJP3hLc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O0eFk58d7lcKSGNqpoiMiAWXe9M="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-08T19:31:23Z"},"road_event_id":"HNHheNJaXHo+/CzrZMNoJP3hLc8=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T12:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"h+gqKdXTGWo62hwe0O9HFRmcb5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BxM11 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, BxM11 Bus at Madison Av/E 47 St (New York) stop is closed, please use the stop on Madison Ave at E 46th St instead., Continuous Saturday March 21st, 2026 12:00 AM thru Saturday December 30th, 2028 11:59 PM","update_date":"2026-03-20T18:57:26Z"},"road_event_id":"h+gqKdXTGWo62hwe0O9HFRmcb5M=","beginning_cross_street":"Madison Av/E 47 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976941,40.755877]]}},{"id":"R8W7x8RL3byyx9LXgjRq+hJpElo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction westbound, B65 Bus at Smith St/Atlantic Av (New York) is closed. Please use the stops on Smith St at Bergen St or Livingston St, Continuous Saturday March 8th, 2025 12:00 AM thru Sunday April 1st, 2029 11:59 PM","update_date":"2025-06-11T12:52:45Z"},"road_event_id":"R8W7x8RL3byyx9LXgjRq+hJpElo=","beginning_cross_street":"Smith St/Atlantic Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98898,40.68878]]}},{"id":"+ynr9omdyGKFvb8IR1L7gbxN9xA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B61 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, B61 Bus at Smith St/Atlantic Av (New York) is closed. Please use the stops on Atlantic Ave at Court St or Smith St at Livingston St. , Continuous Tuesday October 21st, 2025 09:10 AM thru Sunday April 1st, 2029 11:59 PM","update_date":"2025-10-21T13:11:55Z"},"road_event_id":"+ynr9omdyGKFvb8IR1L7gbxN9xA=","beginning_cross_street":"Smith St/Atlantic Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98898,40.68878]]}},{"id":"ELrqhM3UxJ1N2zsuYvqFOXW+r18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY55"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8U5+oq+QiYIEALsSNUEH98E8NLI="}],"description":"Installation of traffic management systems on US 44/NY55 eastbound at Academy Street (Poughkeepsie) D265523/32650209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:25Z"},"road_event_id":"ELrqhM3UxJ1N2zsuYvqFOXW+r18=","beginning_cross_street":"Academy Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917959,41.702333]]}},{"id":"8U5+oq+QiYIEALsSNUEH98E8NLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ELrqhM3UxJ1N2zsuYvqFOXW+r18="},{"type":"next-occurrence","id":"UBG1Ys6pXSxZCl6bWvPPyRD0jL8="}],"description":"Installation of traffic management systems on US 44/NY55 eastbound at Academy Street (Poughkeepsie) D265523/32650209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:25Z"},"road_event_id":"8U5+oq+QiYIEALsSNUEH98E8NLI=","beginning_cross_street":"Academy Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917959,41.702333]]}},{"id":"UBG1Ys6pXSxZCl6bWvPPyRD0jL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ELrqhM3UxJ1N2zsuYvqFOXW+r18="},{"type":"next-occurrence","id":"3Yw6jfyKGMYGwR/LK2C8nLYBUbY="}],"description":"Installation of traffic management systems on US 44/NY55 eastbound at Academy Street (Poughkeepsie) D265523/32650209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:25Z"},"road_event_id":"UBG1Ys6pXSxZCl6bWvPPyRD0jL8=","beginning_cross_street":"Academy Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917959,41.702333]]}},{"id":"3Yw6jfyKGMYGwR/LK2C8nLYBUbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ELrqhM3UxJ1N2zsuYvqFOXW+r18="}],"description":"Installation of traffic management systems on US 44/NY55 eastbound at Academy Street (Poughkeepsie) D265523/32650209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:25Z"},"road_event_id":"3Yw6jfyKGMYGwR/LK2C8nLYBUbY=","beginning_cross_street":"Academy Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917959,41.702333]]}},{"id":"R4PiMB6v1lzLz4YYqS0FEgxgRsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[],"description":"Scheduled roadwork on George Washington Bridge Upper Level westbound ramp to Center Avenue (Fort Lee) will be closed through July. Cars/Buses use Exit 73 for Local Streets. Trucks follow posted detours, Continuous Monday January 12th, 2026 10:00 PM thru Friday July 31st, 2026 11:59 PM All lanes closed","update_date":"2026-01-13T10:42:46Z"},"road_event_id":"R4PiMB6v1lzLz4YYqS0FEgxgRsM=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.969412,40.855231]]}},{"id":"Q6tOP2UgwDlYHLOrEB+5V38v4KE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0yc+etCAZaRIGIUYzFLDKYrKbMU="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, right lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-30T19:01:24Z"},"road_event_id":"Q6tOP2UgwDlYHLOrEB+5V38v4KE=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.685559,41.245432]]}},{"id":"0yc+etCAZaRIGIUYzFLDKYrKbMU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q6tOP2UgwDlYHLOrEB+5V38v4KE="},{"type":"next-occurrence","id":"trfl7i6gw6a6QLr9Rhhm3deLSrY="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, right lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-30T19:01:24Z"},"road_event_id":"0yc+etCAZaRIGIUYzFLDKYrKbMU=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.685559,41.245432]]}},{"id":"trfl7i6gw6a6QLr9Rhhm3deLSrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q6tOP2UgwDlYHLOrEB+5V38v4KE="},{"type":"next-occurrence","id":"4f6QbdI4AtIx0rWQE/NqCMK4eFM="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, right lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-30T19:01:24Z"},"road_event_id":"trfl7i6gw6a6QLr9Rhhm3deLSrY=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.685559,41.245432]]}},{"id":"4f6QbdI4AtIx0rWQE/NqCMK4eFM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q6tOP2UgwDlYHLOrEB+5V38v4KE="},{"type":"next-occurrence","id":"Hj6d7mQuNFfAseI9t9EGG4wxnJE="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, right lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-30T19:01:24Z"},"road_event_id":"4f6QbdI4AtIx0rWQE/NqCMK4eFM=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.685559,41.245432]]}},{"id":"Hj6d7mQuNFfAseI9t9EGG4wxnJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q6tOP2UgwDlYHLOrEB+5V38v4KE="},{"type":"next-occurrence","id":"lMUkQYr7TOq9TuwCo51T1DvXPsc="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, right lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-30T19:01:24Z"},"road_event_id":"Hj6d7mQuNFfAseI9t9EGG4wxnJE=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.685559,41.245432]]}},{"id":"lMUkQYr7TOq9TuwCo51T1DvXPsc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q6tOP2UgwDlYHLOrEB+5V38v4KE="},{"type":"next-occurrence","id":"mAZWmS7yk7LW5GXS4g0tEMOrnIg="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, right lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-30T19:01:24Z"},"road_event_id":"lMUkQYr7TOq9TuwCo51T1DvXPsc=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.685559,41.245432]]}},{"id":"mAZWmS7yk7LW5GXS4g0tEMOrnIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q6tOP2UgwDlYHLOrEB+5V38v4KE="},{"type":"next-occurrence","id":"+OKf6uPqZM5GlatlIqF9UUp4vf8="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, right lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-30T19:01:24Z"},"road_event_id":"mAZWmS7yk7LW5GXS4g0tEMOrnIg=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.685559,41.245432]]}},{"id":"+OKf6uPqZM5GlatlIqF9UUp4vf8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q6tOP2UgwDlYHLOrEB+5V38v4KE="},{"type":"next-occurrence","id":"8hyEg4FWY1a8s2nJu2iPpFvKMBo="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, right lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-30T19:01:24Z"},"road_event_id":"+OKf6uPqZM5GlatlIqF9UUp4vf8=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.685559,41.245432]]}},{"id":"8hyEg4FWY1a8s2nJu2iPpFvKMBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q6tOP2UgwDlYHLOrEB+5V38v4KE="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, right lane closure, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-30T19:01:24Z"},"road_event_id":"8hyEg4FWY1a8s2nJu2iPpFvKMBo=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T18:00:00Z","end_date":"2026-05-28T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.685559,41.245432]]}},{"id":"rN/DMV3PZdgn6ElcuBXCGQYXonY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bruce Reynolds Blvd"],"direction":"unknown","related_road_events":[],"description":"Scheduled roadwork on Bruce Reynolds Blvd westbound between Lemoine Avenue (Fort Lee) and Center Avenue (Fort Lee) will be closed through September., Continuous Monday January 12th, 2026 10:00 PM thru Wednesday September 30th, 2026 11:59 PM All lanes closed","update_date":"2026-01-13T10:43:29Z"},"road_event_id":"rN/DMV3PZdgn6ElcuBXCGQYXonY=","beginning_cross_street":"Lemoine Avenue ","ending_cross_street":"Center Avenue ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968544,40.853674]]}},{"id":"MpwhwHOX3keg5IO77w21sJpgaLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ix/3ttR7ZFH4pvvjzGqGFpoRYGE="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"MpwhwHOX3keg5IO77w21sJpgaLQ=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"ix/3ttR7ZFH4pvvjzGqGFpoRYGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MpwhwHOX3keg5IO77w21sJpgaLQ="},{"type":"next-occurrence","id":"7USl4b+CZRkQXhappzd/rj55/tM="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"ix/3ttR7ZFH4pvvjzGqGFpoRYGE=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"7USl4b+CZRkQXhappzd/rj55/tM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MpwhwHOX3keg5IO77w21sJpgaLQ="},{"type":"next-occurrence","id":"V2deA66uvZDRLMiApwqbOPYeYEI="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"7USl4b+CZRkQXhappzd/rj55/tM=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"V2deA66uvZDRLMiApwqbOPYeYEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MpwhwHOX3keg5IO77w21sJpgaLQ="},{"type":"next-occurrence","id":"yCRgAIyCH52ekwLd6tDX0Yy5Nb0="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"V2deA66uvZDRLMiApwqbOPYeYEI=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"yCRgAIyCH52ekwLd6tDX0Yy5Nb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MpwhwHOX3keg5IO77w21sJpgaLQ="},{"type":"next-occurrence","id":"c4UtqR3lDgg8UDDx1fxZkL7QRMg="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"yCRgAIyCH52ekwLd6tDX0Yy5Nb0=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T02:00:00Z","end_date":"2026-05-18T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"c4UtqR3lDgg8UDDx1fxZkL7QRMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MpwhwHOX3keg5IO77w21sJpgaLQ="},{"type":"next-occurrence","id":"L2Tl8MfMCzd/upRzEfPgbbhfd14="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"c4UtqR3lDgg8UDDx1fxZkL7QRMg=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T02:00:00Z","end_date":"2026-05-19T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"L2Tl8MfMCzd/upRzEfPgbbhfd14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MpwhwHOX3keg5IO77w21sJpgaLQ="},{"type":"next-occurrence","id":"ruSSeqnK8YW8uqa68tq8BUoFqNc="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"L2Tl8MfMCzd/upRzEfPgbbhfd14=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T02:00:00Z","end_date":"2026-05-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"ruSSeqnK8YW8uqa68tq8BUoFqNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MpwhwHOX3keg5IO77w21sJpgaLQ="},{"type":"next-occurrence","id":"Q/qxLLDTNJx9hJuWiPNlC3agFZA="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"ruSSeqnK8YW8uqa68tq8BUoFqNc=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T02:00:00Z","end_date":"2026-05-21T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"Q/qxLLDTNJx9hJuWiPNlC3agFZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MpwhwHOX3keg5IO77w21sJpgaLQ="},{"type":"next-occurrence","id":"7b/98uPlqPxoNxXWmVani+ATAx8="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"Q/qxLLDTNJx9hJuWiPNlC3agFZA=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T02:00:00Z","end_date":"2026-05-22T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"7b/98uPlqPxoNxXWmVani+ATAx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MpwhwHOX3keg5IO77w21sJpgaLQ="},{"type":"next-occurrence","id":"wzmsLy/o7MtSWkicMTPEKCfwYOE="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"7b/98uPlqPxoNxXWmVani+ATAx8=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T02:00:00Z","end_date":"2026-05-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"wzmsLy/o7MtSWkicMTPEKCfwYOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MpwhwHOX3keg5IO77w21sJpgaLQ="},{"type":"next-occurrence","id":"vUZDP9XxTThwqwh43IHQgRddnrk="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"wzmsLy/o7MtSWkicMTPEKCfwYOE=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T02:00:00Z","end_date":"2026-05-24T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"vUZDP9XxTThwqwh43IHQgRddnrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MpwhwHOX3keg5IO77w21sJpgaLQ="},{"type":"next-occurrence","id":"nieoRLU4jAKzuCTNKL/4T6Nbitc="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"vUZDP9XxTThwqwh43IHQgRddnrk=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T02:00:00Z","end_date":"2026-05-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"nieoRLU4jAKzuCTNKL/4T6Nbitc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MpwhwHOX3keg5IO77w21sJpgaLQ="},{"type":"next-occurrence","id":"+CiVu6HfinmYuONgYQxbElCvNzk="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"nieoRLU4jAKzuCTNKL/4T6Nbitc=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T02:00:00Z","end_date":"2026-05-26T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"+CiVu6HfinmYuONgYQxbElCvNzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MpwhwHOX3keg5IO77w21sJpgaLQ="},{"type":"next-occurrence","id":"vfyHGRggA9kvMgEvm+dMYdZgLmM="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"+CiVu6HfinmYuONgYQxbElCvNzk=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T02:00:00Z","end_date":"2026-05-27T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"vfyHGRggA9kvMgEvm+dMYdZgLmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MpwhwHOX3keg5IO77w21sJpgaLQ="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"vfyHGRggA9kvMgEvm+dMYdZgLmM=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T02:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"mQxtYgY+4yNRYSjNOk7JQO/pLys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BKXGz6K1RC+jgQo60Y5Ga7CsJ0M="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"mQxtYgY+4yNRYSjNOk7JQO/pLys=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"BKXGz6K1RC+jgQo60Y5Ga7CsJ0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQxtYgY+4yNRYSjNOk7JQO/pLys="},{"type":"next-occurrence","id":"OxfSqH/Xqfcghd2cGRHfz0IFCQ0="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"BKXGz6K1RC+jgQo60Y5Ga7CsJ0M=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"OxfSqH/Xqfcghd2cGRHfz0IFCQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQxtYgY+4yNRYSjNOk7JQO/pLys="},{"type":"next-occurrence","id":"z+vBdM2Yl6HnIKn39WFzY9qatNc="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"OxfSqH/Xqfcghd2cGRHfz0IFCQ0=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"z+vBdM2Yl6HnIKn39WFzY9qatNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQxtYgY+4yNRYSjNOk7JQO/pLys="},{"type":"next-occurrence","id":"3OURmvttFn3+dGzpBY7tNTjEPeg="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"z+vBdM2Yl6HnIKn39WFzY9qatNc=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"3OURmvttFn3+dGzpBY7tNTjEPeg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQxtYgY+4yNRYSjNOk7JQO/pLys="},{"type":"next-occurrence","id":"7+25Pya7HQdePSNg1TEgBYVrkhg="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"3OURmvttFn3+dGzpBY7tNTjEPeg=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"7+25Pya7HQdePSNg1TEgBYVrkhg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQxtYgY+4yNRYSjNOk7JQO/pLys="},{"type":"next-occurrence","id":"yGfyvtqPFBfn75vtl56A57OW9jI="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"7+25Pya7HQdePSNg1TEgBYVrkhg=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"yGfyvtqPFBfn75vtl56A57OW9jI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQxtYgY+4yNRYSjNOk7JQO/pLys="},{"type":"next-occurrence","id":"Lp5+Wg26pmCdi9h1xbpUrzCG9a8="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"yGfyvtqPFBfn75vtl56A57OW9jI=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"Lp5+Wg26pmCdi9h1xbpUrzCG9a8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQxtYgY+4yNRYSjNOk7JQO/pLys="},{"type":"next-occurrence","id":"UqtGpbxr1YgRVfziR1sX+TrDDTI="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"Lp5+Wg26pmCdi9h1xbpUrzCG9a8=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"UqtGpbxr1YgRVfziR1sX+TrDDTI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQxtYgY+4yNRYSjNOk7JQO/pLys="},{"type":"next-occurrence","id":"jDu6WS3wiAU0sW4TaMdS230ZbRQ="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"UqtGpbxr1YgRVfziR1sX+TrDDTI=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"jDu6WS3wiAU0sW4TaMdS230ZbRQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQxtYgY+4yNRYSjNOk7JQO/pLys="},{"type":"next-occurrence","id":"/qh3qAoCfPHXkvQOh0QQoW1REiw="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"jDu6WS3wiAU0sW4TaMdS230ZbRQ=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"/qh3qAoCfPHXkvQOh0QQoW1REiw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQxtYgY+4yNRYSjNOk7JQO/pLys="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"/qh3qAoCfPHXkvQOh0QQoW1REiw=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"yayekHBanI5xVsmsIgrw2rpJoSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8cwAzoMt+Ct38BbHoYBxirWa42g="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"yayekHBanI5xVsmsIgrw2rpJoSE=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"8cwAzoMt+Ct38BbHoYBxirWa42g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yayekHBanI5xVsmsIgrw2rpJoSE="},{"type":"next-occurrence","id":"/MEbgiMhDS0ws+Osr7+Oygml4hk="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"8cwAzoMt+Ct38BbHoYBxirWa42g=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"/MEbgiMhDS0ws+Osr7+Oygml4hk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yayekHBanI5xVsmsIgrw2rpJoSE="},{"type":"next-occurrence","id":"t2NUxolmWBijuhyOKiPTUj9e2DM="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"/MEbgiMhDS0ws+Osr7+Oygml4hk=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"t2NUxolmWBijuhyOKiPTUj9e2DM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yayekHBanI5xVsmsIgrw2rpJoSE="},{"type":"next-occurrence","id":"ZAbVoOD9OffL8s08bFhUZoIFO0Y="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"t2NUxolmWBijuhyOKiPTUj9e2DM=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"ZAbVoOD9OffL8s08bFhUZoIFO0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yayekHBanI5xVsmsIgrw2rpJoSE="},{"type":"next-occurrence","id":"e/hz2wPV7gZhf5In9WKG3w1H/OU="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"ZAbVoOD9OffL8s08bFhUZoIFO0Y=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"e/hz2wPV7gZhf5In9WKG3w1H/OU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yayekHBanI5xVsmsIgrw2rpJoSE="},{"type":"next-occurrence","id":"xyem34iFWJS2qdiqczTsCL7dFBU="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"e/hz2wPV7gZhf5In9WKG3w1H/OU=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"xyem34iFWJS2qdiqczTsCL7dFBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yayekHBanI5xVsmsIgrw2rpJoSE="},{"type":"next-occurrence","id":"P1ctTDT+wVIGTwkxRDOYTQlppgo="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"xyem34iFWJS2qdiqczTsCL7dFBU=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"P1ctTDT+wVIGTwkxRDOYTQlppgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yayekHBanI5xVsmsIgrw2rpJoSE="},{"type":"next-occurrence","id":"0PvTIO844vbow7Ox8Lgl7P/xPWY="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"P1ctTDT+wVIGTwkxRDOYTQlppgo=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"0PvTIO844vbow7Ox8Lgl7P/xPWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yayekHBanI5xVsmsIgrw2rpJoSE="},{"type":"next-occurrence","id":"Ik/byPDlwba7r7fuzVwG0Dn0irQ="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"0PvTIO844vbow7Ox8Lgl7P/xPWY=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"Ik/byPDlwba7r7fuzVwG0Dn0irQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yayekHBanI5xVsmsIgrw2rpJoSE="},{"type":"next-occurrence","id":"2dLrv3Xw9F4dP+tTbjSgRj8YN04="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"Ik/byPDlwba7r7fuzVwG0Dn0irQ=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"2dLrv3Xw9F4dP+tTbjSgRj8YN04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yayekHBanI5xVsmsIgrw2rpJoSE="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"2dLrv3Xw9F4dP+tTbjSgRj8YN04=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"8yPj7JNjOt0IAiwc4nxyg++6vBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"c/vZMq0PZ7xBZ3IeL8YdHKxh1Zg="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"8yPj7JNjOt0IAiwc4nxyg++6vBU=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"c/vZMq0PZ7xBZ3IeL8YdHKxh1Zg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8yPj7JNjOt0IAiwc4nxyg++6vBU="},{"type":"next-occurrence","id":"6qJyk4lIh0pS2leZONQEPXYIJc4="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"c/vZMq0PZ7xBZ3IeL8YdHKxh1Zg=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"6qJyk4lIh0pS2leZONQEPXYIJc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8yPj7JNjOt0IAiwc4nxyg++6vBU="},{"type":"next-occurrence","id":"z1gpn1FuVw9PzZAbdaUOY4f8V24="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"6qJyk4lIh0pS2leZONQEPXYIJc4=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"z1gpn1FuVw9PzZAbdaUOY4f8V24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8yPj7JNjOt0IAiwc4nxyg++6vBU="},{"type":"next-occurrence","id":"/WiK7JKm6uhIxxzgNxIDkEVndTg="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"z1gpn1FuVw9PzZAbdaUOY4f8V24=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"/WiK7JKm6uhIxxzgNxIDkEVndTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8yPj7JNjOt0IAiwc4nxyg++6vBU="},{"type":"next-occurrence","id":"qMQWUajCP60PaVgowmZGdbsF5NE="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"/WiK7JKm6uhIxxzgNxIDkEVndTg=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"qMQWUajCP60PaVgowmZGdbsF5NE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8yPj7JNjOt0IAiwc4nxyg++6vBU="},{"type":"next-occurrence","id":"XkS5fAh2VVtwKQTKNg1K4hNhyjk="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"qMQWUajCP60PaVgowmZGdbsF5NE=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"XkS5fAh2VVtwKQTKNg1K4hNhyjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8yPj7JNjOt0IAiwc4nxyg++6vBU="},{"type":"next-occurrence","id":"d2ZKm2jAE34ErS+K7Ba1zXo6yas="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"XkS5fAh2VVtwKQTKNg1K4hNhyjk=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"d2ZKm2jAE34ErS+K7Ba1zXo6yas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8yPj7JNjOt0IAiwc4nxyg++6vBU="},{"type":"next-occurrence","id":"aPsQmAgn1sq54iAanQIra7aq5mE="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"d2ZKm2jAE34ErS+K7Ba1zXo6yas=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"aPsQmAgn1sq54iAanQIra7aq5mE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8yPj7JNjOt0IAiwc4nxyg++6vBU="},{"type":"next-occurrence","id":"y5atQ+bJTECC+Xf0AhWuClhpyTE="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"aPsQmAgn1sq54iAanQIra7aq5mE=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"y5atQ+bJTECC+Xf0AhWuClhpyTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8yPj7JNjOt0IAiwc4nxyg++6vBU="},{"type":"next-occurrence","id":"9OI1RjpuL2WWwJW8dcaQ0Dn2Vc8="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"y5atQ+bJTECC+Xf0AhWuClhpyTE=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"9OI1RjpuL2WWwJW8dcaQ0Dn2Vc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8yPj7JNjOt0IAiwc4nxyg++6vBU="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"9OI1RjpuL2WWwJW8dcaQ0Dn2Vc8=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"zUDJkvJMgeLtbYosSdqjkFmm5X0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TBESzeEPXnTPPDVWfCPLSM81Wzw="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"zUDJkvJMgeLtbYosSdqjkFmm5X0=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"TBESzeEPXnTPPDVWfCPLSM81Wzw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zUDJkvJMgeLtbYosSdqjkFmm5X0="},{"type":"next-occurrence","id":"OI3067ffS5T1ftTXGzhw8pDWWwQ="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"TBESzeEPXnTPPDVWfCPLSM81Wzw=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"OI3067ffS5T1ftTXGzhw8pDWWwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zUDJkvJMgeLtbYosSdqjkFmm5X0="},{"type":"next-occurrence","id":"IBxE8Z/AIu5xSx8dJeEmgnF2NYI="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"OI3067ffS5T1ftTXGzhw8pDWWwQ=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"IBxE8Z/AIu5xSx8dJeEmgnF2NYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zUDJkvJMgeLtbYosSdqjkFmm5X0="},{"type":"next-occurrence","id":"Bcofxxz8iXIltcuGqA7L32NIvSk="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"IBxE8Z/AIu5xSx8dJeEmgnF2NYI=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"Bcofxxz8iXIltcuGqA7L32NIvSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zUDJkvJMgeLtbYosSdqjkFmm5X0="},{"type":"next-occurrence","id":"Cwrj6+XfA9GKQ7yW/Kn/WE736Ho="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"Bcofxxz8iXIltcuGqA7L32NIvSk=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"Cwrj6+XfA9GKQ7yW/Kn/WE736Ho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zUDJkvJMgeLtbYosSdqjkFmm5X0="},{"type":"next-occurrence","id":"SwWXfSN/uR3KNEvWyoPbQpRHMQ8="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"Cwrj6+XfA9GKQ7yW/Kn/WE736Ho=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"SwWXfSN/uR3KNEvWyoPbQpRHMQ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zUDJkvJMgeLtbYosSdqjkFmm5X0="},{"type":"next-occurrence","id":"t2oHbNAZt243M3w4HU1/QVvOb50="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"SwWXfSN/uR3KNEvWyoPbQpRHMQ8=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"t2oHbNAZt243M3w4HU1/QVvOb50=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zUDJkvJMgeLtbYosSdqjkFmm5X0="},{"type":"next-occurrence","id":"6dTphoAFG+YLh0WhXGquRJCo8IE="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"t2oHbNAZt243M3w4HU1/QVvOb50=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"6dTphoAFG+YLh0WhXGquRJCo8IE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zUDJkvJMgeLtbYosSdqjkFmm5X0="},{"type":"next-occurrence","id":"u4JXgDwX8AO/9EDSiS3srLZs4Hs="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"6dTphoAFG+YLh0WhXGquRJCo8IE=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"u4JXgDwX8AO/9EDSiS3srLZs4Hs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zUDJkvJMgeLtbYosSdqjkFmm5X0="},{"type":"next-occurrence","id":"B+7tGmUxUHUndUMCAA3gdZuT9zo="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"u4JXgDwX8AO/9EDSiS3srLZs4Hs=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"B+7tGmUxUHUndUMCAA3gdZuT9zo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zUDJkvJMgeLtbYosSdqjkFmm5X0="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"B+7tGmUxUHUndUMCAA3gdZuT9zo=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"vRZlWA1dSyNaIobPPLpDfdU9WOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bqKbNAKV4jc3UP/BOGrio+d50D8="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"vRZlWA1dSyNaIobPPLpDfdU9WOg=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"bqKbNAKV4jc3UP/BOGrio+d50D8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vRZlWA1dSyNaIobPPLpDfdU9WOg="},{"type":"next-occurrence","id":"oFcMnNSPtTMx9chmeCHwziXJC74="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"bqKbNAKV4jc3UP/BOGrio+d50D8=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"oFcMnNSPtTMx9chmeCHwziXJC74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vRZlWA1dSyNaIobPPLpDfdU9WOg="},{"type":"next-occurrence","id":"I7ch5WlgDrynLJs99wnXBAGWiXQ="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"oFcMnNSPtTMx9chmeCHwziXJC74=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"I7ch5WlgDrynLJs99wnXBAGWiXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vRZlWA1dSyNaIobPPLpDfdU9WOg="},{"type":"next-occurrence","id":"BvMvYFmOVuLW5gRBxA4dC0xtavY="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"I7ch5WlgDrynLJs99wnXBAGWiXQ=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"BvMvYFmOVuLW5gRBxA4dC0xtavY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vRZlWA1dSyNaIobPPLpDfdU9WOg="},{"type":"next-occurrence","id":"3dM4EKpY/nRNZuWtHFUromqCzMM="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"BvMvYFmOVuLW5gRBxA4dC0xtavY=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"3dM4EKpY/nRNZuWtHFUromqCzMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vRZlWA1dSyNaIobPPLpDfdU9WOg="},{"type":"next-occurrence","id":"SNo5EsQqoDeqlQauiBi03TaHwOs="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"3dM4EKpY/nRNZuWtHFUromqCzMM=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"SNo5EsQqoDeqlQauiBi03TaHwOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vRZlWA1dSyNaIobPPLpDfdU9WOg="},{"type":"next-occurrence","id":"L7QgY9fDGcjU8Pi00Wfv9iy1gCY="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"SNo5EsQqoDeqlQauiBi03TaHwOs=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"L7QgY9fDGcjU8Pi00Wfv9iy1gCY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vRZlWA1dSyNaIobPPLpDfdU9WOg="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"L7QgY9fDGcjU8Pi00Wfv9iy1gCY=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"ULNYgdZAW3ReYWyRGxNMdS+iEKY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kTC890V0WI9Xv/ZO0wMMTS+vnTY="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"ULNYgdZAW3ReYWyRGxNMdS+iEKY=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"kTC890V0WI9Xv/ZO0wMMTS+vnTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULNYgdZAW3ReYWyRGxNMdS+iEKY="},{"type":"next-occurrence","id":"oV8PGnXTwcDRa2KqGCXt+ssnbGc="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"kTC890V0WI9Xv/ZO0wMMTS+vnTY=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"oV8PGnXTwcDRa2KqGCXt+ssnbGc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULNYgdZAW3ReYWyRGxNMdS+iEKY="},{"type":"next-occurrence","id":"aNZI9C5T9Cj3nF51U7eyqU6Ek6Q="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"oV8PGnXTwcDRa2KqGCXt+ssnbGc=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"aNZI9C5T9Cj3nF51U7eyqU6Ek6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULNYgdZAW3ReYWyRGxNMdS+iEKY="},{"type":"next-occurrence","id":"T1++Eh/lVWgnpM2+M3VVLy+HKHI="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"aNZI9C5T9Cj3nF51U7eyqU6Ek6Q=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"T1++Eh/lVWgnpM2+M3VVLy+HKHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULNYgdZAW3ReYWyRGxNMdS+iEKY="},{"type":"next-occurrence","id":"4a+q2rpei6EU/Z+pwaYKMEMK4Zg="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"T1++Eh/lVWgnpM2+M3VVLy+HKHI=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"4a+q2rpei6EU/Z+pwaYKMEMK4Zg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULNYgdZAW3ReYWyRGxNMdS+iEKY="},{"type":"next-occurrence","id":"6K4t9yWRFkhfhllyfFbDT2rpcD0="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"4a+q2rpei6EU/Z+pwaYKMEMK4Zg=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"6K4t9yWRFkhfhllyfFbDT2rpcD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULNYgdZAW3ReYWyRGxNMdS+iEKY="},{"type":"next-occurrence","id":"Tz/ol4t7nyecuSqjmuehIo/v5qU="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"6K4t9yWRFkhfhllyfFbDT2rpcD0=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"Tz/ol4t7nyecuSqjmuehIo/v5qU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULNYgdZAW3ReYWyRGxNMdS+iEKY="},{"type":"next-occurrence","id":"ZKKOMyu27AOPGb4k/usUQB/m5Y0="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"Tz/ol4t7nyecuSqjmuehIo/v5qU=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"ZKKOMyu27AOPGb4k/usUQB/m5Y0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULNYgdZAW3ReYWyRGxNMdS+iEKY="},{"type":"next-occurrence","id":"M0MnXDsIXsioPCkEYhuDsYakm+g="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"ZKKOMyu27AOPGb4k/usUQB/m5Y0=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"M0MnXDsIXsioPCkEYhuDsYakm+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULNYgdZAW3ReYWyRGxNMdS+iEKY="},{"type":"next-occurrence","id":"92duU587EDINaHerRYUpPHHLjU4="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"M0MnXDsIXsioPCkEYhuDsYakm+g=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"92duU587EDINaHerRYUpPHHLjU4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULNYgdZAW3ReYWyRGxNMdS+iEKY="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"92duU587EDINaHerRYUpPHHLjU4=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"4Ns3wHXH4OAo54lt4O7yMLN+sck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PF4ZTDSnIZhbrHsztpSl6ywbJSc="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"4Ns3wHXH4OAo54lt4O7yMLN+sck=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"PF4ZTDSnIZhbrHsztpSl6ywbJSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Ns3wHXH4OAo54lt4O7yMLN+sck="},{"type":"next-occurrence","id":"9/rEabA1aM2p7fNwmsx5yYJVxD4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"PF4ZTDSnIZhbrHsztpSl6ywbJSc=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"9/rEabA1aM2p7fNwmsx5yYJVxD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Ns3wHXH4OAo54lt4O7yMLN+sck="},{"type":"next-occurrence","id":"RoKmsnzDDOhNeYb6mxwy8uiAk2I="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"9/rEabA1aM2p7fNwmsx5yYJVxD4=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"RoKmsnzDDOhNeYb6mxwy8uiAk2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Ns3wHXH4OAo54lt4O7yMLN+sck="},{"type":"next-occurrence","id":"3zryU23UU1Rc04jtd8yPHH3UqUU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"RoKmsnzDDOhNeYb6mxwy8uiAk2I=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"3zryU23UU1Rc04jtd8yPHH3UqUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Ns3wHXH4OAo54lt4O7yMLN+sck="},{"type":"next-occurrence","id":"tdybJHOIPlSSa6lPdTie8gQcDq8="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"3zryU23UU1Rc04jtd8yPHH3UqUU=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"tdybJHOIPlSSa6lPdTie8gQcDq8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Ns3wHXH4OAo54lt4O7yMLN+sck="},{"type":"next-occurrence","id":"nwXhu/38b+UhaLgZyGU2AXnKVUs="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"tdybJHOIPlSSa6lPdTie8gQcDq8=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"nwXhu/38b+UhaLgZyGU2AXnKVUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Ns3wHXH4OAo54lt4O7yMLN+sck="},{"type":"next-occurrence","id":"n7NoYdcTs9i6UTz0clg5+FXmyQY="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"nwXhu/38b+UhaLgZyGU2AXnKVUs=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"n7NoYdcTs9i6UTz0clg5+FXmyQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Ns3wHXH4OAo54lt4O7yMLN+sck="},{"type":"next-occurrence","id":"vjmDpcOo1h30BBrmxStCmsK5UyM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"n7NoYdcTs9i6UTz0clg5+FXmyQY=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"vjmDpcOo1h30BBrmxStCmsK5UyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Ns3wHXH4OAo54lt4O7yMLN+sck="},{"type":"next-occurrence","id":"5AmsO5sEU/bpb/x5yTobO4QdvlM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"vjmDpcOo1h30BBrmxStCmsK5UyM=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"5AmsO5sEU/bpb/x5yTobO4QdvlM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Ns3wHXH4OAo54lt4O7yMLN+sck="},{"type":"next-occurrence","id":"p9w27y8QsV9T6aEzJ9P4WjskaPQ="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"5AmsO5sEU/bpb/x5yTobO4QdvlM=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"p9w27y8QsV9T6aEzJ9P4WjskaPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Ns3wHXH4OAo54lt4O7yMLN+sck="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"p9w27y8QsV9T6aEzJ9P4WjskaPQ=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"XZSGpLI0QNxk48t6ieYYo3GDkdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5n5VwglGGpoUgm2HICCEDhw1kBo="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"XZSGpLI0QNxk48t6ieYYo3GDkdk=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"5n5VwglGGpoUgm2HICCEDhw1kBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZSGpLI0QNxk48t6ieYYo3GDkdk="},{"type":"next-occurrence","id":"X6MQZ6ctJeGJxwzCsaNKMeeh0F8="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"5n5VwglGGpoUgm2HICCEDhw1kBo=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"X6MQZ6ctJeGJxwzCsaNKMeeh0F8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZSGpLI0QNxk48t6ieYYo3GDkdk="},{"type":"next-occurrence","id":"YHhr+Ef40ZahUkU/JMw8Bc6Yt7w="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"X6MQZ6ctJeGJxwzCsaNKMeeh0F8=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"YHhr+Ef40ZahUkU/JMw8Bc6Yt7w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZSGpLI0QNxk48t6ieYYo3GDkdk="},{"type":"next-occurrence","id":"/Bqmv5CMYo3ODUoVGCOAvebM1ew="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"YHhr+Ef40ZahUkU/JMw8Bc6Yt7w=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"/Bqmv5CMYo3ODUoVGCOAvebM1ew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZSGpLI0QNxk48t6ieYYo3GDkdk="},{"type":"next-occurrence","id":"ao4XkY3nHibrOLXfx3hlLHtr+ek="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"/Bqmv5CMYo3ODUoVGCOAvebM1ew=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"ao4XkY3nHibrOLXfx3hlLHtr+ek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZSGpLI0QNxk48t6ieYYo3GDkdk="},{"type":"next-occurrence","id":"Vq79Kc5m5LEoqufujI6o9rjsgeo="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"ao4XkY3nHibrOLXfx3hlLHtr+ek=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"Vq79Kc5m5LEoqufujI6o9rjsgeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZSGpLI0QNxk48t6ieYYo3GDkdk="},{"type":"next-occurrence","id":"5veSP6Z+CuMPslB0ZCEpBlHtOHA="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"Vq79Kc5m5LEoqufujI6o9rjsgeo=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"5veSP6Z+CuMPslB0ZCEpBlHtOHA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZSGpLI0QNxk48t6ieYYo3GDkdk="},{"type":"next-occurrence","id":"uLS8lfDEEVKmyIzWii6H4H4M8mo="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"5veSP6Z+CuMPslB0ZCEpBlHtOHA=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"uLS8lfDEEVKmyIzWii6H4H4M8mo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZSGpLI0QNxk48t6ieYYo3GDkdk="},{"type":"next-occurrence","id":"e8ZeMRR47J6g16v45o4kJtXAxWU="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"uLS8lfDEEVKmyIzWii6H4H4M8mo=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"e8ZeMRR47J6g16v45o4kJtXAxWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZSGpLI0QNxk48t6ieYYo3GDkdk="},{"type":"next-occurrence","id":"VNb5DW5Q5AppGsozn80gOA/jPPc="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"e8ZeMRR47J6g16v45o4kJtXAxWU=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"VNb5DW5Q5AppGsozn80gOA/jPPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZSGpLI0QNxk48t6ieYYo3GDkdk="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"VNb5DW5Q5AppGsozn80gOA/jPPc=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"EB6bTUqP5fInSvg6OgS3fTiQfOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"M9vb6sphv8eVJXhz61O+W6eUpb4="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"EB6bTUqP5fInSvg6OgS3fTiQfOg=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"M9vb6sphv8eVJXhz61O+W6eUpb4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EB6bTUqP5fInSvg6OgS3fTiQfOg="},{"type":"next-occurrence","id":"IiT8sHLOqp1LUcZ7dx2wRkxr+8Q="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"M9vb6sphv8eVJXhz61O+W6eUpb4=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"IiT8sHLOqp1LUcZ7dx2wRkxr+8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EB6bTUqP5fInSvg6OgS3fTiQfOg="},{"type":"next-occurrence","id":"WMNCPZbED1G0kD6zcQ4AuZJ4yZc="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"IiT8sHLOqp1LUcZ7dx2wRkxr+8Q=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"WMNCPZbED1G0kD6zcQ4AuZJ4yZc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EB6bTUqP5fInSvg6OgS3fTiQfOg="},{"type":"next-occurrence","id":"4H4ZMmMgyKk/QOTA6YKMTJsklho="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"WMNCPZbED1G0kD6zcQ4AuZJ4yZc=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"4H4ZMmMgyKk/QOTA6YKMTJsklho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EB6bTUqP5fInSvg6OgS3fTiQfOg="},{"type":"next-occurrence","id":"HmrMQvMReOec/9w/CFdThekg27E="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"4H4ZMmMgyKk/QOTA6YKMTJsklho=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"HmrMQvMReOec/9w/CFdThekg27E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EB6bTUqP5fInSvg6OgS3fTiQfOg="},{"type":"next-occurrence","id":"0toXCzmbvL/LUrXFyexvoYZzKHk="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"HmrMQvMReOec/9w/CFdThekg27E=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"0toXCzmbvL/LUrXFyexvoYZzKHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EB6bTUqP5fInSvg6OgS3fTiQfOg="},{"type":"next-occurrence","id":"wKoZc8Bxgi6iArh4wJT1QNr3lPg="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"0toXCzmbvL/LUrXFyexvoYZzKHk=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"wKoZc8Bxgi6iArh4wJT1QNr3lPg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EB6bTUqP5fInSvg6OgS3fTiQfOg="},{"type":"next-occurrence","id":"4DjjeY1aomXLgFFKL7xvUCymlYk="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"wKoZc8Bxgi6iArh4wJT1QNr3lPg=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"4DjjeY1aomXLgFFKL7xvUCymlYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EB6bTUqP5fInSvg6OgS3fTiQfOg="},{"type":"next-occurrence","id":"asFYnX2/I10u0x3E3dZRy/K6zC8="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"4DjjeY1aomXLgFFKL7xvUCymlYk=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"asFYnX2/I10u0x3E3dZRy/K6zC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EB6bTUqP5fInSvg6OgS3fTiQfOg="},{"type":"next-occurrence","id":"q3eU5onHEsgWB1rAbVL+u2d+vWs="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"asFYnX2/I10u0x3E3dZRy/K6zC8=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"q3eU5onHEsgWB1rAbVL+u2d+vWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EB6bTUqP5fInSvg6OgS3fTiQfOg="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"q3eU5onHEsgWB1rAbVL+u2d+vWs=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"PBFaGKfy5tL88FCvZYncD/MbiMw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iW5LCzklLDQ2yVx0/7yA0pZ7+AM="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"PBFaGKfy5tL88FCvZYncD/MbiMw=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"iW5LCzklLDQ2yVx0/7yA0pZ7+AM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PBFaGKfy5tL88FCvZYncD/MbiMw="},{"type":"next-occurrence","id":"3oCwJpQvtnH4KPK3aGqtIFC+JYI="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"iW5LCzklLDQ2yVx0/7yA0pZ7+AM=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"3oCwJpQvtnH4KPK3aGqtIFC+JYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PBFaGKfy5tL88FCvZYncD/MbiMw="},{"type":"next-occurrence","id":"U/bdezfXZcVwTUjqZrGhAzRQbPM="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"3oCwJpQvtnH4KPK3aGqtIFC+JYI=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"U/bdezfXZcVwTUjqZrGhAzRQbPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PBFaGKfy5tL88FCvZYncD/MbiMw="},{"type":"next-occurrence","id":"wv7ZO0Lu9ThSXF+prHhfQ3g1h1U="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"U/bdezfXZcVwTUjqZrGhAzRQbPM=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"wv7ZO0Lu9ThSXF+prHhfQ3g1h1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PBFaGKfy5tL88FCvZYncD/MbiMw="},{"type":"next-occurrence","id":"5gL/HdPfgqDLxNo8O+sRuf0EkoM="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"wv7ZO0Lu9ThSXF+prHhfQ3g1h1U=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"5gL/HdPfgqDLxNo8O+sRuf0EkoM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PBFaGKfy5tL88FCvZYncD/MbiMw="},{"type":"next-occurrence","id":"8rdes5kyb+R6CXrogWvSCVi5lpg="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"5gL/HdPfgqDLxNo8O+sRuf0EkoM=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"8rdes5kyb+R6CXrogWvSCVi5lpg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PBFaGKfy5tL88FCvZYncD/MbiMw="},{"type":"next-occurrence","id":"50GEpcXKTG5wFLKmO99Ca6mLKn8="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"8rdes5kyb+R6CXrogWvSCVi5lpg=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"50GEpcXKTG5wFLKmO99Ca6mLKn8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PBFaGKfy5tL88FCvZYncD/MbiMw="},{"type":"next-occurrence","id":"g+cP3jOrVOafopjiYT6ZFGUpfiM="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"50GEpcXKTG5wFLKmO99Ca6mLKn8=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"g+cP3jOrVOafopjiYT6ZFGUpfiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PBFaGKfy5tL88FCvZYncD/MbiMw="},{"type":"next-occurrence","id":"lZkLZkoAeSYjiKhA5gUtIjnpGnE="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"g+cP3jOrVOafopjiYT6ZFGUpfiM=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"lZkLZkoAeSYjiKhA5gUtIjnpGnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PBFaGKfy5tL88FCvZYncD/MbiMw="},{"type":"next-occurrence","id":"M3fbYdc6DujAPfAyMGCIN6d9lIk="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"lZkLZkoAeSYjiKhA5gUtIjnpGnE=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"M3fbYdc6DujAPfAyMGCIN6d9lIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PBFaGKfy5tL88FCvZYncD/MbiMw="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"M3fbYdc6DujAPfAyMGCIN6d9lIk=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"9w3UPOp1Frtoaa9kiG67I8MW9sE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pHib4KwdSbqXWO435iB5QY3dl9Y="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"9w3UPOp1Frtoaa9kiG67I8MW9sE=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"pHib4KwdSbqXWO435iB5QY3dl9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9w3UPOp1Frtoaa9kiG67I8MW9sE="},{"type":"next-occurrence","id":"1lY7Elmoozyx76ZQBQYOcOxeQ0Y="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"pHib4KwdSbqXWO435iB5QY3dl9Y=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"1lY7Elmoozyx76ZQBQYOcOxeQ0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9w3UPOp1Frtoaa9kiG67I8MW9sE="},{"type":"next-occurrence","id":"72doVvwXom9iQhXZ4kBV17XVDKE="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"1lY7Elmoozyx76ZQBQYOcOxeQ0Y=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"72doVvwXom9iQhXZ4kBV17XVDKE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9w3UPOp1Frtoaa9kiG67I8MW9sE="},{"type":"next-occurrence","id":"/APuYkfdeIOBTgPqJ4GXWjPCpOY="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"72doVvwXom9iQhXZ4kBV17XVDKE=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"/APuYkfdeIOBTgPqJ4GXWjPCpOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9w3UPOp1Frtoaa9kiG67I8MW9sE="},{"type":"next-occurrence","id":"gmDC0PMe7zgITUfuPI4RCj8cldk="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"/APuYkfdeIOBTgPqJ4GXWjPCpOY=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"gmDC0PMe7zgITUfuPI4RCj8cldk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9w3UPOp1Frtoaa9kiG67I8MW9sE="},{"type":"next-occurrence","id":"WB87xE82Zx2pxFHcxQ9XhtN0nOY="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"gmDC0PMe7zgITUfuPI4RCj8cldk=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"WB87xE82Zx2pxFHcxQ9XhtN0nOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9w3UPOp1Frtoaa9kiG67I8MW9sE="},{"type":"next-occurrence","id":"EY6V0iNIqPgm73Oo/jJ+6VGTaEw="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"WB87xE82Zx2pxFHcxQ9XhtN0nOY=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"EY6V0iNIqPgm73Oo/jJ+6VGTaEw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9w3UPOp1Frtoaa9kiG67I8MW9sE="},{"type":"next-occurrence","id":"vGZkYzwgPEPYyOYTYkRbM30NWQg="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"EY6V0iNIqPgm73Oo/jJ+6VGTaEw=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"vGZkYzwgPEPYyOYTYkRbM30NWQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9w3UPOp1Frtoaa9kiG67I8MW9sE="},{"type":"next-occurrence","id":"kKkYpQdnf7r66vVwWEqTsAQ6zc8="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"vGZkYzwgPEPYyOYTYkRbM30NWQg=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"kKkYpQdnf7r66vVwWEqTsAQ6zc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9w3UPOp1Frtoaa9kiG67I8MW9sE="},{"type":"next-occurrence","id":"UiqKzsCoPS/jiUgUXsvJdZhBhXo="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"kKkYpQdnf7r66vVwWEqTsAQ6zc8=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"UiqKzsCoPS/jiUgUXsvJdZhBhXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9w3UPOp1Frtoaa9kiG67I8MW9sE="},{"type":"next-occurrence","id":"TQ5u3iLQUPmdS8E+CL8wkJ15sAc="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"UiqKzsCoPS/jiUgUXsvJdZhBhXo=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T00:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"TQ5u3iLQUPmdS8E+CL8wkJ15sAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9w3UPOp1Frtoaa9kiG67I8MW9sE="},{"type":"next-occurrence","id":"JYGgF/MWjoTd7Rp6S5VRiYYYKOM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"TQ5u3iLQUPmdS8E+CL8wkJ15sAc=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T00:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"JYGgF/MWjoTd7Rp6S5VRiYYYKOM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9w3UPOp1Frtoaa9kiG67I8MW9sE="},{"type":"next-occurrence","id":"4ZMiPICd2p3um99en5No0NbCVm8="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"JYGgF/MWjoTd7Rp6S5VRiYYYKOM=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"4ZMiPICd2p3um99en5No0NbCVm8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9w3UPOp1Frtoaa9kiG67I8MW9sE="},{"type":"next-occurrence","id":"yxPLyZxZw6Pr5+zXPBXyg1wNKzk="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"4ZMiPICd2p3um99en5No0NbCVm8=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"yxPLyZxZw6Pr5+zXPBXyg1wNKzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9w3UPOp1Frtoaa9kiG67I8MW9sE="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"yxPLyZxZw6Pr5+zXPBXyg1wNKzk=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"N4WRRr6D2cCnX96lYPbqdtkleVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q4Qhlb1PKYYS3UFBL4JzyUampGM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"N4WRRr6D2cCnX96lYPbqdtkleVU=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"q4Qhlb1PKYYS3UFBL4JzyUampGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4WRRr6D2cCnX96lYPbqdtkleVU="},{"type":"next-occurrence","id":"LY99qe2vJW6oqJe8tLTZ5RVrifU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"q4Qhlb1PKYYS3UFBL4JzyUampGM=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"LY99qe2vJW6oqJe8tLTZ5RVrifU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4WRRr6D2cCnX96lYPbqdtkleVU="},{"type":"next-occurrence","id":"XW4zYAazb8SvPRBu+65yCXdabnY="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"LY99qe2vJW6oqJe8tLTZ5RVrifU=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"XW4zYAazb8SvPRBu+65yCXdabnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4WRRr6D2cCnX96lYPbqdtkleVU="},{"type":"next-occurrence","id":"o5xwe2hBTz1FX/S7+3ttxtZwhOY="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"XW4zYAazb8SvPRBu+65yCXdabnY=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"o5xwe2hBTz1FX/S7+3ttxtZwhOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4WRRr6D2cCnX96lYPbqdtkleVU="},{"type":"next-occurrence","id":"hF/aaQqRlVpng+OUEkNjobK5ZHc="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"o5xwe2hBTz1FX/S7+3ttxtZwhOY=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"hF/aaQqRlVpng+OUEkNjobK5ZHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4WRRr6D2cCnX96lYPbqdtkleVU="},{"type":"next-occurrence","id":"qTsRmoOHx+fGPMoGNc8pnDMOcno="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"hF/aaQqRlVpng+OUEkNjobK5ZHc=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"qTsRmoOHx+fGPMoGNc8pnDMOcno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4WRRr6D2cCnX96lYPbqdtkleVU="},{"type":"next-occurrence","id":"UPqOToCx03XEsO3Ayy8uoAQRDPM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"qTsRmoOHx+fGPMoGNc8pnDMOcno=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"UPqOToCx03XEsO3Ayy8uoAQRDPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4WRRr6D2cCnX96lYPbqdtkleVU="},{"type":"next-occurrence","id":"MN5NIWOcimil81MhJcDyvO0liQE="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"UPqOToCx03XEsO3Ayy8uoAQRDPM=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"MN5NIWOcimil81MhJcDyvO0liQE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4WRRr6D2cCnX96lYPbqdtkleVU="},{"type":"next-occurrence","id":"QpQmZFejXBF/kxQdzPDWfB9RzIg="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"MN5NIWOcimil81MhJcDyvO0liQE=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"QpQmZFejXBF/kxQdzPDWfB9RzIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4WRRr6D2cCnX96lYPbqdtkleVU="},{"type":"next-occurrence","id":"tZvzGgQA/+NHGzylzIa927HW9tM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"QpQmZFejXBF/kxQdzPDWfB9RzIg=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"tZvzGgQA/+NHGzylzIa927HW9tM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4WRRr6D2cCnX96lYPbqdtkleVU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"tZvzGgQA/+NHGzylzIa927HW9tM=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"IuJO88n6Ym4phoNgm3BwyHQgzp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VIV/myyD1wzgL+oLTmri384S5TA="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"IuJO88n6Ym4phoNgm3BwyHQgzp8=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"VIV/myyD1wzgL+oLTmri384S5TA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IuJO88n6Ym4phoNgm3BwyHQgzp8="},{"type":"next-occurrence","id":"H5+XNoeHcmXz6TmlA5swq3ue5TU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"VIV/myyD1wzgL+oLTmri384S5TA=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"H5+XNoeHcmXz6TmlA5swq3ue5TU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IuJO88n6Ym4phoNgm3BwyHQgzp8="},{"type":"next-occurrence","id":"BwlIu7oTXGS3FFWMpZXWm8gVjTc="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"H5+XNoeHcmXz6TmlA5swq3ue5TU=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"BwlIu7oTXGS3FFWMpZXWm8gVjTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IuJO88n6Ym4phoNgm3BwyHQgzp8="},{"type":"next-occurrence","id":"YupRNgcIzGBM9TbaJO+Q8JrpVWk="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"BwlIu7oTXGS3FFWMpZXWm8gVjTc=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"YupRNgcIzGBM9TbaJO+Q8JrpVWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IuJO88n6Ym4phoNgm3BwyHQgzp8="},{"type":"next-occurrence","id":"Zvfe6vXZDn6CeXiSgfb9VdSmQIw="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"YupRNgcIzGBM9TbaJO+Q8JrpVWk=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"Zvfe6vXZDn6CeXiSgfb9VdSmQIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IuJO88n6Ym4phoNgm3BwyHQgzp8="},{"type":"next-occurrence","id":"eHnz3tAQ3z1sD6GUhDb3umwj+yg="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"Zvfe6vXZDn6CeXiSgfb9VdSmQIw=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"eHnz3tAQ3z1sD6GUhDb3umwj+yg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IuJO88n6Ym4phoNgm3BwyHQgzp8="},{"type":"next-occurrence","id":"ECJJ8oaJL09RhKGrhp8v8CXjwCM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"eHnz3tAQ3z1sD6GUhDb3umwj+yg=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"ECJJ8oaJL09RhKGrhp8v8CXjwCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IuJO88n6Ym4phoNgm3BwyHQgzp8="},{"type":"next-occurrence","id":"aPSEEXnqSYDX4wsFn9UnY6ikBFg="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"ECJJ8oaJL09RhKGrhp8v8CXjwCM=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"aPSEEXnqSYDX4wsFn9UnY6ikBFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IuJO88n6Ym4phoNgm3BwyHQgzp8="},{"type":"next-occurrence","id":"DW4ri3RyDM1IgeToNFYvRrlX2lg="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"aPSEEXnqSYDX4wsFn9UnY6ikBFg=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"DW4ri3RyDM1IgeToNFYvRrlX2lg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IuJO88n6Ym4phoNgm3BwyHQgzp8="},{"type":"next-occurrence","id":"RRvdGRSex9U5/G3xY4+6UZAU73I="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"DW4ri3RyDM1IgeToNFYvRrlX2lg=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"RRvdGRSex9U5/G3xY4+6UZAU73I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IuJO88n6Ym4phoNgm3BwyHQgzp8="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"RRvdGRSex9U5/G3xY4+6UZAU73I=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"THHhiWzyNGIJXqUSUOnl8yknP7I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RQTrG2BRt54Djm8/JqRVU1HS3+g="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"THHhiWzyNGIJXqUSUOnl8yknP7I=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"RQTrG2BRt54Djm8/JqRVU1HS3+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THHhiWzyNGIJXqUSUOnl8yknP7I="},{"type":"next-occurrence","id":"k3rKQ1AgQYk17C9CAmUm54nt3mE="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"RQTrG2BRt54Djm8/JqRVU1HS3+g=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"k3rKQ1AgQYk17C9CAmUm54nt3mE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THHhiWzyNGIJXqUSUOnl8yknP7I="},{"type":"next-occurrence","id":"dqVopNwPO4rhHrOYNlmiEPLKV9k="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"k3rKQ1AgQYk17C9CAmUm54nt3mE=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"dqVopNwPO4rhHrOYNlmiEPLKV9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THHhiWzyNGIJXqUSUOnl8yknP7I="},{"type":"next-occurrence","id":"XUwg4kuOSdIF+Bww+bX+BrnX1HY="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"dqVopNwPO4rhHrOYNlmiEPLKV9k=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"XUwg4kuOSdIF+Bww+bX+BrnX1HY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THHhiWzyNGIJXqUSUOnl8yknP7I="},{"type":"next-occurrence","id":"TegIetE+ldXEPhDZv5GuZnZh6zw="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"XUwg4kuOSdIF+Bww+bX+BrnX1HY=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"TegIetE+ldXEPhDZv5GuZnZh6zw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THHhiWzyNGIJXqUSUOnl8yknP7I="},{"type":"next-occurrence","id":"lUSUQp9PSXo1UHyMuLKnyQ1NPKI="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"TegIetE+ldXEPhDZv5GuZnZh6zw=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"lUSUQp9PSXo1UHyMuLKnyQ1NPKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THHhiWzyNGIJXqUSUOnl8yknP7I="},{"type":"next-occurrence","id":"nq2z1vC22hoOc0nF7mRLSFMl7fk="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"lUSUQp9PSXo1UHyMuLKnyQ1NPKI=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"nq2z1vC22hoOc0nF7mRLSFMl7fk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THHhiWzyNGIJXqUSUOnl8yknP7I="},{"type":"next-occurrence","id":"4Ah7+jeJHJe4KrYaNt0YjLzXDLs="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"nq2z1vC22hoOc0nF7mRLSFMl7fk=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"4Ah7+jeJHJe4KrYaNt0YjLzXDLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THHhiWzyNGIJXqUSUOnl8yknP7I="},{"type":"next-occurrence","id":"hyLBz/b6xYwh/7dBdZvwVJw9Crg="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"4Ah7+jeJHJe4KrYaNt0YjLzXDLs=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"hyLBz/b6xYwh/7dBdZvwVJw9Crg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THHhiWzyNGIJXqUSUOnl8yknP7I="},{"type":"next-occurrence","id":"1qawty0ny6gb7uaITA9HDzJvg70="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"hyLBz/b6xYwh/7dBdZvwVJw9Crg=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"1qawty0ny6gb7uaITA9HDzJvg70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THHhiWzyNGIJXqUSUOnl8yknP7I="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"1qawty0ny6gb7uaITA9HDzJvg70=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"Qq3POP7cPCEut/lsAcvvwtncFyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ld3WVD9qO91FKqMzF6tI+ppWNrU="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"Qq3POP7cPCEut/lsAcvvwtncFyY=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"ld3WVD9qO91FKqMzF6tI+ppWNrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qq3POP7cPCEut/lsAcvvwtncFyY="},{"type":"next-occurrence","id":"oMLju0dMnrhHn3wk9Gos2vktli4="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"ld3WVD9qO91FKqMzF6tI+ppWNrU=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"oMLju0dMnrhHn3wk9Gos2vktli4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qq3POP7cPCEut/lsAcvvwtncFyY="},{"type":"next-occurrence","id":"Dr/6Xhu4K5EDXygSeYX3epKJOQY="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"oMLju0dMnrhHn3wk9Gos2vktli4=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"Dr/6Xhu4K5EDXygSeYX3epKJOQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qq3POP7cPCEut/lsAcvvwtncFyY="},{"type":"next-occurrence","id":"+mdo1kWaFjOc/jFxlncXnyWnwys="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"Dr/6Xhu4K5EDXygSeYX3epKJOQY=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"+mdo1kWaFjOc/jFxlncXnyWnwys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qq3POP7cPCEut/lsAcvvwtncFyY="},{"type":"next-occurrence","id":"XWuSW6MT63zPxue6YMnbV/BNq54="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"+mdo1kWaFjOc/jFxlncXnyWnwys=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"XWuSW6MT63zPxue6YMnbV/BNq54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qq3POP7cPCEut/lsAcvvwtncFyY="},{"type":"next-occurrence","id":"Zc13ylzaKOfDPQXKWjyZ5IN52fw="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"XWuSW6MT63zPxue6YMnbV/BNq54=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"Zc13ylzaKOfDPQXKWjyZ5IN52fw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qq3POP7cPCEut/lsAcvvwtncFyY="},{"type":"next-occurrence","id":"odu1tt3X2sJuTch5uBZsYYL0E0Q="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"Zc13ylzaKOfDPQXKWjyZ5IN52fw=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"odu1tt3X2sJuTch5uBZsYYL0E0Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qq3POP7cPCEut/lsAcvvwtncFyY="},{"type":"next-occurrence","id":"pKKSt5hnP8KBH8gb+khEwjvnqow="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"odu1tt3X2sJuTch5uBZsYYL0E0Q=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"pKKSt5hnP8KBH8gb+khEwjvnqow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qq3POP7cPCEut/lsAcvvwtncFyY="},{"type":"next-occurrence","id":"rMeJj6QOIryuAU1atcriAm812wU="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"pKKSt5hnP8KBH8gb+khEwjvnqow=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"rMeJj6QOIryuAU1atcriAm812wU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qq3POP7cPCEut/lsAcvvwtncFyY="},{"type":"next-occurrence","id":"Q/wiA+8P/kBnlnGJxktZXQvpTUA="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"rMeJj6QOIryuAU1atcriAm812wU=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"Q/wiA+8P/kBnlnGJxktZXQvpTUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qq3POP7cPCEut/lsAcvvwtncFyY="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"Q/wiA+8P/kBnlnGJxktZXQvpTUA=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"A/ci6x19TolHdf0beLdRaXnYpWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"toRJbakcJ394ah3i3juoDW+dRYA="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"A/ci6x19TolHdf0beLdRaXnYpWA=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"toRJbakcJ394ah3i3juoDW+dRYA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A/ci6x19TolHdf0beLdRaXnYpWA="},{"type":"next-occurrence","id":"T5EhIOLZZNPa71valv4AdmUD6D8="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"toRJbakcJ394ah3i3juoDW+dRYA=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"T5EhIOLZZNPa71valv4AdmUD6D8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A/ci6x19TolHdf0beLdRaXnYpWA="},{"type":"next-occurrence","id":"PvMR4x69YpHUW0ZbfcdQN6CVtJM="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"T5EhIOLZZNPa71valv4AdmUD6D8=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"PvMR4x69YpHUW0ZbfcdQN6CVtJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A/ci6x19TolHdf0beLdRaXnYpWA="},{"type":"next-occurrence","id":"BtINfkKAujYFTiO/DxB0JSp9L8Q="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"PvMR4x69YpHUW0ZbfcdQN6CVtJM=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"BtINfkKAujYFTiO/DxB0JSp9L8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A/ci6x19TolHdf0beLdRaXnYpWA="},{"type":"next-occurrence","id":"4Ikvy+5TDtIB8obBk2lxQ/9Aq7A="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"BtINfkKAujYFTiO/DxB0JSp9L8Q=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"4Ikvy+5TDtIB8obBk2lxQ/9Aq7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A/ci6x19TolHdf0beLdRaXnYpWA="},{"type":"next-occurrence","id":"DVW+ALTQA13Zfnoa2a2m0b7qofQ="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"4Ikvy+5TDtIB8obBk2lxQ/9Aq7A=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"DVW+ALTQA13Zfnoa2a2m0b7qofQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A/ci6x19TolHdf0beLdRaXnYpWA="},{"type":"next-occurrence","id":"g1jN1t2H6JctvWHh+DCDWe7YWEE="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"DVW+ALTQA13Zfnoa2a2m0b7qofQ=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"g1jN1t2H6JctvWHh+DCDWe7YWEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A/ci6x19TolHdf0beLdRaXnYpWA="},{"type":"next-occurrence","id":"3hn85uQds00fBZsoCNIw6CmLNnY="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"g1jN1t2H6JctvWHh+DCDWe7YWEE=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"3hn85uQds00fBZsoCNIw6CmLNnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A/ci6x19TolHdf0beLdRaXnYpWA="},{"type":"next-occurrence","id":"fVvbCHdjPlAqUB9+SeqRIouYC+I="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"3hn85uQds00fBZsoCNIw6CmLNnY=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"fVvbCHdjPlAqUB9+SeqRIouYC+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A/ci6x19TolHdf0beLdRaXnYpWA="},{"type":"next-occurrence","id":"R227p56TV3cJRrj+BYY6CLXXIVc="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"fVvbCHdjPlAqUB9+SeqRIouYC+I=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"R227p56TV3cJRrj+BYY6CLXXIVc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A/ci6x19TolHdf0beLdRaXnYpWA="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"R227p56TV3cJRrj+BYY6CLXXIVc=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"RjvjKUxIpVHrwaxnCk/di2ciuzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6qSYWCR6LdBtKliq8xaTFq40MPA="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"RjvjKUxIpVHrwaxnCk/di2ciuzA=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"6qSYWCR6LdBtKliq8xaTFq40MPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RjvjKUxIpVHrwaxnCk/di2ciuzA="},{"type":"next-occurrence","id":"1h7lBNZ2Zq4S+cxl9ml7m+gn5vs="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"6qSYWCR6LdBtKliq8xaTFq40MPA=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"1h7lBNZ2Zq4S+cxl9ml7m+gn5vs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RjvjKUxIpVHrwaxnCk/di2ciuzA="},{"type":"next-occurrence","id":"kgVnpx2lVmUbSZ8VnZY7CPlxmQ4="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"1h7lBNZ2Zq4S+cxl9ml7m+gn5vs=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"kgVnpx2lVmUbSZ8VnZY7CPlxmQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RjvjKUxIpVHrwaxnCk/di2ciuzA="},{"type":"next-occurrence","id":"2FQFf95RkYKv9TwUN9BmRT9b9kU="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"kgVnpx2lVmUbSZ8VnZY7CPlxmQ4=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"2FQFf95RkYKv9TwUN9BmRT9b9kU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RjvjKUxIpVHrwaxnCk/di2ciuzA="},{"type":"next-occurrence","id":"ypGgeqrfvqIIJjl2j+Z8B6QY6cI="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"2FQFf95RkYKv9TwUN9BmRT9b9kU=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"ypGgeqrfvqIIJjl2j+Z8B6QY6cI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RjvjKUxIpVHrwaxnCk/di2ciuzA="},{"type":"next-occurrence","id":"0Ky0wydtOkCRELU8a38Hy/Ilpzk="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"ypGgeqrfvqIIJjl2j+Z8B6QY6cI=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"0Ky0wydtOkCRELU8a38Hy/Ilpzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RjvjKUxIpVHrwaxnCk/di2ciuzA="},{"type":"next-occurrence","id":"8CfJy6KrMBkulJG5NPUhFnhbQ6c="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"0Ky0wydtOkCRELU8a38Hy/Ilpzk=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"8CfJy6KrMBkulJG5NPUhFnhbQ6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RjvjKUxIpVHrwaxnCk/di2ciuzA="},{"type":"next-occurrence","id":"dN1sVXt3CcApxp5HU29bThrnNN0="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"8CfJy6KrMBkulJG5NPUhFnhbQ6c=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"dN1sVXt3CcApxp5HU29bThrnNN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RjvjKUxIpVHrwaxnCk/di2ciuzA="},{"type":"next-occurrence","id":"Tz33DpVtmFQHGofNOIa1T73tTWk="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"dN1sVXt3CcApxp5HU29bThrnNN0=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"Tz33DpVtmFQHGofNOIa1T73tTWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RjvjKUxIpVHrwaxnCk/di2ciuzA="},{"type":"next-occurrence","id":"PxerzmkaxO5OFse3m240QPi9UmI="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"Tz33DpVtmFQHGofNOIa1T73tTWk=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"PxerzmkaxO5OFse3m240QPi9UmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RjvjKUxIpVHrwaxnCk/di2ciuzA="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"PxerzmkaxO5OFse3m240QPi9UmI=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"OSEtpE99JHTEdTiUE00nCfnIQ+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"b+50cah1/qCtxeB/ugmP2I1x56w="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"OSEtpE99JHTEdTiUE00nCfnIQ+Q=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"b+50cah1/qCtxeB/ugmP2I1x56w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OSEtpE99JHTEdTiUE00nCfnIQ+Q="},{"type":"next-occurrence","id":"bJIRiLztCAkgaoylNoTQ7WPv2oI="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"b+50cah1/qCtxeB/ugmP2I1x56w=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"bJIRiLztCAkgaoylNoTQ7WPv2oI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OSEtpE99JHTEdTiUE00nCfnIQ+Q="},{"type":"next-occurrence","id":"DGRHm0wV+XmpMZK+bCPVdt96aoQ="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"bJIRiLztCAkgaoylNoTQ7WPv2oI=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"DGRHm0wV+XmpMZK+bCPVdt96aoQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OSEtpE99JHTEdTiUE00nCfnIQ+Q="},{"type":"next-occurrence","id":"j5vVKh70MHniq9pElj22UUS7GzA="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"DGRHm0wV+XmpMZK+bCPVdt96aoQ=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"j5vVKh70MHniq9pElj22UUS7GzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OSEtpE99JHTEdTiUE00nCfnIQ+Q="},{"type":"next-occurrence","id":"5UlI3093Vu59AP4Reg6j1eXFfn0="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"j5vVKh70MHniq9pElj22UUS7GzA=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"5UlI3093Vu59AP4Reg6j1eXFfn0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OSEtpE99JHTEdTiUE00nCfnIQ+Q="},{"type":"next-occurrence","id":"esradHBkfFy6HyXcXVnMeOMkKKo="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"5UlI3093Vu59AP4Reg6j1eXFfn0=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"esradHBkfFy6HyXcXVnMeOMkKKo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OSEtpE99JHTEdTiUE00nCfnIQ+Q="},{"type":"next-occurrence","id":"I5bdhGCEROcyoQG7O+SpsCPA06M="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"esradHBkfFy6HyXcXVnMeOMkKKo=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"I5bdhGCEROcyoQG7O+SpsCPA06M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OSEtpE99JHTEdTiUE00nCfnIQ+Q="},{"type":"next-occurrence","id":"JbKVri64kEIKg33Z88h1zX9f7Xk="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"I5bdhGCEROcyoQG7O+SpsCPA06M=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"JbKVri64kEIKg33Z88h1zX9f7Xk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OSEtpE99JHTEdTiUE00nCfnIQ+Q="},{"type":"next-occurrence","id":"zsVXAK14MXUrdWkLAh65OsTUnyk="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"JbKVri64kEIKg33Z88h1zX9f7Xk=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"zsVXAK14MXUrdWkLAh65OsTUnyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OSEtpE99JHTEdTiUE00nCfnIQ+Q="},{"type":"next-occurrence","id":"r9mzvr9sRm2e0ePER9/powPuQsQ="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"zsVXAK14MXUrdWkLAh65OsTUnyk=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"r9mzvr9sRm2e0ePER9/powPuQsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OSEtpE99JHTEdTiUE00nCfnIQ+Q="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"r9mzvr9sRm2e0ePER9/powPuQsQ=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"eYGO09enDqEUoCkJKOS2uw2ON9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[],"description":"Construction on US 11 both directions in the vicinity of HALLAHAN RD (Lawrence) Narrow Bridge, Continuous Sunday December 15th, 2024 08:59 PM thru Friday December 31st, 2027 11:59 PM All lanes open","update_date":"2024-12-16T01:59:41Z"},"road_event_id":"eYGO09enDqEUoCkJKOS2uw2ON9U=","beginning_cross_street":"HALLAHAN RD","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.713616,44.772081]]}},{"id":"S7H6iavDA1Iiq+3/x+CgCIZ9ppg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QpGFMVk8h8s66mEogYBPkEj/k4A="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"S7H6iavDA1Iiq+3/x+CgCIZ9ppg=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"QpGFMVk8h8s66mEogYBPkEj/k4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7H6iavDA1Iiq+3/x+CgCIZ9ppg="},{"type":"next-occurrence","id":"xHiouUcPnLQ7ItgtUMTnHeOZr6I="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"QpGFMVk8h8s66mEogYBPkEj/k4A=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"xHiouUcPnLQ7ItgtUMTnHeOZr6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7H6iavDA1Iiq+3/x+CgCIZ9ppg="},{"type":"next-occurrence","id":"o6DGM1JPDQGeudPGEf+1SNbmD4Q="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"xHiouUcPnLQ7ItgtUMTnHeOZr6I=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"o6DGM1JPDQGeudPGEf+1SNbmD4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7H6iavDA1Iiq+3/x+CgCIZ9ppg="},{"type":"next-occurrence","id":"EgDpRNtCCaLcvuyQA0LSpIPvEH0="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"o6DGM1JPDQGeudPGEf+1SNbmD4Q=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"EgDpRNtCCaLcvuyQA0LSpIPvEH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7H6iavDA1Iiq+3/x+CgCIZ9ppg="},{"type":"next-occurrence","id":"W4gmKLHwBL4eLnwJXV/LXnFV1Go="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"EgDpRNtCCaLcvuyQA0LSpIPvEH0=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"W4gmKLHwBL4eLnwJXV/LXnFV1Go=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7H6iavDA1Iiq+3/x+CgCIZ9ppg="},{"type":"next-occurrence","id":"fRBm6UIT/2fb/RCmUpGCUoazqJk="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"W4gmKLHwBL4eLnwJXV/LXnFV1Go=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"fRBm6UIT/2fb/RCmUpGCUoazqJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7H6iavDA1Iiq+3/x+CgCIZ9ppg="},{"type":"next-occurrence","id":"DLjBUzNhIjLZGus+3b6kbBbbeks="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"fRBm6UIT/2fb/RCmUpGCUoazqJk=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"DLjBUzNhIjLZGus+3b6kbBbbeks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7H6iavDA1Iiq+3/x+CgCIZ9ppg="},{"type":"next-occurrence","id":"nM9YZYG7t7c00uNhJRDgSp9xXYc="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"DLjBUzNhIjLZGus+3b6kbBbbeks=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"nM9YZYG7t7c00uNhJRDgSp9xXYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7H6iavDA1Iiq+3/x+CgCIZ9ppg="},{"type":"next-occurrence","id":"a8iKbsBo0lVAK03QQhP4a95Qprc="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"nM9YZYG7t7c00uNhJRDgSp9xXYc=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"a8iKbsBo0lVAK03QQhP4a95Qprc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7H6iavDA1Iiq+3/x+CgCIZ9ppg="},{"type":"next-occurrence","id":"dWBWyMjAYN2PUi0gLMGJ6SaAGOo="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"a8iKbsBo0lVAK03QQhP4a95Qprc=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"dWBWyMjAYN2PUi0gLMGJ6SaAGOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7H6iavDA1Iiq+3/x+CgCIZ9ppg="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"dWBWyMjAYN2PUi0gLMGJ6SaAGOo=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"X7fJBjzj+xIe12AOPq57JaeZPA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TJxU2OCUBXp9SErxQe1auPyQSE0="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"X7fJBjzj+xIe12AOPq57JaeZPA8=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"TJxU2OCUBXp9SErxQe1auPyQSE0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7fJBjzj+xIe12AOPq57JaeZPA8="},{"type":"next-occurrence","id":"f0dGx9E7k3Li2V9bieI+nNmr/g4="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"TJxU2OCUBXp9SErxQe1auPyQSE0=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"f0dGx9E7k3Li2V9bieI+nNmr/g4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7fJBjzj+xIe12AOPq57JaeZPA8="},{"type":"next-occurrence","id":"iszbql9johLJHGZxiiQFqjU7rB0="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"f0dGx9E7k3Li2V9bieI+nNmr/g4=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"iszbql9johLJHGZxiiQFqjU7rB0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7fJBjzj+xIe12AOPq57JaeZPA8="},{"type":"next-occurrence","id":"sxZstdgNdiMvGF2R5M1Tz/pd8P4="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"iszbql9johLJHGZxiiQFqjU7rB0=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"sxZstdgNdiMvGF2R5M1Tz/pd8P4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7fJBjzj+xIe12AOPq57JaeZPA8="},{"type":"next-occurrence","id":"NGS1tzR5uLl4EBT0F7jhtZqCFSI="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"sxZstdgNdiMvGF2R5M1Tz/pd8P4=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"NGS1tzR5uLl4EBT0F7jhtZqCFSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7fJBjzj+xIe12AOPq57JaeZPA8="},{"type":"next-occurrence","id":"WXbvHyeQdwdieAyLlG3BYSV/8RU="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"NGS1tzR5uLl4EBT0F7jhtZqCFSI=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"WXbvHyeQdwdieAyLlG3BYSV/8RU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7fJBjzj+xIe12AOPq57JaeZPA8="},{"type":"next-occurrence","id":"bHXgNK8e2/w0F2iFTw8U1RiwbR0="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"WXbvHyeQdwdieAyLlG3BYSV/8RU=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"bHXgNK8e2/w0F2iFTw8U1RiwbR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7fJBjzj+xIe12AOPq57JaeZPA8="},{"type":"next-occurrence","id":"oI/gkiqvIYNCzWgthgM/ZpBLJx4="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"bHXgNK8e2/w0F2iFTw8U1RiwbR0=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"oI/gkiqvIYNCzWgthgM/ZpBLJx4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7fJBjzj+xIe12AOPq57JaeZPA8="},{"type":"next-occurrence","id":"x3UnCCu+OSTz2wDD3Jg0Lio29ps="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"oI/gkiqvIYNCzWgthgM/ZpBLJx4=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"x3UnCCu+OSTz2wDD3Jg0Lio29ps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7fJBjzj+xIe12AOPq57JaeZPA8="},{"type":"next-occurrence","id":"9IT1StTb57cq/Y8caOsXDc9JcMc="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"x3UnCCu+OSTz2wDD3Jg0Lio29ps=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"9IT1StTb57cq/Y8caOsXDc9JcMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7fJBjzj+xIe12AOPq57JaeZPA8="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"9IT1StTb57cq/Y8caOsXDc9JcMc=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"br9uLfvrCDnQJ9zM9ye7v30jIo0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nAdtj3G0I0uTICd73SFuTTkS5y0="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"br9uLfvrCDnQJ9zM9ye7v30jIo0=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"nAdtj3G0I0uTICd73SFuTTkS5y0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"br9uLfvrCDnQJ9zM9ye7v30jIo0="},{"type":"next-occurrence","id":"2J7YHdS3aqyDkUi95mi1McSDloA="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"nAdtj3G0I0uTICd73SFuTTkS5y0=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"2J7YHdS3aqyDkUi95mi1McSDloA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"br9uLfvrCDnQJ9zM9ye7v30jIo0="},{"type":"next-occurrence","id":"3UAbkFYyfhSgeL0t6hnsjIE6EM4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"2J7YHdS3aqyDkUi95mi1McSDloA=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"3UAbkFYyfhSgeL0t6hnsjIE6EM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"br9uLfvrCDnQJ9zM9ye7v30jIo0="},{"type":"next-occurrence","id":"5VCH87Phl0ou2W4c5MZoUhVlWw4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"3UAbkFYyfhSgeL0t6hnsjIE6EM4=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"5VCH87Phl0ou2W4c5MZoUhVlWw4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"br9uLfvrCDnQJ9zM9ye7v30jIo0="},{"type":"next-occurrence","id":"45mFFuHYNjp9hcl58JPzcCxmDgA="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"5VCH87Phl0ou2W4c5MZoUhVlWw4=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"45mFFuHYNjp9hcl58JPzcCxmDgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"br9uLfvrCDnQJ9zM9ye7v30jIo0="},{"type":"next-occurrence","id":"TSpV3ZpK6jzSISk98LaIFRRgqO8="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"45mFFuHYNjp9hcl58JPzcCxmDgA=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"TSpV3ZpK6jzSISk98LaIFRRgqO8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"br9uLfvrCDnQJ9zM9ye7v30jIo0="},{"type":"next-occurrence","id":"XgbW57EgHpzdy65DZb8HVjFshqA="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"TSpV3ZpK6jzSISk98LaIFRRgqO8=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"XgbW57EgHpzdy65DZb8HVjFshqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"br9uLfvrCDnQJ9zM9ye7v30jIo0="},{"type":"next-occurrence","id":"5Dlma6Pa1vJJb3Lq6fC9Hzu2STM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"XgbW57EgHpzdy65DZb8HVjFshqA=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"5Dlma6Pa1vJJb3Lq6fC9Hzu2STM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"br9uLfvrCDnQJ9zM9ye7v30jIo0="},{"type":"next-occurrence","id":"MasiwQh6AJYdbVfnmQ/FxiMvNJw="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"5Dlma6Pa1vJJb3Lq6fC9Hzu2STM=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"MasiwQh6AJYdbVfnmQ/FxiMvNJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"br9uLfvrCDnQJ9zM9ye7v30jIo0="},{"type":"next-occurrence","id":"6WRGl82MXuuAqPW9rtGi67dQjn0="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"MasiwQh6AJYdbVfnmQ/FxiMvNJw=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"6WRGl82MXuuAqPW9rtGi67dQjn0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"br9uLfvrCDnQJ9zM9ye7v30jIo0="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"6WRGl82MXuuAqPW9rtGi67dQjn0=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"XCz7fK0uxRvDJQyRIp+dJXNvAeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8SPdsxnMQLh9WjypiTls42ZQmeA="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"XCz7fK0uxRvDJQyRIp+dJXNvAeE=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"8SPdsxnMQLh9WjypiTls42ZQmeA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XCz7fK0uxRvDJQyRIp+dJXNvAeE="},{"type":"next-occurrence","id":"1bXcKJWNn24zCyKS23Lv62m1rQk="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"8SPdsxnMQLh9WjypiTls42ZQmeA=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"1bXcKJWNn24zCyKS23Lv62m1rQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XCz7fK0uxRvDJQyRIp+dJXNvAeE="},{"type":"next-occurrence","id":"eSyakB1bk97XPbZTRP6IfSw+uF8="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"1bXcKJWNn24zCyKS23Lv62m1rQk=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"eSyakB1bk97XPbZTRP6IfSw+uF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XCz7fK0uxRvDJQyRIp+dJXNvAeE="},{"type":"next-occurrence","id":"1NPQ3fzZHFJEDq9+Ot6F2ATfqbk="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"eSyakB1bk97XPbZTRP6IfSw+uF8=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"1NPQ3fzZHFJEDq9+Ot6F2ATfqbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XCz7fK0uxRvDJQyRIp+dJXNvAeE="},{"type":"next-occurrence","id":"+Ix5Q6QuxwvD9eVJC1YzeG+xhXo="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"1NPQ3fzZHFJEDq9+Ot6F2ATfqbk=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"+Ix5Q6QuxwvD9eVJC1YzeG+xhXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XCz7fK0uxRvDJQyRIp+dJXNvAeE="},{"type":"next-occurrence","id":"oFIMtoxBEBCm11MFNLJC6XlECmc="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"+Ix5Q6QuxwvD9eVJC1YzeG+xhXo=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"oFIMtoxBEBCm11MFNLJC6XlECmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XCz7fK0uxRvDJQyRIp+dJXNvAeE="},{"type":"next-occurrence","id":"qaXIcKGPdDeFHG6bMW15HjOlYnw="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"oFIMtoxBEBCm11MFNLJC6XlECmc=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"qaXIcKGPdDeFHG6bMW15HjOlYnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XCz7fK0uxRvDJQyRIp+dJXNvAeE="},{"type":"next-occurrence","id":"c4A/Wlbby072VmUYSg9g8aMzKH0="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"qaXIcKGPdDeFHG6bMW15HjOlYnw=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"c4A/Wlbby072VmUYSg9g8aMzKH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XCz7fK0uxRvDJQyRIp+dJXNvAeE="},{"type":"next-occurrence","id":"F209QFxLDoi91oRvcHOgwTCuEbw="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"c4A/Wlbby072VmUYSg9g8aMzKH0=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"F209QFxLDoi91oRvcHOgwTCuEbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XCz7fK0uxRvDJQyRIp+dJXNvAeE="},{"type":"next-occurrence","id":"5H5pkXc+uBGz1DpJ27q7UP80qn4="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"F209QFxLDoi91oRvcHOgwTCuEbw=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"5H5pkXc+uBGz1DpJ27q7UP80qn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XCz7fK0uxRvDJQyRIp+dJXNvAeE="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"5H5pkXc+uBGz1DpJ27q7UP80qn4=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"CWrtOK5RwE89tJUEiyww7k1firs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jGE3thPcn8LkYyeiFgkKAmz3LA4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"CWrtOK5RwE89tJUEiyww7k1firs=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"jGE3thPcn8LkYyeiFgkKAmz3LA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CWrtOK5RwE89tJUEiyww7k1firs="},{"type":"next-occurrence","id":"yk4ZkCzhvhvDbJJgkiLe8N8JUJg="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"jGE3thPcn8LkYyeiFgkKAmz3LA4=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"yk4ZkCzhvhvDbJJgkiLe8N8JUJg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CWrtOK5RwE89tJUEiyww7k1firs="},{"type":"next-occurrence","id":"rosT7uKdUm4gq1hDfiGARHGxKuU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"yk4ZkCzhvhvDbJJgkiLe8N8JUJg=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"rosT7uKdUm4gq1hDfiGARHGxKuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CWrtOK5RwE89tJUEiyww7k1firs="},{"type":"next-occurrence","id":"iePl87sIRb7i0UyljvvP8r6/IxI="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"rosT7uKdUm4gq1hDfiGARHGxKuU=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"iePl87sIRb7i0UyljvvP8r6/IxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CWrtOK5RwE89tJUEiyww7k1firs="},{"type":"next-occurrence","id":"lNjx3+Wf0i/+vOGw6r3t8xFI8Hc="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"iePl87sIRb7i0UyljvvP8r6/IxI=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"lNjx3+Wf0i/+vOGw6r3t8xFI8Hc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CWrtOK5RwE89tJUEiyww7k1firs="},{"type":"next-occurrence","id":"J/Dm9Y792KOOzAIlR8c69pHPF+I="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"lNjx3+Wf0i/+vOGw6r3t8xFI8Hc=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"J/Dm9Y792KOOzAIlR8c69pHPF+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CWrtOK5RwE89tJUEiyww7k1firs="},{"type":"next-occurrence","id":"3DMKxjceSWDG9BUP2VBrYazgS8s="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"J/Dm9Y792KOOzAIlR8c69pHPF+I=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"3DMKxjceSWDG9BUP2VBrYazgS8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CWrtOK5RwE89tJUEiyww7k1firs="},{"type":"next-occurrence","id":"hnG32K0F4hvZqiHqJd5FMjaUKbY="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"3DMKxjceSWDG9BUP2VBrYazgS8s=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"hnG32K0F4hvZqiHqJd5FMjaUKbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CWrtOK5RwE89tJUEiyww7k1firs="},{"type":"next-occurrence","id":"/QnyqR+fvns0BOKCKQaFzBDwReY="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"hnG32K0F4hvZqiHqJd5FMjaUKbY=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"/QnyqR+fvns0BOKCKQaFzBDwReY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CWrtOK5RwE89tJUEiyww7k1firs="},{"type":"next-occurrence","id":"zNVcMk18fMoW0CozuKfYif/8j1Y="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"/QnyqR+fvns0BOKCKQaFzBDwReY=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"zNVcMk18fMoW0CozuKfYif/8j1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CWrtOK5RwE89tJUEiyww7k1firs="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"zNVcMk18fMoW0CozuKfYif/8j1Y=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"Ai2ZPqrwMDWoGkm8sT7xkziuQpQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iFUCvHtGwVCQsCSNpR8WiVxp0QY="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"Ai2ZPqrwMDWoGkm8sT7xkziuQpQ=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"iFUCvHtGwVCQsCSNpR8WiVxp0QY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ai2ZPqrwMDWoGkm8sT7xkziuQpQ="},{"type":"next-occurrence","id":"4GCK+4aJEGBN8YKbBsFpXrQn6Ho="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"iFUCvHtGwVCQsCSNpR8WiVxp0QY=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"4GCK+4aJEGBN8YKbBsFpXrQn6Ho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ai2ZPqrwMDWoGkm8sT7xkziuQpQ="},{"type":"next-occurrence","id":"kFKmpg4snjjciHS90DnZbh/9jN8="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"4GCK+4aJEGBN8YKbBsFpXrQn6Ho=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"kFKmpg4snjjciHS90DnZbh/9jN8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ai2ZPqrwMDWoGkm8sT7xkziuQpQ="},{"type":"next-occurrence","id":"OViYh5zg2xEM1HjoIs1DvqqeXRw="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"kFKmpg4snjjciHS90DnZbh/9jN8=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"OViYh5zg2xEM1HjoIs1DvqqeXRw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ai2ZPqrwMDWoGkm8sT7xkziuQpQ="},{"type":"next-occurrence","id":"3vr+RwZQBiR4Q3QmBiYYDEs2IFE="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"OViYh5zg2xEM1HjoIs1DvqqeXRw=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"3vr+RwZQBiR4Q3QmBiYYDEs2IFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ai2ZPqrwMDWoGkm8sT7xkziuQpQ="},{"type":"next-occurrence","id":"kOr2Enjm/9sjtEhO9ngGS0K0DTY="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"3vr+RwZQBiR4Q3QmBiYYDEs2IFE=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"kOr2Enjm/9sjtEhO9ngGS0K0DTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ai2ZPqrwMDWoGkm8sT7xkziuQpQ="},{"type":"next-occurrence","id":"Zg0jKhS2FXPFKfKOLRqZYeegV30="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"kOr2Enjm/9sjtEhO9ngGS0K0DTY=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"Zg0jKhS2FXPFKfKOLRqZYeegV30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ai2ZPqrwMDWoGkm8sT7xkziuQpQ="},{"type":"next-occurrence","id":"UlKL766huBQPegEc248u4/5TA3E="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"Zg0jKhS2FXPFKfKOLRqZYeegV30=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"UlKL766huBQPegEc248u4/5TA3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ai2ZPqrwMDWoGkm8sT7xkziuQpQ="},{"type":"next-occurrence","id":"DN+6AqtFaZADfQ8uaTlGAus8LY8="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"UlKL766huBQPegEc248u4/5TA3E=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"DN+6AqtFaZADfQ8uaTlGAus8LY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ai2ZPqrwMDWoGkm8sT7xkziuQpQ="},{"type":"next-occurrence","id":"ALKZxvaLxpjw02yCJOm3F3rIMys="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"DN+6AqtFaZADfQ8uaTlGAus8LY8=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"ALKZxvaLxpjw02yCJOm3F3rIMys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ai2ZPqrwMDWoGkm8sT7xkziuQpQ="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"ALKZxvaLxpjw02yCJOm3F3rIMys=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"gmzg0KStJFjyLOvrspR3M+qjE5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pM3qdI+ITJarVbZBHaHBOxftRmo="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"gmzg0KStJFjyLOvrspR3M+qjE5M=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"pM3qdI+ITJarVbZBHaHBOxftRmo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmzg0KStJFjyLOvrspR3M+qjE5M="},{"type":"next-occurrence","id":"50qFtXtlArY0b3BtxP8A5OHIai0="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"pM3qdI+ITJarVbZBHaHBOxftRmo=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"50qFtXtlArY0b3BtxP8A5OHIai0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmzg0KStJFjyLOvrspR3M+qjE5M="},{"type":"next-occurrence","id":"DEnXcxMkeJRSxH9jzoAswJAPDeM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"50qFtXtlArY0b3BtxP8A5OHIai0=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"DEnXcxMkeJRSxH9jzoAswJAPDeM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmzg0KStJFjyLOvrspR3M+qjE5M="},{"type":"next-occurrence","id":"abxXc+Z/cjfMYBpEtxXIaS7QsW8="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"DEnXcxMkeJRSxH9jzoAswJAPDeM=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"abxXc+Z/cjfMYBpEtxXIaS7QsW8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmzg0KStJFjyLOvrspR3M+qjE5M="},{"type":"next-occurrence","id":"6n1hSvKGRd6k8MY79aem0pM80e8="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"abxXc+Z/cjfMYBpEtxXIaS7QsW8=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"6n1hSvKGRd6k8MY79aem0pM80e8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmzg0KStJFjyLOvrspR3M+qjE5M="},{"type":"next-occurrence","id":"DwhiyhY4KpGBfwkZiRFeX3f8j4k="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"6n1hSvKGRd6k8MY79aem0pM80e8=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"DwhiyhY4KpGBfwkZiRFeX3f8j4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmzg0KStJFjyLOvrspR3M+qjE5M="},{"type":"next-occurrence","id":"Spu541JfJ8nk3+BcEqoaTkECS8U="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"DwhiyhY4KpGBfwkZiRFeX3f8j4k=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"Spu541JfJ8nk3+BcEqoaTkECS8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmzg0KStJFjyLOvrspR3M+qjE5M="},{"type":"next-occurrence","id":"Q6tN90W1Yspr3V/GpgYLDLVTjyw="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"Spu541JfJ8nk3+BcEqoaTkECS8U=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"Q6tN90W1Yspr3V/GpgYLDLVTjyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmzg0KStJFjyLOvrspR3M+qjE5M="},{"type":"next-occurrence","id":"V8BO+XD1IVyxNHTl42ELqNUGGLU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"Q6tN90W1Yspr3V/GpgYLDLVTjyw=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"V8BO+XD1IVyxNHTl42ELqNUGGLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmzg0KStJFjyLOvrspR3M+qjE5M="},{"type":"next-occurrence","id":"074onZHeg7U4SDo8M5sJfxNyqn4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"V8BO+XD1IVyxNHTl42ELqNUGGLU=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"074onZHeg7U4SDo8M5sJfxNyqn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmzg0KStJFjyLOvrspR3M+qjE5M="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"074onZHeg7U4SDo8M5sJfxNyqn4=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"Bfw7GglBMLFM7EF/jdLbL73T0FY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OWCE81Aq3TR0TaCxHnZUYk7ekwQ="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"Bfw7GglBMLFM7EF/jdLbL73T0FY=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"OWCE81Aq3TR0TaCxHnZUYk7ekwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bfw7GglBMLFM7EF/jdLbL73T0FY="},{"type":"next-occurrence","id":"B0u1C6+BNQyxY1yNyPDxHy7putA="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"OWCE81Aq3TR0TaCxHnZUYk7ekwQ=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"B0u1C6+BNQyxY1yNyPDxHy7putA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bfw7GglBMLFM7EF/jdLbL73T0FY="},{"type":"next-occurrence","id":"cJhAz81pf9eN7+P2ktqQpaqAfyQ="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"B0u1C6+BNQyxY1yNyPDxHy7putA=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"cJhAz81pf9eN7+P2ktqQpaqAfyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bfw7GglBMLFM7EF/jdLbL73T0FY="},{"type":"next-occurrence","id":"+qO0Btumqd7XuZ7rv7FCQYc4MHY="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"cJhAz81pf9eN7+P2ktqQpaqAfyQ=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"+qO0Btumqd7XuZ7rv7FCQYc4MHY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bfw7GglBMLFM7EF/jdLbL73T0FY="},{"type":"next-occurrence","id":"LETAZabbcJya6Lnv+YAdL7Amuu0="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"+qO0Btumqd7XuZ7rv7FCQYc4MHY=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"LETAZabbcJya6Lnv+YAdL7Amuu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bfw7GglBMLFM7EF/jdLbL73T0FY="},{"type":"next-occurrence","id":"QAE2GWNjsHwtFNUsyjkfHr+hKWU="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"LETAZabbcJya6Lnv+YAdL7Amuu0=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"QAE2GWNjsHwtFNUsyjkfHr+hKWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bfw7GglBMLFM7EF/jdLbL73T0FY="},{"type":"next-occurrence","id":"YBTEwEJJo5SSLm43QVSf0PVaLK0="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"QAE2GWNjsHwtFNUsyjkfHr+hKWU=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"YBTEwEJJo5SSLm43QVSf0PVaLK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bfw7GglBMLFM7EF/jdLbL73T0FY="},{"type":"next-occurrence","id":"2yQ2AzL3jZgkWL4DAxqfhTDJcwk="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"YBTEwEJJo5SSLm43QVSf0PVaLK0=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"2yQ2AzL3jZgkWL4DAxqfhTDJcwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bfw7GglBMLFM7EF/jdLbL73T0FY="},{"type":"next-occurrence","id":"XBUcA6KyigxmPsHU5ypzc34vETQ="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"2yQ2AzL3jZgkWL4DAxqfhTDJcwk=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"XBUcA6KyigxmPsHU5ypzc34vETQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bfw7GglBMLFM7EF/jdLbL73T0FY="},{"type":"next-occurrence","id":"b/aWoArwvq+JpbthW6HnaOc7R0Y="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"XBUcA6KyigxmPsHU5ypzc34vETQ=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"b/aWoArwvq+JpbthW6HnaOc7R0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bfw7GglBMLFM7EF/jdLbL73T0FY="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"b/aWoArwvq+JpbthW6HnaOc7R0Y=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"2j1ukZN+FLqbfVbEm+b3TTBFldQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fKQjNSphxP99ZHJwml25a3QcuGU="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"2j1ukZN+FLqbfVbEm+b3TTBFldQ=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"fKQjNSphxP99ZHJwml25a3QcuGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2j1ukZN+FLqbfVbEm+b3TTBFldQ="},{"type":"next-occurrence","id":"ID2dLJvOFw5JQLHWBNAKiMZjQRM="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"fKQjNSphxP99ZHJwml25a3QcuGU=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"ID2dLJvOFw5JQLHWBNAKiMZjQRM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2j1ukZN+FLqbfVbEm+b3TTBFldQ="},{"type":"next-occurrence","id":"rF8k415DlDqfzfkZUDrw16Iep50="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"ID2dLJvOFw5JQLHWBNAKiMZjQRM=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"rF8k415DlDqfzfkZUDrw16Iep50=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2j1ukZN+FLqbfVbEm+b3TTBFldQ="},{"type":"next-occurrence","id":"CdyvkVrwCGpdgMZ0NR4Moqc4qGw="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"rF8k415DlDqfzfkZUDrw16Iep50=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"CdyvkVrwCGpdgMZ0NR4Moqc4qGw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2j1ukZN+FLqbfVbEm+b3TTBFldQ="},{"type":"next-occurrence","id":"70DAG4s1nstJUv1Z1JrDsNO+bf0="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"CdyvkVrwCGpdgMZ0NR4Moqc4qGw=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"70DAG4s1nstJUv1Z1JrDsNO+bf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2j1ukZN+FLqbfVbEm+b3TTBFldQ="},{"type":"next-occurrence","id":"aCl10KGE1ULfj13Zc5iyxkc46B0="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"70DAG4s1nstJUv1Z1JrDsNO+bf0=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"aCl10KGE1ULfj13Zc5iyxkc46B0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2j1ukZN+FLqbfVbEm+b3TTBFldQ="},{"type":"next-occurrence","id":"NXAhRRT4jlxsT8kkwNSD3YXu12o="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"aCl10KGE1ULfj13Zc5iyxkc46B0=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"NXAhRRT4jlxsT8kkwNSD3YXu12o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2j1ukZN+FLqbfVbEm+b3TTBFldQ="},{"type":"next-occurrence","id":"VW5ID9IlKY0C5rLkAvgFbiIaef0="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"NXAhRRT4jlxsT8kkwNSD3YXu12o=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"VW5ID9IlKY0C5rLkAvgFbiIaef0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2j1ukZN+FLqbfVbEm+b3TTBFldQ="},{"type":"next-occurrence","id":"9XOuQgVRpPe8aDCi0KDVoXULuR0="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"VW5ID9IlKY0C5rLkAvgFbiIaef0=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"9XOuQgVRpPe8aDCi0KDVoXULuR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2j1ukZN+FLqbfVbEm+b3TTBFldQ="},{"type":"next-occurrence","id":"zaE7Od2FujszKJ7ZQnlDfnEDmBc="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"9XOuQgVRpPe8aDCi0KDVoXULuR0=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"zaE7Od2FujszKJ7ZQnlDfnEDmBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2j1ukZN+FLqbfVbEm+b3TTBFldQ="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"zaE7Od2FujszKJ7ZQnlDfnEDmBc=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"kJwdNdJkv/1xbBrquuO4Db3qD/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kc1HOgxNI/G+/pmZSpa2CiDr4sI="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"kJwdNdJkv/1xbBrquuO4Db3qD/k=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"kc1HOgxNI/G+/pmZSpa2CiDr4sI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kJwdNdJkv/1xbBrquuO4Db3qD/k="},{"type":"next-occurrence","id":"yyUTebDoY/jJ5qjJQkH8J6tWSio="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"kc1HOgxNI/G+/pmZSpa2CiDr4sI=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"yyUTebDoY/jJ5qjJQkH8J6tWSio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kJwdNdJkv/1xbBrquuO4Db3qD/k="},{"type":"next-occurrence","id":"x1tCrZu8TQM60SM4rYpo/zvaS94="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"yyUTebDoY/jJ5qjJQkH8J6tWSio=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"x1tCrZu8TQM60SM4rYpo/zvaS94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kJwdNdJkv/1xbBrquuO4Db3qD/k="},{"type":"next-occurrence","id":"752anvugjHKWedEBJXYRJ3GS2qk="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"x1tCrZu8TQM60SM4rYpo/zvaS94=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"752anvugjHKWedEBJXYRJ3GS2qk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kJwdNdJkv/1xbBrquuO4Db3qD/k="},{"type":"next-occurrence","id":"T2CCZmXxVbRsrQlGGJTOw57RuOg="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"752anvugjHKWedEBJXYRJ3GS2qk=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"T2CCZmXxVbRsrQlGGJTOw57RuOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kJwdNdJkv/1xbBrquuO4Db3qD/k="},{"type":"next-occurrence","id":"XGffCL7EbvWru3t7ynnbiRPpObg="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"T2CCZmXxVbRsrQlGGJTOw57RuOg=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"XGffCL7EbvWru3t7ynnbiRPpObg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kJwdNdJkv/1xbBrquuO4Db3qD/k="},{"type":"next-occurrence","id":"O+E14PwCZW8znmY41O53rv2+Rwc="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"XGffCL7EbvWru3t7ynnbiRPpObg=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"O+E14PwCZW8znmY41O53rv2+Rwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kJwdNdJkv/1xbBrquuO4Db3qD/k="},{"type":"next-occurrence","id":"TSmfR2bPDOH4c+B39vUUD1Mm3Hc="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"O+E14PwCZW8znmY41O53rv2+Rwc=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"TSmfR2bPDOH4c+B39vUUD1Mm3Hc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kJwdNdJkv/1xbBrquuO4Db3qD/k="},{"type":"next-occurrence","id":"dmN+exxZiOJLhbNGSVZmZbYLxWQ="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"TSmfR2bPDOH4c+B39vUUD1Mm3Hc=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"dmN+exxZiOJLhbNGSVZmZbYLxWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kJwdNdJkv/1xbBrquuO4Db3qD/k="},{"type":"next-occurrence","id":"TgyoiWlmeQQhDWjsH8wGeGHsum0="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"dmN+exxZiOJLhbNGSVZmZbYLxWQ=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"TgyoiWlmeQQhDWjsH8wGeGHsum0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kJwdNdJkv/1xbBrquuO4Db3qD/k="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"TgyoiWlmeQQhDWjsH8wGeGHsum0=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"ojOuco372v4E1gxct8vwemAlaiw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1UlzufGj3Ac7bGS+1bQs40ZjDIE="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"ojOuco372v4E1gxct8vwemAlaiw=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"1UlzufGj3Ac7bGS+1bQs40ZjDIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojOuco372v4E1gxct8vwemAlaiw="},{"type":"next-occurrence","id":"MaUUAL9lcfM+hN4PBbRwJLl3x+E="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"1UlzufGj3Ac7bGS+1bQs40ZjDIE=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"MaUUAL9lcfM+hN4PBbRwJLl3x+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojOuco372v4E1gxct8vwemAlaiw="},{"type":"next-occurrence","id":"4gRY8uHpHv3FtuZ1ctW2Bs43hXI="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"MaUUAL9lcfM+hN4PBbRwJLl3x+E=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"4gRY8uHpHv3FtuZ1ctW2Bs43hXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojOuco372v4E1gxct8vwemAlaiw="},{"type":"next-occurrence","id":"ty21MUYDZHJXwbbJ2VY0RBV6jSA="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"4gRY8uHpHv3FtuZ1ctW2Bs43hXI=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"ty21MUYDZHJXwbbJ2VY0RBV6jSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojOuco372v4E1gxct8vwemAlaiw="},{"type":"next-occurrence","id":"9UVOeg+xIMaBPrTNcwJDAODIGAk="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"ty21MUYDZHJXwbbJ2VY0RBV6jSA=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"9UVOeg+xIMaBPrTNcwJDAODIGAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojOuco372v4E1gxct8vwemAlaiw="},{"type":"next-occurrence","id":"gpF2GHkHUrSTiOShWjgGrexINyU="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"9UVOeg+xIMaBPrTNcwJDAODIGAk=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"gpF2GHkHUrSTiOShWjgGrexINyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojOuco372v4E1gxct8vwemAlaiw="},{"type":"next-occurrence","id":"IaYFd7/qJpZmX/cxkHd2Ckr4lHk="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"gpF2GHkHUrSTiOShWjgGrexINyU=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"IaYFd7/qJpZmX/cxkHd2Ckr4lHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojOuco372v4E1gxct8vwemAlaiw="},{"type":"next-occurrence","id":"+9TJI0WhykQnc//XkTACXp+BqUw="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"IaYFd7/qJpZmX/cxkHd2Ckr4lHk=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"+9TJI0WhykQnc//XkTACXp+BqUw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojOuco372v4E1gxct8vwemAlaiw="},{"type":"next-occurrence","id":"cAat9tn1ESBs44C7JGORHidXEjM="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"+9TJI0WhykQnc//XkTACXp+BqUw=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"cAat9tn1ESBs44C7JGORHidXEjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojOuco372v4E1gxct8vwemAlaiw="},{"type":"next-occurrence","id":"vroK+aDudM7Aq6vIsJrGvzh+N1c="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"cAat9tn1ESBs44C7JGORHidXEjM=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"vroK+aDudM7Aq6vIsJrGvzh+N1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojOuco372v4E1gxct8vwemAlaiw="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"vroK+aDudM7Aq6vIsJrGvzh+N1c=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"bkIcqmLazw+UwoImIcmss2SFk8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7RleW9yWFzZk9M4mwOfpM3Lr1cg="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"bkIcqmLazw+UwoImIcmss2SFk8M=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"7RleW9yWFzZk9M4mwOfpM3Lr1cg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bkIcqmLazw+UwoImIcmss2SFk8M="},{"type":"next-occurrence","id":"9uRbyGCtBuQdzIvSFEWeq1oM/Fs="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"7RleW9yWFzZk9M4mwOfpM3Lr1cg=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"9uRbyGCtBuQdzIvSFEWeq1oM/Fs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bkIcqmLazw+UwoImIcmss2SFk8M="},{"type":"next-occurrence","id":"6bJ3ZIgJDsg+oXtXpLyR5f0c4B4="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"9uRbyGCtBuQdzIvSFEWeq1oM/Fs=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"6bJ3ZIgJDsg+oXtXpLyR5f0c4B4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bkIcqmLazw+UwoImIcmss2SFk8M="},{"type":"next-occurrence","id":"r1fGvHDfLsFTPekssp/KpyWJ/GE="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"6bJ3ZIgJDsg+oXtXpLyR5f0c4B4=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"r1fGvHDfLsFTPekssp/KpyWJ/GE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bkIcqmLazw+UwoImIcmss2SFk8M="},{"type":"next-occurrence","id":"IsLbotZHJzoMriqXFiyYfk3JdA0="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"r1fGvHDfLsFTPekssp/KpyWJ/GE=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"IsLbotZHJzoMriqXFiyYfk3JdA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bkIcqmLazw+UwoImIcmss2SFk8M="},{"type":"next-occurrence","id":"oydf7NcKvSu/l46zHfQJedjZXvs="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"IsLbotZHJzoMriqXFiyYfk3JdA0=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"oydf7NcKvSu/l46zHfQJedjZXvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bkIcqmLazw+UwoImIcmss2SFk8M="},{"type":"next-occurrence","id":"rbLIEXUdyWJgRN/utcEVAjfqkt8="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"oydf7NcKvSu/l46zHfQJedjZXvs=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"rbLIEXUdyWJgRN/utcEVAjfqkt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bkIcqmLazw+UwoImIcmss2SFk8M="},{"type":"next-occurrence","id":"+9G7cjjaSyERZ5e/42AmZs1yUmk="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"rbLIEXUdyWJgRN/utcEVAjfqkt8=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"+9G7cjjaSyERZ5e/42AmZs1yUmk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bkIcqmLazw+UwoImIcmss2SFk8M="},{"type":"next-occurrence","id":"ijhfx/ubXa5dQQ7HUVUWVKzAMcA="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"+9G7cjjaSyERZ5e/42AmZs1yUmk=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"ijhfx/ubXa5dQQ7HUVUWVKzAMcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bkIcqmLazw+UwoImIcmss2SFk8M="},{"type":"next-occurrence","id":"tM0RE68xJkzxm8g/qZg24ot4ge8="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"ijhfx/ubXa5dQQ7HUVUWVKzAMcA=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"tM0RE68xJkzxm8g/qZg24ot4ge8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bkIcqmLazw+UwoImIcmss2SFk8M="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"tM0RE68xJkzxm8g/qZg24ot4ge8=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"lfLOidcEm0P9Thi9CwPNU5fPD2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"R41WL0uT4EQ/W1yomNnecJfliVA="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"lfLOidcEm0P9Thi9CwPNU5fPD2A=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"R41WL0uT4EQ/W1yomNnecJfliVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lfLOidcEm0P9Thi9CwPNU5fPD2A="},{"type":"next-occurrence","id":"gb7BGeVtsQ58EaqMCsINFtStrR8="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"R41WL0uT4EQ/W1yomNnecJfliVA=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"gb7BGeVtsQ58EaqMCsINFtStrR8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lfLOidcEm0P9Thi9CwPNU5fPD2A="},{"type":"next-occurrence","id":"HkDE528AZep4kDvnLts29TOr+BM="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"gb7BGeVtsQ58EaqMCsINFtStrR8=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"HkDE528AZep4kDvnLts29TOr+BM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lfLOidcEm0P9Thi9CwPNU5fPD2A="},{"type":"next-occurrence","id":"WI6rQ65OlqvbDwFndXttzedtrvo="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"HkDE528AZep4kDvnLts29TOr+BM=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"WI6rQ65OlqvbDwFndXttzedtrvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lfLOidcEm0P9Thi9CwPNU5fPD2A="},{"type":"next-occurrence","id":"lkJzxColsDtEcsBhVqO3cqU0/C4="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"WI6rQ65OlqvbDwFndXttzedtrvo=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"lkJzxColsDtEcsBhVqO3cqU0/C4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lfLOidcEm0P9Thi9CwPNU5fPD2A="},{"type":"next-occurrence","id":"+Ge1ToADm/V6JMr/VCvkwotnyrw="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"lkJzxColsDtEcsBhVqO3cqU0/C4=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"+Ge1ToADm/V6JMr/VCvkwotnyrw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lfLOidcEm0P9Thi9CwPNU5fPD2A="},{"type":"next-occurrence","id":"o9uZX/sZ77o2LMZSux82dzwmWZE="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"+Ge1ToADm/V6JMr/VCvkwotnyrw=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"o9uZX/sZ77o2LMZSux82dzwmWZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lfLOidcEm0P9Thi9CwPNU5fPD2A="},{"type":"next-occurrence","id":"4ofr1xpgxukIFZMkljaxWHLV++M="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"o9uZX/sZ77o2LMZSux82dzwmWZE=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"4ofr1xpgxukIFZMkljaxWHLV++M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lfLOidcEm0P9Thi9CwPNU5fPD2A="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"4ofr1xpgxukIFZMkljaxWHLV++M=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"DwWySlOYNYLk5q8zwjL0MB3HtXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5S"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 5S both directions between CR 122; Auriesville Road (Glen) and CR 27; Main Street; Hamlet of Fort Hunter (Montgomery) Motorists will encounter lane closures in both directions with temporary signals in place, Continuous Monday March 16th, 2026 6:00 AM thru Saturday November 21st, 2026 6:00 PM","update_date":"2026-03-13T14:11:32Z"},"road_event_id":"DwWySlOYNYLk5q8zwjL0MB3HtXE=","beginning_cross_street":"CR 122; Auriesville Road","ending_cross_street":"CR 27; Main Street; Hamlet of Fort Hunter","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.315,42.9299]]}},{"id":"dAfpjmAAMAmc7kpI4eMhVljhNVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"E8ylr4Hu/3el6DUgWEvDWv9cqss="}],"description":"Roadwork on NY 17K both directions between NY 17 (Wallkill) and Stone School House Road (Wallkill) D265594/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Saturday May 16th, 2026, 06:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-12T11:46:31Z"},"road_event_id":"dAfpjmAAMAmc7kpI4eMhVljhNVg=","beginning_cross_street":"NY 17","ending_cross_street":"Stone School House Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.424374,41.552407]]}},{"id":"E8ylr4Hu/3el6DUgWEvDWv9cqss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dAfpjmAAMAmc7kpI4eMhVljhNVg="},{"type":"next-occurrence","id":"Z3iGOa8Lzxa5P/e/Mb1buzOG9WM="}],"description":"Roadwork on NY 17K both directions between NY 17 (Wallkill) and Stone School House Road (Wallkill) D265594/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Saturday May 16th, 2026, 06:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-12T11:46:31Z"},"road_event_id":"E8ylr4Hu/3el6DUgWEvDWv9cqss=","beginning_cross_street":"NY 17","ending_cross_street":"Stone School House Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.424374,41.552407]]}},{"id":"Z3iGOa8Lzxa5P/e/Mb1buzOG9WM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dAfpjmAAMAmc7kpI4eMhVljhNVg="},{"type":"next-occurrence","id":"3boxVM/kzAr7Ih1Hfkp8FS11I3w="}],"description":"Roadwork on NY 17K both directions between NY 17 (Wallkill) and Stone School House Road (Wallkill) D265594/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Saturday May 16th, 2026, 06:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-12T11:46:31Z"},"road_event_id":"Z3iGOa8Lzxa5P/e/Mb1buzOG9WM=","beginning_cross_street":"NY 17","ending_cross_street":"Stone School House Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.424374,41.552407]]}},{"id":"3boxVM/kzAr7Ih1Hfkp8FS11I3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dAfpjmAAMAmc7kpI4eMhVljhNVg="}],"description":"Roadwork on NY 17K both directions between NY 17 (Wallkill) and Stone School House Road (Wallkill) D265594/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Saturday May 16th, 2026, 06:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-12T11:46:31Z"},"road_event_id":"3boxVM/kzAr7Ih1Hfkp8FS11I3w=","beginning_cross_street":"NY 17","ending_cross_street":"Stone School House Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T16:00:00Z","end_date":"2026-05-17T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.424374,41.552407]]}},{"id":"CNWOZ6zK+ry8175XjjNB5S1mgh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"l/j12zg+K/CIWDGiMVapwvABDbo="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121E - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-05-11T17:26:38Z"},"road_event_id":"CNWOZ6zK+ry8175XjjNB5S1mgh8=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"l/j12zg+K/CIWDGiMVapwvABDbo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CNWOZ6zK+ry8175XjjNB5S1mgh8="},{"type":"next-occurrence","id":"Mg8pTj69es4uKofjd0mwo+8pybY="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121E - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-05-11T17:26:38Z"},"road_event_id":"l/j12zg+K/CIWDGiMVapwvABDbo=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"Mg8pTj69es4uKofjd0mwo+8pybY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CNWOZ6zK+ry8175XjjNB5S1mgh8="},{"type":"next-occurrence","id":"1pvK52UYUHM92T1e0eawNJQv0sA="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121E - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-05-11T17:26:38Z"},"road_event_id":"Mg8pTj69es4uKofjd0mwo+8pybY=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"1pvK52UYUHM92T1e0eawNJQv0sA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CNWOZ6zK+ry8175XjjNB5S1mgh8="},{"type":"next-occurrence","id":"gaQJVgpc1jfbHrhod4Gl/GrJwIc="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121E - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-05-11T17:26:38Z"},"road_event_id":"1pvK52UYUHM92T1e0eawNJQv0sA=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"gaQJVgpc1jfbHrhod4Gl/GrJwIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CNWOZ6zK+ry8175XjjNB5S1mgh8="},{"type":"next-occurrence","id":"5w25QoemIgwpsUZKCDUZPfxEuYY="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121E - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-05-11T17:26:38Z"},"road_event_id":"gaQJVgpc1jfbHrhod4Gl/GrJwIc=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"5w25QoemIgwpsUZKCDUZPfxEuYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CNWOZ6zK+ry8175XjjNB5S1mgh8="},{"type":"next-occurrence","id":"HvOu9lZYNySHxrWPr2ssM0EUABM="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121E - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-05-11T17:26:38Z"},"road_event_id":"5w25QoemIgwpsUZKCDUZPfxEuYY=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"HvOu9lZYNySHxrWPr2ssM0EUABM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CNWOZ6zK+ry8175XjjNB5S1mgh8="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121E - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-05-11T17:26:38Z"},"road_event_id":"HvOu9lZYNySHxrWPr2ssM0EUABM=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"ANsaK3cyTrGElEd1PDiW6HMVX3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tT8Ib3CviHuWOW+Inpme3GAWWGM="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:20Z"},"road_event_id":"ANsaK3cyTrGElEd1PDiW6HMVX3U=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"tT8Ib3CviHuWOW+Inpme3GAWWGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ANsaK3cyTrGElEd1PDiW6HMVX3U="},{"type":"next-occurrence","id":"4RjW1wlwrfQN5aA3xEeLyy07cJo="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:20Z"},"road_event_id":"tT8Ib3CviHuWOW+Inpme3GAWWGM=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"4RjW1wlwrfQN5aA3xEeLyy07cJo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ANsaK3cyTrGElEd1PDiW6HMVX3U="},{"type":"next-occurrence","id":"b2srsB6AISEwE3h9AwST8OgdCCc="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:20Z"},"road_event_id":"4RjW1wlwrfQN5aA3xEeLyy07cJo=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"b2srsB6AISEwE3h9AwST8OgdCCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ANsaK3cyTrGElEd1PDiW6HMVX3U="},{"type":"next-occurrence","id":"hG0QNnIKL9cxGpugj5+punragw8="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:20Z"},"road_event_id":"b2srsB6AISEwE3h9AwST8OgdCCc=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"hG0QNnIKL9cxGpugj5+punragw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ANsaK3cyTrGElEd1PDiW6HMVX3U="},{"type":"next-occurrence","id":"NZ5EApFvGWjMwx4zB+bBhJFMc/Q="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:20Z"},"road_event_id":"hG0QNnIKL9cxGpugj5+punragw8=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"NZ5EApFvGWjMwx4zB+bBhJFMc/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ANsaK3cyTrGElEd1PDiW6HMVX3U="},{"type":"next-occurrence","id":"573/cWnKuhEbShxquijyvsiq+Dg="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:20Z"},"road_event_id":"NZ5EApFvGWjMwx4zB+bBhJFMc/Q=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"573/cWnKuhEbShxquijyvsiq+Dg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ANsaK3cyTrGElEd1PDiW6HMVX3U="},{"type":"next-occurrence","id":"dyxiu7xTOs2yjqQAiw7PWBIqljk="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:20Z"},"road_event_id":"573/cWnKuhEbShxquijyvsiq+Dg=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"dyxiu7xTOs2yjqQAiw7PWBIqljk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ANsaK3cyTrGElEd1PDiW6HMVX3U="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:20Z"},"road_event_id":"dyxiu7xTOs2yjqQAiw7PWBIqljk=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"31OnvZndbwisQ0v1TC0H+D9E12o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[],"description":"Intersection improvements on US-6 both directions between AGNEY AVE (Plymouth) and N MAIN ST (Plymouth) Motorists can expect alternating one-way traffic will occur during off-peak hours on Route 6. Police Officers and traffic control signing patterns will guide motorists through the work zone during construction., Continuous Monday October 13th, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes open","update_date":"2025-10-21T15:38:30Z"},"road_event_id":"31OnvZndbwisQ0v1TC0H+D9E12o=","beginning_cross_street":"AGNEY AVE","ending_cross_street":"N MAIN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.009439,41.678378]]}},{"id":"ORC300517613","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials. Not currently Scheduled","update_date":"2026-02-28T21:00:02Z"},"road_event_id":"ORC300517613","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-02-03T19:17:48Z","end_date":"2026-03-01T04:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694603]]}},{"id":"+MTssK1LHq3NCn5UYuGVKeJyNaA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Rt++Pk77lXiBoVHshXCFy92ABmw="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"+MTssK1LHq3NCn5UYuGVKeJyNaA=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"Rt++Pk77lXiBoVHshXCFy92ABmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+MTssK1LHq3NCn5UYuGVKeJyNaA="},{"type":"next-occurrence","id":"9xpx0A8Cayw0efVL8xro4sZnYHw="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"Rt++Pk77lXiBoVHshXCFy92ABmw=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"9xpx0A8Cayw0efVL8xro4sZnYHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+MTssK1LHq3NCn5UYuGVKeJyNaA="},{"type":"next-occurrence","id":"6kO0d6qfJSWPDuEoBrk5zYPR6dY="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"9xpx0A8Cayw0efVL8xro4sZnYHw=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"6kO0d6qfJSWPDuEoBrk5zYPR6dY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+MTssK1LHq3NCn5UYuGVKeJyNaA="},{"type":"next-occurrence","id":"xTeZz/5sYFhwkm9QWHwcbxNQr5M="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"6kO0d6qfJSWPDuEoBrk5zYPR6dY=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"xTeZz/5sYFhwkm9QWHwcbxNQr5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+MTssK1LHq3NCn5UYuGVKeJyNaA="},{"type":"next-occurrence","id":"UM82DZGQfR/z+sEg63q2b2+llRg="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"xTeZz/5sYFhwkm9QWHwcbxNQr5M=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"UM82DZGQfR/z+sEg63q2b2+llRg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+MTssK1LHq3NCn5UYuGVKeJyNaA="},{"type":"next-occurrence","id":"kGVKXXLN+Z33zl6/nhQPiPuEYac="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"UM82DZGQfR/z+sEg63q2b2+llRg=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"kGVKXXLN+Z33zl6/nhQPiPuEYac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+MTssK1LHq3NCn5UYuGVKeJyNaA="},{"type":"next-occurrence","id":"TZ5KdAJ9DywE1HSYxMnCyk/nbWE="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"kGVKXXLN+Z33zl6/nhQPiPuEYac=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"TZ5KdAJ9DywE1HSYxMnCyk/nbWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+MTssK1LHq3NCn5UYuGVKeJyNaA="},{"type":"next-occurrence","id":"QLX4viepuNyj5Ldc589XXGxhk9E="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"TZ5KdAJ9DywE1HSYxMnCyk/nbWE=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"QLX4viepuNyj5Ldc589XXGxhk9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+MTssK1LHq3NCn5UYuGVKeJyNaA="},{"type":"next-occurrence","id":"zYUkNgKKKrJZxBwZqaoHQaNmPcU="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"QLX4viepuNyj5Ldc589XXGxhk9E=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"zYUkNgKKKrJZxBwZqaoHQaNmPcU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+MTssK1LHq3NCn5UYuGVKeJyNaA="},{"type":"next-occurrence","id":"W9Z0yqMrpqGlSfo4siO9FLJl52A="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"zYUkNgKKKrJZxBwZqaoHQaNmPcU=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T22:00:00Z","end_date":"2026-05-24T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"W9Z0yqMrpqGlSfo4siO9FLJl52A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+MTssK1LHq3NCn5UYuGVKeJyNaA="},{"type":"next-occurrence","id":"JFQBpezakNq9bU4QqoX7swUwXSg="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"W9Z0yqMrpqGlSfo4siO9FLJl52A=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"JFQBpezakNq9bU4QqoX7swUwXSg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+MTssK1LHq3NCn5UYuGVKeJyNaA="},{"type":"next-occurrence","id":"TtQR7ZK7+wKFuRnsGPifKSfgeJ0="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"JFQBpezakNq9bU4QqoX7swUwXSg=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"TtQR7ZK7+wKFuRnsGPifKSfgeJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+MTssK1LHq3NCn5UYuGVKeJyNaA="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"TtQR7ZK7+wKFuRnsGPifKSfgeJ0=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"mIN+z6GahUN44nD5BIeb8LhgZPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"abZQ+l1ualjKpSfhBStnUQZTfTY="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue between Midland Avenue (Yonkers) and Cross County Parkway (Yonkers) D265523/32724109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:25Z"},"road_event_id":"mIN+z6GahUN44nD5BIeb8LhgZPw=","beginning_cross_street":"Midland Avenue","ending_cross_street":"Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87116,40.932775]]}},{"id":"abZQ+l1ualjKpSfhBStnUQZTfTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mIN+z6GahUN44nD5BIeb8LhgZPw="},{"type":"next-occurrence","id":"FJ5BrMVUy4umq88qee4gMHXAxrQ="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue between Midland Avenue (Yonkers) and Cross County Parkway (Yonkers) D265523/32724109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:25Z"},"road_event_id":"abZQ+l1ualjKpSfhBStnUQZTfTY=","beginning_cross_street":"Midland Avenue","ending_cross_street":"Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87116,40.932775]]}},{"id":"FJ5BrMVUy4umq88qee4gMHXAxrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mIN+z6GahUN44nD5BIeb8LhgZPw="},{"type":"next-occurrence","id":"cZ2n+W9bsnhRZp7U3zXgQ4Gg94g="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue between Midland Avenue (Yonkers) and Cross County Parkway (Yonkers) D265523/32724109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:25Z"},"road_event_id":"FJ5BrMVUy4umq88qee4gMHXAxrQ=","beginning_cross_street":"Midland Avenue","ending_cross_street":"Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87116,40.932775]]}},{"id":"cZ2n+W9bsnhRZp7U3zXgQ4Gg94g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mIN+z6GahUN44nD5BIeb8LhgZPw="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue between Midland Avenue (Yonkers) and Cross County Parkway (Yonkers) D265523/32724109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:25Z"},"road_event_id":"cZ2n+W9bsnhRZp7U3zXgQ4Gg94g=","beginning_cross_street":"Midland Avenue","ending_cross_street":"Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87116,40.932775]]}},{"id":"F7b5d0invP+da2znnokutIQX4qM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILER RD"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on WILER RD both directions between CR-203; Brick Schoolhouse Rd (Hamlin) and CR-207; Hamlin Center Rd. (Hamlin) Road closed, follow posted detour., Continuous Thursday April 30th, 2026 09:00 AM thru Sunday November 1st, 2026 05:00 PM All lanes closed and detoured","update_date":"2026-04-13T20:09:51Z"},"road_event_id":"F7b5d0invP+da2znnokutIQX4qM=","beginning_cross_street":" CR-203; Brick Schoolhouse Rd","ending_cross_street":"CR-207; Hamlin Center Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.891045,43.312773]]}},{"id":"9QboV/UlJsxe9KvyQP/TWapJ9us=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["THOMPSON ST"],"direction":"unknown","related_road_events":[],"description":"Construction on THOMPSON ST southbound between GRAND ST (New York) and 6TH AVE (New York), Continuous Wednesday March 11th, 2026 12:00 AM thru Monday June 1st, 2026 11:59 PM All lanes closed","update_date":"2026-03-11T16:23:13Z"},"road_event_id":"9QboV/UlJsxe9KvyQP/TWapJ9us=","beginning_cross_street":"GRAND ST","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004441,40.722705]]}},{"id":"HOov3+yNQG5rCHGdBMpbM/ylYII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QMAC9XBvFoYy/OK0yZrDsZEiyDQ="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from , Thursday April 23rd, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Thursday April 23rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-12T13:21:22Z"},"road_event_id":"HOov3+yNQG5rCHGdBMpbM/ylYII=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"QMAC9XBvFoYy/OK0yZrDsZEiyDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOov3+yNQG5rCHGdBMpbM/ylYII="},{"type":"next-occurrence","id":"QZ+LvhRo9G7OnsB41cx5jtrDUcI="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from , Thursday April 23rd, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Thursday April 23rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-12T13:21:22Z"},"road_event_id":"QMAC9XBvFoYy/OK0yZrDsZEiyDQ=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"QZ+LvhRo9G7OnsB41cx5jtrDUcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOov3+yNQG5rCHGdBMpbM/ylYII="},{"type":"next-occurrence","id":"4ae0ZufmMpfTQSBOaknL2bM3L/8="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from , Thursday April 23rd, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Thursday April 23rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-12T13:21:22Z"},"road_event_id":"QZ+LvhRo9G7OnsB41cx5jtrDUcI=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"4ae0ZufmMpfTQSBOaknL2bM3L/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOov3+yNQG5rCHGdBMpbM/ylYII="},{"type":"next-occurrence","id":"LXvzSXQVkTcW6DyD0udj6/OTz+g="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from , Thursday April 23rd, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Thursday April 23rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-12T13:21:22Z"},"road_event_id":"4ae0ZufmMpfTQSBOaknL2bM3L/8=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"LXvzSXQVkTcW6DyD0udj6/OTz+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOov3+yNQG5rCHGdBMpbM/ylYII="},{"type":"next-occurrence","id":"ADlkDvFK2nmAXdQOH/RUG2pHHbE="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from , Thursday April 23rd, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Thursday April 23rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-12T13:21:22Z"},"road_event_id":"LXvzSXQVkTcW6DyD0udj6/OTz+g=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"ADlkDvFK2nmAXdQOH/RUG2pHHbE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOov3+yNQG5rCHGdBMpbM/ylYII="},{"type":"next-occurrence","id":"HaEB6DCoXy/Qu6DFlPXQz+jznKE="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from , Thursday April 23rd, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Thursday April 23rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-12T13:21:22Z"},"road_event_id":"ADlkDvFK2nmAXdQOH/RUG2pHHbE=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"HaEB6DCoXy/Qu6DFlPXQz+jznKE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOov3+yNQG5rCHGdBMpbM/ylYII="},{"type":"next-occurrence","id":"wNBR9EgPJLOHC5a70/rWj7xZWmo="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from , Thursday April 23rd, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Thursday April 23rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-12T13:21:22Z"},"road_event_id":"HaEB6DCoXy/Qu6DFlPXQz+jznKE=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"wNBR9EgPJLOHC5a70/rWj7xZWmo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOov3+yNQG5rCHGdBMpbM/ylYII="},{"type":"next-occurrence","id":"M4WVkQJNULNtmajPTAx23Z16Kr4="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from , Thursday April 23rd, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Thursday April 23rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-12T13:21:22Z"},"road_event_id":"wNBR9EgPJLOHC5a70/rWj7xZWmo=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"M4WVkQJNULNtmajPTAx23Z16Kr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOov3+yNQG5rCHGdBMpbM/ylYII="},{"type":"next-occurrence","id":"fhIOV5jrV9xL4jJXwvMEGB3Swrw="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from , Thursday April 23rd, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Thursday April 23rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-12T13:21:22Z"},"road_event_id":"M4WVkQJNULNtmajPTAx23Z16Kr4=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"fhIOV5jrV9xL4jJXwvMEGB3Swrw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOov3+yNQG5rCHGdBMpbM/ylYII="},{"type":"next-occurrence","id":"qMD/YDS2BiRQ6W5OHeE8FcwNMyU="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from , Thursday April 23rd, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Thursday April 23rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-12T13:21:22Z"},"road_event_id":"fhIOV5jrV9xL4jJXwvMEGB3Swrw=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"qMD/YDS2BiRQ6W5OHeE8FcwNMyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOov3+yNQG5rCHGdBMpbM/ylYII="},{"type":"next-occurrence","id":"nHnGlNnPXYKhaLQkAW6GA7kkaKg="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from , Thursday April 23rd, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Thursday April 23rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-12T13:21:22Z"},"road_event_id":"qMD/YDS2BiRQ6W5OHeE8FcwNMyU=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"nHnGlNnPXYKhaLQkAW6GA7kkaKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOov3+yNQG5rCHGdBMpbM/ylYII="},{"type":"next-occurrence","id":"qITI8NfwI1+0TYVcBkjRwHwH0Hc="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from , Thursday April 23rd, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Thursday April 23rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-12T13:21:22Z"},"road_event_id":"nHnGlNnPXYKhaLQkAW6GA7kkaKg=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"qITI8NfwI1+0TYVcBkjRwHwH0Hc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOov3+yNQG5rCHGdBMpbM/ylYII="},{"type":"next-occurrence","id":"oxy8m35QTh+xQ5HnvlwDZVC9dh8="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from , Thursday April 23rd, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Thursday April 23rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-12T13:21:22Z"},"road_event_id":"qITI8NfwI1+0TYVcBkjRwHwH0Hc=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"oxy8m35QTh+xQ5HnvlwDZVC9dh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOov3+yNQG5rCHGdBMpbM/ylYII="},{"type":"next-occurrence","id":"Bu79ALRNBudL4FH/XWMJoz8eV4E="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from , Thursday April 23rd, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Thursday April 23rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-12T13:21:22Z"},"road_event_id":"oxy8m35QTh+xQ5HnvlwDZVC9dh8=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"Bu79ALRNBudL4FH/XWMJoz8eV4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOov3+yNQG5rCHGdBMpbM/ylYII="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from , Thursday April 23rd, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Thursday April 23rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-12T13:21:22Z"},"road_event_id":"Bu79ALRNBudL4FH/XWMJoz8eV4E=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"T273uPmYQ5E1zlQrUChezSkXTwA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JhXgCWaB0rxja7hUBsEcxIYA/VY="}],"description":"Roadwork on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 06:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-12T11:45:46Z"},"road_event_id":"T273uPmYQ5E1zlQrUChezSkXTwA=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"JhXgCWaB0rxja7hUBsEcxIYA/VY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T273uPmYQ5E1zlQrUChezSkXTwA="},{"type":"next-occurrence","id":"QzerHvDE+PoMW9O2TeqJXTwqUic="}],"description":"Roadwork on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 06:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-12T11:45:46Z"},"road_event_id":"JhXgCWaB0rxja7hUBsEcxIYA/VY=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"QzerHvDE+PoMW9O2TeqJXTwqUic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T273uPmYQ5E1zlQrUChezSkXTwA="},{"type":"next-occurrence","id":"aJZ4C3+zQhjq96S9zLkRh+RYZtA="}],"description":"Roadwork on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 06:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-12T11:45:46Z"},"road_event_id":"QzerHvDE+PoMW9O2TeqJXTwqUic=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"aJZ4C3+zQhjq96S9zLkRh+RYZtA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T273uPmYQ5E1zlQrUChezSkXTwA="}],"description":"Roadwork on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 06:00 AM thru 02:00 PM, various lane closures","update_date":"2026-05-12T11:45:46Z"},"road_event_id":"aJZ4C3+zQhjq96S9zLkRh+RYZtA=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T16:00:00Z","end_date":"2026-05-17T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"79WXW0yIddEwAv89ooo774/yseQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-171"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MJSWPxPWxpsLPWZUpl8QJfmpG2k="}],"description":"Paving operations and milling on CT-171 both directions between HOLLAND RD (Union) and CT-171 (Union) Motorists can expect lane closures, Thursday May 7th,2026 thru Friday May 15th,2026, Monday thru Friday, 06:30 AM thru 05:30 PM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-04T21:30:00Z"},"road_event_id":"79WXW0yIddEwAv89ooo774/yseQ=","beginning_cross_street":"HOLLAND RD","ending_cross_street":"CT-171","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.141912,42.023865]]}},{"id":"MJSWPxPWxpsLPWZUpl8QJfmpG2k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-171"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"79WXW0yIddEwAv89ooo774/yseQ="},{"type":"next-occurrence","id":"ieAilS9gr4I6SBIKhYfuUVly5ko="}],"description":"Paving operations and milling on CT-171 both directions between HOLLAND RD (Union) and CT-171 (Union) Motorists can expect lane closures, Thursday May 7th,2026 thru Friday May 15th,2026, Monday thru Friday, 06:30 AM thru 05:30 PM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-04T21:30:00Z"},"road_event_id":"MJSWPxPWxpsLPWZUpl8QJfmpG2k=","beginning_cross_street":"HOLLAND RD","ending_cross_street":"CT-171","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.141912,42.023865]]}},{"id":"ieAilS9gr4I6SBIKhYfuUVly5ko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-171"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"79WXW0yIddEwAv89ooo774/yseQ="}],"description":"Paving operations and milling on CT-171 both directions between HOLLAND RD (Union) and CT-171 (Union) Motorists can expect lane closures, Thursday May 7th,2026 thru Friday May 15th,2026, Monday thru Friday, 06:30 AM thru 05:30 PM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-04T21:30:00Z"},"road_event_id":"ieAilS9gr4I6SBIKhYfuUVly5ko=","beginning_cross_street":"HOLLAND RD","ending_cross_street":"CT-171","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.141912,42.023865]]}},{"id":"vbg9xakj8R+wC10eiokauYPqZ0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xeC4F9awRkhZ6bMcRxNtOCDtX+U="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"vbg9xakj8R+wC10eiokauYPqZ0I=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"xeC4F9awRkhZ6bMcRxNtOCDtX+U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vbg9xakj8R+wC10eiokauYPqZ0I="},{"type":"next-occurrence","id":"vwoP74h/q/puGqi6P8znAkJxaS4="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"xeC4F9awRkhZ6bMcRxNtOCDtX+U=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"vwoP74h/q/puGqi6P8znAkJxaS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vbg9xakj8R+wC10eiokauYPqZ0I="},{"type":"next-occurrence","id":"FnWjGqHElrZT30KIPo+O8M1Pcto="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"vwoP74h/q/puGqi6P8znAkJxaS4=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"FnWjGqHElrZT30KIPo+O8M1Pcto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vbg9xakj8R+wC10eiokauYPqZ0I="},{"type":"next-occurrence","id":"V+umbkV8w0MvdIN5OBr4Rd+NImk="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"FnWjGqHElrZT30KIPo+O8M1Pcto=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"V+umbkV8w0MvdIN5OBr4Rd+NImk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vbg9xakj8R+wC10eiokauYPqZ0I="},{"type":"next-occurrence","id":"0nbDtRS1vftmGecWsbnLnGMepgM="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"V+umbkV8w0MvdIN5OBr4Rd+NImk=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"0nbDtRS1vftmGecWsbnLnGMepgM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vbg9xakj8R+wC10eiokauYPqZ0I="},{"type":"next-occurrence","id":"/SxF3SEpMIzkEheQdxdoiTYyKiA="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"0nbDtRS1vftmGecWsbnLnGMepgM=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"/SxF3SEpMIzkEheQdxdoiTYyKiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vbg9xakj8R+wC10eiokauYPqZ0I="},{"type":"next-occurrence","id":"g2tKqki7fqYdK/8a5x+HxilvezM="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"/SxF3SEpMIzkEheQdxdoiTYyKiA=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"g2tKqki7fqYdK/8a5x+HxilvezM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vbg9xakj8R+wC10eiokauYPqZ0I="},{"type":"next-occurrence","id":"L+C3mj5IqVc3JOqAosnsljQ7NDE="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"g2tKqki7fqYdK/8a5x+HxilvezM=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"L+C3mj5IqVc3JOqAosnsljQ7NDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vbg9xakj8R+wC10eiokauYPqZ0I="},{"type":"next-occurrence","id":"R1+uQmVlHvQwjZ44ivddXdKWckk="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"L+C3mj5IqVc3JOqAosnsljQ7NDE=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"R1+uQmVlHvQwjZ44ivddXdKWckk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vbg9xakj8R+wC10eiokauYPqZ0I="},{"type":"next-occurrence","id":"yvHmZnY42wOx2Tu/nIerO7nDdO4="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"R1+uQmVlHvQwjZ44ivddXdKWckk=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"yvHmZnY42wOx2Tu/nIerO7nDdO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vbg9xakj8R+wC10eiokauYPqZ0I="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"yvHmZnY42wOx2Tu/nIerO7nDdO4=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"GtBcq6V7L3swDYRbrmZiZ4y246c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cBJdGHDAeFbY7c1An3N3lmxzEo0="}],"description":"Construction on NY 26 both directions between Houser Road (Ava) and River Road (Ava) Motorists will encounter lane and shoulder closures with flaggers in place, Tuesday February 24th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-08T11:42:43Z"},"road_event_id":"GtBcq6V7L3swDYRbrmZiZ4y246c=","beginning_cross_street":"Houser Road","ending_cross_street":"River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.482335,43.372251]]}},{"id":"cBJdGHDAeFbY7c1An3N3lmxzEo0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GtBcq6V7L3swDYRbrmZiZ4y246c="},{"type":"next-occurrence","id":"f5Jv2HaZiVWPJwwipf7gvMtfatM="}],"description":"Construction on NY 26 both directions between Houser Road (Ava) and River Road (Ava) Motorists will encounter lane and shoulder closures with flaggers in place, Tuesday February 24th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-08T11:42:43Z"},"road_event_id":"cBJdGHDAeFbY7c1An3N3lmxzEo0=","beginning_cross_street":"Houser Road","ending_cross_street":"River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.482335,43.372251]]}},{"id":"f5Jv2HaZiVWPJwwipf7gvMtfatM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GtBcq6V7L3swDYRbrmZiZ4y246c="}],"description":"Construction on NY 26 both directions between Houser Road (Ava) and River Road (Ava) Motorists will encounter lane and shoulder closures with flaggers in place, Tuesday February 24th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-08T11:42:43Z"},"road_event_id":"f5Jv2HaZiVWPJwwipf7gvMtfatM=","beginning_cross_street":"Houser Road","ending_cross_street":"River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.482335,43.372251]]}},{"id":"LeS29dnDpQmuIpSjh8Dz2jjlnkI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"43uAaej1p3mEj6UfG2E+igi/EeY="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"LeS29dnDpQmuIpSjh8Dz2jjlnkI=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"43uAaej1p3mEj6UfG2E+igi/EeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LeS29dnDpQmuIpSjh8Dz2jjlnkI="},{"type":"next-occurrence","id":"EzAszd79+8p6H8Ev4QeGAu9GBAw="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"43uAaej1p3mEj6UfG2E+igi/EeY=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"EzAszd79+8p6H8Ev4QeGAu9GBAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LeS29dnDpQmuIpSjh8Dz2jjlnkI="},{"type":"next-occurrence","id":"/BY/H4dhjUiE1B0S+HZda03kCww="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"EzAszd79+8p6H8Ev4QeGAu9GBAw=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"/BY/H4dhjUiE1B0S+HZda03kCww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LeS29dnDpQmuIpSjh8Dz2jjlnkI="},{"type":"next-occurrence","id":"teCpJHiR8QusBK4NhcvSwlxiPIw="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"/BY/H4dhjUiE1B0S+HZda03kCww=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"teCpJHiR8QusBK4NhcvSwlxiPIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LeS29dnDpQmuIpSjh8Dz2jjlnkI="},{"type":"next-occurrence","id":"wEYrevEp0pV806fT01dY0xcynd8="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"teCpJHiR8QusBK4NhcvSwlxiPIw=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"wEYrevEp0pV806fT01dY0xcynd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LeS29dnDpQmuIpSjh8Dz2jjlnkI="},{"type":"next-occurrence","id":"37Y5rB7WqyRnf4S5ztcznKlEGL8="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"wEYrevEp0pV806fT01dY0xcynd8=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"37Y5rB7WqyRnf4S5ztcznKlEGL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LeS29dnDpQmuIpSjh8Dz2jjlnkI="},{"type":"next-occurrence","id":"NDRNuBmwFNwsjBHohOBf7F7NjIw="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"37Y5rB7WqyRnf4S5ztcznKlEGL8=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"NDRNuBmwFNwsjBHohOBf7F7NjIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LeS29dnDpQmuIpSjh8Dz2jjlnkI="},{"type":"next-occurrence","id":"pudad4vJWUDnL0kSNW07IKFB9ms="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"NDRNuBmwFNwsjBHohOBf7F7NjIw=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"pudad4vJWUDnL0kSNW07IKFB9ms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LeS29dnDpQmuIpSjh8Dz2jjlnkI="},{"type":"next-occurrence","id":"sFUfggwXA79gyszIVNQunn4WJNM="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"pudad4vJWUDnL0kSNW07IKFB9ms=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"sFUfggwXA79gyszIVNQunn4WJNM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LeS29dnDpQmuIpSjh8Dz2jjlnkI="},{"type":"next-occurrence","id":"fuZl2CHdkWvdVZooV306hQO8Mnk="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"sFUfggwXA79gyszIVNQunn4WJNM=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"fuZl2CHdkWvdVZooV306hQO8Mnk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LeS29dnDpQmuIpSjh8Dz2jjlnkI="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"fuZl2CHdkWvdVZooV306hQO8Mnk=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"FNG4rLG2Fm6pKUKOvkR7iyQdwAU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wHe1hylvFtee6W56iZePmzt7PG0="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"FNG4rLG2Fm6pKUKOvkR7iyQdwAU=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"wHe1hylvFtee6W56iZePmzt7PG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FNG4rLG2Fm6pKUKOvkR7iyQdwAU="},{"type":"next-occurrence","id":"CaBaj4drIUEy7lG8YqfdYlT09Gc="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"wHe1hylvFtee6W56iZePmzt7PG0=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"CaBaj4drIUEy7lG8YqfdYlT09Gc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FNG4rLG2Fm6pKUKOvkR7iyQdwAU="},{"type":"next-occurrence","id":"mKYq9uVKAPVQ97PCEADZUgtzGis="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"CaBaj4drIUEy7lG8YqfdYlT09Gc=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"mKYq9uVKAPVQ97PCEADZUgtzGis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FNG4rLG2Fm6pKUKOvkR7iyQdwAU="},{"type":"next-occurrence","id":"8CzqyjzT2/EcepSHKm1xtpKL+5c="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"mKYq9uVKAPVQ97PCEADZUgtzGis=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"8CzqyjzT2/EcepSHKm1xtpKL+5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FNG4rLG2Fm6pKUKOvkR7iyQdwAU="},{"type":"next-occurrence","id":"DNLWpEEKggIQgTWbdmwE1pKtd6k="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"8CzqyjzT2/EcepSHKm1xtpKL+5c=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"DNLWpEEKggIQgTWbdmwE1pKtd6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FNG4rLG2Fm6pKUKOvkR7iyQdwAU="},{"type":"next-occurrence","id":"6Z0MTJNJnGSCvcoqBoG+zwQydwU="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"DNLWpEEKggIQgTWbdmwE1pKtd6k=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"6Z0MTJNJnGSCvcoqBoG+zwQydwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FNG4rLG2Fm6pKUKOvkR7iyQdwAU="},{"type":"next-occurrence","id":"2SzkSy/GeMEBTNqhrBSHsjXkRrc="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"6Z0MTJNJnGSCvcoqBoG+zwQydwU=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"2SzkSy/GeMEBTNqhrBSHsjXkRrc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FNG4rLG2Fm6pKUKOvkR7iyQdwAU="},{"type":"next-occurrence","id":"VEqe6wYBCx/AfP0b9kowdMgdlu4="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"2SzkSy/GeMEBTNqhrBSHsjXkRrc=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"VEqe6wYBCx/AfP0b9kowdMgdlu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FNG4rLG2Fm6pKUKOvkR7iyQdwAU="},{"type":"next-occurrence","id":"U0tqf0tG02iO0YWK/puZzaCYX4E="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"VEqe6wYBCx/AfP0b9kowdMgdlu4=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"U0tqf0tG02iO0YWK/puZzaCYX4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FNG4rLG2Fm6pKUKOvkR7iyQdwAU="},{"type":"next-occurrence","id":"MCcw1fBpcmhDcavf3yF07b9cQ9M="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"U0tqf0tG02iO0YWK/puZzaCYX4E=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"MCcw1fBpcmhDcavf3yF07b9cQ9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FNG4rLG2Fm6pKUKOvkR7iyQdwAU="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"MCcw1fBpcmhDcavf3yF07b9cQ9M=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"xYX1uYeWoT8OedChT+tXVTqG/YE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zPU0qXfAm8r2pzEW2ww82ea5V38="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"xYX1uYeWoT8OedChT+tXVTqG/YE=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"zPU0qXfAm8r2pzEW2ww82ea5V38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xYX1uYeWoT8OedChT+tXVTqG/YE="},{"type":"next-occurrence","id":"BZ6KmqsZs6YRS9Ews0O0iuFR1Zk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"zPU0qXfAm8r2pzEW2ww82ea5V38=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"BZ6KmqsZs6YRS9Ews0O0iuFR1Zk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xYX1uYeWoT8OedChT+tXVTqG/YE="},{"type":"next-occurrence","id":"Q5f1Nnuvw/dpyIbf/xbUNXe3GkU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"BZ6KmqsZs6YRS9Ews0O0iuFR1Zk=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"Q5f1Nnuvw/dpyIbf/xbUNXe3GkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xYX1uYeWoT8OedChT+tXVTqG/YE="},{"type":"next-occurrence","id":"ul26bzmO1dqYIeciDW0VD2ZE844="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"Q5f1Nnuvw/dpyIbf/xbUNXe3GkU=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"ul26bzmO1dqYIeciDW0VD2ZE844=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xYX1uYeWoT8OedChT+tXVTqG/YE="},{"type":"next-occurrence","id":"chN6qP0YqMX3wGdgEWLVpfSacyA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"ul26bzmO1dqYIeciDW0VD2ZE844=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"chN6qP0YqMX3wGdgEWLVpfSacyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xYX1uYeWoT8OedChT+tXVTqG/YE="},{"type":"next-occurrence","id":"/cvgV7TEx/w9BknhKdiNvVHHSsE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"chN6qP0YqMX3wGdgEWLVpfSacyA=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"/cvgV7TEx/w9BknhKdiNvVHHSsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xYX1uYeWoT8OedChT+tXVTqG/YE="},{"type":"next-occurrence","id":"WHQaAU2nn1iZTgBQfN8sHSMPXkk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"/cvgV7TEx/w9BknhKdiNvVHHSsE=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"WHQaAU2nn1iZTgBQfN8sHSMPXkk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xYX1uYeWoT8OedChT+tXVTqG/YE="},{"type":"next-occurrence","id":"GcK8sqcgJpR+XSl0oDQuYg3DJis="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"WHQaAU2nn1iZTgBQfN8sHSMPXkk=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"GcK8sqcgJpR+XSl0oDQuYg3DJis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xYX1uYeWoT8OedChT+tXVTqG/YE="},{"type":"next-occurrence","id":"Pxh1wJEakznRRUJVrJ7XX0k5ksk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"GcK8sqcgJpR+XSl0oDQuYg3DJis=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"Pxh1wJEakznRRUJVrJ7XX0k5ksk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xYX1uYeWoT8OedChT+tXVTqG/YE="},{"type":"next-occurrence","id":"ZsQneZMEdD6+ZTwvv9OOgAl6eTM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"Pxh1wJEakznRRUJVrJ7XX0k5ksk=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"ZsQneZMEdD6+ZTwvv9OOgAl6eTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xYX1uYeWoT8OedChT+tXVTqG/YE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"ZsQneZMEdD6+ZTwvv9OOgAl6eTM=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"WfLmOeAtWBSmnThMtmAZLdA77tI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8xQIJqSTh3Oopu+Er4ISDqu7bjs="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"WfLmOeAtWBSmnThMtmAZLdA77tI=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"8xQIJqSTh3Oopu+Er4ISDqu7bjs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfLmOeAtWBSmnThMtmAZLdA77tI="},{"type":"next-occurrence","id":"M27DbnNlAEZOR+0Q2xWCOhkpu+w="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"8xQIJqSTh3Oopu+Er4ISDqu7bjs=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"M27DbnNlAEZOR+0Q2xWCOhkpu+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfLmOeAtWBSmnThMtmAZLdA77tI="},{"type":"next-occurrence","id":"JaSRaDHTl5seYXQT3WKvUignU8A="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"M27DbnNlAEZOR+0Q2xWCOhkpu+w=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"JaSRaDHTl5seYXQT3WKvUignU8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfLmOeAtWBSmnThMtmAZLdA77tI="},{"type":"next-occurrence","id":"mY15G9tdxMH+dlmba+OotBQjT90="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"JaSRaDHTl5seYXQT3WKvUignU8A=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"mY15G9tdxMH+dlmba+OotBQjT90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfLmOeAtWBSmnThMtmAZLdA77tI="},{"type":"next-occurrence","id":"rdYQyx4zd07NY/q46MFqHbEespQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"mY15G9tdxMH+dlmba+OotBQjT90=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"rdYQyx4zd07NY/q46MFqHbEespQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfLmOeAtWBSmnThMtmAZLdA77tI="},{"type":"next-occurrence","id":"XNeiKSfrqXSpBzG+fre43vo6+b0="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"rdYQyx4zd07NY/q46MFqHbEespQ=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"XNeiKSfrqXSpBzG+fre43vo6+b0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfLmOeAtWBSmnThMtmAZLdA77tI="},{"type":"next-occurrence","id":"rVflqasHaYgueozvxFhwS7lwWBs="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"XNeiKSfrqXSpBzG+fre43vo6+b0=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"rVflqasHaYgueozvxFhwS7lwWBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfLmOeAtWBSmnThMtmAZLdA77tI="},{"type":"next-occurrence","id":"k7AoNAnWuhqzDQZP3LL5lV2k8sQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"rVflqasHaYgueozvxFhwS7lwWBs=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"k7AoNAnWuhqzDQZP3LL5lV2k8sQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfLmOeAtWBSmnThMtmAZLdA77tI="},{"type":"next-occurrence","id":"0+RfTMHMbe1YZsyDB7iXYWybEU0="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"k7AoNAnWuhqzDQZP3LL5lV2k8sQ=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"0+RfTMHMbe1YZsyDB7iXYWybEU0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfLmOeAtWBSmnThMtmAZLdA77tI="},{"type":"next-occurrence","id":"1ydo1jUU5jBuFlWH6bFVjv7tZ6k="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"0+RfTMHMbe1YZsyDB7iXYWybEU0=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"1ydo1jUU5jBuFlWH6bFVjv7tZ6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WfLmOeAtWBSmnThMtmAZLdA77tI="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"1ydo1jUU5jBuFlWH6bFVjv7tZ6k=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"W2V69zDMrKjFIuplUV5GbZ7pbpg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/PeL9bH6DVVj1t/nmBbJ/zhZeQY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"W2V69zDMrKjFIuplUV5GbZ7pbpg=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"/PeL9bH6DVVj1t/nmBbJ/zhZeQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W2V69zDMrKjFIuplUV5GbZ7pbpg="},{"type":"next-occurrence","id":"rFQqZCVZeGTdukbbR4BDdf/vgJg="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"/PeL9bH6DVVj1t/nmBbJ/zhZeQY=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"rFQqZCVZeGTdukbbR4BDdf/vgJg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W2V69zDMrKjFIuplUV5GbZ7pbpg="},{"type":"next-occurrence","id":"XFONGb2t2wmgteFmvIlI5wghrM4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"rFQqZCVZeGTdukbbR4BDdf/vgJg=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"XFONGb2t2wmgteFmvIlI5wghrM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W2V69zDMrKjFIuplUV5GbZ7pbpg="},{"type":"next-occurrence","id":"G5PFaGPAYUyCki2gMRjx6svncVI="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"XFONGb2t2wmgteFmvIlI5wghrM4=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"G5PFaGPAYUyCki2gMRjx6svncVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W2V69zDMrKjFIuplUV5GbZ7pbpg="},{"type":"next-occurrence","id":"CPkkDv1zhvXNvNz28jxWvWpEnic="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"G5PFaGPAYUyCki2gMRjx6svncVI=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"CPkkDv1zhvXNvNz28jxWvWpEnic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W2V69zDMrKjFIuplUV5GbZ7pbpg="},{"type":"next-occurrence","id":"vG6TW+HC8qect9DS3GVkUJJXrqE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"CPkkDv1zhvXNvNz28jxWvWpEnic=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"vG6TW+HC8qect9DS3GVkUJJXrqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W2V69zDMrKjFIuplUV5GbZ7pbpg="},{"type":"next-occurrence","id":"43FXiXp3FlNWIRORqTWUoCvI5BI="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"vG6TW+HC8qect9DS3GVkUJJXrqE=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"43FXiXp3FlNWIRORqTWUoCvI5BI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W2V69zDMrKjFIuplUV5GbZ7pbpg="},{"type":"next-occurrence","id":"hDkLHSNoSGrdp+ESNf0HVDzpbEk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"43FXiXp3FlNWIRORqTWUoCvI5BI=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"hDkLHSNoSGrdp+ESNf0HVDzpbEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W2V69zDMrKjFIuplUV5GbZ7pbpg="},{"type":"next-occurrence","id":"PVsH02k91W+3UjIv5c9EPiwwKv4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"hDkLHSNoSGrdp+ESNf0HVDzpbEk=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"PVsH02k91W+3UjIv5c9EPiwwKv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W2V69zDMrKjFIuplUV5GbZ7pbpg="},{"type":"next-occurrence","id":"mI5C+5Ct4BvZIuftqKaSHYftSes="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"PVsH02k91W+3UjIv5c9EPiwwKv4=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"mI5C+5Ct4BvZIuftqKaSHYftSes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W2V69zDMrKjFIuplUV5GbZ7pbpg="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"mI5C+5Ct4BvZIuftqKaSHYftSes=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"b5OYrNco7aYa0c0zbbhwEu6IU7I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JZOtbLTMIf5dP4LwQ0ZbKTxqOiA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"b5OYrNco7aYa0c0zbbhwEu6IU7I=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"JZOtbLTMIf5dP4LwQ0ZbKTxqOiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"b5OYrNco7aYa0c0zbbhwEu6IU7I="},{"type":"next-occurrence","id":"uSQv0VMsNBUs5Ih+Hkl8kfavMXU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"JZOtbLTMIf5dP4LwQ0ZbKTxqOiA=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"uSQv0VMsNBUs5Ih+Hkl8kfavMXU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"b5OYrNco7aYa0c0zbbhwEu6IU7I="},{"type":"next-occurrence","id":"00fv6U/T8liy/5am3kKHmcMR+uY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"uSQv0VMsNBUs5Ih+Hkl8kfavMXU=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"00fv6U/T8liy/5am3kKHmcMR+uY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"b5OYrNco7aYa0c0zbbhwEu6IU7I="},{"type":"next-occurrence","id":"LL9wnYV95Z6s+B+KEW+Fbdkei1Q="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"00fv6U/T8liy/5am3kKHmcMR+uY=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"LL9wnYV95Z6s+B+KEW+Fbdkei1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"b5OYrNco7aYa0c0zbbhwEu6IU7I="},{"type":"next-occurrence","id":"x1gQ+ynvcmNIzQynOdVJRDZEh6M="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"LL9wnYV95Z6s+B+KEW+Fbdkei1Q=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"x1gQ+ynvcmNIzQynOdVJRDZEh6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"b5OYrNco7aYa0c0zbbhwEu6IU7I="},{"type":"next-occurrence","id":"yuD32xYi/jyH2B0rj8YBhO5MIPw="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"x1gQ+ynvcmNIzQynOdVJRDZEh6M=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"yuD32xYi/jyH2B0rj8YBhO5MIPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"b5OYrNco7aYa0c0zbbhwEu6IU7I="},{"type":"next-occurrence","id":"MVKpxLBXEp3XWoVbVsUIiquy188="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"yuD32xYi/jyH2B0rj8YBhO5MIPw=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"MVKpxLBXEp3XWoVbVsUIiquy188=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"b5OYrNco7aYa0c0zbbhwEu6IU7I="},{"type":"next-occurrence","id":"NzU9T2JWBMqweydcaUA+VscUdxo="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"MVKpxLBXEp3XWoVbVsUIiquy188=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"NzU9T2JWBMqweydcaUA+VscUdxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"b5OYrNco7aYa0c0zbbhwEu6IU7I="},{"type":"next-occurrence","id":"uESpY6V5RW4MTA0SF9qrlSNaDek="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"NzU9T2JWBMqweydcaUA+VscUdxo=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"uESpY6V5RW4MTA0SF9qrlSNaDek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"b5OYrNco7aYa0c0zbbhwEu6IU7I="},{"type":"next-occurrence","id":"YGZJKdhrRhGIPXpKNJuAY4mPuSQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"uESpY6V5RW4MTA0SF9qrlSNaDek=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"YGZJKdhrRhGIPXpKNJuAY4mPuSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"b5OYrNco7aYa0c0zbbhwEu6IU7I="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"YGZJKdhrRhGIPXpKNJuAY4mPuSQ=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"w1/wD7PA4zuBZ0CVaK6POvp6tlY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ObYNoKHdAc2tffKDampCMDrbVwM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"w1/wD7PA4zuBZ0CVaK6POvp6tlY=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"ObYNoKHdAc2tffKDampCMDrbVwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w1/wD7PA4zuBZ0CVaK6POvp6tlY="},{"type":"next-occurrence","id":"R2WpGSnTguq6ijuSs0063S7i+nk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"ObYNoKHdAc2tffKDampCMDrbVwM=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"R2WpGSnTguq6ijuSs0063S7i+nk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w1/wD7PA4zuBZ0CVaK6POvp6tlY="},{"type":"next-occurrence","id":"HNCz3i3Z/ffOvJXQ+gLftOeEH7Y="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"R2WpGSnTguq6ijuSs0063S7i+nk=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"HNCz3i3Z/ffOvJXQ+gLftOeEH7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w1/wD7PA4zuBZ0CVaK6POvp6tlY="},{"type":"next-occurrence","id":"crsvUTwjyezfPivbitAHgFzf8PA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"HNCz3i3Z/ffOvJXQ+gLftOeEH7Y=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"crsvUTwjyezfPivbitAHgFzf8PA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w1/wD7PA4zuBZ0CVaK6POvp6tlY="},{"type":"next-occurrence","id":"fHq2iDf4kgNMmySgozu8WUy1zU0="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"crsvUTwjyezfPivbitAHgFzf8PA=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"fHq2iDf4kgNMmySgozu8WUy1zU0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w1/wD7PA4zuBZ0CVaK6POvp6tlY="},{"type":"next-occurrence","id":"gR8kde9/dKSXZzIovpvJibeDRWU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"fHq2iDf4kgNMmySgozu8WUy1zU0=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"gR8kde9/dKSXZzIovpvJibeDRWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w1/wD7PA4zuBZ0CVaK6POvp6tlY="},{"type":"next-occurrence","id":"Oxa4FHD1g4sPLlUESyBudx7ndBU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"gR8kde9/dKSXZzIovpvJibeDRWU=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"Oxa4FHD1g4sPLlUESyBudx7ndBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w1/wD7PA4zuBZ0CVaK6POvp6tlY="},{"type":"next-occurrence","id":"y4Kd2e1mM4lcXllZKZO9OhKe6dk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"Oxa4FHD1g4sPLlUESyBudx7ndBU=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"y4Kd2e1mM4lcXllZKZO9OhKe6dk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w1/wD7PA4zuBZ0CVaK6POvp6tlY="},{"type":"next-occurrence","id":"RUpnHxW1PUBCjAbriqou8eXS6U4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"y4Kd2e1mM4lcXllZKZO9OhKe6dk=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"RUpnHxW1PUBCjAbriqou8eXS6U4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w1/wD7PA4zuBZ0CVaK6POvp6tlY="},{"type":"next-occurrence","id":"pQKZJhGxjiPXy+gC2ICuQZAHGi0="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"RUpnHxW1PUBCjAbriqou8eXS6U4=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"pQKZJhGxjiPXy+gC2ICuQZAHGi0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w1/wD7PA4zuBZ0CVaK6POvp6tlY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"pQKZJhGxjiPXy+gC2ICuQZAHGi0=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"qTAmZ9Q2UiPopJtXOOuJmpM+550=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bx39 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction southbound, Bx39 Bus on White Plains Rd/E 215 St (New York) is closed; please use the new stop on White Plains Rd at E 216th St instead., Continuous Friday January 17th, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM","update_date":"2026-03-09T12:28:03Z"},"road_event_id":"qTAmZ9Q2UiPopJtXOOuJmpM+550=","beginning_cross_street":"White Plains Rd/E 215 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.864544,40.880382]]}},{"id":"QHxhFRI/vJenZzL/yIqM2XeHGw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nf/Cp/UP5yYN7jafv7sba3oSqFA="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"QHxhFRI/vJenZzL/yIqM2XeHGw0=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"nf/Cp/UP5yYN7jafv7sba3oSqFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QHxhFRI/vJenZzL/yIqM2XeHGw0="},{"type":"next-occurrence","id":"vsJ/D3QV6pNTxNMQKOpb7QNZJOg="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"nf/Cp/UP5yYN7jafv7sba3oSqFA=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"vsJ/D3QV6pNTxNMQKOpb7QNZJOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QHxhFRI/vJenZzL/yIqM2XeHGw0="},{"type":"next-occurrence","id":"zly/oU+brxDeBturbqHdjK/jXe8="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"vsJ/D3QV6pNTxNMQKOpb7QNZJOg=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"zly/oU+brxDeBturbqHdjK/jXe8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QHxhFRI/vJenZzL/yIqM2XeHGw0="},{"type":"next-occurrence","id":"1YVpVmEnGJgTizOhSYmb/OgKQBA="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"zly/oU+brxDeBturbqHdjK/jXe8=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T23:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"1YVpVmEnGJgTizOhSYmb/OgKQBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QHxhFRI/vJenZzL/yIqM2XeHGw0="},{"type":"next-occurrence","id":"XjJbJd/50nWU8L0zwp0LIn0F4tQ="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"1YVpVmEnGJgTizOhSYmb/OgKQBA=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"XjJbJd/50nWU8L0zwp0LIn0F4tQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QHxhFRI/vJenZzL/yIqM2XeHGw0="},{"type":"next-occurrence","id":"sfRtJEFP2xfH3xk9YLwli3RSaCA="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"XjJbJd/50nWU8L0zwp0LIn0F4tQ=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"sfRtJEFP2xfH3xk9YLwli3RSaCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QHxhFRI/vJenZzL/yIqM2XeHGw0="},{"type":"next-occurrence","id":"X3rRYh6nE6tqQkyuDMMzWXfeNJM="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"sfRtJEFP2xfH3xk9YLwli3RSaCA=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"X3rRYh6nE6tqQkyuDMMzWXfeNJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QHxhFRI/vJenZzL/yIqM2XeHGw0="},{"type":"next-occurrence","id":"N0R1HPKegXcwUwc9DtBmmxJKxG8="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"X3rRYh6nE6tqQkyuDMMzWXfeNJM=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"N0R1HPKegXcwUwc9DtBmmxJKxG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QHxhFRI/vJenZzL/yIqM2XeHGw0="},{"type":"next-occurrence","id":"AMbcUVU9ZwLxgltlDkgMHPGtma4="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"N0R1HPKegXcwUwc9DtBmmxJKxG8=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"AMbcUVU9ZwLxgltlDkgMHPGtma4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QHxhFRI/vJenZzL/yIqM2XeHGw0="},{"type":"next-occurrence","id":"fBZmq+mJmTk0upTsyrVV0hla6FQ="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"AMbcUVU9ZwLxgltlDkgMHPGtma4=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T23:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"fBZmq+mJmTk0upTsyrVV0hla6FQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QHxhFRI/vJenZzL/yIqM2XeHGw0="},{"type":"next-occurrence","id":"i2kXVghBRpv5YrLRs8InLxAbWDM="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"fBZmq+mJmTk0upTsyrVV0hla6FQ=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T23:00:00Z","end_date":"2026-05-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"i2kXVghBRpv5YrLRs8InLxAbWDM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QHxhFRI/vJenZzL/yIqM2XeHGw0="},{"type":"next-occurrence","id":"avooH5AQ9EP2LCmqiRnvGb6bHZE="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"i2kXVghBRpv5YrLRs8InLxAbWDM=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T23:00:00Z","end_date":"2026-05-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"avooH5AQ9EP2LCmqiRnvGb6bHZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QHxhFRI/vJenZzL/yIqM2XeHGw0="},{"type":"next-occurrence","id":"r3DXzy6kReh2rjFKriZzPfhhGa4="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"avooH5AQ9EP2LCmqiRnvGb6bHZE=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T23:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"r3DXzy6kReh2rjFKriZzPfhhGa4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QHxhFRI/vJenZzL/yIqM2XeHGw0="},{"type":"next-occurrence","id":"YFKS7gY/fLOATSrFrgL+KReh3Vg="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"r3DXzy6kReh2rjFKriZzPfhhGa4=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T23:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"YFKS7gY/fLOATSrFrgL+KReh3Vg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QHxhFRI/vJenZzL/yIqM2XeHGw0="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"YFKS7gY/fLOATSrFrgL+KReh3Vg=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"3iF6dnzlsk1rmlALiS4xyyzcKC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9CuKpu7SkNdbPwaqPyzQqotFD0k="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"3iF6dnzlsk1rmlALiS4xyyzcKC8=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"9CuKpu7SkNdbPwaqPyzQqotFD0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3iF6dnzlsk1rmlALiS4xyyzcKC8="},{"type":"next-occurrence","id":"PkwIETXYkMxF2ao9zJNBix+K4LE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"9CuKpu7SkNdbPwaqPyzQqotFD0k=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"PkwIETXYkMxF2ao9zJNBix+K4LE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3iF6dnzlsk1rmlALiS4xyyzcKC8="},{"type":"next-occurrence","id":"oHT+CwlH3rjV5hjbLCqeGu988Qo="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"PkwIETXYkMxF2ao9zJNBix+K4LE=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"oHT+CwlH3rjV5hjbLCqeGu988Qo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3iF6dnzlsk1rmlALiS4xyyzcKC8="},{"type":"next-occurrence","id":"UcBMZoFl+jdth7pnYwd/RLFNAsE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"oHT+CwlH3rjV5hjbLCqeGu988Qo=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"UcBMZoFl+jdth7pnYwd/RLFNAsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3iF6dnzlsk1rmlALiS4xyyzcKC8="},{"type":"next-occurrence","id":"p94SbjwNnbTYRNTA1Kba5WH3YAI="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"UcBMZoFl+jdth7pnYwd/RLFNAsE=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"p94SbjwNnbTYRNTA1Kba5WH3YAI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3iF6dnzlsk1rmlALiS4xyyzcKC8="},{"type":"next-occurrence","id":"XPP6FufL8R9WIV/l3Aw38CzgJvM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"p94SbjwNnbTYRNTA1Kba5WH3YAI=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"XPP6FufL8R9WIV/l3Aw38CzgJvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3iF6dnzlsk1rmlALiS4xyyzcKC8="},{"type":"next-occurrence","id":"WhL0LFCva7EDmfmw7sF8quIG8GE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"XPP6FufL8R9WIV/l3Aw38CzgJvM=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"WhL0LFCva7EDmfmw7sF8quIG8GE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3iF6dnzlsk1rmlALiS4xyyzcKC8="},{"type":"next-occurrence","id":"9GMqXPt1NeNLxUF0pfvjeuBDa44="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"WhL0LFCva7EDmfmw7sF8quIG8GE=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"9GMqXPt1NeNLxUF0pfvjeuBDa44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3iF6dnzlsk1rmlALiS4xyyzcKC8="},{"type":"next-occurrence","id":"RYRMDlzlqWlSe+L/JD2aB3LpJEk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"9GMqXPt1NeNLxUF0pfvjeuBDa44=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"RYRMDlzlqWlSe+L/JD2aB3LpJEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3iF6dnzlsk1rmlALiS4xyyzcKC8="},{"type":"next-occurrence","id":"oBjzbzHwKsblogaCTYIIrs5MmJQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"RYRMDlzlqWlSe+L/JD2aB3LpJEk=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"oBjzbzHwKsblogaCTYIIrs5MmJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3iF6dnzlsk1rmlALiS4xyyzcKC8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"oBjzbzHwKsblogaCTYIIrs5MmJQ=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"3/HYQVaPl96fClxOQKK40lYLlNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Reconstruction on I-87 Northway northbound END ROUTE I-87; US-Canadian Line (Champlain) 8 car lanes NB reduced to 3 (max) lanes , Continuous Thursday September 25th, 2025 12:00 AM thru Sunday February 28th, 2027 11:59 PM 5 lanes of 8 lanes closed","update_date":"2025-10-20T15:28:45Z"},"road_event_id":"3/HYQVaPl96fClxOQKK40lYLlNg=","beginning_cross_street":"END ROUTE I-87; US-Canadian Line","ending_cross_street":"END ROUTE I-87; US-Canadian Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.452063,45.008751]]}},{"id":"aesb8KxrupQiXqvlonzS1ELcUeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"M6CpcRlC1qTk+JK21INCchVokcU="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"aesb8KxrupQiXqvlonzS1ELcUeo=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"M6CpcRlC1qTk+JK21INCchVokcU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aesb8KxrupQiXqvlonzS1ELcUeo="},{"type":"next-occurrence","id":"aEirxzqsyt0VyF7iNsU+S6nzj88="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"M6CpcRlC1qTk+JK21INCchVokcU=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"aEirxzqsyt0VyF7iNsU+S6nzj88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aesb8KxrupQiXqvlonzS1ELcUeo="},{"type":"next-occurrence","id":"t6t5M+8dFkmIQwz4XWml43L/+30="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"aEirxzqsyt0VyF7iNsU+S6nzj88=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"t6t5M+8dFkmIQwz4XWml43L/+30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aesb8KxrupQiXqvlonzS1ELcUeo="},{"type":"next-occurrence","id":"aqjLQO8U0wmy34KYIVtskek1AEQ="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"t6t5M+8dFkmIQwz4XWml43L/+30=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"aqjLQO8U0wmy34KYIVtskek1AEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aesb8KxrupQiXqvlonzS1ELcUeo="},{"type":"next-occurrence","id":"h47+5Fq86fKHzqtxgZiAnMXgGQM="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"aqjLQO8U0wmy34KYIVtskek1AEQ=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"h47+5Fq86fKHzqtxgZiAnMXgGQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aesb8KxrupQiXqvlonzS1ELcUeo="},{"type":"next-occurrence","id":"rpoU1PiNyOWBr6FQ4lXFkS1VeDo="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"h47+5Fq86fKHzqtxgZiAnMXgGQM=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"rpoU1PiNyOWBr6FQ4lXFkS1VeDo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aesb8KxrupQiXqvlonzS1ELcUeo="},{"type":"next-occurrence","id":"ZqpOB4CaClI5tUAINggKSS49PsI="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"rpoU1PiNyOWBr6FQ4lXFkS1VeDo=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"ZqpOB4CaClI5tUAINggKSS49PsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aesb8KxrupQiXqvlonzS1ELcUeo="},{"type":"next-occurrence","id":"88En9uoswMGLih+Z5DNOJmcVUnA="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"ZqpOB4CaClI5tUAINggKSS49PsI=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"88En9uoswMGLih+Z5DNOJmcVUnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aesb8KxrupQiXqvlonzS1ELcUeo="},{"type":"next-occurrence","id":"Vk5UxSTFJcdlqNb05MF0MP2XtAU="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"88En9uoswMGLih+Z5DNOJmcVUnA=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"Vk5UxSTFJcdlqNb05MF0MP2XtAU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aesb8KxrupQiXqvlonzS1ELcUeo="},{"type":"next-occurrence","id":"GnP3S0bIKN6q4avqeEpWm3XeQvI="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"Vk5UxSTFJcdlqNb05MF0MP2XtAU=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"GnP3S0bIKN6q4avqeEpWm3XeQvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aesb8KxrupQiXqvlonzS1ELcUeo="},{"type":"next-occurrence","id":"v985lbiXUNP4//J3E/IYxsFyz8o="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"GnP3S0bIKN6q4avqeEpWm3XeQvI=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"v985lbiXUNP4//J3E/IYxsFyz8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aesb8KxrupQiXqvlonzS1ELcUeo="},{"type":"next-occurrence","id":"FhdRPUvuBhqdUWFa8iZd34EdrPs="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"v985lbiXUNP4//J3E/IYxsFyz8o=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T11:00:00Z","end_date":"2026-05-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"FhdRPUvuBhqdUWFa8iZd34EdrPs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aesb8KxrupQiXqvlonzS1ELcUeo="},{"type":"next-occurrence","id":"+xwZw8G4hdAOaR9j0rYhb6FwX+o="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"FhdRPUvuBhqdUWFa8iZd34EdrPs=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"+xwZw8G4hdAOaR9j0rYhb6FwX+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aesb8KxrupQiXqvlonzS1ELcUeo="},{"type":"next-occurrence","id":"RYKAim5WronCivoSH1NP5E7uNY0="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"+xwZw8G4hdAOaR9j0rYhb6FwX+o=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"RYKAim5WronCivoSH1NP5E7uNY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aesb8KxrupQiXqvlonzS1ELcUeo="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"RYKAim5WronCivoSH1NP5E7uNY0=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"0GT4GYfa+FrlDwij/B7a/xw7H18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lAa9CbsGE25Yzu9ODpHOI7P9Z18="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"0GT4GYfa+FrlDwij/B7a/xw7H18=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"lAa9CbsGE25Yzu9ODpHOI7P9Z18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GT4GYfa+FrlDwij/B7a/xw7H18="},{"type":"next-occurrence","id":"5+ghBvZpsrhHguBVzs/lt2oxafs="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"lAa9CbsGE25Yzu9ODpHOI7P9Z18=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"5+ghBvZpsrhHguBVzs/lt2oxafs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GT4GYfa+FrlDwij/B7a/xw7H18="},{"type":"next-occurrence","id":"5QgzOIsOmP+gYgiwsix9YYEKSdY="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"5+ghBvZpsrhHguBVzs/lt2oxafs=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"5QgzOIsOmP+gYgiwsix9YYEKSdY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GT4GYfa+FrlDwij/B7a/xw7H18="},{"type":"next-occurrence","id":"ZDjltbLOokVZttYFYabfMYWcPNQ="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"5QgzOIsOmP+gYgiwsix9YYEKSdY=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"ZDjltbLOokVZttYFYabfMYWcPNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GT4GYfa+FrlDwij/B7a/xw7H18="},{"type":"next-occurrence","id":"XhCYTXyJIqUJ5IWtoU6pLgxOGVI="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"ZDjltbLOokVZttYFYabfMYWcPNQ=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"XhCYTXyJIqUJ5IWtoU6pLgxOGVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GT4GYfa+FrlDwij/B7a/xw7H18="},{"type":"next-occurrence","id":"SrFQXvI4K8GGORcjWoTbdMautyE="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"XhCYTXyJIqUJ5IWtoU6pLgxOGVI=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"SrFQXvI4K8GGORcjWoTbdMautyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GT4GYfa+FrlDwij/B7a/xw7H18="},{"type":"next-occurrence","id":"CX7JICrsL991NSKou9McpAggAYo="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"SrFQXvI4K8GGORcjWoTbdMautyE=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"CX7JICrsL991NSKou9McpAggAYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GT4GYfa+FrlDwij/B7a/xw7H18="},{"type":"next-occurrence","id":"AyfK0WvzWZ7mdR+Zj3uZTWpfEqg="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"CX7JICrsL991NSKou9McpAggAYo=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"AyfK0WvzWZ7mdR+Zj3uZTWpfEqg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GT4GYfa+FrlDwij/B7a/xw7H18="},{"type":"next-occurrence","id":"HRTUe1UWCBiipq1Rpt882WntdF4="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"AyfK0WvzWZ7mdR+Zj3uZTWpfEqg=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"HRTUe1UWCBiipq1Rpt882WntdF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GT4GYfa+FrlDwij/B7a/xw7H18="},{"type":"next-occurrence","id":"u+u5dV0rd1FzQ3TxZ4j3jY2NA1U="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"HRTUe1UWCBiipq1Rpt882WntdF4=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"u+u5dV0rd1FzQ3TxZ4j3jY2NA1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GT4GYfa+FrlDwij/B7a/xw7H18="},{"type":"next-occurrence","id":"r2UANCXR/DJMX2veLDj+U8ON4gk="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"u+u5dV0rd1FzQ3TxZ4j3jY2NA1U=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"r2UANCXR/DJMX2veLDj+U8ON4gk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GT4GYfa+FrlDwij/B7a/xw7H18="},{"type":"next-occurrence","id":"CRPI/Cj8xmDjA56KcZcUhoNN9YM="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"r2UANCXR/DJMX2veLDj+U8ON4gk=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T11:00:00Z","end_date":"2026-05-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"CRPI/Cj8xmDjA56KcZcUhoNN9YM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GT4GYfa+FrlDwij/B7a/xw7H18="},{"type":"next-occurrence","id":"4nM6wph4S5lUt1EmBm1QS7SReLQ="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"CRPI/Cj8xmDjA56KcZcUhoNN9YM=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"4nM6wph4S5lUt1EmBm1QS7SReLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GT4GYfa+FrlDwij/B7a/xw7H18="},{"type":"next-occurrence","id":"DcibqWug49MvuTp6GaHkdA6DDp4="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"4nM6wph4S5lUt1EmBm1QS7SReLQ=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"DcibqWug49MvuTp6GaHkdA6DDp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GT4GYfa+FrlDwij/B7a/xw7H18="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"DcibqWug49MvuTp6GaHkdA6DDp4=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"pwjmisCGP6oKq4W4lnfNuTRPiCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Cm76QfaACxLneAwSLSLuP4OS0+A="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:51:16Z"},"road_event_id":"pwjmisCGP6oKq4W4lnfNuTRPiCs=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588322,41.986656]]}},{"id":"Cm76QfaACxLneAwSLSLuP4OS0+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pwjmisCGP6oKq4W4lnfNuTRPiCs="},{"type":"next-occurrence","id":"LhOcsefMqtOas+cVNajiA7DNAbA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:51:16Z"},"road_event_id":"Cm76QfaACxLneAwSLSLuP4OS0+A=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588322,41.986656]]}},{"id":"LhOcsefMqtOas+cVNajiA7DNAbA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pwjmisCGP6oKq4W4lnfNuTRPiCs="},{"type":"next-occurrence","id":"Qu9hgQB0UvDiszh32CQKBgA2sbk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:51:16Z"},"road_event_id":"LhOcsefMqtOas+cVNajiA7DNAbA=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588322,41.986656]]}},{"id":"Qu9hgQB0UvDiszh32CQKBgA2sbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pwjmisCGP6oKq4W4lnfNuTRPiCs="},{"type":"next-occurrence","id":"/9Ge2Q9ZaZdo3o2A3ZxaKM6jx9c="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:51:16Z"},"road_event_id":"Qu9hgQB0UvDiszh32CQKBgA2sbk=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588322,41.986656]]}},{"id":"/9Ge2Q9ZaZdo3o2A3ZxaKM6jx9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pwjmisCGP6oKq4W4lnfNuTRPiCs="},{"type":"next-occurrence","id":"mrXRnpZzYHi8cXu7sE60KrGM3NU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:51:16Z"},"road_event_id":"/9Ge2Q9ZaZdo3o2A3ZxaKM6jx9c=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588322,41.986656]]}},{"id":"mrXRnpZzYHi8cXu7sE60KrGM3NU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pwjmisCGP6oKq4W4lnfNuTRPiCs="},{"type":"next-occurrence","id":"kMg08IBqwRCTjTlu0RQVq9wxhRI="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:51:16Z"},"road_event_id":"mrXRnpZzYHi8cXu7sE60KrGM3NU=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588322,41.986656]]}},{"id":"kMg08IBqwRCTjTlu0RQVq9wxhRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pwjmisCGP6oKq4W4lnfNuTRPiCs="},{"type":"next-occurrence","id":"kZbxTGFZXm+sYlv/Z75VDoT/Oio="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:51:16Z"},"road_event_id":"kMg08IBqwRCTjTlu0RQVq9wxhRI=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588322,41.986656]]}},{"id":"kZbxTGFZXm+sYlv/Z75VDoT/Oio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pwjmisCGP6oKq4W4lnfNuTRPiCs="},{"type":"next-occurrence","id":"V/wTYgKoZNx8PcB/KdoCF4Yddns="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:51:16Z"},"road_event_id":"kZbxTGFZXm+sYlv/Z75VDoT/Oio=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588322,41.986656]]}},{"id":"V/wTYgKoZNx8PcB/KdoCF4Yddns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pwjmisCGP6oKq4W4lnfNuTRPiCs="},{"type":"next-occurrence","id":"7qiaZF7YxqCs2FGafEZ/7jOe0uw="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:51:16Z"},"road_event_id":"V/wTYgKoZNx8PcB/KdoCF4Yddns=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588322,41.986656]]}},{"id":"7qiaZF7YxqCs2FGafEZ/7jOe0uw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pwjmisCGP6oKq4W4lnfNuTRPiCs="},{"type":"next-occurrence","id":"8QqCvOH6cukRPhFoSawxhJb8QMs="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:51:16Z"},"road_event_id":"7qiaZF7YxqCs2FGafEZ/7jOe0uw=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588322,41.986656]]}},{"id":"8QqCvOH6cukRPhFoSawxhJb8QMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pwjmisCGP6oKq4W4lnfNuTRPiCs="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:51:16Z"},"road_event_id":"8QqCvOH6cukRPhFoSawxhJb8QMs=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588322,41.986656]]}},{"id":"uZyU+IQR95ygxviAR0pBOwdaqZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rFAyyqGskwdIoH7fili8t6FghCk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:53:12Z"},"road_event_id":"uZyU+IQR95ygxviAR0pBOwdaqZ0=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586839,41.990166]]}},{"id":"rFAyyqGskwdIoH7fili8t6FghCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZyU+IQR95ygxviAR0pBOwdaqZ0="},{"type":"next-occurrence","id":"Hj6YopFQXKKT2qnOLLDkeBRQvY4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:53:12Z"},"road_event_id":"rFAyyqGskwdIoH7fili8t6FghCk=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586839,41.990166]]}},{"id":"Hj6YopFQXKKT2qnOLLDkeBRQvY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZyU+IQR95ygxviAR0pBOwdaqZ0="},{"type":"next-occurrence","id":"wNNxe/0uhFvKNgv8ImJWqYGGzqc="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:53:12Z"},"road_event_id":"Hj6YopFQXKKT2qnOLLDkeBRQvY4=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586839,41.990166]]}},{"id":"wNNxe/0uhFvKNgv8ImJWqYGGzqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZyU+IQR95ygxviAR0pBOwdaqZ0="},{"type":"next-occurrence","id":"A/prgXeK+N3jvw+n0CYRmyVLLwo="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:53:12Z"},"road_event_id":"wNNxe/0uhFvKNgv8ImJWqYGGzqc=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586839,41.990166]]}},{"id":"A/prgXeK+N3jvw+n0CYRmyVLLwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZyU+IQR95ygxviAR0pBOwdaqZ0="},{"type":"next-occurrence","id":"xZ7UWScpYrbysyhvTYlSG9CLSqE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:53:12Z"},"road_event_id":"A/prgXeK+N3jvw+n0CYRmyVLLwo=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586839,41.990166]]}},{"id":"xZ7UWScpYrbysyhvTYlSG9CLSqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZyU+IQR95ygxviAR0pBOwdaqZ0="},{"type":"next-occurrence","id":"mrNHlJDKr3tZgHyUzQ1Xl1hm7p8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:53:12Z"},"road_event_id":"xZ7UWScpYrbysyhvTYlSG9CLSqE=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586839,41.990166]]}},{"id":"mrNHlJDKr3tZgHyUzQ1Xl1hm7p8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZyU+IQR95ygxviAR0pBOwdaqZ0="},{"type":"next-occurrence","id":"PTajqHz1zzGoA/qoG+L0BAzCC6s="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:53:12Z"},"road_event_id":"mrNHlJDKr3tZgHyUzQ1Xl1hm7p8=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586839,41.990166]]}},{"id":"PTajqHz1zzGoA/qoG+L0BAzCC6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZyU+IQR95ygxviAR0pBOwdaqZ0="},{"type":"next-occurrence","id":"FXsEcegW/KnuuKtIfI2lVyWBSUo="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:53:12Z"},"road_event_id":"PTajqHz1zzGoA/qoG+L0BAzCC6s=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586839,41.990166]]}},{"id":"FXsEcegW/KnuuKtIfI2lVyWBSUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZyU+IQR95ygxviAR0pBOwdaqZ0="},{"type":"next-occurrence","id":"ufyPhTGrgzOGCg2CvHdoNXtjEJs="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:53:12Z"},"road_event_id":"FXsEcegW/KnuuKtIfI2lVyWBSUo=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586839,41.990166]]}},{"id":"ufyPhTGrgzOGCg2CvHdoNXtjEJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZyU+IQR95ygxviAR0pBOwdaqZ0="},{"type":"next-occurrence","id":"DIvsWd7XyNuMTMhf1pG3doYnghc="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:53:12Z"},"road_event_id":"ufyPhTGrgzOGCg2CvHdoNXtjEJs=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586839,41.990166]]}},{"id":"DIvsWd7XyNuMTMhf1pG3doYnghc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZyU+IQR95ygxviAR0pBOwdaqZ0="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:53:12Z"},"road_event_id":"DIvsWd7XyNuMTMhf1pG3doYnghc=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586839,41.990166]]}},{"id":"iGirTo28IAfCcJZRoKto/z/r1ag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Cj2nQUmPdQG/WzSnp+Ql1CvdKUI="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:55:15Z"},"road_event_id":"iGirTo28IAfCcJZRoKto/z/r1ag=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588095,41.989372]]}},{"id":"Cj2nQUmPdQG/WzSnp+Ql1CvdKUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGirTo28IAfCcJZRoKto/z/r1ag="},{"type":"next-occurrence","id":"v6CDQ7H//7ne8UyNYMNkjsf3hiM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:55:15Z"},"road_event_id":"Cj2nQUmPdQG/WzSnp+Ql1CvdKUI=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588095,41.989372]]}},{"id":"v6CDQ7H//7ne8UyNYMNkjsf3hiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGirTo28IAfCcJZRoKto/z/r1ag="},{"type":"next-occurrence","id":"a9StRB8qrfDcsPzKBU7tti7xBYY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:55:15Z"},"road_event_id":"v6CDQ7H//7ne8UyNYMNkjsf3hiM=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588095,41.989372]]}},{"id":"a9StRB8qrfDcsPzKBU7tti7xBYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGirTo28IAfCcJZRoKto/z/r1ag="},{"type":"next-occurrence","id":"5U0R+Mw4ZhXtUKVXwG9i0+G48MA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:55:15Z"},"road_event_id":"a9StRB8qrfDcsPzKBU7tti7xBYY=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588095,41.989372]]}},{"id":"5U0R+Mw4ZhXtUKVXwG9i0+G48MA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGirTo28IAfCcJZRoKto/z/r1ag="},{"type":"next-occurrence","id":"SBUWGpKLpTxZDSvm7EDFa10bXk4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:55:15Z"},"road_event_id":"5U0R+Mw4ZhXtUKVXwG9i0+G48MA=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588095,41.989372]]}},{"id":"SBUWGpKLpTxZDSvm7EDFa10bXk4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGirTo28IAfCcJZRoKto/z/r1ag="},{"type":"next-occurrence","id":"vV+iwRsfGJHCcZVMuupO/pRrKTs="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:55:15Z"},"road_event_id":"SBUWGpKLpTxZDSvm7EDFa10bXk4=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588095,41.989372]]}},{"id":"vV+iwRsfGJHCcZVMuupO/pRrKTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGirTo28IAfCcJZRoKto/z/r1ag="},{"type":"next-occurrence","id":"iOuh1SwSai7QUSxuwMRrxj1aB5c="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:55:15Z"},"road_event_id":"vV+iwRsfGJHCcZVMuupO/pRrKTs=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588095,41.989372]]}},{"id":"iOuh1SwSai7QUSxuwMRrxj1aB5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGirTo28IAfCcJZRoKto/z/r1ag="},{"type":"next-occurrence","id":"TqyaNXyzhHhF4ENAtQ+Fa11ZZVc="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:55:15Z"},"road_event_id":"iOuh1SwSai7QUSxuwMRrxj1aB5c=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588095,41.989372]]}},{"id":"TqyaNXyzhHhF4ENAtQ+Fa11ZZVc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGirTo28IAfCcJZRoKto/z/r1ag="},{"type":"next-occurrence","id":"dYjo+f3yUJPGlrqAC5bJJLreBnQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:55:15Z"},"road_event_id":"TqyaNXyzhHhF4ENAtQ+Fa11ZZVc=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588095,41.989372]]}},{"id":"dYjo+f3yUJPGlrqAC5bJJLreBnQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGirTo28IAfCcJZRoKto/z/r1ag="},{"type":"next-occurrence","id":"6r27F5GedcdtDwV3owpMuZh/xwQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:55:15Z"},"road_event_id":"dYjo+f3yUJPGlrqAC5bJJLreBnQ=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588095,41.989372]]}},{"id":"6r27F5GedcdtDwV3owpMuZh/xwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGirTo28IAfCcJZRoKto/z/r1ag="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:55:15Z"},"road_event_id":"6r27F5GedcdtDwV3owpMuZh/xwQ=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588095,41.989372]]}},{"id":"9ydpvxDXcqs37QWSXAqlk46Lzg0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YUxPT0ivc/bj8mix+gJqyBRsgns="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:57:07Z"},"road_event_id":"9ydpvxDXcqs37QWSXAqlk46Lzg0=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.590382,41.990308]]}},{"id":"YUxPT0ivc/bj8mix+gJqyBRsgns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ydpvxDXcqs37QWSXAqlk46Lzg0="},{"type":"next-occurrence","id":"CtVtjcNaK+6P/E9VN2UmC/gp4cI="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:57:07Z"},"road_event_id":"YUxPT0ivc/bj8mix+gJqyBRsgns=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.590382,41.990308]]}},{"id":"CtVtjcNaK+6P/E9VN2UmC/gp4cI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ydpvxDXcqs37QWSXAqlk46Lzg0="},{"type":"next-occurrence","id":"DR3fNekYT4SAtftdieZWMK9IkG8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:57:07Z"},"road_event_id":"CtVtjcNaK+6P/E9VN2UmC/gp4cI=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.590382,41.990308]]}},{"id":"DR3fNekYT4SAtftdieZWMK9IkG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ydpvxDXcqs37QWSXAqlk46Lzg0="},{"type":"next-occurrence","id":"RpR7M0pLPWer/506fwVS82Y/G+o="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:57:07Z"},"road_event_id":"DR3fNekYT4SAtftdieZWMK9IkG8=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.590382,41.990308]]}},{"id":"RpR7M0pLPWer/506fwVS82Y/G+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ydpvxDXcqs37QWSXAqlk46Lzg0="},{"type":"next-occurrence","id":"LGH/YaeaEw5G87KUQbOi0VT+Rgo="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:57:07Z"},"road_event_id":"RpR7M0pLPWer/506fwVS82Y/G+o=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.590382,41.990308]]}},{"id":"LGH/YaeaEw5G87KUQbOi0VT+Rgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ydpvxDXcqs37QWSXAqlk46Lzg0="},{"type":"next-occurrence","id":"pM0+QJAUsJ+7uUJCj2ScCqw+Ndg="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:57:07Z"},"road_event_id":"LGH/YaeaEw5G87KUQbOi0VT+Rgo=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.590382,41.990308]]}},{"id":"pM0+QJAUsJ+7uUJCj2ScCqw+Ndg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ydpvxDXcqs37QWSXAqlk46Lzg0="},{"type":"next-occurrence","id":"ddvHzqWnkD/AmUhpS7v5+ORsG5A="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:57:07Z"},"road_event_id":"pM0+QJAUsJ+7uUJCj2ScCqw+Ndg=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.590382,41.990308]]}},{"id":"ddvHzqWnkD/AmUhpS7v5+ORsG5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ydpvxDXcqs37QWSXAqlk46Lzg0="},{"type":"next-occurrence","id":"CNCdfDR5LcmXAF49Vp6K2D6arWQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:57:07Z"},"road_event_id":"ddvHzqWnkD/AmUhpS7v5+ORsG5A=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.590382,41.990308]]}},{"id":"CNCdfDR5LcmXAF49Vp6K2D6arWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ydpvxDXcqs37QWSXAqlk46Lzg0="},{"type":"next-occurrence","id":"D0rhIr6iFt6rZ9dFn9BOuX2Hejc="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:57:07Z"},"road_event_id":"CNCdfDR5LcmXAF49Vp6K2D6arWQ=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.590382,41.990308]]}},{"id":"D0rhIr6iFt6rZ9dFn9BOuX2Hejc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ydpvxDXcqs37QWSXAqlk46Lzg0="},{"type":"next-occurrence","id":"luY3Tm0FaIZqWPc/pynb0iTFnBU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:57:07Z"},"road_event_id":"D0rhIr6iFt6rZ9dFn9BOuX2Hejc=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.590382,41.990308]]}},{"id":"luY3Tm0FaIZqWPc/pynb0iTFnBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ydpvxDXcqs37QWSXAqlk46Lzg0="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T19:57:07Z"},"road_event_id":"luY3Tm0FaIZqWPc/pynb0iTFnBU=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.590382,41.990308]]}},{"id":"/wb/P2JkxaXQrV1xv1Fdam8SslE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"e4JoZpLHxbUo2+ChfEyHZUQ14E4="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"/wb/P2JkxaXQrV1xv1Fdam8SslE=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T18:00:00Z","end_date":"2026-05-20T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"e4JoZpLHxbUo2+ChfEyHZUQ14E4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/wb/P2JkxaXQrV1xv1Fdam8SslE="},{"type":"next-occurrence","id":"jRxhcrJ/Nt55Yi4Ny7VjIpFoeqY="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"e4JoZpLHxbUo2+ChfEyHZUQ14E4=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T18:00:00Z","end_date":"2026-05-21T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"jRxhcrJ/Nt55Yi4Ny7VjIpFoeqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/wb/P2JkxaXQrV1xv1Fdam8SslE="},{"type":"next-occurrence","id":"iozd8EuWxftuMT9CyaEj8glNFJs="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"jRxhcrJ/Nt55Yi4Ny7VjIpFoeqY=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T18:00:00Z","end_date":"2026-05-22T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"iozd8EuWxftuMT9CyaEj8glNFJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/wb/P2JkxaXQrV1xv1Fdam8SslE="},{"type":"next-occurrence","id":"oR/Z7ywne/RskmR5M2IqEkHE9XA="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"iozd8EuWxftuMT9CyaEj8glNFJs=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T18:00:00Z","end_date":"2026-05-23T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"oR/Z7ywne/RskmR5M2IqEkHE9XA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/wb/P2JkxaXQrV1xv1Fdam8SslE="},{"type":"next-occurrence","id":"tDKSXML4CxU6VuHMs+gunnOXwQU="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"oR/Z7ywne/RskmR5M2IqEkHE9XA=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T18:00:00Z","end_date":"2026-05-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"tDKSXML4CxU6VuHMs+gunnOXwQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/wb/P2JkxaXQrV1xv1Fdam8SslE="},{"type":"next-occurrence","id":"tdvlW7sEzhtAhInEEcPfVFHUv1I="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"tDKSXML4CxU6VuHMs+gunnOXwQU=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T18:00:00Z","end_date":"2026-05-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"tdvlW7sEzhtAhInEEcPfVFHUv1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/wb/P2JkxaXQrV1xv1Fdam8SslE="},{"type":"next-occurrence","id":"wv75RFsEbdTpIF5euuOc2NGEsLg="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"tdvlW7sEzhtAhInEEcPfVFHUv1I=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T18:00:00Z","end_date":"2026-05-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"wv75RFsEbdTpIF5euuOc2NGEsLg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/wb/P2JkxaXQrV1xv1Fdam8SslE="},{"type":"next-occurrence","id":"jPzMg0rdFBhnrvGeMWGS32KIZ8o="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"wv75RFsEbdTpIF5euuOc2NGEsLg=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T18:00:00Z","end_date":"2026-05-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"jPzMg0rdFBhnrvGeMWGS32KIZ8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/wb/P2JkxaXQrV1xv1Fdam8SslE="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"jPzMg0rdFBhnrvGeMWGS32KIZ8o=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T18:00:00Z","end_date":"2026-05-28T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"uMSZgOFLESZcZUzKSqNPsnbhezU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"boU3RkAk8JUy8BOkIzrOandbOk0="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:26:34Z"},"road_event_id":"uMSZgOFLESZcZUzKSqNPsnbhezU=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587312,41.991194]]}},{"id":"boU3RkAk8JUy8BOkIzrOandbOk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMSZgOFLESZcZUzKSqNPsnbhezU="},{"type":"next-occurrence","id":"9fnunU6XWaJP9Vs3DupPUug3fDk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:26:34Z"},"road_event_id":"boU3RkAk8JUy8BOkIzrOandbOk0=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587312,41.991194]]}},{"id":"9fnunU6XWaJP9Vs3DupPUug3fDk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMSZgOFLESZcZUzKSqNPsnbhezU="},{"type":"next-occurrence","id":"tIbIhKEPoHHmRda7Rw1lg360lsQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:26:34Z"},"road_event_id":"9fnunU6XWaJP9Vs3DupPUug3fDk=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587312,41.991194]]}},{"id":"tIbIhKEPoHHmRda7Rw1lg360lsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMSZgOFLESZcZUzKSqNPsnbhezU="},{"type":"next-occurrence","id":"KrS5f4AUHlOVn+ooougWZPwuL/E="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:26:34Z"},"road_event_id":"tIbIhKEPoHHmRda7Rw1lg360lsQ=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587312,41.991194]]}},{"id":"KrS5f4AUHlOVn+ooougWZPwuL/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMSZgOFLESZcZUzKSqNPsnbhezU="},{"type":"next-occurrence","id":"u4zTxKDWi/GvfxK8cPdCvASzxqU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:26:34Z"},"road_event_id":"KrS5f4AUHlOVn+ooougWZPwuL/E=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587312,41.991194]]}},{"id":"u4zTxKDWi/GvfxK8cPdCvASzxqU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMSZgOFLESZcZUzKSqNPsnbhezU="},{"type":"next-occurrence","id":"ENkyYgEdcuDx64jK96DKeJJW2UU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:26:34Z"},"road_event_id":"u4zTxKDWi/GvfxK8cPdCvASzxqU=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587312,41.991194]]}},{"id":"ENkyYgEdcuDx64jK96DKeJJW2UU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMSZgOFLESZcZUzKSqNPsnbhezU="},{"type":"next-occurrence","id":"JPWUNu0eAFxtExgeDFdLZQiT/D8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:26:34Z"},"road_event_id":"ENkyYgEdcuDx64jK96DKeJJW2UU=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587312,41.991194]]}},{"id":"JPWUNu0eAFxtExgeDFdLZQiT/D8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMSZgOFLESZcZUzKSqNPsnbhezU="},{"type":"next-occurrence","id":"DCej8gDxNCQvo8GlIQXDQ6+Ge9s="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:26:34Z"},"road_event_id":"JPWUNu0eAFxtExgeDFdLZQiT/D8=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587312,41.991194]]}},{"id":"DCej8gDxNCQvo8GlIQXDQ6+Ge9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMSZgOFLESZcZUzKSqNPsnbhezU="},{"type":"next-occurrence","id":"zQ7Ks1Xr4T275ZC56ogQgZEzkt4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:26:34Z"},"road_event_id":"DCej8gDxNCQvo8GlIQXDQ6+Ge9s=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587312,41.991194]]}},{"id":"zQ7Ks1Xr4T275ZC56ogQgZEzkt4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMSZgOFLESZcZUzKSqNPsnbhezU="},{"type":"next-occurrence","id":"zGwLESC9w8LgZqD3VrIuJNhD0T8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:26:34Z"},"road_event_id":"zQ7Ks1Xr4T275ZC56ogQgZEzkt4=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587312,41.991194]]}},{"id":"zGwLESC9w8LgZqD3VrIuJNhD0T8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uMSZgOFLESZcZUzKSqNPsnbhezU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:26:34Z"},"road_event_id":"zGwLESC9w8LgZqD3VrIuJNhD0T8=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587312,41.991194]]}},{"id":"1yds9qWXkj6r3/mqpt7YTNYKWp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bCc2Bo7yow8sebsjFEyCMZxrFLM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:28:28Z"},"road_event_id":"1yds9qWXkj6r3/mqpt7YTNYKWp8=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585098,41.990186]]}},{"id":"bCc2Bo7yow8sebsjFEyCMZxrFLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1yds9qWXkj6r3/mqpt7YTNYKWp8="},{"type":"next-occurrence","id":"Jmgh8r9ZPey2sVCzGROGT8LbBe4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:28:28Z"},"road_event_id":"bCc2Bo7yow8sebsjFEyCMZxrFLM=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585098,41.990186]]}},{"id":"Jmgh8r9ZPey2sVCzGROGT8LbBe4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1yds9qWXkj6r3/mqpt7YTNYKWp8="},{"type":"next-occurrence","id":"ryjRla5Lv851Z382HETB5jvEGFc="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:28:28Z"},"road_event_id":"Jmgh8r9ZPey2sVCzGROGT8LbBe4=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585098,41.990186]]}},{"id":"ryjRla5Lv851Z382HETB5jvEGFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1yds9qWXkj6r3/mqpt7YTNYKWp8="},{"type":"next-occurrence","id":"6iE3Qc4NEhrZAZuAruOuRPVa0Vk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:28:28Z"},"road_event_id":"ryjRla5Lv851Z382HETB5jvEGFc=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585098,41.990186]]}},{"id":"6iE3Qc4NEhrZAZuAruOuRPVa0Vk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1yds9qWXkj6r3/mqpt7YTNYKWp8="},{"type":"next-occurrence","id":"uoTl/fm5Aj74IL1tsbneJ85mjig="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:28:28Z"},"road_event_id":"6iE3Qc4NEhrZAZuAruOuRPVa0Vk=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585098,41.990186]]}},{"id":"uoTl/fm5Aj74IL1tsbneJ85mjig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1yds9qWXkj6r3/mqpt7YTNYKWp8="},{"type":"next-occurrence","id":"1y1D436VZ+dgbpTU0QKhXJMdFuU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:28:28Z"},"road_event_id":"uoTl/fm5Aj74IL1tsbneJ85mjig=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585098,41.990186]]}},{"id":"1y1D436VZ+dgbpTU0QKhXJMdFuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1yds9qWXkj6r3/mqpt7YTNYKWp8="},{"type":"next-occurrence","id":"Gs28Y9qCPkIryz429iQJq1S0zzo="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:28:28Z"},"road_event_id":"1y1D436VZ+dgbpTU0QKhXJMdFuU=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585098,41.990186]]}},{"id":"Gs28Y9qCPkIryz429iQJq1S0zzo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1yds9qWXkj6r3/mqpt7YTNYKWp8="},{"type":"next-occurrence","id":"FqHJ8Trb+BGZJeH1YHjkVFDFQxg="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:28:28Z"},"road_event_id":"Gs28Y9qCPkIryz429iQJq1S0zzo=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585098,41.990186]]}},{"id":"FqHJ8Trb+BGZJeH1YHjkVFDFQxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1yds9qWXkj6r3/mqpt7YTNYKWp8="},{"type":"next-occurrence","id":"pRXJjx4ZH9sQlv5V8vxbw9dNe6I="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:28:28Z"},"road_event_id":"FqHJ8Trb+BGZJeH1YHjkVFDFQxg=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585098,41.990186]]}},{"id":"pRXJjx4ZH9sQlv5V8vxbw9dNe6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1yds9qWXkj6r3/mqpt7YTNYKWp8="},{"type":"next-occurrence","id":"Vvd6l4KqNiGDMD4aTBr1AyFL/jU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:28:28Z"},"road_event_id":"pRXJjx4ZH9sQlv5V8vxbw9dNe6I=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585098,41.990186]]}},{"id":"Vvd6l4KqNiGDMD4aTBr1AyFL/jU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1yds9qWXkj6r3/mqpt7YTNYKWp8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:28:28Z"},"road_event_id":"Vvd6l4KqNiGDMD4aTBr1AyFL/jU=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585098,41.990186]]}},{"id":"HFuMCsIB1liHIJJSBDP2MXdG648=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"C9K/7wnu7TSYeFLUhLUiXEt3x90="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:30:40Z"},"road_event_id":"HFuMCsIB1liHIJJSBDP2MXdG648=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586972,41.993772]]}},{"id":"C9K/7wnu7TSYeFLUhLUiXEt3x90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HFuMCsIB1liHIJJSBDP2MXdG648="},{"type":"next-occurrence","id":"0ltXqtNeZhomHfNyJZtkpAQ4RTE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:30:40Z"},"road_event_id":"C9K/7wnu7TSYeFLUhLUiXEt3x90=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586972,41.993772]]}},{"id":"0ltXqtNeZhomHfNyJZtkpAQ4RTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HFuMCsIB1liHIJJSBDP2MXdG648="},{"type":"next-occurrence","id":"pF4QSvMsVcnXemza5QHrLco+/j4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:30:40Z"},"road_event_id":"0ltXqtNeZhomHfNyJZtkpAQ4RTE=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586972,41.993772]]}},{"id":"pF4QSvMsVcnXemza5QHrLco+/j4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HFuMCsIB1liHIJJSBDP2MXdG648="},{"type":"next-occurrence","id":"eTiENzEAbnZfj6++Q/Ao1b8kZyk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:30:40Z"},"road_event_id":"pF4QSvMsVcnXemza5QHrLco+/j4=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586972,41.993772]]}},{"id":"eTiENzEAbnZfj6++Q/Ao1b8kZyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HFuMCsIB1liHIJJSBDP2MXdG648="},{"type":"next-occurrence","id":"KnBrmmOwKKb8tvmkRJn/PqRS6eo="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:30:40Z"},"road_event_id":"eTiENzEAbnZfj6++Q/Ao1b8kZyk=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586972,41.993772]]}},{"id":"KnBrmmOwKKb8tvmkRJn/PqRS6eo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HFuMCsIB1liHIJJSBDP2MXdG648="},{"type":"next-occurrence","id":"DS1WIECgVqdQDGsTrzfPi3VnutA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:30:40Z"},"road_event_id":"KnBrmmOwKKb8tvmkRJn/PqRS6eo=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586972,41.993772]]}},{"id":"DS1WIECgVqdQDGsTrzfPi3VnutA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HFuMCsIB1liHIJJSBDP2MXdG648="},{"type":"next-occurrence","id":"uyIaS8Qr+BagFUme54sdXjaMkZk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:30:40Z"},"road_event_id":"DS1WIECgVqdQDGsTrzfPi3VnutA=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586972,41.993772]]}},{"id":"uyIaS8Qr+BagFUme54sdXjaMkZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HFuMCsIB1liHIJJSBDP2MXdG648="},{"type":"next-occurrence","id":"/WlXw8rGqpdlN0sbwbe4CQqwqcA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:30:40Z"},"road_event_id":"uyIaS8Qr+BagFUme54sdXjaMkZk=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586972,41.993772]]}},{"id":"/WlXw8rGqpdlN0sbwbe4CQqwqcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HFuMCsIB1liHIJJSBDP2MXdG648="},{"type":"next-occurrence","id":"LuBlrugfZw02vOhITnTR1mYkYCM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:30:40Z"},"road_event_id":"/WlXw8rGqpdlN0sbwbe4CQqwqcA=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586972,41.993772]]}},{"id":"LuBlrugfZw02vOhITnTR1mYkYCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HFuMCsIB1liHIJJSBDP2MXdG648="},{"type":"next-occurrence","id":"MVDa000fwPJIqIZ0IUIF4mvids4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:30:40Z"},"road_event_id":"LuBlrugfZw02vOhITnTR1mYkYCM=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586972,41.993772]]}},{"id":"MVDa000fwPJIqIZ0IUIF4mvids4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HFuMCsIB1liHIJJSBDP2MXdG648="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:30:40Z"},"road_event_id":"MVDa000fwPJIqIZ0IUIF4mvids4=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586972,41.993772]]}},{"id":"9jaxmKcFzO0acVCXkFW6naYnsMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GcW3B23pv1LyusWXJ+kuLnIwdjc="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:32:28Z"},"road_event_id":"9jaxmKcFzO0acVCXkFW6naYnsMQ=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588357,41.990339]]}},{"id":"GcW3B23pv1LyusWXJ+kuLnIwdjc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9jaxmKcFzO0acVCXkFW6naYnsMQ="},{"type":"next-occurrence","id":"wa4N8trqGT6GX+FTl/DEis6TwKo="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:32:28Z"},"road_event_id":"GcW3B23pv1LyusWXJ+kuLnIwdjc=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588357,41.990339]]}},{"id":"wa4N8trqGT6GX+FTl/DEis6TwKo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9jaxmKcFzO0acVCXkFW6naYnsMQ="},{"type":"next-occurrence","id":"wnm/nbm1X/t+d17AXR/+JkkT+Mk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:32:28Z"},"road_event_id":"wa4N8trqGT6GX+FTl/DEis6TwKo=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588357,41.990339]]}},{"id":"wnm/nbm1X/t+d17AXR/+JkkT+Mk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9jaxmKcFzO0acVCXkFW6naYnsMQ="},{"type":"next-occurrence","id":"HX6s6NFwF9dcn0u+7l///pAoop4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:32:28Z"},"road_event_id":"wnm/nbm1X/t+d17AXR/+JkkT+Mk=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588357,41.990339]]}},{"id":"HX6s6NFwF9dcn0u+7l///pAoop4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9jaxmKcFzO0acVCXkFW6naYnsMQ="},{"type":"next-occurrence","id":"YA4XH37OgRxX7v4ChMfqWE3HkwY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:32:28Z"},"road_event_id":"HX6s6NFwF9dcn0u+7l///pAoop4=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588357,41.990339]]}},{"id":"YA4XH37OgRxX7v4ChMfqWE3HkwY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9jaxmKcFzO0acVCXkFW6naYnsMQ="},{"type":"next-occurrence","id":"1uo5ec1yQM1bUQi1kZtNxWfKF/k="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:32:28Z"},"road_event_id":"YA4XH37OgRxX7v4ChMfqWE3HkwY=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588357,41.990339]]}},{"id":"1uo5ec1yQM1bUQi1kZtNxWfKF/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9jaxmKcFzO0acVCXkFW6naYnsMQ="},{"type":"next-occurrence","id":"p+LEudQW9pMQCdRX5okXX7wAUqA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:32:28Z"},"road_event_id":"1uo5ec1yQM1bUQi1kZtNxWfKF/k=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588357,41.990339]]}},{"id":"p+LEudQW9pMQCdRX5okXX7wAUqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9jaxmKcFzO0acVCXkFW6naYnsMQ="},{"type":"next-occurrence","id":"n5saVAbbrXDeZuF+vn4/G90PHXw="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:32:28Z"},"road_event_id":"p+LEudQW9pMQCdRX5okXX7wAUqA=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588357,41.990339]]}},{"id":"n5saVAbbrXDeZuF+vn4/G90PHXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9jaxmKcFzO0acVCXkFW6naYnsMQ="},{"type":"next-occurrence","id":"VfgOzp+HkO4tBisAASwq18YGGOY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:32:28Z"},"road_event_id":"n5saVAbbrXDeZuF+vn4/G90PHXw=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588357,41.990339]]}},{"id":"VfgOzp+HkO4tBisAASwq18YGGOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9jaxmKcFzO0acVCXkFW6naYnsMQ="},{"type":"next-occurrence","id":"h1jVzL0T8kvd1jvu8raMqgtSlCg="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:32:28Z"},"road_event_id":"VfgOzp+HkO4tBisAASwq18YGGOY=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588357,41.990339]]}},{"id":"h1jVzL0T8kvd1jvu8raMqgtSlCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9jaxmKcFzO0acVCXkFW6naYnsMQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 47 - CT 190/Hazard Avenue (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:32:28Z"},"road_event_id":"h1jVzL0T8kvd1jvu8raMqgtSlCg=","beginning_cross_street":"Exit 47 - CT 190/Hazard Avenue","ending_cross_street":"Exit 47 - CT 190/Hazard Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588357,41.990339]]}},{"id":"2Fh1/nfb5aTuXvlTVeWHAFKxhPk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OEGJsRrCi0VuYsKVSJFMbzH94Io="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:34:39Z"},"road_event_id":"2Fh1/nfb5aTuXvlTVeWHAFKxhPk=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586264,41.995429]]}},{"id":"OEGJsRrCi0VuYsKVSJFMbzH94Io=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Fh1/nfb5aTuXvlTVeWHAFKxhPk="},{"type":"next-occurrence","id":"kBHhTpt3q+aRuyE6Rc1ci/Mj3f8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:34:39Z"},"road_event_id":"OEGJsRrCi0VuYsKVSJFMbzH94Io=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586264,41.995429]]}},{"id":"kBHhTpt3q+aRuyE6Rc1ci/Mj3f8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Fh1/nfb5aTuXvlTVeWHAFKxhPk="},{"type":"next-occurrence","id":"bHIsejGt54K/ukTMr18DF6QjIXY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:34:39Z"},"road_event_id":"kBHhTpt3q+aRuyE6Rc1ci/Mj3f8=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586264,41.995429]]}},{"id":"bHIsejGt54K/ukTMr18DF6QjIXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Fh1/nfb5aTuXvlTVeWHAFKxhPk="},{"type":"next-occurrence","id":"s76Cp+EL7bfKic7JBSZ1SOD0iyM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:34:39Z"},"road_event_id":"bHIsejGt54K/ukTMr18DF6QjIXY=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586264,41.995429]]}},{"id":"s76Cp+EL7bfKic7JBSZ1SOD0iyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Fh1/nfb5aTuXvlTVeWHAFKxhPk="},{"type":"next-occurrence","id":"TXsokDyFH62hzy/0eKdLJt7Y4Es="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:34:39Z"},"road_event_id":"s76Cp+EL7bfKic7JBSZ1SOD0iyM=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586264,41.995429]]}},{"id":"TXsokDyFH62hzy/0eKdLJt7Y4Es=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Fh1/nfb5aTuXvlTVeWHAFKxhPk="},{"type":"next-occurrence","id":"MLiye9s2gvucDNxJiDdMmQQy+R8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:34:39Z"},"road_event_id":"TXsokDyFH62hzy/0eKdLJt7Y4Es=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586264,41.995429]]}},{"id":"MLiye9s2gvucDNxJiDdMmQQy+R8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Fh1/nfb5aTuXvlTVeWHAFKxhPk="},{"type":"next-occurrence","id":"Grnv5XsGwVZzRzRnStsC5sPDPzA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:34:39Z"},"road_event_id":"MLiye9s2gvucDNxJiDdMmQQy+R8=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586264,41.995429]]}},{"id":"Grnv5XsGwVZzRzRnStsC5sPDPzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Fh1/nfb5aTuXvlTVeWHAFKxhPk="},{"type":"next-occurrence","id":"awUBQZOYXmdkjPTVdLZ/+0dibGY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:34:39Z"},"road_event_id":"Grnv5XsGwVZzRzRnStsC5sPDPzA=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586264,41.995429]]}},{"id":"awUBQZOYXmdkjPTVdLZ/+0dibGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Fh1/nfb5aTuXvlTVeWHAFKxhPk="},{"type":"next-occurrence","id":"CYYOCp5xMMmfP80xIEFVmE8U0A4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:34:39Z"},"road_event_id":"awUBQZOYXmdkjPTVdLZ/+0dibGY=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586264,41.995429]]}},{"id":"CYYOCp5xMMmfP80xIEFVmE8U0A4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Fh1/nfb5aTuXvlTVeWHAFKxhPk="},{"type":"next-occurrence","id":"WXyaAGgUlfYAH/8gU2cIOmoAuZY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:34:39Z"},"road_event_id":"CYYOCp5xMMmfP80xIEFVmE8U0A4=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586264,41.995429]]}},{"id":"WXyaAGgUlfYAH/8gU2cIOmoAuZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Fh1/nfb5aTuXvlTVeWHAFKxhPk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:34:39Z"},"road_event_id":"WXyaAGgUlfYAH/8gU2cIOmoAuZY=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586264,41.995429]]}},{"id":"URleVQE+DOL9lYilxW76NfKcnWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Nq3sSPvj03QR32ZrcxJbD0RlvQ0="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:36:37Z"},"road_event_id":"URleVQE+DOL9lYilxW76NfKcnWk=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.584925,41.9979]]}},{"id":"Nq3sSPvj03QR32ZrcxJbD0RlvQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"URleVQE+DOL9lYilxW76NfKcnWk="},{"type":"next-occurrence","id":"z+xPedHkD19YOzBD2oLYDUyH52g="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:36:37Z"},"road_event_id":"Nq3sSPvj03QR32ZrcxJbD0RlvQ0=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.584925,41.9979]]}},{"id":"z+xPedHkD19YOzBD2oLYDUyH52g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"URleVQE+DOL9lYilxW76NfKcnWk="},{"type":"next-occurrence","id":"ivy32ZoTtrjJ/nnT5IMUio6knGc="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:36:37Z"},"road_event_id":"z+xPedHkD19YOzBD2oLYDUyH52g=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.584925,41.9979]]}},{"id":"ivy32ZoTtrjJ/nnT5IMUio6knGc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"URleVQE+DOL9lYilxW76NfKcnWk="},{"type":"next-occurrence","id":"cbLDFa8LWZ+x2Koi3Av2f2HAvLY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:36:37Z"},"road_event_id":"ivy32ZoTtrjJ/nnT5IMUio6knGc=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.584925,41.9979]]}},{"id":"cbLDFa8LWZ+x2Koi3Av2f2HAvLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"URleVQE+DOL9lYilxW76NfKcnWk="},{"type":"next-occurrence","id":"k21scJsiiDTZSyZ3iVqiJyYfiGE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:36:37Z"},"road_event_id":"cbLDFa8LWZ+x2Koi3Av2f2HAvLY=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.584925,41.9979]]}},{"id":"k21scJsiiDTZSyZ3iVqiJyYfiGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"URleVQE+DOL9lYilxW76NfKcnWk="},{"type":"next-occurrence","id":"ANv0Zu5QwnoNI2MkdlW9PxB7BcU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:36:37Z"},"road_event_id":"k21scJsiiDTZSyZ3iVqiJyYfiGE=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.584925,41.9979]]}},{"id":"ANv0Zu5QwnoNI2MkdlW9PxB7BcU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"URleVQE+DOL9lYilxW76NfKcnWk="},{"type":"next-occurrence","id":"xKSxZ6vZWvPvapuBWuqPxpdoPXE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:36:37Z"},"road_event_id":"ANv0Zu5QwnoNI2MkdlW9PxB7BcU=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.584925,41.9979]]}},{"id":"xKSxZ6vZWvPvapuBWuqPxpdoPXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"URleVQE+DOL9lYilxW76NfKcnWk="},{"type":"next-occurrence","id":"YAHEwf6A1mFabg54eJnWtk+kJn4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:36:37Z"},"road_event_id":"xKSxZ6vZWvPvapuBWuqPxpdoPXE=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.584925,41.9979]]}},{"id":"YAHEwf6A1mFabg54eJnWtk+kJn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"URleVQE+DOL9lYilxW76NfKcnWk="},{"type":"next-occurrence","id":"75aHxgXCzPM90vWRYxglC8Ihpp8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:36:37Z"},"road_event_id":"YAHEwf6A1mFabg54eJnWtk+kJn4=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.584925,41.9979]]}},{"id":"75aHxgXCzPM90vWRYxglC8Ihpp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"URleVQE+DOL9lYilxW76NfKcnWk="},{"type":"next-occurrence","id":"j1pUinPVPYTDjQYVRW9Liz9r8xc="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:36:37Z"},"road_event_id":"75aHxgXCzPM90vWRYxglC8Ihpp8=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.584925,41.9979]]}},{"id":"j1pUinPVPYTDjQYVRW9Liz9r8xc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"URleVQE+DOL9lYilxW76NfKcnWk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:36:37Z"},"road_event_id":"j1pUinPVPYTDjQYVRW9Liz9r8xc=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.584925,41.9979]]}},{"id":"qutndZ1f6jYHx1UaKGeSs8GkyC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NP8BUnCfYBkJRFRc6NIvD4XvANU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:39:17Z"},"road_event_id":"qutndZ1f6jYHx1UaKGeSs8GkyC4=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585373,42.000127]]}},{"id":"NP8BUnCfYBkJRFRc6NIvD4XvANU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qutndZ1f6jYHx1UaKGeSs8GkyC4="},{"type":"next-occurrence","id":"bS3P8iscJLd6Td3hSEpXS5t2a4c="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:39:17Z"},"road_event_id":"NP8BUnCfYBkJRFRc6NIvD4XvANU=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585373,42.000127]]}},{"id":"bS3P8iscJLd6Td3hSEpXS5t2a4c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qutndZ1f6jYHx1UaKGeSs8GkyC4="},{"type":"next-occurrence","id":"Fz7eZdF+1unizw+pbM1pvf1VuIQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:39:17Z"},"road_event_id":"bS3P8iscJLd6Td3hSEpXS5t2a4c=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585373,42.000127]]}},{"id":"Fz7eZdF+1unizw+pbM1pvf1VuIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qutndZ1f6jYHx1UaKGeSs8GkyC4="},{"type":"next-occurrence","id":"D6Yh48/IhB3fJ37GwNyOuCY91u8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:39:17Z"},"road_event_id":"Fz7eZdF+1unizw+pbM1pvf1VuIQ=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585373,42.000127]]}},{"id":"D6Yh48/IhB3fJ37GwNyOuCY91u8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qutndZ1f6jYHx1UaKGeSs8GkyC4="},{"type":"next-occurrence","id":"ksysMQNcIi61/pNnIPFFStfBy4s="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:39:17Z"},"road_event_id":"D6Yh48/IhB3fJ37GwNyOuCY91u8=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585373,42.000127]]}},{"id":"ksysMQNcIi61/pNnIPFFStfBy4s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qutndZ1f6jYHx1UaKGeSs8GkyC4="},{"type":"next-occurrence","id":"39EtQg+3VvMgPBfKktjZfutkY8o="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:39:17Z"},"road_event_id":"ksysMQNcIi61/pNnIPFFStfBy4s=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585373,42.000127]]}},{"id":"39EtQg+3VvMgPBfKktjZfutkY8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qutndZ1f6jYHx1UaKGeSs8GkyC4="},{"type":"next-occurrence","id":"UQfsdRQrjTuiuLo1m6mdvyzq1qc="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:39:17Z"},"road_event_id":"39EtQg+3VvMgPBfKktjZfutkY8o=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585373,42.000127]]}},{"id":"UQfsdRQrjTuiuLo1m6mdvyzq1qc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qutndZ1f6jYHx1UaKGeSs8GkyC4="},{"type":"next-occurrence","id":"vckpetjyY0kkthT5TLoBLmtxNRk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:39:17Z"},"road_event_id":"UQfsdRQrjTuiuLo1m6mdvyzq1qc=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585373,42.000127]]}},{"id":"vckpetjyY0kkthT5TLoBLmtxNRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qutndZ1f6jYHx1UaKGeSs8GkyC4="},{"type":"next-occurrence","id":"i+l4E7+P4pE+EyW3v9qnJnOpNFs="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:39:17Z"},"road_event_id":"vckpetjyY0kkthT5TLoBLmtxNRk=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585373,42.000127]]}},{"id":"i+l4E7+P4pE+EyW3v9qnJnOpNFs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qutndZ1f6jYHx1UaKGeSs8GkyC4="},{"type":"next-occurrence","id":"mSXv0s6OW/Ax2PqHYvEJZGnEqpU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:39:17Z"},"road_event_id":"i+l4E7+P4pE+EyW3v9qnJnOpNFs=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585373,42.000127]]}},{"id":"mSXv0s6OW/Ax2PqHYvEJZGnEqpU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qutndZ1f6jYHx1UaKGeSs8GkyC4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:39:17Z"},"road_event_id":"mSXv0s6OW/Ax2PqHYvEJZGnEqpU=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.585373,42.000127]]}},{"id":"NiICn7z2Yeq3Q8+Z/DNNVgyzuxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rFAmddGcuPT4CIf74pA/NoCEDSc="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramps Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:41:16Z"},"road_event_id":"NiICn7z2Yeq3Q8+Z/DNNVgyzuxo=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.58698,41.997684]]}},{"id":"rFAmddGcuPT4CIf74pA/NoCEDSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NiICn7z2Yeq3Q8+Z/DNNVgyzuxo="},{"type":"next-occurrence","id":"eoX51/vmEfIJLlTNaQRxTpXiwdY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramps Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:41:16Z"},"road_event_id":"rFAmddGcuPT4CIf74pA/NoCEDSc=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.58698,41.997684]]}},{"id":"eoX51/vmEfIJLlTNaQRxTpXiwdY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NiICn7z2Yeq3Q8+Z/DNNVgyzuxo="},{"type":"next-occurrence","id":"+tDt7LjN0rDhB9N5MLykQkopTrw="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramps Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:41:16Z"},"road_event_id":"eoX51/vmEfIJLlTNaQRxTpXiwdY=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.58698,41.997684]]}},{"id":"+tDt7LjN0rDhB9N5MLykQkopTrw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NiICn7z2Yeq3Q8+Z/DNNVgyzuxo="},{"type":"next-occurrence","id":"FUQG/JZfNTaJm5Oxcd4PlW7bgG4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramps Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:41:16Z"},"road_event_id":"+tDt7LjN0rDhB9N5MLykQkopTrw=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.58698,41.997684]]}},{"id":"FUQG/JZfNTaJm5Oxcd4PlW7bgG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NiICn7z2Yeq3Q8+Z/DNNVgyzuxo="},{"type":"next-occurrence","id":"wc3d7zSiqEdRxcd5LKi42t9kZjw="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramps Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:41:16Z"},"road_event_id":"FUQG/JZfNTaJm5Oxcd4PlW7bgG4=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.58698,41.997684]]}},{"id":"wc3d7zSiqEdRxcd5LKi42t9kZjw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NiICn7z2Yeq3Q8+Z/DNNVgyzuxo="},{"type":"next-occurrence","id":"pjPoizQtDVsGIXQiiI08JyMj4Y8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramps Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:41:16Z"},"road_event_id":"wc3d7zSiqEdRxcd5LKi42t9kZjw=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.58698,41.997684]]}},{"id":"pjPoizQtDVsGIXQiiI08JyMj4Y8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NiICn7z2Yeq3Q8+Z/DNNVgyzuxo="},{"type":"next-occurrence","id":"W0gSeNlZXzn3+AGQetGYNk9wKv4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramps Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:41:16Z"},"road_event_id":"pjPoizQtDVsGIXQiiI08JyMj4Y8=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.58698,41.997684]]}},{"id":"W0gSeNlZXzn3+AGQetGYNk9wKv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NiICn7z2Yeq3Q8+Z/DNNVgyzuxo="},{"type":"next-occurrence","id":"5xYxXqWM8geEYwlQE338JF17Jx0="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramps Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:41:16Z"},"road_event_id":"W0gSeNlZXzn3+AGQetGYNk9wKv4=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.58698,41.997684]]}},{"id":"5xYxXqWM8geEYwlQE338JF17Jx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NiICn7z2Yeq3Q8+Z/DNNVgyzuxo="},{"type":"next-occurrence","id":"IQSTdZFPwOCx4attV9Pwcen7XjE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramps Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:41:16Z"},"road_event_id":"5xYxXqWM8geEYwlQE338JF17Jx0=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.58698,41.997684]]}},{"id":"IQSTdZFPwOCx4attV9Pwcen7XjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NiICn7z2Yeq3Q8+Z/DNNVgyzuxo="},{"type":"next-occurrence","id":"dFFj/VYtAwV6q0AKBs4C3DFsEYw="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramps Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:41:16Z"},"road_event_id":"IQSTdZFPwOCx4attV9Pwcen7XjE=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.58698,41.997684]]}},{"id":"dFFj/VYtAwV6q0AKBs4C3DFsEYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NiICn7z2Yeq3Q8+Z/DNNVgyzuxo="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramps Exit 48 - CT 220/Elm Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:41:16Z"},"road_event_id":"dFFj/VYtAwV6q0AKBs4C3DFsEYw=","beginning_cross_street":"Exit 48 - CT 220/Elm Street","ending_cross_street":"Exit 48 - CT 220/Elm Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.58698,41.997684]]}},{"id":"X6Rr9mS8sntyEqCDRPXM5+m/Xd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dTAOxCHRcDP05gfOse8cHzC4MDk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramps Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:43:03Z"},"road_event_id":"X6Rr9mS8sntyEqCDRPXM5+m/Xd8=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586816,42.017632999999996]]}},{"id":"dTAOxCHRcDP05gfOse8cHzC4MDk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Rr9mS8sntyEqCDRPXM5+m/Xd8="},{"type":"next-occurrence","id":"doD+6a07Rb+Ij1UneE5OegeHH/I="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramps Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:43:03Z"},"road_event_id":"dTAOxCHRcDP05gfOse8cHzC4MDk=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586816,42.017632999999996]]}},{"id":"doD+6a07Rb+Ij1UneE5OegeHH/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Rr9mS8sntyEqCDRPXM5+m/Xd8="},{"type":"next-occurrence","id":"warYTd8lB/oaQn20aeVQ45bL7bg="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramps Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:43:03Z"},"road_event_id":"doD+6a07Rb+Ij1UneE5OegeHH/I=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586816,42.017632999999996]]}},{"id":"warYTd8lB/oaQn20aeVQ45bL7bg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Rr9mS8sntyEqCDRPXM5+m/Xd8="},{"type":"next-occurrence","id":"bMTz4LJzja+bn0w4SvAXUIFlmxc="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramps Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:43:03Z"},"road_event_id":"warYTd8lB/oaQn20aeVQ45bL7bg=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586816,42.017632999999996]]}},{"id":"bMTz4LJzja+bn0w4SvAXUIFlmxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Rr9mS8sntyEqCDRPXM5+m/Xd8="},{"type":"next-occurrence","id":"PFQBPQolEslc6ekhal1LQmaNYqE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramps Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:43:03Z"},"road_event_id":"bMTz4LJzja+bn0w4SvAXUIFlmxc=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586816,42.017632999999996]]}},{"id":"PFQBPQolEslc6ekhal1LQmaNYqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Rr9mS8sntyEqCDRPXM5+m/Xd8="},{"type":"next-occurrence","id":"1pJtkbToVPc5noorN2cnxWgVF3U="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramps Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:43:03Z"},"road_event_id":"PFQBPQolEslc6ekhal1LQmaNYqE=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586816,42.017632999999996]]}},{"id":"1pJtkbToVPc5noorN2cnxWgVF3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Rr9mS8sntyEqCDRPXM5+m/Xd8="},{"type":"next-occurrence","id":"kZVwSKr/BeBImyRztf4VT7D39BU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramps Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:43:03Z"},"road_event_id":"1pJtkbToVPc5noorN2cnxWgVF3U=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586816,42.017632999999996]]}},{"id":"kZVwSKr/BeBImyRztf4VT7D39BU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Rr9mS8sntyEqCDRPXM5+m/Xd8="},{"type":"next-occurrence","id":"0SK4d+tkyxITOI5erNswnL/z1BQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramps Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:43:03Z"},"road_event_id":"kZVwSKr/BeBImyRztf4VT7D39BU=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586816,42.017632999999996]]}},{"id":"0SK4d+tkyxITOI5erNswnL/z1BQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Rr9mS8sntyEqCDRPXM5+m/Xd8="},{"type":"next-occurrence","id":"mlDaYmz2uD3ua1tv+F1pMdAOGJo="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramps Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:43:03Z"},"road_event_id":"0SK4d+tkyxITOI5erNswnL/z1BQ=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586816,42.017632999999996]]}},{"id":"mlDaYmz2uD3ua1tv+F1pMdAOGJo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Rr9mS8sntyEqCDRPXM5+m/Xd8="},{"type":"next-occurrence","id":"S7RNbIKFvO9WUg6fPGAOW2cvKb0="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramps Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:43:03Z"},"road_event_id":"mlDaYmz2uD3ua1tv+F1pMdAOGJo=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586816,42.017632999999996]]}},{"id":"S7RNbIKFvO9WUg6fPGAOW2cvKb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Rr9mS8sntyEqCDRPXM5+m/Xd8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramps Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:43:03Z"},"road_event_id":"S7RNbIKFvO9WUg6fPGAOW2cvKb0=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.586816,42.017632999999996]]}},{"id":"ZdJBqFbCkDtVy0EYY/vADjONSZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YDnABmVfs8Rbr3B0Nq1WRiGyQGM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:45:36Z"},"road_event_id":"ZdJBqFbCkDtVy0EYY/vADjONSZs=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587585,42.021374]]}},{"id":"YDnABmVfs8Rbr3B0Nq1WRiGyQGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdJBqFbCkDtVy0EYY/vADjONSZs="},{"type":"next-occurrence","id":"0mgOSiKyKQ3zRWFCaFCKroOeZAk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:45:36Z"},"road_event_id":"YDnABmVfs8Rbr3B0Nq1WRiGyQGM=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587585,42.021374]]}},{"id":"0mgOSiKyKQ3zRWFCaFCKroOeZAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdJBqFbCkDtVy0EYY/vADjONSZs="},{"type":"next-occurrence","id":"76NnlxhgYb9S1QVteYDt7OmQ5VQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:45:36Z"},"road_event_id":"0mgOSiKyKQ3zRWFCaFCKroOeZAk=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587585,42.021374]]}},{"id":"76NnlxhgYb9S1QVteYDt7OmQ5VQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdJBqFbCkDtVy0EYY/vADjONSZs="},{"type":"next-occurrence","id":"vkRuyiHQhJpsnZqjjAHzGK+P48I="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:45:36Z"},"road_event_id":"76NnlxhgYb9S1QVteYDt7OmQ5VQ=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587585,42.021374]]}},{"id":"vkRuyiHQhJpsnZqjjAHzGK+P48I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdJBqFbCkDtVy0EYY/vADjONSZs="},{"type":"next-occurrence","id":"FydmgBhHHtzqRXJX72Ld/AFXcFg="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:45:36Z"},"road_event_id":"vkRuyiHQhJpsnZqjjAHzGK+P48I=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587585,42.021374]]}},{"id":"FydmgBhHHtzqRXJX72Ld/AFXcFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdJBqFbCkDtVy0EYY/vADjONSZs="},{"type":"next-occurrence","id":"0SX28wwuvpW+v6024oF07ozm6fY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:45:36Z"},"road_event_id":"FydmgBhHHtzqRXJX72Ld/AFXcFg=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587585,42.021374]]}},{"id":"0SX28wwuvpW+v6024oF07ozm6fY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdJBqFbCkDtVy0EYY/vADjONSZs="},{"type":"next-occurrence","id":"4nW35u2QBaCY98NNpJA7AKPY4kU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:45:36Z"},"road_event_id":"0SX28wwuvpW+v6024oF07ozm6fY=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587585,42.021374]]}},{"id":"4nW35u2QBaCY98NNpJA7AKPY4kU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdJBqFbCkDtVy0EYY/vADjONSZs="},{"type":"next-occurrence","id":"dm3y9MN14ziTOSQkWB43Zr1UTiM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:45:36Z"},"road_event_id":"4nW35u2QBaCY98NNpJA7AKPY4kU=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587585,42.021374]]}},{"id":"dm3y9MN14ziTOSQkWB43Zr1UTiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdJBqFbCkDtVy0EYY/vADjONSZs="},{"type":"next-occurrence","id":"7dPQLYwHMj3e6QN59EEPjUs1hAM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:45:36Z"},"road_event_id":"dm3y9MN14ziTOSQkWB43Zr1UTiM=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587585,42.021374]]}},{"id":"7dPQLYwHMj3e6QN59EEPjUs1hAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdJBqFbCkDtVy0EYY/vADjONSZs="},{"type":"next-occurrence","id":"zPLBMkr+y/XLFVpVon9MsXyTiB4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:45:36Z"},"road_event_id":"7dPQLYwHMj3e6QN59EEPjUs1hAM=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587585,42.021374]]}},{"id":"zPLBMkr+y/XLFVpVon9MsXyTiB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdJBqFbCkDtVy0EYY/vADjONSZs="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:45:36Z"},"road_event_id":"zPLBMkr+y/XLFVpVon9MsXyTiB4=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.587585,42.021374]]}},{"id":"pcoUME1ycFablPnkEZ95rXoCxqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sjsRdKOQmftZq5EE6UAdG/b7UFQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:49:55Z"},"road_event_id":"pcoUME1ycFablPnkEZ95rXoCxqY=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.589573,42.023686]]}},{"id":"sjsRdKOQmftZq5EE6UAdG/b7UFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pcoUME1ycFablPnkEZ95rXoCxqY="},{"type":"next-occurrence","id":"85YdesMTM4Sz8MEIyE+lpNiHJdE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:49:55Z"},"road_event_id":"sjsRdKOQmftZq5EE6UAdG/b7UFQ=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.589573,42.023686]]}},{"id":"85YdesMTM4Sz8MEIyE+lpNiHJdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pcoUME1ycFablPnkEZ95rXoCxqY="},{"type":"next-occurrence","id":"nxDDkJ4e/CoLP2BcKwuIGraTWaY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:49:55Z"},"road_event_id":"85YdesMTM4Sz8MEIyE+lpNiHJdE=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.589573,42.023686]]}},{"id":"nxDDkJ4e/CoLP2BcKwuIGraTWaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pcoUME1ycFablPnkEZ95rXoCxqY="},{"type":"next-occurrence","id":"CZYGiSnkwZb2FIcJ+QW7PZ99klU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:49:55Z"},"road_event_id":"nxDDkJ4e/CoLP2BcKwuIGraTWaY=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.589573,42.023686]]}},{"id":"CZYGiSnkwZb2FIcJ+QW7PZ99klU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pcoUME1ycFablPnkEZ95rXoCxqY="},{"type":"next-occurrence","id":"nkNZYcQ9ICGqoXGyIuWCtw1RAzw="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:49:55Z"},"road_event_id":"CZYGiSnkwZb2FIcJ+QW7PZ99klU=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.589573,42.023686]]}},{"id":"nkNZYcQ9ICGqoXGyIuWCtw1RAzw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pcoUME1ycFablPnkEZ95rXoCxqY="},{"type":"next-occurrence","id":"C4LxaiJDvOzTuhwdsee9/T9uVu8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:49:55Z"},"road_event_id":"nkNZYcQ9ICGqoXGyIuWCtw1RAzw=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.589573,42.023686]]}},{"id":"C4LxaiJDvOzTuhwdsee9/T9uVu8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pcoUME1ycFablPnkEZ95rXoCxqY="},{"type":"next-occurrence","id":"t98i36YOY+IjEWABkDnJrUiNTHM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:49:55Z"},"road_event_id":"C4LxaiJDvOzTuhwdsee9/T9uVu8=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.589573,42.023686]]}},{"id":"t98i36YOY+IjEWABkDnJrUiNTHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pcoUME1ycFablPnkEZ95rXoCxqY="},{"type":"next-occurrence","id":"b+BVLOgIc3xL19+zTel0C8xDKF0="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:49:55Z"},"road_event_id":"t98i36YOY+IjEWABkDnJrUiNTHM=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.589573,42.023686]]}},{"id":"b+BVLOgIc3xL19+zTel0C8xDKF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pcoUME1ycFablPnkEZ95rXoCxqY="},{"type":"next-occurrence","id":"EMBOWWgUrTjxFPBVEjSsJSpuWFA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:49:55Z"},"road_event_id":"b+BVLOgIc3xL19+zTel0C8xDKF0=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.589573,42.023686]]}},{"id":"EMBOWWgUrTjxFPBVEjSsJSpuWFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pcoUME1ycFablPnkEZ95rXoCxqY="},{"type":"next-occurrence","id":"nhoSaMjU/nXDFcBWBpjjFcTBGZ0="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:49:55Z"},"road_event_id":"EMBOWWgUrTjxFPBVEjSsJSpuWFA=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.589573,42.023686]]}},{"id":"nhoSaMjU/nXDFcBWBpjjFcTBGZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pcoUME1ycFablPnkEZ95rXoCxqY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:49:55Z"},"road_event_id":"nhoSaMjU/nXDFcBWBpjjFcTBGZ0=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.589573,42.023686]]}},{"id":"krFmBPl5mxlszgJNe0xrCEZ0l08=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hGFCsyA1YIXfuUPc2rPRpf31dxk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:51:48Z"},"road_event_id":"krFmBPl5mxlszgJNe0xrCEZ0l08=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588826,42.020804]]}},{"id":"hGFCsyA1YIXfuUPc2rPRpf31dxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"krFmBPl5mxlszgJNe0xrCEZ0l08="},{"type":"next-occurrence","id":"dJ//yrc+R1QNMOHBOvFfOjToGZk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:51:48Z"},"road_event_id":"hGFCsyA1YIXfuUPc2rPRpf31dxk=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588826,42.020804]]}},{"id":"dJ//yrc+R1QNMOHBOvFfOjToGZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"krFmBPl5mxlszgJNe0xrCEZ0l08="},{"type":"next-occurrence","id":"9mYMxh95EuJiaF6HUk5vXVJA3Eo="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:51:48Z"},"road_event_id":"dJ//yrc+R1QNMOHBOvFfOjToGZk=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588826,42.020804]]}},{"id":"9mYMxh95EuJiaF6HUk5vXVJA3Eo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"krFmBPl5mxlszgJNe0xrCEZ0l08="},{"type":"next-occurrence","id":"NDDOgCCFGz9G/4QEWoq5Ywohtsg="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:51:48Z"},"road_event_id":"9mYMxh95EuJiaF6HUk5vXVJA3Eo=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588826,42.020804]]}},{"id":"NDDOgCCFGz9G/4QEWoq5Ywohtsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"krFmBPl5mxlszgJNe0xrCEZ0l08="},{"type":"next-occurrence","id":"s8PCbkNxwcezPyqaEXoi7bV5g74="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:51:48Z"},"road_event_id":"NDDOgCCFGz9G/4QEWoq5Ywohtsg=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588826,42.020804]]}},{"id":"s8PCbkNxwcezPyqaEXoi7bV5g74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"krFmBPl5mxlszgJNe0xrCEZ0l08="},{"type":"next-occurrence","id":"P2QAUZfXwOvq4+SN8WTb0ntl6DM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:51:48Z"},"road_event_id":"s8PCbkNxwcezPyqaEXoi7bV5g74=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588826,42.020804]]}},{"id":"P2QAUZfXwOvq4+SN8WTb0ntl6DM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"krFmBPl5mxlszgJNe0xrCEZ0l08="},{"type":"next-occurrence","id":"SkWGjGzA7avtanWXQzhXo3KFc3w="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:51:48Z"},"road_event_id":"P2QAUZfXwOvq4+SN8WTb0ntl6DM=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588826,42.020804]]}},{"id":"SkWGjGzA7avtanWXQzhXo3KFc3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"krFmBPl5mxlszgJNe0xrCEZ0l08="},{"type":"next-occurrence","id":"jF6szv1xHrA3c3RZ7eY5t0Q5jaE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:51:48Z"},"road_event_id":"SkWGjGzA7avtanWXQzhXo3KFc3w=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588826,42.020804]]}},{"id":"jF6szv1xHrA3c3RZ7eY5t0Q5jaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"krFmBPl5mxlszgJNe0xrCEZ0l08="},{"type":"next-occurrence","id":"hFLi1304F8VoviOzeQDCsphfLgI="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:51:48Z"},"road_event_id":"jF6szv1xHrA3c3RZ7eY5t0Q5jaE=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T00:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588826,42.020804]]}},{"id":"hFLi1304F8VoviOzeQDCsphfLgI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"krFmBPl5mxlszgJNe0xrCEZ0l08="},{"type":"next-occurrence","id":"dl9gim9cQpQ2LKZt7pLSWI6rPSU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:51:48Z"},"road_event_id":"hFLi1304F8VoviOzeQDCsphfLgI=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588826,42.020804]]}},{"id":"dl9gim9cQpQ2LKZt7pLSWI6rPSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"krFmBPl5mxlszgJNe0xrCEZ0l08="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 49 - US 5 (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T20:51:48Z"},"road_event_id":"dl9gim9cQpQ2LKZt7pLSWI6rPSU=","beginning_cross_street":"Exit 49 - US 5","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.588826,42.020804]]}},{"id":"S+re4bD6uLjTS7BDV4fgMHGTRhg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAUREL HILL RD"],"direction":"unknown","related_road_events":[],"description":"Bridge work on LAUREL HILL RD both directions between 43 (Torrington) and HILLSIDE AVE (Torrington), Continuous Wednesday April 22nd, 2026 12:00 AM thru Monday June 22nd, 2026 11:59 PM All lanes closed","update_date":"2026-04-22T20:54:45Z"},"road_event_id":"S+re4bD6uLjTS7BDV4fgMHGTRhg=","beginning_cross_street":"43","ending_cross_street":"HILLSIDE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.113637,41.798303]]}},{"id":"X4nUUGp4f1WlogXX1+DRCg0c8rM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XfeQT7FCCkTHHq3GqxHY7BQypXE="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"X4nUUGp4f1WlogXX1+DRCg0c8rM=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T18:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"XfeQT7FCCkTHHq3GqxHY7BQypXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X4nUUGp4f1WlogXX1+DRCg0c8rM="},{"type":"next-occurrence","id":"GsP/S6JcrMP7fCWOzceuBNJChkE="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"XfeQT7FCCkTHHq3GqxHY7BQypXE=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T18:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"GsP/S6JcrMP7fCWOzceuBNJChkE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X4nUUGp4f1WlogXX1+DRCg0c8rM="},{"type":"next-occurrence","id":"Ddvz50HiYXv5i6XRMOJPRVy/EpI="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"GsP/S6JcrMP7fCWOzceuBNJChkE=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T18:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"Ddvz50HiYXv5i6XRMOJPRVy/EpI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X4nUUGp4f1WlogXX1+DRCg0c8rM="},{"type":"next-occurrence","id":"PC+7FgVmCZCgUz4jQs3OAbloYD8="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"Ddvz50HiYXv5i6XRMOJPRVy/EpI=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T18:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"PC+7FgVmCZCgUz4jQs3OAbloYD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X4nUUGp4f1WlogXX1+DRCg0c8rM="},{"type":"next-occurrence","id":"+Ler0SFv3EqQCEsusYQPkGPbajE="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"PC+7FgVmCZCgUz4jQs3OAbloYD8=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T18:00:00Z","end_date":"2026-05-23T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"+Ler0SFv3EqQCEsusYQPkGPbajE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X4nUUGp4f1WlogXX1+DRCg0c8rM="},{"type":"next-occurrence","id":"crXR3CMVVkzK5GWA2akbOZXjIbI="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"+Ler0SFv3EqQCEsusYQPkGPbajE=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T18:00:00Z","end_date":"2026-05-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"crXR3CMVVkzK5GWA2akbOZXjIbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X4nUUGp4f1WlogXX1+DRCg0c8rM="},{"type":"next-occurrence","id":"GyyzFPZh8Wf/mpZ6HrV5/AVWqzU="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"crXR3CMVVkzK5GWA2akbOZXjIbI=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T18:00:00Z","end_date":"2026-05-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"GyyzFPZh8Wf/mpZ6HrV5/AVWqzU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X4nUUGp4f1WlogXX1+DRCg0c8rM="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"GyyzFPZh8Wf/mpZ6HrV5/AVWqzU=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T18:00:00Z","end_date":"2026-05-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"2B9hsy8cEGJQUcYRt1/QFiKMVtw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fXoyr+nn3ZEF0+vbN5CdZdxyxWo="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"2B9hsy8cEGJQUcYRt1/QFiKMVtw=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"fXoyr+nn3ZEF0+vbN5CdZdxyxWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2B9hsy8cEGJQUcYRt1/QFiKMVtw="},{"type":"next-occurrence","id":"QOHNBfnEGAmD4BCqSxIWfCAPg9U="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"fXoyr+nn3ZEF0+vbN5CdZdxyxWo=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"QOHNBfnEGAmD4BCqSxIWfCAPg9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2B9hsy8cEGJQUcYRt1/QFiKMVtw="},{"type":"next-occurrence","id":"I8g6ZZdkmsyLT44ZmNwmTDq4/KE="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"QOHNBfnEGAmD4BCqSxIWfCAPg9U=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"I8g6ZZdkmsyLT44ZmNwmTDq4/KE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2B9hsy8cEGJQUcYRt1/QFiKMVtw="},{"type":"next-occurrence","id":"WTv2BWmy+cN+F2p3wyL7caI8KPI="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"I8g6ZZdkmsyLT44ZmNwmTDq4/KE=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"WTv2BWmy+cN+F2p3wyL7caI8KPI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2B9hsy8cEGJQUcYRt1/QFiKMVtw="},{"type":"next-occurrence","id":"vseKJ4dgFnkLyEOtCAxngadjcSA="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"WTv2BWmy+cN+F2p3wyL7caI8KPI=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T12:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"vseKJ4dgFnkLyEOtCAxngadjcSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2B9hsy8cEGJQUcYRt1/QFiKMVtw="},{"type":"next-occurrence","id":"qSSenAu/lzaWU9j8X/qkvwIs150="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"vseKJ4dgFnkLyEOtCAxngadjcSA=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T12:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"qSSenAu/lzaWU9j8X/qkvwIs150=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2B9hsy8cEGJQUcYRt1/QFiKMVtw="},{"type":"next-occurrence","id":"0vYn2uctWOBpc0t8xn2pyP4UPjc="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"qSSenAu/lzaWU9j8X/qkvwIs150=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T12:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"0vYn2uctWOBpc0t8xn2pyP4UPjc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2B9hsy8cEGJQUcYRt1/QFiKMVtw="},{"type":"next-occurrence","id":"/+EMDe1lMvZ32vAHAkqzDZOfS5A="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"0vYn2uctWOBpc0t8xn2pyP4UPjc=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T12:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"/+EMDe1lMvZ32vAHAkqzDZOfS5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2B9hsy8cEGJQUcYRt1/QFiKMVtw="},{"type":"next-occurrence","id":"WfAsCNjI7ZcDUXrW8U2UiOR4KxE="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"/+EMDe1lMvZ32vAHAkqzDZOfS5A=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T12:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"WfAsCNjI7ZcDUXrW8U2UiOR4KxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2B9hsy8cEGJQUcYRt1/QFiKMVtw="},{"type":"next-occurrence","id":"2xdsHRtWp7uKR/vRV7lsIP5HlX8="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"WfAsCNjI7ZcDUXrW8U2UiOR4KxE=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T12:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"2xdsHRtWp7uKR/vRV7lsIP5HlX8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2B9hsy8cEGJQUcYRt1/QFiKMVtw="},{"type":"next-occurrence","id":"hPMtVVCDxoWTZCsXfomZ5a4PosY="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"2xdsHRtWp7uKR/vRV7lsIP5HlX8=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"hPMtVVCDxoWTZCsXfomZ5a4PosY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2B9hsy8cEGJQUcYRt1/QFiKMVtw="},{"type":"next-occurrence","id":"YaoBo9EcwhVHzNH0qWNgTDREpIM="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"hPMtVVCDxoWTZCsXfomZ5a4PosY=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T12:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"YaoBo9EcwhVHzNH0qWNgTDREpIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2B9hsy8cEGJQUcYRt1/QFiKMVtw="},{"type":"next-occurrence","id":"IrOHoGeQOfP/6o1CTfEZj6CvSl0="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"YaoBo9EcwhVHzNH0qWNgTDREpIM=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T12:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"IrOHoGeQOfP/6o1CTfEZj6CvSl0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2B9hsy8cEGJQUcYRt1/QFiKMVtw="},{"type":"next-occurrence","id":"1XwF444MB7TSwHRhGdC+8xj+BhY="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"IrOHoGeQOfP/6o1CTfEZj6CvSl0=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T12:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"1XwF444MB7TSwHRhGdC+8xj+BhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2B9hsy8cEGJQUcYRt1/QFiKMVtw="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"1XwF444MB7TSwHRhGdC+8xj+BhY=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T12:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"anEJtxnuB+AJRWtt0DSmkDwEcW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q8P7QsFvNhjpawb7W8q7OXJLoZQ="}],"description":"Milling and paving operations on I-91 southbound between Exit 23 - CT 3/West Street (Rocky Hill) and Exit 21 - CT 372 (Cromwell), Sunday May 10th, 2026 thru Thursday June 4th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:12:56Z"},"road_event_id":"anEJtxnuB+AJRWtt0DSmkDwEcW0=","beginning_cross_street":"Exit 23 - CT 3/West Street","ending_cross_street":"Exit 21 - CT 372","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.673797,41.647529]]}},{"id":"q8P7QsFvNhjpawb7W8q7OXJLoZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anEJtxnuB+AJRWtt0DSmkDwEcW0="},{"type":"next-occurrence","id":"VWYMYo02HnydtGc7GvMUHOY4qe8="}],"description":"Milling and paving operations on I-91 southbound between Exit 23 - CT 3/West Street (Rocky Hill) and Exit 21 - CT 372 (Cromwell), Sunday May 10th, 2026 thru Thursday June 4th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:12:56Z"},"road_event_id":"q8P7QsFvNhjpawb7W8q7OXJLoZQ=","beginning_cross_street":"Exit 23 - CT 3/West Street","ending_cross_street":"Exit 21 - CT 372","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.673797,41.647529]]}},{"id":"VWYMYo02HnydtGc7GvMUHOY4qe8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anEJtxnuB+AJRWtt0DSmkDwEcW0="},{"type":"next-occurrence","id":"rDnu5MuclloHoWUAD5zgsP725oE="}],"description":"Milling and paving operations on I-91 southbound between Exit 23 - CT 3/West Street (Rocky Hill) and Exit 21 - CT 372 (Cromwell), Sunday May 10th, 2026 thru Thursday June 4th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:12:56Z"},"road_event_id":"VWYMYo02HnydtGc7GvMUHOY4qe8=","beginning_cross_street":"Exit 23 - CT 3/West Street","ending_cross_street":"Exit 21 - CT 372","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.673797,41.647529]]}},{"id":"rDnu5MuclloHoWUAD5zgsP725oE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anEJtxnuB+AJRWtt0DSmkDwEcW0="},{"type":"next-occurrence","id":"ZwGMtG9aOalij+qLx3w6d8vcn2I="}],"description":"Milling and paving operations on I-91 southbound between Exit 23 - CT 3/West Street (Rocky Hill) and Exit 21 - CT 372 (Cromwell), Sunday May 10th, 2026 thru Thursday June 4th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:12:56Z"},"road_event_id":"rDnu5MuclloHoWUAD5zgsP725oE=","beginning_cross_street":"Exit 23 - CT 3/West Street","ending_cross_street":"Exit 21 - CT 372","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.673797,41.647529]]}},{"id":"ZwGMtG9aOalij+qLx3w6d8vcn2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anEJtxnuB+AJRWtt0DSmkDwEcW0="},{"type":"next-occurrence","id":"xeoRHa2JVV7k9ZeSREmDeFPIFQY="}],"description":"Milling and paving operations on I-91 southbound between Exit 23 - CT 3/West Street (Rocky Hill) and Exit 21 - CT 372 (Cromwell), Sunday May 10th, 2026 thru Thursday June 4th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:12:56Z"},"road_event_id":"ZwGMtG9aOalij+qLx3w6d8vcn2I=","beginning_cross_street":"Exit 23 - CT 3/West Street","ending_cross_street":"Exit 21 - CT 372","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.673797,41.647529]]}},{"id":"xeoRHa2JVV7k9ZeSREmDeFPIFQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anEJtxnuB+AJRWtt0DSmkDwEcW0="},{"type":"next-occurrence","id":"dTtKWosPQ5b5xCK7mU1CSo+hHJM="}],"description":"Milling and paving operations on I-91 southbound between Exit 23 - CT 3/West Street (Rocky Hill) and Exit 21 - CT 372 (Cromwell), Sunday May 10th, 2026 thru Thursday June 4th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:12:56Z"},"road_event_id":"xeoRHa2JVV7k9ZeSREmDeFPIFQY=","beginning_cross_street":"Exit 23 - CT 3/West Street","ending_cross_street":"Exit 21 - CT 372","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.673797,41.647529]]}},{"id":"dTtKWosPQ5b5xCK7mU1CSo+hHJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anEJtxnuB+AJRWtt0DSmkDwEcW0="},{"type":"next-occurrence","id":"A+B981UxC81bxDvkU9xfASU/PyE="}],"description":"Milling and paving operations on I-91 southbound between Exit 23 - CT 3/West Street (Rocky Hill) and Exit 21 - CT 372 (Cromwell), Sunday May 10th, 2026 thru Thursday June 4th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:12:56Z"},"road_event_id":"dTtKWosPQ5b5xCK7mU1CSo+hHJM=","beginning_cross_street":"Exit 23 - CT 3/West Street","ending_cross_street":"Exit 21 - CT 372","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.673797,41.647529]]}},{"id":"A+B981UxC81bxDvkU9xfASU/PyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anEJtxnuB+AJRWtt0DSmkDwEcW0="},{"type":"next-occurrence","id":"gN9JQQ6bc0oDs6P6hffcO0gZ9Mo="}],"description":"Milling and paving operations on I-91 southbound between Exit 23 - CT 3/West Street (Rocky Hill) and Exit 21 - CT 372 (Cromwell), Sunday May 10th, 2026 thru Thursday June 4th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:12:56Z"},"road_event_id":"A+B981UxC81bxDvkU9xfASU/PyE=","beginning_cross_street":"Exit 23 - CT 3/West Street","ending_cross_street":"Exit 21 - CT 372","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T23:00:00Z","end_date":"2026-05-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.673797,41.647529]]}},{"id":"gN9JQQ6bc0oDs6P6hffcO0gZ9Mo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anEJtxnuB+AJRWtt0DSmkDwEcW0="},{"type":"next-occurrence","id":"pPfIxMQarXFQE6AFbufqobaO0aM="}],"description":"Milling and paving operations on I-91 southbound between Exit 23 - CT 3/West Street (Rocky Hill) and Exit 21 - CT 372 (Cromwell), Sunday May 10th, 2026 thru Thursday June 4th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:12:56Z"},"road_event_id":"gN9JQQ6bc0oDs6P6hffcO0gZ9Mo=","beginning_cross_street":"Exit 23 - CT 3/West Street","ending_cross_street":"Exit 21 - CT 372","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T23:00:00Z","end_date":"2026-05-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.673797,41.647529]]}},{"id":"pPfIxMQarXFQE6AFbufqobaO0aM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anEJtxnuB+AJRWtt0DSmkDwEcW0="},{"type":"next-occurrence","id":"BxtkcTiJieaTKrimfSPxE2aDpVY="}],"description":"Milling and paving operations on I-91 southbound between Exit 23 - CT 3/West Street (Rocky Hill) and Exit 21 - CT 372 (Cromwell), Sunday May 10th, 2026 thru Thursday June 4th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:12:56Z"},"road_event_id":"pPfIxMQarXFQE6AFbufqobaO0aM=","beginning_cross_street":"Exit 23 - CT 3/West Street","ending_cross_street":"Exit 21 - CT 372","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T23:00:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.673797,41.647529]]}},{"id":"BxtkcTiJieaTKrimfSPxE2aDpVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anEJtxnuB+AJRWtt0DSmkDwEcW0="}],"description":"Milling and paving operations on I-91 southbound between Exit 23 - CT 3/West Street (Rocky Hill) and Exit 21 - CT 372 (Cromwell), Sunday May 10th, 2026 thru Thursday June 4th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:12:56Z"},"road_event_id":"BxtkcTiJieaTKrimfSPxE2aDpVY=","beginning_cross_street":"Exit 23 - CT 3/West Street","ending_cross_street":"Exit 21 - CT 372","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.673797,41.647529]]}},{"id":"GTJoJsm4bJIFcKLS+Ilip21RB9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 72"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6lmXLSle2PO784MKbarmJquhOVU="}],"description":"Milling and paving operations on CT 72 both directions between Exit 1 - CT 177/Unionville Avenue (Plainville) and BLAKESLEE ST (Bristol) Motorists can expect lane closures, Wednesday May 13th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:18:06Z"},"road_event_id":"GTJoJsm4bJIFcKLS+Ilip21RB9g=","beginning_cross_street":"Exit 1 - CT 177/Unionville Avenue","ending_cross_street":"BLAKESLEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.886183,41.672587]]}},{"id":"6lmXLSle2PO784MKbarmJquhOVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 72"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GTJoJsm4bJIFcKLS+Ilip21RB9g="},{"type":"next-occurrence","id":"GWx1amtx45Y6aBxFAdB3kxBdREc="}],"description":"Milling and paving operations on CT 72 both directions between Exit 1 - CT 177/Unionville Avenue (Plainville) and BLAKESLEE ST (Bristol) Motorists can expect lane closures, Wednesday May 13th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:18:06Z"},"road_event_id":"6lmXLSle2PO784MKbarmJquhOVU=","beginning_cross_street":"Exit 1 - CT 177/Unionville Avenue","ending_cross_street":"BLAKESLEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.886183,41.672587]]}},{"id":"GWx1amtx45Y6aBxFAdB3kxBdREc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 72"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GTJoJsm4bJIFcKLS+Ilip21RB9g="},{"type":"next-occurrence","id":"E8LEomX7GPi86/21reF/hz00DEQ="}],"description":"Milling and paving operations on CT 72 both directions between Exit 1 - CT 177/Unionville Avenue (Plainville) and BLAKESLEE ST (Bristol) Motorists can expect lane closures, Wednesday May 13th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:18:06Z"},"road_event_id":"GWx1amtx45Y6aBxFAdB3kxBdREc=","beginning_cross_street":"Exit 1 - CT 177/Unionville Avenue","ending_cross_street":"BLAKESLEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T18:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.886183,41.672587]]}},{"id":"E8LEomX7GPi86/21reF/hz00DEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 72"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GTJoJsm4bJIFcKLS+Ilip21RB9g="},{"type":"next-occurrence","id":"3y37754O8gpE3seGoI52qET9CwQ="}],"description":"Milling and paving operations on CT 72 both directions between Exit 1 - CT 177/Unionville Avenue (Plainville) and BLAKESLEE ST (Bristol) Motorists can expect lane closures, Wednesday May 13th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:18:06Z"},"road_event_id":"E8LEomX7GPi86/21reF/hz00DEQ=","beginning_cross_street":"Exit 1 - CT 177/Unionville Avenue","ending_cross_street":"BLAKESLEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T18:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.886183,41.672587]]}},{"id":"3y37754O8gpE3seGoI52qET9CwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 72"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GTJoJsm4bJIFcKLS+Ilip21RB9g="},{"type":"next-occurrence","id":"py5PuA3lHhnrv7Yz3xoYqoxuUbU="}],"description":"Milling and paving operations on CT 72 both directions between Exit 1 - CT 177/Unionville Avenue (Plainville) and BLAKESLEE ST (Bristol) Motorists can expect lane closures, Wednesday May 13th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:18:06Z"},"road_event_id":"3y37754O8gpE3seGoI52qET9CwQ=","beginning_cross_street":"Exit 1 - CT 177/Unionville Avenue","ending_cross_street":"BLAKESLEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T18:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.886183,41.672587]]}},{"id":"py5PuA3lHhnrv7Yz3xoYqoxuUbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 72"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GTJoJsm4bJIFcKLS+Ilip21RB9g="},{"type":"next-occurrence","id":"FNBl+b2pSMsKUijbp9nQCrtnFlg="}],"description":"Milling and paving operations on CT 72 both directions between Exit 1 - CT 177/Unionville Avenue (Plainville) and BLAKESLEE ST (Bristol) Motorists can expect lane closures, Wednesday May 13th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:18:06Z"},"road_event_id":"py5PuA3lHhnrv7Yz3xoYqoxuUbU=","beginning_cross_street":"Exit 1 - CT 177/Unionville Avenue","ending_cross_street":"BLAKESLEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T18:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.886183,41.672587]]}},{"id":"FNBl+b2pSMsKUijbp9nQCrtnFlg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 72"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GTJoJsm4bJIFcKLS+Ilip21RB9g="}],"description":"Milling and paving operations on CT 72 both directions between Exit 1 - CT 177/Unionville Avenue (Plainville) and BLAKESLEE ST (Bristol) Motorists can expect lane closures, Wednesday May 13th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-22T21:18:06Z"},"road_event_id":"FNBl+b2pSMsKUijbp9nQCrtnFlg=","beginning_cross_street":"Exit 1 - CT 177/Unionville Avenue","ending_cross_street":"BLAKESLEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T18:00:00Z","end_date":"2026-05-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.886183,41.672587]]}},{"id":"CwoNhFOSWCFx2vjrpIJkMXNl3LA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GYyR58RrHE8pJdaQ+GbB53mYjsc="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday May 11th,2026 thru Saturday May 16th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday May 18th,2026 thru Saturday May 23rd,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Tuesday May 26th,2026 thru Saturday May 30th,2026, Tuesday/Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday May 15th,2026 09:45 PM thru Monday May 18th,2026 05:00 AM","update_date":"2026-05-11T09:00:21Z"},"road_event_id":"CwoNhFOSWCFx2vjrpIJkMXNl3LA=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:45:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"GYyR58RrHE8pJdaQ+GbB53mYjsc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CwoNhFOSWCFx2vjrpIJkMXNl3LA="},{"type":"next-occurrence","id":"AimV0P5Ik1yrLxiTGi3lPCP/ySA="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday May 11th,2026 thru Saturday May 16th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday May 18th,2026 thru Saturday May 23rd,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Tuesday May 26th,2026 thru Saturday May 30th,2026, Tuesday/Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday May 15th,2026 09:45 PM thru Monday May 18th,2026 05:00 AM","update_date":"2026-05-11T09:00:21Z"},"road_event_id":"GYyR58RrHE8pJdaQ+GbB53mYjsc=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:45:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"AimV0P5Ik1yrLxiTGi3lPCP/ySA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CwoNhFOSWCFx2vjrpIJkMXNl3LA="},{"type":"next-occurrence","id":"JhzcDn1bdaRpx6QNdKVigRxXSVk="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday May 11th,2026 thru Saturday May 16th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday May 18th,2026 thru Saturday May 23rd,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Tuesday May 26th,2026 thru Saturday May 30th,2026, Tuesday/Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday May 15th,2026 09:45 PM thru Monday May 18th,2026 05:00 AM","update_date":"2026-05-11T09:00:21Z"},"road_event_id":"AimV0P5Ik1yrLxiTGi3lPCP/ySA=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:45:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"JhzcDn1bdaRpx6QNdKVigRxXSVk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CwoNhFOSWCFx2vjrpIJkMXNl3LA="},{"type":"next-occurrence","id":"kMis4ja7TbKBiUfYbuhsVHYBhpw="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday May 11th,2026 thru Saturday May 16th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday May 18th,2026 thru Saturday May 23rd,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Tuesday May 26th,2026 thru Saturday May 30th,2026, Tuesday/Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday May 15th,2026 09:45 PM thru Monday May 18th,2026 05:00 AM","update_date":"2026-05-11T09:00:21Z"},"road_event_id":"JhzcDn1bdaRpx6QNdKVigRxXSVk=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:30:00Z","end_date":"2026-05-20T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"kMis4ja7TbKBiUfYbuhsVHYBhpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CwoNhFOSWCFx2vjrpIJkMXNl3LA="},{"type":"next-occurrence","id":"IlDmd2SoFlOKRx+rxcPw+WcH/7Q="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday May 11th,2026 thru Saturday May 16th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday May 18th,2026 thru Saturday May 23rd,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Tuesday May 26th,2026 thru Saturday May 30th,2026, Tuesday/Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday May 15th,2026 09:45 PM thru Monday May 18th,2026 05:00 AM","update_date":"2026-05-11T09:00:21Z"},"road_event_id":"kMis4ja7TbKBiUfYbuhsVHYBhpw=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:30:00Z","end_date":"2026-05-21T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"IlDmd2SoFlOKRx+rxcPw+WcH/7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CwoNhFOSWCFx2vjrpIJkMXNl3LA="},{"type":"next-occurrence","id":"hZXz3+gMNkmn9Kt1BpP37970CCA="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday May 11th,2026 thru Saturday May 16th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday May 18th,2026 thru Saturday May 23rd,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Tuesday May 26th,2026 thru Saturday May 30th,2026, Tuesday/Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday May 15th,2026 09:45 PM thru Monday May 18th,2026 05:00 AM","update_date":"2026-05-11T09:00:21Z"},"road_event_id":"IlDmd2SoFlOKRx+rxcPw+WcH/7Q=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:30:00Z","end_date":"2026-05-22T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"hZXz3+gMNkmn9Kt1BpP37970CCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CwoNhFOSWCFx2vjrpIJkMXNl3LA="},{"type":"next-occurrence","id":"UV831nizCHi3kWANBBsRCz6dCf8="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday May 11th,2026 thru Saturday May 16th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday May 18th,2026 thru Saturday May 23rd,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Tuesday May 26th,2026 thru Saturday May 30th,2026, Tuesday/Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday May 15th,2026 09:45 PM thru Monday May 18th,2026 05:00 AM","update_date":"2026-05-11T09:00:21Z"},"road_event_id":"hZXz3+gMNkmn9Kt1BpP37970CCA=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T23:30:00Z","end_date":"2026-05-23T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"UV831nizCHi3kWANBBsRCz6dCf8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CwoNhFOSWCFx2vjrpIJkMXNl3LA="},{"type":"next-occurrence","id":"Irbmhb0wyV+jRs18ZMQOb+0XLAA="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday May 11th,2026 thru Saturday May 16th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday May 18th,2026 thru Saturday May 23rd,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Tuesday May 26th,2026 thru Saturday May 30th,2026, Tuesday/Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday May 15th,2026 09:45 PM thru Monday May 18th,2026 05:00 AM","update_date":"2026-05-11T09:00:21Z"},"road_event_id":"UV831nizCHi3kWANBBsRCz6dCf8=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T23:30:00Z","end_date":"2026-05-24T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"Irbmhb0wyV+jRs18ZMQOb+0XLAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CwoNhFOSWCFx2vjrpIJkMXNl3LA="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday May 11th,2026 thru Saturday May 16th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday May 18th,2026 thru Saturday May 23rd,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Tuesday May 26th,2026 thru Saturday May 30th,2026, Tuesday/Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday May 15th,2026 09:45 PM thru Monday May 18th,2026 05:00 AM","update_date":"2026-05-11T09:00:21Z"},"road_event_id":"Irbmhb0wyV+jRs18ZMQOb+0XLAA=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:30:00Z","end_date":"2026-05-28T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"VDVUUOzc+eWwkbpx+fuzxiJfrrg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-110"],"direction":"unknown","related_road_events":[],"description":"Utility work on CT-110 both directions between MAIN ST (Stratford), Continuous Monday May 4th, 2026 06:00 AM thru Friday June 12th, 2026 08:00 PM All lanes closed","update_date":"2026-04-22T21:26:36Z"},"road_event_id":"VDVUUOzc+eWwkbpx+fuzxiJfrrg=","beginning_cross_street":"MAIN ST","ending_cross_street":"MAIN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107162,41.236501]]}},{"id":"MlAleet1sXA+zC8dTAToufdLxAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"V25ZDsACwXKOqfbb2AfxY95TShk="}],"description":"Road maintenance operations on Taconic State Parkway northbound between Exit 35 - Miller Hill Rd. (East Fishkill) and Exit 47B - NY 55 (La Grange) Res 8-3 RW/32698309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-05-08T18:30:11Z"},"road_event_id":"MlAleet1sXA+zC8dTAToufdLxAQ=","beginning_cross_street":"Exit 35 - Miller Hill Rd. ","ending_cross_street":"Exit 47B - NY 55","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772557,41.541898]]}},{"id":"V25ZDsACwXKOqfbb2AfxY95TShk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MlAleet1sXA+zC8dTAToufdLxAQ="},{"type":"next-occurrence","id":"Vi1g8CNC0fcBYkt1coOSHYIexQs="}],"description":"Road maintenance operations on Taconic State Parkway northbound between Exit 35 - Miller Hill Rd. (East Fishkill) and Exit 47B - NY 55 (La Grange) Res 8-3 RW/32698309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-05-08T18:30:11Z"},"road_event_id":"V25ZDsACwXKOqfbb2AfxY95TShk=","beginning_cross_street":"Exit 35 - Miller Hill Rd. ","ending_cross_street":"Exit 47B - NY 55","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772557,41.541898]]}},{"id":"Vi1g8CNC0fcBYkt1coOSHYIexQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MlAleet1sXA+zC8dTAToufdLxAQ="}],"description":"Road maintenance operations on Taconic State Parkway northbound between Exit 35 - Miller Hill Rd. (East Fishkill) and Exit 47B - NY 55 (La Grange) Res 8-3 RW/32698309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-05-08T18:30:11Z"},"road_event_id":"Vi1g8CNC0fcBYkt1coOSHYIexQs=","beginning_cross_street":"Exit 35 - Miller Hill Rd. ","ending_cross_street":"Exit 47B - NY 55","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772557,41.541898]]}},{"id":"j+6u/BDFKCBiVMO8jAvreG5riUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RWfhl+uHfC1hxA0VRBxs+qGUkZs="}],"description":"Drainage improvements and sign work and survey work on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and I-287 (Greenburgh) D265463/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closure","update_date":"2026-05-08T12:57:19Z"},"road_event_id":"j+6u/BDFKCBiVMO8jAvreG5riUI=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852955,40.953435]]}},{"id":"RWfhl+uHfC1hxA0VRBxs+qGUkZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j+6u/BDFKCBiVMO8jAvreG5riUI="},{"type":"next-occurrence","id":"eJZjtPteHMo+uWa+AH+pbjTv4YI="}],"description":"Drainage improvements and sign work and survey work on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and I-287 (Greenburgh) D265463/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closure","update_date":"2026-05-08T12:57:19Z"},"road_event_id":"RWfhl+uHfC1hxA0VRBxs+qGUkZs=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852955,40.953435]]}},{"id":"eJZjtPteHMo+uWa+AH+pbjTv4YI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j+6u/BDFKCBiVMO8jAvreG5riUI="},{"type":"next-occurrence","id":"lS15GciEnqEoWN5/dsvLCUtF9pg="}],"description":"Drainage improvements and sign work and survey work on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and I-287 (Greenburgh) D265463/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closure","update_date":"2026-05-08T12:57:19Z"},"road_event_id":"eJZjtPteHMo+uWa+AH+pbjTv4YI=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852955,40.953435]]}},{"id":"lS15GciEnqEoWN5/dsvLCUtF9pg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j+6u/BDFKCBiVMO8jAvreG5riUI="},{"type":"next-occurrence","id":"CSr035uLj/E1ysFAlnwfbZXWzho="}],"description":"Drainage improvements and sign work and survey work on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and I-287 (Greenburgh) D265463/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closure","update_date":"2026-05-08T12:57:19Z"},"road_event_id":"lS15GciEnqEoWN5/dsvLCUtF9pg=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852955,40.953435]]}},{"id":"CSr035uLj/E1ysFAlnwfbZXWzho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j+6u/BDFKCBiVMO8jAvreG5riUI="},{"type":"next-occurrence","id":"CayzZeGcNNhMozih7vNgWMyre7E="}],"description":"Drainage improvements and sign work and survey work on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and I-287 (Greenburgh) D265463/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closure","update_date":"2026-05-08T12:57:19Z"},"road_event_id":"CSr035uLj/E1ysFAlnwfbZXWzho=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852955,40.953435]]}},{"id":"CayzZeGcNNhMozih7vNgWMyre7E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j+6u/BDFKCBiVMO8jAvreG5riUI="},{"type":"next-occurrence","id":"KWKuiV0zwDl77JSKcycBmo33gI0="}],"description":"Drainage improvements and sign work and survey work on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and I-287 (Greenburgh) D265463/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closure","update_date":"2026-05-08T12:57:19Z"},"road_event_id":"CayzZeGcNNhMozih7vNgWMyre7E=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852955,40.953435]]}},{"id":"KWKuiV0zwDl77JSKcycBmo33gI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j+6u/BDFKCBiVMO8jAvreG5riUI="}],"description":"Drainage improvements and sign work and survey work on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and I-287 (Greenburgh) D265463/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closure","update_date":"2026-05-08T12:57:19Z"},"road_event_id":"KWKuiV0zwDl77JSKcycBmo33gI0=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852955,40.953435]]}},{"id":"bpfGaPiayzkaA3HDlTZrlIudHs4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on NY 208 both directions between Salzburg Road (Blooming Grove) and Twin Arch Road (Blooming Grove) D265386/32732609 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Monday May 11th, 2026 12:00 AM thru Tuesday August 11th, 2026 12:00 AM all lanes closed and detoured","update_date":"2026-04-23T11:50:47Z"},"road_event_id":"bpfGaPiayzkaA3HDlTZrlIudHs4=","beginning_cross_street":"Salzburg Road","ending_cross_street":"Twin Arch Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.184067,41.431177]]}},{"id":"X8SJJyIf9OhZqrjoxAtcBwjvdB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 9D southbound between Coris Lane (Cold Spring) and Fair Street (Cold Spring) 2026084697290/30372609 - 24/7 S/B LANE CLOSURE - This work is weather permitting. Plan travel accordingly; delays may exist, Continuous Thursday April 30th, 2026 8:30 AM thru Tuesday September 29th, 2026 7:00 AM alternating traffic","update_date":"2026-04-23T14:50:59Z"},"road_event_id":"X8SJJyIf9OhZqrjoxAtcBwjvdB4=","beginning_cross_street":"Coris Lane","ending_cross_street":"Fair Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977608,41.443102]]}},{"id":"ngUWyKB6tMuKd/LXmwQ+ymPBNwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0VK4+Ez/1gDdmUBCfnPI//IW2D8="}],"description":"Utility work on NY 63 eastbound 2931 Genesee St (Geneseo), Monday April 27th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-07T16:35:29Z"},"road_event_id":"ngUWyKB6tMuKd/LXmwQ+ymPBNwg=","beginning_cross_street":"2931 Genesee St ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.829352,42.765854]]}},{"id":"0VK4+Ez/1gDdmUBCfnPI//IW2D8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ngUWyKB6tMuKd/LXmwQ+ymPBNwg="},{"type":"next-occurrence","id":"GHQaoZhKArfrr+Z5gYe1IGNykW4="}],"description":"Utility work on NY 63 eastbound 2931 Genesee St (Geneseo), Monday April 27th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-07T16:35:29Z"},"road_event_id":"0VK4+Ez/1gDdmUBCfnPI//IW2D8=","beginning_cross_street":"2931 Genesee St ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.829352,42.765854]]}},{"id":"GHQaoZhKArfrr+Z5gYe1IGNykW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ngUWyKB6tMuKd/LXmwQ+ymPBNwg="}],"description":"Utility work on NY 63 eastbound 2931 Genesee St (Geneseo), Monday April 27th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-07T16:35:29Z"},"road_event_id":"GHQaoZhKArfrr+Z5gYe1IGNykW4=","beginning_cross_street":"2931 Genesee St ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.829352,42.765854]]}},{"id":"Kbu1mlpoDkngQC9PVO/N1ymcwbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Xl3nVaxAMP3+Gr6vtqwvXFauwaY="}],"description":"Gas main work on US 9 both directions between Tower Hill Road (Briarcliff Manor) and Scarborough Road (Briarcliff Manor) 2024081733525/32653109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-09T18:01:09Z"},"road_event_id":"Kbu1mlpoDkngQC9PVO/N1ymcwbM=","beginning_cross_street":"Tower Hill Road","ending_cross_street":"Scarborough Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860719,41.133028]]}},{"id":"Xl3nVaxAMP3+Gr6vtqwvXFauwaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Kbu1mlpoDkngQC9PVO/N1ymcwbM="},{"type":"next-occurrence","id":"k4L7furTfOYn8jJRg4wSxaWT9sw="}],"description":"Gas main work on US 9 both directions between Tower Hill Road (Briarcliff Manor) and Scarborough Road (Briarcliff Manor) 2024081733525/32653109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-09T18:01:09Z"},"road_event_id":"Xl3nVaxAMP3+Gr6vtqwvXFauwaY=","beginning_cross_street":"Tower Hill Road","ending_cross_street":"Scarborough Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860719,41.133028]]}},{"id":"k4L7furTfOYn8jJRg4wSxaWT9sw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Kbu1mlpoDkngQC9PVO/N1ymcwbM="},{"type":"next-occurrence","id":"2IqqlGe3437upL1Z/zY+7dNjBBw="}],"description":"Gas main work on US 9 both directions between Tower Hill Road (Briarcliff Manor) and Scarborough Road (Briarcliff Manor) 2024081733525/32653109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-09T18:01:09Z"},"road_event_id":"k4L7furTfOYn8jJRg4wSxaWT9sw=","beginning_cross_street":"Tower Hill Road","ending_cross_street":"Scarborough Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860719,41.133028]]}},{"id":"2IqqlGe3437upL1Z/zY+7dNjBBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Kbu1mlpoDkngQC9PVO/N1ymcwbM="},{"type":"next-occurrence","id":"igTy1bK/3B1Ct6LTVem/wMSvRHo="}],"description":"Gas main work on US 9 both directions between Tower Hill Road (Briarcliff Manor) and Scarborough Road (Briarcliff Manor) 2024081733525/32653109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-09T18:01:09Z"},"road_event_id":"2IqqlGe3437upL1Z/zY+7dNjBBw=","beginning_cross_street":"Tower Hill Road","ending_cross_street":"Scarborough Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860719,41.133028]]}},{"id":"igTy1bK/3B1Ct6LTVem/wMSvRHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Kbu1mlpoDkngQC9PVO/N1ymcwbM="},{"type":"next-occurrence","id":"/cRs4cDucwYDaJVCaIXrFKDaHzc="}],"description":"Gas main work on US 9 both directions between Tower Hill Road (Briarcliff Manor) and Scarborough Road (Briarcliff Manor) 2024081733525/32653109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-09T18:01:09Z"},"road_event_id":"igTy1bK/3B1Ct6LTVem/wMSvRHo=","beginning_cross_street":"Tower Hill Road","ending_cross_street":"Scarborough Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860719,41.133028]]}},{"id":"/cRs4cDucwYDaJVCaIXrFKDaHzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Kbu1mlpoDkngQC9PVO/N1ymcwbM="},{"type":"next-occurrence","id":"2Nb4LcqrnkBvXwnDV85FVTBj/Hk="}],"description":"Gas main work on US 9 both directions between Tower Hill Road (Briarcliff Manor) and Scarborough Road (Briarcliff Manor) 2024081733525/32653109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-09T18:01:09Z"},"road_event_id":"/cRs4cDucwYDaJVCaIXrFKDaHzc=","beginning_cross_street":"Tower Hill Road","ending_cross_street":"Scarborough Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860719,41.133028]]}},{"id":"2Nb4LcqrnkBvXwnDV85FVTBj/Hk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Kbu1mlpoDkngQC9PVO/N1ymcwbM="},{"type":"next-occurrence","id":"Y7NuHOY894XczPwuLzZYcYWdzvI="}],"description":"Gas main work on US 9 both directions between Tower Hill Road (Briarcliff Manor) and Scarborough Road (Briarcliff Manor) 2024081733525/32653109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-09T18:01:09Z"},"road_event_id":"2Nb4LcqrnkBvXwnDV85FVTBj/Hk=","beginning_cross_street":"Tower Hill Road","ending_cross_street":"Scarborough Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860719,41.133028]]}},{"id":"Y7NuHOY894XczPwuLzZYcYWdzvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Kbu1mlpoDkngQC9PVO/N1ymcwbM="}],"description":"Gas main work on US 9 both directions between Tower Hill Road (Briarcliff Manor) and Scarborough Road (Briarcliff Manor) 2024081733525/32653109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-09T18:01:09Z"},"road_event_id":"Y7NuHOY894XczPwuLzZYcYWdzvI=","beginning_cross_street":"Tower Hill Road","ending_cross_street":"Scarborough Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860719,41.133028]]}},{"id":"3/RggMqixlRkgH7x+d6FPhSqKyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dnpUXtKgN0ZGrrKOkmx6qExVUec="}],"description":"Utility work on US 20A both directions between Pennimite Rd (Livonia) and Longview Blvd (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 29th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-01T15:34:08Z"},"road_event_id":"3/RggMqixlRkgH7x+d6FPhSqKyM=","beginning_cross_street":"Pennimite Rd","ending_cross_street":"Longview Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.686821,42.826285]]}},{"id":"dnpUXtKgN0ZGrrKOkmx6qExVUec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3/RggMqixlRkgH7x+d6FPhSqKyM="},{"type":"next-occurrence","id":"e21JmUjAu6bSevADMDJSdN7umZg="}],"description":"Utility work on US 20A both directions between Pennimite Rd (Livonia) and Longview Blvd (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 29th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-01T15:34:08Z"},"road_event_id":"dnpUXtKgN0ZGrrKOkmx6qExVUec=","beginning_cross_street":"Pennimite Rd","ending_cross_street":"Longview Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.686821,42.826285]]}},{"id":"e21JmUjAu6bSevADMDJSdN7umZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3/RggMqixlRkgH7x+d6FPhSqKyM="}],"description":"Utility work on US 20A both directions between Pennimite Rd (Livonia) and Longview Blvd (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 29th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-01T15:34:08Z"},"road_event_id":"e21JmUjAu6bSevADMDJSdN7umZg=","beginning_cross_street":"Pennimite Rd","ending_cross_street":"Longview Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.686821,42.826285]]}},{"id":"9sVnEHur4lHJvmPnsx6gB+xYg28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4SkKpUPSCG3hyyPdKDf4Z60U25Y="}],"description":"Utility work on NY 5 both directions between Buckley Rd (Stafford) and Royal Dr (Le Roy) Placing/splicing aerial/underground cable. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossing. Work beyond shoulder., Saturday April 25th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T11:13:43Z"},"road_event_id":"9sVnEHur4lHJvmPnsx6gB+xYg28=","beginning_cross_street":"Buckley Rd","ending_cross_street":"Royal Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.046136,42.97984]]}},{"id":"4SkKpUPSCG3hyyPdKDf4Z60U25Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9sVnEHur4lHJvmPnsx6gB+xYg28="},{"type":"next-occurrence","id":"wHP6Dg4nQuXKsJaBFkYfrT1b/8U="}],"description":"Utility work on NY 5 both directions between Buckley Rd (Stafford) and Royal Dr (Le Roy) Placing/splicing aerial/underground cable. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossing. Work beyond shoulder., Saturday April 25th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T11:13:43Z"},"road_event_id":"4SkKpUPSCG3hyyPdKDf4Z60U25Y=","beginning_cross_street":"Buckley Rd","ending_cross_street":"Royal Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.046136,42.97984]]}},{"id":"wHP6Dg4nQuXKsJaBFkYfrT1b/8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9sVnEHur4lHJvmPnsx6gB+xYg28="}],"description":"Utility work on NY 5 both directions between Buckley Rd (Stafford) and Royal Dr (Le Roy) Placing/splicing aerial/underground cable. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossing. Work beyond shoulder., Saturday April 25th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T11:13:43Z"},"road_event_id":"wHP6Dg4nQuXKsJaBFkYfrT1b/8U=","beginning_cross_street":"Buckley Rd","ending_cross_street":"Royal Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.046136,42.97984]]}},{"id":"QP58Ylmy2ONnNM4YhpVTu7/xgZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson Bergen Light Rail"],"direction":"unknown","related_road_events":[],"description":"Due to Track repairs both directions, Hudson Bergen Light Rail between Tonnelle Avenue Light Rail Station (North Bergen Twp) and Port Imperial Hblr Station (Weehawken Twp) Tracks R1 and R2 will be out of service between Tonnelle Avenue and Port Imperial Stations. A bus bridge will be in place from Tonnelle Avenue, Bergenline Avenue, and Port Imperial Stations, Continuous Saturday May 16th, 2026 06:00 AM thru Sunday May 17th, 2026 08:00 PM bus service only","update_date":"2026-04-23T19:47:00Z"},"road_event_id":"QP58Ylmy2ONnNM4YhpVTu7/xgZI=","beginning_cross_street":"Tonnelle Avenue Light Rail Station","ending_cross_street":"Port Imperial Hblr Station","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T10:00:00Z","end_date":"2026-05-18T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.031263,40.78733]]}},{"id":"vrumGjLpsamM85/oTLNKb4OxSSM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/C6iFldyq2UOL8rRIBetLsfDJEQ="}],"description":"Construction on NY 104 westbound at 1933 Rt-104 (Ontario) REPLACE POLE 97 AND INSTALL A NEW RECLOSER ON THE REPLACED POLE. POLE IS FAR OFF THE SHOULDER OF STATE ROUTE 104 AND WILL NOT IMPACT TRAFFIC. LOCATED NEAR 1933 STATE ROUTE 104 ONTARIO/WAYNE COUNTY AND MM 104 37041044, Monday May 4th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes","update_date":"2026-04-23T20:54:30Z"},"road_event_id":"vrumGjLpsamM85/oTLNKb4OxSSM=","beginning_cross_street":"1933 Rt-104","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.28736,43.227512]]}},{"id":"/C6iFldyq2UOL8rRIBetLsfDJEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vrumGjLpsamM85/oTLNKb4OxSSM="},{"type":"next-occurrence","id":"7bYULlrJLWAqA2TydkQEGY6vEkU="}],"description":"Construction on NY 104 westbound at 1933 Rt-104 (Ontario) REPLACE POLE 97 AND INSTALL A NEW RECLOSER ON THE REPLACED POLE. POLE IS FAR OFF THE SHOULDER OF STATE ROUTE 104 AND WILL NOT IMPACT TRAFFIC. LOCATED NEAR 1933 STATE ROUTE 104 ONTARIO/WAYNE COUNTY AND MM 104 37041044, Monday May 4th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes","update_date":"2026-04-23T20:54:30Z"},"road_event_id":"/C6iFldyq2UOL8rRIBetLsfDJEQ=","beginning_cross_street":"1933 Rt-104","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.28736,43.227512]]}},{"id":"7bYULlrJLWAqA2TydkQEGY6vEkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vrumGjLpsamM85/oTLNKb4OxSSM="}],"description":"Construction on NY 104 westbound at 1933 Rt-104 (Ontario) REPLACE POLE 97 AND INSTALL A NEW RECLOSER ON THE REPLACED POLE. POLE IS FAR OFF THE SHOULDER OF STATE ROUTE 104 AND WILL NOT IMPACT TRAFFIC. LOCATED NEAR 1933 STATE ROUTE 104 ONTARIO/WAYNE COUNTY AND MM 104 37041044, Monday May 4th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes","update_date":"2026-04-23T20:54:30Z"},"road_event_id":"7bYULlrJLWAqA2TydkQEGY6vEkU=","beginning_cross_street":"1933 Rt-104","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.28736,43.227512]]}},{"id":"d4Vd+qchgnv4DZmeo7E1THeBG/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Korean Veterans Memorial Parkway"],"direction":"unknown","related_road_events":[],"description":"Construction on Korean Veterans Memorial Parkway westbound between Arden Avenue (Staten Island) and Huguenot Avenue (Staten Island) Subject to change without notice., Monday May 11th,2026 thru Sunday May 17th,2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM 1 Right lane of 2 lanes closed westbound,","update_date":"2026-05-10T03:59:01Z"},"road_event_id":"d4Vd+qchgnv4DZmeo7E1THeBG/U=","beginning_cross_street":"Arden Avenue","ending_cross_street":"Huguenot Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-18T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.176041,40.555183]]}},{"id":"QwcoOSON0NylRP+oNwo31FF1YBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[],"description":"Utility work on VAN BUREN ST both directions between ALMOND ST (Syracuse) and HENRY ST (Syracuse) ; follow detour, Continuous Thursday April 23rd, 2026 06:00 AM thru Thursday October 15th, 2026 05:00 PM All lanes closed","update_date":"2026-04-23T22:46:38Z"},"road_event_id":"QwcoOSON0NylRP+oNwo31FF1YBs=","beginning_cross_street":"ALMOND ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142081,43.038465]]}},{"id":"j6Z+oUdNGqemjx5gLIz8uf65bIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ALMOND ST"],"direction":"unknown","related_road_events":[],"description":"Longterm construction on ALMOND ST both directions between E TAYLOR ST (Syracuse) and VAN BUREN ST (Syracuse) ; Alternating one-way traffic with flaggers, Continuous Wednesday April 15th, 2026 06:00 AM thru Thursday October 15th, 2026 05:00 PM All lanes open","update_date":"2026-04-23T22:50:14Z"},"road_event_id":"j6Z+oUdNGqemjx5gLIz8uf65bIk=","beginning_cross_street":"E TAYLOR ST","ending_cross_street":"VAN BUREN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142204,43.039399]]}},{"id":"W5NjMiGjQMHGOwBedUXNf80XCWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7WqwKaPT9yNpFnDCMjP5CkNwSWE="}],"description":"Construction on NY 33A both directions at Union Street; NY 259; CR 170 (Chili), Monday April 27th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-07T13:28:19Z"},"road_event_id":"W5NjMiGjQMHGOwBedUXNf80XCWk=","beginning_cross_street":"Union Street; NY 259; CR 170","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.798028,43.093039]]}},{"id":"7WqwKaPT9yNpFnDCMjP5CkNwSWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W5NjMiGjQMHGOwBedUXNf80XCWk="},{"type":"next-occurrence","id":"eEna3h4ta8GLuhmpDG+CrBZ3x3g="}],"description":"Construction on NY 33A both directions at Union Street; NY 259; CR 170 (Chili), Monday April 27th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-07T13:28:19Z"},"road_event_id":"7WqwKaPT9yNpFnDCMjP5CkNwSWE=","beginning_cross_street":"Union Street; NY 259; CR 170","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.798028,43.093039]]}},{"id":"eEna3h4ta8GLuhmpDG+CrBZ3x3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W5NjMiGjQMHGOwBedUXNf80XCWk="}],"description":"Construction on NY 33A both directions at Union Street; NY 259; CR 170 (Chili), Monday April 27th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-07T13:28:19Z"},"road_event_id":"eEna3h4ta8GLuhmpDG+CrBZ3x3g=","beginning_cross_street":"Union Street; NY 259; CR 170","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.798028,43.093039]]}},{"id":"Mn8356EYlSXz0fM3KJAt4mKHREM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7ggZm3HpdjJus9ELYuTqwH1Bk5s="}],"description":"Installation of traffic management systems on US 44/NY 55 westbound between Cherry Street (Poughkeepsie) D265523/32733309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:26Z"},"road_event_id":"Mn8356EYlSXz0fM3KJAt4mKHREM=","beginning_cross_street":"Cherry Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917558,41.702247]]}},{"id":"7ggZm3HpdjJus9ELYuTqwH1Bk5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mn8356EYlSXz0fM3KJAt4mKHREM="},{"type":"next-occurrence","id":"L257zb7abtCqsc2tkRwchJJg8yY="}],"description":"Installation of traffic management systems on US 44/NY 55 westbound between Cherry Street (Poughkeepsie) D265523/32733309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:26Z"},"road_event_id":"7ggZm3HpdjJus9ELYuTqwH1Bk5s=","beginning_cross_street":"Cherry Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917558,41.702247]]}},{"id":"L257zb7abtCqsc2tkRwchJJg8yY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mn8356EYlSXz0fM3KJAt4mKHREM="},{"type":"next-occurrence","id":"0Az42vJDeQrik4eLzZU/q1PpM6c="}],"description":"Installation of traffic management systems on US 44/NY 55 westbound between Cherry Street (Poughkeepsie) D265523/32733309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:26Z"},"road_event_id":"L257zb7abtCqsc2tkRwchJJg8yY=","beginning_cross_street":"Cherry Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917558,41.702247]]}},{"id":"0Az42vJDeQrik4eLzZU/q1PpM6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mn8356EYlSXz0fM3KJAt4mKHREM="}],"description":"Installation of traffic management systems on US 44/NY 55 westbound between Cherry Street (Poughkeepsie) D265523/32733309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:26Z"},"road_event_id":"0Az42vJDeQrik4eLzZU/q1PpM6c=","beginning_cross_street":"Cherry Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917558,41.702247]]}},{"id":"JKv7Mfi3mFIk3AO2xIuwSNpY43A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 51"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"j2qDqQBaw5U5b6TaOXsrNQQZyzI="}],"description":"Construction on NY 51 both directions area of Remington Road (Ilion) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 27th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:54:51Z"},"road_event_id":"JKv7Mfi3mFIk3AO2xIuwSNpY43A=","beginning_cross_street":"Remington Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.077996,42.985683]]}},{"id":"j2qDqQBaw5U5b6TaOXsrNQQZyzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 51"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JKv7Mfi3mFIk3AO2xIuwSNpY43A="},{"type":"next-occurrence","id":"+zZhsTkNvaqeanUArKyy24YUjt0="}],"description":"Construction on NY 51 both directions area of Remington Road (Ilion) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 27th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:54:51Z"},"road_event_id":"j2qDqQBaw5U5b6TaOXsrNQQZyzI=","beginning_cross_street":"Remington Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.077996,42.985683]]}},{"id":"+zZhsTkNvaqeanUArKyy24YUjt0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 51"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JKv7Mfi3mFIk3AO2xIuwSNpY43A="}],"description":"Construction on NY 51 both directions area of Remington Road (Ilion) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 27th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:54:51Z"},"road_event_id":"+zZhsTkNvaqeanUArKyy24YUjt0=","beginning_cross_street":"Remington Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.077996,42.985683]]}},{"id":"x55rmeA3Z3I9DYygG3T/W+80aSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cuS/IZpfhPmC4Ja9RSfjZaeVX8g="}],"description":"Installation of traffic management systems on US 9 southbound at Croton Avenue (Ossining) D265523/32733509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:26Z"},"road_event_id":"x55rmeA3Z3I9DYygG3T/W+80aSw=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861622,41.162805]]}},{"id":"cuS/IZpfhPmC4Ja9RSfjZaeVX8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x55rmeA3Z3I9DYygG3T/W+80aSw="},{"type":"next-occurrence","id":"IbPsy+dJf4SmMhFv62MT5Ry14Lo="}],"description":"Installation of traffic management systems on US 9 southbound at Croton Avenue (Ossining) D265523/32733509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:26Z"},"road_event_id":"cuS/IZpfhPmC4Ja9RSfjZaeVX8g=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861622,41.162805]]}},{"id":"IbPsy+dJf4SmMhFv62MT5Ry14Lo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x55rmeA3Z3I9DYygG3T/W+80aSw="},{"type":"next-occurrence","id":"GQNQgzdoG31sPX81zLxD7tqWVkc="}],"description":"Installation of traffic management systems on US 9 southbound at Croton Avenue (Ossining) D265523/32733509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:26Z"},"road_event_id":"IbPsy+dJf4SmMhFv62MT5Ry14Lo=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861622,41.162805]]}},{"id":"GQNQgzdoG31sPX81zLxD7tqWVkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x55rmeA3Z3I9DYygG3T/W+80aSw="}],"description":"Installation of traffic management systems on US 9 southbound at Croton Avenue (Ossining) D265523/32733509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:26Z"},"road_event_id":"GQNQgzdoG31sPX81zLxD7tqWVkc=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:30:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861622,41.162805]]}},{"id":"NLGmcnOFENC4tBqCuUqlgmxaUZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Riverdale Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"A4r2TkMo01D8N5DoKXEPW3pEcUQ="}],"description":"Installation of traffic management systems on Riverdale Avenue southbound at Hudson Street (Yonkers) D265523/32733609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:26Z"},"road_event_id":"NLGmcnOFENC4tBqCuUqlgmxaUZo=","beginning_cross_street":"Hudson Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899759,40.93346]]}},{"id":"A4r2TkMo01D8N5DoKXEPW3pEcUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Riverdale Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NLGmcnOFENC4tBqCuUqlgmxaUZo="},{"type":"next-occurrence","id":"5eP6f3nYpAdGtpgmz1aljjyZ+mw="}],"description":"Installation of traffic management systems on Riverdale Avenue southbound at Hudson Street (Yonkers) D265523/32733609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:26Z"},"road_event_id":"A4r2TkMo01D8N5DoKXEPW3pEcUQ=","beginning_cross_street":"Hudson Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899759,40.93346]]}},{"id":"5eP6f3nYpAdGtpgmz1aljjyZ+mw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Riverdale Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NLGmcnOFENC4tBqCuUqlgmxaUZo="},{"type":"next-occurrence","id":"cKQNN2ZOPbnxOiD6zYaMbwUDLOY="}],"description":"Installation of traffic management systems on Riverdale Avenue southbound at Hudson Street (Yonkers) D265523/32733609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:26Z"},"road_event_id":"5eP6f3nYpAdGtpgmz1aljjyZ+mw=","beginning_cross_street":"Hudson Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899759,40.93346]]}},{"id":"cKQNN2ZOPbnxOiD6zYaMbwUDLOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Riverdale Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NLGmcnOFENC4tBqCuUqlgmxaUZo="}],"description":"Installation of traffic management systems on Riverdale Avenue southbound at Hudson Street (Yonkers) D265523/32733609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:26Z"},"road_event_id":"cKQNN2ZOPbnxOiD6zYaMbwUDLOY=","beginning_cross_street":"Hudson Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899759,40.93346]]}},{"id":"KrO3s3Y9iXPZhxU7pfz7ARPMupE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+CgIYHLi/YtM1hDrp+4uzJn15lA="}],"description":"Installation of traffic management systems on NY 9A southbound at Nepperhan Avenue (Yonkers) D265523/32726609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:25Z"},"road_event_id":"KrO3s3Y9iXPZhxU7pfz7ARPMupE=","beginning_cross_street":"Nepperhan Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898882,40.931732]]}},{"id":"+CgIYHLi/YtM1hDrp+4uzJn15lA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KrO3s3Y9iXPZhxU7pfz7ARPMupE="},{"type":"next-occurrence","id":"JTVBOCS6yh98HFEsog0xhbuCiC8="}],"description":"Installation of traffic management systems on NY 9A southbound at Nepperhan Avenue (Yonkers) D265523/32726609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:25Z"},"road_event_id":"+CgIYHLi/YtM1hDrp+4uzJn15lA=","beginning_cross_street":"Nepperhan Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898882,40.931732]]}},{"id":"JTVBOCS6yh98HFEsog0xhbuCiC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KrO3s3Y9iXPZhxU7pfz7ARPMupE="},{"type":"next-occurrence","id":"KD5IsUd4pDjdGUAdbDKTJUZLi2E="}],"description":"Installation of traffic management systems on NY 9A southbound at Nepperhan Avenue (Yonkers) D265523/32726609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:25Z"},"road_event_id":"JTVBOCS6yh98HFEsog0xhbuCiC8=","beginning_cross_street":"Nepperhan Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898882,40.931732]]}},{"id":"KD5IsUd4pDjdGUAdbDKTJUZLi2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KrO3s3Y9iXPZhxU7pfz7ARPMupE="}],"description":"Installation of traffic management systems on NY 9A southbound at Nepperhan Avenue (Yonkers) D265523/32726609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-09T19:00:25Z"},"road_event_id":"KD5IsUd4pDjdGUAdbDKTJUZLi2E=","beginning_cross_street":"Nepperhan Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898882,40.931732]]}},{"id":"A7ZJXhgpGDtlGMgelM3S9S2qpW8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 30 both directions over Hatchery Brook (Lake Pleasant) Motorists will encounter lane closures in both directions with temporary signals in place., Continuous Monday April 13th, 2026 7:00 AM thru Friday May 15th, 2026 5:30 PM","update_date":"2026-05-08T11:43:29Z"},"road_event_id":"A7ZJXhgpGDtlGMgelM3S9S2qpW8=","beginning_cross_street":"Hatchery Brook","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.386687,43.526934]]}},{"id":"E2nbZrP9bQo9pOuGV/sVuHyrXi4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"z4kiIfonDgo2Znsl4bsAT35l/XE="}],"description":"Gas main work on NY 32 southbound between S Manor Avenue (Kingston) and St James Court (Kingston) 2026084710447/32731609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:20Z"},"road_event_id":"E2nbZrP9bQo9pOuGV/sVuHyrXi4=","beginning_cross_street":"S Manor Avenue","ending_cross_street":"St James Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003805,41.937816]]}},{"id":"z4kiIfonDgo2Znsl4bsAT35l/XE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E2nbZrP9bQo9pOuGV/sVuHyrXi4="},{"type":"next-occurrence","id":"rZjzS2vlOqSZsFuzLY7gtvZVohI="}],"description":"Gas main work on NY 32 southbound between S Manor Avenue (Kingston) and St James Court (Kingston) 2026084710447/32731609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:20Z"},"road_event_id":"z4kiIfonDgo2Znsl4bsAT35l/XE=","beginning_cross_street":"S Manor Avenue","ending_cross_street":"St James Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003805,41.937816]]}},{"id":"rZjzS2vlOqSZsFuzLY7gtvZVohI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E2nbZrP9bQo9pOuGV/sVuHyrXi4="},{"type":"next-occurrence","id":"PBZ8PMSKHdKhjnnmAK5srP/F0/w="}],"description":"Gas main work on NY 32 southbound between S Manor Avenue (Kingston) and St James Court (Kingston) 2026084710447/32731609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:20Z"},"road_event_id":"rZjzS2vlOqSZsFuzLY7gtvZVohI=","beginning_cross_street":"S Manor Avenue","ending_cross_street":"St James Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003805,41.937816]]}},{"id":"PBZ8PMSKHdKhjnnmAK5srP/F0/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E2nbZrP9bQo9pOuGV/sVuHyrXi4="},{"type":"next-occurrence","id":"yKC4A2WUprUFIP2Y4Pl53md/JNE="}],"description":"Gas main work on NY 32 southbound between S Manor Avenue (Kingston) and St James Court (Kingston) 2026084710447/32731609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:20Z"},"road_event_id":"PBZ8PMSKHdKhjnnmAK5srP/F0/w=","beginning_cross_street":"S Manor Avenue","ending_cross_street":"St James Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003805,41.937816]]}},{"id":"yKC4A2WUprUFIP2Y4Pl53md/JNE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E2nbZrP9bQo9pOuGV/sVuHyrXi4="},{"type":"next-occurrence","id":"lJNtPgpvqn0PGV9WRDYVJ9rBd9U="}],"description":"Gas main work on NY 32 southbound between S Manor Avenue (Kingston) and St James Court (Kingston) 2026084710447/32731609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:20Z"},"road_event_id":"yKC4A2WUprUFIP2Y4Pl53md/JNE=","beginning_cross_street":"S Manor Avenue","ending_cross_street":"St James Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003805,41.937816]]}},{"id":"lJNtPgpvqn0PGV9WRDYVJ9rBd9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E2nbZrP9bQo9pOuGV/sVuHyrXi4="},{"type":"next-occurrence","id":"Lmvs6RnG2H4umEuIIRQAlVl61k0="}],"description":"Gas main work on NY 32 southbound between S Manor Avenue (Kingston) and St James Court (Kingston) 2026084710447/32731609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:20Z"},"road_event_id":"lJNtPgpvqn0PGV9WRDYVJ9rBd9U=","beginning_cross_street":"S Manor Avenue","ending_cross_street":"St James Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003805,41.937816]]}},{"id":"Lmvs6RnG2H4umEuIIRQAlVl61k0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E2nbZrP9bQo9pOuGV/sVuHyrXi4="}],"description":"Gas main work on NY 32 southbound between S Manor Avenue (Kingston) and St James Court (Kingston) 2026084710447/32731609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:20Z"},"road_event_id":"Lmvs6RnG2H4umEuIIRQAlVl61k0=","beginning_cross_street":"S Manor Avenue","ending_cross_street":"St James Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003805,41.937816]]}},{"id":"5L6qS8ex2mKfdOGG0RO0yRNHuxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 78 northbound Sheridan Drive; NY 324 (Clarence) to Greiner Road; Maple Road (Clarence), Monday April 27th, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM 2 Right lanes of 4 lanes closed","update_date":"2026-04-24T16:57:41Z"},"road_event_id":"5L6qS8ex2mKfdOGG0RO0yRNHuxg=","beginning_cross_street":"Sheridan Drive; NY 324","ending_cross_street":"Greiner Road; Maple Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.696959,42.981482]]}},{"id":"ae7LIUvonUYoMnZj5TAdqGuK9f8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"70CZFJxFw9B8XaOdjOyHcFLdI5o="}],"description":"Drainage improvements and survey work on Hutchinson River Parkway [Westchester] both directions between Exit 4A/B - Boston Post Road - US 1 (Pelham) and Exit 13A/B - Mamaroneck Avenue (White Plains) D265463/NIGHT/32714709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-08T14:43:25Z"},"road_event_id":"ae7LIUvonUYoMnZj5TAdqGuK9f8=","beginning_cross_street":"Exit 4A/B - Boston Post Road - US 1","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815902,40.891899]]}},{"id":"70CZFJxFw9B8XaOdjOyHcFLdI5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ae7LIUvonUYoMnZj5TAdqGuK9f8="},{"type":"next-occurrence","id":"mS+vvbzC/4oztQMKY5PKc2KEjpk="}],"description":"Drainage improvements and survey work on Hutchinson River Parkway [Westchester] both directions between Exit 4A/B - Boston Post Road - US 1 (Pelham) and Exit 13A/B - Mamaroneck Avenue (White Plains) D265463/NIGHT/32714709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-08T14:43:25Z"},"road_event_id":"70CZFJxFw9B8XaOdjOyHcFLdI5o=","beginning_cross_street":"Exit 4A/B - Boston Post Road - US 1","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815902,40.891899]]}},{"id":"mS+vvbzC/4oztQMKY5PKc2KEjpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ae7LIUvonUYoMnZj5TAdqGuK9f8="},{"type":"next-occurrence","id":"NbJJTGx6iYuc2C9B39Ui4OJOqSI="}],"description":"Drainage improvements and survey work on Hutchinson River Parkway [Westchester] both directions between Exit 4A/B - Boston Post Road - US 1 (Pelham) and Exit 13A/B - Mamaroneck Avenue (White Plains) D265463/NIGHT/32714709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-08T14:43:25Z"},"road_event_id":"mS+vvbzC/4oztQMKY5PKc2KEjpk=","beginning_cross_street":"Exit 4A/B - Boston Post Road - US 1","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T02:00:00Z","end_date":"2026-05-19T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815902,40.891899]]}},{"id":"NbJJTGx6iYuc2C9B39Ui4OJOqSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ae7LIUvonUYoMnZj5TAdqGuK9f8="},{"type":"next-occurrence","id":"LWKyswIqdDgWqvb83/1J5XucGWw="}],"description":"Drainage improvements and survey work on Hutchinson River Parkway [Westchester] both directions between Exit 4A/B - Boston Post Road - US 1 (Pelham) and Exit 13A/B - Mamaroneck Avenue (White Plains) D265463/NIGHT/32714709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-08T14:43:25Z"},"road_event_id":"NbJJTGx6iYuc2C9B39Ui4OJOqSI=","beginning_cross_street":"Exit 4A/B - Boston Post Road - US 1","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T02:00:00Z","end_date":"2026-05-20T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815902,40.891899]]}},{"id":"LWKyswIqdDgWqvb83/1J5XucGWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ae7LIUvonUYoMnZj5TAdqGuK9f8="},{"type":"next-occurrence","id":"S/qsQ1COgqTsgsMG0Wh4wWq69og="}],"description":"Drainage improvements and survey work on Hutchinson River Parkway [Westchester] both directions between Exit 4A/B - Boston Post Road - US 1 (Pelham) and Exit 13A/B - Mamaroneck Avenue (White Plains) D265463/NIGHT/32714709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-08T14:43:25Z"},"road_event_id":"LWKyswIqdDgWqvb83/1J5XucGWw=","beginning_cross_street":"Exit 4A/B - Boston Post Road - US 1","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T02:00:00Z","end_date":"2026-05-21T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815902,40.891899]]}},{"id":"S/qsQ1COgqTsgsMG0Wh4wWq69og=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ae7LIUvonUYoMnZj5TAdqGuK9f8="},{"type":"next-occurrence","id":"jWc6lRrrlSSmAsMmcKTFzmL958g="}],"description":"Drainage improvements and survey work on Hutchinson River Parkway [Westchester] both directions between Exit 4A/B - Boston Post Road - US 1 (Pelham) and Exit 13A/B - Mamaroneck Avenue (White Plains) D265463/NIGHT/32714709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-08T14:43:25Z"},"road_event_id":"S/qsQ1COgqTsgsMG0Wh4wWq69og=","beginning_cross_street":"Exit 4A/B - Boston Post Road - US 1","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T02:00:00Z","end_date":"2026-05-22T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815902,40.891899]]}},{"id":"jWc6lRrrlSSmAsMmcKTFzmL958g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ae7LIUvonUYoMnZj5TAdqGuK9f8="}],"description":"Drainage improvements and survey work on Hutchinson River Parkway [Westchester] both directions between Exit 4A/B - Boston Post Road - US 1 (Pelham) and Exit 13A/B - Mamaroneck Avenue (White Plains) D265463/NIGHT/32714709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-08T14:43:25Z"},"road_event_id":"jWc6lRrrlSSmAsMmcKTFzmL958g=","beginning_cross_street":"Exit 4A/B - Boston Post Road - US 1","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T02:00:00Z","end_date":"2026-05-23T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815902,40.891899]]}},{"id":"sUXu/gz80c38Sy5JkgSOQwKFYmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aMfgWlWtFGg6k4FsqjFw9tJLNqo="}],"description":"Construction on E 77TH ST westbound between PARK AVE (New York) and MADISON AVE (New York) to place knuckle boom to lift steel and materials., Saturday April 25th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 26th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-24T18:03:46Z"},"road_event_id":"sUXu/gz80c38Sy5JkgSOQwKFYmM=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.961697,40.774421]]}},{"id":"aMfgWlWtFGg6k4FsqjFw9tJLNqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sUXu/gz80c38Sy5JkgSOQwKFYmM="},{"type":"next-occurrence","id":"j9k+vCQkpdT4f4hWwbAMH9txzK4="}],"description":"Construction on E 77TH ST westbound between PARK AVE (New York) and MADISON AVE (New York) to place knuckle boom to lift steel and materials., Saturday April 25th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 26th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-24T18:03:46Z"},"road_event_id":"aMfgWlWtFGg6k4FsqjFw9tJLNqo=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.961697,40.774421]]}},{"id":"j9k+vCQkpdT4f4hWwbAMH9txzK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sUXu/gz80c38Sy5JkgSOQwKFYmM="},{"type":"next-occurrence","id":"TKDfWhxTUbb7PIV5tFFhVdLNq2A="}],"description":"Construction on E 77TH ST westbound between PARK AVE (New York) and MADISON AVE (New York) to place knuckle boom to lift steel and materials., Saturday April 25th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 26th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-24T18:03:46Z"},"road_event_id":"j9k+vCQkpdT4f4hWwbAMH9txzK4=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.961697,40.774421]]}},{"id":"TKDfWhxTUbb7PIV5tFFhVdLNq2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sUXu/gz80c38Sy5JkgSOQwKFYmM="}],"description":"Construction on E 77TH ST westbound between PARK AVE (New York) and MADISON AVE (New York) to place knuckle boom to lift steel and materials., Saturday April 25th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 26th, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-24T18:03:46Z"},"road_event_id":"TKDfWhxTUbb7PIV5tFFhVdLNq2A=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.961697,40.774421]]}},{"id":"7ywhYN2xX359zGnwZ0yMnK0jW1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wKXHqYO2IybBt35rGl+NgVXHuaM="}],"description":"Construction on DOWNING ST westbound between 6TH AVE (New York) for use of knuckle boom to hoist dunnage building materials and structural steel/container., Friday April 24th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:07:38Z"},"road_event_id":"7ywhYN2xX359zGnwZ0yMnK0jW1c=","beginning_cross_street":"6TH AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002293,40.729727]]}},{"id":"wKXHqYO2IybBt35rGl+NgVXHuaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ywhYN2xX359zGnwZ0yMnK0jW1c="},{"type":"next-occurrence","id":"TNp6YVOItSj6D+5or18iF3z+k8k="}],"description":"Construction on DOWNING ST westbound between 6TH AVE (New York) for use of knuckle boom to hoist dunnage building materials and structural steel/container., Friday April 24th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:07:38Z"},"road_event_id":"wKXHqYO2IybBt35rGl+NgVXHuaM=","beginning_cross_street":"6TH AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002293,40.729727]]}},{"id":"TNp6YVOItSj6D+5or18iF3z+k8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ywhYN2xX359zGnwZ0yMnK0jW1c="},{"type":"next-occurrence","id":"at9jKtX77BmAT2Ggnch2ueMpmOs="}],"description":"Construction on DOWNING ST westbound between 6TH AVE (New York) for use of knuckle boom to hoist dunnage building materials and structural steel/container., Friday April 24th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:07:38Z"},"road_event_id":"TNp6YVOItSj6D+5or18iF3z+k8k=","beginning_cross_street":"6TH AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002293,40.729727]]}},{"id":"at9jKtX77BmAT2Ggnch2ueMpmOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ywhYN2xX359zGnwZ0yMnK0jW1c="},{"type":"next-occurrence","id":"AFWarin2Pd2hPxZ9WNSdfLUR4xg="}],"description":"Construction on DOWNING ST westbound between 6TH AVE (New York) for use of knuckle boom to hoist dunnage building materials and structural steel/container., Friday April 24th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:07:38Z"},"road_event_id":"at9jKtX77BmAT2Ggnch2ueMpmOs=","beginning_cross_street":"6TH AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002293,40.729727]]}},{"id":"AFWarin2Pd2hPxZ9WNSdfLUR4xg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ywhYN2xX359zGnwZ0yMnK0jW1c="},{"type":"next-occurrence","id":"oN1Hrt7LhPomCrvteSiLy0EkKtg="}],"description":"Construction on DOWNING ST westbound between 6TH AVE (New York) for use of knuckle boom to hoist dunnage building materials and structural steel/container., Friday April 24th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:07:38Z"},"road_event_id":"AFWarin2Pd2hPxZ9WNSdfLUR4xg=","beginning_cross_street":"6TH AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002293,40.729727]]}},{"id":"oN1Hrt7LhPomCrvteSiLy0EkKtg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ywhYN2xX359zGnwZ0yMnK0jW1c="},{"type":"next-occurrence","id":"qfAqlpz+ECOuLT/6m1nlcVzbsY4="}],"description":"Construction on DOWNING ST westbound between 6TH AVE (New York) for use of knuckle boom to hoist dunnage building materials and structural steel/container., Friday April 24th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:07:38Z"},"road_event_id":"oN1Hrt7LhPomCrvteSiLy0EkKtg=","beginning_cross_street":"6TH AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002293,40.729727]]}},{"id":"qfAqlpz+ECOuLT/6m1nlcVzbsY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ywhYN2xX359zGnwZ0yMnK0jW1c="},{"type":"next-occurrence","id":"W7iGcNivd+J2wuNLrcI6TtYf7lY="}],"description":"Construction on DOWNING ST westbound between 6TH AVE (New York) for use of knuckle boom to hoist dunnage building materials and structural steel/container., Friday April 24th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:07:38Z"},"road_event_id":"qfAqlpz+ECOuLT/6m1nlcVzbsY4=","beginning_cross_street":"6TH AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002293,40.729727]]}},{"id":"W7iGcNivd+J2wuNLrcI6TtYf7lY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ywhYN2xX359zGnwZ0yMnK0jW1c="},{"type":"next-occurrence","id":"Wfb8P+WMzjHtVgyW4CDFAsPZXBM="}],"description":"Construction on DOWNING ST westbound between 6TH AVE (New York) for use of knuckle boom to hoist dunnage building materials and structural steel/container., Friday April 24th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:07:38Z"},"road_event_id":"W7iGcNivd+J2wuNLrcI6TtYf7lY=","beginning_cross_street":"6TH AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002293,40.729727]]}},{"id":"Wfb8P+WMzjHtVgyW4CDFAsPZXBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ywhYN2xX359zGnwZ0yMnK0jW1c="},{"type":"next-occurrence","id":"2iQk+nUkQLIP+hVaUqXjYJUQ9mw="}],"description":"Construction on DOWNING ST westbound between 6TH AVE (New York) for use of knuckle boom to hoist dunnage building materials and structural steel/container., Friday April 24th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:07:38Z"},"road_event_id":"Wfb8P+WMzjHtVgyW4CDFAsPZXBM=","beginning_cross_street":"6TH AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002293,40.729727]]}},{"id":"2iQk+nUkQLIP+hVaUqXjYJUQ9mw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ywhYN2xX359zGnwZ0yMnK0jW1c="},{"type":"next-occurrence","id":"8+qmCkqgalvb62pLGVezuBK1fTc="}],"description":"Construction on DOWNING ST westbound between 6TH AVE (New York) for use of knuckle boom to hoist dunnage building materials and structural steel/container., Friday April 24th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:07:38Z"},"road_event_id":"2iQk+nUkQLIP+hVaUqXjYJUQ9mw=","beginning_cross_street":"6TH AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002293,40.729727]]}},{"id":"8+qmCkqgalvb62pLGVezuBK1fTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ywhYN2xX359zGnwZ0yMnK0jW1c="},{"type":"next-occurrence","id":"qFAdOX2eJtOm79JBjuxUuGzwW5k="}],"description":"Construction on DOWNING ST westbound between 6TH AVE (New York) for use of knuckle boom to hoist dunnage building materials and structural steel/container., Friday April 24th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:07:38Z"},"road_event_id":"8+qmCkqgalvb62pLGVezuBK1fTc=","beginning_cross_street":"6TH AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002293,40.729727]]}},{"id":"qFAdOX2eJtOm79JBjuxUuGzwW5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ywhYN2xX359zGnwZ0yMnK0jW1c="},{"type":"next-occurrence","id":"shXycC3uCOWXfD45qGdNsOWnvfQ="}],"description":"Construction on DOWNING ST westbound between 6TH AVE (New York) for use of knuckle boom to hoist dunnage building materials and structural steel/container., Friday April 24th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:07:38Z"},"road_event_id":"qFAdOX2eJtOm79JBjuxUuGzwW5k=","beginning_cross_street":"6TH AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002293,40.729727]]}},{"id":"shXycC3uCOWXfD45qGdNsOWnvfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ywhYN2xX359zGnwZ0yMnK0jW1c="},{"type":"next-occurrence","id":"6ajshaBTzOxUdSWRhXLf135MeAw="}],"description":"Construction on DOWNING ST westbound between 6TH AVE (New York) for use of knuckle boom to hoist dunnage building materials and structural steel/container., Friday April 24th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:07:38Z"},"road_event_id":"shXycC3uCOWXfD45qGdNsOWnvfQ=","beginning_cross_street":"6TH AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002293,40.729727]]}},{"id":"6ajshaBTzOxUdSWRhXLf135MeAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ywhYN2xX359zGnwZ0yMnK0jW1c="},{"type":"next-occurrence","id":"71B8s0rCmjzTBRQSk8PaphI5r0A="}],"description":"Construction on DOWNING ST westbound between 6TH AVE (New York) for use of knuckle boom to hoist dunnage building materials and structural steel/container., Friday April 24th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:07:38Z"},"road_event_id":"6ajshaBTzOxUdSWRhXLf135MeAw=","beginning_cross_street":"6TH AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002293,40.729727]]}},{"id":"71B8s0rCmjzTBRQSk8PaphI5r0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ywhYN2xX359zGnwZ0yMnK0jW1c="}],"description":"Construction on DOWNING ST westbound between 6TH AVE (New York) for use of knuckle boom to hoist dunnage building materials and structural steel/container., Friday April 24th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:07:38Z"},"road_event_id":"71B8s0rCmjzTBRQSk8PaphI5r0A=","beginning_cross_street":"6TH AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002293,40.729727]]}},{"id":"YLRMuzV35+d0RDTokad+2KcE14o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SpX1LWQKxerxjRJ2RZulHnkl6yE="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:28:11Z"},"road_event_id":"YLRMuzV35+d0RDTokad+2KcE14o=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"SpX1LWQKxerxjRJ2RZulHnkl6yE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLRMuzV35+d0RDTokad+2KcE14o="},{"type":"next-occurrence","id":"eI5gxoSNs4xO3pV2hPLd263GcNQ="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:28:11Z"},"road_event_id":"SpX1LWQKxerxjRJ2RZulHnkl6yE=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"eI5gxoSNs4xO3pV2hPLd263GcNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLRMuzV35+d0RDTokad+2KcE14o="},{"type":"next-occurrence","id":"gx4gTs71hKcCHNT4EJQnWXb5yMc="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:28:11Z"},"road_event_id":"eI5gxoSNs4xO3pV2hPLd263GcNQ=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"gx4gTs71hKcCHNT4EJQnWXb5yMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLRMuzV35+d0RDTokad+2KcE14o="},{"type":"next-occurrence","id":"X1K2xqjDsWW/kXpq0w2o5f1SkNE="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:28:11Z"},"road_event_id":"gx4gTs71hKcCHNT4EJQnWXb5yMc=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"X1K2xqjDsWW/kXpq0w2o5f1SkNE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLRMuzV35+d0RDTokad+2KcE14o="},{"type":"next-occurrence","id":"GRDtxwQDtQ9mZjWO7Jmlj5L2ZU4="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:28:11Z"},"road_event_id":"X1K2xqjDsWW/kXpq0w2o5f1SkNE=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"GRDtxwQDtQ9mZjWO7Jmlj5L2ZU4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLRMuzV35+d0RDTokad+2KcE14o="},{"type":"next-occurrence","id":"5fb4PxC7jDBQzq1FNol48GvXDMs="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:28:11Z"},"road_event_id":"GRDtxwQDtQ9mZjWO7Jmlj5L2ZU4=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"5fb4PxC7jDBQzq1FNol48GvXDMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLRMuzV35+d0RDTokad+2KcE14o="},{"type":"next-occurrence","id":"QdiyoPWjDONmRHLZQyKusvMkc38="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:28:11Z"},"road_event_id":"5fb4PxC7jDBQzq1FNol48GvXDMs=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"QdiyoPWjDONmRHLZQyKusvMkc38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLRMuzV35+d0RDTokad+2KcE14o="},{"type":"next-occurrence","id":"9WPLDiuvOe3A/K2yVT4DQ45AW7w="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:28:11Z"},"road_event_id":"QdiyoPWjDONmRHLZQyKusvMkc38=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"9WPLDiuvOe3A/K2yVT4DQ45AW7w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLRMuzV35+d0RDTokad+2KcE14o="},{"type":"next-occurrence","id":"6wyyexEcqwEkc/iR4h5OQmiyQ7Q="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:28:11Z"},"road_event_id":"9WPLDiuvOe3A/K2yVT4DQ45AW7w=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"6wyyexEcqwEkc/iR4h5OQmiyQ7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLRMuzV35+d0RDTokad+2KcE14o="},{"type":"next-occurrence","id":"Xc1TeGYVcgt+pQ8Fiweb2hu0tf8="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:28:11Z"},"road_event_id":"6wyyexEcqwEkc/iR4h5OQmiyQ7Q=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"Xc1TeGYVcgt+pQ8Fiweb2hu0tf8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLRMuzV35+d0RDTokad+2KcE14o="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:28:11Z"},"road_event_id":"Xc1TeGYVcgt+pQ8Fiweb2hu0tf8=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"U23x2nKhTB/4tpmE2cSFYFzzRas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on US 11 both directions Delancy Avenue (Moira) The bridge on Rte. 11 over Little Salmon River is reduced to one lane alternating traffic under control of a temporary signal, Continuous Friday April 24th, 2026 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes diverted","update_date":"2026-04-24T18:34:17Z"},"road_event_id":"U23x2nKhTB/4tpmE2cSFYFzzRas=","beginning_cross_street":"Delancy Avenue","ending_cross_street":"Delancy Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.509729,44.830738]]}},{"id":"XYBjf+9ykNr55jKVue+a3SNjGaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cSRqjwBgqXTvi/PbCxGAXaYrpZw="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for installation of pre-cast panels, special operations (ie; concrete)., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:37:44Z"},"road_event_id":"XYBjf+9ykNr55jKVue+a3SNjGaU=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92882,40.820069]]}},{"id":"cSRqjwBgqXTvi/PbCxGAXaYrpZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XYBjf+9ykNr55jKVue+a3SNjGaU="},{"type":"next-occurrence","id":"oiFHd8jLBZjzO8Vrmp9xJDtMDLU="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for installation of pre-cast panels, special operations (ie; concrete)., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:37:44Z"},"road_event_id":"cSRqjwBgqXTvi/PbCxGAXaYrpZw=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92882,40.820069]]}},{"id":"oiFHd8jLBZjzO8Vrmp9xJDtMDLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XYBjf+9ykNr55jKVue+a3SNjGaU="},{"type":"next-occurrence","id":"YX218t0DPL6vrClJmjkpUJhF3gA="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for installation of pre-cast panels, special operations (ie; concrete)., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:37:44Z"},"road_event_id":"oiFHd8jLBZjzO8Vrmp9xJDtMDLU=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92882,40.820069]]}},{"id":"YX218t0DPL6vrClJmjkpUJhF3gA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XYBjf+9ykNr55jKVue+a3SNjGaU="},{"type":"next-occurrence","id":"Bkj8CK+JA6IEKcMhhum/OXxYYY0="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for installation of pre-cast panels, special operations (ie; concrete)., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:37:44Z"},"road_event_id":"YX218t0DPL6vrClJmjkpUJhF3gA=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92882,40.820069]]}},{"id":"Bkj8CK+JA6IEKcMhhum/OXxYYY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XYBjf+9ykNr55jKVue+a3SNjGaU="},{"type":"next-occurrence","id":"OkmMJi/D5XRPT7VXodLOFN8y/QI="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for installation of pre-cast panels, special operations (ie; concrete)., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:37:44Z"},"road_event_id":"Bkj8CK+JA6IEKcMhhum/OXxYYY0=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92882,40.820069]]}},{"id":"OkmMJi/D5XRPT7VXodLOFN8y/QI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XYBjf+9ykNr55jKVue+a3SNjGaU="},{"type":"next-occurrence","id":"6ME1Tz+E/o77dofxtjo8VT3Mc/Y="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for installation of pre-cast panels, special operations (ie; concrete)., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:37:44Z"},"road_event_id":"OkmMJi/D5XRPT7VXodLOFN8y/QI=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92882,40.820069]]}},{"id":"6ME1Tz+E/o77dofxtjo8VT3Mc/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XYBjf+9ykNr55jKVue+a3SNjGaU="},{"type":"next-occurrence","id":"H4c4ViN2XXrrJQaSc6mSlVQqets="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for installation of pre-cast panels, special operations (ie; concrete)., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:37:44Z"},"road_event_id":"6ME1Tz+E/o77dofxtjo8VT3Mc/Y=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92882,40.820069]]}},{"id":"H4c4ViN2XXrrJQaSc6mSlVQqets=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XYBjf+9ykNr55jKVue+a3SNjGaU="},{"type":"next-occurrence","id":"8bRIIiFhcpd3M5GVbRIhNyJljec="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for installation of pre-cast panels, special operations (ie; concrete)., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:37:44Z"},"road_event_id":"H4c4ViN2XXrrJQaSc6mSlVQqets=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92882,40.820069]]}},{"id":"8bRIIiFhcpd3M5GVbRIhNyJljec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XYBjf+9ykNr55jKVue+a3SNjGaU="},{"type":"next-occurrence","id":"saFed32VIRpgJHJ9s337JZmMzQU="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for installation of pre-cast panels, special operations (ie; concrete)., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:37:44Z"},"road_event_id":"8bRIIiFhcpd3M5GVbRIhNyJljec=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92882,40.820069]]}},{"id":"saFed32VIRpgJHJ9s337JZmMzQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XYBjf+9ykNr55jKVue+a3SNjGaU="},{"type":"next-occurrence","id":"amlZTN1yJCr6RN2Pa2CU4mQYg1c="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for installation of pre-cast panels, special operations (ie; concrete)., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:37:44Z"},"road_event_id":"saFed32VIRpgJHJ9s337JZmMzQU=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92882,40.820069]]}},{"id":"amlZTN1yJCr6RN2Pa2CU4mQYg1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XYBjf+9ykNr55jKVue+a3SNjGaU="},{"type":"next-occurrence","id":"N5JfuUfg+ErdSH0lkaWHjAjsIsk="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for installation of pre-cast panels, special operations (ie; concrete)., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:37:44Z"},"road_event_id":"amlZTN1yJCr6RN2Pa2CU4mQYg1c=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92882,40.820069]]}},{"id":"N5JfuUfg+ErdSH0lkaWHjAjsIsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XYBjf+9ykNr55jKVue+a3SNjGaU="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for installation of pre-cast panels, special operations (ie; concrete)., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:37:44Z"},"road_event_id":"N5JfuUfg+ErdSH0lkaWHjAjsIsk=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92882,40.820069]]}},{"id":"TwiE76540xjixPkH7O5+cKiVdh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mfuQd2OyoiAGtips3lmv1nZqT6w="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:46:20Z"},"road_event_id":"TwiE76540xjixPkH7O5+cKiVdh4=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"mfuQd2OyoiAGtips3lmv1nZqT6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TwiE76540xjixPkH7O5+cKiVdh4="},{"type":"next-occurrence","id":"M7lQdEKSOsyIt9V2fBMt4AMyw40="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:46:20Z"},"road_event_id":"mfuQd2OyoiAGtips3lmv1nZqT6w=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"M7lQdEKSOsyIt9V2fBMt4AMyw40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TwiE76540xjixPkH7O5+cKiVdh4="},{"type":"next-occurrence","id":"OSTUnQCeHy4q8AyHFRVohoImAmQ="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:46:20Z"},"road_event_id":"M7lQdEKSOsyIt9V2fBMt4AMyw40=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"OSTUnQCeHy4q8AyHFRVohoImAmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TwiE76540xjixPkH7O5+cKiVdh4="},{"type":"next-occurrence","id":"QTq7TmuVag7KUiKVeUWmlpRO83w="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:46:20Z"},"road_event_id":"OSTUnQCeHy4q8AyHFRVohoImAmQ=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"QTq7TmuVag7KUiKVeUWmlpRO83w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TwiE76540xjixPkH7O5+cKiVdh4="},{"type":"next-occurrence","id":"ZkkWrQuGE59SyxFatE53r/3lSiY="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:46:20Z"},"road_event_id":"QTq7TmuVag7KUiKVeUWmlpRO83w=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"ZkkWrQuGE59SyxFatE53r/3lSiY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TwiE76540xjixPkH7O5+cKiVdh4="},{"type":"next-occurrence","id":"XSKwE/FZ3+f6uaSxiqPLL/vJXNQ="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:46:20Z"},"road_event_id":"ZkkWrQuGE59SyxFatE53r/3lSiY=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"XSKwE/FZ3+f6uaSxiqPLL/vJXNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TwiE76540xjixPkH7O5+cKiVdh4="},{"type":"next-occurrence","id":"oiZOJoXpMMrNNd6idk1ZtAcda3s="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:46:20Z"},"road_event_id":"XSKwE/FZ3+f6uaSxiqPLL/vJXNQ=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"oiZOJoXpMMrNNd6idk1ZtAcda3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TwiE76540xjixPkH7O5+cKiVdh4="},{"type":"next-occurrence","id":"3txT1uQdvTy5XekiD35jcJsvmkg="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:46:20Z"},"road_event_id":"oiZOJoXpMMrNNd6idk1ZtAcda3s=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"3txT1uQdvTy5XekiD35jcJsvmkg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TwiE76540xjixPkH7O5+cKiVdh4="},{"type":"next-occurrence","id":"bG365IszcpcFroXjI4LWb1QB2Is="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:46:20Z"},"road_event_id":"3txT1uQdvTy5XekiD35jcJsvmkg=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"bG365IszcpcFroXjI4LWb1QB2Is=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TwiE76540xjixPkH7O5+cKiVdh4="},{"type":"next-occurrence","id":"QYmuyVREKmWXwgSnHm4Z4QStbFQ="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:46:20Z"},"road_event_id":"bG365IszcpcFroXjI4LWb1QB2Is=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"QYmuyVREKmWXwgSnHm4Z4QStbFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TwiE76540xjixPkH7O5+cKiVdh4="},{"type":"next-occurrence","id":"47V6wogaDFE3sRfCTaRsm8rpjzQ="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:46:20Z"},"road_event_id":"QYmuyVREKmWXwgSnHm4Z4QStbFQ=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"47V6wogaDFE3sRfCTaRsm8rpjzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TwiE76540xjixPkH7O5+cKiVdh4="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:46:20Z"},"road_event_id":"47V6wogaDFE3sRfCTaRsm8rpjzQ=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"vjPnDpW/6fn9WxVckKCfBhtcp/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RYER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HP5/JoCiHCRQmcNlegoe1369rOw="}],"description":"Construction on RYER AVE southbound between E 180TH ST (New York) and E BURNSIDE AVE (New York) for use of boom, pump and crane operation for new building construction., Friday April 24th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed, Saturday April 25th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-24T18:49:11Z"},"road_event_id":"vjPnDpW/6fn9WxVckKCfBhtcp/Q=","beginning_cross_street":"E 180TH ST","ending_cross_street":"E BURNSIDE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.900938,40.852791]]}},{"id":"HP5/JoCiHCRQmcNlegoe1369rOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RYER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vjPnDpW/6fn9WxVckKCfBhtcp/Q="},{"type":"next-occurrence","id":"Pw3GeYL52uSuCWweA6STpY1iKi8="}],"description":"Construction on RYER AVE southbound between E 180TH ST (New York) and E BURNSIDE AVE (New York) for use of boom, pump and crane operation for new building construction., Friday April 24th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed, Saturday April 25th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-24T18:49:11Z"},"road_event_id":"HP5/JoCiHCRQmcNlegoe1369rOw=","beginning_cross_street":"E 180TH ST","ending_cross_street":"E BURNSIDE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.900938,40.852791]]}},{"id":"Pw3GeYL52uSuCWweA6STpY1iKi8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RYER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vjPnDpW/6fn9WxVckKCfBhtcp/Q="},{"type":"next-occurrence","id":"dXrcEohe2MRKXe3OckjLvyd7S/Q="}],"description":"Construction on RYER AVE southbound between E 180TH ST (New York) and E BURNSIDE AVE (New York) for use of boom, pump and crane operation for new building construction., Friday April 24th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed, Saturday April 25th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-24T18:49:11Z"},"road_event_id":"Pw3GeYL52uSuCWweA6STpY1iKi8=","beginning_cross_street":"E 180TH ST","ending_cross_street":"E BURNSIDE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.900938,40.852791]]}},{"id":"dXrcEohe2MRKXe3OckjLvyd7S/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RYER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vjPnDpW/6fn9WxVckKCfBhtcp/Q="},{"type":"next-occurrence","id":"AeDQyoRUNXoJtQpo+ZlLfN+FIok="}],"description":"Construction on RYER AVE southbound between E 180TH ST (New York) and E BURNSIDE AVE (New York) for use of boom, pump and crane operation for new building construction., Friday April 24th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed, Saturday April 25th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-24T18:49:11Z"},"road_event_id":"dXrcEohe2MRKXe3OckjLvyd7S/Q=","beginning_cross_street":"E 180TH ST","ending_cross_street":"E BURNSIDE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.900938,40.852791]]}},{"id":"AeDQyoRUNXoJtQpo+ZlLfN+FIok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RYER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vjPnDpW/6fn9WxVckKCfBhtcp/Q="},{"type":"next-occurrence","id":"obfbiZqaW7XgUpK1Y5IKbv7N8ug="}],"description":"Construction on RYER AVE southbound between E 180TH ST (New York) and E BURNSIDE AVE (New York) for use of boom, pump and crane operation for new building construction., Friday April 24th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed, Saturday April 25th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-24T18:49:11Z"},"road_event_id":"AeDQyoRUNXoJtQpo+ZlLfN+FIok=","beginning_cross_street":"E 180TH ST","ending_cross_street":"E BURNSIDE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T12:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.900938,40.852791]]}},{"id":"obfbiZqaW7XgUpK1Y5IKbv7N8ug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RYER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vjPnDpW/6fn9WxVckKCfBhtcp/Q="},{"type":"next-occurrence","id":"GxtefDMxk7iwcdmR6F9n/HkJ0/0="}],"description":"Construction on RYER AVE southbound between E 180TH ST (New York) and E BURNSIDE AVE (New York) for use of boom, pump and crane operation for new building construction., Friday April 24th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed, Saturday April 25th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-24T18:49:11Z"},"road_event_id":"obfbiZqaW7XgUpK1Y5IKbv7N8ug=","beginning_cross_street":"E 180TH ST","ending_cross_street":"E BURNSIDE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.900938,40.852791]]}},{"id":"GxtefDMxk7iwcdmR6F9n/HkJ0/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RYER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vjPnDpW/6fn9WxVckKCfBhtcp/Q="}],"description":"Construction on RYER AVE southbound between E 180TH ST (New York) and E BURNSIDE AVE (New York) for use of boom, pump and crane operation for new building construction., Friday April 24th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed, Saturday April 25th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-24T18:49:11Z"},"road_event_id":"GxtefDMxk7iwcdmR6F9n/HkJ0/0=","beginning_cross_street":"E 180TH ST","ending_cross_street":"E BURNSIDE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.900938,40.852791]]}},{"id":"vCL7RE8qeXht4h6AICd9GWHw8uY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CxagxtxERULnhLbDr4e9NgWGPLQ="}],"description":"Construction on 7TH ST eastbound between 3RD AVE (New York) and 4TH AVE (New York) for 7th Street Sewers., Friday April 24th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:55:21Z"},"road_event_id":"vCL7RE8qeXht4h6AICd9GWHw8uY=","beginning_cross_street":"3RD AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989941,40.672616]]}},{"id":"CxagxtxERULnhLbDr4e9NgWGPLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vCL7RE8qeXht4h6AICd9GWHw8uY="},{"type":"next-occurrence","id":"bxxN6h16bwwlWLmSCi15ipwu0f8="}],"description":"Construction on 7TH ST eastbound between 3RD AVE (New York) and 4TH AVE (New York) for 7th Street Sewers., Friday April 24th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:55:21Z"},"road_event_id":"CxagxtxERULnhLbDr4e9NgWGPLQ=","beginning_cross_street":"3RD AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989941,40.672616]]}},{"id":"bxxN6h16bwwlWLmSCi15ipwu0f8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vCL7RE8qeXht4h6AICd9GWHw8uY="},{"type":"next-occurrence","id":"M9KcQa6Ki9LzAUQ4wsEisoIZ2ro="}],"description":"Construction on 7TH ST eastbound between 3RD AVE (New York) and 4TH AVE (New York) for 7th Street Sewers., Friday April 24th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:55:21Z"},"road_event_id":"bxxN6h16bwwlWLmSCi15ipwu0f8=","beginning_cross_street":"3RD AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989941,40.672616]]}},{"id":"M9KcQa6Ki9LzAUQ4wsEisoIZ2ro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vCL7RE8qeXht4h6AICd9GWHw8uY="},{"type":"next-occurrence","id":"Kl0JejyAHM9QQEs/8RmCmP4gX3k="}],"description":"Construction on 7TH ST eastbound between 3RD AVE (New York) and 4TH AVE (New York) for 7th Street Sewers., Friday April 24th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:55:21Z"},"road_event_id":"M9KcQa6Ki9LzAUQ4wsEisoIZ2ro=","beginning_cross_street":"3RD AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989941,40.672616]]}},{"id":"Kl0JejyAHM9QQEs/8RmCmP4gX3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vCL7RE8qeXht4h6AICd9GWHw8uY="},{"type":"next-occurrence","id":"eXIde1IG6ejdnfVgK0S3odMFhs0="}],"description":"Construction on 7TH ST eastbound between 3RD AVE (New York) and 4TH AVE (New York) for 7th Street Sewers., Friday April 24th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:55:21Z"},"road_event_id":"Kl0JejyAHM9QQEs/8RmCmP4gX3k=","beginning_cross_street":"3RD AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989941,40.672616]]}},{"id":"eXIde1IG6ejdnfVgK0S3odMFhs0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vCL7RE8qeXht4h6AICd9GWHw8uY="},{"type":"next-occurrence","id":"3HJxkOD9JqeQDBSOXeTqIaYEPoA="}],"description":"Construction on 7TH ST eastbound between 3RD AVE (New York) and 4TH AVE (New York) for 7th Street Sewers., Friday April 24th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:55:21Z"},"road_event_id":"eXIde1IG6ejdnfVgK0S3odMFhs0=","beginning_cross_street":"3RD AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989941,40.672616]]}},{"id":"3HJxkOD9JqeQDBSOXeTqIaYEPoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vCL7RE8qeXht4h6AICd9GWHw8uY="}],"description":"Construction on 7TH ST eastbound between 3RD AVE (New York) and 4TH AVE (New York) for 7th Street Sewers., Friday April 24th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-24T18:55:21Z"},"road_event_id":"3HJxkOD9JqeQDBSOXeTqIaYEPoA=","beginning_cross_street":"3RD AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989941,40.672616]]}},{"id":"2FUD4cdhQS54NlGiOks62X4h9Ik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qz9idC68xa/+QRUqeVwenTnLZJk="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"2FUD4cdhQS54NlGiOks62X4h9Ik=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"qz9idC68xa/+QRUqeVwenTnLZJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2FUD4cdhQS54NlGiOks62X4h9Ik="},{"type":"next-occurrence","id":"kFhzJ30NdVD4re96DuQj5CqnB6g="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"qz9idC68xa/+QRUqeVwenTnLZJk=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"kFhzJ30NdVD4re96DuQj5CqnB6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2FUD4cdhQS54NlGiOks62X4h9Ik="},{"type":"next-occurrence","id":"238fH5gi0/8nzzc1yY8giaeR794="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"kFhzJ30NdVD4re96DuQj5CqnB6g=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"238fH5gi0/8nzzc1yY8giaeR794=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2FUD4cdhQS54NlGiOks62X4h9Ik="},{"type":"next-occurrence","id":"BOD1+qyAo4zQ732W/myQSSV9/a0="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"238fH5gi0/8nzzc1yY8giaeR794=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"BOD1+qyAo4zQ732W/myQSSV9/a0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2FUD4cdhQS54NlGiOks62X4h9Ik="},{"type":"next-occurrence","id":"VWn4uQFK5A+WR++ns0QyGxM380k="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"BOD1+qyAo4zQ732W/myQSSV9/a0=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"VWn4uQFK5A+WR++ns0QyGxM380k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2FUD4cdhQS54NlGiOks62X4h9Ik="},{"type":"next-occurrence","id":"HCYNgIM+vcP8yHLL4bcHblPSjpM="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"VWn4uQFK5A+WR++ns0QyGxM380k=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"HCYNgIM+vcP8yHLL4bcHblPSjpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2FUD4cdhQS54NlGiOks62X4h9Ik="},{"type":"next-occurrence","id":"3/Vatf9Ae++FATvaynP+utChamo="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"HCYNgIM+vcP8yHLL4bcHblPSjpM=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"3/Vatf9Ae++FATvaynP+utChamo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2FUD4cdhQS54NlGiOks62X4h9Ik="},{"type":"next-occurrence","id":"IDGS2zhXfufOCsu058dDewzLwP4="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"3/Vatf9Ae++FATvaynP+utChamo=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"IDGS2zhXfufOCsu058dDewzLwP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2FUD4cdhQS54NlGiOks62X4h9Ik="},{"type":"next-occurrence","id":"ZA0ERE6KLSj0sa79KGsd7DQmios="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"IDGS2zhXfufOCsu058dDewzLwP4=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"ZA0ERE6KLSj0sa79KGsd7DQmios=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2FUD4cdhQS54NlGiOks62X4h9Ik="},{"type":"next-occurrence","id":"bWweVFzFAwUn82UnZevbQj4K/Zo="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"ZA0ERE6KLSj0sa79KGsd7DQmios=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"bWweVFzFAwUn82UnZevbQj4K/Zo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2FUD4cdhQS54NlGiOks62X4h9Ik="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"bWweVFzFAwUn82UnZevbQj4K/Zo=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"F/Bl9pYDXehfySIHJVg7hEq1w/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-86 both directions Exit 8 - NY 394 West Lake Road (North Harmony) to Exit 10 9 - I-86 (Ellery), Continuous Friday April 24th, 2026 12:00 AM thru Tuesday November 30th, 2027 11:59 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-24T19:20:50Z"},"road_event_id":"F/Bl9pYDXehfySIHJVg7hEq1w/o=","beginning_cross_street":"Exit 8 - NY 394 West Lake Road","ending_cross_street":"Exit 10 9 - I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.411908,42.15157]]}},{"id":"wESFDmwrLmzmk11xAyiqlcdKAjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S RAILROAD AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on S RAILROAD AVE both directions between BUFFALO ST (New York) and HOPKINS AVE (New York) for large ballast loading/offloading onto tracks., Continuous Saturday April 25th, 2026 02:00 AM thru Sunday May 31st, 2026 02:00 PM All lanes closed","update_date":"2026-04-24T19:57:18Z"},"road_event_id":"wESFDmwrLmzmk11xAyiqlcdKAjE=","beginning_cross_street":"BUFFALO ST","ending_cross_street":"HOPKINS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.132716,40.559466]]}},{"id":"L3rWW10giSgxWXgQrz+bkbGJXQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BUFFALO ST"],"direction":"unknown","related_road_events":[],"description":"Construction on BUFFALO ST both directions between TWOMBLY AVE (New York) and S RAILROAD AVE (New York) for large ballast loading/offloading onto tracks., Continuous Saturday April 25th, 2026 02:00 AM thru Sunday May 31st, 2026 02:00 PM All lanes closed","update_date":"2026-04-24T19:59:13Z"},"road_event_id":"L3rWW10giSgxWXgQrz+bkbGJXQw=","beginning_cross_street":"TWOMBLY AVE","ending_cross_street":"S RAILROAD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.13218,40.559138]]}},{"id":"0qI1Ejro2o/sAoVgohoLF6RIWgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"L9Y992suoawS6+PnCgojzX8D+s8="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"0qI1Ejro2o/sAoVgohoLF6RIWgY=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"L9Y992suoawS6+PnCgojzX8D+s8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0qI1Ejro2o/sAoVgohoLF6RIWgY="},{"type":"next-occurrence","id":"VUlzD0GqIcmhCFHeUqrlHCRz35A="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"L9Y992suoawS6+PnCgojzX8D+s8=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"VUlzD0GqIcmhCFHeUqrlHCRz35A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0qI1Ejro2o/sAoVgohoLF6RIWgY="},{"type":"next-occurrence","id":"ckzMAQJlwPxQgBQDgKvam7W/+ng="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"VUlzD0GqIcmhCFHeUqrlHCRz35A=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"ckzMAQJlwPxQgBQDgKvam7W/+ng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0qI1Ejro2o/sAoVgohoLF6RIWgY="},{"type":"next-occurrence","id":"/r9+/Uwdwyx3IHKr3SW00BNld/o="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"ckzMAQJlwPxQgBQDgKvam7W/+ng=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"/r9+/Uwdwyx3IHKr3SW00BNld/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0qI1Ejro2o/sAoVgohoLF6RIWgY="},{"type":"next-occurrence","id":"zYceXSEdHBXa9VWsz+SKkyMSS8M="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"/r9+/Uwdwyx3IHKr3SW00BNld/o=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"zYceXSEdHBXa9VWsz+SKkyMSS8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0qI1Ejro2o/sAoVgohoLF6RIWgY="},{"type":"next-occurrence","id":"Nvw2MCnm7holdK+Iz6LWoKGSCz8="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"zYceXSEdHBXa9VWsz+SKkyMSS8M=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"Nvw2MCnm7holdK+Iz6LWoKGSCz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0qI1Ejro2o/sAoVgohoLF6RIWgY="},{"type":"next-occurrence","id":"Glf39X94FiOdem+v6bLm/L8FHFo="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"Nvw2MCnm7holdK+Iz6LWoKGSCz8=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"Glf39X94FiOdem+v6bLm/L8FHFo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0qI1Ejro2o/sAoVgohoLF6RIWgY="},{"type":"next-occurrence","id":"6PSAfU+ajb1O6NnzYKCl6JmJT0g="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"Glf39X94FiOdem+v6bLm/L8FHFo=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"6PSAfU+ajb1O6NnzYKCl6JmJT0g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0qI1Ejro2o/sAoVgohoLF6RIWgY="},{"type":"next-occurrence","id":"ahxovKxzVmpQekqQMOGtTogRJ9c="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"6PSAfU+ajb1O6NnzYKCl6JmJT0g=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"ahxovKxzVmpQekqQMOGtTogRJ9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0qI1Ejro2o/sAoVgohoLF6RIWgY="},{"type":"next-occurrence","id":"IIarmW/h9d8mWC7NR4mYIXq30bs="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"ahxovKxzVmpQekqQMOGtTogRJ9c=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"IIarmW/h9d8mWC7NR4mYIXq30bs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0qI1Ejro2o/sAoVgohoLF6RIWgY="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"IIarmW/h9d8mWC7NR4mYIXq30bs=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"AqaSVjrMzshDOVLWEcakgdWe4e8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9OROV/QWiapoiuv/CNMumB23feI="}],"description":"Road rehabilitation on NY 100 both directions between Moseman Avenue (Somers) and Muscoot Lane (Somers) D265424/32597209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:11Z"},"road_event_id":"AqaSVjrMzshDOVLWEcakgdWe4e8=","beginning_cross_street":"Moseman Avenue","ending_cross_street":"Muscoot Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.740831,41.249997]]}},{"id":"9OROV/QWiapoiuv/CNMumB23feI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqaSVjrMzshDOVLWEcakgdWe4e8="},{"type":"next-occurrence","id":"1+pC/AXPOn5Z/7wUBa0PuCMNf8Q="}],"description":"Road rehabilitation on NY 100 both directions between Moseman Avenue (Somers) and Muscoot Lane (Somers) D265424/32597209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:11Z"},"road_event_id":"9OROV/QWiapoiuv/CNMumB23feI=","beginning_cross_street":"Moseman Avenue","ending_cross_street":"Muscoot Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.740831,41.249997]]}},{"id":"1+pC/AXPOn5Z/7wUBa0PuCMNf8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqaSVjrMzshDOVLWEcakgdWe4e8="}],"description":"Road rehabilitation on NY 100 both directions between Moseman Avenue (Somers) and Muscoot Lane (Somers) D265424/32597209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-08T20:01:11Z"},"road_event_id":"1+pC/AXPOn5Z/7wUBa0PuCMNf8Q=","beginning_cross_street":"Moseman Avenue","ending_cross_street":"Muscoot Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.740831,41.249997]]}},{"id":"PLDB2/BvE9FQdXscFYD/t62prts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements and safety improvements and sign work and survey work on NY 17A both directions between Quarry Road (Warwick) and Reservoir Road (Warwick) D265402/32734509 - TEMPORARY SIGNAL IN PLACE - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Monday May 4th, 2026 9:00 AM thru Friday June 5th, 2026 9:00 AM alternating traffic","update_date":"2026-04-27T13:26:54Z"},"road_event_id":"PLDB2/BvE9FQdXscFYD/t62prts=","beginning_cross_street":"Quarry Road","ending_cross_street":"Reservoir Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.356503,41.358927]]}},{"id":"nChuzJTGZEo/4QPNHG4EXO4pZzo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zNMR0t5CnmCJ4WFdSH3ko61TmFA="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday April 28th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-27T16:47:39Z"},"road_event_id":"nChuzJTGZEo/4QPNHG4EXO4pZzo=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"zNMR0t5CnmCJ4WFdSH3ko61TmFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nChuzJTGZEo/4QPNHG4EXO4pZzo="},{"type":"next-occurrence","id":"ahGs5Idh8XW4wwiYVr0pehMi3fI="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday April 28th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-27T16:47:39Z"},"road_event_id":"zNMR0t5CnmCJ4WFdSH3ko61TmFA=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"ahGs5Idh8XW4wwiYVr0pehMi3fI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nChuzJTGZEo/4QPNHG4EXO4pZzo="},{"type":"next-occurrence","id":"uyZSs/syonuUUXC/JlooRBJDLOg="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday April 28th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-27T16:47:39Z"},"road_event_id":"ahGs5Idh8XW4wwiYVr0pehMi3fI=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"uyZSs/syonuUUXC/JlooRBJDLOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nChuzJTGZEo/4QPNHG4EXO4pZzo="},{"type":"next-occurrence","id":"QYKntlOyEoC1WQOWWIi9ADJ4BZA="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday April 28th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-27T16:47:39Z"},"road_event_id":"uyZSs/syonuUUXC/JlooRBJDLOg=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"QYKntlOyEoC1WQOWWIi9ADJ4BZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nChuzJTGZEo/4QPNHG4EXO4pZzo="},{"type":"next-occurrence","id":"E5tzazRS9e2Jga9MWF7F4CCz4gw="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday April 28th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-27T16:47:39Z"},"road_event_id":"QYKntlOyEoC1WQOWWIi9ADJ4BZA=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"E5tzazRS9e2Jga9MWF7F4CCz4gw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nChuzJTGZEo/4QPNHG4EXO4pZzo="},{"type":"next-occurrence","id":"9YPXDs6l9xSayFVwmaIHJEZVELc="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday April 28th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-27T16:47:39Z"},"road_event_id":"E5tzazRS9e2Jga9MWF7F4CCz4gw=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"9YPXDs6l9xSayFVwmaIHJEZVELc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nChuzJTGZEo/4QPNHG4EXO4pZzo="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday April 28th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-27T16:47:39Z"},"road_event_id":"9YPXDs6l9xSayFVwmaIHJEZVELc=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"buEZhKGdmvlfDFAeweUPX0r4nWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"63EQhXSqwcEiyb7KLTXek5b40sc="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"buEZhKGdmvlfDFAeweUPX0r4nWI=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"63EQhXSqwcEiyb7KLTXek5b40sc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"buEZhKGdmvlfDFAeweUPX0r4nWI="},{"type":"next-occurrence","id":"2O8WOfrTz6gTFRgnZoacPHbcNBs="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"63EQhXSqwcEiyb7KLTXek5b40sc=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"2O8WOfrTz6gTFRgnZoacPHbcNBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"buEZhKGdmvlfDFAeweUPX0r4nWI="},{"type":"next-occurrence","id":"xkRK8FHLOKjA9SSHiAWj3gCRldo="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"2O8WOfrTz6gTFRgnZoacPHbcNBs=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"xkRK8FHLOKjA9SSHiAWj3gCRldo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"buEZhKGdmvlfDFAeweUPX0r4nWI="},{"type":"next-occurrence","id":"czpzNQ6o04sMyUkEX6KWvPBcFms="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"xkRK8FHLOKjA9SSHiAWj3gCRldo=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"czpzNQ6o04sMyUkEX6KWvPBcFms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"buEZhKGdmvlfDFAeweUPX0r4nWI="},{"type":"next-occurrence","id":"reTF8ikaCJPD24mEmaI+A6Kah/M="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"czpzNQ6o04sMyUkEX6KWvPBcFms=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"reTF8ikaCJPD24mEmaI+A6Kah/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"buEZhKGdmvlfDFAeweUPX0r4nWI="},{"type":"next-occurrence","id":"0SyK5To6u2ZtQ6nBlAi4mb8zoe0="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"reTF8ikaCJPD24mEmaI+A6Kah/M=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"0SyK5To6u2ZtQ6nBlAi4mb8zoe0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"buEZhKGdmvlfDFAeweUPX0r4nWI="},{"type":"next-occurrence","id":"z57aL1cE5dlbVSzU2cLtxNyjVnw="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"0SyK5To6u2ZtQ6nBlAi4mb8zoe0=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"z57aL1cE5dlbVSzU2cLtxNyjVnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"buEZhKGdmvlfDFAeweUPX0r4nWI="},{"type":"next-occurrence","id":"vRedgvJI4bn3834hnz8kdvLzGFM="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"z57aL1cE5dlbVSzU2cLtxNyjVnw=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"vRedgvJI4bn3834hnz8kdvLzGFM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"buEZhKGdmvlfDFAeweUPX0r4nWI="},{"type":"next-occurrence","id":"9S/8bzSlnt/FPOgadZI0ZikXcPA="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"vRedgvJI4bn3834hnz8kdvLzGFM=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"9S/8bzSlnt/FPOgadZI0ZikXcPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"buEZhKGdmvlfDFAeweUPX0r4nWI="},{"type":"next-occurrence","id":"Ob7IbrjUsH934YxNINVlSGU/LtM="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"9S/8bzSlnt/FPOgadZI0ZikXcPA=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"Ob7IbrjUsH934YxNINVlSGU/LtM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"buEZhKGdmvlfDFAeweUPX0r4nWI="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"Ob7IbrjUsH934YxNINVlSGU/LtM=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"rh39EkOHjCgQYhRvdYTIKBdoAjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"p1U7oA+Wr/pDig+XeUNdm1tBGtg="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes Reduced to 1, Tuesday April 28th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-11T20:27:27Z"},"road_event_id":"rh39EkOHjCgQYhRvdYTIKBdoAjQ=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.457372,42.438929]]}},{"id":"p1U7oA+Wr/pDig+XeUNdm1tBGtg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rh39EkOHjCgQYhRvdYTIKBdoAjQ="},{"type":"next-occurrence","id":"U+b1piC2P9FAUat5EBMQmJYxxrA="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes Reduced to 1, Tuesday April 28th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-11T20:27:27Z"},"road_event_id":"p1U7oA+Wr/pDig+XeUNdm1tBGtg=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.457372,42.438929]]}},{"id":"U+b1piC2P9FAUat5EBMQmJYxxrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rh39EkOHjCgQYhRvdYTIKBdoAjQ="},{"type":"next-occurrence","id":"QflhDSELm8pNLoHYxGVZHHW0U84="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes Reduced to 1, Tuesday April 28th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-11T20:27:27Z"},"road_event_id":"U+b1piC2P9FAUat5EBMQmJYxxrA=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.457372,42.438929]]}},{"id":"QflhDSELm8pNLoHYxGVZHHW0U84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rh39EkOHjCgQYhRvdYTIKBdoAjQ="},{"type":"next-occurrence","id":"YLY5fd4dRTVlZOZGY5aydjxeOPw="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes Reduced to 1, Tuesday April 28th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-11T20:27:27Z"},"road_event_id":"QflhDSELm8pNLoHYxGVZHHW0U84=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.457372,42.438929]]}},{"id":"YLY5fd4dRTVlZOZGY5aydjxeOPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rh39EkOHjCgQYhRvdYTIKBdoAjQ="},{"type":"next-occurrence","id":"UrLcATEZ6zFnE+uueDodtONevFk="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes Reduced to 1, Tuesday April 28th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-11T20:27:27Z"},"road_event_id":"YLY5fd4dRTVlZOZGY5aydjxeOPw=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.457372,42.438929]]}},{"id":"UrLcATEZ6zFnE+uueDodtONevFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rh39EkOHjCgQYhRvdYTIKBdoAjQ="},{"type":"next-occurrence","id":"dXvEqYNvRKhT0CzIyo4WsU/ssxU="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes Reduced to 1, Tuesday April 28th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-11T20:27:27Z"},"road_event_id":"UrLcATEZ6zFnE+uueDodtONevFk=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.457372,42.438929]]}},{"id":"dXvEqYNvRKhT0CzIyo4WsU/ssxU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rh39EkOHjCgQYhRvdYTIKBdoAjQ="},{"type":"next-occurrence","id":"iOA6AiB70JGwtkzpihapvsF3tYw="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes Reduced to 1, Tuesday April 28th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-11T20:27:27Z"},"road_event_id":"dXvEqYNvRKhT0CzIyo4WsU/ssxU=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.457372,42.438929]]}},{"id":"iOA6AiB70JGwtkzpihapvsF3tYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rh39EkOHjCgQYhRvdYTIKBdoAjQ="},{"type":"next-occurrence","id":"lnFa0f5+Qdl8yJNqRktn98ISaZM="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes Reduced to 1, Tuesday April 28th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-11T20:27:27Z"},"road_event_id":"iOA6AiB70JGwtkzpihapvsF3tYw=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.457372,42.438929]]}},{"id":"lnFa0f5+Qdl8yJNqRktn98ISaZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rh39EkOHjCgQYhRvdYTIKBdoAjQ="},{"type":"next-occurrence","id":"MHFaRgTpZfcyMmR7oAX1kcX4kKw="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes Reduced to 1, Tuesday April 28th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-11T20:27:27Z"},"road_event_id":"lnFa0f5+Qdl8yJNqRktn98ISaZM=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.457372,42.438929]]}},{"id":"MHFaRgTpZfcyMmR7oAX1kcX4kKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rh39EkOHjCgQYhRvdYTIKBdoAjQ="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes Reduced to 1, Tuesday April 28th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-11T20:27:27Z"},"road_event_id":"MHFaRgTpZfcyMmR7oAX1kcX4kKw=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.457372,42.438929]]}},{"id":"CWZkaM5ezbv+dP12VMCSu94z/ek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"B2I2wLG4t/1kB/57VrGuHKaZHl4="}],"description":"Roadwork on NY 5 westbound between West Genesee Street (Geddes) and Route 695 (Camillus), Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-28T16:12:53Z"},"road_event_id":"CWZkaM5ezbv+dP12VMCSu94z/ek=","beginning_cross_street":"West Genesee Street","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.223806,43.048504]]}},{"id":"B2I2wLG4t/1kB/57VrGuHKaZHl4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CWZkaM5ezbv+dP12VMCSu94z/ek="},{"type":"next-occurrence","id":"R7c7h/jWSRvXayapBxlpH3sbrBA="}],"description":"Roadwork on NY 5 westbound between West Genesee Street (Geddes) and Route 695 (Camillus), Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-28T16:12:53Z"},"road_event_id":"B2I2wLG4t/1kB/57VrGuHKaZHl4=","beginning_cross_street":"West Genesee Street","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.223806,43.048504]]}},{"id":"R7c7h/jWSRvXayapBxlpH3sbrBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CWZkaM5ezbv+dP12VMCSu94z/ek="}],"description":"Roadwork on NY 5 westbound between West Genesee Street (Geddes) and Route 695 (Camillus), Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-28T16:12:53Z"},"road_event_id":"R7c7h/jWSRvXayapBxlpH3sbrBA=","beginning_cross_street":"West Genesee Street","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.223806,43.048504]]}},{"id":"uiBwF3tnBW+dIWqyR26CGXFTIxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OMdQaNUe3m+uGgLGN8jiOV5Xh5U="}],"description":"Roadwork on NY 5 eastbound between NY-695 (Camillus) and West Genesee Street (Geddes), Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-28T16:15:26Z"},"road_event_id":"uiBwF3tnBW+dIWqyR26CGXFTIxA=","beginning_cross_street":"NY-695","ending_cross_street":"West Genesee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.23826,43.055062]]}},{"id":"OMdQaNUe3m+uGgLGN8jiOV5Xh5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uiBwF3tnBW+dIWqyR26CGXFTIxA="},{"type":"next-occurrence","id":"3PamGEzP0OX9GoQ4XvcjBdm+/HM="}],"description":"Roadwork on NY 5 eastbound between NY-695 (Camillus) and West Genesee Street (Geddes), Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-28T16:15:26Z"},"road_event_id":"OMdQaNUe3m+uGgLGN8jiOV5Xh5U=","beginning_cross_street":"NY-695","ending_cross_street":"West Genesee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.23826,43.055062]]}},{"id":"3PamGEzP0OX9GoQ4XvcjBdm+/HM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uiBwF3tnBW+dIWqyR26CGXFTIxA="}],"description":"Roadwork on NY 5 eastbound between NY-695 (Camillus) and West Genesee Street (Geddes), Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-28T16:15:26Z"},"road_event_id":"3PamGEzP0OX9GoQ4XvcjBdm+/HM=","beginning_cross_street":"NY-695","ending_cross_street":"West Genesee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.23826,43.055062]]}},{"id":"aV7yAJD+nUP/n1Qp66YLQYERKns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SAcNc58IHFFIJyEyWegjaV70szo="}],"description":"Roadwork on NY 695 northbound between NY-5 (Camillus) and I-690 (Geddes), Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-28T16:21:52Z"},"road_event_id":"aV7yAJD+nUP/n1Qp66YLQYERKns=","beginning_cross_street":"NY-5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235835,43.060495]]}},{"id":"SAcNc58IHFFIJyEyWegjaV70szo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aV7yAJD+nUP/n1Qp66YLQYERKns="},{"type":"next-occurrence","id":"40X+x1tSe+C5vEhyvvAbKD0ZIaU="}],"description":"Roadwork on NY 695 northbound between NY-5 (Camillus) and I-690 (Geddes), Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-28T16:21:52Z"},"road_event_id":"SAcNc58IHFFIJyEyWegjaV70szo=","beginning_cross_street":"NY-5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235835,43.060495]]}},{"id":"40X+x1tSe+C5vEhyvvAbKD0ZIaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aV7yAJD+nUP/n1Qp66YLQYERKns="}],"description":"Roadwork on NY 695 northbound between NY-5 (Camillus) and I-690 (Geddes), Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-28T16:21:52Z"},"road_event_id":"40X+x1tSe+C5vEhyvvAbKD0ZIaU=","beginning_cross_street":"NY-5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235835,43.060495]]}},{"id":"2b82pJxphUzObY4pB8i2m2hmtaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8heGiIpIGWCNDPtWOq3nf2ONVQg="}],"description":"Roadwork on NY 695 southbound between I-690 (Geddes) and NY 5 (Camillus), Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-28T16:24:39Z"},"road_event_id":"2b82pJxphUzObY4pB8i2m2hmtaY=","beginning_cross_street":"I-690 ","ending_cross_street":"NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227872,43.077027]]}},{"id":"8heGiIpIGWCNDPtWOq3nf2ONVQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2b82pJxphUzObY4pB8i2m2hmtaY="},{"type":"next-occurrence","id":"tbCoS3W2rSb3o+hpcbaaLmAeAoA="}],"description":"Roadwork on NY 695 southbound between I-690 (Geddes) and NY 5 (Camillus), Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-28T16:24:39Z"},"road_event_id":"8heGiIpIGWCNDPtWOq3nf2ONVQg=","beginning_cross_street":"I-690 ","ending_cross_street":"NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227872,43.077027]]}},{"id":"tbCoS3W2rSb3o+hpcbaaLmAeAoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2b82pJxphUzObY4pB8i2m2hmtaY="}],"description":"Roadwork on NY 695 southbound between I-690 (Geddes) and NY 5 (Camillus), Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-28T16:24:39Z"},"road_event_id":"tbCoS3W2rSb3o+hpcbaaLmAeAoA=","beginning_cross_street":"I-690 ","ending_cross_street":"NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227872,43.077027]]}},{"id":"yky0it3xzWJG4ZunvnZ+2vHQKmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KyINlA99BeI0JoQr3OKFsHCgwmA="}],"description":"Watermain break repairs on NY 14 both directions Forgham Street; NY 31 (Lyons) alternating lane closures, Wednesday April 29th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM both shoulder closed","update_date":"2026-04-28T17:28:16Z"},"road_event_id":"yky0it3xzWJG4ZunvnZ+2vHQKmQ=","beginning_cross_street":"Forgham Street; NY 31","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.99033,43.064181]]}},{"id":"KyINlA99BeI0JoQr3OKFsHCgwmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yky0it3xzWJG4ZunvnZ+2vHQKmQ="},{"type":"next-occurrence","id":"YiLzDoHrP8cw+jG5Wb+BBECyBIU="}],"description":"Watermain break repairs on NY 14 both directions Forgham Street; NY 31 (Lyons) alternating lane closures, Wednesday April 29th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM both shoulder closed","update_date":"2026-04-28T17:28:16Z"},"road_event_id":"KyINlA99BeI0JoQr3OKFsHCgwmA=","beginning_cross_street":"Forgham Street; NY 31","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.99033,43.064181]]}},{"id":"YiLzDoHrP8cw+jG5Wb+BBECyBIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yky0it3xzWJG4ZunvnZ+2vHQKmQ="}],"description":"Watermain break repairs on NY 14 both directions Forgham Street; NY 31 (Lyons) alternating lane closures, Wednesday April 29th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM both shoulder closed","update_date":"2026-04-28T17:28:16Z"},"road_event_id":"YiLzDoHrP8cw+jG5Wb+BBECyBIU=","beginning_cross_street":"Forgham Street; NY 31","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.99033,43.064181]]}},{"id":"qQqZgCaR5UOqcDjkP3WN3WB5Bx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"psC/rI2tjnvjbJ3drSPUIIJQw9o="}],"description":"Utility work on NY 31 both directions at Moseley Road; NY 250 (Perinton) Alternating lane closures with flaggers as needed, Wednesday April 29th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-06T17:10:17Z"},"road_event_id":"qQqZgCaR5UOqcDjkP3WN3WB5Bx8=","beginning_cross_street":"Moseley Road; NY 250","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.44251,43.069312]]}},{"id":"psC/rI2tjnvjbJ3drSPUIIJQw9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qQqZgCaR5UOqcDjkP3WN3WB5Bx8="},{"type":"next-occurrence","id":"86wklqtBubFCif2g92ytXsjt/Wk="}],"description":"Utility work on NY 31 both directions at Moseley Road; NY 250 (Perinton) Alternating lane closures with flaggers as needed, Wednesday April 29th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-06T17:10:17Z"},"road_event_id":"psC/rI2tjnvjbJ3drSPUIIJQw9o=","beginning_cross_street":"Moseley Road; NY 250","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.44251,43.069312]]}},{"id":"86wklqtBubFCif2g92ytXsjt/Wk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qQqZgCaR5UOqcDjkP3WN3WB5Bx8="}],"description":"Utility work on NY 31 both directions at Moseley Road; NY 250 (Perinton) Alternating lane closures with flaggers as needed, Wednesday April 29th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-06T17:10:17Z"},"road_event_id":"86wklqtBubFCif2g92ytXsjt/Wk=","beginning_cross_street":"Moseley Road; NY 250","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.44251,43.069312]]}},{"id":"WF7kggUi/5j06L9NbP49h33wBHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Both Directions North of CR 603/Bayshore Rd (Middle Twp) Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, 1 left lane of 2 lanes closed southbound; 1 left lane of 2 lanes closed northbound","update_date":"2026-04-28T23:51:46Z"},"road_event_id":"WF7kggUi/5j06L9NbP49h33wBHU=","beginning_cross_street":"North of CR 603/Bayshore Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.899612,39.056789]]}},{"id":"Z04bxL7LCGFIJd3sQK+S/MiwGkI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Both Directions North of CR 603/Bayshore Rd (Middle Twp) Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, 1 left lane of 2 lanes closed southbound; 1 left lane of 2 lanes closed northbound","update_date":"2026-04-28T23:51:50Z"},"road_event_id":"Z04bxL7LCGFIJd3sQK+S/MiwGkI=","beginning_cross_street":"North of CR 603/Bayshore Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.899612,39.056789]]}},{"id":"z2V5pueW+tQns5rVw10DKKV8bj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Both Directions North of CR 603/Bayshore Rd (Middle Twp) Tuesday May 19, 2026 08:00 PM thru Wednesday May 20, 2026 06:00 AM, 1 left lane of 2 lanes closed southbound; 1 left lane of 2 lanes closed northbound","update_date":"2026-04-28T23:52:02Z"},"road_event_id":"z2V5pueW+tQns5rVw10DKKV8bj4=","beginning_cross_street":"North of CR 603/Bayshore Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.899612,39.056789]]}},{"id":"qhYsrxO62ngJFtQGAFPZnvr4YCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Both Directions North of CR 603/Bayshore Rd (Middle Twp) Monday May 18, 2026 08:00 PM thru Tuesday May 19, 2026 06:00 AM, 1 left lane of 2 lanes closed southbound; 1 left lane of 2 lanes closed northbound","update_date":"2026-04-28T23:52:09Z"},"road_event_id":"qhYsrxO62ngJFtQGAFPZnvr4YCg=","beginning_cross_street":"North of CR 603/Bayshore Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.899612,39.056789]]}},{"id":"mabai/gqOdGvrlwZbzGXPHmKKes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Both Directions North of CR 603/Bayshore Rd (Middle Twp) Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, 1 left lane of 2 lanes closed southbound; 1 left lane of 2 lanes closed northbound","update_date":"2026-04-28T23:51:59Z"},"road_event_id":"mabai/gqOdGvrlwZbzGXPHmKKes=","beginning_cross_street":"North of CR 603/Bayshore Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.899612,39.056789]]}},{"id":"oZBAaOUoFMlr1j7f2jGgRIrBm/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OMlBVq2hi2A3qbkSCryh4iGKrTw="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-29T10:23:17Z"},"road_event_id":"oZBAaOUoFMlr1j7f2jGgRIrBm/E=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"OMlBVq2hi2A3qbkSCryh4iGKrTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZBAaOUoFMlr1j7f2jGgRIrBm/E="},{"type":"next-occurrence","id":"923ANE9/ggHogXJHMvDjxuRu5M8="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-29T10:23:17Z"},"road_event_id":"OMlBVq2hi2A3qbkSCryh4iGKrTw=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"923ANE9/ggHogXJHMvDjxuRu5M8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZBAaOUoFMlr1j7f2jGgRIrBm/E="},{"type":"next-occurrence","id":"jM9mAPLwYzc3dyZffBTAAmj9+4w="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-29T10:23:17Z"},"road_event_id":"923ANE9/ggHogXJHMvDjxuRu5M8=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"jM9mAPLwYzc3dyZffBTAAmj9+4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZBAaOUoFMlr1j7f2jGgRIrBm/E="},{"type":"next-occurrence","id":"h5r9Qyzrth0qUpJMblkxqgPz93c="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-29T10:23:17Z"},"road_event_id":"jM9mAPLwYzc3dyZffBTAAmj9+4w=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:30:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"h5r9Qyzrth0qUpJMblkxqgPz93c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZBAaOUoFMlr1j7f2jGgRIrBm/E="},{"type":"next-occurrence","id":"CubZR8ORDJ//Mk3U2hdFBuIWdmg="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-29T10:23:17Z"},"road_event_id":"h5r9Qyzrth0qUpJMblkxqgPz93c=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:30:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"CubZR8ORDJ//Mk3U2hdFBuIWdmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZBAaOUoFMlr1j7f2jGgRIrBm/E="},{"type":"next-occurrence","id":"rvzXO299FKzTQV0j+Z4/J3IkLvE="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-29T10:23:17Z"},"road_event_id":"CubZR8ORDJ//Mk3U2hdFBuIWdmg=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:30:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"rvzXO299FKzTQV0j+Z4/J3IkLvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZBAaOUoFMlr1j7f2jGgRIrBm/E="},{"type":"next-occurrence","id":"tKp/Ca/ExRp2xHhHBCVxvTPQCww="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-29T10:23:17Z"},"road_event_id":"rvzXO299FKzTQV0j+Z4/J3IkLvE=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:30:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"tKp/Ca/ExRp2xHhHBCVxvTPQCww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZBAaOUoFMlr1j7f2jGgRIrBm/E="},{"type":"next-occurrence","id":"K6rlt4OItmix8EbrVQMrJd35iWY="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-29T10:23:17Z"},"road_event_id":"tKp/Ca/ExRp2xHhHBCVxvTPQCww=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"K6rlt4OItmix8EbrVQMrJd35iWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZBAaOUoFMlr1j7f2jGgRIrBm/E="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-29T10:23:17Z"},"road_event_id":"K6rlt4OItmix8EbrVQMrJd35iWY=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"m1zu+A2aMG0J7NT4kMLYVx4YecQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"w9MCVbAYhwVrYCdhIOoQNH6h7b4="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:3","update_date":"2026-05-09T18:01:14Z"},"road_event_id":"m1zu+A2aMG0J7NT4kMLYVx4YecQ=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"w9MCVbAYhwVrYCdhIOoQNH6h7b4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m1zu+A2aMG0J7NT4kMLYVx4YecQ="},{"type":"next-occurrence","id":"IlQfMLyCdtpvlYd8DyTU0jUvmFU="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:3","update_date":"2026-05-09T18:01:14Z"},"road_event_id":"w9MCVbAYhwVrYCdhIOoQNH6h7b4=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"IlQfMLyCdtpvlYd8DyTU0jUvmFU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m1zu+A2aMG0J7NT4kMLYVx4YecQ="},{"type":"next-occurrence","id":"BGIMH5BXANdjsLqhb6C5B8A9PuM="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:3","update_date":"2026-05-09T18:01:14Z"},"road_event_id":"IlQfMLyCdtpvlYd8DyTU0jUvmFU=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"BGIMH5BXANdjsLqhb6C5B8A9PuM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m1zu+A2aMG0J7NT4kMLYVx4YecQ="},{"type":"next-occurrence","id":"riGoJ3nWGBdYuEOQ0TWHKrrGSdU="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:3","update_date":"2026-05-09T18:01:14Z"},"road_event_id":"BGIMH5BXANdjsLqhb6C5B8A9PuM=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"riGoJ3nWGBdYuEOQ0TWHKrrGSdU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m1zu+A2aMG0J7NT4kMLYVx4YecQ="},{"type":"next-occurrence","id":"SWjywnehvap+x788JGr0poVLhdk="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:3","update_date":"2026-05-09T18:01:14Z"},"road_event_id":"riGoJ3nWGBdYuEOQ0TWHKrrGSdU=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"SWjywnehvap+x788JGr0poVLhdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m1zu+A2aMG0J7NT4kMLYVx4YecQ="},{"type":"next-occurrence","id":"k5hn95QJl6gPPDq6j7hbrLMpAlU="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:3","update_date":"2026-05-09T18:01:14Z"},"road_event_id":"SWjywnehvap+x788JGr0poVLhdk=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"k5hn95QJl6gPPDq6j7hbrLMpAlU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m1zu+A2aMG0J7NT4kMLYVx4YecQ="},{"type":"next-occurrence","id":"98rxoONZSLu45FSi1MX2/0ayxCU="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:3","update_date":"2026-05-09T18:01:14Z"},"road_event_id":"k5hn95QJl6gPPDq6j7hbrLMpAlU=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"98rxoONZSLu45FSi1MX2/0ayxCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m1zu+A2aMG0J7NT4kMLYVx4YecQ="},{"type":"next-occurrence","id":"HGqSxMIJoKJXkVWuOYJYcfZOxb0="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:3","update_date":"2026-05-09T18:01:14Z"},"road_event_id":"98rxoONZSLu45FSi1MX2/0ayxCU=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"HGqSxMIJoKJXkVWuOYJYcfZOxb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m1zu+A2aMG0J7NT4kMLYVx4YecQ="},{"type":"next-occurrence","id":"3xIMoTsAHoPRgkZwV2S4MP6/VFs="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:3","update_date":"2026-05-09T18:01:14Z"},"road_event_id":"HGqSxMIJoKJXkVWuOYJYcfZOxb0=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"3xIMoTsAHoPRgkZwV2S4MP6/VFs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m1zu+A2aMG0J7NT4kMLYVx4YecQ="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:3","update_date":"2026-05-09T18:01:14Z"},"road_event_id":"3xIMoTsAHoPRgkZwV2S4MP6/VFs=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"uDk3Tz3dwcV95vZ0wlD6aPBUz3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GqZaVJQvj1bBG3bRf35wQTxNwtc="}],"description":"Roadwork on NY 39 both directions between US 20A (Leicester) and Keeney Rd (Leicester) Alternating lane closures with flaggers as needed, Friday April 24th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T11:54:00Z"},"road_event_id":"uDk3Tz3dwcV95vZ0wlD6aPBUz3o=","beginning_cross_street":"US 20A","ending_cross_street":"Keeney Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.929243,42.753471]]}},{"id":"GqZaVJQvj1bBG3bRf35wQTxNwtc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDk3Tz3dwcV95vZ0wlD6aPBUz3o="},{"type":"next-occurrence","id":"dzSZ0W70Now/SnBMEfhvNbbKdRI="}],"description":"Roadwork on NY 39 both directions between US 20A (Leicester) and Keeney Rd (Leicester) Alternating lane closures with flaggers as needed, Friday April 24th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T11:54:00Z"},"road_event_id":"GqZaVJQvj1bBG3bRf35wQTxNwtc=","beginning_cross_street":"US 20A","ending_cross_street":"Keeney Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.929243,42.753471]]}},{"id":"dzSZ0W70Now/SnBMEfhvNbbKdRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDk3Tz3dwcV95vZ0wlD6aPBUz3o="},{"type":"next-occurrence","id":"kLBhEvVECHk7zuRVS3LLdLk1At8="}],"description":"Roadwork on NY 39 both directions between US 20A (Leicester) and Keeney Rd (Leicester) Alternating lane closures with flaggers as needed, Friday April 24th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T11:54:00Z"},"road_event_id":"dzSZ0W70Now/SnBMEfhvNbbKdRI=","beginning_cross_street":"US 20A","ending_cross_street":"Keeney Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.929243,42.753471]]}},{"id":"kLBhEvVECHk7zuRVS3LLdLk1At8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDk3Tz3dwcV95vZ0wlD6aPBUz3o="},{"type":"next-occurrence","id":"KUyHMi23hNv9/4z5dwBg5p39AA4="}],"description":"Roadwork on NY 39 both directions between US 20A (Leicester) and Keeney Rd (Leicester) Alternating lane closures with flaggers as needed, Friday April 24th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T11:54:00Z"},"road_event_id":"kLBhEvVECHk7zuRVS3LLdLk1At8=","beginning_cross_street":"US 20A","ending_cross_street":"Keeney Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.929243,42.753471]]}},{"id":"KUyHMi23hNv9/4z5dwBg5p39AA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDk3Tz3dwcV95vZ0wlD6aPBUz3o="},{"type":"next-occurrence","id":"4BTfo5YH42eTzsN+U7QV3yxOMS0="}],"description":"Roadwork on NY 39 both directions between US 20A (Leicester) and Keeney Rd (Leicester) Alternating lane closures with flaggers as needed, Friday April 24th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T11:54:00Z"},"road_event_id":"KUyHMi23hNv9/4z5dwBg5p39AA4=","beginning_cross_street":"US 20A","ending_cross_street":"Keeney Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.929243,42.753471]]}},{"id":"4BTfo5YH42eTzsN+U7QV3yxOMS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDk3Tz3dwcV95vZ0wlD6aPBUz3o="},{"type":"next-occurrence","id":"/Aw8FeKVDoQDaRWZ7VFHBXWVj8g="}],"description":"Roadwork on NY 39 both directions between US 20A (Leicester) and Keeney Rd (Leicester) Alternating lane closures with flaggers as needed, Friday April 24th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T11:54:00Z"},"road_event_id":"4BTfo5YH42eTzsN+U7QV3yxOMS0=","beginning_cross_street":"US 20A","ending_cross_street":"Keeney Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.929243,42.753471]]}},{"id":"/Aw8FeKVDoQDaRWZ7VFHBXWVj8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDk3Tz3dwcV95vZ0wlD6aPBUz3o="},{"type":"next-occurrence","id":"UuHIGeFYJnkxgUtrXtD+Zg6wd4Y="}],"description":"Roadwork on NY 39 both directions between US 20A (Leicester) and Keeney Rd (Leicester) Alternating lane closures with flaggers as needed, Friday April 24th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T11:54:00Z"},"road_event_id":"/Aw8FeKVDoQDaRWZ7VFHBXWVj8g=","beginning_cross_street":"US 20A","ending_cross_street":"Keeney Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.929243,42.753471]]}},{"id":"UuHIGeFYJnkxgUtrXtD+Zg6wd4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDk3Tz3dwcV95vZ0wlD6aPBUz3o="},{"type":"next-occurrence","id":"+aAIejUbsCF+qmmd4R1WxJwzJQs="}],"description":"Roadwork on NY 39 both directions between US 20A (Leicester) and Keeney Rd (Leicester) Alternating lane closures with flaggers as needed, Friday April 24th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T11:54:00Z"},"road_event_id":"UuHIGeFYJnkxgUtrXtD+Zg6wd4Y=","beginning_cross_street":"US 20A","ending_cross_street":"Keeney Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.929243,42.753471]]}},{"id":"+aAIejUbsCF+qmmd4R1WxJwzJQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDk3Tz3dwcV95vZ0wlD6aPBUz3o="},{"type":"next-occurrence","id":"hW5KyKs7aksIkEM3KfBcTw4L1oo="}],"description":"Roadwork on NY 39 both directions between US 20A (Leicester) and Keeney Rd (Leicester) Alternating lane closures with flaggers as needed, Friday April 24th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T11:54:00Z"},"road_event_id":"+aAIejUbsCF+qmmd4R1WxJwzJQs=","beginning_cross_street":"US 20A","ending_cross_street":"Keeney Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.929243,42.753471]]}},{"id":"hW5KyKs7aksIkEM3KfBcTw4L1oo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDk3Tz3dwcV95vZ0wlD6aPBUz3o="},{"type":"next-occurrence","id":"WtfVAfE+oXs7i8Ck7RQgwUiMs4c="}],"description":"Roadwork on NY 39 both directions between US 20A (Leicester) and Keeney Rd (Leicester) Alternating lane closures with flaggers as needed, Friday April 24th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T11:54:00Z"},"road_event_id":"hW5KyKs7aksIkEM3KfBcTw4L1oo=","beginning_cross_street":"US 20A","ending_cross_street":"Keeney Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.929243,42.753471]]}},{"id":"WtfVAfE+oXs7i8Ck7RQgwUiMs4c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDk3Tz3dwcV95vZ0wlD6aPBUz3o="}],"description":"Roadwork on NY 39 both directions between US 20A (Leicester) and Keeney Rd (Leicester) Alternating lane closures with flaggers as needed, Friday April 24th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T11:54:00Z"},"road_event_id":"WtfVAfE+oXs7i8Ck7RQgwUiMs4c=","beginning_cross_street":"US 20A","ending_cross_street":"Keeney Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.929243,42.753471]]}},{"id":"K3gppEoYDhuEyi0lyK+ax9EpzAg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JhMjnm0jNXwfOnqgF+xjjCzl8ao="}],"description":"Utility work on NY 33A both directions between I-390 (Gates) and City of Rochester and Town of Gates Line (Rochester) Alternating lane closures with flaggers as needed, Monday May 4th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T13:38:04Z"},"road_event_id":"K3gppEoYDhuEyi0lyK+ax9EpzAg=","beginning_cross_street":"I-390","ending_cross_street":"City of Rochester and Town of Gates Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668196,43.139474]]}},{"id":"JhMjnm0jNXwfOnqgF+xjjCzl8ao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K3gppEoYDhuEyi0lyK+ax9EpzAg="},{"type":"next-occurrence","id":"8KqlAjZmfIf4KurgqnjvWqSgyR4="}],"description":"Utility work on NY 33A both directions between I-390 (Gates) and City of Rochester and Town of Gates Line (Rochester) Alternating lane closures with flaggers as needed, Monday May 4th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T13:38:04Z"},"road_event_id":"JhMjnm0jNXwfOnqgF+xjjCzl8ao=","beginning_cross_street":"I-390","ending_cross_street":"City of Rochester and Town of Gates Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668196,43.139474]]}},{"id":"8KqlAjZmfIf4KurgqnjvWqSgyR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K3gppEoYDhuEyi0lyK+ax9EpzAg="}],"description":"Utility work on NY 33A both directions between I-390 (Gates) and City of Rochester and Town of Gates Line (Rochester) Alternating lane closures with flaggers as needed, Monday May 4th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-29T13:38:04Z"},"road_event_id":"8KqlAjZmfIf4KurgqnjvWqSgyR4=","beginning_cross_street":"I-390","ending_cross_street":"City of Rochester and Town of Gates Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668196,43.139474]]}},{"id":"PYhkLEi8kdEd2x5Tr/CT7XzkFjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NjbZ3DzGtjGxKreBGjht1gqZYy0="}],"description":"Repaving on I-81 northbound ramp to/from Exit 1A - E Glen Ave/Brighton Ave (Syracuse) ; follow detour, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 07:00 PM All lanes closed","update_date":"2026-04-29T14:37:28Z"},"road_event_id":"PYhkLEi8kdEd2x5Tr/CT7XzkFjM=","beginning_cross_street":"Exit 1A - E Glen Ave/Brighton Ave ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.134579,43.008028]]}},{"id":"NjbZ3DzGtjGxKreBGjht1gqZYy0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PYhkLEi8kdEd2x5Tr/CT7XzkFjM="},{"type":"next-occurrence","id":"JxjXlsDYj+iZs5kqAP8A9fP7rwc="}],"description":"Repaving on I-81 northbound ramp to/from Exit 1A - E Glen Ave/Brighton Ave (Syracuse) ; follow detour, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 07:00 PM All lanes closed","update_date":"2026-04-29T14:37:28Z"},"road_event_id":"NjbZ3DzGtjGxKreBGjht1gqZYy0=","beginning_cross_street":"Exit 1A - E Glen Ave/Brighton Ave ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.134579,43.008028]]}},{"id":"JxjXlsDYj+iZs5kqAP8A9fP7rwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PYhkLEi8kdEd2x5Tr/CT7XzkFjM="}],"description":"Repaving on I-81 northbound ramp to/from Exit 1A - E Glen Ave/Brighton Ave (Syracuse) ; follow detour, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 07:00 PM All lanes closed","update_date":"2026-04-29T14:37:28Z"},"road_event_id":"JxjXlsDYj+iZs5kqAP8A9fP7rwc=","beginning_cross_street":"Exit 1A - E Glen Ave/Brighton Ave ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.134579,43.008028]]}},{"id":"U95NLKwvZxaOz6uv/0tkp7vFZVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/5aAi91sykSaZjbvk0gx9G+J5KI="}],"description":"Repaving on I-81 southbound ramp to Exit 1B (Syracuse) ; follow detour, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 07:00 PM All lanes closed","update_date":"2026-04-29T14:43:13Z"},"road_event_id":"U95NLKwvZxaOz6uv/0tkp7vFZVo=","beginning_cross_street":"Exit 1B","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.135966,43.009346]]}},{"id":"/5aAi91sykSaZjbvk0gx9G+J5KI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U95NLKwvZxaOz6uv/0tkp7vFZVo="},{"type":"next-occurrence","id":"BddhNqLL3Hv4b+sE8Ki2O6QrwGg="}],"description":"Repaving on I-81 southbound ramp to Exit 1B (Syracuse) ; follow detour, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 07:00 PM All lanes closed","update_date":"2026-04-29T14:43:13Z"},"road_event_id":"/5aAi91sykSaZjbvk0gx9G+J5KI=","beginning_cross_street":"Exit 1B","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.135966,43.009346]]}},{"id":"BddhNqLL3Hv4b+sE8Ki2O6QrwGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U95NLKwvZxaOz6uv/0tkp7vFZVo="}],"description":"Repaving on I-81 southbound ramp to Exit 1B (Syracuse) ; follow detour, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 07:00 PM All lanes closed","update_date":"2026-04-29T14:43:13Z"},"road_event_id":"BddhNqLL3Hv4b+sE8Ki2O6QrwGg=","beginning_cross_street":"Exit 1B","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.135966,43.009346]]}},{"id":"0dHnBoo2ZtHJFX1qbbVnGxb7oyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9yPxMrewfJ7xC//svUyzya+Lux4="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, shoulder closure, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-29T17:31:39Z"},"road_event_id":"0dHnBoo2ZtHJFX1qbbVnGxb7oyU=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"9yPxMrewfJ7xC//svUyzya+Lux4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0dHnBoo2ZtHJFX1qbbVnGxb7oyU="},{"type":"next-occurrence","id":"avNMKfneBGh0Bn1oxUzHgTc9ZxU="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, shoulder closure, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-29T17:31:39Z"},"road_event_id":"9yPxMrewfJ7xC//svUyzya+Lux4=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"avNMKfneBGh0Bn1oxUzHgTc9ZxU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0dHnBoo2ZtHJFX1qbbVnGxb7oyU="},{"type":"next-occurrence","id":"m1J435eks6Okg//F770Q9tKSV2M="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, shoulder closure, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-29T17:31:39Z"},"road_event_id":"avNMKfneBGh0Bn1oxUzHgTc9ZxU=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"m1J435eks6Okg//F770Q9tKSV2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0dHnBoo2ZtHJFX1qbbVnGxb7oyU="},{"type":"next-occurrence","id":"se1RMUyemH4zbYGFgDqrIM8qEnE="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, shoulder closure, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-29T17:31:39Z"},"road_event_id":"m1J435eks6Okg//F770Q9tKSV2M=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"se1RMUyemH4zbYGFgDqrIM8qEnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0dHnBoo2ZtHJFX1qbbVnGxb7oyU="},{"type":"next-occurrence","id":"yuBBEBOul1cBhGfh5wdpeMmOVrY="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, shoulder closure, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-29T17:31:39Z"},"road_event_id":"se1RMUyemH4zbYGFgDqrIM8qEnE=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"yuBBEBOul1cBhGfh5wdpeMmOVrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0dHnBoo2ZtHJFX1qbbVnGxb7oyU="},{"type":"next-occurrence","id":"BqO3PxnIPqqzYnYnx/0mZCqjuBQ="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, shoulder closure, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-29T17:31:39Z"},"road_event_id":"yuBBEBOul1cBhGfh5wdpeMmOVrY=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"BqO3PxnIPqqzYnYnx/0mZCqjuBQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0dHnBoo2ZtHJFX1qbbVnGxb7oyU="},{"type":"next-occurrence","id":"7pATGsSMhj1PK/XpW+64xiEsTvg="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, shoulder closure, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-29T17:31:39Z"},"road_event_id":"BqO3PxnIPqqzYnYnx/0mZCqjuBQ=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"7pATGsSMhj1PK/XpW+64xiEsTvg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0dHnBoo2ZtHJFX1qbbVnGxb7oyU="},{"type":"next-occurrence","id":"RZb1WBlVQsXRGo2bZteeGOv4mtw="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, shoulder closure, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-29T17:31:39Z"},"road_event_id":"7pATGsSMhj1PK/XpW+64xiEsTvg=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"RZb1WBlVQsXRGo2bZteeGOv4mtw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0dHnBoo2ZtHJFX1qbbVnGxb7oyU="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, shoulder closure, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-29T17:31:39Z"},"road_event_id":"RZb1WBlVQsXRGo2bZteeGOv4mtw=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"vKNRPkyRAbx0hZp761I9buBZ7xU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 352"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 352 both directions Town of Big Flats; Town of Elmira Line (Elmira) to CR 55; Harris Hill Road (Big Flats) Periodic flagging in both directions of Route 352 to stop traffic less than 5 minutes, allowing trucks and equipment safe access to the work area behind guiderail. , Thursday April 30th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-29T18:26:20Z"},"road_event_id":"vKNRPkyRAbx0hZp761I9buBZ7xU=","beginning_cross_street":"Town of Big Flats; Town of Elmira Line","ending_cross_street":"CR 55; Harris Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.874259,42.091754]]}},{"id":"xA2A16ldH0yJ28Pe9l3Nb/H/Iy4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 15"],"direction":"unknown","related_road_events":[],"description":"Installation of traffic monitoring systems on US 15 both directions Town of Erwin; Town of Lindley Line; Ramp (Lindley) to Smith Road; Presho CR 5 (Lindley) Left lanes closed, Thursday May 21st, 2026, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed southbound; 1 Left lane of 2 lanes closed northbound","update_date":"2026-04-29T19:10:01Z"},"road_event_id":"xA2A16ldH0yJ28Pe9l3Nb/H/Iy4=","beginning_cross_street":"Town of Erwin; Town of Lindley Line; Ramp","ending_cross_street":"Smith Road; Presho CR 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T20:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.159451,42.092466]]}},{"id":"Kym5XMfMstuVxdImLN7moDyv2II=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 13TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LD+t3Y/sgxtO374fzFBFuyDU1qI="}],"description":"Construction on E 13TH ST westbound at UNIVERSITY PL (New York), Wednesday April 29th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 06:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:48:11Z"},"road_event_id":"Kym5XMfMstuVxdImLN7moDyv2II=","beginning_cross_street":"UNIVERSITY PL","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T10:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992288,40.734542]]}},{"id":"LD+t3Y/sgxtO374fzFBFuyDU1qI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 13TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Kym5XMfMstuVxdImLN7moDyv2II="}],"description":"Construction on E 13TH ST westbound at UNIVERSITY PL (New York), Wednesday April 29th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 06:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:48:11Z"},"road_event_id":"LD+t3Y/sgxtO374fzFBFuyDU1qI=","beginning_cross_street":"UNIVERSITY PL","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T10:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992288,40.734542]]}},{"id":"zE4HCMcz8xeEEifsPUZWtGWfsMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 24TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5gRxBPa5z2cFmyTh1V9xXa3cScs="}],"description":"Construction on E 24TH ST eastbound between 2ND AVE (New York) and 1ST AVE (New York), Wednesday April 29th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:53:08Z"},"road_event_id":"zE4HCMcz8xeEEifsPUZWtGWfsMg=","beginning_cross_street":"2ND AVE","ending_cross_street":"1ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T10:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980372,40.738522]]}},{"id":"5gRxBPa5z2cFmyTh1V9xXa3cScs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 24TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zE4HCMcz8xeEEifsPUZWtGWfsMg="}],"description":"Construction on E 24TH ST eastbound between 2ND AVE (New York) and 1ST AVE (New York), Wednesday April 29th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:53:08Z"},"road_event_id":"5gRxBPa5z2cFmyTh1V9xXa3cScs=","beginning_cross_street":"2ND AVE","ending_cross_street":"1ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T10:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980372,40.738522]]}},{"id":"epgySFeGDAuObt5FON54jS4Lmm4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AtJS6iLWygS9MOkmuhu7i5hOfag="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"epgySFeGDAuObt5FON54jS4Lmm4=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"AtJS6iLWygS9MOkmuhu7i5hOfag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epgySFeGDAuObt5FON54jS4Lmm4="},{"type":"next-occurrence","id":"vErJ4kCnslkZnmTvXkuRALfhTrY="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"AtJS6iLWygS9MOkmuhu7i5hOfag=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"vErJ4kCnslkZnmTvXkuRALfhTrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epgySFeGDAuObt5FON54jS4Lmm4="},{"type":"next-occurrence","id":"NBkLUgHIIc5GWC2hitoafG/bpBg="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"vErJ4kCnslkZnmTvXkuRALfhTrY=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"NBkLUgHIIc5GWC2hitoafG/bpBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epgySFeGDAuObt5FON54jS4Lmm4="},{"type":"next-occurrence","id":"IZ9oLXw0oh/VLvXMKRzIWA9V4Oo="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"NBkLUgHIIc5GWC2hitoafG/bpBg=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"IZ9oLXw0oh/VLvXMKRzIWA9V4Oo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epgySFeGDAuObt5FON54jS4Lmm4="},{"type":"next-occurrence","id":"SjAF2Y8sKZToM8xbSTz/qmOiNjk="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"IZ9oLXw0oh/VLvXMKRzIWA9V4Oo=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"SjAF2Y8sKZToM8xbSTz/qmOiNjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epgySFeGDAuObt5FON54jS4Lmm4="},{"type":"next-occurrence","id":"EefVk2ChyebqpjCyFaJWPVKv7vM="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"SjAF2Y8sKZToM8xbSTz/qmOiNjk=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"EefVk2ChyebqpjCyFaJWPVKv7vM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epgySFeGDAuObt5FON54jS4Lmm4="},{"type":"next-occurrence","id":"8c3ABSYEIzf2i5Wdg1+a6pO0vXs="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"EefVk2ChyebqpjCyFaJWPVKv7vM=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"8c3ABSYEIzf2i5Wdg1+a6pO0vXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epgySFeGDAuObt5FON54jS4Lmm4="},{"type":"next-occurrence","id":"1Ybb0aX6eqztVD9x/yyxV68vMXE="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"8c3ABSYEIzf2i5Wdg1+a6pO0vXs=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"1Ybb0aX6eqztVD9x/yyxV68vMXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epgySFeGDAuObt5FON54jS4Lmm4="},{"type":"next-occurrence","id":"FoEDHIpV90bQEW3+zjtwzBdv0DU="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"1Ybb0aX6eqztVD9x/yyxV68vMXE=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"FoEDHIpV90bQEW3+zjtwzBdv0DU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epgySFeGDAuObt5FON54jS4Lmm4="},{"type":"next-occurrence","id":"suSVamO3GFYqRjon98gFxiY6tnk="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"FoEDHIpV90bQEW3+zjtwzBdv0DU=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"suSVamO3GFYqRjon98gFxiY6tnk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epgySFeGDAuObt5FON54jS4Lmm4="},{"type":"next-occurrence","id":"WO0WXUGoBAxXh035I+wc9idA6bk="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"suSVamO3GFYqRjon98gFxiY6tnk=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"WO0WXUGoBAxXh035I+wc9idA6bk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epgySFeGDAuObt5FON54jS4Lmm4="},{"type":"next-occurrence","id":"cFrPHv3+qcnfBsuOuhIDrRN7fmA="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"WO0WXUGoBAxXh035I+wc9idA6bk=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"cFrPHv3+qcnfBsuOuhIDrRN7fmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epgySFeGDAuObt5FON54jS4Lmm4="},{"type":"next-occurrence","id":"4mikggJQ6BHSKm70E+CLrbtQrVI="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"cFrPHv3+qcnfBsuOuhIDrRN7fmA=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"4mikggJQ6BHSKm70E+CLrbtQrVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epgySFeGDAuObt5FON54jS4Lmm4="},{"type":"next-occurrence","id":"VinmbIZeZTatBWUcfJxCNY3BmhU="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"4mikggJQ6BHSKm70E+CLrbtQrVI=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"VinmbIZeZTatBWUcfJxCNY3BmhU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epgySFeGDAuObt5FON54jS4Lmm4="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"VinmbIZeZTatBWUcfJxCNY3BmhU=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"vg4HagT6/CYkht0oVXjl8I36yyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qURS8xf7NOhD+vNZ8WizxMBYNp0="}],"description":"Construction on W 28TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York), Wednesday April 29th, 2026 thru Sunday May 24th, 2026, Saturday/ Sunday, 05:00 AM thru 05:00 PM All lanes closed","update_date":"2026-04-29T19:54:40Z"},"road_event_id":"vg4HagT6/CYkht0oVXjl8I36yyc=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T09:00:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00186,40.750827]]}},{"id":"qURS8xf7NOhD+vNZ8WizxMBYNp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vg4HagT6/CYkht0oVXjl8I36yyc="},{"type":"next-occurrence","id":"zLvIYipGl8DMPQOsEqDrXcNolO0="}],"description":"Construction on W 28TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York), Wednesday April 29th, 2026 thru Sunday May 24th, 2026, Saturday/ Sunday, 05:00 AM thru 05:00 PM All lanes closed","update_date":"2026-04-29T19:54:40Z"},"road_event_id":"qURS8xf7NOhD+vNZ8WizxMBYNp0=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T09:00:00Z","end_date":"2026-05-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00186,40.750827]]}},{"id":"zLvIYipGl8DMPQOsEqDrXcNolO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vg4HagT6/CYkht0oVXjl8I36yyc="},{"type":"next-occurrence","id":"0JPmc+zl5yHwMqhJbzF9+n7xBS8="}],"description":"Construction on W 28TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York), Wednesday April 29th, 2026 thru Sunday May 24th, 2026, Saturday/ Sunday, 05:00 AM thru 05:00 PM All lanes closed","update_date":"2026-04-29T19:54:40Z"},"road_event_id":"zLvIYipGl8DMPQOsEqDrXcNolO0=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T09:00:00Z","end_date":"2026-05-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00186,40.750827]]}},{"id":"0JPmc+zl5yHwMqhJbzF9+n7xBS8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vg4HagT6/CYkht0oVXjl8I36yyc="}],"description":"Construction on W 28TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York), Wednesday April 29th, 2026 thru Sunday May 24th, 2026, Saturday/ Sunday, 05:00 AM thru 05:00 PM All lanes closed","update_date":"2026-04-29T19:54:40Z"},"road_event_id":"0JPmc+zl5yHwMqhJbzF9+n7xBS8=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T09:00:00Z","end_date":"2026-05-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00186,40.750827]]}},{"id":"+ZU7t+6OMndmx0lp9a8fKeRmtNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"f3g7ocOgv+huRAYlHXoGMM7XlTc="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"+ZU7t+6OMndmx0lp9a8fKeRmtNY=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"f3g7ocOgv+huRAYlHXoGMM7XlTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+ZU7t+6OMndmx0lp9a8fKeRmtNY="},{"type":"next-occurrence","id":"0U/mbssBdJXFRITCuUgoy3aURyg="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"f3g7ocOgv+huRAYlHXoGMM7XlTc=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"0U/mbssBdJXFRITCuUgoy3aURyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+ZU7t+6OMndmx0lp9a8fKeRmtNY="},{"type":"next-occurrence","id":"bz8cCQG8HwAqaqVqa8TOMZYVmlk="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"0U/mbssBdJXFRITCuUgoy3aURyg=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"bz8cCQG8HwAqaqVqa8TOMZYVmlk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+ZU7t+6OMndmx0lp9a8fKeRmtNY="},{"type":"next-occurrence","id":"gPHNHKmSTzKTk+yY7dyYZBGAEXE="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"bz8cCQG8HwAqaqVqa8TOMZYVmlk=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"gPHNHKmSTzKTk+yY7dyYZBGAEXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+ZU7t+6OMndmx0lp9a8fKeRmtNY="},{"type":"next-occurrence","id":"jOJ5Freob6/bTau26RSgx1+mQAQ="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"gPHNHKmSTzKTk+yY7dyYZBGAEXE=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"jOJ5Freob6/bTau26RSgx1+mQAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+ZU7t+6OMndmx0lp9a8fKeRmtNY="},{"type":"next-occurrence","id":"EAk86OlumbsPbvePMuM4zTqwbmg="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"jOJ5Freob6/bTau26RSgx1+mQAQ=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"EAk86OlumbsPbvePMuM4zTqwbmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+ZU7t+6OMndmx0lp9a8fKeRmtNY="},{"type":"next-occurrence","id":"5SF4X+n/FzaWj3L3cX+268yifAQ="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"EAk86OlumbsPbvePMuM4zTqwbmg=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"5SF4X+n/FzaWj3L3cX+268yifAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+ZU7t+6OMndmx0lp9a8fKeRmtNY="},{"type":"next-occurrence","id":"2AUkgh1swK5Kw+/lLkf4XaCjA0I="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"5SF4X+n/FzaWj3L3cX+268yifAQ=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"2AUkgh1swK5Kw+/lLkf4XaCjA0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+ZU7t+6OMndmx0lp9a8fKeRmtNY="},{"type":"next-occurrence","id":"B7/rCydEMMQU9jc3hBZjyBxSzjU="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"2AUkgh1swK5Kw+/lLkf4XaCjA0I=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"B7/rCydEMMQU9jc3hBZjyBxSzjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+ZU7t+6OMndmx0lp9a8fKeRmtNY="},{"type":"next-occurrence","id":"Gvv8r7E9ASgbtnCEfRHjf1s7zq4="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"B7/rCydEMMQU9jc3hBZjyBxSzjU=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"Gvv8r7E9ASgbtnCEfRHjf1s7zq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+ZU7t+6OMndmx0lp9a8fKeRmtNY="},{"type":"next-occurrence","id":"FR/E4PFjA1mgOltgDipw4b5i/ZQ="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"Gvv8r7E9ASgbtnCEfRHjf1s7zq4=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"FR/E4PFjA1mgOltgDipw4b5i/ZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+ZU7t+6OMndmx0lp9a8fKeRmtNY="},{"type":"next-occurrence","id":"F0OFQZNWRiypTnHo6WNqZDeg3WM="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"FR/E4PFjA1mgOltgDipw4b5i/ZQ=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"F0OFQZNWRiypTnHo6WNqZDeg3WM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+ZU7t+6OMndmx0lp9a8fKeRmtNY="},{"type":"next-occurrence","id":"mAfSYDai+/R4IEKaMr7sqzNQIJs="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"F0OFQZNWRiypTnHo6WNqZDeg3WM=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"mAfSYDai+/R4IEKaMr7sqzNQIJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+ZU7t+6OMndmx0lp9a8fKeRmtNY="},{"type":"next-occurrence","id":"9Lzv20ZMlzT7ZQzgTvEgl1WPPg8="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"mAfSYDai+/R4IEKaMr7sqzNQIJs=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"9Lzv20ZMlzT7ZQzgTvEgl1WPPg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+ZU7t+6OMndmx0lp9a8fKeRmtNY="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"9Lzv20ZMlzT7ZQzgTvEgl1WPPg8=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"yAKUMFkH/2aTm9fp23qPYtVEouQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 47TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1gv8ZX+YOC5dgrLIYmVFLYC6fpA="}],"description":"Construction on W 47TH ST westbound between BROADWAY (New York) and 8TH AVE (New York), Wednesday April 29th, 2026 thru Saturday August 29th, 2026, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-29T19:58:52Z"},"road_event_id":"yAKUMFkH/2aTm9fp23qPYtVEouQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T03:30:00Z","end_date":"2026-05-18T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985163,40.759439]]}},{"id":"1gv8ZX+YOC5dgrLIYmVFLYC6fpA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yAKUMFkH/2aTm9fp23qPYtVEouQ="}],"description":"Construction on W 47TH ST westbound between BROADWAY (New York) and 8TH AVE (New York), Wednesday April 29th, 2026 thru Saturday August 29th, 2026, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-29T19:58:52Z"},"road_event_id":"1gv8ZX+YOC5dgrLIYmVFLYC6fpA=","beginning_cross_street":"BROADWAY","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T03:30:00Z","end_date":"2026-05-25T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985163,40.759439]]}},{"id":"0jHBSQgemegt1fyAWJYRXLz1kh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["22ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4k/9dn4K/tPSkl3UTWNRRlUB8/s="}],"description":"Construction on 22ND ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for concrete pour., Friday May 1st, 2026 thru Thursday May 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:59:42Z"},"road_event_id":"0jHBSQgemegt1fyAWJYRXLz1kh8=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99411,40.66083]]}},{"id":"4k/9dn4K/tPSkl3UTWNRRlUB8/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["22ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0jHBSQgemegt1fyAWJYRXLz1kh8="}],"description":"Construction on 22ND ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for concrete pour., Friday May 1st, 2026 thru Thursday May 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:59:42Z"},"road_event_id":"4k/9dn4K/tPSkl3UTWNRRlUB8/s=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99411,40.66083]]}},{"id":"ZM6DxqIXi4HZyxasIZpm4pQHfRM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sS8hxyscIpnkvCl75Vbs8hjpQEA="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installations., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:05:16Z"},"road_event_id":"ZM6DxqIXi4HZyxasIZpm4pQHfRM=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994319,40.575546]]}},{"id":"sS8hxyscIpnkvCl75Vbs8hjpQEA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZM6DxqIXi4HZyxasIZpm4pQHfRM="},{"type":"next-occurrence","id":"kWQOlO6QpxPUZvbiUvPLGFBvDbc="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installations., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:05:16Z"},"road_event_id":"sS8hxyscIpnkvCl75Vbs8hjpQEA=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994319,40.575546]]}},{"id":"kWQOlO6QpxPUZvbiUvPLGFBvDbc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZM6DxqIXi4HZyxasIZpm4pQHfRM="},{"type":"next-occurrence","id":"WAOvoALZJE7EDPyKCR0Sk5Lo5r0="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installations., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:05:16Z"},"road_event_id":"kWQOlO6QpxPUZvbiUvPLGFBvDbc=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994319,40.575546]]}},{"id":"WAOvoALZJE7EDPyKCR0Sk5Lo5r0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZM6DxqIXi4HZyxasIZpm4pQHfRM="},{"type":"next-occurrence","id":"OYpdV/+FpEdHQ4mxbQdoeiSZ+44="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installations., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:05:16Z"},"road_event_id":"WAOvoALZJE7EDPyKCR0Sk5Lo5r0=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994319,40.575546]]}},{"id":"OYpdV/+FpEdHQ4mxbQdoeiSZ+44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZM6DxqIXi4HZyxasIZpm4pQHfRM="},{"type":"next-occurrence","id":"L3y0As06jQRFVMjo1kRIBTjou9M="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installations., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:05:16Z"},"road_event_id":"OYpdV/+FpEdHQ4mxbQdoeiSZ+44=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994319,40.575546]]}},{"id":"L3y0As06jQRFVMjo1kRIBTjou9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZM6DxqIXi4HZyxasIZpm4pQHfRM="},{"type":"next-occurrence","id":"vTVsEhhj4VTDAJOVxg9vcoO0upM="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installations., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:05:16Z"},"road_event_id":"L3y0As06jQRFVMjo1kRIBTjou9M=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994319,40.575546]]}},{"id":"vTVsEhhj4VTDAJOVxg9vcoO0upM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZM6DxqIXi4HZyxasIZpm4pQHfRM="},{"type":"next-occurrence","id":"CIb9CnmeoQhh111BFTrVi4tlhhE="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installations., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:05:16Z"},"road_event_id":"vTVsEhhj4VTDAJOVxg9vcoO0upM=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994319,40.575546]]}},{"id":"CIb9CnmeoQhh111BFTrVi4tlhhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZM6DxqIXi4HZyxasIZpm4pQHfRM="},{"type":"next-occurrence","id":"nrN/CY9ZbcRs8yvBTTL3/Z3LHbI="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installations., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:05:16Z"},"road_event_id":"CIb9CnmeoQhh111BFTrVi4tlhhE=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994319,40.575546]]}},{"id":"nrN/CY9ZbcRs8yvBTTL3/Z3LHbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZM6DxqIXi4HZyxasIZpm4pQHfRM="},{"type":"next-occurrence","id":"QbX7dLrX6y0PcadmWq0BMRRLVSk="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installations., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:05:16Z"},"road_event_id":"nrN/CY9ZbcRs8yvBTTL3/Z3LHbI=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994319,40.575546]]}},{"id":"QbX7dLrX6y0PcadmWq0BMRRLVSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZM6DxqIXi4HZyxasIZpm4pQHfRM="},{"type":"next-occurrence","id":"PKsWbV4a784x3uyiT104GzgFKiA="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installations., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:05:16Z"},"road_event_id":"QbX7dLrX6y0PcadmWq0BMRRLVSk=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994319,40.575546]]}},{"id":"PKsWbV4a784x3uyiT104GzgFKiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZM6DxqIXi4HZyxasIZpm4pQHfRM="},{"type":"next-occurrence","id":"qTT3eHuG//AIytV1rHdw4S5WW8U="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installations., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:05:16Z"},"road_event_id":"PKsWbV4a784x3uyiT104GzgFKiA=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994319,40.575546]]}},{"id":"qTT3eHuG//AIytV1rHdw4S5WW8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZM6DxqIXi4HZyxasIZpm4pQHfRM="},{"type":"next-occurrence","id":"mgt6yU4zaDY68DJ7QooAmK1/fqU="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installations., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:05:16Z"},"road_event_id":"qTT3eHuG//AIytV1rHdw4S5WW8U=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994319,40.575546]]}},{"id":"mgt6yU4zaDY68DJ7QooAmK1/fqU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZM6DxqIXi4HZyxasIZpm4pQHfRM="},{"type":"next-occurrence","id":"yscttQLDrdvtmH898Mc4sK/dNnM="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installations., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:05:16Z"},"road_event_id":"mgt6yU4zaDY68DJ7QooAmK1/fqU=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994319,40.575546]]}},{"id":"yscttQLDrdvtmH898Mc4sK/dNnM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZM6DxqIXi4HZyxasIZpm4pQHfRM="},{"type":"next-occurrence","id":"qngEEkij00xD4fr906bP71P9ix0="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installations., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:05:16Z"},"road_event_id":"yscttQLDrdvtmH898Mc4sK/dNnM=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994319,40.575546]]}},{"id":"qngEEkij00xD4fr906bP71P9ix0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZM6DxqIXi4HZyxasIZpm4pQHfRM="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installations., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:05:16Z"},"road_event_id":"qngEEkij00xD4fr906bP71P9ix0=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994319,40.575546]]}},{"id":"tH7yNenGPMCF7doHZNMY1Y0Ll+U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mm9AQrZvmCfnRNmKm27wfXcYvS4="}],"description":"Construction and crane operations on E 77TH ST westbound between 2ND AVE (New York) and 3RD AVE (New York), Wednesday April 29th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 08:00 PM All lanes closed, Sunday May 3rd, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-12T20:32:24Z"},"road_event_id":"tH7yNenGPMCF7doHZNMY1Y0Ll+U=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-17T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956067,40.772044]]}},{"id":"mm9AQrZvmCfnRNmKm27wfXcYvS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tH7yNenGPMCF7doHZNMY1Y0Ll+U="},{"type":"next-occurrence","id":"iTLhq264wuq2ij0f9r1p7nWoQlw="}],"description":"Construction and crane operations on E 77TH ST westbound between 2ND AVE (New York) and 3RD AVE (New York), Wednesday April 29th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 08:00 PM All lanes closed, Sunday May 3rd, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-12T20:32:24Z"},"road_event_id":"mm9AQrZvmCfnRNmKm27wfXcYvS4=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956067,40.772044]]}},{"id":"iTLhq264wuq2ij0f9r1p7nWoQlw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tH7yNenGPMCF7doHZNMY1Y0Ll+U="},{"type":"next-occurrence","id":"NvwC0ia512yGaKJD3sT8vdsQfgI="}],"description":"Construction and crane operations on E 77TH ST westbound between 2ND AVE (New York) and 3RD AVE (New York), Wednesday April 29th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 08:00 PM All lanes closed, Sunday May 3rd, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-12T20:32:24Z"},"road_event_id":"iTLhq264wuq2ij0f9r1p7nWoQlw=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-24T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956067,40.772044]]}},{"id":"NvwC0ia512yGaKJD3sT8vdsQfgI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tH7yNenGPMCF7doHZNMY1Y0Ll+U="}],"description":"Construction and crane operations on E 77TH ST westbound between 2ND AVE (New York) and 3RD AVE (New York), Wednesday April 29th, 2026 thru Saturday May 30th, 2026, 08:00 AM thru 08:00 PM All lanes closed, Sunday May 3rd, 2026 thru Sunday May 31st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-12T20:32:24Z"},"road_event_id":"NvwC0ia512yGaKJD3sT8vdsQfgI=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956067,40.772044]]}},{"id":"VpiBq43JH8xCgaQu455NWp/osHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"f5RIVnb4vO5SDpZ3o62VfCMX+Bg="}],"description":"Construction on 54TH ST eastbound between 1ST AVE (New York) and 2ND AVE (New York) for major gas installation., Wednesday April 29th, 2026 thru Saturday May 30th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-29T20:07:19Z"},"road_event_id":"VpiBq43JH8xCgaQu455NWp/osHk=","beginning_cross_street":"1ST AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021357,40.648104]]}},{"id":"f5RIVnb4vO5SDpZ3o62VfCMX+Bg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VpiBq43JH8xCgaQu455NWp/osHk="},{"type":"next-occurrence","id":"i0QdwKYym4YVR9i7NzbTl08NWNQ="}],"description":"Construction on 54TH ST eastbound between 1ST AVE (New York) and 2ND AVE (New York) for major gas installation., Wednesday April 29th, 2026 thru Saturday May 30th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-29T20:07:19Z"},"road_event_id":"f5RIVnb4vO5SDpZ3o62VfCMX+Bg=","beginning_cross_street":"1ST AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021357,40.648104]]}},{"id":"i0QdwKYym4YVR9i7NzbTl08NWNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VpiBq43JH8xCgaQu455NWp/osHk="},{"type":"next-occurrence","id":"X0N33CWLCO/rtVOAHmGKhVNKZS0="}],"description":"Construction on 54TH ST eastbound between 1ST AVE (New York) and 2ND AVE (New York) for major gas installation., Wednesday April 29th, 2026 thru Saturday May 30th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-29T20:07:19Z"},"road_event_id":"i0QdwKYym4YVR9i7NzbTl08NWNQ=","beginning_cross_street":"1ST AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021357,40.648104]]}},{"id":"X0N33CWLCO/rtVOAHmGKhVNKZS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VpiBq43JH8xCgaQu455NWp/osHk="},{"type":"next-occurrence","id":"VB1EQyf5CBRSnuuy9KWsxk9Ufrk="}],"description":"Construction on 54TH ST eastbound between 1ST AVE (New York) and 2ND AVE (New York) for major gas installation., Wednesday April 29th, 2026 thru Saturday May 30th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-29T20:07:19Z"},"road_event_id":"X0N33CWLCO/rtVOAHmGKhVNKZS0=","beginning_cross_street":"1ST AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T02:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021357,40.648104]]}},{"id":"VB1EQyf5CBRSnuuy9KWsxk9Ufrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VpiBq43JH8xCgaQu455NWp/osHk="},{"type":"next-occurrence","id":"WBbyRVnLNtN2a/LVURthchoLURw="}],"description":"Construction on 54TH ST eastbound between 1ST AVE (New York) and 2ND AVE (New York) for major gas installation., Wednesday April 29th, 2026 thru Saturday May 30th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-29T20:07:19Z"},"road_event_id":"VB1EQyf5CBRSnuuy9KWsxk9Ufrk=","beginning_cross_street":"1ST AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T02:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021357,40.648104]]}},{"id":"WBbyRVnLNtN2a/LVURthchoLURw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VpiBq43JH8xCgaQu455NWp/osHk="},{"type":"next-occurrence","id":"eKJfnunxO7woaSIAkJHX96FkuoM="}],"description":"Construction on 54TH ST eastbound between 1ST AVE (New York) and 2ND AVE (New York) for major gas installation., Wednesday April 29th, 2026 thru Saturday May 30th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-29T20:07:19Z"},"road_event_id":"WBbyRVnLNtN2a/LVURthchoLURw=","beginning_cross_street":"1ST AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T02:00:00Z","end_date":"2026-05-21T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021357,40.648104]]}},{"id":"eKJfnunxO7woaSIAkJHX96FkuoM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VpiBq43JH8xCgaQu455NWp/osHk="},{"type":"next-occurrence","id":"EldK88gohGknFpoD986sUoApZ9Y="}],"description":"Construction on 54TH ST eastbound between 1ST AVE (New York) and 2ND AVE (New York) for major gas installation., Wednesday April 29th, 2026 thru Saturday May 30th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-29T20:07:19Z"},"road_event_id":"eKJfnunxO7woaSIAkJHX96FkuoM=","beginning_cross_street":"1ST AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T02:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021357,40.648104]]}},{"id":"EldK88gohGknFpoD986sUoApZ9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VpiBq43JH8xCgaQu455NWp/osHk="},{"type":"next-occurrence","id":"uJ8vOs/bJC1tJ3NnmwfIJWiV9xg="}],"description":"Construction on 54TH ST eastbound between 1ST AVE (New York) and 2ND AVE (New York) for major gas installation., Wednesday April 29th, 2026 thru Saturday May 30th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-29T20:07:19Z"},"road_event_id":"EldK88gohGknFpoD986sUoApZ9Y=","beginning_cross_street":"1ST AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T02:00:00Z","end_date":"2026-05-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021357,40.648104]]}},{"id":"uJ8vOs/bJC1tJ3NnmwfIJWiV9xg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VpiBq43JH8xCgaQu455NWp/osHk="},{"type":"next-occurrence","id":"835gdu02LtiDe21We5CaynFNfKI="}],"description":"Construction on 54TH ST eastbound between 1ST AVE (New York) and 2ND AVE (New York) for major gas installation., Wednesday April 29th, 2026 thru Saturday May 30th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-29T20:07:19Z"},"road_event_id":"uJ8vOs/bJC1tJ3NnmwfIJWiV9xg=","beginning_cross_street":"1ST AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T02:00:00Z","end_date":"2026-05-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021357,40.648104]]}},{"id":"835gdu02LtiDe21We5CaynFNfKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VpiBq43JH8xCgaQu455NWp/osHk="},{"type":"next-occurrence","id":"BHGxGNJY0tDqBz1ZOL+bNCyToD8="}],"description":"Construction on 54TH ST eastbound between 1ST AVE (New York) and 2ND AVE (New York) for major gas installation., Wednesday April 29th, 2026 thru Saturday May 30th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-29T20:07:19Z"},"road_event_id":"835gdu02LtiDe21We5CaynFNfKI=","beginning_cross_street":"1ST AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T02:00:00Z","end_date":"2026-05-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021357,40.648104]]}},{"id":"BHGxGNJY0tDqBz1ZOL+bNCyToD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VpiBq43JH8xCgaQu455NWp/osHk="}],"description":"Construction on 54TH ST eastbound between 1ST AVE (New York) and 2ND AVE (New York) for major gas installation., Wednesday April 29th, 2026 thru Saturday May 30th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-29T20:07:19Z"},"road_event_id":"BHGxGNJY0tDqBz1ZOL+bNCyToD8=","beginning_cross_street":"1ST AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T02:00:00Z","end_date":"2026-05-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021357,40.648104]]}},{"id":"IxQHBPyYM1ustR2gpbcZnxHWkmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[],"description":"Construction on W 91ST ST westbound between AMSTERDAM AVE (New York) and northbound BROADWAY at W 91ST ST (New York), Wednesday April 29th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Saturday May 16th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:07:12Z"},"road_event_id":"IxQHBPyYM1ustR2gpbcZnxHWkmI=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"W 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.972717,40.790881]]}},{"id":"4iJXFW5dDBe5YqSqnJvQCu5r2SM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["57TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Je8dCEl4HmWH48ZeQCP1wzOI8Y4="}],"description":"Construction on 57TH ST westbound between 4TH AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:10:03Z"},"road_event_id":"4iJXFW5dDBe5YqSqnJvQCu5r2SM=","beginning_cross_street":"4TH AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016755,40.642598]]}},{"id":"Je8dCEl4HmWH48ZeQCP1wzOI8Y4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["57TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4iJXFW5dDBe5YqSqnJvQCu5r2SM="},{"type":"next-occurrence","id":"myD9OdIkYz1YXgZ2AxjZWCyDmLo="}],"description":"Construction on 57TH ST westbound between 4TH AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:10:03Z"},"road_event_id":"Je8dCEl4HmWH48ZeQCP1wzOI8Y4=","beginning_cross_street":"4TH AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016755,40.642598]]}},{"id":"myD9OdIkYz1YXgZ2AxjZWCyDmLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["57TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4iJXFW5dDBe5YqSqnJvQCu5r2SM="},{"type":"next-occurrence","id":"pTpVa+XANa0D1oU/EoWiSOm98pc="}],"description":"Construction on 57TH ST westbound between 4TH AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:10:03Z"},"road_event_id":"myD9OdIkYz1YXgZ2AxjZWCyDmLo=","beginning_cross_street":"4TH AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016755,40.642598]]}},{"id":"pTpVa+XANa0D1oU/EoWiSOm98pc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["57TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4iJXFW5dDBe5YqSqnJvQCu5r2SM="},{"type":"next-occurrence","id":"L7X2HNx2WYcVxEP523tk1M/VLeA="}],"description":"Construction on 57TH ST westbound between 4TH AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:10:03Z"},"road_event_id":"pTpVa+XANa0D1oU/EoWiSOm98pc=","beginning_cross_street":"4TH AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016755,40.642598]]}},{"id":"L7X2HNx2WYcVxEP523tk1M/VLeA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["57TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4iJXFW5dDBe5YqSqnJvQCu5r2SM="},{"type":"next-occurrence","id":"9G+bWsCLwqfqRZSSHWVSlRIR1xI="}],"description":"Construction on 57TH ST westbound between 4TH AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:10:03Z"},"road_event_id":"L7X2HNx2WYcVxEP523tk1M/VLeA=","beginning_cross_street":"4TH AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016755,40.642598]]}},{"id":"9G+bWsCLwqfqRZSSHWVSlRIR1xI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["57TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4iJXFW5dDBe5YqSqnJvQCu5r2SM="},{"type":"next-occurrence","id":"Pkcix/UPd+bHD2p9l4TC9h5Ch/Q="}],"description":"Construction on 57TH ST westbound between 4TH AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:10:03Z"},"road_event_id":"9G+bWsCLwqfqRZSSHWVSlRIR1xI=","beginning_cross_street":"4TH AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016755,40.642598]]}},{"id":"Pkcix/UPd+bHD2p9l4TC9h5Ch/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["57TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4iJXFW5dDBe5YqSqnJvQCu5r2SM="},{"type":"next-occurrence","id":"4ulDYJ08ASZq00r21R91EGGdF0U="}],"description":"Construction on 57TH ST westbound between 4TH AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:10:03Z"},"road_event_id":"Pkcix/UPd+bHD2p9l4TC9h5Ch/Q=","beginning_cross_street":"4TH AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016755,40.642598]]}},{"id":"4ulDYJ08ASZq00r21R91EGGdF0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["57TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4iJXFW5dDBe5YqSqnJvQCu5r2SM="},{"type":"next-occurrence","id":"sviGV/7v5YlqtFAkMG2H2Azu/g0="}],"description":"Construction on 57TH ST westbound between 4TH AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:10:03Z"},"road_event_id":"4ulDYJ08ASZq00r21R91EGGdF0U=","beginning_cross_street":"4TH AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016755,40.642598]]}},{"id":"sviGV/7v5YlqtFAkMG2H2Azu/g0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["57TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4iJXFW5dDBe5YqSqnJvQCu5r2SM="},{"type":"next-occurrence","id":"fy7jEBhjXBnswXRg6LUUEEffs0M="}],"description":"Construction on 57TH ST westbound between 4TH AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:10:03Z"},"road_event_id":"sviGV/7v5YlqtFAkMG2H2Azu/g0=","beginning_cross_street":"4TH AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016755,40.642598]]}},{"id":"fy7jEBhjXBnswXRg6LUUEEffs0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["57TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4iJXFW5dDBe5YqSqnJvQCu5r2SM="},{"type":"next-occurrence","id":"SIqlhwOmjAdq/8oGJTJsEbuFaCM="}],"description":"Construction on 57TH ST westbound between 4TH AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:10:03Z"},"road_event_id":"fy7jEBhjXBnswXRg6LUUEEffs0M=","beginning_cross_street":"4TH AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016755,40.642598]]}},{"id":"SIqlhwOmjAdq/8oGJTJsEbuFaCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["57TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4iJXFW5dDBe5YqSqnJvQCu5r2SM="},{"type":"next-occurrence","id":"3aj/P6qpt//4G7Yeepl1F23nRBg="}],"description":"Construction on 57TH ST westbound between 4TH AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:10:03Z"},"road_event_id":"SIqlhwOmjAdq/8oGJTJsEbuFaCM=","beginning_cross_street":"4TH AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016755,40.642598]]}},{"id":"3aj/P6qpt//4G7Yeepl1F23nRBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["57TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4iJXFW5dDBe5YqSqnJvQCu5r2SM="},{"type":"next-occurrence","id":"PdQGpH3nkDjktBzxFmbEFL9ZlBE="}],"description":"Construction on 57TH ST westbound between 4TH AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:10:03Z"},"road_event_id":"3aj/P6qpt//4G7Yeepl1F23nRBg=","beginning_cross_street":"4TH AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016755,40.642598]]}},{"id":"PdQGpH3nkDjktBzxFmbEFL9ZlBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["57TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4iJXFW5dDBe5YqSqnJvQCu5r2SM="},{"type":"next-occurrence","id":"kIe4CD6Z2Wq+LjVNBhlgGtviDlA="}],"description":"Construction on 57TH ST westbound between 4TH AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:10:03Z"},"road_event_id":"PdQGpH3nkDjktBzxFmbEFL9ZlBE=","beginning_cross_street":"4TH AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016755,40.642598]]}},{"id":"kIe4CD6Z2Wq+LjVNBhlgGtviDlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["57TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4iJXFW5dDBe5YqSqnJvQCu5r2SM="},{"type":"next-occurrence","id":"DZoFSq1WNo4dRv5ggRJeiTQQrgU="}],"description":"Construction on 57TH ST westbound between 4TH AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:10:03Z"},"road_event_id":"kIe4CD6Z2Wq+LjVNBhlgGtviDlA=","beginning_cross_street":"4TH AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016755,40.642598]]}},{"id":"DZoFSq1WNo4dRv5ggRJeiTQQrgU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["57TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4iJXFW5dDBe5YqSqnJvQCu5r2SM="}],"description":"Construction on 57TH ST westbound between 4TH AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:10:03Z"},"road_event_id":"DZoFSq1WNo4dRv5ggRJeiTQQrgU=","beginning_cross_street":"4TH AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016755,40.642598]]}},{"id":"6BEMtoi0Krb9JUuvzFIDDFA3Ul0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LISPENARD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SS946hNzHKzqpKCoi5Zx7sgirZ8="}],"description":"Construction on LISPENARD ST eastbound between CHURCH ST (New York) and BROADWAY (New York), Wednesday April 29th, 2026 thru Sunday May 17th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:17:33Z"},"road_event_id":"6BEMtoi0Krb9JUuvzFIDDFA3Ul0=","beginning_cross_street":"CHURCH ST","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003827,40.719997]]}},{"id":"SS946hNzHKzqpKCoi5Zx7sgirZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LISPENARD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6BEMtoi0Krb9JUuvzFIDDFA3Ul0="}],"description":"Construction on LISPENARD ST eastbound between CHURCH ST (New York) and BROADWAY (New York), Wednesday April 29th, 2026 thru Sunday May 17th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:17:33Z"},"road_event_id":"SS946hNzHKzqpKCoi5Zx7sgirZ8=","beginning_cross_street":"CHURCH ST","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003827,40.719997]]}},{"id":"jyNeM9TQAMxSmsnyFllNNdk2wMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BROADWAY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3VWHjfSSE4jgrEFMMwyX2Xd36Hk="}],"description":"Construction on BROADWAY southbound between W 47TH ST (New York) and W 48TH ST (New York), Wednesday April 29th, 2026 thru Saturday August 29th, 2026, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-29T20:20:20Z"},"road_event_id":"jyNeM9TQAMxSmsnyFllNNdk2wMA=","beginning_cross_street":"W 47TH ST","ending_cross_street":"W 48TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T03:30:00Z","end_date":"2026-05-18T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985057,40.759434]]}},{"id":"3VWHjfSSE4jgrEFMMwyX2Xd36Hk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BROADWAY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jyNeM9TQAMxSmsnyFllNNdk2wMA="}],"description":"Construction on BROADWAY southbound between W 47TH ST (New York) and W 48TH ST (New York), Wednesday April 29th, 2026 thru Saturday August 29th, 2026, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-29T20:20:20Z"},"road_event_id":"3VWHjfSSE4jgrEFMMwyX2Xd36Hk=","beginning_cross_street":"W 47TH ST","ending_cross_street":"W 48TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T03:30:00Z","end_date":"2026-05-25T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985057,40.759434]]}},{"id":"lTrOMqGYqyqmP3wk21emSjebvzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ST MARKS PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"G4xoH4Ta0OBz6M9h9C0+wyJHqug="}],"description":"Construction on ST MARKS PL eastbound between 3RD AVE (New York) for use of concrete pump for building alteration., Friday May 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:23:59Z"},"road_event_id":"lTrOMqGYqyqmP3wk21emSjebvzs=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982333,40.682742]]}},{"id":"G4xoH4Ta0OBz6M9h9C0+wyJHqug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ST MARKS PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lTrOMqGYqyqmP3wk21emSjebvzs="},{"type":"next-occurrence","id":"gS0v9eMcoef5t/NjAGSrRWY/qcg="}],"description":"Construction on ST MARKS PL eastbound between 3RD AVE (New York) for use of concrete pump for building alteration., Friday May 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:23:59Z"},"road_event_id":"G4xoH4Ta0OBz6M9h9C0+wyJHqug=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982333,40.682742]]}},{"id":"gS0v9eMcoef5t/NjAGSrRWY/qcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ST MARKS PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lTrOMqGYqyqmP3wk21emSjebvzs="},{"type":"next-occurrence","id":"jEddhnQZEfFm95N6vMZTFz0kWxA="}],"description":"Construction on ST MARKS PL eastbound between 3RD AVE (New York) for use of concrete pump for building alteration., Friday May 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:23:59Z"},"road_event_id":"gS0v9eMcoef5t/NjAGSrRWY/qcg=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982333,40.682742]]}},{"id":"jEddhnQZEfFm95N6vMZTFz0kWxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ST MARKS PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lTrOMqGYqyqmP3wk21emSjebvzs="},{"type":"next-occurrence","id":"FZqhugovoCmab2slqZDYP1thWTM="}],"description":"Construction on ST MARKS PL eastbound between 3RD AVE (New York) for use of concrete pump for building alteration., Friday May 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:23:59Z"},"road_event_id":"jEddhnQZEfFm95N6vMZTFz0kWxA=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982333,40.682742]]}},{"id":"FZqhugovoCmab2slqZDYP1thWTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ST MARKS PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lTrOMqGYqyqmP3wk21emSjebvzs="},{"type":"next-occurrence","id":"y5aPquW3+8yc++hrvTJ8a3jm+IY="}],"description":"Construction on ST MARKS PL eastbound between 3RD AVE (New York) for use of concrete pump for building alteration., Friday May 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:23:59Z"},"road_event_id":"FZqhugovoCmab2slqZDYP1thWTM=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982333,40.682742]]}},{"id":"y5aPquW3+8yc++hrvTJ8a3jm+IY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ST MARKS PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lTrOMqGYqyqmP3wk21emSjebvzs="},{"type":"next-occurrence","id":"5aiKLdLNn1/ZyX3XrXGYfNQo6fw="}],"description":"Construction on ST MARKS PL eastbound between 3RD AVE (New York) for use of concrete pump for building alteration., Friday May 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:23:59Z"},"road_event_id":"y5aPquW3+8yc++hrvTJ8a3jm+IY=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982333,40.682742]]}},{"id":"5aiKLdLNn1/ZyX3XrXGYfNQo6fw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ST MARKS PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lTrOMqGYqyqmP3wk21emSjebvzs="},{"type":"next-occurrence","id":"tm+KZ3vMhiyGXc5evkyC34a7uqM="}],"description":"Construction on ST MARKS PL eastbound between 3RD AVE (New York) for use of concrete pump for building alteration., Friday May 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:23:59Z"},"road_event_id":"5aiKLdLNn1/ZyX3XrXGYfNQo6fw=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982333,40.682742]]}},{"id":"tm+KZ3vMhiyGXc5evkyC34a7uqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ST MARKS PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lTrOMqGYqyqmP3wk21emSjebvzs="},{"type":"next-occurrence","id":"tcY75PgvM9qMc2SYTXBMGqRhiKo="}],"description":"Construction on ST MARKS PL eastbound between 3RD AVE (New York) for use of concrete pump for building alteration., Friday May 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:23:59Z"},"road_event_id":"tm+KZ3vMhiyGXc5evkyC34a7uqM=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982333,40.682742]]}},{"id":"tcY75PgvM9qMc2SYTXBMGqRhiKo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ST MARKS PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lTrOMqGYqyqmP3wk21emSjebvzs="},{"type":"next-occurrence","id":"/xJnIiRh0cOjNx0PGgDD9JpwOG8="}],"description":"Construction on ST MARKS PL eastbound between 3RD AVE (New York) for use of concrete pump for building alteration., Friday May 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:23:59Z"},"road_event_id":"tcY75PgvM9qMc2SYTXBMGqRhiKo=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982333,40.682742]]}},{"id":"/xJnIiRh0cOjNx0PGgDD9JpwOG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ST MARKS PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lTrOMqGYqyqmP3wk21emSjebvzs="},{"type":"next-occurrence","id":"GbryUS/2fT/18ZXJEwBif3Od8eg="}],"description":"Construction on ST MARKS PL eastbound between 3RD AVE (New York) for use of concrete pump for building alteration., Friday May 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:23:59Z"},"road_event_id":"/xJnIiRh0cOjNx0PGgDD9JpwOG8=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982333,40.682742]]}},{"id":"GbryUS/2fT/18ZXJEwBif3Od8eg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ST MARKS PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lTrOMqGYqyqmP3wk21emSjebvzs="},{"type":"next-occurrence","id":"Tq48CB2loyIyJWDnfA3MXD8HkjQ="}],"description":"Construction on ST MARKS PL eastbound between 3RD AVE (New York) for use of concrete pump for building alteration., Friday May 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:23:59Z"},"road_event_id":"GbryUS/2fT/18ZXJEwBif3Od8eg=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982333,40.682742]]}},{"id":"Tq48CB2loyIyJWDnfA3MXD8HkjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ST MARKS PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lTrOMqGYqyqmP3wk21emSjebvzs="},{"type":"next-occurrence","id":"ulEQpoqpPbzuUewO+AZKbqXpmYE="}],"description":"Construction on ST MARKS PL eastbound between 3RD AVE (New York) for use of concrete pump for building alteration., Friday May 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:23:59Z"},"road_event_id":"Tq48CB2loyIyJWDnfA3MXD8HkjQ=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982333,40.682742]]}},{"id":"ulEQpoqpPbzuUewO+AZKbqXpmYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ST MARKS PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lTrOMqGYqyqmP3wk21emSjebvzs="},{"type":"next-occurrence","id":"7gnsejHqJ/C797oVhX+8BsbqU/M="}],"description":"Construction on ST MARKS PL eastbound between 3RD AVE (New York) for use of concrete pump for building alteration., Friday May 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:23:59Z"},"road_event_id":"ulEQpoqpPbzuUewO+AZKbqXpmYE=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982333,40.682742]]}},{"id":"7gnsejHqJ/C797oVhX+8BsbqU/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ST MARKS PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lTrOMqGYqyqmP3wk21emSjebvzs="},{"type":"next-occurrence","id":"nkzHKr0YyhoCIfADNqoRhx17Zyw="}],"description":"Construction on ST MARKS PL eastbound between 3RD AVE (New York) for use of concrete pump for building alteration., Friday May 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:23:59Z"},"road_event_id":"7gnsejHqJ/C797oVhX+8BsbqU/M=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982333,40.682742]]}},{"id":"nkzHKr0YyhoCIfADNqoRhx17Zyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ST MARKS PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lTrOMqGYqyqmP3wk21emSjebvzs="}],"description":"Construction on ST MARKS PL eastbound between 3RD AVE (New York) for use of concrete pump for building alteration., Friday May 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:23:59Z"},"road_event_id":"nkzHKr0YyhoCIfADNqoRhx17Zyw=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982333,40.682742]]}},{"id":"Nn+mG24XCfxkiPsQ8J0myvcdzNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S WILLIAM ST"],"direction":"unknown","related_road_events":[],"description":"Construction on S WILLIAM ST eastbound between BROAD ST (New York) and MILL LN (New York), Wednesday April 29th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Saturday May 16th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:23:45Z"},"road_event_id":"Nn+mG24XCfxkiPsQ8J0myvcdzNI=","beginning_cross_street":"BROAD ST","ending_cross_street":"MILL LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.011555,40.704244]]}},{"id":"fVaNdnS0L0iQr01MYikzs4GVr9Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STONE ST"],"direction":"unknown","related_road_events":[],"description":"Construction on STONE ST eastbound between MILL LN (New York) and HANOVER SQ (New York), Wednesday April 29th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Saturday May 16th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:26:33Z"},"road_event_id":"fVaNdnS0L0iQr01MYikzs4GVr9Q=","beginning_cross_street":"MILL LN","ending_cross_street":"HANOVER SQ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.010044,40.704551]]}},{"id":"gRB3u2vN9Dgp243oKclQ62NUCyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL LN"],"direction":"unknown","related_road_events":[],"description":"Construction on MILL LN eastbound between STONE ST (New York) and S WILLIAM ST (New York), Wednesday April 29th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Saturday May 16th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:30:27Z"},"road_event_id":"gRB3u2vN9Dgp243oKclQ62NUCyc=","beginning_cross_street":"STONE ST","ending_cross_street":"S WILLIAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01009,40.704566]]}},{"id":"dUfrnCJ0CzOW9F3LLPBlzv9oW4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Fho6mthXO4wln9fFPy0OPxxbvOQ="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:33:06Z"},"road_event_id":"dUfrnCJ0CzOW9F3LLPBlzv9oW4Y=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995659,40.687917]]}},{"id":"Fho6mthXO4wln9fFPy0OPxxbvOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dUfrnCJ0CzOW9F3LLPBlzv9oW4Y="},{"type":"next-occurrence","id":"HmSZSp54gDkq0x0T5W3DtwBMqfw="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:33:06Z"},"road_event_id":"Fho6mthXO4wln9fFPy0OPxxbvOQ=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995659,40.687917]]}},{"id":"HmSZSp54gDkq0x0T5W3DtwBMqfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dUfrnCJ0CzOW9F3LLPBlzv9oW4Y="},{"type":"next-occurrence","id":"73jv0o/cXCwhJtApzHfy1bfEnk8="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:33:06Z"},"road_event_id":"HmSZSp54gDkq0x0T5W3DtwBMqfw=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995659,40.687917]]}},{"id":"73jv0o/cXCwhJtApzHfy1bfEnk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dUfrnCJ0CzOW9F3LLPBlzv9oW4Y="},{"type":"next-occurrence","id":"BKUl/L+sWToqNlHLifWepAvXbMg="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:33:06Z"},"road_event_id":"73jv0o/cXCwhJtApzHfy1bfEnk8=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995659,40.687917]]}},{"id":"BKUl/L+sWToqNlHLifWepAvXbMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dUfrnCJ0CzOW9F3LLPBlzv9oW4Y="},{"type":"next-occurrence","id":"PqfOSpv8k1phAyGRfjD4VISBxww="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:33:06Z"},"road_event_id":"BKUl/L+sWToqNlHLifWepAvXbMg=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995659,40.687917]]}},{"id":"PqfOSpv8k1phAyGRfjD4VISBxww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dUfrnCJ0CzOW9F3LLPBlzv9oW4Y="},{"type":"next-occurrence","id":"N6Upaqvu6CNe6VjWzaPFbLKaGU8="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:33:06Z"},"road_event_id":"PqfOSpv8k1phAyGRfjD4VISBxww=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995659,40.687917]]}},{"id":"N6Upaqvu6CNe6VjWzaPFbLKaGU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dUfrnCJ0CzOW9F3LLPBlzv9oW4Y="},{"type":"next-occurrence","id":"JBLcXX1VBTL6RnCeR//vUj4/uqQ="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:33:06Z"},"road_event_id":"N6Upaqvu6CNe6VjWzaPFbLKaGU8=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995659,40.687917]]}},{"id":"JBLcXX1VBTL6RnCeR//vUj4/uqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dUfrnCJ0CzOW9F3LLPBlzv9oW4Y="},{"type":"next-occurrence","id":"A/1QTsPks1m4ffNSOWSboOlORYc="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:33:06Z"},"road_event_id":"JBLcXX1VBTL6RnCeR//vUj4/uqQ=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995659,40.687917]]}},{"id":"A/1QTsPks1m4ffNSOWSboOlORYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dUfrnCJ0CzOW9F3LLPBlzv9oW4Y="},{"type":"next-occurrence","id":"j0gRRgrnfUbjz9o65pYHCNKYKlQ="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:33:06Z"},"road_event_id":"A/1QTsPks1m4ffNSOWSboOlORYc=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995659,40.687917]]}},{"id":"j0gRRgrnfUbjz9o65pYHCNKYKlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dUfrnCJ0CzOW9F3LLPBlzv9oW4Y="},{"type":"next-occurrence","id":"IlW+UbrQaqYpCChKoeFDVUm3bQI="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:33:06Z"},"road_event_id":"j0gRRgrnfUbjz9o65pYHCNKYKlQ=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995659,40.687917]]}},{"id":"IlW+UbrQaqYpCChKoeFDVUm3bQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dUfrnCJ0CzOW9F3LLPBlzv9oW4Y="},{"type":"next-occurrence","id":"w+a8I+sgRDdVH58f+Rh5lG2RH3w="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:33:06Z"},"road_event_id":"IlW+UbrQaqYpCChKoeFDVUm3bQI=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995659,40.687917]]}},{"id":"w+a8I+sgRDdVH58f+Rh5lG2RH3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dUfrnCJ0CzOW9F3LLPBlzv9oW4Y="},{"type":"next-occurrence","id":"akSeCdwX8h7bX4gsJOSakGtpKbE="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:33:06Z"},"road_event_id":"w+a8I+sgRDdVH58f+Rh5lG2RH3w=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995659,40.687917]]}},{"id":"akSeCdwX8h7bX4gsJOSakGtpKbE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dUfrnCJ0CzOW9F3LLPBlzv9oW4Y="},{"type":"next-occurrence","id":"bTWC0ABg4twsRSRlAD2iQJEodDE="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:33:06Z"},"road_event_id":"akSeCdwX8h7bX4gsJOSakGtpKbE=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995659,40.687917]]}},{"id":"bTWC0ABg4twsRSRlAD2iQJEodDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dUfrnCJ0CzOW9F3LLPBlzv9oW4Y="},{"type":"next-occurrence","id":"6eZA++32Rw4GfJ5hVeuW676L9jQ="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:33:06Z"},"road_event_id":"bTWC0ABg4twsRSRlAD2iQJEodDE=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995659,40.687917]]}},{"id":"6eZA++32Rw4GfJ5hVeuW676L9jQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dUfrnCJ0CzOW9F3LLPBlzv9oW4Y="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:33:06Z"},"road_event_id":"6eZA++32Rw4GfJ5hVeuW676L9jQ=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995659,40.687917]]}},{"id":"gWS764i2PQZJQxyQ2gAhn7lYlAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FYlaSZfSa4VJcE2EudG62Fn69Qs="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"gWS764i2PQZJQxyQ2gAhn7lYlAk=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"FYlaSZfSa4VJcE2EudG62Fn69Qs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gWS764i2PQZJQxyQ2gAhn7lYlAk="},{"type":"next-occurrence","id":"SCZEzaXoM9vC1n1vW+sPcFCOscI="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"FYlaSZfSa4VJcE2EudG62Fn69Qs=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"SCZEzaXoM9vC1n1vW+sPcFCOscI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gWS764i2PQZJQxyQ2gAhn7lYlAk="},{"type":"next-occurrence","id":"yWbWEfekewzr6XANan0xuBxNU98="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"SCZEzaXoM9vC1n1vW+sPcFCOscI=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"yWbWEfekewzr6XANan0xuBxNU98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gWS764i2PQZJQxyQ2gAhn7lYlAk="},{"type":"next-occurrence","id":"I5xoEIkotvJMm5paMbeBmUzquzs="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"yWbWEfekewzr6XANan0xuBxNU98=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"I5xoEIkotvJMm5paMbeBmUzquzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gWS764i2PQZJQxyQ2gAhn7lYlAk="},{"type":"next-occurrence","id":"RFAgs5NIpqvRvm8dNzNG/+FCo6c="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"I5xoEIkotvJMm5paMbeBmUzquzs=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"RFAgs5NIpqvRvm8dNzNG/+FCo6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gWS764i2PQZJQxyQ2gAhn7lYlAk="},{"type":"next-occurrence","id":"F9HjQRsRVyACjTCE59Iga8d7qO4="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"RFAgs5NIpqvRvm8dNzNG/+FCo6c=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"F9HjQRsRVyACjTCE59Iga8d7qO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gWS764i2PQZJQxyQ2gAhn7lYlAk="},{"type":"next-occurrence","id":"GsO2DYonoh5U4xBaiMtSRWRxDo4="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"F9HjQRsRVyACjTCE59Iga8d7qO4=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"GsO2DYonoh5U4xBaiMtSRWRxDo4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gWS764i2PQZJQxyQ2gAhn7lYlAk="},{"type":"next-occurrence","id":"IYrVUVcQ/t2IZdD+P1TMTEgTBM8="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"GsO2DYonoh5U4xBaiMtSRWRxDo4=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"IYrVUVcQ/t2IZdD+P1TMTEgTBM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gWS764i2PQZJQxyQ2gAhn7lYlAk="},{"type":"next-occurrence","id":"XdClF7MUg+eYIlgo2pkZKXZS1xY="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"IYrVUVcQ/t2IZdD+P1TMTEgTBM8=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"XdClF7MUg+eYIlgo2pkZKXZS1xY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gWS764i2PQZJQxyQ2gAhn7lYlAk="},{"type":"next-occurrence","id":"w/26v/bwft1E6cLLZit3i2Qr/QQ="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"XdClF7MUg+eYIlgo2pkZKXZS1xY=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"w/26v/bwft1E6cLLZit3i2Qr/QQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gWS764i2PQZJQxyQ2gAhn7lYlAk="},{"type":"next-occurrence","id":"ufwYX3+iOO0fWJn4Z4r00IjS6ZA="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"w/26v/bwft1E6cLLZit3i2Qr/QQ=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"ufwYX3+iOO0fWJn4Z4r00IjS6ZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gWS764i2PQZJQxyQ2gAhn7lYlAk="},{"type":"next-occurrence","id":"0994zZoJTn/1gsmn1JyqXq7nrp0="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"ufwYX3+iOO0fWJn4Z4r00IjS6ZA=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"0994zZoJTn/1gsmn1JyqXq7nrp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gWS764i2PQZJQxyQ2gAhn7lYlAk="},{"type":"next-occurrence","id":"kBAbEpTGjve4b12MP3bV612JZFQ="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"0994zZoJTn/1gsmn1JyqXq7nrp0=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"kBAbEpTGjve4b12MP3bV612JZFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gWS764i2PQZJQxyQ2gAhn7lYlAk="},{"type":"next-occurrence","id":"WrF5DMQqjpL2StiUw1+3QPJVi0I="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"kBAbEpTGjve4b12MP3bV612JZFQ=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"WrF5DMQqjpL2StiUw1+3QPJVi0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gWS764i2PQZJQxyQ2gAhn7lYlAk="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"WrF5DMQqjpL2StiUw1+3QPJVi0I=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"AQDLncJOVY+TaUPTMWjfq8+oX1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0OIs4pyK+NXSOQkQdwjBrfvK6DA="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:37:53Z"},"road_event_id":"AQDLncJOVY+TaUPTMWjfq8+oX1Q=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986697,40.679635]]}},{"id":"0OIs4pyK+NXSOQkQdwjBrfvK6DA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQDLncJOVY+TaUPTMWjfq8+oX1Q="},{"type":"next-occurrence","id":"SAhVd4QJptBXQ8u/MbskdGUVVJA="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:37:53Z"},"road_event_id":"0OIs4pyK+NXSOQkQdwjBrfvK6DA=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986697,40.679635]]}},{"id":"SAhVd4QJptBXQ8u/MbskdGUVVJA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQDLncJOVY+TaUPTMWjfq8+oX1Q="},{"type":"next-occurrence","id":"DktM7AVFTeXn8JXEdvdCTvXwJxw="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:37:53Z"},"road_event_id":"SAhVd4QJptBXQ8u/MbskdGUVVJA=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986697,40.679635]]}},{"id":"DktM7AVFTeXn8JXEdvdCTvXwJxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQDLncJOVY+TaUPTMWjfq8+oX1Q="},{"type":"next-occurrence","id":"SA5sxb4Km15nO0HAvL/aKdQYBTM="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:37:53Z"},"road_event_id":"DktM7AVFTeXn8JXEdvdCTvXwJxw=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986697,40.679635]]}},{"id":"SA5sxb4Km15nO0HAvL/aKdQYBTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQDLncJOVY+TaUPTMWjfq8+oX1Q="},{"type":"next-occurrence","id":"wtUmFmsK4KOrYWcZMbfaASjKYXU="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:37:53Z"},"road_event_id":"SA5sxb4Km15nO0HAvL/aKdQYBTM=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986697,40.679635]]}},{"id":"wtUmFmsK4KOrYWcZMbfaASjKYXU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQDLncJOVY+TaUPTMWjfq8+oX1Q="},{"type":"next-occurrence","id":"ton0jXRiXDLvwhgG0X6Js69uG/A="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:37:53Z"},"road_event_id":"wtUmFmsK4KOrYWcZMbfaASjKYXU=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986697,40.679635]]}},{"id":"ton0jXRiXDLvwhgG0X6Js69uG/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQDLncJOVY+TaUPTMWjfq8+oX1Q="},{"type":"next-occurrence","id":"4HRoPgadayeG5b4R/CGkWmsoMJk="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:37:53Z"},"road_event_id":"ton0jXRiXDLvwhgG0X6Js69uG/A=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986697,40.679635]]}},{"id":"4HRoPgadayeG5b4R/CGkWmsoMJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQDLncJOVY+TaUPTMWjfq8+oX1Q="},{"type":"next-occurrence","id":"9TrbkVundlnm8r6CKqcZRu1iMRk="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:37:53Z"},"road_event_id":"4HRoPgadayeG5b4R/CGkWmsoMJk=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986697,40.679635]]}},{"id":"9TrbkVundlnm8r6CKqcZRu1iMRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQDLncJOVY+TaUPTMWjfq8+oX1Q="},{"type":"next-occurrence","id":"Nn9LjYrrTStFC/qK9atcISC4qtg="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:37:53Z"},"road_event_id":"9TrbkVundlnm8r6CKqcZRu1iMRk=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986697,40.679635]]}},{"id":"Nn9LjYrrTStFC/qK9atcISC4qtg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQDLncJOVY+TaUPTMWjfq8+oX1Q="},{"type":"next-occurrence","id":"JoG0O0JIP61zNfVBUlS4mgVkKbM="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:37:53Z"},"road_event_id":"Nn9LjYrrTStFC/qK9atcISC4qtg=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986697,40.679635]]}},{"id":"JoG0O0JIP61zNfVBUlS4mgVkKbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQDLncJOVY+TaUPTMWjfq8+oX1Q="},{"type":"next-occurrence","id":"QvMk/OV7jX6gtE7FTHgCOJto04s="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:37:53Z"},"road_event_id":"JoG0O0JIP61zNfVBUlS4mgVkKbM=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986697,40.679635]]}},{"id":"QvMk/OV7jX6gtE7FTHgCOJto04s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQDLncJOVY+TaUPTMWjfq8+oX1Q="},{"type":"next-occurrence","id":"VINeBcdAePU4NllgkVOd5zOqjk0="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:37:53Z"},"road_event_id":"QvMk/OV7jX6gtE7FTHgCOJto04s=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986697,40.679635]]}},{"id":"VINeBcdAePU4NllgkVOd5zOqjk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQDLncJOVY+TaUPTMWjfq8+oX1Q="},{"type":"next-occurrence","id":"zUSICwFDq+OzZCLXOAMot5EOP2c="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:37:53Z"},"road_event_id":"VINeBcdAePU4NllgkVOd5zOqjk0=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986697,40.679635]]}},{"id":"zUSICwFDq+OzZCLXOAMot5EOP2c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQDLncJOVY+TaUPTMWjfq8+oX1Q="},{"type":"next-occurrence","id":"5wLRhruFig+8zEhAitGCAJKmAFI="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:37:53Z"},"road_event_id":"zUSICwFDq+OzZCLXOAMot5EOP2c=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986697,40.679635]]}},{"id":"5wLRhruFig+8zEhAitGCAJKmAFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQDLncJOVY+TaUPTMWjfq8+oX1Q="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday May 1st, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:37:53Z"},"road_event_id":"5wLRhruFig+8zEhAitGCAJKmAFI=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986697,40.679635]]}},{"id":"n4/TvLbU1xeVczO+LqOhLQkDx00=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MULBERRY ST"],"direction":"unknown","related_road_events":[],"description":"Construction on MULBERRY ST northbound between BROOME ST (New York) and KENMARE ST (New York), Wednesday April 29th, 2026 thru Friday May 15th, 2026, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-29T20:42:24Z"},"road_event_id":"n4/TvLbU1xeVczO+LqOhLQkDx00=","beginning_cross_street":"BROOME ST","ending_cross_street":"KENMARE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996825,40.720537]]}},{"id":"LU0oxJkuVlbpHIasowMtD1GLBfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BAXTER ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1MQiAHCHNm0bWJXGwfPsTDpqa4E="}],"description":"Construction on BAXTER ST southbound between BAYARD ST (New York), Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:44:38Z"},"road_event_id":"LU0oxJkuVlbpHIasowMtD1GLBfQ=","beginning_cross_street":"BAYARD ST","ending_cross_street":"BAYARD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999933,40.716534]]}},{"id":"1MQiAHCHNm0bWJXGwfPsTDpqa4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BAXTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LU0oxJkuVlbpHIasowMtD1GLBfQ="},{"type":"next-occurrence","id":"1H67XsBknyDlqSZ5mGXUjT55i88="}],"description":"Construction on BAXTER ST southbound between BAYARD ST (New York), Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:44:38Z"},"road_event_id":"1MQiAHCHNm0bWJXGwfPsTDpqa4E=","beginning_cross_street":"BAYARD ST","ending_cross_street":"BAYARD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999933,40.716534]]}},{"id":"1H67XsBknyDlqSZ5mGXUjT55i88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BAXTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LU0oxJkuVlbpHIasowMtD1GLBfQ="},{"type":"next-occurrence","id":"j7zAYL4CM35aYdjg+0Xr55ms4mM="}],"description":"Construction on BAXTER ST southbound between BAYARD ST (New York), Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:44:38Z"},"road_event_id":"1H67XsBknyDlqSZ5mGXUjT55i88=","beginning_cross_street":"BAYARD ST","ending_cross_street":"BAYARD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999933,40.716534]]}},{"id":"j7zAYL4CM35aYdjg+0Xr55ms4mM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BAXTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LU0oxJkuVlbpHIasowMtD1GLBfQ="},{"type":"next-occurrence","id":"U5LoVsmTaSrowXJRqv46Z7DTZgY="}],"description":"Construction on BAXTER ST southbound between BAYARD ST (New York), Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:44:38Z"},"road_event_id":"j7zAYL4CM35aYdjg+0Xr55ms4mM=","beginning_cross_street":"BAYARD ST","ending_cross_street":"BAYARD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999933,40.716534]]}},{"id":"U5LoVsmTaSrowXJRqv46Z7DTZgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BAXTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LU0oxJkuVlbpHIasowMtD1GLBfQ="},{"type":"next-occurrence","id":"Hi89ojBZS/5WZi8G3SUbBAo+0aw="}],"description":"Construction on BAXTER ST southbound between BAYARD ST (New York), Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:44:38Z"},"road_event_id":"U5LoVsmTaSrowXJRqv46Z7DTZgY=","beginning_cross_street":"BAYARD ST","ending_cross_street":"BAYARD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999933,40.716534]]}},{"id":"Hi89ojBZS/5WZi8G3SUbBAo+0aw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BAXTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LU0oxJkuVlbpHIasowMtD1GLBfQ="},{"type":"next-occurrence","id":"Mi2TjfdekBxna2IqKli8Zl9U5ys="}],"description":"Construction on BAXTER ST southbound between BAYARD ST (New York), Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:44:38Z"},"road_event_id":"Hi89ojBZS/5WZi8G3SUbBAo+0aw=","beginning_cross_street":"BAYARD ST","ending_cross_street":"BAYARD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999933,40.716534]]}},{"id":"Mi2TjfdekBxna2IqKli8Zl9U5ys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BAXTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LU0oxJkuVlbpHIasowMtD1GLBfQ="},{"type":"next-occurrence","id":"DW9D7byB2vVE+mwjq4XxaMtU6PY="}],"description":"Construction on BAXTER ST southbound between BAYARD ST (New York), Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:44:38Z"},"road_event_id":"Mi2TjfdekBxna2IqKli8Zl9U5ys=","beginning_cross_street":"BAYARD ST","ending_cross_street":"BAYARD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999933,40.716534]]}},{"id":"DW9D7byB2vVE+mwjq4XxaMtU6PY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BAXTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LU0oxJkuVlbpHIasowMtD1GLBfQ="},{"type":"next-occurrence","id":"kt5/CzUCXGpZRw1Vg1vKNLdmeyQ="}],"description":"Construction on BAXTER ST southbound between BAYARD ST (New York), Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:44:38Z"},"road_event_id":"DW9D7byB2vVE+mwjq4XxaMtU6PY=","beginning_cross_street":"BAYARD ST","ending_cross_street":"BAYARD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999933,40.716534]]}},{"id":"kt5/CzUCXGpZRw1Vg1vKNLdmeyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BAXTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LU0oxJkuVlbpHIasowMtD1GLBfQ="},{"type":"next-occurrence","id":"zD3Dm5pFcsy8BHcqIy6Yh+ygUB4="}],"description":"Construction on BAXTER ST southbound between BAYARD ST (New York), Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:44:38Z"},"road_event_id":"kt5/CzUCXGpZRw1Vg1vKNLdmeyQ=","beginning_cross_street":"BAYARD ST","ending_cross_street":"BAYARD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999933,40.716534]]}},{"id":"zD3Dm5pFcsy8BHcqIy6Yh+ygUB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BAXTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LU0oxJkuVlbpHIasowMtD1GLBfQ="},{"type":"next-occurrence","id":"ctrUPpH9iWq/XDWz2IpXUIuvKCQ="}],"description":"Construction on BAXTER ST southbound between BAYARD ST (New York), Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:44:38Z"},"road_event_id":"zD3Dm5pFcsy8BHcqIy6Yh+ygUB4=","beginning_cross_street":"BAYARD ST","ending_cross_street":"BAYARD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999933,40.716534]]}},{"id":"ctrUPpH9iWq/XDWz2IpXUIuvKCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BAXTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LU0oxJkuVlbpHIasowMtD1GLBfQ="},{"type":"next-occurrence","id":"LcJn1FB9sS6bT2ldER+AFFubEaI="}],"description":"Construction on BAXTER ST southbound between BAYARD ST (New York), Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:44:38Z"},"road_event_id":"ctrUPpH9iWq/XDWz2IpXUIuvKCQ=","beginning_cross_street":"BAYARD ST","ending_cross_street":"BAYARD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999933,40.716534]]}},{"id":"LcJn1FB9sS6bT2ldER+AFFubEaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BAXTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LU0oxJkuVlbpHIasowMtD1GLBfQ="},{"type":"next-occurrence","id":"89kXgOqhSMaZg7oFwPLyygyqFOs="}],"description":"Construction on BAXTER ST southbound between BAYARD ST (New York), Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:44:38Z"},"road_event_id":"LcJn1FB9sS6bT2ldER+AFFubEaI=","beginning_cross_street":"BAYARD ST","ending_cross_street":"BAYARD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999933,40.716534]]}},{"id":"89kXgOqhSMaZg7oFwPLyygyqFOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BAXTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LU0oxJkuVlbpHIasowMtD1GLBfQ="},{"type":"next-occurrence","id":"I8Ca5liQlb9TQ9qKQVLpzRL+CoY="}],"description":"Construction on BAXTER ST southbound between BAYARD ST (New York), Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:44:38Z"},"road_event_id":"89kXgOqhSMaZg7oFwPLyygyqFOs=","beginning_cross_street":"BAYARD ST","ending_cross_street":"BAYARD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999933,40.716534]]}},{"id":"I8Ca5liQlb9TQ9qKQVLpzRL+CoY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BAXTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LU0oxJkuVlbpHIasowMtD1GLBfQ="}],"description":"Construction on BAXTER ST southbound between BAYARD ST (New York), Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:44:38Z"},"road_event_id":"I8Ca5liQlb9TQ9qKQVLpzRL+CoY=","beginning_cross_street":"BAYARD ST","ending_cross_street":"BAYARD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999933,40.716534]]}},{"id":"oRUJCMERebvhSf8T5RH/Snc0RQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vl+GRYv77gegWXKaB65AcoXPCzM="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York), Wednesday April 29th, 2026 thru Monday May 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Monday May 25th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:56:55Z"},"road_event_id":"oRUJCMERebvhSf8T5RH/Snc0RQM=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"vl+GRYv77gegWXKaB65AcoXPCzM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oRUJCMERebvhSf8T5RH/Snc0RQM="},{"type":"next-occurrence","id":"5+ksNjSfpBdQJCgxrr34a+S1274="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York), Wednesday April 29th, 2026 thru Monday May 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Monday May 25th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:56:55Z"},"road_event_id":"vl+GRYv77gegWXKaB65AcoXPCzM=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"5+ksNjSfpBdQJCgxrr34a+S1274=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oRUJCMERebvhSf8T5RH/Snc0RQM="},{"type":"next-occurrence","id":"LjqS9o8vEZDkmfbgIW326emc/wA="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York), Wednesday April 29th, 2026 thru Monday May 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Monday May 25th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:56:55Z"},"road_event_id":"5+ksNjSfpBdQJCgxrr34a+S1274=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"LjqS9o8vEZDkmfbgIW326emc/wA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oRUJCMERebvhSf8T5RH/Snc0RQM="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York), Wednesday April 29th, 2026 thru Monday May 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday April 29th, 2026 thru Monday May 25th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T20:56:55Z"},"road_event_id":"LjqS9o8vEZDkmfbgIW326emc/wA=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"CaxjzFhHEnF4wzpStqCCqbeVC30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[],"description":"CCTV repairs on I-390 northbound under Presbyterian Road bridge (West Sparta), Wednesday May 20th, 2026, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-29T21:35:37Z"},"road_event_id":"CaxjzFhHEnF4wzpStqCCqbeVC30=","beginning_cross_street":"Presbyterian Road bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T20:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.808053,42.659514]]}},{"id":"sHL7mnjHUc0y9m9J3WdNDcV1OzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bY7j3Vy7phH+wDPAq9iEIPlqY9I="}],"description":"Guard rail repairs on NY 690 southbound between Hencle Boulevard; NY 48; Oswego Road (Lysander) and Van Buren Road; CR 159 (Van Buren), Wednesday April 29th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-29T23:26:28Z"},"road_event_id":"sHL7mnjHUc0y9m9J3WdNDcV1OzQ=","beginning_cross_street":"Hencle Boulevard; NY 48; Oswego Road","ending_cross_street":"Van Buren Road; CR 159","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.360396,43.184714]]}},{"id":"bY7j3Vy7phH+wDPAq9iEIPlqY9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sHL7mnjHUc0y9m9J3WdNDcV1OzQ="},{"type":"next-occurrence","id":"VTGaccaWdF+sR/djtFdiNjgWA8Y="}],"description":"Guard rail repairs on NY 690 southbound between Hencle Boulevard; NY 48; Oswego Road (Lysander) and Van Buren Road; CR 159 (Van Buren), Wednesday April 29th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-29T23:26:28Z"},"road_event_id":"bY7j3Vy7phH+wDPAq9iEIPlqY9I=","beginning_cross_street":"Hencle Boulevard; NY 48; Oswego Road","ending_cross_street":"Van Buren Road; CR 159","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.360396,43.184714]]}},{"id":"VTGaccaWdF+sR/djtFdiNjgWA8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sHL7mnjHUc0y9m9J3WdNDcV1OzQ="}],"description":"Guard rail repairs on NY 690 southbound between Hencle Boulevard; NY 48; Oswego Road (Lysander) and Van Buren Road; CR 159 (Van Buren), Wednesday April 29th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-29T23:26:28Z"},"road_event_id":"VTGaccaWdF+sR/djtFdiNjgWA8Y=","beginning_cross_street":"Hencle Boulevard; NY 48; Oswego Road","ending_cross_street":"Van Buren Road; CR 159","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.360396,43.184714]]}},{"id":"sa+a49Ufj+9dVpi2iPfCFPvkGtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Og/yDCzDMkaxAnLEGTOMe9YkUIE="}],"description":"Guard rail repairs on I-690 eastbound ramp to Exit 7 - Jones Road; CR 118 (Van Buren), Thursday April 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-30T00:24:26Z"},"road_event_id":"sa+a49Ufj+9dVpi2iPfCFPvkGtE=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.284392,43.111537]]}},{"id":"Og/yDCzDMkaxAnLEGTOMe9YkUIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sa+a49Ufj+9dVpi2iPfCFPvkGtE="},{"type":"next-occurrence","id":"vnjM+w9u+2/YNhyeTtOf9cSjpbI="}],"description":"Guard rail repairs on I-690 eastbound ramp to Exit 7 - Jones Road; CR 118 (Van Buren), Thursday April 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-30T00:24:26Z"},"road_event_id":"Og/yDCzDMkaxAnLEGTOMe9YkUIE=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.284392,43.111537]]}},{"id":"vnjM+w9u+2/YNhyeTtOf9cSjpbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sa+a49Ufj+9dVpi2iPfCFPvkGtE="}],"description":"Guard rail repairs on I-690 eastbound ramp to Exit 7 - Jones Road; CR 118 (Van Buren), Thursday April 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-30T00:24:26Z"},"road_event_id":"vnjM+w9u+2/YNhyeTtOf9cSjpbI=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.284392,43.111537]]}},{"id":"wZOsSsk5YIN/1GhFo/ZwNB1ehfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9xc0/heJbF7KMA9ofRHOdMWWLvA="}],"description":"Guard rail repairs on I-690 eastbound ramp from Jones Road; CR 118 (Van Buren), Thursday April 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-30T00:27:28Z"},"road_event_id":"wZOsSsk5YIN/1GhFo/ZwNB1ehfs=","beginning_cross_street":"Jones Road; CR 118","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.283879,43.11031]]}},{"id":"9xc0/heJbF7KMA9ofRHOdMWWLvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wZOsSsk5YIN/1GhFo/ZwNB1ehfs="},{"type":"next-occurrence","id":"+6jCloNSHfK25xw3wDdjOr/wNPw="}],"description":"Guard rail repairs on I-690 eastbound ramp from Jones Road; CR 118 (Van Buren), Thursday April 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-30T00:27:28Z"},"road_event_id":"9xc0/heJbF7KMA9ofRHOdMWWLvA=","beginning_cross_street":"Jones Road; CR 118","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.283879,43.11031]]}},{"id":"+6jCloNSHfK25xw3wDdjOr/wNPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wZOsSsk5YIN/1GhFo/ZwNB1ehfs="}],"description":"Guard rail repairs on I-690 eastbound ramp from Jones Road; CR 118 (Van Buren), Thursday April 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-30T00:27:28Z"},"road_event_id":"+6jCloNSHfK25xw3wDdjOr/wNPw=","beginning_cross_street":"Jones Road; CR 118","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.283879,43.11031]]}},{"id":"veaWg2PSi2FRWKNaxzpNr3uQQPs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VlOAgOImw8uahCZNSbosoi6sgGU="}],"description":"Guard rail repairs on I-690 westbound ramp to Exit 7 - Jones Road; CR 118 (Van Buren), Thursday April 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-30T00:30:02Z"},"road_event_id":"veaWg2PSi2FRWKNaxzpNr3uQQPs=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.282637,43.111903]]}},{"id":"VlOAgOImw8uahCZNSbosoi6sgGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"veaWg2PSi2FRWKNaxzpNr3uQQPs="},{"type":"next-occurrence","id":"5He8mQUECtgC4VE/xCTl7pV4ZwU="}],"description":"Guard rail repairs on I-690 westbound ramp to Exit 7 - Jones Road; CR 118 (Van Buren), Thursday April 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-30T00:30:02Z"},"road_event_id":"VlOAgOImw8uahCZNSbosoi6sgGU=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.282637,43.111903]]}},{"id":"5He8mQUECtgC4VE/xCTl7pV4ZwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"veaWg2PSi2FRWKNaxzpNr3uQQPs="}],"description":"Guard rail repairs on I-690 westbound ramp to Exit 7 - Jones Road; CR 118 (Van Buren), Thursday April 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-30T00:30:02Z"},"road_event_id":"5He8mQUECtgC4VE/xCTl7pV4ZwU=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.282637,43.111903]]}},{"id":"T78dlZjaINY6jTDvZUmKwVYx+ZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[],"description":"Bridge demolition on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse) ; follow detour, Continuous Friday May 8th, 2026 07:00 AM thru Friday May 22nd, 2026 05:00 PM All lanes closed","update_date":"2026-04-30T00:41:32Z"},"road_event_id":"T78dlZjaINY6jTDvZUmKwVYx+ZA=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13063,43.051099]]}},{"id":"3mz8ew93KU0Q7BjBVlirqFapwQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 6"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wnFhy+LWOWRYNp9ixHkbrDAOmKY="}],"description":"Safety improvements on US 6 both directions between Veschi Lane N (Carmel) and Bucks Hollow Road (Carmel) 2026083147101/32735809 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 6th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-30T12:46:18Z"},"road_event_id":"3mz8ew93KU0Q7BjBVlirqFapwQA=","beginning_cross_street":"Veschi Lane N","ending_cross_street":"Bucks Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745853,41.36306]]}},{"id":"wnFhy+LWOWRYNp9ixHkbrDAOmKY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3mz8ew93KU0Q7BjBVlirqFapwQA="},{"type":"next-occurrence","id":"ztNd11i+iY2RWyTOAaeJNKnR2LE="}],"description":"Safety improvements on US 6 both directions between Veschi Lane N (Carmel) and Bucks Hollow Road (Carmel) 2026083147101/32735809 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 6th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-30T12:46:18Z"},"road_event_id":"wnFhy+LWOWRYNp9ixHkbrDAOmKY=","beginning_cross_street":"Veschi Lane N","ending_cross_street":"Bucks Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745853,41.36306]]}},{"id":"ztNd11i+iY2RWyTOAaeJNKnR2LE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3mz8ew93KU0Q7BjBVlirqFapwQA="},{"type":"next-occurrence","id":"VeWqJOtVY50cAbRbOX7u3+BAwjU="}],"description":"Safety improvements on US 6 both directions between Veschi Lane N (Carmel) and Bucks Hollow Road (Carmel) 2026083147101/32735809 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 6th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-30T12:46:18Z"},"road_event_id":"ztNd11i+iY2RWyTOAaeJNKnR2LE=","beginning_cross_street":"Veschi Lane N","ending_cross_street":"Bucks Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745853,41.36306]]}},{"id":"VeWqJOtVY50cAbRbOX7u3+BAwjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3mz8ew93KU0Q7BjBVlirqFapwQA="},{"type":"next-occurrence","id":"slNOxBVBQLDU3Tq+6kplrYdG6C8="}],"description":"Safety improvements on US 6 both directions between Veschi Lane N (Carmel) and Bucks Hollow Road (Carmel) 2026083147101/32735809 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 6th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-30T12:46:18Z"},"road_event_id":"VeWqJOtVY50cAbRbOX7u3+BAwjU=","beginning_cross_street":"Veschi Lane N","ending_cross_street":"Bucks Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:30:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745853,41.36306]]}},{"id":"slNOxBVBQLDU3Tq+6kplrYdG6C8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3mz8ew93KU0Q7BjBVlirqFapwQA="},{"type":"next-occurrence","id":"C6g5G+rYKTqxZKKWWXnRQQJ1F3k="}],"description":"Safety improvements on US 6 both directions between Veschi Lane N (Carmel) and Bucks Hollow Road (Carmel) 2026083147101/32735809 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 6th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-30T12:46:18Z"},"road_event_id":"slNOxBVBQLDU3Tq+6kplrYdG6C8=","beginning_cross_street":"Veschi Lane N","ending_cross_street":"Bucks Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:30:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745853,41.36306]]}},{"id":"C6g5G+rYKTqxZKKWWXnRQQJ1F3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3mz8ew93KU0Q7BjBVlirqFapwQA="}],"description":"Safety improvements on US 6 both directions between Veschi Lane N (Carmel) and Bucks Hollow Road (Carmel) 2026083147101/32735809 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 6th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-30T12:46:18Z"},"road_event_id":"C6g5G+rYKTqxZKKWWXnRQQJ1F3k=","beginning_cross_street":"Veschi Lane N","ending_cross_street":"Bucks Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:30:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745853,41.36306]]}},{"id":"meHX/PeBhQv2JOC8+YCgvHJ+XNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 6"],"direction":"unknown","related_road_events":[],"description":"Safety improvements on US 6 both directions between Veschi Lane N (Carmel) and Bucks Hollow Road (Carmel) 2026083147101/32735909 - 24/7 SHOULDER CLOSURE - This work is weather permitting, Plan travel accordingly; delays may exist, Continuous Wednesday May 6th, 2026 12:00 AM thru Wednesday May 20th, 2026 11:59 PM shoulder closed to traffic","update_date":"2026-04-30T12:59:24Z"},"road_event_id":"meHX/PeBhQv2JOC8+YCgvHJ+XNw=","beginning_cross_street":"Veschi Lane N","ending_cross_street":"Bucks Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-21T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745761,41.363144]]}},{"id":"05YQaYAe/TcUrBZtgd3vvi3ELn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ccOEqweO4jsLgR7iivg70Rpwk1A="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"05YQaYAe/TcUrBZtgd3vvi3ELn4=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"ccOEqweO4jsLgR7iivg70Rpwk1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05YQaYAe/TcUrBZtgd3vvi3ELn4="},{"type":"next-occurrence","id":"+Yy7hawYkirwK7J4wZnoDNt0dlA="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"ccOEqweO4jsLgR7iivg70Rpwk1A=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"+Yy7hawYkirwK7J4wZnoDNt0dlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05YQaYAe/TcUrBZtgd3vvi3ELn4="},{"type":"next-occurrence","id":"objJAOnwT7XH8nFq/ByXofGNR9I="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"+Yy7hawYkirwK7J4wZnoDNt0dlA=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"objJAOnwT7XH8nFq/ByXofGNR9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05YQaYAe/TcUrBZtgd3vvi3ELn4="},{"type":"next-occurrence","id":"/4+AmzCLa81k4E0OCvnVCD/HEOk="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"objJAOnwT7XH8nFq/ByXofGNR9I=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"/4+AmzCLa81k4E0OCvnVCD/HEOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05YQaYAe/TcUrBZtgd3vvi3ELn4="},{"type":"next-occurrence","id":"H1C/3HTWzsd6R6XPKNbw/FV2fbQ="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"/4+AmzCLa81k4E0OCvnVCD/HEOk=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"H1C/3HTWzsd6R6XPKNbw/FV2fbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05YQaYAe/TcUrBZtgd3vvi3ELn4="},{"type":"next-occurrence","id":"1Tx11o01FYbJtMnebQM6IIrRM3w="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"H1C/3HTWzsd6R6XPKNbw/FV2fbQ=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"1Tx11o01FYbJtMnebQM6IIrRM3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05YQaYAe/TcUrBZtgd3vvi3ELn4="},{"type":"next-occurrence","id":"oJ/a8w6y0UOdJ5Rd37dMHHUhH2Y="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"1Tx11o01FYbJtMnebQM6IIrRM3w=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"oJ/a8w6y0UOdJ5Rd37dMHHUhH2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05YQaYAe/TcUrBZtgd3vvi3ELn4="},{"type":"next-occurrence","id":"iGr4pkc9sjAx+HxKUVUtqugIkzg="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"oJ/a8w6y0UOdJ5Rd37dMHHUhH2Y=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"iGr4pkc9sjAx+HxKUVUtqugIkzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05YQaYAe/TcUrBZtgd3vvi3ELn4="},{"type":"next-occurrence","id":"9mHVFMdCMX6LS4qugjjmHL9r92o="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"iGr4pkc9sjAx+HxKUVUtqugIkzg=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"9mHVFMdCMX6LS4qugjjmHL9r92o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05YQaYAe/TcUrBZtgd3vvi3ELn4="},{"type":"next-occurrence","id":"FFDKOHtwzzoUA2riX6kz51SOoqc="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"9mHVFMdCMX6LS4qugjjmHL9r92o=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"FFDKOHtwzzoUA2riX6kz51SOoqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05YQaYAe/TcUrBZtgd3vvi3ELn4="},{"type":"next-occurrence","id":"TPMF6x7E+AgtqgaU7yPFGR4zhgY="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"FFDKOHtwzzoUA2riX6kz51SOoqc=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"TPMF6x7E+AgtqgaU7yPFGR4zhgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05YQaYAe/TcUrBZtgd3vvi3ELn4="},{"type":"next-occurrence","id":"Ipz75qpmOrORNG2FNmdoQL2a2sU="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"TPMF6x7E+AgtqgaU7yPFGR4zhgY=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T11:00:00Z","end_date":"2026-05-24T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"Ipz75qpmOrORNG2FNmdoQL2a2sU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05YQaYAe/TcUrBZtgd3vvi3ELn4="},{"type":"next-occurrence","id":"HiTbpyrjzCf6vPCmxQznA13WPMc="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"Ipz75qpmOrORNG2FNmdoQL2a2sU=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"HiTbpyrjzCf6vPCmxQznA13WPMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05YQaYAe/TcUrBZtgd3vvi3ELn4="},{"type":"next-occurrence","id":"Fo2cQw3XearDwa3BYUJ96JFEkC4="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"HiTbpyrjzCf6vPCmxQznA13WPMc=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"Fo2cQw3XearDwa3BYUJ96JFEkC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05YQaYAe/TcUrBZtgd3vvi3ELn4="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"Fo2cQw3XearDwa3BYUJ96JFEkC4=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"ORC300543366","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 40"],"direction":"unknown","description":"Repaving on NY 40 both directions Irish Road (Schaghticoke) to City of Troy; Town of Brunswick Line (Troy) Alternating Lanes Not currently Scheduled","update_date":"2026-05-01T19:30:01Z"},"road_event_id":"ORC300543366","beginning_cross_street":"Irish Road","ending_cross_street":"City of Troy; Town of Brunswick Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T15:04:46Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.634261,42.804627]]}},{"id":"tQc+Jxih33wua/tJN72rdSNAbiw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 308"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sOgiYPuryc6fTlP00pC0mkXq4zA="}],"description":"Road maintenance operations on NY 308 both directions between Montgomery Street - US 9 - Mill Street (Rhinebeck) and NY 199 (Milan) D265650/32736209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-30T14:43:42Z"},"road_event_id":"tQc+Jxih33wua/tJN72rdSNAbiw=","beginning_cross_street":"Montgomery Street - US 9 -  Mill Street","ending_cross_street":"NY 199","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911988,41.926886]]}},{"id":"sOgiYPuryc6fTlP00pC0mkXq4zA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 308"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tQc+Jxih33wua/tJN72rdSNAbiw="},{"type":"next-occurrence","id":"JSIIlAoiafe5lPR87XH5WbTxXTQ="}],"description":"Road maintenance operations on NY 308 both directions between Montgomery Street - US 9 - Mill Street (Rhinebeck) and NY 199 (Milan) D265650/32736209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-30T14:43:42Z"},"road_event_id":"sOgiYPuryc6fTlP00pC0mkXq4zA=","beginning_cross_street":"Montgomery Street - US 9 -  Mill Street","ending_cross_street":"NY 199","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911988,41.926886]]}},{"id":"JSIIlAoiafe5lPR87XH5WbTxXTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 308"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tQc+Jxih33wua/tJN72rdSNAbiw="}],"description":"Road maintenance operations on NY 308 both directions between Montgomery Street - US 9 - Mill Street (Rhinebeck) and NY 199 (Milan) D265650/32736209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-30T14:43:42Z"},"road_event_id":"JSIIlAoiafe5lPR87XH5WbTxXTQ=","beginning_cross_street":"Montgomery Street - US 9 -  Mill Street","ending_cross_street":"NY 199","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911988,41.926886]]}},{"id":"FePPP45ih0IvohmEBpWepYtjzLE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uvIiEi2tzC1BPjOgJtjjccCYu0c="}],"description":"Road maintenance operations on US 202 both directions between Orange Avenue - NY 59 (Ramapo) and Orchard Street (Suffern) D265522/32736509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-11T14:17:44Z"},"road_event_id":"FePPP45ih0IvohmEBpWepYtjzLE=","beginning_cross_street":"Orange Avenue - NY 59","ending_cross_street":"Orchard Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.153281,41.117487]]}},{"id":"uvIiEi2tzC1BPjOgJtjjccCYu0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FePPP45ih0IvohmEBpWepYtjzLE="},{"type":"next-occurrence","id":"gjSda3xPWJITil6LSx19YAeSU8k="}],"description":"Road maintenance operations on US 202 both directions between Orange Avenue - NY 59 (Ramapo) and Orchard Street (Suffern) D265522/32736509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-11T14:17:44Z"},"road_event_id":"uvIiEi2tzC1BPjOgJtjjccCYu0c=","beginning_cross_street":"Orange Avenue - NY 59","ending_cross_street":"Orchard Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.153281,41.117487]]}},{"id":"gjSda3xPWJITil6LSx19YAeSU8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FePPP45ih0IvohmEBpWepYtjzLE="},{"type":"next-occurrence","id":"F4C3xVRcnZhlCgpASCTzBmd2w2w="}],"description":"Road maintenance operations on US 202 both directions between Orange Avenue - NY 59 (Ramapo) and Orchard Street (Suffern) D265522/32736509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-11T14:17:44Z"},"road_event_id":"gjSda3xPWJITil6LSx19YAeSU8k=","beginning_cross_street":"Orange Avenue - NY 59","ending_cross_street":"Orchard Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.153281,41.117487]]}},{"id":"F4C3xVRcnZhlCgpASCTzBmd2w2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FePPP45ih0IvohmEBpWepYtjzLE="},{"type":"next-occurrence","id":"+zKkbXCHUZotVKNFFKEG2JxVtXY="}],"description":"Road maintenance operations on US 202 both directions between Orange Avenue - NY 59 (Ramapo) and Orchard Street (Suffern) D265522/32736509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-11T14:17:44Z"},"road_event_id":"F4C3xVRcnZhlCgpASCTzBmd2w2w=","beginning_cross_street":"Orange Avenue - NY 59","ending_cross_street":"Orchard Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.153281,41.117487]]}},{"id":"+zKkbXCHUZotVKNFFKEG2JxVtXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FePPP45ih0IvohmEBpWepYtjzLE="},{"type":"next-occurrence","id":"ud+rYfx8Vtg16qbIUh3beLx4ca0="}],"description":"Road maintenance operations on US 202 both directions between Orange Avenue - NY 59 (Ramapo) and Orchard Street (Suffern) D265522/32736509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-11T14:17:44Z"},"road_event_id":"+zKkbXCHUZotVKNFFKEG2JxVtXY=","beginning_cross_street":"Orange Avenue - NY 59","ending_cross_street":"Orchard Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.153281,41.117487]]}},{"id":"ud+rYfx8Vtg16qbIUh3beLx4ca0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FePPP45ih0IvohmEBpWepYtjzLE="},{"type":"next-occurrence","id":"8DKoSeoQVhc3y5jqiWOJfVkl7pA="}],"description":"Road maintenance operations on US 202 both directions between Orange Avenue - NY 59 (Ramapo) and Orchard Street (Suffern) D265522/32736509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-11T14:17:44Z"},"road_event_id":"ud+rYfx8Vtg16qbIUh3beLx4ca0=","beginning_cross_street":"Orange Avenue - NY 59","ending_cross_street":"Orchard Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.153281,41.117487]]}},{"id":"8DKoSeoQVhc3y5jqiWOJfVkl7pA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FePPP45ih0IvohmEBpWepYtjzLE="}],"description":"Road maintenance operations on US 202 both directions between Orange Avenue - NY 59 (Ramapo) and Orchard Street (Suffern) D265522/32736509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-11T14:17:44Z"},"road_event_id":"8DKoSeoQVhc3y5jqiWOJfVkl7pA=","beginning_cross_street":"Orange Avenue - NY 59","ending_cross_street":"Orchard Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.153281,41.117487]]}},{"id":"F91bZg1WyGqE4L/I9jQBj9w+nQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rEvsYEpwircEzV01cIWqZWm3X70="}],"description":"Road maintenance operations on Taconic State Parkway northbound between Exit 35 - Miller Hill Rd. (East Fishkill) and Exit 47B - NY 55 Westbound (La Grange) D265522/32736809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-11T14:12:11Z"},"road_event_id":"F91bZg1WyGqE4L/I9jQBj9w+nQs=","beginning_cross_street":"Exit 35 - Miller Hill Rd. ","ending_cross_street":"Exit 47B - NY 55 Westbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.78917,41.511022]]}},{"id":"rEvsYEpwircEzV01cIWqZWm3X70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F91bZg1WyGqE4L/I9jQBj9w+nQs="},{"type":"next-occurrence","id":"ItlhkIHukSyHopqRXzVzGTwXAs8="}],"description":"Road maintenance operations on Taconic State Parkway northbound between Exit 35 - Miller Hill Rd. (East Fishkill) and Exit 47B - NY 55 Westbound (La Grange) D265522/32736809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-11T14:12:11Z"},"road_event_id":"rEvsYEpwircEzV01cIWqZWm3X70=","beginning_cross_street":"Exit 35 - Miller Hill Rd. ","ending_cross_street":"Exit 47B - NY 55 Westbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.78917,41.511022]]}},{"id":"ItlhkIHukSyHopqRXzVzGTwXAs8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F91bZg1WyGqE4L/I9jQBj9w+nQs="},{"type":"next-occurrence","id":"TynVjrNSPLKXHamGLvNl3S5Jk3I="}],"description":"Road maintenance operations on Taconic State Parkway northbound between Exit 35 - Miller Hill Rd. (East Fishkill) and Exit 47B - NY 55 Westbound (La Grange) D265522/32736809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-11T14:12:11Z"},"road_event_id":"ItlhkIHukSyHopqRXzVzGTwXAs8=","beginning_cross_street":"Exit 35 - Miller Hill Rd. ","ending_cross_street":"Exit 47B - NY 55 Westbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.78917,41.511022]]}},{"id":"TynVjrNSPLKXHamGLvNl3S5Jk3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F91bZg1WyGqE4L/I9jQBj9w+nQs="},{"type":"next-occurrence","id":"ILb+VwvXv5dhJAJ+ksqZz3i3z6M="}],"description":"Road maintenance operations on Taconic State Parkway northbound between Exit 35 - Miller Hill Rd. (East Fishkill) and Exit 47B - NY 55 Westbound (La Grange) D265522/32736809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-11T14:12:11Z"},"road_event_id":"TynVjrNSPLKXHamGLvNl3S5Jk3I=","beginning_cross_street":"Exit 35 - Miller Hill Rd. ","ending_cross_street":"Exit 47B - NY 55 Westbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T18:00:00Z","end_date":"2026-05-19T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.78917,41.511022]]}},{"id":"ILb+VwvXv5dhJAJ+ksqZz3i3z6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F91bZg1WyGqE4L/I9jQBj9w+nQs="},{"type":"next-occurrence","id":"eumZjRYOycKWAMQeXrSNgncoa5U="}],"description":"Road maintenance operations on Taconic State Parkway northbound between Exit 35 - Miller Hill Rd. (East Fishkill) and Exit 47B - NY 55 Westbound (La Grange) D265522/32736809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-11T14:12:11Z"},"road_event_id":"ILb+VwvXv5dhJAJ+ksqZz3i3z6M=","beginning_cross_street":"Exit 35 - Miller Hill Rd. ","ending_cross_street":"Exit 47B - NY 55 Westbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T18:00:00Z","end_date":"2026-05-20T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.78917,41.511022]]}},{"id":"eumZjRYOycKWAMQeXrSNgncoa5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F91bZg1WyGqE4L/I9jQBj9w+nQs="},{"type":"next-occurrence","id":"mmPDiNQxwa2s1iNDwgiy+fjOZb8="}],"description":"Road maintenance operations on Taconic State Parkway northbound between Exit 35 - Miller Hill Rd. (East Fishkill) and Exit 47B - NY 55 Westbound (La Grange) D265522/32736809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-11T14:12:11Z"},"road_event_id":"eumZjRYOycKWAMQeXrSNgncoa5U=","beginning_cross_street":"Exit 35 - Miller Hill Rd. ","ending_cross_street":"Exit 47B - NY 55 Westbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T18:00:00Z","end_date":"2026-05-21T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.78917,41.511022]]}},{"id":"mmPDiNQxwa2s1iNDwgiy+fjOZb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F91bZg1WyGqE4L/I9jQBj9w+nQs="}],"description":"Road maintenance operations on Taconic State Parkway northbound between Exit 35 - Miller Hill Rd. (East Fishkill) and Exit 47B - NY 55 Westbound (La Grange) D265522/32736809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-11T14:12:11Z"},"road_event_id":"mmPDiNQxwa2s1iNDwgiy+fjOZb8=","beginning_cross_street":"Exit 35 - Miller Hill Rd. ","ending_cross_street":"Exit 47B - NY 55 Westbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T18:00:00Z","end_date":"2026-05-22T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.78917,41.511022]]}},{"id":"gcV1qvZPqGBUPSjCDhw9wqpOoh0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"K6JWvedZ01QVT8dmao8YoY9j9MM="}],"description":"Road maintenance operations on Taconic State Parkway southbound between Exit 47B - NY 55 Westbound (La Grange) and Exit 35 - Miller Hill Rd. (East Fishkill) D265522/32736909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-05-11T14:13:54Z"},"road_event_id":"gcV1qvZPqGBUPSjCDhw9wqpOoh0=","beginning_cross_street":"Exit 47B - NY 55 Westbound","ending_cross_street":"Exit 35 - Miller Hill Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789653,41.666651]]}},{"id":"K6JWvedZ01QVT8dmao8YoY9j9MM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcV1qvZPqGBUPSjCDhw9wqpOoh0="},{"type":"next-occurrence","id":"sEG6PTTsosYYGOeaXfZa0CKHkBo="}],"description":"Road maintenance operations on Taconic State Parkway southbound between Exit 47B - NY 55 Westbound (La Grange) and Exit 35 - Miller Hill Rd. (East Fishkill) D265522/32736909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-05-11T14:13:54Z"},"road_event_id":"K6JWvedZ01QVT8dmao8YoY9j9MM=","beginning_cross_street":"Exit 47B - NY 55 Westbound","ending_cross_street":"Exit 35 - Miller Hill Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789653,41.666651]]}},{"id":"sEG6PTTsosYYGOeaXfZa0CKHkBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcV1qvZPqGBUPSjCDhw9wqpOoh0="},{"type":"next-occurrence","id":"nv4IAW2KkalqaVZmgPQ7FDAEcJI="}],"description":"Road maintenance operations on Taconic State Parkway southbound between Exit 47B - NY 55 Westbound (La Grange) and Exit 35 - Miller Hill Rd. (East Fishkill) D265522/32736909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-05-11T14:13:54Z"},"road_event_id":"sEG6PTTsosYYGOeaXfZa0CKHkBo=","beginning_cross_street":"Exit 47B - NY 55 Westbound","ending_cross_street":"Exit 35 - Miller Hill Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789653,41.666651]]}},{"id":"nv4IAW2KkalqaVZmgPQ7FDAEcJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcV1qvZPqGBUPSjCDhw9wqpOoh0="},{"type":"next-occurrence","id":"0sOyTUVeSdLTlfRavbq+CMJQM3k="}],"description":"Road maintenance operations on Taconic State Parkway southbound between Exit 47B - NY 55 Westbound (La Grange) and Exit 35 - Miller Hill Rd. (East Fishkill) D265522/32736909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-05-11T14:13:54Z"},"road_event_id":"nv4IAW2KkalqaVZmgPQ7FDAEcJI=","beginning_cross_street":"Exit 47B - NY 55 Westbound","ending_cross_street":"Exit 35 - Miller Hill Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789653,41.666651]]}},{"id":"0sOyTUVeSdLTlfRavbq+CMJQM3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcV1qvZPqGBUPSjCDhw9wqpOoh0="},{"type":"next-occurrence","id":"gQLb2Ov/XlvW1GsND8IaULkACqA="}],"description":"Road maintenance operations on Taconic State Parkway southbound between Exit 47B - NY 55 Westbound (La Grange) and Exit 35 - Miller Hill Rd. (East Fishkill) D265522/32736909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-05-11T14:13:54Z"},"road_event_id":"0sOyTUVeSdLTlfRavbq+CMJQM3k=","beginning_cross_street":"Exit 47B - NY 55 Westbound","ending_cross_street":"Exit 35 - Miller Hill Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789653,41.666651]]}},{"id":"gQLb2Ov/XlvW1GsND8IaULkACqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcV1qvZPqGBUPSjCDhw9wqpOoh0="},{"type":"next-occurrence","id":"QChK9rl6NFYmhJwHha1Lcgh3rCc="}],"description":"Road maintenance operations on Taconic State Parkway southbound between Exit 47B - NY 55 Westbound (La Grange) and Exit 35 - Miller Hill Rd. (East Fishkill) D265522/32736909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-05-11T14:13:54Z"},"road_event_id":"gQLb2Ov/XlvW1GsND8IaULkACqA=","beginning_cross_street":"Exit 47B - NY 55 Westbound","ending_cross_street":"Exit 35 - Miller Hill Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789653,41.666651]]}},{"id":"QChK9rl6NFYmhJwHha1Lcgh3rCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcV1qvZPqGBUPSjCDhw9wqpOoh0="}],"description":"Road maintenance operations on Taconic State Parkway southbound between Exit 47B - NY 55 Westbound (La Grange) and Exit 35 - Miller Hill Rd. (East Fishkill) D265522/32736909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-05-11T14:13:54Z"},"road_event_id":"QChK9rl6NFYmhJwHha1Lcgh3rCc=","beginning_cross_street":"Exit 47B - NY 55 Westbound","ending_cross_street":"Exit 35 - Miller Hill Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789653,41.666651]]}},{"id":"50zt8Q0CLm3GcEemwGWHoBYNMM0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xs/C5SeCXgEdVTnvH9NKcFteOYk="}],"description":"Utility work on NY 65 both directions between Aman Rd (West Bloomfield) and Ideson Rd. (Lima) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T16:37:42Z"},"road_event_id":"50zt8Q0CLm3GcEemwGWHoBYNMM0=","beginning_cross_street":"Aman Rd","ending_cross_street":"Ideson Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.555045,42.930903]]}},{"id":"xs/C5SeCXgEdVTnvH9NKcFteOYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"50zt8Q0CLm3GcEemwGWHoBYNMM0="},{"type":"next-occurrence","id":"JjsnQM3jhZNEITfgz4MOdHHhh+0="}],"description":"Utility work on NY 65 both directions between Aman Rd (West Bloomfield) and Ideson Rd. (Lima) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T16:37:42Z"},"road_event_id":"xs/C5SeCXgEdVTnvH9NKcFteOYk=","beginning_cross_street":"Aman Rd","ending_cross_street":"Ideson Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.555045,42.930903]]}},{"id":"JjsnQM3jhZNEITfgz4MOdHHhh+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"50zt8Q0CLm3GcEemwGWHoBYNMM0="}],"description":"Utility work on NY 65 both directions between Aman Rd (West Bloomfield) and Ideson Rd. (Lima) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T16:37:42Z"},"road_event_id":"JjsnQM3jhZNEITfgz4MOdHHhh+0=","beginning_cross_street":"Aman Rd","ending_cross_street":"Ideson Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.555045,42.930903]]}},{"id":"KWjMgq78w5bQrQQWN3Lv2Q/+cQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lY6bTG1xglMoTbsLf+xFtMtUxY8="}],"description":"Bridge work on NY 50 both directions I-87 Exit 15 (Saratoga Springs), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 08:00 PM thru 05:00 AM 2 lanes of 3 lanes closed","update_date":"2026-04-30T17:30:46Z"},"road_event_id":"KWjMgq78w5bQrQQWN3Lv2Q/+cQA=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.752478,43.096518]]}},{"id":"lY6bTG1xglMoTbsLf+xFtMtUxY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KWjMgq78w5bQrQQWN3Lv2Q/+cQA="}],"description":"Bridge work on NY 50 both directions I-87 Exit 15 (Saratoga Springs), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 08:00 PM thru 05:00 AM 2 lanes of 3 lanes closed","update_date":"2026-04-30T17:30:46Z"},"road_event_id":"lY6bTG1xglMoTbsLf+xFtMtUxY8=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.752478,43.096518]]}},{"id":"G8V+6RQE/ln3JdCo22WlJNj5/Zc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aI1lfnw2n3OFa9rs0ivjFD3mG3c="}],"description":"Bridge work and overnight roadwork on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday May 4th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-30T23:47:35Z"},"road_event_id":"G8V+6RQE/ln3JdCo22WlJNj5/Zc=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"aI1lfnw2n3OFa9rs0ivjFD3mG3c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G8V+6RQE/ln3JdCo22WlJNj5/Zc="},{"type":"next-occurrence","id":"NlyxAn7JCsttG8EHNLw8xfaLSiw="}],"description":"Bridge work and overnight roadwork on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday May 4th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-30T23:47:35Z"},"road_event_id":"aI1lfnw2n3OFa9rs0ivjFD3mG3c=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"NlyxAn7JCsttG8EHNLw8xfaLSiw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G8V+6RQE/ln3JdCo22WlJNj5/Zc="},{"type":"next-occurrence","id":"wKtnHEJVKyrmsQcurJPeAbGvfQc="}],"description":"Bridge work and overnight roadwork on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday May 4th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-30T23:47:35Z"},"road_event_id":"NlyxAn7JCsttG8EHNLw8xfaLSiw=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"wKtnHEJVKyrmsQcurJPeAbGvfQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G8V+6RQE/ln3JdCo22WlJNj5/Zc="}],"description":"Bridge work and overnight roadwork on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday May 4th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-30T23:47:35Z"},"road_event_id":"wKtnHEJVKyrmsQcurJPeAbGvfQc=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"51xc/Qm6EZgZCBBpFpdg+GmjjT8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vbcS9qa/LDZm8vkimSF0edK6eRU="}],"description":"Bridge work and overnight roadwork on I-81 southbound between Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Destiny USA Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 20 - Franklin Street; West Street (Syracuse), Monday May 4th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-30T23:52:27Z"},"road_event_id":"51xc/Qm6EZgZCBBpFpdg+GmjjT8=","beginning_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Destiny USA Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170978,43.074422]]}},{"id":"vbcS9qa/LDZm8vkimSF0edK6eRU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"51xc/Qm6EZgZCBBpFpdg+GmjjT8="},{"type":"next-occurrence","id":"ISsT567A9RD7CfBSAVO8cz0sghw="}],"description":"Bridge work and overnight roadwork on I-81 southbound between Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Destiny USA Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 20 - Franklin Street; West Street (Syracuse), Monday May 4th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-30T23:52:27Z"},"road_event_id":"vbcS9qa/LDZm8vkimSF0edK6eRU=","beginning_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Destiny USA Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170978,43.074422]]}},{"id":"ISsT567A9RD7CfBSAVO8cz0sghw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"51xc/Qm6EZgZCBBpFpdg+GmjjT8="},{"type":"next-occurrence","id":"DoKDrqq8yKEiLNP0sLaBUHA6L1Q="}],"description":"Bridge work and overnight roadwork on I-81 southbound between Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Destiny USA Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 20 - Franklin Street; West Street (Syracuse), Monday May 4th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-30T23:52:27Z"},"road_event_id":"ISsT567A9RD7CfBSAVO8cz0sghw=","beginning_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Destiny USA Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170978,43.074422]]}},{"id":"DoKDrqq8yKEiLNP0sLaBUHA6L1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"51xc/Qm6EZgZCBBpFpdg+GmjjT8="}],"description":"Bridge work and overnight roadwork on I-81 southbound between Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Destiny USA Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 20 - Franklin Street; West Street (Syracuse), Monday May 4th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-30T23:52:27Z"},"road_event_id":"DoKDrqq8yKEiLNP0sLaBUHA6L1Q=","beginning_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Destiny USA Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170978,43.074422]]}},{"id":"NKZQqw7+ExrZqQXaFDvMra8P5M4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"e6i85+OTWungztWRktl6334tIrE="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"NKZQqw7+ExrZqQXaFDvMra8P5M4=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"e6i85+OTWungztWRktl6334tIrE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NKZQqw7+ExrZqQXaFDvMra8P5M4="},{"type":"next-occurrence","id":"apPTc11EIWRYaybrUIaMTeuDcJA="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"e6i85+OTWungztWRktl6334tIrE=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"apPTc11EIWRYaybrUIaMTeuDcJA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NKZQqw7+ExrZqQXaFDvMra8P5M4="},{"type":"next-occurrence","id":"RWkxxhxirJ0GBNgGjDbMFn2mk9M="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"apPTc11EIWRYaybrUIaMTeuDcJA=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"RWkxxhxirJ0GBNgGjDbMFn2mk9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NKZQqw7+ExrZqQXaFDvMra8P5M4="},{"type":"next-occurrence","id":"+8f5BFpzNvm+jtuqoGqzayUiPBo="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"RWkxxhxirJ0GBNgGjDbMFn2mk9M=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"+8f5BFpzNvm+jtuqoGqzayUiPBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NKZQqw7+ExrZqQXaFDvMra8P5M4="},{"type":"next-occurrence","id":"ZOHvmlzIjzYX9XaSyl+tSq078BA="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"+8f5BFpzNvm+jtuqoGqzayUiPBo=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"ZOHvmlzIjzYX9XaSyl+tSq078BA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NKZQqw7+ExrZqQXaFDvMra8P5M4="},{"type":"next-occurrence","id":"oIF8p5hXril6J2FYWQ/ZSoH0r4g="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"ZOHvmlzIjzYX9XaSyl+tSq078BA=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"oIF8p5hXril6J2FYWQ/ZSoH0r4g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NKZQqw7+ExrZqQXaFDvMra8P5M4="},{"type":"next-occurrence","id":"+5uJj7nrn1obKPb/6Gdu851Ol/c="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"oIF8p5hXril6J2FYWQ/ZSoH0r4g=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"+5uJj7nrn1obKPb/6Gdu851Ol/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NKZQqw7+ExrZqQXaFDvMra8P5M4="},{"type":"next-occurrence","id":"ETr2d/Po/pfsHO8SGpodzS1o3SU="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"+5uJj7nrn1obKPb/6Gdu851Ol/c=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"ETr2d/Po/pfsHO8SGpodzS1o3SU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NKZQqw7+ExrZqQXaFDvMra8P5M4="},{"type":"next-occurrence","id":"4PjuJUwVQd7n3Fj8J+x5pab9748="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"ETr2d/Po/pfsHO8SGpodzS1o3SU=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"4PjuJUwVQd7n3Fj8J+x5pab9748=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NKZQqw7+ExrZqQXaFDvMra8P5M4="},{"type":"next-occurrence","id":"L1AfnCV9BrKpxQerKxHVFuGjB1Y="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"4PjuJUwVQd7n3Fj8J+x5pab9748=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"L1AfnCV9BrKpxQerKxHVFuGjB1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NKZQqw7+ExrZqQXaFDvMra8P5M4="},{"type":"next-occurrence","id":"PpiF5Dpk89KW7nMQw+MWRpjTc1w="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"L1AfnCV9BrKpxQerKxHVFuGjB1Y=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"PpiF5Dpk89KW7nMQw+MWRpjTc1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NKZQqw7+ExrZqQXaFDvMra8P5M4="},{"type":"next-occurrence","id":"NKkYaR7nHSJWVeq1tSqe+2OQgl4="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"PpiF5Dpk89KW7nMQw+MWRpjTc1w=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"NKkYaR7nHSJWVeq1tSqe+2OQgl4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NKZQqw7+ExrZqQXaFDvMra8P5M4="},{"type":"next-occurrence","id":"V2KsJTwqbGKHZsW7Xs+hAJzdDW4="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"NKkYaR7nHSJWVeq1tSqe+2OQgl4=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"V2KsJTwqbGKHZsW7Xs+hAJzdDW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NKZQqw7+ExrZqQXaFDvMra8P5M4="},{"type":"next-occurrence","id":"WEO+13xwphDRwPFA5xvnwHyCJeY="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"V2KsJTwqbGKHZsW7Xs+hAJzdDW4=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"WEO+13xwphDRwPFA5xvnwHyCJeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NKZQqw7+ExrZqQXaFDvMra8P5M4="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"WEO+13xwphDRwPFA5xvnwHyCJeY=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"gK8YOvG8L2qeNI2E2W+fNskLKhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FKzqJUgy42gqYh1p/SHWEFbOcJU="}],"description":"Construction on NY 46 both directions between Elmer Hill Road (Rome) and Pennystreet Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place. Work is weather dependent, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:28:05Z"},"road_event_id":"gK8YOvG8L2qeNI2E2W+fNskLKhY=","beginning_cross_street":"Elmer Hill Road","ending_cross_street":"Pennystreet Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.437474,43.262245]]}},{"id":"FKzqJUgy42gqYh1p/SHWEFbOcJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gK8YOvG8L2qeNI2E2W+fNskLKhY="},{"type":"next-occurrence","id":"x2E3TX6HEwkbHN0c1+XsFIuFPXM="}],"description":"Construction on NY 46 both directions between Elmer Hill Road (Rome) and Pennystreet Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place. Work is weather dependent, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:28:05Z"},"road_event_id":"FKzqJUgy42gqYh1p/SHWEFbOcJU=","beginning_cross_street":"Elmer Hill Road","ending_cross_street":"Pennystreet Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.437474,43.262245]]}},{"id":"x2E3TX6HEwkbHN0c1+XsFIuFPXM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gK8YOvG8L2qeNI2E2W+fNskLKhY="}],"description":"Construction on NY 46 both directions between Elmer Hill Road (Rome) and Pennystreet Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place. Work is weather dependent, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:28:05Z"},"road_event_id":"x2E3TX6HEwkbHN0c1+XsFIuFPXM=","beginning_cross_street":"Elmer Hill Road","ending_cross_street":"Pennystreet Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.437474,43.262245]]}},{"id":"D+JXxe1dPxk1oxdfChA2KHQ1O84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hl+3WZf40fDdeFbDE/BK0G4TQNQ="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Saturday May 30th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-01T10:29:24Z"},"road_event_id":"D+JXxe1dPxk1oxdfChA2KHQ1O84=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"hl+3WZf40fDdeFbDE/BK0G4TQNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D+JXxe1dPxk1oxdfChA2KHQ1O84="},{"type":"next-occurrence","id":"JiB9+6NFk3KFF2bKvxahtlhgZVk="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Saturday May 30th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-01T10:29:24Z"},"road_event_id":"hl+3WZf40fDdeFbDE/BK0G4TQNQ=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"JiB9+6NFk3KFF2bKvxahtlhgZVk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D+JXxe1dPxk1oxdfChA2KHQ1O84="},{"type":"next-occurrence","id":"KsANTf8mR0wsHyWfTCq8LPxgfnw="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Saturday May 30th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-01T10:29:24Z"},"road_event_id":"JiB9+6NFk3KFF2bKvxahtlhgZVk=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"KsANTf8mR0wsHyWfTCq8LPxgfnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D+JXxe1dPxk1oxdfChA2KHQ1O84="},{"type":"next-occurrence","id":"3v/qFv7uNSD/53wf9ruILK/48V0="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Saturday May 30th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-01T10:29:24Z"},"road_event_id":"KsANTf8mR0wsHyWfTCq8LPxgfnw=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"3v/qFv7uNSD/53wf9ruILK/48V0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D+JXxe1dPxk1oxdfChA2KHQ1O84="},{"type":"next-occurrence","id":"9BpMPNhNKIAUs9EAJGj2il27hv0="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Saturday May 30th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-01T10:29:24Z"},"road_event_id":"3v/qFv7uNSD/53wf9ruILK/48V0=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"9BpMPNhNKIAUs9EAJGj2il27hv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D+JXxe1dPxk1oxdfChA2KHQ1O84="},{"type":"next-occurrence","id":"9BiBgtu6VQsrths/Bm0u+c2egBI="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Saturday May 30th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-01T10:29:24Z"},"road_event_id":"9BpMPNhNKIAUs9EAJGj2il27hv0=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"9BiBgtu6VQsrths/Bm0u+c2egBI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D+JXxe1dPxk1oxdfChA2KHQ1O84="},{"type":"next-occurrence","id":"WL9AED929AwebWeXECtBY9X3mKM="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Saturday May 30th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-01T10:29:24Z"},"road_event_id":"9BiBgtu6VQsrths/Bm0u+c2egBI=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"WL9AED929AwebWeXECtBY9X3mKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D+JXxe1dPxk1oxdfChA2KHQ1O84="},{"type":"next-occurrence","id":"vMbj03sO6rIcOjjzTiIbErTAWdU="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Saturday May 30th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-01T10:29:24Z"},"road_event_id":"WL9AED929AwebWeXECtBY9X3mKM=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"vMbj03sO6rIcOjjzTiIbErTAWdU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D+JXxe1dPxk1oxdfChA2KHQ1O84="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Wednesday May 27th, 2026 thru Saturday May 30th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, right lane closure","update_date":"2026-05-01T10:29:24Z"},"road_event_id":"vMbj03sO6rIcOjjzTiIbErTAWdU=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"CQeFp1bIcNWYik+XccFtBKtsZoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5S"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 5S both directions between Currytown Road (Root) and Sprakers Hill Road (Root) Motorists will encounter lane closures in both directions with temp signals in place, Continuous Monday May 11th, 2026 7:00 AM thru Monday May 25th, 2026 4:00 PM","update_date":"2026-05-01T10:27:31Z"},"road_event_id":"CQeFp1bIcNWYik+XccFtBKtsZoA=","beginning_cross_street":"Currytown Road","ending_cross_street":"Sprakers Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.470783,42.895207]]}},{"id":"etE1jxd+azrQOCeyV8AE/z23MdY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 173"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uExriy8AGvx4LdzqWjH4bLZI/+k="}],"description":"Paving operations on NY 173 both directions between Cheese Factory Road (Chittenango) and Palmer Road (Chittenango) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:44:49Z"},"road_event_id":"etE1jxd+azrQOCeyV8AE/z23MdY=","beginning_cross_street":"Cheese Factory Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.90769,43.028031]]}},{"id":"uExriy8AGvx4LdzqWjH4bLZI/+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 173"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"etE1jxd+azrQOCeyV8AE/z23MdY="},{"type":"next-occurrence","id":"U6S5xvrMmPgJYdbZXU/BLk8pf6g="}],"description":"Paving operations on NY 173 both directions between Cheese Factory Road (Chittenango) and Palmer Road (Chittenango) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:44:49Z"},"road_event_id":"uExriy8AGvx4LdzqWjH4bLZI/+k=","beginning_cross_street":"Cheese Factory Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.90769,43.028031]]}},{"id":"U6S5xvrMmPgJYdbZXU/BLk8pf6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 173"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"etE1jxd+azrQOCeyV8AE/z23MdY="}],"description":"Paving operations on NY 173 both directions between Cheese Factory Road (Chittenango) and Palmer Road (Chittenango) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:44:49Z"},"road_event_id":"U6S5xvrMmPgJYdbZXU/BLk8pf6g=","beginning_cross_street":"Cheese Factory Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.90769,43.028031]]}},{"id":"wMmUB57sCZHHX/StWhKRuPmbfls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4lDMA+abIZcUAzFCAeGqt6t6Xz8="}],"description":"Culvert repairs on NY 46 both directions between (Rome) and Delta Lake State Park Entrance (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM,","update_date":"2026-05-08T11:45:20Z"},"road_event_id":"wMmUB57sCZHHX/StWhKRuPmbfls=","beginning_cross_street":"","ending_cross_street":"Delta Lake State Park Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.418571,43.283511]]}},{"id":"4lDMA+abIZcUAzFCAeGqt6t6Xz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wMmUB57sCZHHX/StWhKRuPmbfls="},{"type":"next-occurrence","id":"9aJlKKWpH8LCN1WhjXyCvTvpsAY="}],"description":"Culvert repairs on NY 46 both directions between (Rome) and Delta Lake State Park Entrance (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM,","update_date":"2026-05-08T11:45:20Z"},"road_event_id":"4lDMA+abIZcUAzFCAeGqt6t6Xz8=","beginning_cross_street":"","ending_cross_street":"Delta Lake State Park Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.418571,43.283511]]}},{"id":"9aJlKKWpH8LCN1WhjXyCvTvpsAY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wMmUB57sCZHHX/StWhKRuPmbfls="}],"description":"Culvert repairs on NY 46 both directions between (Rome) and Delta Lake State Park Entrance (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM,","update_date":"2026-05-08T11:45:20Z"},"road_event_id":"9aJlKKWpH8LCN1WhjXyCvTvpsAY=","beginning_cross_street":"","ending_cross_street":"Delta Lake State Park Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.418571,43.283511]]}},{"id":"X/iCPfXpUDswrv4glCtgrlbU5Y4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JzxVk8WDJ8gzCNvJoSN4HzgY5t8="}],"description":"Roadwork on NY 30 both directions between Hamilton County; Franklin County Line (Tupper Lake) and NY 28N; Long Lake (Long Lake) Motorists will encounter lane closures in both dierctions with flaggers in place, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-08T11:26:57Z"},"road_event_id":"X/iCPfXpUDswrv4glCtgrlbU5Y4=","beginning_cross_street":"Hamilton County; Franklin County Line","ending_cross_street":"NY 28N; Long Lake","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.528999,44.099601]]}},{"id":"JzxVk8WDJ8gzCNvJoSN4HzgY5t8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X/iCPfXpUDswrv4glCtgrlbU5Y4="},{"type":"next-occurrence","id":"ovp0eCQ02QqL3eZVXkIxlDf6UWQ="}],"description":"Roadwork on NY 30 both directions between Hamilton County; Franklin County Line (Tupper Lake) and NY 28N; Long Lake (Long Lake) Motorists will encounter lane closures in both dierctions with flaggers in place, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-08T11:26:57Z"},"road_event_id":"JzxVk8WDJ8gzCNvJoSN4HzgY5t8=","beginning_cross_street":"Hamilton County; Franklin County Line","ending_cross_street":"NY 28N; Long Lake","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.528999,44.099601]]}},{"id":"ovp0eCQ02QqL3eZVXkIxlDf6UWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X/iCPfXpUDswrv4glCtgrlbU5Y4="}],"description":"Roadwork on NY 30 both directions between Hamilton County; Franklin County Line (Tupper Lake) and NY 28N; Long Lake (Long Lake) Motorists will encounter lane closures in both dierctions with flaggers in place, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-08T11:26:57Z"},"road_event_id":"ovp0eCQ02QqL3eZVXkIxlDf6UWQ=","beginning_cross_street":"Hamilton County; Franklin County Line","ending_cross_street":"NY 28N; Long Lake","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.528999,44.099601]]}},{"id":"4/dmjgw0LR9PVGVahsTLeVn3vv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/YBgWxlSGiUHZk6MhfJCqVDPQxg="}],"description":"Construction on NY 46 both directions between Potter Road (Rome) and North James Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Wednesday May 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:53:39Z"},"road_event_id":"4/dmjgw0LR9PVGVahsTLeVn3vv0=","beginning_cross_street":"Potter Road","ending_cross_street":"North James Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.438394,43.242289]]}},{"id":"/YBgWxlSGiUHZk6MhfJCqVDPQxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4/dmjgw0LR9PVGVahsTLeVn3vv0="},{"type":"next-occurrence","id":"pGAd3nm1tIolwK+vgBb90MyCRXI="}],"description":"Construction on NY 46 both directions between Potter Road (Rome) and North James Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Wednesday May 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:53:39Z"},"road_event_id":"/YBgWxlSGiUHZk6MhfJCqVDPQxg=","beginning_cross_street":"Potter Road","ending_cross_street":"North James Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.438394,43.242289]]}},{"id":"pGAd3nm1tIolwK+vgBb90MyCRXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4/dmjgw0LR9PVGVahsTLeVn3vv0="}],"description":"Construction on NY 46 both directions between Potter Road (Rome) and North James Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Wednesday May 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:53:39Z"},"road_event_id":"pGAd3nm1tIolwK+vgBb90MyCRXI=","beginning_cross_street":"Potter Road","ending_cross_street":"North James Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.438394,43.242289]]}},{"id":"RxtucwNbIXprG019hYzJLwloZ7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"++C8G+tgGUrRHnuvjXqtpLWlSts="}],"description":"Bridge painting on NY 30 both directions between Dock Road (Long Lake) and Rice Road (Long Lake) Motorists will encounter lane closures in both directions with temporary signals in place, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:47:55Z"},"road_event_id":"RxtucwNbIXprG019hYzJLwloZ7M=","beginning_cross_street":"Dock Road","ending_cross_street":"Rice Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425992,43.974566]]}},{"id":"++C8G+tgGUrRHnuvjXqtpLWlSts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RxtucwNbIXprG019hYzJLwloZ7M="},{"type":"next-occurrence","id":"nJZpExjzWO83WAzQwtklsvFF6A8="}],"description":"Bridge painting on NY 30 both directions between Dock Road (Long Lake) and Rice Road (Long Lake) Motorists will encounter lane closures in both directions with temporary signals in place, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:47:55Z"},"road_event_id":"++C8G+tgGUrRHnuvjXqtpLWlSts=","beginning_cross_street":"Dock Road","ending_cross_street":"Rice Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425992,43.974566]]}},{"id":"nJZpExjzWO83WAzQwtklsvFF6A8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RxtucwNbIXprG019hYzJLwloZ7M="}],"description":"Bridge painting on NY 30 both directions between Dock Road (Long Lake) and Rice Road (Long Lake) Motorists will encounter lane closures in both directions with temporary signals in place, Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:47:55Z"},"road_event_id":"nJZpExjzWO83WAzQwtklsvFF6A8=","beginning_cross_street":"Dock Road","ending_cross_street":"Rice Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425992,43.974566]]}},{"id":"Iqq7Wu8kOC4dERFZgiEhWatWu20=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fqsHkaovfzp4pGTzu3jIhIQrS24="}],"description":"Tree trimming on NY 5 both directions between Route 290 Mycenae (Manlius) and George Taylor Rd (Manlius) ; Alternating one-way traffic with flaggers, Monday May 4th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-01T12:52:07Z"},"road_event_id":"Iqq7Wu8kOC4dERFZgiEhWatWu20=","beginning_cross_street":"Route 290 Mycenae","ending_cross_street":"George Taylor Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.93068,43.048867]]}},{"id":"fqsHkaovfzp4pGTzu3jIhIQrS24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Iqq7Wu8kOC4dERFZgiEhWatWu20="}],"description":"Tree trimming on NY 5 both directions between Route 290 Mycenae (Manlius) and George Taylor Rd (Manlius) ; Alternating one-way traffic with flaggers, Monday May 4th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-01T12:52:07Z"},"road_event_id":"fqsHkaovfzp4pGTzu3jIhIQrS24=","beginning_cross_street":"Route 290 Mycenae","ending_cross_street":"George Taylor Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.93068,43.048867]]}},{"id":"uZvXwFzURyZlnQQBazJYQSeVIBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[],"description":"Tree trimming on NY 32 both directions between Chestnut Lane (Balmville) and Old North Plank Road (Balmville) 2024081748389/32636509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 6th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-01T13:20:34Z"},"road_event_id":"uZvXwFzURyZlnQQBazJYQSeVIBo=","beginning_cross_street":"Chestnut Lane","ending_cross_street":"Old North Plank Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.953563,42.043608]]}},{"id":"uBp8vHw+hOi302qQItoSDuN387M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DeuD7CmJzvvztc/s/V/4hHJs938="}],"description":"Bridge work on NY 18 both directions between Hilton Parma Road; NY 259 (Parma) and Roosevelt Highway (Connector from NY 98 to NY 18) (Carlton) Mobile operation for bridge washing. Alternating lane closures with flaggers as needed, Friday May 1st, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-05-08T14:28:09Z"},"road_event_id":"uBp8vHw+hOi302qQItoSDuN387M=","beginning_cross_street":"Hilton Parma Road; NY 259","ending_cross_street":"Roosevelt Highway (Connector from NY 98 to NY 18)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.790856,43.25892]]}},{"id":"DeuD7CmJzvvztc/s/V/4hHJs938=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uBp8vHw+hOi302qQItoSDuN387M="},{"type":"next-occurrence","id":"2qp5agdDrTwxChPJKlaJ17PKFrc="}],"description":"Bridge work on NY 18 both directions between Hilton Parma Road; NY 259 (Parma) and Roosevelt Highway (Connector from NY 98 to NY 18) (Carlton) Mobile operation for bridge washing. Alternating lane closures with flaggers as needed, Friday May 1st, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-05-08T14:28:09Z"},"road_event_id":"DeuD7CmJzvvztc/s/V/4hHJs938=","beginning_cross_street":"Hilton Parma Road; NY 259","ending_cross_street":"Roosevelt Highway (Connector from NY 98 to NY 18)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.790856,43.25892]]}},{"id":"2qp5agdDrTwxChPJKlaJ17PKFrc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uBp8vHw+hOi302qQItoSDuN387M="}],"description":"Bridge work on NY 18 both directions between Hilton Parma Road; NY 259 (Parma) and Roosevelt Highway (Connector from NY 98 to NY 18) (Carlton) Mobile operation for bridge washing. Alternating lane closures with flaggers as needed, Friday May 1st, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-05-08T14:28:09Z"},"road_event_id":"2qp5agdDrTwxChPJKlaJ17PKFrc=","beginning_cross_street":"Hilton Parma Road; NY 259","ending_cross_street":"Roosevelt Highway (Connector from NY 98 to NY 18)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.790856,43.25892]]}},{"id":"ZzQVZfr+OJihP2Y63+ywr0kye3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 260"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pO6UwHGzkSZuZkDNidxZ4MBGiZQ="}],"description":"Bridge work on NY 260 both directions between Ridge Road West; NY 104 (Clarkson) and Lake Ontario State Parkway East (Hamlin) Mobile operation for bridge washing. Alternating lane closures with flaggers as needed, Friday May 1st, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-05-08T14:29:59Z"},"road_event_id":"ZzQVZfr+OJihP2Y63+ywr0kye3g=","beginning_cross_street":"Ridge Road  West; NY 104","ending_cross_street":"Lake Ontario State Parkway  East","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.890061,43.225585]]}},{"id":"pO6UwHGzkSZuZkDNidxZ4MBGiZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 260"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZzQVZfr+OJihP2Y63+ywr0kye3g="},{"type":"next-occurrence","id":"Hu8i8e3666gkQtCZ9Wi4TUx216c="}],"description":"Bridge work on NY 260 both directions between Ridge Road West; NY 104 (Clarkson) and Lake Ontario State Parkway East (Hamlin) Mobile operation for bridge washing. Alternating lane closures with flaggers as needed, Friday May 1st, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-05-08T14:29:59Z"},"road_event_id":"pO6UwHGzkSZuZkDNidxZ4MBGiZQ=","beginning_cross_street":"Ridge Road  West; NY 104","ending_cross_street":"Lake Ontario State Parkway  East","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.890061,43.225585]]}},{"id":"Hu8i8e3666gkQtCZ9Wi4TUx216c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 260"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZzQVZfr+OJihP2Y63+ywr0kye3g="}],"description":"Bridge work on NY 260 both directions between Ridge Road West; NY 104 (Clarkson) and Lake Ontario State Parkway East (Hamlin) Mobile operation for bridge washing. Alternating lane closures with flaggers as needed, Friday May 1st, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-05-08T14:29:59Z"},"road_event_id":"Hu8i8e3666gkQtCZ9Wi4TUx216c=","beginning_cross_street":"Ridge Road  West; NY 104","ending_cross_street":"Lake Ontario State Parkway  East","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.890061,43.225585]]}},{"id":"IDWK1uJH1FXXUd02cn2Bda610ss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FAxmuNEs9cQ81D3eFl4A40VvGb0="}],"description":"Utility work on US 209 southbound between Deepam Lane (Wawarsing) and Beckley Street (Wawarsing) 2025082206973/32626409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T19:31:18Z"},"road_event_id":"IDWK1uJH1FXXUd02cn2Bda610ss=","beginning_cross_street":"Deepam Lane","ending_cross_street":"Beckley Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.387622,41.726439]]}},{"id":"FAxmuNEs9cQ81D3eFl4A40VvGb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IDWK1uJH1FXXUd02cn2Bda610ss="},{"type":"next-occurrence","id":"pPCt5+UClWZuOG+xxkY8S2VuubQ="}],"description":"Utility work on US 209 southbound between Deepam Lane (Wawarsing) and Beckley Street (Wawarsing) 2025082206973/32626409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T19:31:18Z"},"road_event_id":"FAxmuNEs9cQ81D3eFl4A40VvGb0=","beginning_cross_street":"Deepam Lane","ending_cross_street":"Beckley Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.387622,41.726439]]}},{"id":"pPCt5+UClWZuOG+xxkY8S2VuubQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IDWK1uJH1FXXUd02cn2Bda610ss="}],"description":"Utility work on US 209 southbound between Deepam Lane (Wawarsing) and Beckley Street (Wawarsing) 2025082206973/32626409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T19:31:18Z"},"road_event_id":"pPCt5+UClWZuOG+xxkY8S2VuubQ=","beginning_cross_street":"Deepam Lane","ending_cross_street":"Beckley Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.387622,41.726439]]}},{"id":"bswKqbVyPS/kaX9a2Ei/2J0leFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QJbyGJUZaH1NxrLxTyXbjstLUCc="}],"description":"Utility work on US 11 both directions between GILDNER RD (Hastings) and CR 37 (Hastings) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-01T13:55:18Z"},"road_event_id":"bswKqbVyPS/kaX9a2Ei/2J0leFk=","beginning_cross_street":"GILDNER RD","ending_cross_street":"CR 37","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.143214,43.263121]]}},{"id":"QJbyGJUZaH1NxrLxTyXbjstLUCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bswKqbVyPS/kaX9a2Ei/2J0leFk="},{"type":"next-occurrence","id":"lZmu4je3IgyFrug2eThoUicPEiU="}],"description":"Utility work on US 11 both directions between GILDNER RD (Hastings) and CR 37 (Hastings) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-01T13:55:18Z"},"road_event_id":"QJbyGJUZaH1NxrLxTyXbjstLUCc=","beginning_cross_street":"GILDNER RD","ending_cross_street":"CR 37","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.143214,43.263121]]}},{"id":"lZmu4je3IgyFrug2eThoUicPEiU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bswKqbVyPS/kaX9a2Ei/2J0leFk="},{"type":"next-occurrence","id":"Pwg9PskL5DvCcsc1dZHWetRFwuA="}],"description":"Utility work on US 11 both directions between GILDNER RD (Hastings) and CR 37 (Hastings) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-01T13:55:18Z"},"road_event_id":"lZmu4je3IgyFrug2eThoUicPEiU=","beginning_cross_street":"GILDNER RD","ending_cross_street":"CR 37","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.143214,43.263121]]}},{"id":"Pwg9PskL5DvCcsc1dZHWetRFwuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bswKqbVyPS/kaX9a2Ei/2J0leFk="},{"type":"next-occurrence","id":"0kI4D6CvxEMT2AK2zUVjL5otx9I="}],"description":"Utility work on US 11 both directions between GILDNER RD (Hastings) and CR 37 (Hastings) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-01T13:55:18Z"},"road_event_id":"Pwg9PskL5DvCcsc1dZHWetRFwuA=","beginning_cross_street":"GILDNER RD","ending_cross_street":"CR 37","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T12:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.143214,43.263121]]}},{"id":"0kI4D6CvxEMT2AK2zUVjL5otx9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bswKqbVyPS/kaX9a2Ei/2J0leFk="},{"type":"next-occurrence","id":"xM+Tj+E8JM0V8t8HYYT7nGJiHmk="}],"description":"Utility work on US 11 both directions between GILDNER RD (Hastings) and CR 37 (Hastings) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-01T13:55:18Z"},"road_event_id":"0kI4D6CvxEMT2AK2zUVjL5otx9I=","beginning_cross_street":"GILDNER RD","ending_cross_street":"CR 37","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T12:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.143214,43.263121]]}},{"id":"xM+Tj+E8JM0V8t8HYYT7nGJiHmk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bswKqbVyPS/kaX9a2Ei/2J0leFk="},{"type":"next-occurrence","id":"UlL0YoWZCu1Aj3+SeW4x0NBRPIo="}],"description":"Utility work on US 11 both directions between GILDNER RD (Hastings) and CR 37 (Hastings) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-01T13:55:18Z"},"road_event_id":"xM+Tj+E8JM0V8t8HYYT7nGJiHmk=","beginning_cross_street":"GILDNER RD","ending_cross_street":"CR 37","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T12:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.143214,43.263121]]}},{"id":"UlL0YoWZCu1Aj3+SeW4x0NBRPIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bswKqbVyPS/kaX9a2Ei/2J0leFk="},{"type":"next-occurrence","id":"J1Qf7QEIwga7YnLl+kBPMb67qKg="}],"description":"Utility work on US 11 both directions between GILDNER RD (Hastings) and CR 37 (Hastings) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-01T13:55:18Z"},"road_event_id":"UlL0YoWZCu1Aj3+SeW4x0NBRPIo=","beginning_cross_street":"GILDNER RD","ending_cross_street":"CR 37","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T12:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.143214,43.263121]]}},{"id":"J1Qf7QEIwga7YnLl+kBPMb67qKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bswKqbVyPS/kaX9a2Ei/2J0leFk="},{"type":"next-occurrence","id":"XtbMhvuHXPOwWajlaboQQ7IrQ7g="}],"description":"Utility work on US 11 both directions between GILDNER RD (Hastings) and CR 37 (Hastings) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-01T13:55:18Z"},"road_event_id":"J1Qf7QEIwga7YnLl+kBPMb67qKg=","beginning_cross_street":"GILDNER RD","ending_cross_street":"CR 37","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T20:00:00Z","end_date":"2026-05-27T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.143214,43.263121]]}},{"id":"XtbMhvuHXPOwWajlaboQQ7IrQ7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bswKqbVyPS/kaX9a2Ei/2J0leFk="}],"description":"Utility work on US 11 both directions between GILDNER RD (Hastings) and CR 37 (Hastings) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-01T13:55:18Z"},"road_event_id":"XtbMhvuHXPOwWajlaboQQ7IrQ7g=","beginning_cross_street":"GILDNER RD","ending_cross_street":"CR 37","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T20:00:00Z","end_date":"2026-05-28T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.143214,43.263121]]}},{"id":"46hxrZXXAd+Sz/pKF9MB0VWA1D0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uqB9X/v+4TjVL/eE7Y3EsngacUs="}],"description":"Utility work on NY 77 both directions area of Cohocton Rd (Pembroke) Alternating lane closures with flaggers as needed, Friday May 1st, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-01T14:24:16Z"},"road_event_id":"46hxrZXXAd+Sz/pKF9MB0VWA1D0=","beginning_cross_street":"Cohocton Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.40603,42.978253]]}},{"id":"uqB9X/v+4TjVL/eE7Y3EsngacUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"46hxrZXXAd+Sz/pKF9MB0VWA1D0="},{"type":"next-occurrence","id":"tpmFzs7Y/nXOUusyNGbzeVNcVh4="}],"description":"Utility work on NY 77 both directions area of Cohocton Rd (Pembroke) Alternating lane closures with flaggers as needed, Friday May 1st, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-01T14:24:16Z"},"road_event_id":"uqB9X/v+4TjVL/eE7Y3EsngacUs=","beginning_cross_street":"Cohocton Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.40603,42.978253]]}},{"id":"tpmFzs7Y/nXOUusyNGbzeVNcVh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"46hxrZXXAd+Sz/pKF9MB0VWA1D0="}],"description":"Utility work on NY 77 both directions area of Cohocton Rd (Pembroke) Alternating lane closures with flaggers as needed, Friday May 1st, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-01T14:24:16Z"},"road_event_id":"tpmFzs7Y/nXOUusyNGbzeVNcVh4=","beginning_cross_street":"Cohocton Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.40603,42.978253]]}},{"id":"xLXOtezUpa/eLMrJrPU7xlqVu7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sK2dZ8nDdGezfq0Kl8nsv2ZxfJE="}],"description":"Utility work on US 209 southbound between Essex Street (Wawarsing) and Circle Avenue (Wawarsing) 2025083113206/32738309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T19:31:25Z"},"road_event_id":"xLXOtezUpa/eLMrJrPU7xlqVu7Y=","beginning_cross_street":"","ending_cross_street":"Circle Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.397294,41.715229]]}},{"id":"sK2dZ8nDdGezfq0Kl8nsv2ZxfJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xLXOtezUpa/eLMrJrPU7xlqVu7Y="},{"type":"next-occurrence","id":"jRhITIGQrtO6/FtijFk6N8ysWLo="}],"description":"Utility work on US 209 southbound between Essex Street (Wawarsing) and Circle Avenue (Wawarsing) 2025083113206/32738309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T19:31:25Z"},"road_event_id":"sK2dZ8nDdGezfq0Kl8nsv2ZxfJE=","beginning_cross_street":"","ending_cross_street":"Circle Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.397294,41.715229]]}},{"id":"jRhITIGQrtO6/FtijFk6N8ysWLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xLXOtezUpa/eLMrJrPU7xlqVu7Y="}],"description":"Utility work on US 209 southbound between Essex Street (Wawarsing) and Circle Avenue (Wawarsing) 2025083113206/32738309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T19:31:25Z"},"road_event_id":"jRhITIGQrtO6/FtijFk6N8ysWLo=","beginning_cross_street":"","ending_cross_street":"Circle Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.397294,41.715229]]}},{"id":"MVteo+fJLcohscjBH184xUCYFLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"29//BpxSu13Pg7sIjtdbYXFypCU="}],"description":"Utility work on NY 5 both directions between Sand Rd. (West Bloomfield) and Route 64 Junction (East Bloomfield) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:10:30Z"},"road_event_id":"MVteo+fJLcohscjBH184xUCYFLk=","beginning_cross_street":"Sand Rd.","ending_cross_street":"Route 64 Junction","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.484777,42.902488]]}},{"id":"29//BpxSu13Pg7sIjtdbYXFypCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MVteo+fJLcohscjBH184xUCYFLk="}],"description":"Utility work on NY 5 both directions between Sand Rd. (West Bloomfield) and Route 64 Junction (East Bloomfield) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:10:30Z"},"road_event_id":"29//BpxSu13Pg7sIjtdbYXFypCU=","beginning_cross_street":"Sand Rd.","ending_cross_street":"Route 64 Junction","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.484777,42.902488]]}},{"id":"zH9+r98HdqsdOuq+MZ1QaOxghVM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"o/dC08EzQu/yf9Zgzoi91K2dQWQ="}],"description":"Utility work on NY 64 both directions between Canan Rd (West Bloomfield) and Ontario and Monroe County Line (West Bloomfield) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:15:35Z"},"road_event_id":"zH9+r98HdqsdOuq+MZ1QaOxghVM=","beginning_cross_street":"Canan Rd","ending_cross_street":"Ontario and Monroe County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.46838,42.922199]]}},{"id":"o/dC08EzQu/yf9Zgzoi91K2dQWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zH9+r98HdqsdOuq+MZ1QaOxghVM="},{"type":"next-occurrence","id":"XxX4VSf2hSirz/BDA6O8XjFrbYQ="}],"description":"Utility work on NY 64 both directions between Canan Rd (West Bloomfield) and Ontario and Monroe County Line (West Bloomfield) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:15:35Z"},"road_event_id":"o/dC08EzQu/yf9Zgzoi91K2dQWQ=","beginning_cross_street":"Canan Rd","ending_cross_street":"Ontario and Monroe County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.46838,42.922199]]}},{"id":"XxX4VSf2hSirz/BDA6O8XjFrbYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zH9+r98HdqsdOuq+MZ1QaOxghVM="}],"description":"Utility work on NY 64 both directions between Canan Rd (West Bloomfield) and Ontario and Monroe County Line (West Bloomfield) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:15:35Z"},"road_event_id":"XxX4VSf2hSirz/BDA6O8XjFrbYQ=","beginning_cross_street":"Canan Rd","ending_cross_street":"Ontario and Monroe County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.46838,42.922199]]}},{"id":"GQIhB5ZwXeBICAKUUlQdIk3K2GQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"c7DIgPFlwk6Wjwih0UslI0Vl/F4="}],"description":"Utility work on US 209 northbound between Joshua Avenue (Wawarsing) and Foordmore Road (Wawarsing) 2025082234837/32655109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T19:31:19Z"},"road_event_id":"GQIhB5ZwXeBICAKUUlQdIk3K2GQ=","beginning_cross_street":"Joshua Avenue","ending_cross_street":"Foordmore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.347844,41.762227]]}},{"id":"c7DIgPFlwk6Wjwih0UslI0Vl/F4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GQIhB5ZwXeBICAKUUlQdIk3K2GQ="},{"type":"next-occurrence","id":"TJQJLPPTXPs+Eh25mOoTOIeFd1w="}],"description":"Utility work on US 209 northbound between Joshua Avenue (Wawarsing) and Foordmore Road (Wawarsing) 2025082234837/32655109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T19:31:19Z"},"road_event_id":"c7DIgPFlwk6Wjwih0UslI0Vl/F4=","beginning_cross_street":"Joshua Avenue","ending_cross_street":"Foordmore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.347844,41.762227]]}},{"id":"TJQJLPPTXPs+Eh25mOoTOIeFd1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GQIhB5ZwXeBICAKUUlQdIk3K2GQ="}],"description":"Utility work on US 209 northbound between Joshua Avenue (Wawarsing) and Foordmore Road (Wawarsing) 2025082234837/32655109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T19:31:19Z"},"road_event_id":"TJQJLPPTXPs+Eh25mOoTOIeFd1w=","beginning_cross_street":"Joshua Avenue","ending_cross_street":"Foordmore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.347844,41.762227]]}},{"id":"XQce9RE6AXf/YgdOy3qtEiGBzkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+k6pWxszr3BDXwQ0/oG9t1g4zu8="}],"description":"Construction on I-278 both directions between END ROUTE; I-95 (New York) and I-95 - New England Thruway at After Exit 14(I-95) - Huchinson River Parkway South (New York), Tuesday May 5th,2026 thru Saturday May 16th,2026, Sunday thru Saturday, 10:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed eastbound, westbound","update_date":"2026-05-12T19:00:12Z"},"road_event_id":"XQce9RE6AXf/YgdOy3qtEiGBzkc=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"After Exit 14(I-95) - Huchinson River Parkway South","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835163,40.829252]]}},{"id":"+k6pWxszr3BDXwQ0/oG9t1g4zu8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XQce9RE6AXf/YgdOy3qtEiGBzkc="},{"type":"next-occurrence","id":"rsl2kykA0PWTzzgSMchx34OY0sI="}],"description":"Construction on I-278 both directions between END ROUTE; I-95 (New York) and I-95 - New England Thruway at After Exit 14(I-95) - Huchinson River Parkway South (New York), Tuesday May 5th,2026 thru Saturday May 16th,2026, Sunday thru Saturday, 10:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed eastbound, westbound","update_date":"2026-05-12T19:00:12Z"},"road_event_id":"+k6pWxszr3BDXwQ0/oG9t1g4zu8=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"After Exit 14(I-95) - Huchinson River Parkway South","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835163,40.829252]]}},{"id":"rsl2kykA0PWTzzgSMchx34OY0sI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XQce9RE6AXf/YgdOy3qtEiGBzkc="},{"type":"next-occurrence","id":"HYGEozAz4h00GhDGRr3mhjBvYd4="}],"description":"Construction on I-278 both directions between END ROUTE; I-95 (New York) and I-95 - New England Thruway at After Exit 14(I-95) - Huchinson River Parkway South (New York), Tuesday May 5th,2026 thru Saturday May 16th,2026, Sunday thru Saturday, 10:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed eastbound, westbound","update_date":"2026-05-12T19:00:12Z"},"road_event_id":"rsl2kykA0PWTzzgSMchx34OY0sI=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"After Exit 14(I-95) - Huchinson River Parkway South","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835163,40.829252]]}},{"id":"HYGEozAz4h00GhDGRr3mhjBvYd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XQce9RE6AXf/YgdOy3qtEiGBzkc="}],"description":"Construction on I-278 both directions between END ROUTE; I-95 (New York) and I-95 - New England Thruway at After Exit 14(I-95) - Huchinson River Parkway South (New York), Tuesday May 5th,2026 thru Saturday May 16th,2026, Sunday thru Saturday, 10:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed eastbound, westbound","update_date":"2026-05-12T19:00:12Z"},"road_event_id":"HYGEozAz4h00GhDGRr3mhjBvYd4=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"After Exit 14(I-95) - Huchinson River Parkway South","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T14:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835163,40.829252]]}},{"id":"iHrsf6mhZwR85oigmnMbTVcqBH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NbrJys18rPAeHCg5R4Ld1vqQ9zY="}],"description":"Construction on I-278 both directions between East 138th Street; I-278-Bruckner Expressway (New York) and END ROUTE; I-95 (New York), Monday May 11th,2026 thru Thursday May 14th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed eastbound, westbound","update_date":"2026-05-08T19:00:41Z"},"road_event_id":"iHrsf6mhZwR85oigmnMbTVcqBH4=","beginning_cross_street":"East 138th Street; I-278-Bruckner Expressway","ending_cross_street":"END ROUTE; I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912029,40.804525]]}},{"id":"NbrJys18rPAeHCg5R4Ld1vqQ9zY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iHrsf6mhZwR85oigmnMbTVcqBH4="}],"description":"Construction on I-278 both directions between East 138th Street; I-278-Bruckner Expressway (New York) and END ROUTE; I-95 (New York), Monday May 11th,2026 thru Thursday May 14th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed eastbound, westbound","update_date":"2026-05-08T19:00:41Z"},"road_event_id":"NbrJys18rPAeHCg5R4Ld1vqQ9zY=","beginning_cross_street":"East 138th Street; I-278-Bruckner Expressway","ending_cross_street":"END ROUTE; I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912029,40.804525]]}},{"id":"fe1T210W277rVe9ffhptFQs+lvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[],"description":"Road maintenance operations on NY 9A southbound between Beverley Road (Mount Pleasant) and Old Saw Mill River Road (Mount Pleasant) Res 8-9 RW/, Continuous Friday May 1st, 2026 2:30 PM thru Monday June 1st, 2026 11:59 PM right lane closures","update_date":"2026-05-01T18:27:58Z"},"road_event_id":"fe1T210W277rVe9ffhptFQs+lvA=","beginning_cross_street":"Beverley Road","ending_cross_street":"Old Saw Mill River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.808306,41.098166]]}},{"id":"GUZ5eSXwdeO2YaaMH+eetLCAVHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0tUERawDs6Ae2soSqJfWxNpoU6w="}],"description":"Repaving on NY 9N both directions between NY 74; NY 22 (Ticonderoga) and Shore Airport Road (Ticonderoga) alternating lanes , Monday May 11th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-01T19:45:43Z"},"road_event_id":"GUZ5eSXwdeO2YaaMH+eetLCAVHM=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Shore Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437965,43.858831]]}},{"id":"0tUERawDs6Ae2soSqJfWxNpoU6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUZ5eSXwdeO2YaaMH+eetLCAVHM="},{"type":"next-occurrence","id":"fzajycsfW7ndMoSgK7lGjnabp+E="}],"description":"Repaving on NY 9N both directions between NY 74; NY 22 (Ticonderoga) and Shore Airport Road (Ticonderoga) alternating lanes , Monday May 11th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-01T19:45:43Z"},"road_event_id":"0tUERawDs6Ae2soSqJfWxNpoU6w=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Shore Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437965,43.858831]]}},{"id":"fzajycsfW7ndMoSgK7lGjnabp+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUZ5eSXwdeO2YaaMH+eetLCAVHM="},{"type":"next-occurrence","id":"2SsPUnhtb+nJkCOzT7iC/P3Jn2I="}],"description":"Repaving on NY 9N both directions between NY 74; NY 22 (Ticonderoga) and Shore Airport Road (Ticonderoga) alternating lanes , Monday May 11th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-01T19:45:43Z"},"road_event_id":"fzajycsfW7ndMoSgK7lGjnabp+E=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Shore Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437965,43.858831]]}},{"id":"2SsPUnhtb+nJkCOzT7iC/P3Jn2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUZ5eSXwdeO2YaaMH+eetLCAVHM="},{"type":"next-occurrence","id":"vSEHf33NiIUAcJE1cKgzXAUEKG0="}],"description":"Repaving on NY 9N both directions between NY 74; NY 22 (Ticonderoga) and Shore Airport Road (Ticonderoga) alternating lanes , Monday May 11th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-01T19:45:43Z"},"road_event_id":"2SsPUnhtb+nJkCOzT7iC/P3Jn2I=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Shore Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437965,43.858831]]}},{"id":"vSEHf33NiIUAcJE1cKgzXAUEKG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUZ5eSXwdeO2YaaMH+eetLCAVHM="},{"type":"next-occurrence","id":"KjLPSv7t3b3jPeGhho+gak8SYyk="}],"description":"Repaving on NY 9N both directions between NY 74; NY 22 (Ticonderoga) and Shore Airport Road (Ticonderoga) alternating lanes , Monday May 11th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-01T19:45:43Z"},"road_event_id":"vSEHf33NiIUAcJE1cKgzXAUEKG0=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Shore Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437965,43.858831]]}},{"id":"KjLPSv7t3b3jPeGhho+gak8SYyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUZ5eSXwdeO2YaaMH+eetLCAVHM="},{"type":"next-occurrence","id":"YbDiRtQ+0XOL9a0lC0Ss3+PvfgU="}],"description":"Repaving on NY 9N both directions between NY 74; NY 22 (Ticonderoga) and Shore Airport Road (Ticonderoga) alternating lanes , Monday May 11th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-01T19:45:43Z"},"road_event_id":"KjLPSv7t3b3jPeGhho+gak8SYyk=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Shore Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437965,43.858831]]}},{"id":"YbDiRtQ+0XOL9a0lC0Ss3+PvfgU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUZ5eSXwdeO2YaaMH+eetLCAVHM="},{"type":"next-occurrence","id":"7XTGiA3IjQnxOtcTRrr4H0jAfuQ="}],"description":"Repaving on NY 9N both directions between NY 74; NY 22 (Ticonderoga) and Shore Airport Road (Ticonderoga) alternating lanes , Monday May 11th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-01T19:45:43Z"},"road_event_id":"YbDiRtQ+0XOL9a0lC0Ss3+PvfgU=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Shore Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437965,43.858831]]}},{"id":"7XTGiA3IjQnxOtcTRrr4H0jAfuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUZ5eSXwdeO2YaaMH+eetLCAVHM="},{"type":"next-occurrence","id":"4NkdWHYHXaCFkslLwiCQaQeBg9s="}],"description":"Repaving on NY 9N both directions between NY 74; NY 22 (Ticonderoga) and Shore Airport Road (Ticonderoga) alternating lanes , Monday May 11th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-01T19:45:43Z"},"road_event_id":"7XTGiA3IjQnxOtcTRrr4H0jAfuQ=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Shore Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437965,43.858831]]}},{"id":"4NkdWHYHXaCFkslLwiCQaQeBg9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUZ5eSXwdeO2YaaMH+eetLCAVHM="},{"type":"next-occurrence","id":"jM0aPyMn2tParCRibbHTTTA51F0="}],"description":"Repaving on NY 9N both directions between NY 74; NY 22 (Ticonderoga) and Shore Airport Road (Ticonderoga) alternating lanes , Monday May 11th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-01T19:45:43Z"},"road_event_id":"4NkdWHYHXaCFkslLwiCQaQeBg9s=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Shore Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437965,43.858831]]}},{"id":"jM0aPyMn2tParCRibbHTTTA51F0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUZ5eSXwdeO2YaaMH+eetLCAVHM="},{"type":"next-occurrence","id":"fca25PuQsOVczv2ax4hvb6HtuNE="}],"description":"Repaving on NY 9N both directions between NY 74; NY 22 (Ticonderoga) and Shore Airport Road (Ticonderoga) alternating lanes , Monday May 11th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-01T19:45:43Z"},"road_event_id":"jM0aPyMn2tParCRibbHTTTA51F0=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Shore Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437965,43.858831]]}},{"id":"fca25PuQsOVczv2ax4hvb6HtuNE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUZ5eSXwdeO2YaaMH+eetLCAVHM="},{"type":"next-occurrence","id":"wnPaM3jtQWUqxtRJEqEQJBxE2Bo="}],"description":"Repaving on NY 9N both directions between NY 74; NY 22 (Ticonderoga) and Shore Airport Road (Ticonderoga) alternating lanes , Monday May 11th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-01T19:45:43Z"},"road_event_id":"fca25PuQsOVczv2ax4hvb6HtuNE=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Shore Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437965,43.858831]]}},{"id":"wnPaM3jtQWUqxtRJEqEQJBxE2Bo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUZ5eSXwdeO2YaaMH+eetLCAVHM="},{"type":"next-occurrence","id":"Cc8bHRnvjEVaga4mALBvrZPzLWM="}],"description":"Repaving on NY 9N both directions between NY 74; NY 22 (Ticonderoga) and Shore Airport Road (Ticonderoga) alternating lanes , Monday May 11th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-01T19:45:43Z"},"road_event_id":"wnPaM3jtQWUqxtRJEqEQJBxE2Bo=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Shore Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T11:00:00Z","end_date":"2026-05-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437965,43.858831]]}},{"id":"Cc8bHRnvjEVaga4mALBvrZPzLWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUZ5eSXwdeO2YaaMH+eetLCAVHM="},{"type":"next-occurrence","id":"1kT2yDRcZVenOAwCRB3ufrFBsaE="}],"description":"Repaving on NY 9N both directions between NY 74; NY 22 (Ticonderoga) and Shore Airport Road (Ticonderoga) alternating lanes , Monday May 11th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-01T19:45:43Z"},"road_event_id":"Cc8bHRnvjEVaga4mALBvrZPzLWM=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Shore Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437965,43.858831]]}},{"id":"1kT2yDRcZVenOAwCRB3ufrFBsaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUZ5eSXwdeO2YaaMH+eetLCAVHM="},{"type":"next-occurrence","id":"Yabika9Vk45Ca7tYgkV/MfJfG6M="}],"description":"Repaving on NY 9N both directions between NY 74; NY 22 (Ticonderoga) and Shore Airport Road (Ticonderoga) alternating lanes , Monday May 11th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-01T19:45:43Z"},"road_event_id":"1kT2yDRcZVenOAwCRB3ufrFBsaE=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Shore Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437965,43.858831]]}},{"id":"Yabika9Vk45Ca7tYgkV/MfJfG6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUZ5eSXwdeO2YaaMH+eetLCAVHM="}],"description":"Repaving on NY 9N both directions between NY 74; NY 22 (Ticonderoga) and Shore Airport Road (Ticonderoga) alternating lanes , Monday May 11th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-01T19:45:43Z"},"road_event_id":"Yabika9Vk45Ca7tYgkV/MfJfG6M=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Shore Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437965,43.858831]]}},{"id":"7TJf/ctiUaodAyu2Wx0MiGEtjdg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[],"description":"Repairs on Newark AirTrain both directions between Newark Liberty Airport Station (Newark) and Terminal A (Newark) Service will be suspended. Free shuttle bus service will be provided as an alternative., Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday, 08:00 PM thru 07:00 AM","update_date":"2026-05-10T10:00:21Z"},"road_event_id":"7TJf/ctiUaodAyu2Wx0MiGEtjdg=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"Terminal A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T20:00:00Z","end_date":"2026-05-18T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"cNWBQ4x9LI987TcF4X+GShfuwJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AQeBZrtBHBParnW9Q9ldyztonuI="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-01T20:29:14Z"},"road_event_id":"cNWBQ4x9LI987TcF4X+GShfuwJU=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"AQeBZrtBHBParnW9Q9ldyztonuI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cNWBQ4x9LI987TcF4X+GShfuwJU="},{"type":"next-occurrence","id":"lLF69RbNMmsj7PSpqgaXoQ2Y2v4="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-01T20:29:14Z"},"road_event_id":"AQeBZrtBHBParnW9Q9ldyztonuI=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"lLF69RbNMmsj7PSpqgaXoQ2Y2v4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cNWBQ4x9LI987TcF4X+GShfuwJU="},{"type":"next-occurrence","id":"6iQ7oAt3IH49PeHAstnjdJDXwFk="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-01T20:29:14Z"},"road_event_id":"lLF69RbNMmsj7PSpqgaXoQ2Y2v4=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"6iQ7oAt3IH49PeHAstnjdJDXwFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cNWBQ4x9LI987TcF4X+GShfuwJU="},{"type":"next-occurrence","id":"1IV+qgKRfwKQLB8P5rCDnVNqIfY="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-01T20:29:14Z"},"road_event_id":"6iQ7oAt3IH49PeHAstnjdJDXwFk=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"1IV+qgKRfwKQLB8P5rCDnVNqIfY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cNWBQ4x9LI987TcF4X+GShfuwJU="},{"type":"next-occurrence","id":"BqEF4wojW51KFTA3Ihg2f5u76Es="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-01T20:29:14Z"},"road_event_id":"1IV+qgKRfwKQLB8P5rCDnVNqIfY=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"BqEF4wojW51KFTA3Ihg2f5u76Es=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cNWBQ4x9LI987TcF4X+GShfuwJU="},{"type":"next-occurrence","id":"6ixe3pzArlxX9BwDlCD1R9SpJ1Y="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-01T20:29:14Z"},"road_event_id":"BqEF4wojW51KFTA3Ihg2f5u76Es=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"6ixe3pzArlxX9BwDlCD1R9SpJ1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cNWBQ4x9LI987TcF4X+GShfuwJU="},{"type":"next-occurrence","id":"lcw4zMwKZpQFS9WhwUtq/O/sacE="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-01T20:29:14Z"},"road_event_id":"6ixe3pzArlxX9BwDlCD1R9SpJ1Y=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"lcw4zMwKZpQFS9WhwUtq/O/sacE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cNWBQ4x9LI987TcF4X+GShfuwJU="},{"type":"next-occurrence","id":"1zG5QHpbhbaam3Lwfkj3mKFTB3M="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-01T20:29:14Z"},"road_event_id":"lcw4zMwKZpQFS9WhwUtq/O/sacE=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"1zG5QHpbhbaam3Lwfkj3mKFTB3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cNWBQ4x9LI987TcF4X+GShfuwJU="},{"type":"next-occurrence","id":"KFUM8BSnIFQwtNpiU+jIzE/Eb1k="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-01T20:29:14Z"},"road_event_id":"1zG5QHpbhbaam3Lwfkj3mKFTB3M=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"KFUM8BSnIFQwtNpiU+jIzE/Eb1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cNWBQ4x9LI987TcF4X+GShfuwJU="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-01T20:29:14Z"},"road_event_id":"KFUM8BSnIFQwtNpiU+jIzE/Eb1k=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"bPhSP3D7ycWJCMVHcia5TRK4Yq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fUNDEFCJ9k8qnwRqlp5NU01blKg="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to Rockaway Boulevard (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed southbound, , Friday May 15th,2026 11:00 PM thru 11:59 PM 1 Right lane of 4 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:59 PM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Saturday May 16th,2026 05:00 AM thru 08:00 AM 1 Right lane of 4 lanes closed southbound,","update_date":"2026-05-09T12:00:02Z"},"road_event_id":"bPhSP3D7ycWJCMVHcia5TRK4Yq4=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Rockaway Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803277,40.677548]]}},{"id":"fUNDEFCJ9k8qnwRqlp5NU01blKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bPhSP3D7ycWJCMVHcia5TRK4Yq4="},{"type":"next-occurrence","id":"gL++cSfdBixHhczTVHA6+DJ3Q34="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to Rockaway Boulevard (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed southbound, , Friday May 15th,2026 11:00 PM thru 11:59 PM 1 Right lane of 4 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:59 PM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Saturday May 16th,2026 05:00 AM thru 08:00 AM 1 Right lane of 4 lanes closed southbound,","update_date":"2026-05-09T12:00:02Z"},"road_event_id":"fUNDEFCJ9k8qnwRqlp5NU01blKg=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Rockaway Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803277,40.677548]]}},{"id":"gL++cSfdBixHhczTVHA6+DJ3Q34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bPhSP3D7ycWJCMVHcia5TRK4Yq4="},{"type":"next-occurrence","id":"wIeI4ugfmaBLtIH7BVAbqM7z4Hk="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to Rockaway Boulevard (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed southbound, , Friday May 15th,2026 11:00 PM thru 11:59 PM 1 Right lane of 4 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:59 PM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Saturday May 16th,2026 05:00 AM thru 08:00 AM 1 Right lane of 4 lanes closed southbound,","update_date":"2026-05-09T12:00:02Z"},"road_event_id":"gL++cSfdBixHhczTVHA6+DJ3Q34=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Rockaway Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803277,40.677548]]}},{"id":"wIeI4ugfmaBLtIH7BVAbqM7z4Hk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bPhSP3D7ycWJCMVHcia5TRK4Yq4="},{"type":"next-occurrence","id":"+JL0XisuenbtDn8ceTzf1+sMI70="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to Rockaway Boulevard (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed southbound, , Friday May 15th,2026 11:00 PM thru 11:59 PM 1 Right lane of 4 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:59 PM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Saturday May 16th,2026 05:00 AM thru 08:00 AM 1 Right lane of 4 lanes closed southbound,","update_date":"2026-05-09T12:00:02Z"},"road_event_id":"wIeI4ugfmaBLtIH7BVAbqM7z4Hk=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Rockaway Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T14:00:00Z","end_date":"2026-05-16T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803277,40.677548]]}},{"id":"+JL0XisuenbtDn8ceTzf1+sMI70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bPhSP3D7ycWJCMVHcia5TRK4Yq4="},{"type":"next-occurrence","id":"GlHy7kkyT8S0oVYzLB1nogooDZ4="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to Rockaway Boulevard (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed southbound, , Friday May 15th,2026 11:00 PM thru 11:59 PM 1 Right lane of 4 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:59 PM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Saturday May 16th,2026 05:00 AM thru 08:00 AM 1 Right lane of 4 lanes closed southbound,","update_date":"2026-05-09T12:00:02Z"},"road_event_id":"+JL0XisuenbtDn8ceTzf1+sMI70=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Rockaway Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T02:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803277,40.677548]]}},{"id":"GlHy7kkyT8S0oVYzLB1nogooDZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bPhSP3D7ycWJCMVHcia5TRK4Yq4="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to Rockaway Boulevard (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed southbound, , Friday May 15th,2026 11:00 PM thru 11:59 PM 1 Right lane of 4 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:59 PM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Saturday May 16th,2026 05:00 AM thru 08:00 AM 1 Right lane of 4 lanes closed southbound,","update_date":"2026-05-09T12:00:02Z"},"road_event_id":"GlHy7kkyT8S0oVYzLB1nogooDZ4=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Rockaway Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T03:58:00Z","end_date":"2026-05-17T08:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803277,40.677548]]}},{"id":"C7t07drgTTz9DZglevxVoBwnF/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Z9Qt/CrnEEUpIB9wwm/HDXKat2M="}],"description":"Utility work on US 20 eastbound between Peoria Rd (Pavilion) and 2371 Telephone Rd (York) Placing/splicing aerial/underground cable. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossing. Work beyond shoulder., Monday April 6th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:07:41Z"},"road_event_id":"C7t07drgTTz9DZglevxVoBwnF/g=","beginning_cross_street":"Peoria Rd","ending_cross_street":"2371 Telephone Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.966096,42.911804]]}},{"id":"Z9Qt/CrnEEUpIB9wwm/HDXKat2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C7t07drgTTz9DZglevxVoBwnF/g="},{"type":"next-occurrence","id":"/oIIp/kJjrzNr9a1bKeuppsTcSs="}],"description":"Utility work on US 20 eastbound between Peoria Rd (Pavilion) and 2371 Telephone Rd (York) Placing/splicing aerial/underground cable. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossing. Work beyond shoulder., Monday April 6th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:07:41Z"},"road_event_id":"Z9Qt/CrnEEUpIB9wwm/HDXKat2M=","beginning_cross_street":"Peoria Rd","ending_cross_street":"2371 Telephone Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.966096,42.911804]]}},{"id":"/oIIp/kJjrzNr9a1bKeuppsTcSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C7t07drgTTz9DZglevxVoBwnF/g="}],"description":"Utility work on US 20 eastbound between Peoria Rd (Pavilion) and 2371 Telephone Rd (York) Placing/splicing aerial/underground cable. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossing. Work beyond shoulder., Monday April 6th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:07:41Z"},"road_event_id":"/oIIp/kJjrzNr9a1bKeuppsTcSs=","beginning_cross_street":"Peoria Rd","ending_cross_street":"2371 Telephone Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.966096,42.911804]]}},{"id":"UcOwRH2fhzx0fNNRiwC5AknSKZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EBBQfjZB5OemDrAfFeV97J9wBE0="}],"description":"Utility work on NY 31 eastbound between HARTSHORN DR (Sweden) and Sherry Ln (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday April 13th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:11:39Z"},"road_event_id":"UcOwRH2fhzx0fNNRiwC5AknSKZY=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"Sherry Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954872,43.19835]]}},{"id":"EBBQfjZB5OemDrAfFeV97J9wBE0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UcOwRH2fhzx0fNNRiwC5AknSKZY="},{"type":"next-occurrence","id":"J8CUzZfNMKgpGOguhijw5bPjFrk="}],"description":"Utility work on NY 31 eastbound between HARTSHORN DR (Sweden) and Sherry Ln (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday April 13th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:11:39Z"},"road_event_id":"EBBQfjZB5OemDrAfFeV97J9wBE0=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"Sherry Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954872,43.19835]]}},{"id":"J8CUzZfNMKgpGOguhijw5bPjFrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UcOwRH2fhzx0fNNRiwC5AknSKZY="},{"type":"next-occurrence","id":"i1llQYluEMc0EfQLOPwX4/uYwFI="}],"description":"Utility work on NY 31 eastbound between HARTSHORN DR (Sweden) and Sherry Ln (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday April 13th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:11:39Z"},"road_event_id":"J8CUzZfNMKgpGOguhijw5bPjFrk=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"Sherry Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954872,43.19835]]}},{"id":"i1llQYluEMc0EfQLOPwX4/uYwFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UcOwRH2fhzx0fNNRiwC5AknSKZY="},{"type":"next-occurrence","id":"zuEE6xj3i9w6HI8u3g0WyXUStOg="}],"description":"Utility work on NY 31 eastbound between HARTSHORN DR (Sweden) and Sherry Ln (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday April 13th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:11:39Z"},"road_event_id":"i1llQYluEMc0EfQLOPwX4/uYwFI=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"Sherry Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954872,43.19835]]}},{"id":"zuEE6xj3i9w6HI8u3g0WyXUStOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UcOwRH2fhzx0fNNRiwC5AknSKZY="},{"type":"next-occurrence","id":"5URuwSb9jw+W2YO//qApJ/2ryDE="}],"description":"Utility work on NY 31 eastbound between HARTSHORN DR (Sweden) and Sherry Ln (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday April 13th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:11:39Z"},"road_event_id":"zuEE6xj3i9w6HI8u3g0WyXUStOg=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"Sherry Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954872,43.19835]]}},{"id":"5URuwSb9jw+W2YO//qApJ/2ryDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UcOwRH2fhzx0fNNRiwC5AknSKZY="},{"type":"next-occurrence","id":"aBkTjapTmrPfWuQLxZJ4spakEWU="}],"description":"Utility work on NY 31 eastbound between HARTSHORN DR (Sweden) and Sherry Ln (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday April 13th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:11:39Z"},"road_event_id":"5URuwSb9jw+W2YO//qApJ/2ryDE=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"Sherry Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954872,43.19835]]}},{"id":"aBkTjapTmrPfWuQLxZJ4spakEWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UcOwRH2fhzx0fNNRiwC5AknSKZY="}],"description":"Utility work on NY 31 eastbound between HARTSHORN DR (Sweden) and Sherry Ln (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday April 13th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:11:39Z"},"road_event_id":"aBkTjapTmrPfWuQLxZJ4spakEWU=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"Sherry Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954872,43.19835]]}},{"id":"jjVAbJjNxQqHMbnvBaYAvE4+BT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AZ77REiKdqojVnNYX6UGmBFov5w="}],"description":"Utility work on NY 96 southbound at Pelham Rd (Brighton) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T23:34:11Z"},"road_event_id":"jjVAbJjNxQqHMbnvBaYAvE4+BT0=","beginning_cross_street":"Pelham Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.544709,43.14079]]}},{"id":"AZ77REiKdqojVnNYX6UGmBFov5w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jjVAbJjNxQqHMbnvBaYAvE4+BT0="},{"type":"next-occurrence","id":"xS2KeKRGBw9DikPHiZdZwu1juHU="}],"description":"Utility work on NY 96 southbound at Pelham Rd (Brighton) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T23:34:11Z"},"road_event_id":"AZ77REiKdqojVnNYX6UGmBFov5w=","beginning_cross_street":"Pelham Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.544709,43.14079]]}},{"id":"xS2KeKRGBw9DikPHiZdZwu1juHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jjVAbJjNxQqHMbnvBaYAvE4+BT0="}],"description":"Utility work on NY 96 southbound at Pelham Rd (Brighton) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday May 4th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T23:34:11Z"},"road_event_id":"xS2KeKRGBw9DikPHiZdZwu1juHU=","beginning_cross_street":"Pelham Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.544709,43.14079]]}},{"id":"vbag8mMMsVGLGAGFop9MR9RccsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QcJcZ43fW3S/uTZAEh2R6gkYqdA="}],"description":"Utility work on US 20A northbound from Vincent Hill Rd (Bristol) to Whalen Rd (East Bloomfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Friday May 1st, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:09:06Z"},"road_event_id":"vbag8mMMsVGLGAGFop9MR9RccsU=","beginning_cross_street":"Vincent Hill Rd ","ending_cross_street":"Whalen Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.401108,42.835149]]}},{"id":"QcJcZ43fW3S/uTZAEh2R6gkYqdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vbag8mMMsVGLGAGFop9MR9RccsU="},{"type":"next-occurrence","id":"XKQ52P3d/YNRUD4rQ6d/nRxI/SE="}],"description":"Utility work on US 20A northbound from Vincent Hill Rd (Bristol) to Whalen Rd (East Bloomfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Friday May 1st, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:09:06Z"},"road_event_id":"QcJcZ43fW3S/uTZAEh2R6gkYqdA=","beginning_cross_street":"Vincent Hill Rd ","ending_cross_street":"Whalen Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.401108,42.835149]]}},{"id":"XKQ52P3d/YNRUD4rQ6d/nRxI/SE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vbag8mMMsVGLGAGFop9MR9RccsU="}],"description":"Utility work on US 20A northbound from Vincent Hill Rd (Bristol) to Whalen Rd (East Bloomfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Friday May 1st, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:09:06Z"},"road_event_id":"XKQ52P3d/YNRUD4rQ6d/nRxI/SE=","beginning_cross_street":"Vincent Hill Rd ","ending_cross_street":"Whalen Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.401108,42.835149]]}},{"id":"xT7GVEZZ1f+zppSe6RdxyqmsNok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"u7lc0/iRjWM6ukyenWM0zRSK5Fk="}],"description":"Utility work on NY 19 both directions between Shumway Rd (Sweden) and Brookdale Rd (Sweden) Alternating lane closures with flaggers as needed, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:14:38Z"},"road_event_id":"xT7GVEZZ1f+zppSe6RdxyqmsNok=","beginning_cross_street":"Shumway Rd","ending_cross_street":"Brookdale Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.94439,43.186997]]}},{"id":"u7lc0/iRjWM6ukyenWM0zRSK5Fk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xT7GVEZZ1f+zppSe6RdxyqmsNok="},{"type":"next-occurrence","id":"zlSB20k/hwITJXpoPuUqPrLQjys="}],"description":"Utility work on NY 19 both directions between Shumway Rd (Sweden) and Brookdale Rd (Sweden) Alternating lane closures with flaggers as needed, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:14:38Z"},"road_event_id":"u7lc0/iRjWM6ukyenWM0zRSK5Fk=","beginning_cross_street":"Shumway Rd","ending_cross_street":"Brookdale Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.94439,43.186997]]}},{"id":"zlSB20k/hwITJXpoPuUqPrLQjys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xT7GVEZZ1f+zppSe6RdxyqmsNok="}],"description":"Utility work on NY 19 both directions between Shumway Rd (Sweden) and Brookdale Rd (Sweden) Alternating lane closures with flaggers as needed, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:14:38Z"},"road_event_id":"zlSB20k/hwITJXpoPuUqPrLQjys=","beginning_cross_street":"Shumway Rd","ending_cross_street":"Brookdale Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.94439,43.186997]]}},{"id":"n5uy0AYwibq+nzEKYlA9DC4gKDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"m5W5C7hfXTMkq85D7SI02hyEID4="}],"description":"Construction on I-278 westbound from Union Street (New York) to Summit Street (New York) Subject to change without notice., Tuesday May 12th,2026 thru Saturday May 16th,2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 1 Left lane of 3 lanes closed westbound, , Wednesday May 6th,2026 thru Saturday May 16th,2026, Sunday thru Saturday, 01:00 AM thru 06:00 AM 2 Left lanes of 3 lanes closed westbound,","update_date":"2026-05-09T10:00:15Z"},"road_event_id":"n5uy0AYwibq+nzEKYlA9DC4gKDg=","beginning_cross_street":"Union Street","ending_cross_street":"Summit Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:01:00Z","end_date":"2026-05-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.001837,40.683314]]}},{"id":"m5W5C7hfXTMkq85D7SI02hyEID4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n5uy0AYwibq+nzEKYlA9DC4gKDg="},{"type":"next-occurrence","id":"KNQLpcqNDK55ldZ2jgtn2PvBenw="}],"description":"Construction on I-278 westbound from Union Street (New York) to Summit Street (New York) Subject to change without notice., Tuesday May 12th,2026 thru Saturday May 16th,2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 1 Left lane of 3 lanes closed westbound, , Wednesday May 6th,2026 thru Saturday May 16th,2026, Sunday thru Saturday, 01:00 AM thru 06:00 AM 2 Left lanes of 3 lanes closed westbound,","update_date":"2026-05-09T10:00:15Z"},"road_event_id":"m5W5C7hfXTMkq85D7SI02hyEID4=","beginning_cross_street":"Union Street","ending_cross_street":"Summit Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:01:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.001837,40.683314]]}},{"id":"KNQLpcqNDK55ldZ2jgtn2PvBenw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n5uy0AYwibq+nzEKYlA9DC4gKDg="},{"type":"next-occurrence","id":"vaqEvlf/zRwiaa/ds9PqcU7+SoM="}],"description":"Construction on I-278 westbound from Union Street (New York) to Summit Street (New York) Subject to change without notice., Tuesday May 12th,2026 thru Saturday May 16th,2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 1 Left lane of 3 lanes closed westbound, , Wednesday May 6th,2026 thru Saturday May 16th,2026, Sunday thru Saturday, 01:00 AM thru 06:00 AM 2 Left lanes of 3 lanes closed westbound,","update_date":"2026-05-09T10:00:15Z"},"road_event_id":"KNQLpcqNDK55ldZ2jgtn2PvBenw=","beginning_cross_street":"Union Street","ending_cross_street":"Summit Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T04:01:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.001837,40.683314]]}},{"id":"vaqEvlf/zRwiaa/ds9PqcU7+SoM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n5uy0AYwibq+nzEKYlA9DC4gKDg="}],"description":"Construction on I-278 westbound from Union Street (New York) to Summit Street (New York) Subject to change without notice., Tuesday May 12th,2026 thru Saturday May 16th,2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 1 Left lane of 3 lanes closed westbound, , Wednesday May 6th,2026 thru Saturday May 16th,2026, Sunday thru Saturday, 01:00 AM thru 06:00 AM 2 Left lanes of 3 lanes closed westbound,","update_date":"2026-05-09T10:00:15Z"},"road_event_id":"vaqEvlf/zRwiaa/ds9PqcU7+SoM=","beginning_cross_street":"Union Street","ending_cross_street":"Summit Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:01:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.001837,40.683314]]}},{"id":"631hOC40tL86KKUL0qfU1kFlEA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"50ZY7E7NuHpfgaT478QPYeNpZPE="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Exit 9 - East 42nd Street (New York) and Exit 9 - East 42nd Street (New York) Subject to change without notice., Monday May 4th,2026 thru Friday May 15th,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM 2 Left lanes of 3 lanes closed northbound, southbound","update_date":"2026-05-09T09:00:04Z"},"road_event_id":"631hOC40tL86KKUL0qfU1kFlEA0=","beginning_cross_street":"Exit 9 - East 42nd Street","ending_cross_street":"Exit 9 - East 42nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971981,40.743197]]}},{"id":"50ZY7E7NuHpfgaT478QPYeNpZPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"631hOC40tL86KKUL0qfU1kFlEA0="},{"type":"next-occurrence","id":"bKFF5asL0ZLVDubM3jTIoNnESL4="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Exit 9 - East 42nd Street (New York) and Exit 9 - East 42nd Street (New York) Subject to change without notice., Monday May 4th,2026 thru Friday May 15th,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM 2 Left lanes of 3 lanes closed northbound, southbound","update_date":"2026-05-09T09:00:04Z"},"road_event_id":"50ZY7E7NuHpfgaT478QPYeNpZPE=","beginning_cross_street":"Exit 9 - East 42nd Street","ending_cross_street":"Exit 9 - East 42nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971981,40.743197]]}},{"id":"bKFF5asL0ZLVDubM3jTIoNnESL4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"631hOC40tL86KKUL0qfU1kFlEA0="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Exit 9 - East 42nd Street (New York) and Exit 9 - East 42nd Street (New York) Subject to change without notice., Monday May 4th,2026 thru Friday May 15th,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM 2 Left lanes of 3 lanes closed northbound, southbound","update_date":"2026-05-09T09:00:04Z"},"road_event_id":"bKFF5asL0ZLVDubM3jTIoNnESL4=","beginning_cross_street":"Exit 9 - East 42nd Street","ending_cross_street":"Exit 9 - East 42nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971981,40.743197]]}},{"id":"TmeKW8HGCWxin3//ysPI+F5nYXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["150TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8AhcJC4VcNgTG31aWUDHSHfAK5Y="}],"description":"Construction on 150TH ST southbound from 133RD AVE (New York) to 148TH ST at 150TH AVE (New York) Subject to change without notice., Monday May 4th,2026 thru Friday May 15th,2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed southbound,","update_date":"2026-05-09T10:00:17Z"},"road_event_id":"TmeKW8HGCWxin3//ysPI+F5nYXY=","beginning_cross_street":"133RD AVE","ending_cross_street":"150TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789192,40.668262]]}},{"id":"8AhcJC4VcNgTG31aWUDHSHfAK5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["150TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TmeKW8HGCWxin3//ysPI+F5nYXY="},{"type":"next-occurrence","id":"1J7ApUn23d5OXKKavrcu02GIiR4="}],"description":"Construction on 150TH ST southbound from 133RD AVE (New York) to 148TH ST at 150TH AVE (New York) Subject to change without notice., Monday May 4th,2026 thru Friday May 15th,2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed southbound,","update_date":"2026-05-09T10:00:17Z"},"road_event_id":"8AhcJC4VcNgTG31aWUDHSHfAK5Y=","beginning_cross_street":"133RD AVE","ending_cross_street":"150TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789192,40.668262]]}},{"id":"1J7ApUn23d5OXKKavrcu02GIiR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["150TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TmeKW8HGCWxin3//ysPI+F5nYXY="}],"description":"Construction on 150TH ST southbound from 133RD AVE (New York) to 148TH ST at 150TH AVE (New York) Subject to change without notice., Monday May 4th,2026 thru Friday May 15th,2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed southbound,","update_date":"2026-05-09T10:00:17Z"},"road_event_id":"1J7ApUn23d5OXKKavrcu02GIiR4=","beginning_cross_street":"133RD AVE","ending_cross_street":"150TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789192,40.668262]]}},{"id":"PkCon7bstq+i0nN9dtdIlAovLNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 440"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qTqN/CpuHvaFnvLy6kjVzrRWI6I="}],"description":"Construction on NY 440 both directions from Exit 10W - I-278; Ramp (Staten Island) to Forest Avenue (Staten Island) Subject to change without notice., Monday May 4th,2026 thru Friday May 15th,2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM 2 Right lanes of 3 lanes closed northbound, southbound","update_date":"2026-05-09T10:00:15Z"},"road_event_id":"PkCon7bstq+i0nN9dtdIlAovLNY=","beginning_cross_street":"Exit 10W - I-278; Ramp","ending_cross_street":"Forest Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.153651,40.61249]]}},{"id":"qTqN/CpuHvaFnvLy6kjVzrRWI6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 440"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PkCon7bstq+i0nN9dtdIlAovLNY="},{"type":"next-occurrence","id":"HnHVq9DFC5w0WNbnavv9+TpbyRk="}],"description":"Construction on NY 440 both directions from Exit 10W - I-278; Ramp (Staten Island) to Forest Avenue (Staten Island) Subject to change without notice., Monday May 4th,2026 thru Friday May 15th,2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM 2 Right lanes of 3 lanes closed northbound, southbound","update_date":"2026-05-09T10:00:15Z"},"road_event_id":"qTqN/CpuHvaFnvLy6kjVzrRWI6I=","beginning_cross_street":"Exit 10W - I-278; Ramp","ending_cross_street":"Forest Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.153651,40.61249]]}},{"id":"HnHVq9DFC5w0WNbnavv9+TpbyRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 440"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PkCon7bstq+i0nN9dtdIlAovLNY="}],"description":"Construction on NY 440 both directions from Exit 10W - I-278; Ramp (Staten Island) to Forest Avenue (Staten Island) Subject to change without notice., Monday May 4th,2026 thru Friday May 15th,2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM 2 Right lanes of 3 lanes closed northbound, southbound","update_date":"2026-05-09T10:00:15Z"},"road_event_id":"HnHVq9DFC5w0WNbnavv9+TpbyRk=","beginning_cross_street":"Exit 10W - I-278; Ramp","ending_cross_street":"Forest Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.153651,40.61249]]}},{"id":"1C0nFwePoUawns2UfzKP+FHvHe4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 440"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"g8EznbyLJIvoqbXxvu1nMUNo5hQ="}],"description":"Construction on NY 440 northbound from Watchogue Road (Staten Island) to Richmond Terrace (Staten Island) Subject to change without notice., Monday May 4th,2026 thru Friday May 15th,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed northbound,","update_date":"2026-05-09T09:00:14Z"},"road_event_id":"1C0nFwePoUawns2UfzKP+FHvHe4=","beginning_cross_street":"Watchogue Road","ending_cross_street":"Richmond Terrace","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.151888,40.617608]]}},{"id":"g8EznbyLJIvoqbXxvu1nMUNo5hQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 440"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1C0nFwePoUawns2UfzKP+FHvHe4="},{"type":"next-occurrence","id":"CFD6h6ujApHT/RA88rdfX7d+9EE="}],"description":"Construction on NY 440 northbound from Watchogue Road (Staten Island) to Richmond Terrace (Staten Island) Subject to change without notice., Monday May 4th,2026 thru Friday May 15th,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed northbound,","update_date":"2026-05-09T09:00:14Z"},"road_event_id":"g8EznbyLJIvoqbXxvu1nMUNo5hQ=","beginning_cross_street":"Watchogue Road","ending_cross_street":"Richmond Terrace","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.151888,40.617608]]}},{"id":"CFD6h6ujApHT/RA88rdfX7d+9EE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 440"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1C0nFwePoUawns2UfzKP+FHvHe4="}],"description":"Construction on NY 440 northbound from Watchogue Road (Staten Island) to Richmond Terrace (Staten Island) Subject to change without notice., Monday May 4th,2026 thru Friday May 15th,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed northbound,","update_date":"2026-05-09T09:00:14Z"},"road_event_id":"CFD6h6ujApHT/RA88rdfX7d+9EE=","beginning_cross_street":"Watchogue Road","ending_cross_street":"Richmond Terrace","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.151888,40.617608]]}},{"id":"0P75EaTBzGxJYp2Y5zb5Hx9LBjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"686x3cKj9gsMBniUtlwL4w4WnUs="}],"description":"Construction on I-278 both directions from Richmond Avenue Exit (Staten Island) to Victory Boulevard Exit; Bayonne Bridge Exit (Staten Island) Subject to change without notice., Monday May 4th,2026 thru Friday May 15th,2026, Sunday thru Saturday, 10:00 PM thru 05:00 AM 1 Left lane of 4 lanes closed eastbound, westbound","update_date":"2026-05-09T09:00:13Z"},"road_event_id":"0P75EaTBzGxJYp2Y5zb5Hx9LBjk=","beginning_cross_street":"Richmond Avenue Exit","ending_cross_street":"Victory Boulevard Exit; Bayonne Bridge Exit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.157371,40.614875]]}},{"id":"686x3cKj9gsMBniUtlwL4w4WnUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0P75EaTBzGxJYp2Y5zb5Hx9LBjk="},{"type":"next-occurrence","id":"l0ZcawH6M+w8xGpdlEV6Bo+D3WY="}],"description":"Construction on I-278 both directions from Richmond Avenue Exit (Staten Island) to Victory Boulevard Exit; Bayonne Bridge Exit (Staten Island) Subject to change without notice., Monday May 4th,2026 thru Friday May 15th,2026, Sunday thru Saturday, 10:00 PM thru 05:00 AM 1 Left lane of 4 lanes closed eastbound, westbound","update_date":"2026-05-09T09:00:13Z"},"road_event_id":"686x3cKj9gsMBniUtlwL4w4WnUs=","beginning_cross_street":"Richmond Avenue Exit","ending_cross_street":"Victory Boulevard Exit; Bayonne Bridge Exit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.157371,40.614875]]}},{"id":"l0ZcawH6M+w8xGpdlEV6Bo+D3WY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0P75EaTBzGxJYp2Y5zb5Hx9LBjk="}],"description":"Construction on I-278 both directions from Richmond Avenue Exit (Staten Island) to Victory Boulevard Exit; Bayonne Bridge Exit (Staten Island) Subject to change without notice., Monday May 4th,2026 thru Friday May 15th,2026, Sunday thru Saturday, 10:00 PM thru 05:00 AM 1 Left lane of 4 lanes closed eastbound, westbound","update_date":"2026-05-09T09:00:13Z"},"road_event_id":"l0ZcawH6M+w8xGpdlEV6Bo+D3WY=","beginning_cross_street":"Richmond Avenue Exit","ending_cross_street":"Victory Boulevard Exit; Bayonne Bridge Exit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.157371,40.614875]]}},{"id":"bKaWDSWv390cQOwXT9gnGil9xa4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tpLqc3BKYpGU7DcrFntFGdI+7aA="}],"description":"Construction on I-278 eastbound from Drive Martin Luther King Expressway (Staten Island) to Woolley Avenue (Staten Island) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed eastbound,","update_date":"2026-05-09T09:00:16Z"},"road_event_id":"bKaWDSWv390cQOwXT9gnGil9xa4=","beginning_cross_street":"Drive Martin Luther King Expressway","ending_cross_street":"Woolley Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.153651,40.612006]]}},{"id":"tpLqc3BKYpGU7DcrFntFGdI+7aA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bKaWDSWv390cQOwXT9gnGil9xa4="}],"description":"Construction on I-278 eastbound from Drive Martin Luther King Expressway (Staten Island) to Woolley Avenue (Staten Island) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed eastbound,","update_date":"2026-05-09T09:00:16Z"},"road_event_id":"tpLqc3BKYpGU7DcrFntFGdI+7aA=","beginning_cross_street":"Drive Martin Luther King Expressway","ending_cross_street":"Woolley Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.153651,40.612006]]}},{"id":"9plGxFiGBmUm4/0MDx7Xeufu894=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MEREDITH AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gEwHK2uJZorPTx6LZ82fyx8RsjI="}],"description":"Construction on MEREDITH AVE both directions from SOUTH AVE (New York) to CANNON AVE (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed eastbound, westbound","update_date":"2026-05-09T09:00:06Z"},"road_event_id":"9plGxFiGBmUm4/0MDx7Xeufu894=","beginning_cross_street":"SOUTH AVE","ending_cross_street":"CANNON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.19498,40.600622]]}},{"id":"gEwHK2uJZorPTx6LZ82fyx8RsjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MEREDITH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9plGxFiGBmUm4/0MDx7Xeufu894="}],"description":"Construction on MEREDITH AVE both directions from SOUTH AVE (New York) to CANNON AVE (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed eastbound, westbound","update_date":"2026-05-09T09:00:06Z"},"road_event_id":"gEwHK2uJZorPTx6LZ82fyx8RsjI=","beginning_cross_street":"SOUTH AVE","ending_cross_street":"CANNON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.19498,40.600622]]}},{"id":"AXHn01RBXZhSOoqI+1okt/gBf9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q59 Bus"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+fy6WJsrVam9PgaUamwY/vmehaU="}],"description":"Due to Construction both directions, Q59 Bus between GRAND ST/GRAND ST BRIDGE (New York) and GRAND ST/METROPOLITAN AV BR (New York) are detoured from Grand St/Grand Ave between 55th St and the Metropolitan Ave Bridge. For eastbound service, use the stops on Grand St at Metropolitan Ave Bridge or Grand Ave at Rust St. For westbound service, use the stops on Grand Ave at 56th St or Grand St at Metropolitan Ave Bridge. Buses also make requested stops along Metropolitan Ave in both directions. , Sunday May 3rd, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM","update_date":"2026-05-02T21:43:24Z"},"road_event_id":"AXHn01RBXZhSOoqI+1okt/gBf9g=","beginning_cross_street":"GRAND ST/GRAND ST BRIDGE","ending_cross_street":"GRAND ST/METROPOLITAN AV BR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.923685,40.716201]]}},{"id":"+fy6WJsrVam9PgaUamwY/vmehaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q59 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AXHn01RBXZhSOoqI+1okt/gBf9g="},{"type":"next-occurrence","id":"GK5/mi0FehqANnJtN7H2qH4e/Ik="}],"description":"Due to Construction both directions, Q59 Bus between GRAND ST/GRAND ST BRIDGE (New York) and GRAND ST/METROPOLITAN AV BR (New York) are detoured from Grand St/Grand Ave between 55th St and the Metropolitan Ave Bridge. For eastbound service, use the stops on Grand St at Metropolitan Ave Bridge or Grand Ave at Rust St. For westbound service, use the stops on Grand Ave at 56th St or Grand St at Metropolitan Ave Bridge. Buses also make requested stops along Metropolitan Ave in both directions. , Sunday May 3rd, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM","update_date":"2026-05-02T21:43:24Z"},"road_event_id":"+fy6WJsrVam9PgaUamwY/vmehaU=","beginning_cross_street":"GRAND ST/GRAND ST BRIDGE","ending_cross_street":"GRAND ST/METROPOLITAN AV BR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.923685,40.716201]]}},{"id":"GK5/mi0FehqANnJtN7H2qH4e/Ik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q59 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AXHn01RBXZhSOoqI+1okt/gBf9g="}],"description":"Due to Construction both directions, Q59 Bus between GRAND ST/GRAND ST BRIDGE (New York) and GRAND ST/METROPOLITAN AV BR (New York) are detoured from Grand St/Grand Ave between 55th St and the Metropolitan Ave Bridge. For eastbound service, use the stops on Grand St at Metropolitan Ave Bridge or Grand Ave at Rust St. For westbound service, use the stops on Grand Ave at 56th St or Grand St at Metropolitan Ave Bridge. Buses also make requested stops along Metropolitan Ave in both directions. , Sunday May 3rd, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM","update_date":"2026-05-02T21:43:24Z"},"road_event_id":"GK5/mi0FehqANnJtN7H2qH4e/Ik=","beginning_cross_street":"GRAND ST/GRAND ST BRIDGE","ending_cross_street":"GRAND ST/METROPOLITAN AV BR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.923685,40.716201]]}},{"id":"Zi5wucLgk2qA9yLlCPd+R5fbE9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tGCpe2F2mxj4dhWY/EphYl3qbNI="}],"description":"Utility work on US 9W southbound at NY 23 (Catskill), Monday May 4th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-03T00:36:42Z"},"road_event_id":"Zi5wucLgk2qA9yLlCPd+R5fbE9c=","beginning_cross_street":"NY 23","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869686,42.232246]]}},{"id":"tGCpe2F2mxj4dhWY/EphYl3qbNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zi5wucLgk2qA9yLlCPd+R5fbE9c="},{"type":"next-occurrence","id":"l1ORYvG3syyBmHxNPS9TqqvwkyQ="}],"description":"Utility work on US 9W southbound at NY 23 (Catskill), Monday May 4th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-03T00:36:42Z"},"road_event_id":"tGCpe2F2mxj4dhWY/EphYl3qbNI=","beginning_cross_street":"NY 23","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869686,42.232246]]}},{"id":"l1ORYvG3syyBmHxNPS9TqqvwkyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zi5wucLgk2qA9yLlCPd+R5fbE9c="},{"type":"next-occurrence","id":"fR3cDc2WkrHRj3LzjJ/EvfsP3zY="}],"description":"Utility work on US 9W southbound at NY 23 (Catskill), Monday May 4th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-03T00:36:42Z"},"road_event_id":"l1ORYvG3syyBmHxNPS9TqqvwkyQ=","beginning_cross_street":"NY 23","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869686,42.232246]]}},{"id":"fR3cDc2WkrHRj3LzjJ/EvfsP3zY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zi5wucLgk2qA9yLlCPd+R5fbE9c="}],"description":"Utility work on US 9W southbound at NY 23 (Catskill), Monday May 4th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-03T00:36:42Z"},"road_event_id":"fR3cDc2WkrHRj3LzjJ/EvfsP3zY=","beginning_cross_street":"NY 23","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869686,42.232246]]}},{"id":"YQYDyQhe+iEQptb1Rjs5DHb4HzU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"O1CVVwFR3f7taWHQfkJniIEbS2I="}],"description":"Utility work on NY 23 westbound ramp to US 9W (Catskill), Monday May 4th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM right shoulder closed","update_date":"2026-05-03T00:40:14Z"},"road_event_id":"YQYDyQhe+iEQptb1Rjs5DHb4HzU=","beginning_cross_street":"US 9W","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.867032,42.229904]]}},{"id":"O1CVVwFR3f7taWHQfkJniIEbS2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YQYDyQhe+iEQptb1Rjs5DHb4HzU="},{"type":"next-occurrence","id":"F7wKnB5p3+GuZnqyM1kNk8qKLno="}],"description":"Utility work on NY 23 westbound ramp to US 9W (Catskill), Monday May 4th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM right shoulder closed","update_date":"2026-05-03T00:40:14Z"},"road_event_id":"O1CVVwFR3f7taWHQfkJniIEbS2I=","beginning_cross_street":"US 9W","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.867032,42.229904]]}},{"id":"F7wKnB5p3+GuZnqyM1kNk8qKLno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YQYDyQhe+iEQptb1Rjs5DHb4HzU="},{"type":"next-occurrence","id":"m849Oqtqwx1KgDF/kf4EJ9J3MpI="}],"description":"Utility work on NY 23 westbound ramp to US 9W (Catskill), Monday May 4th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM right shoulder closed","update_date":"2026-05-03T00:40:14Z"},"road_event_id":"F7wKnB5p3+GuZnqyM1kNk8qKLno=","beginning_cross_street":"US 9W","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.867032,42.229904]]}},{"id":"m849Oqtqwx1KgDF/kf4EJ9J3MpI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YQYDyQhe+iEQptb1Rjs5DHb4HzU="}],"description":"Utility work on NY 23 westbound ramp to US 9W (Catskill), Monday May 4th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM right shoulder closed","update_date":"2026-05-03T00:40:14Z"},"road_event_id":"m849Oqtqwx1KgDF/kf4EJ9J3MpI=","beginning_cross_street":"US 9W","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.867032,42.229904]]}},{"id":"JluHJllwH+83AqpJQDhRB5VGtbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound near West of Exit 20 - CR 639 (Clinton Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, at least one lane closed","update_date":"2026-05-03T11:45:33Z"},"road_event_id":"JluHJllwH+83AqpJQDhRB5VGtbM=","beginning_cross_street":"West of Exit 20 - CR 639","ending_cross_street":"West of Exit 20 - CR 639","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.849151,40.646621]]}},{"id":"l76wSi88V+c7Xaia8VRDwSk1Ezs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound near South of CR 522/Stouts Ln (South Brunswick Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM,","update_date":"2026-05-03T11:45:32Z"},"road_event_id":"l76wSi88V+c7Xaia8VRDwSk1Ezs=","beginning_cross_street":"South of CR 522/Stouts Ln","ending_cross_street":"South of CR 522/Stouts Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.573295,40.384716]]}},{"id":"Io/yFI3Mjcp8jae4QnAsLtoJ0Gw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound near South of CR 522/Stouts Ln (South Brunswick Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM,","update_date":"2026-05-03T11:45:29Z"},"road_event_id":"Io/yFI3Mjcp8jae4QnAsLtoJ0Gw=","beginning_cross_street":"South of CR 522/Stouts Ln","ending_cross_street":"South of CR 522/Stouts Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.573295,40.384716]]}},{"id":"JKIbzYav4rskc9S6qUiFLS/Na90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Southbound near North of Exit 10A - NJ 168/Black Horse Pike (Gloucester Twp), Thursday May 21, 2026 08:00 PM thru Friday May 22, 2026 06:00 AM, right lane closed","update_date":"2026-05-03T11:45:27Z"},"road_event_id":"JKIbzYav4rskc9S6qUiFLS/Na90=","beginning_cross_street":"North of Exit 10A - NJ 168/Black Horse Pike","ending_cross_street":"South of Exit 10A - NJ 168/Black Horse Pike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T20:00:00Z","end_date":"2026-05-23T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.072547,39.819175]]}},{"id":"QHGrIMNdiIhLDVhQBOKuHX302Ko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp) and East of I-287 (Parsippany-Troy Hills Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-03T11:45:24Z"},"road_event_id":"QHGrIMNdiIhLDVhQBOKuHX302Ko=","beginning_cross_street":"West of US 202/CR 511/Parsippany Blvd","ending_cross_street":"East of I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.42678,40.87215]]}},{"id":"o1a81KfKHDpOVvrcAIVePrlNPLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound at South of NJ 91/Jersey Ave (North Brunswick Twp) Wednesday May 13, 2026 11:00 PM thru Thursday May 14, 2026 05:00 AM, ramp","update_date":"2026-05-03T11:45:23Z"},"road_event_id":"o1a81KfKHDpOVvrcAIVePrlNPLY=","beginning_cross_street":"South of NJ 91/Jersey Ave","ending_cross_street":"South of NJ 91/Jersey Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.489143,40.4533]]}},{"id":"6aTmjyCIZt7DmeVNoH58H2URyGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Southbound at South of Exit 10A - NJ 168/Black Horse Pike (Gloucester Twp) Continuous Monday May 11, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, ramp","update_date":"2026-05-07T22:48:27Z"},"road_event_id":"6aTmjyCIZt7DmeVNoH58H2URyGU=","beginning_cross_street":"South of Exit 10A - NJ 168/Black Horse Pike","ending_cross_street":"South of Exit 10A - NJ 168/Black Horse Pike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.066642,39.815647]]}},{"id":"oQ2y976YwEFVjO73LD3VHWnsSGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound between Quaker Bridge Rd (West Windsor Twp) and Meadow Rd (West Windsor Twp), Thursday May 14, 2026 09:00 AM thru 02:00 PM, right shoulder closed","update_date":"2026-05-03T11:45:49Z"},"road_event_id":"oQ2y976YwEFVjO73LD3VHWnsSGg=","beginning_cross_street":"Quaker Bridge Rd","ending_cross_street":"Meadow Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.678871,40.297676]]}},{"id":"Yqawh4k3X1DrLMXaHVFdxGRBiBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Southbound between Meadow Rd (West Windsor Twp) and Quaker Bridge Rd (West Windsor Twp), Wednesday May 13, 2026 09:00 AM thru 02:00 PM, right shoulder closed","update_date":"2026-05-03T11:45:48Z"},"road_event_id":"Yqawh4k3X1DrLMXaHVFdxGRBiBE=","beginning_cross_street":"Meadow Rd","ending_cross_street":"Quaker Bridge Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.661079,40.3124]]}},{"id":"ZVrtcPa5r9lrZ++Iq3DmMMQz4yw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound near South of CR 522/Stouts Ln (South Brunswick Twp), Friday May 15, 2026 09:00 AM thru 03:00 PM,","update_date":"2026-05-03T11:45:45Z"},"road_event_id":"ZVrtcPa5r9lrZ++Iq3DmMMQz4yw=","beginning_cross_street":"South of CR 522/Stouts Ln","ending_cross_street":"South of CR 522/Stouts Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.573295,40.384716]]}},{"id":"O4TGlafCMqPnpZwyJwPUSAOMYnI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between South of Summit Ave (Hackensack) and North of NJ 4 (Paramus), Thursday May 14, 2026 11:00 PM thru Friday May 15, 2026 05:00 AM, left lane closed","update_date":"2026-05-03T11:45:44Z"},"road_event_id":"O4TGlafCMqPnpZwyJwPUSAOMYnI=","beginning_cross_street":"South of Summit Ave","ending_cross_street":"North of NJ 4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.062957,40.877239]]}},{"id":"q6K775isR+xbO+cbPRlzUWRavzw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound near West of Exit 20 - CR 639 (Clinton Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 04:00 AM)","update_date":"2026-05-03T11:45:43Z"},"road_event_id":"q6K775isR+xbO+cbPRlzUWRavzw=","beginning_cross_street":"West of Exit 20 - CR 639","ending_cross_street":"West of Exit 20 - CR 639","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.849151,40.646621]]}},{"id":"YSIfsNvLxMuyvTFvI2J9fle2F/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Friday May 15, 2026 07:00 AM thru 07:00 PM, right shoulder closed","update_date":"2026-05-03T11:45:41Z"},"road_event_id":"YSIfsNvLxMuyvTFvI2J9fle2F/E=","beginning_cross_street":"South of US 206/NJ 28","ending_cross_street":"North of Ortho Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.635749,40.574195]]}},{"id":"soX+B8MdpPLHEBsvfa5s1xsq4Cs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Southbound between North of NJ 4 (Paramus) and Summit Ave (Hackensack), Wednesday May 13, 2026 11:00 PM thru Thursday May 14, 2026 05:00 AM, left lane closed","update_date":"2026-05-03T11:45:39Z"},"road_event_id":"soX+B8MdpPLHEBsvfa5s1xsq4Cs=","beginning_cross_street":"North of NJ 4","ending_cross_street":"Summit Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.071853,40.921611]]}},{"id":"XluCJGRO8FCsRfAt8R60b16voHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between East of I-287 (Parsippany-Troy Hills Twp) and West of US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-03T11:45:38Z"},"road_event_id":"XluCJGRO8FCsRfAt8R60b16voHU=","beginning_cross_street":"East of I-287","ending_cross_street":"West of US 202/CR 511/Parsippany Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.40953,40.866123]]}},{"id":"4eUbqkPHh1OpWzjscRsEJtmdgi8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound between Quaker Bridge Rd (West Windsor Twp) and Meadow Rd (West Windsor Twp), Wednesday May 13, 2026 09:00 AM thru 02:00 PM, right shoulder closed","update_date":"2026-05-03T11:45:56Z"},"road_event_id":"4eUbqkPHh1OpWzjscRsEJtmdgi8=","beginning_cross_street":"Quaker Bridge Rd","ending_cross_street":"Meadow Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.678871,40.297676]]}},{"id":"keTLRFJhr2IEMkSAYWlJXgnSqKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Southbound between Meadow Rd (West Windsor Twp) and Quaker Bridge Rd (West Windsor Twp), Thursday May 14, 2026 09:00 AM thru 02:00 PM, right shoulder closed","update_date":"2026-05-03T11:45:55Z"},"road_event_id":"keTLRFJhr2IEMkSAYWlJXgnSqKI=","beginning_cross_street":"Meadow Rd","ending_cross_street":"Quaker Bridge Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.661079,40.3124]]}},{"id":"xIUezrIMEz+GkH+0WKEmZ3qD2R0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Continuous Friday May 15, 2026 07:00 AM thru Saturday February 27, 2027 07:00 PM,","update_date":"2026-05-03T11:45:52Z"},"road_event_id":"xIUezrIMEz+GkH+0WKEmZ3qD2R0=","beginning_cross_street":"South of US 206/NJ 28","ending_cross_street":"North of Ortho Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.635749,40.574195]]}},{"id":"KZCgNjSRUB+uhzyPECKLWzKsnns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound at South of NJ 91/Jersey Ave (North Brunswick Twp) Thursday May 14, 2026 11:00 PM thru Friday May 15, 2026 05:00 AM, ramp","update_date":"2026-05-03T11:45:50Z"},"road_event_id":"KZCgNjSRUB+uhzyPECKLWzKsnns=","beginning_cross_street":"South of NJ 91/Jersey Ave","ending_cross_street":"South of NJ 91/Jersey Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.489143,40.4533]]}},{"id":"ZZOUcLr35qZDz3PINNnKY9jV61A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 134"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hx8muNiFQl3lr/rrWMBjV1VcD5k="}],"description":"Road rehabilitation on NY 134 both directions between NY 9A (Ossining) and McDonalds Road (Yorktown) D265484/NIGHT/32514009 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 11th, 2025 thru Friday May 15th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-08T12:09:54Z"},"road_event_id":"ZZOUcLr35qZDz3PINNnKY9jV61A=","beginning_cross_street":" NY 9A","ending_cross_street":"McDonalds Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.846359,41.182641]]}},{"id":"hx8muNiFQl3lr/rrWMBjV1VcD5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 134"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZOUcLr35qZDz3PINNnKY9jV61A="},{"type":"next-occurrence","id":"Q6MTwrWzgyuS88M2ijHqS32jFFo="}],"description":"Road rehabilitation on NY 134 both directions between NY 9A (Ossining) and McDonalds Road (Yorktown) D265484/NIGHT/32514009 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 11th, 2025 thru Friday May 15th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-08T12:09:54Z"},"road_event_id":"hx8muNiFQl3lr/rrWMBjV1VcD5k=","beginning_cross_street":" NY 9A","ending_cross_street":"McDonalds Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.846359,41.182641]]}},{"id":"Q6MTwrWzgyuS88M2ijHqS32jFFo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 134"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZOUcLr35qZDz3PINNnKY9jV61A="}],"description":"Road rehabilitation on NY 134 both directions between NY 9A (Ossining) and McDonalds Road (Yorktown) D265484/NIGHT/32514009 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 11th, 2025 thru Friday May 15th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-08T12:09:54Z"},"road_event_id":"Q6MTwrWzgyuS88M2ijHqS32jFFo=","beginning_cross_street":" NY 9A","ending_cross_street":"McDonalds Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.846359,41.182641]]}},{"id":"pknlbLqJpzq03W+0PaquW6/LT3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3i5pQ7qNBxKBVN425cOtP5oYMV4="}],"description":"Utility work on NY 9A northbound between Van Wart Street (Elmsford) 2026084681338/32738609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternate lanes, Wednesday May 27th, 2026 thru Thursday May 28th, 2026 Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-07T13:53:33Z"},"road_event_id":"pknlbLqJpzq03W+0PaquW6/LT3E=","beginning_cross_street":"Van Wart Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820973,41.053262]]}},{"id":"3i5pQ7qNBxKBVN425cOtP5oYMV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pknlbLqJpzq03W+0PaquW6/LT3E="},{"type":"next-occurrence","id":"J+rdHmgR28Qpf6GNWBJgb88nuMs="}],"description":"Utility work on NY 9A northbound between Van Wart Street (Elmsford) 2026084681338/32738609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternate lanes, Wednesday May 27th, 2026 thru Thursday May 28th, 2026 Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-07T13:53:33Z"},"road_event_id":"3i5pQ7qNBxKBVN425cOtP5oYMV4=","beginning_cross_street":"Van Wart Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820973,41.053262]]}},{"id":"J+rdHmgR28Qpf6GNWBJgb88nuMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pknlbLqJpzq03W+0PaquW6/LT3E="},{"type":"next-occurrence","id":"XrJPgoMCgRtSpgjkuZqG902Wczs="}],"description":"Utility work on NY 9A northbound between Van Wart Street (Elmsford) 2026084681338/32738609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternate lanes, Wednesday May 27th, 2026 thru Thursday May 28th, 2026 Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-07T13:53:33Z"},"road_event_id":"J+rdHmgR28Qpf6GNWBJgb88nuMs=","beginning_cross_street":"Van Wart Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820973,41.053262]]}},{"id":"XrJPgoMCgRtSpgjkuZqG902Wczs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pknlbLqJpzq03W+0PaquW6/LT3E="},{"type":"next-occurrence","id":"15/XQDz5txMGZvkeAmvTOux/Ua8="}],"description":"Utility work on NY 9A northbound between Van Wart Street (Elmsford) 2026084681338/32738609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternate lanes, Wednesday May 27th, 2026 thru Thursday May 28th, 2026 Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-07T13:53:33Z"},"road_event_id":"XrJPgoMCgRtSpgjkuZqG902Wczs=","beginning_cross_street":"Van Wart Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:30:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820973,41.053262]]}},{"id":"15/XQDz5txMGZvkeAmvTOux/Ua8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pknlbLqJpzq03W+0PaquW6/LT3E="},{"type":"next-occurrence","id":"3YRVY/0vqKxbOye0C/Za9CpS+GU="}],"description":"Utility work on NY 9A northbound between Van Wart Street (Elmsford) 2026084681338/32738609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternate lanes, Wednesday May 27th, 2026 thru Thursday May 28th, 2026 Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-07T13:53:33Z"},"road_event_id":"15/XQDz5txMGZvkeAmvTOux/Ua8=","beginning_cross_street":"Van Wart Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:30:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820973,41.053262]]}},{"id":"3YRVY/0vqKxbOye0C/Za9CpS+GU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pknlbLqJpzq03W+0PaquW6/LT3E="},{"type":"next-occurrence","id":"idShIdcxnyMFsxMBAtVgJMVWXOc="}],"description":"Utility work on NY 9A northbound between Van Wart Street (Elmsford) 2026084681338/32738609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternate lanes, Wednesday May 27th, 2026 thru Thursday May 28th, 2026 Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-07T13:53:33Z"},"road_event_id":"3YRVY/0vqKxbOye0C/Za9CpS+GU=","beginning_cross_street":"Van Wart Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:30:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820973,41.053262]]}},{"id":"idShIdcxnyMFsxMBAtVgJMVWXOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pknlbLqJpzq03W+0PaquW6/LT3E="},{"type":"next-occurrence","id":"dL0Td9tLTXOtbjU83g88YGefLj0="}],"description":"Utility work on NY 9A northbound between Van Wart Street (Elmsford) 2026084681338/32738609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternate lanes, Wednesday May 27th, 2026 thru Thursday May 28th, 2026 Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-07T13:53:33Z"},"road_event_id":"idShIdcxnyMFsxMBAtVgJMVWXOc=","beginning_cross_street":"Van Wart Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:30:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820973,41.053262]]}},{"id":"dL0Td9tLTXOtbjU83g88YGefLj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pknlbLqJpzq03W+0PaquW6/LT3E="},{"type":"next-occurrence","id":"+MqXF9KtWbI5Xi/sPDZ/+htdhtw="}],"description":"Utility work on NY 9A northbound between Van Wart Street (Elmsford) 2026084681338/32738609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternate lanes, Wednesday May 27th, 2026 thru Thursday May 28th, 2026 Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-07T13:53:33Z"},"road_event_id":"dL0Td9tLTXOtbjU83g88YGefLj0=","beginning_cross_street":"Van Wart Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820973,41.053262]]}},{"id":"+MqXF9KtWbI5Xi/sPDZ/+htdhtw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pknlbLqJpzq03W+0PaquW6/LT3E="}],"description":"Utility work on NY 9A northbound between Van Wart Street (Elmsford) 2026084681338/32738609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternate lanes, Wednesday May 27th, 2026 thru Thursday May 28th, 2026 Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-07T13:53:33Z"},"road_event_id":"+MqXF9KtWbI5Xi/sPDZ/+htdhtw=","beginning_cross_street":"Van Wart Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820973,41.053262]]}},{"id":"8hNIlE1RqNssvtU0cAjbl6UDv+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"li+XLDztbjnTVQhlAK+QLRwh4I8="}],"description":"Culvert repairs on NY 22 both directions south of Elm St (Essex) alternating lane closures, Tuesday May 5th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-04T11:25:03Z"},"road_event_id":"8hNIlE1RqNssvtU0cAjbl6UDv+k=","beginning_cross_street":"Elm St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.35392,44.309612]]}},{"id":"li+XLDztbjnTVQhlAK+QLRwh4I8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8hNIlE1RqNssvtU0cAjbl6UDv+k="},{"type":"next-occurrence","id":"cKmngt78eesnebAARaBSRzJQF2g="}],"description":"Culvert repairs on NY 22 both directions south of Elm St (Essex) alternating lane closures, Tuesday May 5th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-04T11:25:03Z"},"road_event_id":"li+XLDztbjnTVQhlAK+QLRwh4I8=","beginning_cross_street":"Elm St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.35392,44.309612]]}},{"id":"cKmngt78eesnebAARaBSRzJQF2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8hNIlE1RqNssvtU0cAjbl6UDv+k="},{"type":"next-occurrence","id":"3YRjCMFdOVFjjkDHGuxH4Ml2sU0="}],"description":"Culvert repairs on NY 22 both directions south of Elm St (Essex) alternating lane closures, Tuesday May 5th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-04T11:25:03Z"},"road_event_id":"cKmngt78eesnebAARaBSRzJQF2g=","beginning_cross_street":"Elm St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.35392,44.309612]]}},{"id":"3YRjCMFdOVFjjkDHGuxH4Ml2sU0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8hNIlE1RqNssvtU0cAjbl6UDv+k="},{"type":"next-occurrence","id":"z4tr1MIzmXnXZVxibLjS9/IF1oY="}],"description":"Culvert repairs on NY 22 both directions south of Elm St (Essex) alternating lane closures, Tuesday May 5th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-04T11:25:03Z"},"road_event_id":"3YRjCMFdOVFjjkDHGuxH4Ml2sU0=","beginning_cross_street":"Elm St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.35392,44.309612]]}},{"id":"z4tr1MIzmXnXZVxibLjS9/IF1oY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8hNIlE1RqNssvtU0cAjbl6UDv+k="},{"type":"next-occurrence","id":"AGPleOqPz/83yklr4zFH8J8x2rg="}],"description":"Culvert repairs on NY 22 both directions south of Elm St (Essex) alternating lane closures, Tuesday May 5th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-04T11:25:03Z"},"road_event_id":"z4tr1MIzmXnXZVxibLjS9/IF1oY=","beginning_cross_street":"Elm St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.35392,44.309612]]}},{"id":"AGPleOqPz/83yklr4zFH8J8x2rg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8hNIlE1RqNssvtU0cAjbl6UDv+k="},{"type":"next-occurrence","id":"HifeRrtmi3Zz41XDYlUPMpqojOE="}],"description":"Culvert repairs on NY 22 both directions south of Elm St (Essex) alternating lane closures, Tuesday May 5th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-04T11:25:03Z"},"road_event_id":"AGPleOqPz/83yklr4zFH8J8x2rg=","beginning_cross_street":"Elm St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.35392,44.309612]]}},{"id":"HifeRrtmi3Zz41XDYlUPMpqojOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8hNIlE1RqNssvtU0cAjbl6UDv+k="},{"type":"next-occurrence","id":"l2rB0w7avyOXW2/LqAOS8z2wNBY="}],"description":"Culvert repairs on NY 22 both directions south of Elm St (Essex) alternating lane closures, Tuesday May 5th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-04T11:25:03Z"},"road_event_id":"HifeRrtmi3Zz41XDYlUPMpqojOE=","beginning_cross_street":"Elm St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.35392,44.309612]]}},{"id":"l2rB0w7avyOXW2/LqAOS8z2wNBY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8hNIlE1RqNssvtU0cAjbl6UDv+k="},{"type":"next-occurrence","id":"5bDqLHSp/9CSf9zgM4rkMftEGNM="}],"description":"Culvert repairs on NY 22 both directions south of Elm St (Essex) alternating lane closures, Tuesday May 5th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-04T11:25:03Z"},"road_event_id":"l2rB0w7avyOXW2/LqAOS8z2wNBY=","beginning_cross_street":"Elm St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.35392,44.309612]]}},{"id":"5bDqLHSp/9CSf9zgM4rkMftEGNM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8hNIlE1RqNssvtU0cAjbl6UDv+k="},{"type":"next-occurrence","id":"gdTrLTrKFnr/CdAURK9KF02JFRw="}],"description":"Culvert repairs on NY 22 both directions south of Elm St (Essex) alternating lane closures, Tuesday May 5th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-04T11:25:03Z"},"road_event_id":"5bDqLHSp/9CSf9zgM4rkMftEGNM=","beginning_cross_street":"Elm St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.35392,44.309612]]}},{"id":"gdTrLTrKFnr/CdAURK9KF02JFRw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8hNIlE1RqNssvtU0cAjbl6UDv+k="},{"type":"next-occurrence","id":"id5GaswU40QkdSbb7STKnqcypUo="}],"description":"Culvert repairs on NY 22 both directions south of Elm St (Essex) alternating lane closures, Tuesday May 5th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-04T11:25:03Z"},"road_event_id":"gdTrLTrKFnr/CdAURK9KF02JFRw=","beginning_cross_street":"Elm St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.35392,44.309612]]}},{"id":"id5GaswU40QkdSbb7STKnqcypUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8hNIlE1RqNssvtU0cAjbl6UDv+k="},{"type":"next-occurrence","id":"v9IS6jL2vVnjJFOgSEIeenqbRos="}],"description":"Culvert repairs on NY 22 both directions south of Elm St (Essex) alternating lane closures, Tuesday May 5th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-04T11:25:03Z"},"road_event_id":"id5GaswU40QkdSbb7STKnqcypUo=","beginning_cross_street":"Elm St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.35392,44.309612]]}},{"id":"v9IS6jL2vVnjJFOgSEIeenqbRos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8hNIlE1RqNssvtU0cAjbl6UDv+k="},{"type":"next-occurrence","id":"ZFe2wO9P5+odGhGUjoPI2rFBg60="}],"description":"Culvert repairs on NY 22 both directions south of Elm St (Essex) alternating lane closures, Tuesday May 5th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-04T11:25:03Z"},"road_event_id":"v9IS6jL2vVnjJFOgSEIeenqbRos=","beginning_cross_street":"Elm St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T11:00:00Z","end_date":"2026-05-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.35392,44.309612]]}},{"id":"ZFe2wO9P5+odGhGUjoPI2rFBg60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8hNIlE1RqNssvtU0cAjbl6UDv+k="},{"type":"next-occurrence","id":"7ucbqXeZB//xBjP2Sy2mEWr8BmA="}],"description":"Culvert repairs on NY 22 both directions south of Elm St (Essex) alternating lane closures, Tuesday May 5th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-04T11:25:03Z"},"road_event_id":"ZFe2wO9P5+odGhGUjoPI2rFBg60=","beginning_cross_street":"Elm St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.35392,44.309612]]}},{"id":"7ucbqXeZB//xBjP2Sy2mEWr8BmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8hNIlE1RqNssvtU0cAjbl6UDv+k="},{"type":"next-occurrence","id":"OLVe0xWZNHGC4kIT3SZE+y7dPEY="}],"description":"Culvert repairs on NY 22 both directions south of Elm St (Essex) alternating lane closures, Tuesday May 5th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-04T11:25:03Z"},"road_event_id":"7ucbqXeZB//xBjP2Sy2mEWr8BmA=","beginning_cross_street":"Elm St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.35392,44.309612]]}},{"id":"OLVe0xWZNHGC4kIT3SZE+y7dPEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8hNIlE1RqNssvtU0cAjbl6UDv+k="}],"description":"Culvert repairs on NY 22 both directions south of Elm St (Essex) alternating lane closures, Tuesday May 5th, 2026 thru Friday June 5th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-04T11:25:03Z"},"road_event_id":"OLVe0xWZNHGC4kIT3SZE+y7dPEY=","beginning_cross_street":"Elm St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.35392,44.309612]]}},{"id":"oOyhl6TcqjtyZn+TXubhtFo56FI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JFK Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zEQEaguYxQidKQsRkHd3JqlrV2w="}],"description":"Scheduled roadwork on JFK Expressway southbound ramp to Terminals 5 & 7 (New York) Terminal 5 and Terminal 7 will be redirected to the Van Wyck Expressway.. , Thursday May 14th, 2026, 01:00 AM thru 03:00 AM All lanes closed, Saturday May 16th, 2026, 01:00 AM thru 03:00 AM All lanes closed","update_date":"2026-05-10T13:45:36Z"},"road_event_id":"oOyhl6TcqjtyZn+TXubhtFo56FI=","beginning_cross_street":"Terminals 5 & 7","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T06:00:00Z","end_date":"2026-05-14T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785709,40.649232]]}},{"id":"zEQEaguYxQidKQsRkHd3JqlrV2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JFK Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oOyhl6TcqjtyZn+TXubhtFo56FI="}],"description":"Scheduled roadwork on JFK Expressway southbound ramp to Terminals 5 & 7 (New York) Terminal 5 and Terminal 7 will be redirected to the Van Wyck Expressway.. , Thursday May 14th, 2026, 01:00 AM thru 03:00 AM All lanes closed, Saturday May 16th, 2026, 01:00 AM thru 03:00 AM All lanes closed","update_date":"2026-05-10T13:45:36Z"},"road_event_id":"zEQEaguYxQidKQsRkHd3JqlrV2w=","beginning_cross_street":"Terminals 5 & 7","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T06:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785709,40.649232]]}},{"id":"NXdjCCVXyBz9atTamHWzZcxIDUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28N"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on NY 28N both directions between OWENS RD (Chester) and COBBLE CREEK RD (Chester) alternating lane closures, Continuous Wednesday May 6th, 2026 12:00 AM thru Tuesday June 30th, 2026 11:59 PM All lanes open","update_date":"2026-05-04T13:21:19Z"},"road_event_id":"NXdjCCVXyBz9atTamHWzZcxIDUE=","beginning_cross_street":"OWENS RD","ending_cross_street":"COBBLE CREEK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968034,43.728092]]}},{"id":"xm2s6KFdTzg65gN/VVSRStp4T78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wwLNA05EsJO/xVogZf/8+T8JsSA="}],"description":"Survey work on NY 17A eastbound between Iron Forge Road (Warwick) and Cascade Road (Warwick) D265617/32717009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026 thru Thursday May 28th, 2026 Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-04T15:22:38Z"},"road_event_id":"xm2s6KFdTzg65gN/VVSRStp4T78=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Cascade Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.310213,41.24998]]}},{"id":"wwLNA05EsJO/xVogZf/8+T8JsSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xm2s6KFdTzg65gN/VVSRStp4T78="},{"type":"next-occurrence","id":"WzaKrFNDkIrSIs02oq0sVhgNAIw="}],"description":"Survey work on NY 17A eastbound between Iron Forge Road (Warwick) and Cascade Road (Warwick) D265617/32717009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026 thru Thursday May 28th, 2026 Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-04T15:22:38Z"},"road_event_id":"wwLNA05EsJO/xVogZf/8+T8JsSA=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Cascade Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.310213,41.24998]]}},{"id":"WzaKrFNDkIrSIs02oq0sVhgNAIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xm2s6KFdTzg65gN/VVSRStp4T78="},{"type":"next-occurrence","id":"/qYI2evycBtMQdejgqrBZjsdhvc="}],"description":"Survey work on NY 17A eastbound between Iron Forge Road (Warwick) and Cascade Road (Warwick) D265617/32717009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026 thru Thursday May 28th, 2026 Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-04T15:22:38Z"},"road_event_id":"WzaKrFNDkIrSIs02oq0sVhgNAIw=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Cascade Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.310213,41.24998]]}},{"id":"/qYI2evycBtMQdejgqrBZjsdhvc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xm2s6KFdTzg65gN/VVSRStp4T78="},{"type":"next-occurrence","id":"85PUJ2z/W00RKqqxAX7i9HJ8YQo="}],"description":"Survey work on NY 17A eastbound between Iron Forge Road (Warwick) and Cascade Road (Warwick) D265617/32717009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026 thru Thursday May 28th, 2026 Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-04T15:22:38Z"},"road_event_id":"/qYI2evycBtMQdejgqrBZjsdhvc=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Cascade Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.310213,41.24998]]}},{"id":"85PUJ2z/W00RKqqxAX7i9HJ8YQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xm2s6KFdTzg65gN/VVSRStp4T78="},{"type":"next-occurrence","id":"jzuA4DlAgc75of+KeyhpVLBAHrg="}],"description":"Survey work on NY 17A eastbound between Iron Forge Road (Warwick) and Cascade Road (Warwick) D265617/32717009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026 thru Thursday May 28th, 2026 Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-04T15:22:38Z"},"road_event_id":"85PUJ2z/W00RKqqxAX7i9HJ8YQo=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Cascade Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.310213,41.24998]]}},{"id":"jzuA4DlAgc75of+KeyhpVLBAHrg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xm2s6KFdTzg65gN/VVSRStp4T78="},{"type":"next-occurrence","id":"WkAVGGzk3cNDxJwKZy+4tAgJuKo="}],"description":"Survey work on NY 17A eastbound between Iron Forge Road (Warwick) and Cascade Road (Warwick) D265617/32717009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026 thru Thursday May 28th, 2026 Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-04T15:22:38Z"},"road_event_id":"jzuA4DlAgc75of+KeyhpVLBAHrg=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Cascade Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.310213,41.24998]]}},{"id":"WkAVGGzk3cNDxJwKZy+4tAgJuKo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xm2s6KFdTzg65gN/VVSRStp4T78="},{"type":"next-occurrence","id":"Ec1AxuFGZhfbi+gDT9S8VZwbs0Y="}],"description":"Survey work on NY 17A eastbound between Iron Forge Road (Warwick) and Cascade Road (Warwick) D265617/32717009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026 thru Thursday May 28th, 2026 Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-04T15:22:38Z"},"road_event_id":"WkAVGGzk3cNDxJwKZy+4tAgJuKo=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Cascade Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.310213,41.24998]]}},{"id":"Ec1AxuFGZhfbi+gDT9S8VZwbs0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xm2s6KFdTzg65gN/VVSRStp4T78="}],"description":"Survey work on NY 17A eastbound between Iron Forge Road (Warwick) and Cascade Road (Warwick) D265617/32717009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026 thru Thursday May 28th, 2026 Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-04T15:22:38Z"},"road_event_id":"Ec1AxuFGZhfbi+gDT9S8VZwbs0Y=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Cascade Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.310213,41.24998]]}},{"id":"xE/SLxy8qHEoLtf4TluDGEA+JpQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[],"description":"Longterm construction on US 9W both directions between NY 304 (Haverstraw) and Short Clove Road (Haverstraw) 202308107656/202508112934/32545509 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Sunday May 4th, 2025 7:00 PM thru Friday May 22nd, 2026 5:00 AM all lanes closed and detoured","update_date":"2026-05-04T15:40:52Z"},"road_event_id":"xE/SLxy8qHEoLtf4TluDGEA+JpQ=","beginning_cross_street":"NY 304","ending_cross_street":"Short Clove Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94384,41.175199]]}},{"id":"4OYlzpMXdUc0/6XoEP15PcsNOkY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"eRz/73PtZ6kVvGjAOsC3lOJLpAM="}],"description":"Construction on NY 17K eastbound between Union School Road (Crawford) and Old NY 17K (Crawford) D265440/32720209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-05-13T10:11:08Z"},"road_event_id":"4OYlzpMXdUc0/6XoEP15PcsNOkY=","beginning_cross_street":"Union School Road","ending_cross_street":"Old NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.28906,41.531455]]}},{"id":"eRz/73PtZ6kVvGjAOsC3lOJLpAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4OYlzpMXdUc0/6XoEP15PcsNOkY="},{"type":"next-occurrence","id":"WRI/VTqXSxkrHajet9WbbrpmqRc="}],"description":"Construction on NY 17K eastbound between Union School Road (Crawford) and Old NY 17K (Crawford) D265440/32720209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-05-13T10:11:08Z"},"road_event_id":"eRz/73PtZ6kVvGjAOsC3lOJLpAM=","beginning_cross_street":"Union School Road","ending_cross_street":"Old NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.28906,41.531455]]}},{"id":"WRI/VTqXSxkrHajet9WbbrpmqRc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4OYlzpMXdUc0/6XoEP15PcsNOkY="},{"type":"next-occurrence","id":"3ON3B52J1hMsmfemXtSIAcMXy7g="}],"description":"Construction on NY 17K eastbound between Union School Road (Crawford) and Old NY 17K (Crawford) D265440/32720209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-05-13T10:11:08Z"},"road_event_id":"WRI/VTqXSxkrHajet9WbbrpmqRc=","beginning_cross_street":"Union School Road","ending_cross_street":"Old NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.28906,41.531455]]}},{"id":"3ON3B52J1hMsmfemXtSIAcMXy7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4OYlzpMXdUc0/6XoEP15PcsNOkY="},{"type":"next-occurrence","id":"MtJsjLkqGNC1QQxVaQ+Bhc/PUrA="}],"description":"Construction on NY 17K eastbound between Union School Road (Crawford) and Old NY 17K (Crawford) D265440/32720209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-05-13T10:11:08Z"},"road_event_id":"3ON3B52J1hMsmfemXtSIAcMXy7g=","beginning_cross_street":"Union School Road","ending_cross_street":"Old NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T12:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.28906,41.531455]]}},{"id":"MtJsjLkqGNC1QQxVaQ+Bhc/PUrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4OYlzpMXdUc0/6XoEP15PcsNOkY="},{"type":"next-occurrence","id":"TCMixpWJMRtvp23bn5L34ZyzrG0="}],"description":"Construction on NY 17K eastbound between Union School Road (Crawford) and Old NY 17K (Crawford) D265440/32720209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-05-13T10:11:08Z"},"road_event_id":"MtJsjLkqGNC1QQxVaQ+Bhc/PUrA=","beginning_cross_street":"Union School Road","ending_cross_street":"Old NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T12:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.28906,41.531455]]}},{"id":"TCMixpWJMRtvp23bn5L34ZyzrG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4OYlzpMXdUc0/6XoEP15PcsNOkY="},{"type":"next-occurrence","id":"NwbI0pAZW1Xhfs9EfmagKIMnJ00="}],"description":"Construction on NY 17K eastbound between Union School Road (Crawford) and Old NY 17K (Crawford) D265440/32720209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-05-13T10:11:08Z"},"road_event_id":"TCMixpWJMRtvp23bn5L34ZyzrG0=","beginning_cross_street":"Union School Road","ending_cross_street":"Old NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T12:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.28906,41.531455]]}},{"id":"NwbI0pAZW1Xhfs9EfmagKIMnJ00=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4OYlzpMXdUc0/6XoEP15PcsNOkY="}],"description":"Construction on NY 17K eastbound between Union School Road (Crawford) and Old NY 17K (Crawford) D265440/32720209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-05-13T10:11:08Z"},"road_event_id":"NwbI0pAZW1Xhfs9EfmagKIMnJ00=","beginning_cross_street":"Union School Road","ending_cross_street":"Old NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T12:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.28906,41.531455]]}},{"id":"ORC32543409","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","description":"Utility work on US 9 both directions between Van Wyck Lake Road (Fishkill) and Westage Drive (Fishkill) 2024MO1512416/32543409 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-05-12T19:01:24Z"},"road_event_id":"ORC32543409","beginning_cross_street":"Van Wyck Lake Road","ending_cross_street":"Westage Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-09-04T15:36:16Z","end_date":"2026-05-13T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.888784,41.519404]]}},{"id":"ffdXxkq84vl5M/okdC1I4SxM7Fc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7/KXfWQYFLmK56fUiI7w6g6u27U="}],"description":"Utility work on NY 370 both directions between Hayes Road (Lysander) and Colington Pointe Way (Lysander) ; Alternating one-way traffic with flaggers, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-04T17:14:19Z"},"road_event_id":"ffdXxkq84vl5M/okdC1I4SxM7Fc=","beginning_cross_street":"Hayes Road ","ending_cross_street":"Colington Pointe Way ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.254531,43.131502]]}},{"id":"7/KXfWQYFLmK56fUiI7w6g6u27U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ffdXxkq84vl5M/okdC1I4SxM7Fc="},{"type":"next-occurrence","id":"tvyV2bSAT+XrLAcPd1VnL0GrcjU="}],"description":"Utility work on NY 370 both directions between Hayes Road (Lysander) and Colington Pointe Way (Lysander) ; Alternating one-way traffic with flaggers, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-04T17:14:19Z"},"road_event_id":"7/KXfWQYFLmK56fUiI7w6g6u27U=","beginning_cross_street":"Hayes Road ","ending_cross_street":"Colington Pointe Way ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.254531,43.131502]]}},{"id":"tvyV2bSAT+XrLAcPd1VnL0GrcjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ffdXxkq84vl5M/okdC1I4SxM7Fc="},{"type":"next-occurrence","id":"q2nrg9Gqq1zFE6j2Nlx8wspiPEM="}],"description":"Utility work on NY 370 both directions between Hayes Road (Lysander) and Colington Pointe Way (Lysander) ; Alternating one-way traffic with flaggers, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-04T17:14:19Z"},"road_event_id":"tvyV2bSAT+XrLAcPd1VnL0GrcjU=","beginning_cross_street":"Hayes Road ","ending_cross_street":"Colington Pointe Way ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.254531,43.131502]]}},{"id":"q2nrg9Gqq1zFE6j2Nlx8wspiPEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ffdXxkq84vl5M/okdC1I4SxM7Fc="},{"type":"next-occurrence","id":"ndo3XU6I3PWobYC1TEwJhhjYsyU="}],"description":"Utility work on NY 370 both directions between Hayes Road (Lysander) and Colington Pointe Way (Lysander) ; Alternating one-way traffic with flaggers, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-04T17:14:19Z"},"road_event_id":"q2nrg9Gqq1zFE6j2Nlx8wspiPEM=","beginning_cross_street":"Hayes Road ","ending_cross_street":"Colington Pointe Way ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T12:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.254531,43.131502]]}},{"id":"ndo3XU6I3PWobYC1TEwJhhjYsyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ffdXxkq84vl5M/okdC1I4SxM7Fc="},{"type":"next-occurrence","id":"2ucmIZ/MW45xtBwSvfvyeEJbDj8="}],"description":"Utility work on NY 370 both directions between Hayes Road (Lysander) and Colington Pointe Way (Lysander) ; Alternating one-way traffic with flaggers, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-04T17:14:19Z"},"road_event_id":"ndo3XU6I3PWobYC1TEwJhhjYsyU=","beginning_cross_street":"Hayes Road ","ending_cross_street":"Colington Pointe Way ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T12:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.254531,43.131502]]}},{"id":"2ucmIZ/MW45xtBwSvfvyeEJbDj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ffdXxkq84vl5M/okdC1I4SxM7Fc="},{"type":"next-occurrence","id":"/hSawNxYWa/2klEuoPSk8m/onYE="}],"description":"Utility work on NY 370 both directions between Hayes Road (Lysander) and Colington Pointe Way (Lysander) ; Alternating one-way traffic with flaggers, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-04T17:14:19Z"},"road_event_id":"2ucmIZ/MW45xtBwSvfvyeEJbDj8=","beginning_cross_street":"Hayes Road ","ending_cross_street":"Colington Pointe Way ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T12:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.254531,43.131502]]}},{"id":"/hSawNxYWa/2klEuoPSk8m/onYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ffdXxkq84vl5M/okdC1I4SxM7Fc="},{"type":"next-occurrence","id":"KTO+gtvtrkue0ofRfuw34x/TxiI="}],"description":"Utility work on NY 370 both directions between Hayes Road (Lysander) and Colington Pointe Way (Lysander) ; Alternating one-way traffic with flaggers, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-04T17:14:19Z"},"road_event_id":"/hSawNxYWa/2klEuoPSk8m/onYE=","beginning_cross_street":"Hayes Road ","ending_cross_street":"Colington Pointe Way ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T12:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.254531,43.131502]]}},{"id":"KTO+gtvtrkue0ofRfuw34x/TxiI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ffdXxkq84vl5M/okdC1I4SxM7Fc="},{"type":"next-occurrence","id":"tmsXefO2nd4mnyIkD441npCcMz0="}],"description":"Utility work on NY 370 both directions between Hayes Road (Lysander) and Colington Pointe Way (Lysander) ; Alternating one-way traffic with flaggers, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-04T17:14:19Z"},"road_event_id":"KTO+gtvtrkue0ofRfuw34x/TxiI=","beginning_cross_street":"Hayes Road ","ending_cross_street":"Colington Pointe Way ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T20:00:00Z","end_date":"2026-05-27T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.254531,43.131502]]}},{"id":"tmsXefO2nd4mnyIkD441npCcMz0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ffdXxkq84vl5M/okdC1I4SxM7Fc="}],"description":"Utility work on NY 370 both directions between Hayes Road (Lysander) and Colington Pointe Way (Lysander) ; Alternating one-way traffic with flaggers, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open, Tuesday May 26th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-04T17:14:19Z"},"road_event_id":"tmsXefO2nd4mnyIkD441npCcMz0=","beginning_cross_street":"Hayes Road ","ending_cross_street":"Colington Pointe Way ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T20:00:00Z","end_date":"2026-05-28T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.254531,43.131502]]}},{"id":"adHk9nyHgDpfRNMlQcW6PXO10vw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between North of CR 607/Lackawanna Dr (Byram Twp) and South of CR 517 (Byram Twp), Continuous Monday May 11, 2026 07:00 PM thru Friday May 15, 2026 05:00 AM, right lane closed","update_date":"2026-05-05T02:18:22Z"},"road_event_id":"adHk9nyHgDpfRNMlQcW6PXO10vw=","beginning_cross_street":"North of CR 607/Lackawanna Dr","ending_cross_street":"South of CR 517","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.726676,40.940475]]}},{"id":"gVVvKEhc4H2H9w+LYcPT11cO5VQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TgWXn47v4exUJ+FPf3toWncC/Do="}],"description":"Culvert repairs on NY 81 both directions at Bill Matter Road (Coxsackie) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:00:35Z"},"road_event_id":"gVVvKEhc4H2H9w+LYcPT11cO5VQ=","beginning_cross_street":"Bill Matter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88907,42.356094]]}},{"id":"TgWXn47v4exUJ+FPf3toWncC/Do=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gVVvKEhc4H2H9w+LYcPT11cO5VQ="},{"type":"next-occurrence","id":"R+4StxUr2sZh2U4Ly3OgpZW/sbQ="}],"description":"Culvert repairs on NY 81 both directions at Bill Matter Road (Coxsackie) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:00:35Z"},"road_event_id":"TgWXn47v4exUJ+FPf3toWncC/Do=","beginning_cross_street":"Bill Matter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88907,42.356094]]}},{"id":"R+4StxUr2sZh2U4Ly3OgpZW/sbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gVVvKEhc4H2H9w+LYcPT11cO5VQ="},{"type":"next-occurrence","id":"mXyAK7yAtL0roPPzWIYLhO1oCBs="}],"description":"Culvert repairs on NY 81 both directions at Bill Matter Road (Coxsackie) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:00:35Z"},"road_event_id":"R+4StxUr2sZh2U4Ly3OgpZW/sbQ=","beginning_cross_street":"Bill Matter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88907,42.356094]]}},{"id":"mXyAK7yAtL0roPPzWIYLhO1oCBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gVVvKEhc4H2H9w+LYcPT11cO5VQ="},{"type":"next-occurrence","id":"xZEkgNr6z4w638Nu0A73Fr15anA="}],"description":"Culvert repairs on NY 81 both directions at Bill Matter Road (Coxsackie) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:00:35Z"},"road_event_id":"mXyAK7yAtL0roPPzWIYLhO1oCBs=","beginning_cross_street":"Bill Matter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88907,42.356094]]}},{"id":"xZEkgNr6z4w638Nu0A73Fr15anA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gVVvKEhc4H2H9w+LYcPT11cO5VQ="},{"type":"next-occurrence","id":"1TQ7GIxkF3pNjKo6aJOJCdMQQ78="}],"description":"Culvert repairs on NY 81 both directions at Bill Matter Road (Coxsackie) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:00:35Z"},"road_event_id":"xZEkgNr6z4w638Nu0A73Fr15anA=","beginning_cross_street":"Bill Matter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88907,42.356094]]}},{"id":"1TQ7GIxkF3pNjKo6aJOJCdMQQ78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gVVvKEhc4H2H9w+LYcPT11cO5VQ="},{"type":"next-occurrence","id":"gmVtqk0vmLQNWvvuXhVqusC3zHg="}],"description":"Culvert repairs on NY 81 both directions at Bill Matter Road (Coxsackie) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:00:35Z"},"road_event_id":"1TQ7GIxkF3pNjKo6aJOJCdMQQ78=","beginning_cross_street":"Bill Matter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88907,42.356094]]}},{"id":"gmVtqk0vmLQNWvvuXhVqusC3zHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gVVvKEhc4H2H9w+LYcPT11cO5VQ="},{"type":"next-occurrence","id":"B2zKXWaGaiTnKoj3QgEkNLd2L3g="}],"description":"Culvert repairs on NY 81 both directions at Bill Matter Road (Coxsackie) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:00:35Z"},"road_event_id":"gmVtqk0vmLQNWvvuXhVqusC3zHg=","beginning_cross_street":"Bill Matter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88907,42.356094]]}},{"id":"B2zKXWaGaiTnKoj3QgEkNLd2L3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gVVvKEhc4H2H9w+LYcPT11cO5VQ="},{"type":"next-occurrence","id":"+krFuHvFylgGy3/hmVMBEJTUL7U="}],"description":"Culvert repairs on NY 81 both directions at Bill Matter Road (Coxsackie) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:00:35Z"},"road_event_id":"B2zKXWaGaiTnKoj3QgEkNLd2L3g=","beginning_cross_street":"Bill Matter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88907,42.356094]]}},{"id":"+krFuHvFylgGy3/hmVMBEJTUL7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gVVvKEhc4H2H9w+LYcPT11cO5VQ="},{"type":"next-occurrence","id":"n8GZjLIMybXE1o3ka3uo3pR0TKc="}],"description":"Culvert repairs on NY 81 both directions at Bill Matter Road (Coxsackie) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:00:35Z"},"road_event_id":"+krFuHvFylgGy3/hmVMBEJTUL7U=","beginning_cross_street":"Bill Matter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88907,42.356094]]}},{"id":"n8GZjLIMybXE1o3ka3uo3pR0TKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gVVvKEhc4H2H9w+LYcPT11cO5VQ="}],"description":"Culvert repairs on NY 81 both directions at Bill Matter Road (Coxsackie) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:00:35Z"},"road_event_id":"n8GZjLIMybXE1o3ka3uo3pR0TKc=","beginning_cross_street":"Bill Matter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88907,42.356094]]}},{"id":"Yy7QeXPfcegKeZLRJB+CxH5APTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7BopG9cGBHjqXp0dZo4NwNg9xDQ="}],"description":"Culvert repairs on NY 23A both directions at NY 296 (Hunter) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:03:34Z"},"road_event_id":"Yy7QeXPfcegKeZLRJB+CxH5APTM=","beginning_cross_street":"NY 296","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.226948,42.216497]]}},{"id":"7BopG9cGBHjqXp0dZo4NwNg9xDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Yy7QeXPfcegKeZLRJB+CxH5APTM="},{"type":"next-occurrence","id":"mG9YF8VleUf9StswdF5iwYJKF6A="}],"description":"Culvert repairs on NY 23A both directions at NY 296 (Hunter) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:03:34Z"},"road_event_id":"7BopG9cGBHjqXp0dZo4NwNg9xDQ=","beginning_cross_street":"NY 296","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.226948,42.216497]]}},{"id":"mG9YF8VleUf9StswdF5iwYJKF6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Yy7QeXPfcegKeZLRJB+CxH5APTM="}],"description":"Culvert repairs on NY 23A both directions at NY 296 (Hunter) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:03:34Z"},"road_event_id":"mG9YF8VleUf9StswdF5iwYJKF6A=","beginning_cross_street":"NY 296","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.226948,42.216497]]}},{"id":"QIfmVfArYUkE/y3+Qv9ay6kMd5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"r45QXiV8yuZs9ID9e/MaOBFFj3I="}],"description":"Culvert repairs on NY 22 both directions at CLEMONS LN (Putnam) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:06:53Z"},"road_event_id":"QIfmVfArYUkE/y3+Qv9ay6kMd5M=","beginning_cross_street":"CLEMONS LN","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.411266,43.763371]]}},{"id":"r45QXiV8yuZs9ID9e/MaOBFFj3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QIfmVfArYUkE/y3+Qv9ay6kMd5M="},{"type":"next-occurrence","id":"hK/vrby9YL1GBYRqbHoEKkcOtR4="}],"description":"Culvert repairs on NY 22 both directions at CLEMONS LN (Putnam) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:06:53Z"},"road_event_id":"r45QXiV8yuZs9ID9e/MaOBFFj3I=","beginning_cross_street":"CLEMONS LN","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.411266,43.763371]]}},{"id":"hK/vrby9YL1GBYRqbHoEKkcOtR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QIfmVfArYUkE/y3+Qv9ay6kMd5M="},{"type":"next-occurrence","id":"I6oJqec18h9NqT/4ve6hRt9KmRA="}],"description":"Culvert repairs on NY 22 both directions at CLEMONS LN (Putnam) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:06:53Z"},"road_event_id":"hK/vrby9YL1GBYRqbHoEKkcOtR4=","beginning_cross_street":"CLEMONS LN","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.411266,43.763371]]}},{"id":"I6oJqec18h9NqT/4ve6hRt9KmRA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QIfmVfArYUkE/y3+Qv9ay6kMd5M="},{"type":"next-occurrence","id":"EbndYHHJAGCDCKt98VlSqk9uRTk="}],"description":"Culvert repairs on NY 22 both directions at CLEMONS LN (Putnam) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:06:53Z"},"road_event_id":"I6oJqec18h9NqT/4ve6hRt9KmRA=","beginning_cross_street":"CLEMONS LN","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T10:30:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.411266,43.763371]]}},{"id":"EbndYHHJAGCDCKt98VlSqk9uRTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QIfmVfArYUkE/y3+Qv9ay6kMd5M="},{"type":"next-occurrence","id":"eak/d5rVhX9pxORuPCVxA3PFMOE="}],"description":"Culvert repairs on NY 22 both directions at CLEMONS LN (Putnam) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:06:53Z"},"road_event_id":"EbndYHHJAGCDCKt98VlSqk9uRTk=","beginning_cross_street":"CLEMONS LN","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T10:30:00Z","end_date":"2026-05-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.411266,43.763371]]}},{"id":"eak/d5rVhX9pxORuPCVxA3PFMOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QIfmVfArYUkE/y3+Qv9ay6kMd5M="},{"type":"next-occurrence","id":"6NkNQCZ/KHAZxgbbHfVW2XcOx0M="}],"description":"Culvert repairs on NY 22 both directions at CLEMONS LN (Putnam) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:06:53Z"},"road_event_id":"eak/d5rVhX9pxORuPCVxA3PFMOE=","beginning_cross_street":"CLEMONS LN","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:30:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.411266,43.763371]]}},{"id":"6NkNQCZ/KHAZxgbbHfVW2XcOx0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QIfmVfArYUkE/y3+Qv9ay6kMd5M="},{"type":"next-occurrence","id":"d8L5k6rnO6TXro+5aiHOsAyNrhA="}],"description":"Culvert repairs on NY 22 both directions at CLEMONS LN (Putnam) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:06:53Z"},"road_event_id":"6NkNQCZ/KHAZxgbbHfVW2XcOx0M=","beginning_cross_street":"CLEMONS LN","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:30:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.411266,43.763371]]}},{"id":"d8L5k6rnO6TXro+5aiHOsAyNrhA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QIfmVfArYUkE/y3+Qv9ay6kMd5M="},{"type":"next-occurrence","id":"9+0rnmU9Ij0U76XAsfUKNimy/Hc="}],"description":"Culvert repairs on NY 22 both directions at CLEMONS LN (Putnam) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:06:53Z"},"road_event_id":"d8L5k6rnO6TXro+5aiHOsAyNrhA=","beginning_cross_street":"CLEMONS LN","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:30:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.411266,43.763371]]}},{"id":"9+0rnmU9Ij0U76XAsfUKNimy/Hc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QIfmVfArYUkE/y3+Qv9ay6kMd5M="},{"type":"next-occurrence","id":"nFfW6EFF/FeM4ggBPoBAsQpDW5s="}],"description":"Culvert repairs on NY 22 both directions at CLEMONS LN (Putnam) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:06:53Z"},"road_event_id":"9+0rnmU9Ij0U76XAsfUKNimy/Hc=","beginning_cross_street":"CLEMONS LN","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:30:00Z","end_date":"2026-05-21T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.411266,43.763371]]}},{"id":"nFfW6EFF/FeM4ggBPoBAsQpDW5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QIfmVfArYUkE/y3+Qv9ay6kMd5M="}],"description":"Culvert repairs on NY 22 both directions at CLEMONS LN (Putnam) alternating lane closures, Tuesday May 5th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-05T10:06:53Z"},"road_event_id":"nFfW6EFF/FeM4ggBPoBAsQpDW5s=","beginning_cross_street":"CLEMONS LN","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:30:00Z","end_date":"2026-05-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.411266,43.763371]]}},{"id":"4rG29PKO3TYWXJiofhAwmZ5TXwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+nHEQDbywPVbd02Q0kpD0fhYqiU="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between Maple Street (Hillsdale) and Shepard Hill Circulo (Hillsdale) D265717/32739009 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:38:03Z"},"road_event_id":"4rG29PKO3TYWXJiofhAwmZ5TXwc=","beginning_cross_street":"Maple Street","ending_cross_street":"Shepard Hill Circulo","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.521315,42.180219]]}},{"id":"+nHEQDbywPVbd02Q0kpD0fhYqiU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rG29PKO3TYWXJiofhAwmZ5TXwc="},{"type":"next-occurrence","id":"MnTTsDoG0MSgFn3WJXqIUsZuIWE="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between Maple Street (Hillsdale) and Shepard Hill Circulo (Hillsdale) D265717/32739009 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:38:03Z"},"road_event_id":"+nHEQDbywPVbd02Q0kpD0fhYqiU=","beginning_cross_street":"Maple Street","ending_cross_street":"Shepard Hill Circulo","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.521315,42.180219]]}},{"id":"MnTTsDoG0MSgFn3WJXqIUsZuIWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rG29PKO3TYWXJiofhAwmZ5TXwc="},{"type":"next-occurrence","id":"UA/xiOBm7QYJeeVCXWKz3iAKhe4="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between Maple Street (Hillsdale) and Shepard Hill Circulo (Hillsdale) D265717/32739009 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:38:03Z"},"road_event_id":"MnTTsDoG0MSgFn3WJXqIUsZuIWE=","beginning_cross_street":"Maple Street","ending_cross_street":"Shepard Hill Circulo","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.521315,42.180219]]}},{"id":"UA/xiOBm7QYJeeVCXWKz3iAKhe4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rG29PKO3TYWXJiofhAwmZ5TXwc="},{"type":"next-occurrence","id":"SYjFJN+xiWpUQ+jvOqcZtAlCw+o="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between Maple Street (Hillsdale) and Shepard Hill Circulo (Hillsdale) D265717/32739009 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:38:03Z"},"road_event_id":"UA/xiOBm7QYJeeVCXWKz3iAKhe4=","beginning_cross_street":"Maple Street","ending_cross_street":"Shepard Hill Circulo","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.521315,42.180219]]}},{"id":"SYjFJN+xiWpUQ+jvOqcZtAlCw+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rG29PKO3TYWXJiofhAwmZ5TXwc="},{"type":"next-occurrence","id":"Bs0e9oL9AnfYkqydKDih8xKBdYc="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between Maple Street (Hillsdale) and Shepard Hill Circulo (Hillsdale) D265717/32739009 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:38:03Z"},"road_event_id":"SYjFJN+xiWpUQ+jvOqcZtAlCw+o=","beginning_cross_street":"Maple Street","ending_cross_street":"Shepard Hill Circulo","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.521315,42.180219]]}},{"id":"Bs0e9oL9AnfYkqydKDih8xKBdYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rG29PKO3TYWXJiofhAwmZ5TXwc="},{"type":"next-occurrence","id":"XBbE6b6uHS4S81C8nHmjKAJUKBE="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between Maple Street (Hillsdale) and Shepard Hill Circulo (Hillsdale) D265717/32739009 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:38:03Z"},"road_event_id":"Bs0e9oL9AnfYkqydKDih8xKBdYc=","beginning_cross_street":"Maple Street","ending_cross_street":"Shepard Hill Circulo","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.521315,42.180219]]}},{"id":"XBbE6b6uHS4S81C8nHmjKAJUKBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rG29PKO3TYWXJiofhAwmZ5TXwc="},{"type":"next-occurrence","id":"2bGNszaabd4i87iY3rfzNtMNmzo="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between Maple Street (Hillsdale) and Shepard Hill Circulo (Hillsdale) D265717/32739009 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:38:03Z"},"road_event_id":"XBbE6b6uHS4S81C8nHmjKAJUKBE=","beginning_cross_street":"Maple Street","ending_cross_street":"Shepard Hill Circulo","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.521315,42.180219]]}},{"id":"2bGNszaabd4i87iY3rfzNtMNmzo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rG29PKO3TYWXJiofhAwmZ5TXwc="},{"type":"next-occurrence","id":"Mj5Ex1hUKlBEjgELIJ2tzPNKb4I="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between Maple Street (Hillsdale) and Shepard Hill Circulo (Hillsdale) D265717/32739009 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:38:03Z"},"road_event_id":"2bGNszaabd4i87iY3rfzNtMNmzo=","beginning_cross_street":"Maple Street","ending_cross_street":"Shepard Hill Circulo","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.521315,42.180219]]}},{"id":"Mj5Ex1hUKlBEjgELIJ2tzPNKb4I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4rG29PKO3TYWXJiofhAwmZ5TXwc="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between Maple Street (Hillsdale) and Shepard Hill Circulo (Hillsdale) D265717/32739009 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:38:03Z"},"road_event_id":"Mj5Ex1hUKlBEjgELIJ2tzPNKb4I=","beginning_cross_street":"Maple Street","ending_cross_street":"Shepard Hill Circulo","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.521315,42.180219]]}},{"id":"7xbrTV3XZaEfqFYnXLf/hEkcJ9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"W8LGr3jh7g5f6pOMXZQWHkcv3d4="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between US 20 (New Lebanon) and Columbia-Rensselaer County Line (New Lebanon) D265717/32739109 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:51:11Z"},"road_event_id":"7xbrTV3XZaEfqFYnXLf/hEkcJ9c=","beginning_cross_street":"US 20","ending_cross_street":"Columbia-Rensselaer County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.38527,42.4719]]}},{"id":"W8LGr3jh7g5f6pOMXZQWHkcv3d4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7xbrTV3XZaEfqFYnXLf/hEkcJ9c="},{"type":"next-occurrence","id":"rV7fHYpKr6jegKYkIS237etOM9Q="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between US 20 (New Lebanon) and Columbia-Rensselaer County Line (New Lebanon) D265717/32739109 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:51:11Z"},"road_event_id":"W8LGr3jh7g5f6pOMXZQWHkcv3d4=","beginning_cross_street":"US 20","ending_cross_street":"Columbia-Rensselaer County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.38527,42.4719]]}},{"id":"rV7fHYpKr6jegKYkIS237etOM9Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7xbrTV3XZaEfqFYnXLf/hEkcJ9c="},{"type":"next-occurrence","id":"Jzf+IylEzrkPOiCASP9/DoB8HO0="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between US 20 (New Lebanon) and Columbia-Rensselaer County Line (New Lebanon) D265717/32739109 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:51:11Z"},"road_event_id":"rV7fHYpKr6jegKYkIS237etOM9Q=","beginning_cross_street":"US 20","ending_cross_street":"Columbia-Rensselaer County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.38527,42.4719]]}},{"id":"Jzf+IylEzrkPOiCASP9/DoB8HO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7xbrTV3XZaEfqFYnXLf/hEkcJ9c="},{"type":"next-occurrence","id":"insfl5cELBI3QrfDwmXp1Wt92aQ="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between US 20 (New Lebanon) and Columbia-Rensselaer County Line (New Lebanon) D265717/32739109 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:51:11Z"},"road_event_id":"Jzf+IylEzrkPOiCASP9/DoB8HO0=","beginning_cross_street":"US 20","ending_cross_street":"Columbia-Rensselaer County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.38527,42.4719]]}},{"id":"insfl5cELBI3QrfDwmXp1Wt92aQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7xbrTV3XZaEfqFYnXLf/hEkcJ9c="},{"type":"next-occurrence","id":"yyzEjTNwQfAUxenwpTTArn/nT0E="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between US 20 (New Lebanon) and Columbia-Rensselaer County Line (New Lebanon) D265717/32739109 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:51:11Z"},"road_event_id":"insfl5cELBI3QrfDwmXp1Wt92aQ=","beginning_cross_street":"US 20","ending_cross_street":"Columbia-Rensselaer County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.38527,42.4719]]}},{"id":"yyzEjTNwQfAUxenwpTTArn/nT0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7xbrTV3XZaEfqFYnXLf/hEkcJ9c="},{"type":"next-occurrence","id":"c/n6SorIl3wf4iCmLesr6TKNazk="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between US 20 (New Lebanon) and Columbia-Rensselaer County Line (New Lebanon) D265717/32739109 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:51:11Z"},"road_event_id":"yyzEjTNwQfAUxenwpTTArn/nT0E=","beginning_cross_street":"US 20","ending_cross_street":"Columbia-Rensselaer County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.38527,42.4719]]}},{"id":"c/n6SorIl3wf4iCmLesr6TKNazk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7xbrTV3XZaEfqFYnXLf/hEkcJ9c="},{"type":"next-occurrence","id":"bDxYi3fxpeNqNxtHM5aei95Wmnk="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between US 20 (New Lebanon) and Columbia-Rensselaer County Line (New Lebanon) D265717/32739109 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:51:11Z"},"road_event_id":"c/n6SorIl3wf4iCmLesr6TKNazk=","beginning_cross_street":"US 20","ending_cross_street":"Columbia-Rensselaer County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.38527,42.4719]]}},{"id":"bDxYi3fxpeNqNxtHM5aei95Wmnk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7xbrTV3XZaEfqFYnXLf/hEkcJ9c="},{"type":"next-occurrence","id":"Nii+I6kUHAnryqR4cP/22hw2h9o="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between US 20 (New Lebanon) and Columbia-Rensselaer County Line (New Lebanon) D265717/32739109 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:51:11Z"},"road_event_id":"bDxYi3fxpeNqNxtHM5aei95Wmnk=","beginning_cross_street":"US 20","ending_cross_street":"Columbia-Rensselaer County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.38527,42.4719]]}},{"id":"Nii+I6kUHAnryqR4cP/22hw2h9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7xbrTV3XZaEfqFYnXLf/hEkcJ9c="}],"description":"Road maintenance operations and sign work and survey work on NY 22 both directions between US 20 (New Lebanon) and Columbia-Rensselaer County Line (New Lebanon) D265717/32739109 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 7th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-05T10:51:11Z"},"road_event_id":"Nii+I6kUHAnryqR4cP/22hw2h9o=","beginning_cross_street":"US 20","ending_cross_street":"Columbia-Rensselaer County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.38527,42.4719]]}},{"id":"/vvCeWA1An8O6H0xriTcABCrrFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 299"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q+m+/L57MSLiloPvcjAZeWum+fc="}],"description":"Road maintenance operations on NY 299 both directions between Park Lane (Lloyd) and Kristen Drive (Lloyd) D265638/32739209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 04:30 PM, shoulder closure","update_date":"2026-05-11T01:58:45Z"},"road_event_id":"/vvCeWA1An8O6H0xriTcABCrrFc=","beginning_cross_street":"Park Lane","ending_cross_street":"Kristen Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T20:00:00Z","end_date":"2026-05-19T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.030411,41.737236]]}},{"id":"q+m+/L57MSLiloPvcjAZeWum+fc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 299"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/vvCeWA1An8O6H0xriTcABCrrFc="},{"type":"next-occurrence","id":"wQzmduj7J/GymLVgZOCmvRYhJIo="}],"description":"Road maintenance operations on NY 299 both directions between Park Lane (Lloyd) and Kristen Drive (Lloyd) D265638/32739209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 04:30 PM, shoulder closure","update_date":"2026-05-11T01:58:45Z"},"road_event_id":"q+m+/L57MSLiloPvcjAZeWum+fc=","beginning_cross_street":"Park Lane","ending_cross_street":"Kristen Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T20:00:00Z","end_date":"2026-05-20T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.030411,41.737236]]}},{"id":"wQzmduj7J/GymLVgZOCmvRYhJIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 299"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/vvCeWA1An8O6H0xriTcABCrrFc="},{"type":"next-occurrence","id":"JTu+UvmH4TAqNKukeoqwblKtEDI="}],"description":"Road maintenance operations on NY 299 both directions between Park Lane (Lloyd) and Kristen Drive (Lloyd) D265638/32739209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 04:30 PM, shoulder closure","update_date":"2026-05-11T01:58:45Z"},"road_event_id":"wQzmduj7J/GymLVgZOCmvRYhJIo=","beginning_cross_street":"Park Lane","ending_cross_street":"Kristen Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T20:00:00Z","end_date":"2026-05-21T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.030411,41.737236]]}},{"id":"JTu+UvmH4TAqNKukeoqwblKtEDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 299"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/vvCeWA1An8O6H0xriTcABCrrFc="}],"description":"Road maintenance operations on NY 299 both directions between Park Lane (Lloyd) and Kristen Drive (Lloyd) D265638/32739209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 04:30 PM, shoulder closure","update_date":"2026-05-11T01:58:45Z"},"road_event_id":"JTu+UvmH4TAqNKukeoqwblKtEDI=","beginning_cross_street":"Park Lane","ending_cross_street":"Kristen Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T20:00:00Z","end_date":"2026-05-22T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.030411,41.737236]]}},{"id":"lgQCk5LsGmmgzc+VX5sXlD+HqDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zp/mfKIX4wBwBbze7KfVRs7Uk7o="}],"description":"Roadwork on NY 404 both directions between Town of Webster; Town of Penfield Line; Ramp (Penfield), Thursday May 7th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-05T12:11:12Z"},"road_event_id":"lgQCk5LsGmmgzc+VX5sXlD+HqDE=","beginning_cross_street":"Town of Webster; Town of Penfield Line; Ramp","ending_cross_street":"Town of Webster; Town of Penfield Line; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.500517,43.196318]]}},{"id":"zp/mfKIX4wBwBbze7KfVRs7Uk7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lgQCk5LsGmmgzc+VX5sXlD+HqDE="},{"type":"next-occurrence","id":"1tp9fA8+Day5VMWI59Cn+HVlsk0="}],"description":"Roadwork on NY 404 both directions between Town of Webster; Town of Penfield Line; Ramp (Penfield), Thursday May 7th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-05T12:11:12Z"},"road_event_id":"zp/mfKIX4wBwBbze7KfVRs7Uk7o=","beginning_cross_street":"Town of Webster; Town of Penfield Line; Ramp","ending_cross_street":"Town of Webster; Town of Penfield Line; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.500517,43.196318]]}},{"id":"1tp9fA8+Day5VMWI59Cn+HVlsk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lgQCk5LsGmmgzc+VX5sXlD+HqDE="},{"type":"next-occurrence","id":"uNldeDBMKacP2L1YqrcuGGxWFCc="}],"description":"Roadwork on NY 404 both directions between Town of Webster; Town of Penfield Line; Ramp (Penfield), Thursday May 7th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-05T12:11:12Z"},"road_event_id":"1tp9fA8+Day5VMWI59Cn+HVlsk0=","beginning_cross_street":"Town of Webster; Town of Penfield Line; Ramp","ending_cross_street":"Town of Webster; Town of Penfield Line; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.500517,43.196318]]}},{"id":"uNldeDBMKacP2L1YqrcuGGxWFCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lgQCk5LsGmmgzc+VX5sXlD+HqDE="},{"type":"next-occurrence","id":"Gy5O4VCao+I9N9eo/JGSwOpaNNA="}],"description":"Roadwork on NY 404 both directions between Town of Webster; Town of Penfield Line; Ramp (Penfield), Thursday May 7th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-05T12:11:12Z"},"road_event_id":"uNldeDBMKacP2L1YqrcuGGxWFCc=","beginning_cross_street":"Town of Webster; Town of Penfield Line; Ramp","ending_cross_street":"Town of Webster; Town of Penfield Line; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.500517,43.196318]]}},{"id":"Gy5O4VCao+I9N9eo/JGSwOpaNNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lgQCk5LsGmmgzc+VX5sXlD+HqDE="},{"type":"next-occurrence","id":"+Ms1pJLTH3636P2EmQ8Ob1tiRpQ="}],"description":"Roadwork on NY 404 both directions between Town of Webster; Town of Penfield Line; Ramp (Penfield), Thursday May 7th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-05T12:11:12Z"},"road_event_id":"Gy5O4VCao+I9N9eo/JGSwOpaNNA=","beginning_cross_street":"Town of Webster; Town of Penfield Line; Ramp","ending_cross_street":"Town of Webster; Town of Penfield Line; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.500517,43.196318]]}},{"id":"+Ms1pJLTH3636P2EmQ8Ob1tiRpQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lgQCk5LsGmmgzc+VX5sXlD+HqDE="},{"type":"next-occurrence","id":"ovJs1jzyc/uxgY2lG5BDTTVdiT0="}],"description":"Roadwork on NY 404 both directions between Town of Webster; Town of Penfield Line; Ramp (Penfield), Thursday May 7th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-05T12:11:12Z"},"road_event_id":"+Ms1pJLTH3636P2EmQ8Ob1tiRpQ=","beginning_cross_street":"Town of Webster; Town of Penfield Line; Ramp","ending_cross_street":"Town of Webster; Town of Penfield Line; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.500517,43.196318]]}},{"id":"ovJs1jzyc/uxgY2lG5BDTTVdiT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lgQCk5LsGmmgzc+VX5sXlD+HqDE="},{"type":"next-occurrence","id":"tT0H4ABDRJqXwM5FS4BDV4jgEHc="}],"description":"Roadwork on NY 404 both directions between Town of Webster; Town of Penfield Line; Ramp (Penfield), Thursday May 7th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-05T12:11:12Z"},"road_event_id":"ovJs1jzyc/uxgY2lG5BDTTVdiT0=","beginning_cross_street":"Town of Webster; Town of Penfield Line; Ramp","ending_cross_street":"Town of Webster; Town of Penfield Line; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.500517,43.196318]]}},{"id":"tT0H4ABDRJqXwM5FS4BDV4jgEHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lgQCk5LsGmmgzc+VX5sXlD+HqDE="},{"type":"next-occurrence","id":"C+Oes61Nji+8s8l6Q0s0fWUhTdA="}],"description":"Roadwork on NY 404 both directions between Town of Webster; Town of Penfield Line; Ramp (Penfield), Thursday May 7th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-05T12:11:12Z"},"road_event_id":"tT0H4ABDRJqXwM5FS4BDV4jgEHc=","beginning_cross_street":"Town of Webster; Town of Penfield Line; Ramp","ending_cross_street":"Town of Webster; Town of Penfield Line; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.500517,43.196318]]}},{"id":"C+Oes61Nji+8s8l6Q0s0fWUhTdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lgQCk5LsGmmgzc+VX5sXlD+HqDE="},{"type":"next-occurrence","id":"oFiRTxAIdUAID4/gregEvmmMBZA="}],"description":"Roadwork on NY 404 both directions between Town of Webster; Town of Penfield Line; Ramp (Penfield), Thursday May 7th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-05T12:11:12Z"},"road_event_id":"C+Oes61Nji+8s8l6Q0s0fWUhTdA=","beginning_cross_street":"Town of Webster; Town of Penfield Line; Ramp","ending_cross_street":"Town of Webster; Town of Penfield Line; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.500517,43.196318]]}},{"id":"oFiRTxAIdUAID4/gregEvmmMBZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lgQCk5LsGmmgzc+VX5sXlD+HqDE="},{"type":"next-occurrence","id":"1xemgx8oxzvNAHNoekezUGlLF0c="}],"description":"Roadwork on NY 404 both directions between Town of Webster; Town of Penfield Line; Ramp (Penfield), Thursday May 7th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-05T12:11:12Z"},"road_event_id":"oFiRTxAIdUAID4/gregEvmmMBZA=","beginning_cross_street":"Town of Webster; Town of Penfield Line; Ramp","ending_cross_street":"Town of Webster; Town of Penfield Line; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.500517,43.196318]]}},{"id":"1xemgx8oxzvNAHNoekezUGlLF0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lgQCk5LsGmmgzc+VX5sXlD+HqDE="}],"description":"Roadwork on NY 404 both directions between Town of Webster; Town of Penfield Line; Ramp (Penfield), Thursday May 7th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-05T12:11:12Z"},"road_event_id":"1xemgx8oxzvNAHNoekezUGlLF0c=","beginning_cross_street":"Town of Webster; Town of Penfield Line; Ramp","ending_cross_street":"Town of Webster; Town of Penfield Line; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.500517,43.196318]]}},{"id":"5M4DOa5NWiHW+W+d3WLbK2W0Ztk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3DWMB1+oxetBYvcepsEAd89+HrI="}],"description":"Safety improvements on US 1 both directions between E William Street (Port Chester) and Westchester Avenue (Port Chester) 2025084765629/32739309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-05T13:23:33Z"},"road_event_id":"5M4DOa5NWiHW+W+d3WLbK2W0Ztk=","beginning_cross_street":"E William Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664794,40.998821]]}},{"id":"3DWMB1+oxetBYvcepsEAd89+HrI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5M4DOa5NWiHW+W+d3WLbK2W0Ztk="},{"type":"next-occurrence","id":"Nlvl/LbSn7+oPqhnQcnosHq4rgA="}],"description":"Safety improvements on US 1 both directions between E William Street (Port Chester) and Westchester Avenue (Port Chester) 2025084765629/32739309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-05T13:23:33Z"},"road_event_id":"3DWMB1+oxetBYvcepsEAd89+HrI=","beginning_cross_street":"E William Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664794,40.998821]]}},{"id":"Nlvl/LbSn7+oPqhnQcnosHq4rgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5M4DOa5NWiHW+W+d3WLbK2W0Ztk="},{"type":"next-occurrence","id":"GWUakNJFcMH+1oR9sPa2gKbscg0="}],"description":"Safety improvements on US 1 both directions between E William Street (Port Chester) and Westchester Avenue (Port Chester) 2025084765629/32739309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-05T13:23:33Z"},"road_event_id":"Nlvl/LbSn7+oPqhnQcnosHq4rgA=","beginning_cross_street":"E William Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664794,40.998821]]}},{"id":"GWUakNJFcMH+1oR9sPa2gKbscg0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5M4DOa5NWiHW+W+d3WLbK2W0Ztk="},{"type":"next-occurrence","id":"7UEgumYTtFGc1RUHH5HAI2GReYw="}],"description":"Safety improvements on US 1 both directions between E William Street (Port Chester) and Westchester Avenue (Port Chester) 2025084765629/32739309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-05T13:23:33Z"},"road_event_id":"GWUakNJFcMH+1oR9sPa2gKbscg0=","beginning_cross_street":"E William Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:30:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664794,40.998821]]}},{"id":"7UEgumYTtFGc1RUHH5HAI2GReYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5M4DOa5NWiHW+W+d3WLbK2W0Ztk="},{"type":"next-occurrence","id":"9M1HERNwL1KT6IMnuNXT3XEFQXQ="}],"description":"Safety improvements on US 1 both directions between E William Street (Port Chester) and Westchester Avenue (Port Chester) 2025084765629/32739309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-05T13:23:33Z"},"road_event_id":"7UEgumYTtFGc1RUHH5HAI2GReYw=","beginning_cross_street":"E William Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:30:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664794,40.998821]]}},{"id":"9M1HERNwL1KT6IMnuNXT3XEFQXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5M4DOa5NWiHW+W+d3WLbK2W0Ztk="},{"type":"next-occurrence","id":"wV/VDsf1sY5BWMOaP2cFMQ4C/AA="}],"description":"Safety improvements on US 1 both directions between E William Street (Port Chester) and Westchester Avenue (Port Chester) 2025084765629/32739309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-05T13:23:33Z"},"road_event_id":"9M1HERNwL1KT6IMnuNXT3XEFQXQ=","beginning_cross_street":"E William Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:30:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664794,40.998821]]}},{"id":"wV/VDsf1sY5BWMOaP2cFMQ4C/AA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5M4DOa5NWiHW+W+d3WLbK2W0Ztk="}],"description":"Safety improvements on US 1 both directions between E William Street (Port Chester) and Westchester Avenue (Port Chester) 2025084765629/32739309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-05T13:23:33Z"},"road_event_id":"wV/VDsf1sY5BWMOaP2cFMQ4C/AA=","beginning_cross_street":"E William Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:30:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664794,40.998821]]}},{"id":"BGcHJO7FUaVma5ea03gZ2/u3g1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 43"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AK1p0S8nnQod7qFH8/3eHpIOf/Y="}],"description":"Utility work on NY 43 eastbound between Schuman Rd (Sand Lake) and Methodist Farm Rd (Sand Lake) alternating lane closures, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:30 AM thru 04:00 PM All lanes open","update_date":"2026-05-05T13:27:33Z"},"road_event_id":"BGcHJO7FUaVma5ea03gZ2/u3g1A=","beginning_cross_street":"Schuman Rd","ending_cross_street":"Methodist Farm Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.531413,42.630281]]}},{"id":"AK1p0S8nnQod7qFH8/3eHpIOf/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 43"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGcHJO7FUaVma5ea03gZ2/u3g1A="},{"type":"next-occurrence","id":"gTz5vQBkZpjJsN7xNttpDOZ42c0="}],"description":"Utility work on NY 43 eastbound between Schuman Rd (Sand Lake) and Methodist Farm Rd (Sand Lake) alternating lane closures, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:30 AM thru 04:00 PM All lanes open","update_date":"2026-05-05T13:27:33Z"},"road_event_id":"AK1p0S8nnQod7qFH8/3eHpIOf/Y=","beginning_cross_street":"Schuman Rd","ending_cross_street":"Methodist Farm Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.531413,42.630281]]}},{"id":"gTz5vQBkZpjJsN7xNttpDOZ42c0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 43"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGcHJO7FUaVma5ea03gZ2/u3g1A="},{"type":"next-occurrence","id":"axzT9GFfrscim3iaDsAatqbMrPM="}],"description":"Utility work on NY 43 eastbound between Schuman Rd (Sand Lake) and Methodist Farm Rd (Sand Lake) alternating lane closures, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:30 AM thru 04:00 PM All lanes open","update_date":"2026-05-05T13:27:33Z"},"road_event_id":"gTz5vQBkZpjJsN7xNttpDOZ42c0=","beginning_cross_street":"Schuman Rd","ending_cross_street":"Methodist Farm Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.531413,42.630281]]}},{"id":"axzT9GFfrscim3iaDsAatqbMrPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 43"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGcHJO7FUaVma5ea03gZ2/u3g1A="},{"type":"next-occurrence","id":"SLJwBTZPlx1cKB9wRqM95d/Vw3I="}],"description":"Utility work on NY 43 eastbound between Schuman Rd (Sand Lake) and Methodist Farm Rd (Sand Lake) alternating lane closures, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:30 AM thru 04:00 PM All lanes open","update_date":"2026-05-05T13:27:33Z"},"road_event_id":"axzT9GFfrscim3iaDsAatqbMrPM=","beginning_cross_street":"Schuman Rd","ending_cross_street":"Methodist Farm Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:30:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.531413,42.630281]]}},{"id":"SLJwBTZPlx1cKB9wRqM95d/Vw3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 43"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGcHJO7FUaVma5ea03gZ2/u3g1A="},{"type":"next-occurrence","id":"67otB/vQcVWO7yNz3fortVgrrIs="}],"description":"Utility work on NY 43 eastbound between Schuman Rd (Sand Lake) and Methodist Farm Rd (Sand Lake) alternating lane closures, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:30 AM thru 04:00 PM All lanes open","update_date":"2026-05-05T13:27:33Z"},"road_event_id":"SLJwBTZPlx1cKB9wRqM95d/Vw3I=","beginning_cross_street":"Schuman Rd","ending_cross_street":"Methodist Farm Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:30:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.531413,42.630281]]}},{"id":"67otB/vQcVWO7yNz3fortVgrrIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 43"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGcHJO7FUaVma5ea03gZ2/u3g1A="},{"type":"next-occurrence","id":"3Rcipv/fd1cM95VCaFd7Zr1+gKU="}],"description":"Utility work on NY 43 eastbound between Schuman Rd (Sand Lake) and Methodist Farm Rd (Sand Lake) alternating lane closures, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:30 AM thru 04:00 PM All lanes open","update_date":"2026-05-05T13:27:33Z"},"road_event_id":"67otB/vQcVWO7yNz3fortVgrrIs=","beginning_cross_street":"Schuman Rd","ending_cross_street":"Methodist Farm Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:30:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.531413,42.630281]]}},{"id":"3Rcipv/fd1cM95VCaFd7Zr1+gKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 43"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGcHJO7FUaVma5ea03gZ2/u3g1A="},{"type":"next-occurrence","id":"1T/lPGGO3ZSFIxyvEHi8nqORAnw="}],"description":"Utility work on NY 43 eastbound between Schuman Rd (Sand Lake) and Methodist Farm Rd (Sand Lake) alternating lane closures, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:30 AM thru 04:00 PM All lanes open","update_date":"2026-05-05T13:27:33Z"},"road_event_id":"3Rcipv/fd1cM95VCaFd7Zr1+gKU=","beginning_cross_street":"Schuman Rd","ending_cross_street":"Methodist Farm Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:30:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.531413,42.630281]]}},{"id":"1T/lPGGO3ZSFIxyvEHi8nqORAnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 43"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGcHJO7FUaVma5ea03gZ2/u3g1A="},{"type":"next-occurrence","id":"7v+UzZO/1ZL5f2YcE5sjX/1ze0U="}],"description":"Utility work on NY 43 eastbound between Schuman Rd (Sand Lake) and Methodist Farm Rd (Sand Lake) alternating lane closures, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:30 AM thru 04:00 PM All lanes open","update_date":"2026-05-05T13:27:33Z"},"road_event_id":"1T/lPGGO3ZSFIxyvEHi8nqORAnw=","beginning_cross_street":"Schuman Rd","ending_cross_street":"Methodist Farm Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:30:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.531413,42.630281]]}},{"id":"7v+UzZO/1ZL5f2YcE5sjX/1ze0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 43"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGcHJO7FUaVma5ea03gZ2/u3g1A="}],"description":"Utility work on NY 43 eastbound between Schuman Rd (Sand Lake) and Methodist Farm Rd (Sand Lake) alternating lane closures, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:30 AM thru 04:00 PM All lanes open","update_date":"2026-05-05T13:27:33Z"},"road_event_id":"7v+UzZO/1ZL5f2YcE5sjX/1ze0U=","beginning_cross_street":"Schuman Rd","ending_cross_street":"Methodist Farm Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:30:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.531413,42.630281]]}},{"id":"zp+QJyTX47X+WZfltnbJ/0SrSog=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZnjolSy32ZMOjNMzqqEn7+m/LwI="}],"description":"Gas main repairs on US 44 eastbound between North Avenue (Pleasant Valley) and South Avenue (Pleasant Valley) 2025083140911/32739509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-05T15:24:12Z"},"road_event_id":"zp+QJyTX47X+WZfltnbJ/0SrSog=","beginning_cross_street":"","ending_cross_street":"South Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.824292,41.744199]]}},{"id":"ZnjolSy32ZMOjNMzqqEn7+m/LwI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zp+QJyTX47X+WZfltnbJ/0SrSog="},{"type":"next-occurrence","id":"rvruro+IRdcW8LpPCGD2yGoUOys="}],"description":"Gas main repairs on US 44 eastbound between North Avenue (Pleasant Valley) and South Avenue (Pleasant Valley) 2025083140911/32739509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-05T15:24:12Z"},"road_event_id":"ZnjolSy32ZMOjNMzqqEn7+m/LwI=","beginning_cross_street":"","ending_cross_street":"South Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.824292,41.744199]]}},{"id":"rvruro+IRdcW8LpPCGD2yGoUOys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zp+QJyTX47X+WZfltnbJ/0SrSog="},{"type":"next-occurrence","id":"7LrQXabAcMOJinEgbD/bITLPz64="}],"description":"Gas main repairs on US 44 eastbound between North Avenue (Pleasant Valley) and South Avenue (Pleasant Valley) 2025083140911/32739509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-05T15:24:12Z"},"road_event_id":"rvruro+IRdcW8LpPCGD2yGoUOys=","beginning_cross_street":"","ending_cross_street":"South Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.824292,41.744199]]}},{"id":"7LrQXabAcMOJinEgbD/bITLPz64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zp+QJyTX47X+WZfltnbJ/0SrSog="},{"type":"next-occurrence","id":"SfcOWaE7Pfk/CwQU91lPD2mChik="}],"description":"Gas main repairs on US 44 eastbound between North Avenue (Pleasant Valley) and South Avenue (Pleasant Valley) 2025083140911/32739509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-05T15:24:12Z"},"road_event_id":"7LrQXabAcMOJinEgbD/bITLPz64=","beginning_cross_street":"","ending_cross_street":"South Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:30:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.824292,41.744199]]}},{"id":"SfcOWaE7Pfk/CwQU91lPD2mChik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zp+QJyTX47X+WZfltnbJ/0SrSog="},{"type":"next-occurrence","id":"lxpRguV4z3/9vhQsKP/yuSxa5Nk="}],"description":"Gas main repairs on US 44 eastbound between North Avenue (Pleasant Valley) and South Avenue (Pleasant Valley) 2025083140911/32739509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-05T15:24:12Z"},"road_event_id":"SfcOWaE7Pfk/CwQU91lPD2mChik=","beginning_cross_street":"","ending_cross_street":"South Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:30:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.824292,41.744199]]}},{"id":"lxpRguV4z3/9vhQsKP/yuSxa5Nk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zp+QJyTX47X+WZfltnbJ/0SrSog="},{"type":"next-occurrence","id":"y/BvIN8HPyfXMjV9T7w75K/0NLI="}],"description":"Gas main repairs on US 44 eastbound between North Avenue (Pleasant Valley) and South Avenue (Pleasant Valley) 2025083140911/32739509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-05T15:24:12Z"},"road_event_id":"lxpRguV4z3/9vhQsKP/yuSxa5Nk=","beginning_cross_street":"","ending_cross_street":"South Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:30:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.824292,41.744199]]}},{"id":"y/BvIN8HPyfXMjV9T7w75K/0NLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zp+QJyTX47X+WZfltnbJ/0SrSog="}],"description":"Gas main repairs on US 44 eastbound between North Avenue (Pleasant Valley) and South Avenue (Pleasant Valley) 2025083140911/32739509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-05T15:24:12Z"},"road_event_id":"y/BvIN8HPyfXMjV9T7w75K/0NLI=","beginning_cross_street":"","ending_cross_street":"South Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:30:00Z","end_date":"2026-05-21T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.824292,41.744199]]}},{"id":"icBfNfGBYk7/sBY8UgzpJpKdCwY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 436"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UI8VjV9obJ0B4956tu6w8q6xzRI="}],"description":"Utility work on NY 436 both directions between Scipio Rd (Nunda) and CR-57 (Ossian) Alternating lane closures with flaggers as needed, Wednesday May 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-05T15:33:19Z"},"road_event_id":"icBfNfGBYk7/sBY8UgzpJpKdCwY=","beginning_cross_street":"Scipio Rd","ending_cross_street":"CR-57 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.862047,42.563663]]}},{"id":"UI8VjV9obJ0B4956tu6w8q6xzRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 436"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"icBfNfGBYk7/sBY8UgzpJpKdCwY="},{"type":"next-occurrence","id":"EXcFPTGwcZK0Ux0mzdrKNUs6Qw4="}],"description":"Utility work on NY 436 both directions between Scipio Rd (Nunda) and CR-57 (Ossian) Alternating lane closures with flaggers as needed, Wednesday May 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-05T15:33:19Z"},"road_event_id":"UI8VjV9obJ0B4956tu6w8q6xzRI=","beginning_cross_street":"Scipio Rd","ending_cross_street":"CR-57 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.862047,42.563663]]}},{"id":"EXcFPTGwcZK0Ux0mzdrKNUs6Qw4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 436"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"icBfNfGBYk7/sBY8UgzpJpKdCwY="}],"description":"Utility work on NY 436 both directions between Scipio Rd (Nunda) and CR-57 (Ossian) Alternating lane closures with flaggers as needed, Wednesday May 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-05T15:33:19Z"},"road_event_id":"EXcFPTGwcZK0Ux0mzdrKNUs6Qw4=","beginning_cross_street":"Scipio Rd","ending_cross_street":"CR-57 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.862047,42.563663]]}},{"id":"K5uJccirbLof5S/PIKbVPkVbUKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+KAWb/LeDViWZ71QX8cuxOcic8M="}],"description":"Milling and paving operations on Merritt Parkway/CT 15 both directions Exit ramps Exit 27 - King Street (Greenwich) motorists can expect ramp closures, Sunday May 10th, 2026 thru Friday May 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-05T15:55:23Z"},"road_event_id":"K5uJccirbLof5S/PIKbVPkVbUKg=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"+KAWb/LeDViWZ71QX8cuxOcic8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K5uJccirbLof5S/PIKbVPkVbUKg="}],"description":"Milling and paving operations on Merritt Parkway/CT 15 both directions Exit ramps Exit 27 - King Street (Greenwich) motorists can expect ramp closures, Sunday May 10th, 2026 thru Friday May 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-05T15:55:23Z"},"road_event_id":"+KAWb/LeDViWZ71QX8cuxOcic8M=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"4kz3QLO+gfc3nF0O1VBzFH0KpRA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SsLw2c1ikBZUqSocfAZz3iEOeAk="}],"description":"Guard rail repairs on Saw Mill River Parkway northbound between Bronx-Westchester County Line (Yonkers) and Exit 4 - Cross County Parkway (Yonkers) D265183/NIGHT/32657809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM, right lane closure, Monday May 18th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 05:00 AM, right lane closure","update_date":"2026-05-13T13:10:48Z"},"road_event_id":"4kz3QLO+gfc3nF0O1VBzFH0KpRA=","beginning_cross_street":"Bronx-Westchester County Line","ending_cross_street":"Exit 4 - Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884411,40.912071]]}},{"id":"SsLw2c1ikBZUqSocfAZz3iEOeAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4kz3QLO+gfc3nF0O1VBzFH0KpRA="},{"type":"next-occurrence","id":"pQE9hdI9KHI8Ao5G1D3Bcg/QBg8="}],"description":"Guard rail repairs on Saw Mill River Parkway northbound between Bronx-Westchester County Line (Yonkers) and Exit 4 - Cross County Parkway (Yonkers) D265183/NIGHT/32657809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM, right lane closure, Monday May 18th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 05:00 AM, right lane closure","update_date":"2026-05-13T13:10:48Z"},"road_event_id":"SsLw2c1ikBZUqSocfAZz3iEOeAk=","beginning_cross_street":"Bronx-Westchester County Line","ending_cross_street":"Exit 4 - Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884411,40.912071]]}},{"id":"pQE9hdI9KHI8Ao5G1D3Bcg/QBg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4kz3QLO+gfc3nF0O1VBzFH0KpRA="},{"type":"next-occurrence","id":"o9v5nSvxr9S2E4+8wIPYH+IqNT8="}],"description":"Guard rail repairs on Saw Mill River Parkway northbound between Bronx-Westchester County Line (Yonkers) and Exit 4 - Cross County Parkway (Yonkers) D265183/NIGHT/32657809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM, right lane closure, Monday May 18th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 05:00 AM, right lane closure","update_date":"2026-05-13T13:10:48Z"},"road_event_id":"pQE9hdI9KHI8Ao5G1D3Bcg/QBg8=","beginning_cross_street":"Bronx-Westchester County Line","ending_cross_street":"Exit 4 - Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884411,40.912071]]}},{"id":"o9v5nSvxr9S2E4+8wIPYH+IqNT8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4kz3QLO+gfc3nF0O1VBzFH0KpRA="},{"type":"next-occurrence","id":"NqzQw8ffNZOwc4PSkkFtDxMA7Hc="}],"description":"Guard rail repairs on Saw Mill River Parkway northbound between Bronx-Westchester County Line (Yonkers) and Exit 4 - Cross County Parkway (Yonkers) D265183/NIGHT/32657809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM, right lane closure, Monday May 18th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 05:00 AM, right lane closure","update_date":"2026-05-13T13:10:48Z"},"road_event_id":"o9v5nSvxr9S2E4+8wIPYH+IqNT8=","beginning_cross_street":"Bronx-Westchester County Line","ending_cross_street":"Exit 4 - Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884411,40.912071]]}},{"id":"NqzQw8ffNZOwc4PSkkFtDxMA7Hc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4kz3QLO+gfc3nF0O1VBzFH0KpRA="},{"type":"next-occurrence","id":"VRbnhjRFn8V/aNkR3O5LlAs7Of8="}],"description":"Guard rail repairs on Saw Mill River Parkway northbound between Bronx-Westchester County Line (Yonkers) and Exit 4 - Cross County Parkway (Yonkers) D265183/NIGHT/32657809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM, right lane closure, Monday May 18th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 05:00 AM, right lane closure","update_date":"2026-05-13T13:10:48Z"},"road_event_id":"NqzQw8ffNZOwc4PSkkFtDxMA7Hc=","beginning_cross_street":"Bronx-Westchester County Line","ending_cross_street":"Exit 4 - Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884411,40.912071]]}},{"id":"VRbnhjRFn8V/aNkR3O5LlAs7Of8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4kz3QLO+gfc3nF0O1VBzFH0KpRA="},{"type":"next-occurrence","id":"nTH3nIcB2v0wuWBfC9zKiby9+6U="}],"description":"Guard rail repairs on Saw Mill River Parkway northbound between Bronx-Westchester County Line (Yonkers) and Exit 4 - Cross County Parkway (Yonkers) D265183/NIGHT/32657809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM, right lane closure, Monday May 18th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 05:00 AM, right lane closure","update_date":"2026-05-13T13:10:48Z"},"road_event_id":"VRbnhjRFn8V/aNkR3O5LlAs7Of8=","beginning_cross_street":"Bronx-Westchester County Line","ending_cross_street":"Exit 4 - Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884411,40.912071]]}},{"id":"nTH3nIcB2v0wuWBfC9zKiby9+6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4kz3QLO+gfc3nF0O1VBzFH0KpRA="}],"description":"Guard rail repairs on Saw Mill River Parkway northbound between Bronx-Westchester County Line (Yonkers) and Exit 4 - Cross County Parkway (Yonkers) D265183/NIGHT/32657809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM, right lane closure, Monday May 18th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 05:00 AM, right lane closure","update_date":"2026-05-13T13:10:48Z"},"road_event_id":"nTH3nIcB2v0wuWBfC9zKiby9+6U=","beginning_cross_street":"Bronx-Westchester County Line","ending_cross_street":"Exit 4 - Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884411,40.912071]]}},{"id":"X0yddAbM2Mp+32OJC5JsFcAubzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LdIluVgfLDOCSnwBRie9rz+uHEk="}],"description":"Intersection improvements on NY 17M eastbound at Dolsontown Road (Middletown) 20220898808/32727709 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane and shoulder closure, Tuesday May 19th, 2026 thru Wednesday May 20th, 2026, 08:00 PM thru 06:00 AM, right lane and shoulder closure","update_date":"2026-05-05T17:17:46Z"},"road_event_id":"X0yddAbM2Mp+32OJC5JsFcAubzg=","beginning_cross_street":"Dolsontown Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.428191,41.422655]]}},{"id":"LdIluVgfLDOCSnwBRie9rz+uHEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X0yddAbM2Mp+32OJC5JsFcAubzg="},{"type":"next-occurrence","id":"v7whcXHF/Vc6M8I6Zk/O7jwC/hY="}],"description":"Intersection improvements on NY 17M eastbound at Dolsontown Road (Middletown) 20220898808/32727709 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane and shoulder closure, Tuesday May 19th, 2026 thru Wednesday May 20th, 2026, 08:00 PM thru 06:00 AM, right lane and shoulder closure","update_date":"2026-05-05T17:17:46Z"},"road_event_id":"LdIluVgfLDOCSnwBRie9rz+uHEk=","beginning_cross_street":"Dolsontown Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T20:00:00Z","end_date":"2026-05-21T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.428191,41.422655]]}},{"id":"v7whcXHF/Vc6M8I6Zk/O7jwC/hY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X0yddAbM2Mp+32OJC5JsFcAubzg="}],"description":"Intersection improvements on NY 17M eastbound at Dolsontown Road (Middletown) 20220898808/32727709 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane and shoulder closure, Tuesday May 19th, 2026 thru Wednesday May 20th, 2026, 08:00 PM thru 06:00 AM, right lane and shoulder closure","update_date":"2026-05-05T17:17:46Z"},"road_event_id":"v7whcXHF/Vc6M8I6Zk/O7jwC/hY=","beginning_cross_street":"Dolsontown Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.428191,41.422655]]}},{"id":"4+zvWGwLPfx3GGlC6ZBg5SYGshQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"h5Jter5ouozeuoUjkzGLGJKN9S0="}],"description":"Utility work on NY 33A both directions between Palmer Rd. (Riga) and Churchville-Riga Road; NY 36 (Riga) Alternating lane closures with flaggers as needed, Wednesday May 6th, 2026 thru Sunday May 17th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-05T17:38:41Z"},"road_event_id":"4+zvWGwLPfx3GGlC6ZBg5SYGshQ=","beginning_cross_street":"Palmer Rd.","ending_cross_street":"Churchville-Riga Road; NY 36","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.860075,43.069537]]}},{"id":"h5Jter5ouozeuoUjkzGLGJKN9S0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4+zvWGwLPfx3GGlC6ZBg5SYGshQ="},{"type":"next-occurrence","id":"Nh3Ryay5Bb8hZ/dCc5qOXV9CWok="}],"description":"Utility work on NY 33A both directions between Palmer Rd. (Riga) and Churchville-Riga Road; NY 36 (Riga) Alternating lane closures with flaggers as needed, Wednesday May 6th, 2026 thru Sunday May 17th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-05T17:38:41Z"},"road_event_id":"h5Jter5ouozeuoUjkzGLGJKN9S0=","beginning_cross_street":"Palmer Rd.","ending_cross_street":"Churchville-Riga Road; NY 36","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.860075,43.069537]]}},{"id":"Nh3Ryay5Bb8hZ/dCc5qOXV9CWok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4+zvWGwLPfx3GGlC6ZBg5SYGshQ="},{"type":"next-occurrence","id":"FchL8L1sKYyX+zBHy9ipdCxufps="}],"description":"Utility work on NY 33A both directions between Palmer Rd. (Riga) and Churchville-Riga Road; NY 36 (Riga) Alternating lane closures with flaggers as needed, Wednesday May 6th, 2026 thru Sunday May 17th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-05T17:38:41Z"},"road_event_id":"Nh3Ryay5Bb8hZ/dCc5qOXV9CWok=","beginning_cross_street":"Palmer Rd.","ending_cross_street":"Churchville-Riga Road; NY 36","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.860075,43.069537]]}},{"id":"FchL8L1sKYyX+zBHy9ipdCxufps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4+zvWGwLPfx3GGlC6ZBg5SYGshQ="},{"type":"next-occurrence","id":"pd7DKPVGgIUic01mbGK0jT4awiQ="}],"description":"Utility work on NY 33A both directions between Palmer Rd. (Riga) and Churchville-Riga Road; NY 36 (Riga) Alternating lane closures with flaggers as needed, Wednesday May 6th, 2026 thru Sunday May 17th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-05T17:38:41Z"},"road_event_id":"FchL8L1sKYyX+zBHy9ipdCxufps=","beginning_cross_street":"Palmer Rd.","ending_cross_street":"Churchville-Riga Road; NY 36","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.860075,43.069537]]}},{"id":"pd7DKPVGgIUic01mbGK0jT4awiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4+zvWGwLPfx3GGlC6ZBg5SYGshQ="}],"description":"Utility work on NY 33A both directions between Palmer Rd. (Riga) and Churchville-Riga Road; NY 36 (Riga) Alternating lane closures with flaggers as needed, Wednesday May 6th, 2026 thru Sunday May 17th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-05T17:38:41Z"},"road_event_id":"pd7DKPVGgIUic01mbGK0jT4awiQ=","beginning_cross_street":"Palmer Rd.","ending_cross_street":"Churchville-Riga Road; NY 36","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.860075,43.069537]]}},{"id":"9wWz32oTHiV6wzhASmDrdCTQb7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 34"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 34 Southbound near CR 30/18th Av (Wall Twp), Thursday May 14, 2026 06:00 AM thru 06:00 PM, right shoulder closed","update_date":"2026-05-05T18:12:38Z"},"road_event_id":"9wWz32oTHiV6wzhASmDrdCTQb7M=","beginning_cross_street":"CR 30/18th Av","ending_cross_street":"South of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T16:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104019,40.165451]]}},{"id":"4d3JkHI2T3uAqoqPFzGtpOT8mrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 33"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 33 Westbound near West of White Horse-Hamilton Square Rd (Hamilton Twp), Wednesday May 13, 2026 09:00 PM thru Thursday May 14, 2026 05:00 AM, right shoulder closed","update_date":"2026-05-05T18:12:34Z"},"road_event_id":"4d3JkHI2T3uAqoqPFzGtpOT8mrM=","beginning_cross_street":"West of White Horse-Hamilton Square Rd","ending_cross_street":"East of CR 533/Mercerville White Horse Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.67424,40.2303]]}},{"id":"mQjX8HdUXTAgK55Gq+zC5JRR0ZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound near East of CR 724/Wiltseys Mill Rd (Winslow Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-05T18:12:27Z"},"road_event_id":"mQjX8HdUXTAgK55Gq+zC5JRR0ZM=","beginning_cross_street":"East of CR 724/Wiltseys Mill Rd","ending_cross_street":"East of CR 724/Wiltseys Mill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.816596,39.665641]]}},{"id":"EFfaQ1C4hI+cAKTv/xuQQyzXuZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 34"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 34 Southbound near CR 30/18th Av (Wall Twp), Wednesday May 13, 2026 06:00 AM thru 06:00 PM, right shoulder closed","update_date":"2026-05-05T18:12:28Z"},"road_event_id":"EFfaQ1C4hI+cAKTv/xuQQyzXuZ0=","beginning_cross_street":"CR 30/18th Av","ending_cross_street":"South of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104019,40.165451]]}},{"id":"wjdwZawf1AExyaZR9wLRh0KRPr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 34"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 34 Southbound near CR 30/18th Av (Wall Twp), Friday May 15, 2026 06:00 AM thru 06:00 PM, right shoulder closed","update_date":"2026-05-05T18:12:29Z"},"road_event_id":"wjdwZawf1AExyaZR9wLRh0KRPr4=","beginning_cross_street":"CR 30/18th Av","ending_cross_street":"South of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T16:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104019,40.165451]]}},{"id":"vcSRyH0wofBjwlknqHEmhoMnGj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near South of NJ 90 (Pennsauken Twp), Wednesday May 13, 2026 10:00 PM thru Thursday May 14, 2026 05:00 AM, right lane closed","update_date":"2026-05-05T18:12:30Z"},"road_event_id":"vcSRyH0wofBjwlknqHEmhoMnGj8=","beginning_cross_street":"South of NJ 90","ending_cross_street":"South of CR 615/Union Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.039184,39.97293]]}},{"id":"XsxoYEhTctQx/qyr80C6ZlJTxl8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound near East of CR 724/Wiltseys Mill Rd (Winslow Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-05T18:12:31Z"},"road_event_id":"XsxoYEhTctQx/qyr80C6ZlJTxl8=","beginning_cross_street":"East of CR 724/Wiltseys Mill Rd","ending_cross_street":"East of CR 724/Wiltseys Mill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.816596,39.665641]]}},{"id":"AZC1e9MzklEgBvuqYSLyIF/X42I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near East of Exit 61 - CR 507/River Rd (Elmwood Park), Monday May 18, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-05T18:12:26Z"},"road_event_id":"AZC1e9MzklEgBvuqYSLyIF/X42I=","beginning_cross_street":"East of Exit 61 - CR 507/River Rd","ending_cross_street":"East of Exit 61 - CR 507/River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.118507,40.903686]]}},{"id":"Y6y6r68aI5IAU8XyhfVXsU8DBCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near West of Exit 37 - CR 513/Hibernia Ave (Rockaway Twp), Thursday May 21, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-05-05T18:12:25Z"},"road_event_id":"Y6y6r68aI5IAU8XyhfVXsU8DBCc=","beginning_cross_street":"West of Exit 37 - CR 513/Hibernia Ave","ending_cross_street":"East of Exit 37 - CR 513/Hibernia Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.511695,40.911247]]}},{"id":"8tyq00x9OV8KfoBYh8Ihqj4jFWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound near East of CR 724/Wiltseys Mill Rd (Winslow Twp), Friday May 15, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-05T18:12:35Z"},"road_event_id":"8tyq00x9OV8KfoBYh8Ihqj4jFWw=","beginning_cross_street":"East of CR 724/Wiltseys Mill Rd","ending_cross_street":"East of CR 724/Wiltseys Mill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.816596,39.665641]]}},{"id":"8NQtETsF722SVrk83wmEgn0+nh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Northbound near North of Utter Av (Hawthorne), Monday May 18, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-05T18:12:32Z"},"road_event_id":"8NQtETsF722SVrk83wmEgn0+nh4=","beginning_cross_street":"North of Utter Av","ending_cross_street":"North of Utter Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.147064,40.962551]]}},{"id":"eyyHyE61nD0K/XRh4oxtRpnnecw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near East of Exit 61 - CR 507/River Rd (Elmwood Park), Monday May 18, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-05T18:12:20Z"},"road_event_id":"eyyHyE61nD0K/XRh4oxtRpnnecw=","beginning_cross_street":"East of Exit 61 - CR 507/River Rd","ending_cross_street":"East of Exit 61 - CR 507/River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.122009,40.902561]]}},{"id":"622WQErA61iw76tRJ9dvkm/APfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound near North of Exit 11 - CR 618/Paulison Av (Passaic), Wednesday May 20, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-05T18:12:19Z"},"road_event_id":"622WQErA61iw76tRJ9dvkm/APfs=","beginning_cross_street":"North of Exit 11 - CR 618/Paulison Av","ending_cross_street":"South of Exit 12 - Dayton St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.119873,40.859588]]}},{"id":"tQR6jQ35Suudu5diXSfENTJzQH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near East of Exit 37 - CR 513/Hibernia Ave (Rockaway Twp), Thursday May 21, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-05-05T18:12:23Z"},"road_event_id":"tQR6jQ35Suudu5diXSfENTJzQH4=","beginning_cross_street":"East of Exit 37 - CR 513/Hibernia Ave","ending_cross_street":"West of Exit 37 - CR 513/Hibernia Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.502761,40.908927]]}},{"id":"OjoADVF2w64G0t3fBNkmZX4Maqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near South of NJ 90 (Pennsauken Twp), Thursday May 14, 2026 10:00 PM thru Friday May 15, 2026 05:00 AM, right lane closed","update_date":"2026-05-05T18:12:22Z"},"road_event_id":"OjoADVF2w64G0t3fBNkmZX4Maqc=","beginning_cross_street":"South of NJ 90","ending_cross_street":"CR 615/Union Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.039184,39.97293]]}},{"id":"aDPG1HsvCrtz3Nmu4B6vhkIugp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Southbound near North of Utter Av (Hawthorne), Monday May 18, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-05T18:12:21Z"},"road_event_id":"aDPG1HsvCrtz3Nmu4B6vhkIugp0=","beginning_cross_street":"North of Utter Av","ending_cross_street":"North of Utter Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.149726,40.964641]]}},{"id":"OVcpLClKYulT1xT0hH3a6FC309U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 104 westbound between Saint Paul Street (Rochester) and Lake Ave (Rochester), Continuous Tuesday May 12th,2026 03:00 PM thru Friday May 15th,2026 03:00 PM 1 Left lane of 3 lanes closed westbound,","update_date":"2026-05-12T19:00:23Z"},"road_event_id":"OVcpLClKYulT1xT0hH3a6FC309U=","beginning_cross_street":"Saint Paul Street","ending_cross_street":"Lake Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.617683,43.19155]]}},{"id":"xnwLeBUXWnOQM/dgpBifzSjcq9Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sav2DvlQ2L69CzNx8yfBY5xLoCw="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes reduced to 1 Lane, Wednesday May 6th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-05T19:50:00Z"},"road_event_id":"xnwLeBUXWnOQM/dgpBifzSjcq9Q=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468697,42.442761]]}},{"id":"sav2DvlQ2L69CzNx8yfBY5xLoCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xnwLeBUXWnOQM/dgpBifzSjcq9Q="},{"type":"next-occurrence","id":"VXrrhoB+uvOQi7zG3xO/tY18tzA="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes reduced to 1 Lane, Wednesday May 6th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-05T19:50:00Z"},"road_event_id":"sav2DvlQ2L69CzNx8yfBY5xLoCw=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468697,42.442761]]}},{"id":"VXrrhoB+uvOQi7zG3xO/tY18tzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xnwLeBUXWnOQM/dgpBifzSjcq9Q="},{"type":"next-occurrence","id":"3vKSaRQdePN+BwaYjyCIrHjLZJM="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes reduced to 1 Lane, Wednesday May 6th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-05T19:50:00Z"},"road_event_id":"VXrrhoB+uvOQi7zG3xO/tY18tzA=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468697,42.442761]]}},{"id":"3vKSaRQdePN+BwaYjyCIrHjLZJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xnwLeBUXWnOQM/dgpBifzSjcq9Q="},{"type":"next-occurrence","id":"BVehnU0xxSvSYjSeIhra77OrlZk="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes reduced to 1 Lane, Wednesday May 6th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-05T19:50:00Z"},"road_event_id":"3vKSaRQdePN+BwaYjyCIrHjLZJM=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468697,42.442761]]}},{"id":"BVehnU0xxSvSYjSeIhra77OrlZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xnwLeBUXWnOQM/dgpBifzSjcq9Q="},{"type":"next-occurrence","id":"WwQNtMiW0q4qLy5t45VFBuaXmcU="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes reduced to 1 Lane, Wednesday May 6th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-05T19:50:00Z"},"road_event_id":"BVehnU0xxSvSYjSeIhra77OrlZk=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468697,42.442761]]}},{"id":"WwQNtMiW0q4qLy5t45VFBuaXmcU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xnwLeBUXWnOQM/dgpBifzSjcq9Q="},{"type":"next-occurrence","id":"oxL2W/fnSv9QpJIWODYmp+QhRGE="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes reduced to 1 Lane, Wednesday May 6th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-05T19:50:00Z"},"road_event_id":"WwQNtMiW0q4qLy5t45VFBuaXmcU=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468697,42.442761]]}},{"id":"oxL2W/fnSv9QpJIWODYmp+QhRGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xnwLeBUXWnOQM/dgpBifzSjcq9Q="},{"type":"next-occurrence","id":"7+/6PbFuslZ3qNfm8hJzpgK756k="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes reduced to 1 Lane, Wednesday May 6th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-05T19:50:00Z"},"road_event_id":"oxL2W/fnSv9QpJIWODYmp+QhRGE=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468697,42.442761]]}},{"id":"7+/6PbFuslZ3qNfm8hJzpgK756k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xnwLeBUXWnOQM/dgpBifzSjcq9Q="},{"type":"next-occurrence","id":"B3uF+T9qT89iZZOL1wiLxLivgAY="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes reduced to 1 Lane, Wednesday May 6th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-05T19:50:00Z"},"road_event_id":"7+/6PbFuslZ3qNfm8hJzpgK756k=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468697,42.442761]]}},{"id":"B3uF+T9qT89iZZOL1wiLxLivgAY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xnwLeBUXWnOQM/dgpBifzSjcq9Q="},{"type":"next-occurrence","id":"l0ZOi9SBBuw8magcKnLCyPD/xd8="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes reduced to 1 Lane, Wednesday May 6th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-05T19:50:00Z"},"road_event_id":"B3uF+T9qT89iZZOL1wiLxLivgAY=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468697,42.442761]]}},{"id":"l0ZOi9SBBuw8magcKnLCyPD/xd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xnwLeBUXWnOQM/dgpBifzSjcq9Q="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 Lanes reduced to 1 Lane, Wednesday May 6th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-05T19:50:00Z"},"road_event_id":"l0ZOi9SBBuw8magcKnLCyPD/xd8=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468697,42.442761]]}},{"id":"fUei7TlLBFZXSKVPVBDzONgX8rE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair on I-390 northbound area of Exit 20A - I-490 (Gates) Single Left Lane Closed with Live Climb over 1/2 Center Lane. Single Right Lane Closed with Live Climb over 1/2 Center Lane., Monday May 11th, 2026 thru Wednesday May 13th, 2026, Monday/Tuesday/Wednesday, 09:00 AM thru 02:00 PM All lanes","update_date":"2026-05-05T20:06:45Z"},"road_event_id":"fUei7TlLBFZXSKVPVBDzONgX8rE=","beginning_cross_street":"Exit 20A - I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.679107,43.153006]]}},{"id":"cbo28B8LcEvtVlSj5fN9m5qWp2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair on NY 104 eastbound at North Goodman Street; CR 108 (Irondequoit) NY-104 EB: Single Left Lane Closed; Right Shoulder Closed. - Access may be: Walking; park behind guiderailing., Tuesday May 12th, 2026 thru Wednesday May 13th, 2026, Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-05T21:50:31Z"},"road_event_id":"cbo28B8LcEvtVlSj5fN9m5qWp2I=","beginning_cross_street":"North Goodman Street; CR 108","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.577197,43.196247]]}},{"id":"AhixbTAtE4FGErCNY1mRWYYgWK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5xN+/5OuqRDLc5xt9glvnzCKkJw="}],"description":"Overhead sign repair on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-06T00:07:36Z"},"road_event_id":"AhixbTAtE4FGErCNY1mRWYYgWK0=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158175,43.062644]]}},{"id":"5xN+/5OuqRDLc5xt9glvnzCKkJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AhixbTAtE4FGErCNY1mRWYYgWK0="}],"description":"Overhead sign repair on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-06T00:07:36Z"},"road_event_id":"5xN+/5OuqRDLc5xt9glvnzCKkJw=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158175,43.062644]]}},{"id":"53u2qpDD41ameUH8g8Uo1xqx5bs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"L4D4upxdoa5TnVuZCTtH1XloiAU="}],"description":"Overhead sign repair on I-81 northbound ramp to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-06T00:14:17Z"},"road_event_id":"53u2qpDD41ameUH8g8Uo1xqx5bs=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.168116,43.070042]]}},{"id":"L4D4upxdoa5TnVuZCTtH1XloiAU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"53u2qpDD41ameUH8g8Uo1xqx5bs="}],"description":"Overhead sign repair on I-81 northbound ramp to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-06T00:14:17Z"},"road_event_id":"L4D4upxdoa5TnVuZCTtH1XloiAU=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.168116,43.070042]]}},{"id":"CMvimYDZnMC7EvRbEHML8MBMdAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q7z5vTEj/1aywrB0D8EW9p6QHKM="}],"description":"Overhead sign repair on I-81 northbound ramp to Exit 24B; Old Liverpool Road; Liverpool (Syracuse) ; Alternating lane closures, Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-06T00:17:26Z"},"road_event_id":"CMvimYDZnMC7EvRbEHML8MBMdAk=","beginning_cross_street":"Exit 24B; Old Liverpool Road; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.168961,43.071777]]}},{"id":"q7z5vTEj/1aywrB0D8EW9p6QHKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CMvimYDZnMC7EvRbEHML8MBMdAk="}],"description":"Overhead sign repair on I-81 northbound ramp to Exit 24B; Old Liverpool Road; Liverpool (Syracuse) ; Alternating lane closures, Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-06T00:17:26Z"},"road_event_id":"q7z5vTEj/1aywrB0D8EW9p6QHKM=","beginning_cross_street":"Exit 24B; Old Liverpool Road; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.168961,43.071777]]}},{"id":"OnmdDOb1JE5TN3+cX5zu9iyyVcQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair on NY 104 eastbound at Five Mile Line Road; CR 18 (Webster) NY-104 EB: Single Left Lane Closed; Single Right/Ramp Lanes Closed (Staged), Tuesday May 12th, 2026 thru Wednesday May 13th, 2026, Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-06T00:33:32Z"},"road_event_id":"OnmdDOb1JE5TN3+cX5zu9iyyVcQ=","beginning_cross_street":"Five Mile Line Road; CR 18","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.47541,43.21379]]}},{"id":"NpxoedjHl9U2h7GF/bNbqu9NFhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair on I-590 southbound area of START ROUTE I-590; I-390; Exit 15 - I-390 (Brighton), Monday May 11th, 2026 thru Wednesday May 13th, 2026, Tuesday/Wednesday, 09:00 AM thru 02:00 PM right shoulder","update_date":"2026-05-06T00:37:33Z"},"road_event_id":"NpxoedjHl9U2h7GF/bNbqu9NFhE=","beginning_cross_street":"START ROUTE I-590; I-390; Exit 15 - I-390","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.59357,43.109582]]}},{"id":"uxF1AHAqR1QFJ/P79OyiZtdo53E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair on NY 104 eastbound at Hudson Avenue (Rochester) NY-104 EB: Closes exit ramp to Hudson Ave Portable VMS Required. Left/ Right lanes closed on Service Road (NY-956A), Tuesday May 12th, 2026 thru Wednesday May 13th, 2026, Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-06T00:43:58Z"},"road_event_id":"uxF1AHAqR1QFJ/P79OyiZtdo53E=","beginning_cross_street":"Hudson Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.600199,43.191897]]}},{"id":"Bkd8Y4vOw83hDh/2+k0AdmggErE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hx46k0xT7ejfzsHBm6ebfg0n+4M="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] southbound ramps to/from Exit 14 - NY 127 (White Plains) D265183/NIGHT/32591009 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Sunday May 17th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM, ramp closed and detoured","update_date":"2026-05-13T13:50:25Z"},"road_event_id":"Bkd8Y4vOw83hDh/2+k0AdmggErE=","beginning_cross_street":"Exit 14 - NY 127","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724185,41.001542]]}},{"id":"hx46k0xT7ejfzsHBm6ebfg0n+4M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bkd8Y4vOw83hDh/2+k0AdmggErE="},{"type":"next-occurrence","id":"rFqsOQuV+6yy3PxQpmDeRDAdsF8="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] southbound ramps to/from Exit 14 - NY 127 (White Plains) D265183/NIGHT/32591009 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Sunday May 17th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM, ramp closed and detoured","update_date":"2026-05-13T13:50:25Z"},"road_event_id":"hx46k0xT7ejfzsHBm6ebfg0n+4M=","beginning_cross_street":"Exit 14 - NY 127","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724185,41.001542]]}},{"id":"rFqsOQuV+6yy3PxQpmDeRDAdsF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bkd8Y4vOw83hDh/2+k0AdmggErE="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] southbound ramps to/from Exit 14 - NY 127 (White Plains) D265183/NIGHT/32591009 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Sunday May 17th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM, ramp closed and detoured","update_date":"2026-05-13T13:50:25Z"},"road_event_id":"rFqsOQuV+6yy3PxQpmDeRDAdsF8=","beginning_cross_street":"Exit 14 - NY 127","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724185,41.001542]]}},{"id":"lEeknPbL8BewK+Qg3+k8Cpebd0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cRGw4q+aGpafSSNzxhIixQrIPv8="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] northbound between Exit 11 - Weaver Street (Scarsdale) and Exit 15A/B - Westchester Avenue (Harrison) D265183/NIGHT/32630309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-06T10:12:19Z"},"road_event_id":"lEeknPbL8BewK+Qg3+k8Cpebd0M=","beginning_cross_street":"Exit 11 - Weaver Street","ending_cross_street":"Exit 15A/B - Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.765631,40.97284]]}},{"id":"cRGw4q+aGpafSSNzxhIixQrIPv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lEeknPbL8BewK+Qg3+k8Cpebd0M="},{"type":"next-occurrence","id":"dCdaLsgixoNKl1MkcObMJBdCtbg="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] northbound between Exit 11 - Weaver Street (Scarsdale) and Exit 15A/B - Westchester Avenue (Harrison) D265183/NIGHT/32630309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-06T10:12:19Z"},"road_event_id":"cRGw4q+aGpafSSNzxhIixQrIPv8=","beginning_cross_street":"Exit 11 - Weaver Street","ending_cross_street":"Exit 15A/B - Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.765631,40.97284]]}},{"id":"dCdaLsgixoNKl1MkcObMJBdCtbg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lEeknPbL8BewK+Qg3+k8Cpebd0M="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] northbound between Exit 11 - Weaver Street (Scarsdale) and Exit 15A/B - Westchester Avenue (Harrison) D265183/NIGHT/32630309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-06T10:12:19Z"},"road_event_id":"dCdaLsgixoNKl1MkcObMJBdCtbg=","beginning_cross_street":"Exit 11 - Weaver Street","ending_cross_street":"Exit 15A/B - Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.765631,40.97284]]}},{"id":"z4Dyg5IdluaQKUHm3gpcUmTBa4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EVqRE7MpXWWEaMo7beOGqfkdF9g="}],"description":"Utility work on NY 52 both directions between Pine Street (Montgomery) and Hepper Street (Montgomery) 2025MO3381214/32701409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Wednesday May 13th, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 03:00 PM, alternating traffic, Friday May 15th, 2026 thru Wednesday May 20th, 2026 Monday/ Tuesday/ Wednesday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-12T16:51:11Z"},"road_event_id":"z4Dyg5IdluaQKUHm3gpcUmTBa4w=","beginning_cross_street":"Pine Street","ending_cross_street":"Hepper Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.189234,41.560867]]}},{"id":"EVqRE7MpXWWEaMo7beOGqfkdF9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4Dyg5IdluaQKUHm3gpcUmTBa4w="},{"type":"next-occurrence","id":"xW+hCY4aDh2apherZ3Thls9UXOw="}],"description":"Utility work on NY 52 both directions between Pine Street (Montgomery) and Hepper Street (Montgomery) 2025MO3381214/32701409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Wednesday May 13th, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 03:00 PM, alternating traffic, Friday May 15th, 2026 thru Wednesday May 20th, 2026 Monday/ Tuesday/ Wednesday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-12T16:51:11Z"},"road_event_id":"EVqRE7MpXWWEaMo7beOGqfkdF9g=","beginning_cross_street":"Pine Street","ending_cross_street":"Hepper Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.189234,41.560867]]}},{"id":"xW+hCY4aDh2apherZ3Thls9UXOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4Dyg5IdluaQKUHm3gpcUmTBa4w="},{"type":"next-occurrence","id":"aM0562YjHASaV0q0RTzHmRPEeT4="}],"description":"Utility work on NY 52 both directions between Pine Street (Montgomery) and Hepper Street (Montgomery) 2025MO3381214/32701409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Wednesday May 13th, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 03:00 PM, alternating traffic, Friday May 15th, 2026 thru Wednesday May 20th, 2026 Monday/ Tuesday/ Wednesday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-12T16:51:11Z"},"road_event_id":"xW+hCY4aDh2apherZ3Thls9UXOw=","beginning_cross_street":"Pine Street","ending_cross_street":"Hepper Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.189234,41.560867]]}},{"id":"aM0562YjHASaV0q0RTzHmRPEeT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4Dyg5IdluaQKUHm3gpcUmTBa4w="},{"type":"next-occurrence","id":"WnFMiQISlmEiizg7npkiWVf2OmA="}],"description":"Utility work on NY 52 both directions between Pine Street (Montgomery) and Hepper Street (Montgomery) 2025MO3381214/32701409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Wednesday May 13th, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 03:00 PM, alternating traffic, Friday May 15th, 2026 thru Wednesday May 20th, 2026 Monday/ Tuesday/ Wednesday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-12T16:51:11Z"},"road_event_id":"aM0562YjHASaV0q0RTzHmRPEeT4=","beginning_cross_street":"Pine Street","ending_cross_street":"Hepper Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.189234,41.560867]]}},{"id":"WnFMiQISlmEiizg7npkiWVf2OmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4Dyg5IdluaQKUHm3gpcUmTBa4w="}],"description":"Utility work on NY 52 both directions between Pine Street (Montgomery) and Hepper Street (Montgomery) 2025MO3381214/32701409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Wednesday May 13th, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 03:00 PM, alternating traffic, Friday May 15th, 2026 thru Wednesday May 20th, 2026 Monday/ Tuesday/ Wednesday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-12T16:51:11Z"},"road_event_id":"WnFMiQISlmEiizg7npkiWVf2OmA=","beginning_cross_street":"Pine Street","ending_cross_street":"Hepper Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.189234,41.560867]]}},{"id":"B4oxzFCLOTLa9RfHOEjHY0P2aLg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"msFy4nFnM6ethuHUWLxFtNeEwsM="}],"description":"Utility work on NY 208 both directions between William Street (Montgomery) and Grove Street (Montgomery) 2025MO3381214/32731509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Wednesday May 13th, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 03:00 PM, alternating traffic, Friday May 15th, 2026 thru Wednesday May 20th, 2026 Monday/ Tuesday/ Wednesday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-12T16:50:14Z"},"road_event_id":"B4oxzFCLOTLa9RfHOEjHY0P2aLg=","beginning_cross_street":"William Street","ending_cross_street":"Grove Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188216,41.561357]]}},{"id":"msFy4nFnM6ethuHUWLxFtNeEwsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B4oxzFCLOTLa9RfHOEjHY0P2aLg="},{"type":"next-occurrence","id":"oIJ8BRskZLQm95zZqUtSbp6Bf70="}],"description":"Utility work on NY 208 both directions between William Street (Montgomery) and Grove Street (Montgomery) 2025MO3381214/32731509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Wednesday May 13th, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 03:00 PM, alternating traffic, Friday May 15th, 2026 thru Wednesday May 20th, 2026 Monday/ Tuesday/ Wednesday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-12T16:50:14Z"},"road_event_id":"msFy4nFnM6ethuHUWLxFtNeEwsM=","beginning_cross_street":"William Street","ending_cross_street":"Grove Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188216,41.561357]]}},{"id":"oIJ8BRskZLQm95zZqUtSbp6Bf70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B4oxzFCLOTLa9RfHOEjHY0P2aLg="},{"type":"next-occurrence","id":"OuFXRPhV3GbFYoyJDW+q4sNRwO8="}],"description":"Utility work on NY 208 both directions between William Street (Montgomery) and Grove Street (Montgomery) 2025MO3381214/32731509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Wednesday May 13th, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 03:00 PM, alternating traffic, Friday May 15th, 2026 thru Wednesday May 20th, 2026 Monday/ Tuesday/ Wednesday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-12T16:50:14Z"},"road_event_id":"oIJ8BRskZLQm95zZqUtSbp6Bf70=","beginning_cross_street":"William Street","ending_cross_street":"Grove Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188216,41.561357]]}},{"id":"OuFXRPhV3GbFYoyJDW+q4sNRwO8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B4oxzFCLOTLa9RfHOEjHY0P2aLg="},{"type":"next-occurrence","id":"wrSNL6Mw7I2E8mTRuLms9O/gK3Y="}],"description":"Utility work on NY 208 both directions between William Street (Montgomery) and Grove Street (Montgomery) 2025MO3381214/32731509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Wednesday May 13th, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 03:00 PM, alternating traffic, Friday May 15th, 2026 thru Wednesday May 20th, 2026 Monday/ Tuesday/ Wednesday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-12T16:50:14Z"},"road_event_id":"OuFXRPhV3GbFYoyJDW+q4sNRwO8=","beginning_cross_street":"William Street","ending_cross_street":"Grove Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188216,41.561357]]}},{"id":"wrSNL6Mw7I2E8mTRuLms9O/gK3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B4oxzFCLOTLa9RfHOEjHY0P2aLg="}],"description":"Utility work on NY 208 both directions between William Street (Montgomery) and Grove Street (Montgomery) 2025MO3381214/32731509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Wednesday May 13th, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 03:00 PM, alternating traffic, Friday May 15th, 2026 thru Wednesday May 20th, 2026 Monday/ Tuesday/ Wednesday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-12T16:50:14Z"},"road_event_id":"wrSNL6Mw7I2E8mTRuLms9O/gK3Y=","beginning_cross_street":"William Street","ending_cross_street":"Grove Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188216,41.561357]]}},{"id":"hVeMEpW5I9uuvaVpnGw0bGKRLI4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between CR 601/Avalon Blvd (Middle Twp) and CR 550/Woodbine Ocean View Rd (Dennis Twp), Friday May 15, 2026 07:00 PM thru Saturday May 16, 2026 05:00 AM, right shoulder closed","update_date":"2026-05-06T12:27:19Z"},"road_event_id":"hVeMEpW5I9uuvaVpnGw0bGKRLI4=","beginning_cross_street":"CR 601/Avalon Blvd","ending_cross_street":"CR 550/Woodbine Ocean View Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T18:00:00Z","end_date":"2026-05-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.780685,39.129325]]}},{"id":"eUOzZuI5TQmskULzvMBo1++Rr5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between CR 601/Avalon Blvd (Middle Twp) and CR 550/Woodbine Ocean View Rd (Dennis Twp), Saturday May 16, 2026 07:00 PM thru Sunday May 17, 2026 05:00 AM, right shoulder closed","update_date":"2026-05-06T12:27:18Z"},"road_event_id":"eUOzZuI5TQmskULzvMBo1++Rr5Y=","beginning_cross_street":"CR 601/Avalon Blvd","ending_cross_street":"CR 550/Woodbine Ocean View Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T18:00:00Z","end_date":"2026-05-18T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.780685,39.129325]]}},{"id":"QduH1PjAq7qDafMC806c6h58/SE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near South of CR 522/Throckmorton St (Freehold Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, right lane closed","update_date":"2026-05-06T12:27:22Z"},"road_event_id":"QduH1PjAq7qDafMC806c6h58/SE=","beginning_cross_street":"South of CR 522/Throckmorton St","ending_cross_street":"North of CR 522/Throckmorton St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.293777,40.26583]]}},{"id":"/+4hVwaY06tcVhuvzBFScHMSTgM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound near West of Exit 21 - CR 527 (Jackson Twp), Monday May 18, 2026 09:00 AM thru 12:00 PM, right lane closed","update_date":"2026-05-06T12:27:21Z"},"road_event_id":"/+4hVwaY06tcVhuvzBFScHMSTgM=","beginning_cross_street":"West of Exit 21 - CR 527","ending_cross_street":"West of Exit 21 - CR 527","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.370094,40.154846]]}},{"id":"TBcQtVae80q+KjsyqCh5xyXxldg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between CR 601/Avalon Blvd (Middle Twp) and CR 550/Woodbine Ocean View Rd (Dennis Twp), Wednesday May 13, 2026 07:00 PM thru Thursday May 14, 2026 05:00 AM, right shoulder closed","update_date":"2026-05-06T12:27:32Z"},"road_event_id":"TBcQtVae80q+KjsyqCh5xyXxldg=","beginning_cross_street":"CR 601/Avalon Blvd","ending_cross_street":"CR 550/Woodbine Ocean View Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.780685,39.129325]]}},{"id":"r628l8SC0viUIKpHbo+1S6ByZ/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near South of CR 522/Throckmorton St (Freehold Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, right lane closed","update_date":"2026-05-06T12:27:30Z"},"road_event_id":"r628l8SC0viUIKpHbo+1S6ByZ/M=","beginning_cross_street":"South of CR 522/Throckmorton St","ending_cross_street":"North of CR 522/Throckmorton St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.293777,40.26583]]}},{"id":"E1y646M0tiZjgqL9fiCmtp4NMAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between CR 601/Avalon Blvd (Middle Twp) and CR 550/Woodbine Ocean View Rd (Dennis Twp), Thursday May 14, 2026 07:00 PM thru Friday May 15, 2026 05:00 AM, right shoulder closed","update_date":"2026-05-06T12:27:29Z"},"road_event_id":"E1y646M0tiZjgqL9fiCmtp4NMAo=","beginning_cross_street":"CR 601/Avalon Blvd","ending_cross_street":"CR 550/Woodbine Ocean View Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.780685,39.129325]]}},{"id":"1uGp7W6HGi9Oug1jZIx73HXHZfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound near North of Exit 36 - NJ 73 (Mount Laurel Twp), Wednesday May 13, 2026 09:00 AM thru Thursday May 14, 2026 12:00 AM, right shoulder closed","update_date":"2026-05-06T12:27:27Z"},"road_event_id":"1uGp7W6HGi9Oug1jZIx73HXHZfw=","beginning_cross_street":"North of Exit 36 - NJ 73","ending_cross_street":"North of Exit 36 - NJ 73","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-14T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.940307,39.944408]]}},{"id":"OQSv6u0H/3Fjm9kga9mPY0MebZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-290"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-290 westbound Town of Tonawanda; Town of Amherst Line; Niagara Falls Boulevard; US 62 (Tonawanda) to NY 384 Delaware Avenue (Tonawanda), Saturday May 16th, 2026, 07:00 AM thru 05:00 PM 2 Left lanes of 3 lanes closed","update_date":"2026-05-06T12:38:47Z"},"road_event_id":"OQSv6u0H/3Fjm9kga9mPY0MebZY=","beginning_cross_street":"Town of Tonawanda; Town of Amherst Line; Niagara Falls Boulevard; US 62","ending_cross_street":"NY 384 Delaware Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T18:00:00Z","end_date":"2026-05-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.824916,43.004243]]}},{"id":"koU9rgqANxjCykAhwxavHZ7IjUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 59"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PVTMhbI0cE3gevOVUicJrYClvUM="}],"description":"Curb work on NY 59 westbound between Campbell Avenue (Ramapo) and Hillcrest Road (Ramapo) 202508114390/29327909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-06T13:01:04Z"},"road_event_id":"koU9rgqANxjCykAhwxavHZ7IjUY=","beginning_cross_street":"Campbell Avenue","ending_cross_street":"Hillcrest Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.131028,41.112488]]}},{"id":"PVTMhbI0cE3gevOVUicJrYClvUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 59"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"koU9rgqANxjCykAhwxavHZ7IjUY="}],"description":"Curb work on NY 59 westbound between Campbell Avenue (Ramapo) and Hillcrest Road (Ramapo) 202508114390/29327909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-06T13:01:04Z"},"road_event_id":"PVTMhbI0cE3gevOVUicJrYClvUM=","beginning_cross_street":"Campbell Avenue","ending_cross_street":"Hillcrest Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.131028,41.112488]]}},{"id":"F0OxjE4v1SX5E7qbSmPlP4QOFaw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3tyJLWYvvSbbV9d9A/DBb0SYYjM="}],"description":"Safety improvements on NY 9A northbound between Craft Lane (Cortlandt) and White Street (Cortlandt) 2026083121645/32739909 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-06T13:35:40Z"},"road_event_id":"F0OxjE4v1SX5E7qbSmPlP4QOFaw=","beginning_cross_street":"Craft Lane","ending_cross_street":"White Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.935499,41.260541]]}},{"id":"3tyJLWYvvSbbV9d9A/DBb0SYYjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F0OxjE4v1SX5E7qbSmPlP4QOFaw="},{"type":"next-occurrence","id":"TAbnqDjD/Kxa6C7B05HrPVIVdwE="}],"description":"Safety improvements on NY 9A northbound between Craft Lane (Cortlandt) and White Street (Cortlandt) 2026083121645/32739909 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-06T13:35:40Z"},"road_event_id":"3tyJLWYvvSbbV9d9A/DBb0SYYjM=","beginning_cross_street":"Craft Lane","ending_cross_street":"White Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.935499,41.260541]]}},{"id":"TAbnqDjD/Kxa6C7B05HrPVIVdwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F0OxjE4v1SX5E7qbSmPlP4QOFaw="},{"type":"next-occurrence","id":"XeKK/VphINW7lhfE17AAzW47X2c="}],"description":"Safety improvements on NY 9A northbound between Craft Lane (Cortlandt) and White Street (Cortlandt) 2026083121645/32739909 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-06T13:35:40Z"},"road_event_id":"TAbnqDjD/Kxa6C7B05HrPVIVdwE=","beginning_cross_street":"Craft Lane","ending_cross_street":"White Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.935499,41.260541]]}},{"id":"XeKK/VphINW7lhfE17AAzW47X2c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F0OxjE4v1SX5E7qbSmPlP4QOFaw="},{"type":"next-occurrence","id":"TMz+5axqURjtJN0WmQKIkZcYHQE="}],"description":"Safety improvements on NY 9A northbound between Craft Lane (Cortlandt) and White Street (Cortlandt) 2026083121645/32739909 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-06T13:35:40Z"},"road_event_id":"XeKK/VphINW7lhfE17AAzW47X2c=","beginning_cross_street":"Craft Lane","ending_cross_street":"White Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:30:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.935499,41.260541]]}},{"id":"TMz+5axqURjtJN0WmQKIkZcYHQE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F0OxjE4v1SX5E7qbSmPlP4QOFaw="}],"description":"Safety improvements on NY 9A northbound between Craft Lane (Cortlandt) and White Street (Cortlandt) 2026083121645/32739909 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-06T13:35:40Z"},"road_event_id":"TMz+5axqURjtJN0WmQKIkZcYHQE=","beginning_cross_street":"Craft Lane","ending_cross_street":"White Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:30:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.935499,41.260541]]}},{"id":"jZnXB8iltRpbKiAQAe1gCGnao+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gfnwZq5SJVHpaWa+WOkUaWW/yG0="}],"description":"Road rehabilitation on NY 303 southbound ramp to NY 59 (Clarkstown) D265648/NIGHT/29685409 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure","update_date":"2026-05-13T13:58:35Z"},"road_event_id":"jZnXB8iltRpbKiAQAe1gCGnao+k=","beginning_cross_street":"NY 59","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.951336,41.095373]]}},{"id":"gfnwZq5SJVHpaWa+WOkUaWW/yG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jZnXB8iltRpbKiAQAe1gCGnao+k="},{"type":"next-occurrence","id":"6jpOiKcJILRpQkT7STvCSO4F9ZM="}],"description":"Road rehabilitation on NY 303 southbound ramp to NY 59 (Clarkstown) D265648/NIGHT/29685409 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure","update_date":"2026-05-13T13:58:35Z"},"road_event_id":"gfnwZq5SJVHpaWa+WOkUaWW/yG0=","beginning_cross_street":"NY 59","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.951336,41.095373]]}},{"id":"6jpOiKcJILRpQkT7STvCSO4F9ZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jZnXB8iltRpbKiAQAe1gCGnao+k="},{"type":"next-occurrence","id":"5AOQ7NzDJ27suH+oVJxpnSdK/4Q="}],"description":"Road rehabilitation on NY 303 southbound ramp to NY 59 (Clarkstown) D265648/NIGHT/29685409 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure","update_date":"2026-05-13T13:58:35Z"},"road_event_id":"6jpOiKcJILRpQkT7STvCSO4F9ZM=","beginning_cross_street":"NY 59","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.951336,41.095373]]}},{"id":"5AOQ7NzDJ27suH+oVJxpnSdK/4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jZnXB8iltRpbKiAQAe1gCGnao+k="},{"type":"next-occurrence","id":"5aWywVKz0fKzUTJh3RDApDZ5Byo="}],"description":"Road rehabilitation on NY 303 southbound ramp to NY 59 (Clarkstown) D265648/NIGHT/29685409 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure","update_date":"2026-05-13T13:58:35Z"},"road_event_id":"5AOQ7NzDJ27suH+oVJxpnSdK/4Q=","beginning_cross_street":"NY 59","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.951336,41.095373]]}},{"id":"5aWywVKz0fKzUTJh3RDApDZ5Byo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jZnXB8iltRpbKiAQAe1gCGnao+k="},{"type":"next-occurrence","id":"7xAYtfztLnKeieyWpsiX15WlLgU="}],"description":"Road rehabilitation on NY 303 southbound ramp to NY 59 (Clarkstown) D265648/NIGHT/29685409 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure","update_date":"2026-05-13T13:58:35Z"},"road_event_id":"5aWywVKz0fKzUTJh3RDApDZ5Byo=","beginning_cross_street":"NY 59","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.951336,41.095373]]}},{"id":"7xAYtfztLnKeieyWpsiX15WlLgU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jZnXB8iltRpbKiAQAe1gCGnao+k="},{"type":"next-occurrence","id":"3i+jW0KJFyd7A4lts8RtNTI/2x8="}],"description":"Road rehabilitation on NY 303 southbound ramp to NY 59 (Clarkstown) D265648/NIGHT/29685409 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure","update_date":"2026-05-13T13:58:35Z"},"road_event_id":"7xAYtfztLnKeieyWpsiX15WlLgU=","beginning_cross_street":"NY 59","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.951336,41.095373]]}},{"id":"3i+jW0KJFyd7A4lts8RtNTI/2x8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jZnXB8iltRpbKiAQAe1gCGnao+k="}],"description":"Road rehabilitation on NY 303 southbound ramp to NY 59 (Clarkstown) D265648/NIGHT/29685409 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure","update_date":"2026-05-13T13:58:35Z"},"road_event_id":"3i+jW0KJFyd7A4lts8RtNTI/2x8=","beginning_cross_street":"NY 59","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.951336,41.095373]]}},{"id":"HftFBlKbl+pW1XD/gPettzE7OMU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 59"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9TItuvFuPxUQ0vmIvZCcLOaDOuY="}],"description":"Road rehabilitation on NY 59 eastbound ramp to NY 303 (Clarkstown) D265648/NIGHT/32740009 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure","update_date":"2026-05-13T13:57:26Z"},"road_event_id":"HftFBlKbl+pW1XD/gPettzE7OMU=","beginning_cross_street":"NY 303","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.951566,41.093459]]}},{"id":"9TItuvFuPxUQ0vmIvZCcLOaDOuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 59"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HftFBlKbl+pW1XD/gPettzE7OMU="},{"type":"next-occurrence","id":"NKbW6wxgqtgPZdvIkHEwxSbqTWw="}],"description":"Road rehabilitation on NY 59 eastbound ramp to NY 303 (Clarkstown) D265648/NIGHT/32740009 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure","update_date":"2026-05-13T13:57:26Z"},"road_event_id":"9TItuvFuPxUQ0vmIvZCcLOaDOuY=","beginning_cross_street":"NY 303","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.951566,41.093459]]}},{"id":"NKbW6wxgqtgPZdvIkHEwxSbqTWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 59"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HftFBlKbl+pW1XD/gPettzE7OMU="},{"type":"next-occurrence","id":"2lSdpYOLqc9/aEKowkmkBuxkW+8="}],"description":"Road rehabilitation on NY 59 eastbound ramp to NY 303 (Clarkstown) D265648/NIGHT/32740009 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure","update_date":"2026-05-13T13:57:26Z"},"road_event_id":"NKbW6wxgqtgPZdvIkHEwxSbqTWw=","beginning_cross_street":"NY 303","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.951566,41.093459]]}},{"id":"2lSdpYOLqc9/aEKowkmkBuxkW+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 59"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HftFBlKbl+pW1XD/gPettzE7OMU="},{"type":"next-occurrence","id":"iStLTzYvALOyuZWjcGvQ3b73oPA="}],"description":"Road rehabilitation on NY 59 eastbound ramp to NY 303 (Clarkstown) D265648/NIGHT/32740009 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure","update_date":"2026-05-13T13:57:26Z"},"road_event_id":"2lSdpYOLqc9/aEKowkmkBuxkW+8=","beginning_cross_street":"NY 303","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.951566,41.093459]]}},{"id":"iStLTzYvALOyuZWjcGvQ3b73oPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 59"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HftFBlKbl+pW1XD/gPettzE7OMU="},{"type":"next-occurrence","id":"GFWbKNFZsd6hCkm582xVQM4oJSU="}],"description":"Road rehabilitation on NY 59 eastbound ramp to NY 303 (Clarkstown) D265648/NIGHT/32740009 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure","update_date":"2026-05-13T13:57:26Z"},"road_event_id":"iStLTzYvALOyuZWjcGvQ3b73oPA=","beginning_cross_street":"NY 303","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.951566,41.093459]]}},{"id":"GFWbKNFZsd6hCkm582xVQM4oJSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 59"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HftFBlKbl+pW1XD/gPettzE7OMU="},{"type":"next-occurrence","id":"QCstVvarnCDrSBX6Kvy7o0318HA="}],"description":"Road rehabilitation on NY 59 eastbound ramp to NY 303 (Clarkstown) D265648/NIGHT/32740009 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure","update_date":"2026-05-13T13:57:26Z"},"road_event_id":"GFWbKNFZsd6hCkm582xVQM4oJSU=","beginning_cross_street":"NY 303","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.951566,41.093459]]}},{"id":"QCstVvarnCDrSBX6Kvy7o0318HA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 59"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HftFBlKbl+pW1XD/gPettzE7OMU="}],"description":"Road rehabilitation on NY 59 eastbound ramp to NY 303 (Clarkstown) D265648/NIGHT/32740009 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday May 10th, 2026 thru Friday May 15th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closure","update_date":"2026-05-13T13:57:26Z"},"road_event_id":"QCstVvarnCDrSBX6Kvy7o0318HA=","beginning_cross_street":"NY 303","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.951566,41.093459]]}},{"id":"t+Hm79ZVrIzeiJgZSV8eTbPmfVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike Outer Roadway northbound between Inner and Outer Roadway Merge (Mansfield Twp) and North of Interchange 14 - I-78/US 1&9 (Newark), Wednesday May 13th,2026 thru Thursday May 14th,2026, Wednesday, 08:00 PM thru 05:00 AM All lanes closed northbound,","update_date":"2026-05-09T10:00:10Z"},"road_event_id":"t+Hm79ZVrIzeiJgZSV8eTbPmfVo=","beginning_cross_street":"Inner and Outer Roadway Merge","ending_cross_street":"North of Interchange 14 - I-78/US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.748395,40.079602]]}},{"id":"XyhoEsWqmEYkTZFI+r9VbeBaTgQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DZ8ukSVoylLuwZTSyRI9QsXo8hQ="}],"description":"Utility work on NY 5 both directions between Leroy Village Line (Le Roy) and Route 19 Leroy (Le Roy) Alternating lane closures with flaggers as needed, Thursday May 7th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-06T15:15:37Z"},"road_event_id":"XyhoEsWqmEYkTZFI+r9VbeBaTgQ=","beginning_cross_street":"Leroy  Village Line","ending_cross_street":"Route 19 Leroy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.009413,42.978422]]}},{"id":"DZ8ukSVoylLuwZTSyRI9QsXo8hQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XyhoEsWqmEYkTZFI+r9VbeBaTgQ="},{"type":"next-occurrence","id":"HHumiirsnpmAMUa4+iX75wvSZfo="}],"description":"Utility work on NY 5 both directions between Leroy Village Line (Le Roy) and Route 19 Leroy (Le Roy) Alternating lane closures with flaggers as needed, Thursday May 7th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-06T15:15:37Z"},"road_event_id":"DZ8ukSVoylLuwZTSyRI9QsXo8hQ=","beginning_cross_street":"Leroy  Village Line","ending_cross_street":"Route 19 Leroy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.009413,42.978422]]}},{"id":"HHumiirsnpmAMUa4+iX75wvSZfo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XyhoEsWqmEYkTZFI+r9VbeBaTgQ="}],"description":"Utility work on NY 5 both directions between Leroy Village Line (Le Roy) and Route 19 Leroy (Le Roy) Alternating lane closures with flaggers as needed, Thursday May 7th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-06T15:15:37Z"},"road_event_id":"HHumiirsnpmAMUa4+iX75wvSZfo=","beginning_cross_street":"Leroy  Village Line","ending_cross_street":"Route 19 Leroy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.009413,42.978422]]}},{"id":"MTQz1rum/+IdS1zBhHbZ0nQB9P0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"W83FJfOlQsygYD37LucVAQleOxA="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, ","update_date":"2026-05-06T15:39:10Z"},"road_event_id":"MTQz1rum/+IdS1zBhHbZ0nQB9P0=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"W83FJfOlQsygYD37LucVAQleOxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MTQz1rum/+IdS1zBhHbZ0nQB9P0="},{"type":"next-occurrence","id":"4/9fWXofkFBv2Q3GcvY/Q8l1tQ4="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, ","update_date":"2026-05-06T15:39:10Z"},"road_event_id":"W83FJfOlQsygYD37LucVAQleOxA=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"4/9fWXofkFBv2Q3GcvY/Q8l1tQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MTQz1rum/+IdS1zBhHbZ0nQB9P0="},{"type":"next-occurrence","id":"bw6PszzrxZORjFe/hqOwnDJll5k="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, ","update_date":"2026-05-06T15:39:10Z"},"road_event_id":"4/9fWXofkFBv2Q3GcvY/Q8l1tQ4=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"bw6PszzrxZORjFe/hqOwnDJll5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MTQz1rum/+IdS1zBhHbZ0nQB9P0="},{"type":"next-occurrence","id":"ct3HBhL3mHiapviNjHzZhHlwIcQ="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, ","update_date":"2026-05-06T15:39:10Z"},"road_event_id":"bw6PszzrxZORjFe/hqOwnDJll5k=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"ct3HBhL3mHiapviNjHzZhHlwIcQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MTQz1rum/+IdS1zBhHbZ0nQB9P0="},{"type":"next-occurrence","id":"LVwWYTQqBLZNd6IzvCOVMdgDQAk="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, ","update_date":"2026-05-06T15:39:10Z"},"road_event_id":"ct3HBhL3mHiapviNjHzZhHlwIcQ=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"LVwWYTQqBLZNd6IzvCOVMdgDQAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MTQz1rum/+IdS1zBhHbZ0nQB9P0="},{"type":"next-occurrence","id":"X3yA0F5HT9j91M79EmUJrYT3o2o="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, ","update_date":"2026-05-06T15:39:10Z"},"road_event_id":"LVwWYTQqBLZNd6IzvCOVMdgDQAk=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"X3yA0F5HT9j91M79EmUJrYT3o2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MTQz1rum/+IdS1zBhHbZ0nQB9P0="},{"type":"next-occurrence","id":"PBaQlF3tZw+1nt53rLx2cSi73zM="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, ","update_date":"2026-05-06T15:39:10Z"},"road_event_id":"X3yA0F5HT9j91M79EmUJrYT3o2o=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"PBaQlF3tZw+1nt53rLx2cSi73zM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MTQz1rum/+IdS1zBhHbZ0nQB9P0="},{"type":"next-occurrence","id":"BsXmuwMTtzQkUxerkOwKzAQjKZY="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, ","update_date":"2026-05-06T15:39:10Z"},"road_event_id":"PBaQlF3tZw+1nt53rLx2cSi73zM=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"BsXmuwMTtzQkUxerkOwKzAQjKZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MTQz1rum/+IdS1zBhHbZ0nQB9P0="},{"type":"next-occurrence","id":"LPZvxS/aopeaJxjd3FwaViIMNaA="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, ","update_date":"2026-05-06T15:39:10Z"},"road_event_id":"BsXmuwMTtzQkUxerkOwKzAQjKZY=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"LPZvxS/aopeaJxjd3FwaViIMNaA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MTQz1rum/+IdS1zBhHbZ0nQB9P0="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, ","update_date":"2026-05-06T15:39:10Z"},"road_event_id":"LPZvxS/aopeaJxjd3FwaViIMNaA=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"3AsgBY81jDP9H7SjVcCa+ffsxTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line"],"direction":"unknown","related_road_events":[],"description":"Due to Signal repairs northbound, E Line between Sutphin Blvd (New York) and Forest Hills - 71 Av (New York) stops at Briarwood and 75 Av., Wednesday May 13th, 2026, 10:00 AM thru 03:00 PM local service only","update_date":"2026-05-06T15:55:21Z"},"road_event_id":"3AsgBY81jDP9H7SjVcCa+ffsxTY=","beginning_cross_street":"Sutphin Blvd","ending_cross_street":"Forest Hills - 71 Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810708,40.70546]]}},{"id":"CXZPg99mcNwIaWs8VMYfO8f092k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+xMx3RFX6Sn00Aa1vcCWh4Ko2Wk="}],"description":"Due to Signal repairs northbound, A Line between Canal St (New York) and 59 St - Columbus Circle (New York) skips Spring St, 23 St and 50 St. For service to these stations, take the A line to W 4 St-Wash Sq, 34 St-Penn Station or 59 St-Columbus Circle and transfer to a downtown A line local. For service from these stations, take the A line to 42 St-Port Authority, 14 St or Canal St and transfer to an uptown A line., Friday May 15th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-05-06T15:58:25Z"},"road_event_id":"CXZPg99mcNwIaWs8VMYfO8f092k=","beginning_cross_street":"Canal St","ending_cross_street":"59 St - Columbus Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T03:30:00Z","end_date":"2026-05-17T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005229,40.720824]]}},{"id":"+xMx3RFX6Sn00Aa1vcCWh4Ko2Wk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CXZPg99mcNwIaWs8VMYfO8f092k="},{"type":"next-occurrence","id":"8CNTPKV2OB/4mKc3uLduYm48vCQ="}],"description":"Due to Signal repairs northbound, A Line between Canal St (New York) and 59 St - Columbus Circle (New York) skips Spring St, 23 St and 50 St. For service to these stations, take the A line to W 4 St-Wash Sq, 34 St-Penn Station or 59 St-Columbus Circle and transfer to a downtown A line local. For service from these stations, take the A line to 42 St-Port Authority, 14 St or Canal St and transfer to an uptown A line., Friday May 15th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-05-06T15:58:25Z"},"road_event_id":"+xMx3RFX6Sn00Aa1vcCWh4Ko2Wk=","beginning_cross_street":"Canal St","ending_cross_street":"59 St - Columbus Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T03:30:00Z","end_date":"2026-05-18T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005229,40.720824]]}},{"id":"8CNTPKV2OB/4mKc3uLduYm48vCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CXZPg99mcNwIaWs8VMYfO8f092k="},{"type":"next-occurrence","id":"zkDn6dmYB690S3ekizjPVHqlS+w="}],"description":"Due to Signal repairs northbound, A Line between Canal St (New York) and 59 St - Columbus Circle (New York) skips Spring St, 23 St and 50 St. For service to these stations, take the A line to W 4 St-Wash Sq, 34 St-Penn Station or 59 St-Columbus Circle and transfer to a downtown A line local. For service from these stations, take the A line to 42 St-Port Authority, 14 St or Canal St and transfer to an uptown A line., Friday May 15th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-05-06T15:58:25Z"},"road_event_id":"8CNTPKV2OB/4mKc3uLduYm48vCQ=","beginning_cross_street":"Canal St","ending_cross_street":"59 St - Columbus Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T03:30:00Z","end_date":"2026-05-19T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005229,40.720824]]}},{"id":"zkDn6dmYB690S3ekizjPVHqlS+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CXZPg99mcNwIaWs8VMYfO8f092k="}],"description":"Due to Signal repairs northbound, A Line between Canal St (New York) and 59 St - Columbus Circle (New York) skips Spring St, 23 St and 50 St. For service to these stations, take the A line to W 4 St-Wash Sq, 34 St-Penn Station or 59 St-Columbus Circle and transfer to a downtown A line local. For service from these stations, take the A line to 42 St-Port Authority, 14 St or Canal St and transfer to an uptown A line., Friday May 15th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-05-06T15:58:25Z"},"road_event_id":"zkDn6dmYB690S3ekizjPVHqlS+w=","beginning_cross_street":"Canal St","ending_cross_street":"59 St - Columbus Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T03:30:00Z","end_date":"2026-05-20T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005229,40.720824]]}},{"id":"kLw9CPrixlgc/OAzzb1A7MTpxkQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zAym8JQI2H9ZWt7tfDz4cHDm87c="}],"description":"Drainage improvements on I-690 eastbound between Exit 11 - ROUTE 297; Solvay-Fairgrounds (Geddes) and Exit 13 - Hiawatha Boulevard (Syracuse) ; Alternating left and right lane closures, Wednesday May 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-06T16:01:58Z"},"road_event_id":"kLw9CPrixlgc/OAzzb1A7MTpxkQ=","beginning_cross_street":"Exit 11 - ROUTE 297; Solvay-Fairgrounds","ending_cross_street":"Exit 13 - Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.218637,43.07939]]}},{"id":"zAym8JQI2H9ZWt7tfDz4cHDm87c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLw9CPrixlgc/OAzzb1A7MTpxkQ="},{"type":"next-occurrence","id":"jgIIoYWjCKurz7gluXaE4HFQRzQ="}],"description":"Drainage improvements on I-690 eastbound between Exit 11 - ROUTE 297; Solvay-Fairgrounds (Geddes) and Exit 13 - Hiawatha Boulevard (Syracuse) ; Alternating left and right lane closures, Wednesday May 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-06T16:01:58Z"},"road_event_id":"zAym8JQI2H9ZWt7tfDz4cHDm87c=","beginning_cross_street":"Exit 11 - ROUTE 297; Solvay-Fairgrounds","ending_cross_street":"Exit 13 - Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.218637,43.07939]]}},{"id":"jgIIoYWjCKurz7gluXaE4HFQRzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLw9CPrixlgc/OAzzb1A7MTpxkQ="}],"description":"Drainage improvements on I-690 eastbound between Exit 11 - ROUTE 297; Solvay-Fairgrounds (Geddes) and Exit 13 - Hiawatha Boulevard (Syracuse) ; Alternating left and right lane closures, Wednesday May 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-06T16:01:58Z"},"road_event_id":"jgIIoYWjCKurz7gluXaE4HFQRzQ=","beginning_cross_street":"Exit 11 - ROUTE 297; Solvay-Fairgrounds","ending_cross_street":"Exit 13 - Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.218637,43.07939]]}},{"id":"W5e/7it2MSghMDAJk3F+6vWbwaA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["C Line"],"direction":"unknown","related_road_events":[],"description":"Due to Signal repairs northbound, C Line between Canal St (New York) and 59 St - Columbus Circle (New York) skips Spring St, 23 St and 50 St. For service to these stations, take the C line to W 4 St-Wash Sq, 34 St-Penn Station, or 59 St-Columbus Circle and transfer to a downtown C line. For service from these stations, take the C line to 42 St-Port Authority, 14 St or Canal St and transfer to an uptown C line., Friday May 15th, 2026, 09:45 PM thru 11:00 PM, Continuous Saturday May 16th, 2026 12:00 AM thru Sunday May 17th, 2026 11:59 PM","update_date":"2026-05-06T16:02:19Z"},"road_event_id":"W5e/7it2MSghMDAJk3F+6vWbwaA=","beginning_cross_street":"Canal St","ending_cross_street":"59 St - Columbus Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:00:00Z","end_date":"2026-05-18T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005229,40.720824]]}},{"id":"mCFBgTRSDekPN9iETkG1zgUrwzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iFGHqST9B/GLhobPQYvrODkslKI="}],"description":"Drainage improvements on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and Exit 12A - NY 695 (Geddes) ; Alternating left and right lane closures, Wednesday May 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-06T16:04:33Z"},"road_event_id":"mCFBgTRSDekPN9iETkG1zgUrwzY=","beginning_cross_street":"Exit 14 - Geddes Street  ","ending_cross_street":"Exit 12A - NY 695  ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.176171,43.056893]]}},{"id":"iFGHqST9B/GLhobPQYvrODkslKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mCFBgTRSDekPN9iETkG1zgUrwzY="},{"type":"next-occurrence","id":"hVkE7CY8J7pxld/9NwNz1XYN6/U="}],"description":"Drainage improvements on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and Exit 12A - NY 695 (Geddes) ; Alternating left and right lane closures, Wednesday May 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-06T16:04:33Z"},"road_event_id":"iFGHqST9B/GLhobPQYvrODkslKI=","beginning_cross_street":"Exit 14 - Geddes Street  ","ending_cross_street":"Exit 12A - NY 695  ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.176171,43.056893]]}},{"id":"hVkE7CY8J7pxld/9NwNz1XYN6/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mCFBgTRSDekPN9iETkG1zgUrwzY="}],"description":"Drainage improvements on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and Exit 12A - NY 695 (Geddes) ; Alternating left and right lane closures, Wednesday May 6th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-06T16:04:33Z"},"road_event_id":"hVkE7CY8J7pxld/9NwNz1XYN6/U=","beginning_cross_street":"Exit 14 - Geddes Street  ","ending_cross_street":"Exit 12A - NY 695  ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.176171,43.056893]]}},{"id":"mGk99IiEjCUn9nZCPP54Mlub+3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line"],"direction":"unknown","related_road_events":[],"description":"Due to Signal repairs both directions, E Line between Court Sq (New York) and Spring St (New York) between 21 St-Queensbridge, Queens and 2 Av, Manhattan. No E line at Queens Plaza, Court Sq-23 St, Lexington Av/53 St, 5 Av/53 St, 7 Av, 50 St, 42 St-Port Authority, 34 St-Penn Station, 23 St, 14 St, Spring St, Canal St and World Trade Center. For Queens Plaza, take the (days/evenings) or use the nearby Queensboro Plaza 7 line or N line. For Court Sq-23 St, take the 7 line. Free Q96 shuttle buses run between 21 St-Queensbridge and Court Sq-23 St, stopping at Queens Plaza (days/evenings). For Lexington Av/53 St, use the nearby Lexington Av/59 St N line or R line. Or, take the 4 line local or 6 line at 51 St to connect with the 7 line at Grand Central-42 St. For 5 Av/53 St, use nearby F line at 57 St or 47-50 Sts-Rockefeller Ctr. For 7 Av, take the D line. For 50 St, 42 St-Port Authority, 34 St-Penn Station, 23 St, and 14 St, use nearby F line stops along 6 Av, or take the A line or C line. For Spring St, Canal St and World Trade Center(Chambers St), take the A line or C line., Continuous Friday May 15th, 2026 09:45 PM thru Monday May 18th, 2026 05:00 AM runs via F line","update_date":"2026-05-06T16:09:46Z"},"road_event_id":"mGk99IiEjCUn9nZCPP54Mlub+3E=","beginning_cross_street":"Court Sq","ending_cross_street":"Spring St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:45:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.946,40.747846]]}},{"id":"76BmaJ3psTX+fYVMPGfBscK05D0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8t4+EHN0POCGtUTRCDqgD6jOYZk="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th,","update_date":"2026-05-06T16:11:40Z"},"road_event_id":"76BmaJ3psTX+fYVMPGfBscK05D0=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"8t4+EHN0POCGtUTRCDqgD6jOYZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76BmaJ3psTX+fYVMPGfBscK05D0="},{"type":"next-occurrence","id":"qu35rP0ICnNPHGsexsw6vpoNjlI="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th,","update_date":"2026-05-06T16:11:40Z"},"road_event_id":"8t4+EHN0POCGtUTRCDqgD6jOYZk=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"qu35rP0ICnNPHGsexsw6vpoNjlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76BmaJ3psTX+fYVMPGfBscK05D0="},{"type":"next-occurrence","id":"6sQrlOdysSJjhF2KYMChba9qck0="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th,","update_date":"2026-05-06T16:11:40Z"},"road_event_id":"qu35rP0ICnNPHGsexsw6vpoNjlI=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"6sQrlOdysSJjhF2KYMChba9qck0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76BmaJ3psTX+fYVMPGfBscK05D0="},{"type":"next-occurrence","id":"IQesOfhnBL5JD3zcc5m+2Hi/iG4="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th,","update_date":"2026-05-06T16:11:40Z"},"road_event_id":"6sQrlOdysSJjhF2KYMChba9qck0=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"IQesOfhnBL5JD3zcc5m+2Hi/iG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76BmaJ3psTX+fYVMPGfBscK05D0="},{"type":"next-occurrence","id":"Yzin+XawKwrjjiLYWXckAQdJQbw="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th,","update_date":"2026-05-06T16:11:40Z"},"road_event_id":"IQesOfhnBL5JD3zcc5m+2Hi/iG4=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"Yzin+XawKwrjjiLYWXckAQdJQbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76BmaJ3psTX+fYVMPGfBscK05D0="},{"type":"next-occurrence","id":"IYpTRKvAuWG6vdA+R0pcmGyRz3k="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th,","update_date":"2026-05-06T16:11:40Z"},"road_event_id":"Yzin+XawKwrjjiLYWXckAQdJQbw=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"IYpTRKvAuWG6vdA+R0pcmGyRz3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76BmaJ3psTX+fYVMPGfBscK05D0="},{"type":"next-occurrence","id":"cxoQyonQ3kBfzrS+lqnJ8Uxoy0c="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th,","update_date":"2026-05-06T16:11:40Z"},"road_event_id":"IYpTRKvAuWG6vdA+R0pcmGyRz3k=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"cxoQyonQ3kBfzrS+lqnJ8Uxoy0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76BmaJ3psTX+fYVMPGfBscK05D0="},{"type":"next-occurrence","id":"08xZDwzN+dtT1snuZ+HuYFlE1gM="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th,","update_date":"2026-05-06T16:11:40Z"},"road_event_id":"cxoQyonQ3kBfzrS+lqnJ8Uxoy0c=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"08xZDwzN+dtT1snuZ+HuYFlE1gM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76BmaJ3psTX+fYVMPGfBscK05D0="},{"type":"next-occurrence","id":"ukzXGzSvSVBMzCrd6DjQlrBeTOY="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th,","update_date":"2026-05-06T16:11:40Z"},"road_event_id":"08xZDwzN+dtT1snuZ+HuYFlE1gM=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"ukzXGzSvSVBMzCrd6DjQlrBeTOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76BmaJ3psTX+fYVMPGfBscK05D0="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th,","update_date":"2026-05-06T16:11:40Z"},"road_event_id":"ukzXGzSvSVBMzCrd6DjQlrBeTOY=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"4mF4nFX6qHDKmg3O8HZiybKa1Dc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line"],"direction":"unknown","related_road_events":[],"description":"Due to Signal repairs southbound, E Line between Forest Hills - 71 Av (New York) and Jamaica - Van Wyck (New York) stops at 75 Av and Briarwood. , Friday May 15th, 2026, 10:00 AM thru 03:00 PM local service only","update_date":"2026-05-06T16:13:49Z"},"road_event_id":"4mF4nFX6qHDKmg3O8HZiybKa1Dc=","beginning_cross_street":"Forest Hills - 71 Av","ending_cross_street":"Jamaica - Van Wyck","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.844521,40.721691]]}},{"id":"+opvD107fLy6z1pZlb6ABVp1MP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"is1vxnSTX3jbByZKxg6Wfl1ZCdI="}],"description":"Street sweeping on I-81 northbound between Exit 1A - E Glen Ave/Brighton Ave (Syracuse) and Exit 11B - NY-481 (Cicero) ; Alternating mobile lane closures, Wednesday May 6th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-06T16:34:51Z"},"road_event_id":"+opvD107fLy6z1pZlb6ABVp1MP4=","beginning_cross_street":"Exit 1A - E Glen Ave/Brighton Ave ","ending_cross_street":"Exit 11B - NY-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.135798,43.00953]]}},{"id":"is1vxnSTX3jbByZKxg6Wfl1ZCdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+opvD107fLy6z1pZlb6ABVp1MP4="},{"type":"next-occurrence","id":"srlVIswPFgvBEEDa3UJCwDlpcyY="}],"description":"Street sweeping on I-81 northbound between Exit 1A - E Glen Ave/Brighton Ave (Syracuse) and Exit 11B - NY-481 (Cicero) ; Alternating mobile lane closures, Wednesday May 6th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-06T16:34:51Z"},"road_event_id":"is1vxnSTX3jbByZKxg6Wfl1ZCdI=","beginning_cross_street":"Exit 1A - E Glen Ave/Brighton Ave ","ending_cross_street":"Exit 11B - NY-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.135798,43.00953]]}},{"id":"srlVIswPFgvBEEDa3UJCwDlpcyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+opvD107fLy6z1pZlb6ABVp1MP4="},{"type":"next-occurrence","id":"rfshfeU1BzsElD9It7Rhx7jG1Nw="}],"description":"Street sweeping on I-81 northbound between Exit 1A - E Glen Ave/Brighton Ave (Syracuse) and Exit 11B - NY-481 (Cicero) ; Alternating mobile lane closures, Wednesday May 6th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-06T16:34:51Z"},"road_event_id":"srlVIswPFgvBEEDa3UJCwDlpcyY=","beginning_cross_street":"Exit 1A - E Glen Ave/Brighton Ave ","ending_cross_street":"Exit 11B - NY-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.135798,43.00953]]}},{"id":"rfshfeU1BzsElD9It7Rhx7jG1Nw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+opvD107fLy6z1pZlb6ABVp1MP4="}],"description":"Street sweeping on I-81 northbound between Exit 1A - E Glen Ave/Brighton Ave (Syracuse) and Exit 11B - NY-481 (Cicero) ; Alternating mobile lane closures, Wednesday May 6th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-06T16:34:51Z"},"road_event_id":"rfshfeU1BzsElD9It7Rhx7jG1Nw=","beginning_cross_street":"Exit 1A - E Glen Ave/Brighton Ave ","ending_cross_street":"Exit 11B - NY-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.135798,43.00953]]}},{"id":"AJ3XTq5kIKSi3zI0S7JepnjcjF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[],"description":"Escalator Work on F Line westbound between Jackson Hts - Roosevelt Av (New York) and 47-50 Sts - Rockefeller Ctr (New York) at 21 St-Queensbridge, Roosevelt Island, Lexington Av/63 St and 57 St. Brooklyn-bound F line are rerouted via Court Sq E line from 36 St to 5 Av/53 St and resumes service at 47-50 Sts-Rockefeller Ctr. For service to these stations, take the F line to 47-50 Sts-Rockefeller Ctr and transfer to a Jamaica-bound F line. For service from 21 St-Queensbridge and Roosevelt Island, take the F line to Steinway St and transfer to a Brooklyn-bound F line. From Lexington Av/63 St, take the Q line to 34 St-Herald Sq and transfer to a Brooklyn-bound F line. From 57 St, use the nearby 57 St-7 Av N line or Q line for downtown service to 34 St-Herald Sq where Brooklyn-bound F line is available., Thursday May 14th,2026 thru Friday May 15th,2026, Thursday, 09:45 PM thru 05:00 AM service suspended","update_date":"2026-05-13T09:00:20Z"},"road_event_id":"AJ3XTq5kIKSi3zI0S7JepnjcjF4=","beginning_cross_street":"Jackson Hts - Roosevelt Av","ending_cross_street":"47-50 Sts - Rockefeller Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:30:00Z","end_date":"2026-05-16T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891338,40.746644]]}},{"id":"bWyfAd6YNOL95x7hZWCwshjmU5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BpePuRTUTi9zVNubY3UP6D8hJKs="}],"description":"Street sweeping on I-81 southbound between Exit 11 - NY-481 (Cicero) and Exit 1B - E Glen Ave/Brighton Ave (Syracuse) ; Alternating mobile lane closures, Wednesday May 6th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-06T16:35:26Z"},"road_event_id":"bWyfAd6YNOL95x7hZWCwshjmU5Y=","beginning_cross_street":"Exit 11 - NY-481","ending_cross_street":"Exit 1B  - E Glen Ave/Brighton Ave ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.116263,43.138277]]}},{"id":"BpePuRTUTi9zVNubY3UP6D8hJKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bWyfAd6YNOL95x7hZWCwshjmU5Y="},{"type":"next-occurrence","id":"/pY5LMkngnmuzsesImpsIeR47H8="}],"description":"Street sweeping on I-81 southbound between Exit 11 - NY-481 (Cicero) and Exit 1B - E Glen Ave/Brighton Ave (Syracuse) ; Alternating mobile lane closures, Wednesday May 6th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-06T16:35:26Z"},"road_event_id":"BpePuRTUTi9zVNubY3UP6D8hJKs=","beginning_cross_street":"Exit 11 - NY-481","ending_cross_street":"Exit 1B  - E Glen Ave/Brighton Ave ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.116263,43.138277]]}},{"id":"/pY5LMkngnmuzsesImpsIeR47H8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bWyfAd6YNOL95x7hZWCwshjmU5Y="},{"type":"next-occurrence","id":"3us1LI569jE0y5j7UoxGjjzkz3w="}],"description":"Street sweeping on I-81 southbound between Exit 11 - NY-481 (Cicero) and Exit 1B - E Glen Ave/Brighton Ave (Syracuse) ; Alternating mobile lane closures, Wednesday May 6th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-06T16:35:26Z"},"road_event_id":"/pY5LMkngnmuzsesImpsIeR47H8=","beginning_cross_street":"Exit 11 - NY-481","ending_cross_street":"Exit 1B  - E Glen Ave/Brighton Ave ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.116263,43.138277]]}},{"id":"3us1LI569jE0y5j7UoxGjjzkz3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bWyfAd6YNOL95x7hZWCwshjmU5Y="}],"description":"Street sweeping on I-81 southbound between Exit 11 - NY-481 (Cicero) and Exit 1B - E Glen Ave/Brighton Ave (Syracuse) ; Alternating mobile lane closures, Wednesday May 6th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-06T16:35:26Z"},"road_event_id":"3us1LI569jE0y5j7UoxGjjzkz3w=","beginning_cross_street":"Exit 11 - NY-481","ending_cross_street":"Exit 1B  - E Glen Ave/Brighton Ave ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.116263,43.138277]]}},{"id":"djUfxeJuL0WNpohxlGxQVkcgLHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 9TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8U/mBxqcPI5riUA90nhbGGEb+jc="}],"description":"Crane operations on W 9TH ST westbound between 5TH AVE (New York) and 6TH AVE (New York), Saturday May 9th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T16:33:08Z"},"road_event_id":"djUfxeJuL0WNpohxlGxQVkcgLHI=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996023,40.732896]]}},{"id":"8U/mBxqcPI5riUA90nhbGGEb+jc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 9TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"djUfxeJuL0WNpohxlGxQVkcgLHI="}],"description":"Crane operations on W 9TH ST westbound between 5TH AVE (New York) and 6TH AVE (New York), Saturday May 9th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T16:33:08Z"},"road_event_id":"8U/mBxqcPI5riUA90nhbGGEb+jc=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996023,40.732896]]}},{"id":"XMzFlGD/ytif6LOOK4pga4fOuGI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"elexd+6cf2pQ+xqv00SWSCnxi68="}],"description":"Street sweeping on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and I-481 (De Witt) ; Alternating mobile lane closures, Wednesday May 6th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-06T16:37:56Z"},"road_event_id":"XMzFlGD/ytif6LOOK4pga4fOuGI=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.286013,43.111737]]}},{"id":"elexd+6cf2pQ+xqv00SWSCnxi68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XMzFlGD/ytif6LOOK4pga4fOuGI="},{"type":"next-occurrence","id":"pMXVP8RVH0YhlclPyYUA1Jdjj2A="}],"description":"Street sweeping on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and I-481 (De Witt) ; Alternating mobile lane closures, Wednesday May 6th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-06T16:37:56Z"},"road_event_id":"elexd+6cf2pQ+xqv00SWSCnxi68=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.286013,43.111737]]}},{"id":"pMXVP8RVH0YhlclPyYUA1Jdjj2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XMzFlGD/ytif6LOOK4pga4fOuGI="},{"type":"next-occurrence","id":"E8P5yWCUTqtKB/e881C1cr1z+5M="}],"description":"Street sweeping on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and I-481 (De Witt) ; Alternating mobile lane closures, Wednesday May 6th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-06T16:37:56Z"},"road_event_id":"pMXVP8RVH0YhlclPyYUA1Jdjj2A=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.286013,43.111737]]}},{"id":"E8P5yWCUTqtKB/e881C1cr1z+5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XMzFlGD/ytif6LOOK4pga4fOuGI="}],"description":"Street sweeping on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and I-481 (De Witt) ; Alternating mobile lane closures, Wednesday May 6th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-06T16:37:56Z"},"road_event_id":"E8P5yWCUTqtKB/e881C1cr1z+5M=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.286013,43.111737]]}},{"id":"vQ8iACD4SZNb+7Uq7ECm2YyeKmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Dfi6iahqR7ilIiLOtbG22KcKi1Q="}],"description":"Street sweeping on I-690 westbound between I-481 (De Witt) ; Alternating mobile lane closures, Wednesday May 6th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-06T16:39:58Z"},"road_event_id":"vQ8iACD4SZNb+7Uq7ECm2YyeKmA=","beginning_cross_street":"I-481","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061854,43.057]]}},{"id":"Dfi6iahqR7ilIiLOtbG22KcKi1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vQ8iACD4SZNb+7Uq7ECm2YyeKmA="},{"type":"next-occurrence","id":"SvNB0FVPldJrm0RR8zC893lsByQ="}],"description":"Street sweeping on I-690 westbound between I-481 (De Witt) ; Alternating mobile lane closures, Wednesday May 6th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-06T16:39:58Z"},"road_event_id":"Dfi6iahqR7ilIiLOtbG22KcKi1Q=","beginning_cross_street":"I-481","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061854,43.057]]}},{"id":"SvNB0FVPldJrm0RR8zC893lsByQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vQ8iACD4SZNb+7Uq7ECm2YyeKmA="},{"type":"next-occurrence","id":"c3TyQMbabQ9wKs6YioeHs2LH5pI="}],"description":"Street sweeping on I-690 westbound between I-481 (De Witt) ; Alternating mobile lane closures, Wednesday May 6th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-06T16:39:58Z"},"road_event_id":"SvNB0FVPldJrm0RR8zC893lsByQ=","beginning_cross_street":"I-481","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061854,43.057]]}},{"id":"c3TyQMbabQ9wKs6YioeHs2LH5pI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vQ8iACD4SZNb+7Uq7ECm2YyeKmA="}],"description":"Street sweeping on I-690 westbound between I-481 (De Witt) ; Alternating mobile lane closures, Wednesday May 6th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-06T16:39:58Z"},"road_event_id":"c3TyQMbabQ9wKs6YioeHs2LH5pI=","beginning_cross_street":"I-481","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061854,43.057]]}},{"id":"DupMAPdivdEgmjoXOV04kQaSC1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 18TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ifHdOfYDyfl1pGalV/jjNtK6Dqs="}],"description":"Construction on W 18TH ST eastbound between 6TH AVE (New York) and 5TH AVE (New York) for use of knuckle boom to hoist dunnage., Saturday May 9th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T16:42:20Z"},"road_event_id":"DupMAPdivdEgmjoXOV04kQaSC1s=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99491,40.739813]]}},{"id":"ifHdOfYDyfl1pGalV/jjNtK6Dqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DupMAPdivdEgmjoXOV04kQaSC1s="}],"description":"Construction on W 18TH ST eastbound between 6TH AVE (New York) and 5TH AVE (New York) for use of knuckle boom to hoist dunnage., Saturday May 9th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T16:42:20Z"},"road_event_id":"ifHdOfYDyfl1pGalV/jjNtK6Dqs=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99491,40.739813]]}},{"id":"rBOODZMjLJaPQKAYJNNheozg44I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bJerCvVZZ3/+/4+ugnwLW5IRLr0="}],"description":"Due to Track repairs northbound, D Line from 59 St - Columbus Circle (New York) to 125 St (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-05-06T16:45:46Z"},"road_event_id":"rBOODZMjLJaPQKAYJNNheozg44I=","beginning_cross_street":"59 St - Columbus Circle","ending_cross_street":"125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:01:00Z","end_date":"2026-05-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981736,40.768296]]}},{"id":"bJerCvVZZ3/+/4+ugnwLW5IRLr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rBOODZMjLJaPQKAYJNNheozg44I="},{"type":"next-occurrence","id":"FjQMQLR/qpJstGPUwZG6eVxsbQM="}],"description":"Due to Track repairs northbound, D Line from 59 St - Columbus Circle (New York) to 125 St (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-05-06T16:45:46Z"},"road_event_id":"bJerCvVZZ3/+/4+ugnwLW5IRLr0=","beginning_cross_street":"59 St - Columbus Circle","ending_cross_street":"125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:01:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981736,40.768296]]}},{"id":"FjQMQLR/qpJstGPUwZG6eVxsbQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rBOODZMjLJaPQKAYJNNheozg44I="}],"description":"Due to Track repairs northbound, D Line from 59 St - Columbus Circle (New York) to 125 St (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-05-06T16:45:46Z"},"road_event_id":"FjQMQLR/qpJstGPUwZG6eVxsbQM=","beginning_cross_street":"59 St - Columbus Circle","ending_cross_street":"125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T04:01:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981736,40.768296]]}},{"id":"gLrPerLMEoNcGRJUqdfm4OiLFyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 26TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1KnsPVyQljdJ6id/nlRbD+rEhbw="}],"description":"Construction on E 26TH ST eastbound between 5TH AVE (New York) and MADISON AVE (New York) for building inspection from boom truck., Saturday May 16th,2026 thru Sunday May 31st,2026, Saturday/Sunday, 05:00 AM thru 11:59 AM All lanes closed eastbound,","update_date":"2026-05-09T15:59:01Z"},"road_event_id":"gLrPerLMEoNcGRJUqdfm4OiLFyE=","beginning_cross_street":"5TH AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T14:00:00Z","end_date":"2026-05-16T20:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988144,40.743416]]}},{"id":"1KnsPVyQljdJ6id/nlRbD+rEhbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 26TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gLrPerLMEoNcGRJUqdfm4OiLFyE="},{"type":"next-occurrence","id":"60YGVbT5UzSJYfPiEhtocFPjyt8="}],"description":"Construction on E 26TH ST eastbound between 5TH AVE (New York) and MADISON AVE (New York) for building inspection from boom truck., Saturday May 16th,2026 thru Sunday May 31st,2026, Saturday/Sunday, 05:00 AM thru 11:59 AM All lanes closed eastbound,","update_date":"2026-05-09T15:59:01Z"},"road_event_id":"1KnsPVyQljdJ6id/nlRbD+rEhbw=","beginning_cross_street":"5TH AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T14:00:00Z","end_date":"2026-05-17T20:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988144,40.743416]]}},{"id":"60YGVbT5UzSJYfPiEhtocFPjyt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 26TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gLrPerLMEoNcGRJUqdfm4OiLFyE="},{"type":"next-occurrence","id":"bNzY7XZAoAYEFpJHofmlSBo9iy8="}],"description":"Construction on E 26TH ST eastbound between 5TH AVE (New York) and MADISON AVE (New York) for building inspection from boom truck., Saturday May 16th,2026 thru Sunday May 31st,2026, Saturday/Sunday, 05:00 AM thru 11:59 AM All lanes closed eastbound,","update_date":"2026-05-09T15:59:01Z"},"road_event_id":"60YGVbT5UzSJYfPiEhtocFPjyt8=","beginning_cross_street":"5TH AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T14:00:00Z","end_date":"2026-05-23T20:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988144,40.743416]]}},{"id":"bNzY7XZAoAYEFpJHofmlSBo9iy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 26TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gLrPerLMEoNcGRJUqdfm4OiLFyE="}],"description":"Construction on E 26TH ST eastbound between 5TH AVE (New York) and MADISON AVE (New York) for building inspection from boom truck., Saturday May 16th,2026 thru Sunday May 31st,2026, Saturday/Sunday, 05:00 AM thru 11:59 AM All lanes closed eastbound,","update_date":"2026-05-09T15:59:01Z"},"road_event_id":"bNzY7XZAoAYEFpJHofmlSBo9iy8=","beginning_cross_street":"5TH AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T14:00:00Z","end_date":"2026-05-24T20:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988144,40.743416]]}},{"id":"7OrZ8G3vQQEuRw/K74W9S7r5WK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/Ah4AcCzDj0PBzsfKLQEqrzNA1c="}],"description":"Utility work on US 20A both directions between West Lake Road; NY 256 (Geneseo) and Big Tree Street; NY 15 (Livonia) Alternating lane closures with flaggers as needed, Thursday May 7th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-06T16:53:21Z"},"road_event_id":"7OrZ8G3vQQEuRw/K74W9S7r5WK8=","beginning_cross_street":"West Lake Road; NY 256","ending_cross_street":"Big Tree Street; NY 15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.715032,42.83494]]}},{"id":"/Ah4AcCzDj0PBzsfKLQEqrzNA1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7OrZ8G3vQQEuRw/K74W9S7r5WK8="},{"type":"next-occurrence","id":"ZuyUWmW9Vs70lLXA2u0x93J4xs4="}],"description":"Utility work on US 20A both directions between West Lake Road; NY 256 (Geneseo) and Big Tree Street; NY 15 (Livonia) Alternating lane closures with flaggers as needed, Thursday May 7th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-06T16:53:21Z"},"road_event_id":"/Ah4AcCzDj0PBzsfKLQEqrzNA1c=","beginning_cross_street":"West Lake Road; NY 256","ending_cross_street":"Big Tree Street; NY 15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.715032,42.83494]]}},{"id":"ZuyUWmW9Vs70lLXA2u0x93J4xs4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7OrZ8G3vQQEuRw/K74W9S7r5WK8="}],"description":"Utility work on US 20A both directions between West Lake Road; NY 256 (Geneseo) and Big Tree Street; NY 15 (Livonia) Alternating lane closures with flaggers as needed, Thursday May 7th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-06T16:53:21Z"},"road_event_id":"ZuyUWmW9Vs70lLXA2u0x93J4xs4=","beginning_cross_street":"West Lake Road; NY 256","ending_cross_street":"Big Tree Street; NY 15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.715032,42.83494]]}},{"id":"RlN+UR6Wskjy+oaFS/WCu4P/hPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"j8co66y/wpeoVCiBzI/EYOzTWGo="}],"description":"Crane operations on W 28TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York), Saturday May 9th, 2026 thru Sunday May 24th, 2026, Saturday/ Sunday, 05:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-06T16:52:57Z"},"road_event_id":"RlN+UR6Wskjy+oaFS/WCu4P/hPo=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T09:00:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0018,40.750802]]}},{"id":"j8co66y/wpeoVCiBzI/EYOzTWGo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RlN+UR6Wskjy+oaFS/WCu4P/hPo="},{"type":"next-occurrence","id":"pfZEI+MB9Tj+dBaASAfeb1yFFps="}],"description":"Crane operations on W 28TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York), Saturday May 9th, 2026 thru Sunday May 24th, 2026, Saturday/ Sunday, 05:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-06T16:52:57Z"},"road_event_id":"j8co66y/wpeoVCiBzI/EYOzTWGo=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T09:00:00Z","end_date":"2026-05-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0018,40.750802]]}},{"id":"pfZEI+MB9Tj+dBaASAfeb1yFFps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RlN+UR6Wskjy+oaFS/WCu4P/hPo="},{"type":"next-occurrence","id":"xX//G7RI86kNqAjl59qp0idFDHs="}],"description":"Crane operations on W 28TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York), Saturday May 9th, 2026 thru Sunday May 24th, 2026, Saturday/ Sunday, 05:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-06T16:52:57Z"},"road_event_id":"pfZEI+MB9Tj+dBaASAfeb1yFFps=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T09:00:00Z","end_date":"2026-05-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0018,40.750802]]}},{"id":"xX//G7RI86kNqAjl59qp0idFDHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RlN+UR6Wskjy+oaFS/WCu4P/hPo="}],"description":"Crane operations on W 28TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York), Saturday May 9th, 2026 thru Sunday May 24th, 2026, Saturday/ Sunday, 05:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-06T16:52:57Z"},"road_event_id":"xX//G7RI86kNqAjl59qp0idFDHs=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T09:00:00Z","end_date":"2026-05-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0018,40.750802]]}},{"id":"rhgVvThr2iCrDzeozhYTwtJ4oSg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 33RD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q6AD+Rr4KxiVuWEHiTgch9IL9TU="}],"description":"Crane operations on W 33RD ST westbound between 6TH AVE (New York) and 7TH AVE (New York), Saturday May 9th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 12:01 AM thru 11:59 PM All lanes closed","update_date":"2026-05-06T16:55:02Z"},"road_event_id":"rhgVvThr2iCrDzeozhYTwtJ4oSg=","beginning_cross_street":"6TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:01:00Z","end_date":"2026-05-14T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988363,40.749173]]}},{"id":"q6AD+Rr4KxiVuWEHiTgch9IL9TU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 33RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rhgVvThr2iCrDzeozhYTwtJ4oSg="},{"type":"next-occurrence","id":"cwEU7PxZzfeBdTrqNas2ji9K+7w="}],"description":"Crane operations on W 33RD ST westbound between 6TH AVE (New York) and 7TH AVE (New York), Saturday May 9th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 12:01 AM thru 11:59 PM All lanes closed","update_date":"2026-05-06T16:55:02Z"},"road_event_id":"q6AD+Rr4KxiVuWEHiTgch9IL9TU=","beginning_cross_street":"6TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:01:00Z","end_date":"2026-05-15T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988363,40.749173]]}},{"id":"cwEU7PxZzfeBdTrqNas2ji9K+7w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 33RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rhgVvThr2iCrDzeozhYTwtJ4oSg="},{"type":"next-occurrence","id":"r9sK7oTknvyb+8REgVpVLiPzb5o="}],"description":"Crane operations on W 33RD ST westbound between 6TH AVE (New York) and 7TH AVE (New York), Saturday May 9th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 12:01 AM thru 11:59 PM All lanes closed","update_date":"2026-05-06T16:55:02Z"},"road_event_id":"cwEU7PxZzfeBdTrqNas2ji9K+7w=","beginning_cross_street":"6TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T04:01:00Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988363,40.749173]]}},{"id":"r9sK7oTknvyb+8REgVpVLiPzb5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 33RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rhgVvThr2iCrDzeozhYTwtJ4oSg="}],"description":"Crane operations on W 33RD ST westbound between 6TH AVE (New York) and 7TH AVE (New York), Saturday May 9th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 12:01 AM thru 11:59 PM All lanes closed","update_date":"2026-05-06T16:55:02Z"},"road_event_id":"r9sK7oTknvyb+8REgVpVLiPzb5o=","beginning_cross_street":"6TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:01:00Z","end_date":"2026-05-17T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988363,40.749173]]}},{"id":"6yHcDEeC3PydtanW7TYGG9M9uxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[],"description":"Due to Signal repairs southbound, F Line between Forest Hills - 71 Av (New York) and Parsons Blvd (New York) skips 75 Av, Briarwood and Sutphin Blvd. For service to these stations, take the F line to Kew Gardens-Union Tpke or Parsons Blvd and transfer to a Manhattan-bound F line. For service from these stations, take the F line to Kew Gardens-Union Tpke or Forest Hills-71 Av and transfer to a Jamaica-bound F line., Thursday May 14th, 2026, 09:45 AM thru 03:00 PM","update_date":"2026-05-06T16:55:38Z"},"road_event_id":"6yHcDEeC3PydtanW7TYGG9M9uxo=","beginning_cross_street":"Forest Hills - 71 Av","ending_cross_street":"Parsons Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:30:00Z","end_date":"2026-05-15T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.844521,40.721691]]}},{"id":"6LsweD+yycNdk6mZRDPfEozbV3Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xYBJ2jhZcjflCgz7NKADvD+FPS4="}],"description":"Roadwork on I-590 northbound area of START ROUTE I-590; I-390; Exit 15 - I-390 (Brighton), Friday May 8th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 11:59 PM right shoulder closed","update_date":"2026-05-12T18:53:29Z"},"road_event_id":"6LsweD+yycNdk6mZRDPfEozbV3Q=","beginning_cross_street":"START ROUTE I-590; I-390; Exit 15 - I-390","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-14T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.60633,43.110149]]}},{"id":"xYBJ2jhZcjflCgz7NKADvD+FPS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6LsweD+yycNdk6mZRDPfEozbV3Q="},{"type":"next-occurrence","id":"wQM/OTfN0OldH8HjZGPNy6F/vcA="}],"description":"Roadwork on I-590 northbound area of START ROUTE I-590; I-390; Exit 15 - I-390 (Brighton), Friday May 8th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 11:59 PM right shoulder closed","update_date":"2026-05-12T18:53:29Z"},"road_event_id":"xYBJ2jhZcjflCgz7NKADvD+FPS4=","beginning_cross_street":"START ROUTE I-590; I-390; Exit 15 - I-390","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-15T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.60633,43.110149]]}},{"id":"wQM/OTfN0OldH8HjZGPNy6F/vcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6LsweD+yycNdk6mZRDPfEozbV3Q="}],"description":"Roadwork on I-590 northbound area of START ROUTE I-590; I-390; Exit 15 - I-390 (Brighton), Friday May 8th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 11:59 PM right shoulder closed","update_date":"2026-05-12T18:53:29Z"},"road_event_id":"wQM/OTfN0OldH8HjZGPNy6F/vcA=","beginning_cross_street":"START ROUTE I-590; I-390; Exit 15 - I-390","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.60633,43.110149]]}},{"id":"MroLEKFflWC+YvrvYHQXLXOrsBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-290"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-290 westbound at START ROUTE I-290; from the I-190 Niagara Thruway (Tonawanda), Saturday May 16th, 2026, 06:00 AM thru 10:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-06T16:57:42Z"},"road_event_id":"MroLEKFflWC+YvrvYHQXLXOrsBc=","beginning_cross_street":"START ROUTE I-290; from the I-190 Niagara Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T16:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.912743,42.988238]]}},{"id":"C8CKsgUVJ+NXUUYBt4b624LEwnM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 40TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"M5lzrSt3BTD4gjnbKxlrOOBKnPg="}],"description":"Construction on W 40TH ST eastbound between 10TH AVE (New York) and DYER AVE (New York) for removal of plate girders and remaining joists on kinney ramp., Friday May 8th, 2026 thru Sunday May 24th, 2026, Sunday/Friday/Saturday, 09:00 PM thru 09:00 AM All lanes closed","update_date":"2026-05-06T16:57:31Z"},"road_event_id":"C8CKsgUVJ+NXUUYBt4b624LEwnM=","beginning_cross_street":"10TH AVE","ending_cross_street":"DYER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996376,40.758321]]}},{"id":"M5lzrSt3BTD4gjnbKxlrOOBKnPg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C8CKsgUVJ+NXUUYBt4b624LEwnM="},{"type":"next-occurrence","id":"YbcXfcJKG4dPmo9UalMCVxy2r3Y="}],"description":"Construction on W 40TH ST eastbound between 10TH AVE (New York) and DYER AVE (New York) for removal of plate girders and remaining joists on kinney ramp., Friday May 8th, 2026 thru Sunday May 24th, 2026, Sunday/Friday/Saturday, 09:00 PM thru 09:00 AM All lanes closed","update_date":"2026-05-06T16:57:31Z"},"road_event_id":"M5lzrSt3BTD4gjnbKxlrOOBKnPg=","beginning_cross_street":"10TH AVE","ending_cross_street":"DYER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T01:00:00Z","end_date":"2026-05-17T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996376,40.758321]]}},{"id":"YbcXfcJKG4dPmo9UalMCVxy2r3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C8CKsgUVJ+NXUUYBt4b624LEwnM="},{"type":"next-occurrence","id":"/gp7SAe4JuW8nX4jrV2SeunzSPo="}],"description":"Construction on W 40TH ST eastbound between 10TH AVE (New York) and DYER AVE (New York) for removal of plate girders and remaining joists on kinney ramp., Friday May 8th, 2026 thru Sunday May 24th, 2026, Sunday/Friday/Saturday, 09:00 PM thru 09:00 AM All lanes closed","update_date":"2026-05-06T16:57:31Z"},"road_event_id":"YbcXfcJKG4dPmo9UalMCVxy2r3Y=","beginning_cross_street":"10TH AVE","ending_cross_street":"DYER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T01:00:00Z","end_date":"2026-05-18T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996376,40.758321]]}},{"id":"/gp7SAe4JuW8nX4jrV2SeunzSPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C8CKsgUVJ+NXUUYBt4b624LEwnM="},{"type":"next-occurrence","id":"c9FVhsG+pgfaysnF5IiD4Y+F7T0="}],"description":"Construction on W 40TH ST eastbound between 10TH AVE (New York) and DYER AVE (New York) for removal of plate girders and remaining joists on kinney ramp., Friday May 8th, 2026 thru Sunday May 24th, 2026, Sunday/Friday/Saturday, 09:00 PM thru 09:00 AM All lanes closed","update_date":"2026-05-06T16:57:31Z"},"road_event_id":"/gp7SAe4JuW8nX4jrV2SeunzSPo=","beginning_cross_street":"10TH AVE","ending_cross_street":"DYER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T01:00:00Z","end_date":"2026-05-23T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996376,40.758321]]}},{"id":"c9FVhsG+pgfaysnF5IiD4Y+F7T0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C8CKsgUVJ+NXUUYBt4b624LEwnM="},{"type":"next-occurrence","id":"4WwKH4VHjGM8w1UkcoJ2312/7KI="}],"description":"Construction on W 40TH ST eastbound between 10TH AVE (New York) and DYER AVE (New York) for removal of plate girders and remaining joists on kinney ramp., Friday May 8th, 2026 thru Sunday May 24th, 2026, Sunday/Friday/Saturday, 09:00 PM thru 09:00 AM All lanes closed","update_date":"2026-05-06T16:57:31Z"},"road_event_id":"c9FVhsG+pgfaysnF5IiD4Y+F7T0=","beginning_cross_street":"10TH AVE","ending_cross_street":"DYER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T01:00:00Z","end_date":"2026-05-24T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996376,40.758321]]}},{"id":"4WwKH4VHjGM8w1UkcoJ2312/7KI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C8CKsgUVJ+NXUUYBt4b624LEwnM="}],"description":"Construction on W 40TH ST eastbound between 10TH AVE (New York) and DYER AVE (New York) for removal of plate girders and remaining joists on kinney ramp., Friday May 8th, 2026 thru Sunday May 24th, 2026, Sunday/Friday/Saturday, 09:00 PM thru 09:00 AM All lanes closed","update_date":"2026-05-06T16:57:31Z"},"road_event_id":"4WwKH4VHjGM8w1UkcoJ2312/7KI=","beginning_cross_street":"10TH AVE","ending_cross_street":"DYER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T01:00:00Z","end_date":"2026-05-25T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996376,40.758321]]}},{"id":"zmQ4+uzqrbjw0hPZOOJFWjaXgq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CSklc/A+qbjKaRfwMMPH2gPtGeM="}],"description":"Due to Repairs northbound, D Line between 36 St (New York) and Atlantic Av - Barclays Ctr (New York) and skips DeKalb Av. For service to 25 St, Prospect Av, 4 Av-9 St and Union St, take the D line to Atlantic Av-Barclays Ctr and transfer to a local Coney Island-bound D line or N line. For service from these stations, take the D line or N line to 36 St and transfer to a Manhattan-bound D line. For DeKalb Av, take the Q line. Transfer at Atlantic Av-Barclays Ctr or 34 St-Herald Sq., Friday May 15th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM express only","update_date":"2026-05-06T16:58:41Z"},"road_event_id":"zmQ4+uzqrbjw0hPZOOJFWjaXgq4=","beginning_cross_street":"36 St","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T03:30:00Z","end_date":"2026-05-17T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003549,40.655144]]}},{"id":"CSklc/A+qbjKaRfwMMPH2gPtGeM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmQ4+uzqrbjw0hPZOOJFWjaXgq4="},{"type":"next-occurrence","id":"ETHLOmrUj0DrmTj0xHvKCMJHmV0="}],"description":"Due to Repairs northbound, D Line between 36 St (New York) and Atlantic Av - Barclays Ctr (New York) and skips DeKalb Av. For service to 25 St, Prospect Av, 4 Av-9 St and Union St, take the D line to Atlantic Av-Barclays Ctr and transfer to a local Coney Island-bound D line or N line. For service from these stations, take the D line or N line to 36 St and transfer to a Manhattan-bound D line. For DeKalb Av, take the Q line. Transfer at Atlantic Av-Barclays Ctr or 34 St-Herald Sq., Friday May 15th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM express only","update_date":"2026-05-06T16:58:41Z"},"road_event_id":"CSklc/A+qbjKaRfwMMPH2gPtGeM=","beginning_cross_street":"36 St","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T03:30:00Z","end_date":"2026-05-18T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003549,40.655144]]}},{"id":"ETHLOmrUj0DrmTj0xHvKCMJHmV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmQ4+uzqrbjw0hPZOOJFWjaXgq4="},{"type":"next-occurrence","id":"WpiolSOIBXxNbFbAjMg4hVGKAb0="}],"description":"Due to Repairs northbound, D Line between 36 St (New York) and Atlantic Av - Barclays Ctr (New York) and skips DeKalb Av. For service to 25 St, Prospect Av, 4 Av-9 St and Union St, take the D line to Atlantic Av-Barclays Ctr and transfer to a local Coney Island-bound D line or N line. For service from these stations, take the D line or N line to 36 St and transfer to a Manhattan-bound D line. For DeKalb Av, take the Q line. Transfer at Atlantic Av-Barclays Ctr or 34 St-Herald Sq., Friday May 15th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM express only","update_date":"2026-05-06T16:58:41Z"},"road_event_id":"ETHLOmrUj0DrmTj0xHvKCMJHmV0=","beginning_cross_street":"36 St","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T03:30:00Z","end_date":"2026-05-19T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003549,40.655144]]}},{"id":"WpiolSOIBXxNbFbAjMg4hVGKAb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmQ4+uzqrbjw0hPZOOJFWjaXgq4="}],"description":"Due to Repairs northbound, D Line between 36 St (New York) and Atlantic Av - Barclays Ctr (New York) and skips DeKalb Av. For service to 25 St, Prospect Av, 4 Av-9 St and Union St, take the D line to Atlantic Av-Barclays Ctr and transfer to a local Coney Island-bound D line or N line. For service from these stations, take the D line or N line to 36 St and transfer to a Manhattan-bound D line. For DeKalb Av, take the Q line. Transfer at Atlantic Av-Barclays Ctr or 34 St-Herald Sq., Friday May 15th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM express only","update_date":"2026-05-06T16:58:41Z"},"road_event_id":"WpiolSOIBXxNbFbAjMg4hVGKAb0=","beginning_cross_street":"36 St","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T03:30:00Z","end_date":"2026-05-20T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003549,40.655144]]}},{"id":"qLVSuNFygUXFp5q3anec0/+xAPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 43RD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QkOFw5C21Zaqs05Aw0klhGHGptY="}],"description":"Crane operations on E 43RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Saturday May 9th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T16:59:59Z"},"road_event_id":"qLVSuNFygUXFp5q3anec0/+xAPw=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.978842,40.753506]]}},{"id":"QkOFw5C21Zaqs05Aw0klhGHGptY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 43RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qLVSuNFygUXFp5q3anec0/+xAPw="}],"description":"Crane operations on E 43RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Saturday May 9th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T16:59:59Z"},"road_event_id":"QkOFw5C21Zaqs05Aw0klhGHGptY=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T12:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.978842,40.753506]]}},{"id":"E2dFNjVGR46EfRu7PRUyIThzEIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations southbound, F Line bypassing 169 St (New York) Use nearby Parsons Blvd or Jamaica-179 St stations. For service to this station, take the F line to Jamaica-179 St and transfer to a Manhattan-bound F line. For service from this station, take the F line to Parsons Blvd and transfer to a Jamaica-bound F line., Continuous Friday May 15th, 2026 11:45 PM thru Monday May 18th, 2026 05:00 AM","update_date":"2026-05-06T17:01:07Z"},"road_event_id":"E2dFNjVGR46EfRu7PRUyIThzEIM=","beginning_cross_street":"169 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:45:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793604,40.71047]]}},{"id":"jTMWYhfR6JZMtkVf27fjpMrhq0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-290"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-290 both directions Exit 3A Ramp to US 62 Niagara Falls Boulevard South (Tonawanda) to NY 425 Twin Cities Memorial Highway (Tonawanda), Sunday May 17th, 2026, 06:00 AM thru 12:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-05-06T17:00:43Z"},"road_event_id":"jTMWYhfR6JZMtkVf27fjpMrhq0E=","beginning_cross_street":"Exit 3A Ramp to US 62 Niagara Falls Boulevard South","ending_cross_street":"NY 425 Twin Cities Memorial Highway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T16:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.827841,43.003726]]}},{"id":"8V+cIoTVyc1083aG8Ri/86QMtIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"oOPDkGczUp8zlXgaSp40SLVi91o="}],"description":"Crane operations on E 47TH ST westbound between 3RD AVE (New York) and LEXINGTON AVE (New York), Saturday May 9th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T17:03:05Z"},"road_event_id":"8V+cIoTVyc1083aG8Ri/86QMtIM=","beginning_cross_street":"3RD AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.972189,40.75396]]}},{"id":"oOPDkGczUp8zlXgaSp40SLVi91o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8V+cIoTVyc1083aG8Ri/86QMtIM="},{"type":"next-occurrence","id":"0fYtwF3IgHldbnInPBmZkhrb7o8="}],"description":"Crane operations on E 47TH ST westbound between 3RD AVE (New York) and LEXINGTON AVE (New York), Saturday May 9th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T17:03:05Z"},"road_event_id":"oOPDkGczUp8zlXgaSp40SLVi91o=","beginning_cross_street":"3RD AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.972189,40.75396]]}},{"id":"0fYtwF3IgHldbnInPBmZkhrb7o8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8V+cIoTVyc1083aG8Ri/86QMtIM="},{"type":"next-occurrence","id":"jiEXJlO0KH4Q/hQrKsuuLl/Gq8g="}],"description":"Crane operations on E 47TH ST westbound between 3RD AVE (New York) and LEXINGTON AVE (New York), Saturday May 9th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T17:03:05Z"},"road_event_id":"0fYtwF3IgHldbnInPBmZkhrb7o8=","beginning_cross_street":"3RD AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.972189,40.75396]]}},{"id":"jiEXJlO0KH4Q/hQrKsuuLl/Gq8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8V+cIoTVyc1083aG8Ri/86QMtIM="}],"description":"Crane operations on E 47TH ST westbound between 3RD AVE (New York) and LEXINGTON AVE (New York), Saturday May 9th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T17:03:05Z"},"road_event_id":"jiEXJlO0KH4Q/hQrKsuuLl/Gq8g=","beginning_cross_street":"3RD AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.972189,40.75396]]}},{"id":"FLlG480P0aiR3F4/pRTujE8mctQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[],"description":"Track replacement on N Line southbound from Canal St (New York) to DeKalb Av (New York) Local service only. In Manhattan, use nearby 4 line or J line for City Hall, Cortlandt St, Rector St and Whitehall St-South Ferry. In Brooklyn, use nearby Borough Hall 2 line or 4 line for Court St and Jay St-MetroTech. For service to Court St and Jay St-MetroTech, take the N line to DeKalb Av and transfer to a Manhattan-bound N line., Wednesday May 13th,2026 thru Thursday May 14th,2026, Wednesday, 11:45 PM thru 05:00 AM runs via Q line","update_date":"2026-05-09T09:00:20Z"},"road_event_id":"FLlG480P0aiR3F4/pRTujE8mctQ=","beginning_cross_street":"Canal St","ending_cross_street":"DeKalb Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:30:00Z","end_date":"2026-05-15T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.001775,40.719527]]}},{"id":"I7AhGQ1E8/9aACsLjol+93NjYbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cNZhB7GWDnMzagYPG1rUSbM3I9s="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) All trains at 1 Av and 3 Av board from the Brooklyn-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line., Thursday May 7th, 2026 thru Friday May 29th, 2026, Wednesday/Friday, 01:30 AM thru 05:00 AM","update_date":"2026-05-06T17:17:36Z"},"road_event_id":"I7AhGQ1E8/9aACsLjol+93NjYbY=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T05:30:00Z","end_date":"2026-05-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"cNZhB7GWDnMzagYPG1rUSbM3I9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7AhGQ1E8/9aACsLjol+93NjYbY="},{"type":"next-occurrence","id":"zSDqbKlKIZwMQ8vEXY9m4jIS8yM="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) All trains at 1 Av and 3 Av board from the Brooklyn-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line., Thursday May 7th, 2026 thru Friday May 29th, 2026, Wednesday/Friday, 01:30 AM thru 05:00 AM","update_date":"2026-05-06T17:17:36Z"},"road_event_id":"cNZhB7GWDnMzagYPG1rUSbM3I9s=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T05:30:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"zSDqbKlKIZwMQ8vEXY9m4jIS8yM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7AhGQ1E8/9aACsLjol+93NjYbY="},{"type":"next-occurrence","id":"xxlI/d84FX41w8va/7+uelsrgFA="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) All trains at 1 Av and 3 Av board from the Brooklyn-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line., Thursday May 7th, 2026 thru Friday May 29th, 2026, Wednesday/Friday, 01:30 AM thru 05:00 AM","update_date":"2026-05-06T17:17:36Z"},"road_event_id":"zSDqbKlKIZwMQ8vEXY9m4jIS8yM=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T05:30:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"xxlI/d84FX41w8va/7+uelsrgFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7AhGQ1E8/9aACsLjol+93NjYbY="},{"type":"next-occurrence","id":"/KfnkaYU715c/KS8maJ04voVYDo="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) All trains at 1 Av and 3 Av board from the Brooklyn-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line., Thursday May 7th, 2026 thru Friday May 29th, 2026, Wednesday/Friday, 01:30 AM thru 05:00 AM","update_date":"2026-05-06T17:17:36Z"},"road_event_id":"xxlI/d84FX41w8va/7+uelsrgFA=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T05:30:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"/KfnkaYU715c/KS8maJ04voVYDo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I7AhGQ1E8/9aACsLjol+93NjYbY="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) All trains at 1 Av and 3 Av board from the Brooklyn-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line., Thursday May 7th, 2026 thru Friday May 29th, 2026, Wednesday/Friday, 01:30 AM thru 05:00 AM","update_date":"2026-05-06T17:17:36Z"},"road_event_id":"/KfnkaYU715c/KS8maJ04voVYDo=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T05:30:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"jRSkz6U0g0novgqpMVZ3knA0NQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and 8 Av (New York) L line runs between Canarsie-Rockaway Pkwy and 14 St-Union Sq, the last stop. M14 and free L92 shuttle buses make L line stops between 14 St-Union Sq and 8 Av. Transfer between L line and M14/L92 buses at 14 St-Union Sq., Monday May 11th, 2026 thru Thursday May 14th, 2026, Monday/Tuesday/Wednesday, 11:45 PM thru 05:00 AM service suspended","update_date":"2026-05-06T17:29:48Z"},"road_event_id":"jRSkz6U0g0novgqpMVZ3knA0NQc=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"8 Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:45:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"uuFGt8UWfLHzBhdn+eWfy1BX0rk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"M7P82kFGaWm5bUiqMIbsxkmxSyU="}],"description":"Due to Track repairs southbound, N Line from 36 St (New York) to Coney Island - Stillwell Av (New York) Trains stop at 62 St/New Utrecht Av. For 59 St, take the R line instead. Transfer between trains at 36 St. For service to 8 Av and Fort Hamilton Pkwy, take the N line to 62 St/New Utrecht Av and transfer to a Manhattan-bound N line. For service to 18 Av, 20 Av, Bay Pkwy, Kings Hwy, Avenue U and 86 St, take the N line to Coney Island-Stillwell Av and transfer to a Manhattan-bound N line. For service from these stations, take the N line to New Utrecht Av/62 St or 36 St and transfer to a Coney Island-bound N line., Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:45 AM thru 03:00 PM runs via D line","update_date":"2026-05-06T17:36:07Z"},"road_event_id":"uuFGt8UWfLHzBhdn+eWfy1BX0rk=","beginning_cross_street":"36 St","ending_cross_street":"Coney Island - Stillwell Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:45:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003549,40.655144]]}},{"id":"M7P82kFGaWm5bUiqMIbsxkmxSyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uuFGt8UWfLHzBhdn+eWfy1BX0rk="},{"type":"next-occurrence","id":"YXziBbpIx8rZ8qO96swmxPJp7Ik="}],"description":"Due to Track repairs southbound, N Line from 36 St (New York) to Coney Island - Stillwell Av (New York) Trains stop at 62 St/New Utrecht Av. For 59 St, take the R line instead. Transfer between trains at 36 St. For service to 8 Av and Fort Hamilton Pkwy, take the N line to 62 St/New Utrecht Av and transfer to a Manhattan-bound N line. For service to 18 Av, 20 Av, Bay Pkwy, Kings Hwy, Avenue U and 86 St, take the N line to Coney Island-Stillwell Av and transfer to a Manhattan-bound N line. For service from these stations, take the N line to New Utrecht Av/62 St or 36 St and transfer to a Coney Island-bound N line., Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:45 AM thru 03:00 PM runs via D line","update_date":"2026-05-06T17:36:07Z"},"road_event_id":"M7P82kFGaWm5bUiqMIbsxkmxSyU=","beginning_cross_street":"36 St","ending_cross_street":"Coney Island - Stillwell Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:45:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003549,40.655144]]}},{"id":"YXziBbpIx8rZ8qO96swmxPJp7Ik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uuFGt8UWfLHzBhdn+eWfy1BX0rk="}],"description":"Due to Track repairs southbound, N Line from 36 St (New York) to Coney Island - Stillwell Av (New York) Trains stop at 62 St/New Utrecht Av. For 59 St, take the R line instead. Transfer between trains at 36 St. For service to 8 Av and Fort Hamilton Pkwy, take the N line to 62 St/New Utrecht Av and transfer to a Manhattan-bound N line. For service to 18 Av, 20 Av, Bay Pkwy, Kings Hwy, Avenue U and 86 St, take the N line to Coney Island-Stillwell Av and transfer to a Manhattan-bound N line. For service from these stations, take the N line to New Utrecht Av/62 St or 36 St and transfer to a Coney Island-bound N line., Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:45 AM thru 03:00 PM runs via D line","update_date":"2026-05-06T17:36:07Z"},"road_event_id":"YXziBbpIx8rZ8qO96swmxPJp7Ik=","beginning_cross_street":"36 St","ending_cross_street":"Coney Island - Stillwell Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:45:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003549,40.655144]]}},{"id":"pZlzY1AWPzMVBJqZDPTDjcE+IDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"W4mEYXnj/947cOqLOfgjhlN3lFE="}],"description":"Construction on I-278 westbound from NY 25; Queens Boulevard (New York) to 48th Street (New York) Subject to change without notice. For Concrete Pour., Thursday May 14th, 2026 thru Friday May 15th, 2026, 09:00 PM thru 06:00 AM 1 Center lane of 3 lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 09:00 PM thru 07:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-06T17:34:55Z"},"road_event_id":"pZlzY1AWPzMVBJqZDPTDjcE+IDE=","beginning_cross_street":"NY 25; Queens Boulevard","ending_cross_street":"48th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899242,40.740585]]}},{"id":"W4mEYXnj/947cOqLOfgjhlN3lFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pZlzY1AWPzMVBJqZDPTDjcE+IDE="}],"description":"Construction on I-278 westbound from NY 25; Queens Boulevard (New York) to 48th Street (New York) Subject to change without notice. For Concrete Pour., Thursday May 14th, 2026 thru Friday May 15th, 2026, 09:00 PM thru 06:00 AM 1 Center lane of 3 lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 09:00 PM thru 07:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-06T17:34:55Z"},"road_event_id":"W4mEYXnj/947cOqLOfgjhlN3lFE=","beginning_cross_street":"NY 25; Queens Boulevard","ending_cross_street":"48th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899242,40.740585]]}},{"id":"/AGsvKM7nO61d3zVvIwAUbSj+is=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[],"description":"Due to Track repairs both directions, L Line between Myrtle - Wyckoff Avs (New York) and Atlantic Av (New York) L line operates in two sections. The first one is between 8 Av and Myrtle-Wyckoff Avs, every 8 minutes. The second one is between Atlantic Av and Canarsie-Rockaway Pkwy, every 10 minutes. Free B111 shuttle buses make stops between Myrtle-Wyckoff Avs and Atlantic Av. Transfer between L line and buses at Myrtle-Wyckoff Avs and/or Atlantic Av. For service between Brooklyn and Manhattan, consider the A line, C line, or J line. Transfer between trains and shuttle buses at Broadway Junction., Thursday May 14th, 2026, 10:00 AM thru 02:30 PM service suspended","update_date":"2026-05-06T17:42:56Z"},"road_event_id":"/AGsvKM7nO61d3zVvIwAUbSj+is=","beginning_cross_street":"Myrtle - Wyckoff Avs","ending_cross_street":"Atlantic Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911586,40.699814]]}},{"id":"s5MKTVgi/FxBTUirHJ3qClYgL3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[],"description":"Due to Track repairs northbound, N Line from DeKalb Av (New York) to Canal St (New York) Local service only. In Brooklyn, use nearby Borough Hall 2 line or 4 line for Jay St-MetroTech and Court St. In Manhattan, use nearby 4 line or J line for Whitehall St-South Ferry, Rector St, Cortlandt St and City Hall., Thursday May 14th, 2026 thru Friday May 15th, 2026, 11:45 PM thru 05:00 AM runs via Q line","update_date":"2026-05-06T17:48:24Z"},"road_event_id":"s5MKTVgi/FxBTUirHJ3qClYgL3E=","beginning_cross_street":"DeKalb Av","ending_cross_street":"Canal St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:30:00Z","end_date":"2026-05-16T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981824,40.690635]]}},{"id":"Jdfp7Uy3EYwNHKqHz6IMUtB9yxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1qcBnzUGbDL/Kj3ynS7FKOpD7bc="}],"description":"Due to Repairs northbound, N Line from 36 St (New York) to Atlantic Av - Barclays Ctr (New York) and runs via the Q line to Canal St, skipping DeKalb Av. For service to 25 St, Prospect Av, 4 Av-9 St and Union St, take the N line to Atlantic Av-Barclays Ctr and transfer to a local Coney Island-bound D line or N line. For service from these stations, take the D line or N line to 36 St and transfer to a Manhattan-bound N line. For DeKalb Av, Court St, Jay St-MetroTech, Whitehall St-South Ferry, Rector St, Cortlandt St and City Hall, take the Q line instead. Transfer at Atlantic Av-Barclays Ctr. 96 St-bound Q line runs via the R line from DeKalb Av to Canal St., Friday May 15th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM express only","update_date":"2026-05-06T17:55:29Z"},"road_event_id":"Jdfp7Uy3EYwNHKqHz6IMUtB9yxw=","beginning_cross_street":"36 St","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T03:30:00Z","end_date":"2026-05-17T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003549,40.655144]]}},{"id":"1qcBnzUGbDL/Kj3ynS7FKOpD7bc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jdfp7Uy3EYwNHKqHz6IMUtB9yxw="},{"type":"next-occurrence","id":"mtFnzdRBt69JKYcgcUu1u74WsNU="}],"description":"Due to Repairs northbound, N Line from 36 St (New York) to Atlantic Av - Barclays Ctr (New York) and runs via the Q line to Canal St, skipping DeKalb Av. For service to 25 St, Prospect Av, 4 Av-9 St and Union St, take the N line to Atlantic Av-Barclays Ctr and transfer to a local Coney Island-bound D line or N line. For service from these stations, take the D line or N line to 36 St and transfer to a Manhattan-bound N line. For DeKalb Av, Court St, Jay St-MetroTech, Whitehall St-South Ferry, Rector St, Cortlandt St and City Hall, take the Q line instead. Transfer at Atlantic Av-Barclays Ctr. 96 St-bound Q line runs via the R line from DeKalb Av to Canal St., Friday May 15th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM express only","update_date":"2026-05-06T17:55:29Z"},"road_event_id":"1qcBnzUGbDL/Kj3ynS7FKOpD7bc=","beginning_cross_street":"36 St","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T03:30:00Z","end_date":"2026-05-18T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003549,40.655144]]}},{"id":"mtFnzdRBt69JKYcgcUu1u74WsNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jdfp7Uy3EYwNHKqHz6IMUtB9yxw="},{"type":"next-occurrence","id":"Qo2UlgO9bkA0kijxuR+zwibCGiI="}],"description":"Due to Repairs northbound, N Line from 36 St (New York) to Atlantic Av - Barclays Ctr (New York) and runs via the Q line to Canal St, skipping DeKalb Av. For service to 25 St, Prospect Av, 4 Av-9 St and Union St, take the N line to Atlantic Av-Barclays Ctr and transfer to a local Coney Island-bound D line or N line. For service from these stations, take the D line or N line to 36 St and transfer to a Manhattan-bound N line. For DeKalb Av, Court St, Jay St-MetroTech, Whitehall St-South Ferry, Rector St, Cortlandt St and City Hall, take the Q line instead. Transfer at Atlantic Av-Barclays Ctr. 96 St-bound Q line runs via the R line from DeKalb Av to Canal St., Friday May 15th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM express only","update_date":"2026-05-06T17:55:29Z"},"road_event_id":"mtFnzdRBt69JKYcgcUu1u74WsNU=","beginning_cross_street":"36 St","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T03:30:00Z","end_date":"2026-05-19T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003549,40.655144]]}},{"id":"Qo2UlgO9bkA0kijxuR+zwibCGiI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jdfp7Uy3EYwNHKqHz6IMUtB9yxw="}],"description":"Due to Repairs northbound, N Line from 36 St (New York) to Atlantic Av - Barclays Ctr (New York) and runs via the Q line to Canal St, skipping DeKalb Av. For service to 25 St, Prospect Av, 4 Av-9 St and Union St, take the N line to Atlantic Av-Barclays Ctr and transfer to a local Coney Island-bound D line or N line. For service from these stations, take the D line or N line to 36 St and transfer to a Manhattan-bound N line. For DeKalb Av, Court St, Jay St-MetroTech, Whitehall St-South Ferry, Rector St, Cortlandt St and City Hall, take the Q line instead. Transfer at Atlantic Av-Barclays Ctr. 96 St-bound Q line runs via the R line from DeKalb Av to Canal St., Friday May 15th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM express only","update_date":"2026-05-06T17:55:29Z"},"road_event_id":"Qo2UlgO9bkA0kijxuR+zwibCGiI=","beginning_cross_street":"36 St","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T03:30:00Z","end_date":"2026-05-20T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003549,40.655144]]}},{"id":"G0wXNs8akRCqbsiRBxBTSZmMU/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 65TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fYTgQN1wuqAlq+iR0kB/1dI6qKU="}],"description":"Crane operations on E 65TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York), Friday May 8th, 2026 thru Sunday May 17th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:01:50Z"},"road_event_id":"G0wXNs8akRCqbsiRBxBTSZmMU/k=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96365,40.765232]]}},{"id":"fYTgQN1wuqAlq+iR0kB/1dI6qKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 65TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G0wXNs8akRCqbsiRBxBTSZmMU/k="},{"type":"next-occurrence","id":"FCybiXoyIrsYMHzrhsHF7ds/0GY="}],"description":"Crane operations on E 65TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York), Friday May 8th, 2026 thru Sunday May 17th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:01:50Z"},"road_event_id":"fYTgQN1wuqAlq+iR0kB/1dI6qKU=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96365,40.765232]]}},{"id":"FCybiXoyIrsYMHzrhsHF7ds/0GY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 65TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G0wXNs8akRCqbsiRBxBTSZmMU/k="},{"type":"next-occurrence","id":"mMtUv3Zino7RAHBiRrklSPcCUbo="}],"description":"Crane operations on E 65TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York), Friday May 8th, 2026 thru Sunday May 17th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:01:50Z"},"road_event_id":"FCybiXoyIrsYMHzrhsHF7ds/0GY=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96365,40.765232]]}},{"id":"mMtUv3Zino7RAHBiRrklSPcCUbo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 65TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G0wXNs8akRCqbsiRBxBTSZmMU/k="},{"type":"next-occurrence","id":"XraYGmXK2Mdxn9+Xu+oGI6liWnw="}],"description":"Crane operations on E 65TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York), Friday May 8th, 2026 thru Sunday May 17th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:01:50Z"},"road_event_id":"mMtUv3Zino7RAHBiRrklSPcCUbo=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96365,40.765232]]}},{"id":"XraYGmXK2Mdxn9+Xu+oGI6liWnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 65TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G0wXNs8akRCqbsiRBxBTSZmMU/k="}],"description":"Crane operations on E 65TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York), Friday May 8th, 2026 thru Sunday May 17th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:01:50Z"},"road_event_id":"XraYGmXK2Mdxn9+Xu+oGI6liWnw=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96365,40.765232]]}},{"id":"RM1EEYI6ws3R96KByqm3NdJtkWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 75TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"APRVU+9P1wemxPujG5Kwvzq/Gg0="}],"description":"Construction on E 75TH ST westbound between 3RD AVE (New York) and LEXINGTON AVE (New York) for building inspection from boom truck., Saturday May 9th, 2026 thru Saturday May 23rd, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:06:17Z"},"road_event_id":"RM1EEYI6ws3R96KByqm3NdJtkWE=","beginning_cross_street":"3RD AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959263,40.771738]]}},{"id":"APRVU+9P1wemxPujG5Kwvzq/Gg0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 75TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RM1EEYI6ws3R96KByqm3NdJtkWE="},{"type":"next-occurrence","id":"ZcJWdAxJtH1hiuwMfAc823byw8g="}],"description":"Construction on E 75TH ST westbound between 3RD AVE (New York) and LEXINGTON AVE (New York) for building inspection from boom truck., Saturday May 9th, 2026 thru Saturday May 23rd, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:06:17Z"},"road_event_id":"APRVU+9P1wemxPujG5Kwvzq/Gg0=","beginning_cross_street":"3RD AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959263,40.771738]]}},{"id":"ZcJWdAxJtH1hiuwMfAc823byw8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 75TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RM1EEYI6ws3R96KByqm3NdJtkWE="}],"description":"Construction on E 75TH ST westbound between 3RD AVE (New York) and LEXINGTON AVE (New York) for building inspection from boom truck., Saturday May 9th, 2026 thru Saturday May 23rd, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:06:17Z"},"road_event_id":"ZcJWdAxJtH1hiuwMfAc823byw8g=","beginning_cross_street":"3RD AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959263,40.771738]]}},{"id":"HOzIh/YJbDztnV0EKtf06bn8ud0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 92ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"u+L44L+ykwyH0Ag981MrTo6xFQ0="}],"description":"Crane operations on W 92ND ST eastbound between BROADWAY (New York) and AMSTERDAM AVE (New York), Saturday May 9th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:33:20Z"},"road_event_id":"HOzIh/YJbDztnV0EKtf06bn8ud0=","beginning_cross_street":"BROADWAY","ending_cross_street":"AMSTERDAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973501,40.792035]]}},{"id":"u+L44L+ykwyH0Ag981MrTo6xFQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOzIh/YJbDztnV0EKtf06bn8ud0="},{"type":"next-occurrence","id":"DEULZ2hS+GhGlvxikWkoL/sCFZg="}],"description":"Crane operations on W 92ND ST eastbound between BROADWAY (New York) and AMSTERDAM AVE (New York), Saturday May 9th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:33:20Z"},"road_event_id":"u+L44L+ykwyH0Ag981MrTo6xFQ0=","beginning_cross_street":"BROADWAY","ending_cross_street":"AMSTERDAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973501,40.792035]]}},{"id":"DEULZ2hS+GhGlvxikWkoL/sCFZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOzIh/YJbDztnV0EKtf06bn8ud0="},{"type":"next-occurrence","id":"AoZm3oqcmDqjDELEaGDe2PaA+Yw="}],"description":"Crane operations on W 92ND ST eastbound between BROADWAY (New York) and AMSTERDAM AVE (New York), Saturday May 9th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:33:20Z"},"road_event_id":"DEULZ2hS+GhGlvxikWkoL/sCFZg=","beginning_cross_street":"BROADWAY","ending_cross_street":"AMSTERDAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973501,40.792035]]}},{"id":"AoZm3oqcmDqjDELEaGDe2PaA+Yw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOzIh/YJbDztnV0EKtf06bn8ud0="},{"type":"next-occurrence","id":"xYOWN0/z5b22vCxEdTX58uGpHHE="}],"description":"Crane operations on W 92ND ST eastbound between BROADWAY (New York) and AMSTERDAM AVE (New York), Saturday May 9th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:33:20Z"},"road_event_id":"AoZm3oqcmDqjDELEaGDe2PaA+Yw=","beginning_cross_street":"BROADWAY","ending_cross_street":"AMSTERDAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973501,40.792035]]}},{"id":"xYOWN0/z5b22vCxEdTX58uGpHHE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOzIh/YJbDztnV0EKtf06bn8ud0="},{"type":"next-occurrence","id":"nxom4FnzTjvA9fY3Be49pnvOJOU="}],"description":"Crane operations on W 92ND ST eastbound between BROADWAY (New York) and AMSTERDAM AVE (New York), Saturday May 9th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:33:20Z"},"road_event_id":"xYOWN0/z5b22vCxEdTX58uGpHHE=","beginning_cross_street":"BROADWAY","ending_cross_street":"AMSTERDAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T12:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973501,40.792035]]}},{"id":"nxom4FnzTjvA9fY3Be49pnvOJOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOzIh/YJbDztnV0EKtf06bn8ud0="},{"type":"next-occurrence","id":"kN24iDl7l3c7AkkMup6DFXOcT2U="}],"description":"Crane operations on W 92ND ST eastbound between BROADWAY (New York) and AMSTERDAM AVE (New York), Saturday May 9th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:33:20Z"},"road_event_id":"nxom4FnzTjvA9fY3Be49pnvOJOU=","beginning_cross_street":"BROADWAY","ending_cross_street":"AMSTERDAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T12:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973501,40.792035]]}},{"id":"kN24iDl7l3c7AkkMup6DFXOcT2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOzIh/YJbDztnV0EKtf06bn8ud0="},{"type":"next-occurrence","id":"23JvWqwXSZ+6MnKhipg9lQKdrhM="}],"description":"Crane operations on W 92ND ST eastbound between BROADWAY (New York) and AMSTERDAM AVE (New York), Saturday May 9th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:33:20Z"},"road_event_id":"kN24iDl7l3c7AkkMup6DFXOcT2U=","beginning_cross_street":"BROADWAY","ending_cross_street":"AMSTERDAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T12:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973501,40.792035]]}},{"id":"23JvWqwXSZ+6MnKhipg9lQKdrhM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOzIh/YJbDztnV0EKtf06bn8ud0="},{"type":"next-occurrence","id":"6w8T8N0A66rbSVljiQBuhKt/PiI="}],"description":"Crane operations on W 92ND ST eastbound between BROADWAY (New York) and AMSTERDAM AVE (New York), Saturday May 9th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:33:20Z"},"road_event_id":"23JvWqwXSZ+6MnKhipg9lQKdrhM=","beginning_cross_street":"BROADWAY","ending_cross_street":"AMSTERDAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T12:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973501,40.792035]]}},{"id":"6w8T8N0A66rbSVljiQBuhKt/PiI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOzIh/YJbDztnV0EKtf06bn8ud0="},{"type":"next-occurrence","id":"JDCyfsMkgWYhsIOOnwr6QieKJLg="}],"description":"Crane operations on W 92ND ST eastbound between BROADWAY (New York) and AMSTERDAM AVE (New York), Saturday May 9th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:33:20Z"},"road_event_id":"6w8T8N0A66rbSVljiQBuhKt/PiI=","beginning_cross_street":"BROADWAY","ending_cross_street":"AMSTERDAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T12:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973501,40.792035]]}},{"id":"JDCyfsMkgWYhsIOOnwr6QieKJLg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOzIh/YJbDztnV0EKtf06bn8ud0="},{"type":"next-occurrence","id":"/lAJivgwxxjgYnqiNXPkciochpQ="}],"description":"Crane operations on W 92ND ST eastbound between BROADWAY (New York) and AMSTERDAM AVE (New York), Saturday May 9th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:33:20Z"},"road_event_id":"JDCyfsMkgWYhsIOOnwr6QieKJLg=","beginning_cross_street":"BROADWAY","ending_cross_street":"AMSTERDAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T12:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973501,40.792035]]}},{"id":"/lAJivgwxxjgYnqiNXPkciochpQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOzIh/YJbDztnV0EKtf06bn8ud0="},{"type":"next-occurrence","id":"goItaor4Y/Sw+V4CYBQerPn705E="}],"description":"Crane operations on W 92ND ST eastbound between BROADWAY (New York) and AMSTERDAM AVE (New York), Saturday May 9th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:33:20Z"},"road_event_id":"/lAJivgwxxjgYnqiNXPkciochpQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"AMSTERDAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973501,40.792035]]}},{"id":"goItaor4Y/Sw+V4CYBQerPn705E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOzIh/YJbDztnV0EKtf06bn8ud0="}],"description":"Crane operations on W 92ND ST eastbound between BROADWAY (New York) and AMSTERDAM AVE (New York), Saturday May 9th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:33:20Z"},"road_event_id":"goItaor4Y/Sw+V4CYBQerPn705E=","beginning_cross_street":"BROADWAY","ending_cross_street":"AMSTERDAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T12:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973501,40.792035]]}},{"id":"fcSEy9b5p82UW5a+Bv2jxA/DJ20=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xzEMG22R8uxkuMTo/wc8xlsQe9I="}],"description":"Construction and crane operations on IRVING PL both directions between E 18TH ST (New York) and E 19TH ST (New York) for mobile crane installation to set steel., Saturday May 9th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:10:47Z"},"road_event_id":"fcSEy9b5p82UW5a+Bv2jxA/DJ20=","beginning_cross_street":"E 18TH ST","ending_cross_street":"E 19TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986935,40.736493]]}},{"id":"xzEMG22R8uxkuMTo/wc8xlsQe9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fcSEy9b5p82UW5a+Bv2jxA/DJ20="}],"description":"Construction and crane operations on IRVING PL both directions between E 18TH ST (New York) and E 19TH ST (New York) for mobile crane installation to set steel., Saturday May 9th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:10:47Z"},"road_event_id":"xzEMG22R8uxkuMTo/wc8xlsQe9I=","beginning_cross_street":"E 18TH ST","ending_cross_street":"E 19TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986935,40.736493]]}},{"id":"W1G0gNY9erhooH7TlNogWaMyfUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"S7Fsyj/RaNlQ7qOW1YeSqoK0Ah4="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"W1G0gNY9erhooH7TlNogWaMyfUU=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"S7Fsyj/RaNlQ7qOW1YeSqoK0Ah4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W1G0gNY9erhooH7TlNogWaMyfUU="},{"type":"next-occurrence","id":"hxTf0PnSo7svWZGIMCodMd/db08="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"S7Fsyj/RaNlQ7qOW1YeSqoK0Ah4=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"hxTf0PnSo7svWZGIMCodMd/db08=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W1G0gNY9erhooH7TlNogWaMyfUU="},{"type":"next-occurrence","id":"E5D70+PREq8feKNxEKO/gCr+T+Q="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"hxTf0PnSo7svWZGIMCodMd/db08=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"E5D70+PREq8feKNxEKO/gCr+T+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W1G0gNY9erhooH7TlNogWaMyfUU="},{"type":"next-occurrence","id":"p9jC+MR+K1R8zI2Y+bhucWvsms4="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"E5D70+PREq8feKNxEKO/gCr+T+Q=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"p9jC+MR+K1R8zI2Y+bhucWvsms4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W1G0gNY9erhooH7TlNogWaMyfUU="},{"type":"next-occurrence","id":"u54wU7uJG7Xiqya03xKdeDVs6CY="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"p9jC+MR+K1R8zI2Y+bhucWvsms4=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"u54wU7uJG7Xiqya03xKdeDVs6CY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W1G0gNY9erhooH7TlNogWaMyfUU="},{"type":"next-occurrence","id":"p3JmzX2kw6yQqeX9GE9P034dJY8="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"u54wU7uJG7Xiqya03xKdeDVs6CY=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"p3JmzX2kw6yQqeX9GE9P034dJY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W1G0gNY9erhooH7TlNogWaMyfUU="},{"type":"next-occurrence","id":"kT3nnxn4MbF3Djbk5KIyzH6OhpI="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"p3JmzX2kw6yQqeX9GE9P034dJY8=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"kT3nnxn4MbF3Djbk5KIyzH6OhpI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W1G0gNY9erhooH7TlNogWaMyfUU="},{"type":"next-occurrence","id":"MywxhSK4R5AuNKkeaQ/tKpjlWio="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"kT3nnxn4MbF3Djbk5KIyzH6OhpI=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"MywxhSK4R5AuNKkeaQ/tKpjlWio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W1G0gNY9erhooH7TlNogWaMyfUU="},{"type":"next-occurrence","id":"K9HUEJ/FIaEGDQTAxZKGaenyhz4="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"MywxhSK4R5AuNKkeaQ/tKpjlWio=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"K9HUEJ/FIaEGDQTAxZKGaenyhz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W1G0gNY9erhooH7TlNogWaMyfUU="},{"type":"next-occurrence","id":"KrDiluBRDIs4r9IP4vpO5XGDSTk="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"K9HUEJ/FIaEGDQTAxZKGaenyhz4=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"KrDiluBRDIs4r9IP4vpO5XGDSTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W1G0gNY9erhooH7TlNogWaMyfUU="},{"type":"next-occurrence","id":"iCkxzrCc7HW42h9rdvPy7QfonnQ="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"KrDiluBRDIs4r9IP4vpO5XGDSTk=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"iCkxzrCc7HW42h9rdvPy7QfonnQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W1G0gNY9erhooH7TlNogWaMyfUU="},{"type":"next-occurrence","id":"1PKQ4YfK7Uri0a8uPvoTD9+oaKc="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"iCkxzrCc7HW42h9rdvPy7QfonnQ=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"1PKQ4YfK7Uri0a8uPvoTD9+oaKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W1G0gNY9erhooH7TlNogWaMyfUU="},{"type":"next-occurrence","id":"irX7DELRVngSV3eHAxQfhXo+13I="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"1PKQ4YfK7Uri0a8uPvoTD9+oaKc=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"irX7DELRVngSV3eHAxQfhXo+13I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W1G0gNY9erhooH7TlNogWaMyfUU="},{"type":"next-occurrence","id":"aHX995Q4yFk3MJaea0GeG8bQNNQ="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"irX7DELRVngSV3eHAxQfhXo+13I=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"aHX995Q4yFk3MJaea0GeG8bQNNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W1G0gNY9erhooH7TlNogWaMyfUU="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"aHX995Q4yFk3MJaea0GeG8bQNNQ=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"VWyjeXoJKgqsB2iopaM936oKB1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FYySpGsXXdCJb5bI+VPbLzpgyk8="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"VWyjeXoJKgqsB2iopaM936oKB1E=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"FYySpGsXXdCJb5bI+VPbLzpgyk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VWyjeXoJKgqsB2iopaM936oKB1E="},{"type":"next-occurrence","id":"C8NBdN9w3/AoPQ7Iye5RW72IwDY="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"FYySpGsXXdCJb5bI+VPbLzpgyk8=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"C8NBdN9w3/AoPQ7Iye5RW72IwDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VWyjeXoJKgqsB2iopaM936oKB1E="},{"type":"next-occurrence","id":"IlCEwsYEaQ/sIll7lwc2oBHSxFo="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"C8NBdN9w3/AoPQ7Iye5RW72IwDY=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"IlCEwsYEaQ/sIll7lwc2oBHSxFo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VWyjeXoJKgqsB2iopaM936oKB1E="},{"type":"next-occurrence","id":"NP791p0h/T8ce1RpJhrM2ZEMSQ0="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"IlCEwsYEaQ/sIll7lwc2oBHSxFo=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"NP791p0h/T8ce1RpJhrM2ZEMSQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VWyjeXoJKgqsB2iopaM936oKB1E="},{"type":"next-occurrence","id":"cDFtD1dWPt0NJtH0sa4EXyP83uE="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"NP791p0h/T8ce1RpJhrM2ZEMSQ0=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"cDFtD1dWPt0NJtH0sa4EXyP83uE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VWyjeXoJKgqsB2iopaM936oKB1E="},{"type":"next-occurrence","id":"wYbo4DSFqc3o3rGdhST1QpNseWs="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"cDFtD1dWPt0NJtH0sa4EXyP83uE=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"wYbo4DSFqc3o3rGdhST1QpNseWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VWyjeXoJKgqsB2iopaM936oKB1E="},{"type":"next-occurrence","id":"HqqRBm7d5wPm/ZyjyX1vfkpgXKs="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"wYbo4DSFqc3o3rGdhST1QpNseWs=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"HqqRBm7d5wPm/ZyjyX1vfkpgXKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VWyjeXoJKgqsB2iopaM936oKB1E="},{"type":"next-occurrence","id":"m8f7lMRa97SZkpfY1Wyf/+J5d54="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"HqqRBm7d5wPm/ZyjyX1vfkpgXKs=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"m8f7lMRa97SZkpfY1Wyf/+J5d54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VWyjeXoJKgqsB2iopaM936oKB1E="},{"type":"next-occurrence","id":"Hm3kydE8u8CA5mQyyMCjrRB7xzE="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"m8f7lMRa97SZkpfY1Wyf/+J5d54=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"Hm3kydE8u8CA5mQyyMCjrRB7xzE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VWyjeXoJKgqsB2iopaM936oKB1E="},{"type":"next-occurrence","id":"Pg2UkH+xoj4wjXlJG0qsW+4qXWU="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"Hm3kydE8u8CA5mQyyMCjrRB7xzE=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"Pg2UkH+xoj4wjXlJG0qsW+4qXWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VWyjeXoJKgqsB2iopaM936oKB1E="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"Pg2UkH+xoj4wjXlJG0qsW+4qXWU=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"XP77hGysC7HF1P+RaEhLECyZSr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Both Directions North of CR 508 (Kearny) Wednesday May 13, 2026 09:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-06T18:16:43Z"},"road_event_id":"XP77hGysC7HF1P+RaEhLECyZSr0=","beginning_cross_street":"North of CR 508","ending_cross_street":"North of CR 508","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.100448,40.74765]]}},{"id":"6/r/8tc+aWoOYNeOpAwk8ZoTM/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NASSAU ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1P4LkmT0oxBnx4gIZ9WVZCnX4ws="}],"description":"Construction on NASSAU ST northbound between PINE ST (New York) and CEDAR ST (New York) for reconstruction of Nassau Street., Friday May 8th, 2026 thru Friday May 29th, 2026, 07:00 AM thru 04:00 PM All lanes closed, Saturday May 9th, 2026 thru Saturday May 23rd, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday May 24th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:19:10Z"},"road_event_id":"6/r/8tc+aWoOYNeOpAwk8ZoTM/A=","beginning_cross_street":"PINE ST","ending_cross_street":"CEDAR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.010179,40.707722]]}},{"id":"1P4LkmT0oxBnx4gIZ9WVZCnX4ws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NASSAU ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6/r/8tc+aWoOYNeOpAwk8ZoTM/A="},{"type":"next-occurrence","id":"r4lWzr1L5NkONSGU3UX/HV19HW8="}],"description":"Construction on NASSAU ST northbound between PINE ST (New York) and CEDAR ST (New York) for reconstruction of Nassau Street., Friday May 8th, 2026 thru Friday May 29th, 2026, 07:00 AM thru 04:00 PM All lanes closed, Saturday May 9th, 2026 thru Saturday May 23rd, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday May 24th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:19:10Z"},"road_event_id":"1P4LkmT0oxBnx4gIZ9WVZCnX4ws=","beginning_cross_street":"PINE ST","ending_cross_street":"CEDAR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.010179,40.707722]]}},{"id":"r4lWzr1L5NkONSGU3UX/HV19HW8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NASSAU ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6/r/8tc+aWoOYNeOpAwk8ZoTM/A="},{"type":"next-occurrence","id":"qvN3h8DXlva4ELv6ZcQJk42NSNU="}],"description":"Construction on NASSAU ST northbound between PINE ST (New York) and CEDAR ST (New York) for reconstruction of Nassau Street., Friday May 8th, 2026 thru Friday May 29th, 2026, 07:00 AM thru 04:00 PM All lanes closed, Saturday May 9th, 2026 thru Saturday May 23rd, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday May 24th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:19:10Z"},"road_event_id":"r4lWzr1L5NkONSGU3UX/HV19HW8=","beginning_cross_street":"PINE ST","ending_cross_street":"CEDAR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.010179,40.707722]]}},{"id":"qvN3h8DXlva4ELv6ZcQJk42NSNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NASSAU ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6/r/8tc+aWoOYNeOpAwk8ZoTM/A="},{"type":"next-occurrence","id":"9FvCXhXW7zIf7r7fAqCUHWyn87M="}],"description":"Construction on NASSAU ST northbound between PINE ST (New York) and CEDAR ST (New York) for reconstruction of Nassau Street., Friday May 8th, 2026 thru Friday May 29th, 2026, 07:00 AM thru 04:00 PM All lanes closed, Saturday May 9th, 2026 thru Saturday May 23rd, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday May 24th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:19:10Z"},"road_event_id":"qvN3h8DXlva4ELv6ZcQJk42NSNU=","beginning_cross_street":"PINE ST","ending_cross_street":"CEDAR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.010179,40.707722]]}},{"id":"9FvCXhXW7zIf7r7fAqCUHWyn87M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NASSAU ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6/r/8tc+aWoOYNeOpAwk8ZoTM/A="},{"type":"next-occurrence","id":"C3b88DL54mFRVFk+CRu3aKeOp8Y="}],"description":"Construction on NASSAU ST northbound between PINE ST (New York) and CEDAR ST (New York) for reconstruction of Nassau Street., Friday May 8th, 2026 thru Friday May 29th, 2026, 07:00 AM thru 04:00 PM All lanes closed, Saturday May 9th, 2026 thru Saturday May 23rd, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday May 24th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:19:10Z"},"road_event_id":"9FvCXhXW7zIf7r7fAqCUHWyn87M=","beginning_cross_street":"PINE ST","ending_cross_street":"CEDAR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.010179,40.707722]]}},{"id":"C3b88DL54mFRVFk+CRu3aKeOp8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NASSAU ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6/r/8tc+aWoOYNeOpAwk8ZoTM/A="}],"description":"Construction on NASSAU ST northbound between PINE ST (New York) and CEDAR ST (New York) for reconstruction of Nassau Street., Friday May 8th, 2026 thru Friday May 29th, 2026, 07:00 AM thru 04:00 PM All lanes closed, Saturday May 9th, 2026 thru Saturday May 23rd, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday May 24th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:19:10Z"},"road_event_id":"C3b88DL54mFRVFk+CRu3aKeOp8Y=","beginning_cross_street":"PINE ST","ending_cross_street":"CEDAR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.010179,40.707722]]}},{"id":"TUxrOEKOGF/8dERSnVSrhQt1XKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rmr4z+uadqrFLveZc5BvpujLzIg="}],"description":"Construction on WHITE ST westbound between FRANKLIN PL (New York) and CHURCH ST (New York) for new gas service., Saturday May 9th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 08:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:24:58Z"},"road_event_id":"TUxrOEKOGF/8dERSnVSrhQt1XKU=","beginning_cross_street":"FRANKLIN PL","ending_cross_street":"CHURCH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-17T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003752,40.71835]]}},{"id":"rmr4z+uadqrFLveZc5BvpujLzIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TUxrOEKOGF/8dERSnVSrhQt1XKU="},{"type":"next-occurrence","id":"T106TOn+eohYv7nVlTkWT6CaT74="}],"description":"Construction on WHITE ST westbound between FRANKLIN PL (New York) and CHURCH ST (New York) for new gas service., Saturday May 9th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 08:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:24:58Z"},"road_event_id":"rmr4z+uadqrFLveZc5BvpujLzIg=","beginning_cross_street":"FRANKLIN PL","ending_cross_street":"CHURCH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003752,40.71835]]}},{"id":"T106TOn+eohYv7nVlTkWT6CaT74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TUxrOEKOGF/8dERSnVSrhQt1XKU="},{"type":"next-occurrence","id":"/V4rubfxaOWjtpdhsggJVpidPZ4="}],"description":"Construction on WHITE ST westbound between FRANKLIN PL (New York) and CHURCH ST (New York) for new gas service., Saturday May 9th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 08:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:24:58Z"},"road_event_id":"T106TOn+eohYv7nVlTkWT6CaT74=","beginning_cross_street":"FRANKLIN PL","ending_cross_street":"CHURCH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-24T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003752,40.71835]]}},{"id":"/V4rubfxaOWjtpdhsggJVpidPZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TUxrOEKOGF/8dERSnVSrhQt1XKU="}],"description":"Construction on WHITE ST westbound between FRANKLIN PL (New York) and CHURCH ST (New York) for new gas service., Saturday May 9th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 08:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:24:58Z"},"road_event_id":"/V4rubfxaOWjtpdhsggJVpidPZ4=","beginning_cross_street":"FRANKLIN PL","ending_cross_street":"CHURCH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003752,40.71835]]}},{"id":"rCE4t7EFI5WDwX8fyuo20YO4Ag8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRANKLIN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PobL+IZCtpgikHVOdBPrkT6MSYM="}],"description":"Construction on FRANKLIN ST eastbound between W BROADWAY (New York) and 6TH AVE (New York) for system upgrade., Saturday May 9th, 2026 thru Sunday July 5th, 2026, Saturday/ Sunday, 10:00 AM thru 10:00 PM All lanes closed","update_date":"2026-05-06T18:29:27Z"},"road_event_id":"rCE4t7EFI5WDwX8fyuo20YO4Ag8=","beginning_cross_street":"W BROADWAY","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T14:00:00Z","end_date":"2026-05-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006551,40.718837]]}},{"id":"PobL+IZCtpgikHVOdBPrkT6MSYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRANKLIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rCE4t7EFI5WDwX8fyuo20YO4Ag8="},{"type":"next-occurrence","id":"o1mgJ1GHDnneTgt7sYkhFadbARw="}],"description":"Construction on FRANKLIN ST eastbound between W BROADWAY (New York) and 6TH AVE (New York) for system upgrade., Saturday May 9th, 2026 thru Sunday July 5th, 2026, Saturday/ Sunday, 10:00 AM thru 10:00 PM All lanes closed","update_date":"2026-05-06T18:29:27Z"},"road_event_id":"PobL+IZCtpgikHVOdBPrkT6MSYM=","beginning_cross_street":"W BROADWAY","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T14:00:00Z","end_date":"2026-05-18T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006551,40.718837]]}},{"id":"o1mgJ1GHDnneTgt7sYkhFadbARw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRANKLIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rCE4t7EFI5WDwX8fyuo20YO4Ag8="},{"type":"next-occurrence","id":"jEHMis1U2d7K37uxzAnaICaJXM8="}],"description":"Construction on FRANKLIN ST eastbound between W BROADWAY (New York) and 6TH AVE (New York) for system upgrade., Saturday May 9th, 2026 thru Sunday July 5th, 2026, Saturday/ Sunday, 10:00 AM thru 10:00 PM All lanes closed","update_date":"2026-05-06T18:29:27Z"},"road_event_id":"o1mgJ1GHDnneTgt7sYkhFadbARw=","beginning_cross_street":"W BROADWAY","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T14:00:00Z","end_date":"2026-05-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006551,40.718837]]}},{"id":"jEHMis1U2d7K37uxzAnaICaJXM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRANKLIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rCE4t7EFI5WDwX8fyuo20YO4Ag8="}],"description":"Construction on FRANKLIN ST eastbound between W BROADWAY (New York) and 6TH AVE (New York) for system upgrade., Saturday May 9th, 2026 thru Sunday July 5th, 2026, Saturday/ Sunday, 10:00 AM thru 10:00 PM All lanes closed","update_date":"2026-05-06T18:29:27Z"},"road_event_id":"jEHMis1U2d7K37uxzAnaICaJXM8=","beginning_cross_street":"W BROADWAY","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T14:00:00Z","end_date":"2026-05-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006551,40.718837]]}},{"id":"oNVfyKt9H4erp8Vo5f80/btFqec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["R Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"a4vBM7Vey96NqONEzJnFlN8BhZA="}],"description":"Due to Track repairs both directions, R Line between Whitehall St - South Ferry (New York) and Atlantic Av - Barclays Ctr (New York) R line runs express between Atlantic Av-Barclays Ctr and 36 St. R line runs between Bay Ridge-95 St and 36 St and express to/from Atlantic Av-Barclays Ctr, the last stop. For Whitehall St-South Ferry, Court St and Jay St-MetroTech, use nearby 4 line or take a Manhattan-bound N line. For DeKalb Av, take the D line, N line, or Q line instead. For Union St, 4 Av-9 St, Prospect Av and 25 St, take the D line or N line. Transfer at Atlantic Av-Barclays Ctr 4 line, D line, N line, Q line, R line or 36 St D line, N line, or R line., Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 11:45 PM thru 05:00 AM service suspended, Thursday May 14th, 2026 thru Friday May 15th, 2026, 11:45 PM thru 05:00 AM service suspended","update_date":"2026-05-06T18:35:01Z"},"road_event_id":"oNVfyKt9H4erp8Vo5f80/btFqec=","beginning_cross_street":"Whitehall St - South Ferry","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:30:00Z","end_date":"2026-05-15T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.012994,40.703087]]}},{"id":"a4vBM7Vey96NqONEzJnFlN8BhZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["R Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oNVfyKt9H4erp8Vo5f80/btFqec="}],"description":"Due to Track repairs both directions, R Line between Whitehall St - South Ferry (New York) and Atlantic Av - Barclays Ctr (New York) R line runs express between Atlantic Av-Barclays Ctr and 36 St. R line runs between Bay Ridge-95 St and 36 St and express to/from Atlantic Av-Barclays Ctr, the last stop. For Whitehall St-South Ferry, Court St and Jay St-MetroTech, use nearby 4 line or take a Manhattan-bound N line. For DeKalb Av, take the D line, N line, or Q line instead. For Union St, 4 Av-9 St, Prospect Av and 25 St, take the D line or N line. Transfer at Atlantic Av-Barclays Ctr 4 line, D line, N line, Q line, R line or 36 St D line, N line, or R line., Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 11:45 PM thru 05:00 AM service suspended, Thursday May 14th, 2026 thru Friday May 15th, 2026, 11:45 PM thru 05:00 AM service suspended","update_date":"2026-05-06T18:35:01Z"},"road_event_id":"a4vBM7Vey96NqONEzJnFlN8BhZA=","beginning_cross_street":"Whitehall St - South Ferry","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:30:00Z","end_date":"2026-05-16T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.012994,40.703087]]}},{"id":"F+BWOoxo/wM0ixNEkfcS18HpJhI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLINTON ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1W+05zk6H+I53+3n4oVAjoCi90s="}],"description":"Construction on CLINTON ST northbound between GRAND ST (New York) and BROOME ST (New York) for installation of conduit for system reinforcement., Saturday May 9th, 2026 thru Saturday July 4th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday July 5th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:36:31Z"},"road_event_id":"F+BWOoxo/wM0ixNEkfcS18HpJhI=","beginning_cross_street":"GRAND ST","ending_cross_street":"BROOME ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986671,40.715998]]}},{"id":"1W+05zk6H+I53+3n4oVAjoCi90s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLINTON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F+BWOoxo/wM0ixNEkfcS18HpJhI="},{"type":"next-occurrence","id":"3B1DShVlmByvVenNuYyJX4RM6CI="}],"description":"Construction on CLINTON ST northbound between GRAND ST (New York) and BROOME ST (New York) for installation of conduit for system reinforcement., Saturday May 9th, 2026 thru Saturday July 4th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday July 5th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:36:31Z"},"road_event_id":"1W+05zk6H+I53+3n4oVAjoCi90s=","beginning_cross_street":"GRAND ST","ending_cross_street":"BROOME ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986671,40.715998]]}},{"id":"3B1DShVlmByvVenNuYyJX4RM6CI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLINTON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F+BWOoxo/wM0ixNEkfcS18HpJhI="},{"type":"next-occurrence","id":"D9wFSmvorOne8QtDTCNASEaO9mc="}],"description":"Construction on CLINTON ST northbound between GRAND ST (New York) and BROOME ST (New York) for installation of conduit for system reinforcement., Saturday May 9th, 2026 thru Saturday July 4th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday July 5th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:36:31Z"},"road_event_id":"3B1DShVlmByvVenNuYyJX4RM6CI=","beginning_cross_street":"GRAND ST","ending_cross_street":"BROOME ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986671,40.715998]]}},{"id":"D9wFSmvorOne8QtDTCNASEaO9mc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLINTON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F+BWOoxo/wM0ixNEkfcS18HpJhI="}],"description":"Construction on CLINTON ST northbound between GRAND ST (New York) and BROOME ST (New York) for installation of conduit for system reinforcement., Saturday May 9th, 2026 thru Saturday July 4th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday July 5th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:36:31Z"},"road_event_id":"D9wFSmvorOne8QtDTCNASEaO9mc=","beginning_cross_street":"GRAND ST","ending_cross_street":"BROOME ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986671,40.715998]]}},{"id":"lkhUGcwXXWlF3yv9J2XDV2pjD2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["1 Line"],"direction":"unknown","related_road_events":[],"description":"Due to Signal repairs both directions, 1 Line at Van Cortlandt Park - 242 St (New York) 1 line runs between South Ferry and 238 St, the last stop. Take the Bx9 bus instead. Transfer at 238 St., Thursday May 14th, 2026, 09:45 AM thru 02:00 PM service suspended","update_date":"2026-05-06T18:47:11Z"},"road_event_id":"lkhUGcwXXWlF3yv9J2XDV2pjD2w=","beginning_cross_street":"Van Cortlandt Park - 242 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:30:00Z","end_date":"2026-05-15T03:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898583,40.889248]]}},{"id":"UcXS1nhIIReCiKhefBc8RriDGT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q Line"],"direction":"unknown","related_road_events":[],"description":"Due to Repairs northbound, Q Line from DeKalb Av (New York) to Canal St (New York) Trains stop at Jay St-MetroTech, Court St, Whitehall St-South Ferry, Rector St, Cortlandt St and City Hall., Continuous Friday May 15th, 2026 11:15 PM thru Monday May 18th, 2026 05:00 AM runs via R line","update_date":"2026-05-06T18:48:59Z"},"road_event_id":"UcXS1nhIIReCiKhefBc8RriDGT0=","beginning_cross_street":"DeKalb Av","ending_cross_street":"Canal St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:15:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981824,40.690635]]}},{"id":"T1TQn7xtJrFR5RV6gjOEFhjtP6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["R Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AyVpnm0xOK5Ng2MnQIHKUra0ax4="}],"description":"Due to Repairs both directions, R Line between Whitehall St - South Ferry (New York) and 59 St (New York) R line runs between Bay Ridge-95 St and 59 St in Brooklyn. For 53 St and 45 St, take the N line instead. For 25 St, Prospect Av, 4 Av-9 St and Union St, take a local Coney Island-bound D line or N line. For 36 St and Atlantic Av-Barclays Ctr, take the D line or N line. For service to DeKalb Av, Jay St-MetroTech, Court St and Whitehall St-South Ferry, take a Manhattan-bound Q line. For service from these stations, take the N line instead., Friday May 15th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM service suspended","update_date":"2026-05-06T18:51:20Z"},"road_event_id":"T1TQn7xtJrFR5RV6gjOEFhjtP6Y=","beginning_cross_street":"Whitehall St - South Ferry","ending_cross_street":"59 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T03:30:00Z","end_date":"2026-05-17T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.012994,40.703087]]}},{"id":"AyVpnm0xOK5Ng2MnQIHKUra0ax4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["R Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T1TQn7xtJrFR5RV6gjOEFhjtP6Y="},{"type":"next-occurrence","id":"N4uA4jEiYUkBPsNz7seLICVOv5A="}],"description":"Due to Repairs both directions, R Line between Whitehall St - South Ferry (New York) and 59 St (New York) R line runs between Bay Ridge-95 St and 59 St in Brooklyn. For 53 St and 45 St, take the N line instead. For 25 St, Prospect Av, 4 Av-9 St and Union St, take a local Coney Island-bound D line or N line. For 36 St and Atlantic Av-Barclays Ctr, take the D line or N line. For service to DeKalb Av, Jay St-MetroTech, Court St and Whitehall St-South Ferry, take a Manhattan-bound Q line. For service from these stations, take the N line instead., Friday May 15th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM service suspended","update_date":"2026-05-06T18:51:20Z"},"road_event_id":"AyVpnm0xOK5Ng2MnQIHKUra0ax4=","beginning_cross_street":"Whitehall St - South Ferry","ending_cross_street":"59 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T03:30:00Z","end_date":"2026-05-18T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.012994,40.703087]]}},{"id":"N4uA4jEiYUkBPsNz7seLICVOv5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["R Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T1TQn7xtJrFR5RV6gjOEFhjtP6Y="},{"type":"next-occurrence","id":"+R/G0tATzCMdesTDRH0el9U8arc="}],"description":"Due to Repairs both directions, R Line between Whitehall St - South Ferry (New York) and 59 St (New York) R line runs between Bay Ridge-95 St and 59 St in Brooklyn. For 53 St and 45 St, take the N line instead. For 25 St, Prospect Av, 4 Av-9 St and Union St, take a local Coney Island-bound D line or N line. For 36 St and Atlantic Av-Barclays Ctr, take the D line or N line. For service to DeKalb Av, Jay St-MetroTech, Court St and Whitehall St-South Ferry, take a Manhattan-bound Q line. For service from these stations, take the N line instead., Friday May 15th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM service suspended","update_date":"2026-05-06T18:51:20Z"},"road_event_id":"N4uA4jEiYUkBPsNz7seLICVOv5A=","beginning_cross_street":"Whitehall St - South Ferry","ending_cross_street":"59 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T03:30:00Z","end_date":"2026-05-19T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.012994,40.703087]]}},{"id":"+R/G0tATzCMdesTDRH0el9U8arc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["R Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T1TQn7xtJrFR5RV6gjOEFhjtP6Y="}],"description":"Due to Repairs both directions, R Line between Whitehall St - South Ferry (New York) and 59 St (New York) R line runs between Bay Ridge-95 St and 59 St in Brooklyn. For 53 St and 45 St, take the N line instead. For 25 St, Prospect Av, 4 Av-9 St and Union St, take a local Coney Island-bound D line or N line. For 36 St and Atlantic Av-Barclays Ctr, take the D line or N line. For service to DeKalb Av, Jay St-MetroTech, Court St and Whitehall St-South Ferry, take a Manhattan-bound Q line. For service from these stations, take the N line instead., Friday May 15th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM service suspended","update_date":"2026-05-06T18:51:20Z"},"road_event_id":"+R/G0tATzCMdesTDRH0el9U8arc=","beginning_cross_street":"Whitehall St - South Ferry","ending_cross_street":"59 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T03:30:00Z","end_date":"2026-05-20T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.012994,40.703087]]}},{"id":"rE3z7CTV4eNSDs5MkHEZrbPLUj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"REhOKjeEWTVQF4Ma+Z0yFaqZgO4="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Wednesday May 6th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:53:13Z"},"road_event_id":"rE3z7CTV4eNSDs5MkHEZrbPLUj8=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883459,40.875754]]}},{"id":"REhOKjeEWTVQF4Ma+Z0yFaqZgO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rE3z7CTV4eNSDs5MkHEZrbPLUj8="},{"type":"next-occurrence","id":"j0d6zzp+uFoUaBDff77DzASbDI4="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Wednesday May 6th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:53:13Z"},"road_event_id":"REhOKjeEWTVQF4Ma+Z0yFaqZgO4=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883459,40.875754]]}},{"id":"j0d6zzp+uFoUaBDff77DzASbDI4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rE3z7CTV4eNSDs5MkHEZrbPLUj8="},{"type":"next-occurrence","id":"dKGNIkGy66A6Q7L76Ejmy+kL02I="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Wednesday May 6th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:53:13Z"},"road_event_id":"j0d6zzp+uFoUaBDff77DzASbDI4=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883459,40.875754]]}},{"id":"dKGNIkGy66A6Q7L76Ejmy+kL02I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rE3z7CTV4eNSDs5MkHEZrbPLUj8="},{"type":"next-occurrence","id":"loMiLO0nP6DPObH9DEgTJn1+Tms="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Wednesday May 6th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:53:13Z"},"road_event_id":"dKGNIkGy66A6Q7L76Ejmy+kL02I=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883459,40.875754]]}},{"id":"loMiLO0nP6DPObH9DEgTJn1+Tms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rE3z7CTV4eNSDs5MkHEZrbPLUj8="},{"type":"next-occurrence","id":"uqBax5S4FYLP8Q2H1uJyTBKfcpY="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Wednesday May 6th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:53:13Z"},"road_event_id":"loMiLO0nP6DPObH9DEgTJn1+Tms=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883459,40.875754]]}},{"id":"uqBax5S4FYLP8Q2H1uJyTBKfcpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rE3z7CTV4eNSDs5MkHEZrbPLUj8="},{"type":"next-occurrence","id":"g4o8T6wCA6FArArqzpvE6xcuK/0="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Wednesday May 6th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:53:13Z"},"road_event_id":"uqBax5S4FYLP8Q2H1uJyTBKfcpY=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883459,40.875754]]}},{"id":"g4o8T6wCA6FArArqzpvE6xcuK/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rE3z7CTV4eNSDs5MkHEZrbPLUj8="},{"type":"next-occurrence","id":"lWp7tryepCIJM14WDtMlceyksZE="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Wednesday May 6th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:53:13Z"},"road_event_id":"g4o8T6wCA6FArArqzpvE6xcuK/0=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883459,40.875754]]}},{"id":"lWp7tryepCIJM14WDtMlceyksZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rE3z7CTV4eNSDs5MkHEZrbPLUj8="},{"type":"next-occurrence","id":"ExSODW24U3Hl+oUVNNi5h6lrXOs="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Wednesday May 6th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:53:13Z"},"road_event_id":"lWp7tryepCIJM14WDtMlceyksZE=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883459,40.875754]]}},{"id":"ExSODW24U3Hl+oUVNNi5h6lrXOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rE3z7CTV4eNSDs5MkHEZrbPLUj8="},{"type":"next-occurrence","id":"wsfJ9ZLkZCN/nqpkZu+LA8GUxjU="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Wednesday May 6th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:53:13Z"},"road_event_id":"ExSODW24U3Hl+oUVNNi5h6lrXOs=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883459,40.875754]]}},{"id":"wsfJ9ZLkZCN/nqpkZu+LA8GUxjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rE3z7CTV4eNSDs5MkHEZrbPLUj8="},{"type":"next-occurrence","id":"+ILy/+LC4iqWZcTQiLz5y0vE2WU="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Wednesday May 6th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:53:13Z"},"road_event_id":"wsfJ9ZLkZCN/nqpkZu+LA8GUxjU=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883459,40.875754]]}},{"id":"+ILy/+LC4iqWZcTQiLz5y0vE2WU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rE3z7CTV4eNSDs5MkHEZrbPLUj8="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Wednesday May 6th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:53:13Z"},"road_event_id":"+ILy/+LC4iqWZcTQiLz5y0vE2WU=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883459,40.875754]]}},{"id":"/XgqHNFaRI1i+ZnQQ71C64v3D2k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-05-06T19:06:31Z"},"road_event_id":"/XgqHNFaRI1i+ZnQQ71C64v3D2k=","beginning_cross_street":"In the vicinity of Garden State Parkway","ending_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078071,40.922229]]}},{"id":"CJq3/ZTTOH5LwUklC/LwRcgbSyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-06T19:06:43Z"},"road_event_id":"CJq3/ZTTOH5LwUklC/LwRcgbSyo=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"In the vicinity of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"OLvXyLrWrOr56qTkn/LyJPr3mDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CjYXbISqL/5zm69KxBPQSQiwJZc="}],"description":"Tree trimming on NY 371 northbound South Main Street; NY 415; START ROUTE NY 371; Maple Avenue (Cohocton) to CR-35 (Cohocton) 2 Lanes reduced to 1 Lane W/ Flaggers, Friday May 8th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM both shoulder closed","update_date":"2026-05-06T19:15:29Z"},"road_event_id":"OLvXyLrWrOr56qTkn/LyJPr3mDg=","beginning_cross_street":"South Main Street; NY 415; START ROUTE NY 371; Maple Avenue","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.492718,42.502689]]}},{"id":"CjYXbISqL/5zm69KxBPQSQiwJZc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OLvXyLrWrOr56qTkn/LyJPr3mDg="},{"type":"next-occurrence","id":"VshzHGfbvk/Ci3V1vYPfTq9zy5k="}],"description":"Tree trimming on NY 371 northbound South Main Street; NY 415; START ROUTE NY 371; Maple Avenue (Cohocton) to CR-35 (Cohocton) 2 Lanes reduced to 1 Lane W/ Flaggers, Friday May 8th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM both shoulder closed","update_date":"2026-05-06T19:15:29Z"},"road_event_id":"CjYXbISqL/5zm69KxBPQSQiwJZc=","beginning_cross_street":"South Main Street; NY 415; START ROUTE NY 371; Maple Avenue","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.492718,42.502689]]}},{"id":"VshzHGfbvk/Ci3V1vYPfTq9zy5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OLvXyLrWrOr56qTkn/LyJPr3mDg="}],"description":"Tree trimming on NY 371 northbound South Main Street; NY 415; START ROUTE NY 371; Maple Avenue (Cohocton) to CR-35 (Cohocton) 2 Lanes reduced to 1 Lane W/ Flaggers, Friday May 8th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM both shoulder closed","update_date":"2026-05-06T19:15:29Z"},"road_event_id":"VshzHGfbvk/Ci3V1vYPfTq9zy5k=","beginning_cross_street":"South Main Street; NY 415; START ROUTE NY 371; Maple Avenue","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.492718,42.502689]]}},{"id":"5YTErWdetLH/l9B39Tw6dUIjI/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["182ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Jo7haNdrsSBzlV+RaQcmnW89kcI="}],"description":"Crane operations on 182ND ST southbound between AVON ST (New York) and 89TH AVE (New York), Saturday May 9th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T19:16:00Z"},"road_event_id":"5YTErWdetLH/l9B39Tw6dUIjI/o=","beginning_cross_street":"AVON ST","ending_cross_street":"89TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.780589,40.713428]]}},{"id":"Jo7haNdrsSBzlV+RaQcmnW89kcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["182ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5YTErWdetLH/l9B39Tw6dUIjI/o="}],"description":"Crane operations on 182ND ST southbound between AVON ST (New York) and 89TH AVE (New York), Saturday May 9th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T19:16:00Z"},"road_event_id":"Jo7haNdrsSBzlV+RaQcmnW89kcI=","beginning_cross_street":"AVON ST","ending_cross_street":"89TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.780589,40.713428]]}},{"id":"Hp4S04f97WE6XWWCe1Wxw0+hk1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"B1UuR/1DoztWKX5CN4e/g4jtPVQ="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York) for use of boom truck for lifting operation., Wednesday May 6th, 2026 thru Thursday June 4th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T19:18:22Z"},"road_event_id":"Hp4S04f97WE6XWWCe1Wxw0+hk1g=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787048,40.712852]]}},{"id":"B1UuR/1DoztWKX5CN4e/g4jtPVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hp4S04f97WE6XWWCe1Wxw0+hk1g="},{"type":"next-occurrence","id":"j7MQBSZGYitY2Bw9J5bbMUaSqnk="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York) for use of boom truck for lifting operation., Wednesday May 6th, 2026 thru Thursday June 4th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T19:18:22Z"},"road_event_id":"B1UuR/1DoztWKX5CN4e/g4jtPVQ=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787048,40.712852]]}},{"id":"j7MQBSZGYitY2Bw9J5bbMUaSqnk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hp4S04f97WE6XWWCe1Wxw0+hk1g="},{"type":"next-occurrence","id":"0djwQM4X0mgx+9ObPzN7xunNKdw="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York) for use of boom truck for lifting operation., Wednesday May 6th, 2026 thru Thursday June 4th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T19:18:22Z"},"road_event_id":"j7MQBSZGYitY2Bw9J5bbMUaSqnk=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787048,40.712852]]}},{"id":"0djwQM4X0mgx+9ObPzN7xunNKdw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hp4S04f97WE6XWWCe1Wxw0+hk1g="},{"type":"next-occurrence","id":"099ZdvqcxmyNK0uQhF0xrUjv1Jk="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York) for use of boom truck for lifting operation., Wednesday May 6th, 2026 thru Thursday June 4th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T19:18:22Z"},"road_event_id":"0djwQM4X0mgx+9ObPzN7xunNKdw=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787048,40.712852]]}},{"id":"099ZdvqcxmyNK0uQhF0xrUjv1Jk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hp4S04f97WE6XWWCe1Wxw0+hk1g="},{"type":"next-occurrence","id":"WUG/ZFEaOvHTk69UIHj9x2wu1P4="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York) for use of boom truck for lifting operation., Wednesday May 6th, 2026 thru Thursday June 4th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T19:18:22Z"},"road_event_id":"099ZdvqcxmyNK0uQhF0xrUjv1Jk=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787048,40.712852]]}},{"id":"WUG/ZFEaOvHTk69UIHj9x2wu1P4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hp4S04f97WE6XWWCe1Wxw0+hk1g="},{"type":"next-occurrence","id":"18/q/v5PRbHnuqo+K2P1V91KVoA="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York) for use of boom truck for lifting operation., Wednesday May 6th, 2026 thru Thursday June 4th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T19:18:22Z"},"road_event_id":"WUG/ZFEaOvHTk69UIHj9x2wu1P4=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787048,40.712852]]}},{"id":"18/q/v5PRbHnuqo+K2P1V91KVoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hp4S04f97WE6XWWCe1Wxw0+hk1g="},{"type":"next-occurrence","id":"BWfO7EjBEk31J4Ji/Lj2rQMcf8g="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York) for use of boom truck for lifting operation., Wednesday May 6th, 2026 thru Thursday June 4th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T19:18:22Z"},"road_event_id":"18/q/v5PRbHnuqo+K2P1V91KVoA=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787048,40.712852]]}},{"id":"BWfO7EjBEk31J4Ji/Lj2rQMcf8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hp4S04f97WE6XWWCe1Wxw0+hk1g="},{"type":"next-occurrence","id":"PINem2xu1Xe+SBS26Z1Zi2fotIg="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York) for use of boom truck for lifting operation., Wednesday May 6th, 2026 thru Thursday June 4th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T19:18:22Z"},"road_event_id":"BWfO7EjBEk31J4Ji/Lj2rQMcf8g=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787048,40.712852]]}},{"id":"PINem2xu1Xe+SBS26Z1Zi2fotIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hp4S04f97WE6XWWCe1Wxw0+hk1g="},{"type":"next-occurrence","id":"KCuQHgx0/b15yojS/RzMDzESi28="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York) for use of boom truck for lifting operation., Wednesday May 6th, 2026 thru Thursday June 4th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T19:18:22Z"},"road_event_id":"PINem2xu1Xe+SBS26Z1Zi2fotIg=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787048,40.712852]]}},{"id":"KCuQHgx0/b15yojS/RzMDzESi28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hp4S04f97WE6XWWCe1Wxw0+hk1g="},{"type":"next-occurrence","id":"9/Sq/jevWVN09UuPX1uEGfkqNvk="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York) for use of boom truck for lifting operation., Wednesday May 6th, 2026 thru Thursday June 4th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T19:18:22Z"},"road_event_id":"KCuQHgx0/b15yojS/RzMDzESi28=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787048,40.712852]]}},{"id":"9/Sq/jevWVN09UuPX1uEGfkqNvk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hp4S04f97WE6XWWCe1Wxw0+hk1g="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York) for use of boom truck for lifting operation., Wednesday May 6th, 2026 thru Thursday June 4th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T19:18:22Z"},"road_event_id":"9/Sq/jevWVN09UuPX1uEGfkqNvk=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787048,40.712852]]}},{"id":"Qb/Oe82de5/6WA5tbqOmie7JdYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["52ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Vv3qKm6cUXdpOYDLcTP8GumEzA0="}],"description":"Construction on 52ND ST eastbound between 2ND AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 8th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:21:45Z"},"road_event_id":"Qb/Oe82de5/6WA5tbqOmie7JdYs=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018022,40.647929]]}},{"id":"Vv3qKm6cUXdpOYDLcTP8GumEzA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qb/Oe82de5/6WA5tbqOmie7JdYs="},{"type":"next-occurrence","id":"WjO1dfFmD6CDggti7xGdtM86Yfc="}],"description":"Construction on 52ND ST eastbound between 2ND AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 8th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:21:45Z"},"road_event_id":"Vv3qKm6cUXdpOYDLcTP8GumEzA0=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018022,40.647929]]}},{"id":"WjO1dfFmD6CDggti7xGdtM86Yfc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qb/Oe82de5/6WA5tbqOmie7JdYs="},{"type":"next-occurrence","id":"9pHX2DQn4NClyeIoKoQ6EykU49U="}],"description":"Construction on 52ND ST eastbound between 2ND AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 8th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:21:45Z"},"road_event_id":"WjO1dfFmD6CDggti7xGdtM86Yfc=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018022,40.647929]]}},{"id":"9pHX2DQn4NClyeIoKoQ6EykU49U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qb/Oe82de5/6WA5tbqOmie7JdYs="},{"type":"next-occurrence","id":"i6bDj8qOb4BkHbz6BaYFWyib16M="}],"description":"Construction on 52ND ST eastbound between 2ND AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 8th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:21:45Z"},"road_event_id":"9pHX2DQn4NClyeIoKoQ6EykU49U=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018022,40.647929]]}},{"id":"i6bDj8qOb4BkHbz6BaYFWyib16M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qb/Oe82de5/6WA5tbqOmie7JdYs="},{"type":"next-occurrence","id":"eA9YxiUt4SfuyZLtJEDDK3aXG5Q="}],"description":"Construction on 52ND ST eastbound between 2ND AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 8th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:21:45Z"},"road_event_id":"i6bDj8qOb4BkHbz6BaYFWyib16M=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018022,40.647929]]}},{"id":"eA9YxiUt4SfuyZLtJEDDK3aXG5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qb/Oe82de5/6WA5tbqOmie7JdYs="},{"type":"next-occurrence","id":"olcffw13Hfzd36+YQV6GwLmbll4="}],"description":"Construction on 52ND ST eastbound between 2ND AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 8th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:21:45Z"},"road_event_id":"eA9YxiUt4SfuyZLtJEDDK3aXG5Q=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018022,40.647929]]}},{"id":"olcffw13Hfzd36+YQV6GwLmbll4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qb/Oe82de5/6WA5tbqOmie7JdYs="},{"type":"next-occurrence","id":"Y5cweXvoOAnlMPX7O1aB78X8dnU="}],"description":"Construction on 52ND ST eastbound between 2ND AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 8th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:21:45Z"},"road_event_id":"olcffw13Hfzd36+YQV6GwLmbll4=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018022,40.647929]]}},{"id":"Y5cweXvoOAnlMPX7O1aB78X8dnU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qb/Oe82de5/6WA5tbqOmie7JdYs="},{"type":"next-occurrence","id":"x8ESqw7DaQi5GIWlnMMwy6BiNss="}],"description":"Construction on 52ND ST eastbound between 2ND AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 8th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:21:45Z"},"road_event_id":"Y5cweXvoOAnlMPX7O1aB78X8dnU=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018022,40.647929]]}},{"id":"x8ESqw7DaQi5GIWlnMMwy6BiNss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qb/Oe82de5/6WA5tbqOmie7JdYs="},{"type":"next-occurrence","id":"yLvAZT4HWfJ43f0eEBQM0D4A5w8="}],"description":"Construction on 52ND ST eastbound between 2ND AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 8th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:21:45Z"},"road_event_id":"x8ESqw7DaQi5GIWlnMMwy6BiNss=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018022,40.647929]]}},{"id":"yLvAZT4HWfJ43f0eEBQM0D4A5w8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qb/Oe82de5/6WA5tbqOmie7JdYs="},{"type":"next-occurrence","id":"Lhsuu5cgraJ49SkSHJ2vWzsrp1U="}],"description":"Construction on 52ND ST eastbound between 2ND AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 8th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:21:45Z"},"road_event_id":"yLvAZT4HWfJ43f0eEBQM0D4A5w8=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018022,40.647929]]}},{"id":"Lhsuu5cgraJ49SkSHJ2vWzsrp1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qb/Oe82de5/6WA5tbqOmie7JdYs="},{"type":"next-occurrence","id":"Mbjos43CaBey5qEuZRDF82vesdY="}],"description":"Construction on 52ND ST eastbound between 2ND AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 8th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:21:45Z"},"road_event_id":"Lhsuu5cgraJ49SkSHJ2vWzsrp1U=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018022,40.647929]]}},{"id":"Mbjos43CaBey5qEuZRDF82vesdY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qb/Oe82de5/6WA5tbqOmie7JdYs="},{"type":"next-occurrence","id":"M462SSp7+eF1gHv/wZpUSR1dWeQ="}],"description":"Construction on 52ND ST eastbound between 2ND AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 8th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:21:45Z"},"road_event_id":"Mbjos43CaBey5qEuZRDF82vesdY=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018022,40.647929]]}},{"id":"M462SSp7+eF1gHv/wZpUSR1dWeQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qb/Oe82de5/6WA5tbqOmie7JdYs="},{"type":"next-occurrence","id":"HtoM1NPi3yaLF8ivX9s85MH7I4s="}],"description":"Construction on 52ND ST eastbound between 2ND AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 8th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:21:45Z"},"road_event_id":"M462SSp7+eF1gHv/wZpUSR1dWeQ=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018022,40.647929]]}},{"id":"HtoM1NPi3yaLF8ivX9s85MH7I4s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qb/Oe82de5/6WA5tbqOmie7JdYs="},{"type":"next-occurrence","id":"oix+VC3yV4TRLZ2s8miWpDTL2fg="}],"description":"Construction on 52ND ST eastbound between 2ND AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 8th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:21:45Z"},"road_event_id":"HtoM1NPi3yaLF8ivX9s85MH7I4s=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018022,40.647929]]}},{"id":"oix+VC3yV4TRLZ2s8miWpDTL2fg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qb/Oe82de5/6WA5tbqOmie7JdYs="}],"description":"Construction on 52ND ST eastbound between 2ND AVE (New York) and 3RD AVE (New York) to lift materials from roof with knuckle boom., Friday May 8th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:21:45Z"},"road_event_id":"oix+VC3yV4TRLZ2s8miWpDTL2fg=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018022,40.647929]]}},{"id":"Ab7GiqvPeJeFIAU4xMOKnyyW3Ew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6rYuSbjZbsAcbkWy14t+PJuKOME="}],"description":"Crane operations on WILLOUGHBY ST westbound between ASHLAND PL (New York) and FLEET PL (New York), Saturday May 9th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 07:00 AM thru 11:59 PM All lanes closed","update_date":"2026-05-06T19:30:06Z"},"road_event_id":"Ab7GiqvPeJeFIAU4xMOKnyyW3Ew=","beginning_cross_street":"ASHLAND PL","ending_cross_street":"FLEET PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-17T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979074,40.691914]]}},{"id":"6rYuSbjZbsAcbkWy14t+PJuKOME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ab7GiqvPeJeFIAU4xMOKnyyW3Ew="}],"description":"Crane operations on WILLOUGHBY ST westbound between ASHLAND PL (New York) and FLEET PL (New York), Saturday May 9th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 07:00 AM thru 11:59 PM All lanes closed","update_date":"2026-05-06T19:30:06Z"},"road_event_id":"6rYuSbjZbsAcbkWy14t+PJuKOME=","beginning_cross_street":"ASHLAND PL","ending_cross_street":"FLEET PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-18T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979074,40.691914]]}},{"id":"2Y4F9QwdSwdd1g4CSOKH+UfIS60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dElRxLXEHlMP9Om6oEePHvaoEng="}],"description":"Crane operations on WILLOUGHBY ST westbound between FLEET PL (New York) and FLATBUSH AVE EXT (New York), Saturday May 9th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 07:00 AM thru 11:59 PM All lanes closed","update_date":"2026-05-06T19:32:42Z"},"road_event_id":"2Y4F9QwdSwdd1g4CSOKH+UfIS60=","beginning_cross_street":"FLEET PL","ending_cross_street":"FLATBUSH AVE EXT","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-17T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981842,40.692011]]}},{"id":"dElRxLXEHlMP9Om6oEePHvaoEng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Y4F9QwdSwdd1g4CSOKH+UfIS60="}],"description":"Crane operations on WILLOUGHBY ST westbound between FLEET PL (New York) and FLATBUSH AVE EXT (New York), Saturday May 9th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 07:00 AM thru 11:59 PM All lanes closed","update_date":"2026-05-06T19:32:42Z"},"road_event_id":"dElRxLXEHlMP9Om6oEePHvaoEng=","beginning_cross_street":"FLEET PL","ending_cross_street":"FLATBUSH AVE EXT","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-18T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981842,40.692011]]}},{"id":"NniQSHlePY6Jv+pqAxmzp+DJe94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aebpP4guoVrGqDdY1ZkTnYa6miI="}],"description":"Crane operations on FLEET PL northbound between WILLOUGHBY ST (New York), Saturday May 9th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 07:00 AM thru 11:59 PM All lanes closed","update_date":"2026-05-06T19:34:53Z"},"road_event_id":"NniQSHlePY6Jv+pqAxmzp+DJe94=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"WILLOUGHBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-17T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98178,40.691625]]}},{"id":"aebpP4guoVrGqDdY1ZkTnYa6miI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NniQSHlePY6Jv+pqAxmzp+DJe94="}],"description":"Crane operations on FLEET PL northbound between WILLOUGHBY ST (New York), Saturday May 9th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 07:00 AM thru 11:59 PM All lanes closed","update_date":"2026-05-06T19:34:53Z"},"road_event_id":"aebpP4guoVrGqDdY1ZkTnYa6miI=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"WILLOUGHBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-18T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98178,40.691625]]}},{"id":"vKlMs5bR2+NS/ikh6EMwO/GUDb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GPNrp0q93g7q0q7YXbbqWj1DR2Q="}],"description":"Crane operations on FLEET ST eastbound between FLATBUSH AVE EXT (New York) and northbound FLEET PL at WILLOUGHBY ST (New York), Saturday May 9th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 07:00 AM thru 11:59 PM All lanes closed","update_date":"2026-05-06T19:36:35Z"},"road_event_id":"vKlMs5bR2+NS/ikh6EMwO/GUDb8=","beginning_cross_street":"FLATBUSH AVE EXT","ending_cross_street":"WILLOUGHBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-17T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982039,40.691349]]}},{"id":"GPNrp0q93g7q0q7YXbbqWj1DR2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vKlMs5bR2+NS/ikh6EMwO/GUDb8="}],"description":"Crane operations on FLEET ST eastbound between FLATBUSH AVE EXT (New York) and northbound FLEET PL at WILLOUGHBY ST (New York), Saturday May 9th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 07:00 AM thru 11:59 PM All lanes closed","update_date":"2026-05-06T19:36:35Z"},"road_event_id":"GPNrp0q93g7q0q7YXbbqWj1DR2Q=","beginning_cross_street":"FLATBUSH AVE EXT","ending_cross_street":"WILLOUGHBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-18T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982039,40.691349]]}},{"id":"pr03hf0aZc9VmsW5y2IahFGk1h8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fPh+/zi5cq/SFXmZe8oXRxANXzU="}],"description":"Crane operations on FLEET PL northbound between WILLOUGHBY ST (New York) and MYRTLE AVE (New York), Saturday May 9th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 07:00 AM thru 11:59 PM All lanes closed","update_date":"2026-05-06T19:37:58Z"},"road_event_id":"pr03hf0aZc9VmsW5y2IahFGk1h8=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-17T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981777,40.692059]]}},{"id":"fPh+/zi5cq/SFXmZe8oXRxANXzU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pr03hf0aZc9VmsW5y2IahFGk1h8="}],"description":"Crane operations on FLEET PL northbound between WILLOUGHBY ST (New York) and MYRTLE AVE (New York), Saturday May 9th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 07:00 AM thru 11:59 PM All lanes closed","update_date":"2026-05-06T19:37:58Z"},"road_event_id":"fPh+/zi5cq/SFXmZe8oXRxANXzU=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-18T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981777,40.692059]]}},{"id":"geSPEWDWS612H8veBBzA6xGmQr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yUNCXKwhWXgiKwBZeaMlbMFBEjs="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"geSPEWDWS612H8veBBzA6xGmQr4=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"yUNCXKwhWXgiKwBZeaMlbMFBEjs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"geSPEWDWS612H8veBBzA6xGmQr4="},{"type":"next-occurrence","id":"uftW9LkPkoY5cnOnxd/4bPjbwbw="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"yUNCXKwhWXgiKwBZeaMlbMFBEjs=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"uftW9LkPkoY5cnOnxd/4bPjbwbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"geSPEWDWS612H8veBBzA6xGmQr4="},{"type":"next-occurrence","id":"pOgOgihufI5EEtHBgkoDFlQJ5x8="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"uftW9LkPkoY5cnOnxd/4bPjbwbw=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"pOgOgihufI5EEtHBgkoDFlQJ5x8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"geSPEWDWS612H8veBBzA6xGmQr4="},{"type":"next-occurrence","id":"5eqtZ9vU+9p1WtzXS6ipeicCJLY="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"pOgOgihufI5EEtHBgkoDFlQJ5x8=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"5eqtZ9vU+9p1WtzXS6ipeicCJLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"geSPEWDWS612H8veBBzA6xGmQr4="},{"type":"next-occurrence","id":"uzhH3HZigBEQoqf64ksfhTkwuE8="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"5eqtZ9vU+9p1WtzXS6ipeicCJLY=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"uzhH3HZigBEQoqf64ksfhTkwuE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"geSPEWDWS612H8veBBzA6xGmQr4="},{"type":"next-occurrence","id":"I2W0yNwJw9JiuSl8wvrH8Etiwa8="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"uzhH3HZigBEQoqf64ksfhTkwuE8=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"I2W0yNwJw9JiuSl8wvrH8Etiwa8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"geSPEWDWS612H8veBBzA6xGmQr4="},{"type":"next-occurrence","id":"lLif6cDcUcqmKCywBIwErXnGapk="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"I2W0yNwJw9JiuSl8wvrH8Etiwa8=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"lLif6cDcUcqmKCywBIwErXnGapk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"geSPEWDWS612H8veBBzA6xGmQr4="},{"type":"next-occurrence","id":"xR1nMni2mzMVoGivF070HNUTYmw="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"lLif6cDcUcqmKCywBIwErXnGapk=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"xR1nMni2mzMVoGivF070HNUTYmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"geSPEWDWS612H8veBBzA6xGmQr4="},{"type":"next-occurrence","id":"rOIvkCpAL/EU83MHUe5yMpr14/A="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"xR1nMni2mzMVoGivF070HNUTYmw=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"rOIvkCpAL/EU83MHUe5yMpr14/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"geSPEWDWS612H8veBBzA6xGmQr4="},{"type":"next-occurrence","id":"CK2pTsn8DiPd0sTxSvr/O35bBb0="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"rOIvkCpAL/EU83MHUe5yMpr14/A=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"CK2pTsn8DiPd0sTxSvr/O35bBb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"geSPEWDWS612H8veBBzA6xGmQr4="},{"type":"next-occurrence","id":"IjvLsR23raRavJ/QfqUObb5kV4E="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"CK2pTsn8DiPd0sTxSvr/O35bBb0=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T13:00:00Z","end_date":"2026-05-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"IjvLsR23raRavJ/QfqUObb5kV4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"geSPEWDWS612H8veBBzA6xGmQr4="},{"type":"next-occurrence","id":"1fvsod6dsvdP6kL3O7SxHmsAyx4="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"IjvLsR23raRavJ/QfqUObb5kV4E=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T13:00:00Z","end_date":"2026-05-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"1fvsod6dsvdP6kL3O7SxHmsAyx4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"geSPEWDWS612H8veBBzA6xGmQr4="},{"type":"next-occurrence","id":"N4N8imHbZxNtNBlXkmcr6e8dUF4="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"1fvsod6dsvdP6kL3O7SxHmsAyx4=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"N4N8imHbZxNtNBlXkmcr6e8dUF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"geSPEWDWS612H8veBBzA6xGmQr4="},{"type":"next-occurrence","id":"/G1ueAdaIyp0U11g9ZeRHcZUR38="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"N4N8imHbZxNtNBlXkmcr6e8dUF4=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"/G1ueAdaIyp0U11g9ZeRHcZUR38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"geSPEWDWS612H8veBBzA6xGmQr4="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"/G1ueAdaIyp0U11g9ZeRHcZUR38=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"XeR/TZeYkOog5+WMQfrVLbQNJr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aw+ga9Ja57TYXhxHnFW71DDCdkA="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"XeR/TZeYkOog5+WMQfrVLbQNJr0=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"aw+ga9Ja57TYXhxHnFW71DDCdkA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeR/TZeYkOog5+WMQfrVLbQNJr0="},{"type":"next-occurrence","id":"l+hSLlF1j9Gt4PupwdfjD5OUeT4="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"aw+ga9Ja57TYXhxHnFW71DDCdkA=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"l+hSLlF1j9Gt4PupwdfjD5OUeT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeR/TZeYkOog5+WMQfrVLbQNJr0="},{"type":"next-occurrence","id":"4J1YtIAfmWLxYuWKKineu5yBmXM="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"l+hSLlF1j9Gt4PupwdfjD5OUeT4=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"4J1YtIAfmWLxYuWKKineu5yBmXM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeR/TZeYkOog5+WMQfrVLbQNJr0="},{"type":"next-occurrence","id":"QXzOKr2V1WhspXb0X5cJPCpHQJQ="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"4J1YtIAfmWLxYuWKKineu5yBmXM=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"QXzOKr2V1WhspXb0X5cJPCpHQJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeR/TZeYkOog5+WMQfrVLbQNJr0="},{"type":"next-occurrence","id":"GOd9JvkwjuT9Z2AHXDXUXPjm548="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"QXzOKr2V1WhspXb0X5cJPCpHQJQ=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"GOd9JvkwjuT9Z2AHXDXUXPjm548=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeR/TZeYkOog5+WMQfrVLbQNJr0="},{"type":"next-occurrence","id":"5WuL5+2s9a8hsFaxVdvPl7B4EGY="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"GOd9JvkwjuT9Z2AHXDXUXPjm548=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"5WuL5+2s9a8hsFaxVdvPl7B4EGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeR/TZeYkOog5+WMQfrVLbQNJr0="},{"type":"next-occurrence","id":"x+RsoY6rBaiTcipc6UPzjP+BEb0="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"5WuL5+2s9a8hsFaxVdvPl7B4EGY=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"x+RsoY6rBaiTcipc6UPzjP+BEb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeR/TZeYkOog5+WMQfrVLbQNJr0="},{"type":"next-occurrence","id":"uMSuiCWKF0fQ6UWQXLBE/BNJDGs="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"x+RsoY6rBaiTcipc6UPzjP+BEb0=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"uMSuiCWKF0fQ6UWQXLBE/BNJDGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeR/TZeYkOog5+WMQfrVLbQNJr0="},{"type":"next-occurrence","id":"bZFyGAJkALmhiNwmcoSQ1UeUGhg="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"uMSuiCWKF0fQ6UWQXLBE/BNJDGs=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"bZFyGAJkALmhiNwmcoSQ1UeUGhg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeR/TZeYkOog5+WMQfrVLbQNJr0="},{"type":"next-occurrence","id":"ueOjvZCR7Dy8l758hiUNl1wcrs8="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"bZFyGAJkALmhiNwmcoSQ1UeUGhg=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"ueOjvZCR7Dy8l758hiUNl1wcrs8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeR/TZeYkOog5+WMQfrVLbQNJr0="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"ueOjvZCR7Dy8l758hiUNl1wcrs8=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"2ZBzgV9aW4lAjc74fPu/EZboCmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+5eKM25yJTNUOunpOGGUBkrLbbE="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"2ZBzgV9aW4lAjc74fPu/EZboCmc=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"+5eKM25yJTNUOunpOGGUBkrLbbE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZBzgV9aW4lAjc74fPu/EZboCmc="},{"type":"next-occurrence","id":"BOC8cYxBcQ9BYIC8jjzNSl/WjtU="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"+5eKM25yJTNUOunpOGGUBkrLbbE=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"BOC8cYxBcQ9BYIC8jjzNSl/WjtU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZBzgV9aW4lAjc74fPu/EZboCmc="},{"type":"next-occurrence","id":"23lQrFv63w5uJOrExdIEm/G4ovo="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"BOC8cYxBcQ9BYIC8jjzNSl/WjtU=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"23lQrFv63w5uJOrExdIEm/G4ovo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZBzgV9aW4lAjc74fPu/EZboCmc="},{"type":"next-occurrence","id":"voQADLISNgbFgUwWbFqKXfLJ0II="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"23lQrFv63w5uJOrExdIEm/G4ovo=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"voQADLISNgbFgUwWbFqKXfLJ0II=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZBzgV9aW4lAjc74fPu/EZboCmc="},{"type":"next-occurrence","id":"Iz2NZ9WvL1FnjapbekFdb8e23Q8="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"voQADLISNgbFgUwWbFqKXfLJ0II=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"Iz2NZ9WvL1FnjapbekFdb8e23Q8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZBzgV9aW4lAjc74fPu/EZboCmc="},{"type":"next-occurrence","id":"56Sktbh9aOAg3lBvn7lfIcCBy/E="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"Iz2NZ9WvL1FnjapbekFdb8e23Q8=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"56Sktbh9aOAg3lBvn7lfIcCBy/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZBzgV9aW4lAjc74fPu/EZboCmc="},{"type":"next-occurrence","id":"xJbVyix6+WhLHYn/l97MGCTEKCc="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"56Sktbh9aOAg3lBvn7lfIcCBy/E=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"xJbVyix6+WhLHYn/l97MGCTEKCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZBzgV9aW4lAjc74fPu/EZboCmc="},{"type":"next-occurrence","id":"yWRBmg3V0C/Qn7GxjxjPYPK+wpw="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"xJbVyix6+WhLHYn/l97MGCTEKCc=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"yWRBmg3V0C/Qn7GxjxjPYPK+wpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZBzgV9aW4lAjc74fPu/EZboCmc="},{"type":"next-occurrence","id":"oiYDT67ckR/2Qqekcl7KUswtFTU="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"yWRBmg3V0C/Qn7GxjxjPYPK+wpw=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"oiYDT67ckR/2Qqekcl7KUswtFTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZBzgV9aW4lAjc74fPu/EZboCmc="},{"type":"next-occurrence","id":"iPztpu5ZXV+vsZr/jqrL7pqfmTo="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"oiYDT67ckR/2Qqekcl7KUswtFTU=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"iPztpu5ZXV+vsZr/jqrL7pqfmTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZBzgV9aW4lAjc74fPu/EZboCmc="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"iPztpu5ZXV+vsZr/jqrL7pqfmTo=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"S8aueVXymqKbj3Zh4g2s6g8zBQ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-06T19:45:48Z"},"road_event_id":"S8aueVXymqKbj3Zh4g2s6g8zBQ8=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"QesgjyBOGcJig+VVBr3It9xjG2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-06T19:45:44Z"},"road_event_id":"QesgjyBOGcJig+VVBr3It9xjG2o=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"ed6P2uUcN3Qeik9EWiqE297Fst4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/MLgajptnnSamKKeMIZwjKLxmWs="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"ed6P2uUcN3Qeik9EWiqE297Fst4=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"/MLgajptnnSamKKeMIZwjKLxmWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ed6P2uUcN3Qeik9EWiqE297Fst4="},{"type":"next-occurrence","id":"oZFWzPSAQgmmTQD1JYvBQlGRXRs="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"/MLgajptnnSamKKeMIZwjKLxmWs=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"oZFWzPSAQgmmTQD1JYvBQlGRXRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ed6P2uUcN3Qeik9EWiqE297Fst4="},{"type":"next-occurrence","id":"6OXdjuJKTYp4d4qApF8wMq7OXhM="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"oZFWzPSAQgmmTQD1JYvBQlGRXRs=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"6OXdjuJKTYp4d4qApF8wMq7OXhM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ed6P2uUcN3Qeik9EWiqE297Fst4="},{"type":"next-occurrence","id":"5w3ZE27E4zn9uLA7EPy2gnOAcsE="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"6OXdjuJKTYp4d4qApF8wMq7OXhM=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"5w3ZE27E4zn9uLA7EPy2gnOAcsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ed6P2uUcN3Qeik9EWiqE297Fst4="},{"type":"next-occurrence","id":"nqixpScsWIwORW674n65ouKvztM="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"5w3ZE27E4zn9uLA7EPy2gnOAcsE=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"nqixpScsWIwORW674n65ouKvztM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ed6P2uUcN3Qeik9EWiqE297Fst4="},{"type":"next-occurrence","id":"o2yj3R/Pja4kIWml0tGmtTYxcng="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"nqixpScsWIwORW674n65ouKvztM=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"o2yj3R/Pja4kIWml0tGmtTYxcng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ed6P2uUcN3Qeik9EWiqE297Fst4="},{"type":"next-occurrence","id":"J0VVhhjmFgylB7RSTmC+kFSz74E="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"o2yj3R/Pja4kIWml0tGmtTYxcng=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"J0VVhhjmFgylB7RSTmC+kFSz74E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ed6P2uUcN3Qeik9EWiqE297Fst4="},{"type":"next-occurrence","id":"fAFHu92B3rYyEn+PoB/Lx0RpkvQ="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"J0VVhhjmFgylB7RSTmC+kFSz74E=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"fAFHu92B3rYyEn+PoB/Lx0RpkvQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ed6P2uUcN3Qeik9EWiqE297Fst4="},{"type":"next-occurrence","id":"NumoDkAkIBRCK3Q0tPRWrqhApSI="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"fAFHu92B3rYyEn+PoB/Lx0RpkvQ=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"NumoDkAkIBRCK3Q0tPRWrqhApSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ed6P2uUcN3Qeik9EWiqE297Fst4="},{"type":"next-occurrence","id":"PzFSGhB6bI7sxCkbQ05swTCSHSI="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"NumoDkAkIBRCK3Q0tPRWrqhApSI=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"PzFSGhB6bI7sxCkbQ05swTCSHSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ed6P2uUcN3Qeik9EWiqE297Fst4="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"PzFSGhB6bI7sxCkbQ05swTCSHSI=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"+c1LqeN+H5hMabWimMjTKEqvepY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KF1sO4m3TQNdlICxhkj5DXe/0kg="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"+c1LqeN+H5hMabWimMjTKEqvepY=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"KF1sO4m3TQNdlICxhkj5DXe/0kg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+c1LqeN+H5hMabWimMjTKEqvepY="},{"type":"next-occurrence","id":"SFauVZrzRfxts49OrTggDZHR/rw="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"KF1sO4m3TQNdlICxhkj5DXe/0kg=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"SFauVZrzRfxts49OrTggDZHR/rw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+c1LqeN+H5hMabWimMjTKEqvepY="},{"type":"next-occurrence","id":"3iHrjfAY5lSDAuiY46PLECpcEWg="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"SFauVZrzRfxts49OrTggDZHR/rw=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"3iHrjfAY5lSDAuiY46PLECpcEWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+c1LqeN+H5hMabWimMjTKEqvepY="},{"type":"next-occurrence","id":"AULyZin2WulNH+JZVHvjkhOoVrw="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"3iHrjfAY5lSDAuiY46PLECpcEWg=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"AULyZin2WulNH+JZVHvjkhOoVrw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+c1LqeN+H5hMabWimMjTKEqvepY="},{"type":"next-occurrence","id":"g/Qp1BBB2CEhpGUy9tLH3t5vIbM="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"AULyZin2WulNH+JZVHvjkhOoVrw=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"g/Qp1BBB2CEhpGUy9tLH3t5vIbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+c1LqeN+H5hMabWimMjTKEqvepY="},{"type":"next-occurrence","id":"tZUrPNA2LNl6QkTfZc18VR05dTM="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"g/Qp1BBB2CEhpGUy9tLH3t5vIbM=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"tZUrPNA2LNl6QkTfZc18VR05dTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+c1LqeN+H5hMabWimMjTKEqvepY="},{"type":"next-occurrence","id":"zapizM5P2K2NLzlh6p7Q5YC4O38="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"tZUrPNA2LNl6QkTfZc18VR05dTM=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"zapizM5P2K2NLzlh6p7Q5YC4O38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+c1LqeN+H5hMabWimMjTKEqvepY="},{"type":"next-occurrence","id":"L5iLszCF4gJJjCyBiSpNapBbpFM="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"zapizM5P2K2NLzlh6p7Q5YC4O38=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"L5iLszCF4gJJjCyBiSpNapBbpFM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+c1LqeN+H5hMabWimMjTKEqvepY="},{"type":"next-occurrence","id":"Q0G+n0E0qoD3wKXgi5WoYxzu3/U="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"L5iLszCF4gJJjCyBiSpNapBbpFM=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"Q0G+n0E0qoD3wKXgi5WoYxzu3/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+c1LqeN+H5hMabWimMjTKEqvepY="},{"type":"next-occurrence","id":"coOJjzK0BC2583Z3sI99HAlEVSI="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"Q0G+n0E0qoD3wKXgi5WoYxzu3/U=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"coOJjzK0BC2583Z3sI99HAlEVSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+c1LqeN+H5hMabWimMjTKEqvepY="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"coOJjzK0BC2583Z3sI99HAlEVSI=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"1qxR3TrQI8OrUuTANF2EiSNfn+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Nq2Ff8qA8je7GNdP5NGBmKIK8Dg="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"1qxR3TrQI8OrUuTANF2EiSNfn+o=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"Nq2Ff8qA8je7GNdP5NGBmKIK8Dg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1qxR3TrQI8OrUuTANF2EiSNfn+o="},{"type":"next-occurrence","id":"9KUlCy7qaj0Jb7EwQSkf6/Wp+1E="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"Nq2Ff8qA8je7GNdP5NGBmKIK8Dg=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"9KUlCy7qaj0Jb7EwQSkf6/Wp+1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1qxR3TrQI8OrUuTANF2EiSNfn+o="},{"type":"next-occurrence","id":"7pesa797ew6Oyl36+u1op0KjBMc="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"9KUlCy7qaj0Jb7EwQSkf6/Wp+1E=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"7pesa797ew6Oyl36+u1op0KjBMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1qxR3TrQI8OrUuTANF2EiSNfn+o="},{"type":"next-occurrence","id":"xtosSSpwDunap9TgVWQ85JRdTZM="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"7pesa797ew6Oyl36+u1op0KjBMc=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"xtosSSpwDunap9TgVWQ85JRdTZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1qxR3TrQI8OrUuTANF2EiSNfn+o="},{"type":"next-occurrence","id":"CMIpPAqg+uICYm4Kw7S6pmUXL68="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"xtosSSpwDunap9TgVWQ85JRdTZM=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"CMIpPAqg+uICYm4Kw7S6pmUXL68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1qxR3TrQI8OrUuTANF2EiSNfn+o="},{"type":"next-occurrence","id":"BALGeznM/K5Lovgd8W52xzRX0V0="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"CMIpPAqg+uICYm4Kw7S6pmUXL68=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"BALGeznM/K5Lovgd8W52xzRX0V0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1qxR3TrQI8OrUuTANF2EiSNfn+o="},{"type":"next-occurrence","id":"QLCID6jVZMaA7bMXzIPivL8DDyo="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"BALGeznM/K5Lovgd8W52xzRX0V0=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"QLCID6jVZMaA7bMXzIPivL8DDyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1qxR3TrQI8OrUuTANF2EiSNfn+o="},{"type":"next-occurrence","id":"feb62vDR84dLs36SWLJoksLfEBA="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"QLCID6jVZMaA7bMXzIPivL8DDyo=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"feb62vDR84dLs36SWLJoksLfEBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1qxR3TrQI8OrUuTANF2EiSNfn+o="},{"type":"next-occurrence","id":"n8J+grPGdKvIB4TtiHY/LoJhKRk="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"feb62vDR84dLs36SWLJoksLfEBA=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"n8J+grPGdKvIB4TtiHY/LoJhKRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1qxR3TrQI8OrUuTANF2EiSNfn+o="},{"type":"next-occurrence","id":"sW3Rlgdw+YzkGVzPHPq5+HhAhtM="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"n8J+grPGdKvIB4TtiHY/LoJhKRk=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"sW3Rlgdw+YzkGVzPHPq5+HhAhtM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1qxR3TrQI8OrUuTANF2EiSNfn+o="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"sW3Rlgdw+YzkGVzPHPq5+HhAhtM=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"w0dkv0IAF3IS+pbfYL1A2Xwi91I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vS9oYZ6YGGXrW8t8Nkem/HeciPc="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"w0dkv0IAF3IS+pbfYL1A2Xwi91I=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"vS9oYZ6YGGXrW8t8Nkem/HeciPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w0dkv0IAF3IS+pbfYL1A2Xwi91I="},{"type":"next-occurrence","id":"fpv+BYFQgLLcCSqTHurmup3h2tM="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"vS9oYZ6YGGXrW8t8Nkem/HeciPc=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"fpv+BYFQgLLcCSqTHurmup3h2tM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w0dkv0IAF3IS+pbfYL1A2Xwi91I="},{"type":"next-occurrence","id":"pTbkXRASAMmC6E/vbaK/0PU5Ml4="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"fpv+BYFQgLLcCSqTHurmup3h2tM=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"pTbkXRASAMmC6E/vbaK/0PU5Ml4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w0dkv0IAF3IS+pbfYL1A2Xwi91I="},{"type":"next-occurrence","id":"5UeeZllnMIm7YfivvSVID3kK5Ak="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"pTbkXRASAMmC6E/vbaK/0PU5Ml4=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"5UeeZllnMIm7YfivvSVID3kK5Ak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w0dkv0IAF3IS+pbfYL1A2Xwi91I="},{"type":"next-occurrence","id":"AUClqm4DkGqahhyp159V5q5lT/Y="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"5UeeZllnMIm7YfivvSVID3kK5Ak=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"AUClqm4DkGqahhyp159V5q5lT/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w0dkv0IAF3IS+pbfYL1A2Xwi91I="},{"type":"next-occurrence","id":"rig78fq41biRez+q3aNSCXw8MoU="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"AUClqm4DkGqahhyp159V5q5lT/Y=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"rig78fq41biRez+q3aNSCXw8MoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w0dkv0IAF3IS+pbfYL1A2Xwi91I="},{"type":"next-occurrence","id":"FNb2yD2apdNRoWuZXqYaRkxMXwI="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"rig78fq41biRez+q3aNSCXw8MoU=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"FNb2yD2apdNRoWuZXqYaRkxMXwI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w0dkv0IAF3IS+pbfYL1A2Xwi91I="},{"type":"next-occurrence","id":"FcCSN0MK+4aLl9hWiIeRey5M7ho="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"FNb2yD2apdNRoWuZXqYaRkxMXwI=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"FcCSN0MK+4aLl9hWiIeRey5M7ho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w0dkv0IAF3IS+pbfYL1A2Xwi91I="},{"type":"next-occurrence","id":"/OBmDAffmMrOdV460VstuoRoK9o="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"FcCSN0MK+4aLl9hWiIeRey5M7ho=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"/OBmDAffmMrOdV460VstuoRoK9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w0dkv0IAF3IS+pbfYL1A2Xwi91I="},{"type":"next-occurrence","id":"1O2bkIModSJRmWh3cVyL8NfpdQU="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"/OBmDAffmMrOdV460VstuoRoK9o=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"1O2bkIModSJRmWh3cVyL8NfpdQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w0dkv0IAF3IS+pbfYL1A2Xwi91I="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"1O2bkIModSJRmWh3cVyL8NfpdQU=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"dXxn/FWnzXjIB74i/fjg4rrTQHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Yf73JsVxo2VtX6lZb0AEdzlJ7vQ="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"dXxn/FWnzXjIB74i/fjg4rrTQHw=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"Yf73JsVxo2VtX6lZb0AEdzlJ7vQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dXxn/FWnzXjIB74i/fjg4rrTQHw="},{"type":"next-occurrence","id":"f41kVik+nTM1KC8Y860LKmEkHes="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"Yf73JsVxo2VtX6lZb0AEdzlJ7vQ=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"f41kVik+nTM1KC8Y860LKmEkHes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dXxn/FWnzXjIB74i/fjg4rrTQHw="},{"type":"next-occurrence","id":"OpGUWW6VxKhyZfJ+p9zYew0DApQ="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"f41kVik+nTM1KC8Y860LKmEkHes=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"OpGUWW6VxKhyZfJ+p9zYew0DApQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dXxn/FWnzXjIB74i/fjg4rrTQHw="},{"type":"next-occurrence","id":"C+/zi1aT2LdjXnu8FopLB9Uz+Ro="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"OpGUWW6VxKhyZfJ+p9zYew0DApQ=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"C+/zi1aT2LdjXnu8FopLB9Uz+Ro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dXxn/FWnzXjIB74i/fjg4rrTQHw="},{"type":"next-occurrence","id":"8IgbIe7IfRqBu4tSLQ/kcCy8DHU="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"C+/zi1aT2LdjXnu8FopLB9Uz+Ro=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"8IgbIe7IfRqBu4tSLQ/kcCy8DHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dXxn/FWnzXjIB74i/fjg4rrTQHw="},{"type":"next-occurrence","id":"AuyvOR7eUC/DJAk+mt4puxHg0go="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"8IgbIe7IfRqBu4tSLQ/kcCy8DHU=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"AuyvOR7eUC/DJAk+mt4puxHg0go=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dXxn/FWnzXjIB74i/fjg4rrTQHw="},{"type":"next-occurrence","id":"90r/vuzGGI6EripUpUE5Bu3l0nk="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"AuyvOR7eUC/DJAk+mt4puxHg0go=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"90r/vuzGGI6EripUpUE5Bu3l0nk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dXxn/FWnzXjIB74i/fjg4rrTQHw="},{"type":"next-occurrence","id":"IjLZ8/lOYbgowZ0hg3MqjZPs3Mg="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"90r/vuzGGI6EripUpUE5Bu3l0nk=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"IjLZ8/lOYbgowZ0hg3MqjZPs3Mg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dXxn/FWnzXjIB74i/fjg4rrTQHw="},{"type":"next-occurrence","id":"NNDT0BW03b/o5BJJC1HRZqjX7BA="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"IjLZ8/lOYbgowZ0hg3MqjZPs3Mg=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"NNDT0BW03b/o5BJJC1HRZqjX7BA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dXxn/FWnzXjIB74i/fjg4rrTQHw="},{"type":"next-occurrence","id":"5SbBMUDgVBawdxh+RrAKPBfDI0g="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"NNDT0BW03b/o5BJJC1HRZqjX7BA=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"5SbBMUDgVBawdxh+RrAKPBfDI0g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dXxn/FWnzXjIB74i/fjg4rrTQHw="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"5SbBMUDgVBawdxh+RrAKPBfDI0g=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"sZaLMLrl+ycunurIC31NeXK+4Bk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tQND6ojU2PxgbtYH6zApYd5Tgic="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"sZaLMLrl+ycunurIC31NeXK+4Bk=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"tQND6ojU2PxgbtYH6zApYd5Tgic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZaLMLrl+ycunurIC31NeXK+4Bk="},{"type":"next-occurrence","id":"XlJDMfDFDlUmQWYoTtiF0814xm4="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"tQND6ojU2PxgbtYH6zApYd5Tgic=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"XlJDMfDFDlUmQWYoTtiF0814xm4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZaLMLrl+ycunurIC31NeXK+4Bk="},{"type":"next-occurrence","id":"6omr2hMGpZPp3hDmz+3JslyZAHg="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"XlJDMfDFDlUmQWYoTtiF0814xm4=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"6omr2hMGpZPp3hDmz+3JslyZAHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZaLMLrl+ycunurIC31NeXK+4Bk="},{"type":"next-occurrence","id":"zRhKp3RwNZEDpaWezCp/2DayaRw="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"6omr2hMGpZPp3hDmz+3JslyZAHg=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"zRhKp3RwNZEDpaWezCp/2DayaRw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZaLMLrl+ycunurIC31NeXK+4Bk="},{"type":"next-occurrence","id":"D+5qTKAK/Q8kFfmt7wNn0SRWIVQ="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"zRhKp3RwNZEDpaWezCp/2DayaRw=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"D+5qTKAK/Q8kFfmt7wNn0SRWIVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZaLMLrl+ycunurIC31NeXK+4Bk="},{"type":"next-occurrence","id":"I31UZJhArSaVVlOSFSJ+OfZ4HbE="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"D+5qTKAK/Q8kFfmt7wNn0SRWIVQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"I31UZJhArSaVVlOSFSJ+OfZ4HbE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZaLMLrl+ycunurIC31NeXK+4Bk="},{"type":"next-occurrence","id":"ncyvyFz34YwXVlWLYSfNVXEM/hI="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"I31UZJhArSaVVlOSFSJ+OfZ4HbE=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"ncyvyFz34YwXVlWLYSfNVXEM/hI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZaLMLrl+ycunurIC31NeXK+4Bk="},{"type":"next-occurrence","id":"0GP/34/fLyNFZB8GK9kUDe7SFTI="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"ncyvyFz34YwXVlWLYSfNVXEM/hI=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"0GP/34/fLyNFZB8GK9kUDe7SFTI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZaLMLrl+ycunurIC31NeXK+4Bk="},{"type":"next-occurrence","id":"JcS6KPBy4BN1QS0/kCfz+0saMEQ="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"0GP/34/fLyNFZB8GK9kUDe7SFTI=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"JcS6KPBy4BN1QS0/kCfz+0saMEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZaLMLrl+ycunurIC31NeXK+4Bk="},{"type":"next-occurrence","id":"VmtvzA3/6sp7b0HhQhEM9OIZGrs="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"JcS6KPBy4BN1QS0/kCfz+0saMEQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"VmtvzA3/6sp7b0HhQhEM9OIZGrs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZaLMLrl+ycunurIC31NeXK+4Bk="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"VmtvzA3/6sp7b0HhQhEM9OIZGrs=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"n0FAwEvGv+HUXJgEBx4GRMIS/Rc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ttPJkN+osr5AgOJxyLoQTsMPHME="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:58:17Z"},"road_event_id":"n0FAwEvGv+HUXJgEBx4GRMIS/Rc=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91975,40.688309]]}},{"id":"ttPJkN+osr5AgOJxyLoQTsMPHME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n0FAwEvGv+HUXJgEBx4GRMIS/Rc="},{"type":"next-occurrence","id":"k/5c4Tf23W+BhVAdGFc45wLvLiU="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:58:17Z"},"road_event_id":"ttPJkN+osr5AgOJxyLoQTsMPHME=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91975,40.688309]]}},{"id":"k/5c4Tf23W+BhVAdGFc45wLvLiU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n0FAwEvGv+HUXJgEBx4GRMIS/Rc="},{"type":"next-occurrence","id":"2mhkMAyRO1fYnG/T4tR8rLA/Q+Q="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:58:17Z"},"road_event_id":"k/5c4Tf23W+BhVAdGFc45wLvLiU=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91975,40.688309]]}},{"id":"2mhkMAyRO1fYnG/T4tR8rLA/Q+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n0FAwEvGv+HUXJgEBx4GRMIS/Rc="},{"type":"next-occurrence","id":"0rzTmAwNZt0h1I3VR/zQn1F0cjQ="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:58:17Z"},"road_event_id":"2mhkMAyRO1fYnG/T4tR8rLA/Q+Q=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91975,40.688309]]}},{"id":"0rzTmAwNZt0h1I3VR/zQn1F0cjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n0FAwEvGv+HUXJgEBx4GRMIS/Rc="},{"type":"next-occurrence","id":"amL/6pHLSG3GNIjhePxS8JjXsOg="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:58:17Z"},"road_event_id":"0rzTmAwNZt0h1I3VR/zQn1F0cjQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91975,40.688309]]}},{"id":"amL/6pHLSG3GNIjhePxS8JjXsOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n0FAwEvGv+HUXJgEBx4GRMIS/Rc="},{"type":"next-occurrence","id":"zn3BjBnyaX4d3okXqTX0c5yWmUY="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:58:17Z"},"road_event_id":"amL/6pHLSG3GNIjhePxS8JjXsOg=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91975,40.688309]]}},{"id":"zn3BjBnyaX4d3okXqTX0c5yWmUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n0FAwEvGv+HUXJgEBx4GRMIS/Rc="},{"type":"next-occurrence","id":"XqIhi+P6BzxjmzA2PBu9W/roj5k="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:58:17Z"},"road_event_id":"zn3BjBnyaX4d3okXqTX0c5yWmUY=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91975,40.688309]]}},{"id":"XqIhi+P6BzxjmzA2PBu9W/roj5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n0FAwEvGv+HUXJgEBx4GRMIS/Rc="},{"type":"next-occurrence","id":"lnAkaZpKa3yWq5gc31xA/AKs88c="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:58:17Z"},"road_event_id":"XqIhi+P6BzxjmzA2PBu9W/roj5k=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91975,40.688309]]}},{"id":"lnAkaZpKa3yWq5gc31xA/AKs88c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n0FAwEvGv+HUXJgEBx4GRMIS/Rc="},{"type":"next-occurrence","id":"886Nyaenc7f07hKmwRvcrylNDv0="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:58:17Z"},"road_event_id":"lnAkaZpKa3yWq5gc31xA/AKs88c=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91975,40.688309]]}},{"id":"886Nyaenc7f07hKmwRvcrylNDv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n0FAwEvGv+HUXJgEBx4GRMIS/Rc="},{"type":"next-occurrence","id":"tjR7Jr7rcdCxXT0Kta3HoqM+uv8="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:58:17Z"},"road_event_id":"886Nyaenc7f07hKmwRvcrylNDv0=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91975,40.688309]]}},{"id":"tjR7Jr7rcdCxXT0Kta3HoqM+uv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n0FAwEvGv+HUXJgEBx4GRMIS/Rc="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:58:17Z"},"road_event_id":"tjR7Jr7rcdCxXT0Kta3HoqM+uv8=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91975,40.688309]]}},{"id":"2PAOSDqiKU5ZzFR6WF0cmqUaKvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["UNION ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"afWIxElIXKxKLzg4gqWgsv1Q4Js="}],"description":"Construction on UNION ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York) for boom truck., Wednesday May 6th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T20:02:44Z"},"road_event_id":"2PAOSDqiKU5ZzFR6WF0cmqUaKvs=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921344,40.665467]]}},{"id":"afWIxElIXKxKLzg4gqWgsv1Q4Js=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["UNION ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2PAOSDqiKU5ZzFR6WF0cmqUaKvs="},{"type":"next-occurrence","id":"4A9/uKCzwfcxLpjCV7FXwF34zjI="}],"description":"Construction on UNION ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York) for boom truck., Wednesday May 6th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T20:02:44Z"},"road_event_id":"afWIxElIXKxKLzg4gqWgsv1Q4Js=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921344,40.665467]]}},{"id":"4A9/uKCzwfcxLpjCV7FXwF34zjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["UNION ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2PAOSDqiKU5ZzFR6WF0cmqUaKvs="},{"type":"next-occurrence","id":"A5m+X2kHP5PUbHPdUicvy1SrgrQ="}],"description":"Construction on UNION ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York) for boom truck., Wednesday May 6th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T20:02:44Z"},"road_event_id":"4A9/uKCzwfcxLpjCV7FXwF34zjI=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921344,40.665467]]}},{"id":"A5m+X2kHP5PUbHPdUicvy1SrgrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["UNION ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2PAOSDqiKU5ZzFR6WF0cmqUaKvs="},{"type":"next-occurrence","id":"vzdNu9yW7BAh4+vAQcOjY1yAjXQ="}],"description":"Construction on UNION ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York) for boom truck., Wednesday May 6th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T20:02:44Z"},"road_event_id":"A5m+X2kHP5PUbHPdUicvy1SrgrQ=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921344,40.665467]]}},{"id":"vzdNu9yW7BAh4+vAQcOjY1yAjXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["UNION ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2PAOSDqiKU5ZzFR6WF0cmqUaKvs="},{"type":"next-occurrence","id":"8BMd/Uxu3yamYpxzvmDUYpRcm88="}],"description":"Construction on UNION ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York) for boom truck., Wednesday May 6th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T20:02:44Z"},"road_event_id":"vzdNu9yW7BAh4+vAQcOjY1yAjXQ=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921344,40.665467]]}},{"id":"8BMd/Uxu3yamYpxzvmDUYpRcm88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["UNION ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2PAOSDqiKU5ZzFR6WF0cmqUaKvs="},{"type":"next-occurrence","id":"if9q/EPq76kJ/LWlxOEh44gRgxo="}],"description":"Construction on UNION ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York) for boom truck., Wednesday May 6th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T20:02:44Z"},"road_event_id":"8BMd/Uxu3yamYpxzvmDUYpRcm88=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921344,40.665467]]}},{"id":"if9q/EPq76kJ/LWlxOEh44gRgxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["UNION ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2PAOSDqiKU5ZzFR6WF0cmqUaKvs="},{"type":"next-occurrence","id":"uxNMh1VQh0niWvGBhPPte8S0ewQ="}],"description":"Construction on UNION ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York) for boom truck., Wednesday May 6th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T20:02:44Z"},"road_event_id":"if9q/EPq76kJ/LWlxOEh44gRgxo=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921344,40.665467]]}},{"id":"uxNMh1VQh0niWvGBhPPte8S0ewQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["UNION ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2PAOSDqiKU5ZzFR6WF0cmqUaKvs="},{"type":"next-occurrence","id":"pHAv9kZr6R8fVOA9gmPjxLr7vxg="}],"description":"Construction on UNION ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York) for boom truck., Wednesday May 6th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T20:02:44Z"},"road_event_id":"uxNMh1VQh0niWvGBhPPte8S0ewQ=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921344,40.665467]]}},{"id":"pHAv9kZr6R8fVOA9gmPjxLr7vxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["UNION ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2PAOSDqiKU5ZzFR6WF0cmqUaKvs="},{"type":"next-occurrence","id":"f4h0Iw223RE1iKnoGSz5Oh0SZ98="}],"description":"Construction on UNION ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York) for boom truck., Wednesday May 6th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T20:02:44Z"},"road_event_id":"pHAv9kZr6R8fVOA9gmPjxLr7vxg=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T13:00:00Z","end_date":"2026-05-25T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921344,40.665467]]}},{"id":"f4h0Iw223RE1iKnoGSz5Oh0SZ98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["UNION ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2PAOSDqiKU5ZzFR6WF0cmqUaKvs="},{"type":"next-occurrence","id":"qmn2V/ltYvuV/l5AQx7eT4vdoWU="}],"description":"Construction on UNION ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York) for boom truck., Wednesday May 6th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T20:02:44Z"},"road_event_id":"f4h0Iw223RE1iKnoGSz5Oh0SZ98=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T13:00:00Z","end_date":"2026-05-26T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921344,40.665467]]}},{"id":"qmn2V/ltYvuV/l5AQx7eT4vdoWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["UNION ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2PAOSDqiKU5ZzFR6WF0cmqUaKvs="}],"description":"Construction on UNION ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York) for boom truck., Wednesday May 6th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-06T20:02:44Z"},"road_event_id":"qmn2V/ltYvuV/l5AQx7eT4vdoWU=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T13:00:00Z","end_date":"2026-05-27T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921344,40.665467]]}},{"id":"3aWYJPmuLb1nygwNIrTZrdopn6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FOuFpXr+iwBfBShxOtxeb3m0Kg8="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"3aWYJPmuLb1nygwNIrTZrdopn6Q=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"FOuFpXr+iwBfBShxOtxeb3m0Kg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3aWYJPmuLb1nygwNIrTZrdopn6Q="},{"type":"next-occurrence","id":"655AO7uHlV5tlJl+uZ5TMAfnkV4="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"FOuFpXr+iwBfBShxOtxeb3m0Kg8=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"655AO7uHlV5tlJl+uZ5TMAfnkV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3aWYJPmuLb1nygwNIrTZrdopn6Q="},{"type":"next-occurrence","id":"kPJeru+vH8Y/x//j+Evmo6KfC1g="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"655AO7uHlV5tlJl+uZ5TMAfnkV4=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"kPJeru+vH8Y/x//j+Evmo6KfC1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3aWYJPmuLb1nygwNIrTZrdopn6Q="},{"type":"next-occurrence","id":"AaSbq/tnk7qLlw5d039a5ppiUWg="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"kPJeru+vH8Y/x//j+Evmo6KfC1g=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"AaSbq/tnk7qLlw5d039a5ppiUWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3aWYJPmuLb1nygwNIrTZrdopn6Q="},{"type":"next-occurrence","id":"DcJgsJHgkmgjb0jJoHhvWepGB7Q="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"AaSbq/tnk7qLlw5d039a5ppiUWg=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"DcJgsJHgkmgjb0jJoHhvWepGB7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3aWYJPmuLb1nygwNIrTZrdopn6Q="},{"type":"next-occurrence","id":"n8sUMuJJUcLAZCJNf3pHpYLJKzo="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"DcJgsJHgkmgjb0jJoHhvWepGB7Q=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"n8sUMuJJUcLAZCJNf3pHpYLJKzo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3aWYJPmuLb1nygwNIrTZrdopn6Q="},{"type":"next-occurrence","id":"CpKnaQkVgEJmUh/r2/Vm39f3i88="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"n8sUMuJJUcLAZCJNf3pHpYLJKzo=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"CpKnaQkVgEJmUh/r2/Vm39f3i88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3aWYJPmuLb1nygwNIrTZrdopn6Q="},{"type":"next-occurrence","id":"E1v3D4Yp1AsmmmAzEJ0zZzmDRa0="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"CpKnaQkVgEJmUh/r2/Vm39f3i88=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"E1v3D4Yp1AsmmmAzEJ0zZzmDRa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3aWYJPmuLb1nygwNIrTZrdopn6Q="},{"type":"next-occurrence","id":"5h8KMWTeKzs2Qmaw7J23mw98b80="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"E1v3D4Yp1AsmmmAzEJ0zZzmDRa0=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"5h8KMWTeKzs2Qmaw7J23mw98b80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3aWYJPmuLb1nygwNIrTZrdopn6Q="},{"type":"next-occurrence","id":"u0R6LYm3y1pcRzCqY+3LamUQxBs="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"5h8KMWTeKzs2Qmaw7J23mw98b80=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"u0R6LYm3y1pcRzCqY+3LamUQxBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3aWYJPmuLb1nygwNIrTZrdopn6Q="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"u0R6LYm3y1pcRzCqY+3LamUQxBs=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"JGcyjJWR7DPubh2N3b2U1ghzTiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZVN+iOhusg2ip5pKVIjeAxq5+Pg="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"JGcyjJWR7DPubh2N3b2U1ghzTiA=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"ZVN+iOhusg2ip5pKVIjeAxq5+Pg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JGcyjJWR7DPubh2N3b2U1ghzTiA="},{"type":"next-occurrence","id":"Ky8/HMwPpqCMVDvKh7bQMH4QWAA="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"ZVN+iOhusg2ip5pKVIjeAxq5+Pg=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"Ky8/HMwPpqCMVDvKh7bQMH4QWAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JGcyjJWR7DPubh2N3b2U1ghzTiA="},{"type":"next-occurrence","id":"jzzg6TvsNMzbUK6ZJvPKHApPRBo="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"Ky8/HMwPpqCMVDvKh7bQMH4QWAA=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"jzzg6TvsNMzbUK6ZJvPKHApPRBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JGcyjJWR7DPubh2N3b2U1ghzTiA="},{"type":"next-occurrence","id":"9ePDxa5vJIpXEeILVBOadA4Y+qA="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"jzzg6TvsNMzbUK6ZJvPKHApPRBo=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"9ePDxa5vJIpXEeILVBOadA4Y+qA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JGcyjJWR7DPubh2N3b2U1ghzTiA="},{"type":"next-occurrence","id":"c3LZI6j81Gh/vSZtZhvD2S/qoxY="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"9ePDxa5vJIpXEeILVBOadA4Y+qA=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"c3LZI6j81Gh/vSZtZhvD2S/qoxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JGcyjJWR7DPubh2N3b2U1ghzTiA="},{"type":"next-occurrence","id":"dhClCXDcwUsUF/fa9707qNcKPRs="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"c3LZI6j81Gh/vSZtZhvD2S/qoxY=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"dhClCXDcwUsUF/fa9707qNcKPRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JGcyjJWR7DPubh2N3b2U1ghzTiA="},{"type":"next-occurrence","id":"4hfK3uAPCqujeqgUUmOjDD0Etfk="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"dhClCXDcwUsUF/fa9707qNcKPRs=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"4hfK3uAPCqujeqgUUmOjDD0Etfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JGcyjJWR7DPubh2N3b2U1ghzTiA="},{"type":"next-occurrence","id":"kwhIw+vLMDltXtDouoVnl0Rj6Xc="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"4hfK3uAPCqujeqgUUmOjDD0Etfk=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"kwhIw+vLMDltXtDouoVnl0Rj6Xc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JGcyjJWR7DPubh2N3b2U1ghzTiA="},{"type":"next-occurrence","id":"CqvcPQumvlvr/H8+hnuTIkxgOfs="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"kwhIw+vLMDltXtDouoVnl0Rj6Xc=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"CqvcPQumvlvr/H8+hnuTIkxgOfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JGcyjJWR7DPubh2N3b2U1ghzTiA="},{"type":"next-occurrence","id":"553jdnpZF+1F4f7dvo8SQJvqHz4="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"CqvcPQumvlvr/H8+hnuTIkxgOfs=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"553jdnpZF+1F4f7dvo8SQJvqHz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JGcyjJWR7DPubh2N3b2U1ghzTiA="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"553jdnpZF+1F4f7dvo8SQJvqHz4=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"gilypQu1NIuUTRM9aanyVDA/6WQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"i9no8XPK0ThicAbqZ7fgdk8JCmA="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"gilypQu1NIuUTRM9aanyVDA/6WQ=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"i9no8XPK0ThicAbqZ7fgdk8JCmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gilypQu1NIuUTRM9aanyVDA/6WQ="},{"type":"next-occurrence","id":"XMhUHUGY5UlnZz435hID1VQe43E="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"i9no8XPK0ThicAbqZ7fgdk8JCmA=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"XMhUHUGY5UlnZz435hID1VQe43E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gilypQu1NIuUTRM9aanyVDA/6WQ="},{"type":"next-occurrence","id":"d0dz9aZlJP/THqAqvyeYD1c8O0I="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"XMhUHUGY5UlnZz435hID1VQe43E=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"d0dz9aZlJP/THqAqvyeYD1c8O0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gilypQu1NIuUTRM9aanyVDA/6WQ="},{"type":"next-occurrence","id":"xjTJgC2sfEVoZUsgf8KYv28sh24="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"d0dz9aZlJP/THqAqvyeYD1c8O0I=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"xjTJgC2sfEVoZUsgf8KYv28sh24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gilypQu1NIuUTRM9aanyVDA/6WQ="},{"type":"next-occurrence","id":"ifxipu1/pQFj1hZ/JpRo9/wCJQM="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"xjTJgC2sfEVoZUsgf8KYv28sh24=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"ifxipu1/pQFj1hZ/JpRo9/wCJQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gilypQu1NIuUTRM9aanyVDA/6WQ="},{"type":"next-occurrence","id":"9ZQNiLZqFO7tvH5pN1XaSLfskL4="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"ifxipu1/pQFj1hZ/JpRo9/wCJQM=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"9ZQNiLZqFO7tvH5pN1XaSLfskL4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gilypQu1NIuUTRM9aanyVDA/6WQ="},{"type":"next-occurrence","id":"QIQBh/Ltv98VYLVoxzucedHyyxs="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"9ZQNiLZqFO7tvH5pN1XaSLfskL4=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"QIQBh/Ltv98VYLVoxzucedHyyxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gilypQu1NIuUTRM9aanyVDA/6WQ="},{"type":"next-occurrence","id":"GkKpRyUKm/m+zXksQDOd1n8Bj6E="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"QIQBh/Ltv98VYLVoxzucedHyyxs=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"GkKpRyUKm/m+zXksQDOd1n8Bj6E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gilypQu1NIuUTRM9aanyVDA/6WQ="},{"type":"next-occurrence","id":"xG9c/PztsfsBjlPLckLPFFMZlAg="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"GkKpRyUKm/m+zXksQDOd1n8Bj6E=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"xG9c/PztsfsBjlPLckLPFFMZlAg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gilypQu1NIuUTRM9aanyVDA/6WQ="},{"type":"next-occurrence","id":"j3NPMKqo4fGbImT0Ux1Hp9uBCzo="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"xG9c/PztsfsBjlPLckLPFFMZlAg=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"j3NPMKqo4fGbImT0Ux1Hp9uBCzo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gilypQu1NIuUTRM9aanyVDA/6WQ="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"j3NPMKqo4fGbImT0Ux1Hp9uBCzo=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"dMroo4NpBuldJUI/rvWedEkwi9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Deck work and crack sealing and drainage improvements and milling on New Jersey Turnpike Inner Roadway southbound between North of Interchange 14 - I-78/US 1&9 (Newark) and Interchange 6 - Pennsylvania Turnpike (Mansfield Twp), Thursday May 14th,2026 thru Friday May 15th,2026, Thursday, 09:00 PM thru 05:00 AM All lanes closed southbound,","update_date":"2026-05-12T09:00:09Z"},"road_event_id":"dMroo4NpBuldJUI/rvWedEkwi9U=","beginning_cross_street":"North of Interchange 14 - I-78/US 1&9","ending_cross_street":"Interchange 6 - Pennsylvania Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.144248,40.71233]]}},{"id":"PFDS3TXu5KByyndaJCKS1Egmn5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge work and construction on Garden State Parkway southbound between Pascack Valley Toll Plaza (Washington Twp) and Pascack Valley Toll Plaza (Washington Twp), Thursday May 14th,2026 thru Friday May 15th,2026, Thursday, 09:00 PM thru 06:00 AM 2 Left lanes of 4 lanes closed southbound,","update_date":"2026-05-07T18:00:04Z"},"road_event_id":"PFDS3TXu5KByyndaJCKS1Egmn5Y=","beginning_cross_street":"Pascack Valley Toll Plaza","ending_cross_street":"Pascack Valley Toll Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.071307,40.98022]]}},{"id":"dIGvbWIDuEf3vJ3ZYfajN9My6pk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["3 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TMqcb1Ge3qqHsND1N5BDURgZYQI="}],"description":"Due to Construction both directions, 3 Line into/out of New Lots Av (New York) extended late night 3 line replaces 4 line. 3 line runs to/from New Lots Av days and evenings. 3 line provides alternate service in Brooklyn during planned work on the 4 line. , Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM","update_date":"2026-05-06T21:27:04Z"},"road_event_id":"dIGvbWIDuEf3vJ3ZYfajN9My6pk=","beginning_cross_street":"New Lots Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:30:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884079,40.666235]]}},{"id":"TMqcb1Ge3qqHsND1N5BDURgZYQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["3 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIGvbWIDuEf3vJ3ZYfajN9My6pk="},{"type":"next-occurrence","id":"tY2rMWZknnjQ9DRBlDhbpY1CL9A="}],"description":"Due to Construction both directions, 3 Line into/out of New Lots Av (New York) extended late night 3 line replaces 4 line. 3 line runs to/from New Lots Av days and evenings. 3 line provides alternate service in Brooklyn during planned work on the 4 line. , Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM","update_date":"2026-05-06T21:27:04Z"},"road_event_id":"TMqcb1Ge3qqHsND1N5BDURgZYQI=","beginning_cross_street":"New Lots Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:30:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884079,40.666235]]}},{"id":"tY2rMWZknnjQ9DRBlDhbpY1CL9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["3 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIGvbWIDuEf3vJ3ZYfajN9My6pk="},{"type":"next-occurrence","id":"IZwF82CgA2NVDYULmZuoNdbV3eg="}],"description":"Due to Construction both directions, 3 Line into/out of New Lots Av (New York) extended late night 3 line replaces 4 line. 3 line runs to/from New Lots Av days and evenings. 3 line provides alternate service in Brooklyn during planned work on the 4 line. , Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM","update_date":"2026-05-06T21:27:04Z"},"road_event_id":"tY2rMWZknnjQ9DRBlDhbpY1CL9A=","beginning_cross_street":"New Lots Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:30:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884079,40.666235]]}},{"id":"IZwF82CgA2NVDYULmZuoNdbV3eg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["3 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIGvbWIDuEf3vJ3ZYfajN9My6pk="},{"type":"next-occurrence","id":"DdWTjVR3j5XO8CTEDTHKw5/wdv0="}],"description":"Due to Construction both directions, 3 Line into/out of New Lots Av (New York) extended late night 3 line replaces 4 line. 3 line runs to/from New Lots Av days and evenings. 3 line provides alternate service in Brooklyn during planned work on the 4 line. , Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM","update_date":"2026-05-06T21:27:04Z"},"road_event_id":"IZwF82CgA2NVDYULmZuoNdbV3eg=","beginning_cross_street":"New Lots Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T03:00:00Z","end_date":"2026-05-20T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884079,40.666235]]}},{"id":"DdWTjVR3j5XO8CTEDTHKw5/wdv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["3 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIGvbWIDuEf3vJ3ZYfajN9My6pk="},{"type":"next-occurrence","id":"hSjGJFQpy6HboMGSTeAflBVZHCQ="}],"description":"Due to Construction both directions, 3 Line into/out of New Lots Av (New York) extended late night 3 line replaces 4 line. 3 line runs to/from New Lots Av days and evenings. 3 line provides alternate service in Brooklyn during planned work on the 4 line. , Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM","update_date":"2026-05-06T21:27:04Z"},"road_event_id":"DdWTjVR3j5XO8CTEDTHKw5/wdv0=","beginning_cross_street":"New Lots Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T03:00:00Z","end_date":"2026-05-21T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884079,40.666235]]}},{"id":"hSjGJFQpy6HboMGSTeAflBVZHCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["3 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIGvbWIDuEf3vJ3ZYfajN9My6pk="},{"type":"next-occurrence","id":"D5IMXzr8q+JOpBOw2W9n7HHqDPE="}],"description":"Due to Construction both directions, 3 Line into/out of New Lots Av (New York) extended late night 3 line replaces 4 line. 3 line runs to/from New Lots Av days and evenings. 3 line provides alternate service in Brooklyn during planned work on the 4 line. , Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM","update_date":"2026-05-06T21:27:04Z"},"road_event_id":"hSjGJFQpy6HboMGSTeAflBVZHCQ=","beginning_cross_street":"New Lots Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T03:00:00Z","end_date":"2026-05-22T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884079,40.666235]]}},{"id":"D5IMXzr8q+JOpBOw2W9n7HHqDPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["3 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIGvbWIDuEf3vJ3ZYfajN9My6pk="},{"type":"next-occurrence","id":"QTQThX9TzKgwe8bmVHe6hn3H4z4="}],"description":"Due to Construction both directions, 3 Line into/out of New Lots Av (New York) extended late night 3 line replaces 4 line. 3 line runs to/from New Lots Av days and evenings. 3 line provides alternate service in Brooklyn during planned work on the 4 line. , Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM","update_date":"2026-05-06T21:27:04Z"},"road_event_id":"D5IMXzr8q+JOpBOw2W9n7HHqDPE=","beginning_cross_street":"New Lots Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T03:00:00Z","end_date":"2026-05-23T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884079,40.666235]]}},{"id":"QTQThX9TzKgwe8bmVHe6hn3H4z4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["3 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIGvbWIDuEf3vJ3ZYfajN9My6pk="}],"description":"Due to Construction both directions, 3 Line into/out of New Lots Av (New York) extended late night 3 line replaces 4 line. 3 line runs to/from New Lots Av days and evenings. 3 line provides alternate service in Brooklyn during planned work on the 4 line. , Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM","update_date":"2026-05-06T21:27:04Z"},"road_event_id":"QTQThX9TzKgwe8bmVHe6hn3H4z4=","beginning_cross_street":"New Lots Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T03:00:00Z","end_date":"2026-05-24T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884079,40.666235]]}},{"id":"2mJLH4vXYkoWQYpfH8HuyhVYH28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5C6SGoPoTTFKdgTTp57t6LPOqoc="}],"description":"Due to Track replacement both directions, 4 Line between Brooklyn Bridge - City Hall (New York) and New Lots Av (New York) 4 line runs between Woodlawn and Brooklyn Bridge-City Hall. 3 line run to/from New Lots Av. For Fulton St, Wall St and Bowling Green, use nearby J line, N line, or R line. For service between Manhattan and Brooklyn, take the N line or Q line. For service between Borough Hall and Franklin Av-Medgar Evers College, take the 2 line or 3 line. Take the 3 line between Franklin Av-Medgar Evers College and New Lots Av., Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended","update_date":"2026-05-06T21:30:30Z"},"road_event_id":"2mJLH4vXYkoWQYpfH8HuyhVYH28=","beginning_cross_street":"Brooklyn Bridge - City Hall","ending_cross_street":"New Lots Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:30:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004131,40.713065]]}},{"id":"5C6SGoPoTTFKdgTTp57t6LPOqoc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2mJLH4vXYkoWQYpfH8HuyhVYH28="},{"type":"next-occurrence","id":"RdWGa3MkMjdnQpzSt9IHhxRpyyc="}],"description":"Due to Track replacement both directions, 4 Line between Brooklyn Bridge - City Hall (New York) and New Lots Av (New York) 4 line runs between Woodlawn and Brooklyn Bridge-City Hall. 3 line run to/from New Lots Av. For Fulton St, Wall St and Bowling Green, use nearby J line, N line, or R line. For service between Manhattan and Brooklyn, take the N line or Q line. For service between Borough Hall and Franklin Av-Medgar Evers College, take the 2 line or 3 line. Take the 3 line between Franklin Av-Medgar Evers College and New Lots Av., Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended","update_date":"2026-05-06T21:30:30Z"},"road_event_id":"5C6SGoPoTTFKdgTTp57t6LPOqoc=","beginning_cross_street":"Brooklyn Bridge - City Hall","ending_cross_street":"New Lots Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:30:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004131,40.713065]]}},{"id":"RdWGa3MkMjdnQpzSt9IHhxRpyyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2mJLH4vXYkoWQYpfH8HuyhVYH28="},{"type":"next-occurrence","id":"PLx9PlcbVNV8Ihg9SiXCXphWeJ8="}],"description":"Due to Track replacement both directions, 4 Line between Brooklyn Bridge - City Hall (New York) and New Lots Av (New York) 4 line runs between Woodlawn and Brooklyn Bridge-City Hall. 3 line run to/from New Lots Av. For Fulton St, Wall St and Bowling Green, use nearby J line, N line, or R line. For service between Manhattan and Brooklyn, take the N line or Q line. For service between Borough Hall and Franklin Av-Medgar Evers College, take the 2 line or 3 line. Take the 3 line between Franklin Av-Medgar Evers College and New Lots Av., Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended","update_date":"2026-05-06T21:30:30Z"},"road_event_id":"RdWGa3MkMjdnQpzSt9IHhxRpyyc=","beginning_cross_street":"Brooklyn Bridge - City Hall","ending_cross_street":"New Lots Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:30:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004131,40.713065]]}},{"id":"PLx9PlcbVNV8Ihg9SiXCXphWeJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2mJLH4vXYkoWQYpfH8HuyhVYH28="},{"type":"next-occurrence","id":"aIoemwaBpOUUuZCGnGiWLhQ2gLw="}],"description":"Due to Track replacement both directions, 4 Line between Brooklyn Bridge - City Hall (New York) and New Lots Av (New York) 4 line runs between Woodlawn and Brooklyn Bridge-City Hall. 3 line run to/from New Lots Av. For Fulton St, Wall St and Bowling Green, use nearby J line, N line, or R line. For service between Manhattan and Brooklyn, take the N line or Q line. For service between Borough Hall and Franklin Av-Medgar Evers College, take the 2 line or 3 line. Take the 3 line between Franklin Av-Medgar Evers College and New Lots Av., Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended","update_date":"2026-05-06T21:30:30Z"},"road_event_id":"PLx9PlcbVNV8Ihg9SiXCXphWeJ8=","beginning_cross_street":"Brooklyn Bridge - City Hall","ending_cross_street":"New Lots Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T03:00:00Z","end_date":"2026-05-20T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004131,40.713065]]}},{"id":"aIoemwaBpOUUuZCGnGiWLhQ2gLw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2mJLH4vXYkoWQYpfH8HuyhVYH28="},{"type":"next-occurrence","id":"14v4d7mJpBfsBl9SnIbuWioBF5c="}],"description":"Due to Track replacement both directions, 4 Line between Brooklyn Bridge - City Hall (New York) and New Lots Av (New York) 4 line runs between Woodlawn and Brooklyn Bridge-City Hall. 3 line run to/from New Lots Av. For Fulton St, Wall St and Bowling Green, use nearby J line, N line, or R line. For service between Manhattan and Brooklyn, take the N line or Q line. For service between Borough Hall and Franklin Av-Medgar Evers College, take the 2 line or 3 line. Take the 3 line between Franklin Av-Medgar Evers College and New Lots Av., Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended","update_date":"2026-05-06T21:30:30Z"},"road_event_id":"aIoemwaBpOUUuZCGnGiWLhQ2gLw=","beginning_cross_street":"Brooklyn Bridge - City Hall","ending_cross_street":"New Lots Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T03:00:00Z","end_date":"2026-05-21T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004131,40.713065]]}},{"id":"14v4d7mJpBfsBl9SnIbuWioBF5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2mJLH4vXYkoWQYpfH8HuyhVYH28="},{"type":"next-occurrence","id":"SjrKTfCczAR3fpVm7Y9jdLhps/w="}],"description":"Due to Track replacement both directions, 4 Line between Brooklyn Bridge - City Hall (New York) and New Lots Av (New York) 4 line runs between Woodlawn and Brooklyn Bridge-City Hall. 3 line run to/from New Lots Av. For Fulton St, Wall St and Bowling Green, use nearby J line, N line, or R line. For service between Manhattan and Brooklyn, take the N line or Q line. For service between Borough Hall and Franklin Av-Medgar Evers College, take the 2 line or 3 line. Take the 3 line between Franklin Av-Medgar Evers College and New Lots Av., Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended","update_date":"2026-05-06T21:30:30Z"},"road_event_id":"14v4d7mJpBfsBl9SnIbuWioBF5c=","beginning_cross_street":"Brooklyn Bridge - City Hall","ending_cross_street":"New Lots Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T03:00:00Z","end_date":"2026-05-22T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004131,40.713065]]}},{"id":"SjrKTfCczAR3fpVm7Y9jdLhps/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2mJLH4vXYkoWQYpfH8HuyhVYH28="},{"type":"next-occurrence","id":"hy/0rjy4Dfh8vhJzbDa67zB/3f0="}],"description":"Due to Track replacement both directions, 4 Line between Brooklyn Bridge - City Hall (New York) and New Lots Av (New York) 4 line runs between Woodlawn and Brooklyn Bridge-City Hall. 3 line run to/from New Lots Av. For Fulton St, Wall St and Bowling Green, use nearby J line, N line, or R line. For service between Manhattan and Brooklyn, take the N line or Q line. For service between Borough Hall and Franklin Av-Medgar Evers College, take the 2 line or 3 line. Take the 3 line between Franklin Av-Medgar Evers College and New Lots Av., Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended","update_date":"2026-05-06T21:30:30Z"},"road_event_id":"SjrKTfCczAR3fpVm7Y9jdLhps/w=","beginning_cross_street":"Brooklyn Bridge - City Hall","ending_cross_street":"New Lots Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T03:00:00Z","end_date":"2026-05-23T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004131,40.713065]]}},{"id":"hy/0rjy4Dfh8vhJzbDa67zB/3f0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2mJLH4vXYkoWQYpfH8HuyhVYH28="}],"description":"Due to Track replacement both directions, 4 Line between Brooklyn Bridge - City Hall (New York) and New Lots Av (New York) 4 line runs between Woodlawn and Brooklyn Bridge-City Hall. 3 line run to/from New Lots Av. For Fulton St, Wall St and Bowling Green, use nearby J line, N line, or R line. For service between Manhattan and Brooklyn, take the N line or Q line. For service between Borough Hall and Franklin Av-Medgar Evers College, take the 2 line or 3 line. Take the 3 line between Franklin Av-Medgar Evers College and New Lots Av., Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended","update_date":"2026-05-06T21:30:30Z"},"road_event_id":"hy/0rjy4Dfh8vhJzbDa67zB/3f0=","beginning_cross_street":"Brooklyn Bridge - City Hall","ending_cross_street":"New Lots Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T03:00:00Z","end_date":"2026-05-24T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004131,40.713065]]}},{"id":"YeSFCpUFmzBOxZDS0ARugTACx+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["5 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yzZ0Ei84Y042s+s81rmA10IImxI="}],"description":"Due to Signal repairs both directions, 5 Line between Eastchester - Dyre Av (New York) and E 180 St (New York) Free T113 shuttle buses make stops between Dyre Av and E 180 St. Transfer between 2 line and at E 180 St., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:45 PM thru 05:00 AM service suspended","update_date":"2026-05-06T21:32:10Z"},"road_event_id":"YeSFCpUFmzBOxZDS0ARugTACx+Y=","beginning_cross_street":"Eastchester - Dyre Av","ending_cross_street":"E 180 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:45:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830834,40.8883]]}},{"id":"yzZ0Ei84Y042s+s81rmA10IImxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["5 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YeSFCpUFmzBOxZDS0ARugTACx+Y="}],"description":"Due to Signal repairs both directions, 5 Line between Eastchester - Dyre Av (New York) and E 180 St (New York) Free T113 shuttle buses make stops between Dyre Av and E 180 St. Transfer between 2 line and at E 180 St., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:45 PM thru 05:00 AM service suspended","update_date":"2026-05-06T21:32:10Z"},"road_event_id":"yzZ0Ei84Y042s+s81rmA10IImxI=","beginning_cross_street":"Eastchester - Dyre Av","ending_cross_street":"E 180 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:45:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830834,40.8883]]}},{"id":"hm5Xci6MKDFMni23Xoa+mCjVG8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dusAFt/xUvAqvcFZkn9nKl1HJ+o="}],"description":"Due to Track repairs both directions, 2 Line between Beverly Rd (New York) and President St (New York) all trains at Church Av, Winthrop St and Sterling St board from the Flatbush Av-bound platform., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:30 AM thru 05:00 AM","update_date":"2026-05-06T21:35:35Z"},"road_event_id":"hm5Xci6MKDFMni23Xoa+mCjVG8Q=","beginning_cross_street":"Beverly Rd","ending_cross_street":"President St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:30:00Z","end_date":"2026-05-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.948959,40.645098]]}},{"id":"dusAFt/xUvAqvcFZkn9nKl1HJ+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hm5Xci6MKDFMni23Xoa+mCjVG8Q="},{"type":"next-occurrence","id":"j5AZF52V6Qqs/TbWUyUN2iYbt3U="}],"description":"Due to Track repairs both directions, 2 Line between Beverly Rd (New York) and President St (New York) all trains at Church Av, Winthrop St and Sterling St board from the Flatbush Av-bound platform., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:30 AM thru 05:00 AM","update_date":"2026-05-06T21:35:35Z"},"road_event_id":"dusAFt/xUvAqvcFZkn9nKl1HJ+o=","beginning_cross_street":"Beverly Rd","ending_cross_street":"President St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:30:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.948959,40.645098]]}},{"id":"j5AZF52V6Qqs/TbWUyUN2iYbt3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hm5Xci6MKDFMni23Xoa+mCjVG8Q="}],"description":"Due to Track repairs both directions, 2 Line between Beverly Rd (New York) and President St (New York) all trains at Church Av, Winthrop St and Sterling St board from the Flatbush Av-bound platform., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:30 AM thru 05:00 AM","update_date":"2026-05-06T21:35:35Z"},"road_event_id":"j5AZF52V6Qqs/TbWUyUN2iYbt3U=","beginning_cross_street":"Beverly Rd","ending_cross_street":"President St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T04:30:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.948959,40.645098]]}},{"id":"boDn/sDrSIgMd7FhsuVZ7q84b1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WLopyWpQU1j9412celbMW03bsJA="}],"description":"Due to Track replacement both directions, 4 Line between 125 St (New York) and Brooklyn Bridge - City Hall (New York) service begins early. Late night 4 line runs local between these stations., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-05-06T21:37:38Z"},"road_event_id":"boDn/sDrSIgMd7FhsuVZ7q84b1M=","beginning_cross_street":"125 St","ending_cross_street":"Brooklyn Bridge - City Hall","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:01:00Z","end_date":"2026-05-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937594,40.804138]]}},{"id":"WLopyWpQU1j9412celbMW03bsJA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boDn/sDrSIgMd7FhsuVZ7q84b1M="},{"type":"next-occurrence","id":"algw5A95tK1WjSOJ4DRPxZGWgjo="}],"description":"Due to Track replacement both directions, 4 Line between 125 St (New York) and Brooklyn Bridge - City Hall (New York) service begins early. Late night 4 line runs local between these stations., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-05-06T21:37:38Z"},"road_event_id":"WLopyWpQU1j9412celbMW03bsJA=","beginning_cross_street":"125 St","ending_cross_street":"Brooklyn Bridge - City Hall","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:01:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937594,40.804138]]}},{"id":"algw5A95tK1WjSOJ4DRPxZGWgjo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boDn/sDrSIgMd7FhsuVZ7q84b1M="},{"type":"next-occurrence","id":"qqk3QWmjGZz52TQyJ1RB+MMxtJo="}],"description":"Due to Track replacement both directions, 4 Line between 125 St (New York) and Brooklyn Bridge - City Hall (New York) service begins early. Late night 4 line runs local between these stations., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-05-06T21:37:38Z"},"road_event_id":"algw5A95tK1WjSOJ4DRPxZGWgjo=","beginning_cross_street":"125 St","ending_cross_street":"Brooklyn Bridge - City Hall","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T04:01:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937594,40.804138]]}},{"id":"qqk3QWmjGZz52TQyJ1RB+MMxtJo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boDn/sDrSIgMd7FhsuVZ7q84b1M="},{"type":"next-occurrence","id":"uY4T+QVj+/Vp4NZ1u+ywUNxDSO8="}],"description":"Due to Track replacement both directions, 4 Line between 125 St (New York) and Brooklyn Bridge - City Hall (New York) service begins early. Late night 4 line runs local between these stations., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-05-06T21:37:38Z"},"road_event_id":"qqk3QWmjGZz52TQyJ1RB+MMxtJo=","beginning_cross_street":"125 St","ending_cross_street":"Brooklyn Bridge - City Hall","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T04:02:00Z","end_date":"2026-05-19T09:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937594,40.804138]]}},{"id":"uY4T+QVj+/Vp4NZ1u+ywUNxDSO8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boDn/sDrSIgMd7FhsuVZ7q84b1M="},{"type":"next-occurrence","id":"WJ0qurqbzQ6FFqWletgF9tOauCc="}],"description":"Due to Track replacement both directions, 4 Line between 125 St (New York) and Brooklyn Bridge - City Hall (New York) service begins early. Late night 4 line runs local between these stations., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-05-06T21:37:38Z"},"road_event_id":"uY4T+QVj+/Vp4NZ1u+ywUNxDSO8=","beginning_cross_street":"125 St","ending_cross_street":"Brooklyn Bridge - City Hall","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T04:02:00Z","end_date":"2026-05-20T09:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937594,40.804138]]}},{"id":"WJ0qurqbzQ6FFqWletgF9tOauCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boDn/sDrSIgMd7FhsuVZ7q84b1M="},{"type":"next-occurrence","id":"JmwnCMMI9FM433Ti0D4cS005Vgc="}],"description":"Due to Track replacement both directions, 4 Line between 125 St (New York) and Brooklyn Bridge - City Hall (New York) service begins early. Late night 4 line runs local between these stations., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-05-06T21:37:38Z"},"road_event_id":"WJ0qurqbzQ6FFqWletgF9tOauCc=","beginning_cross_street":"125 St","ending_cross_street":"Brooklyn Bridge - City Hall","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T04:02:00Z","end_date":"2026-05-21T09:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937594,40.804138]]}},{"id":"JmwnCMMI9FM433Ti0D4cS005Vgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"boDn/sDrSIgMd7FhsuVZ7q84b1M="}],"description":"Due to Track replacement both directions, 4 Line between 125 St (New York) and Brooklyn Bridge - City Hall (New York) service begins early. Late night 4 line runs local between these stations., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-05-06T21:37:38Z"},"road_event_id":"JmwnCMMI9FM433Ti0D4cS005Vgc=","beginning_cross_street":"125 St","ending_cross_street":"Brooklyn Bridge - City Hall","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T04:02:00Z","end_date":"2026-05-22T09:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937594,40.804138]]}},{"id":"wTU29Gk3GGWabcyq9oeBFe8mpi8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2 Line"],"direction":"unknown","related_road_events":[],"description":"Due to Signal repairs both directions, 2 Line at E 180 St (New York) all trains board from the uptown platform., Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 11:45 PM thru 05:00 AM","update_date":"2026-05-06T21:39:08Z"},"road_event_id":"wTU29Gk3GGWabcyq9oeBFe8mpi8=","beginning_cross_street":"E 180 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:30:00Z","end_date":"2026-05-15T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.873488,40.841894]]}},{"id":"+pxHGokTf9FM4XqwFPcivwNd0NM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7X Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations westbound, 7X Line between Junction Blvd (New York) and Woodside - 61 St (New York) skips 74 St-Broadway. Manhattan-bound 7 line local continues to stop at this station. For service to 74 St-Broadway and/or transfer to Jackson Hts-Roosevelt Av E line, F line, M line, or R line, transfer at Junction Blvd to a Manhattan-bound 7 line local. For service to this station, take the 7x line to 61 St-Woodside and transfer to a Flushing-bound 7 line. , Continuous Thursday May 7th, 2026 12:00 AM thru Saturday May 30th, 2026 11:59 PM express only","update_date":"2026-05-06T21:53:01Z"},"road_event_id":"+pxHGokTf9FM4XqwFPcivwNd0NM=","beginning_cross_street":"Junction Blvd","ending_cross_street":"Woodside - 61 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869527,40.749145]]}},{"id":"2j+w2Yx0+2XxaYxONTX0KY8P+zU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations westbound, 7 Line between 74 St - Broadway (New York) and 46 St - Bliss St (New York) skips 69 St and 52 St. All trains at 61 St-Woodside board from the Flushing-bound platform. Use nearby 74 St-Broadway, 61 St-Woodside or 46 St-Bliss St stations. For service to 69 St, take the 7 line to 61 St-Woodside and transfer to a Flushing-bound 7 line. For service to 52 St, take the 7 line to 46 St-Bliss St and transfer to a Flushing-bound 7 line. For service from these stations, take the 7 line to 61 St-Woodside or 74 St-Broadway and transfer to a Manhattan-bound 7 line., Continuous Thursday May 7th, 2026 12:00 AM thru Saturday May 30th, 2026 11:59 PM","update_date":"2026-05-07T21:10:47Z"},"road_event_id":"2j+w2Yx0+2XxaYxONTX0KY8P+zU=","beginning_cross_street":"74 St - Broadway","ending_cross_street":"46 St - Bliss St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891394,40.746848]]}},{"id":"lnmBoXsGFln9V3aToG9C6Ml4ZzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations eastbound, 7 Line bypassing 103 St - Corona Plaza (New York) Use nearby Junction Blvd or 111 St stations. For service to this station, take the 7 line to 111 St and transfer to a Manhattan-bound train. For service from this station, take the 7 line to Junction Blvd and transfer to a Flushing-bound train., Continuous Thursday May 7th, 2026 12:00 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-05-06T21:57:08Z"},"road_event_id":"lnmBoXsGFln9V3aToG9C6Ml4ZzI=","beginning_cross_street":"103 St - Corona Plaza","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.8627,40.749865]]}},{"id":"A+p2oOMTi6bKo0vAhT9cgv3oDgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-690 eastbound before Exit 15 and Exit 15B - West Street Arterial; West Genesee Street (Syracuse), Thursday May 7th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:00 AM thru 09:00 PM 1 Right lane and shoulder of 4 lanes closed","update_date":"2026-05-06T23:45:44Z"},"road_event_id":"A+p2oOMTi6bKo0vAhT9cgv3oDgg=","beginning_cross_street":"Exit 15 and Exit 15B -  West Street Arterial; West Genesee Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-14T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.165738,43.055614]]}},{"id":"T1w+Tl4tjUi4cnCC19Gau9f28sw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair on I-490 eastbound Goodman Street South (Rochester) to Winton Road South (Rochester) 1) Right shoulder closure at SIN 40825; 2) Right lane closure, shift on ramp into closed lane for 40837. Extend closed ramp lane to 40842 close off ramp with PVMS; 3) Left Shoulder closure at 40865. See approved WZTC plans for more details., Wednesday May 13th, 2026, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-07T01:47:02Z"},"road_event_id":"T1w+Tl4tjUi4cnCC19Gau9f28sw=","beginning_cross_street":"Goodman Street  South","ending_cross_street":"Winton Road  South","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.595003,43.14186]]}},{"id":"TzKi9svXGUQyZhhlN6fGYjymx+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair on I-490 westbound between South Avenue (Rochester) and Rochester Inner Loop Highway (Rochester) 1) Alternating Right and Left lane closures with live climbing for center lane at SIN 40239; 2) Right shoulder closure at 40249; 3) Right shoulder closure at SIN 40251. See approved WZTC plans for more details., Thursday May 14th, 2026, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T01:50:24Z"},"road_event_id":"TzKi9svXGUQyZhhlN6fGYjymx+w=","beginning_cross_street":"South Avenue","ending_cross_street":"Rochester Inner Loop Highway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607229,43.151113]]}},{"id":"st+G4d2z3UBrCucy6SoYud3AlyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2GncrfOLW152FAvyVlCapTCfbZU="}],"description":"Gas main repairs on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, ","update_date":"2026-05-07T03:48:59Z"},"road_event_id":"st+G4d2z3UBrCucy6SoYud3AlyI=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"2GncrfOLW152FAvyVlCapTCfbZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"st+G4d2z3UBrCucy6SoYud3AlyI="},{"type":"next-occurrence","id":"4vhg6SXkseQKqxycMenmTWmW2bs="}],"description":"Gas main repairs on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, ","update_date":"2026-05-07T03:48:59Z"},"road_event_id":"2GncrfOLW152FAvyVlCapTCfbZU=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"4vhg6SXkseQKqxycMenmTWmW2bs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"st+G4d2z3UBrCucy6SoYud3AlyI="},{"type":"next-occurrence","id":"VyGActk8hdc/c9j4UgT40KxGS9A="}],"description":"Gas main repairs on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, ","update_date":"2026-05-07T03:48:59Z"},"road_event_id":"4vhg6SXkseQKqxycMenmTWmW2bs=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"VyGActk8hdc/c9j4UgT40KxGS9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"st+G4d2z3UBrCucy6SoYud3AlyI="},{"type":"next-occurrence","id":"H4gfL5umBOPMINkX4O71JPTkbIs="}],"description":"Gas main repairs on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, ","update_date":"2026-05-07T03:48:59Z"},"road_event_id":"VyGActk8hdc/c9j4UgT40KxGS9A=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"H4gfL5umBOPMINkX4O71JPTkbIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"st+G4d2z3UBrCucy6SoYud3AlyI="},{"type":"next-occurrence","id":"La27ngx+4SyIRGgZ8aKePwBGeDg="}],"description":"Gas main repairs on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, ","update_date":"2026-05-07T03:48:59Z"},"road_event_id":"H4gfL5umBOPMINkX4O71JPTkbIs=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"La27ngx+4SyIRGgZ8aKePwBGeDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"st+G4d2z3UBrCucy6SoYud3AlyI="}],"description":"Gas main repairs on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, ","update_date":"2026-05-07T03:48:59Z"},"road_event_id":"La27ngx+4SyIRGgZ8aKePwBGeDg=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"oh0uCbni+Obb/l4nNBLnZqwMS0Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YqTVY+AIRx4S3geCxFVkvBlsBWM="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 23rd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 A","update_date":"2026-05-09T18:01:16Z"},"road_event_id":"oh0uCbni+Obb/l4nNBLnZqwMS0Q=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"YqTVY+AIRx4S3geCxFVkvBlsBWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oh0uCbni+Obb/l4nNBLnZqwMS0Q="},{"type":"next-occurrence","id":"RD3nB4DHQ2TmHr+K0r/OM2RekWA="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 23rd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 A","update_date":"2026-05-09T18:01:16Z"},"road_event_id":"YqTVY+AIRx4S3geCxFVkvBlsBWM=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"RD3nB4DHQ2TmHr+K0r/OM2RekWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oh0uCbni+Obb/l4nNBLnZqwMS0Q="},{"type":"next-occurrence","id":"N8F6BegDcx1rW/stJc+BhkKLZKc="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 23rd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 A","update_date":"2026-05-09T18:01:16Z"},"road_event_id":"RD3nB4DHQ2TmHr+K0r/OM2RekWA=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"N8F6BegDcx1rW/stJc+BhkKLZKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oh0uCbni+Obb/l4nNBLnZqwMS0Q="},{"type":"next-occurrence","id":"j904pCpacOnyY13/o3WWKxBQfJ4="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 23rd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 A","update_date":"2026-05-09T18:01:16Z"},"road_event_id":"N8F6BegDcx1rW/stJc+BhkKLZKc=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"j904pCpacOnyY13/o3WWKxBQfJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oh0uCbni+Obb/l4nNBLnZqwMS0Q="},{"type":"next-occurrence","id":"cHHuk7e/eFG9XNbJChqgvKYJhaI="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 23rd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 A","update_date":"2026-05-09T18:01:16Z"},"road_event_id":"j904pCpacOnyY13/o3WWKxBQfJ4=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"cHHuk7e/eFG9XNbJChqgvKYJhaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oh0uCbni+Obb/l4nNBLnZqwMS0Q="},{"type":"next-occurrence","id":"oVLOPGjVuTmWWE8bCQYoMPMhMAc="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 23rd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 A","update_date":"2026-05-09T18:01:16Z"},"road_event_id":"cHHuk7e/eFG9XNbJChqgvKYJhaI=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"oVLOPGjVuTmWWE8bCQYoMPMhMAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oh0uCbni+Obb/l4nNBLnZqwMS0Q="},{"type":"next-occurrence","id":"1XABMCiwbNjF1DrGlwtgpOPdbH8="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 23rd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 A","update_date":"2026-05-09T18:01:16Z"},"road_event_id":"oVLOPGjVuTmWWE8bCQYoMPMhMAc=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"1XABMCiwbNjF1DrGlwtgpOPdbH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oh0uCbni+Obb/l4nNBLnZqwMS0Q="},{"type":"next-occurrence","id":"ArnuaIQbt1ZM0roYYKmtPUM4EcI="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 23rd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 A","update_date":"2026-05-09T18:01:16Z"},"road_event_id":"1XABMCiwbNjF1DrGlwtgpOPdbH8=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"ArnuaIQbt1ZM0roYYKmtPUM4EcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oh0uCbni+Obb/l4nNBLnZqwMS0Q="},{"type":"next-occurrence","id":"Dsr992QY/+Lzvk+lx7t+RQKRmuc="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 23rd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 A","update_date":"2026-05-09T18:01:16Z"},"road_event_id":"ArnuaIQbt1ZM0roYYKmtPUM4EcI=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"Dsr992QY/+Lzvk+lx7t+RQKRmuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oh0uCbni+Obb/l4nNBLnZqwMS0Q="},{"type":"next-occurrence","id":"buNgeFpYCdJoCAAQzwLNnyrQe5E="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 23rd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 A","update_date":"2026-05-09T18:01:16Z"},"road_event_id":"Dsr992QY/+Lzvk+lx7t+RQKRmuc=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T20:00:00Z","end_date":"2026-05-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"buNgeFpYCdJoCAAQzwLNnyrQe5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oh0uCbni+Obb/l4nNBLnZqwMS0Q="},{"type":"next-occurrence","id":"YvEK1FSSrgM+wFJT2JXauCsDCoE="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 23rd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 A","update_date":"2026-05-09T18:01:16Z"},"road_event_id":"buNgeFpYCdJoCAAQzwLNnyrQe5E=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"YvEK1FSSrgM+wFJT2JXauCsDCoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oh0uCbni+Obb/l4nNBLnZqwMS0Q="},{"type":"next-occurrence","id":"tzhMis2gg8e3Qf1XxfY6Ffr++wU="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 23rd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 A","update_date":"2026-05-09T18:01:16Z"},"road_event_id":"YvEK1FSSrgM+wFJT2JXauCsDCoE=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"tzhMis2gg8e3Qf1XxfY6Ffr++wU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oh0uCbni+Obb/l4nNBLnZqwMS0Q="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 23rd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 A","update_date":"2026-05-09T18:01:16Z"},"road_event_id":"tzhMis2gg8e3Qf1XxfY6Ffr++wU=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"MAsGNSBlxkpxUgwwoli9WDyxwGk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Cross County Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3hhJeq6XExjVGKuZQIPhM5A9wkY="}],"description":"Bridge inspection on Cross County Parkway eastbound between Exit 4S - I-87 SB (Yonkers) and Exit 9 - Hutchinson River Parkway (Mount Vernon) D042080/B5016533-5501210-5521649/32720809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 14th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-05-07T05:17:48Z"},"road_event_id":"MAsGNSBlxkpxUgwwoli9WDyxwGk=","beginning_cross_street":"Exit 4S - I-87 SB","ending_cross_street":"Exit 9 - Hutchinson River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822849,40.923061]]}},{"id":"3hhJeq6XExjVGKuZQIPhM5A9wkY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Cross County Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MAsGNSBlxkpxUgwwoli9WDyxwGk="}],"description":"Bridge inspection on Cross County Parkway eastbound between Exit 4S - I-87 SB (Yonkers) and Exit 9 - Hutchinson River Parkway (Mount Vernon) D042080/B5016533-5501210-5521649/32720809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 14th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-05-07T05:17:48Z"},"road_event_id":"3hhJeq6XExjVGKuZQIPhM5A9wkY=","beginning_cross_street":"Exit 4S - I-87 SB","ending_cross_street":"Exit 9 - Hutchinson River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822849,40.923061]]}},{"id":"sd9yl49R6duoAOmaJrLpl9DSy3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Cross County Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IJMluZhjUaIUPMeGX4CpaqIyje8="}],"description":"Bridge inspection on Cross County Parkway westbound between Exit 9 - Hutchinson River Parkway (Mount Vernon) and Exit 4N - I-87 NB; CR 47II; Ramp (Yonkers) D042080/B5016533-5501210-5521649/32740509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 14th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-05-07T05:19:28Z"},"road_event_id":"sd9yl49R6duoAOmaJrLpl9DSy3I=","beginning_cross_street":"Exit 9 - Hutchinson River Parkway","ending_cross_street":"Exit 4N - I-87 NB","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.82262,40.923266]]}},{"id":"IJMluZhjUaIUPMeGX4CpaqIyje8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Cross County Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sd9yl49R6duoAOmaJrLpl9DSy3I="}],"description":"Bridge inspection on Cross County Parkway westbound between Exit 9 - Hutchinson River Parkway (Mount Vernon) and Exit 4N - I-87 NB; CR 47II; Ramp (Yonkers) D042080/B5016533-5501210-5521649/32740509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 14th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-05-07T05:19:28Z"},"road_event_id":"IJMluZhjUaIUPMeGX4CpaqIyje8=","beginning_cross_street":"Exit 9 - Hutchinson River Parkway","ending_cross_street":"Exit 4N - I-87 NB","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.82262,40.923266]]}},{"id":"I2kW7RBQ5Eg9oqRw1UZR7KG9wR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"POrplqTJJvSfkclsMKqNpKEIDOw="}],"description":"Road maintenance operations on Taconic State Parkway southbound between Exit 47B - NY 55 Westbound (La Grange) and Exit 35 - Miller Hill Rd. (East Fishkill) Res 8-3 RW/32740709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-05-08T18:30:12Z"},"road_event_id":"I2kW7RBQ5Eg9oqRw1UZR7KG9wR4=","beginning_cross_street":"Exit 47B - NY 55 Westbound","ending_cross_street":"Exit 35 - Miller Hill Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789746,41.666448]]}},{"id":"POrplqTJJvSfkclsMKqNpKEIDOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I2kW7RBQ5Eg9oqRw1UZR7KG9wR4="},{"type":"next-occurrence","id":"kg5nQMsEMuSnZIVdRLJOUPUF4WI="}],"description":"Road maintenance operations on Taconic State Parkway southbound between Exit 47B - NY 55 Westbound (La Grange) and Exit 35 - Miller Hill Rd. (East Fishkill) Res 8-3 RW/32740709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-05-08T18:30:12Z"},"road_event_id":"POrplqTJJvSfkclsMKqNpKEIDOw=","beginning_cross_street":"Exit 47B - NY 55 Westbound","ending_cross_street":"Exit 35 - Miller Hill Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789746,41.666448]]}},{"id":"kg5nQMsEMuSnZIVdRLJOUPUF4WI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I2kW7RBQ5Eg9oqRw1UZR7KG9wR4="}],"description":"Road maintenance operations on Taconic State Parkway southbound between Exit 47B - NY 55 Westbound (La Grange) and Exit 35 - Miller Hill Rd. (East Fishkill) Res 8-3 RW/32740709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-05-08T18:30:12Z"},"road_event_id":"kg5nQMsEMuSnZIVdRLJOUPUF4WI=","beginning_cross_street":"Exit 47B - NY 55 Westbound","ending_cross_street":"Exit 35 - Miller Hill Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789746,41.666448]]}},{"id":"QodEjNvF/kYKxbnNsOe6RDm7Y+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YW+Gs0YMYDUA92TOcJ9P5KC7UAw="}],"description":"Road maintenance operations on I-84 westbound between Exit 68A/B - I-684 (Southeast) and Exit 41 - NY 9D (Fishkill) Res 8-3 RW/32740809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-05-08T18:30:13Z"},"road_event_id":"QodEjNvF/kYKxbnNsOe6RDm7Y+I=","beginning_cross_street":"Exit 68A/B - I-684","ending_cross_street":"Exit 41 - NY 9D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.596559,41.389931]]}},{"id":"YW+Gs0YMYDUA92TOcJ9P5KC7UAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QodEjNvF/kYKxbnNsOe6RDm7Y+I="},{"type":"next-occurrence","id":"vcbPom9ogvIzB/d7epmRIaWz4rQ="}],"description":"Road maintenance operations on I-84 westbound between Exit 68A/B - I-684 (Southeast) and Exit 41 - NY 9D (Fishkill) Res 8-3 RW/32740809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-05-08T18:30:13Z"},"road_event_id":"YW+Gs0YMYDUA92TOcJ9P5KC7UAw=","beginning_cross_street":"Exit 68A/B - I-684","ending_cross_street":"Exit 41 - NY 9D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.596559,41.389931]]}},{"id":"vcbPom9ogvIzB/d7epmRIaWz4rQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QodEjNvF/kYKxbnNsOe6RDm7Y+I="}],"description":"Road maintenance operations on I-84 westbound between Exit 68A/B - I-684 (Southeast) and Exit 41 - NY 9D (Fishkill) Res 8-3 RW/32740809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-05-08T18:30:13Z"},"road_event_id":"vcbPom9ogvIzB/d7epmRIaWz4rQ=","beginning_cross_street":"Exit 68A/B - I-684","ending_cross_street":"Exit 41 - NY 9D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.596559,41.389931]]}},{"id":"sWyyAeDpJpR6MNnriYeVd3+dnYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MWj1zpfZsGtuPc9wVhnf8NjMc/g="}],"description":"Utility work on NY 119 westbound between Valley Avenue (Elmsford) and Undercliff Avenue (Elmsford) 2026084681338/32740909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-05-09T18:01:17Z"},"road_event_id":"sWyyAeDpJpR6MNnriYeVd3+dnYI=","beginning_cross_street":"Valley Avenue","ending_cross_street":"Undercliff Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821692,41.055791]]}},{"id":"MWj1zpfZsGtuPc9wVhnf8NjMc/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sWyyAeDpJpR6MNnriYeVd3+dnYI="},{"type":"next-occurrence","id":"jMOXH3p+YIih3GN1OdMmR5y7wtM="}],"description":"Utility work on NY 119 westbound between Valley Avenue (Elmsford) and Undercliff Avenue (Elmsford) 2026084681338/32740909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-05-09T18:01:17Z"},"road_event_id":"MWj1zpfZsGtuPc9wVhnf8NjMc/g=","beginning_cross_street":"Valley Avenue","ending_cross_street":"Undercliff Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821692,41.055791]]}},{"id":"jMOXH3p+YIih3GN1OdMmR5y7wtM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sWyyAeDpJpR6MNnriYeVd3+dnYI="},{"type":"next-occurrence","id":"wfFhDZbksK1C0yU2tiC38PqLBZI="}],"description":"Utility work on NY 119 westbound between Valley Avenue (Elmsford) and Undercliff Avenue (Elmsford) 2026084681338/32740909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-05-09T18:01:17Z"},"road_event_id":"jMOXH3p+YIih3GN1OdMmR5y7wtM=","beginning_cross_street":"Valley Avenue","ending_cross_street":"Undercliff Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821692,41.055791]]}},{"id":"wfFhDZbksK1C0yU2tiC38PqLBZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sWyyAeDpJpR6MNnriYeVd3+dnYI="},{"type":"next-occurrence","id":"zMVoWUlxUfMPxZdEDFVnEygG3UU="}],"description":"Utility work on NY 119 westbound between Valley Avenue (Elmsford) and Undercliff Avenue (Elmsford) 2026084681338/32740909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-05-09T18:01:17Z"},"road_event_id":"wfFhDZbksK1C0yU2tiC38PqLBZI=","beginning_cross_street":"Valley Avenue","ending_cross_street":"Undercliff Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821692,41.055791]]}},{"id":"zMVoWUlxUfMPxZdEDFVnEygG3UU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sWyyAeDpJpR6MNnriYeVd3+dnYI="},{"type":"next-occurrence","id":"R3EmH5ZNyTG2WRvxX+xgOqmMraY="}],"description":"Utility work on NY 119 westbound between Valley Avenue (Elmsford) and Undercliff Avenue (Elmsford) 2026084681338/32740909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-05-09T18:01:17Z"},"road_event_id":"zMVoWUlxUfMPxZdEDFVnEygG3UU=","beginning_cross_street":"Valley Avenue","ending_cross_street":"Undercliff Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821692,41.055791]]}},{"id":"R3EmH5ZNyTG2WRvxX+xgOqmMraY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sWyyAeDpJpR6MNnriYeVd3+dnYI="},{"type":"next-occurrence","id":"jncHt595HZtG+ncdOYUoNwj8WU8="}],"description":"Utility work on NY 119 westbound between Valley Avenue (Elmsford) and Undercliff Avenue (Elmsford) 2026084681338/32740909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-05-09T18:01:17Z"},"road_event_id":"R3EmH5ZNyTG2WRvxX+xgOqmMraY=","beginning_cross_street":"Valley Avenue","ending_cross_street":"Undercliff Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821692,41.055791]]}},{"id":"jncHt595HZtG+ncdOYUoNwj8WU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sWyyAeDpJpR6MNnriYeVd3+dnYI="},{"type":"next-occurrence","id":"V58fsCyIBNwI3u/X86+hnaRlElk="}],"description":"Utility work on NY 119 westbound between Valley Avenue (Elmsford) and Undercliff Avenue (Elmsford) 2026084681338/32740909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-05-09T18:01:17Z"},"road_event_id":"jncHt595HZtG+ncdOYUoNwj8WU8=","beginning_cross_street":"Valley Avenue","ending_cross_street":"Undercliff Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821692,41.055791]]}},{"id":"V58fsCyIBNwI3u/X86+hnaRlElk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sWyyAeDpJpR6MNnriYeVd3+dnYI="}],"description":"Utility work on NY 119 westbound between Valley Avenue (Elmsford) and Undercliff Avenue (Elmsford) 2026084681338/32740909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-05-09T18:01:17Z"},"road_event_id":"V58fsCyIBNwI3u/X86+hnaRlElk=","beginning_cross_street":"Valley Avenue","ending_cross_street":"Undercliff Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821692,41.055791]]}},{"id":"sEusREMmKgzSg6rmKGOZGXd9miY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Q7QleAylJqduKg/RoHwkUwmsFCs="}],"description":"Survey work on NY 100A both directions between Stuart Way (Greenburgh) and NY 100 (Greenburgh) D265312/32477509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, shoulder closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, shoulder closure","update_date":"2026-05-07T06:56:34Z"},"road_event_id":"sEusREMmKgzSg6rmKGOZGXd9miY=","beginning_cross_street":"Stuart Way","ending_cross_street":"NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807766,41.039251]]}},{"id":"Q7QleAylJqduKg/RoHwkUwmsFCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEusREMmKgzSg6rmKGOZGXd9miY="},{"type":"next-occurrence","id":"MmzrRHPmcaeU5Jo5xTnFs9Ww3sM="}],"description":"Survey work on NY 100A both directions between Stuart Way (Greenburgh) and NY 100 (Greenburgh) D265312/32477509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, shoulder closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, shoulder closure","update_date":"2026-05-07T06:56:34Z"},"road_event_id":"Q7QleAylJqduKg/RoHwkUwmsFCs=","beginning_cross_street":"Stuart Way","ending_cross_street":"NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807766,41.039251]]}},{"id":"MmzrRHPmcaeU5Jo5xTnFs9Ww3sM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEusREMmKgzSg6rmKGOZGXd9miY="},{"type":"next-occurrence","id":"Gjso4ufFHq/6S6LHuzIX3lJiS0A="}],"description":"Survey work on NY 100A both directions between Stuart Way (Greenburgh) and NY 100 (Greenburgh) D265312/32477509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, shoulder closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, shoulder closure","update_date":"2026-05-07T06:56:34Z"},"road_event_id":"MmzrRHPmcaeU5Jo5xTnFs9Ww3sM=","beginning_cross_street":"Stuart Way","ending_cross_street":"NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807766,41.039251]]}},{"id":"Gjso4ufFHq/6S6LHuzIX3lJiS0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEusREMmKgzSg6rmKGOZGXd9miY="},{"type":"next-occurrence","id":"Ql98DvHLFWUeXZD2/M+D1KslCfM="}],"description":"Survey work on NY 100A both directions between Stuart Way (Greenburgh) and NY 100 (Greenburgh) D265312/32477509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, shoulder closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, shoulder closure","update_date":"2026-05-07T06:56:34Z"},"road_event_id":"Gjso4ufFHq/6S6LHuzIX3lJiS0A=","beginning_cross_street":"Stuart Way","ending_cross_street":"NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807766,41.039251]]}},{"id":"Ql98DvHLFWUeXZD2/M+D1KslCfM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEusREMmKgzSg6rmKGOZGXd9miY="},{"type":"next-occurrence","id":"5iZIntt028ActNuplTW5umGEhx0="}],"description":"Survey work on NY 100A both directions between Stuart Way (Greenburgh) and NY 100 (Greenburgh) D265312/32477509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, shoulder closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, shoulder closure","update_date":"2026-05-07T06:56:34Z"},"road_event_id":"Ql98DvHLFWUeXZD2/M+D1KslCfM=","beginning_cross_street":"Stuart Way","ending_cross_street":"NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807766,41.039251]]}},{"id":"5iZIntt028ActNuplTW5umGEhx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEusREMmKgzSg6rmKGOZGXd9miY="},{"type":"next-occurrence","id":"NCoU0RFDhZ/teEjDEIZbwt9/F+E="}],"description":"Survey work on NY 100A both directions between Stuart Way (Greenburgh) and NY 100 (Greenburgh) D265312/32477509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, shoulder closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, shoulder closure","update_date":"2026-05-07T06:56:34Z"},"road_event_id":"5iZIntt028ActNuplTW5umGEhx0=","beginning_cross_street":"Stuart Way","ending_cross_street":"NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807766,41.039251]]}},{"id":"NCoU0RFDhZ/teEjDEIZbwt9/F+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEusREMmKgzSg6rmKGOZGXd9miY="}],"description":"Survey work on NY 100A both directions between Stuart Way (Greenburgh) and NY 100 (Greenburgh) D265312/32477509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, shoulder closure, Sunday May 17th, 2026 thru Friday May 22nd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, shoulder closure","update_date":"2026-05-07T06:56:34Z"},"road_event_id":"NCoU0RFDhZ/teEjDEIZbwt9/F+E=","beginning_cross_street":"Stuart Way","ending_cross_street":"NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807766,41.039251]]}},{"id":"IjJuWNG2X6AQ9XJdcUSMgNTpUZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 312"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on NY 312 both directions between Prospect Hill Road (Southeast) and Independent Way (Southeast) 20230898135/32560909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Wednesday May 13th, 2026 Monday/ Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-07T07:08:37Z"},"road_event_id":"IjJuWNG2X6AQ9XJdcUSMgNTpUZE=","beginning_cross_street":"Prospect Hill Road","ending_cross_street":"Independent Way","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.634326,41.420949]]}},{"id":"/9jMPHeafM0SI2FHch1oWjo8+Qc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 213"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iRTVQJiYEReY54G31Iur1G/T5+k="}],"description":"Utility work on NY 213 westbound between Rifton Terrace (Esopus) and Church Hill Road (Esopus) 2024082136825/32741009 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, shoulder closure","update_date":"2026-05-07T07:59:31Z"},"road_event_id":"/9jMPHeafM0SI2FHch1oWjo8+Qc=","beginning_cross_street":"Rifton Terrace","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.043278,41.836847]]}},{"id":"iRTVQJiYEReY54G31Iur1G/T5+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/9jMPHeafM0SI2FHch1oWjo8+Qc="},{"type":"next-occurrence","id":"bCBmO2Uxwp0l0C7o+cMPGDTZNz0="}],"description":"Utility work on NY 213 westbound between Rifton Terrace (Esopus) and Church Hill Road (Esopus) 2024082136825/32741009 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, shoulder closure","update_date":"2026-05-07T07:59:31Z"},"road_event_id":"iRTVQJiYEReY54G31Iur1G/T5+k=","beginning_cross_street":"Rifton Terrace","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.043278,41.836847]]}},{"id":"bCBmO2Uxwp0l0C7o+cMPGDTZNz0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/9jMPHeafM0SI2FHch1oWjo8+Qc="},{"type":"next-occurrence","id":"qGeZO4O5oxu9Wuzx8CwipniwNSs="}],"description":"Utility work on NY 213 westbound between Rifton Terrace (Esopus) and Church Hill Road (Esopus) 2024082136825/32741009 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, shoulder closure","update_date":"2026-05-07T07:59:31Z"},"road_event_id":"bCBmO2Uxwp0l0C7o+cMPGDTZNz0=","beginning_cross_street":"Rifton Terrace","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.043278,41.836847]]}},{"id":"qGeZO4O5oxu9Wuzx8CwipniwNSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/9jMPHeafM0SI2FHch1oWjo8+Qc="}],"description":"Utility work on NY 213 westbound between Rifton Terrace (Esopus) and Church Hill Road (Esopus) 2024082136825/32741009 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, shoulder closure","update_date":"2026-05-07T07:59:31Z"},"road_event_id":"qGeZO4O5oxu9Wuzx8CwipniwNSs=","beginning_cross_street":"Rifton Terrace","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.043278,41.836847]]}},{"id":"CVfDB43B1FMFFOr67U+3USY5/Yg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uvtAZQcd2obJkG4ZgsoEc73a/hw="}],"description":"Gas main work on NY 52 both directions between Jackson Street (Fishkill) and Robinson Street (Fishkill) 2026084636715/NIGHT/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday April 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-12T12:00:42Z"},"road_event_id":"CVfDB43B1FMFFOr67U+3USY5/Yg=","beginning_cross_street":"","ending_cross_street":"Robinson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904742,41.534007]]}},{"id":"uvtAZQcd2obJkG4ZgsoEc73a/hw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CVfDB43B1FMFFOr67U+3USY5/Yg="},{"type":"next-occurrence","id":"WKfKFkOzE6e5JHAHsK9fpC5k0jQ="}],"description":"Gas main work on NY 52 both directions between Jackson Street (Fishkill) and Robinson Street (Fishkill) 2026084636715/NIGHT/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday April 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-12T12:00:42Z"},"road_event_id":"uvtAZQcd2obJkG4ZgsoEc73a/hw=","beginning_cross_street":"","ending_cross_street":"Robinson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904742,41.534007]]}},{"id":"WKfKFkOzE6e5JHAHsK9fpC5k0jQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CVfDB43B1FMFFOr67U+3USY5/Yg="},{"type":"next-occurrence","id":"VASiXOxamQyQhGS4ojynGklHcMA="}],"description":"Gas main work on NY 52 both directions between Jackson Street (Fishkill) and Robinson Street (Fishkill) 2026084636715/NIGHT/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday April 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-12T12:00:42Z"},"road_event_id":"WKfKFkOzE6e5JHAHsK9fpC5k0jQ=","beginning_cross_street":"","ending_cross_street":"Robinson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904742,41.534007]]}},{"id":"VASiXOxamQyQhGS4ojynGklHcMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CVfDB43B1FMFFOr67U+3USY5/Yg="},{"type":"next-occurrence","id":"OOedqrjCT4dWMxESwACkom/or58="}],"description":"Gas main work on NY 52 both directions between Jackson Street (Fishkill) and Robinson Street (Fishkill) 2026084636715/NIGHT/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday April 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-12T12:00:42Z"},"road_event_id":"VASiXOxamQyQhGS4ojynGklHcMA=","beginning_cross_street":"","ending_cross_street":"Robinson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T20:00:00Z","end_date":"2026-05-20T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904742,41.534007]]}},{"id":"OOedqrjCT4dWMxESwACkom/or58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CVfDB43B1FMFFOr67U+3USY5/Yg="},{"type":"next-occurrence","id":"MZHt/vHQl9c+n+D5m0tR0EdKdoE="}],"description":"Gas main work on NY 52 both directions between Jackson Street (Fishkill) and Robinson Street (Fishkill) 2026084636715/NIGHT/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday April 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-12T12:00:42Z"},"road_event_id":"OOedqrjCT4dWMxESwACkom/or58=","beginning_cross_street":"","ending_cross_street":"Robinson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T20:00:00Z","end_date":"2026-05-21T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904742,41.534007]]}},{"id":"MZHt/vHQl9c+n+D5m0tR0EdKdoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CVfDB43B1FMFFOr67U+3USY5/Yg="},{"type":"next-occurrence","id":"2d4cyjpDf4CsoigxS+Tr2cr7wwI="}],"description":"Gas main work on NY 52 both directions between Jackson Street (Fishkill) and Robinson Street (Fishkill) 2026084636715/NIGHT/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday April 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-12T12:00:42Z"},"road_event_id":"MZHt/vHQl9c+n+D5m0tR0EdKdoE=","beginning_cross_street":"","ending_cross_street":"Robinson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T20:00:00Z","end_date":"2026-05-22T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904742,41.534007]]}},{"id":"2d4cyjpDf4CsoigxS+Tr2cr7wwI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CVfDB43B1FMFFOr67U+3USY5/Yg="},{"type":"next-occurrence","id":"N7MwsDCT4YlCARUTLOTyO0D8JMA="}],"description":"Gas main work on NY 52 both directions between Jackson Street (Fishkill) and Robinson Street (Fishkill) 2026084636715/NIGHT/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday April 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-12T12:00:42Z"},"road_event_id":"2d4cyjpDf4CsoigxS+Tr2cr7wwI=","beginning_cross_street":"","ending_cross_street":"Robinson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T20:00:00Z","end_date":"2026-05-23T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904742,41.534007]]}},{"id":"N7MwsDCT4YlCARUTLOTyO0D8JMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CVfDB43B1FMFFOr67U+3USY5/Yg="}],"description":"Gas main work on NY 52 both directions between Jackson Street (Fishkill) and Robinson Street (Fishkill) 2026084636715/NIGHT/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday April 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic, Monday May 18th, 2026 thru Saturday May 23rd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-12T12:00:42Z"},"road_event_id":"N7MwsDCT4YlCARUTLOTyO0D8JMA=","beginning_cross_street":"","ending_cross_street":"Robinson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T20:00:00Z","end_date":"2026-05-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904742,41.534007]]}},{"id":"Syta7fUBQ/K1v0KrB7RQBr5o2Nw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xJKj+IEysTqZ3wsKX3eKzQNHSps="}],"description":"Construction on US 9W southbound between Elm Street (Nyack) and Birchwood Avenue (Nyack) 2025083412119/32741109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-05-07T08:18:05Z"},"road_event_id":"Syta7fUBQ/K1v0KrB7RQBr5o2Nw=","beginning_cross_street":"","ending_cross_street":"Birchwood Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927189,41.106339]]}},{"id":"xJKj+IEysTqZ3wsKX3eKzQNHSps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Syta7fUBQ/K1v0KrB7RQBr5o2Nw="},{"type":"next-occurrence","id":"Tr3whbWZFbDvSseJXu9m+dj/BoA="}],"description":"Construction on US 9W southbound between Elm Street (Nyack) and Birchwood Avenue (Nyack) 2025083412119/32741109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-05-07T08:18:05Z"},"road_event_id":"xJKj+IEysTqZ3wsKX3eKzQNHSps=","beginning_cross_street":"","ending_cross_street":"Birchwood Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927189,41.106339]]}},{"id":"Tr3whbWZFbDvSseJXu9m+dj/BoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Syta7fUBQ/K1v0KrB7RQBr5o2Nw="},{"type":"next-occurrence","id":"PvAB4tA5Ptu8I5NDX+4MzyYW7EQ="}],"description":"Construction on US 9W southbound between Elm Street (Nyack) and Birchwood Avenue (Nyack) 2025083412119/32741109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-05-07T08:18:05Z"},"road_event_id":"Tr3whbWZFbDvSseJXu9m+dj/BoA=","beginning_cross_street":"","ending_cross_street":"Birchwood Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927189,41.106339]]}},{"id":"PvAB4tA5Ptu8I5NDX+4MzyYW7EQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Syta7fUBQ/K1v0KrB7RQBr5o2Nw="},{"type":"next-occurrence","id":"ehXq9fjYipeJpYVlTbzWGX3ybTU="}],"description":"Construction on US 9W southbound between Elm Street (Nyack) and Birchwood Avenue (Nyack) 2025083412119/32741109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-05-07T08:18:05Z"},"road_event_id":"PvAB4tA5Ptu8I5NDX+4MzyYW7EQ=","beginning_cross_street":"","ending_cross_street":"Birchwood Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927189,41.106339]]}},{"id":"ehXq9fjYipeJpYVlTbzWGX3ybTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Syta7fUBQ/K1v0KrB7RQBr5o2Nw="},{"type":"next-occurrence","id":"chiNHhBaC8JFomARJCOLiXmNcOs="}],"description":"Construction on US 9W southbound between Elm Street (Nyack) and Birchwood Avenue (Nyack) 2025083412119/32741109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-05-07T08:18:05Z"},"road_event_id":"ehXq9fjYipeJpYVlTbzWGX3ybTU=","beginning_cross_street":"","ending_cross_street":"Birchwood Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927189,41.106339]]}},{"id":"chiNHhBaC8JFomARJCOLiXmNcOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Syta7fUBQ/K1v0KrB7RQBr5o2Nw="},{"type":"next-occurrence","id":"4bFnIFsA0tbTH/GjAWn0LVs/Vl0="}],"description":"Construction on US 9W southbound between Elm Street (Nyack) and Birchwood Avenue (Nyack) 2025083412119/32741109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-05-07T08:18:05Z"},"road_event_id":"chiNHhBaC8JFomARJCOLiXmNcOs=","beginning_cross_street":"","ending_cross_street":"Birchwood Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927189,41.106339]]}},{"id":"4bFnIFsA0tbTH/GjAWn0LVs/Vl0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Syta7fUBQ/K1v0KrB7RQBr5o2Nw="}],"description":"Construction on US 9W southbound between Elm Street (Nyack) and Birchwood Avenue (Nyack) 2025083412119/32741109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-05-07T08:18:05Z"},"road_event_id":"4bFnIFsA0tbTH/GjAWn0LVs/Vl0=","beginning_cross_street":"","ending_cross_street":"Birchwood Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927189,41.106339]]}},{"id":"l3E+oJojSUsuwTZf6F6awkhT6xE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 117 both directions between Haines Road (Bedford) and School Street (Bedford) 2025082502725/32551009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 12th, 2026 thru Wednesday May 13th, 2026 Tuesday/ Wednesday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-07T08:26:06Z"},"road_event_id":"l3E+oJojSUsuwTZf6F6awkhT6xE=","beginning_cross_street":"Haines Road","ending_cross_street":"School Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.700716,41.238532]]}},{"id":"wXpuyGu01i8roT7NWW1t//xQKvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on Saw Mill River Parkway northbound between Exit 25 - NY 9A (Mount Pleasant) and Exit 26 - Taconic State Parkway (Mount Pleasant) D042080/B5006131/32718709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-05-07T09:27:22Z"},"road_event_id":"wXpuyGu01i8roT7NWW1t//xQKvo=","beginning_cross_street":"Exit 25 - NY 9A","ending_cross_street":"Exit 26 - Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806298,41.107955]]}},{"id":"9BPh+yYiI4bpfcDGSmc+EMvsfHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on Saw Mill River Parkway southbound between Exit 26 - Taconic State Parkway (Mount Pleasant) and Exit 23 - Old Saw Mill Road (Greenburgh) D042080/B5006131/32741209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-05-07T09:33:32Z"},"road_event_id":"9BPh+yYiI4bpfcDGSmc+EMvsfHQ=","beginning_cross_street":"Exit 26 - Taconic State Parkway","ending_cross_street":"Exit 23 - Old Saw Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80642,41.108085]]}},{"id":"CFkIcJKFy3az7A22jtb5xCSJhjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3jPsJTrdikqx5SQBivwXYBIP4EQ="}],"description":"Road maintenance operations on I-684 southbound between Exit 7 - NY 116 (North Salem) and Exit 4 - NY 172 (Bedford) D265459/32564109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 14th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 04:00 PM,","update_date":"2026-05-07T09:49:39Z"},"road_event_id":"CFkIcJKFy3az7A22jtb5xCSJhjI=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 4 - NY 172","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658753,41.322296]]}},{"id":"3jPsJTrdikqx5SQBivwXYBIP4EQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CFkIcJKFy3az7A22jtb5xCSJhjI="}],"description":"Road maintenance operations on I-684 southbound between Exit 7 - NY 116 (North Salem) and Exit 4 - NY 172 (Bedford) D265459/32564109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 14th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 04:00 PM,","update_date":"2026-05-07T09:49:39Z"},"road_event_id":"3jPsJTrdikqx5SQBivwXYBIP4EQ=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 4 - NY 172","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658753,41.322296]]}},{"id":"Bpf8zHCadpB/Uaeir8nnaKmolls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LhfwbOZLRsalZb40btOWJMrNR4M="}],"description":"Road maintenance operations on I-684 northbound between Exit 4 - NY 172 (Bedford) and Exit 7 - NY 116 (North Salem) D265459/32606509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 14th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-05-07T09:41:28Z"},"road_event_id":"Bpf8zHCadpB/Uaeir8nnaKmolls=","beginning_cross_street":"Exit 4 - NY 172","ending_cross_street":"Exit 7 - NY 116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.687168,41.191227]]}},{"id":"LhfwbOZLRsalZb40btOWJMrNR4M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bpf8zHCadpB/Uaeir8nnaKmolls="}],"description":"Road maintenance operations on I-684 northbound between Exit 4 - NY 172 (Bedford) and Exit 7 - NY 116 (North Salem) D265459/32606509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 14th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-05-07T09:41:28Z"},"road_event_id":"LhfwbOZLRsalZb40btOWJMrNR4M=","beginning_cross_street":"Exit 4 - NY 172","ending_cross_street":"Exit 7 - NY 116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.687168,41.191227]]}},{"id":"9pZOllLkJghiz4qjVMSgx46p9OE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+8gJyUTR083LeqbnVV4VQftJXao="}],"description":"Drainage improvements on Saw Mill River Parkway southbound between Exit 21 - NY 119 (Greenburgh) and Exit 18 - Cyrus Field Road (Dobbs Ferry) D265459/32645509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-05-07T09:57:48Z"},"road_event_id":"9pZOllLkJghiz4qjVMSgx46p9OE=","beginning_cross_street":"Exit 21 - NY 119","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821338,41.05658]]}},{"id":"+8gJyUTR083LeqbnVV4VQftJXao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9pZOllLkJghiz4qjVMSgx46p9OE="},{"type":"next-occurrence","id":"xLuwNsYEqahHpcbTaecdWwX4Wck="}],"description":"Drainage improvements on Saw Mill River Parkway southbound between Exit 21 - NY 119 (Greenburgh) and Exit 18 - Cyrus Field Road (Dobbs Ferry) D265459/32645509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-05-07T09:57:48Z"},"road_event_id":"+8gJyUTR083LeqbnVV4VQftJXao=","beginning_cross_street":"Exit 21 - NY 119","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821338,41.05658]]}},{"id":"xLuwNsYEqahHpcbTaecdWwX4Wck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9pZOllLkJghiz4qjVMSgx46p9OE="},{"type":"next-occurrence","id":"8LaX6My+rps5kkuYvzCaz4H22s8="}],"description":"Drainage improvements on Saw Mill River Parkway southbound between Exit 21 - NY 119 (Greenburgh) and Exit 18 - Cyrus Field Road (Dobbs Ferry) D265459/32645509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-05-07T09:57:48Z"},"road_event_id":"xLuwNsYEqahHpcbTaecdWwX4Wck=","beginning_cross_street":"Exit 21 - NY 119","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821338,41.05658]]}},{"id":"8LaX6My+rps5kkuYvzCaz4H22s8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9pZOllLkJghiz4qjVMSgx46p9OE="},{"type":"next-occurrence","id":"qB7+F20TURa6JAeTW8RveZSYOLU="}],"description":"Drainage improvements on Saw Mill River Parkway southbound between Exit 21 - NY 119 (Greenburgh) and Exit 18 - Cyrus Field Road (Dobbs Ferry) D265459/32645509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-05-07T09:57:48Z"},"road_event_id":"8LaX6My+rps5kkuYvzCaz4H22s8=","beginning_cross_street":"Exit 21 - NY 119","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821338,41.05658]]}},{"id":"qB7+F20TURa6JAeTW8RveZSYOLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9pZOllLkJghiz4qjVMSgx46p9OE="}],"description":"Drainage improvements on Saw Mill River Parkway southbound between Exit 21 - NY 119 (Greenburgh) and Exit 18 - Cyrus Field Road (Dobbs Ferry) D265459/32645509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-05-07T09:57:48Z"},"road_event_id":"qB7+F20TURa6JAeTW8RveZSYOLU=","beginning_cross_street":"Exit 21 - NY 119","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821338,41.05658]]}},{"id":"32AQkK3feODjCUtv+E4R4jydA1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vDosmGUJF5/crf5IV8eZlz3r9ik="}],"description":"Drainage improvements on NY 22 southbound between King Street - NY 120 (North Castle) and Old Orchard Street (North Castle) D265459/32741309 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-05-07T10:20:43Z"},"road_event_id":"32AQkK3feODjCUtv+E4R4jydA1s=","beginning_cross_street":"King Street - NY 120","ending_cross_street":"Old Orchard Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.731918,41.10492]]}},{"id":"vDosmGUJF5/crf5IV8eZlz3r9ik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32AQkK3feODjCUtv+E4R4jydA1s="},{"type":"next-occurrence","id":"ttd5LtymNOIZfUQAJ3LBS/d4ZuQ="}],"description":"Drainage improvements on NY 22 southbound between King Street - NY 120 (North Castle) and Old Orchard Street (North Castle) D265459/32741309 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-05-07T10:20:43Z"},"road_event_id":"vDosmGUJF5/crf5IV8eZlz3r9ik=","beginning_cross_street":"King Street - NY 120","ending_cross_street":"Old Orchard Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.731918,41.10492]]}},{"id":"ttd5LtymNOIZfUQAJ3LBS/d4ZuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32AQkK3feODjCUtv+E4R4jydA1s="},{"type":"next-occurrence","id":"aSJV9fmUGAcsubT4MSiKLmZarto="}],"description":"Drainage improvements on NY 22 southbound between King Street - NY 120 (North Castle) and Old Orchard Street (North Castle) D265459/32741309 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-05-07T10:20:43Z"},"road_event_id":"ttd5LtymNOIZfUQAJ3LBS/d4ZuQ=","beginning_cross_street":"King Street - NY 120","ending_cross_street":"Old Orchard Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.731918,41.10492]]}},{"id":"aSJV9fmUGAcsubT4MSiKLmZarto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32AQkK3feODjCUtv+E4R4jydA1s="},{"type":"next-occurrence","id":"tQS4XJAVbAg1qjdhfLu3978iJ6k="}],"description":"Drainage improvements on NY 22 southbound between King Street - NY 120 (North Castle) and Old Orchard Street (North Castle) D265459/32741309 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-05-07T10:20:43Z"},"road_event_id":"aSJV9fmUGAcsubT4MSiKLmZarto=","beginning_cross_street":"King Street - NY 120","ending_cross_street":"Old Orchard Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.731918,41.10492]]}},{"id":"tQS4XJAVbAg1qjdhfLu3978iJ6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32AQkK3feODjCUtv+E4R4jydA1s="}],"description":"Drainage improvements on NY 22 southbound between King Street - NY 120 (North Castle) and Old Orchard Street (North Castle) D265459/32741309 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-05-07T10:20:43Z"},"road_event_id":"tQS4XJAVbAg1qjdhfLu3978iJ6k=","beginning_cross_street":"King Street - NY 120","ending_cross_street":"Old Orchard Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.731918,41.10492]]}},{"id":"UG7LDBskvT4XZpSlRS/mzHKNthk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Northbound between South of Kennedy Boulevard (Bayonne) and South of US 1&9 Truck Route/Communipaw Av (Jersey City), Wednesday May 13, 2026 09:00 PM thru Thursday May 14, 2026 05:00 AM, left lane closed","update_date":"2026-05-07T11:12:30Z"},"road_event_id":"UG7LDBskvT4XZpSlRS/mzHKNthk=","beginning_cross_street":"South of Kennedy Boulevard","ending_cross_street":"South of US 1&9 Truck Route/Communipaw Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104354,40.691184]]}},{"id":"pjLa64/+oa8idEYoJ/oItjqp6sU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-07T11:12:29Z"},"road_event_id":"pjLa64/+oa8idEYoJ/oItjqp6sU=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"a/g4TDq4Yl2ODZiTQdjCKfdb2RM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Southbound between South of US 1&9 Truck Route/Communipaw Av (Jersey City) and South of Kennedy Boulevard (Bayonne), Wednesday May 13, 2026 11:00 PM thru Thursday May 14, 2026 05:00 AM, left lane closed","update_date":"2026-05-07T11:12:28Z"},"road_event_id":"a/g4TDq4Yl2ODZiTQdjCKfdb2RM=","beginning_cross_street":"South of US 1&9 Truck Route/Communipaw Av","ending_cross_street":"South of Kennedy Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.092521,40.721855]]}},{"id":"4C6ubYPLD/a02nnU0Hi0gyq02Xo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right lane closed","update_date":"2026-05-07T11:12:26Z"},"road_event_id":"4C6ubYPLD/a02nnU0Hi0gyq02Xo=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"p5KWGBmhtQdfPP2oQ24GXtXQFWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-07T11:12:25Z"},"road_event_id":"p5KWGBmhtQdfPP2oQ24GXtXQFWI=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"hnZXc3L4nErm+yWJMfE3h9X6iFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-07T11:12:23Z"},"road_event_id":"hnZXc3L4nErm+yWJMfE3h9X6iFg=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"In the vicinity of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"HnSZDqsBQlTz89fVNG6rHc0oWAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right lane closed local lane","update_date":"2026-05-07T11:12:43Z"},"road_event_id":"HnSZDqsBQlTz89fVNG6rHc0oWAs=","beginning_cross_street":"In the vicinity of Garden State Parkway","ending_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078071,40.922229]]}},{"id":"QhtDPiGPXFmgepBa9eb/6yFf9bE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-05-07T11:12:47Z"},"road_event_id":"QhtDPiGPXFmgepBa9eb/6yFf9bE=","beginning_cross_street":"In the vicinity of Garden State Parkway","ending_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078071,40.922229]]}},{"id":"gpZPenoDEyVXstrThD1i/a5+99g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right lane closed","update_date":"2026-05-07T11:12:46Z"},"road_event_id":"gpZPenoDEyVXstrThD1i/a5+99g=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"8K0wjz2rB8aXYlaja03arpXhEkY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound at I-280 (Newark) Wednesday May 13, 2026 11:00 PM thru Thursday May 14, 2026 05:00 AM, ramp","update_date":"2026-05-07T11:12:39Z"},"road_event_id":"8K0wjz2rB8aXYlaja03arpXhEkY=","beginning_cross_street":"I-280","ending_cross_street":"I-280","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.167442,40.74731]]}},{"id":"ETe/axTQHnNHuUW8BXUxXxZ8HAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Wednesday May 13, 2026 10:00 PM thru Thursday May 14, 2026 06:00 AM, right lane closed","update_date":"2026-05-07T11:12:36Z"},"road_event_id":"ETe/axTQHnNHuUW8BXUxXxZ8HAA=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"In the vicinity of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"VFdMI3FNgpYvk+uAdOWed+XRqC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bVAyRqWH3dESGLPlO0KQ3MPnRHI="}],"description":"Construction on NY 9A both directions at Saw Mill River Parkway (Yonkers) D265529/32741409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T11:23:03Z"},"road_event_id":"VFdMI3FNgpYvk+uAdOWed+XRqC0=","beginning_cross_street":"Saw Mill River Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817283,41.093099]]}},{"id":"bVAyRqWH3dESGLPlO0KQ3MPnRHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VFdMI3FNgpYvk+uAdOWed+XRqC0="},{"type":"next-occurrence","id":"YBr2e5hUZOwl+PD4TGP4RDhogM4="}],"description":"Construction on NY 9A both directions at Saw Mill River Parkway (Yonkers) D265529/32741409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T11:23:03Z"},"road_event_id":"bVAyRqWH3dESGLPlO0KQ3MPnRHI=","beginning_cross_street":"Saw Mill River Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817283,41.093099]]}},{"id":"YBr2e5hUZOwl+PD4TGP4RDhogM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VFdMI3FNgpYvk+uAdOWed+XRqC0="}],"description":"Construction on NY 9A both directions at Saw Mill River Parkway (Yonkers) D265529/32741409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T11:23:03Z"},"road_event_id":"YBr2e5hUZOwl+PD4TGP4RDhogM4=","beginning_cross_street":"Saw Mill River Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817283,41.093099]]}},{"id":"acjN1pWVpRmjfLOb+Dvl7Jm5mow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cb2ebACyR43WqscFpkl9kh7S6qY="}],"description":"Construction on US 9 both directions at Main Street (Yonkers) D265529/32741509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T12:07:16Z"},"road_event_id":"acjN1pWVpRmjfLOb+Dvl7Jm5mow=","beginning_cross_street":"Main Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.864971,41.038716]]}},{"id":"cb2ebACyR43WqscFpkl9kh7S6qY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"acjN1pWVpRmjfLOb+Dvl7Jm5mow="},{"type":"next-occurrence","id":"dYgVotYWoLNiu5CTcpn85ybLGQc="}],"description":"Construction on US 9 both directions at Main Street (Yonkers) D265529/32741509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T12:07:16Z"},"road_event_id":"cb2ebACyR43WqscFpkl9kh7S6qY=","beginning_cross_street":"Main Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.864971,41.038716]]}},{"id":"dYgVotYWoLNiu5CTcpn85ybLGQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"acjN1pWVpRmjfLOb+Dvl7Jm5mow="}],"description":"Construction on US 9 both directions at Main Street (Yonkers) D265529/32741509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T12:07:16Z"},"road_event_id":"dYgVotYWoLNiu5CTcpn85ybLGQc=","beginning_cross_street":"Main Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.864971,41.038716]]}},{"id":"10SYwck+D9t915gN6/+lfvTOKRE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"eXG2Vkd8uHsq0tsIJ6Tt1gsay7M="}],"description":"Construction on US 9 both directions at Fraser Place (Hastings-on-Hudson) D265529/32741609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T12:00:26Z"},"road_event_id":"10SYwck+D9t915gN6/+lfvTOKRE=","beginning_cross_street":"Fraser Place","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.881269,40.998]]}},{"id":"eXG2Vkd8uHsq0tsIJ6Tt1gsay7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"10SYwck+D9t915gN6/+lfvTOKRE="},{"type":"next-occurrence","id":"3gp2KdZK895X4RqiOUsRiCtB0Io="}],"description":"Construction on US 9 both directions at Fraser Place (Hastings-on-Hudson) D265529/32741609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T12:00:26Z"},"road_event_id":"eXG2Vkd8uHsq0tsIJ6Tt1gsay7M=","beginning_cross_street":"Fraser Place","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.881269,40.998]]}},{"id":"3gp2KdZK895X4RqiOUsRiCtB0Io=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"10SYwck+D9t915gN6/+lfvTOKRE="}],"description":"Construction on US 9 both directions at Fraser Place (Hastings-on-Hudson) D265529/32741609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T12:00:26Z"},"road_event_id":"3gp2KdZK895X4RqiOUsRiCtB0Io=","beginning_cross_street":"Fraser Place","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.881269,40.998]]}},{"id":"LA70jIzmnxulTbyMm1yVP+9S7ns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Southbound near North of Utter Av (Hawthorne), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-07T12:30:26Z"},"road_event_id":"LA70jIzmnxulTbyMm1yVP+9S7ns=","beginning_cross_street":"North of Utter Av","ending_cross_street":"Lincoln Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.149726,40.964641]]}},{"id":"6dlNvV5Mmm+CjaGv5iMHB7sWDZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 116"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on NY 116 both directions between Hunts Lane (North Salem) and Peach Lake Road - NY 121 (North Salem) D265445/32700709 - 24/7 LANE CLOSURE - This work is weather permitting, Plan travel accordingly; delays may exist, Continuous Thursday May 7th, 2026 12:00 AM thru Thursday December 31st, 2026 12:00 AM alternating traffic","update_date":"2026-05-07T12:44:47Z"},"road_event_id":"6dlNvV5Mmm+CjaGv5iMHB7sWDZ8=","beginning_cross_street":"Hunts Lane","ending_cross_street":"Peach Lake Road - NY 121","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.549337,41.330566]]}},{"id":"wqgtu7hRA5IRLdBGvYSwUvoNZ2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vgYKCvHYVp3YMEOUjD4rLkiPWBM="}],"description":"Construction on NY 22 both directions at Ackerman Place (Eastchester) D265529/32741709 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T12:55:22Z"},"road_event_id":"wqgtu7hRA5IRLdBGvYSwUvoNZ2A=","beginning_cross_street":"Ackerman Place","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802849,40.975466]]}},{"id":"vgYKCvHYVp3YMEOUjD4rLkiPWBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wqgtu7hRA5IRLdBGvYSwUvoNZ2A="},{"type":"next-occurrence","id":"zjOfI0TduoVDo9wW9bnjv0AYZUA="}],"description":"Construction on NY 22 both directions at Ackerman Place (Eastchester) D265529/32741709 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T12:55:22Z"},"road_event_id":"vgYKCvHYVp3YMEOUjD4rLkiPWBM=","beginning_cross_street":"Ackerman Place","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802849,40.975466]]}},{"id":"zjOfI0TduoVDo9wW9bnjv0AYZUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wqgtu7hRA5IRLdBGvYSwUvoNZ2A="}],"description":"Construction on NY 22 both directions at Ackerman Place (Eastchester) D265529/32741709 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T12:55:22Z"},"road_event_id":"zjOfI0TduoVDo9wW9bnjv0AYZUA=","beginning_cross_street":"Ackerman Place","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802849,40.975466]]}},{"id":"opP/m5yZjiNDEhjbM4PhPb41Ju0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Main Line"],"direction":"unknown","related_road_events":[],"description":"Due to Track repairs both directions, Main Line between Frank R Lautenberg Secaucus Lower Level (Secaucus) and Lyndhurst (Lyndhurst Twp) on the Upper Hack Bridge between Secaucus Junction and Lyndhurst, significantly affecting the Main, Bergen County, and Port Jervis lines. Port Jervis trains will reroute via the Bergen County Line with minor delays, while Main Line service will be reduced to shuttle trains every 2�3 hours, requiring transfers at Ridgewood for travel between southern stations (Hawthorne�Lyndhurst) and northern stations (Ho-Ho-Kus�Port Jervis). Passengers should expect connection wait times of up to 30 minutes at Secaucus and Lyndhurst, and those normally using Glen Rock�Main Line are advised to use Glen Rock�Boro Hall for more direct service to Hoboken and New York, Continuous Saturday May 16th, 2026 12:00 AM thru Sunday May 17th, 2026 11:59 PM bus service only","update_date":"2026-05-07T12:59:44Z"},"road_event_id":"opP/m5yZjiNDEhjbM4PhPb41Ju0=","beginning_cross_street":"Frank R Lautenberg Secaucus Lower Level","ending_cross_street":"Lyndhurst","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:00:00Z","end_date":"2026-05-18T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075821,40.761188]]}},{"id":"FPRn9UYckOyR4/kOgKZqYo9owuI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"v2eDv1c56Qf9VtTl16VT5OyNOxA="}],"description":"Due to Overhead wire/catenary wire repairs both directions, Morris & Essex Line between New York Penn Station (New York) and Hackettstown (Hackettstown) Line trains are subject to delays of up to 15 minutes due to overhead catenary wire maintenance near Newark Broad Street Station. During this time, both Morris & Essex and Montclair Line trains will operate on track 2 in both directions at Newark Broad Street. Customers will need to walk along the platform to transfer between trains., Saturday May 16th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 07:00 AM thru 04:00 PM","update_date":"2026-05-07T13:09:49Z"},"road_event_id":"FPRn9UYckOyR4/kOgKZqYo9owuI=","beginning_cross_street":"New York Penn Station","ending_cross_street":"Hackettstown","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T18:00:00Z","end_date":"2026-05-17T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992358,40.750046]]}},{"id":"v2eDv1c56Qf9VtTl16VT5OyNOxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FPRn9UYckOyR4/kOgKZqYo9owuI="}],"description":"Due to Overhead wire/catenary wire repairs both directions, Morris & Essex Line between New York Penn Station (New York) and Hackettstown (Hackettstown) Line trains are subject to delays of up to 15 minutes due to overhead catenary wire maintenance near Newark Broad Street Station. During this time, both Morris & Essex and Montclair Line trains will operate on track 2 in both directions at Newark Broad Street. Customers will need to walk along the platform to transfer between trains., Saturday May 16th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 07:00 AM thru 04:00 PM","update_date":"2026-05-07T13:09:49Z"},"road_event_id":"v2eDv1c56Qf9VtTl16VT5OyNOxA=","beginning_cross_street":"New York Penn Station","ending_cross_street":"Hackettstown","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T18:00:00Z","end_date":"2026-05-18T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992358,40.750046]]}},{"id":"hFVVOShcLo/9maCgzrw/j9VSSUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NooXn1l0WGOURan1RKsGej2WZfc="}],"description":"Construction on NY 125 both directions at Mamaroneck Road (Scarsdale) D265529/32741809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T13:17:04Z"},"road_event_id":"hFVVOShcLo/9maCgzrw/j9VSSUo=","beginning_cross_street":"Mamaroneck Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767742,40.987918]]}},{"id":"NooXn1l0WGOURan1RKsGej2WZfc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hFVVOShcLo/9maCgzrw/j9VSSUo="},{"type":"next-occurrence","id":"YtNWzkwOHnupPZ4Ikzfy8g/BRrc="}],"description":"Construction on NY 125 both directions at Mamaroneck Road (Scarsdale) D265529/32741809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T13:17:04Z"},"road_event_id":"NooXn1l0WGOURan1RKsGej2WZfc=","beginning_cross_street":"Mamaroneck Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767742,40.987918]]}},{"id":"YtNWzkwOHnupPZ4Ikzfy8g/BRrc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hFVVOShcLo/9maCgzrw/j9VSSUo="}],"description":"Construction on NY 125 both directions at Mamaroneck Road (Scarsdale) D265529/32741809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T13:17:04Z"},"road_event_id":"YtNWzkwOHnupPZ4Ikzfy8g/BRrc=","beginning_cross_street":"Mamaroneck Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767742,40.987918]]}},{"id":"NtVCg/5n8D7p8C2uiYbd5d4DrCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Gladstone Branch and Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QVXuqT3CEy7UejG+6oELvjd23Ig="}],"description":"Due to Track repairs westbound, Gladstone Branch and Morris & Essex Line between East Orange (East Orange) and Summit (Summit) trains are subject to 10 minute delays due to the track work near Highland Station, Thursday May 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-07T13:23:40Z"},"road_event_id":"NtVCg/5n8D7p8C2uiYbd5d4DrCk=","beginning_cross_street":"East Orange","ending_cross_street":"Summit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.210464,40.760977]]}},{"id":"QVXuqT3CEy7UejG+6oELvjd23Ig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Gladstone Branch and Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NtVCg/5n8D7p8C2uiYbd5d4DrCk="},{"type":"next-occurrence","id":"v0u3Tv86FFgAtvZKsjEZ7AbiTwo="}],"description":"Due to Track repairs westbound, Gladstone Branch and Morris & Essex Line between East Orange (East Orange) and Summit (Summit) trains are subject to 10 minute delays due to the track work near Highland Station, Thursday May 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-07T13:23:40Z"},"road_event_id":"QVXuqT3CEy7UejG+6oELvjd23Ig=","beginning_cross_street":"East Orange","ending_cross_street":"Summit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.210464,40.760977]]}},{"id":"v0u3Tv86FFgAtvZKsjEZ7AbiTwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Gladstone Branch and Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NtVCg/5n8D7p8C2uiYbd5d4DrCk="},{"type":"next-occurrence","id":"6y8n7i0i4cu7mWKv/8dIMewXrKA="}],"description":"Due to Track repairs westbound, Gladstone Branch and Morris & Essex Line between East Orange (East Orange) and Summit (Summit) trains are subject to 10 minute delays due to the track work near Highland Station, Thursday May 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-07T13:23:40Z"},"road_event_id":"v0u3Tv86FFgAtvZKsjEZ7AbiTwo=","beginning_cross_street":"East Orange","ending_cross_street":"Summit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.210464,40.760977]]}},{"id":"6y8n7i0i4cu7mWKv/8dIMewXrKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Gladstone Branch and Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NtVCg/5n8D7p8C2uiYbd5d4DrCk="},{"type":"next-occurrence","id":"rFWD1A3jmbE5ygS1KxjtGAO9TwI="}],"description":"Due to Track repairs westbound, Gladstone Branch and Morris & Essex Line between East Orange (East Orange) and Summit (Summit) trains are subject to 10 minute delays due to the track work near Highland Station, Thursday May 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-07T13:23:40Z"},"road_event_id":"6y8n7i0i4cu7mWKv/8dIMewXrKA=","beginning_cross_street":"East Orange","ending_cross_street":"Summit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T14:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.210464,40.760977]]}},{"id":"rFWD1A3jmbE5ygS1KxjtGAO9TwI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Gladstone Branch and Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NtVCg/5n8D7p8C2uiYbd5d4DrCk="},{"type":"next-occurrence","id":"3KmD4WJYUHiDhTn/N8g7ohc/rx8="}],"description":"Due to Track repairs westbound, Gladstone Branch and Morris & Essex Line between East Orange (East Orange) and Summit (Summit) trains are subject to 10 minute delays due to the track work near Highland Station, Thursday May 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-07T13:23:40Z"},"road_event_id":"rFWD1A3jmbE5ygS1KxjtGAO9TwI=","beginning_cross_street":"East Orange","ending_cross_street":"Summit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T14:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.210464,40.760977]]}},{"id":"3KmD4WJYUHiDhTn/N8g7ohc/rx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Gladstone Branch and Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NtVCg/5n8D7p8C2uiYbd5d4DrCk="},{"type":"next-occurrence","id":"5KoMBcxrziXZMq+8i2tVMGWAxys="}],"description":"Due to Track repairs westbound, Gladstone Branch and Morris & Essex Line between East Orange (East Orange) and Summit (Summit) trains are subject to 10 minute delays due to the track work near Highland Station, Thursday May 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-07T13:23:40Z"},"road_event_id":"3KmD4WJYUHiDhTn/N8g7ohc/rx8=","beginning_cross_street":"East Orange","ending_cross_street":"Summit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T14:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.210464,40.760977]]}},{"id":"5KoMBcxrziXZMq+8i2tVMGWAxys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Gladstone Branch and Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NtVCg/5n8D7p8C2uiYbd5d4DrCk="},{"type":"next-occurrence","id":"Jqu72vegWT7Q1fBNnl4iH4WLTH8="}],"description":"Due to Track repairs westbound, Gladstone Branch and Morris & Essex Line between East Orange (East Orange) and Summit (Summit) trains are subject to 10 minute delays due to the track work near Highland Station, Thursday May 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-07T13:23:40Z"},"road_event_id":"5KoMBcxrziXZMq+8i2tVMGWAxys=","beginning_cross_street":"East Orange","ending_cross_street":"Summit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T14:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.210464,40.760977]]}},{"id":"Jqu72vegWT7Q1fBNnl4iH4WLTH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Gladstone Branch and Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NtVCg/5n8D7p8C2uiYbd5d4DrCk="}],"description":"Due to Track repairs westbound, Gladstone Branch and Morris & Essex Line between East Orange (East Orange) and Summit (Summit) trains are subject to 10 minute delays due to the track work near Highland Station, Thursday May 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-07T13:23:40Z"},"road_event_id":"Jqu72vegWT7Q1fBNnl4iH4WLTH8=","beginning_cross_street":"East Orange","ending_cross_street":"Summit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T14:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.210464,40.760977]]}},{"id":"Z65saEin5FPM37liaXmez0YBEzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 299"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QYbOzx3VMHJaUY6yOLsHnecHAMk="}],"description":"Road rehabilitation and road widening on NY 299 both directions between South Street (Lloyd) and New Paltz Road (Lloyd) D265638/32574209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 04:30 PM, alternating traffic","update_date":"2026-05-11T01:59:10Z"},"road_event_id":"Z65saEin5FPM37liaXmez0YBEzI=","beginning_cross_street":"South Street","ending_cross_street":"New Paltz Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T20:00:00Z","end_date":"2026-05-19T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021868,41.737574]]}},{"id":"QYbOzx3VMHJaUY6yOLsHnecHAMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 299"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z65saEin5FPM37liaXmez0YBEzI="},{"type":"next-occurrence","id":"q7blHMB2gSG0vEJ4qBXoF18puCM="}],"description":"Road rehabilitation and road widening on NY 299 both directions between South Street (Lloyd) and New Paltz Road (Lloyd) D265638/32574209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 04:30 PM, alternating traffic","update_date":"2026-05-11T01:59:10Z"},"road_event_id":"QYbOzx3VMHJaUY6yOLsHnecHAMk=","beginning_cross_street":"South Street","ending_cross_street":"New Paltz Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T20:00:00Z","end_date":"2026-05-20T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021868,41.737574]]}},{"id":"q7blHMB2gSG0vEJ4qBXoF18puCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 299"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z65saEin5FPM37liaXmez0YBEzI="},{"type":"next-occurrence","id":"7ALXr+pnpzei5eRvLRanSK/vKsM="}],"description":"Road rehabilitation and road widening on NY 299 both directions between South Street (Lloyd) and New Paltz Road (Lloyd) D265638/32574209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 04:30 PM, alternating traffic","update_date":"2026-05-11T01:59:10Z"},"road_event_id":"q7blHMB2gSG0vEJ4qBXoF18puCM=","beginning_cross_street":"South Street","ending_cross_street":"New Paltz Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T20:00:00Z","end_date":"2026-05-21T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021868,41.737574]]}},{"id":"7ALXr+pnpzei5eRvLRanSK/vKsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 299"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z65saEin5FPM37liaXmez0YBEzI="}],"description":"Road rehabilitation and road widening on NY 299 both directions between South Street (Lloyd) and New Paltz Road (Lloyd) D265638/32574209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 04:30 PM, alternating traffic","update_date":"2026-05-11T01:59:10Z"},"road_event_id":"7ALXr+pnpzei5eRvLRanSK/vKsM=","beginning_cross_street":"South Street","ending_cross_street":"New Paltz Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T20:00:00Z","end_date":"2026-05-22T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021868,41.737574]]}},{"id":"gFL9eOc17FqczXz9hJ7pT60Z+b0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rjeAgJ8OyJc16mvO1GRJE7NDgIU="}],"description":"Construction on NY 22 both directions at Pondfield Road (Eastchester) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane","update_date":"2026-05-07T14:56:25Z"},"road_event_id":"gFL9eOc17FqczXz9hJ7pT60Z+b0=","beginning_cross_street":"Pondfield Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.818368,40.934847]]}},{"id":"rjeAgJ8OyJc16mvO1GRJE7NDgIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gFL9eOc17FqczXz9hJ7pT60Z+b0="},{"type":"next-occurrence","id":"SYQ9Ye9PNYjrDsKqdOVAPF7U9Bs="}],"description":"Construction on NY 22 both directions at Pondfield Road (Eastchester) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane","update_date":"2026-05-07T14:56:25Z"},"road_event_id":"rjeAgJ8OyJc16mvO1GRJE7NDgIU=","beginning_cross_street":"Pondfield Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.818368,40.934847]]}},{"id":"SYQ9Ye9PNYjrDsKqdOVAPF7U9Bs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gFL9eOc17FqczXz9hJ7pT60Z+b0="}],"description":"Construction on NY 22 both directions at Pondfield Road (Eastchester) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane","update_date":"2026-05-07T14:56:25Z"},"road_event_id":"SYQ9Ye9PNYjrDsKqdOVAPF7U9Bs=","beginning_cross_street":"Pondfield Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.818368,40.934847]]}},{"id":"FsbDpa91jSWoMbfOJ4T0Yk3TDek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kKbPaMnmgfkzz3wrFUvWuf4Ixug="}],"description":"Utility work on NY 250 northbound Penfield Road; NY 441 (Penfield) to eastbound NY 441 at Nine Mile Point Road; NY 250 (Penfield), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:30 AM thru 04:15 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-07T13:33:43Z"},"road_event_id":"FsbDpa91jSWoMbfOJ4T0Yk3TDek=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"Nine Mile Point Road; NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:30:00Z","end_date":"2026-05-13T20:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.4413,43.130436]]}},{"id":"kKbPaMnmgfkzz3wrFUvWuf4Ixug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FsbDpa91jSWoMbfOJ4T0Yk3TDek="},{"type":"next-occurrence","id":"kjAFj+2Hcp1Kr/EdyrEp02LTip0="}],"description":"Utility work on NY 250 northbound Penfield Road; NY 441 (Penfield) to eastbound NY 441 at Nine Mile Point Road; NY 250 (Penfield), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:30 AM thru 04:15 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-07T13:33:43Z"},"road_event_id":"kKbPaMnmgfkzz3wrFUvWuf4Ixug=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"Nine Mile Point Road; NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:30:00Z","end_date":"2026-05-14T20:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.4413,43.130436]]}},{"id":"kjAFj+2Hcp1Kr/EdyrEp02LTip0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FsbDpa91jSWoMbfOJ4T0Yk3TDek="}],"description":"Utility work on NY 250 northbound Penfield Road; NY 441 (Penfield) to eastbound NY 441 at Nine Mile Point Road; NY 250 (Penfield), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:30 AM thru 04:15 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-07T13:33:43Z"},"road_event_id":"kjAFj+2Hcp1Kr/EdyrEp02LTip0=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"Nine Mile Point Road; NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:30:00Z","end_date":"2026-05-15T20:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.4413,43.130436]]}},{"id":"aTagToCi7dMbmw7p2UCNHgGP09A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31F"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9DRJWXPmYRok+pCxGWUX0WLVGyM="}],"description":"Utility work on NY 31F eastbound approaching South Lincoln Road; CR 36; Marsh Road; CR 38 (Perinton), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-07T13:39:28Z"},"road_event_id":"aTagToCi7dMbmw7p2UCNHgGP09A=","beginning_cross_street":"South Lincoln Road; CR 36; Marsh Road; CR 38","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.481495,43.102741]]}},{"id":"9DRJWXPmYRok+pCxGWUX0WLVGyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31F"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aTagToCi7dMbmw7p2UCNHgGP09A="},{"type":"next-occurrence","id":"XAMzRmo79hLd3yUX8dTVcrTBq60="}],"description":"Utility work on NY 31F eastbound approaching South Lincoln Road; CR 36; Marsh Road; CR 38 (Perinton), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-07T13:39:28Z"},"road_event_id":"9DRJWXPmYRok+pCxGWUX0WLVGyM=","beginning_cross_street":"South Lincoln Road; CR 36; Marsh Road; CR 38","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.481495,43.102741]]}},{"id":"XAMzRmo79hLd3yUX8dTVcrTBq60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31F"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aTagToCi7dMbmw7p2UCNHgGP09A="}],"description":"Utility work on NY 31F eastbound approaching South Lincoln Road; CR 36; Marsh Road; CR 38 (Perinton), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-07T13:39:28Z"},"road_event_id":"XAMzRmo79hLd3yUX8dTVcrTBq60=","beginning_cross_street":"South Lincoln Road; CR 36; Marsh Road; CR 38","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.481495,43.102741]]}},{"id":"QNr5E7xlU7RsYRSmIEY55vAcUFM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16 Bus, 81 Bus and 86 Bus"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"j9MAQjy2souVypP5JFrkBgYbAKc="}],"description":"Due to Construction both directions, 16 Bus, 81 Bus and 86 Bus between Jersey Ave At Bright St (Jersey City) and Jersey Ave At Montgomery St (Jersey City) bus stops along Jersey Avenue at Bright, Mercer, and Montgomery streets will be temporarily unavailable, affecting NJ TRANSIT Bus Route Nos. 16, 81, and 86. Passengers using stops #20786, #20789, #30502, or #20788 should utilize the MyBus tool to locate the nearest alternate boarding points during these restricted evening hours, Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 08:00 PM thru 11:00 PM","update_date":"2026-05-07T13:42:10Z"},"road_event_id":"QNr5E7xlU7RsYRSmIEY55vAcUFM=","beginning_cross_street":"Jersey Ave At Bright St","ending_cross_street":"Jersey Ave At Montgomery St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048531,40.717198]]}},{"id":"j9MAQjy2souVypP5JFrkBgYbAKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16 Bus, 81 Bus and 86 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QNr5E7xlU7RsYRSmIEY55vAcUFM="}],"description":"Due to Construction both directions, 16 Bus, 81 Bus and 86 Bus between Jersey Ave At Bright St (Jersey City) and Jersey Ave At Montgomery St (Jersey City) bus stops along Jersey Avenue at Bright, Mercer, and Montgomery streets will be temporarily unavailable, affecting NJ TRANSIT Bus Route Nos. 16, 81, and 86. Passengers using stops #20786, #20789, #30502, or #20788 should utilize the MyBus tool to locate the nearest alternate boarding points during these restricted evening hours, Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 08:00 PM thru 11:00 PM","update_date":"2026-05-07T13:42:10Z"},"road_event_id":"j9MAQjy2souVypP5JFrkBgYbAKc=","beginning_cross_street":"Jersey Ave At Bright St","ending_cross_street":"Jersey Ave At Montgomery St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-16T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048531,40.717198]]}},{"id":"jx04njgi9OgWv+alf/Ac1RZAHBY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["11 Bus, 28 Bus, 29 Bus and 712 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, 11 Bus, 28 Bus, 29 Bus and 712 Bus between Washington St At Washington Pl (Newark) and Washington St At Bleeker St (Newark) bus stops along Washington Street�located at the intersections of James Avenue, Central Avenue, and Washington Place (MyBus #19077, #19076, and #19075)�will be temporarily unavailable. This service disruption affects NJ TRANSIT Bus Route Nos. 11, 28, 29, and 72, and passengers are advised to use the MyBus tool to identify alternate boarding locations during these twelve hours., Monday May 18th, 2026 thru Monday May 18th, 2026, 12:00 PM thru 11:59 PM","update_date":"2026-05-07T13:51:23Z"},"road_event_id":"jx04njgi9OgWv+alf/Ac1RZAHBY=","beginning_cross_street":"Washington St At Washington Pl","ending_cross_street":"Washington St At Bleeker St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T04:00:00Z","end_date":"2026-05-19T15:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.171201,40.74271]]}},{"id":"QjBLjNUOeGeRJo1b/dpVuRfmqD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"70Gm2uCEihzHfN+HOHewXEZGNWU="}],"description":"Utility work on NY 441 westbound area of Brentwood Dr (Penfield), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-07T13:55:44Z"},"road_event_id":"QjBLjNUOeGeRJo1b/dpVuRfmqD8=","beginning_cross_street":"Brentwood Dr","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.458009,43.131114]]}},{"id":"70Gm2uCEihzHfN+HOHewXEZGNWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QjBLjNUOeGeRJo1b/dpVuRfmqD8="},{"type":"next-occurrence","id":"kMhK1WbjzAA7ZPmhWCzSdy7vpFw="}],"description":"Utility work on NY 441 westbound area of Brentwood Dr (Penfield), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-07T13:55:44Z"},"road_event_id":"70Gm2uCEihzHfN+HOHewXEZGNWU=","beginning_cross_street":"Brentwood Dr","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.458009,43.131114]]}},{"id":"kMhK1WbjzAA7ZPmhWCzSdy7vpFw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QjBLjNUOeGeRJo1b/dpVuRfmqD8="}],"description":"Utility work on NY 441 westbound area of Brentwood Dr (Penfield), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-07T13:55:44Z"},"road_event_id":"kMhK1WbjzAA7ZPmhWCzSdy7vpFw=","beginning_cross_street":"Brentwood Dr","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.458009,43.131114]]}},{"id":"zxC1Mtc2t/+v7OX/+W2MV6BHC+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound near East of NJ 120/Paterson Plank Road/New Jersey Turnpike - Western Spur (East Rutherford), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-05-07T14:24:27Z"},"road_event_id":"zxC1Mtc2t/+v7OX/+W2MV6BHC+4=","beginning_cross_street":"East of NJ 120/Paterson Plank Road/New Jersey Turnpike - Western Spur","ending_cross_street":"East of Meadowlands Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.072769,40.803459]]}},{"id":"C9JyIXdb0gPlOZ3qLW8WH/W4NKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound between East of NJ 120/Paterson Plank Road/New Jersey Turnpike - Western Spur (East Rutherford) and East of Meadowlands Parkway (Secaucus), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, at least one lane closed","update_date":"2026-05-07T14:24:25Z"},"road_event_id":"C9JyIXdb0gPlOZ3qLW8WH/W4NKM=","beginning_cross_street":"East of NJ 120/Paterson Plank Road/New Jersey Turnpike - Western Spur","ending_cross_street":"East of Meadowlands Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.072769,40.803459]]}},{"id":"lCUWPPoM+N7EE7rDtZ6Vrf8r/04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Both Directions between South of CR 617/Wood Av (Linden) and South of CR 619/Roselle St (Linden) Friday May 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-07T14:38:09Z"},"road_event_id":"lCUWPPoM+N7EE7rDtZ6Vrf8r/04=","beginning_cross_street":"South of CR 617/Wood Av","ending_cross_street":"South of CR 619/Roselle St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.267341,40.634048]]}},{"id":"2VwIBv50GLcne91cQnAE2rjzK0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Both Directions between South of CR 617/Wood Av (Linden) and South of CR 619/Roselle St (Linden) Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-07T14:38:04Z"},"road_event_id":"2VwIBv50GLcne91cQnAE2rjzK0M=","beginning_cross_street":"South of CR 617/Wood Av","ending_cross_street":"South of CR 619/Roselle St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.267341,40.634048]]}},{"id":"/88QSwPbEpoHM8Mh33MjvRpJ9kw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Both Directions between South of CR 617/Wood Av (Linden) and South of CR 619/Roselle St (Linden) Thursday May 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-07T14:37:58Z"},"road_event_id":"/88QSwPbEpoHM8Mh33MjvRpJ9kw=","beginning_cross_street":"South of CR 617/Wood Av","ending_cross_street":"South of CR 619/Roselle St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.267341,40.634048]]}},{"id":"cy7Rv1T7V0NE/vP7mUMm7lP3QJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between North of CR 550/Woodbine Ocean View Rd (Dennis Twp) and South of NJ 50 (Upper Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-07T14:39:36Z"},"road_event_id":"cy7Rv1T7V0NE/vP7mUMm7lP3QJw=","beginning_cross_street":"North of CR 550/Woodbine Ocean View Rd","ending_cross_street":"South of NJ 50","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.72451,39.185642]]}},{"id":"IzBs1x+SPYKXtZLVK9nVlGPDWhM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between south of Exit 72 - NJ 31 (Hopewell Twp) and south of Exit 76 - NJ 29 (Ewing Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-07T14:39:35Z"},"road_event_id":"IzBs1x+SPYKXtZLVK9nVlGPDWhM=","beginning_cross_street":"south of Exit 72 - NJ 31","ending_cross_street":"south of Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.779342,40.291366]]}},{"id":"8VTZhingYe1ZxYNjJsPprebfYv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound near CR 692/Franklin Av (Berlin), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, right lane closed, moving operation","update_date":"2026-05-07T14:39:27Z"},"road_event_id":"8VTZhingYe1ZxYNjJsPprebfYv4=","beginning_cross_street":"CR 692/Franklin Av","ending_cross_street":"South of CR 693/Lafayette Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.930572,39.81142]]}},{"id":"AUh47DNguLkSFoJE3ij4aierhZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Both Directions between South of CR 617/Wood Av (Linden) and South of CR 619/Roselle St (Linden) Friday May 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-07T14:38:50Z"},"road_event_id":"AUh47DNguLkSFoJE3ij4aierhZk=","beginning_cross_street":"South of CR 617/Wood Av","ending_cross_street":"South of CR 619/Roselle St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T13:00:00Z","end_date":"2026-05-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.267341,40.634048]]}},{"id":"JjVrvGddXwjPk9s53t4SU45kxjs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Both Directions between South of CR 617/Wood Av (Linden) and South of CR 619/Roselle St (Linden) Thursday May 21, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-07T14:38:46Z"},"road_event_id":"JjVrvGddXwjPk9s53t4SU45kxjs=","beginning_cross_street":"South of CR 617/Wood Av","ending_cross_street":"South of CR 619/Roselle St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.267341,40.634048]]}},{"id":"OX5jAOzxCz5sdkjuQJeKwtyE7Dw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Both Directions between South of CR 617/Wood Av (Linden) and South of CR 619/Roselle St (Linden) Wednesday May 20, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-07T14:38:41Z"},"road_event_id":"OX5jAOzxCz5sdkjuQJeKwtyE7Dw=","beginning_cross_street":"South of CR 617/Wood Av","ending_cross_street":"South of CR 619/Roselle St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.267341,40.634048]]}},{"id":"l/+2VoJTUNopcL8FE5AZ6kaDPBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Both Directions between South of CR 617/Wood Av (Linden) and South of CR 619/Roselle St (Linden) Tuesday May 19, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-07T14:38:36Z"},"road_event_id":"l/+2VoJTUNopcL8FE5AZ6kaDPBU=","beginning_cross_street":"South of CR 617/Wood Av","ending_cross_street":"South of CR 619/Roselle St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.267341,40.634048]]}},{"id":"jP3YwKvq52sFGgOMwHbxtWkLkoM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Both Directions between South of CR 617/Wood Av (Linden) and South of CR 619/Roselle St (Linden) Monday May 18, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-07T14:38:31Z"},"road_event_id":"jP3YwKvq52sFGgOMwHbxtWkLkoM=","beginning_cross_street":"South of CR 617/Wood Av","ending_cross_street":"South of CR 619/Roselle St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.267341,40.634048]]}},{"id":"jx86W8QxSJAfaIy+bXYtUt83fCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between south of Exit 72 - NJ 31 (Hopewell Twp) and south of Exit 76 - NJ 29 (Ewing Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-07T14:39:39Z"},"road_event_id":"jx86W8QxSJAfaIy+bXYtUt83fCw=","beginning_cross_street":"south of Exit 72 - NJ 31","ending_cross_street":"south of Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.779342,40.291366]]}},{"id":"LbidYTL0FvOrNwd+t24FkrMJ6nQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between South of Exit 52 - Columbus Rd (Mansfield Twp) and North of Exit 57 - US 130 (Bordentown Twp), Thursday May 14, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-07T14:39:50Z"},"road_event_id":"LbidYTL0FvOrNwd+t24FkrMJ6nQ=","beginning_cross_street":"South of Exit 52 - Columbus Rd","ending_cross_street":"North of Exit 57 - US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.764533,40.081165]]}},{"id":"XB7f+F/CZqfCxiJpInVSAxs7pfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between South of Exit 52 - Columbus Rd (Mansfield Twp) and North of Exit 57 - US 130 (Bordentown Twp), Wednesday May 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-07T14:40:00Z"},"road_event_id":"XB7f+F/CZqfCxiJpInVSAxs7pfk=","beginning_cross_street":"South of Exit 52 - Columbus Rd","ending_cross_street":"North of Exit 57 - US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.764533,40.081165]]}},{"id":"mzRaCy3xBnt0QopVyXcb0ReQpaA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound near South of CR 546/Washington Crossing Pennington Rd (Hopewell Twp), Wednesday May 13, 2026 09:00 PM thru Thursday May 14, 2026 12:00 AM, deceleration lane closed","update_date":"2026-05-07T14:39:54Z"},"road_event_id":"mzRaCy3xBnt0QopVyXcb0ReQpaA=","beginning_cross_street":"South of CR 546/Washington Crossing Pennington Rd","ending_cross_street":"North of I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.784423,40.304096]]}},{"id":"DpEfDlcveGWbxhWiMIzQNVSUeXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound near South of CR 693/Lafayette Av (Berlin), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right lane closed, moving operation","update_date":"2026-05-07T14:39:48Z"},"road_event_id":"DpEfDlcveGWbxhWiMIzQNVSUeXE=","beginning_cross_street":"South of CR 693/Lafayette Av","ending_cross_street":"CR 692/Franklin Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.929039,39.820056]]}},{"id":"Ui2adnX/hdnRMQLlmvCMTJoDVAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between North of Exit 57 - US 130 (Bordentown Twp) and South of Exit 52 - Columbus Rd (Mansfield Twp), Thursday May 14, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-07T14:39:45Z"},"road_event_id":"Ui2adnX/hdnRMQLlmvCMTJoDVAo=","beginning_cross_street":"North of Exit 57 - US 130","ending_cross_street":"South of Exit 52 - Columbus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.71685,40.139522]]}},{"id":"UKAb/YQ+MXEZiE9XV1dB6+Z4KDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound near South of CR 546/Washington Crossing Pennington Rd (Hopewell Twp), Thursday May 14, 2026 12:00 AM thru 05:00 AM, deceleration lane closed","update_date":"2026-05-13T11:42:06Z"},"road_event_id":"UKAb/YQ+MXEZiE9XV1dB6+Z4KDI=","beginning_cross_street":"South of CR 546/Washington Crossing Pennington Rd","ending_cross_street":"North of I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.784423,40.304096]]}},{"id":"+rMQiIPvEhox8FtUi1sert1LwRA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between North of Exit 57 - US 130 (Bordentown Twp) and South of Exit 52 - Columbus Rd (Mansfield Twp), Wednesday May 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-07T14:40:07Z"},"road_event_id":"+rMQiIPvEhox8FtUi1sert1LwRA=","beginning_cross_street":"North of Exit 57 - US 130","ending_cross_street":"South of Exit 52 - Columbus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.71685,40.139522]]}},{"id":"aeUYeco4vUpO0XOGUYxaFTprEOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2JkFQY1efrPaVO7LLuACr8xKEyU="}],"description":"Construction on NY 984E - Yonkers Avenue both directions at Kimball Avenue (Mount Pleasant) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T14:55:58Z"},"road_event_id":"aeUYeco4vUpO0XOGUYxaFTprEOw=","beginning_cross_street":"Kimball Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796204,41.133014]]}},{"id":"2JkFQY1efrPaVO7LLuACr8xKEyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aeUYeco4vUpO0XOGUYxaFTprEOw="},{"type":"next-occurrence","id":"a+Z4HKjNbvbzJs8DdaGxjV09dY4="}],"description":"Construction on NY 984E - Yonkers Avenue both directions at Kimball Avenue (Mount Pleasant) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T14:55:58Z"},"road_event_id":"2JkFQY1efrPaVO7LLuACr8xKEyU=","beginning_cross_street":"Kimball Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796204,41.133014]]}},{"id":"a+Z4HKjNbvbzJs8DdaGxjV09dY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aeUYeco4vUpO0XOGUYxaFTprEOw="}],"description":"Construction on NY 984E - Yonkers Avenue both directions at Kimball Avenue (Mount Pleasant) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-07T14:55:58Z"},"road_event_id":"a+Z4HKjNbvbzJs8DdaGxjV09dY4=","beginning_cross_street":"Kimball Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796204,41.133014]]}},{"id":"KvT4BAeibMdmg+gf0o2nQ7owGcM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9t3Kibqz/FUZca5e7omipQ3vDpY="}],"description":"Utility work on NY 441 both directions east of Harris Rd (Penfield) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T15:03:46Z"},"road_event_id":"KvT4BAeibMdmg+gf0o2nQ7owGcM=","beginning_cross_street":"Harris Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.410174,43.130269]]}},{"id":"9t3Kibqz/FUZca5e7omipQ3vDpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KvT4BAeibMdmg+gf0o2nQ7owGcM="},{"type":"next-occurrence","id":"VkI81bImqeC6d79cDZCaWETN1ZU="}],"description":"Utility work on NY 441 both directions east of Harris Rd (Penfield) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T15:03:46Z"},"road_event_id":"9t3Kibqz/FUZca5e7omipQ3vDpY=","beginning_cross_street":"Harris Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.410174,43.130269]]}},{"id":"VkI81bImqeC6d79cDZCaWETN1ZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KvT4BAeibMdmg+gf0o2nQ7owGcM="}],"description":"Utility work on NY 441 both directions east of Harris Rd (Penfield) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T15:03:46Z"},"road_event_id":"VkI81bImqeC6d79cDZCaWETN1ZU=","beginning_cross_street":"Harris Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.410174,43.130269]]}},{"id":"l+KRQp/oxUwR4BBVBmoMjp9r5Pg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between North of Exit 30 - North Maple Ave (Harding Twp) and North of Exit 21 - I-78 (Bedminster Twp), Thursday May 14, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-07T15:09:26Z"},"road_event_id":"l+KRQp/oxUwR4BBVBmoMjp9r5Pg=","beginning_cross_street":"North of Exit 30 - North Maple Ave","ending_cross_street":"North of Exit 21 - I-78","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.536544,40.73521]]}},{"id":"dJOpbBjWuADXWveIT6Uo0RHB/Fo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 39 - NJ 10 (Hanover Twp), left shoulder","update_date":"2026-05-07T15:09:28Z"},"road_event_id":"dJOpbBjWuADXWveIT6Uo0RHB/Fo=","beginning_cross_street":"North of Exit 39 - NJ 10","ending_cross_street":"South of Exit 39 - NJ 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:30:00Z","end_date":"2026-05-13T16:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.436912,40.834472]]}},{"id":"fpIDvzDXfKIvOrBebCV8SNdCyns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between North of Exit 30 - North Maple Ave (Harding Twp) and North of Exit 21 - I-78 (Bedminster Twp), Wednesday May 13, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-07T15:09:36Z"},"road_event_id":"fpIDvzDXfKIvOrBebCV8SNdCyns=","beginning_cross_street":"North of Exit 30 - North Maple Ave","ending_cross_street":"North of Exit 21 - I-78","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.536544,40.73521]]}},{"id":"0JlF5WdoMrORrM5NAYYuVyhHLPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EP0zp01VU4pK6G/dIbc5X+hIg/8="}],"description":"Street sweeping on I-86 westbound Exit 48 - NY 352; Ramp (Corning) 2 Lanes Reduced to 1, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 03:00 PM All lanes open","update_date":"2026-05-07T15:14:38Z"},"road_event_id":"0JlF5WdoMrORrM5NAYYuVyhHLPU=","beginning_cross_street":"Exit 48 - NY 352; Ramp","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.989964,42.123306]]}},{"id":"EP0zp01VU4pK6G/dIbc5X+hIg/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0JlF5WdoMrORrM5NAYYuVyhHLPU="},{"type":"next-occurrence","id":"5r6JpjdMT7E4BIlhway1EbDLnv8="}],"description":"Street sweeping on I-86 westbound Exit 48 - NY 352; Ramp (Corning) 2 Lanes Reduced to 1, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 03:00 PM All lanes open","update_date":"2026-05-07T15:14:38Z"},"road_event_id":"EP0zp01VU4pK6G/dIbc5X+hIg/8=","beginning_cross_street":"Exit 48 - NY 352; Ramp","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.989964,42.123306]]}},{"id":"5r6JpjdMT7E4BIlhway1EbDLnv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0JlF5WdoMrORrM5NAYYuVyhHLPU="}],"description":"Street sweeping on I-86 westbound Exit 48 - NY 352; Ramp (Corning) 2 Lanes Reduced to 1, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 03:00 PM All lanes open","update_date":"2026-05-07T15:14:38Z"},"road_event_id":"5r6JpjdMT7E4BIlhway1EbDLnv8=","beginning_cross_street":"Exit 48 - NY 352; Ramp","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.989964,42.123306]]}},{"id":"kwFZEvwfl3LHxQmQmrn0cynIuss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"k3az97rNuqZV7WWR2sKgicKs1tI="}],"description":"Survey work on NY 17 [Orange] both directions between Exit 125 - South Street - NY 17M (Goshen) and Exit 119 - NY 302 (Wallkill) D265651/32735009 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, shoulder closure","update_date":"2026-05-07T15:37:06Z"},"road_event_id":"kwFZEvwfl3LHxQmQmrn0cynIuss=","beginning_cross_street":"Exit 125 - South Street - NY 17M","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.303935,41.381693]]}},{"id":"k3az97rNuqZV7WWR2sKgicKs1tI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kwFZEvwfl3LHxQmQmrn0cynIuss="},{"type":"next-occurrence","id":"iCcLMLcqK6ADD8pK74WEuvS9X7o="}],"description":"Survey work on NY 17 [Orange] both directions between Exit 125 - South Street - NY 17M (Goshen) and Exit 119 - NY 302 (Wallkill) D265651/32735009 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, shoulder closure","update_date":"2026-05-07T15:37:06Z"},"road_event_id":"k3az97rNuqZV7WWR2sKgicKs1tI=","beginning_cross_street":"Exit 125 - South Street - NY 17M","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.303935,41.381693]]}},{"id":"iCcLMLcqK6ADD8pK74WEuvS9X7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kwFZEvwfl3LHxQmQmrn0cynIuss="}],"description":"Survey work on NY 17 [Orange] both directions between Exit 125 - South Street - NY 17M (Goshen) and Exit 119 - NY 302 (Wallkill) D265651/32735009 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, shoulder closure","update_date":"2026-05-07T15:37:06Z"},"road_event_id":"iCcLMLcqK6ADD8pK74WEuvS9X7o=","beginning_cross_street":"Exit 125 - South Street - NY 17M","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.303935,41.381693]]}},{"id":"ourszaD6h1ygLipdkvnfmyG9ocs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge work on Garden State Parkway southbound between Essex Toll Plaza (Bloomfield) and Essex Toll Plaza (Bloomfield), Wednesday May 13th,2026 thru Thursday May 14th,2026, Wednesday, 08:00 PM thru 05:00 AM 2 Left lanes of 11 lanes closed southbound,","update_date":"2026-05-12T09:00:10Z"},"road_event_id":"ourszaD6h1ygLipdkvnfmyG9ocs=","beginning_cross_street":"Essex Toll Plaza","ending_cross_street":"Essex Toll Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.184324,40.805329]]}},{"id":"CM0htEUo+WHEM1/KRJusx4r/SZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"scg8v2S1/EtTh3kDYOaSJTBSpiI="}],"description":"Milling and paving operations on Garden State Parkway southbound between North of Exit 136 - Stiles St (Cranford Twp) and North of Colonia Service Area (Woodbridge Twp), Tuesday May 12th,2026 thru Thursday May 14th,2026, Tuesday/Wednesday, 09:00 PM thru 06:00 AM 2 Left lanes of 5 lanes closed southbound, , Tuesday May 12th,2026 thru Thursday May 14th,2026, Tuesday/Wednesday, 11:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed southbound, , Thursday May 14th,2026 thru Friday May 15th,2026, Thursday, 09:00 PM thru 06:00 AM 2 Right lanes of 5 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 10:00 PM thru 06:00 AM 1 Right lane of 5 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed southbound,","update_date":"2026-05-12T10:00:02Z"},"road_event_id":"CM0htEUo+WHEM1/KRJusx4r/SZ4=","beginning_cross_street":"North of Exit 136 - Stiles St","ending_cross_street":"North of Colonia Service Area","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.287693,40.645834]]}},{"id":"scg8v2S1/EtTh3kDYOaSJTBSpiI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CM0htEUo+WHEM1/KRJusx4r/SZ4="},{"type":"next-occurrence","id":"Hn2dEfg4kj7WNMNWbytYYcaA6UI="}],"description":"Milling and paving operations on Garden State Parkway southbound between North of Exit 136 - Stiles St (Cranford Twp) and North of Colonia Service Area (Woodbridge Twp), Tuesday May 12th,2026 thru Thursday May 14th,2026, Tuesday/Wednesday, 09:00 PM thru 06:00 AM 2 Left lanes of 5 lanes closed southbound, , Tuesday May 12th,2026 thru Thursday May 14th,2026, Tuesday/Wednesday, 11:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed southbound, , Thursday May 14th,2026 thru Friday May 15th,2026, Thursday, 09:00 PM thru 06:00 AM 2 Right lanes of 5 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 10:00 PM thru 06:00 AM 1 Right lane of 5 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed southbound,","update_date":"2026-05-12T10:00:02Z"},"road_event_id":"scg8v2S1/EtTh3kDYOaSJTBSpiI=","beginning_cross_street":"North of Exit 136 - Stiles St","ending_cross_street":"North of Colonia Service Area","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.287693,40.645834]]}},{"id":"Hn2dEfg4kj7WNMNWbytYYcaA6UI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CM0htEUo+WHEM1/KRJusx4r/SZ4="}],"description":"Milling and paving operations on Garden State Parkway southbound between North of Exit 136 - Stiles St (Cranford Twp) and North of Colonia Service Area (Woodbridge Twp), Tuesday May 12th,2026 thru Thursday May 14th,2026, Tuesday/Wednesday, 09:00 PM thru 06:00 AM 2 Left lanes of 5 lanes closed southbound, , Tuesday May 12th,2026 thru Thursday May 14th,2026, Tuesday/Wednesday, 11:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed southbound, , Thursday May 14th,2026 thru Friday May 15th,2026, Thursday, 09:00 PM thru 06:00 AM 2 Right lanes of 5 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 10:00 PM thru 06:00 AM 1 Right lane of 5 lanes closed southbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 11:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed southbound,","update_date":"2026-05-12T10:00:02Z"},"road_event_id":"Hn2dEfg4kj7WNMNWbytYYcaA6UI=","beginning_cross_street":"North of Exit 136 - Stiles St","ending_cross_street":"North of Colonia Service Area","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.287693,40.645834]]}},{"id":"ozBrCJgIai41lhpAux7KKOpoaH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on Garden State Parkway Local Lanes northbound between North of Exit 114 - Red Hill Rd (Holmdel Twp) and North of Exit 117 - NJ 36 (Aberdeen Twp), Thursday May 14th,2026 thru Friday May 15th,2026, Thursday, 07:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed northbound, , Thursday May 14th,2026 thru Friday May 15th,2026, Thursday, 07:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed northbound,","update_date":"2026-05-13T10:00:08Z"},"road_event_id":"ozBrCJgIai41lhpAux7KKOpoaH4=","beginning_cross_street":"North of Exit 114 - Red Hill Rd","ending_cross_street":"North of Exit 117 - NJ 36","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.157482,40.380792]]}},{"id":"Y6dLq98h+3v+t1yHdnzAxEZhdBQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iO+isYyJZl1Vb3IF1S1J+bqaVAQ="}],"description":"Milling and paving operations on Garden State Parkway Express Lanes northbound Cross over ramp North of Exit 117 - NJ 36 (Aberdeen Twp), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes closed, Saturday May 16th, 2026, 06:00 AM thru 08:00 AM All lanes closed","update_date":"2026-05-07T15:59:46Z"},"road_event_id":"Y6dLq98h+3v+t1yHdnzAxEZhdBQ=","beginning_cross_street":"North of Exit 117 - NJ 36","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.217777,40.423802]]}},{"id":"iO+isYyJZl1Vb3IF1S1J+bqaVAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6dLq98h+3v+t1yHdnzAxEZhdBQ="},{"type":"next-occurrence","id":"cHd1mOt7NCw/KM9NmH8txWTKVVU="}],"description":"Milling and paving operations on Garden State Parkway Express Lanes northbound Cross over ramp North of Exit 117 - NJ 36 (Aberdeen Twp), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes closed, Saturday May 16th, 2026, 06:00 AM thru 08:00 AM All lanes closed","update_date":"2026-05-07T15:59:46Z"},"road_event_id":"iO+isYyJZl1Vb3IF1S1J+bqaVAQ=","beginning_cross_street":"North of Exit 117 - NJ 36","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.217777,40.423802]]}},{"id":"cHd1mOt7NCw/KM9NmH8txWTKVVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6dLq98h+3v+t1yHdnzAxEZhdBQ="},{"type":"next-occurrence","id":"Dhho+PL2PViyJAvYvueeDgPSYUk="}],"description":"Milling and paving operations on Garden State Parkway Express Lanes northbound Cross over ramp North of Exit 117 - NJ 36 (Aberdeen Twp), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes closed, Saturday May 16th, 2026, 06:00 AM thru 08:00 AM All lanes closed","update_date":"2026-05-07T15:59:46Z"},"road_event_id":"cHd1mOt7NCw/KM9NmH8txWTKVVU=","beginning_cross_street":"North of Exit 117 - NJ 36","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.217777,40.423802]]}},{"id":"Dhho+PL2PViyJAvYvueeDgPSYUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6dLq98h+3v+t1yHdnzAxEZhdBQ="}],"description":"Milling and paving operations on Garden State Parkway Express Lanes northbound Cross over ramp North of Exit 117 - NJ 36 (Aberdeen Twp), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes closed, Saturday May 16th, 2026, 06:00 AM thru 08:00 AM All lanes closed","update_date":"2026-05-07T15:59:46Z"},"road_event_id":"Dhho+PL2PViyJAvYvueeDgPSYUk=","beginning_cross_street":"North of Exit 117 - NJ 36","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T16:00:00Z","end_date":"2026-05-16T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.217777,40.423802]]}},{"id":"VixM2P46dgKMrC2tBNnAWAlchg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TB4CqBYyREiG1DKMfavwc69sXlo="}],"description":"Line striping and expansion joint repairs and survey work on Garden State Parkway northbound between South of Union Toll Plaza (Hillside Twp) and South of Union Toll Plaza (Hillside Twp), Tuesday May 12th,2026 thru Thursday May 14th,2026, Tuesday/Wednesday, 08:00 PM thru 06:00 AM 6 Left lanes of 14 lanes closed northbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday/Sunday, 06:00 AM thru 06:00 AM 2 Center lanes of 13 lanes closed northbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 08:00 PM thru 06:00 AM 2 Center lanes of 13 lanes closed northbound,","update_date":"2026-05-09T10:00:11Z"},"road_event_id":"VixM2P46dgKMrC2tBNnAWAlchg8=","beginning_cross_street":"South of Union Toll Plaza","ending_cross_street":"South of Union Toll Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.246445,40.703261]]}},{"id":"TB4CqBYyREiG1DKMfavwc69sXlo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VixM2P46dgKMrC2tBNnAWAlchg8="},{"type":"next-occurrence","id":"T97A4FM4zzgxCQ8KYBx6KXI3jY4="}],"description":"Line striping and expansion joint repairs and survey work on Garden State Parkway northbound between South of Union Toll Plaza (Hillside Twp) and South of Union Toll Plaza (Hillside Twp), Tuesday May 12th,2026 thru Thursday May 14th,2026, Tuesday/Wednesday, 08:00 PM thru 06:00 AM 6 Left lanes of 14 lanes closed northbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday/Sunday, 06:00 AM thru 06:00 AM 2 Center lanes of 13 lanes closed northbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 08:00 PM thru 06:00 AM 2 Center lanes of 13 lanes closed northbound,","update_date":"2026-05-09T10:00:11Z"},"road_event_id":"TB4CqBYyREiG1DKMfavwc69sXlo=","beginning_cross_street":"South of Union Toll Plaza","ending_cross_street":"South of Union Toll Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T16:00:00Z","end_date":"2026-05-16T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.246445,40.703261]]}},{"id":"T97A4FM4zzgxCQ8KYBx6KXI3jY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VixM2P46dgKMrC2tBNnAWAlchg8="},{"type":"next-occurrence","id":"4JvyrB5BsBRrYy4di1HS1VQgM4Y="}],"description":"Line striping and expansion joint repairs and survey work on Garden State Parkway northbound between South of Union Toll Plaza (Hillside Twp) and South of Union Toll Plaza (Hillside Twp), Tuesday May 12th,2026 thru Thursday May 14th,2026, Tuesday/Wednesday, 08:00 PM thru 06:00 AM 6 Left lanes of 14 lanes closed northbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday/Sunday, 06:00 AM thru 06:00 AM 2 Center lanes of 13 lanes closed northbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 08:00 PM thru 06:00 AM 2 Center lanes of 13 lanes closed northbound,","update_date":"2026-05-09T10:00:11Z"},"road_event_id":"T97A4FM4zzgxCQ8KYBx6KXI3jY4=","beginning_cross_street":"South of Union Toll Plaza","ending_cross_street":"South of Union Toll Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.246445,40.703261]]}},{"id":"4JvyrB5BsBRrYy4di1HS1VQgM4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VixM2P46dgKMrC2tBNnAWAlchg8="}],"description":"Line striping and expansion joint repairs and survey work on Garden State Parkway northbound between South of Union Toll Plaza (Hillside Twp) and South of Union Toll Plaza (Hillside Twp), Tuesday May 12th,2026 thru Thursday May 14th,2026, Tuesday/Wednesday, 08:00 PM thru 06:00 AM 6 Left lanes of 14 lanes closed northbound, , Saturday May 16th,2026 thru Sunday May 17th,2026, Saturday/Sunday, 06:00 AM thru 06:00 AM 2 Center lanes of 13 lanes closed northbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 08:00 PM thru 06:00 AM 2 Center lanes of 13 lanes closed northbound,","update_date":"2026-05-09T10:00:11Z"},"road_event_id":"4JvyrB5BsBRrYy4di1HS1VQgM4Y=","beginning_cross_street":"South of Union Toll Plaza","ending_cross_street":"South of Union Toll Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T16:00:00Z","end_date":"2026-05-17T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.246445,40.703261]]}},{"id":"oDcENS55A174MzpnQXo+6AkrPrg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 386"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZbtmdV8ruwVElG+V29yzpICWuR8="}],"description":"Utility work on NY 386 both directions area of Humphrey Rd. (Chili) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes, Thursday May 14th, 2026 thru Friday May 15th, 2026, 11:00 PM thru 06:00 AM All lanes open northbound; All lanes southbound","update_date":"2026-05-08T17:26:36Z"},"road_event_id":"oDcENS55A174MzpnQXo+6AkrPrg=","beginning_cross_street":"Humphrey Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.759347,43.087804]]}},{"id":"ZbtmdV8ruwVElG+V29yzpICWuR8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 386"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDcENS55A174MzpnQXo+6AkrPrg="},{"type":"next-occurrence","id":"DhOlitAls9JgOr8cmkenw/M9cZ4="}],"description":"Utility work on NY 386 both directions area of Humphrey Rd. (Chili) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes, Thursday May 14th, 2026 thru Friday May 15th, 2026, 11:00 PM thru 06:00 AM All lanes open northbound; All lanes southbound","update_date":"2026-05-08T17:26:36Z"},"road_event_id":"ZbtmdV8ruwVElG+V29yzpICWuR8=","beginning_cross_street":"Humphrey Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.759347,43.087804]]}},{"id":"DhOlitAls9JgOr8cmkenw/M9cZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 386"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDcENS55A174MzpnQXo+6AkrPrg="},{"type":"next-occurrence","id":"KFzm3GSI3m5wuJSTbDzQ6qeMNmc="}],"description":"Utility work on NY 386 both directions area of Humphrey Rd. (Chili) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes, Thursday May 14th, 2026 thru Friday May 15th, 2026, 11:00 PM thru 06:00 AM All lanes open northbound; All lanes southbound","update_date":"2026-05-08T17:26:36Z"},"road_event_id":"DhOlitAls9JgOr8cmkenw/M9cZ4=","beginning_cross_street":"Humphrey Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.759347,43.087804]]}},{"id":"KFzm3GSI3m5wuJSTbDzQ6qeMNmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 386"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDcENS55A174MzpnQXo+6AkrPrg="}],"description":"Utility work on NY 386 both directions area of Humphrey Rd. (Chili) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes, Thursday May 14th, 2026 thru Friday May 15th, 2026, 11:00 PM thru 06:00 AM All lanes open northbound; All lanes southbound","update_date":"2026-05-08T17:26:36Z"},"road_event_id":"KFzm3GSI3m5wuJSTbDzQ6qeMNmc=","beginning_cross_street":"Humphrey Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.759347,43.087804]]}},{"id":"oe4HcVpgA1d1oH2WclHOs0I/sCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Line striping on Garden State Parkway northbound between Exit 138 - CR 509 (Kenilworth) and Union Toll Plaza (Hillside Twp), Tuesday May 12th, 2026 thru Thursday May 14th, 2026, Tuesday/Wednesday, 08:00 PM thru 06:00 AM 1 Left lane of 5 lanes closed, Tuesday May 12th, 2026 thru Thursday May 14th, 2026, Tuesday/Wednesday, 10:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed","update_date":"2026-05-07T16:17:10Z"},"road_event_id":"oe4HcVpgA1d1oH2WclHOs0I/sCs=","beginning_cross_street":"Exit 138 - CR 509","ending_cross_street":"Union Toll Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.278134,40.679186]]}},{"id":"kNHei3hpnwl44j8CIw62EUSzNg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Tree trimming on Garden State Parkway southbound Exit ramp Exit 6 - NJ 147 (Middle Twp), Tuesday May 12th, 2026 thru Wednesday May 13th, 2026, Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-07T16:20:37Z"},"road_event_id":"kNHei3hpnwl44j8CIw62EUSzNg4=","beginning_cross_street":"Exit 6 - NJ 147","ending_cross_street":"Exit 6 - NJ 147","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.846582,39.04269]]}},{"id":"RvSx5Qx4ipbfnlSHMlre/CVohXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Line striping and milling and paving operations on Garden State Parkway southbound between South of Exit 168 - NJ 502/Washington Ave (Washington Twp) and South of Exit 163 - NJ 17 (Paramus), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 08:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed, Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 10:00 PM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-07T16:24:37Z"},"road_event_id":"RvSx5Qx4ipbfnlSHMlre/CVohXs=","beginning_cross_street":"South of Exit 168 - NJ 502/Washington Ave","ending_cross_street":"South of Exit 163 - NJ 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.072754,40.995443]]}},{"id":"bhhn/3hEIyR0R/hf8zDqlwsQM3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on Garden State Parkway southbound Exit ramp Exit 165A-B - Ridgewood Ave (Paramus), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T16:26:52Z"},"road_event_id":"bhhn/3hEIyR0R/hf8zDqlwsQM3g=","beginning_cross_street":"Exit 165A-B - Ridgewood Ave","ending_cross_street":"Exit 165A-B - Ridgewood Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.065755,40.96632]]}},{"id":"Rc2jjVTOBfg1297zvXM1vpz8siI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jQJb8vav+jJDEprz+gd4orjxR7k="}],"description":"Milling and paving operations on Garden State Parkway northbound between Larry Doby Service Area (Bloomfield) and South of Exit 153A - NJ 3 (Clifton), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 08:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 10:00 PM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-07T16:29:50Z"},"road_event_id":"Rc2jjVTOBfg1297zvXM1vpz8siI=","beginning_cross_street":"Larry Doby Service Area","ending_cross_street":"South of Exit 153A - NJ 3","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.179412,40.837026]]}},{"id":"jQJb8vav+jJDEprz+gd4orjxR7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rc2jjVTOBfg1297zvXM1vpz8siI="}],"description":"Milling and paving operations on Garden State Parkway northbound between Larry Doby Service Area (Bloomfield) and South of Exit 153A - NJ 3 (Clifton), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 08:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 10:00 PM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-07T16:29:50Z"},"road_event_id":"jQJb8vav+jJDEprz+gd4orjxR7k=","beginning_cross_street":"Larry Doby Service Area","ending_cross_street":"South of Exit 153A - NJ 3","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.179412,40.837026]]}},{"id":"Qeps5fWJwMgOg8cUeTikAxoLuow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"U4PZMRG+imaiy5PG/T0v90o9j+Y="}],"description":"Milling and paving operations on Garden State Parkway southbound between South of Exit 154 - US 46 (Clifton) and South of Exit 153A - NJ 3 (Bloomfield), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 08:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Thursday May 14th, 2026 thru Thursday May 14th, 2026, 12:00 AM thru 05:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-07T16:35:10Z"},"road_event_id":"Qeps5fWJwMgOg8cUeTikAxoLuow=","beginning_cross_street":"South of Exit 154 - US 46","ending_cross_street":"South of Exit 153A - NJ 3","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.170718,40.865969]]}},{"id":"U4PZMRG+imaiy5PG/T0v90o9j+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qeps5fWJwMgOg8cUeTikAxoLuow="}],"description":"Milling and paving operations on Garden State Parkway southbound between South of Exit 154 - US 46 (Clifton) and South of Exit 153A - NJ 3 (Bloomfield), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 08:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Thursday May 14th, 2026 thru Thursday May 14th, 2026, 12:00 AM thru 05:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-07T16:35:10Z"},"road_event_id":"U4PZMRG+imaiy5PG/T0v90o9j+Y=","beginning_cross_street":"South of Exit 154 - US 46","ending_cross_street":"South of Exit 153A - NJ 3","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.170718,40.865969]]}},{"id":"mbyb8JoKUXbcxy8XpKmxqzYXVxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Northbound from North of Meeker Av (Newark) to US 22 (Newark) Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, 2 right lanes of 4 lanes closed","update_date":"2026-05-07T16:38:13Z"},"road_event_id":"mbyb8JoKUXbcxy8XpKmxqzYXVxQ=","beginning_cross_street":"North of Meeker Av","ending_cross_street":"US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.194839,40.703369]]}},{"id":"5vX8SCm/3SnTR6bBBMBU4mP6WMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on Garden State Parkway Local Lanes northbound between South of Exit 117 - NJ 36 (Hazlet Twp) and North of Exit 120 - Laurence Harbor (Old Bridge Twp), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 07:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 08:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-07T16:38:53Z"},"road_event_id":"5vX8SCm/3SnTR6bBBMBU4mP6WMA=","beginning_cross_street":"South of Exit 117 - NJ 36","ending_cross_street":"North of Exit 120 - Laurence Harbor","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.199565,40.412181]]}},{"id":"635e3b1OxBDh4qJct1HBOIDDzvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BAw1xEpI1TNkCy016UH0mEN2hkY="}],"description":"Construction on Garden State Parkway southbound Entrance ramp Exit 82A - NJ 37 West (Toms River Twp), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T16:40:35Z"},"road_event_id":"635e3b1OxBDh4qJct1HBOIDDzvI=","beginning_cross_street":"Exit 82A - NJ 37 West","ending_cross_street":"Exit 82A - NJ 37 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.20778,39.964206]]}},{"id":"BAw1xEpI1TNkCy016UH0mEN2hkY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"635e3b1OxBDh4qJct1HBOIDDzvI="}],"description":"Construction on Garden State Parkway southbound Entrance ramp Exit 82A - NJ 37 West (Toms River Twp), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T16:40:35Z"},"road_event_id":"BAw1xEpI1TNkCy016UH0mEN2hkY=","beginning_cross_street":"Exit 82A - NJ 37 West","ending_cross_street":"Exit 82A - NJ 37 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.20778,39.964206]]}},{"id":"mM95/YFmEOkWj+6YjPjFrOAk2GA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Wz5v67GBwnMQlT+ejM7H1hqAjkQ="}],"description":"Utility work on NY 245 both directions area of Phelps Rd (Gorham), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T16:43:17Z"},"road_event_id":"mM95/YFmEOkWj+6YjPjFrOAk2GA=","beginning_cross_street":"Phelps Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.198337,42.778319]]}},{"id":"Wz5v67GBwnMQlT+ejM7H1hqAjkQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mM95/YFmEOkWj+6YjPjFrOAk2GA="},{"type":"next-occurrence","id":"RkxVw/idfv25EPnjdxhdKLdctA8="}],"description":"Utility work on NY 245 both directions area of Phelps Rd (Gorham), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T16:43:17Z"},"road_event_id":"Wz5v67GBwnMQlT+ejM7H1hqAjkQ=","beginning_cross_street":"Phelps Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.198337,42.778319]]}},{"id":"RkxVw/idfv25EPnjdxhdKLdctA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mM95/YFmEOkWj+6YjPjFrOAk2GA="}],"description":"Utility work on NY 245 both directions area of Phelps Rd (Gorham), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T16:43:17Z"},"road_event_id":"RkxVw/idfv25EPnjdxhdKLdctA8=","beginning_cross_street":"Phelps Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.198337,42.778319]]}},{"id":"m8jKDprDIociaKgj3SDXF2zpCkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on Garden State Parkway northbound Exit ramp Exit 172 - Grand Ave (Montvale), Friday May 15th, 2026 thru Saturday May 16th, 2026, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-07T16:49:19Z"},"road_event_id":"m8jKDprDIociaKgj3SDXF2zpCkc=","beginning_cross_street":"Exit 172 - Grand Ave","ending_cross_street":"Exit 172 - Grand Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.065136999999993,41.053272]]}},{"id":"Pm4xbaj69d9F1loULSagfqzASyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"i9TAeNhq6ACM/uW0dYLHhrSRLCQ="}],"description":"Milling and paving operations on Garden State Parkway southbound Entrance ramp Exit 172 - Grand Ave (Montvale), Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 06:00 AM All lanes closed, Saturday May 16th, 2026, 06:00 AM thru 07:00 AM All lanes closed","update_date":"2026-05-07T16:52:14Z"},"road_event_id":"Pm4xbaj69d9F1loULSagfqzASyk=","beginning_cross_street":"Exit 172 - Grand Ave","ending_cross_street":"Exit 172 - Grand Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T16:00:00Z","end_date":"2026-05-16T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.066737,41.055693]]}},{"id":"i9TAeNhq6ACM/uW0dYLHhrSRLCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Pm4xbaj69d9F1loULSagfqzASyk="}],"description":"Milling and paving operations on Garden State Parkway southbound Entrance ramp Exit 172 - Grand Ave (Montvale), Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 06:00 AM All lanes closed, Saturday May 16th, 2026, 06:00 AM thru 07:00 AM All lanes closed","update_date":"2026-05-07T16:52:14Z"},"road_event_id":"i9TAeNhq6ACM/uW0dYLHhrSRLCQ=","beginning_cross_street":"Exit 172 - Grand Ave","ending_cross_street":"Exit 172 - Grand Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.066737,41.055693]]}},{"id":"trPyBLAfie4qBJmgJaW9iGHllxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Cj35skup2ODkawRb5iwnjrIu0ao="}],"description":"Line striping on Garden State Parkway northbound between Bergen Toll Plaza (Saddle Brook Twp) and South of Exit 168 - NJ 502/Washington Ave (Washington Twp), Friday May 15th, 2026 thru Saturday May 16th, 2026, 09:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Saturday May 16th, 2026 thru Saturday May 16th, 2026, 12:00 AM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-07T16:54:00Z"},"road_event_id":"trPyBLAfie4qBJmgJaW9iGHllxk=","beginning_cross_street":"Bergen Toll Plaza","ending_cross_street":"South of Exit 168 - NJ 502/Washington Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.098143,40.908178]]}},{"id":"Cj35skup2ODkawRb5iwnjrIu0ao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"trPyBLAfie4qBJmgJaW9iGHllxk="}],"description":"Line striping on Garden State Parkway northbound between Bergen Toll Plaza (Saddle Brook Twp) and South of Exit 168 - NJ 502/Washington Ave (Washington Twp), Friday May 15th, 2026 thru Saturday May 16th, 2026, 09:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Saturday May 16th, 2026 thru Saturday May 16th, 2026, 12:00 AM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-07T16:54:00Z"},"road_event_id":"Cj35skup2ODkawRb5iwnjrIu0ao=","beginning_cross_street":"Bergen Toll Plaza","ending_cross_street":"South of Exit 168 - NJ 502/Washington Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.098143,40.908178]]}},{"id":"DhYdEvG7aTvVc5TYcAK3vfvbfRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Line striping on Garden State Parkway northbound between Bergen Toll Plaza (Saddle Brook Twp) and Bergen Toll Plaza (Saddle Brook Twp), Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 08:00 PM thru 06:00 AM 4 Left lanes of 12 lanes closed northbound,","update_date":"2026-05-09T10:00:01Z"},"road_event_id":"DhYdEvG7aTvVc5TYcAK3vfvbfRs=","beginning_cross_street":"Bergen Toll Plaza","ending_cross_street":"Bergen Toll Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.097537,40.908426]]}},{"id":"QTCmfW0l0hbyaKuEcgJVh+6J6M0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OSmpp6SqqQfBy6rA2j07R7FayNQ="}],"description":"Expansion joint repairs on Garden State Parkway southbound between South of Exit 163 - NJ 17 (Paramus) and North of Exit 157 - US 46 (Elmwood Park), Friday May 15th, 2026 thru Saturday May 16th, 2026, 09:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed, Saturday May 16th, 2026 thru Saturday May 16th, 2026, 12:00 AM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-07T16:58:46Z"},"road_event_id":"QTCmfW0l0hbyaKuEcgJVh+6J6M0=","beginning_cross_street":"South of Exit 163 - NJ 17","ending_cross_street":"North of Exit 157 - US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.072544,40.931115]]}},{"id":"OSmpp6SqqQfBy6rA2j07R7FayNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTCmfW0l0hbyaKuEcgJVh+6J6M0="}],"description":"Expansion joint repairs on Garden State Parkway southbound between South of Exit 163 - NJ 17 (Paramus) and North of Exit 157 - US 46 (Elmwood Park), Friday May 15th, 2026 thru Saturday May 16th, 2026, 09:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed, Saturday May 16th, 2026 thru Saturday May 16th, 2026, 12:00 AM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-07T16:58:46Z"},"road_event_id":"OSmpp6SqqQfBy6rA2j07R7FayNQ=","beginning_cross_street":"South of Exit 163 - NJ 17","ending_cross_street":"North of Exit 157 - US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.072544,40.931115]]}},{"id":"2oFeczqlzy3/Y28TYueuka4Wj0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"f/awnJPLs9fXDeDs8gZ/KVpiQQY="}],"description":"Milling and paving operations on Garden State Parkway northbound between Exit 150 - Hoover Avenue (Bloomfield) and South of Exit 153A - NJ 3 (Clifton), Friday May 15th, 2026 thru Saturday May 16th, 2026, 09:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed, Saturday May 16th, 2026 thru Saturday May 16th, 2026, 12:00 AM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-07T17:01:30Z"},"road_event_id":"2oFeczqlzy3/Y28TYueuka4Wj0U=","beginning_cross_street":"Exit 150 - Hoover Avenue","ending_cross_street":"South of Exit 153A - NJ 3","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.181254,40.809326]]}},{"id":"f/awnJPLs9fXDeDs8gZ/KVpiQQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2oFeczqlzy3/Y28TYueuka4Wj0U="}],"description":"Milling and paving operations on Garden State Parkway northbound between Exit 150 - Hoover Avenue (Bloomfield) and South of Exit 153A - NJ 3 (Clifton), Friday May 15th, 2026 thru Saturday May 16th, 2026, 09:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed, Saturday May 16th, 2026 thru Saturday May 16th, 2026, 12:00 AM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-07T17:01:30Z"},"road_event_id":"f/awnJPLs9fXDeDs8gZ/KVpiQQY=","beginning_cross_street":"Exit 150 - Hoover Avenue","ending_cross_street":"South of Exit 153A - NJ 3","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.181254,40.809326]]}},{"id":"6cN/ow0FAzXiXSOONk2ehsc0IGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on Garden State Parkway southbound between South of Exit 154 - US 46 (Clifton) and South of Exit 153A - NJ 3 (Bloomfield), Saturday May 16th, 2026 thru Saturday May 16th, 2026, 12:00 AM thru 06:00 AM 1 Right lane of 3 lanes closed, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-07T17:03:36Z"},"road_event_id":"6cN/ow0FAzXiXSOONk2ehsc0IGY=","beginning_cross_street":"South of Exit 154 - US 46","ending_cross_street":"South of Exit 153A - NJ 3","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:00:00Z","end_date":"2026-05-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.170718,40.865969]]}},{"id":"QbkKjFHoIvGYbzi0/RBeCLtXESs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0V+eSO2aGnjp3h8fampevLKI9jE="}],"description":"Milling and paving operations on Garden State Parkway Local Lanes northbound between North of Exit 114 - Red Hill Rd (Holmdel Twp) and South of Exit 120 - Laurence Harbor (Aberdeen Twp), Friday May 15th, 2026 thru Saturday May 16th, 2026, 08:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 09:00 PM thru 06:00 AM 1 Center lane of 3 lanes closed, Saturday May 16th, 2026, 06:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed","update_date":"2026-05-07T17:09:46Z"},"road_event_id":"QbkKjFHoIvGYbzi0/RBeCLtXESs=","beginning_cross_street":"North of Exit 114 - Red Hill Rd","ending_cross_street":"South of Exit 120 - Laurence Harbor","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T16:00:00Z","end_date":"2026-05-16T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.169661,40.384816]]}},{"id":"0V+eSO2aGnjp3h8fampevLKI9jE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QbkKjFHoIvGYbzi0/RBeCLtXESs="}],"description":"Milling and paving operations on Garden State Parkway Local Lanes northbound between North of Exit 114 - Red Hill Rd (Holmdel Twp) and South of Exit 120 - Laurence Harbor (Aberdeen Twp), Friday May 15th, 2026 thru Saturday May 16th, 2026, 08:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 09:00 PM thru 06:00 AM 1 Center lane of 3 lanes closed, Saturday May 16th, 2026, 06:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed","update_date":"2026-05-07T17:09:46Z"},"road_event_id":"0V+eSO2aGnjp3h8fampevLKI9jE=","beginning_cross_street":"North of Exit 114 - Red Hill Rd","ending_cross_street":"South of Exit 120 - Laurence Harbor","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.169661,40.384816]]}},{"id":"cEg0CgyMnAy7hfyoKRjUY+XOk3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Paving operations on Garden State Parkway Local Lanes northbound between North of Asbury Toll Plaza (Tinton Falls) and North of Exit 105 - NJ 36 (Tinton Falls), Friday May 15th, 2026 thru Saturday May 16th, 2026, 07:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 10:00 PM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-07T17:13:30Z"},"road_event_id":"cEg0CgyMnAy7hfyoKRjUY+XOk3M=","beginning_cross_street":"North of Asbury Toll Plaza","ending_cross_street":"North of Exit 105 - NJ 36","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T18:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078225,40.264094]]}},{"id":"wppVH/9KXVYixm6OeK7OynbE19U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Line striping on Garden State Parkway northbound between South of Asbury Toll Plaza (Tinton Falls), Friday May 15th, 2026 thru Saturday May 16th, 2026, 06:00 PM thru 06:00 AM 4 Left lanes of 11 lanes closed","update_date":"2026-05-07T17:15:14Z"},"road_event_id":"wppVH/9KXVYixm6OeK7OynbE19U=","beginning_cross_street":"South of Asbury Toll Plaza","ending_cross_street":"South of Asbury Toll Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T16:00:00Z","end_date":"2026-05-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081643,40.250324]]}},{"id":"7e9RBdaB7Yc4b+Nus21MfVKQ1Tg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Guard rail repairs on Garden State Parkway northbound Entrance ramp Exit 63A - NJ 72 East (Stafford Twp), Saturday May 16th, 2026 thru Saturday May 16th, 2026, 12:00 AM thru 04:00 AM All lanes closed","update_date":"2026-05-07T17:17:05Z"},"road_event_id":"7e9RBdaB7Yc4b+Nus21MfVKQ1Tg=","beginning_cross_street":"Exit 63A - NJ 72 East","ending_cross_street":"Exit 63A - NJ 72 East","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.278586,39.71017]]}},{"id":"PrMiYzujplAomk+LunJTFeUmvqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near In the vicinity of I-287 (Hanover Twp), Wednesday May 13, 2026 01:00 PM thru 02:30 PM, left lane closed","update_date":"2026-05-07T17:18:33Z"},"road_event_id":"PrMiYzujplAomk+LunJTFeUmvqs=","beginning_cross_street":"In the vicinity of I-287","ending_cross_street":"In the vicinity of I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T06:00:00Z","end_date":"2026-05-14T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.439514,40.833278]]}},{"id":"irL4fqcNQiAb6U7AHOWQ6rM6Hcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Guard rail repairs on Garden State Parkway northbound Exit ramp Exit 63B - NJ 72 West (Stafford Twp), Saturday May 16th, 2026 thru Saturday May 16th, 2026, 12:00 AM thru 04:00 AM All lanes closed","update_date":"2026-05-07T17:18:45Z"},"road_event_id":"irL4fqcNQiAb6U7AHOWQ6rM6Hcg=","beginning_cross_street":"Exit 63B - NJ 72 West","ending_cross_street":"Exit 63B - NJ 72 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.277786,39.712528]]}},{"id":"4AvOlaC0uoGXD/Wl2+OrmpvTe2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near In the vicinity of Irish Spring Rd (Randolph Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, right lane closed","update_date":"2026-05-07T17:21:29Z"},"road_event_id":"4AvOlaC0uoGXD/Wl2+OrmpvTe2E=","beginning_cross_street":"In the vicinity of Irish Spring Rd","ending_cross_street":"In the vicinity of CR 617","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.6194,40.857051]]}},{"id":"KHhk2rfY6GT7HRk91Yzy0Fd1gZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Southbound between US 206/NJ 28 (Raritan Boro) and North of Ortho Dr (Raritan Boro), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-07T17:24:26Z"},"road_event_id":"KHhk2rfY6GT7HRk91Yzy0Fd1gZo=","beginning_cross_street":"US 206/NJ 28","ending_cross_street":"North of Ortho Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632003,40.574443]]}},{"id":"2WfHMhRnHAdKbIJ2lfIao7srk7I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Southbound between US 206/NJ 28 (Raritan Boro) and North of Ortho Dr (Raritan Boro), Thursday May 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-07T17:24:27Z"},"road_event_id":"2WfHMhRnHAdKbIJ2lfIao7srk7I=","beginning_cross_street":"US 206/NJ 28","ending_cross_street":"North of Ortho Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632003,40.574443]]}},{"id":"MIXBdPsG3j3z2Hu1OUSjo2wcm94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Both Directions At Wittpenn Bridge (Jersey City) Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 01:00 AM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-07T17:43:06Z"},"road_event_id":"MIXBdPsG3j3z2Hu1OUSjo2wcm94=","beginning_cross_street":"Wittpenn Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081787,40.741451]]}},{"id":"esjO26Vt3IJvkDpxVVFZgb2DV9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[],"description":"Construction on 18TH ST westbound at 3RD AVE (New York), Wednesday May 13th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-07T17:53:24Z"},"road_event_id":"esjO26Vt3IJvkDpxVVFZgb2DV9A=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995958,40.665617]]}},{"id":"cKApSKpx96xt+h9qVKbaCsZ82FM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["22ND ST"],"direction":"unknown","related_road_events":[],"description":"Construction on 22ND ST westbound at 3RD AVE (New York), Wednesday May 13th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-07T17:55:23Z"},"road_event_id":"cKApSKpx96xt+h9qVKbaCsZ82FM=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997825,40.663126]]}},{"id":"g33foY43no7mmvdkJjBV3qzExDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["17TH ST"],"direction":"unknown","related_road_events":[],"description":"Construction on 17TH ST eastbound at 3RD AVE (New York), Wednesday May 13th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-07T17:58:15Z"},"road_event_id":"g33foY43no7mmvdkJjBV3qzExDU=","beginning_cross_street":"3RD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995718,40.666358]]}},{"id":"X9kaj+G9R25QIJlTAME4CeSDI38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike Inner Roadway southbound Entrance ramp Interchange 10 - NJ 440/I-287 (Edison Twp) to Interchange 10 - NJ 440/I-287 (Edison Twp), Thursday May 14th,2026 thru Friday May 15th,2026, Thursday, 08:00 PM thru 05:00 AM All lanes closed southbound,","update_date":"2026-05-12T09:00:06Z"},"road_event_id":"X9kaj+G9R25QIJlTAME4CeSDI38=","beginning_cross_street":"Interchange 10 - NJ 440/I-287","ending_cross_street":"Interchange 10 - NJ 440/I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.34202,40.528014]]}},{"id":"1HUMML7JKHZxudf/lFxCXkAEGio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike Inner Roadway northbound Entrance ramp Interchange 9 - NJ 18 (East Brunswick Twp) to Interchange 9 - NJ 18 (New Brunswick), Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 07:00 PM thru 05:00 AM All lanes closed northbound,","update_date":"2026-05-13T09:00:02Z"},"road_event_id":"1HUMML7JKHZxudf/lFxCXkAEGio=","beginning_cross_street":"Interchange 9 - NJ 18","ending_cross_street":"Interchange 9 - NJ 18","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T18:00:00Z","end_date":"2026-05-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.402913,40.477242]]}},{"id":"jROd4w/u94sM1O8Try+tdv7DZxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Both Directions At Wittpenn Bridge (Jersey City) Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 01:00 AM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-07T18:04:52Z"},"road_event_id":"jROd4w/u94sM1O8Try+tdv7DZxs=","beginning_cross_street":"Wittpenn Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081787,40.741451]]}},{"id":"GrHjHLNqybQUkI1Q30KZJnDPWrw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NAVY ST"],"direction":"unknown","related_road_events":[],"description":"Construction on NAVY ST both directions at PARK AVE (New York), Friday May 15th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-07T18:05:00Z"},"road_event_id":"GrHjHLNqybQUkI1Q30KZJnDPWrw=","beginning_cross_street":"PARK AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980369,40.696332]]}},{"id":"1d6Qu9XMmyQMuQBYewrNcBv95j4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Eastern Spur"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on New Jersey Turnpike - Eastern Spur southbound between South of Northern Mixing Bowl (North Bergen Twp) and North of Interchange 17E - NJ 3/Lincoln Tunnel (Secaucus), Tuesday May 12th, 2026 thru Thursday May 14th, 2026, Tuesday/Wednesday, 07:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed, Tuesday May 12th, 2026 thru Thursday May 14th, 2026, Tuesday/Wednesday, 09:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-07T18:06:17Z"},"road_event_id":"1d6Qu9XMmyQMuQBYewrNcBv95j4=","beginning_cross_street":"South of Northern Mixing Bowl","ending_cross_street":"North of Interchange 17E - NJ 3/Lincoln Tunnel","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.029782,40.810888]]}},{"id":"RXKdq+9fkyCgVLxURASYvbJOSfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WYTHE AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on WYTHE AVE eastbound at WILLIAMSBURG ST E (New York), Friday May 15th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-07T18:08:55Z"},"road_event_id":"RXKdq+9fkyCgVLxURASYvbJOSfQ=","beginning_cross_street":"WILLIAMSBURG ST E","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960951,40.701191]]}},{"id":"7McE3tPbpzarI78TsvmsKZ72Oag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Pennsylvania Ext."],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3By0lg2+EjEVp2Lr/XwpzSWnznw="}],"description":"Traffic shift on New Jersey Turnpike - Pennsylvania Ext. eastbound between East of Delaware River Bridge (Florence Twp) and West of US 130 (Florence Twp), Thursday May 14th,2026 12:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed eastbound, , Wednesday May 13th,2026 thru Thursday May 14th,2026, Wednesday, 06:00 PM thru 12:00 AM 2 Left lanes of 3 lanes closed eastbound,","update_date":"2026-05-13T10:00:08Z"},"road_event_id":"7McE3tPbpzarI78TsvmsKZ72Oag=","beginning_cross_street":"East of Delaware River Bridge","ending_cross_street":"West of US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.814474,40.112464]]}},{"id":"3By0lg2+EjEVp2Lr/XwpzSWnznw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Pennsylvania Ext."],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7McE3tPbpzarI78TsvmsKZ72Oag="}],"description":"Traffic shift on New Jersey Turnpike - Pennsylvania Ext. eastbound between East of Delaware River Bridge (Florence Twp) and West of US 130 (Florence Twp), Thursday May 14th,2026 12:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed eastbound, , Wednesday May 13th,2026 thru Thursday May 14th,2026, Wednesday, 06:00 PM thru 12:00 AM 2 Left lanes of 3 lanes closed eastbound,","update_date":"2026-05-13T10:00:08Z"},"road_event_id":"3By0lg2+EjEVp2Lr/XwpzSWnznw=","beginning_cross_street":"East of Delaware River Bridge","ending_cross_street":"West of US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T16:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.814474,40.112464]]}},{"id":"ffpcXJ+V+f4Tq6lhmtp6rawmIbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAHAM AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on GRAHAM AVE both directions at HERBERT ST (New York), Friday May 15th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-07T18:10:49Z"},"road_event_id":"ffpcXJ+V+f4Tq6lhmtp6rawmIbY=","beginning_cross_street":"HERBERT ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945237,40.719058]]}},{"id":"HE+KamympmgTxjGXjcJLchBoWLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike Outer Roadway northbound Entrance ramp Interchange 9 - NJ 18 (East Brunswick Twp), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 07:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T18:11:44Z"},"road_event_id":"HE+KamympmgTxjGXjcJLchBoWLY=","beginning_cross_street":"Interchange 9 - NJ 18","ending_cross_street":"Interchange 9 - NJ 18","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.402878,40.477353]]}},{"id":"auQE+S9mHmKixAJAoztZdfMQnWc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike between to US 206 from Interchange 7 (Bordentown Twp), Friday May 15th, 2026 thru Saturday May 16th, 2026, 09:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T18:14:15Z"},"road_event_id":"auQE+S9mHmKixAJAoztZdfMQnWc=","beginning_cross_street":"to US 206 from Interchange 7","ending_cross_street":"to US 206 from Interchange 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.704649,40.123734]]}},{"id":"fF2P0U/SiqzwDmgmj4AGju6Wa6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on New Jersey Turnpike - Western Spur northbound between South of Interchange 15E - US 1&9 (Newark) and South of Interchange 16W - NJ 3 (Rutherford), Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 08:00 PM thru 06:00 AM 1 Left lane of 5 lanes closed northbound, , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 10:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed northbound,","update_date":"2026-05-13T10:00:05Z"},"road_event_id":"fF2P0U/SiqzwDmgmj4AGju6Wa6s=","beginning_cross_street":"South of Interchange 15E - US 1&9","ending_cross_street":"South of Interchange 16W - NJ 3","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.133165,40.724557]]}},{"id":"VtTqzzuUpUs8/mFc/tHuN2GfmqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[],"description":"Pothole repair on Taconic State Parkway both directions between Exit 4 - NY 117 (Mount Pleasant) and Bronx River Parkway (North Castle) Res 8-9 RW/32616009 - This is a moving operation. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026, 07:00 PM thru 11:00 PM, mobile lane closure","update_date":"2026-05-13T09:00:51Z"},"road_event_id":"VtTqzzuUpUs8/mFc/tHuN2GfmqM=","beginning_cross_street":"Exit 4 - NY 117","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.808228,41.120701]]}},{"id":"t+9TxOYMnkRjX3zV7YV55LL1pGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Line striping and crack sealing and barrier repairs on New Jersey Turnpike Inner Roadway northbound between Inner and Outer Roadway Merge (Mansfield Twp) and North of Interchange 14 - I-78/US 1&9 (Newark), Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 08:00 PM thru 05:00 AM All lanes closed northbound,","update_date":"2026-05-13T09:00:01Z"},"road_event_id":"t+9TxOYMnkRjX3zV7YV55LL1pGM=","beginning_cross_street":"Inner and Outer Roadway Merge","ending_cross_street":"North of Interchange 14 - I-78/US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.748435,40.079704]]}},{"id":"e3ct7U2kchlRVut5mRPoc+rYEhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Eastern Spur"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements and overhead sign repair on New Jersey Turnpike - Eastern Spur southbound between Northern Mixing Bowl (Ridgefield) and South of Interchange 15E - US 1&9 (Newark), Tuesday May 12th, 2026 thru Thursday May 14th, 2026, Tuesday/Wednesday, 09:00 PM thru 04:00 AM All lanes closed","update_date":"2026-05-07T18:29:51Z"},"road_event_id":"e3ct7U2kchlRVut5mRPoc+rYEhQ=","beginning_cross_street":"Northern Mixing Bowl","ending_cross_street":"South of Interchange 15E - US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.022705,40.831627]]}},{"id":"KB4hE4N5GGfNUMZFOH2iAE2PbU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[],"description":"Barrier repairs and deck work and milling and paving operations on New Jersey Turnpike - Western Spur northbound between Southern Mixing Bowl (Newark) and South of Northern Mixing Bowl (Ridgefield), Thursday May 14th, 2026 thru Friday May 15th, 2026, 09:00 PM thru 04:00 AM All lanes closed","update_date":"2026-05-07T18:33:08Z"},"road_event_id":"KB4hE4N5GGfNUMZFOH2iAE2PbU8=","beginning_cross_street":"Southern Mixing Bowl","ending_cross_street":"South of Northern Mixing Bowl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.140531,40.713624]]}},{"id":"kpauojGVdKMEKqepjpQ57K1iRbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on New Jersey Turnpike - Western Spur southbound between South of Northern Mixing Bowl (Ridgefield) and South of Interchange 15E - US 1&9 (Newark), Sunday May 17th,2026 thru Monday May 18th,2026, Sunday, 10:00 PM thru 04:00 AM All lanes closed southbound,","update_date":"2026-05-09T10:00:13Z"},"road_event_id":"kpauojGVdKMEKqepjpQ57K1iRbI=","beginning_cross_street":"South of Northern Mixing Bowl","ending_cross_street":"South of Interchange 15E - US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.027355,40.828845]]}},{"id":"8u4B10jfGPUaMTcWF3TkBYAB5Y4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 79"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 79 Northbound At CR 3/Tennent Rd (Marlboro Twp) Wednesday May 13, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-07T18:39:16Z"},"road_event_id":"8u4B10jfGPUaMTcWF3TkBYAB5Y4=","beginning_cross_street":"CR 3/Tennent Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.241455,40.382534]]}},{"id":"Zjy4lXy8v/4wF+Q9Vr3xfVoGwyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 79"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 79 Northbound At CR 3/Tennent Rd (Marlboro Twp) Thursday May 14, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-07T18:39:24Z"},"road_event_id":"Zjy4lXy8v/4wF+Q9Vr3xfVoGwyg=","beginning_cross_street":"CR 3/Tennent Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.241455,40.382534]]}},{"id":"WQA51CY8ga4cDuGqki46gBoCXwY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 79"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 79 Northbound At CR 3/Tennent Rd (Marlboro Twp) Friday May 15, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-07T18:39:31Z"},"road_event_id":"WQA51CY8ga4cDuGqki46gBoCXwY=","beginning_cross_street":"CR 3/Tennent Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.241455,40.382534]]}},{"id":"5x7RCWhzM1IeZCBq0plPCOqVggQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8QyX1V5abCjr4SMOiekdt63UK4I="}],"description":"Utility work on NY 250 southbound between Penfield Road; NY 441 (Penfield) and New Wickham Rd (Perinton) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crossings, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:41:01Z"},"road_event_id":"5x7RCWhzM1IeZCBq0plPCOqVggQ=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Wickham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441351,43.131308]]}},{"id":"8QyX1V5abCjr4SMOiekdt63UK4I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5x7RCWhzM1IeZCBq0plPCOqVggQ="},{"type":"next-occurrence","id":"QSW3ocIQunAxu3/jzuuPScUz6aI="}],"description":"Utility work on NY 250 southbound between Penfield Road; NY 441 (Penfield) and New Wickham Rd (Perinton) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crossings, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:41:01Z"},"road_event_id":"8QyX1V5abCjr4SMOiekdt63UK4I=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Wickham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441351,43.131308]]}},{"id":"QSW3ocIQunAxu3/jzuuPScUz6aI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5x7RCWhzM1IeZCBq0plPCOqVggQ="},{"type":"next-occurrence","id":"KrLj8UB3hntEBLXR6uAXuWCrJ38="}],"description":"Utility work on NY 250 southbound between Penfield Road; NY 441 (Penfield) and New Wickham Rd (Perinton) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crossings, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:41:01Z"},"road_event_id":"QSW3ocIQunAxu3/jzuuPScUz6aI=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Wickham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441351,43.131308]]}},{"id":"KrLj8UB3hntEBLXR6uAXuWCrJ38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5x7RCWhzM1IeZCBq0plPCOqVggQ="},{"type":"next-occurrence","id":"JHH2vaVdG/2BmgRFNxCSVnv40xQ="}],"description":"Utility work on NY 250 southbound between Penfield Road; NY 441 (Penfield) and New Wickham Rd (Perinton) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crossings, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:41:01Z"},"road_event_id":"KrLj8UB3hntEBLXR6uAXuWCrJ38=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Wickham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441351,43.131308]]}},{"id":"JHH2vaVdG/2BmgRFNxCSVnv40xQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5x7RCWhzM1IeZCBq0plPCOqVggQ="},{"type":"next-occurrence","id":"v75vWPjUA7FjWY1iCLTiGh4cOL4="}],"description":"Utility work on NY 250 southbound between Penfield Road; NY 441 (Penfield) and New Wickham Rd (Perinton) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crossings, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:41:01Z"},"road_event_id":"JHH2vaVdG/2BmgRFNxCSVnv40xQ=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Wickham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441351,43.131308]]}},{"id":"v75vWPjUA7FjWY1iCLTiGh4cOL4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5x7RCWhzM1IeZCBq0plPCOqVggQ="},{"type":"next-occurrence","id":"6CAlnHTW+/rwyl/witkX0bU+1VY="}],"description":"Utility work on NY 250 southbound between Penfield Road; NY 441 (Penfield) and New Wickham Rd (Perinton) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crossings, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:41:01Z"},"road_event_id":"v75vWPjUA7FjWY1iCLTiGh4cOL4=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Wickham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441351,43.131308]]}},{"id":"6CAlnHTW+/rwyl/witkX0bU+1VY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5x7RCWhzM1IeZCBq0plPCOqVggQ="},{"type":"next-occurrence","id":"u82bY7+McU8XJEZvK5bQrRKT4v4="}],"description":"Utility work on NY 250 southbound between Penfield Road; NY 441 (Penfield) and New Wickham Rd (Perinton) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crossings, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:41:01Z"},"road_event_id":"6CAlnHTW+/rwyl/witkX0bU+1VY=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Wickham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441351,43.131308]]}},{"id":"u82bY7+McU8XJEZvK5bQrRKT4v4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5x7RCWhzM1IeZCBq0plPCOqVggQ="},{"type":"next-occurrence","id":"Nd3N4JRilF2yv6Q3jXqQ0QaeCtA="}],"description":"Utility work on NY 250 southbound between Penfield Road; NY 441 (Penfield) and New Wickham Rd (Perinton) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crossings, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:41:01Z"},"road_event_id":"u82bY7+McU8XJEZvK5bQrRKT4v4=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Wickham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441351,43.131308]]}},{"id":"Nd3N4JRilF2yv6Q3jXqQ0QaeCtA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5x7RCWhzM1IeZCBq0plPCOqVggQ="}],"description":"Utility work on NY 250 southbound between Penfield Road; NY 441 (Penfield) and New Wickham Rd (Perinton) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crossings, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:41:01Z"},"road_event_id":"Nd3N4JRilF2yv6Q3jXqQ0QaeCtA=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Wickham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441351,43.131308]]}},{"id":"h9G+/ZpLxDjF1nwdONqhnrf0PZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Construction on I-295 both directions area of Union Turnpike (New York), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 09:00 PM thru 03:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-07T18:47:30Z"},"road_event_id":"h9G+/ZpLxDjF1nwdONqhnrf0PZs=","beginning_cross_street":"Union Turnpike","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.765515,40.732539]]}},{"id":"Db3OIxVTQOQ7vt5ja9JvoYkkiIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q/tXRtHXCvsCv8/DZyVmmsk8mRE="}],"description":"Utility work on NY 286 eastbound between Fairport Nine Mile Point Road; NY 250 (Penfield) and 3330 Atlantic Ave (Penfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:47:52Z"},"road_event_id":"Db3OIxVTQOQ7vt5ja9JvoYkkiIw=","beginning_cross_street":"Fairport Nine Mile Point Road; NY 250","ending_cross_street":"3330 Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.432037,43.160019]]}},{"id":"q/tXRtHXCvsCv8/DZyVmmsk8mRE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Db3OIxVTQOQ7vt5ja9JvoYkkiIw="},{"type":"next-occurrence","id":"jjqhr2gYMf084h4Ng5xnNlTVDn8="}],"description":"Utility work on NY 286 eastbound between Fairport Nine Mile Point Road; NY 250 (Penfield) and 3330 Atlantic Ave (Penfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:47:52Z"},"road_event_id":"q/tXRtHXCvsCv8/DZyVmmsk8mRE=","beginning_cross_street":"Fairport Nine Mile Point Road; NY 250","ending_cross_street":"3330 Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.432037,43.160019]]}},{"id":"jjqhr2gYMf084h4Ng5xnNlTVDn8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Db3OIxVTQOQ7vt5ja9JvoYkkiIw="},{"type":"next-occurrence","id":"Jznjgy8OlQ2l11Gy4VB0WLeyQoY="}],"description":"Utility work on NY 286 eastbound between Fairport Nine Mile Point Road; NY 250 (Penfield) and 3330 Atlantic Ave (Penfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:47:52Z"},"road_event_id":"jjqhr2gYMf084h4Ng5xnNlTVDn8=","beginning_cross_street":"Fairport Nine Mile Point Road; NY 250","ending_cross_street":"3330 Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.432037,43.160019]]}},{"id":"Jznjgy8OlQ2l11Gy4VB0WLeyQoY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Db3OIxVTQOQ7vt5ja9JvoYkkiIw="},{"type":"next-occurrence","id":"KRQvEXVec/3a/h7haBnly83xv5E="}],"description":"Utility work on NY 286 eastbound between Fairport Nine Mile Point Road; NY 250 (Penfield) and 3330 Atlantic Ave (Penfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:47:52Z"},"road_event_id":"Jznjgy8OlQ2l11Gy4VB0WLeyQoY=","beginning_cross_street":"Fairport Nine Mile Point Road; NY 250","ending_cross_street":"3330 Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.432037,43.160019]]}},{"id":"KRQvEXVec/3a/h7haBnly83xv5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Db3OIxVTQOQ7vt5ja9JvoYkkiIw="},{"type":"next-occurrence","id":"PzlVfhheYjW3JUMJWGLS1RpkAtQ="}],"description":"Utility work on NY 286 eastbound between Fairport Nine Mile Point Road; NY 250 (Penfield) and 3330 Atlantic Ave (Penfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:47:52Z"},"road_event_id":"KRQvEXVec/3a/h7haBnly83xv5E=","beginning_cross_street":"Fairport Nine Mile Point Road; NY 250","ending_cross_street":"3330 Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.432037,43.160019]]}},{"id":"PzlVfhheYjW3JUMJWGLS1RpkAtQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Db3OIxVTQOQ7vt5ja9JvoYkkiIw="},{"type":"next-occurrence","id":"zrl8jBTLOEXlSWNSI85M0xxH03I="}],"description":"Utility work on NY 286 eastbound between Fairport Nine Mile Point Road; NY 250 (Penfield) and 3330 Atlantic Ave (Penfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:47:52Z"},"road_event_id":"PzlVfhheYjW3JUMJWGLS1RpkAtQ=","beginning_cross_street":"Fairport Nine Mile Point Road; NY 250","ending_cross_street":"3330 Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.432037,43.160019]]}},{"id":"zrl8jBTLOEXlSWNSI85M0xxH03I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Db3OIxVTQOQ7vt5ja9JvoYkkiIw="},{"type":"next-occurrence","id":"AjLxCFVCww1eVjd9ApmIxlZBzjo="}],"description":"Utility work on NY 286 eastbound between Fairport Nine Mile Point Road; NY 250 (Penfield) and 3330 Atlantic Ave (Penfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:47:52Z"},"road_event_id":"zrl8jBTLOEXlSWNSI85M0xxH03I=","beginning_cross_street":"Fairport Nine Mile Point Road; NY 250","ending_cross_street":"3330 Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.432037,43.160019]]}},{"id":"AjLxCFVCww1eVjd9ApmIxlZBzjo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Db3OIxVTQOQ7vt5ja9JvoYkkiIw="},{"type":"next-occurrence","id":"xSRnIBsnMBZfswkyLhTXB4uby8g="}],"description":"Utility work on NY 286 eastbound between Fairport Nine Mile Point Road; NY 250 (Penfield) and 3330 Atlantic Ave (Penfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:47:52Z"},"road_event_id":"AjLxCFVCww1eVjd9ApmIxlZBzjo=","beginning_cross_street":"Fairport Nine Mile Point Road; NY 250","ending_cross_street":"3330 Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.432037,43.160019]]}},{"id":"xSRnIBsnMBZfswkyLhTXB4uby8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Db3OIxVTQOQ7vt5ja9JvoYkkiIw="}],"description":"Utility work on NY 286 eastbound between Fairport Nine Mile Point Road; NY 250 (Penfield) and 3330 Atlantic Ave (Penfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T18:47:52Z"},"road_event_id":"xSRnIBsnMBZfswkyLhTXB4uby8g=","beginning_cross_street":"Fairport Nine Mile Point Road; NY 250","ending_cross_street":"3330 Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.432037,43.160019]]}},{"id":"CIwwZn7pzZ+GiYwYki6Viuo+4ks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[],"description":"Guard rail repairs on NY 119 both directions between NY 9A - Saw Mill River Road (Elmsford) and Knollwood Road - NY 100A (Greenburgh) Res 8-9 RW/32407509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 20th, 2026 thru Wednesday May 20th, 2026, 12:01 AM thru 05:00 AM, right lane closure","update_date":"2026-05-13T09:00:48Z"},"road_event_id":"CIwwZn7pzZ+GiYwYki6Viuo+4ks=","beginning_cross_street":"NY 9A - Saw Mill River Road","ending_cross_street":"Knollwood Road - NY 100A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T04:02:00Z","end_date":"2026-05-20T09:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819763,41.054889]]}},{"id":"DGMo9LizE3LWT0j/BsUK6lHxs+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Construction on I-495 westbound ramp to Exit 31 - Cross Island Parkway (New York), Thursday May 14th, 2026 thru Friday May 15th, 2026, 09:00 PM thru 03:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-05-07T19:03:30Z"},"road_event_id":"DGMo9LizE3LWT0j/BsUK6lHxs+Q=","beginning_cross_street":"Exit 31 - Cross Island Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.742187,40.755528]]}},{"id":"U4b/WKk9jaypXjt6gjh7v5u+sTA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Jackie Robinson Parkway"],"direction":"unknown","related_road_events":[],"description":"Construction on Jackie Robinson Parkway both directions at Woodhaven Boulevard (New York), Friday May 15th, 2026 thru Saturday May 16th, 2026, 09:00 PM thru 03:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-05-07T19:08:51Z"},"road_event_id":"U4b/WKk9jaypXjt6gjh7v5u+sTA=","beginning_cross_street":"Woodhaven Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.856208,40.703572]]}},{"id":"NESs4/TbfUY8594bkoJtuB9FHDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"naUls2cDkPaSQXNAQUEeKTY/OvI="}],"description":"Construction on I-295 both directions between Randall Avenue (New York) and Exit - I- 278 Bruckner Expressway (New York), Thursday May 7th, 2026 thru Thursday May 14th, 2026, Sunday thru Saturday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-07T19:13:16Z"},"road_event_id":"NESs4/TbfUY8594bkoJtuB9FHDI=","beginning_cross_street":"Randall Avenue","ending_cross_street":"Exit   - I- 278 Bruckner Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.827576,40.825687]]}},{"id":"naUls2cDkPaSQXNAQUEeKTY/OvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NESs4/TbfUY8594bkoJtuB9FHDI="}],"description":"Construction on I-295 both directions between Randall Avenue (New York) and Exit - I- 278 Bruckner Expressway (New York), Thursday May 7th, 2026 thru Thursday May 14th, 2026, Sunday thru Saturday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-07T19:13:16Z"},"road_event_id":"naUls2cDkPaSQXNAQUEeKTY/OvI=","beginning_cross_street":"Randall Avenue","ending_cross_street":"Exit   - I- 278 Bruckner Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.827576,40.825687]]}},{"id":"J448fdpAMBtyauH52pc33EMvzJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRUCKNER EXPY"],"direction":"unknown","related_road_events":[],"description":"Construction on BRUCKNER EXPY westbound at (New York), Thursday May 14th, 2026 thru Friday May 15th, 2026, 10:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-05-07T19:18:00Z"},"road_event_id":"J448fdpAMBtyauH52pc33EMvzJU=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.84392,40.828813]]}},{"id":"PxBUfZ2nL4FbnGockJwuXtd0Fls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Westbound At CR 541/Main St (Medford Twp) Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-07T19:18:40Z"},"road_event_id":"PxBUfZ2nL4FbnGockJwuXtd0Fls=","beginning_cross_street":"CR 541/Main St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.824844,39.904663]]}},{"id":"2RWqfq3GqDFhMPjNyQUf2IkxVao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Westbound At CR 541/Main St (Medford Twp) Thursday May 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-07T19:18:46Z"},"road_event_id":"2RWqfq3GqDFhMPjNyQUf2IkxVao=","beginning_cross_street":"CR 541/Main St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.824844,39.904663]]}},{"id":"WmMbq+zQUodQZC1P1o5nzwnLCjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[],"description":"Pothole repair on NY 120 northbound between High Hill Road (North Castle) and Armonk-Bedford Road - NY 22 (North Castle) Res 8-9 RW/32345609 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday May 16th, 2026, 06:00 AM thru 02:00 PM, right lane closure","update_date":"2026-05-12T16:40:01Z"},"road_event_id":"WmMbq+zQUodQZC1P1o5nzwnLCjM=","beginning_cross_street":"","ending_cross_street":"Armonk-Bedford Road - NY 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T16:00:00Z","end_date":"2026-05-17T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.728617,41.104888]]}},{"id":"j/IUZ1hHm/j/duaDRp4AhGH1eCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Harlem River Drive"],"direction":"unknown","related_road_events":[],"description":"Construction on Harlem River Drive northbound at Adam Clayton Powell Jr Boulevard; Macombs Dam Bridge (New York), Thursday May 14th, 2026, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-07T19:30:59Z"},"road_event_id":"j/IUZ1hHm/j/duaDRp4AhGH1eCo=","beginning_cross_street":"Adam Clayton Powell Jr Boulevard; Macombs Dam Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934709,40.828231]]}},{"id":"pHDM/DFdSzBH0rY6LOf98senlOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[],"description":"Construction on Bronx River Parkway both directions between Nereid Avenue (New York) and Exit 2W - Bruckner Boulevard (New York), Friday May 15th, 2026, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-07T19:46:36Z"},"road_event_id":"pHDM/DFdSzBH0rY6LOf98senlOI=","beginning_cross_street":"Nereid Avenue","ending_cross_street":"Exit 2W - Bruckner Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860974,40.900781]]}},{"id":"4IOe5Ppu5a2RlsiG66r4FLtCOx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3sFNWQADrYkSmtmXY+bXxHAXFZE="}],"description":"Utility work on NY 245 northbound at 3687 Gorham Hall Rd (Gorham) Pole replacement due to natural causes. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossings. Work beyond shoulder., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T19:47:00Z"},"road_event_id":"4IOe5Ppu5a2RlsiG66r4FLtCOx8=","beginning_cross_street":"3687 Gorham Hall Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.198077,42.778327]]}},{"id":"3sFNWQADrYkSmtmXY+bXxHAXFZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4IOe5Ppu5a2RlsiG66r4FLtCOx8="},{"type":"next-occurrence","id":"p95bRk3X4tieOEkBJS/4l832LKs="}],"description":"Utility work on NY 245 northbound at 3687 Gorham Hall Rd (Gorham) Pole replacement due to natural causes. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossings. Work beyond shoulder., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T19:47:00Z"},"road_event_id":"3sFNWQADrYkSmtmXY+bXxHAXFZE=","beginning_cross_street":"3687 Gorham Hall Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.198077,42.778327]]}},{"id":"p95bRk3X4tieOEkBJS/4l832LKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4IOe5Ppu5a2RlsiG66r4FLtCOx8="}],"description":"Utility work on NY 245 northbound at 3687 Gorham Hall Rd (Gorham) Pole replacement due to natural causes. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossings. Work beyond shoulder., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-07T19:47:00Z"},"road_event_id":"p95bRk3X4tieOEkBJS/4l832LKs=","beginning_cross_street":"3687 Gorham Hall Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.198077,42.778327]]}},{"id":"mouJJ4oiKl1Z607tA0aeDrBE4uU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-190"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lMyU9+J88o5N68ggxDxdXUlM5Uw="}],"description":"Milling and repaving on I-190 both directions between Witmer Road; NY 31 (Niagara) and Upper Mountain Road Ramp (Lewiston), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-07T20:27:03Z"},"road_event_id":"mouJJ4oiKl1Z607tA0aeDrBE4uU=","beginning_cross_street":"Witmer Road; NY 31","ending_cross_street":"Upper Mountain Road  Ramp ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.018352,43.130026]]}},{"id":"lMyU9+J88o5N68ggxDxdXUlM5Uw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-190"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mouJJ4oiKl1Z607tA0aeDrBE4uU="},{"type":"next-occurrence","id":"/HuTl2TSYMb8HJpnjgwaXKfaWVI="}],"description":"Milling and repaving on I-190 both directions between Witmer Road; NY 31 (Niagara) and Upper Mountain Road Ramp (Lewiston), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-07T20:27:03Z"},"road_event_id":"lMyU9+J88o5N68ggxDxdXUlM5Uw=","beginning_cross_street":"Witmer Road; NY 31","ending_cross_street":"Upper Mountain Road  Ramp ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.018352,43.130026]]}},{"id":"/HuTl2TSYMb8HJpnjgwaXKfaWVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-190"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mouJJ4oiKl1Z607tA0aeDrBE4uU="}],"description":"Milling and repaving on I-190 both directions between Witmer Road; NY 31 (Niagara) and Upper Mountain Road Ramp (Lewiston), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-07T20:27:03Z"},"road_event_id":"/HuTl2TSYMb8HJpnjgwaXKfaWVI=","beginning_cross_street":"Witmer Road; NY 31","ending_cross_street":"Upper Mountain Road  Ramp ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.018352,43.130026]]}},{"id":"b0LYHk8cToSfTuBaR2U00+IFqC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South of CR 607/Lackawanna Dr (Byram Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, right lane closed","update_date":"2026-05-07T20:36:28Z"},"road_event_id":"b0LYHk8cToSfTuBaR2U00+IFqC0=","beginning_cross_street":"South of CR 607/Lackawanna Dr","ending_cross_street":"North of CR 604/Waterloo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.718803,40.928169]]}},{"id":"EwFpcelV04l2nKIu1dhMkgSkzpg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near North of CR 604/Waterloo Rd (Byram Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, right lane closed","update_date":"2026-05-07T20:36:26Z"},"road_event_id":"EwFpcelV04l2nKIu1dhMkgSkzpg=","beginning_cross_street":"North of CR 604/Waterloo Rd","ending_cross_street":"South of CR 607/Lackawanna Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.718727,40.926712]]}},{"id":"mMv3xOJcIgGmG2Y6hhunePTWxF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of Main St (Roxbury Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, right lane closed","update_date":"2026-05-07T20:36:38Z"},"road_event_id":"mMv3xOJcIgGmG2Y6hhunePTWxF8=","beginning_cross_street":"West of Main St","ending_cross_street":"West of Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.668037,40.890239]]}},{"id":"FYUp9ih9vNC4Zs5Qfa6b3dJhhrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2NyZmI/n8j+PysIEbL7R8wHc9Qc="}],"description":"Due to Track replacement southbound, 6 Line between Parkchester (New York) and Hunts Point Av (New York) skips St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av. The last stop for some Bronx-bound trains is 3 Av-138 St. For service to these stations, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service from these stations take the 6 line to Parkchester and transfer to a Manhattan-bound 6 line., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 AM thru 03:30 PM, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 AM thru 03:30 PM","update_date":"2026-05-07T21:34:39Z"},"road_event_id":"FYUp9ih9vNC4Zs5Qfa6b3dJhhrY=","beginning_cross_street":"Parkchester","ending_cross_street":"Hunts Point Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:45:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"2NyZmI/n8j+PysIEbL7R8wHc9Qc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYUp9ih9vNC4Zs5Qfa6b3dJhhrY="},{"type":"next-occurrence","id":"/GIpLAzAk14n0jWy39EkUFS8TrA="}],"description":"Due to Track replacement southbound, 6 Line between Parkchester (New York) and Hunts Point Av (New York) skips St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av. The last stop for some Bronx-bound trains is 3 Av-138 St. For service to these stations, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service from these stations take the 6 line to Parkchester and transfer to a Manhattan-bound 6 line., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 AM thru 03:30 PM, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 AM thru 03:30 PM","update_date":"2026-05-07T21:34:39Z"},"road_event_id":"2NyZmI/n8j+PysIEbL7R8wHc9Qc=","beginning_cross_street":"Parkchester","ending_cross_street":"Hunts Point Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:45:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"/GIpLAzAk14n0jWy39EkUFS8TrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYUp9ih9vNC4Zs5Qfa6b3dJhhrY="},{"type":"next-occurrence","id":"eH1KjjirZ8How15QSXf5NkvyWMg="}],"description":"Due to Track replacement southbound, 6 Line between Parkchester (New York) and Hunts Point Av (New York) skips St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av. The last stop for some Bronx-bound trains is 3 Av-138 St. For service to these stations, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service from these stations take the 6 line to Parkchester and transfer to a Manhattan-bound 6 line., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 AM thru 03:30 PM, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 AM thru 03:30 PM","update_date":"2026-05-07T21:34:39Z"},"road_event_id":"/GIpLAzAk14n0jWy39EkUFS8TrA=","beginning_cross_street":"Parkchester","ending_cross_street":"Hunts Point Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:45:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"eH1KjjirZ8How15QSXf5NkvyWMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYUp9ih9vNC4Zs5Qfa6b3dJhhrY="},{"type":"next-occurrence","id":"tVK5Hy1rFDM2MUPloRVTVwnGHJY="}],"description":"Due to Track replacement southbound, 6 Line between Parkchester (New York) and Hunts Point Av (New York) skips St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av. The last stop for some Bronx-bound trains is 3 Av-138 St. For service to these stations, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service from these stations take the 6 line to Parkchester and transfer to a Manhattan-bound 6 line., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 AM thru 03:30 PM, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 AM thru 03:30 PM","update_date":"2026-05-07T21:34:39Z"},"road_event_id":"eH1KjjirZ8How15QSXf5NkvyWMg=","beginning_cross_street":"Parkchester","ending_cross_street":"Hunts Point Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:30:00Z","end_date":"2026-05-20T05:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"tVK5Hy1rFDM2MUPloRVTVwnGHJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYUp9ih9vNC4Zs5Qfa6b3dJhhrY="},{"type":"next-occurrence","id":"1HuiugHrFP84OZJHe0wbHJ++Fmk="}],"description":"Due to Track replacement southbound, 6 Line between Parkchester (New York) and Hunts Point Av (New York) skips St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av. The last stop for some Bronx-bound trains is 3 Av-138 St. For service to these stations, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service from these stations take the 6 line to Parkchester and transfer to a Manhattan-bound 6 line., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 AM thru 03:30 PM, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 AM thru 03:30 PM","update_date":"2026-05-07T21:34:39Z"},"road_event_id":"tVK5Hy1rFDM2MUPloRVTVwnGHJY=","beginning_cross_street":"Parkchester","ending_cross_street":"Hunts Point Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:30:00Z","end_date":"2026-05-21T05:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"1HuiugHrFP84OZJHe0wbHJ++Fmk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYUp9ih9vNC4Zs5Qfa6b3dJhhrY="},{"type":"next-occurrence","id":"DWIXsPrjB9slCY3m1hqwT192ARc="}],"description":"Due to Track replacement southbound, 6 Line between Parkchester (New York) and Hunts Point Av (New York) skips St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av. The last stop for some Bronx-bound trains is 3 Av-138 St. For service to these stations, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service from these stations take the 6 line to Parkchester and transfer to a Manhattan-bound 6 line., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 AM thru 03:30 PM, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 AM thru 03:30 PM","update_date":"2026-05-07T21:34:39Z"},"road_event_id":"1HuiugHrFP84OZJHe0wbHJ++Fmk=","beginning_cross_street":"Parkchester","ending_cross_street":"Hunts Point Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:30:00Z","end_date":"2026-05-22T05:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"DWIXsPrjB9slCY3m1hqwT192ARc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYUp9ih9vNC4Zs5Qfa6b3dJhhrY="}],"description":"Due to Track replacement southbound, 6 Line between Parkchester (New York) and Hunts Point Av (New York) skips St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av. The last stop for some Bronx-bound trains is 3 Av-138 St. For service to these stations, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service from these stations take the 6 line to Parkchester and transfer to a Manhattan-bound 6 line., Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 AM thru 03:30 PM, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 AM thru 03:30 PM","update_date":"2026-05-07T21:34:39Z"},"road_event_id":"DWIXsPrjB9slCY3m1hqwT192ARc=","beginning_cross_street":"Parkchester","ending_cross_street":"Hunts Point Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T23:30:00Z","end_date":"2026-05-23T05:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"wj1lAy7mSlCpltHAuzAOjhbv988=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EgQSS1mAXEbXy4WJvl/+tO+XFDE="}],"description":"Due to Track replacement northbound, 6X Line from 3 Av - 138 St (New York) to Parkchester (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only","update_date":"2026-05-07T21:38:23Z"},"road_event_id":"wj1lAy7mSlCpltHAuzAOjhbv988=","beginning_cross_street":"3 Av - 138 St","ending_cross_street":"Parkchester","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T17:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926138,40.810476]]}},{"id":"EgQSS1mAXEbXy4WJvl/+tO+XFDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wj1lAy7mSlCpltHAuzAOjhbv988="},{"type":"next-occurrence","id":"QEeQtdn02mPB3Nu5PHGdyHgS3KI="}],"description":"Due to Track replacement northbound, 6X Line from 3 Av - 138 St (New York) to Parkchester (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only","update_date":"2026-05-07T21:38:23Z"},"road_event_id":"EgQSS1mAXEbXy4WJvl/+tO+XFDE=","beginning_cross_street":"3 Av - 138 St","ending_cross_street":"Parkchester","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T17:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926138,40.810476]]}},{"id":"QEeQtdn02mPB3Nu5PHGdyHgS3KI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wj1lAy7mSlCpltHAuzAOjhbv988="},{"type":"next-occurrence","id":"58UXupwuGhaKN0CppC41TuNoYYU="}],"description":"Due to Track replacement northbound, 6X Line from 3 Av - 138 St (New York) to Parkchester (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only","update_date":"2026-05-07T21:38:23Z"},"road_event_id":"QEeQtdn02mPB3Nu5PHGdyHgS3KI=","beginning_cross_street":"3 Av - 138 St","ending_cross_street":"Parkchester","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T17:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926138,40.810476]]}},{"id":"58UXupwuGhaKN0CppC41TuNoYYU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wj1lAy7mSlCpltHAuzAOjhbv988="},{"type":"next-occurrence","id":"1uNY7+0E3m24BP+c4ktMDIATo4A="}],"description":"Due to Track replacement northbound, 6X Line from 3 Av - 138 St (New York) to Parkchester (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only","update_date":"2026-05-07T21:38:23Z"},"road_event_id":"58UXupwuGhaKN0CppC41TuNoYYU=","beginning_cross_street":"3 Av - 138 St","ending_cross_street":"Parkchester","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T06:00:00Z","end_date":"2026-05-20T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926138,40.810476]]}},{"id":"1uNY7+0E3m24BP+c4ktMDIATo4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wj1lAy7mSlCpltHAuzAOjhbv988="},{"type":"next-occurrence","id":"LAj5Gwfklqo8wGxOwYNWW7ntW3s="}],"description":"Due to Track replacement northbound, 6X Line from 3 Av - 138 St (New York) to Parkchester (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only","update_date":"2026-05-07T21:38:23Z"},"road_event_id":"1uNY7+0E3m24BP+c4ktMDIATo4A=","beginning_cross_street":"3 Av - 138 St","ending_cross_street":"Parkchester","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T06:00:00Z","end_date":"2026-05-21T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926138,40.810476]]}},{"id":"LAj5Gwfklqo8wGxOwYNWW7ntW3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wj1lAy7mSlCpltHAuzAOjhbv988="},{"type":"next-occurrence","id":"3B7GpXjJfPkST2/nZbZBXQuLfps="}],"description":"Due to Track replacement northbound, 6X Line from 3 Av - 138 St (New York) to Parkchester (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only","update_date":"2026-05-07T21:38:23Z"},"road_event_id":"LAj5Gwfklqo8wGxOwYNWW7ntW3s=","beginning_cross_street":"3 Av - 138 St","ending_cross_street":"Parkchester","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T06:00:00Z","end_date":"2026-05-22T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926138,40.810476]]}},{"id":"3B7GpXjJfPkST2/nZbZBXQuLfps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wj1lAy7mSlCpltHAuzAOjhbv988="},{"type":"next-occurrence","id":"xrT9I4RV1nyu4MMBLdRYEw/YPMM="}],"description":"Due to Track replacement northbound, 6X Line from 3 Av - 138 St (New York) to Parkchester (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only","update_date":"2026-05-07T21:38:23Z"},"road_event_id":"3B7GpXjJfPkST2/nZbZBXQuLfps=","beginning_cross_street":"3 Av - 138 St","ending_cross_street":"Parkchester","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T06:00:00Z","end_date":"2026-05-23T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926138,40.810476]]}},{"id":"xrT9I4RV1nyu4MMBLdRYEw/YPMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wj1lAy7mSlCpltHAuzAOjhbv988="}],"description":"Due to Track replacement northbound, 6X Line from 3 Av - 138 St (New York) to Parkchester (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 PM thru 03:30 PM local service only","update_date":"2026-05-07T21:38:23Z"},"road_event_id":"xrT9I4RV1nyu4MMBLdRYEw/YPMM=","beginning_cross_street":"3 Av - 138 St","ending_cross_street":"Parkchester","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T06:00:00Z","end_date":"2026-05-27T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926138,40.810476]]}},{"id":"0ZpDDW/0tpbb9eLzl7fgd4rQCXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 17M eastbound between Maples Road (Wallkill) and NY-302 (Wallkill) 2025084500874/32434609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-07T21:49:55Z"},"road_event_id":"0ZpDDW/0tpbb9eLzl7fgd4rQCXI=","beginning_cross_street":"Maples Road","ending_cross_street":"NY-302","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.412539,41.487742]]}},{"id":"191aKtHUWUYYl+x6cOGEXoXFY9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"syFN+FeO78TZeiG6SNeUAvH4JCI="}],"description":"Due to Signal repairs and Track replacement southbound, 6X Line from Hunts Point Av (New York) to 3 Av - 138 St (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only","update_date":"2026-05-07T21:43:36Z"},"road_event_id":"191aKtHUWUYYl+x6cOGEXoXFY9I=","beginning_cross_street":"Hunts Point Av","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.890549,40.820948]]}},{"id":"syFN+FeO78TZeiG6SNeUAvH4JCI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"191aKtHUWUYYl+x6cOGEXoXFY9I="},{"type":"next-occurrence","id":"RZeqqy7LJbhCs3F3eFFnenhqP2w="}],"description":"Due to Signal repairs and Track replacement southbound, 6X Line from Hunts Point Av (New York) to 3 Av - 138 St (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only","update_date":"2026-05-07T21:43:36Z"},"road_event_id":"syFN+FeO78TZeiG6SNeUAvH4JCI=","beginning_cross_street":"Hunts Point Av","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.890549,40.820948]]}},{"id":"RZeqqy7LJbhCs3F3eFFnenhqP2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"191aKtHUWUYYl+x6cOGEXoXFY9I="},{"type":"next-occurrence","id":"fZHJuIUgs6SsTAM9K3aySv1gB/c="}],"description":"Due to Signal repairs and Track replacement southbound, 6X Line from Hunts Point Av (New York) to 3 Av - 138 St (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only","update_date":"2026-05-07T21:43:36Z"},"road_event_id":"RZeqqy7LJbhCs3F3eFFnenhqP2w=","beginning_cross_street":"Hunts Point Av","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.890549,40.820948]]}},{"id":"fZHJuIUgs6SsTAM9K3aySv1gB/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"191aKtHUWUYYl+x6cOGEXoXFY9I="},{"type":"next-occurrence","id":"QPIuWI/YWua/crTiL7tU1H+UkG0="}],"description":"Due to Signal repairs and Track replacement southbound, 6X Line from Hunts Point Av (New York) to 3 Av - 138 St (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only","update_date":"2026-05-07T21:43:36Z"},"road_event_id":"fZHJuIUgs6SsTAM9K3aySv1gB/c=","beginning_cross_street":"Hunts Point Av","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.890549,40.820948]]}},{"id":"QPIuWI/YWua/crTiL7tU1H+UkG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"191aKtHUWUYYl+x6cOGEXoXFY9I="},{"type":"next-occurrence","id":"v2/sM11Y/PbgCI4aZWFsisKW4SA="}],"description":"Due to Signal repairs and Track replacement southbound, 6X Line from Hunts Point Av (New York) to 3 Av - 138 St (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only","update_date":"2026-05-07T21:43:36Z"},"road_event_id":"QPIuWI/YWua/crTiL7tU1H+UkG0=","beginning_cross_street":"Hunts Point Av","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.890549,40.820948]]}},{"id":"v2/sM11Y/PbgCI4aZWFsisKW4SA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"191aKtHUWUYYl+x6cOGEXoXFY9I="},{"type":"next-occurrence","id":"UErzwMABIAfCZi7sUbxm/sJUlKI="}],"description":"Due to Signal repairs and Track replacement southbound, 6X Line from Hunts Point Av (New York) to 3 Av - 138 St (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only","update_date":"2026-05-07T21:43:36Z"},"road_event_id":"v2/sM11Y/PbgCI4aZWFsisKW4SA=","beginning_cross_street":"Hunts Point Av","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.890549,40.820948]]}},{"id":"UErzwMABIAfCZi7sUbxm/sJUlKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"191aKtHUWUYYl+x6cOGEXoXFY9I="},{"type":"next-occurrence","id":"NmdjER6xWEutQhYNcE704vOv1Iw="}],"description":"Due to Signal repairs and Track replacement southbound, 6X Line from Hunts Point Av (New York) to 3 Av - 138 St (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only","update_date":"2026-05-07T21:43:36Z"},"road_event_id":"UErzwMABIAfCZi7sUbxm/sJUlKI=","beginning_cross_street":"Hunts Point Av","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.890549,40.820948]]}},{"id":"NmdjER6xWEutQhYNcE704vOv1Iw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"191aKtHUWUYYl+x6cOGEXoXFY9I="},{"type":"next-occurrence","id":"zVKoaNyuyVag8gUPpidWIhm5wKE="}],"description":"Due to Signal repairs and Track replacement southbound, 6X Line from Hunts Point Av (New York) to 3 Av - 138 St (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only","update_date":"2026-05-07T21:43:36Z"},"road_event_id":"NmdjER6xWEutQhYNcE704vOv1Iw=","beginning_cross_street":"Hunts Point Av","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.890549,40.820948]]}},{"id":"zVKoaNyuyVag8gUPpidWIhm5wKE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6X Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"191aKtHUWUYYl+x6cOGEXoXFY9I="}],"description":"Due to Signal repairs and Track replacement southbound, 6X Line from Hunts Point Av (New York) to 3 Av - 138 St (New York), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 19th, 2026 thru Friday May 22nd, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 01:00 PM local service only","update_date":"2026-05-07T21:43:36Z"},"road_event_id":"zVKoaNyuyVag8gUPpidWIhm5wKE=","beginning_cross_street":"Hunts Point Av","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T00:00:00Z","end_date":"2026-05-28T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.890549,40.820948]]}},{"id":"SBYWZmCukzmaqTg5mA6gJhF4J80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+bUyy4BzexbQDHlG1zbfBAPlDbI="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon Blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Friday May 8th, 2026 thru Saturday June 27th, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-05-07T21:48:01Z"},"road_event_id":"SBYWZmCukzmaqTg5mA6gJhF4J80=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T05:30:00Z","end_date":"2026-05-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"+bUyy4BzexbQDHlG1zbfBAPlDbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SBYWZmCukzmaqTg5mA6gJhF4J80="},{"type":"next-occurrence","id":"3lJcFc1xrwmv5hNnBiC3q5ZWBgg="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon Blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Friday May 8th, 2026 thru Saturday June 27th, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-05-07T21:48:01Z"},"road_event_id":"+bUyy4BzexbQDHlG1zbfBAPlDbI=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T05:30:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"3lJcFc1xrwmv5hNnBiC3q5ZWBgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SBYWZmCukzmaqTg5mA6gJhF4J80="},{"type":"next-occurrence","id":"+dhnMMCPcPiaYLoIm/jl4/tMV4E="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon Blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Friday May 8th, 2026 thru Saturday June 27th, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-05-07T21:48:01Z"},"road_event_id":"3lJcFc1xrwmv5hNnBiC3q5ZWBgg=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T05:30:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"+dhnMMCPcPiaYLoIm/jl4/tMV4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SBYWZmCukzmaqTg5mA6gJhF4J80="},{"type":"next-occurrence","id":"4BSflbyAnWhWMPM3y8AgLYFYH5c="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon Blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Friday May 8th, 2026 thru Saturday June 27th, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-05-07T21:48:01Z"},"road_event_id":"+dhnMMCPcPiaYLoIm/jl4/tMV4E=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T05:30:00Z","end_date":"2026-05-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"4BSflbyAnWhWMPM3y8AgLYFYH5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SBYWZmCukzmaqTg5mA6gJhF4J80="},{"type":"next-occurrence","id":"ui2nnIJWR1+Jr53T/T9lpuOlucE="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon Blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Friday May 8th, 2026 thru Saturday June 27th, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-05-07T21:48:01Z"},"road_event_id":"4BSflbyAnWhWMPM3y8AgLYFYH5c=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T05:30:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"ui2nnIJWR1+Jr53T/T9lpuOlucE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SBYWZmCukzmaqTg5mA6gJhF4J80="},{"type":"next-occurrence","id":"p4yUign1NbUlXXAUK/2Tc6tbo/4="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon Blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Friday May 8th, 2026 thru Saturday June 27th, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-05-07T21:48:01Z"},"road_event_id":"ui2nnIJWR1+Jr53T/T9lpuOlucE=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T05:30:00Z","end_date":"2026-05-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"p4yUign1NbUlXXAUK/2Tc6tbo/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SBYWZmCukzmaqTg5mA6gJhF4J80="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon Blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Friday May 8th, 2026 thru Saturday June 27th, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-05-07T21:48:01Z"},"road_event_id":"p4yUign1NbUlXXAUK/2Tc6tbo/4=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T05:30:00Z","end_date":"2026-05-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"cUTkjGo47/iv8O3tpSmNGYQ8UTI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations westbound, 7 Line between 74 St - Broadway (New York) and Queensboro Plaza (New York) skips 69 St, 52 St, 46 St-Bliss St and 33 St-Rawson St. All trains at Woodside-61 St board from the Flushing-bound platform. Use nearby 74 St-Broadway, Woodside-61 St or 40 St-Lowery St stations. For service to these stations, take the 7 line to Woodside-61 St, 40 St-Lowery St or Queensboro Plaza and transfer to a Flushing-bound 7 line. For service from these stations, take the 7 line to 40 St-Lowery St, Woodside-61 St or 74 St-Broadway and transfer to a Manhattan-bound 7 line., Continuous Monday May 11th, 2026 03:01 AM thru Friday May 22nd, 2026 11:59 PM","update_date":"2026-05-07T21:50:36Z"},"road_event_id":"cUTkjGo47/iv8O3tpSmNGYQ8UTI=","beginning_cross_street":"74 St - Broadway","ending_cross_street":"Queensboro Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891394,40.746848]]}},{"id":"QF3dATvjJ5m1tdPPGDTw2w7felk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"h3/s7slWWsiRBxaweUnqaspLYDc="}],"description":"Tree trimming on NY 5 westbound between Mott Road (Manlius) and Lyndon Road (De Witt), Monday May 11th, 2026 thru Thursday May 14th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-07T21:54:42Z"},"road_event_id":"QF3dATvjJ5m1tdPPGDTw2w7felk=","beginning_cross_street":"Mott Road","ending_cross_street":"Lyndon Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.019111,43.029186]]}},{"id":"h3/s7slWWsiRBxaweUnqaspLYDc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QF3dATvjJ5m1tdPPGDTw2w7felk="}],"description":"Tree trimming on NY 5 westbound between Mott Road (Manlius) and Lyndon Road (De Witt), Monday May 11th, 2026 thru Thursday May 14th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-07T21:54:42Z"},"road_event_id":"h3/s7slWWsiRBxaweUnqaspLYDc=","beginning_cross_street":"Mott Road","ending_cross_street":"Lyndon Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.019111,43.029186]]}},{"id":"X8jvMv8SySLh/IFbFSmbJmQ+r0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Rockaway Park Shuttle"],"direction":"unknown","related_road_events":[],"description":"Due to Track repairs both directions, Rockaway Park Shuttle between Rockaway Park - Beach 116 St (New York) and Broad Channel (New York) is replaced by free shuttle buses. Free shuttle buses make stops between Beach 67 St A line and Rockaway Park-Beach 116 St. For Broad Channel, take the A line. Transfer between A line and buses at Beach 67 St., Continuous Friday May 15th, 2026 11:45 PM thru Monday May 18th, 2026 05:00 AM","update_date":"2026-05-07T21:55:17Z"},"road_event_id":"X8jvMv8SySLh/IFbFSmbJmQ+r0A=","beginning_cross_street":"Rockaway Park - Beach 116 St","ending_cross_street":"Broad Channel","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:45:00Z","end_date":"2026-05-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835592,40.580903]]}},{"id":"2865GgN+NvO8I+mFXUHeKfkIqXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 17M both directions between South Street (Goshen) and Arcadia Road (Goshen) 2025081583143/32547809 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday May 14th, 2026, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-07T22:10:19Z"},"road_event_id":"2865GgN+NvO8I+mFXUHeKfkIqXk=","beginning_cross_street":"South Street","ending_cross_street":"Arcadia Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.292638,41.375582]]}},{"id":"D2cKRc/9lrrofb+PH2/yd6yq5zA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kLigHfo+cAOiMXrVfSIcaklDAFg="}],"description":"Bridge work and roadwork on I-690 eastbound between I-81 Northbound ramp (Syracuse) and Exit 17 - Teall Avenue (Syracuse), Thursday May 7th,2026 thru Friday May 15th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed eastbound,","update_date":"2026-05-08T19:00:10Z"},"road_event_id":"D2cKRc/9lrrofb+PH2/yd6yq5zA=","beginning_cross_street":"I-81 Northbound ramp","ending_cross_street":"Exit 17 - Teall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140605,43.051499]]}},{"id":"kLigHfo+cAOiMXrVfSIcaklDAFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D2cKRc/9lrrofb+PH2/yd6yq5zA="},{"type":"next-occurrence","id":"Ruvvva3KHMztoRpmocw8uiD8Fcg="}],"description":"Bridge work and roadwork on I-690 eastbound between I-81 Northbound ramp (Syracuse) and Exit 17 - Teall Avenue (Syracuse), Thursday May 7th,2026 thru Friday May 15th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed eastbound,","update_date":"2026-05-08T19:00:10Z"},"road_event_id":"kLigHfo+cAOiMXrVfSIcaklDAFg=","beginning_cross_street":"I-81 Northbound ramp","ending_cross_street":"Exit 17 - Teall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140605,43.051499]]}},{"id":"Ruvvva3KHMztoRpmocw8uiD8Fcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D2cKRc/9lrrofb+PH2/yd6yq5zA="}],"description":"Bridge work and roadwork on I-690 eastbound between I-81 Northbound ramp (Syracuse) and Exit 17 - Teall Avenue (Syracuse), Thursday May 7th,2026 thru Friday May 15th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed eastbound,","update_date":"2026-05-08T19:00:10Z"},"road_event_id":"Ruvvva3KHMztoRpmocw8uiD8Fcg=","beginning_cross_street":"I-81 Northbound ramp","ending_cross_street":"Exit 17 - Teall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140605,43.051499]]}},{"id":"WCBJcSrWKVOoObYgFuE9PGxizpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near Okner Pkwy (Livingston Twp), Wednesday May 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-08T00:00:44Z"},"road_event_id":"WCBJcSrWKVOoObYgFuE9PGxizpY=","beginning_cross_street":"Okner Pkwy","ending_cross_street":"In the vicinity of River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.356948,40.799343]]}},{"id":"Ox0uNLC8a+W+5UGp4P+1a/UD93I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near West of Exit 34 - NJ 15 (Jefferson Twp), Thursday May 14, 2026 09:00 AM thru 01:00 PM,","update_date":"2026-05-08T00:00:29Z"},"road_event_id":"Ox0uNLC8a+W+5UGp4P+1a/UD93I=","beginning_cross_street":"West of Exit 34 - NJ 15","ending_cross_street":"West of Exit 34 - NJ 15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.596977,40.908531]]}},{"id":"Py5H/XMTCyWq86zyrqhDHBlH9Nc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near West of Exit 34 - NJ 15 (Jefferson Twp), Wednesday May 13, 2026 09:00 AM thru 01:00 PM,","update_date":"2026-05-08T00:00:28Z"},"road_event_id":"Py5H/XMTCyWq86zyrqhDHBlH9Nc=","beginning_cross_street":"West of Exit 34 - NJ 15","ending_cross_street":"West of Exit 34 - NJ 15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.596977,40.908531]]}},{"id":"ihyma9MWiT62FKGii003twSpClM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near In the vicinity of River Rd (Livingston Twp), Wednesday May 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-08T00:00:35Z"},"road_event_id":"ihyma9MWiT62FKGii003twSpClM=","beginning_cross_street":"In the vicinity of River Rd","ending_cross_street":"Okner Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.358406,40.80027]]}},{"id":"jDcvwcWuc/dccsOProW1wawxI4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near Okner Pkwy (Livingston Twp), Thursday May 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-08T00:00:38Z"},"road_event_id":"jDcvwcWuc/dccsOProW1wawxI4o=","beginning_cross_street":"Okner Pkwy","ending_cross_street":"In the vicinity of River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.356948,40.799343]]}},{"id":"FtP+8skti2R5jD4PNefxSIk46mc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near In the vicinity of River Rd (Livingston Twp), Thursday May 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-08T00:00:40Z"},"road_event_id":"FtP+8skti2R5jD4PNefxSIk46mc=","beginning_cross_street":"In the vicinity of River Rd","ending_cross_street":"Okner Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.358406,40.80027]]}},{"id":"aSxq5ul+ZBQykPcnJE73rYWtpOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ffk8QeYouVsemxD9KAFV6kRORlQ="}],"description":"Utility work on NY 441 eastbound between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250 (Penfield) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crosising, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T00:37:35Z"},"road_event_id":"aSxq5ul+ZBQykPcnJE73rYWtpOc=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.451229,43.13093]]}},{"id":"ffk8QeYouVsemxD9KAFV6kRORlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aSxq5ul+ZBQykPcnJE73rYWtpOc="},{"type":"next-occurrence","id":"YpC3Nvk8oDMg5jxvusD6e0u9fag="}],"description":"Utility work on NY 441 eastbound between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250 (Penfield) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crosising, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T00:37:35Z"},"road_event_id":"ffk8QeYouVsemxD9KAFV6kRORlQ=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.451229,43.13093]]}},{"id":"YpC3Nvk8oDMg5jxvusD6e0u9fag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aSxq5ul+ZBQykPcnJE73rYWtpOc="},{"type":"next-occurrence","id":"HGEBupb1c+ZiaY5LJBVpf9eYTys="}],"description":"Utility work on NY 441 eastbound between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250 (Penfield) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crosising, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T00:37:35Z"},"road_event_id":"YpC3Nvk8oDMg5jxvusD6e0u9fag=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.451229,43.13093]]}},{"id":"HGEBupb1c+ZiaY5LJBVpf9eYTys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aSxq5ul+ZBQykPcnJE73rYWtpOc="},{"type":"next-occurrence","id":"lwtO5a9b/+LWoWsBOvGWjaGOtc8="}],"description":"Utility work on NY 441 eastbound between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250 (Penfield) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crosising, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T00:37:35Z"},"road_event_id":"HGEBupb1c+ZiaY5LJBVpf9eYTys=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.451229,43.13093]]}},{"id":"lwtO5a9b/+LWoWsBOvGWjaGOtc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aSxq5ul+ZBQykPcnJE73rYWtpOc="},{"type":"next-occurrence","id":"WzwpK/FwmeMU0triUSRjovDQGHw="}],"description":"Utility work on NY 441 eastbound between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250 (Penfield) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crosising, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T00:37:35Z"},"road_event_id":"lwtO5a9b/+LWoWsBOvGWjaGOtc8=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.451229,43.13093]]}},{"id":"WzwpK/FwmeMU0triUSRjovDQGHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aSxq5ul+ZBQykPcnJE73rYWtpOc="},{"type":"next-occurrence","id":"an8FtGMjvWe3XD115gH/6BMt+Zk="}],"description":"Utility work on NY 441 eastbound between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250 (Penfield) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crosising, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T00:37:35Z"},"road_event_id":"WzwpK/FwmeMU0triUSRjovDQGHw=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.451229,43.13093]]}},{"id":"an8FtGMjvWe3XD115gH/6BMt+Zk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aSxq5ul+ZBQykPcnJE73rYWtpOc="},{"type":"next-occurrence","id":"2yco0JIh9ra/R+ocuKvO6XbLdq4="}],"description":"Utility work on NY 441 eastbound between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250 (Penfield) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crosising, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T00:37:35Z"},"road_event_id":"an8FtGMjvWe3XD115gH/6BMt+Zk=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.451229,43.13093]]}},{"id":"2yco0JIh9ra/R+ocuKvO6XbLdq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aSxq5ul+ZBQykPcnJE73rYWtpOc="},{"type":"next-occurrence","id":"gvFnosVZuhDkZHLgW8dH3rJJ0fQ="}],"description":"Utility work on NY 441 eastbound between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250 (Penfield) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crosising, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T00:37:35Z"},"road_event_id":"2yco0JIh9ra/R+ocuKvO6XbLdq4=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.451229,43.13093]]}},{"id":"gvFnosVZuhDkZHLgW8dH3rJJ0fQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aSxq5ul+ZBQykPcnJE73rYWtpOc="}],"description":"Utility work on NY 441 eastbound between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250 (Penfield) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crosising, Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T00:37:35Z"},"road_event_id":"gvFnosVZuhDkZHLgW8dH3rJJ0fQ=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.451229,43.13093]]}},{"id":"kGC5NumH87lhSr94JkdB0fhFFd0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 181"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 181 Northbound from North of Espanong Rd (Jefferson Twp) to Prospect Point Rd (Jefferson Twp) Monday May 11, 2026 09:00 AM thru Saturday May 16, 2026 03:00 PM, All lanes open","update_date":"2026-05-08T02:31:29Z"},"road_event_id":"kGC5NumH87lhSr94JkdB0fhFFd0=","beginning_cross_street":"North of Espanong Rd","ending_cross_street":"Prospect Point Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.603347,40.971691]]}},{"id":"jyxSpjoG3/Qk6qW/hbKXiSxS2EE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 57"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 57 Southbound East of Allen Rd/Newburg Rd (Hackettstown) Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, 1 right lane of 2 lanes closed","update_date":"2026-05-08T02:31:50Z"},"road_event_id":"jyxSpjoG3/Qk6qW/hbKXiSxS2EE=","beginning_cross_street":"East of Allen Rd/Newburg Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.831413,40.829349]]}},{"id":"Ved2ih/kpvNGqUQdBfOH4s7fKpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 57"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 57 Southbound East of Allen Rd/Newburg Rd (Hackettstown) Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, 1 right lane of 2 lanes closed","update_date":"2026-05-08T02:32:00Z"},"road_event_id":"Ved2ih/kpvNGqUQdBfOH4s7fKpE=","beginning_cross_street":"East of Allen Rd/Newburg Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.831413,40.829349]]}},{"id":"OgS6Sb/1blMl+Dgq1AfXG8LjC/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Local Lanes Westbound South of Exit 21 - I-78 (Bedminster Twp) Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, 1 right lane of 2 lanes, right shoulder closed","update_date":"2026-05-08T02:33:55Z"},"road_event_id":"OgS6Sb/1blMl+Dgq1AfXG8LjC/c=","beginning_cross_street":"South of Exit 21 - I-78","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.643997,40.637451]]}},{"id":"fdA9ZJofwd2sKJzIdtZjnKkd07o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound between East of US 46 (Clifton) and US 1&9 (North Bergen Twp), Thursday May 14, 2026 05:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-08T11:15:28Z"},"road_event_id":"fdA9ZJofwd2sKJzIdtZjnKkd07o=","beginning_cross_street":"East of US 46","ending_cross_street":"US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-15T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.186302,40.8693]]}},{"id":"gBlTmpfVZT3pTbsLkQipFfMiTJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed","update_date":"2026-05-08T11:15:27Z"},"road_event_id":"gBlTmpfVZT3pTbsLkQipFfMiTJc=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"WJY2cQU53Gg3/heG8YfTS3ZJ1M8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South of CR 626/Somerset St (Somerville), Thursday May 14, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-08T11:15:24Z"},"road_event_id":"WJY2cQU53Gg3/heG8YfTS3ZJ1M8=","beginning_cross_street":"South of CR 626/Somerset St","ending_cross_street":"South of CR 626/Somerset St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.621894,40.563972]]}},{"id":"iGW4yTUxhyCM8h4UXmVaiTqDgXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound at I-280 (Newark) Thursday May 14, 2026 11:00 PM thru Friday May 15, 2026 05:00 AM, ramp","update_date":"2026-05-08T11:15:26Z"},"road_event_id":"iGW4yTUxhyCM8h4UXmVaiTqDgXw=","beginning_cross_street":"I-280","ending_cross_street":"I-280","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.167442,40.74731]]}},{"id":"sSA/0XuACGRCrSbtY8vMGxBixTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near North of CR 604/Waterloo Rd (Byram Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, right lane closed","update_date":"2026-05-08T11:15:23Z"},"road_event_id":"sSA/0XuACGRCrSbtY8vMGxBixTk=","beginning_cross_street":"North of CR 604/Waterloo Rd","ending_cross_street":"South of CR 607/Lackawanna Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.718727,40.926712]]}},{"id":"0S281nPYZryiJi/gWsAGlUQSm1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between Century Rd (Paramus) and New York State Line (Mahwah Twp), Thursday May 14, 2026 09:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed","update_date":"2026-05-08T11:15:34Z"},"road_event_id":"0S281nPYZryiJi/gWsAGlUQSm1o=","beginning_cross_street":"Century Rd","ending_cross_street":"New York State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07051,40.930118]]}},{"id":"5MDInQZwCV1LOBYsBFi6rrs2YM0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near In the vicinity of Irish Spring Rd (Randolph Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, right lane closed","update_date":"2026-05-08T11:15:36Z"},"road_event_id":"5MDInQZwCV1LOBYsBFi6rrs2YM0=","beginning_cross_street":"In the vicinity of Irish Spring Rd","ending_cross_street":"In the vicinity of CR 617","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.6194,40.857051]]}},{"id":"p2hgMdUMi9vdqo+Pi2+TaSw8iLg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound between East of US 46 (Clifton) and US 1&9 (North Bergen Twp), Friday May 15, 2026 05:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-08T11:15:55Z"},"road_event_id":"p2hgMdUMi9vdqo+Pi2+TaSw8iLg=","beginning_cross_street":"East of US 46","ending_cross_street":"US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-16T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.186302,40.8693]]}},{"id":"sAUl0CFCoKGVaubyBr4Mg0wKQWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between Century Rd (Paramus) and New York State Line (Mahwah Twp), Wednesday May 13, 2026 09:00 PM thru Thursday May 14, 2026 06:00 AM, right lane closed","update_date":"2026-05-08T11:15:56Z"},"road_event_id":"sAUl0CFCoKGVaubyBr4Mg0wKQWI=","beginning_cross_street":"Century Rd","ending_cross_street":"New York State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07051,40.930118]]}},{"id":"Pci2CK9mRs6Cbd2GQs9yo1rvBQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound between East of US 46 (Clifton) and US 1&9 (North Bergen Twp), Wednesday May 13, 2026 05:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-08T11:15:57Z"},"road_event_id":"Pci2CK9mRs6Cbd2GQs9yo1rvBQI=","beginning_cross_street":"East of US 46","ending_cross_street":"US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T09:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.186302,40.8693]]}},{"id":"jP8BrSTiCHW1Dbm+EFYOuogtVc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between North of Exit 30 - North Maple Ave (Harding Twp) and North of Exit 21 - I-78 (Bedminster Twp), Friday May 15, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-08T11:15:59Z"},"road_event_id":"jP8BrSTiCHW1Dbm+EFYOuogtVc8=","beginning_cross_street":"North of Exit 30 - North Maple Ave","ending_cross_street":"North of Exit 21 - I-78","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.536544,40.73521]]}},{"id":"Uf0sGgY+BaRuSCVAyXih/ZSM3wI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Friday May 15, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-08T11:16:01Z"},"road_event_id":"Uf0sGgY+BaRuSCVAyXih/ZSM3wI=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"eRhe7WJ8KJAfsi1fEOa90R9yMvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South of CR 626/Somerset St (Somerville), Friday May 15, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-08T11:16:02Z"},"road_event_id":"eRhe7WJ8KJAfsi1fEOa90R9yMvE=","beginning_cross_street":"South of CR 626/Somerset St","ending_cross_street":"South of CR 626/Somerset St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.621894,40.563972]]}},{"id":"+xW61YXH8x2oM9hYB5o0nLus73M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound near East of NJ 120/Paterson Plank Road/New Jersey Turnpike - Western Spur (East Rutherford), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-05-08T11:15:52Z"},"road_event_id":"+xW61YXH8x2oM9hYB5o0nLus73M=","beginning_cross_street":"East of NJ 120/Paterson Plank Road/New Jersey Turnpike - Western Spur","ending_cross_street":"East of Meadowlands Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.072769,40.803459]]}},{"id":"GLr3OuAyDT9HLvQBBw8ZQ/hEk7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Northbound between South of Kennedy Boulevard (Bayonne) and South of US 1&9 Truck Route/Communipaw Av (Jersey City), Thursday May 14, 2026 09:00 PM thru Friday May 15, 2026 05:00 AM, left lane closed","update_date":"2026-05-08T11:15:53Z"},"road_event_id":"GLr3OuAyDT9HLvQBBw8ZQ/hEk7Y=","beginning_cross_street":"South of Kennedy Boulevard","ending_cross_street":"South of US 1&9 Truck Route/Communipaw Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104354,40.691184]]}},{"id":"LJAbAOPBMhlulLWaPSgq+WES4qw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound between East of NJ 120/Paterson Plank Road/New Jersey Turnpike - Western Spur (East Rutherford) and East of Meadowlands Parkway (Secaucus), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, at least one lane closed","update_date":"2026-05-08T11:15:54Z"},"road_event_id":"LJAbAOPBMhlulLWaPSgq+WES4qw=","beginning_cross_street":"East of NJ 120/Paterson Plank Road/New Jersey Turnpike - Western Spur","ending_cross_street":"East of Meadowlands Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.072769,40.803459]]}},{"id":"imiuMrVd0tI+uoYMw0av6p+vD/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near In the vicinity of River Rd (Livingston Twp), Friday May 15, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-08T11:15:42Z"},"road_event_id":"imiuMrVd0tI+uoYMw0av6p+vD/s=","beginning_cross_street":"In the vicinity of River Rd","ending_cross_street":"Okner Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.358406,40.80027]]}},{"id":"6GXzmG/pxSrO22iFjijWyjiqtJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Friday May 15, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-08T11:15:44Z"},"road_event_id":"6GXzmG/pxSrO22iFjijWyjiqtJk=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"nbA/ioNjeKP8bM9MfydtlP/wWCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed local lane","update_date":"2026-05-08T11:15:46Z"},"road_event_id":"nbA/ioNjeKP8bM9MfydtlP/wWCE=","beginning_cross_street":"In the vicinity of Garden State Parkway","ending_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078071,40.922229]]}},{"id":"9M+Orv1XSVSQV9dWbpAkhmyHtWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Thursday May 14, 2026 10:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed","update_date":"2026-05-08T11:15:47Z"},"road_event_id":"9M+Orv1XSVSQV9dWbpAkhmyHtWA=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"In the vicinity of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"Xv6f91o4LxzV3OtORxzyb2Wi20I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South of CR 626/Somerset St (Somerville), Wednesday May 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-08T11:15:48Z"},"road_event_id":"Xv6f91o4LxzV3OtORxzyb2Wi20I=","beginning_cross_street":"South of CR 626/Somerset St","ending_cross_street":"South of CR 626/Somerset St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.621894,40.563972]]}},{"id":"+VnV94NB0mroVORnAAmYWfpdVTI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near Okner Pkwy (Livingston Twp), Friday May 15, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-08T11:15:49Z"},"road_event_id":"+VnV94NB0mroVORnAAmYWfpdVTI=","beginning_cross_street":"Okner Pkwy","ending_cross_street":"In the vicinity of River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.356948,40.799343]]}},{"id":"O+Wz/1Fx/7Ol7IP8bpYXdtmiviM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Friday May 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T11:15:50Z"},"road_event_id":"O+Wz/1Fx/7Ol7IP8bpYXdtmiviM=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"In the vicinity of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"7rZplhEw3rUQe54xFxNLx05U1HU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between Garden Terrace (North Arlington) and North of Midland Av (Paramus), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed","update_date":"2026-05-08T11:15:40Z"},"road_event_id":"7rZplhEw3rUQe54xFxNLx05U1HU=","beginning_cross_street":"Garden Terrace","ending_cross_street":"North of Midland Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.137557,40.783008]]}},{"id":"YT3GqHeF9diQRb+iYJkIf46kQPI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Southbound between South of US 1&9 Truck Route/Communipaw Av (Jersey City) and South of Kennedy Boulevard (Bayonne), Thursday May 14, 2026 11:00 PM thru Friday May 15, 2026 05:00 AM, left lane closed","update_date":"2026-05-08T11:15:41Z"},"road_event_id":"YT3GqHeF9diQRb+iYJkIf46kQPI=","beginning_cross_street":"South of US 1&9 Truck Route/Communipaw Av","ending_cross_street":"South of Kennedy Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.092521,40.721855]]}},{"id":"JojXk5QZCYsFJOC9R7GPyPWlvdo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South of CR 607/Lackawanna Dr (Byram Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, right lane closed","update_date":"2026-05-08T11:16:08Z"},"road_event_id":"JojXk5QZCYsFJOC9R7GPyPWlvdo=","beginning_cross_street":"South of CR 607/Lackawanna Dr","ending_cross_street":"North of CR 604/Waterloo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.718803,40.928169]]}},{"id":"5ieUV0iDXtHE5FkZZLKJyUtFXsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of Main St (Roxbury Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, right lane closed","update_date":"2026-05-08T11:16:09Z"},"road_event_id":"5ieUV0iDXtHE5FkZZLKJyUtFXsw=","beginning_cross_street":"West of Main St","ending_cross_street":"West of Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.668037,40.890239]]}},{"id":"FrUwWZ46uUT6TYrIbVOIl4DUovM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between Garden Terrace (North Arlington) and North of Midland Av (Paramus), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right lane closed","update_date":"2026-05-08T11:16:05Z"},"road_event_id":"FrUwWZ46uUT6TYrIbVOIl4DUovM=","beginning_cross_street":"Garden Terrace","ending_cross_street":"North of Midland Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.137557,40.783008]]}},{"id":"foLjPb8ISPlopH9V+RNlgokhdqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Friday May 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-05-08T11:16:06Z"},"road_event_id":"foLjPb8ISPlopH9V+RNlgokhdqo=","beginning_cross_street":"In the vicinity of Garden State Parkway","ending_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078071,40.922229]]}},{"id":"ohSyBa4ieuMRpj4X6pJRYowoTAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Southbound between US 206/NJ 28 (Raritan Boro) and North of Ortho Dr (Raritan Boro), Friday May 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T11:16:07Z"},"road_event_id":"ohSyBa4ieuMRpj4X6pJRYowoTAw=","beginning_cross_street":"US 206/NJ 28","ending_cross_street":"North of Ortho Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632003,40.574443]]}},{"id":"WICExt++c6bnT/tMe5WW/z4w//g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 69"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bD0Mpwv0dsvocyBKIyzr2U0Ot3I="}],"description":"Paving operations on NY 69 both directions between Union Street (Camden) and Wolcott Street (Camden) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 05:30 PM,","update_date":"2026-05-08T11:21:24Z"},"road_event_id":"WICExt++c6bnT/tMe5WW/z4w//g=","beginning_cross_street":"Union Street","ending_cross_street":"Wolcott Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.74055,43.336498]]}},{"id":"bD0Mpwv0dsvocyBKIyzr2U0Ot3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 69"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WICExt++c6bnT/tMe5WW/z4w//g="},{"type":"next-occurrence","id":"7Sv+aSootNqMYyJkLoHmv+5ntyA="}],"description":"Paving operations on NY 69 both directions between Union Street (Camden) and Wolcott Street (Camden) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 05:30 PM,","update_date":"2026-05-08T11:21:24Z"},"road_event_id":"bD0Mpwv0dsvocyBKIyzr2U0Ot3I=","beginning_cross_street":"Union Street","ending_cross_street":"Wolcott Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.74055,43.336498]]}},{"id":"7Sv+aSootNqMYyJkLoHmv+5ntyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 69"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WICExt++c6bnT/tMe5WW/z4w//g="}],"description":"Paving operations on NY 69 both directions between Union Street (Camden) and Wolcott Street (Camden) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 05:30 PM,","update_date":"2026-05-08T11:21:24Z"},"road_event_id":"7Sv+aSootNqMYyJkLoHmv+5ntyA=","beginning_cross_street":"Union Street","ending_cross_street":"Wolcott Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.74055,43.336498]]}},{"id":"Ar+vtJ+H6XTrbAQwcfUXqgTXvLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9k83jHWol1gcWRCaCo+yjr9Pa1E="}],"description":"Construction on NY 46 both directions between Erie Boulevard; NY 49; South James Street; NY 46; NY 26 (Rome) and South George Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 03:30 PM,","update_date":"2026-05-08T11:31:17Z"},"road_event_id":"Ar+vtJ+H6XTrbAQwcfUXqgTXvLA=","beginning_cross_street":"Erie Boulevard; NY 49; South James Street; NY 46; NY 26","ending_cross_street":"South George Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.458396,43.2098]]}},{"id":"9k83jHWol1gcWRCaCo+yjr9Pa1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ar+vtJ+H6XTrbAQwcfUXqgTXvLA="},{"type":"next-occurrence","id":"unt11bjBLHAfjnaJxvOkzbkfj1I="}],"description":"Construction on NY 46 both directions between Erie Boulevard; NY 49; South James Street; NY 46; NY 26 (Rome) and South George Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 03:30 PM,","update_date":"2026-05-08T11:31:17Z"},"road_event_id":"9k83jHWol1gcWRCaCo+yjr9Pa1E=","beginning_cross_street":"Erie Boulevard; NY 49; South James Street; NY 46; NY 26","ending_cross_street":"South George Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.458396,43.2098]]}},{"id":"unt11bjBLHAfjnaJxvOkzbkfj1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ar+vtJ+H6XTrbAQwcfUXqgTXvLA="}],"description":"Construction on NY 46 both directions between Erie Boulevard; NY 49; South James Street; NY 46; NY 26 (Rome) and South George Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 03:30 PM,","update_date":"2026-05-08T11:31:17Z"},"road_event_id":"unt11bjBLHAfjnaJxvOkzbkfj1I=","beginning_cross_street":"Erie Boulevard; NY 49; South James Street; NY 46; NY 26","ending_cross_street":"South George Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.458396,43.2098]]}},{"id":"Ps0/44PkWZS3ZoMIZlX1t22JsDs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5S"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 5S westbound over Reese Road (Frankfort) Motorists will encounter a westbound lane closure, Continuous Monday May 11th, 2026 7:00 AM thru Friday June 5th, 2026 4:00 PM","update_date":"2026-05-08T11:35:06Z"},"road_event_id":"Ps0/44PkWZS3ZoMIZlX1t22JsDs=","beginning_cross_street":"Reese Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.071306,43.02514]]}},{"id":"jBn25AMyoiXyGuLVhcS25muXp+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iHLTbPIF3reZcNJPJqvwCiYiyAI="}],"description":"Construction on NY 365 both directions at CR 52; Blackman Corners Road (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:40:15Z"},"road_event_id":"jBn25AMyoiXyGuLVhcS25muXp+o=","beginning_cross_street":"CR 52; Blackman Corners Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.5522,43.1608]]}},{"id":"iHLTbPIF3reZcNJPJqvwCiYiyAI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jBn25AMyoiXyGuLVhcS25muXp+o="},{"type":"next-occurrence","id":"CQCR69NRPtcFbrGKiFyzBcgtGuM="}],"description":"Construction on NY 365 both directions at CR 52; Blackman Corners Road (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:40:15Z"},"road_event_id":"iHLTbPIF3reZcNJPJqvwCiYiyAI=","beginning_cross_street":"CR 52; Blackman Corners Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:30:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.5522,43.1608]]}},{"id":"CQCR69NRPtcFbrGKiFyzBcgtGuM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jBn25AMyoiXyGuLVhcS25muXp+o="}],"description":"Construction on NY 365 both directions at CR 52; Blackman Corners Road (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-05-08T11:40:15Z"},"road_event_id":"CQCR69NRPtcFbrGKiFyzBcgtGuM=","beginning_cross_street":"CR 52; Blackman Corners Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:30:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.5522,43.1608]]}},{"id":"nDCutPEjJSz3lmuKpWswq+iCBYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ilWksyyZe/58/xa1hKwetDL5chI="}],"description":"Paving operations on NY 49 both directions between Lauther Road (Verona) and Drummond Drive (Verona) motorists will encounter lane closures with flaggers in place, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:41:38Z"},"road_event_id":"nDCutPEjJSz3lmuKpWswq+iCBYQ=","beginning_cross_street":"Lauther Road","ending_cross_street":"Drummond Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.593619,43.22319]]}},{"id":"ilWksyyZe/58/xa1hKwetDL5chI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nDCutPEjJSz3lmuKpWswq+iCBYQ="},{"type":"next-occurrence","id":"YCCHVfAzbTnf0/Mold1fT7oOeOU="}],"description":"Paving operations on NY 49 both directions between Lauther Road (Verona) and Drummond Drive (Verona) motorists will encounter lane closures with flaggers in place, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:41:38Z"},"road_event_id":"ilWksyyZe/58/xa1hKwetDL5chI=","beginning_cross_street":"Lauther Road","ending_cross_street":"Drummond Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.593619,43.22319]]}},{"id":"YCCHVfAzbTnf0/Mold1fT7oOeOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nDCutPEjJSz3lmuKpWswq+iCBYQ="}],"description":"Paving operations on NY 49 both directions between Lauther Road (Verona) and Drummond Drive (Verona) motorists will encounter lane closures with flaggers in place, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:41:38Z"},"road_event_id":"YCCHVfAzbTnf0/Mold1fT7oOeOU=","beginning_cross_street":"Lauther Road","ending_cross_street":"Drummond Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.593619,43.22319]]}},{"id":"UaETPjZTZhJQbiWKpJoEfq7wmcM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Elizabethtown Road"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gBDXZhQiSFgz4Ay3KXVfRnqxIN0="}],"description":"Guard rail repairs on Elizabethtown Road both directions between Brewer Road (Litchfield) and North Columbia Road (Litchfield) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:57:26Z"},"road_event_id":"UaETPjZTZhJQbiWKpJoEfq7wmcM=","beginning_cross_street":"Brewer Road","ending_cross_street":"North Columbia Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.074512,42.972519]]}},{"id":"gBDXZhQiSFgz4Ay3KXVfRnqxIN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Elizabethtown Road"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UaETPjZTZhJQbiWKpJoEfq7wmcM="},{"type":"next-occurrence","id":"vF+R5Y4ZNgYjPFmEdEL0deYzy4g="}],"description":"Guard rail repairs on Elizabethtown Road both directions between Brewer Road (Litchfield) and North Columbia Road (Litchfield) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:57:26Z"},"road_event_id":"gBDXZhQiSFgz4Ay3KXVfRnqxIN0=","beginning_cross_street":"Brewer Road","ending_cross_street":"North Columbia Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.074512,42.972519]]}},{"id":"vF+R5Y4ZNgYjPFmEdEL0deYzy4g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Elizabethtown Road"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UaETPjZTZhJQbiWKpJoEfq7wmcM="}],"description":"Guard rail repairs on Elizabethtown Road both directions between Brewer Road (Litchfield) and North Columbia Road (Litchfield) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-05-08T11:57:26Z"},"road_event_id":"vF+R5Y4ZNgYjPFmEdEL0deYzy4g=","beginning_cross_street":"Brewer Road","ending_cross_street":"North Columbia Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.074512,42.972519]]}},{"id":"e6+vMnAmj4CZ7F7fxfuAXGm+1Ts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between West of Exit 16 - CR 537/Great Adventure (Millstone Twp) and I-295 (Hamilton Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, left lane closed, moving operation","update_date":"2026-05-08T12:00:25Z"},"road_event_id":"e6+vMnAmj4CZ7F7fxfuAXGm+1Ts=","beginning_cross_street":"West of Exit 16 - CR 537/Great Adventure","ending_cross_street":"I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.437126,40.164821]]}},{"id":"OB8yqWhCkTZFf3B5SA0Hw98x5hc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between South of NJ 72 (Stafford Twp) and North of CR 14/Hillard Blvd (Stafford Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T12:01:18Z"},"road_event_id":"OB8yqWhCkTZFf3B5SA0Hw98x5hc=","beginning_cross_street":"South of NJ 72","ending_cross_street":"North of CR 14/Hillard Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.26123,39.693565]]}},{"id":"FxvI+Frn6RcLcK+gxCu+JQA+OWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound between I-295 (Hamilton Twp) and West of Exit 16 - CR 537/Great Adventure (Millstone Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, left lane closed, moving operation","update_date":"2026-05-08T12:01:21Z"},"road_event_id":"FxvI+Frn6RcLcK+gxCu+JQA+OWM=","beginning_cross_street":"I-295","ending_cross_street":"West of Exit 16 - CR 537/Great Adventure","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.72351,40.183963]]}},{"id":"AZDKR3LX4vB7taBh0E4XxFHLGD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between North of Exit 32 - CR 561/Haddonfield Berlin Rd (Cherry Hill Twp) and North of Exit 28 - NJ 168/Black Horse Pike (Barrington), Thursday May 14, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-08T12:01:12Z"},"road_event_id":"AZDKR3LX4vB7taBh0E4XxFHLGD0=","beginning_cross_street":"North of Exit 32 - CR 561/Haddonfield Berlin Rd","ending_cross_street":"North of Exit 28 - NJ 168/Black Horse Pike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.002212,39.888751]]}},{"id":"2qMFO1GElNB0lGpK6/Dg+4sI+MU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 28 - NJ 168/Black Horse Pike (Barrington) and North of Exit 32 - CR 561/Haddonfield Berlin Rd (Cherry Hill Twp), Wednesday May 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-08T12:01:11Z"},"road_event_id":"2qMFO1GElNB0lGpK6/Dg+4sI+MU=","beginning_cross_street":"North of Exit 28 - NJ 168/Black Horse Pike","ending_cross_street":"North of Exit 32 - CR 561/Haddonfield Berlin Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.065734,39.871822]]}},{"id":"rZB0Q27SAxDQUOHp5rVMygKYwOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound between I-295 (Hamilton Twp) and West of Exit 16 - CR 537/Great Adventure (Millstone Twp), Wednesday May 13, 2026 07:00 AM thru 05:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T12:01:10Z"},"road_event_id":"rZB0Q27SAxDQUOHp5rVMygKYwOI=","beginning_cross_street":"I-295","ending_cross_street":"West of Exit 16 - CR 537/Great Adventure","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.72351,40.183963]]}},{"id":"yTOfqoDtS2k1NebDAMiAx2Wt5qc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near North of CR 571/Princeton-Hightstown Rd (East Windsor Twp), Thursday May 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-08T12:01:36Z"},"road_event_id":"yTOfqoDtS2k1NebDAMiAx2Wt5qc=","beginning_cross_street":"North of CR 571/Princeton-Hightstown Rd","ending_cross_street":"North of CR 571/Princeton-Hightstown Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.534614,40.276695]]}},{"id":"xmU3NRPUIbmkyEQlQ+pdqsQU1Lw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near North of I-295 (Bordentown Twp), Thursday May 14, 2026 07:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-05-08T12:01:37Z"},"road_event_id":"xmU3NRPUIbmkyEQlQ+pdqsQU1Lw=","beginning_cross_street":"North of I-295","ending_cross_street":"North of US 206","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.710403,40.137733]]}},{"id":"lICu5+TKJe2OyeQWltlY65JILO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near North of CR 571/Princeton-Hightstown Rd (East Windsor Twp), Thursday May 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-08T12:01:38Z"},"road_event_id":"lICu5+TKJe2OyeQWltlY65JILO0=","beginning_cross_street":"North of CR 571/Princeton-Hightstown Rd","ending_cross_street":"North of CR 571/Princeton-Hightstown Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.535705,40.275524]]}},{"id":"T7+8mEBp71IuL5gLEE+LXm1tf44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between North of CR 550/Woodbine Ocean View Rd (Dennis Twp) and South of NJ 50 (Upper Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-08T12:01:39Z"},"road_event_id":"T7+8mEBp71IuL5gLEE+LXm1tf44=","beginning_cross_street":"North of CR 550/Woodbine Ocean View Rd","ending_cross_street":"South of NJ 50","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.72451,39.185642]]}},{"id":"zZ2ui9oF3V45tUqDai6prk0yxr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between North of Exit 32 - CR 561/Haddonfield Berlin Rd (Cherry Hill Twp) and North of Exit 28 - NJ 168/Black Horse Pike (Barrington), Friday May 15, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-08T12:01:25Z"},"road_event_id":"zZ2ui9oF3V45tUqDai6prk0yxr0=","beginning_cross_street":"North of Exit 32 - CR 561/Haddonfield Berlin Rd","ending_cross_street":"North of Exit 28 - NJ 168/Black Horse Pike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.002212,39.888751]]}},{"id":"hAyh6xlsc9t+LB2U5S2fcVdFXpQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 76 - NJ 29 (Ewing Twp) and south of Exit 72 - NJ 31 (Hopewell Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-05-08T12:01:29Z"},"road_event_id":"hAyh6xlsc9t+LB2U5S2fcVdFXpQ=","beginning_cross_street":"Exit 76 - NJ 29","ending_cross_street":"south of Exit 72 - NJ 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844207,40.260536]]}},{"id":"aCtbcReMSbBjq01jjueLpi/bBSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between North of Exit 57 - US 130 (Bordentown Twp) and South of Exit 52 - Columbus Rd (Mansfield Twp), Friday May 15, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-08T12:01:28Z"},"road_event_id":"aCtbcReMSbBjq01jjueLpi/bBSw=","beginning_cross_street":"North of Exit 57 - US 130","ending_cross_street":"South of Exit 52 - Columbus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.71685,40.139522]]}},{"id":"dAFcZtJ3T20yoah5y0NXP08CAFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 76 - NJ 29 (Ewing Twp) and south of Exit 72 - NJ 31 (Hopewell Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-08T12:01:30Z"},"road_event_id":"dAFcZtJ3T20yoah5y0NXP08CAFQ=","beginning_cross_street":"Exit 76 - NJ 29","ending_cross_street":"south of Exit 72 - NJ 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844207,40.260536]]}},{"id":"ZUHr7rOCrYtgyKJHyjZA1q8pOVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound between I-295 (Hamilton Twp) and West of Exit 16 - CR 537/Great Adventure (Millstone Twp), left shoulder, moving operation","update_date":"2026-05-08T12:01:09Z"},"road_event_id":"ZUHr7rOCrYtgyKJHyjZA1q8pOVE=","beginning_cross_street":"I-295","ending_cross_street":"West of Exit 16 - CR 537/Great Adventure","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.72351,40.183963]]}},{"id":"d3xa94PMNl9S2p2jnOxVOcMbjG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near North of CR 571/Princeton-Hightstown Rd (East Windsor Twp), Wednesday May 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-08T12:01:17Z"},"road_event_id":"d3xa94PMNl9S2p2jnOxVOcMbjG0=","beginning_cross_street":"North of CR 571/Princeton-Hightstown Rd","ending_cross_street":"North of CR 571/Princeton-Hightstown Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.534614,40.276695]]}},{"id":"5JDcG4OfIpsP7+6vIXCUqCrpRW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound near CR 692/Franklin Av (Berlin), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, right lane closed, moving operation","update_date":"2026-05-08T12:00:57Z"},"road_event_id":"5JDcG4OfIpsP7+6vIXCUqCrpRW0=","beginning_cross_street":"CR 692/Franklin Av","ending_cross_street":"South of CR 693/Lafayette Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.930572,39.81142]]}},{"id":"pcTuwLh4mlzydPnonVdBnJQ91rA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 28 - NJ 168/Black Horse Pike (Barrington) and North of Exit 32 - CR 561/Haddonfield Berlin Rd (Cherry Hill Twp), Thursday May 14, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-08T12:01:00Z"},"road_event_id":"pcTuwLh4mlzydPnonVdBnJQ91rA=","beginning_cross_street":"North of Exit 28 - NJ 168/Black Horse Pike","ending_cross_street":"North of Exit 32 - CR 561/Haddonfield Berlin Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.065734,39.871822]]}},{"id":"s0G7Om5NTk56waAaKoJYIUSOiRE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 28 - NJ 168/Black Horse Pike (Barrington) and North of Exit 32 - CR 561/Haddonfield Berlin Rd (Cherry Hill Twp), Friday May 15, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-08T12:01:01Z"},"road_event_id":"s0G7Om5NTk56waAaKoJYIUSOiRE=","beginning_cross_street":"North of Exit 28 - NJ 168/Black Horse Pike","ending_cross_street":"North of Exit 32 - CR 561/Haddonfield Berlin Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.065734,39.871822]]}},{"id":"rfB4JlS3e8GaVDVOCBYeFNL7RI8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound near South of CR 693/Lafayette Av (Berlin), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed, moving operation","update_date":"2026-05-08T12:01:03Z"},"road_event_id":"rfB4JlS3e8GaVDVOCBYeFNL7RI8=","beginning_cross_street":"South of CR 693/Lafayette Av","ending_cross_street":"CR 692/Franklin Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.929039,39.820056]]}},{"id":"ZONQOYblmRbycwNs/K4DbUTwDVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound near CR 635/Broadway (Point Pleasant Beach), Wednesday May 13, 2026 08:00 AM thru 04:00 PM, right lane closed","update_date":"2026-05-08T12:01:04Z"},"road_event_id":"ZONQOYblmRbycwNs/K4DbUTwDVA=","beginning_cross_street":"CR 635/Broadway","ending_cross_street":"CR 69/Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.050346,40.100028]]}},{"id":"BJEGrpk6PHIOI2QHr8MRQN6fDGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound near CR 635/Broadway (Point Pleasant Beach), Friday May 15, 2026 08:00 AM thru 04:00 PM, right lane closed","update_date":"2026-05-08T12:01:06Z"},"road_event_id":"BJEGrpk6PHIOI2QHr8MRQN6fDGQ=","beginning_cross_street":"CR 635/Broadway","ending_cross_street":"CR 69/Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.050346,40.100028]]}},{"id":"3HjRyYY0guciC8I6H9S0wxcEYcY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between West of Exit 16 - CR 537/Great Adventure (Millstone Twp) and I-295 (Hamilton Twp), left shoulder, moving operation","update_date":"2026-05-08T12:01:07Z"},"road_event_id":"3HjRyYY0guciC8I6H9S0wxcEYcY=","beginning_cross_street":"West of Exit 16 - CR 537/Great Adventure","ending_cross_street":"I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.437126,40.164821]]}},{"id":"ZYl4tRfbFME0+R5wvpNENy/uAjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between south of Exit 72 - NJ 31 (Hopewell Twp) and south of Exit 76 - NJ 29 (Ewing Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-08T12:00:30Z"},"road_event_id":"ZYl4tRfbFME0+R5wvpNENy/uAjU=","beginning_cross_street":"south of Exit 72 - NJ 31","ending_cross_street":"south of Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.779342,40.291366]]}},{"id":"kxl8foz80VcltTMirRtQfKkLk1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between South of Exit 52 - Columbus Rd (Mansfield Twp) and North of Exit 57 - US 130 (Bordentown Twp), Friday May 15, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-08T12:00:53Z"},"road_event_id":"kxl8foz80VcltTMirRtQfKkLk1Q=","beginning_cross_street":"South of Exit 52 - Columbus Rd","ending_cross_street":"North of Exit 57 - US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.764533,40.081165]]}},{"id":"qboP5HLSM5xxilTfzzilhfjq8FE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near North of I-295 (Bordentown Twp), Wednesday May 13, 2026 07:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-05-08T12:00:54Z"},"road_event_id":"qboP5HLSM5xxilTfzzilhfjq8FE=","beginning_cross_street":"North of I-295","ending_cross_street":"North of US 206","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.710403,40.137733]]}},{"id":"cRcaKClLjRrORLhfaHApLAe8lcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near North of CR 571/Princeton-Hightstown Rd (East Windsor Twp), Wednesday May 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-08T12:00:56Z"},"road_event_id":"cRcaKClLjRrORLhfaHApLAe8lcg=","beginning_cross_street":"North of CR 571/Princeton-Hightstown Rd","ending_cross_street":"North of CR 571/Princeton-Hightstown Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.535705,40.275524]]}},{"id":"c6/ZzC6s9wpsaRVc1Q6Leg7S63A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between West of Exit 16 - CR 537/Great Adventure (Millstone Twp) and I-295 (Hamilton Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, left lane closed, moving operation","update_date":"2026-05-08T12:00:45Z"},"road_event_id":"c6/ZzC6s9wpsaRVc1Q6Leg7S63A=","beginning_cross_street":"West of Exit 16 - CR 537/Great Adventure","ending_cross_street":"I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.437126,40.164821]]}},{"id":"iYdvQtn/AucQF2bkNRg0poPsT+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between West of Exit 16 - CR 537/Great Adventure (Millstone Twp) and I-295 (Hamilton Twp), Wednesday May 13, 2026 07:00 AM thru 05:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T12:00:47Z"},"road_event_id":"iYdvQtn/AucQF2bkNRg0poPsT+8=","beginning_cross_street":"West of Exit 16 - CR 537/Great Adventure","ending_cross_street":"I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.437126,40.164821]]}},{"id":"VMG3X1PVVc57VhPWKq7MxMk5EXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound between I-295 (Hamilton Twp) and West of Exit 16 - CR 537/Great Adventure (Millstone Twp), left shoulder, moving operation","update_date":"2026-05-08T12:00:50Z"},"road_event_id":"VMG3X1PVVc57VhPWKq7MxMk5EXE=","beginning_cross_street":"I-295","ending_cross_street":"West of Exit 16 - CR 537/Great Adventure","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.72351,40.183963]]}},{"id":"bNO97s16ZjlsNZ4RzmwXpo414ng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between South of Exit 60 - I-195/NJ 129 (Hamilton Twp) and South of Exit 67 - US 1 (Lawrence Twp), Friday May 15, 2026 10:00 AM thru 03:00 PM, , moving operation","update_date":"2026-05-08T12:00:52Z"},"road_event_id":"bNO97s16ZjlsNZ4RzmwXpo414ng=","beginning_cross_street":"South of Exit 60 - I-195/NJ 129","ending_cross_street":"South of Exit 67 - US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.721443,40.167728]]}},{"id":"avs8iVsxJwRB36Nl/gEVw41tq3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near North of I-295 (Bordentown Twp), Friday May 15, 2026 07:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-05-08T12:00:42Z"},"road_event_id":"avs8iVsxJwRB36Nl/gEVw41tq3A=","beginning_cross_street":"North of I-295","ending_cross_street":"North of US 206","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.710403,40.137733]]}},{"id":"AVhEaPhLn4TwF7LVh4aXld1qJZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between West of Exit 16 - CR 537/Great Adventure (Millstone Twp) and I-295 (Hamilton Twp), left shoulder, moving operation","update_date":"2026-05-08T12:00:44Z"},"road_event_id":"AVhEaPhLn4TwF7LVh4aXld1qJZY=","beginning_cross_street":"West of Exit 16 - CR 537/Great Adventure","ending_cross_street":"I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.437126,40.164821]]}},{"id":"xyiOFuYoTSJcnZehvxrD5q5ZBbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound near CR 635/Broadway (Point Pleasant Beach), Thursday May 14, 2026 08:00 AM thru 04:00 PM, right lane closed","update_date":"2026-05-08T12:00:33Z"},"road_event_id":"xyiOFuYoTSJcnZehvxrD5q5ZBbI=","beginning_cross_street":"CR 635/Broadway","ending_cross_street":"CR 69/Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.050346,40.100028]]}},{"id":"Tl+lgCKrBMbMfUy0GhOqrN3WUdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed","update_date":"2026-05-08T12:00:35Z"},"road_event_id":"Tl+lgCKrBMbMfUy0GhOqrN3WUdc=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"PPbwgJK93w756koCbF+KXtDgYlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between South of Exit 60 - I-195/NJ 129 (Hamilton Twp) and South of Exit 67 - US 1 (Lawrence Twp), Thursday May 14, 2026 10:00 AM thru 03:00 PM, , moving operation","update_date":"2026-05-08T12:01:59Z"},"road_event_id":"PPbwgJK93w756koCbF+KXtDgYlQ=","beginning_cross_street":"South of Exit 60 - I-195/NJ 129","ending_cross_street":"South of Exit 67 - US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.721443,40.167728]]}},{"id":"Hx1GNUrfBmA5n7c+NYE9hs4dP0g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between South of Exit 60 - I-195/NJ 129 (Hamilton Twp) and South of Exit 67 - US 1 (Lawrence Twp), Wednesday May 13, 2026 10:00 AM thru 03:00 PM, , moving operation","update_date":"2026-05-08T12:02:00Z"},"road_event_id":"Hx1GNUrfBmA5n7c+NYE9hs4dP0g=","beginning_cross_street":"South of Exit 60 - I-195/NJ 129","ending_cross_street":"South of Exit 67 - US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.721443,40.167728]]}},{"id":"rpPgjYDIeAeYxjSTHfnsYwkzm0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near North of CR 571/Princeton-Hightstown Rd (East Windsor Twp), Friday May 15, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-08T12:01:50Z"},"road_event_id":"rpPgjYDIeAeYxjSTHfnsYwkzm0A=","beginning_cross_street":"North of CR 571/Princeton-Hightstown Rd","ending_cross_street":"North of CR 571/Princeton-Hightstown Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.535705,40.275524]]}},{"id":"+MM5TI/8g9XbRI95OfGZyUKYkXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between South of NJ 72 (Stafford Twp) and North of CR 14/Hillard Blvd (Stafford Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T12:01:51Z"},"road_event_id":"+MM5TI/8g9XbRI95OfGZyUKYkXI=","beginning_cross_street":"South of NJ 72","ending_cross_street":"North of CR 14/Hillard Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.26123,39.693565]]}},{"id":"wcNb0SzdLqz4acakZZkt9WhvwrI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between West of Exit 16 - CR 537/Great Adventure (Millstone Twp) and I-295 (Hamilton Twp), left shoulder, moving operation","update_date":"2026-05-08T12:01:52Z"},"road_event_id":"wcNb0SzdLqz4acakZZkt9WhvwrI=","beginning_cross_street":"West of Exit 16 - CR 537/Great Adventure","ending_cross_street":"I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.437126,40.164821]]}},{"id":"KZaYmMOrWRgoYOwZhGB/KTRee2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near North of CR 571/Princeton-Hightstown Rd (East Windsor Twp), Friday May 15, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-08T12:01:47Z"},"road_event_id":"KZaYmMOrWRgoYOwZhGB/KTRee2M=","beginning_cross_street":"North of CR 571/Princeton-Hightstown Rd","ending_cross_street":"North of CR 571/Princeton-Hightstown Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.534614,40.276695]]}},{"id":"kUrd2qnJQrFmZm4BC3cc0TL1Jgk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between south of Exit 72 - NJ 31 (Hopewell Twp) and south of Exit 76 - NJ 29 (Ewing Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-08T12:01:45Z"},"road_event_id":"kUrd2qnJQrFmZm4BC3cc0TL1Jgk=","beginning_cross_street":"south of Exit 72 - NJ 31","ending_cross_street":"south of Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.779342,40.291366]]}},{"id":"/fp/ULTWhV2s8F33INw1xpx0W1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound between I-295 (Hamilton Twp) and West of Exit 16 - CR 537/Great Adventure (Millstone Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, left lane closed, moving operation","update_date":"2026-05-08T12:01:42Z"},"road_event_id":"/fp/ULTWhV2s8F33INw1xpx0W1E=","beginning_cross_street":"I-295","ending_cross_street":"West of Exit 16 - CR 537/Great Adventure","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.72351,40.183963]]}},{"id":"pbv4laq468QQvOh0giPXe6JnxPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between North of Exit 32 - CR 561/Haddonfield Berlin Rd (Cherry Hill Twp) and North of Exit 28 - NJ 168/Black Horse Pike (Barrington), Wednesday May 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-08T12:01:44Z"},"road_event_id":"pbv4laq468QQvOh0giPXe6JnxPM=","beginning_cross_street":"North of Exit 32 - CR 561/Haddonfield Berlin Rd","ending_cross_street":"North of Exit 28 - NJ 168/Black Horse Pike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.002212,39.888751]]}},{"id":"E09LbCDqWdATQ2JSZ0AcDkg26V8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound between North of CR 655/Fries Mill Rd (Washington Twp) and North of CR 651/Greentree Rd (Washington Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, right lane closed","update_date":"2026-05-08T12:21:24Z"},"road_event_id":"E09LbCDqWdATQ2JSZ0AcDkg26V8=","beginning_cross_street":"North of CR 655/Fries Mill Rd","ending_cross_street":"North of CR 651/Greentree Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.045402,39.748291]]}},{"id":"hQebqjhBnahxI6c3cS6bgpWyhH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound near South of CR 689/Cross Keys Berlin Rd (Monroe Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed","update_date":"2026-05-08T12:21:28Z"},"road_event_id":"hQebqjhBnahxI6c3cS6bgpWyhH4=","beginning_cross_street":"South of CR 689/Cross Keys Berlin Rd","ending_cross_street":"South of CR 689/Cross Keys Berlin Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.010009,39.706527]]}},{"id":"SSki6h/+TFOdlKBBF53bYqe1LdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound near South of CR 689/Cross Keys Berlin Rd (Monroe Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right lane closed","update_date":"2026-05-08T12:21:30Z"},"road_event_id":"SSki6h/+TFOdlKBBF53bYqe1LdI=","beginning_cross_street":"South of CR 689/Cross Keys Berlin Rd","ending_cross_street":"South of CR 689/Cross Keys Berlin Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.010009,39.706527]]}},{"id":"scxOksNF3racbeCB831dGxOpvRg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound between North of CR 655/Fries Mill Rd (Washington Twp) and North of CR 651/Greentree Rd (Washington Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, right lane closed","update_date":"2026-05-08T12:21:34Z"},"road_event_id":"scxOksNF3racbeCB831dGxOpvRg=","beginning_cross_street":"North of CR 655/Fries Mill Rd","ending_cross_street":"North of CR 651/Greentree Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.045402,39.748291]]}},{"id":"ORC300545554","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","description":"Roadwork on US 9 northbound Watervliet Shaker Road; NY 155 (Colonie) Not currently Scheduled","update_date":"2026-05-08T19:00:11Z"},"road_event_id":"ORC300545554","beginning_cross_street":"Watervliet Shaker Road; NY 155","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-08T12:24:22Z","end_date":"2026-05-09T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.762168,42.736839]]}},{"id":"PjhSibBbGbCZwaNZ6nDMD/zUn1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 117 both directions between Upland Drive (New Castle) and Roaring Brook Road (New Castle) 2025082502725/32580509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-08T12:30:25Z"},"road_event_id":"PjhSibBbGbCZwaNZ6nDMD/zUn1A=","beginning_cross_street":"Upland Drive","ending_cross_street":"Roaring Brook Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.751495,41.173617]]}},{"id":"hGLGsAym02cqsiLJiM+gA1Cwv4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 252"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PsD4D0p91glN9sPFpuhm8MDkXR0="}],"description":"Utility work on NY 252 both directions area of Pinnacle Road (Henrietta) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-08T12:40:48Z"},"road_event_id":"hGLGsAym02cqsiLJiM+gA1Cwv4Q=","beginning_cross_street":"Pinnacle Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.578647,43.087223]]}},{"id":"PsD4D0p91glN9sPFpuhm8MDkXR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 252"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hGLGsAym02cqsiLJiM+gA1Cwv4Q="}],"description":"Utility work on NY 252 both directions area of Pinnacle Road (Henrietta) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-08T12:40:48Z"},"road_event_id":"PsD4D0p91glN9sPFpuhm8MDkXR0=","beginning_cross_street":"Pinnacle Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.578647,43.087223]]}},{"id":"XfdBXXcwwlWTxNiEJFOJd5tWRqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7V6AS4tDI470/oyOU6djxKESMcc="}],"description":"Pothole repair on NY 104 both directions between Town of Irondequoit and Town of Webster Line (Webster) and Town of Webster and Town of Ontario Line; Monroe and Wayne County Line (Webster) Alternating lane closures with flaggers as needed, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:00 AM thru 02:00 PM All lanes","update_date":"2026-05-08T12:50:31Z"},"road_event_id":"XfdBXXcwwlWTxNiEJFOJd5tWRqo=","beginning_cross_street":"Town of Irondequoit and Town of Webster Line","ending_cross_street":"Town of Webster and Town of Ontario Line; Monroe and Wayne County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.530651,43.212293]]}},{"id":"7V6AS4tDI470/oyOU6djxKESMcc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XfdBXXcwwlWTxNiEJFOJd5tWRqo="},{"type":"next-occurrence","id":"PvJqOqDeXZuZlHv2EABKf6erVZg="}],"description":"Pothole repair on NY 104 both directions between Town of Irondequoit and Town of Webster Line (Webster) and Town of Webster and Town of Ontario Line; Monroe and Wayne County Line (Webster) Alternating lane closures with flaggers as needed, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:00 AM thru 02:00 PM All lanes","update_date":"2026-05-08T12:50:31Z"},"road_event_id":"7V6AS4tDI470/oyOU6djxKESMcc=","beginning_cross_street":"Town of Irondequoit and Town of Webster Line","ending_cross_street":"Town of Webster and Town of Ontario Line; Monroe and Wayne County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.530651,43.212293]]}},{"id":"PvJqOqDeXZuZlHv2EABKf6erVZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XfdBXXcwwlWTxNiEJFOJd5tWRqo="}],"description":"Pothole repair on NY 104 both directions between Town of Irondequoit and Town of Webster Line (Webster) and Town of Webster and Town of Ontario Line; Monroe and Wayne County Line (Webster) Alternating lane closures with flaggers as needed, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:00 AM thru 02:00 PM All lanes","update_date":"2026-05-08T12:50:31Z"},"road_event_id":"PvJqOqDeXZuZlHv2EABKf6erVZg=","beginning_cross_street":"Town of Irondequoit and Town of Webster Line","ending_cross_street":"Town of Webster and Town of Ontario Line; Monroe and Wayne County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.530651,43.212293]]}},{"id":"Qs7zaXpd5xunXvjfdM/Ee2IecOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fv4ajwLy2DmPBjGOvY+3YknVM+c="}],"description":"Bridge work on US 15 northbound MERSEREAU LN (Lindley) to Exit 6 (Lindley) 2 lanes reduced to 1, Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 08:30 AM thru 02:00 PM All lanes open","update_date":"2026-05-08T13:07:40Z"},"road_event_id":"Qs7zaXpd5xunXvjfdM/Ee2IecOE=","beginning_cross_street":"MERSEREAU LN","ending_cross_street":"Exit 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T21:00:00Z","end_date":"2026-05-15T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.13957,42.048386]]}},{"id":"fv4ajwLy2DmPBjGOvY+3YknVM+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qs7zaXpd5xunXvjfdM/Ee2IecOE="}],"description":"Bridge work on US 15 northbound MERSEREAU LN (Lindley) to Exit 6 (Lindley) 2 lanes reduced to 1, Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 08:30 AM thru 02:00 PM All lanes open","update_date":"2026-05-08T13:07:40Z"},"road_event_id":"fv4ajwLy2DmPBjGOvY+3YknVM+c=","beginning_cross_street":"MERSEREAU LN","ending_cross_street":"Exit 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T21:00:00Z","end_date":"2026-05-16T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.13957,42.048386]]}},{"id":"D4KvaCmOKt8OI3PqNCPGpQk84js=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/kPzi8VDFkGaK7jYOYCGcnGvJW4="}],"description":"Pothole repair on NY 695 northbound between NY 5 (Camillus) and I-690 EB (Geddes) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:24:02Z"},"road_event_id":"D4KvaCmOKt8OI3PqNCPGpQk84js=","beginning_cross_street":"NY 5","ending_cross_street":"I-690 EB ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.233362,43.071474]]}},{"id":"/kPzi8VDFkGaK7jYOYCGcnGvJW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D4KvaCmOKt8OI3PqNCPGpQk84js="},{"type":"next-occurrence","id":"1M2euS94nGjy9h3R38LQrE0LMfM="}],"description":"Pothole repair on NY 695 northbound between NY 5 (Camillus) and I-690 EB (Geddes) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:24:02Z"},"road_event_id":"/kPzi8VDFkGaK7jYOYCGcnGvJW4=","beginning_cross_street":"NY 5","ending_cross_street":"I-690 EB ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.233362,43.071474]]}},{"id":"1M2euS94nGjy9h3R38LQrE0LMfM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D4KvaCmOKt8OI3PqNCPGpQk84js="}],"description":"Pothole repair on NY 695 northbound between NY 5 (Camillus) and I-690 EB (Geddes) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:24:02Z"},"road_event_id":"1M2euS94nGjy9h3R38LQrE0LMfM=","beginning_cross_street":"NY 5","ending_cross_street":"I-690 EB ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.233362,43.071474]]}},{"id":"nQ0RUpeDygYggHf9OnNxOJrvEQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PMsh5AV3g7gKwJYP/3zwYGmamew="}],"description":"Pothole repair on NY 695 northbound between NY 5 (Camillus) and I-690 West (Geddes) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:23:32Z"},"road_event_id":"nQ0RUpeDygYggHf9OnNxOJrvEQQ=","beginning_cross_street":"NY 5","ending_cross_street":"I-690 West ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.234415,43.070429]]}},{"id":"PMsh5AV3g7gKwJYP/3zwYGmamew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nQ0RUpeDygYggHf9OnNxOJrvEQQ="},{"type":"next-occurrence","id":"E9i/VG/IE8RYOHkOAf/grw4OMsA="}],"description":"Pothole repair on NY 695 northbound between NY 5 (Camillus) and I-690 West (Geddes) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:23:32Z"},"road_event_id":"PMsh5AV3g7gKwJYP/3zwYGmamew=","beginning_cross_street":"NY 5","ending_cross_street":"I-690 West ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.234415,43.070429]]}},{"id":"E9i/VG/IE8RYOHkOAf/grw4OMsA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nQ0RUpeDygYggHf9OnNxOJrvEQQ="}],"description":"Pothole repair on NY 695 northbound between NY 5 (Camillus) and I-690 West (Geddes) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:23:32Z"},"road_event_id":"E9i/VG/IE8RYOHkOAf/grw4OMsA=","beginning_cross_street":"NY 5","ending_cross_street":"I-690 West ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.234415,43.070429]]}},{"id":"/Uhf1hPiZtBDy0Zjfb9a51lhPMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-86 eastbound Exit 8 - NY 394 West Lake Road (North Harmony) to Exit 10 - NY 17; Ramp (Ellery), Friday May 15th, 2026 thru Saturday May 16th, 2026, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-08T13:35:30Z"},"road_event_id":"/Uhf1hPiZtBDy0Zjfb9a51lhPMs=","beginning_cross_street":"Exit 8 - NY 394 West Lake Road","ending_cross_street":"Exit 10 - NY 17; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.410953,42.15158]]}},{"id":"90rW0nwVb8fLdhDdDzErO1KFXjg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Iqj2ZsoM75+apmIt2xx3eN/uRDU="}],"description":"Construction on Bronx River Parkway southbound between Palmer Road (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) there will be lane closures within these limits and all closures are weather permitting, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes open","update_date":"2026-05-08T13:26:25Z"},"road_event_id":"90rW0nwVb8fLdhDdDzErO1KFXjg=","beginning_cross_street":"Palmer Road","ending_cross_street":"Exit - Sprain Brook Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.83907,40.9413]]}},{"id":"Iqj2ZsoM75+apmIt2xx3eN/uRDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"90rW0nwVb8fLdhDdDzErO1KFXjg="},{"type":"next-occurrence","id":"TAbap95NXLYfUx+iqE9Ov7bEFx4="}],"description":"Construction on Bronx River Parkway southbound between Palmer Road (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) there will be lane closures within these limits and all closures are weather permitting, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes open","update_date":"2026-05-08T13:26:25Z"},"road_event_id":"Iqj2ZsoM75+apmIt2xx3eN/uRDU=","beginning_cross_street":"Palmer Road","ending_cross_street":"Exit - Sprain Brook Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.83907,40.9413]]}},{"id":"TAbap95NXLYfUx+iqE9Ov7bEFx4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"90rW0nwVb8fLdhDdDzErO1KFXjg="}],"description":"Construction on Bronx River Parkway southbound between Palmer Road (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) there will be lane closures within these limits and all closures are weather permitting, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes open","update_date":"2026-05-08T13:26:25Z"},"road_event_id":"TAbap95NXLYfUx+iqE9Ov7bEFx4=","beginning_cross_street":"Palmer Road","ending_cross_street":"Exit - Sprain Brook Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.83907,40.9413]]}},{"id":"bGAtm5U9tLFcij2cCe56dkxLWuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gJkSr8syoeIA9psSefJcBYxu3+o="}],"description":"Pothole repair on I-690 eastbound between Exit 6 - I-90 (Van Buren) and I-81 Southbound (Syracuse) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:32:03Z"},"road_event_id":"bGAtm5U9tLFcij2cCe56dkxLWuk=","beginning_cross_street":"Exit 6 - I-90  ","ending_cross_street":"I-81 Southbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.286665,43.111822]]}},{"id":"gJkSr8syoeIA9psSefJcBYxu3+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bGAtm5U9tLFcij2cCe56dkxLWuk="},{"type":"next-occurrence","id":"eVZePGv0VW36OYqK1BwWPZp14/I="}],"description":"Pothole repair on I-690 eastbound between Exit 6 - I-90 (Van Buren) and I-81 Southbound (Syracuse) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:32:03Z"},"road_event_id":"gJkSr8syoeIA9psSefJcBYxu3+o=","beginning_cross_street":"Exit 6 - I-90  ","ending_cross_street":"I-81 Southbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.286665,43.111822]]}},{"id":"eVZePGv0VW36OYqK1BwWPZp14/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bGAtm5U9tLFcij2cCe56dkxLWuk="}],"description":"Pothole repair on I-690 eastbound between Exit 6 - I-90 (Van Buren) and I-81 Southbound (Syracuse) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:32:03Z"},"road_event_id":"eVZePGv0VW36OYqK1BwWPZp14/I=","beginning_cross_street":"Exit 6 - I-90  ","ending_cross_street":"I-81 Southbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.286665,43.111822]]}},{"id":"BrACaGiiTIi/vamx6FQ3W6cLACQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rKmne29WB6N1+HqmfW7xG/B9J1o="}],"description":"Pothole repair on I-690 westbound between I-81 Southbound (Syracuse) and Exit 1 - I-90 (Van Buren) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:35:06Z"},"road_event_id":"BrACaGiiTIi/vamx6FQ3W6cLACQ=","beginning_cross_street":"I-81 Southbound","ending_cross_street":"Exit 1 - I-90","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.150185,43.052798]]}},{"id":"rKmne29WB6N1+HqmfW7xG/B9J1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BrACaGiiTIi/vamx6FQ3W6cLACQ="},{"type":"next-occurrence","id":"ngEyapnjxt1OO84H1JJMn3lPWXk="}],"description":"Pothole repair on I-690 westbound between I-81 Southbound (Syracuse) and Exit 1 - I-90 (Van Buren) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:35:06Z"},"road_event_id":"rKmne29WB6N1+HqmfW7xG/B9J1o=","beginning_cross_street":"I-81 Southbound","ending_cross_street":"Exit 1 - I-90","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.150185,43.052798]]}},{"id":"ngEyapnjxt1OO84H1JJMn3lPWXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BrACaGiiTIi/vamx6FQ3W6cLACQ="}],"description":"Pothole repair on I-690 westbound between I-81 Southbound (Syracuse) and Exit 1 - I-90 (Van Buren) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:35:06Z"},"road_event_id":"ngEyapnjxt1OO84H1JJMn3lPWXk=","beginning_cross_street":"I-81 Southbound","ending_cross_street":"Exit 1 - I-90","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.150185,43.052798]]}},{"id":"dUU85FoEPjDxIi6vTtGBq0lwDOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sUSTZtPqC8Yn8HksFd7JTa9vMrA="}],"description":"Pothole repair on I-690 westbound ramp to Exit 12A - SB NY-695 (Geddes) ; Alternating shoulder closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:39:35Z"},"road_event_id":"dUU85FoEPjDxIi6vTtGBq0lwDOs=","beginning_cross_street":"Exit 12A - SB NY-695","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.212561,43.075758]]}},{"id":"sUSTZtPqC8Yn8HksFd7JTa9vMrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dUU85FoEPjDxIi6vTtGBq0lwDOs="},{"type":"next-occurrence","id":"tNsFVhsWCSpM8QOuIs/dVsRJPL8="}],"description":"Pothole repair on I-690 westbound ramp to Exit 12A - SB NY-695 (Geddes) ; Alternating shoulder closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:39:35Z"},"road_event_id":"sUSTZtPqC8Yn8HksFd7JTa9vMrA=","beginning_cross_street":"Exit 12A - SB NY-695","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.212561,43.075758]]}},{"id":"tNsFVhsWCSpM8QOuIs/dVsRJPL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dUU85FoEPjDxIi6vTtGBq0lwDOs="}],"description":"Pothole repair on I-690 westbound ramp to Exit 12A - SB NY-695 (Geddes) ; Alternating shoulder closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:39:35Z"},"road_event_id":"tNsFVhsWCSpM8QOuIs/dVsRJPL8=","beginning_cross_street":"Exit 12A - SB NY-695","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.212561,43.075758]]}},{"id":"BKkALdLs63sHAsAzhUBRdZkUtiU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uxQ44I/mCps9Mr/xcIvLr09MibU="}],"description":"Pothole repair on I-690 westbound ramp to Exit 11 - SB NY-695 (Geddes), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:39:06Z"},"road_event_id":"BKkALdLs63sHAsAzhUBRdZkUtiU=","beginning_cross_street":"Exit 11 - SB NY-695","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.228009,43.083948]]}},{"id":"uxQ44I/mCps9Mr/xcIvLr09MibU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BKkALdLs63sHAsAzhUBRdZkUtiU="},{"type":"next-occurrence","id":"BGZebNijK0MoOWojoF27KmNTjfI="}],"description":"Pothole repair on I-690 westbound ramp to Exit 11 - SB NY-695 (Geddes), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:39:06Z"},"road_event_id":"uxQ44I/mCps9Mr/xcIvLr09MibU=","beginning_cross_street":"Exit 11 - SB NY-695","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.228009,43.083948]]}},{"id":"BGZebNijK0MoOWojoF27KmNTjfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BKkALdLs63sHAsAzhUBRdZkUtiU="}],"description":"Pothole repair on I-690 westbound ramp to Exit 11 - SB NY-695 (Geddes), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-08T13:39:06Z"},"road_event_id":"BGZebNijK0MoOWojoF27KmNTjfI=","beginning_cross_street":"Exit 11 - SB NY-695","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.228009,43.083948]]}},{"id":"IbY10O8RMHed60d56f8EiX7gpyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1LIz5pcRLqSwbeYmp7Z59fghVe8="}],"description":"Construction on Bronx River Parkway northbound between Midland Avenue (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) there will be single lane closures within these limits and all work is weather dependent, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes open","update_date":"2026-05-08T13:49:22Z"},"road_event_id":"IbY10O8RMHed60d56f8EiX7gpyo=","beginning_cross_street":"Midland Avenue","ending_cross_street":"Exit - Sprain Brook Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.836297,40.934023]]}},{"id":"1LIz5pcRLqSwbeYmp7Z59fghVe8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IbY10O8RMHed60d56f8EiX7gpyo="},{"type":"next-occurrence","id":"eRtTqHRAhauG3A3AhKaJDNhCO3k="}],"description":"Construction on Bronx River Parkway northbound between Midland Avenue (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) there will be single lane closures within these limits and all work is weather dependent, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes open","update_date":"2026-05-08T13:49:22Z"},"road_event_id":"1LIz5pcRLqSwbeYmp7Z59fghVe8=","beginning_cross_street":"Midland Avenue","ending_cross_street":"Exit - Sprain Brook Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.836297,40.934023]]}},{"id":"eRtTqHRAhauG3A3AhKaJDNhCO3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IbY10O8RMHed60d56f8EiX7gpyo="}],"description":"Construction on Bronx River Parkway northbound between Midland Avenue (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) there will be single lane closures within these limits and all work is weather dependent, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes open","update_date":"2026-05-08T13:49:22Z"},"road_event_id":"eRtTqHRAhauG3A3AhKaJDNhCO3k=","beginning_cross_street":"Midland Avenue","ending_cross_street":"Exit - Sprain Brook Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.836297,40.934023]]}},{"id":"s6bjNZtAVpcjS4/JJHyHErnTj74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4R+XMFu5NreIzQK4JwCgZHEDSmA="}],"description":"Construction on I-495 eastbound between 48th Street; Ramp (New York) and Exit 22A - Grand Central Parkwy (New York) Moving Operation , Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T13:59:42Z"},"road_event_id":"s6bjNZtAVpcjS4/JJHyHErnTj74=","beginning_cross_street":"48th Street; Ramp","ending_cross_street":"Exit 22A - Grand Central Parkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919072,40.731977]]}},{"id":"4R+XMFu5NreIzQK4JwCgZHEDSmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s6bjNZtAVpcjS4/JJHyHErnTj74="}],"description":"Construction on I-495 eastbound between 48th Street; Ramp (New York) and Exit 22A - Grand Central Parkwy (New York) Moving Operation , Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T13:59:42Z"},"road_event_id":"4R+XMFu5NreIzQK4JwCgZHEDSmA=","beginning_cross_street":"48th Street; Ramp","ending_cross_street":"Exit 22A - Grand Central Parkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919072,40.731977]]}},{"id":"/nFdMltlwRmQlqZ+8JYcQcNAKlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 8"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 8 both directions I-87 (Chester) Alternating Lanes, Continuous Wednesday May 6th, 2026 12:00 AM thru Saturday May 16th, 2026 03:00 PM All lanes open","update_date":"2026-05-08T14:03:06Z"},"road_event_id":"/nFdMltlwRmQlqZ+8JYcQcNAKlc=","beginning_cross_street":"I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.778234,43.668596]]}},{"id":"VQOEuOcTxyormSfCOfeTvRb+2fA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+5CPz4qbb+xnYJKROSiYFOS5MBU="}],"description":"Construction on Franklin D. Roosevelt Drive both directions at Brooklyn Bridge (New York), Friday May 8th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T14:08:17Z"},"road_event_id":"VQOEuOcTxyormSfCOfeTvRb+2fA=","beginning_cross_street":"Brooklyn Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999036,40.708261]]}},{"id":"+5CPz4qbb+xnYJKROSiYFOS5MBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQOEuOcTxyormSfCOfeTvRb+2fA="},{"type":"next-occurrence","id":"Mtw9uayVplxL09OHaNKT13FbMpg="}],"description":"Construction on Franklin D. Roosevelt Drive both directions at Brooklyn Bridge (New York), Friday May 8th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T14:08:17Z"},"road_event_id":"+5CPz4qbb+xnYJKROSiYFOS5MBU=","beginning_cross_street":"Brooklyn Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999036,40.708261]]}},{"id":"Mtw9uayVplxL09OHaNKT13FbMpg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQOEuOcTxyormSfCOfeTvRb+2fA="},{"type":"next-occurrence","id":"GYk1+AAAr/n/S/zfzLBADN26yvo="}],"description":"Construction on Franklin D. Roosevelt Drive both directions at Brooklyn Bridge (New York), Friday May 8th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T14:08:17Z"},"road_event_id":"Mtw9uayVplxL09OHaNKT13FbMpg=","beginning_cross_street":"Brooklyn Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999036,40.708261]]}},{"id":"GYk1+AAAr/n/S/zfzLBADN26yvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQOEuOcTxyormSfCOfeTvRb+2fA="}],"description":"Construction on Franklin D. Roosevelt Drive both directions at Brooklyn Bridge (New York), Friday May 8th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T14:08:17Z"},"road_event_id":"GYk1+AAAr/n/S/zfzLBADN26yvo=","beginning_cross_street":"Brooklyn Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999036,40.708261]]}},{"id":"ugC1bU11ewGkiboPSgQWtraodWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rfKh0IyL1k2NA/1Uy85U80UIfd8="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Brooklyn Bridge (New York) and Harlem River Drive at Exit 19 - East 127th Street (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:00 PM thru 05:30 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T14:14:09Z"},"road_event_id":"ugC1bU11ewGkiboPSgQWtraodWY=","beginning_cross_street":"Brooklyn Bridge","ending_cross_street":"Exit 19 - East 127th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999156,40.708192]]}},{"id":"rfKh0IyL1k2NA/1Uy85U80UIfd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugC1bU11ewGkiboPSgQWtraodWY="},{"type":"next-occurrence","id":"r9/752TPoEamf9FU+LgbXUZZ9sk="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Brooklyn Bridge (New York) and Harlem River Drive at Exit 19 - East 127th Street (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:00 PM thru 05:30 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T14:14:09Z"},"road_event_id":"rfKh0IyL1k2NA/1Uy85U80UIfd8=","beginning_cross_street":"Brooklyn Bridge","ending_cross_street":"Exit 19 - East 127th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:00:00Z","end_date":"2026-05-15T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999156,40.708192]]}},{"id":"r9/752TPoEamf9FU+LgbXUZZ9sk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugC1bU11ewGkiboPSgQWtraodWY="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Brooklyn Bridge (New York) and Harlem River Drive at Exit 19 - East 127th Street (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:00 PM thru 05:30 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T14:14:09Z"},"road_event_id":"r9/752TPoEamf9FU+LgbXUZZ9sk=","beginning_cross_street":"Brooklyn Bridge","ending_cross_street":"Exit 19 - East 127th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:00:00Z","end_date":"2026-05-16T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999156,40.708192]]}},{"id":"ZaC6LMeS6Q6Sxu2CYOcmosjhVKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between West of Exit 56 - Elizabeth Ave (Newark) and East of Exit 51 - Burnett Av (Union Twp), Friday May 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed express lane","update_date":"2026-05-08T14:18:37Z"},"road_event_id":"ZaC6LMeS6Q6Sxu2CYOcmosjhVKg=","beginning_cross_street":"West of Exit 56 - Elizabeth Ave","ending_cross_street":"East of Exit 51 - Burnett Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.201339,40.713207]]}},{"id":"BxgSr7XQE8ZuPv9+n33y6RykVAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between West of Exit 56 - Elizabeth Ave (Newark) and East of Exit 51 - Burnett Av (Union Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed express lane","update_date":"2026-05-08T14:18:29Z"},"road_event_id":"BxgSr7XQE8ZuPv9+n33y6RykVAs=","beginning_cross_street":"West of Exit 56 - Elizabeth Ave","ending_cross_street":"East of Exit 51 - Burnett Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.201339,40.713207]]}},{"id":"Uagisdhjp1F0l2QJ4RzXGAiS4Os=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between West of Exit 56 - Elizabeth Ave (Newark) and East of Exit 51 - Burnett Av (Union Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed express lane","update_date":"2026-05-08T14:18:33Z"},"road_event_id":"Uagisdhjp1F0l2QJ4RzXGAiS4Os=","beginning_cross_street":"West of Exit 56 - Elizabeth Ave","ending_cross_street":"East of Exit 51 - Burnett Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.201339,40.713207]]}},{"id":"Haw+8Ymu4SgWv332qU4+vhZgJxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Southbound between NJ 4 (Paramus) and Summit Ave (Hackensack), Thursday May 14, 2026 11:00 PM thru Friday May 15, 2026 06:00 AM, left lane closed","update_date":"2026-05-08T14:18:42Z"},"road_event_id":"Haw+8Ymu4SgWv332qU4+vhZgJxA=","beginning_cross_street":"NJ 4","ending_cross_street":"Summit Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.072364,40.92044]]}},{"id":"yG3n0HkpQTgLvyRnuXj0UafCDII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZyWk0x21eIaoF5n+QDxgs88loWA="}],"description":"Bridge work on I-590 both directions between START ROUTE I-590; I-390; Exit 15 - I-390 (Brighton) and NY 590 at Exit 10A - NY 104 (Irondequoit) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T14:23:30Z"},"road_event_id":"yG3n0HkpQTgLvyRnuXj0UafCDII=","beginning_cross_street":"START ROUTE I-590; I-390; Exit 15 - I-390","ending_cross_street":"Exit 10A - NY 104","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.605894,43.110239]]}},{"id":"ZyWk0x21eIaoF5n+QDxgs88loWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yG3n0HkpQTgLvyRnuXj0UafCDII="},{"type":"next-occurrence","id":"KbxfP98EwZY84FIiDvxZjdjrRbA="}],"description":"Bridge work on I-590 both directions between START ROUTE I-590; I-390; Exit 15 - I-390 (Brighton) and NY 590 at Exit 10A - NY 104 (Irondequoit) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T14:23:30Z"},"road_event_id":"ZyWk0x21eIaoF5n+QDxgs88loWA=","beginning_cross_street":"START ROUTE I-590; I-390; Exit 15 - I-390","ending_cross_street":"Exit 10A - NY 104","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.605894,43.110239]]}},{"id":"KbxfP98EwZY84FIiDvxZjdjrRbA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yG3n0HkpQTgLvyRnuXj0UafCDII="}],"description":"Bridge work on I-590 both directions between START ROUTE I-590; I-390; Exit 15 - I-390 (Brighton) and NY 590 at Exit 10A - NY 104 (Irondequoit) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T14:23:30Z"},"road_event_id":"KbxfP98EwZY84FIiDvxZjdjrRbA=","beginning_cross_street":"START ROUTE I-590; I-390; Exit 15 - I-390","ending_cross_street":"Exit 10A - NY 104","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.605894,43.110239]]}},{"id":"1CDY3J0X61xM0DTJJEo2oNP0qC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-478"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"L0pf97UekxG4nRB/fNejBl6C9Hg="}],"description":"Construction on I-478 both directions between I-478; Ramp (New York) and Gowanus Expressway/I-278 HOV Lane at 61st Street (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T14:26:25Z"},"road_event_id":"1CDY3J0X61xM0DTJJEo2oNP0qC0=","beginning_cross_street":"I-478; Ramp","ending_cross_street":"61st Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003161,40.678677]]}},{"id":"L0pf97UekxG4nRB/fNejBl6C9Hg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-478"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1CDY3J0X61xM0DTJJEo2oNP0qC0="},{"type":"next-occurrence","id":"2ZYK6+ooW245qcgCat69EqmmvG4="}],"description":"Construction on I-478 both directions between I-478; Ramp (New York) and Gowanus Expressway/I-278 HOV Lane at 61st Street (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T14:26:25Z"},"road_event_id":"L0pf97UekxG4nRB/fNejBl6C9Hg=","beginning_cross_street":"I-478; Ramp","ending_cross_street":"61st Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003161,40.678677]]}},{"id":"2ZYK6+ooW245qcgCat69EqmmvG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-478"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1CDY3J0X61xM0DTJJEo2oNP0qC0="}],"description":"Construction on I-478 both directions between I-478; Ramp (New York) and Gowanus Expressway/I-278 HOV Lane at 61st Street (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T14:26:25Z"},"road_event_id":"2ZYK6+ooW245qcgCat69EqmmvG4=","beginning_cross_street":"I-478; Ramp","ending_cross_street":"61st Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003161,40.678677]]}},{"id":"MMaW82uqEZNd662e6thd1gvcVlE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7/ByEtLUj4urOkPgzwe1zn+2/X8="}],"description":"Bridge work on I-490 both directions between I-590 (Brighton) and Pittsford Palmyra Road; NY 31 (Perinton) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T14:26:27Z"},"road_event_id":"MMaW82uqEZNd662e6thd1gvcVlE=","beginning_cross_street":"I-590","ending_cross_street":"Pittsford Palmyra Road; NY 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.54724,43.143036]]}},{"id":"7/ByEtLUj4urOkPgzwe1zn+2/X8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MMaW82uqEZNd662e6thd1gvcVlE="},{"type":"next-occurrence","id":"73mUwc/JHuvPN2PAFCpvy31Y3BY="}],"description":"Bridge work on I-490 both directions between I-590 (Brighton) and Pittsford Palmyra Road; NY 31 (Perinton) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T14:26:27Z"},"road_event_id":"7/ByEtLUj4urOkPgzwe1zn+2/X8=","beginning_cross_street":"I-590","ending_cross_street":"Pittsford Palmyra Road; NY 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.54724,43.143036]]}},{"id":"73mUwc/JHuvPN2PAFCpvy31Y3BY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MMaW82uqEZNd662e6thd1gvcVlE="}],"description":"Bridge work on I-490 both directions between I-590 (Brighton) and Pittsford Palmyra Road; NY 31 (Perinton) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T14:26:27Z"},"road_event_id":"73mUwc/JHuvPN2PAFCpvy31Y3BY=","beginning_cross_street":"I-590","ending_cross_street":"Pittsford Palmyra Road; NY 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.54724,43.143036]]}},{"id":"p6BGo0jveEGnK4q1SP84wU/d//Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zlfWWnYJtzqPy2DTRc41L0neeFs="}],"description":"Construction on Gowanus Expressway/I-278 HOV Lane both directions at Exit 24 - NY 27; Prospect Expressway Exit (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 08:00 PM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T14:41:12Z"},"road_event_id":"p6BGo0jveEGnK4q1SP84wU/d//Q=","beginning_cross_street":"Exit 24  - NY 27; Prospect Expressway Exit","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996258,40.665964]]}},{"id":"zlfWWnYJtzqPy2DTRc41L0neeFs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p6BGo0jveEGnK4q1SP84wU/d//Q="},{"type":"next-occurrence","id":"qp8kv5W8VnFPg72JSL5OmdZWRkE="}],"description":"Construction on Gowanus Expressway/I-278 HOV Lane both directions at Exit 24 - NY 27; Prospect Expressway Exit (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 08:00 PM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T14:41:12Z"},"road_event_id":"zlfWWnYJtzqPy2DTRc41L0neeFs=","beginning_cross_street":"Exit 24  - NY 27; Prospect Expressway Exit","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996258,40.665964]]}},{"id":"qp8kv5W8VnFPg72JSL5OmdZWRkE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p6BGo0jveEGnK4q1SP84wU/d//Q="}],"description":"Construction on Gowanus Expressway/I-278 HOV Lane both directions at Exit 24 - NY 27; Prospect Expressway Exit (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 08:00 PM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T14:41:12Z"},"road_event_id":"qp8kv5W8VnFPg72JSL5OmdZWRkE=","beginning_cross_street":"Exit 24  - NY 27; Prospect Expressway Exit","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996258,40.665964]]}},{"id":"+TjSeVICbQZw/ti37d+E+x294xc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Northbound near South of Main St (Lebanon Twp), Friday May 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T14:51:34Z"},"road_event_id":"+TjSeVICbQZw/ti37d+E+x294xc=","beginning_cross_street":"South of Main St","ending_cross_street":"North of Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.930191,40.685264]]}},{"id":"LwEq7m38t7voEb01dDKxTTVzBYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Northbound near South of Main St (Lebanon Twp), Thursday May 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T14:51:29Z"},"road_event_id":"LwEq7m38t7voEb01dDKxTTVzBYo=","beginning_cross_street":"South of Main St","ending_cross_street":"North of Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.930191,40.685264]]}},{"id":"buNqIKqwTqD6j6suzWP2HgIiINQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Northbound near South of Main St (Lebanon Twp), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T14:51:30Z"},"road_event_id":"buNqIKqwTqD6j6suzWP2HgIiINQ=","beginning_cross_street":"South of Main St","ending_cross_street":"North of Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.930191,40.685264]]}},{"id":"UVPiXU+99V/2yg/oYF4qVclM4As=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"73DbRX/UMDB0I4+k1DI/hax3/MU="}],"description":"Roadwork on NY 33 both directions East Delavan Avenue (Buffalo) to Harlem Road; NY 240 (Cheektowaga), Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-08T14:52:14Z"},"road_event_id":"UVPiXU+99V/2yg/oYF4qVclM4As=","beginning_cross_street":"East Delavan Avenue","ending_cross_street":"Harlem Road; NY 240","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T18:00:00Z","end_date":"2026-05-20T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.842339,42.923776]]}},{"id":"73DbRX/UMDB0I4+k1DI/hax3/MU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UVPiXU+99V/2yg/oYF4qVclM4As="},{"type":"next-occurrence","id":"DecLX7ZRii9k6Z6ElFgk4rBq71g="}],"description":"Roadwork on NY 33 both directions East Delavan Avenue (Buffalo) to Harlem Road; NY 240 (Cheektowaga), Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-08T14:52:14Z"},"road_event_id":"73DbRX/UMDB0I4+k1DI/hax3/MU=","beginning_cross_street":"East Delavan Avenue","ending_cross_street":"Harlem Road; NY 240","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T18:00:00Z","end_date":"2026-05-21T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.842339,42.923776]]}},{"id":"DecLX7ZRii9k6Z6ElFgk4rBq71g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UVPiXU+99V/2yg/oYF4qVclM4As="},{"type":"next-occurrence","id":"95HchPBAPWcu78uemcDTuhuHj5I="}],"description":"Roadwork on NY 33 both directions East Delavan Avenue (Buffalo) to Harlem Road; NY 240 (Cheektowaga), Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-08T14:52:14Z"},"road_event_id":"DecLX7ZRii9k6Z6ElFgk4rBq71g=","beginning_cross_street":"East Delavan Avenue","ending_cross_street":"Harlem Road; NY 240","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T18:00:00Z","end_date":"2026-05-22T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.842339,42.923776]]}},{"id":"95HchPBAPWcu78uemcDTuhuHj5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UVPiXU+99V/2yg/oYF4qVclM4As="}],"description":"Roadwork on NY 33 both directions East Delavan Avenue (Buffalo) to Harlem Road; NY 240 (Cheektowaga), Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-08T14:52:14Z"},"road_event_id":"95HchPBAPWcu78uemcDTuhuHj5I=","beginning_cross_street":"East Delavan Avenue","ending_cross_street":"Harlem Road; NY 240","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T18:00:00Z","end_date":"2026-05-23T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.842339,42.923776]]}},{"id":"Hm1iKq34/2QkImKVDsX7DNS6BjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound near North of Charlotte Circle (Jersey City), Wednesday May 13, 2026 10:00 AM thru 02:00 PM, left lane closed","update_date":"2026-05-08T14:54:33Z"},"road_event_id":"Hm1iKq34/2QkImKVDsX7DNS6BjM=","beginning_cross_street":"North of Charlotte Circle","ending_cross_street":"Sip Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.074012,40.738357]]}},{"id":"+XeQLm++eCajPyVeynw0wLdUuX8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near CR 518/Washington St (Montgomery Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T14:54:26Z"},"road_event_id":"+XeQLm++eCajPyVeynw0wLdUuX8=","beginning_cross_street":"CR 518/Washington St","ending_cross_street":"South of CR 518/Washington St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.649543,40.403152]]}},{"id":"6zUpnqbAHzxgs97ZHbCPt5o7TB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound between North of Wantage School Rd (Wantage Twp) and South of Brink Rd (Wantage Twp), Wednesday May 13, 2026 09:00 AM thru 03:30 PM, right shoulder closed, moving operation","update_date":"2026-05-08T14:54:27Z"},"road_event_id":"6zUpnqbAHzxgs97ZHbCPt5o7TB8=","beginning_cross_street":"North of Wantage School Rd","ending_cross_street":"South of Brink Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.618453,41.234889]]}},{"id":"7mEkg+IrmyopZmyO5akWjVpud4s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near CR 518/Washington St (Montgomery Twp), Friday May 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T14:54:28Z"},"road_event_id":"7mEkg+IrmyopZmyO5akWjVpud4s=","beginning_cross_street":"CR 518/Washington St","ending_cross_street":"South of CR 518/Washington St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.649543,40.403152]]}},{"id":"uPeparP6PIgHcl9GJ+BSkWBh5tI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Sip Av (Jersey City), Wednesday May 13, 2026 10:00 AM thru 02:00 PM, left lane closed","update_date":"2026-05-08T14:54:29Z"},"road_event_id":"uPeparP6PIgHcl9GJ+BSkWBh5tI=","beginning_cross_street":"Sip Av","ending_cross_street":"North of Charlotte Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081649,40.734077]]}},{"id":"BRgY3b+QRBeFdWzKaYHg9FNWaPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near CR 518/Washington St (Montgomery Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T14:54:31Z"},"road_event_id":"BRgY3b+QRBeFdWzKaYHg9FNWaPU=","beginning_cross_street":"CR 518/Washington St","ending_cross_street":"South of CR 518/Washington St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.649543,40.403152]]}},{"id":"3rOCdYQUhLJOs6rO4+A/SPCi+7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kXQ3KtiesZKCbA+wasHr4hJ2eng="}],"description":"Repaving on NY 385 both directions 2nd Street; CR 28 (Athens), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM both shoulder closed","update_date":"2026-05-08T15:10:12Z"},"road_event_id":"3rOCdYQUhLJOs6rO4+A/SPCi+7U=","beginning_cross_street":"2nd Street; CR 28","ending_cross_street":"2nd Street; CR 28","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811157,42.257566]]}},{"id":"kXQ3KtiesZKCbA+wasHr4hJ2eng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3rOCdYQUhLJOs6rO4+A/SPCi+7U="},{"type":"next-occurrence","id":"ayx++dR+8dVlXDFWeqS6Uuzxqv8="}],"description":"Repaving on NY 385 both directions 2nd Street; CR 28 (Athens), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM both shoulder closed","update_date":"2026-05-08T15:10:12Z"},"road_event_id":"kXQ3KtiesZKCbA+wasHr4hJ2eng=","beginning_cross_street":"2nd Street; CR 28","ending_cross_street":"2nd Street; CR 28","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811157,42.257566]]}},{"id":"ayx++dR+8dVlXDFWeqS6Uuzxqv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3rOCdYQUhLJOs6rO4+A/SPCi+7U="}],"description":"Repaving on NY 385 both directions 2nd Street; CR 28 (Athens), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM both shoulder closed","update_date":"2026-05-08T15:10:12Z"},"road_event_id":"ayx++dR+8dVlXDFWeqS6Uuzxqv8=","beginning_cross_street":"2nd Street; CR 28","ending_cross_street":"2nd Street; CR 28","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811157,42.257566]]}},{"id":"3pjGFbk/CksEv8I7Gaugu7wyx30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pJAMyBoCm4CZncEBG0YmGx2llu4="}],"description":"Repaving on NY 7 both directions Consaul Road (Schenectady) to Saint Davids Lane (Niskayuna), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM both shoulder closed","update_date":"2026-05-08T15:13:47Z"},"road_event_id":"3pjGFbk/CksEv8I7Gaugu7wyx30=","beginning_cross_street":"Consaul Road","ending_cross_street":"Saint Davids Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907401,42.788407]]}},{"id":"pJAMyBoCm4CZncEBG0YmGx2llu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3pjGFbk/CksEv8I7Gaugu7wyx30="},{"type":"next-occurrence","id":"0FF7YKWBUV2wup/uoSb+5Zr7vWw="}],"description":"Repaving on NY 7 both directions Consaul Road (Schenectady) to Saint Davids Lane (Niskayuna), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM both shoulder closed","update_date":"2026-05-08T15:13:47Z"},"road_event_id":"pJAMyBoCm4CZncEBG0YmGx2llu4=","beginning_cross_street":"Consaul Road","ending_cross_street":"Saint Davids Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907401,42.788407]]}},{"id":"0FF7YKWBUV2wup/uoSb+5Zr7vWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3pjGFbk/CksEv8I7Gaugu7wyx30="}],"description":"Repaving on NY 7 both directions Consaul Road (Schenectady) to Saint Davids Lane (Niskayuna), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM both shoulder closed","update_date":"2026-05-08T15:13:47Z"},"road_event_id":"0FF7YKWBUV2wup/uoSb+5Zr7vWw=","beginning_cross_street":"Consaul Road","ending_cross_street":"Saint Davids Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907401,42.788407]]}},{"id":"3iMLj/FAD7SgIko/jQXdrWQ6kDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25A"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 25A eastbound between 40th Road (New York), Wednesday May 13th, 2026 thru Wednesday May 13th, 2026, 12:00 AM thru 11:59 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T15:25:44Z"},"road_event_id":"3iMLj/FAD7SgIko/jQXdrWQ6kDY=","beginning_cross_street":"40th Road","ending_cross_street":"40th Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-14T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921573,40.75304]]}},{"id":"+GxLhcmj5V9A1yRmnCqsqr+Fy94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25A"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 25A eastbound at Northern Boulevard; 114th Street (New York), Wednesday May 13th, 2026, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T15:27:33Z"},"road_event_id":"+GxLhcmj5V9A1yRmnCqsqr+Fy94=","beginning_cross_street":"Northern Boulevard; 114th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.871535,40.757018]]}},{"id":"qQ0H87xk/9+Zo74sTCj88ki22Uc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-90"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-90 both directions ramps to/from Exit 8; NY 43 (North Greenbush) various lane and shoulder closures, Thursday May 14th, 2026, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-08T15:30:36Z"},"road_event_id":"qQ0H87xk/9+Zo74sTCj88ki22Uc=","beginning_cross_street":"Exit 8; NY 43","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.719153,42.656396]]}},{"id":"jVlAg3V7Q7ayq5Eu0l5ytnOBPY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on NY 7 westbound ramp to Exit to I-787; Exit to NY 787 (Green Island), Wednesday May 13th,2026 10:30 AM thru 11:30 AM right shoulder of 2 lanes closed ,","update_date":"2026-05-13T14:00:02Z"},"road_event_id":"jVlAg3V7Q7ayq5Eu0l5ytnOBPY8=","beginning_cross_street":"Exit to I-787; Exit to NY 787","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:30:00Z","end_date":"2026-05-13T15:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.696108,42.743802]]}},{"id":"1hcZvd5hBdVBOBA3ialSFotUySk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-87 Northway northbound area of Exit 7; NY 7 (Colonie), Wednesday May 13th, 2026, 02:00 PM thru 02:30 PM 1 Left lane of 5 lanes closed","update_date":"2026-05-08T15:33:02Z"},"road_event_id":"1hcZvd5hBdVBOBA3ialSFotUySk=","beginning_cross_street":"Exit 7; NY 7","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T08:00:00Z","end_date":"2026-05-14T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764135,42.759195]]}},{"id":"5bNW6MsX44ntxrqmK1EkGv7+Prw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 376"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LMgclOlaBILcPEOu9nKvrnLbH1w="}],"description":"Overhead sign inspection on NY 376 both directions between East-West Arterial (Poughkeepsie) and Main Street (Poughkeepsie) D041200/32717709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lanes closed","update_date":"2026-05-08T15:43:17Z"},"road_event_id":"5bNW6MsX44ntxrqmK1EkGv7+Prw=","beginning_cross_street":"East-West Arterial","ending_cross_street":"Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.873034,41.654027]]}},{"id":"LMgclOlaBILcPEOu9nKvrnLbH1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 376"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5bNW6MsX44ntxrqmK1EkGv7+Prw="},{"type":"next-occurrence","id":"o8yXEa7eaJM+W7fsNxROr4vj8uQ="}],"description":"Overhead sign inspection on NY 376 both directions between East-West Arterial (Poughkeepsie) and Main Street (Poughkeepsie) D041200/32717709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lanes closed","update_date":"2026-05-08T15:43:17Z"},"road_event_id":"LMgclOlaBILcPEOu9nKvrnLbH1w=","beginning_cross_street":"East-West Arterial","ending_cross_street":"Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.873034,41.654027]]}},{"id":"o8yXEa7eaJM+W7fsNxROr4vj8uQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 376"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5bNW6MsX44ntxrqmK1EkGv7+Prw="}],"description":"Overhead sign inspection on NY 376 both directions between East-West Arterial (Poughkeepsie) and Main Street (Poughkeepsie) D041200/32717709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lanes closed","update_date":"2026-05-08T15:43:17Z"},"road_event_id":"o8yXEa7eaJM+W7fsNxROr4vj8uQ=","beginning_cross_street":"East-West Arterial","ending_cross_street":"Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.873034,41.654027]]}},{"id":"jKEcSR9G0+0nVVqy5of1HcFC6i8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Y+zVyEJCp93lOfDnmZELpdnflV4="}],"description":"Roadwork on NY 417 both directions Johnson Road (Wellsville) to South Main Street; NY 19 (Wellsville) 2 Lanes Reduced to 1, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-08T16:37:40Z"},"road_event_id":"jKEcSR9G0+0nVVqy5of1HcFC6i8=","beginning_cross_street":"Johnson Road","ending_cross_street":"South Main Street; NY 19","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.977325,42.124198]]}},{"id":"Y+zVyEJCp93lOfDnmZELpdnflV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jKEcSR9G0+0nVVqy5of1HcFC6i8="},{"type":"next-occurrence","id":"aiSOxCqtDHGDM+5JVxmEifFcxm0="}],"description":"Roadwork on NY 417 both directions Johnson Road (Wellsville) to South Main Street; NY 19 (Wellsville) 2 Lanes Reduced to 1, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-08T16:37:40Z"},"road_event_id":"Y+zVyEJCp93lOfDnmZELpdnflV4=","beginning_cross_street":"Johnson Road","ending_cross_street":"South Main Street; NY 19","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.977325,42.124198]]}},{"id":"aiSOxCqtDHGDM+5JVxmEifFcxm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jKEcSR9G0+0nVVqy5of1HcFC6i8="}],"description":"Roadwork on NY 417 both directions Johnson Road (Wellsville) to South Main Street; NY 19 (Wellsville) 2 Lanes Reduced to 1, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-08T16:37:40Z"},"road_event_id":"aiSOxCqtDHGDM+5JVxmEifFcxm0=","beginning_cross_street":"Johnson Road","ending_cross_street":"South Main Street; NY 19","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.977325,42.124198]]}},{"id":"obJ5feE9hNPgvPcLn+gs1MwvJIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of CR 618/Mountain Lakes Blvd (Mountain Lakes) and US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Friday May 15, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-08T15:51:37Z"},"road_event_id":"obJ5feE9hNPgvPcLn+gs1MwvJIE=","beginning_cross_street":"West of CR 618/Mountain Lakes Blvd","ending_cross_street":"US 202/CR 511/Parsippany Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.462821,40.885417]]}},{"id":"XZG+7RB+5XfOaN2pWhjtPlGjlNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of CR 654/Cherry Hill Rd (Parsippany-Troy Hills Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-05-08T15:51:41Z"},"road_event_id":"XZG+7RB+5XfOaN2pWhjtPlGjlNw=","beginning_cross_street":"West of CR 654/Cherry Hill Rd","ending_cross_street":"East of CR 618/Mountain Lakes Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.441001,40.876457]]}},{"id":"CzW8Ir5gW2PbWnqcvLciS+htLOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between Exit 62 - Garden State Parkway (Saddle Brook Twp) and East of Exit 60 - NJ 20 (Paterson), Friday May 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T15:51:36Z"},"road_event_id":"CzW8Ir5gW2PbWnqcvLciS+htLOg=","beginning_cross_street":"Exit 62 - Garden State Parkway","ending_cross_street":"East of Exit 60 - NJ 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.101676,40.903633]]}},{"id":"EnLjVBAADFtYQpIHuj+ExxQtAtk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound near West of US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, left lane closed","update_date":"2026-05-08T15:51:34Z"},"road_event_id":"EnLjVBAADFtYQpIHuj+ExxQtAtk=","beginning_cross_street":"West of US 202/CR 511/Parsippany Blvd","ending_cross_street":"West of I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.428611,40.872589]]}},{"id":"iO9E4pITZqkd22GRJV+WGMPze9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of CR 618/Mountain Lakes Blvd (Mountain Lakes) and US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-08T15:51:25Z"},"road_event_id":"iO9E4pITZqkd22GRJV+WGMPze9M=","beginning_cross_street":"West of CR 618/Mountain Lakes Blvd","ending_cross_street":"US 202/CR 511/Parsippany Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.462821,40.885417]]}},{"id":"LMSUMVxh09r6V21fBfqP4uZz4qg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Northbound near South of Maple Ave (Fair Lawn), Thursday May 14, 2026 10:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed","update_date":"2026-05-08T15:51:28Z"},"road_event_id":"LMSUMVxh09r6V21fBfqP4uZz4qg=","beginning_cross_street":"South of Maple Ave","ending_cross_street":"North of Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.135963,40.948986]]}},{"id":"QKA1YWTg6tuKesLbzmp8v/bhT5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Wednesday May 13, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T15:51:30Z"},"road_event_id":"QKA1YWTg6tuKesLbzmp8v/bhT5E=","beginning_cross_street":"West of CR 644/Main St","ending_cross_street":"US 202/CR 511/Parsippany Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.512825,40.890899]]}},{"id":"nexjMJTAvLrLsO2wBUZShy2ueog=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of CR 618/Mountain Lakes Blvd (Mountain Lakes) and US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Wednesday May 13, 2026 09:00 AM thru Thursday May 14, 2026 09:00 AM, right lane closed","update_date":"2026-05-08T15:51:32Z"},"road_event_id":"nexjMJTAvLrLsO2wBUZShy2ueog=","beginning_cross_street":"West of CR 618/Mountain Lakes Blvd","ending_cross_street":"US 202/CR 511/Parsippany Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.462821,40.885417]]}},{"id":"zy9prGycvBaFjjmaSyb33dtgCqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IQ+Ivpyu2/kl0U8m3liZL+5zKfg="}],"description":"Overhead sign inspection on US 44 westbound between Burnett Blvd (Northeast) and Taft Avenue (Northeast) D041200/32717509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-05-08T15:55:54Z"},"road_event_id":"zy9prGycvBaFjjmaSyb33dtgCqY=","beginning_cross_street":"Burnett Blvd","ending_cross_street":"Taft Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.89104,41.696481]]}},{"id":"IQ+Ivpyu2/kl0U8m3liZL+5zKfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zy9prGycvBaFjjmaSyb33dtgCqY="},{"type":"next-occurrence","id":"FVXvgEX0naVPqRShwPUSc7tfPbs="}],"description":"Overhead sign inspection on US 44 westbound between Burnett Blvd (Northeast) and Taft Avenue (Northeast) D041200/32717509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-05-08T15:55:54Z"},"road_event_id":"IQ+Ivpyu2/kl0U8m3liZL+5zKfg=","beginning_cross_street":"Burnett Blvd","ending_cross_street":"Taft Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.89104,41.696481]]}},{"id":"FVXvgEX0naVPqRShwPUSc7tfPbs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zy9prGycvBaFjjmaSyb33dtgCqY="}],"description":"Overhead sign inspection on US 44 westbound between Burnett Blvd (Northeast) and Taft Avenue (Northeast) D041200/32717509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-05-08T15:55:54Z"},"road_event_id":"FVXvgEX0naVPqRShwPUSc7tfPbs=","beginning_cross_street":"Burnett Blvd","ending_cross_street":"Taft Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.89104,41.696481]]}},{"id":"lJNXJaUr7Tvmis5xnsLwYyUoKIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between Exit 62 - Garden State Parkway (Saddle Brook Twp) and East of Exit 60 - NJ 20 (Paterson), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T15:52:04Z"},"road_event_id":"lJNXJaUr7Tvmis5xnsLwYyUoKIE=","beginning_cross_street":"Exit 62 - Garden State Parkway","ending_cross_street":"East of Exit 60 - NJ 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.101676,40.903633]]}},{"id":"S5dCW/IRLE6DJzXAIJ3NWAfz2Rw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Thursday May 14, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T15:52:05Z"},"road_event_id":"S5dCW/IRLE6DJzXAIJ3NWAfz2Rw=","beginning_cross_street":"West of CR 644/Main St","ending_cross_street":"US 202/CR 511/Parsippany Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.512825,40.890899]]}},{"id":"uAX72rMHGEN6Gxp8lEaz/BaUTNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound between East of Rock Av (North Plainfield) and West of Gray St (North Plainfield), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-08T15:52:06Z"},"road_event_id":"uAX72rMHGEN6Gxp8lEaz/BaUTNU=","beginning_cross_street":"East of Rock Av","ending_cross_street":"West of Gray St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.462867,40.610748]]}},{"id":"+bjJMHYo4TCQX5Vp4ZXz7N5upu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of I-287 (Parsippany-Troy Hills Twp), Thursday May 14, 2026 09:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-05-08T15:52:08Z"},"road_event_id":"+bjJMHYo4TCQX5Vp4ZXz7N5upu0=","beginning_cross_street":"West of I-287","ending_cross_street":"East of CR 654/Cherry Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.419418,40.870544]]}},{"id":"fb70f+41wjvexgiKpz/jU/shlFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp) and West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-08T15:52:09Z"},"road_event_id":"fb70f+41wjvexgiKpz/jU/shlFY=","beginning_cross_street":"US 202/CR 511/Parsippany Blvd","ending_cross_street":"West of CR 618/Mountain Lakes Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.421287,40.870948]]}},{"id":"fZ69SOHQzPzX5Lu9ZBeCU0Iec/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound near East of CR 618/Mountain Lakes Blvd (Mountain Lakes), Wednesday May 13, 2026 09:00 PM thru Thursday May 14, 2026 06:00 AM, left lane closed","update_date":"2026-05-08T15:52:11Z"},"road_event_id":"fZ69SOHQzPzX5Lu9ZBeCU0Iec/M=","beginning_cross_street":"East of CR 618/Mountain Lakes Blvd","ending_cross_street":"West of CR 654/Cherry Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.447967,40.878902]]}},{"id":"YG3L1SbaYZg/bV2v6nXQrIz/6Yk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound at Exit 48 - Hook Mountain Rd (Montville Twp) Wednesday May 13, 2026 11:00 PM thru Thursday May 14, 2026 05:00 AM, ramp","update_date":"2026-05-08T15:52:01Z"},"road_event_id":"YG3L1SbaYZg/bV2v6nXQrIz/6Yk=","beginning_cross_street":"Exit 48 - Hook Mountain Rd","ending_cross_street":"Exit 48 - Hook Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.34201,40.861568]]}},{"id":"5bbIkjbY3kZDuBSzviJv6ui93N8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of CR 654/Cherry Hill Rd (Parsippany-Troy Hills Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-08T15:51:52Z"},"road_event_id":"5bbIkjbY3kZDuBSzviJv6ui93N8=","beginning_cross_street":"West of CR 654/Cherry Hill Rd","ending_cross_street":"East of CR 618/Mountain Lakes Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.441001,40.876457]]}},{"id":"zbRJ/4fCPPjy0Q8jI235ePMJWAU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp) and West of CR 644/Main St (Rockaway Twp), Friday May 15, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T15:51:58Z"},"road_event_id":"zbRJ/4fCPPjy0Q8jI235ePMJWAU=","beginning_cross_street":"US 202/CR 511/Parsippany Blvd","ending_cross_street":"West of CR 644/Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.421287,40.870948]]}},{"id":"MhKm0I2XvOR2c+B/FosubckRib4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound between East of Rock Av (North Plainfield) and West of Gray St (North Plainfield), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-08T15:51:59Z"},"road_event_id":"MhKm0I2XvOR2c+B/FosubckRib4=","beginning_cross_street":"East of Rock Av","ending_cross_street":"West of Gray St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.462867,40.610748]]}},{"id":"iGU2zGxVh1biN4TuCkKP8V6MtrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp) and West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-08T15:51:48Z"},"road_event_id":"iGU2zGxVh1biN4TuCkKP8V6MtrQ=","beginning_cross_street":"US 202/CR 511/Parsippany Blvd","ending_cross_street":"West of CR 618/Mountain Lakes Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.421287,40.870948]]}},{"id":"YvR1BW5Mp27nX0N1Tj+1ZyMiptc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mrG9GFHXeFAvT1i7k+k8pMrkIxY="}],"description":"Roadwork on NY 19 both directions South Main Street; Start NY 417 Overlap (Wellsville) to Town of Scio; Town of Wellsville Line (Wellsville) 2 Lanes Reduced to 1, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-08T16:37:06Z"},"road_event_id":"YvR1BW5Mp27nX0N1Tj+1ZyMiptc=","beginning_cross_street":"South Main Street; Start NY 417 Overlap","ending_cross_street":"Town of Scio; Town of Wellsville Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.930532,42.108067]]}},{"id":"mrG9GFHXeFAvT1i7k+k8pMrkIxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YvR1BW5Mp27nX0N1Tj+1ZyMiptc="},{"type":"next-occurrence","id":"FAv3fSAfz0aOf1piCG3adOX7nLw="}],"description":"Roadwork on NY 19 both directions South Main Street; Start NY 417 Overlap (Wellsville) to Town of Scio; Town of Wellsville Line (Wellsville) 2 Lanes Reduced to 1, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-08T16:37:06Z"},"road_event_id":"mrG9GFHXeFAvT1i7k+k8pMrkIxY=","beginning_cross_street":"South Main Street; Start NY 417 Overlap","ending_cross_street":"Town of Scio; Town of Wellsville Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.930532,42.108067]]}},{"id":"FAv3fSAfz0aOf1piCG3adOX7nLw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YvR1BW5Mp27nX0N1Tj+1ZyMiptc="}],"description":"Roadwork on NY 19 both directions South Main Street; Start NY 417 Overlap (Wellsville) to Town of Scio; Town of Wellsville Line (Wellsville) 2 Lanes Reduced to 1, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-08T16:37:06Z"},"road_event_id":"FAv3fSAfz0aOf1piCG3adOX7nLw=","beginning_cross_street":"South Main Street; Start NY 417 Overlap","ending_cross_street":"Town of Scio; Town of Wellsville Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.930532,42.108067]]}},{"id":"o7oX9NVqFKUC2wJgKJwRHli5F0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Northbound near South of Maple Ave (Fair Lawn), Wednesday May 13, 2026 10:00 PM thru Thursday May 14, 2026 06:00 AM, right lane closed","update_date":"2026-05-08T15:52:20Z"},"road_event_id":"o7oX9NVqFKUC2wJgKJwRHli5F0A=","beginning_cross_street":"South of Maple Ave","ending_cross_street":"North of Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.135963,40.948986]]}},{"id":"klnk85cyT3YIyVx2ZYQS5yPJWwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound between East of Rock Av (North Plainfield) and West of Gray St (North Plainfield), Friday May 15, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-08T15:52:21Z"},"road_event_id":"klnk85cyT3YIyVx2ZYQS5yPJWwM=","beginning_cross_street":"East of Rock Av","ending_cross_street":"West of Gray St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.462867,40.610748]]}},{"id":"MoEUje033O0FbMUECzUaVN4u6HY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and East of CR 654/Cherry Hill Rd (Parsippany-Troy Hills Twp), Thursday May 14, 2026 09:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-08T15:52:22Z"},"road_event_id":"MoEUje033O0FbMUECzUaVN4u6HY=","beginning_cross_street":"West of I-287","ending_cross_street":"East of CR 654/Cherry Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.419418,40.870544]]}},{"id":"U766cIn3R8Ead12xkb93WnK0w2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between Exit 62 - Garden State Parkway (Saddle Brook Twp) and East of Exit 60 - NJ 20 (Paterson), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T15:52:12Z"},"road_event_id":"U766cIn3R8Ead12xkb93WnK0w2g=","beginning_cross_street":"Exit 62 - Garden State Parkway","ending_cross_street":"East of Exit 60 - NJ 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.101676,40.903633]]}},{"id":"/RS7jobjIhwsoyNL5rINphbFfLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Friday May 15, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T15:52:15Z"},"road_event_id":"/RS7jobjIhwsoyNL5rINphbFfLk=","beginning_cross_street":"West of CR 644/Main St","ending_cross_street":"US 202/CR 511/Parsippany Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.512825,40.890899]]}},{"id":"/2MWxj/xhhI9ZAA3MOLgpwjS2WQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp) and West of CR 644/Main St (Rockaway Twp), Wednesday May 13, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T15:52:16Z"},"road_event_id":"/2MWxj/xhhI9ZAA3MOLgpwjS2WQ=","beginning_cross_street":"US 202/CR 511/Parsippany Blvd","ending_cross_street":"West of CR 644/Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.421287,40.870948]]}},{"id":"o3lx4YBlwFOMWibUAv8qvlQ3I/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp) and West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Friday May 15, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-08T15:51:47Z"},"road_event_id":"o3lx4YBlwFOMWibUAv8qvlQ3I/8=","beginning_cross_street":"US 202/CR 511/Parsippany Blvd","ending_cross_street":"West of CR 618/Mountain Lakes Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.421287,40.870948]]}},{"id":"ZNyouiqMR3MemgnOwclgmvMetOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound at Exit 48 - Hook Mountain Rd (Montville Twp) Thursday May 14, 2026 11:00 PM thru Friday May 15, 2026 05:00 AM, ramp","update_date":"2026-05-08T15:51:43Z"},"road_event_id":"ZNyouiqMR3MemgnOwclgmvMetOs=","beginning_cross_street":"Exit 48 - Hook Mountain Rd","ending_cross_street":"Exit 48 - Hook Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.34201,40.861568]]}},{"id":"AbyLo5x0lfKVhm7P5iizSN/2lv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp) and West of CR 644/Main St (Rockaway Twp), Thursday May 14, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T15:51:45Z"},"road_event_id":"AbyLo5x0lfKVhm7P5iizSN/2lv4=","beginning_cross_street":"US 202/CR 511/Parsippany Blvd","ending_cross_street":"West of CR 644/Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.421287,40.870948]]}},{"id":"yyoJPLxbQqQAgI6XXOtyubBffNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CFxlZTHOZoGcls8u2ktdjJBN26U="}],"description":"Construction on I-278 westbound area of Kane Street (New York), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T15:52:51Z"},"road_event_id":"yyoJPLxbQqQAgI6XXOtyubBffNI=","beginning_cross_street":"Kane Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999949,40.68729]]}},{"id":"CFxlZTHOZoGcls8u2ktdjJBN26U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yyoJPLxbQqQAgI6XXOtyubBffNI="},{"type":"next-occurrence","id":"be9bKW2ASN0FQEg/DzqXsZ+Nvtc="}],"description":"Construction on I-278 westbound area of Kane Street (New York), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T15:52:51Z"},"road_event_id":"CFxlZTHOZoGcls8u2ktdjJBN26U=","beginning_cross_street":"Kane Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999949,40.68729]]}},{"id":"be9bKW2ASN0FQEg/DzqXsZ+Nvtc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yyoJPLxbQqQAgI6XXOtyubBffNI="}],"description":"Construction on I-278 westbound area of Kane Street (New York), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T15:52:51Z"},"road_event_id":"be9bKW2ASN0FQEg/DzqXsZ+Nvtc=","beginning_cross_street":"Kane Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T04:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999949,40.68729]]}},{"id":"Wu3l4S/0RDF1shAW/wbyHN24r5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hkJbVmcgRrgzRay07/6lrSEJ3EM="}],"description":"Construction on I-278 westbound at Fingerboard Road; Verrazano Narrows Bridge (Staten Island), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T16:04:42Z"},"road_event_id":"Wu3l4S/0RDF1shAW/wbyHN24r5c=","beginning_cross_street":"Fingerboard Road; Verrazano Narrows Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.066012,40.60305]]}},{"id":"hkJbVmcgRrgzRay07/6lrSEJ3EM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wu3l4S/0RDF1shAW/wbyHN24r5c="}],"description":"Construction on I-278 westbound at Fingerboard Road; Verrazano Narrows Bridge (Staten Island), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T16:04:42Z"},"road_event_id":"hkJbVmcgRrgzRay07/6lrSEJ3EM=","beginning_cross_street":"Fingerboard Road; Verrazano Narrows Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.066012,40.60305]]}},{"id":"zZGAGGnrB0b39HsC4fpfrpKHKhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 4 southbound 2nd Street (Waterford) Alternating Lanes, Thursday May 14th, 2026, 09:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-05-13T12:51:42Z"},"road_event_id":"zZGAGGnrB0b39HsC4fpfrpKHKhQ=","beginning_cross_street":"2nd Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.673977,42.796602]]}},{"id":"0EkLtnZarFg9GQduzF/m1/dFeCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Fn5+JTfhh52AMR3WL/bNa873Cp0="}],"description":"Construction on NY 27 westbound area of Exit 4 - John P Devaney Boulevard (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T16:15:08Z"},"road_event_id":"0EkLtnZarFg9GQduzF/m1/dFeCw=","beginning_cross_street":"Exit 4 - John P Devaney Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985214,40.658766]]}},{"id":"Fn5+JTfhh52AMR3WL/bNa873Cp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EkLtnZarFg9GQduzF/m1/dFeCw="},{"type":"next-occurrence","id":"6/VXyFHSevamn9tFnf+gh9K1zA8="}],"description":"Construction on NY 27 westbound area of Exit 4 - John P Devaney Boulevard (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T16:15:08Z"},"road_event_id":"Fn5+JTfhh52AMR3WL/bNa873Cp0=","beginning_cross_street":"Exit 4 - John P Devaney Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985214,40.658766]]}},{"id":"6/VXyFHSevamn9tFnf+gh9K1zA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EkLtnZarFg9GQduzF/m1/dFeCw="},{"type":"next-occurrence","id":"Rfb8yGugcFJYajp9yvBIlDaad7A="}],"description":"Construction on NY 27 westbound area of Exit 4 - John P Devaney Boulevard (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T16:15:08Z"},"road_event_id":"6/VXyFHSevamn9tFnf+gh9K1zA8=","beginning_cross_street":"Exit 4 - John P Devaney Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985214,40.658766]]}},{"id":"Rfb8yGugcFJYajp9yvBIlDaad7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EkLtnZarFg9GQduzF/m1/dFeCw="},{"type":"next-occurrence","id":"c987NUruXTbhDBGZrkqN54gpZls="}],"description":"Construction on NY 27 westbound area of Exit 4 - John P Devaney Boulevard (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T16:15:08Z"},"road_event_id":"Rfb8yGugcFJYajp9yvBIlDaad7A=","beginning_cross_street":"Exit 4 - John P Devaney Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985214,40.658766]]}},{"id":"c987NUruXTbhDBGZrkqN54gpZls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EkLtnZarFg9GQduzF/m1/dFeCw="},{"type":"next-occurrence","id":"//K26cCkIC+J6MnznpVXUKZETdE="}],"description":"Construction on NY 27 westbound area of Exit 4 - John P Devaney Boulevard (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T16:15:08Z"},"road_event_id":"c987NUruXTbhDBGZrkqN54gpZls=","beginning_cross_street":"Exit 4 - John P Devaney Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985214,40.658766]]}},{"id":"//K26cCkIC+J6MnznpVXUKZETdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EkLtnZarFg9GQduzF/m1/dFeCw="},{"type":"next-occurrence","id":"ysjO3VM1sIKT2l4QU1AOxqjiJ0Q="}],"description":"Construction on NY 27 westbound area of Exit 4 - John P Devaney Boulevard (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T16:15:08Z"},"road_event_id":"//K26cCkIC+J6MnznpVXUKZETdE=","beginning_cross_street":"Exit 4 - John P Devaney Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985214,40.658766]]}},{"id":"ysjO3VM1sIKT2l4QU1AOxqjiJ0Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EkLtnZarFg9GQduzF/m1/dFeCw="}],"description":"Construction on NY 27 westbound area of Exit 4 - John P Devaney Boulevard (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T16:15:08Z"},"road_event_id":"ysjO3VM1sIKT2l4QU1AOxqjiJ0Q=","beginning_cross_street":"Exit 4 - John P Devaney Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T14:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985214,40.658766]]}},{"id":"7ywsb9xr+/I5rdJuM5m6lbTldxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ki81U1eVqFA4FlAgx9RokUjn4sQ="}],"description":"Construction on Staten Island Expressway/I-278 HOV Lane both directions area of Clove Road; Ramp (Staten Island), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T16:19:20Z"},"road_event_id":"7ywsb9xr+/I5rdJuM5m6lbTldxE=","beginning_cross_street":"Clove Road; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.097546,40.610651]]}},{"id":"ki81U1eVqFA4FlAgx9RokUjn4sQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ywsb9xr+/I5rdJuM5m6lbTldxE="},{"type":"next-occurrence","id":"6caPsnpizsR2r7/4T6AMwvi1Od4="}],"description":"Construction on Staten Island Expressway/I-278 HOV Lane both directions area of Clove Road; Ramp (Staten Island), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T16:19:20Z"},"road_event_id":"ki81U1eVqFA4FlAgx9RokUjn4sQ=","beginning_cross_street":"Clove Road; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.097546,40.610651]]}},{"id":"6caPsnpizsR2r7/4T6AMwvi1Od4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7ywsb9xr+/I5rdJuM5m6lbTldxE="}],"description":"Construction on Staten Island Expressway/I-278 HOV Lane both directions area of Clove Road; Ramp (Staten Island), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T16:19:20Z"},"road_event_id":"6caPsnpizsR2r7/4T6AMwvi1Od4=","beginning_cross_street":"Clove Road; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.097546,40.610651]]}},{"id":"PGJT+VRXAMO+V2uEEuZAELrwqcw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zkTJPjn4S1DJ54xP6+N9LMgB+iY="}],"description":"Utility work on NY 19 both directions between I-90 (Le Roy) and West Main Street; NY 5 (Le Roy), Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T16:23:47Z"},"road_event_id":"PGJT+VRXAMO+V2uEEuZAELrwqcw=","beginning_cross_street":"I-90","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.972434,43.026739]]}},{"id":"zkTJPjn4S1DJ54xP6+N9LMgB+iY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PGJT+VRXAMO+V2uEEuZAELrwqcw="},{"type":"next-occurrence","id":"rAdK8ImjwOttwRvbMv1YPWrjztY="}],"description":"Utility work on NY 19 both directions between I-90 (Le Roy) and West Main Street; NY 5 (Le Roy), Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T16:23:47Z"},"road_event_id":"zkTJPjn4S1DJ54xP6+N9LMgB+iY=","beginning_cross_street":"I-90","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.972434,43.026739]]}},{"id":"rAdK8ImjwOttwRvbMv1YPWrjztY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PGJT+VRXAMO+V2uEEuZAELrwqcw="},{"type":"next-occurrence","id":"4dTC5js6lJZO4nXe65MumwuSBeA="}],"description":"Utility work on NY 19 both directions between I-90 (Le Roy) and West Main Street; NY 5 (Le Roy), Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T16:23:47Z"},"road_event_id":"rAdK8ImjwOttwRvbMv1YPWrjztY=","beginning_cross_street":"I-90","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.972434,43.026739]]}},{"id":"4dTC5js6lJZO4nXe65MumwuSBeA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PGJT+VRXAMO+V2uEEuZAELrwqcw="},{"type":"next-occurrence","id":"qE54DgU2ui3RWUZfY/vBPDN2evY="}],"description":"Utility work on NY 19 both directions between I-90 (Le Roy) and West Main Street; NY 5 (Le Roy), Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T16:23:47Z"},"road_event_id":"4dTC5js6lJZO4nXe65MumwuSBeA=","beginning_cross_street":"I-90","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.972434,43.026739]]}},{"id":"qE54DgU2ui3RWUZfY/vBPDN2evY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PGJT+VRXAMO+V2uEEuZAELrwqcw="},{"type":"next-occurrence","id":"Q6/FdumU5eXvsjkMFqy4XcOzveo="}],"description":"Utility work on NY 19 both directions between I-90 (Le Roy) and West Main Street; NY 5 (Le Roy), Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T16:23:47Z"},"road_event_id":"qE54DgU2ui3RWUZfY/vBPDN2evY=","beginning_cross_street":"I-90","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.972434,43.026739]]}},{"id":"Q6/FdumU5eXvsjkMFqy4XcOzveo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PGJT+VRXAMO+V2uEEuZAELrwqcw="},{"type":"next-occurrence","id":"47mJWBtWrnoC6mB+w9CRzi7/Ytw="}],"description":"Utility work on NY 19 both directions between I-90 (Le Roy) and West Main Street; NY 5 (Le Roy), Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T16:23:47Z"},"road_event_id":"Q6/FdumU5eXvsjkMFqy4XcOzveo=","beginning_cross_street":"I-90","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.972434,43.026739]]}},{"id":"47mJWBtWrnoC6mB+w9CRzi7/Ytw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PGJT+VRXAMO+V2uEEuZAELrwqcw="},{"type":"next-occurrence","id":"ms+1YsQ6TKu1C9kBCKc2yVmzTgc="}],"description":"Utility work on NY 19 both directions between I-90 (Le Roy) and West Main Street; NY 5 (Le Roy), Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T16:23:47Z"},"road_event_id":"47mJWBtWrnoC6mB+w9CRzi7/Ytw=","beginning_cross_street":"I-90","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.972434,43.026739]]}},{"id":"ms+1YsQ6TKu1C9kBCKc2yVmzTgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PGJT+VRXAMO+V2uEEuZAELrwqcw="},{"type":"next-occurrence","id":"aYlDyby5D5PbVImWGUD7PzlQM5U="}],"description":"Utility work on NY 19 both directions between I-90 (Le Roy) and West Main Street; NY 5 (Le Roy), Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T16:23:47Z"},"road_event_id":"ms+1YsQ6TKu1C9kBCKc2yVmzTgc=","beginning_cross_street":"I-90","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.972434,43.026739]]}},{"id":"aYlDyby5D5PbVImWGUD7PzlQM5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PGJT+VRXAMO+V2uEEuZAELrwqcw="}],"description":"Utility work on NY 19 both directions between I-90 (Le Roy) and West Main Street; NY 5 (Le Roy), Monday May 11th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T16:23:47Z"},"road_event_id":"aYlDyby5D5PbVImWGUD7PzlQM5U=","beginning_cross_street":"I-90","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.972434,43.026739]]}},{"id":"Uyi2ATIABnR1XJOJg+llWwzWr+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9H"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nFHVkDWseF8iISjo2Z1rCd8rdaM="}],"description":"Overhead sign inspection on NY 9H northbound between Apple Lane (Claverack) and NY-23B (Claverack) D041200/30482009 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lanes closed","update_date":"2026-05-08T16:37:56Z"},"road_event_id":"Uyi2ATIABnR1XJOJg+llWwzWr+M=","beginning_cross_street":"Apple Lane","ending_cross_street":"NY-23B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.733148,42.220178]]}},{"id":"nFHVkDWseF8iISjo2Z1rCd8rdaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9H"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uyi2ATIABnR1XJOJg+llWwzWr+M="},{"type":"next-occurrence","id":"b/OGQnrmyKFBFw0IKLaUZNl8/cs="}],"description":"Overhead sign inspection on NY 9H northbound between Apple Lane (Claverack) and NY-23B (Claverack) D041200/30482009 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lanes closed","update_date":"2026-05-08T16:37:56Z"},"road_event_id":"nFHVkDWseF8iISjo2Z1rCd8rdaM=","beginning_cross_street":"Apple Lane","ending_cross_street":"NY-23B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.733148,42.220178]]}},{"id":"b/OGQnrmyKFBFw0IKLaUZNl8/cs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9H"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Uyi2ATIABnR1XJOJg+llWwzWr+M="}],"description":"Overhead sign inspection on NY 9H northbound between Apple Lane (Claverack) and NY-23B (Claverack) D041200/30482009 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lanes closed","update_date":"2026-05-08T16:37:56Z"},"road_event_id":"b/OGQnrmyKFBFw0IKLaUZNl8/cs=","beginning_cross_street":"Apple Lane","ending_cross_street":"NY-23B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.733148,42.220178]]}},{"id":"JFUECe/B6ehtvy3IsxEKfGRgvj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EX5Pa2iz4ZdYr7QGx8TBLmRws08="}],"description":"Crack sealing and overnight roadwork on I-390 both directions ramps to/from Exit 19 - NY 33A (Gates) to NY 390 at Town of Greece and Town of Gates Line (Greece) Mobile operation with RAMP CLOSURES , Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes closed intermittently ramp","update_date":"2026-05-08T16:35:59Z"},"road_event_id":"JFUECe/B6ehtvy3IsxEKfGRgvj8=","beginning_cross_street":"Exit 19 - NY 33A","ending_cross_street":"Town of Greece and Town of Gates Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668312,43.139739]]}},{"id":"EX5Pa2iz4ZdYr7QGx8TBLmRws08=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JFUECe/B6ehtvy3IsxEKfGRgvj8="},{"type":"next-occurrence","id":"YdzwlvYrA4n5FbWp8t7UGZtxlVk="}],"description":"Crack sealing and overnight roadwork on I-390 both directions ramps to/from Exit 19 - NY 33A (Gates) to NY 390 at Town of Greece and Town of Gates Line (Greece) Mobile operation with RAMP CLOSURES , Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes closed intermittently ramp","update_date":"2026-05-08T16:35:59Z"},"road_event_id":"EX5Pa2iz4ZdYr7QGx8TBLmRws08=","beginning_cross_street":"Exit 19 - NY 33A","ending_cross_street":"Town of Greece and Town of Gates Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668312,43.139739]]}},{"id":"YdzwlvYrA4n5FbWp8t7UGZtxlVk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JFUECe/B6ehtvy3IsxEKfGRgvj8="},{"type":"next-occurrence","id":"tKXiT7IK2BrvewidI+4yU9thNlg="}],"description":"Crack sealing and overnight roadwork on I-390 both directions ramps to/from Exit 19 - NY 33A (Gates) to NY 390 at Town of Greece and Town of Gates Line (Greece) Mobile operation with RAMP CLOSURES , Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes closed intermittently ramp","update_date":"2026-05-08T16:35:59Z"},"road_event_id":"YdzwlvYrA4n5FbWp8t7UGZtxlVk=","beginning_cross_street":"Exit 19 - NY 33A","ending_cross_street":"Town of Greece and Town of Gates Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668312,43.139739]]}},{"id":"tKXiT7IK2BrvewidI+4yU9thNlg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JFUECe/B6ehtvy3IsxEKfGRgvj8="},{"type":"next-occurrence","id":"60zQLqS0mlQfhOJjxp8wRDhBihk="}],"description":"Crack sealing and overnight roadwork on I-390 both directions ramps to/from Exit 19 - NY 33A (Gates) to NY 390 at Town of Greece and Town of Gates Line (Greece) Mobile operation with RAMP CLOSURES , Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes closed intermittently ramp","update_date":"2026-05-08T16:35:59Z"},"road_event_id":"tKXiT7IK2BrvewidI+4yU9thNlg=","beginning_cross_street":"Exit 19 - NY 33A","ending_cross_street":"Town of Greece and Town of Gates Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T23:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668312,43.139739]]}},{"id":"60zQLqS0mlQfhOJjxp8wRDhBihk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JFUECe/B6ehtvy3IsxEKfGRgvj8="},{"type":"next-occurrence","id":"XxXAiYciTsFtnZ8bWPmzceX5deY="}],"description":"Crack sealing and overnight roadwork on I-390 both directions ramps to/from Exit 19 - NY 33A (Gates) to NY 390 at Town of Greece and Town of Gates Line (Greece) Mobile operation with RAMP CLOSURES , Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes closed intermittently ramp","update_date":"2026-05-08T16:35:59Z"},"road_event_id":"60zQLqS0mlQfhOJjxp8wRDhBihk=","beginning_cross_street":"Exit 19 - NY 33A","ending_cross_street":"Town of Greece and Town of Gates Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668312,43.139739]]}},{"id":"XxXAiYciTsFtnZ8bWPmzceX5deY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JFUECe/B6ehtvy3IsxEKfGRgvj8="},{"type":"next-occurrence","id":"HksE1yazBPFoQ+1dD6FaPRrOZA0="}],"description":"Crack sealing and overnight roadwork on I-390 both directions ramps to/from Exit 19 - NY 33A (Gates) to NY 390 at Town of Greece and Town of Gates Line (Greece) Mobile operation with RAMP CLOSURES , Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes closed intermittently ramp","update_date":"2026-05-08T16:35:59Z"},"road_event_id":"XxXAiYciTsFtnZ8bWPmzceX5deY=","beginning_cross_street":"Exit 19 - NY 33A","ending_cross_street":"Town of Greece and Town of Gates Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668312,43.139739]]}},{"id":"HksE1yazBPFoQ+1dD6FaPRrOZA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JFUECe/B6ehtvy3IsxEKfGRgvj8="}],"description":"Crack sealing and overnight roadwork on I-390 both directions ramps to/from Exit 19 - NY 33A (Gates) to NY 390 at Town of Greece and Town of Gates Line (Greece) Mobile operation with RAMP CLOSURES , Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes closed intermittently ramp","update_date":"2026-05-08T16:35:59Z"},"road_event_id":"HksE1yazBPFoQ+1dD6FaPRrOZA0=","beginning_cross_street":"Exit 19 - NY 33A","ending_cross_street":"Town of Greece and Town of Gates Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668312,43.139739]]}},{"id":"jRyqWGd+IQCbjlFX0UDTAoMSK5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Southbound between North of Exit 13 - Ackerman Av (Clifton) and North of I-78 (Newark), Thursday May 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T16:42:25Z"},"road_event_id":"jRyqWGd+IQCbjlFX0UDTAoMSK5k=","beginning_cross_street":"North of Exit 13 - Ackerman Av","ending_cross_street":"North of I-78","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.124,40.880176]]}},{"id":"FAaSNB8OnA5Dx6htsMCrClA6uI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound between East of Paterson Plank Road (North Bergen Twp) and West of Main Ave (Clifton), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T16:42:26Z"},"road_event_id":"FAaSNB8OnA5Dx6htsMCrClA6uI0=","beginning_cross_street":"East of Paterson Plank Road","ending_cross_street":"West of Main Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.046417,40.780002]]}},{"id":"86rCs9oefkK/JJtW1XCoTHTr+/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound between West of Main Ave (Clifton) and West of NJ 495 (North Bergen Twp), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T16:42:29Z"},"road_event_id":"86rCs9oefkK/JJtW1XCoTHTr+/4=","beginning_cross_street":"West of Main Ave","ending_cross_street":"West of NJ 495","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.144546,40.832576]]}},{"id":"nEr8l/2jcPbPLsv4zW9cKOv4fpI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound between North of I-78 (Newark) and North of Exit 13 - Ackerman Av (Clifton), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T16:42:30Z"},"road_event_id":"nEr8l/2jcPbPLsv4zW9cKOv4fpI=","beginning_cross_street":"North of I-78","ending_cross_street":"North of Exit 13 - Ackerman Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.183456,40.713314]]}},{"id":"MbXPRgvsSfXKbnx5wXto0DMNHAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound between East of Paterson Plank Road (North Bergen Twp) and West of Main Ave (Clifton), Thursday May 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T16:42:31Z"},"road_event_id":"MbXPRgvsSfXKbnx5wXto0DMNHAo=","beginning_cross_street":"East of Paterson Plank Road","ending_cross_street":"West of Main Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.046417,40.780002]]}},{"id":"akwQs1vs7rrfitsIrbOiBwu/Xs0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Southbound between North of Exit 13 - Ackerman Av (Clifton) and North of I-78 (Newark), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T16:42:38Z"},"road_event_id":"akwQs1vs7rrfitsIrbOiBwu/Xs0=","beginning_cross_street":"North of Exit 13 - Ackerman Av","ending_cross_street":"North of I-78","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.124,40.880176]]}},{"id":"JQvo/7BAnkezbr8tJ3dnvioMqls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound between West of Main Ave (Clifton) and West of NJ 495 (North Bergen Twp), Friday May 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T16:42:43Z"},"road_event_id":"JQvo/7BAnkezbr8tJ3dnvioMqls=","beginning_cross_street":"West of Main Ave","ending_cross_street":"West of NJ 495","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.144546,40.832576]]}},{"id":"yIaroJBqTpGxQsKlMJRHOv1c53Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound between North of I-78 (Newark) and North of Exit 13 - Ackerman Av (Clifton), Friday May 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T16:42:32Z"},"road_event_id":"yIaroJBqTpGxQsKlMJRHOv1c53Y=","beginning_cross_street":"North of I-78","ending_cross_street":"North of Exit 13 - Ackerman Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.183456,40.713314]]}},{"id":"zzO6Jc96JY1WlHgbdH9C0YBND68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Southbound between North of Exit 13 - Ackerman Av (Clifton) and North of I-78 (Newark), Friday May 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T16:42:34Z"},"road_event_id":"zzO6Jc96JY1WlHgbdH9C0YBND68=","beginning_cross_street":"North of Exit 13 - Ackerman Av","ending_cross_street":"North of I-78","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.124,40.880176]]}},{"id":"EXHNvBso3rX6Wy+rNXfn+OARbQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound between West of Main Ave (Clifton) and West of NJ 495 (North Bergen Twp), Thursday May 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T16:42:35Z"},"road_event_id":"EXHNvBso3rX6Wy+rNXfn+OARbQU=","beginning_cross_street":"West of Main Ave","ending_cross_street":"West of NJ 495","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.144546,40.832576]]}},{"id":"xk+rY9/C0PmMrZUPYctcDpYQpE0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound between East of Paterson Plank Road (North Bergen Twp) and West of Main Ave (Clifton), Friday May 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T16:42:36Z"},"road_event_id":"xk+rY9/C0PmMrZUPYctcDpYQpE0=","beginning_cross_street":"East of Paterson Plank Road","ending_cross_street":"West of Main Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.046417,40.780002]]}},{"id":"QB6Zynn9P+7U7+lLQGDawaRur0s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound between North of I-78 (Newark) and North of Exit 13 - Ackerman Av (Clifton), Thursday May 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T16:42:37Z"},"road_event_id":"QB6Zynn9P+7U7+lLQGDawaRur0s=","beginning_cross_street":"North of I-78","ending_cross_street":"North of Exit 13 - Ackerman Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.183456,40.713314]]}},{"id":"TgDGi2+3/47Iqo0KHAqwIk7yvO8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 495"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 495 Westbound near East of US 1&9 (North Bergen Twp), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T16:45:25Z"},"road_event_id":"TgDGi2+3/47Iqo0KHAqwIk7yvO8=","beginning_cross_street":"East of US 1&9","ending_cross_street":"East of US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.038551,40.77507]]}},{"id":"iziQzyuaFHl9nVD0L0/vCnOmrG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 495"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 495 Eastbound near NJ 3 (North Bergen Twp), Thursday May 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T16:45:27Z"},"road_event_id":"iziQzyuaFHl9nVD0L0/vCnOmrG8=","beginning_cross_street":"NJ 3","ending_cross_street":"East of US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.043373,40.776763]]}},{"id":"gSlSz+427QNoTbC8XLKWN5Lhc4s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 495"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 495 Eastbound near NJ 3 (North Bergen Twp), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T16:45:30Z"},"road_event_id":"gSlSz+427QNoTbC8XLKWN5Lhc4s=","beginning_cross_street":"NJ 3","ending_cross_street":"East of US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.043373,40.776763]]}},{"id":"BJGf0ZotnswkV32NVI1YLpqOQa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 495"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 495 Westbound near East of US 1&9 (North Bergen Twp), Thursday May 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-08T16:45:31Z"},"road_event_id":"BJGf0ZotnswkV32NVI1YLpqOQa0=","beginning_cross_street":"East of US 1&9","ending_cross_street":"East of US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.038551,40.77507]]}},{"id":"vtQdKkKR33X0bKhMX5vIeEmiTCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 390"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vXqd5yJLT5H1DYb9wxxy3JsvjP8="}],"description":"Crack sealing and overnight roadwork on NY 390 both directions between Town of Greece and Town of Gates Line (Greece) and Ridge Road West; NY 104 (Greece) Alternating Right/Left Lane closures as needed., Ramp closures may also be ineffect at times, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes","update_date":"2026-05-08T16:56:28Z"},"road_event_id":"vtQdKkKR33X0bKhMX5vIeEmiTCA=","beginning_cross_street":"Town of Greece and Town of Gates Line","ending_cross_street":"Ridge Road  West; NY 104","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.683384,43.178696]]}},{"id":"vXqd5yJLT5H1DYb9wxxy3JsvjP8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vtQdKkKR33X0bKhMX5vIeEmiTCA="},{"type":"next-occurrence","id":"4g4JF717Ek/XYgsM9O8L0vQy9lw="}],"description":"Crack sealing and overnight roadwork on NY 390 both directions between Town of Greece and Town of Gates Line (Greece) and Ridge Road West; NY 104 (Greece) Alternating Right/Left Lane closures as needed., Ramp closures may also be ineffect at times, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes","update_date":"2026-05-08T16:56:28Z"},"road_event_id":"vXqd5yJLT5H1DYb9wxxy3JsvjP8=","beginning_cross_street":"Town of Greece and Town of Gates Line","ending_cross_street":"Ridge Road  West; NY 104","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.683384,43.178696]]}},{"id":"4g4JF717Ek/XYgsM9O8L0vQy9lw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vtQdKkKR33X0bKhMX5vIeEmiTCA="},{"type":"next-occurrence","id":"doitODmsPFIVrgZEcsT2tTv0Wig="}],"description":"Crack sealing and overnight roadwork on NY 390 both directions between Town of Greece and Town of Gates Line (Greece) and Ridge Road West; NY 104 (Greece) Alternating Right/Left Lane closures as needed., Ramp closures may also be ineffect at times, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes","update_date":"2026-05-08T16:56:28Z"},"road_event_id":"4g4JF717Ek/XYgsM9O8L0vQy9lw=","beginning_cross_street":"Town of Greece and Town of Gates Line","ending_cross_street":"Ridge Road  West; NY 104","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.683384,43.178696]]}},{"id":"doitODmsPFIVrgZEcsT2tTv0Wig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vtQdKkKR33X0bKhMX5vIeEmiTCA="},{"type":"next-occurrence","id":"Aai+pRkangFDiItAJoKCo35TOi0="}],"description":"Crack sealing and overnight roadwork on NY 390 both directions between Town of Greece and Town of Gates Line (Greece) and Ridge Road West; NY 104 (Greece) Alternating Right/Left Lane closures as needed., Ramp closures may also be ineffect at times, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes","update_date":"2026-05-08T16:56:28Z"},"road_event_id":"doitODmsPFIVrgZEcsT2tTv0Wig=","beginning_cross_street":"Town of Greece and Town of Gates Line","ending_cross_street":"Ridge Road  West; NY 104","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T23:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.683384,43.178696]]}},{"id":"Aai+pRkangFDiItAJoKCo35TOi0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vtQdKkKR33X0bKhMX5vIeEmiTCA="},{"type":"next-occurrence","id":"UJGKimqUZaobgLHlqhxPR6GIj4c="}],"description":"Crack sealing and overnight roadwork on NY 390 both directions between Town of Greece and Town of Gates Line (Greece) and Ridge Road West; NY 104 (Greece) Alternating Right/Left Lane closures as needed., Ramp closures may also be ineffect at times, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes","update_date":"2026-05-08T16:56:28Z"},"road_event_id":"Aai+pRkangFDiItAJoKCo35TOi0=","beginning_cross_street":"Town of Greece and Town of Gates Line","ending_cross_street":"Ridge Road  West; NY 104","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.683384,43.178696]]}},{"id":"UJGKimqUZaobgLHlqhxPR6GIj4c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vtQdKkKR33X0bKhMX5vIeEmiTCA="},{"type":"next-occurrence","id":"X+Cp78vuS0prnGC4XurXy/jtR6w="}],"description":"Crack sealing and overnight roadwork on NY 390 both directions between Town of Greece and Town of Gates Line (Greece) and Ridge Road West; NY 104 (Greece) Alternating Right/Left Lane closures as needed., Ramp closures may also be ineffect at times, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes","update_date":"2026-05-08T16:56:28Z"},"road_event_id":"UJGKimqUZaobgLHlqhxPR6GIj4c=","beginning_cross_street":"Town of Greece and Town of Gates Line","ending_cross_street":"Ridge Road  West; NY 104","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.683384,43.178696]]}},{"id":"X+Cp78vuS0prnGC4XurXy/jtR6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vtQdKkKR33X0bKhMX5vIeEmiTCA="}],"description":"Crack sealing and overnight roadwork on NY 390 both directions between Town of Greece and Town of Gates Line (Greece) and Ridge Road West; NY 104 (Greece) Alternating Right/Left Lane closures as needed., Ramp closures may also be ineffect at times, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes","update_date":"2026-05-08T16:56:28Z"},"road_event_id":"X+Cp78vuS0prnGC4XurXy/jtR6w=","beginning_cross_street":"Town of Greece and Town of Gates Line","ending_cross_street":"Ridge Road  West; NY 104","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.683384,43.178696]]}},{"id":"Kg1PTLhSNoDZ0ZD/AO7b9lg2xTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[],"description":"Guard rail repairs on US 20 eastbound Schwartz Road (Lancaster) to Ransom Road (Lancaster), Thursday May 14th, 2026, 08:00 AM thru 12:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T17:01:02Z"},"road_event_id":"Kg1PTLhSNoDZ0ZD/AO7b9lg2xTk=","beginning_cross_street":"Schwartz Road","ending_cross_street":"Ransom Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.607281,42.891774]]}},{"id":"1drzFwV/QxSW8tNXBlpXFG7A12M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SP0uhhtUS3ZkwAUIVZ3V2+hYIcI="}],"description":"Crack sealing and overnight roadwork on I-390 both directions Exit ramps I-490 (Gates) to NY 390 at to I-490 (Gates) Alternating RAMP CLOSURES as needed, follow posted detours, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes ramp","update_date":"2026-05-08T17:04:32Z"},"road_event_id":"1drzFwV/QxSW8tNXBlpXFG7A12M=","beginning_cross_street":"I-490","ending_cross_street":"to I-490","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.678896,43.156161]]}},{"id":"SP0uhhtUS3ZkwAUIVZ3V2+hYIcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1drzFwV/QxSW8tNXBlpXFG7A12M="},{"type":"next-occurrence","id":"2lybKoOzVbllv2w422ieSZFkgsM="}],"description":"Crack sealing and overnight roadwork on I-390 both directions Exit ramps I-490 (Gates) to NY 390 at to I-490 (Gates) Alternating RAMP CLOSURES as needed, follow posted detours, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes ramp","update_date":"2026-05-08T17:04:32Z"},"road_event_id":"SP0uhhtUS3ZkwAUIVZ3V2+hYIcI=","beginning_cross_street":"I-490","ending_cross_street":"to I-490","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.678896,43.156161]]}},{"id":"2lybKoOzVbllv2w422ieSZFkgsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1drzFwV/QxSW8tNXBlpXFG7A12M="},{"type":"next-occurrence","id":"cw7x8E3naSeaElg6MNmAgVErbQU="}],"description":"Crack sealing and overnight roadwork on I-390 both directions Exit ramps I-490 (Gates) to NY 390 at to I-490 (Gates) Alternating RAMP CLOSURES as needed, follow posted detours, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes ramp","update_date":"2026-05-08T17:04:32Z"},"road_event_id":"2lybKoOzVbllv2w422ieSZFkgsM=","beginning_cross_street":"I-490","ending_cross_street":"to I-490","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.678896,43.156161]]}},{"id":"cw7x8E3naSeaElg6MNmAgVErbQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1drzFwV/QxSW8tNXBlpXFG7A12M="},{"type":"next-occurrence","id":"vS4JAJI5ZTyz+PNbQj1yDlAJ4rk="}],"description":"Crack sealing and overnight roadwork on I-390 both directions Exit ramps I-490 (Gates) to NY 390 at to I-490 (Gates) Alternating RAMP CLOSURES as needed, follow posted detours, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes ramp","update_date":"2026-05-08T17:04:32Z"},"road_event_id":"cw7x8E3naSeaElg6MNmAgVErbQU=","beginning_cross_street":"I-490","ending_cross_street":"to I-490","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T23:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.678896,43.156161]]}},{"id":"vS4JAJI5ZTyz+PNbQj1yDlAJ4rk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1drzFwV/QxSW8tNXBlpXFG7A12M="},{"type":"next-occurrence","id":"J9aUnad7K4Wha6rsT7/4tm/n2AQ="}],"description":"Crack sealing and overnight roadwork on I-390 both directions Exit ramps I-490 (Gates) to NY 390 at to I-490 (Gates) Alternating RAMP CLOSURES as needed, follow posted detours, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes ramp","update_date":"2026-05-08T17:04:32Z"},"road_event_id":"vS4JAJI5ZTyz+PNbQj1yDlAJ4rk=","beginning_cross_street":"I-490","ending_cross_street":"to I-490","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T23:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.678896,43.156161]]}},{"id":"J9aUnad7K4Wha6rsT7/4tm/n2AQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1drzFwV/QxSW8tNXBlpXFG7A12M="},{"type":"next-occurrence","id":"swK3z1iEl7WoDWmJUeawPDr+X/Y="}],"description":"Crack sealing and overnight roadwork on I-390 both directions Exit ramps I-490 (Gates) to NY 390 at to I-490 (Gates) Alternating RAMP CLOSURES as needed, follow posted detours, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes ramp","update_date":"2026-05-08T17:04:32Z"},"road_event_id":"J9aUnad7K4Wha6rsT7/4tm/n2AQ=","beginning_cross_street":"I-490","ending_cross_street":"to I-490","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.678896,43.156161]]}},{"id":"swK3z1iEl7WoDWmJUeawPDr+X/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1drzFwV/QxSW8tNXBlpXFG7A12M="}],"description":"Crack sealing and overnight roadwork on I-390 both directions Exit ramps I-490 (Gates) to NY 390 at to I-490 (Gates) Alternating RAMP CLOSURES as needed, follow posted detours, Tuesday May 12th, 2026 thru Tuesday May 19th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes ramp","update_date":"2026-05-08T17:04:32Z"},"road_event_id":"swK3z1iEl7WoDWmJUeawPDr+X/Y=","beginning_cross_street":"I-490","ending_cross_street":"to I-490","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.678896,43.156161]]}},{"id":"CenE38rKnGq9O1CiD/LCg5G3Ps8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 531"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Ixd8jbP9/HF7UmtDm7B54JRfzs4="}],"description":"Crack sealing on NY 531 both directions between Exit - I-490; END ROUTE (Gates) and Washington Street; NY 36 (Ogden) Alternating Right/Left Lane closures as needed., ocassional RAMP closings as needed., Sunday May 10th, 2026 thru Friday May 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:30 AM All lanes","update_date":"2026-05-08T17:10:34Z"},"road_event_id":"CenE38rKnGq9O1CiD/LCg5G3Ps8=","beginning_cross_street":"Exit   - I-490; END ROUTE","ending_cross_street":"Washington Street; NY 36","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.722435,43.157207]]}},{"id":"Ixd8jbP9/HF7UmtDm7B54JRfzs4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 531"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CenE38rKnGq9O1CiD/LCg5G3Ps8="}],"description":"Crack sealing on NY 531 both directions between Exit - I-490; END ROUTE (Gates) and Washington Street; NY 36 (Ogden) Alternating Right/Left Lane closures as needed., ocassional RAMP closings as needed., Sunday May 10th, 2026 thru Friday May 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:30 AM All lanes","update_date":"2026-05-08T17:10:34Z"},"road_event_id":"Ixd8jbP9/HF7UmtDm7B54JRfzs4=","beginning_cross_street":"Exit   - I-490; END ROUTE","ending_cross_street":"Washington Street; NY 36","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.722435,43.157207]]}},{"id":"B59tDbJMaIVqlq7hBUZbtcaMjDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[],"description":"Crack sealing and overnight roadwork on NY 104 both directions area of Sweden Walker Road; NY 260 (Clarkson) Alternating Right/Left Lane closures as needed., Sunday May 10th, 2026 thru Thursday May 14th, 2026, Sunday/Monday/Tuesday/Wednesday, 06:00 PM thru 05:30 AM All lanes","update_date":"2026-05-08T17:14:30Z"},"road_event_id":"B59tDbJMaIVqlq7hBUZbtcaMjDg=","beginning_cross_street":"Sweden Walker Road; NY 260","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.890729,43.225438]]}},{"id":"SDNn3dsXxI7Ie7IBOHy23mWiCco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MT READ BLVD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FjHVkQ89I6rE5DgZhZNPs+0CZx0="}],"description":"Crack sealing and overnight roadwork on MT READ BLVD both directions between NY 33 (Rochester) and RT-31 (Rochester) Alternating Right/Left Lane closures as needed., Sunday May 10th, 2026 thru Friday May 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:30 PM All lanes","update_date":"2026-05-08T17:18:21Z"},"road_event_id":"SDNn3dsXxI7Ie7IBOHy23mWiCco=","beginning_cross_street":"NY 33","ending_cross_street":"RT-31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.659581,43.152608]]}},{"id":"FjHVkQ89I6rE5DgZhZNPs+0CZx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MT READ BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SDNn3dsXxI7Ie7IBOHy23mWiCco="}],"description":"Crack sealing and overnight roadwork on MT READ BLVD both directions between NY 33 (Rochester) and RT-31 (Rochester) Alternating Right/Left Lane closures as needed., Sunday May 10th, 2026 thru Friday May 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:30 PM All lanes","update_date":"2026-05-08T17:18:21Z"},"road_event_id":"FjHVkQ89I6rE5DgZhZNPs+0CZx0=","beginning_cross_street":"NY 33","ending_cross_street":"RT-31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.659581,43.152608]]}},{"id":"b9hdzeEdTFOGy3RZyu5llsBhxlw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[],"description":"Reconstruction on NY 13 both directions between Spring House Road (Dryden) and Johnson Road (Dryden) ; Alternating one-way traffic with flaggers, Continuous Monday May 11th, 2026 07:00 AM thru Wednesday May 13th, 2026 03:00 PM All lanes open","update_date":"2026-05-08T17:26:41Z"},"road_event_id":"b9hdzeEdTFOGy3RZyu5llsBhxlw=","beginning_cross_street":"Spring House Road","ending_cross_street":"Johnson Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.313688,42.490037]]}},{"id":"XZ+24sVcJ0bdLgO/tBLmyZQA+tc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uY3OPmlZe1U4owoqLzUGzVyUluQ="}],"description":"Crack sealing on NY 96 both directions between Pittsford Victor Road (Perinton) and Fairport Road; NY 31F (Pittsford) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T17:30:47Z"},"road_event_id":"XZ+24sVcJ0bdLgO/tBLmyZQA+tc=","beginning_cross_street":"Pittsford Victor Road","ending_cross_street":"Fairport Road; NY 31F","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.462944,43.042066]]}},{"id":"uY3OPmlZe1U4owoqLzUGzVyUluQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZ+24sVcJ0bdLgO/tBLmyZQA+tc="},{"type":"next-occurrence","id":"8qwjhfdQvWs6igqVJ9A35hbhkhw="}],"description":"Crack sealing on NY 96 both directions between Pittsford Victor Road (Perinton) and Fairport Road; NY 31F (Pittsford) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T17:30:47Z"},"road_event_id":"uY3OPmlZe1U4owoqLzUGzVyUluQ=","beginning_cross_street":"Pittsford Victor Road","ending_cross_street":"Fairport Road; NY 31F","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.462944,43.042066]]}},{"id":"8qwjhfdQvWs6igqVJ9A35hbhkhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZ+24sVcJ0bdLgO/tBLmyZQA+tc="}],"description":"Crack sealing on NY 96 both directions between Pittsford Victor Road (Perinton) and Fairport Road; NY 31F (Pittsford) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T17:30:47Z"},"road_event_id":"8qwjhfdQvWs6igqVJ9A35hbhkhw=","beginning_cross_street":"Pittsford Victor Road","ending_cross_street":"Fairport Road; NY 31F","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.462944,43.042066]]}},{"id":"u6r7OOAJEZJ5wkE9SPrgLbuwAJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-911H"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yWCT0OTQqp5Eu1cp9wyTC6DOW7o="}],"description":"Gas main repairs on RT-911H eastbound AMSTERDAM AVE (Rotterdam) to CR-73 (Rotterdam) Alternating Lanes, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-08T17:35:53Z"},"road_event_id":"u6r7OOAJEZJ5wkE9SPrgLbuwAJQ=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"CR-73","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949987,42.782618]]}},{"id":"yWCT0OTQqp5Eu1cp9wyTC6DOW7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-911H"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u6r7OOAJEZJ5wkE9SPrgLbuwAJQ="},{"type":"next-occurrence","id":"ORSQ3Qpcyhs3MWm8zEMW50JcWxA="}],"description":"Gas main repairs on RT-911H eastbound AMSTERDAM AVE (Rotterdam) to CR-73 (Rotterdam) Alternating Lanes, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-08T17:35:53Z"},"road_event_id":"yWCT0OTQqp5Eu1cp9wyTC6DOW7o=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"CR-73","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949987,42.782618]]}},{"id":"ORSQ3Qpcyhs3MWm8zEMW50JcWxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-911H"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u6r7OOAJEZJ5wkE9SPrgLbuwAJQ="}],"description":"Gas main repairs on RT-911H eastbound AMSTERDAM AVE (Rotterdam) to CR-73 (Rotterdam) Alternating Lanes, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-08T17:35:53Z"},"road_event_id":"ORSQ3Qpcyhs3MWm8zEMW50JcWxA=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"CR-73","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949987,42.782618]]}},{"id":"rysDWPmRZkIR2Qz2FyWpNVOT2dQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 252"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aRndJxcg6BMdD+Ti0GI3sv31rgM="}],"description":"Crack sealing on NY 252 both directions between Clover Street; NY 65 (Pittsford) and Winton Road South; CR 98 (Henrietta) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T17:39:49Z"},"road_event_id":"rysDWPmRZkIR2Qz2FyWpNVOT2dQ=","beginning_cross_street":"Clover Street; NY 65","ending_cross_street":"Winton Road  South; CR 98","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.550113,43.08742]]}},{"id":"aRndJxcg6BMdD+Ti0GI3sv31rgM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 252"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rysDWPmRZkIR2Qz2FyWpNVOT2dQ="},{"type":"next-occurrence","id":"/O1jBqFeEQvq7tyrE8rau1q+5cc="}],"description":"Crack sealing on NY 252 both directions between Clover Street; NY 65 (Pittsford) and Winton Road South; CR 98 (Henrietta) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T17:39:49Z"},"road_event_id":"aRndJxcg6BMdD+Ti0GI3sv31rgM=","beginning_cross_street":"Clover Street; NY 65","ending_cross_street":"Winton Road  South; CR 98","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.550113,43.08742]]}},{"id":"/O1jBqFeEQvq7tyrE8rau1q+5cc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 252"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rysDWPmRZkIR2Qz2FyWpNVOT2dQ="}],"description":"Crack sealing on NY 252 both directions between Clover Street; NY 65 (Pittsford) and Winton Road South; CR 98 (Henrietta) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T17:39:49Z"},"road_event_id":"/O1jBqFeEQvq7tyrE8rau1q+5cc=","beginning_cross_street":"Clover Street; NY 65","ending_cross_street":"Winton Road  South; CR 98","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.550113,43.08742]]}},{"id":"uj5AEBuQEyO8ecLnWcM9riWvRUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 13 southbound between Exit - Cayuga Heights Road (Lansing) and Dey Street (Ithaca), Continuous Monday May 11th, 2026 07:00 AM thru Wednesday May 13th, 2026 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T17:44:40Z"},"road_event_id":"uj5AEBuQEyO8ecLnWcM9riWvRUU=","beginning_cross_street":"Exit   - Cayuga Heights Road","ending_cross_street":"Dey Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.49872,42.478654]]}},{"id":"PECcEQx69Ln/mc2xlxdD3T4Zdgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BLOSSOM RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ls2QXMTYEkvImE+u+P0Ot0ul5aE="}],"description":"Crack sealing on BLOSSOM RD both directions between NY 590 (Brighton) and RT-286 (Penfield) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T17:47:23Z"},"road_event_id":"PECcEQx69Ln/mc2xlxdD3T4Zdgo=","beginning_cross_street":"NY 590","ending_cross_street":"RT-286","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.540023,43.14925]]}},{"id":"ls2QXMTYEkvImE+u+P0Ot0ul5aE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BLOSSOM RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PECcEQx69Ln/mc2xlxdD3T4Zdgo="},{"type":"next-occurrence","id":"gWj7g0/x9vES7R6u+JxXSlm8C/4="}],"description":"Crack sealing on BLOSSOM RD both directions between NY 590 (Brighton) and RT-286 (Penfield) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T17:47:23Z"},"road_event_id":"ls2QXMTYEkvImE+u+P0Ot0ul5aE=","beginning_cross_street":"NY 590","ending_cross_street":"RT-286","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.540023,43.14925]]}},{"id":"gWj7g0/x9vES7R6u+JxXSlm8C/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BLOSSOM RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PECcEQx69Ln/mc2xlxdD3T4Zdgo="}],"description":"Crack sealing on BLOSSOM RD both directions between NY 590 (Brighton) and RT-286 (Penfield) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T17:47:23Z"},"road_event_id":"gWj7g0/x9vES7R6u+JxXSlm8C/4=","beginning_cross_street":"NY 590","ending_cross_street":"RT-286","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.540023,43.14925]]}},{"id":"9juEe4znOfBVq3as1H02OElsFNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 4"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rgVONDkdhUKKxjd7G7/bbEg7gEw="}],"description":"Roadwork on US 4 both directions Feeder Street; CR 75 (Kingsbury) to Burgoyne Avenue; NY 32; Dix Avenue (Kingsbury), Tuesday May 12th, 2026 thru Thursday May 14th, 2026, Tuesday/Wednesday/Thursday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-08T17:50:48Z"},"road_event_id":"9juEe4znOfBVq3as1H02OElsFNw=","beginning_cross_street":"Feeder Street; CR 75","ending_cross_street":"Burgoyne Avenue; NY 32; Dix Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.583188,43.305696]]}},{"id":"rgVONDkdhUKKxjd7G7/bbEg7gEw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9juEe4znOfBVq3as1H02OElsFNw="}],"description":"Roadwork on US 4 both directions Feeder Street; CR 75 (Kingsbury) to Burgoyne Avenue; NY 32; Dix Avenue (Kingsbury), Tuesday May 12th, 2026 thru Thursday May 14th, 2026, Tuesday/Wednesday/Thursday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-08T17:50:48Z"},"road_event_id":"rgVONDkdhUKKxjd7G7/bbEg7gEw=","beginning_cross_street":"Feeder Street; CR 75","ending_cross_street":"Burgoyne Avenue; NY 32; Dix Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.583188,43.305696]]}},{"id":"A30fYAkPkQWT1aQDiQr2IIhJpVw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"d4WzctT51WXRbyldRPdi745OoM8="}],"description":"Crack sealing on NY 286 both directions between Clark Road (Penfield) and Fairport Nine Mile Point Road; NY 250 (Penfield) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T17:50:43Z"},"road_event_id":"A30fYAkPkQWT1aQDiQr2IIhJpVw=","beginning_cross_street":"Clark Road","ending_cross_street":"Fairport Nine Mile Point Road; NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.4944,43.15368]]}},{"id":"d4WzctT51WXRbyldRPdi745OoM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A30fYAkPkQWT1aQDiQr2IIhJpVw="},{"type":"next-occurrence","id":"3gZ8sw7FFbf7XrvuTI55yhCaknc="}],"description":"Crack sealing on NY 286 both directions between Clark Road (Penfield) and Fairport Nine Mile Point Road; NY 250 (Penfield) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T17:50:43Z"},"road_event_id":"d4WzctT51WXRbyldRPdi745OoM8=","beginning_cross_street":"Clark Road","ending_cross_street":"Fairport Nine Mile Point Road; NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.4944,43.15368]]}},{"id":"3gZ8sw7FFbf7XrvuTI55yhCaknc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A30fYAkPkQWT1aQDiQr2IIhJpVw="}],"description":"Crack sealing on NY 286 both directions between Clark Road (Penfield) and Fairport Nine Mile Point Road; NY 250 (Penfield) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T17:50:43Z"},"road_event_id":"3gZ8sw7FFbf7XrvuTI55yhCaknc=","beginning_cross_street":"Clark Road","ending_cross_street":"Fairport Nine Mile Point Road; NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.4944,43.15368]]}},{"id":"6md15fO1DzSIE1jMoe4jJCbKsYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 253"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"maX1VgWIU8tPp/8UvUnDybfjMUg="}],"description":"Crack sealing on NY 253 both directions between Clover Street; NY 65; END ROUTE (Pittsford) and Town of Henrietta and Town of Wheatland Line (Wheatland) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T17:53:02Z"},"road_event_id":"6md15fO1DzSIE1jMoe4jJCbKsYo=","beginning_cross_street":"Clover Street; NY 65; END ROUTE","ending_cross_street":"Town of Henrietta and Town of Wheatland Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.556922,43.057977]]}},{"id":"maX1VgWIU8tPp/8UvUnDybfjMUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 253"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6md15fO1DzSIE1jMoe4jJCbKsYo="},{"type":"next-occurrence","id":"s3FEPRUHMEZIyZRWs/EE3bMYtoA="}],"description":"Crack sealing on NY 253 both directions between Clover Street; NY 65; END ROUTE (Pittsford) and Town of Henrietta and Town of Wheatland Line (Wheatland) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T17:53:02Z"},"road_event_id":"maX1VgWIU8tPp/8UvUnDybfjMUg=","beginning_cross_street":"Clover Street; NY 65; END ROUTE","ending_cross_street":"Town of Henrietta and Town of Wheatland Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.556922,43.057977]]}},{"id":"s3FEPRUHMEZIyZRWs/EE3bMYtoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 253"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6md15fO1DzSIE1jMoe4jJCbKsYo="}],"description":"Crack sealing on NY 253 both directions between Clover Street; NY 65; END ROUTE (Pittsford) and Town of Henrietta and Town of Wheatland Line (Wheatland) Alternating lane closures with flaggers as needed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T17:53:02Z"},"road_event_id":"s3FEPRUHMEZIyZRWs/EE3bMYtoA=","beginning_cross_street":"Clover Street; NY 65; END ROUTE","ending_cross_street":"Town of Henrietta and Town of Wheatland Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.556922,43.057977]]}},{"id":"5DjXre9BB5eLhDWxr3+vU7b242A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"chF1Fe9I7VyZDqb0KJyEZ4QBcVE="}],"description":"Overhead sign inspection on I-84 eastbound between Exit 37 - Route 52 - Walden (Gardnertown) and Exit 39A/B (I-84) - Newburgh (US 9W - NY 32) (Balmville) D041200/32742409 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lanes closed","update_date":"2026-05-08T17:55:27Z"},"road_event_id":"5DjXre9BB5eLhDWxr3+vU7b242A=","beginning_cross_street":"Exit 37 - Route 52 - Walden","ending_cross_street":"Exit 39A/B (I-84) - Newburgh (US 9W - NY 32)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048744,41.513557]]}},{"id":"chF1Fe9I7VyZDqb0KJyEZ4QBcVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5DjXre9BB5eLhDWxr3+vU7b242A="},{"type":"next-occurrence","id":"0iqP76NX5/Ee2lLB/UhXP0UZ6lg="}],"description":"Overhead sign inspection on I-84 eastbound between Exit 37 - Route 52 - Walden (Gardnertown) and Exit 39A/B (I-84) - Newburgh (US 9W - NY 32) (Balmville) D041200/32742409 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lanes closed","update_date":"2026-05-08T17:55:27Z"},"road_event_id":"chF1Fe9I7VyZDqb0KJyEZ4QBcVE=","beginning_cross_street":"Exit 37 - Route 52 - Walden","ending_cross_street":"Exit 39A/B (I-84) - Newburgh (US 9W - NY 32)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048744,41.513557]]}},{"id":"0iqP76NX5/Ee2lLB/UhXP0UZ6lg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5DjXre9BB5eLhDWxr3+vU7b242A="}],"description":"Overhead sign inspection on I-84 eastbound between Exit 37 - Route 52 - Walden (Gardnertown) and Exit 39A/B (I-84) - Newburgh (US 9W - NY 32) (Balmville) D041200/32742409 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lanes closed","update_date":"2026-05-08T17:55:27Z"},"road_event_id":"0iqP76NX5/Ee2lLB/UhXP0UZ6lg=","beginning_cross_street":"Exit 37 - Route 52 - Walden","ending_cross_street":"Exit 39A/B (I-84) - Newburgh (US 9W - NY 32)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048744,41.513557]]}},{"id":"4CkBIFIO2LKNIwXZgyfKkITMq5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OGLDJA8WJzeWsp+4825vskKpg28="}],"description":"Overhead sign inspection on I-84 westbound between Exit 28 (I-84) - Maybrook (NY 208) (Montgomery) and Exit 19A/B (I-84) - NY17 to Binghamton/NYC (Wallkill) D041200/32494909 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lanes closed","update_date":"2026-05-08T18:12:04Z"},"road_event_id":"4CkBIFIO2LKNIwXZgyfKkITMq5U=","beginning_cross_street":"Exit 28 (I-84) - Maybrook (NY 208)","ending_cross_street":"Exit 19A/B (I-84) - NY17 to Binghamton/NYC","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.232338,41.501381]]}},{"id":"OGLDJA8WJzeWsp+4825vskKpg28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4CkBIFIO2LKNIwXZgyfKkITMq5U="},{"type":"next-occurrence","id":"OMxT+uYYcipYdo6kktz8lDdoF5Y="}],"description":"Overhead sign inspection on I-84 westbound between Exit 28 (I-84) - Maybrook (NY 208) (Montgomery) and Exit 19A/B (I-84) - NY17 to Binghamton/NYC (Wallkill) D041200/32494909 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lanes closed","update_date":"2026-05-08T18:12:04Z"},"road_event_id":"OGLDJA8WJzeWsp+4825vskKpg28=","beginning_cross_street":"Exit 28 (I-84) - Maybrook (NY 208)","ending_cross_street":"Exit 19A/B (I-84) - NY17 to Binghamton/NYC","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.232338,41.501381]]}},{"id":"OMxT+uYYcipYdo6kktz8lDdoF5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4CkBIFIO2LKNIwXZgyfKkITMq5U="}],"description":"Overhead sign inspection on I-84 westbound between Exit 28 (I-84) - Maybrook (NY 208) (Montgomery) and Exit 19A/B (I-84) - NY17 to Binghamton/NYC (Wallkill) D041200/32494909 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lanes closed","update_date":"2026-05-08T18:12:04Z"},"road_event_id":"OMxT+uYYcipYdo6kktz8lDdoF5Y=","beginning_cross_street":"Exit 28 (I-84) - Maybrook (NY 208)","ending_cross_street":"Exit 19A/B (I-84) - NY17 to Binghamton/NYC","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.232338,41.501381]]}},{"id":"3lt5gL26YEL8eIyZuHOZARHVc2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12E"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 12E both directions NY 180 (Brownville) NY Rte. 12E closed to ALL traffic at bridge crossing Perch River in Limerick. Traffic shall follow signed detour, Continuous Tuesday May 12th, 2026 12:00 AM thru Sunday November 15th, 2026 11:59 PM All lanes closed","update_date":"2026-05-08T18:24:26Z"},"road_event_id":"3lt5gL26YEL8eIyZuHOZARHVc2g=","beginning_cross_street":"NY 180","ending_cross_street":"NY 180","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.047167,44.029041]]}},{"id":"T/Lob3HVrH8OuI58Zk9nmkusDnI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound between Exit 5 - CR 527 (Roseland) and East of Exit 7 - Pleasant Valley Way/CR 636 (West Orange Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T18:33:26Z"},"road_event_id":"T/Lob3HVrH8OuI58Zk9nmkusDnI=","beginning_cross_street":"Exit 5 - CR 527","ending_cross_street":"East of Exit 7 - Pleasant Valley Way/CR 636","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.308578,40.812705]]}},{"id":"EJzmtxhoy/gjjgvQQ4t5acdhpk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"f22bXOt9lEGZo9c0XCxJZHpNknY="}],"description":"Overhead sign inspection on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D041200/32470809 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lanes closed","update_date":"2026-05-08T18:40:01Z"},"road_event_id":"EJzmtxhoy/gjjgvQQ4t5acdhpk0=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.372122,41.451705]]}},{"id":"f22bXOt9lEGZo9c0XCxJZHpNknY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJzmtxhoy/gjjgvQQ4t5acdhpk0="},{"type":"next-occurrence","id":"YkKs0O3DRjFbmrFPykUQiFBvk+E="}],"description":"Overhead sign inspection on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D041200/32470809 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lanes closed","update_date":"2026-05-08T18:40:01Z"},"road_event_id":"f22bXOt9lEGZo9c0XCxJZHpNknY=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.372122,41.451705]]}},{"id":"YkKs0O3DRjFbmrFPykUQiFBvk+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJzmtxhoy/gjjgvQQ4t5acdhpk0="}],"description":"Overhead sign inspection on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D041200/32470809 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026 thru Friday May 15th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lanes closed","update_date":"2026-05-08T18:40:01Z"},"road_event_id":"YkKs0O3DRjFbmrFPykUQiFBvk+E=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.372122,41.451705]]}},{"id":"lYusGSAhCzewrMk+evAhx1fSvd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound near New Jersey Turnpike - Eastern Spur (Secaucus), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, left lane closed","update_date":"2026-05-08T18:39:32Z"},"road_event_id":"lYusGSAhCzewrMk+evAhx1fSvd8=","beginning_cross_street":"New Jersey Turnpike - Eastern Spur","ending_cross_street":"West of New Jersey Turnpike - Eastern Spur","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049102,40.78693]]}},{"id":"rxUfirNSTXvcIAxXxoOAQpOxktw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound near Garden State Parkway (Clifton), Friday May 15, 2026 11:00 AM thru 01:00 PM, right shoulder closed","update_date":"2026-05-08T18:39:37Z"},"road_event_id":"rxUfirNSTXvcIAxXxoOAQpOxktw=","beginning_cross_street":"Garden State Parkway","ending_cross_street":"East of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.177169,40.854324]]}},{"id":"pTt3BqCFfXWXYl3wULaX8aSHYlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound near New Jersey Turnpike - Eastern Spur (Secaucus), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM)","update_date":"2026-05-08T18:39:39Z"},"road_event_id":"pTt3BqCFfXWXYl3wULaX8aSHYlA=","beginning_cross_street":"New Jersey Turnpike - Eastern Spur","ending_cross_street":"West of New Jersey Turnpike - Eastern Spur","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049102,40.78693]]}},{"id":"vE9I54gsLu1QiZD3GarhyML/unI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound near New Jersey Turnpike - Eastern Spur (Secaucus), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-08T18:39:40Z"},"road_event_id":"vE9I54gsLu1QiZD3GarhyML/unI=","beginning_cross_street":"New Jersey Turnpike - Eastern Spur","ending_cross_street":"West of New Jersey Turnpike - Eastern Spur","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049102,40.78693]]}},{"id":"tJAWLPDSgQ18pcwoAx3n5N8cPWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound near West of New Jersey Turnpike - Eastern Spur (Secaucus), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-08T18:42:30Z"},"road_event_id":"tJAWLPDSgQ18pcwoAx3n5N8cPWU=","beginning_cross_street":"West of New Jersey Turnpike - Eastern Spur","ending_cross_street":"New Jersey Turnpike - Eastern Spur","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051399,40.789237]]}},{"id":"CKiHB2GiLv0L+EaWQ/yRwZb2HkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound near East of Garden State Parkway (Clifton), left shoulder","update_date":"2026-05-08T18:39:29Z"},"road_event_id":"CKiHB2GiLv0L+EaWQ/yRwZb2HkU=","beginning_cross_street":"East of Garden State Parkway","ending_cross_street":"Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T06:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.17488,40.851764]]}},{"id":"JTU+VhacAcmS7v2+tPUE1HLzle0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound near East of Garden State Parkway (Clifton), Friday May 15, 2026 09:00 AM thru 11:00 AM, right shoulder closed","update_date":"2026-05-08T18:39:30Z"},"road_event_id":"JTU+VhacAcmS7v2+tPUE1HLzle0=","beginning_cross_street":"East of Garden State Parkway","ending_cross_street":"Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.17488,40.851764]]}},{"id":"yrvrjqrJp7XsNZ1ebJ2xOIfOjUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound near New Jersey Turnpike - Eastern Spur (Secaucus), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, left lane closed","update_date":"2026-05-08T18:39:27Z"},"road_event_id":"yrvrjqrJp7XsNZ1ebJ2xOIfOjUY=","beginning_cross_street":"New Jersey Turnpike - Eastern Spur","ending_cross_street":"West of New Jersey Turnpike - Eastern Spur","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049102,40.78693]]}},{"id":"9ZUSvjYCtwm5bs197qzB50ms1tQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T18:42:29Z"},"road_event_id":"9ZUSvjYCtwm5bs197qzB50ms1tQ=","beginning_cross_street":"North of CR 514/Amwell Rd","ending_cross_street":"South of Brooks Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632385,40.51324]]}},{"id":"mJdxmfszI7X3h2TeA8j9hKvSmyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound near West of New Jersey Turnpike - Eastern Spur (Secaucus), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-08T18:42:30Z"},"road_event_id":"mJdxmfszI7X3h2TeA8j9hKvSmyc=","beginning_cross_street":"West of New Jersey Turnpike - Eastern Spur","ending_cross_street":"New Jersey Turnpike - Eastern Spur","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051399,40.789237]]}},{"id":"zMW7IPquAk42fNcRNvzuQ4K6Dbc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Southbound between NJ 91/Jersey Ave (North Brunswick Twp) and North of College Rd (Plainsboro Twp), Wednesday May 13, 2026 10:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T18:42:26Z"},"road_event_id":"zMW7IPquAk42fNcRNvzuQ4K6Dbc=","beginning_cross_street":"NJ 91/Jersey Ave","ending_cross_street":"North of College Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.487518,40.454074]]}},{"id":"D8PkqLGUBuqmAxeKV3FQn+K9J7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound between North of College Rd (Plainsboro Twp) and NJ 91/Jersey Ave (North Brunswick Twp), Wednesday May 13, 2026 10:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T18:42:27Z"},"road_event_id":"D8PkqLGUBuqmAxeKV3FQn+K9J7s=","beginning_cross_street":"North of College Rd","ending_cross_street":"NJ 91/Jersey Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.604217,40.359287]]}},{"id":"DzV9fphlBU0kpK3t0kqpf783YAI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"POrWYmShWFdWOkyJaNF0P+pazu0="}],"description":"Construction on Bronx River Parkway both directions between Cross Bronx Expressway; East 177th Street (New York) and Exit 7E - US 1; Boston Road (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-05-08T18:45:50Z"},"road_event_id":"DzV9fphlBU0kpK3t0kqpf783YAI=","beginning_cross_street":"Cross Bronx Expressway; East 177th Street","ending_cross_street":"Exit 7E - US 1; Boston Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.873519,40.836805]]}},{"id":"POrWYmShWFdWOkyJaNF0P+pazu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DzV9fphlBU0kpK3t0kqpf783YAI="},{"type":"next-occurrence","id":"hKLi/dcMQ+0gJ9K+atdaUWealdo="}],"description":"Construction on Bronx River Parkway both directions between Cross Bronx Expressway; East 177th Street (New York) and Exit 7E - US 1; Boston Road (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-05-08T18:45:50Z"},"road_event_id":"POrWYmShWFdWOkyJaNF0P+pazu0=","beginning_cross_street":"Cross Bronx Expressway; East 177th Street","ending_cross_street":"Exit 7E - US 1; Boston Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.873519,40.836805]]}},{"id":"hKLi/dcMQ+0gJ9K+atdaUWealdo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DzV9fphlBU0kpK3t0kqpf783YAI="}],"description":"Construction on Bronx River Parkway both directions between Cross Bronx Expressway; East 177th Street (New York) and Exit 7E - US 1; Boston Road (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-05-08T18:45:50Z"},"road_event_id":"hKLi/dcMQ+0gJ9K+atdaUWealdo=","beginning_cross_street":"Cross Bronx Expressway; East 177th Street","ending_cross_street":"Exit 7E - US 1; Boston Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.873519,40.836805]]}},{"id":"Ya3IWocquGiRUj/ggC0enVqkXKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Southern Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SY0gSdNFQnpW/vt5VpaDY+H8LNY="}],"description":"Construction on Belt System - Southern Parkway both directions from 130th Street; Ramp (New York) to 150th Street; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Left lanes of 3 lanes closed eastbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Left lanes of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 11:59 PM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 07:00 AM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed westbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed westbound","update_date":"2026-05-08T18:52:49Z"},"road_event_id":"Ya3IWocquGiRUj/ggC0enVqkXKQ=","beginning_cross_street":"130th Street; Ramp","ending_cross_street":"150th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T05:00:00Z","end_date":"2026-05-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810418,40.666566]]}},{"id":"SY0gSdNFQnpW/vt5VpaDY+H8LNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Southern Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ya3IWocquGiRUj/ggC0enVqkXKQ="},{"type":"next-occurrence","id":"VxqM9V3Vkjy7u9MO1Zi1qA0F81E="}],"description":"Construction on Belt System - Southern Parkway both directions from 130th Street; Ramp (New York) to 150th Street; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Left lanes of 3 lanes closed eastbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Left lanes of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 11:59 PM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 07:00 AM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed westbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed westbound","update_date":"2026-05-08T18:52:49Z"},"road_event_id":"SY0gSdNFQnpW/vt5VpaDY+H8LNY=","beginning_cross_street":"130th Street; Ramp","ending_cross_street":"150th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810418,40.666566]]}},{"id":"VxqM9V3Vkjy7u9MO1Zi1qA0F81E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Southern Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ya3IWocquGiRUj/ggC0enVqkXKQ="},{"type":"next-occurrence","id":"iMu9gjkmgr43dBKz7HhzR3W3ovo="}],"description":"Construction on Belt System - Southern Parkway both directions from 130th Street; Ramp (New York) to 150th Street; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Left lanes of 3 lanes closed eastbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Left lanes of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 11:59 PM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 07:00 AM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed westbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed westbound","update_date":"2026-05-08T18:52:49Z"},"road_event_id":"VxqM9V3Vkjy7u9MO1Zi1qA0F81E=","beginning_cross_street":"130th Street; Ramp","ending_cross_street":"150th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810418,40.666566]]}},{"id":"iMu9gjkmgr43dBKz7HhzR3W3ovo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Southern Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ya3IWocquGiRUj/ggC0enVqkXKQ="},{"type":"next-occurrence","id":"+gb0BaZnDKZYWgaP89XroSSXkxk="}],"description":"Construction on Belt System - Southern Parkway both directions from 130th Street; Ramp (New York) to 150th Street; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Left lanes of 3 lanes closed eastbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Left lanes of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 11:59 PM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 07:00 AM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed westbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed westbound","update_date":"2026-05-08T18:52:49Z"},"road_event_id":"iMu9gjkmgr43dBKz7HhzR3W3ovo=","beginning_cross_street":"130th Street; Ramp","ending_cross_street":"150th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810418,40.666566]]}},{"id":"+gb0BaZnDKZYWgaP89XroSSXkxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Southern Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ya3IWocquGiRUj/ggC0enVqkXKQ="},{"type":"next-occurrence","id":"WJhkTLIVYYxCGhfc0SqNu/1fb7o="}],"description":"Construction on Belt System - Southern Parkway both directions from 130th Street; Ramp (New York) to 150th Street; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Left lanes of 3 lanes closed eastbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Left lanes of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 11:59 PM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 07:00 AM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed westbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed westbound","update_date":"2026-05-08T18:52:49Z"},"road_event_id":"+gb0BaZnDKZYWgaP89XroSSXkxk=","beginning_cross_street":"130th Street; Ramp","ending_cross_street":"150th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810418,40.666566]]}},{"id":"WJhkTLIVYYxCGhfc0SqNu/1fb7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Southern Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ya3IWocquGiRUj/ggC0enVqkXKQ="},{"type":"next-occurrence","id":"FJl8q+iBaHttMFj8kkfbMkuXWJI="}],"description":"Construction on Belt System - Southern Parkway both directions from 130th Street; Ramp (New York) to 150th Street; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Left lanes of 3 lanes closed eastbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Left lanes of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 11:59 PM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 07:00 AM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed westbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed westbound","update_date":"2026-05-08T18:52:49Z"},"road_event_id":"WJhkTLIVYYxCGhfc0SqNu/1fb7o=","beginning_cross_street":"130th Street; Ramp","ending_cross_street":"150th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810418,40.666566]]}},{"id":"FJl8q+iBaHttMFj8kkfbMkuXWJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Southern Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ya3IWocquGiRUj/ggC0enVqkXKQ="},{"type":"next-occurrence","id":"6ODeIDNFkowj1uqYXP0zeU3zn0w="}],"description":"Construction on Belt System - Southern Parkway both directions from 130th Street; Ramp (New York) to 150th Street; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Left lanes of 3 lanes closed eastbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Left lanes of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 11:59 PM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 07:00 AM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed westbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed westbound","update_date":"2026-05-08T18:52:49Z"},"road_event_id":"FJl8q+iBaHttMFj8kkfbMkuXWJI=","beginning_cross_street":"130th Street; Ramp","ending_cross_street":"150th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T06:00:00Z","end_date":"2026-05-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810418,40.666566]]}},{"id":"6ODeIDNFkowj1uqYXP0zeU3zn0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Southern Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ya3IWocquGiRUj/ggC0enVqkXKQ="},{"type":"next-occurrence","id":"pIkZpAT33z4uUke9lZPSjW1K6f8="}],"description":"Construction on Belt System - Southern Parkway both directions from 130th Street; Ramp (New York) to 150th Street; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Left lanes of 3 lanes closed eastbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Left lanes of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 11:59 PM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 07:00 AM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed westbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed westbound","update_date":"2026-05-08T18:52:49Z"},"road_event_id":"6ODeIDNFkowj1uqYXP0zeU3zn0w=","beginning_cross_street":"130th Street; Ramp","ending_cross_street":"150th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T16:00:00Z","end_date":"2026-05-17T09:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810418,40.666566]]}},{"id":"pIkZpAT33z4uUke9lZPSjW1K6f8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Southern Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ya3IWocquGiRUj/ggC0enVqkXKQ="}],"description":"Construction on Belt System - Southern Parkway both directions from 130th Street; Ramp (New York) to 150th Street; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Left lanes of 3 lanes closed eastbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Left lanes of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 11:59 PM 1 Left lane of 3 lanes closed eastbound, Saturday May 16th, 2026, 06:00 AM thru 07:00 AM 1 Left lane of 3 lanes closed eastbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed westbound, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed westbound, Saturday May 16th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed westbound","update_date":"2026-05-08T18:52:49Z"},"road_event_id":"pIkZpAT33z4uUke9lZPSjW1K6f8=","beginning_cross_street":"130th Street; Ramp","ending_cross_street":"150th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810418,40.666566]]}},{"id":"1kDsghSdsOxOtLHtNsD58TOqbZc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fNGPAIMh/A9otGR1a5KerwRhsB0="}],"description":"Construction on NY 878 eastbound from Lefferts Boulevard (New York) to Exit 2S - 150th Street (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T18:54:39Z"},"road_event_id":"1kDsghSdsOxOtLHtNsD58TOqbZc=","beginning_cross_street":"Lefferts Boulevard","ending_cross_street":"Exit 2S - 150th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822741,40.663826]]}},{"id":"fNGPAIMh/A9otGR1a5KerwRhsB0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1kDsghSdsOxOtLHtNsD58TOqbZc="},{"type":"next-occurrence","id":"GBgGNpPYrpTerL4547bEnk+E9qk="}],"description":"Construction on NY 878 eastbound from Lefferts Boulevard (New York) to Exit 2S - 150th Street (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T18:54:39Z"},"road_event_id":"fNGPAIMh/A9otGR1a5KerwRhsB0=","beginning_cross_street":"Lefferts Boulevard","ending_cross_street":"Exit 2S - 150th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822741,40.663826]]}},{"id":"GBgGNpPYrpTerL4547bEnk+E9qk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1kDsghSdsOxOtLHtNsD58TOqbZc="}],"description":"Construction on NY 878 eastbound from Lefferts Boulevard (New York) to Exit 2S - 150th Street (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T18:54:39Z"},"road_event_id":"GBgGNpPYrpTerL4547bEnk+E9qk=","beginning_cross_street":"Lefferts Boulevard","ending_cross_street":"Exit 2S - 150th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822741,40.663826]]}},{"id":"Q0LNvWD+Wdl2bn2v72YUTbebHUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"G2Dqbc/n9q8409YTqUCuoFN+69I="}],"description":"Drainage improvements on NY 104 both directions between West Ridge Road; Maplewood Drive (Rochester) and Culver Road; CR 120 (Rochester) 104EB & WB mainline and access roads will have either a left lane of right lane closure. This operation is for cleaning and altering drainage structures so work in locations are short term and mobile. Lanes will only be closed in vicinity of actual work, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T19:07:46Z"},"road_event_id":"Q0LNvWD+Wdl2bn2v72YUTbebHUg=","beginning_cross_street":"West Ridge Road; Maplewood Drive","ending_cross_street":"Culver Road; CR 120","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.624181,43.194234]]}},{"id":"G2Dqbc/n9q8409YTqUCuoFN+69I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q0LNvWD+Wdl2bn2v72YUTbebHUg="},{"type":"next-occurrence","id":"y+DNvFtqX35jEfQ8EA3kZiLhGXo="}],"description":"Drainage improvements on NY 104 both directions between West Ridge Road; Maplewood Drive (Rochester) and Culver Road; CR 120 (Rochester) 104EB & WB mainline and access roads will have either a left lane of right lane closure. This operation is for cleaning and altering drainage structures so work in locations are short term and mobile. Lanes will only be closed in vicinity of actual work, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T19:07:46Z"},"road_event_id":"G2Dqbc/n9q8409YTqUCuoFN+69I=","beginning_cross_street":"West Ridge Road; Maplewood Drive","ending_cross_street":"Culver Road; CR 120","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.624181,43.194234]]}},{"id":"y+DNvFtqX35jEfQ8EA3kZiLhGXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q0LNvWD+Wdl2bn2v72YUTbebHUg="}],"description":"Drainage improvements on NY 104 both directions between West Ridge Road; Maplewood Drive (Rochester) and Culver Road; CR 120 (Rochester) 104EB & WB mainline and access roads will have either a left lane of right lane closure. This operation is for cleaning and altering drainage structures so work in locations are short term and mobile. Lanes will only be closed in vicinity of actual work, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-08T19:07:46Z"},"road_event_id":"y+DNvFtqX35jEfQ8EA3kZiLhGXo=","beginning_cross_street":"West Ridge Road; Maplewood Drive","ending_cross_street":"Culver Road; CR 120","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.624181,43.194234]]}},{"id":"1j8sZqVbS4so2dAX7Z19D1wZfV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zbk72/j0KHtg0a1M/T9zMscztH8="}],"description":"Construction on I-678 northbound from Exit - Federal Cirle; Ramp (New York) to Rockaway Boulevard (New York) Subject to change without notice., Monday May 11th, 2026 thru Thursday May 14th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday May 15th, 2026, 11:00 PM thru 11:59 PM 1 Left lane of 3 lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:59 PM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday May 16th, 2026, 07:00 AM thru 08:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T19:08:15Z"},"road_event_id":"1j8sZqVbS4so2dAX7Z19D1wZfV4=","beginning_cross_street":"Exit   - Federal Cirle; Ramp","ending_cross_street":"Rockaway Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T08:00:00Z","end_date":"2026-05-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80718,40.657751]]}},{"id":"zbk72/j0KHtg0a1M/T9zMscztH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1j8sZqVbS4so2dAX7Z19D1wZfV4="},{"type":"next-occurrence","id":"4PJRNPOqYLiP8Aya9TvG9q35MZA="}],"description":"Construction on I-678 northbound from Exit - Federal Cirle; Ramp (New York) to Rockaway Boulevard (New York) Subject to change without notice., Monday May 11th, 2026 thru Thursday May 14th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday May 15th, 2026, 11:00 PM thru 11:59 PM 1 Left lane of 3 lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:59 PM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday May 16th, 2026, 07:00 AM thru 08:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T19:08:15Z"},"road_event_id":"zbk72/j0KHtg0a1M/T9zMscztH8=","beginning_cross_street":"Exit   - Federal Cirle; Ramp","ending_cross_street":"Rockaway Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80718,40.657751]]}},{"id":"4PJRNPOqYLiP8Aya9TvG9q35MZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1j8sZqVbS4so2dAX7Z19D1wZfV4="},{"type":"next-occurrence","id":"TcBQkZvwY+onC+kMMUtBvhNoG18="}],"description":"Construction on I-678 northbound from Exit - Federal Cirle; Ramp (New York) to Rockaway Boulevard (New York) Subject to change without notice., Monday May 11th, 2026 thru Thursday May 14th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday May 15th, 2026, 11:00 PM thru 11:59 PM 1 Left lane of 3 lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:59 PM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday May 16th, 2026, 07:00 AM thru 08:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T19:08:15Z"},"road_event_id":"4PJRNPOqYLiP8Aya9TvG9q35MZA=","beginning_cross_street":"Exit   - Federal Cirle; Ramp","ending_cross_street":"Rockaway Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80718,40.657751]]}},{"id":"TcBQkZvwY+onC+kMMUtBvhNoG18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1j8sZqVbS4so2dAX7Z19D1wZfV4="},{"type":"next-occurrence","id":"shQRXaEXggbFI6JLp4a4KalgGMY="}],"description":"Construction on I-678 northbound from Exit - Federal Cirle; Ramp (New York) to Rockaway Boulevard (New York) Subject to change without notice., Monday May 11th, 2026 thru Thursday May 14th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday May 15th, 2026, 11:00 PM thru 11:59 PM 1 Left lane of 3 lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:59 PM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday May 16th, 2026, 07:00 AM thru 08:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T19:08:15Z"},"road_event_id":"TcBQkZvwY+onC+kMMUtBvhNoG18=","beginning_cross_street":"Exit   - Federal Cirle; Ramp","ending_cross_street":"Rockaway Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T18:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80718,40.657751]]}},{"id":"shQRXaEXggbFI6JLp4a4KalgGMY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1j8sZqVbS4so2dAX7Z19D1wZfV4="},{"type":"next-occurrence","id":"ncpl2uudAYeesALSD8XRGxwNhd8="}],"description":"Construction on I-678 northbound from Exit - Federal Cirle; Ramp (New York) to Rockaway Boulevard (New York) Subject to change without notice., Monday May 11th, 2026 thru Thursday May 14th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday May 15th, 2026, 11:00 PM thru 11:59 PM 1 Left lane of 3 lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:59 PM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday May 16th, 2026, 07:00 AM thru 08:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T19:08:15Z"},"road_event_id":"shQRXaEXggbFI6JLp4a4KalgGMY=","beginning_cross_street":"Exit   - Federal Cirle; Ramp","ending_cross_street":"Rockaway Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T02:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80718,40.657751]]}},{"id":"ncpl2uudAYeesALSD8XRGxwNhd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1j8sZqVbS4so2dAX7Z19D1wZfV4="}],"description":"Construction on I-678 northbound from Exit - Federal Cirle; Ramp (New York) to Rockaway Boulevard (New York) Subject to change without notice., Monday May 11th, 2026 thru Thursday May 14th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday May 15th, 2026, 11:00 PM thru 11:59 PM 1 Left lane of 3 lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:59 PM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday May 16th, 2026, 07:00 AM thru 08:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-08T19:08:15Z"},"road_event_id":"ncpl2uudAYeesALSD8XRGxwNhd8=","beginning_cross_street":"Exit   - Federal Cirle; Ramp","ending_cross_street":"Rockaway Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T03:58:00Z","end_date":"2026-05-17T10:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80718,40.657751]]}},{"id":"FjYyaWyj3jTQBuvaH9CTRV8JHvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between South of Cindy St (Old Bridge Twp) and South of Woodbridge Av (Woodbridge Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, , moving operation","update_date":"2026-05-08T19:09:27Z"},"road_event_id":"FjYyaWyj3jTQBuvaH9CTRV8JHvM=","beginning_cross_street":"South of Cindy St","ending_cross_street":"South of Woodbridge Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.307998,40.388965]]}},{"id":"C0d6P3QA0Yp2d8HZoXxFsHUMyc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between South of Cindy St (Old Bridge Twp) and South of Woodbridge Av (Woodbridge Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, , moving operation","update_date":"2026-05-08T19:09:28Z"},"road_event_id":"C0d6P3QA0Yp2d8HZoXxFsHUMyc0=","beginning_cross_street":"South of Cindy St","ending_cross_street":"South of Woodbridge Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.307998,40.388965]]}},{"id":"lxl6IKEH+2t9qeSMC6BSeKU8gXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 between In the vicinity of Arrowgate Dr (Randolph Twp) and In the vicinity of CR 617 (Randolph Twp), Wednesday May 13, 2026 09:00 AM thru 01:00 PM, right shoulder closed","update_date":"2026-05-08T19:09:29Z"},"road_event_id":"lxl6IKEH+2t9qeSMC6BSeKU8gXA=","beginning_cross_street":"In the vicinity of Arrowgate Dr","ending_cross_street":"In the vicinity of CR 617","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.606979,40.855949]]}},{"id":"LVQGgb0VnLFeYsACezy/A3EZAyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Hackensack River Drawbridge (Kearny/Jersey City), Thursday May 14, 2026 01:00 AM thru 05:00 AM, at least one lane closed","update_date":"2026-05-08T19:12:27Z"},"road_event_id":"LVQGgb0VnLFeYsACezy/A3EZAyo=","beginning_cross_street":"Hackensack River Drawbridge","ending_cross_street":"North of Hackensack River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T06:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.100341,40.727783]]}},{"id":"/7KCB896rG+7UiwfyPb8rhkB/Sw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound near North of Hackensack River Drawbridge (Jersey City), Wednesday May 13, 2026 09:00 PM thru Thursday May 14, 2026 01:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 01:00 AM)","update_date":"2026-05-08T19:12:28Z"},"road_event_id":"/7KCB896rG+7UiwfyPb8rhkB/Sw=","beginning_cross_street":"North of Hackensack River Drawbridge","ending_cross_street":"Hackensack River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.098526,40.727272]]}},{"id":"T55VxkzHmuTnLar7tVN4az2F5S0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"I9spEnIaVFC98wJQv0BQITxstmQ="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to 133rd Avenue (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM 1 Right lane of 4 lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:59 PM thru 08:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-05-08T19:12:00Z"},"road_event_id":"T55VxkzHmuTnLar7tVN4az2F5S0=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"133rd Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803223,40.677434]]}},{"id":"I9spEnIaVFC98wJQv0BQITxstmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T55VxkzHmuTnLar7tVN4az2F5S0="},{"type":"next-occurrence","id":"4Gu9LIbD7CXpVLfwXUGlfIUmJZk="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to 133rd Avenue (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM 1 Right lane of 4 lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:59 PM thru 08:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-05-08T19:12:00Z"},"road_event_id":"I9spEnIaVFC98wJQv0BQITxstmQ=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"133rd Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803223,40.677434]]}},{"id":"4Gu9LIbD7CXpVLfwXUGlfIUmJZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T55VxkzHmuTnLar7tVN4az2F5S0="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to 133rd Avenue (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM 1 Right lane of 4 lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:59 PM thru 08:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-05-08T19:12:00Z"},"road_event_id":"4Gu9LIbD7CXpVLfwXUGlfIUmJZk=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"133rd Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T03:58:00Z","end_date":"2026-05-17T11:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803223,40.677434]]}},{"id":"1QB4EnwOp2LUstXXmFjEjc/3v6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Hackensack River Drawbridge (Kearny/Jersey City), Thursday May 14, 2026 09:00 PM thru Friday May 15, 2026 01:00 AM, at least one lane closed","update_date":"2026-05-08T19:12:37Z"},"road_event_id":"1QB4EnwOp2LUstXXmFjEjc/3v6c=","beginning_cross_street":"Hackensack River Drawbridge","ending_cross_street":"North of Hackensack River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.100341,40.727783]]}},{"id":"m9jJHSgB2UKtPW6TflHE7HdpWlM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Hackensack River Drawbridge (Kearny/Jersey City), Thursday May 14, 2026 01:00 AM thru 05:00 AM, at least one lane closed, (2nd lane closed from 01:00 AM to 05:00 AM)","update_date":"2026-05-08T19:12:39Z"},"road_event_id":"m9jJHSgB2UKtPW6TflHE7HdpWlM=","beginning_cross_street":"Hackensack River Drawbridge","ending_cross_street":"North of Hackensack River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T06:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.100341,40.727783]]}},{"id":"dFd3WOa/fLJvUH3NcS40NRuydjs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound near North of Hackensack River Drawbridge (Jersey City), Wednesday May 13, 2026 09:00 PM thru Thursday May 14, 2026 01:00 AM, at least one lane closed","update_date":"2026-05-08T19:12:40Z"},"road_event_id":"dFd3WOa/fLJvUH3NcS40NRuydjs=","beginning_cross_street":"North of Hackensack River Drawbridge","ending_cross_street":"Hackensack River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.098526,40.727272]]}},{"id":"Puod3wG1rpa5VauH3jsvDk3x/4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Hackensack River Drawbridge (Kearny/Jersey City), Thursday May 14, 2026 09:00 PM thru Friday May 15, 2026 01:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 01:00 AM)","update_date":"2026-05-08T19:12:44Z"},"road_event_id":"Puod3wG1rpa5VauH3jsvDk3x/4o=","beginning_cross_street":"Hackensack River Drawbridge","ending_cross_street":"North of Hackensack River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.100341,40.727783]]}},{"id":"I8QI+8/xzFXQJRU1lig51N5lYms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[],"description":"Construction on VAN WYCK EXPY northbound from 135TH AVE (New York) to ROCKAWAY BLVD (New York) Subject to change without notice., Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:59 PM thru 08:00 AM 2 Left lanes of 3 lanes closed service road","update_date":"2026-05-08T19:14:34Z"},"road_event_id":"I8QI+8/xzFXQJRU1lig51N5lYms=","beginning_cross_street":"135TH AVE","ending_cross_street":"ROCKAWAY BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T03:58:00Z","end_date":"2026-05-17T11:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.800531,40.668052]]}},{"id":"yxJJmhVn+BTtH5/yp5TJc3oIVd0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of NJ 159/CR 627/Plymouth Rd (Fairfield Twp) and East of CR 613/Passaic Ave (Fairfield Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed","update_date":"2026-05-08T19:15:37Z"},"road_event_id":"yxJJmhVn+BTtH5/yp5TJc3oIVd0=","beginning_cross_street":"West of NJ 159/CR 627/Plymouth Rd","ending_cross_street":"East of CR 613/Passaic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.311561,40.868106]]}},{"id":"NYC3xfciF34KQ2PDHMPOwymgNnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Friday May 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T19:15:39Z"},"road_event_id":"NYC3xfciF34KQ2PDHMPOwymgNnA=","beginning_cross_street":"South of Brooks Blvd","ending_cross_street":"North of CR 514/Amwell Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.620437,40.533859]]}},{"id":"2uJ47Iyqb8IyOJEbcLJgLKHPWAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Thursday May 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T19:15:42Z"},"road_event_id":"2uJ47Iyqb8IyOJEbcLJgLKHPWAk=","beginning_cross_street":"South of Brooks Blvd","ending_cross_street":"North of CR 514/Amwell Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.620437,40.533859]]}},{"id":"8hQ19SCHw2E6LzlpGA/imHChjwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Friday May 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T19:15:29Z"},"road_event_id":"8hQ19SCHw2E6LzlpGA/imHChjwE=","beginning_cross_street":"North of CR 514/Amwell Rd","ending_cross_street":"South of Brooks Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632385,40.51324]]}},{"id":"btmsZl/1tMjaF1MpCTEgE2aeO2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Wednesday May 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-08T19:15:32Z"},"road_event_id":"btmsZl/1tMjaF1MpCTEgE2aeO2Y=","beginning_cross_street":"South of Brooks Blvd","ending_cross_street":"North of CR 514/Amwell Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.620437,40.533859]]}},{"id":"oSxKPwPr8wLpWTWvhSamuZFHmyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of NJ 159/CR 627/Plymouth Rd (Fairfield Twp) and East of CR 613/Passaic Ave (Fairfield Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right lane closed","update_date":"2026-05-08T19:15:27Z"},"road_event_id":"oSxKPwPr8wLpWTWvhSamuZFHmyE=","beginning_cross_street":"West of NJ 159/CR 627/Plymouth Rd","ending_cross_street":"East of CR 613/Passaic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.311561,40.868106]]}},{"id":"iqPecMwcK2ofptFLay4q8/m3WIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Thursday May 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T19:15:26Z"},"road_event_id":"iqPecMwcK2ofptFLay4q8/m3WIM=","beginning_cross_street":"North of CR 514/Amwell Rd","ending_cross_street":"South of Brooks Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632385,40.51324]]}},{"id":"MVXe5KjW7MR+Qu+HsI8FvxYuLuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CnhCCFyhN6UQIrf/PKm3z/ncNZE="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, service road , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed northbound, service road","update_date":"2026-05-09T10:00:16Z"},"road_event_id":"MVXe5KjW7MR+Qu+HsI8FvxYuLuA=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810331,40.69215]]}},{"id":"CnhCCFyhN6UQIrf/PKm3z/ncNZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MVXe5KjW7MR+Qu+HsI8FvxYuLuA="},{"type":"next-occurrence","id":"P6FFCH74a6C1sjFX8Uc5Kf1I2Pw="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, service road , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed northbound, service road","update_date":"2026-05-09T10:00:16Z"},"road_event_id":"CnhCCFyhN6UQIrf/PKm3z/ncNZE=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810331,40.69215]]}},{"id":"P6FFCH74a6C1sjFX8Uc5Kf1I2Pw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MVXe5KjW7MR+Qu+HsI8FvxYuLuA="},{"type":"next-occurrence","id":"2rsRqwN3sjB+pYAzPs21ZX2wuHc="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, service road , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed northbound, service road","update_date":"2026-05-09T10:00:16Z"},"road_event_id":"P6FFCH74a6C1sjFX8Uc5Kf1I2Pw=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810331,40.69215]]}},{"id":"2rsRqwN3sjB+pYAzPs21ZX2wuHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MVXe5KjW7MR+Qu+HsI8FvxYuLuA="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, service road , Friday May 15th,2026 thru Saturday May 16th,2026, Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed northbound, service road","update_date":"2026-05-09T10:00:16Z"},"road_event_id":"2rsRqwN3sjB+pYAzPs21ZX2wuHc=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810331,40.69215]]}},{"id":"3HHMqeHYPBWeUBXrpadwSLWxMXU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JGJVfYlyLHdMfjjmOmJqtWfURF0="}],"description":"Construction on I-678 northbound from Exit 5 - 101st Avenue (New York) Subject to change without notice., Saturday May 16th, 2026 thru Sunday May 17th, 2026, 11:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Sunday May 17th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 4 lanes closed, Sunday May 17th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-05-08T19:20:50Z"},"road_event_id":"3HHMqeHYPBWeUBXrpadwSLWxMXU=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T06:00:00Z","end_date":"2026-05-17T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811773,40.69417]]}},{"id":"JGJVfYlyLHdMfjjmOmJqtWfURF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3HHMqeHYPBWeUBXrpadwSLWxMXU="},{"type":"next-occurrence","id":"eA9g+JSxxAaDt2jBJS+Mxke9R0E="}],"description":"Construction on I-678 northbound from Exit 5 - 101st Avenue (New York) Subject to change without notice., Saturday May 16th, 2026 thru Sunday May 17th, 2026, 11:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Sunday May 17th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 4 lanes closed, Sunday May 17th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-05-08T19:20:50Z"},"road_event_id":"JGJVfYlyLHdMfjjmOmJqtWfURF0=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T18:00:00Z","end_date":"2026-05-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811773,40.69417]]}},{"id":"eA9g+JSxxAaDt2jBJS+Mxke9R0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3HHMqeHYPBWeUBXrpadwSLWxMXU="}],"description":"Construction on I-678 northbound from Exit 5 - 101st Avenue (New York) Subject to change without notice., Saturday May 16th, 2026 thru Sunday May 17th, 2026, 11:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Sunday May 17th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 4 lanes closed, Sunday May 17th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-05-08T19:20:50Z"},"road_event_id":"eA9g+JSxxAaDt2jBJS+Mxke9R0E=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T02:00:00Z","end_date":"2026-05-18T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811773,40.69417]]}},{"id":"HYmYr3gG6TTuYa+4MDOaaiyCfWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"scSle5f+KlSbixnIbPC2oU+l6iA="}],"description":"Construction on I-678 southbound from Hoover Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T19:23:45Z"},"road_event_id":"HYmYr3gG6TTuYa+4MDOaaiyCfWs=","beginning_cross_street":"Hoover Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823923,40.71273]]}},{"id":"scSle5f+KlSbixnIbPC2oU+l6iA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HYmYr3gG6TTuYa+4MDOaaiyCfWs="},{"type":"next-occurrence","id":"gq2k4LZfB6kcZbT45V9f4FfgGf8="}],"description":"Construction on I-678 southbound from Hoover Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T19:23:45Z"},"road_event_id":"scSle5f+KlSbixnIbPC2oU+l6iA=","beginning_cross_street":"Hoover Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823923,40.71273]]}},{"id":"gq2k4LZfB6kcZbT45V9f4FfgGf8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HYmYr3gG6TTuYa+4MDOaaiyCfWs="}],"description":"Construction on I-678 southbound from Hoover Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T19:23:45Z"},"road_event_id":"gq2k4LZfB6kcZbT45V9f4FfgGf8=","beginning_cross_street":"Hoover Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823923,40.71273]]}},{"id":"HSnUg2dXINjeQw3OS6pwiyom+W0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"I1bKUFN61OOsA6/pNGsLlnG8W38="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to 133rd Avenue (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T19:25:22Z"},"road_event_id":"HSnUg2dXINjeQw3OS6pwiyom+W0=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"133rd Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813683,40.697107]]}},{"id":"I1bKUFN61OOsA6/pNGsLlnG8W38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HSnUg2dXINjeQw3OS6pwiyom+W0="},{"type":"next-occurrence","id":"rpK242yDiPiN/RJM7KYnkAVB/1Y="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to 133rd Avenue (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T19:25:22Z"},"road_event_id":"I1bKUFN61OOsA6/pNGsLlnG8W38=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"133rd Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813683,40.697107]]}},{"id":"rpK242yDiPiN/RJM7KYnkAVB/1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HSnUg2dXINjeQw3OS6pwiyom+W0="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to 133rd Avenue (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T19:25:22Z"},"road_event_id":"rpK242yDiPiN/RJM7KYnkAVB/1Y=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"133rd Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813683,40.697107]]}},{"id":"SkNEQG3p+qu5MUsJYXoKhW6IsFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Ym1rk3KXBjwlU6ZcauQoGiAPorE="}],"description":"Construction on I-678 southbound from Nassau Expressway; NY 878 (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-05-08T19:30:23Z"},"road_event_id":"SkNEQG3p+qu5MUsJYXoKhW6IsFQ=","beginning_cross_street":"Nassau Expressway; NY 878","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802297,40.66478]]}},{"id":"Ym1rk3KXBjwlU6ZcauQoGiAPorE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SkNEQG3p+qu5MUsJYXoKhW6IsFQ="},{"type":"next-occurrence","id":"/1tI58dNYpS1VjGHSIq2bhiDG6I="}],"description":"Construction on I-678 southbound from Nassau Expressway; NY 878 (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-05-08T19:30:23Z"},"road_event_id":"Ym1rk3KXBjwlU6ZcauQoGiAPorE=","beginning_cross_street":"Nassau Expressway; NY 878","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802297,40.66478]]}},{"id":"/1tI58dNYpS1VjGHSIq2bhiDG6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SkNEQG3p+qu5MUsJYXoKhW6IsFQ="}],"description":"Construction on I-678 southbound from Nassau Expressway; NY 878 (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-05-08T19:30:23Z"},"road_event_id":"/1tI58dNYpS1VjGHSIq2bhiDG6I=","beginning_cross_street":"Nassau Expressway; NY 878","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802297,40.66478]]}},{"id":"V85cCKEJAs0FV1rFLiOJqmMkjRw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2/z6vmaAEmzTGLWmoQ8+w2PAS4E="}],"description":"Construction on I-678 northbound from Foch Boulevard; Ramp (New York) to Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-08T19:32:03Z"},"road_event_id":"V85cCKEJAs0FV1rFLiOJqmMkjRw=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803199,40.67778]]}},{"id":"2/z6vmaAEmzTGLWmoQ8+w2PAS4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V85cCKEJAs0FV1rFLiOJqmMkjRw="},{"type":"next-occurrence","id":"ftM+MV/hvna3uCRmG5IuRUPY3y0="}],"description":"Construction on I-678 northbound from Foch Boulevard; Ramp (New York) to Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-08T19:32:03Z"},"road_event_id":"2/z6vmaAEmzTGLWmoQ8+w2PAS4E=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803199,40.67778]]}},{"id":"ftM+MV/hvna3uCRmG5IuRUPY3y0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V85cCKEJAs0FV1rFLiOJqmMkjRw="}],"description":"Construction on I-678 northbound from Foch Boulevard; Ramp (New York) to Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-08T19:32:03Z"},"road_event_id":"ftM+MV/hvna3uCRmG5IuRUPY3y0=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803199,40.67778]]}},{"id":"pfT+TkT8j24zGSJWkcIZxWCBfl0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RuxMeQ+jTw03ugJd9UqjUsPIweI="}],"description":"Construction on VAN WYCK EXPY southbound from ATLANTIC AVE (New York) to 133RD AVE (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-05-08T19:33:42Z"},"road_event_id":"pfT+TkT8j24zGSJWkcIZxWCBfl0=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"133RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813867,40.69705]]}},{"id":"RuxMeQ+jTw03ugJd9UqjUsPIweI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pfT+TkT8j24zGSJWkcIZxWCBfl0="},{"type":"next-occurrence","id":"SvwBHCR1/Uz36KraY9sjTvvwnPA="}],"description":"Construction on VAN WYCK EXPY southbound from ATLANTIC AVE (New York) to 133RD AVE (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-05-08T19:33:42Z"},"road_event_id":"RuxMeQ+jTw03ugJd9UqjUsPIweI=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"133RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813867,40.69705]]}},{"id":"SvwBHCR1/Uz36KraY9sjTvvwnPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pfT+TkT8j24zGSJWkcIZxWCBfl0="}],"description":"Construction on VAN WYCK EXPY southbound from ATLANTIC AVE (New York) to 133RD AVE (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-05-08T19:33:42Z"},"road_event_id":"SvwBHCR1/Uz36KraY9sjTvvwnPA=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"133RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813867,40.69705]]}},{"id":"IRduSl6Qnz5HRvUxKB2zGhWx3tg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"c20IoEJXkoc1ZwAjtWx87xCoP4o="}],"description":"Construction on I-490 eastbound ramps to/from Exit 3 - I-490 (Riga) 2 \" Mill and Fill with lane reduction following time restrictions. No lane closures East Bound from 6AM - 8AM Monday through Friday.. No lane closures West Bound from 3PM - 5PM Monday through Friday. Saturday Work will be ramps. , Tuesday May 12th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 08:30 AM thru 06:00 PM All lanes","update_date":"2026-05-08T19:39:39Z"},"road_event_id":"IRduSl6Qnz5HRvUxKB2zGhWx3tg=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:30:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.887239,43.092196]]}},{"id":"c20IoEJXkoc1ZwAjtWx87xCoP4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRduSl6Qnz5HRvUxKB2zGhWx3tg="},{"type":"next-occurrence","id":"70SJ0r/9VFddv1pJTtJwLq8MRNk="}],"description":"Construction on I-490 eastbound ramps to/from Exit 3 - I-490 (Riga) 2 \" Mill and Fill with lane reduction following time restrictions. No lane closures East Bound from 6AM - 8AM Monday through Friday.. No lane closures West Bound from 3PM - 5PM Monday through Friday. Saturday Work will be ramps. , Tuesday May 12th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 08:30 AM thru 06:00 PM All lanes","update_date":"2026-05-08T19:39:39Z"},"road_event_id":"c20IoEJXkoc1ZwAjtWx87xCoP4o=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:30:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.887239,43.092196]]}},{"id":"70SJ0r/9VFddv1pJTtJwLq8MRNk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRduSl6Qnz5HRvUxKB2zGhWx3tg="},{"type":"next-occurrence","id":"QGuXg1sV+KhvolZYFC/P0e6r7mo="}],"description":"Construction on I-490 eastbound ramps to/from Exit 3 - I-490 (Riga) 2 \" Mill and Fill with lane reduction following time restrictions. No lane closures East Bound from 6AM - 8AM Monday through Friday.. No lane closures West Bound from 3PM - 5PM Monday through Friday. Saturday Work will be ramps. , Tuesday May 12th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 08:30 AM thru 06:00 PM All lanes","update_date":"2026-05-08T19:39:39Z"},"road_event_id":"70SJ0r/9VFddv1pJTtJwLq8MRNk=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:30:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.887239,43.092196]]}},{"id":"QGuXg1sV+KhvolZYFC/P0e6r7mo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRduSl6Qnz5HRvUxKB2zGhWx3tg="},{"type":"next-occurrence","id":"FwTlE7wt1GOPV5BroXaFK87nihA="}],"description":"Construction on I-490 eastbound ramps to/from Exit 3 - I-490 (Riga) 2 \" Mill and Fill with lane reduction following time restrictions. No lane closures East Bound from 6AM - 8AM Monday through Friday.. No lane closures West Bound from 3PM - 5PM Monday through Friday. Saturday Work will be ramps. , Tuesday May 12th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 08:30 AM thru 06:00 PM All lanes","update_date":"2026-05-08T19:39:39Z"},"road_event_id":"QGuXg1sV+KhvolZYFC/P0e6r7mo=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T12:30:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.887239,43.092196]]}},{"id":"FwTlE7wt1GOPV5BroXaFK87nihA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRduSl6Qnz5HRvUxKB2zGhWx3tg="},{"type":"next-occurrence","id":"aZFOGj3aAa/yn5kNu7HjQW6x1h4="}],"description":"Construction on I-490 eastbound ramps to/from Exit 3 - I-490 (Riga) 2 \" Mill and Fill with lane reduction following time restrictions. No lane closures East Bound from 6AM - 8AM Monday through Friday.. No lane closures West Bound from 3PM - 5PM Monday through Friday. Saturday Work will be ramps. , Tuesday May 12th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 08:30 AM thru 06:00 PM All lanes","update_date":"2026-05-08T19:39:39Z"},"road_event_id":"FwTlE7wt1GOPV5BroXaFK87nihA=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T12:30:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.887239,43.092196]]}},{"id":"aZFOGj3aAa/yn5kNu7HjQW6x1h4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRduSl6Qnz5HRvUxKB2zGhWx3tg="},{"type":"next-occurrence","id":"F01VzJqma7wwnQ5+VLju60/LJLM="}],"description":"Construction on I-490 eastbound ramps to/from Exit 3 - I-490 (Riga) 2 \" Mill and Fill with lane reduction following time restrictions. No lane closures East Bound from 6AM - 8AM Monday through Friday.. No lane closures West Bound from 3PM - 5PM Monday through Friday. Saturday Work will be ramps. , Tuesday May 12th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 08:30 AM thru 06:00 PM All lanes","update_date":"2026-05-08T19:39:39Z"},"road_event_id":"aZFOGj3aAa/yn5kNu7HjQW6x1h4=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T12:30:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.887239,43.092196]]}},{"id":"F01VzJqma7wwnQ5+VLju60/LJLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRduSl6Qnz5HRvUxKB2zGhWx3tg="},{"type":"next-occurrence","id":"s3q9dexNuxurOGCov0hBuSZGJOs="}],"description":"Construction on I-490 eastbound ramps to/from Exit 3 - I-490 (Riga) 2 \" Mill and Fill with lane reduction following time restrictions. No lane closures East Bound from 6AM - 8AM Monday through Friday.. No lane closures West Bound from 3PM - 5PM Monday through Friday. Saturday Work will be ramps. , Tuesday May 12th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 08:30 AM thru 06:00 PM All lanes","update_date":"2026-05-08T19:39:39Z"},"road_event_id":"F01VzJqma7wwnQ5+VLju60/LJLM=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T12:30:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.887239,43.092196]]}},{"id":"s3q9dexNuxurOGCov0hBuSZGJOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRduSl6Qnz5HRvUxKB2zGhWx3tg="},{"type":"next-occurrence","id":"aNH4SUt6o8vqLQPecf621pFPhf0="}],"description":"Construction on I-490 eastbound ramps to/from Exit 3 - I-490 (Riga) 2 \" Mill and Fill with lane reduction following time restrictions. No lane closures East Bound from 6AM - 8AM Monday through Friday.. No lane closures West Bound from 3PM - 5PM Monday through Friday. Saturday Work will be ramps. , Tuesday May 12th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 08:30 AM thru 06:00 PM All lanes","update_date":"2026-05-08T19:39:39Z"},"road_event_id":"s3q9dexNuxurOGCov0hBuSZGJOs=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T12:30:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.887239,43.092196]]}},{"id":"aNH4SUt6o8vqLQPecf621pFPhf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRduSl6Qnz5HRvUxKB2zGhWx3tg="},{"type":"next-occurrence","id":"GGHWSnIvpkshq8o+/ewAZVEUmT8="}],"description":"Construction on I-490 eastbound ramps to/from Exit 3 - I-490 (Riga) 2 \" Mill and Fill with lane reduction following time restrictions. No lane closures East Bound from 6AM - 8AM Monday through Friday.. No lane closures West Bound from 3PM - 5PM Monday through Friday. Saturday Work will be ramps. , Tuesday May 12th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 08:30 AM thru 06:00 PM All lanes","update_date":"2026-05-08T19:39:39Z"},"road_event_id":"aNH4SUt6o8vqLQPecf621pFPhf0=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T12:30:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.887239,43.092196]]}},{"id":"GGHWSnIvpkshq8o+/ewAZVEUmT8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRduSl6Qnz5HRvUxKB2zGhWx3tg="},{"type":"next-occurrence","id":"ntwNn9qkU9SMDw3JhrKVaGFN+Ow="}],"description":"Construction on I-490 eastbound ramps to/from Exit 3 - I-490 (Riga) 2 \" Mill and Fill with lane reduction following time restrictions. No lane closures East Bound from 6AM - 8AM Monday through Friday.. No lane closures West Bound from 3PM - 5PM Monday through Friday. Saturday Work will be ramps. , Tuesday May 12th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 08:30 AM thru 06:00 PM All lanes","update_date":"2026-05-08T19:39:39Z"},"road_event_id":"GGHWSnIvpkshq8o+/ewAZVEUmT8=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T12:30:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.887239,43.092196]]}},{"id":"ntwNn9qkU9SMDw3JhrKVaGFN+Ow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRduSl6Qnz5HRvUxKB2zGhWx3tg="},{"type":"next-occurrence","id":"DrzWKkoUhqgXPDZh3RAU3iKC33o="}],"description":"Construction on I-490 eastbound ramps to/from Exit 3 - I-490 (Riga) 2 \" Mill and Fill with lane reduction following time restrictions. No lane closures East Bound from 6AM - 8AM Monday through Friday.. No lane closures West Bound from 3PM - 5PM Monday through Friday. Saturday Work will be ramps. , Tuesday May 12th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 08:30 AM thru 06:00 PM All lanes","update_date":"2026-05-08T19:39:39Z"},"road_event_id":"ntwNn9qkU9SMDw3JhrKVaGFN+Ow=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T12:30:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.887239,43.092196]]}},{"id":"DrzWKkoUhqgXPDZh3RAU3iKC33o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRduSl6Qnz5HRvUxKB2zGhWx3tg="},{"type":"next-occurrence","id":"CAY0Q+AqMAOPCSl2x339jslNlC4="}],"description":"Construction on I-490 eastbound ramps to/from Exit 3 - I-490 (Riga) 2 \" Mill and Fill with lane reduction following time restrictions. No lane closures East Bound from 6AM - 8AM Monday through Friday.. No lane closures West Bound from 3PM - 5PM Monday through Friday. Saturday Work will be ramps. , Tuesday May 12th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 08:30 AM thru 06:00 PM All lanes","update_date":"2026-05-08T19:39:39Z"},"road_event_id":"DrzWKkoUhqgXPDZh3RAU3iKC33o=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T12:30:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.887239,43.092196]]}},{"id":"CAY0Q+AqMAOPCSl2x339jslNlC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRduSl6Qnz5HRvUxKB2zGhWx3tg="},{"type":"next-occurrence","id":"I2xpTXB2bkBEvLMWaghPIVTfGZA="}],"description":"Construction on I-490 eastbound ramps to/from Exit 3 - I-490 (Riga) 2 \" Mill and Fill with lane reduction following time restrictions. No lane closures East Bound from 6AM - 8AM Monday through Friday.. No lane closures West Bound from 3PM - 5PM Monday through Friday. Saturday Work will be ramps. , Tuesday May 12th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 08:30 AM thru 06:00 PM All lanes","update_date":"2026-05-08T19:39:39Z"},"road_event_id":"CAY0Q+AqMAOPCSl2x339jslNlC4=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T12:30:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.887239,43.092196]]}},{"id":"I2xpTXB2bkBEvLMWaghPIVTfGZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRduSl6Qnz5HRvUxKB2zGhWx3tg="},{"type":"next-occurrence","id":"HGVsu4tyB8XThNZalpsBkQmDHfQ="}],"description":"Construction on I-490 eastbound ramps to/from Exit 3 - I-490 (Riga) 2 \" Mill and Fill with lane reduction following time restrictions. No lane closures East Bound from 6AM - 8AM Monday through Friday.. No lane closures West Bound from 3PM - 5PM Monday through Friday. Saturday Work will be ramps. , Tuesday May 12th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 08:30 AM thru 06:00 PM All lanes","update_date":"2026-05-08T19:39:39Z"},"road_event_id":"I2xpTXB2bkBEvLMWaghPIVTfGZA=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T12:30:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.887239,43.092196]]}},{"id":"HGVsu4tyB8XThNZalpsBkQmDHfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRduSl6Qnz5HRvUxKB2zGhWx3tg="}],"description":"Construction on I-490 eastbound ramps to/from Exit 3 - I-490 (Riga) 2 \" Mill and Fill with lane reduction following time restrictions. No lane closures East Bound from 6AM - 8AM Monday through Friday.. No lane closures West Bound from 3PM - 5PM Monday through Friday. Saturday Work will be ramps. , Tuesday May 12th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 08:30 AM thru 06:00 PM All lanes","update_date":"2026-05-08T19:39:39Z"},"road_event_id":"HGVsu4tyB8XThNZalpsBkQmDHfQ=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T12:30:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.887239,43.092196]]}},{"id":"gfpadkXfyqjIS3R1/VrvdRC5e68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 both directions between END ROUTE; I-95 (New York) and I-95 at I-695 Throgs Neck Expressway Entrance (New York) Subject to change without notice., Friday May 15th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-08T19:39:39Z"},"road_event_id":"gfpadkXfyqjIS3R1/VrvdRC5e68=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"I-695 Throgs Neck Expressway Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835251,40.829217]]}},{"id":"uDbPLQDtjHDVfF//LhtcDTWXkT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qC2w4UM5tTow5F6IULmmivXvDTM="}],"description":"Construction on I-95 both directions between Webster Avenue; US 1 (New York) and Rosedale Avenue; Ramp (New York) Subject to change without notice., Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 11:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed northbound, Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 10:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed southbound","update_date":"2026-05-08T19:42:09Z"},"road_event_id":"uDbPLQDtjHDVfF//LhtcDTWXkT4=","beginning_cross_street":"Webster Avenue; US 1","ending_cross_street":"Rosedale Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902509,40.844526]]}},{"id":"qC2w4UM5tTow5F6IULmmivXvDTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDbPLQDtjHDVfF//LhtcDTWXkT4="}],"description":"Construction on I-95 both directions between Webster Avenue; US 1 (New York) and Rosedale Avenue; Ramp (New York) Subject to change without notice., Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 11:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed northbound, Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 10:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed southbound","update_date":"2026-05-08T19:42:09Z"},"road_event_id":"qC2w4UM5tTow5F6IULmmivXvDTM=","beginning_cross_street":"Webster Avenue; US 1","ending_cross_street":"Rosedale Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902509,40.844526]]}},{"id":"m1CfySJlDvwOdeciyKSUJlqd7xk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Z6cxZMVpB/Du5FdpJqt9iiVxZmQ="}],"description":"Construction on I-87 Major Deegan Expressway both directions between Exit 3 - Grand Concourse-Third Avenue Bridge (New York) and Macombs Dam Bridge (New York) Subject to change without notice., Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed northbound; 1 Left lane of 3 lanes closed southbound","update_date":"2026-05-08T19:44:26Z"},"road_event_id":"m1CfySJlDvwOdeciyKSUJlqd7xk=","beginning_cross_street":"Exit 3 - Grand Concourse-Third Avenue Bridge","ending_cross_street":"Macombs Dam Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931307,40.811325]]}},{"id":"Z6cxZMVpB/Du5FdpJqt9iiVxZmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m1CfySJlDvwOdeciyKSUJlqd7xk="},{"type":"next-occurrence","id":"YPaDSseSxOaMLj/ceAIfm90wzEM="}],"description":"Construction on I-87 Major Deegan Expressway both directions between Exit 3 - Grand Concourse-Third Avenue Bridge (New York) and Macombs Dam Bridge (New York) Subject to change without notice., Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed northbound; 1 Left lane of 3 lanes closed southbound","update_date":"2026-05-08T19:44:26Z"},"road_event_id":"Z6cxZMVpB/Du5FdpJqt9iiVxZmQ=","beginning_cross_street":"Exit 3 - Grand Concourse-Third Avenue Bridge","ending_cross_street":"Macombs Dam Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931307,40.811325]]}},{"id":"YPaDSseSxOaMLj/ceAIfm90wzEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m1CfySJlDvwOdeciyKSUJlqd7xk="}],"description":"Construction on I-87 Major Deegan Expressway both directions between Exit 3 - Grand Concourse-Third Avenue Bridge (New York) and Macombs Dam Bridge (New York) Subject to change without notice., Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed northbound; 1 Left lane of 3 lanes closed southbound","update_date":"2026-05-08T19:44:26Z"},"road_event_id":"YPaDSseSxOaMLj/ceAIfm90wzEM=","beginning_cross_street":"Exit 3 - Grand Concourse-Third Avenue Bridge","ending_cross_street":"Macombs Dam Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931307,40.811325]]}},{"id":"RqyUUFvots/V+aIuxvGiGbT2rK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 161ST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Jw2FAKnJ4I6q9KD4JOix3n3/J+4="}],"description":"Construction on E 161ST ST both directions between E 161ST ST (New York) and SHERMAN AVE (New York) Subject to change without notice., Wednesday May 13th, 2026 thru Thursday May 14th, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-08T19:51:07Z"},"road_event_id":"RqyUUFvots/V+aIuxvGiGbT2rK0=","beginning_cross_street":"E 161ST ST","ending_cross_street":"SHERMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928844,40.829088]]}},{"id":"Jw2FAKnJ4I6q9KD4JOix3n3/J+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 161ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RqyUUFvots/V+aIuxvGiGbT2rK0="}],"description":"Construction on E 161ST ST both directions between E 161ST ST (New York) and SHERMAN AVE (New York) Subject to change without notice., Wednesday May 13th, 2026 thru Thursday May 14th, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-08T19:51:07Z"},"road_event_id":"Jw2FAKnJ4I6q9KD4JOix3n3/J+4=","beginning_cross_street":"E 161ST ST","ending_cross_street":"SHERMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928844,40.829088]]}},{"id":"W0Qvp8r6+5oteLpKtoIl84Vclz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RENWICK AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on RENWICK AVE both directions between MILFORD DR (New York) and LITTLE CLOVE RD (New York) Subject to change without notice., Thursday May 14th, 2026, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed northbound; 1 Left lane of 3 lanes closed southbound","update_date":"2026-05-08T19:55:45Z"},"road_event_id":"W0Qvp8r6+5oteLpKtoIl84Vclz8=","beginning_cross_street":"MILFORD DR","ending_cross_street":"LITTLE CLOVE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.105451,40.609924]]}},{"id":"TfBiKotXCFVsG8vBdA+q3xtJCJg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ARTHUR KILL RD"],"direction":"unknown","related_road_events":[],"description":"Construction on ARTHUR KILL RD both directions between VETERANS RD E (New York) and VETERANS RD W (New York) Subject to change without notice., Thursday May 14th, 2026, 09:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed westbound; 1 Left lane of 2 lanes closed eastbound","update_date":"2026-05-08T19:57:25Z"},"road_event_id":"TfBiKotXCFVsG8vBdA+q3xtJCJg=","beginning_cross_street":"VETERANS RD E","ending_cross_street":"VETERANS RD W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.204613,40.557052]]}},{"id":"HcUpLkkBCE/le3yvJtKV7y3jwMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 both directions between Exit 12 - Todt Hill Road; Slosson Avenue; Ramp (Staten Island) and Exit 13 - Milford Drive; Clove Road (Staten Island) Subject to change without notice., Friday May 15th, 2026, 10:00 AM thru 02:00 PM 1 Right lane of 5 lanes closed","update_date":"2026-05-08T20:00:39Z"},"road_event_id":"HcUpLkkBCE/le3yvJtKV7y3jwMk=","beginning_cross_street":"Exit 12 - Todt Hill Road; Slosson Avenue; Ramp","ending_cross_street":"Exit 13 - Milford Drive; Clove Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.116682,40.610985]]}},{"id":"1bl+8LvIfcaDeyANFo7Ssa9cmJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Korean Veterans Memorial Parkway"],"direction":"unknown","related_road_events":[],"description":"Construction on Korean Veterans Memorial Parkway both directions between NY 440 (Staten Island) Subject to change without notice., Friday May 15th, 2026, 10:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed eastbound; 1 Left lane of 2 lanes closed westbound","update_date":"2026-05-08T20:02:35Z"},"road_event_id":"1bl+8LvIfcaDeyANFo7Ssa9cmJ4=","beginning_cross_street":"NY 440","ending_cross_street":"NY 440","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.22324,40.526366]]}},{"id":"lNA84xlN/YhKB12mjCFgkjnWfV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1WerKqTdS7B3FPV4SydbEEonoEw="}],"description":"Construction on NY 31 eastbound between Monroe and Orleans County Line (Murray) and Redman Rd (Brockport), Tuesday May 12th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T20:14:33Z"},"road_event_id":"lNA84xlN/YhKB12mjCFgkjnWfV4=","beginning_cross_street":"Monroe and Orleans County Line","ending_cross_street":"Redman Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993441,43.221763]]}},{"id":"1WerKqTdS7B3FPV4SydbEEonoEw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lNA84xlN/YhKB12mjCFgkjnWfV4="},{"type":"next-occurrence","id":"OTUHSFIvrxNbYZtdcEDxFgQ0deE="}],"description":"Construction on NY 31 eastbound between Monroe and Orleans County Line (Murray) and Redman Rd (Brockport), Tuesday May 12th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T20:14:33Z"},"road_event_id":"1WerKqTdS7B3FPV4SydbEEonoEw=","beginning_cross_street":"Monroe and Orleans County Line","ending_cross_street":"Redman Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993441,43.221763]]}},{"id":"OTUHSFIvrxNbYZtdcEDxFgQ0deE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lNA84xlN/YhKB12mjCFgkjnWfV4="},{"type":"next-occurrence","id":"T3pj45zlV252CSEW9V+csAYHyg4="}],"description":"Construction on NY 31 eastbound between Monroe and Orleans County Line (Murray) and Redman Rd (Brockport), Tuesday May 12th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T20:14:33Z"},"road_event_id":"OTUHSFIvrxNbYZtdcEDxFgQ0deE=","beginning_cross_street":"Monroe and Orleans County Line","ending_cross_street":"Redman Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993441,43.221763]]}},{"id":"T3pj45zlV252CSEW9V+csAYHyg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lNA84xlN/YhKB12mjCFgkjnWfV4="},{"type":"next-occurrence","id":"UeJ1BKrOLy+jik6Km71ABm17ciE="}],"description":"Construction on NY 31 eastbound between Monroe and Orleans County Line (Murray) and Redman Rd (Brockport), Tuesday May 12th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T20:14:33Z"},"road_event_id":"T3pj45zlV252CSEW9V+csAYHyg4=","beginning_cross_street":"Monroe and Orleans County Line","ending_cross_street":"Redman Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993441,43.221763]]}},{"id":"UeJ1BKrOLy+jik6Km71ABm17ciE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lNA84xlN/YhKB12mjCFgkjnWfV4="},{"type":"next-occurrence","id":"mkdOCEjam7R3M0l66UeNg+BHHb0="}],"description":"Construction on NY 31 eastbound between Monroe and Orleans County Line (Murray) and Redman Rd (Brockport), Tuesday May 12th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T20:14:33Z"},"road_event_id":"UeJ1BKrOLy+jik6Km71ABm17ciE=","beginning_cross_street":"Monroe and Orleans County Line","ending_cross_street":"Redman Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993441,43.221763]]}},{"id":"mkdOCEjam7R3M0l66UeNg+BHHb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lNA84xlN/YhKB12mjCFgkjnWfV4="},{"type":"next-occurrence","id":"99AbmLoZRXm7jNAHRO9/aHSx3ms="}],"description":"Construction on NY 31 eastbound between Monroe and Orleans County Line (Murray) and Redman Rd (Brockport), Tuesday May 12th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T20:14:33Z"},"road_event_id":"mkdOCEjam7R3M0l66UeNg+BHHb0=","beginning_cross_street":"Monroe and Orleans County Line","ending_cross_street":"Redman Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993441,43.221763]]}},{"id":"99AbmLoZRXm7jNAHRO9/aHSx3ms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lNA84xlN/YhKB12mjCFgkjnWfV4="},{"type":"next-occurrence","id":"9GQ5RGlfbL7Ay1OuTGx6CacsxSw="}],"description":"Construction on NY 31 eastbound between Monroe and Orleans County Line (Murray) and Redman Rd (Brockport), Tuesday May 12th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T20:14:33Z"},"road_event_id":"99AbmLoZRXm7jNAHRO9/aHSx3ms=","beginning_cross_street":"Monroe and Orleans County Line","ending_cross_street":"Redman Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993441,43.221763]]}},{"id":"9GQ5RGlfbL7Ay1OuTGx6CacsxSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lNA84xlN/YhKB12mjCFgkjnWfV4="},{"type":"next-occurrence","id":"z4EnymoUwq8KzAaO8NISqFoEpIs="}],"description":"Construction on NY 31 eastbound between Monroe and Orleans County Line (Murray) and Redman Rd (Brockport), Tuesday May 12th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T20:14:33Z"},"road_event_id":"9GQ5RGlfbL7Ay1OuTGx6CacsxSw=","beginning_cross_street":"Monroe and Orleans County Line","ending_cross_street":"Redman Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993441,43.221763]]}},{"id":"z4EnymoUwq8KzAaO8NISqFoEpIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lNA84xlN/YhKB12mjCFgkjnWfV4="},{"type":"next-occurrence","id":"TfVSTaMLN0ukzOlD3TKLRUnJJ5k="}],"description":"Construction on NY 31 eastbound between Monroe and Orleans County Line (Murray) and Redman Rd (Brockport), Tuesday May 12th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T20:14:33Z"},"road_event_id":"z4EnymoUwq8KzAaO8NISqFoEpIs=","beginning_cross_street":"Monroe and Orleans County Line","ending_cross_street":"Redman Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993441,43.221763]]}},{"id":"TfVSTaMLN0ukzOlD3TKLRUnJJ5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lNA84xlN/YhKB12mjCFgkjnWfV4="}],"description":"Construction on NY 31 eastbound between Monroe and Orleans County Line (Murray) and Redman Rd (Brockport), Tuesday May 12th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T20:14:33Z"},"road_event_id":"TfVSTaMLN0ukzOlD3TKLRUnJJ5k=","beginning_cross_street":"Monroe and Orleans County Line","ending_cross_street":"Redman Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993441,43.221763]]}},{"id":"2i1fyS0ZY1ewiimStUmAf/+70lM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Southbound North of NJ 35/St. Georges Av (Rahway) Thursday May 14, 2026 09:00 AM thru 03:00 PM, 1 right lane of 4 lanes closed","update_date":"2026-05-08T20:14:36Z"},"road_event_id":"2i1fyS0ZY1ewiimStUmAf/+70lM=","beginning_cross_street":"North of NJ 35/St. Georges Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.290374,40.597465]]}},{"id":"SgjlSy/+Uud+HHDohlbrg/Pqu5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Southbound North of NJ 35/St. Georges Av (Rahway) Friday May 15, 2026 09:00 AM thru 03:00 PM, 1 right lane of 4 lanes closed","update_date":"2026-05-08T20:14:40Z"},"road_event_id":"SgjlSy/+Uud+HHDohlbrg/Pqu5I=","beginning_cross_street":"North of NJ 35/St. Georges Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.290374,40.597465]]}},{"id":"kaxeh4SuUbC5t0yATV3/jkHYs1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Southbound North of NJ 35/St. Georges Av (Rahway) Wednesday May 13, 2026 09:00 AM thru 03:00 PM, 1 right lane of 4 lanes closed","update_date":"2026-05-08T20:14:32Z"},"road_event_id":"kaxeh4SuUbC5t0yATV3/jkHYs1A=","beginning_cross_street":"North of NJ 35/St. Georges Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.290374,40.597465]]}},{"id":"g/plmjr8H7vvMcCOd2VNKuo9JPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 westbound ramp to Exit 26 - Hamilton Avenue (New York) Subject to change without notice., Thursday May 14th, 2026, 10:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T20:15:03Z"},"road_event_id":"g/plmjr8H7vvMcCOd2VNKuo9JPU=","beginning_cross_street":"Exit 26 - Hamilton Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003324,40.680443]]}},{"id":"daOFctuGXhXV7/jD1XLfidXL+6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 94"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 94 Both Directions between South of NJ 23 (Hamburg) and New York State Line (Vernon Twp) Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-08T20:18:26Z"},"road_event_id":"daOFctuGXhXV7/jD1XLfidXL+6g=","beginning_cross_street":"South of NJ 23","ending_cross_street":"New York State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.576568,41.153278]]}},{"id":"sxAm2o7RYRavxvtMb9OhIX7Gx8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 27 both directions between 6th Avenue (New York) and 4th Avenue (New York) Subject to change without notice., Tuesday May 12th, 2026 thru Wednesday May 13th, 2026, Tuesday/Wednesday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T20:18:25Z"},"road_event_id":"sxAm2o7RYRavxvtMb9OhIX7Gx8U=","beginning_cross_street":"6th Avenue","ending_cross_street":"4th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988764,40.66255]]}},{"id":"nQpwWGBOm4HwKd6EvNnp604ti+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 94"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 94 Both Directions between South of NJ 23 (Hamburg) and New York State Line (Vernon Twp) Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-08T20:18:46Z"},"road_event_id":"nQpwWGBOm4HwKd6EvNnp604ti+o=","beginning_cross_street":"South of NJ 23","ending_cross_street":"New York State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.576568,41.153278]]}},{"id":"Vg3QhGqgS+H8fupoOpAot6W+ToY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 94"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 94 Both Directions between South of NJ 23 (Hamburg) and New York State Line (Vernon Twp) Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-08T20:18:39Z"},"road_event_id":"Vg3QhGqgS+H8fupoOpAot6W+ToY=","beginning_cross_street":"South of NJ 23","ending_cross_street":"New York State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.576568,41.153278]]}},{"id":"bhi1rOIxFWJozZAlwM4A+MvJmUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 62"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 62 Both Directions between US 46 (Totowa) and I-80 (Totowa) Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound","update_date":"2026-05-08T20:21:44Z"},"road_event_id":"bhi1rOIxFWJozZAlwM4A+MvJmUI=","beginning_cross_street":"US 46","ending_cross_street":"I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.225791,40.893188]]}},{"id":"lHpnzzQRdX0fwaaIr+M1K9N/hpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 62"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 62 Both Directions between US 46 (Totowa) and I-80 (Totowa) Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound","update_date":"2026-05-08T20:21:40Z"},"road_event_id":"lHpnzzQRdX0fwaaIr+M1K9N/hpM=","beginning_cross_street":"US 46","ending_cross_street":"I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.225791,40.893188]]}},{"id":"Imr+65MXnnSpeut7GTw3KTP6KiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 62"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 62 Both Directions between US 46 (Totowa) and I-80 (Totowa) Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound","update_date":"2026-05-08T20:21:35Z"},"road_event_id":"Imr+65MXnnSpeut7GTw3KTP6KiA=","beginning_cross_street":"US 46","ending_cross_street":"I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.225791,40.893188]]}},{"id":"1Ne4kNLoz5z3ohOuiBSHOiGNz/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Both Directions between New Rd (South Brunswick Twp) and Adams Ln/Cozzens Ln (North Brunswick Twp) Wednesday May 13, 2026 10:00 AM thru 03:00 PM, 1 right lane of 3 lanes, right shoulder closed northbound; 1 right lane of 3 lanes, right shoulder closed southbound","update_date":"2026-05-08T20:35:23Z"},"road_event_id":"1Ne4kNLoz5z3ohOuiBSHOiGNz/g=","beginning_cross_street":"New Rd","ending_cross_street":"Adams Ln/Cozzens Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.558029,40.397251]]}},{"id":"muNGIAPhcaShBVx8uDRT0RIGlSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Queensboro Bridge"],"direction":"unknown","related_road_events":[],"description":"Construction on Ed Koch Queensboro Bridge Upper Level at Manhattan Side (Manhattan) Subject to change without notice., Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T20:28:18Z"},"road_event_id":"muNGIAPhcaShBVx8uDRT0RIGlSA=","beginning_cross_street":"Manhattan Side","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.9627,40.760819]]}},{"id":"iuqoMhNHl7bCEDlnFUPiQYJH7fo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Queensboro Bridge"],"direction":"unknown","related_road_events":[],"description":"Construction on Ed Koch Queensboro Bridge Upper Level eastbound at Manhattan Side (Manhattan) Subject to change without notice., Thursday May 14th, 2026 thru Friday May 15th, 2026, 11:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T20:30:06Z"},"road_event_id":"iuqoMhNHl7bCEDlnFUPiQYJH7fo=","beginning_cross_street":"Manhattan Side","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.961776,40.759935]]}},{"id":"/dg4kjWh9TMmAyb1cr3IrIeSc6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Queensboro Bridge"],"direction":"unknown","related_road_events":[],"description":"Construction on Ed Koch Queensboro Bridge Lower Level Outer at Manhattan Side (Manhattan) Subject to change without notice., Thursday May 14th, 2026 thru Friday May 15th, 2026, 11:00 PM thru 05:30 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T20:31:48Z"},"road_event_id":"/dg4kjWh9TMmAyb1cr3IrIeSc6Y=","beginning_cross_street":"Manhattan Side","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.961813,40.759899]]}},{"id":"oDAB7lr2/Zx/RTo6BdYXq3PDHFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 28"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 28 Both Directions between East of CR 527/Mountain Ave (Bound Brook) and East of John F Kennedy Dr (Middlesex) Wednesday May 13, 2026 12:30 PM thru 03:00 PM, 1 right lane of 4 lanes closed eastbound; 1 right lane of 4 lanes closed westbound","update_date":"2026-05-08T20:32:20Z"},"road_event_id":"oDAB7lr2/Zx/RTo6BdYXq3PDHFk=","beginning_cross_street":"East of CR 527/Mountain Ave","ending_cross_street":"East of John F Kennedy Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T16:30:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.528121,40.566349]]}},{"id":"+F54vWIuUCgPh+Ragr1pHqrRqPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Brooklyn Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kkt9t4RO0zKPArenAi7vcDtxvaY="}],"description":"Construction on Brooklyn Bridge eastbound between Center Span (Manhattan/Brooklyn) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed south outer roadway","update_date":"2026-05-08T20:34:56Z"},"road_event_id":"+F54vWIuUCgPh+Ragr1pHqrRqPU=","beginning_cross_street":"Center Span","ending_cross_street":"Center Span","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999014,40.707703]]}},{"id":"kkt9t4RO0zKPArenAi7vcDtxvaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Brooklyn Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+F54vWIuUCgPh+Ragr1pHqrRqPU="},{"type":"next-occurrence","id":"lUCV8bCSt8gD3ETsl9wg3eDEpPQ="}],"description":"Construction on Brooklyn Bridge eastbound between Center Span (Manhattan/Brooklyn) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed south outer roadway","update_date":"2026-05-08T20:34:56Z"},"road_event_id":"kkt9t4RO0zKPArenAi7vcDtxvaY=","beginning_cross_street":"Center Span","ending_cross_street":"Center Span","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999014,40.707703]]}},{"id":"lUCV8bCSt8gD3ETsl9wg3eDEpPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Brooklyn Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+F54vWIuUCgPh+Ragr1pHqrRqPU="}],"description":"Construction on Brooklyn Bridge eastbound between Center Span (Manhattan/Brooklyn) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed south outer roadway","update_date":"2026-05-08T20:34:56Z"},"road_event_id":"lUCV8bCSt8gD3ETsl9wg3eDEpPQ=","beginning_cross_street":"Center Span","ending_cross_street":"Center Span","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999014,40.707703]]}},{"id":"81svF433s2owSBsL7W0T52mK6E0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 443"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"W8BniDIxhqHVUdi44K7ZNU9cfPg="}],"description":"Watermain break repairs on NY 443 both directions between Lincoln Ave (Bethlehem) and Leonard Place (Bethlehem) alternating lanes , Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-08T20:35:19Z"},"road_event_id":"81svF433s2owSBsL7W0T52mK6E0=","beginning_cross_street":"Lincoln Ave","ending_cross_street":"Leonard Place ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817929,42.627629]]}},{"id":"W8BniDIxhqHVUdi44K7ZNU9cfPg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 443"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"81svF433s2owSBsL7W0T52mK6E0="},{"type":"next-occurrence","id":"7EaZoEnR/ClTBHqpGv566Ejnp48="}],"description":"Watermain break repairs on NY 443 both directions between Lincoln Ave (Bethlehem) and Leonard Place (Bethlehem) alternating lanes , Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-08T20:35:19Z"},"road_event_id":"W8BniDIxhqHVUdi44K7ZNU9cfPg=","beginning_cross_street":"Lincoln Ave","ending_cross_street":"Leonard Place ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817929,42.627629]]}},{"id":"7EaZoEnR/ClTBHqpGv566Ejnp48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 443"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"81svF433s2owSBsL7W0T52mK6E0="}],"description":"Watermain break repairs on NY 443 both directions between Lincoln Ave (Bethlehem) and Leonard Place (Bethlehem) alternating lanes , Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-08T20:35:19Z"},"road_event_id":"7EaZoEnR/ClTBHqpGv566Ejnp48=","beginning_cross_street":"Lincoln Ave","ending_cross_street":"Leonard Place ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817929,42.627629]]}},{"id":"3U6ZFVcO16KEOxjZGxLioq7W+oM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 28"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 28 Both Directions West of Mountain Ave (Middlesex) Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, 1 right lane of 4 lanes closed eastbound; 1 right lane of 4 lanes closed westbound","update_date":"2026-05-08T20:41:01Z"},"road_event_id":"3U6ZFVcO16KEOxjZGxLioq7W+oM=","beginning_cross_street":"West of Mountain Ave","ending_cross_street":"West of Mountain Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.507469,40.576778]]}},{"id":"S/V17jDS4X/GWuo8/to8Tc1mQnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 28"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 28 Both Directions West of Mountain Ave (Middlesex) Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, 1 right lane of 4 lanes closed eastbound; 1 right lane of 4 lanes closed westbound","update_date":"2026-05-08T20:41:08Z"},"road_event_id":"S/V17jDS4X/GWuo8/to8Tc1mQnY=","beginning_cross_street":"West of Mountain Ave","ending_cross_street":"West of Mountain Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.507469,40.576778]]}},{"id":"AcrsIuOWQRiWZiNDPN4fCVn5Hr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 both directions at Bulova Avenue; I-278 (New York) Subject to change without notice., Tuesday May 12th, 2026 thru Wednesday May 13th, 2026, Tuesday/Wednesday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed westbound; 1 Left lane of 2 lanes closed eastbound","update_date":"2026-05-08T20:42:29Z"},"road_event_id":"AcrsIuOWQRiWZiNDPN4fCVn5Hr8=","beginning_cross_street":"Bulova Avenue; I-278","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902338,40.762706]]}},{"id":"Ug3EE1elPDkpLSzkdbZsfNKo5NY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 both directions at 61st Street (New York) Subject to change without notice., Thursday May 14th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-05-08T20:44:10Z"},"road_event_id":"Ug3EE1elPDkpLSzkdbZsfNKo5NY=","beginning_cross_street":"61st Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903715,40.738121]]}},{"id":"IEGJoDdNR4yhhxA84J0JKGik73E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 both directions at Grand Central Parkway (New York) Subject to change without notice., Wednesday May 13th,2026 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed eastbound, 1 Left lane of 4 lanes closed westbound","update_date":"2026-05-11T19:00:21Z"},"road_event_id":"IEGJoDdNR4yhhxA84J0JKGik73E=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907052,40.768607]]}},{"id":"fEc5jZ3NMFJgtPJ2W7syaRHuBpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 eastbound at Steinway Street (New York) Subject to change without notice., Thursday May 14th, 2026, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-08T20:48:28Z"},"road_event_id":"fEc5jZ3NMFJgtPJ2W7syaRHuBpw=","beginning_cross_street":"Steinway Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907999,40.768719]]}},{"id":"bVgmmVCgFxfYpF8d00T0De82L4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[],"description":"Construction on Grand Central Parkway both directions near 49th Street (New York) Subject to change without notice., Thursday May 14th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-05-08T20:51:47Z"},"road_event_id":"bVgmmVCgFxfYpF8d00T0De82L4w=","beginning_cross_street":"49th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896979,40.766778]]}},{"id":"BCvnvIwd9yy4+TCHMTjVm8OnXQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IC79UpoF3OdxNIknuw2Q8XRBSTA="}],"description":"Construction on Grand Central Parkway both directions near 49th Street (New York) Subject to change without notice., Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-05-08T20:53:37Z"},"road_event_id":"BCvnvIwd9yy4+TCHMTjVm8OnXQk=","beginning_cross_street":"49th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901995,40.767568]]}},{"id":"IC79UpoF3OdxNIknuw2Q8XRBSTA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BCvnvIwd9yy4+TCHMTjVm8OnXQk="}],"description":"Construction on Grand Central Parkway both directions near 49th Street (New York) Subject to change without notice., Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-05-08T20:53:37Z"},"road_event_id":"IC79UpoF3OdxNIknuw2Q8XRBSTA=","beginning_cross_street":"49th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901995,40.767568]]}},{"id":"i1Y4/KZ5N42HyYwFH/Hat5CGTWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Both Directions between CR 672/Mill St (Belleville Twp) and Greylock Pkwy (Belleville Twp) Wednesday May 13, 2026 06:00 AM thru 04:00 PM, 1 right lane of 4 lanes closed northbound; 1 right lane of 4 lanes closed southbound","update_date":"2026-05-08T20:56:13Z"},"road_event_id":"i1Y4/KZ5N42HyYwFH/Hat5CGTWQ=","beginning_cross_street":"CR 672/Mill St","ending_cross_street":"Greylock Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.154037,40.782741]]}},{"id":"Bzb9QJudxmWmdK5LJgEced2NgnM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Both Directions between CR 672/Mill St (Belleville Twp) and Greylock Pkwy (Belleville Twp) Thursday May 14, 2026 06:00 AM thru 04:00 PM, 1 right lane of 4 lanes closed northbound; 1 right lane of 4 lanes closed southbound","update_date":"2026-05-08T20:56:21Z"},"road_event_id":"Bzb9QJudxmWmdK5LJgEced2NgnM=","beginning_cross_street":"CR 672/Mill St","ending_cross_street":"Greylock Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.154037,40.782741]]}},{"id":"tTCvyOgA79iRiHZS6+S9G56a0do=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Both Directions between CR 672/Mill St (Belleville Twp) and Greylock Pkwy (Belleville Twp) Friday May 15, 2026 06:00 AM thru 04:00 PM, 1 right lane of 4 lanes closed northbound; 1 right lane of 4 lanes closed southbound","update_date":"2026-05-08T20:56:24Z"},"road_event_id":"tTCvyOgA79iRiHZS6+S9G56a0do=","beginning_cross_street":"CR 672/Mill St","ending_cross_street":"Greylock Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.154037,40.782741]]}},{"id":"fkzV8HLfOMUSZuOrXeIznfVZGeQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Construction on I-678 both directions at Exit 5 - 101st Avenue (New York) Subject to change without notice., Friday May 15th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed northbound; 1 Left lane of 3 lanes closed southbound","update_date":"2026-05-08T20:57:21Z"},"road_event_id":"fkzV8HLfOMUSZuOrXeIznfVZGeQ=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813537,40.697133]]}},{"id":"c+R8IkZ/JIgN5QxBoYRtXL80JY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Construction on I-678 both directions at Queens Boulevard; NY 25 (New York) Subject to change without notice., Friday May 15th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed northbound; 1 Left lane of 3 lanes closed southbound","update_date":"2026-05-08T20:58:47Z"},"road_event_id":"c+R8IkZ/JIgN5QxBoYRtXL80JY8=","beginning_cross_street":"Queens Boulevard; NY 25","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819936,40.709463]]}},{"id":"r45pei7cV54PXvzcUsr6GEkAdSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODHAVEN BLVD"],"direction":"unknown","related_road_events":[],"description":"Construction on WOODHAVEN BLVD both directions near ATLANTIC AVE (New York) Subject to change without notice., Friday May 15th, 2026, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed northbound; 1 Right lane of 2 lanes closed southbound","update_date":"2026-05-08T21:01:26Z"},"road_event_id":"r45pei7cV54PXvzcUsr6GEkAdSA=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848492,40.68805]]}},{"id":"WJLBkpRFIWcYXkk2ZVpdAgF6KL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["UNION TPKE"],"direction":"unknown","related_road_events":[],"description":"Construction on UNION TPKE both directions at 244TH ST (New York) Subject to change without notice., Wednesday May 13th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-08T21:03:16Z"},"road_event_id":"WJLBkpRFIWcYXkk2ZVpdAgF6KL0=","beginning_cross_street":"244TH ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724979,40.741296]]}},{"id":"LOwsIL5ckedNsJy+2178HQpEeVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 124"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 124 Both Directions between In the Vicinity of Waverly Pl/CR 608 (Madison) and Brook Lake Rd (Chatham) Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-05-08T21:05:05Z"},"road_event_id":"LOwsIL5ckedNsJy+2178HQpEeVY=","beginning_cross_street":"In the Vicinity of Waverly Pl/CR 608","ending_cross_street":"Brook Lake Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414047,40.758129]]}},{"id":"xDG/vXmZT5wRXeRzH0k+IKjmWQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 124"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 124 Both Directions between In the Vicinity of Waverly Pl/CR 608 (Madison) and Brook Lake Rd (Chatham) Thursday May 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-05-08T21:05:17Z"},"road_event_id":"xDG/vXmZT5wRXeRzH0k+IKjmWQU=","beginning_cross_street":"In the Vicinity of Waverly Pl/CR 608","ending_cross_street":"Brook Lake Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414047,40.758129]]}},{"id":"MTm38nmKsr/hYJsozSTprLgcHkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 124"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 124 Both Directions between In the Vicinity of Waverly Pl/CR 608 (Madison) and Brook Lake Rd (Chatham) Friday May 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-05-08T21:05:41Z"},"road_event_id":"MTm38nmKsr/hYJsozSTprLgcHkU=","beginning_cross_street":"In the Vicinity of Waverly Pl/CR 608","ending_cross_street":"Brook Lake Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414047,40.758129]]}},{"id":"xbr6WH8OAxvuiXkr5XG1E62IYOM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Queensboro Bridge"],"direction":"unknown","related_road_events":[],"description":"Construction on Ed Koch Queensboro Bridge Lower Level westbound at Queens Side (New York) Subject to change without notice., Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T21:08:55Z"},"road_event_id":"xbr6WH8OAxvuiXkr5XG1E62IYOM=","beginning_cross_street":"Queens Side","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.943912,40.75236]]}},{"id":"9Cc7E2gVaZOxcQIVMotrBpVPAjo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Queensboro Bridge"],"direction":"unknown","related_road_events":[],"description":"Construction on Ed Koch Queensboro Bridge Upper Level westbound at Queens Side (New York) Subject to change without notice., Thursday May 14th, 2026 thru Friday May 15th, 2026, 11:00 PM thru 05:30 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T21:10:34Z"},"road_event_id":"9Cc7E2gVaZOxcQIVMotrBpVPAjo=","beginning_cross_street":"Queens Side","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.946374,40.753368]]}},{"id":"kE0Vtl/8PTSUdfQb4LRVEkbMLOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Queensboro Bridge"],"direction":"unknown","related_road_events":[],"description":"Construction on Ed Koch Queensboro Bridge Lower Level both directions at Queens Side (New York) Subject to change without notice., Thursday May 14th, 2026 thru Friday May 15th, 2026, 11:00 PM thru 05:30 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T21:12:51Z"},"road_event_id":"kE0Vtl/8PTSUdfQb4LRVEkbMLOY=","beginning_cross_street":"Queens Side","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.946549,40.753302]]}},{"id":"b/6b/pIni8uTni2KNolVdf/a1Xc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 Both Directions between North of CR 512/Pottersville Rd (Chester Twp) and North of NJ 24/CR 513/West Main St (Chester Twp) Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, 1 right lane of 2 lanes, right shoulder closed northbound; 1 right lane of 2 lanes, right shoulder closed southbound","update_date":"2026-05-08T21:13:35Z"},"road_event_id":"b/6b/pIni8uTni2KNolVdf/a1Xc=","beginning_cross_street":"North of CR 512/Pottersville Rd","ending_cross_street":"North of NJ 24/CR 513/West Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.692657,40.741081]]}},{"id":"forFbXGDJrAdjnAa43Ine+byjrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 Both Directions between North of CR 512/Pottersville Rd (Chester Twp) and North of NJ 24/CR 513/West Main St (Chester Twp) Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, 1 right lane of 2 lanes, right shoulder closed northbound; 1 right lane of 2 lanes, right shoulder closed southbound","update_date":"2026-05-08T21:13:48Z"},"road_event_id":"forFbXGDJrAdjnAa43Ine+byjrU=","beginning_cross_street":"North of CR 512/Pottersville Rd","ending_cross_street":"North of NJ 24/CR 513/West Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.692657,40.741081]]}},{"id":"vc4bjITkbIRQig3YKWL3n7WbugI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 259"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 259 both directions at 1842 N Union St (Parma) Northine Utilities will be replacing pole 201 for RGE across from 1842 N Union St, Parma NY (RT259). Crews will be working in the southbound lane of traffic with alternating traffic control with flaggers and an attenuator, Wednesday May 13th, 2026, 09:00 AM thru 01:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-08T21:13:53Z"},"road_event_id":"vc4bjITkbIRQig3YKWL3n7WbugI=","beginning_cross_street":"1842 N Union St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.792606,43.216204]]}},{"id":"TNlX8cUGOb10t7mhRYy7ZmxiE/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 Both Directions between North of CR 512/Pottersville Rd (Chester Twp) and North of NJ 24/CR 513/West Main St (Chester Twp) Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, 1 right lane of 2 lanes, right shoulder closed northbound; 1 right lane of 2 lanes, right shoulder closed southbound","update_date":"2026-05-08T21:13:22Z"},"road_event_id":"TNlX8cUGOb10t7mhRYy7ZmxiE/Q=","beginning_cross_street":"North of CR 512/Pottersville Rd","ending_cross_street":"North of NJ 24/CR 513/West Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.692657,40.741081]]}},{"id":"T+fZ7R1ggZw4Bn6ZifEhd53Bhgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Eastbound from West of CR 627/Cooper Landing Rd (Cherry Hill Twp) to West of NJ 41/CR 154 (Cherry Hill Twp) Wednesday May 13, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-08T21:45:29Z"},"road_event_id":"T+fZ7R1ggZw4Bn6ZifEhd53Bhgo=","beginning_cross_street":"West of CR 627/Cooper Landing Rd","ending_cross_street":"West of NJ 41/CR 154","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.028442,39.91711]]}},{"id":"8qUCZ6m6o+ayJUGuI2ROnr6UmBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Both Directions between US 322/CR 536 (Glassboro) and CR 635/Lambs Rd (Washington Twp) Wednesday May 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-08T21:46:16Z"},"road_event_id":"8qUCZ6m6o+ayJUGuI2ROnr6UmBc=","beginning_cross_street":"US 322/CR 536","ending_cross_street":"CR 635/Lambs Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.10894,39.707489]]}},{"id":"NC7yRrlBrz6zUje5jYip6muQ3VE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Both Directions between US 322/CR 536 (Glassboro) and CR 635/Lambs Rd (Washington Twp) Thursday May 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-08T21:46:20Z"},"road_event_id":"NC7yRrlBrz6zUje5jYip6muQ3VE=","beginning_cross_street":"US 322/CR 536","ending_cross_street":"CR 635/Lambs Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.10894,39.707489]]}},{"id":"jziwYxhbg02r6dP0s2peHf80X0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Both Directions between US 322/CR 536 (Glassboro) and CR 635/Lambs Rd (Washington Twp) Friday May 15, 2026 07:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-05-08T21:46:26Z"},"road_event_id":"jziwYxhbg02r6dP0s2peHf80X0A=","beginning_cross_street":"US 322/CR 536","ending_cross_street":"CR 635/Lambs Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.10894,39.707489]]}},{"id":"Xl4OXqz7B6oCENTo+kfLkJT43H8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 77"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 77 Both Directions At CR 635/US 40 (Upper Pittsgrove Twp) Wednesday May 13, 2026 09:00 AM thru 05:00 PM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound","update_date":"2026-05-08T21:46:00Z"},"road_event_id":"Xl4OXqz7B6oCENTo+kfLkJT43H8=","beginning_cross_street":"CR 635/US 40","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.23001,39.615959]]}},{"id":"LLbPZ16MU9/iq15IbKZEgAOhVOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 88"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 88 Both Directions West of CR 604/Bay Ave (Point Pleasant) Wednesday May 13, 2026 08:00 AM thru 05:00 PM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-05-08T21:46:40Z"},"road_event_id":"LLbPZ16MU9/iq15IbKZEgAOhVOQ=","beginning_cross_street":"West of CR 604/Bay Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.057449,40.082786]]}},{"id":"7JZGk1p7g0PgFEQKLZG8mAtu5Hs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 88"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 88 Both Directions West of CR 604/Bay Ave (Point Pleasant) Thursday May 14, 2026 08:00 AM thru 05:00 PM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-05-08T21:46:45Z"},"road_event_id":"7JZGk1p7g0PgFEQKLZG8mAtu5Hs=","beginning_cross_street":"West of CR 604/Bay Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.057449,40.082786]]}},{"id":"VjvIGHOgUcYl6sSnWq0jWYZbkpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 88"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 88 Both Directions West of CR 604/Bay Ave (Point Pleasant) Friday May 15, 2026 08:00 AM thru 05:00 PM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-05-08T21:46:50Z"},"road_event_id":"VjvIGHOgUcYl6sSnWq0jWYZbkpE=","beginning_cross_street":"West of CR 604/Bay Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.057449,40.082786]]}},{"id":"51HGbAcuuMhVI3Kh6OHWHuQLiLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[],"description":"Overnight roadwork on NY 13 both directions between Elmira Rd (Ithaca) and 3rd St (Ithaca) ; Alternating lane closures, Sunday May 10th, 2026 thru Thursday May 14th, 2026, Sunday/Monday/Tuesday/Wednesday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-08T23:08:54Z"},"road_event_id":"51HGbAcuuMhVI3Kh6OHWHuQLiLI=","beginning_cross_street":"Elmira Rd","ending_cross_street":"3rd St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508173,42.428414]]}},{"id":"lm427/QwsyHJo5wAKLWhdIgbNQE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8AaxZSlNK+oAWcIVUdKKMwf/Vxg="}],"description":"Roadwork on I-87 Northway both directions between Exit 10; Ushers Road (Clifton Park) and Exit 12; NY 67 (Malta) alternating lanes , Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 07:00 PM thru 06:00 AM All lanes open northbound, Thursday May 14th, 2026 thru Friday May 15th, 2026, 07:00 PM thru 06:00 AM All lanes open southbound","update_date":"2026-05-09T01:07:16Z"},"road_event_id":"lm427/QwsyHJo5wAKLWhdIgbNQE=","beginning_cross_street":"Exit 10; Ushers Road","ending_cross_street":"Exit 12; NY 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784046,42.900443]]}},{"id":"8AaxZSlNK+oAWcIVUdKKMwf/Vxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lm427/QwsyHJo5wAKLWhdIgbNQE="}],"description":"Roadwork on I-87 Northway both directions between Exit 10; Ushers Road (Clifton Park) and Exit 12; NY 67 (Malta) alternating lanes , Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 07:00 PM thru 06:00 AM All lanes open northbound, Thursday May 14th, 2026 thru Friday May 15th, 2026, 07:00 PM thru 06:00 AM All lanes open southbound","update_date":"2026-05-09T01:07:16Z"},"road_event_id":"8AaxZSlNK+oAWcIVUdKKMwf/Vxg=","beginning_cross_street":"Exit 10; Ushers Road","ending_cross_street":"Exit 12; NY 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784046,42.900443]]}},{"id":"jcOpjgInujfyyh/Dvrc9KzjMnUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-87 Northway both directions between Exit 8; Crescent Road (Halfmoon) and Exit 10; Ushers Road (Clifton Park) alternating lanes , Friday May 15th, 2026 thru Saturday May 16th, 2026, 07:00 PM thru 05:00 AM All lanes open southbound","update_date":"2026-05-09T01:09:06Z"},"road_event_id":"jcOpjgInujfyyh/Dvrc9KzjMnUY=","beginning_cross_street":"Exit 8; Crescent Road","ending_cross_street":"Exit 10; Ushers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T18:00:00Z","end_date":"2026-05-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766952,42.816595]]}},{"id":"IeCno1Cqp7u7FpqzqgZWK4PSm7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound at north of Exit 69 - US 206 (Lawrence Twp) Friday May 15, 2026 11:00 PM thru Saturday May 16, 2026 03:00 AM, ramp","update_date":"2026-05-09T04:03:36Z"},"road_event_id":"IeCno1Cqp7u7FpqzqgZWK4PSm7s=","beginning_cross_street":"north of Exit 69 - US 206","ending_cross_street":"north of Exit 69 - US 206","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.733474,40.285766]]}},{"id":"jzUnerFIXNBbo4HSt5LTjIQv8u0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between North of Ernston Rd (Sayreville) and North of Birchwood Dr (Old Bridge Twp), Thursday May 14, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-05-09T04:04:03Z"},"road_event_id":"jzUnerFIXNBbo4HSt5LTjIQv8u0=","beginning_cross_street":"North of Ernston Rd","ending_cross_street":"North of Birchwood Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.278411,40.465423]]}},{"id":"1qXxZSCW+Fr0IcyCEJ15XdVGc2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 at East of NJ 70/CR 601 (Pennsauken Twp) Thursday May 14, 2026 11:00 PM thru Friday May 15, 2026 05:00 AM, ramp","update_date":"2026-05-09T04:04:04Z"},"road_event_id":"1qXxZSCW+Fr0IcyCEJ15XdVGc2I=","beginning_cross_street":"East of NJ 70/CR 601","ending_cross_street":"East of NJ 70/CR 601","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.067802,39.935279]]}},{"id":"aSMu9bC0BkSo62Wepn3e9aPcUdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound between CR 555/Stagecoach Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Friday May 15, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-09T04:04:05Z"},"road_event_id":"aSMu9bC0BkSo62Wepn3e9aPcUdM=","beginning_cross_street":"CR 555/Stagecoach Rd","ending_cross_street":"South of CR 655/Fries Mill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.032798,39.729408]]}},{"id":"G/e9m/XwB3A04RcPNGfaSryYsI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of Main St (Roxbury Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 05:00 AM, right lane closed","update_date":"2026-05-09T04:04:06Z"},"road_event_id":"G/e9m/XwB3A04RcPNGfaSryYsI0=","beginning_cross_street":"West of Main St","ending_cross_street":"West of Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.668037,40.890239]]}},{"id":"+FjnjX2OXCdAVgx/VRr4ZEiwfCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between North of Ernston Rd (Sayreville) and North of Morgan Drawbridge (Sayreville), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:04:07Z"},"road_event_id":"+FjnjX2OXCdAVgx/VRr4ZEiwfCo=","beginning_cross_street":"North of Ernston Rd","ending_cross_street":"North of Morgan Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.278411,40.465423]]}},{"id":"4bxSBmLPTvxzmadFFa/0/C2Eg0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:04:08Z"},"road_event_id":"4bxSBmLPTvxzmadFFa/0/C2Eg0Y=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"96gGbWLm6WzkZo3UvHLu7dzMoAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound near North of CR 622/Olden Ave (Ewing Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-09T04:04:10Z"},"road_event_id":"96gGbWLm6WzkZo3UvHLu7dzMoAE=","beginning_cross_street":"North of CR 622/Olden Ave","ending_cross_street":"North of CR 622/Olden Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.780281,40.260475]]}},{"id":"mEfrFAKhzJZVq2mpcRDGBAYjWjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of I-287 (Parsippany-Troy Hills Twp), Friday May 15, 2026 09:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 06:00 AM)","update_date":"2026-05-09T04:03:59Z"},"road_event_id":"mEfrFAKhzJZVq2mpcRDGBAYjWjI=","beginning_cross_street":"West of I-287","ending_cross_street":"East of CR 654/Cherry Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.419418,40.870544]]}},{"id":"Ixd8e+oiBI4Z/etWFfKFZI4nEWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and North of CR 631/Franklin Av (Franklin Twp), Thursday May 14, 2026 08:00 AM thru 04:00 PM, right shoulder closed, moving operation","update_date":"2026-05-09T04:03:58Z"},"road_event_id":"Ixd8e+oiBI4Z/etWFfKFZI4nEWI=","beginning_cross_street":"North of Holland Mountain Rd","ending_cross_street":"North of CR 631/Franklin Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.529808,41.095325]]}},{"id":"PIOxGGivrD/aJ0nK/8y500nsoXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between US 322 (Logan Twp) and North of I-295/US 40 (Pennsville Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, , moving operation","update_date":"2026-05-09T04:03:50Z"},"road_event_id":"PIOxGGivrD/aJ0nK/8y500nsoXk=","beginning_cross_street":"US 322","ending_cross_street":"North of I-295/US 40","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.349075,39.80278]]}},{"id":"6lgmEnDhaUJpa9Qj7pj927MRmJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right lane closed local lane","update_date":"2026-05-09T04:03:52Z"},"road_event_id":"6lgmEnDhaUJpa9Qj7pj927MRmJw=","beginning_cross_street":"In the vicinity of Garden State Parkway","ending_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078071,40.922229]]}},{"id":"QqCy2h9WrF9kcfHcsTR/0tahv8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Southbound between North of CR 655/Fries Mill Rd (Washington Twp) and CR 555/Stagecoach Rd (Washington Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:03:54Z"},"road_event_id":"QqCy2h9WrF9kcfHcsTR/0tahv8Q=","beginning_cross_street":"North of CR 655/Fries Mill Rd","ending_cross_street":"CR 555/Stagecoach Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.045402,39.748291]]}},{"id":"XVxlIHjA8mlvQydUEQGDM8XNOyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between West of Exit 16 - CR 537/Great Adventure (Millstone Twp) and I-295 (Hamilton Twp), left shoulder, moving operation","update_date":"2026-05-09T04:03:55Z"},"road_event_id":"XVxlIHjA8mlvQydUEQGDM8XNOyU=","beginning_cross_street":"West of Exit 16 - CR 537/Great Adventure","ending_cross_street":"I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.437126,40.164821]]}},{"id":"OYGRnkGPPrJBw65eYBY38bZjZ1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between South of CR 617/Harbor Inn Rd (Berkeley Twp) and South of Bay Pkwy (Ocean Twp), Thursday May 14, 2026 10:00 PM thru Friday May 15, 2026 05:00 AM, right shoulder closed, moving operation","update_date":"2026-05-09T04:03:56Z"},"road_event_id":"OYGRnkGPPrJBw65eYBY38bZjZ1I=","beginning_cross_street":"South of CR 617/Harbor Inn Rd","ending_cross_street":"South of Bay Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.168357,39.868789]]}},{"id":"QtEg5d/JLrzqG6IEu4HC7k2TuG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound between South of Morgan Drawbridge (Old Bridge Twp) and Ernston Rd (Sayreville), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:03:57Z"},"road_event_id":"QtEg5d/JLrzqG6IEu4HC7k2TuG8=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"QDW4CkQ4GP/L4HhbNNSBkwysKuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound between I-295 (Hamilton Twp) and West of Exit 16 - CR 537/Great Adventure (Millstone Twp), left shoulder, moving operation","update_date":"2026-05-09T04:04:15Z"},"road_event_id":"QDW4CkQ4GP/L4HhbNNSBkwysKuE=","beginning_cross_street":"I-295","ending_cross_street":"West of Exit 16 - CR 537/Great Adventure","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.72351,40.183963]]}},{"id":"ei/k/O5aY0aHffFpd//r1FEPRys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound at north of Exit 69 - US 206 (Lawrence Twp) Thursday May 14, 2026 11:00 PM thru Friday May 15, 2026 03:00 AM, ramp","update_date":"2026-05-09T04:04:16Z"},"road_event_id":"ei/k/O5aY0aHffFpd//r1FEPRys=","beginning_cross_street":"north of Exit 69 - US 206","ending_cross_street":"north of Exit 69 - US 206","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.733474,40.285766]]}},{"id":"FRsjP5uUTZW2PSbe5k3XZ5ckIUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near In the vicinity of Irish Spring Rd (Randolph Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 05:00 AM, right lane closed","update_date":"2026-05-09T04:04:20Z"},"road_event_id":"FRsjP5uUTZW2PSbe5k3XZ5ckIUk=","beginning_cross_street":"In the vicinity of Irish Spring Rd","ending_cross_street":"In the vicinity of CR 617","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.6194,40.857051]]}},{"id":"TxkgGJkuAj6xb2xaxNrLv0i1HUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound near South of CR 12A/Navesink River Rd (Middletown Twp), Wednesday May 13, 2026 07:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-05-09T04:04:11Z"},"road_event_id":"TxkgGJkuAj6xb2xaxNrLv0i1HUE=","beginning_cross_street":"South of CR 12A/Navesink River Rd","ending_cross_street":"Coopers Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078414,40.358901]]}},{"id":"mI7BuVbclEqhxjbxCLPeJQgz7Ec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound near North of New Jersey Turnpike (Mount Laurel Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-09T04:04:12Z"},"road_event_id":"mI7BuVbclEqhxjbxCLPeJQgz7Ec=","beginning_cross_street":"North of New Jersey Turnpike","ending_cross_street":"North of CR 673/Fellowship Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.958221,39.929702]]}},{"id":"m5hFZ6gaj4JSsqovRnyISgsUSj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between West of CR 614/Cologne Av (Hamilton Twp) and US 322 (Hamilton Twp), Friday May 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-09T04:04:13Z"},"road_event_id":"m5hFZ6gaj4JSsqovRnyISgsUSj8=","beginning_cross_street":"West of CR 614/Cologne Av","ending_cross_street":"US 322","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.673698,39.44857]]}},{"id":"0MVeJhV7W6GKqlNv8XEipu/MY3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Southbound between South of US 1&9 Truck Route/Communipaw Av (Jersey City) and South of Kennedy Boulevard (Bayonne), Friday May 15, 2026 11:00 PM thru Saturday May 16, 2026 05:00 AM, left lane closed","update_date":"2026-05-09T04:03:46Z"},"road_event_id":"0MVeJhV7W6GKqlNv8XEipu/MY3A=","beginning_cross_street":"South of US 1&9 Truck Route/Communipaw Av","ending_cross_street":"South of Kennedy Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.092521,40.721855]]}},{"id":"cruA0DrH3kYqftwewEyZWjR8CzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between Century Rd (Paramus) and New York State Line (Mahwah Twp), Friday May 15, 2026 09:00 PM thru Saturday May 16, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:03:47Z"},"road_event_id":"cruA0DrH3kYqftwewEyZWjR8CzQ=","beginning_cross_street":"Century Rd","ending_cross_street":"New York State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07051,40.930118]]}},{"id":"NR0upfre6aK6+v6XTmf+kzbxpmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 06:00 AM)","update_date":"2026-05-09T04:03:40Z"},"road_event_id":"NR0upfre6aK6+v6XTmf+kzbxpmI=","beginning_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.560539,40.706226]]}},{"id":"DLZwLj/CHKipcPJYCDazVra8dUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound between I-295 (Mount Laurel Twp) and South of NJ 38 (Maple Shade Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM)","update_date":"2026-05-09T04:03:43Z"},"road_event_id":"DLZwLj/CHKipcPJYCDazVra8dUk=","beginning_cross_street":"I-295","ending_cross_street":"South of NJ 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.965492,39.934547]]}},{"id":"P8QKKNzJ5egZPPQkevAszKTPnTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between West of Exit 16 - CR 537/Great Adventure (Millstone Twp) and I-295 (Hamilton Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, left lane closed, moving operation","update_date":"2026-05-09T04:03:44Z"},"road_event_id":"P8QKKNzJ5egZPPQkevAszKTPnTo=","beginning_cross_street":"West of Exit 16 - CR 537/Great Adventure","ending_cross_street":"I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.437126,40.164821]]}},{"id":"99Co6VPk6SeGdNPoc+X4BVy7my8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 at West of NJ 70/CR 601 (Pennsauken Twp) Thursday May 14, 2026 11:00 PM thru Friday May 15, 2026 05:00 AM, ramp","update_date":"2026-05-09T04:04:40Z"},"road_event_id":"99Co6VPk6SeGdNPoc+X4BVy7my8=","beginning_cross_street":"West of NJ 70/CR 601","ending_cross_street":"West of NJ 70/CR 601","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.076873,39.93404]]}},{"id":"qAGSMk8ujY+0AvAn0tKZeL7v5ck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound between Ocean Av (Point Pleasant Beach) and South of CR 635/Broadway (Point Pleasant Beach), Wednesday May 13, 2026 08:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-05-09T04:04:42Z"},"road_event_id":"qAGSMk8ujY+0AvAn0tKZeL7v5ck=","beginning_cross_street":"Ocean Av","ending_cross_street":"South of CR 635/Broadway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042457,40.077541]]}},{"id":"aX6sa7+7hrdnV/fLRXhUCTyIt4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound between Ocean Av (Point Pleasant Beach) and South of CR 635/Broadway (Point Pleasant Beach), Thursday May 14, 2026 08:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-05-09T04:04:43Z"},"road_event_id":"aX6sa7+7hrdnV/fLRXhUCTyIt4Y=","beginning_cross_street":"Ocean Av","ending_cross_street":"South of CR 635/Broadway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042457,40.077541]]}},{"id":"0KfXAQ02oX0Xaiy/IgKp6JQpGaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound near North of New Jersey Turnpike (Mount Laurel Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 06:00 AM)","update_date":"2026-05-09T04:04:34Z"},"road_event_id":"0KfXAQ02oX0Xaiy/IgKp6JQpGaI=","beginning_cross_street":"North of New Jersey Turnpike","ending_cross_street":"North of CR 673/Fellowship Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.958221,39.929702]]}},{"id":"+2Ik5CM6DV0aEzzlos+wRqE8gqg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-09T04:04:37Z"},"road_event_id":"+2Ik5CM6DV0aEzzlos+wRqE8gqg=","beginning_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.560539,40.706226]]}},{"id":"jNAFsOggSySnmpDWSMCuJgPlsTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, left lane closed","update_date":"2026-05-09T04:04:38Z"},"road_event_id":"jNAFsOggSySnmpDWSMCuJgPlsTE=","beginning_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.560539,40.706226]]}},{"id":"oWKU9TvPae457b/aCP0JMk6Gm1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound near South of CR 12A/Navesink River Rd (Middletown Twp), Friday May 15, 2026 07:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-05-09T04:04:26Z"},"road_event_id":"oWKU9TvPae457b/aCP0JMk6Gm1c=","beginning_cross_street":"South of CR 12A/Navesink River Rd","ending_cross_street":"Coopers Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078414,40.358901]]}},{"id":"BtOrMR+uMaabUtoFIa8NlNyQ+C0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near North of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 06:00 AM)","update_date":"2026-05-09T04:04:28Z"},"road_event_id":"BtOrMR+uMaabUtoFIa8NlNyQ+C0=","beginning_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.561393,40.704929]]}},{"id":"Am05YFJWaIiGcmCGKsMsLwU0Fjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 30 - North Maple Ave (Bernards Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, left lane closed","update_date":"2026-05-09T04:04:29Z"},"road_event_id":"Am05YFJWaIiGcmCGKsMsLwU0Fjk=","beginning_cross_street":"South of Exit 30 - North Maple Ave","ending_cross_street":"South of Exit 30 - North Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.556236,40.712688]]}},{"id":"citVYZk+cgCnIvyosHhkfjsjjDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound between I-295 (Hamilton Twp) and West of Exit 16 - CR 537/Great Adventure (Millstone Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, left lane closed, moving operation","update_date":"2026-05-09T04:04:31Z"},"road_event_id":"citVYZk+cgCnIvyosHhkfjsjjDE=","beginning_cross_street":"I-295","ending_cross_street":"West of Exit 16 - CR 537/Great Adventure","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.72351,40.183963]]}},{"id":"DcBcgy0NUrdGseg7NfJXulqmDy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between US 322 (Logan Twp) and North of I-295/US 40 (Pennsville Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, , moving operation","update_date":"2026-05-09T04:04:24Z"},"road_event_id":"DcBcgy0NUrdGseg7NfJXulqmDy8=","beginning_cross_street":"US 322","ending_cross_street":"North of I-295/US 40","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.349075,39.80278]]}},{"id":"ic4njinEPWsHz4E8GGFq+y7IZRQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between North of CR 550/Woodbine Ocean View Rd (Dennis Twp) and South of NJ 50 (Upper Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-09T04:04:25Z"},"road_event_id":"ic4njinEPWsHz4E8GGFq+y7IZRQ=","beginning_cross_street":"North of CR 550/Woodbine Ocean View Rd","ending_cross_street":"South of NJ 50","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.72451,39.185642]]}},{"id":"Y37UC4UK4q4iO/fK0d6ZQ5IDvfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound between CR 555/Stagecoach Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Wednesday May 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-09T04:05:06Z"},"road_event_id":"Y37UC4UK4q4iO/fK0d6ZQ5IDvfE=","beginning_cross_street":"CR 555/Stagecoach Rd","ending_cross_street":"South of CR 655/Fries Mill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.032798,39.729408]]}},{"id":"yCs9WrLVN4LBNpa9eO3vFCUs44Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound near West of CR 503/Liberty St (South Hackensack Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:05:08Z"},"road_event_id":"yCs9WrLVN4LBNpa9eO3vFCUs44Y=","beginning_cross_street":"West of CR 503/Liberty St","ending_cross_street":"CR 503/Liberty St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.044677,40.85519]]}},{"id":"97sFoodluNH6W+9QpsuW+9/vPtU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound between I-295 (Mount Laurel Twp) and South of NJ 38 (Maple Shade Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM)","update_date":"2026-05-09T04:04:56Z"},"road_event_id":"97sFoodluNH6W+9QpsuW+9/vPtU=","beginning_cross_street":"I-295","ending_cross_street":"South of NJ 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.965492,39.934547]]}},{"id":"Rtmf8GivyqrhMWO/0cR4mvzXt2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between North of Ernston Rd (Sayreville) and North of Birchwood Dr (Old Bridge Twp), Friday May 15, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-05-09T04:05:01Z"},"road_event_id":"Rtmf8GivyqrhMWO/0cR4mvzXt2M=","beginning_cross_street":"North of Ernston Rd","ending_cross_street":"North of Birchwood Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.278411,40.465423]]}},{"id":"+kQrum+QvmWRSbhoIoH+gztjwGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between West of CR 614/Cologne Av (Hamilton Twp) and US 322 (Hamilton Twp), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-09T04:05:02Z"},"road_event_id":"+kQrum+QvmWRSbhoIoH+gztjwGM=","beginning_cross_street":"West of CR 614/Cologne Av","ending_cross_street":"US 322","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.673698,39.44857]]}},{"id":"Q/yd6qImcS3ikZl06J22TixXYc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of I-295/US 40 (Pennsville Twp) and US 322 (Logan Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, , moving operation","update_date":"2026-05-09T04:05:04Z"},"road_event_id":"Q/yd6qImcS3ikZl06J22TixXYc8=","beginning_cross_street":"North of I-295/US 40","ending_cross_street":"US 322","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.492034,39.681301]]}},{"id":"Im/BKhJyNpsACglNIQuNd4CM/ZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound between Ocean Av (Point Pleasant Beach) and South of CR 635/Broadway (Point Pleasant Beach), Friday May 15, 2026 08:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-05-09T04:04:52Z"},"road_event_id":"Im/BKhJyNpsACglNIQuNd4CM/ZQ=","beginning_cross_street":"Ocean Av","ending_cross_street":"South of CR 635/Broadway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042457,40.077541]]}},{"id":"QE7Z7svaguECfMTzt8EWT7PkFLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound near North of CR 616/Church Rd (Mount Laurel Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-09T04:04:53Z"},"road_event_id":"QE7Z7svaguECfMTzt8EWT7PkFLA=","beginning_cross_street":"North of CR 616/Church Rd","ending_cross_street":"South of New Jersey Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.94841,39.922973]]}},{"id":"eqpOoiEzrb9Ou/2IrVqPyH1BfFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and North of CR 631/Franklin Av (Franklin Twp), Wednesday May 13, 2026 08:00 AM thru 04:00 PM, right shoulder closed, moving operation","update_date":"2026-05-09T04:04:54Z"},"road_event_id":"eqpOoiEzrb9Ou/2IrVqPyH1BfFc=","beginning_cross_street":"North of Holland Mountain Rd","ending_cross_street":"North of CR 631/Franklin Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.529808,41.095325]]}},{"id":"fJKGWKhWQZlP7B4pK6KPcfq8g9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Westbound between East of CR 651/Fire Rd (Egg Harbor Twp) and US 322 (Hamilton Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-09T04:04:44Z"},"road_event_id":"fJKGWKhWQZlP7B4pK6KPcfq8g9Y=","beginning_cross_street":"East of CR 651/Fire Rd","ending_cross_street":"US 322","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.549751,39.397087]]}},{"id":"zOadaGFvE0dnZvCOqmjYc/PWt3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound between North of NJ 70 (Evesham Twp) and NJ 38 (Maple Shade Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-09T04:04:48Z"},"road_event_id":"zOadaGFvE0dnZvCOqmjYc/PWt3s=","beginning_cross_street":"North of NJ 70","ending_cross_street":"NJ 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.928695,39.895069]]}},{"id":"2qOVcNbp51ytLW1RUe+b7Bo7OGA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound near East of CR 654/Cherry Hill Rd (Parsippany-Troy Hills Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, left lane closed","update_date":"2026-05-09T04:05:22Z"},"road_event_id":"2qOVcNbp51ytLW1RUe+b7Bo7OGA=","beginning_cross_street":"East of CR 654/Cherry Hill Rd","ending_cross_street":"West of I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.43399,40.874134]]}},{"id":"tH3aqy4r9/W1l0bZVat66sFCsfo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and East of CR 654/Cherry Hill Rd (Parsippany-Troy Hills Twp), Friday May 15, 2026 09:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-09T04:05:23Z"},"road_event_id":"tH3aqy4r9/W1l0bZVat66sFCsfo=","beginning_cross_street":"West of I-287","ending_cross_street":"East of CR 654/Cherry Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.419418,40.870544]]}},{"id":"r8YwRTO/pajpsaKh32MaxTOeAHE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound between North of Howard Blvd (Mount Laurel Twp) and North of NJ 70 (Evesham Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 07:00 AM, right lane closed","update_date":"2026-05-09T04:05:27Z"},"road_event_id":"r8YwRTO/pajpsaKh32MaxTOeAHE=","beginning_cross_street":"North of Howard Blvd","ending_cross_street":"North of NJ 70","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.953933,39.926879]]}},{"id":"3z8aFjA15d/Ovm9sS9bxLTSXo6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Sip Av (Jersey City), Friday May 15, 2026 09:00 PM thru Saturday May 16, 2026 12:00 AM, left lane closed","update_date":"2026-05-09T04:05:29Z"},"road_event_id":"3z8aFjA15d/Ovm9sS9bxLTSXo6M=","beginning_cross_street":"Sip Av","ending_cross_street":"North of Charlotte Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081649,40.734077]]}},{"id":"icc2D3Vc0OFin4h2L/i3QblQom0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between North of Ernston Rd (Sayreville) and North of Birchwood Dr (Old Bridge Twp), Wednesday May 13, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-05-09T04:05:19Z"},"road_event_id":"icc2D3Vc0OFin4h2L/i3QblQom0=","beginning_cross_street":"North of Ernston Rd","ending_cross_street":"North of Birchwood Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.278411,40.465423]]}},{"id":"3pf3ybuWZHgodMg0RJLoOzH3oAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between US 322 (Hamilton Twp) and East of CR 651/Fire Rd (Egg Harbor Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-09T04:05:20Z"},"road_event_id":"3pf3ybuWZHgodMg0RJLoOzH3oAk=","beginning_cross_street":"US 322","ending_cross_street":"East of CR 651/Fire Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.642486,39.4505]]}},{"id":"F0I+SJTAdrK3f/gVWjqlFIddMCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound near South of CR 12A/Navesink River Rd (Middletown Twp), Thursday May 14, 2026 07:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-05-09T04:05:10Z"},"road_event_id":"F0I+SJTAdrK3f/gVWjqlFIddMCo=","beginning_cross_street":"South of CR 12A/Navesink River Rd","ending_cross_street":"Coopers Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078414,40.358901]]}},{"id":"CNyiYhTE7mDaVaFk1nGSKu7rN08=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Westbound between East of CR 651/Fire Rd (Egg Harbor Twp) and US 322 (Hamilton Twp), Friday May 15, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-09T04:05:11Z"},"road_event_id":"CNyiYhTE7mDaVaFk1nGSKu7rN08=","beginning_cross_street":"East of CR 651/Fire Rd","ending_cross_street":"US 322","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.549751,39.397087]]}},{"id":"WHWJQ1IuUS7R6Xun6dFkdivwyiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound at north of Exit 69 - US 206 (Lawrence Twp) Wednesday May 13, 2026 11:00 PM thru Thursday May 14, 2026 03:00 AM, ramp","update_date":"2026-05-09T04:05:14Z"},"road_event_id":"WHWJQ1IuUS7R6Xun6dFkdivwyiM=","beginning_cross_street":"north of Exit 69 - US 206","ending_cross_street":"north of Exit 69 - US 206","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.733474,40.285766]]}},{"id":"auG+b/b6nnaiJG4RioriZGsJ/jE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound at Exit 48 - Hook Mountain Rd (Montville Twp) Friday May 15, 2026 11:00 PM thru Saturday May 16, 2026 05:00 AM, ramp","update_date":"2026-05-09T04:05:48Z"},"road_event_id":"auG+b/b6nnaiJG4RioriZGsJ/jE=","beginning_cross_street":"Exit 48 - Hook Mountain Rd","ending_cross_street":"Exit 48 - Hook Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.34201,40.861568]]}},{"id":"P+0vg3pwjfaZEA8kzShA1tzytFU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near South of Exit 37 - NJ 24 (Morris Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 08:00 PM to 06:00 AM)","update_date":"2026-05-09T04:05:50Z"},"road_event_id":"P+0vg3pwjfaZEA8kzShA1tzytFU=","beginning_cross_street":"South of Exit 37 - NJ 24","ending_cross_street":"South of Exit 37 - NJ 24","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.458641,40.803741]]}},{"id":"Qg9rpukAUmdwPy1P4Cl1j3a2F5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound near South of Hollywood Av (Ho-Ho-Kus), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-09T04:05:53Z"},"road_event_id":"Qg9rpukAUmdwPy1P4Cl1j3a2F5M=","beginning_cross_street":"South of Hollywood Av","ending_cross_street":"North of Hollywood Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.100723,40.999984]]}},{"id":"z+94N8fy2+VPVh05IeK4EQuP9qM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near South of Exit 37 - NJ 24 (Morris Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-09T04:05:54Z"},"road_event_id":"z+94N8fy2+VPVh05IeK4EQuP9qM=","beginning_cross_street":"South of Exit 37 - NJ 24","ending_cross_street":"South of Exit 37 - NJ 24","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.458641,40.803741]]}},{"id":"EsVyWeUt16Ypam/tUSErw1Yem7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound between North of Howard Blvd (Mount Laurel Twp) and North of NJ 70 (Evesham Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:05:46Z"},"road_event_id":"EsVyWeUt16Ypam/tUSErw1Yem7A=","beginning_cross_street":"North of Howard Blvd","ending_cross_street":"North of NJ 70","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.953933,39.926879]]}},{"id":"/WBl696NFuCF80mwJthz7OjI7W4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 37"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 37 between East of Tunney Bridge-Westbound (Dover Twp) and West of Mathis Bridge-Eastbound (Toms River Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-05-09T04:05:47Z"},"road_event_id":"/WBl696NFuCF80mwJthz7OjI7W4=","beginning_cross_street":"East of Tunney Bridge-Westbound","ending_cross_street":"West of Mathis Bridge-Eastbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.089477,39.942928]]}},{"id":"JTcKwMcBdOJ8QYkSYVYGuMVkyo0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between North of Ernston Rd (Sayreville) and North of Morgan Drawbridge (Sayreville), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:05:36Z"},"road_event_id":"JTcKwMcBdOJ8QYkSYVYGuMVkyo0=","beginning_cross_street":"North of Ernston Rd","ending_cross_street":"North of Morgan Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.278411,40.465423]]}},{"id":"PSIol5MIMGHOZLbyZYW/UILpQgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between US 322 (Hamilton Twp) and East of CR 651/Fire Rd (Egg Harbor Twp), Friday May 15, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-09T04:05:37Z"},"road_event_id":"PSIol5MIMGHOZLbyZYW/UILpQgY=","beginning_cross_street":"US 322","ending_cross_street":"East of CR 651/Fire Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.642486,39.4505]]}},{"id":"IKjz9d2lQqGOVdRg9P0YW9dIFbA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 at East of NJ 70/CR 601 (Pennsauken Twp) Friday May 15, 2026 11:00 PM thru Saturday May 16, 2026 05:00 AM, ramp","update_date":"2026-05-09T04:05:38Z"},"road_event_id":"IKjz9d2lQqGOVdRg9P0YW9dIFbA=","beginning_cross_street":"East of NJ 70/CR 601","ending_cross_street":"East of NJ 70/CR 601","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.067802,39.935279]]}},{"id":"02yaT/RJoFVEEVXx/KdjzllP7Tg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 37 - NJ 24 (Hanover Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-09T04:05:39Z"},"road_event_id":"02yaT/RJoFVEEVXx/KdjzllP7Tg=","beginning_cross_street":"South of Exit 37 - NJ 24","ending_cross_street":"South of Exit 37 - NJ 24","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.452835,40.807491]]}},{"id":"dObDwrxcZMvp6nBcnS0eU6WCCZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 37 - NJ 24 (Hanover Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 08:00 PM to 06:00 AM)","update_date":"2026-05-09T04:05:40Z"},"road_event_id":"dObDwrxcZMvp6nBcnS0eU6WCCZQ=","beginning_cross_street":"South of Exit 37 - NJ 24","ending_cross_street":"South of Exit 37 - NJ 24","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.452835,40.807491]]}},{"id":"bi4Zrk3C0NLJO7zeaIdqmJ0Au+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between Summit Ave (Hackensack) and NJ 4 (Paramus), Friday May 15, 2026 11:00 PM thru Saturday May 16, 2026 06:00 AM, left lane closed","update_date":"2026-05-09T04:05:43Z"},"road_event_id":"bi4Zrk3C0NLJO7zeaIdqmJ0Au+Y=","beginning_cross_street":"Summit Ave","ending_cross_street":"NJ 4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.06356,40.878772]]}},{"id":"+9Owo455l48oWUlsVwpOmnsOHHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound near North of Charlotte Circle (Jersey City), Friday May 15, 2026 09:00 PM thru Saturday May 16, 2026 12:00 AM, left lane closed","update_date":"2026-05-09T04:05:44Z"},"road_event_id":"+9Owo455l48oWUlsVwpOmnsOHHw=","beginning_cross_street":"North of Charlotte Circle","ending_cross_street":"Sip Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.074012,40.738357]]}},{"id":"PjbmA6yL39pX1LZGhA0mWVCgnO8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near North of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-09T04:06:14Z"},"road_event_id":"PjbmA6yL39pX1LZGhA0mWVCgnO8=","beginning_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.561393,40.704929]]}},{"id":"4E7AyPzfGOdGP4YW5betYG8NM6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound between North of NJ 70 (Evesham Twp) and NJ 38 (Maple Shade Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-09T04:06:17Z"},"road_event_id":"4E7AyPzfGOdGP4YW5betYG8NM6M=","beginning_cross_street":"North of NJ 70","ending_cross_street":"NJ 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.928695,39.895069]]}},{"id":"XvzCG773DjXU9GQiXbnhDBplNao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Northbound between South of Kennedy Boulevard (Bayonne) and South of US 1&9 Truck Route/Communipaw Av (Jersey City), Friday May 15, 2026 09:00 PM thru Saturday May 16, 2026 05:00 AM, left lane closed","update_date":"2026-05-09T04:06:09Z"},"road_event_id":"XvzCG773DjXU9GQiXbnhDBplNao=","beginning_cross_street":"South of Kennedy Boulevard","ending_cross_street":"South of US 1&9 Truck Route/Communipaw Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104354,40.691184]]}},{"id":"uvghoI/m+TElwhUoTr+Vo7iatGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of NJ 159/CR 627/Plymouth Rd (Fairfield Twp) and East of CR 613/Passaic Ave (Fairfield Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 07:00 AM, left lane closed","update_date":"2026-05-09T04:06:10Z"},"road_event_id":"uvghoI/m+TElwhUoTr+Vo7iatGg=","beginning_cross_street":"West of NJ 159/CR 627/Plymouth Rd","ending_cross_street":"East of CR 613/Passaic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.311561,40.868106]]}},{"id":"STev6axpgIFwTo5vdrtffjGtak8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound between South of Morgan Drawbridge (Old Bridge Twp) and Ernston Rd (Sayreville), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:06:12Z"},"road_event_id":"STev6axpgIFwTo5vdrtffjGtak8=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"YbwSvte3sxAXLkn+j6YrwR3FOTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of I-295/US 40 (Pennsville Twp) and US 322 (Logan Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, , moving operation","update_date":"2026-05-09T04:06:13Z"},"road_event_id":"YbwSvte3sxAXLkn+j6YrwR3FOTo=","beginning_cross_street":"North of I-295/US 40","ending_cross_street":"US 322","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.492034,39.681301]]}},{"id":"Pxle8hcrt3Dxm3LwbSeWKVeLuPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 37 - NJ 24 (Hanover Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-09T04:06:02Z"},"road_event_id":"Pxle8hcrt3Dxm3LwbSeWKVeLuPo=","beginning_cross_street":"South of Exit 37 - NJ 24","ending_cross_street":"South of Exit 37 - NJ 24","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.452835,40.807491]]}},{"id":"8V5BZA8Ny25HSWOlganEW2sKt7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound near West of CR 503/Liberty St (South Hackensack Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:06:03Z"},"road_event_id":"8V5BZA8Ny25HSWOlganEW2sKt7s=","beginning_cross_street":"West of CR 503/Liberty St","ending_cross_street":"CR 503/Liberty St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.044677,40.85519]]}},{"id":"67Ic4og5xZNtzI+H1WAG3oDcaJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound between I-295 (Mount Laurel Twp) and South of NJ 38 (Maple Shade Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 06:00 AM)","update_date":"2026-05-09T04:06:04Z"},"road_event_id":"67Ic4og5xZNtzI+H1WAG3oDcaJ0=","beginning_cross_street":"I-295","ending_cross_street":"South of NJ 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.965492,39.934547]]}},{"id":"KkwbgJ+tSWknReWWEd/bo5EINsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound between North of Howard Blvd (Mount Laurel Twp) and North of NJ 70 (Evesham Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:06:05Z"},"road_event_id":"KkwbgJ+tSWknReWWEd/bo5EINsM=","beginning_cross_street":"North of Howard Blvd","ending_cross_street":"North of NJ 70","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.953933,39.926879]]}},{"id":"JB0xnYUNEPvpEfkctDGtWqTj45s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between North of Ernston Rd (Sayreville) and North of Morgan Drawbridge (Sayreville), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:06:07Z"},"road_event_id":"JB0xnYUNEPvpEfkctDGtWqTj45s=","beginning_cross_street":"North of Ernston Rd","ending_cross_street":"North of Morgan Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.278411,40.465423]]}},{"id":"LO9xPCqxY1chh/LfKpSlc6otGRc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Westbound between East of CR 651/Fire Rd (Egg Harbor Twp) and US 322 (Hamilton Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-09T04:06:08Z"},"road_event_id":"LO9xPCqxY1chh/LfKpSlc6otGRc=","beginning_cross_street":"East of CR 651/Fire Rd","ending_cross_street":"US 322","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.549751,39.397087]]}},{"id":"x9uE7bsZhYw4Kr7nF72Q5KmSLnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 139 Lower"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 139 Lower Westbound near Jersey Ave (Jersey City), Thursday May 14, 2026 10:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:05:56Z"},"road_event_id":"x9uE7bsZhYw4Kr7nF72Q5KmSLnA=","beginning_cross_street":"Jersey Ave","ending_cross_street":"East of Jersey Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.045616,40.730514]]}},{"id":"2MW75FXLTCngjQksZvVZ9t2UxsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound between North of CR 655/Fries Mill Rd (Washington Twp) and North of CR 651/Greentree Rd (Washington Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:05:57Z"},"road_event_id":"2MW75FXLTCngjQksZvVZ9t2UxsI=","beginning_cross_street":"North of CR 655/Fries Mill Rd","ending_cross_street":"North of CR 651/Greentree Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.045402,39.748291]]}},{"id":"xy9TNFxXEhJ6WECxumGAZVriHQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound between North of NJ 70 (Evesham Twp) and NJ 38 (Maple Shade Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-09T04:05:31Z"},"road_event_id":"xy9TNFxXEhJ6WECxumGAZVriHQI=","beginning_cross_street":"North of NJ 70","ending_cross_street":"NJ 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.928695,39.895069]]}},{"id":"QQ8toiOOcwzPjc8aevfL/DQfN2c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound near North of CR 616/Church Rd (Mount Laurel Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 06:00 AM)","update_date":"2026-05-09T04:06:37Z"},"road_event_id":"QQ8toiOOcwzPjc8aevfL/DQfN2c=","beginning_cross_street":"North of CR 616/Church Rd","ending_cross_street":"South of New Jersey Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.94841,39.922973]]}},{"id":"tWPy31zPx8Js9b/lcfOgBLJAXfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Westbound near West of CR 646/Delilah Rd (Hamilton Twp), Thursday May 14, 2026 09:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:06:38Z"},"road_event_id":"tWPy31zPx8Js9b/lcfOgBLJAXfs=","beginning_cross_street":"West of CR 646/Delilah Rd","ending_cross_street":"East of CR 575/Rangleboro Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.621528,39.441162]]}},{"id":"nY87nBMnSK3+byncII4IwYKV/RM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between West of CR 614/Cologne Av (Hamilton Twp) and US 322 (Hamilton Twp), Thursday May 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-09T04:06:32Z"},"road_event_id":"nY87nBMnSK3+byncII4IwYKV/RM=","beginning_cross_street":"West of CR 614/Cologne Av","ending_cross_street":"US 322","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.673698,39.44857]]}},{"id":"AdEVhQ9/6HNyllnF3NtxYQToL/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 37"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 37 between East of Tunney Bridge-Westbound (Dover Twp) and West of Mathis Bridge-Eastbound (Toms River Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-05-09T04:06:33Z"},"road_event_id":"AdEVhQ9/6HNyllnF3NtxYQToL/o=","beginning_cross_street":"East of Tunney Bridge-Westbound","ending_cross_street":"West of Mathis Bridge-Eastbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.089477,39.942928]]}},{"id":"R9MT0fMopRr5bw66pAgGuG+qTC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between South of CR 617/Harbor Inn Rd (Berkeley Twp) and South of Bay Pkwy (Ocean Twp), Wednesday May 13, 2026 10:00 PM thru Thursday May 14, 2026 05:00 AM, right shoulder closed, moving operation","update_date":"2026-05-09T04:06:35Z"},"road_event_id":"R9MT0fMopRr5bw66pAgGuG+qTC4=","beginning_cross_street":"South of CR 617/Harbor Inn Rd","ending_cross_street":"South of Bay Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.168357,39.868789]]}},{"id":"vIDYwUOhC6TQ6M/pX/4CKSHvORM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound between South of Morgan Drawbridge (Old Bridge Twp) and Ernston Rd (Sayreville), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:06:26Z"},"road_event_id":"vIDYwUOhC6TQ6M/pX/4CKSHvORM=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"LVNRWItkwfRlXIPPmp47e6jeNhU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 37 - NJ 24 (Hanover Twp), Friday May 15, 2026 09:00 PM thru Saturday May 16, 2026 07:00 AM, at least one lane closed","update_date":"2026-05-09T04:06:28Z"},"road_event_id":"LVNRWItkwfRlXIPPmp47e6jeNhU=","beginning_cross_street":"South of Exit 37 - NJ 24","ending_cross_street":"South of Exit 37 - NJ 24","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.452835,40.807491]]}},{"id":"EfgyTS/Auqa+IFhtNBKwMhxkjLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 76 - NJ 29 (Ewing Twp) and south of Exit 72 - NJ 31 (Hopewell Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 08:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 07:00 AM)","update_date":"2026-05-09T04:06:29Z"},"road_event_id":"EfgyTS/Auqa+IFhtNBKwMhxkjLc=","beginning_cross_street":"Exit 76 - NJ 29","ending_cross_street":"south of Exit 72 - NJ 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844207,40.260536]]}},{"id":"lWdiaHfMNSXrthko2p47pyijMhs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between South of Cindy St (Old Bridge Twp) and South of Woodbridge Av (Woodbridge Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, , moving operation","update_date":"2026-05-09T04:06:30Z"},"road_event_id":"lWdiaHfMNSXrthko2p47pyijMhs=","beginning_cross_street":"South of Cindy St","ending_cross_street":"South of Woodbridge Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.307998,40.388965]]}},{"id":"ps9wq1E/STjSTRo46q++CCZErEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound near North of New Jersey Turnpike (Mount Laurel Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-09T04:06:22Z"},"road_event_id":"ps9wq1E/STjSTRo46q++CCZErEI=","beginning_cross_street":"North of New Jersey Turnpike","ending_cross_street":"North of CR 673/Fellowship Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.958221,39.929702]]}},{"id":"AN5ELPmvmZ8Ca/7fR23xjdvR/Kg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound near North of CR 616/Church Rd (Mount Laurel Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-09T04:06:40Z"},"road_event_id":"AN5ELPmvmZ8Ca/7fR23xjdvR/Kg=","beginning_cross_street":"North of CR 616/Church Rd","ending_cross_street":"South of New Jersey Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.94841,39.922973]]}},{"id":"85WT9OZGy1B3LiCiDt4a+nrXfDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound near West of CR 503/Liberty St (South Hackensack Twp), Wednesday May 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-09T04:06:46Z"},"road_event_id":"85WT9OZGy1B3LiCiDt4a+nrXfDI=","beginning_cross_street":"West of CR 503/Liberty St","ending_cross_street":"CR 503/Liberty St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.044677,40.85519]]}},{"id":"ukBh5f7Ovw4A45QHcQawFzGfqmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 30 - North Maple Ave (Bernards Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-09T04:07:00Z"},"road_event_id":"ukBh5f7Ovw4A45QHcQawFzGfqmA=","beginning_cross_street":"South of Exit 30 - North Maple Ave","ending_cross_street":"South of Exit 30 - North Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.556236,40.712688]]}},{"id":"ISHsV+8HZO8Qp+4Vm4t9qlAsZ48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near South of Exit 30 - North Maple Ave (Bernards Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 06:00 AM)","update_date":"2026-05-09T04:06:49Z"},"road_event_id":"ISHsV+8HZO8Qp+4Vm4t9qlAsZ48=","beginning_cross_street":"South of Exit 30 - North Maple Ave","ending_cross_street":"South of Exit 30 - North Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.557067,40.71138]]}},{"id":"xKmRmxwRUNcHmoxENd3yrFCwYps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and North of CR 631/Franklin Av (Franklin Twp), Friday May 15, 2026 08:00 AM thru 04:00 PM, right shoulder closed, moving operation","update_date":"2026-05-09T04:07:08Z"},"road_event_id":"xKmRmxwRUNcHmoxENd3yrFCwYps=","beginning_cross_street":"North of Holland Mountain Rd","ending_cross_street":"North of CR 631/Franklin Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.529808,41.095325]]}},{"id":"L0BRY46Mzs8eiGu86TQNNnj5YcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound at North of Sip Av (Jersey City) Friday May 15, 2026 09:00 PM thru Saturday May 16, 2026 12:00 AM, ramp, left partial lane","update_date":"2026-05-09T04:06:51Z"},"road_event_id":"L0BRY46Mzs8eiGu86TQNNnj5YcI=","beginning_cross_street":"North of Sip Av","ending_cross_street":"North of Sip Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.079093,40.736366]]}},{"id":"KKcUPAMHbLqP3exPLhut3UQnVEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 76 - NJ 29 (Ewing Twp) and south of Exit 72 - NJ 31 (Hopewell Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 08:00 AM, at least one lane closed","update_date":"2026-05-09T04:06:50Z"},"road_event_id":"KKcUPAMHbLqP3exPLhut3UQnVEU=","beginning_cross_street":"Exit 76 - NJ 29","ending_cross_street":"south of Exit 72 - NJ 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844207,40.260536]]}},{"id":"MmxrO5L3xHJozfEOWUYaLCAKcPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Friday May 15, 2026 10:00 PM thru Saturday May 16, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:06:58Z"},"road_event_id":"MmxrO5L3xHJozfEOWUYaLCAKcPM=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"In the vicinity of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"9LdKtQYoyg71IO0uP+Xr2pUPYIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:06:55Z"},"road_event_id":"9LdKtQYoyg71IO0uP+Xr2pUPYIk=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"bRe0gLp8MDRCe8vIrcgAgJrMLJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound between CR 555/Stagecoach Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Thursday May 14, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-09T04:06:56Z"},"road_event_id":"bRe0gLp8MDRCe8vIrcgAgJrMLJc=","beginning_cross_street":"CR 555/Stagecoach Rd","ending_cross_street":"South of CR 655/Fries Mill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.032798,39.729408]]}},{"id":"nryk3RcVq2qb1nwBZuMp3TlY0R0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between US 322 (Hamilton Twp) and East of CR 651/Fire Rd (Egg Harbor Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-09T04:06:54Z"},"road_event_id":"nryk3RcVq2qb1nwBZuMp3TlY0R0=","beginning_cross_street":"US 322","ending_cross_street":"East of CR 651/Fire Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.642486,39.4505]]}},{"id":"P2J/fVrIHUbi2td83i6NL4T8YGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound at I-280 (Newark) Friday May 15, 2026 11:00 PM thru Saturday May 16, 2026 05:00 AM, ramp","update_date":"2026-05-09T04:06:45Z"},"road_event_id":"P2J/fVrIHUbi2td83i6NL4T8YGQ=","beginning_cross_street":"I-280","ending_cross_street":"I-280","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.167442,40.74731]]}},{"id":"/+7wtTJGujkC5NxAKO/RtnD0npo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound near East of CR 575/Rangleboro Rd (Hamilton Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:06:44Z"},"road_event_id":"/+7wtTJGujkC5NxAKO/RtnD0npo=","beginning_cross_street":"East of CR 575/Rangleboro Rd","ending_cross_street":"West of CR 646/Delilah Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.629058,39.445468]]}},{"id":"VJcD1WEfPu4U0IAq5ucWBPb8GbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound between North of I-78 (Newark) and North of Exit 13 - Ackerman Av (Clifton), Saturday May 16, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-09T04:06:43Z"},"road_event_id":"VJcD1WEfPu4U0IAq5ucWBPb8GbY=","beginning_cross_street":"North of I-78","ending_cross_street":"North of Exit 13 - Ackerman Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T18:00:00Z","end_date":"2026-05-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.183456,40.713314]]}},{"id":"MXSWN76cPn+syHw2IJAEwMzTjlo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-09T04:06:42Z"},"road_event_id":"MXSWN76cPn+syHw2IJAEwMzTjlo=","beginning_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.560539,40.706226]]}},{"id":"I3VDSgqmNU1kK2JmUbPB6gHIaLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 37 - NJ 24 (Hanover Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 08:00 PM to 05:00 AM)","update_date":"2026-05-09T04:07:21Z"},"road_event_id":"I3VDSgqmNU1kK2JmUbPB6gHIaLY=","beginning_cross_street":"South of Exit 37 - NJ 24","ending_cross_street":"South of Exit 37 - NJ 24","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.452835,40.807491]]}},{"id":"ehfqan1fC4lel47TD1P6zf0uSfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 at West of NJ 70/CR 601 (Pennsauken Twp) Friday May 15, 2026 11:00 PM thru Saturday May 16, 2026 05:00 AM, ramp","update_date":"2026-05-09T04:07:24Z"},"road_event_id":"ehfqan1fC4lel47TD1P6zf0uSfQ=","beginning_cross_street":"West of NJ 70/CR 601","ending_cross_street":"West of NJ 70/CR 601","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.076873,39.93404]]}},{"id":"ZAN3ULMxesApSjHVEPQ0GnnXnkg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-09T04:07:26Z"},"road_event_id":"ZAN3ULMxesApSjHVEPQ0GnnXnkg=","beginning_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.560539,40.706226]]}},{"id":"6dFAJQvFWwNuHekUaqYI5ZuatD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 37"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 37 between East of Tunney Bridge-Westbound (Dover Twp) and West of Mathis Bridge-Eastbound (Toms River Twp), Friday May 15, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-05-09T04:07:06Z"},"road_event_id":"6dFAJQvFWwNuHekUaqYI5ZuatD8=","beginning_cross_street":"East of Tunney Bridge-Westbound","ending_cross_street":"West of Mathis Bridge-Eastbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.089477,39.942928]]}},{"id":"+uh28eIzkkvA0sZTje5W7Q72OxM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound at North of Sip Av (Jersey City) Friday May 15, 2026 09:00 PM thru Saturday May 16, 2026 12:00 AM, ramp","update_date":"2026-05-09T04:07:18Z"},"road_event_id":"+uh28eIzkkvA0sZTje5W7Q72OxM=","beginning_cross_street":"North of Sip Av","ending_cross_street":"North of Sip Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.079093,40.736366]]}},{"id":"qBN8AoQ82wMdOCniNr063EkM93Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound near North of CR 639/Ganttown Rd (Washington Twp), Wednesday May 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-09T04:07:17Z"},"road_event_id":"qBN8AoQ82wMdOCniNr063EkM93Q=","beginning_cross_street":"North of CR 639/Ganttown Rd","ending_cross_street":"North of CR 651/Greentree Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.046707,39.75518]]}},{"id":"4Gi5wtduPTTmybWLd9S1XdxbFZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near South of Exit 30 - North Maple Ave (Bernards Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-09T04:07:07Z"},"road_event_id":"4Gi5wtduPTTmybWLd9S1XdxbFZk=","beginning_cross_street":"South of Exit 30 - North Maple Ave","ending_cross_street":"South of Exit 30 - North Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.557067,40.71138]]}},{"id":"womIfvz3BdxuT9Kc1t1JzyOazAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between Garden Terrace (North Arlington) and North of Midland Av (Paramus), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right lane closed","update_date":"2026-05-09T04:07:10Z"},"road_event_id":"womIfvz3BdxuT9Kc1t1JzyOazAQ=","beginning_cross_street":"Garden Terrace","ending_cross_street":"North of Midland Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.137557,40.783008]]}},{"id":"ZCAXa7jfNMwHH2VvLnzUo0MUI/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between South of CR 617/Harbor Inn Rd (Berkeley Twp) and South of Bay Pkwy (Ocean Twp), Friday May 15, 2026 10:00 PM thru Saturday May 16, 2026 05:00 AM, right shoulder closed, moving operation","update_date":"2026-05-09T04:07:14Z"},"road_event_id":"ZCAXa7jfNMwHH2VvLnzUo0MUI/Q=","beginning_cross_street":"South of CR 617/Harbor Inn Rd","ending_cross_street":"South of Bay Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.168357,39.868789]]}},{"id":"i2zv2obul3vzdIGoy/Gd6oi2JJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 30 - North Maple Ave (Bernards Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-09T04:07:12Z"},"road_event_id":"i2zv2obul3vzdIGoy/Gd6oi2JJU=","beginning_cross_street":"South of Exit 30 - North Maple Ave","ending_cross_street":"South of Exit 30 - North Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.556236,40.712688]]}},{"id":"KDKPZjh7lgFcmIDApg233aoUaHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound near North of CR 639/Ganttown Rd (Washington Twp), Thursday May 14, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-09T04:07:16Z"},"road_event_id":"KDKPZjh7lgFcmIDApg233aoUaHw=","beginning_cross_street":"North of CR 639/Ganttown Rd","ending_cross_street":"North of CR 651/Greentree Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.046707,39.75518]]}},{"id":"ORC300546159","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 531 WB service road"],"direction":"unknown","description":"Drainage improvements on NY 531 WB service road westbound between START ROUTE NY 531 WB service road; Elmgrove Road; NY 386 (Gates) and Rochester Technical Park (Gates) Not currently Scheduled","update_date":"2026-05-12T10:00:04Z"},"road_event_id":"ORC300546159","beginning_cross_street":"START ROUTE  NY 531 WB service road; Elmgrove Road; NY 386","ending_cross_street":"Rochester Technical Park","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-09T05:27:13Z","end_date":"2026-05-13T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-77.732857,43.158949]]}},{"id":"ZxXLT1mK4kWAdVSCQtEGyAC9J70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on I-490 eastbound between Exit 6 - NY 204 (Gates) and Howard Road; 940L; Howard Road (Gates), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 06:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-09T05:46:00Z"},"road_event_id":"ZxXLT1mK4kWAdVSCQtEGyAC9J70=","beginning_cross_street":"Exit 6 - NY 204","ending_cross_street":"Howard Road; 940L; Howard Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T16:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.721223,43.132035]]}},{"id":"+u3oKemtNnv7gzZgNaP4etbZiKk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on I-490 both directions between Exit 6 - NY 204 (Gates) and HOWARD RD (Gates), Thursday May 14th, 2026 thru Friday May 15th, 2026, 06:00 PM thru 06:00 AM All lanes closed intermittently","update_date":"2026-05-09T05:52:58Z"},"road_event_id":"+u3oKemtNnv7gzZgNaP4etbZiKk=","beginning_cross_street":"Exit 6 - NY 204","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T16:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.721272,43.131994]]}},{"id":"TGxBD7o2nHtOJvLsbwydAGyEK7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Eor18L0jj9IJGr4LRuRA6dpwFGY="}],"description":"Drainage improvements on I-490 westbound between Howard Road; 940L; Howard Road (Gates) and Exit 6 - NY 204 (Gates), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 10:00 PM thru 05:00 AM both shoulder closed intermittently","update_date":"2026-05-09T06:12:03Z"},"road_event_id":"TGxBD7o2nHtOJvLsbwydAGyEK7M=","beginning_cross_street":"Howard Road; 940L; Howard Road","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.691098,43.157428]]}},{"id":"Eor18L0jj9IJGr4LRuRA6dpwFGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TGxBD7o2nHtOJvLsbwydAGyEK7M="}],"description":"Drainage improvements on I-490 westbound between Howard Road; 940L; Howard Road (Gates) and Exit 6 - NY 204 (Gates), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 10:00 PM thru 05:00 AM both shoulder closed intermittently","update_date":"2026-05-09T06:12:03Z"},"road_event_id":"Eor18L0jj9IJGr4LRuRA6dpwFGY=","beginning_cross_street":"Howard Road; 940L; Howard Road","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.691098,43.157428]]}},{"id":"/qbTFMMIz+/JGCwkERcHNlMIpcM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-390 northbound over Canaserage Creek (West Sparta), Tuesday May 12th, 2026 thru Wednesday May 13th, 2026, Tuesday/Wednesday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-09T12:43:56Z"},"road_event_id":"/qbTFMMIz+/JGCwkERcHNlMIpcM=","beginning_cross_street":"Canaserage Creek","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.724356,42.570216]]}},{"id":"8hwnauGqhZi4le5m75uwRIMsI8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fPOnZXe9K23DNts21QHqMLxauBw="}],"description":"Gas main repairs on NY 7 eastbound between Burdett Avenue (Troy) and Reid Ave. (Troy), Sunday May 10th, 2026 thru Friday May 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-09T17:14:36Z"},"road_event_id":"8hwnauGqhZi4le5m75uwRIMsI8E=","beginning_cross_street":"Burdett Avenue","ending_cross_street":"Reid Ave.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.66962,42.738215]]}},{"id":"fPOnZXe9K23DNts21QHqMLxauBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8hwnauGqhZi4le5m75uwRIMsI8E="}],"description":"Gas main repairs on NY 7 eastbound between Burdett Avenue (Troy) and Reid Ave. (Troy), Sunday May 10th, 2026 thru Friday May 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-09T17:14:36Z"},"road_event_id":"fPOnZXe9K23DNts21QHqMLxauBw=","beginning_cross_street":"Burdett Avenue","ending_cross_street":"Reid Ave.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.66962,42.738215]]}},{"id":"2x0WnRC+NrPkQe+2FzCJAaQF4n4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-676"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Wednesday May 13, 2026 09:00 PM thru Thursday May 14, 2026 03:00 AM, at least one lane closed","update_date":"2026-05-09T18:33:28Z"},"road_event_id":"2x0WnRC+NrPkQe+2FzCJAaQF4n4=","beginning_cross_street":"North of Exit 4 - Atlantic Ave","ending_cross_street":"North of Exit 4 - Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.114044,39.930305]]}},{"id":"lpQy59xghYO7XWyTYRHF2e2DbjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-676"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Thursday May 14, 2026 09:00 PM thru Friday May 15, 2026 03:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 03:00 AM)","update_date":"2026-05-09T18:33:31Z"},"road_event_id":"lpQy59xghYO7XWyTYRHF2e2DbjA=","beginning_cross_street":"North of Exit 4 - Atlantic Ave","ending_cross_street":"North of Exit 4 - Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.114044,39.930305]]}},{"id":"ZYPm0CgJXshSnjTs0t9W792xG7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-676"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Thursday May 14, 2026 09:00 PM thru Friday May 15, 2026 03:00 AM, at least one lane closed","update_date":"2026-05-09T18:33:32Z"},"road_event_id":"ZYPm0CgJXshSnjTs0t9W792xG7o=","beginning_cross_street":"North of Exit 4 - Atlantic Ave","ending_cross_street":"North of Exit 4 - Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.114044,39.930305]]}},{"id":"EwHAepfmWrKZ1DYiB1aXVD8dU4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-676"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Wednesday May 13, 2026 09:00 PM thru Thursday May 14, 2026 03:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 03:00 AM)","update_date":"2026-05-09T18:33:35Z"},"road_event_id":"EwHAepfmWrKZ1DYiB1aXVD8dU4Y=","beginning_cross_street":"North of Exit 4 - Atlantic Ave","ending_cross_street":"North of Exit 4 - Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.114044,39.930305]]}},{"id":"djpV75bOslvPYmBrbsVGhQ7v03I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 19"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 19 Northbound near CR 509/Broad St (Clifton), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 04:00 AM, at least one lane closed","update_date":"2026-05-09T20:48:33Z"},"road_event_id":"djpV75bOslvPYmBrbsVGhQ7v03I=","beginning_cross_street":"CR 509/Broad St","ending_cross_street":"CR 621/Valley Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.16838,40.889301]]}},{"id":"swLU+E3pv2d0EqNihmUqjC9jDcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 19"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 19 Northbound near CR 509/Broad St (Clifton), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 04:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 04:00 AM)","update_date":"2026-05-09T20:48:29Z"},"road_event_id":"swLU+E3pv2d0EqNihmUqjC9jDcI=","beginning_cross_street":"CR 509/Broad St","ending_cross_street":"CR 621/Valley Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.16838,40.889301]]}},{"id":"Tsw/uLNtrKpYG3p25Q89iM6EbY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair and roadwork on Long Island Expressway/I-495 HOV Lane eastbound at Exit 43 - South Oyster Bay Road (Syosset), Wednesday May 13th, 2026, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-10T02:45:43Z"},"road_event_id":"Tsw/uLNtrKpYG3p25Q89iM6EbY8=","beginning_cross_street":"Exit 43 - South Oyster Bay Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.523124,40.788623]]}},{"id":"+pyx7CaR9o/yxvTSCaA6AHqJSGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair and roadwork on Meadowbrook State Parkway southbound in the vicinity of Exit M9E - Merrick Road (Hempstead), Thursday May 14th, 2026, 10:00 AM thru 03:00 PM 2 Right lanes of 3 lanes closed","update_date":"2026-05-10T02:48:45Z"},"road_event_id":"+pyx7CaR9o/yxvTSCaA6AHqJSGY=","beginning_cross_street":"Exit M9E - Merrick Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.566353,40.65127]]}},{"id":"4AjHeQjtF3gDElDG29X7heDNHsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 109"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair and roadwork on NY 109 westbound between Southern State Parkway (Babylon) and Broadhollow Road; NY 110 (Babylon), Friday May 15th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T02:51:12Z"},"road_event_id":"4AjHeQjtF3gDElDG29X7heDNHsg=","beginning_cross_street":"Southern State Parkway","ending_cross_street":"Broadhollow Road; NY 110","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.407886,40.718152]]}},{"id":"z0w9/mq8wdY1kIztA3b3U5HbJhM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 231"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair and overnight roadwork on NY 231 southbound between August Road; Ramp (Babylon) and CR-34 at MAGRO DR (Babylon), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 10:00 PM thru 02:00 AM 2 Left lanes of 3 lanes closed","update_date":"2026-05-10T03:00:07Z"},"road_event_id":"z0w9/mq8wdY1kIztA3b3U5HbJhM=","beginning_cross_street":"August Road; Ramp","ending_cross_street":"MAGRO DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.320506,40.734598]]}},{"id":"zs0gWZuyCMjQyV7nLiavTVzFrmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 231"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair and overnight roadwork on NY 231 northbound between Union Boulevard; CR 50; John Street (Babylon) and Southern State Parkway (Babylon), Thursday May 14th, 2026 thru Friday May 15th, 2026, 10:00 PM thru 03:00 AM 2 Right lanes of 3 lanes closed","update_date":"2026-05-10T03:06:02Z"},"road_event_id":"zs0gWZuyCMjQyV7nLiavTVzFrmQ=","beginning_cross_street":"Union Boulevard; CR 50; John Street","ending_cross_street":"Southern State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.313617,40.704867]]}},{"id":"014PnAotqYYeC4JhVLaOmK/NZTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 454"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jhLMnWMcS7e4IwxpiQFQoiqJEvE="}],"description":"Drainage improvements and roadwork on NY 454 both directions between Johnson Avenue; CR 112 (Islip) and Broadway Avenue (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed eastbound; 1 Left lane of 2 lanes closed westbound","update_date":"2026-05-10T03:10:04Z"},"road_event_id":"014PnAotqYYeC4JhVLaOmK/NZTs=","beginning_cross_street":"Johnson Avenue; CR 112","ending_cross_street":"Broadway Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.097801,40.782395]]}},{"id":"jhLMnWMcS7e4IwxpiQFQoiqJEvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 454"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"014PnAotqYYeC4JhVLaOmK/NZTs="},{"type":"next-occurrence","id":"w4DdIB1+iilwpmVA+nFlbj0CxYs="}],"description":"Drainage improvements and roadwork on NY 454 both directions between Johnson Avenue; CR 112 (Islip) and Broadway Avenue (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed eastbound; 1 Left lane of 2 lanes closed westbound","update_date":"2026-05-10T03:10:04Z"},"road_event_id":"jhLMnWMcS7e4IwxpiQFQoiqJEvE=","beginning_cross_street":"Johnson Avenue; CR 112","ending_cross_street":"Broadway Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.097801,40.782395]]}},{"id":"w4DdIB1+iilwpmVA+nFlbj0CxYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 454"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"014PnAotqYYeC4JhVLaOmK/NZTs="}],"description":"Drainage improvements and roadwork on NY 454 both directions between Johnson Avenue; CR 112 (Islip) and Broadway Avenue (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed eastbound; 1 Left lane of 2 lanes closed westbound","update_date":"2026-05-10T03:10:04Z"},"road_event_id":"w4DdIB1+iilwpmVA+nFlbj0CxYs=","beginning_cross_street":"Johnson Avenue; CR 112","ending_cross_street":"Broadway Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.097801,40.782395]]}},{"id":"ORC300546197","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Lincoln Tunnel"],"direction":"unknown","description":"Construction on Lincoln Tunnel Center Tube both directions New Jersey Side (Weehawken Twp) to New York Side (New York) Not currently Scheduled","update_date":"2026-05-10T14:00:02Z"},"road_event_id":"ORC300546197","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-10T03:11:30Z","end_date":"2026-05-11T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.016823,40.765934]]}},{"id":"9ojh/Nriqdtt0ScUY0bFx/zKCNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qMNPHo/RLTJzbcqfleOV25JDqEU="}],"description":"Barrier repairs and bridge rehabilitation and repaving and steel repairs on Meadowbrook State Parkway both directions at Exit M4 - NY 24 West; Hempstead Turnpike (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-10T03:13:09Z"},"road_event_id":"9ojh/Nriqdtt0ScUY0bFx/zKCNY=","beginning_cross_street":"Exit M4 - NY 24 West; Hempstead Turnpike","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.588811,40.736568]]}},{"id":"qMNPHo/RLTJzbcqfleOV25JDqEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ojh/Nriqdtt0ScUY0bFx/zKCNY="},{"type":"next-occurrence","id":"1bla3cD8THy+vYHo5xmL3r3fxQ4="}],"description":"Barrier repairs and bridge rehabilitation and repaving and steel repairs on Meadowbrook State Parkway both directions at Exit M4 - NY 24 West; Hempstead Turnpike (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-10T03:13:09Z"},"road_event_id":"qMNPHo/RLTJzbcqfleOV25JDqEU=","beginning_cross_street":"Exit M4 - NY 24 West; Hempstead Turnpike","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.588811,40.736568]]}},{"id":"1bla3cD8THy+vYHo5xmL3r3fxQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ojh/Nriqdtt0ScUY0bFx/zKCNY="}],"description":"Barrier repairs and bridge rehabilitation and repaving and steel repairs on Meadowbrook State Parkway both directions at Exit M4 - NY 24 West; Hempstead Turnpike (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-10T03:13:09Z"},"road_event_id":"1bla3cD8THy+vYHo5xmL3r3fxQ4=","beginning_cross_street":"Exit M4 - NY 24 West; Hempstead Turnpike","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.588811,40.736568]]}},{"id":"LuyknT38IbKrnk3qxIA2rRtNzlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[],"description":"Barrier repairs and bridge rehabilitation and repaving and steel repairs on Meadowbrook State Parkway northbound ramp from Exit M4 - NY 24 West; Hempstead Turnpike (Hempstead), Sunday May 10th, 2026 thru Saturday May 16th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes closed ramp","update_date":"2026-05-10T03:17:06Z"},"road_event_id":"LuyknT38IbKrnk3qxIA2rRtNzlc=","beginning_cross_street":"Exit M4 - NY 24 West; Hempstead Turnpike","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-17T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.588811,40.736568]]}},{"id":"I/NBOqx+QcT2DlzKMc+1JJcftR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OCEAN PKWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IAOlEr/g1yV6831lBNlWmn2esqI="}],"description":"Roadwork and utility work on OCEAN PKWY westbound between GILGO BCH (Babylon) and northbound Wantagh State Parkway at START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T03:23:35Z"},"road_event_id":"I/NBOqx+QcT2DlzKMc+1JJcftR0=","beginning_cross_street":"GILGO BCH","ending_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.392974,40.619033]]}},{"id":"IAOlEr/g1yV6831lBNlWmn2esqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OCEAN PKWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I/NBOqx+QcT2DlzKMc+1JJcftR0="},{"type":"next-occurrence","id":"Snx+ogWgdiNcX7pHN6C1c4CDPsQ="}],"description":"Roadwork and utility work on OCEAN PKWY westbound between GILGO BCH (Babylon) and northbound Wantagh State Parkway at START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T03:23:35Z"},"road_event_id":"IAOlEr/g1yV6831lBNlWmn2esqI=","beginning_cross_street":"GILGO BCH","ending_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.392974,40.619033]]}},{"id":"Snx+ogWgdiNcX7pHN6C1c4CDPsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OCEAN PKWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I/NBOqx+QcT2DlzKMc+1JJcftR0="}],"description":"Roadwork and utility work on OCEAN PKWY westbound between GILGO BCH (Babylon) and northbound Wantagh State Parkway at START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T03:23:35Z"},"road_event_id":"Snx+ogWgdiNcX7pHN6C1c4CDPsQ=","beginning_cross_street":"GILGO BCH","ending_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.392974,40.619033]]}},{"id":"fAaG2r1va6JDnraqiI2M5xi6rAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Nyz/rbfqvwL250yoFINqZTGh4Xs="}],"description":"Repaving and roadwork on NY 24 eastbound between Merrick Avenue (Hempstead) and Front Street (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T03:27:07Z"},"road_event_id":"fAaG2r1va6JDnraqiI2M5xi6rAc=","beginning_cross_street":"Merrick Avenue","ending_cross_street":"Front Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.57693,40.722944]]}},{"id":"Nyz/rbfqvwL250yoFINqZTGh4Xs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fAaG2r1va6JDnraqiI2M5xi6rAc="},{"type":"next-occurrence","id":"xtDC63hmCdVISNEqUuwY0PUE7wA="}],"description":"Repaving and roadwork on NY 24 eastbound between Merrick Avenue (Hempstead) and Front Street (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T03:27:07Z"},"road_event_id":"Nyz/rbfqvwL250yoFINqZTGh4Xs=","beginning_cross_street":"Merrick Avenue","ending_cross_street":"Front Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.57693,40.722944]]}},{"id":"xtDC63hmCdVISNEqUuwY0PUE7wA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fAaG2r1va6JDnraqiI2M5xi6rAc="}],"description":"Repaving and roadwork on NY 24 eastbound between Merrick Avenue (Hempstead) and Front Street (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T03:27:07Z"},"road_event_id":"xtDC63hmCdVISNEqUuwY0PUE7wA=","beginning_cross_street":"Merrick Avenue","ending_cross_street":"Front Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.57693,40.722944]]}},{"id":"LKJF4iKkzuwMmftkO/pfXb82vLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLD POWERHOUSE RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"w729zbcAM6bzp8NE/qyWlu5kLu4="}],"description":"Gas main repairs and utility work on OLD POWERHOUSE RD westbound between JEFFERSON AVE (North Hempstead) and HORACE HARDING BLVD at FAIRWAY DR (Lake Success), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T03:31:08Z"},"road_event_id":"LKJF4iKkzuwMmftkO/pfXb82vLc=","beginning_cross_street":"JEFFERSON AVE","ending_cross_street":"FAIRWAY DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.646755,40.785311]]}},{"id":"w729zbcAM6bzp8NE/qyWlu5kLu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLD POWERHOUSE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LKJF4iKkzuwMmftkO/pfXb82vLc="},{"type":"next-occurrence","id":"nVOBYbV8FWGMDn+qXECSaod+mFI="}],"description":"Gas main repairs and utility work on OLD POWERHOUSE RD westbound between JEFFERSON AVE (North Hempstead) and HORACE HARDING BLVD at FAIRWAY DR (Lake Success), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T03:31:08Z"},"road_event_id":"w729zbcAM6bzp8NE/qyWlu5kLu4=","beginning_cross_street":"JEFFERSON AVE","ending_cross_street":"FAIRWAY DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.646755,40.785311]]}},{"id":"nVOBYbV8FWGMDn+qXECSaod+mFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLD POWERHOUSE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LKJF4iKkzuwMmftkO/pfXb82vLc="}],"description":"Gas main repairs and utility work on OLD POWERHOUSE RD westbound between JEFFERSON AVE (North Hempstead) and HORACE HARDING BLVD at FAIRWAY DR (Lake Success), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T03:31:08Z"},"road_event_id":"nVOBYbV8FWGMDn+qXECSaod+mFI=","beginning_cross_street":"JEFFERSON AVE","ending_cross_street":"FAIRWAY DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.646755,40.785311]]}},{"id":"uQdQP1jNx8tCaGWuKp8g+/G2FJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 110"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yxRrbOZewyQ4mTRdBssPUD6UVFA="}],"description":"Drainage improvements and overnight roadwork and utility work on NY 110 both directions between RailRoad Street; Broadway (Huntington) and 23rd Street; New York Avenue (Huntington), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-10T03:33:39Z"},"road_event_id":"uQdQP1jNx8tCaGWuKp8g+/G2FJM=","beginning_cross_street":"RailRoad Street; Broadway","ending_cross_street":"23rd Street; New York Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.411597,40.8518]]}},{"id":"yxRrbOZewyQ4mTRdBssPUD6UVFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 110"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uQdQP1jNx8tCaGWuKp8g+/G2FJM="},{"type":"next-occurrence","id":"Z6ITFke2K47XEKVE2eoz959MfQc="}],"description":"Drainage improvements and overnight roadwork and utility work on NY 110 both directions between RailRoad Street; Broadway (Huntington) and 23rd Street; New York Avenue (Huntington), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-10T03:33:39Z"},"road_event_id":"yxRrbOZewyQ4mTRdBssPUD6UVFA=","beginning_cross_street":"RailRoad Street; Broadway","ending_cross_street":"23rd Street; New York Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.411597,40.8518]]}},{"id":"Z6ITFke2K47XEKVE2eoz959MfQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 110"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uQdQP1jNx8tCaGWuKp8g+/G2FJM="}],"description":"Drainage improvements and overnight roadwork and utility work on NY 110 both directions between RailRoad Street; Broadway (Huntington) and 23rd Street; New York Avenue (Huntington), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-10T03:33:39Z"},"road_event_id":"Z6ITFke2K47XEKVE2eoz959MfQc=","beginning_cross_street":"RailRoad Street; Broadway","ending_cross_street":"23rd Street; New York Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.411597,40.8518]]}},{"id":"XcfxYnkap+dhOp8lpuOP5QTC2SI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[],"description":"Gas main repairs and overnight roadwork and utility work on NY 25 eastbound between Leonard Boulevard (North Hempstead) and Terminal Road (North Hempstead), Thursday May 14th, 2026 thru Friday May 15th, 2026, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-10T03:39:06Z"},"road_event_id":"XcfxYnkap+dhOp8lpuOP5QTC2SI=","beginning_cross_street":"Leonard Boulevard","ending_cross_street":"Terminal Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.675327,40.735083]]}},{"id":"u3n5KnxhAMrYp4tWYTeGGtpB8f4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/UiHI1ogooyGPrehaY7epULxWPY="}],"description":"Roadwork on NY 27 eastbound between Exit 64 - Lewis Road; Pleasure Drive; CR104 (Southampton) and Exit 65 - Hamptons Bay Road; NY 24 (Southampton), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-10T03:42:23Z"},"road_event_id":"u3n5KnxhAMrYp4tWYTeGGtpB8f4=","beginning_cross_street":"Exit 64 - Lewis Road; Pleasure Drive; CR104","ending_cross_street":"Exit 65 - Hamptons Bay Road; NY 24","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.614213,40.870952]]}},{"id":"/UiHI1ogooyGPrehaY7epULxWPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u3n5KnxhAMrYp4tWYTeGGtpB8f4="},{"type":"next-occurrence","id":"0e7USiei8AynV9KGZU6BUPixcnk="}],"description":"Roadwork on NY 27 eastbound between Exit 64 - Lewis Road; Pleasure Drive; CR104 (Southampton) and Exit 65 - Hamptons Bay Road; NY 24 (Southampton), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-10T03:42:23Z"},"road_event_id":"/UiHI1ogooyGPrehaY7epULxWPY=","beginning_cross_street":"Exit 64 - Lewis Road; Pleasure Drive; CR104","ending_cross_street":"Exit 65 - Hamptons Bay Road; NY 24","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.614213,40.870952]]}},{"id":"0e7USiei8AynV9KGZU6BUPixcnk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u3n5KnxhAMrYp4tWYTeGGtpB8f4="}],"description":"Roadwork on NY 27 eastbound between Exit 64 - Lewis Road; Pleasure Drive; CR104 (Southampton) and Exit 65 - Hamptons Bay Road; NY 24 (Southampton), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-10T03:42:23Z"},"road_event_id":"0e7USiei8AynV9KGZU6BUPixcnk=","beginning_cross_street":"Exit 64 - Lewis Road; Pleasure Drive; CR104","ending_cross_street":"Exit 65 - Hamptons Bay Road; NY 24","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.614213,40.870952]]}},{"id":"YPS50MGJeEppVc+x4YFG/Q+JNIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Southern State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4Ui5UxhUbeh5J0gfcJk4HjSgGGU="}],"description":"Repaving and roadwork and VMS repairs on Southern State Parkway both directions between Exit 41A - Sagtikos State Parkway (Islip) and Exit 42S - 5th Avenue; CR 13 (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T03:45:38Z"},"road_event_id":"YPS50MGJeEppVc+x4YFG/Q+JNIg=","beginning_cross_street":"Exit 41A - Sagtikos State Parkway","ending_cross_street":"Exit 42S - 5th Avenue; CR 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27929,40.74399]]}},{"id":"4Ui5UxhUbeh5J0gfcJk4HjSgGGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Southern State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YPS50MGJeEppVc+x4YFG/Q+JNIg="},{"type":"next-occurrence","id":"Tb4IRHuo+rIgbiHroUEkNiA6o/0="}],"description":"Repaving and roadwork and VMS repairs on Southern State Parkway both directions between Exit 41A - Sagtikos State Parkway (Islip) and Exit 42S - 5th Avenue; CR 13 (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T03:45:38Z"},"road_event_id":"4Ui5UxhUbeh5J0gfcJk4HjSgGGU=","beginning_cross_street":"Exit 41A - Sagtikos State Parkway","ending_cross_street":"Exit 42S - 5th Avenue; CR 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27929,40.74399]]}},{"id":"Tb4IRHuo+rIgbiHroUEkNiA6o/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Southern State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YPS50MGJeEppVc+x4YFG/Q+JNIg="}],"description":"Repaving and roadwork and VMS repairs on Southern State Parkway both directions between Exit 41A - Sagtikos State Parkway (Islip) and Exit 42S - 5th Avenue; CR 13 (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T03:45:38Z"},"road_event_id":"Tb4IRHuo+rIgbiHroUEkNiA6o/0=","beginning_cross_street":"Exit 41A - Sagtikos State Parkway","ending_cross_street":"Exit 42S - 5th Avenue; CR 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27929,40.74399]]}},{"id":"gsIf+eIY48eLXWyRAvWBLFkXhm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Southern State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IcJXZqmjZ7TZcih6aLPFkt+ir1U="}],"description":"Repaving and roadwork and VMS repairs on Southern State Parkway both directions between Exit 42S - 5th Avenue; CR 13 (Islip) and Exit 44W - Sunrise Highway (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T03:48:22Z"},"road_event_id":"gsIf+eIY48eLXWyRAvWBLFkXhm0=","beginning_cross_street":"Exit 42S - 5th Avenue; CR 13","ending_cross_street":"Exit 44W - Sunrise Highway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.2667,40.749195]]}},{"id":"IcJXZqmjZ7TZcih6aLPFkt+ir1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Southern State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gsIf+eIY48eLXWyRAvWBLFkXhm0="},{"type":"next-occurrence","id":"BEeHMgHcLf7j2ZlMgHudU570Itk="}],"description":"Repaving and roadwork and VMS repairs on Southern State Parkway both directions between Exit 42S - 5th Avenue; CR 13 (Islip) and Exit 44W - Sunrise Highway (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T03:48:22Z"},"road_event_id":"IcJXZqmjZ7TZcih6aLPFkt+ir1U=","beginning_cross_street":"Exit 42S - 5th Avenue; CR 13","ending_cross_street":"Exit 44W - Sunrise Highway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.2667,40.749195]]}},{"id":"BEeHMgHcLf7j2ZlMgHudU570Itk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Southern State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gsIf+eIY48eLXWyRAvWBLFkXhm0="}],"description":"Repaving and roadwork and VMS repairs on Southern State Parkway both directions between Exit 42S - 5th Avenue; CR 13 (Islip) and Exit 44W - Sunrise Highway (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T03:48:22Z"},"road_event_id":"BEeHMgHcLf7j2ZlMgHudU570Itk=","beginning_cross_street":"Exit 42S - 5th Avenue; CR 13","ending_cross_street":"Exit 44W - Sunrise Highway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.2667,40.749195]]}},{"id":"LXrla9GJ3Ok9me+3xH9wXaA9InY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[],"description":"Bridge work and roadwork on NY 27 both directions in the vicinity of Peconic Road; Longview Road (Southampton), Wednesday May 13th, 2026, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T04:28:36Z"},"road_event_id":"LXrla9GJ3Ok9me+3xH9wXaA9InY=","beginning_cross_street":"Peconic Road; Longview Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.483517,40.891864]]}},{"id":"YslRY74APrQBlJHvnRBHBMBwVsc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[],"description":"Bridge work and roadwork on NY 27 both directions between Buffalo Avenue (Freeport) and Central Boulevard (Freeport), Thursday May 14th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T04:31:31Z"},"road_event_id":"YslRY74APrQBlJHvnRBHBMBwVsc=","beginning_cross_street":"Buffalo Avenue","ending_cross_street":"Central Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.56971,40.657957]]}},{"id":"LKrshDzt5z2xup7vsnFHfa96t80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[],"description":"Bridge work and roadwork on NY 27 both directions between 45th Street (Babylon) and North Alleghany Avenue (Babylon), Thursday May 14th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T04:33:30Z"},"road_event_id":"LKrshDzt5z2xup7vsnFHfa96t80=","beginning_cross_street":"45th Street","ending_cross_street":"North Alleghany Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.383484,40.697775]]}},{"id":"phJF+tNJZB9XjAjmvT0ePQtT3ko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gst/VSrCWh4Af5PYNXl5Esiiu3U="}],"description":"Line striping and overnight roadwork on NY 25 both directions between River Road; NY 25A; NY 111 (Smithtown) and END ROUTE 25; Orient Point (Southold), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:30 AM All lanes closed","update_date":"2026-05-10T04:35:45Z"},"road_event_id":"phJF+tNJZB9XjAjmvT0ePQtT3ko=","beginning_cross_street":"River Road; NY 25A; NY 111","ending_cross_street":"END ROUTE 25; Orient Point","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1874,40.85616]]}},{"id":"gst/VSrCWh4Af5PYNXl5Esiiu3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"phJF+tNJZB9XjAjmvT0ePQtT3ko="},{"type":"next-occurrence","id":"B8FIE559/sMqSSMG/Xr8ic0GkAQ="}],"description":"Line striping and overnight roadwork on NY 25 both directions between River Road; NY 25A; NY 111 (Smithtown) and END ROUTE 25; Orient Point (Southold), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:30 AM All lanes closed","update_date":"2026-05-10T04:35:45Z"},"road_event_id":"gst/VSrCWh4Af5PYNXl5Esiiu3U=","beginning_cross_street":"River Road; NY 25A; NY 111","ending_cross_street":"END ROUTE 25; Orient Point","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1874,40.85616]]}},{"id":"B8FIE559/sMqSSMG/Xr8ic0GkAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"phJF+tNJZB9XjAjmvT0ePQtT3ko="}],"description":"Line striping and overnight roadwork on NY 25 both directions between River Road; NY 25A; NY 111 (Smithtown) and END ROUTE 25; Orient Point (Southold), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:30 AM All lanes closed","update_date":"2026-05-10T04:35:45Z"},"road_event_id":"B8FIE559/sMqSSMG/Xr8ic0GkAQ=","beginning_cross_street":"River Road; NY 25A; NY 111","ending_cross_street":"END ROUTE 25; Orient Point","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1874,40.85616]]}},{"id":"lKz+rzqEdh7DaP4zQ8yr/cMOs78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"b/V6AdwNt5toxRG1TMF+BOVOCA8="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on NY 24 westbound at Front Street (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T04:37:47Z"},"road_event_id":"lKz+rzqEdh7DaP4zQ8yr/cMOs78=","beginning_cross_street":"Front Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.559011,40.724918]]}},{"id":"b/V6AdwNt5toxRG1TMF+BOVOCA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lKz+rzqEdh7DaP4zQ8yr/cMOs78="},{"type":"next-occurrence","id":"WdTL5Y6cStEY0b7wiRY5IEANx8s="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on NY 24 westbound at Front Street (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T04:37:47Z"},"road_event_id":"b/V6AdwNt5toxRG1TMF+BOVOCA8=","beginning_cross_street":"Front Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.559011,40.724918]]}},{"id":"WdTL5Y6cStEY0b7wiRY5IEANx8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lKz+rzqEdh7DaP4zQ8yr/cMOs78="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on NY 24 westbound at Front Street (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T04:37:47Z"},"road_event_id":"WdTL5Y6cStEY0b7wiRY5IEANx8s=","beginning_cross_street":"Front Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.559011,40.724918]]}},{"id":"Oj493Y8pZnKlPN+yoi7fjz7hAOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vKEPQ14mqedeM0zExMBSQNM5buE="}],"description":"Installation of traffic monitoring systems and roadwork and traffic signal repairs on NY 24 westbound at Benson Avenue (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T04:39:56Z"},"road_event_id":"Oj493Y8pZnKlPN+yoi7fjz7hAOY=","beginning_cross_street":"Benson Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.695405,40.707137]]}},{"id":"vKEPQ14mqedeM0zExMBSQNM5buE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Oj493Y8pZnKlPN+yoi7fjz7hAOY="},{"type":"next-occurrence","id":"R/P1A0Lq6KBIWbbu2xLLf6xmYeY="}],"description":"Installation of traffic monitoring systems and roadwork and traffic signal repairs on NY 24 westbound at Benson Avenue (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T04:39:56Z"},"road_event_id":"vKEPQ14mqedeM0zExMBSQNM5buE=","beginning_cross_street":"Benson Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.695405,40.707137]]}},{"id":"R/P1A0Lq6KBIWbbu2xLLf6xmYeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Oj493Y8pZnKlPN+yoi7fjz7hAOY="}],"description":"Installation of traffic monitoring systems and roadwork and traffic signal repairs on NY 24 westbound at Benson Avenue (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T04:39:56Z"},"road_event_id":"R/P1A0Lq6KBIWbbu2xLLf6xmYeY=","beginning_cross_street":"Benson Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.695405,40.707137]]}},{"id":"jAlNPIp8pTYOazF+hcjZe8BNyxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BrGPEVaE+ukI88ggONiiW7x/4Os="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on NY 25 eastbound at Terry Road; CR 16 (Smithtown), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T04:43:49Z"},"road_event_id":"jAlNPIp8pTYOazF+hcjZe8BNyxc=","beginning_cross_street":"Terry Road; CR 16","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179447,40.855395]]}},{"id":"BrGPEVaE+ukI88ggONiiW7x/4Os=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jAlNPIp8pTYOazF+hcjZe8BNyxc="},{"type":"next-occurrence","id":"mEofZ+bssit2rC9jpW+JA4o6K5Q="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on NY 25 eastbound at Terry Road; CR 16 (Smithtown), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T04:43:49Z"},"road_event_id":"BrGPEVaE+ukI88ggONiiW7x/4Os=","beginning_cross_street":"Terry Road; CR 16","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179447,40.855395]]}},{"id":"mEofZ+bssit2rC9jpW+JA4o6K5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jAlNPIp8pTYOazF+hcjZe8BNyxc="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on NY 25 eastbound at Terry Road; CR 16 (Smithtown), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T04:43:49Z"},"road_event_id":"mEofZ+bssit2rC9jpW+JA4o6K5Q=","beginning_cross_street":"Terry Road; CR 16","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179447,40.855395]]}},{"id":"feyUKuRNLNL5qTKFepRSqjGxvOM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"B6gm+nxTx6tC9nK6imGctqF6/vk="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on NY 25 eastbound at Marcus Avenue (North Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T04:45:09Z"},"road_event_id":"feyUKuRNLNL5qTKFepRSqjGxvOM=","beginning_cross_street":"Marcus Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.66025,40.742412]]}},{"id":"B6gm+nxTx6tC9nK6imGctqF6/vk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"feyUKuRNLNL5qTKFepRSqjGxvOM="},{"type":"next-occurrence","id":"qxbSJBUmn0snLob+MTdRQP/6Fog="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on NY 25 eastbound at Marcus Avenue (North Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T04:45:09Z"},"road_event_id":"B6gm+nxTx6tC9nK6imGctqF6/vk=","beginning_cross_street":"Marcus Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.66025,40.742412]]}},{"id":"qxbSJBUmn0snLob+MTdRQP/6Fog=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"feyUKuRNLNL5qTKFepRSqjGxvOM="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on NY 25 eastbound at Marcus Avenue (North Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T04:45:09Z"},"road_event_id":"qxbSJBUmn0snLob+MTdRQP/6Fog=","beginning_cross_street":"Marcus Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.66025,40.742412]]}},{"id":"xPDhOMpcVNsVWbTl/YS0GipkIgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 111"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PD+e0U1ArTPJmvTWkvzA1Bp9Lhw="}],"description":"Crack sealing and overnight roadwork and repaving on NY 111 both directions between West Suffolk Avenue; CR 100 (Islip) and I-495 Long Island Expressway (Islip), Thursday May 14th, 2026 thru Saturday May 16th, 2026, Thursday/Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T05:04:44Z"},"road_event_id":"xPDhOMpcVNsVWbTl/YS0GipkIgs=","beginning_cross_street":"West Suffolk Avenue; CR 100","ending_cross_street":"I-495 Long Island Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220514,40.786935]]}},{"id":"PD+e0U1ArTPJmvTWkvzA1Bp9Lhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 111"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xPDhOMpcVNsVWbTl/YS0GipkIgs="}],"description":"Crack sealing and overnight roadwork and repaving on NY 111 both directions between West Suffolk Avenue; CR 100 (Islip) and I-495 Long Island Expressway (Islip), Thursday May 14th, 2026 thru Saturday May 16th, 2026, Thursday/Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T05:04:44Z"},"road_event_id":"PD+e0U1ArTPJmvTWkvzA1Bp9Lhw=","beginning_cross_street":"West Suffolk Avenue; CR 100","ending_cross_street":"I-495 Long Island Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220514,40.786935]]}},{"id":"1mg0Q5NSd5m33hTu5eHj5kkTx5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Northern State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RSxJ7/e+GBYzgCFnmC4cSumHuEI="}],"description":"Drainage improvements and overnight roadwork and repaving and utility work on Northern State Parkway eastbound between Exit 36B - NY 135 (Oyster Bay) and Exit 40S - NY 110 (Huntington), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-10T05:12:29Z"},"road_event_id":"1mg0Q5NSd5m33hTu5eHj5kkTx5c=","beginning_cross_street":"Exit 36B - NY 135","ending_cross_street":"Exit 40S - NY 110","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.486501,40.794925]]}},{"id":"RSxJ7/e+GBYzgCFnmC4cSumHuEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Northern State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1mg0Q5NSd5m33hTu5eHj5kkTx5c="},{"type":"next-occurrence","id":"P8WvXoFJhCpWAeDi+Q6oBUagxdA="}],"description":"Drainage improvements and overnight roadwork and repaving and utility work on Northern State Parkway eastbound between Exit 36B - NY 135 (Oyster Bay) and Exit 40S - NY 110 (Huntington), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-10T05:12:29Z"},"road_event_id":"RSxJ7/e+GBYzgCFnmC4cSumHuEI=","beginning_cross_street":"Exit 36B - NY 135","ending_cross_street":"Exit 40S - NY 110","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.486501,40.794925]]}},{"id":"P8WvXoFJhCpWAeDi+Q6oBUagxdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Northern State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1mg0Q5NSd5m33hTu5eHj5kkTx5c="}],"description":"Drainage improvements and overnight roadwork and repaving and utility work on Northern State Parkway eastbound between Exit 36B - NY 135 (Oyster Bay) and Exit 40S - NY 110 (Huntington), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-10T05:12:29Z"},"road_event_id":"P8WvXoFJhCpWAeDi+Q6oBUagxdA=","beginning_cross_street":"Exit 36B - NY 135","ending_cross_street":"Exit 40S - NY 110","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.486501,40.794925]]}},{"id":"20f/VZiCKBDz2jdea6L4Cgr9l8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 135"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"J8+tWQgnoG1BtChQymQHlXB0mIY="}],"description":"Guard rail repairs and repaving and roadwork on NY 135 both directions between Exit 2 - Sunrise Highway; NY 27 (Hempstead) and Exit 10 - Old Country Road (Plainview), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-10T05:16:52Z"},"road_event_id":"20f/VZiCKBDz2jdea6L4Cgr9l8g=","beginning_cross_street":"Exit 2 - Sunrise Highway; NY 27","ending_cross_street":"Exit 10 - Old Country Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.493266,40.674309]]}},{"id":"J8+tWQgnoG1BtChQymQHlXB0mIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 135"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"20f/VZiCKBDz2jdea6L4Cgr9l8g="},{"type":"next-occurrence","id":"wAAfk2zzJz/ZR5G/Gfn/N3MRnIc="}],"description":"Guard rail repairs and repaving and roadwork on NY 135 both directions between Exit 2 - Sunrise Highway; NY 27 (Hempstead) and Exit 10 - Old Country Road (Plainview), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-10T05:16:52Z"},"road_event_id":"J8+tWQgnoG1BtChQymQHlXB0mIY=","beginning_cross_street":"Exit 2 - Sunrise Highway; NY 27","ending_cross_street":"Exit 10 - Old Country Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.493266,40.674309]]}},{"id":"wAAfk2zzJz/ZR5G/Gfn/N3MRnIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 135"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"20f/VZiCKBDz2jdea6L4Cgr9l8g="}],"description":"Guard rail repairs and repaving and roadwork on NY 135 both directions between Exit 2 - Sunrise Highway; NY 27 (Hempstead) and Exit 10 - Old Country Road (Plainview), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-10T05:16:52Z"},"road_event_id":"wAAfk2zzJz/ZR5G/Gfn/N3MRnIc=","beginning_cross_street":"Exit 2 - Sunrise Highway; NY 27","ending_cross_street":"Exit 10 - Old Country Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.493266,40.674309]]}},{"id":"+yQpVTC8xUMY1qLU1UCJyT0/Lwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 135"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JI+0CZkz/tQbMTTjCU+K95ibE7c="}],"description":"Guard rail repairs and repaving and roadwork on NY 135 both directions between Exit 12W - Northern State Parkway (Plainview) and Exit 14E - NY 25; Jericho Turnpike (Oyster Bay), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T05:20:50Z"},"road_event_id":"+yQpVTC8xUMY1qLU1UCJyT0/Lwg=","beginning_cross_street":"Exit 12W - Northern State Parkway","ending_cross_street":"Exit 14E - NY 25; Jericho Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.486465,40.793011]]}},{"id":"JI+0CZkz/tQbMTTjCU+K95ibE7c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 135"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+yQpVTC8xUMY1qLU1UCJyT0/Lwg="},{"type":"next-occurrence","id":"b/ve3UFwh9EDy81drNbPFQ0Qui4="}],"description":"Guard rail repairs and repaving and roadwork on NY 135 both directions between Exit 12W - Northern State Parkway (Plainview) and Exit 14E - NY 25; Jericho Turnpike (Oyster Bay), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T05:20:50Z"},"road_event_id":"JI+0CZkz/tQbMTTjCU+K95ibE7c=","beginning_cross_street":"Exit 12W - Northern State Parkway","ending_cross_street":"Exit 14E - NY 25; Jericho Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.486465,40.793011]]}},{"id":"b/ve3UFwh9EDy81drNbPFQ0Qui4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 135"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+yQpVTC8xUMY1qLU1UCJyT0/Lwg="}],"description":"Guard rail repairs and repaving and roadwork on NY 135 both directions between Exit 12W - Northern State Parkway (Plainview) and Exit 14E - NY 25; Jericho Turnpike (Oyster Bay), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-10T05:20:50Z"},"road_event_id":"b/ve3UFwh9EDy81drNbPFQ0Qui4=","beginning_cross_street":"Exit 12W - Northern State Parkway","ending_cross_street":"Exit 14E - NY 25; Jericho Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.486465,40.793011]]}},{"id":"R8lX34hiP+XdOPDyIq3VNcYfk7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 135"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6zI6x+ubnsTJyLcMaJTFh3OKwZE="}],"description":"Barrier repairs and guard rail repairs and repaving and roadwork on NY 135 both directions between Exit 14E - NY 25; Jericho Turnpike (Oyster Bay) and Exit 13E - I-495; Long Island Expressway (Oyster Bay), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-10T05:23:27Z"},"road_event_id":"R8lX34hiP+XdOPDyIq3VNcYfk7g=","beginning_cross_street":"Exit 14E - NY 25; Jericho Turnpike","ending_cross_street":"Exit 13E - I-495; Long Island Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.491466,40.807734]]}},{"id":"6zI6x+ubnsTJyLcMaJTFh3OKwZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 135"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R8lX34hiP+XdOPDyIq3VNcYfk7g="},{"type":"next-occurrence","id":"MuSDHnb1xP1nULEVsP/u07X4Z40="}],"description":"Barrier repairs and guard rail repairs and repaving and roadwork on NY 135 both directions between Exit 14E - NY 25; Jericho Turnpike (Oyster Bay) and Exit 13E - I-495; Long Island Expressway (Oyster Bay), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-10T05:23:27Z"},"road_event_id":"6zI6x+ubnsTJyLcMaJTFh3OKwZE=","beginning_cross_street":"Exit 14E - NY 25; Jericho Turnpike","ending_cross_street":"Exit 13E - I-495; Long Island Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.491466,40.807734]]}},{"id":"MuSDHnb1xP1nULEVsP/u07X4Z40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 135"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R8lX34hiP+XdOPDyIq3VNcYfk7g="}],"description":"Barrier repairs and guard rail repairs and repaving and roadwork on NY 135 both directions between Exit 14E - NY 25; Jericho Turnpike (Oyster Bay) and Exit 13E - I-495; Long Island Expressway (Oyster Bay), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-10T05:23:27Z"},"road_event_id":"MuSDHnb1xP1nULEVsP/u07X4Z40=","beginning_cross_street":"Exit 14E - NY 25; Jericho Turnpike","ending_cross_street":"Exit 13E - I-495; Long Island Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.491466,40.807734]]}},{"id":"8rw7OweOJeZOWS5sqUzXZHMl8jg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6WrT+HE+npiYxH4bbvGJkou6GCU="}],"description":"Line striping and milling and repaving and roadwork on SUNRISE HWY both directions between BEACON DR (Islip) and NY 27 at Exit 47 - Pond Rd South; EB Only (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T05:31:20Z"},"road_event_id":"8rw7OweOJeZOWS5sqUzXZHMl8jg=","beginning_cross_street":"BEACON DR","ending_cross_street":"Exit 47 - Pond Rd South; EB Only","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.046913,40.772366]]}},{"id":"6WrT+HE+npiYxH4bbvGJkou6GCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8rw7OweOJeZOWS5sqUzXZHMl8jg="},{"type":"next-occurrence","id":"Gyz6RvLvZcRfABqWf+aHtkMB+Yc="}],"description":"Line striping and milling and repaving and roadwork on SUNRISE HWY both directions between BEACON DR (Islip) and NY 27 at Exit 47 - Pond Rd South; EB Only (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T05:31:20Z"},"road_event_id":"6WrT+HE+npiYxH4bbvGJkou6GCU=","beginning_cross_street":"BEACON DR","ending_cross_street":"Exit 47 - Pond Rd South; EB Only","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.046913,40.772366]]}},{"id":"Gyz6RvLvZcRfABqWf+aHtkMB+Yc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8rw7OweOJeZOWS5sqUzXZHMl8jg="}],"description":"Line striping and milling and repaving and roadwork on SUNRISE HWY both directions between BEACON DR (Islip) and NY 27 at Exit 47 - Pond Rd South; EB Only (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T05:31:20Z"},"road_event_id":"Gyz6RvLvZcRfABqWf+aHtkMB+Yc=","beginning_cross_street":"BEACON DR","ending_cross_street":"Exit 47 - Pond Rd South; EB Only","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.046913,40.772366]]}},{"id":"p0vlqSPS6H+iPOVyq8r+YnZdmNk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"m+9nuSWf9rZ3Mt8uczbzE/fZYZg="}],"description":"Line striping and milling and overnight roadwork and repaving on NY 27 eastbound between Exit 46A - NY27A; Montauk Highway; EB Only (Islip) and Exit 47A - Oakdale Bohemia Road; EB Only (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM All lanes closed service road","update_date":"2026-05-10T05:34:30Z"},"road_event_id":"p0vlqSPS6H+iPOVyq8r+YnZdmNk=","beginning_cross_street":"Exit 46A - NY27A; Montauk Highway; EB Only","ending_cross_street":"Exit 47A - Oakdale Bohemia Road; EB Only","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.155303,40.748179]]}},{"id":"m+9nuSWf9rZ3Mt8uczbzE/fZYZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p0vlqSPS6H+iPOVyq8r+YnZdmNk="}],"description":"Line striping and milling and overnight roadwork and repaving on NY 27 eastbound between Exit 46A - NY27A; Montauk Highway; EB Only (Islip) and Exit 47A - Oakdale Bohemia Road; EB Only (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM All lanes closed service road","update_date":"2026-05-10T05:34:30Z"},"road_event_id":"m+9nuSWf9rZ3Mt8uczbzE/fZYZg=","beginning_cross_street":"Exit 46A - NY27A; Montauk Highway; EB Only","ending_cross_street":"Exit 47A - Oakdale Bohemia Road; EB Only","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.155303,40.748179]]}},{"id":"tF5zl331BMxq2ZUDCfYR16D9Ne0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fpUPxclNdVrXWMDLSEHrIb11/kU="}],"description":"Roadwork and survey work on Wantagh State Parkway southbound between Exit W1 - Brush Hollow Road SB (North Hempstead) and Exit W2W - Old Country Road - Town of Hempstead Line (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 01:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T05:37:09Z"},"road_event_id":"tF5zl331BMxq2ZUDCfYR16D9Ne0=","beginning_cross_street":"Exit W1 - Brush Hollow Road SB","ending_cross_street":"Exit W2W - Old Country Road - Town of Hempstead Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.564022,40.769956]]}},{"id":"fpUPxclNdVrXWMDLSEHrIb11/kU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tF5zl331BMxq2ZUDCfYR16D9Ne0="},{"type":"next-occurrence","id":"uaG9zHs8ffd9L5+xPKHuceJAC/0="}],"description":"Roadwork and survey work on Wantagh State Parkway southbound between Exit W1 - Brush Hollow Road SB (North Hempstead) and Exit W2W - Old Country Road - Town of Hempstead Line (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 01:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T05:37:09Z"},"road_event_id":"fpUPxclNdVrXWMDLSEHrIb11/kU=","beginning_cross_street":"Exit W1 - Brush Hollow Road SB","ending_cross_street":"Exit W2W - Old Country Road - Town of Hempstead Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.564022,40.769956]]}},{"id":"uaG9zHs8ffd9L5+xPKHuceJAC/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tF5zl331BMxq2ZUDCfYR16D9Ne0="}],"description":"Roadwork and survey work on Wantagh State Parkway southbound between Exit W1 - Brush Hollow Road SB (North Hempstead) and Exit W2W - Old Country Road - Town of Hempstead Line (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 01:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T05:37:09Z"},"road_event_id":"uaG9zHs8ffd9L5+xPKHuceJAC/0=","beginning_cross_street":"Exit W1 - Brush Hollow Road SB","ending_cross_street":"Exit W2W - Old Country Road - Town of Hempstead Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.564022,40.769956]]}},{"id":"mf7rcofwd6w+TVlFWuUMTu4Hocc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ObEDCOaHnQbn7ilLcv84Gyw2LmM="}],"description":"Drainage improvements and line striping and repaving and roadwork on NY 24 both directions between Madison Avenue (Hempstead) and North Franklin Street (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T05:39:06Z"},"road_event_id":"mf7rcofwd6w+TVlFWuUMTu4Hocc=","beginning_cross_street":"Madison Avenue","ending_cross_street":"North Franklin Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.671596,40.707042]]}},{"id":"ObEDCOaHnQbn7ilLcv84Gyw2LmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mf7rcofwd6w+TVlFWuUMTu4Hocc="},{"type":"next-occurrence","id":"86+htYRn5kCdwO5VZQYFz0lE+iU="}],"description":"Drainage improvements and line striping and repaving and roadwork on NY 24 both directions between Madison Avenue (Hempstead) and North Franklin Street (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T05:39:06Z"},"road_event_id":"ObEDCOaHnQbn7ilLcv84Gyw2LmM=","beginning_cross_street":"Madison Avenue","ending_cross_street":"North Franklin Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.671596,40.707042]]}},{"id":"86+htYRn5kCdwO5VZQYFz0lE+iU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mf7rcofwd6w+TVlFWuUMTu4Hocc="}],"description":"Drainage improvements and line striping and repaving and roadwork on NY 24 both directions between Madison Avenue (Hempstead) and North Franklin Street (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T05:39:06Z"},"road_event_id":"86+htYRn5kCdwO5VZQYFz0lE+iU=","beginning_cross_street":"Madison Avenue","ending_cross_street":"North Franklin Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.671596,40.707042]]}},{"id":"lfHZ0ySiXqKoBH1SXkC53dnGfqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Gz6cxQfGYoF7HPKdNsLdRdFJNvc="}],"description":"Drainage improvements and line striping and overnight roadwork and repaving on NY 24 eastbound between Hendrickson Avenue (Hempstead) and Meadowbrook State Parkway (Hempstead), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T05:41:52Z"},"road_event_id":"lfHZ0ySiXqKoBH1SXkC53dnGfqQ=","beginning_cross_street":"Hendrickson Avenue","ending_cross_street":"Meadowbrook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.607903,40.71261]]}},{"id":"Gz6cxQfGYoF7HPKdNsLdRdFJNvc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lfHZ0ySiXqKoBH1SXkC53dnGfqQ="},{"type":"next-occurrence","id":"pp6fiPqCIPIHL4wEMtPa622HneI="}],"description":"Drainage improvements and line striping and overnight roadwork and repaving on NY 24 eastbound between Hendrickson Avenue (Hempstead) and Meadowbrook State Parkway (Hempstead), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T05:41:52Z"},"road_event_id":"Gz6cxQfGYoF7HPKdNsLdRdFJNvc=","beginning_cross_street":"Hendrickson Avenue","ending_cross_street":"Meadowbrook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.607903,40.71261]]}},{"id":"pp6fiPqCIPIHL4wEMtPa622HneI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lfHZ0ySiXqKoBH1SXkC53dnGfqQ="}],"description":"Drainage improvements and line striping and overnight roadwork and repaving on NY 24 eastbound between Hendrickson Avenue (Hempstead) and Meadowbrook State Parkway (Hempstead), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-10T05:41:52Z"},"road_event_id":"pp6fiPqCIPIHL4wEMtPa622HneI=","beginning_cross_street":"Hendrickson Avenue","ending_cross_street":"Meadowbrook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.607903,40.71261]]}},{"id":"DPOiggSMnb+iwvi3QKpHaEiaK9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Nassau Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"v+tOf+AfQ+a3A8Zi2Vq6BhOMZdA="}],"description":"Scheduled roadwork on Nassau Expressway eastbound Exit ramp JFK Expressway (New York), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 10:00 PM thru 04:00 AM All lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 10:00 PM thru 04:00 AM All lanes closed, Thursday May 14th, 2026 thru Saturday May 16th, 2026, Thursday/Friday, 10:00 PM thru 04:00 AM All lanes closed","update_date":"2026-05-10T13:54:35Z"},"road_event_id":"DPOiggSMnb+iwvi3QKpHaEiaK9c=","beginning_cross_street":"JFK Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.791521,40.664201]]}},{"id":"v+tOf+AfQ+a3A8Zi2Vq6BhOMZdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Nassau Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DPOiggSMnb+iwvi3QKpHaEiaK9c="},{"type":"next-occurrence","id":"beXasHMlYVTmlEG4QsuVHLwOAOQ="}],"description":"Scheduled roadwork on Nassau Expressway eastbound Exit ramp JFK Expressway (New York), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 10:00 PM thru 04:00 AM All lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 10:00 PM thru 04:00 AM All lanes closed, Thursday May 14th, 2026 thru Saturday May 16th, 2026, Thursday/Friday, 10:00 PM thru 04:00 AM All lanes closed","update_date":"2026-05-10T13:54:35Z"},"road_event_id":"v+tOf+AfQ+a3A8Zi2Vq6BhOMZdA=","beginning_cross_street":"JFK Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.791521,40.664201]]}},{"id":"beXasHMlYVTmlEG4QsuVHLwOAOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Nassau Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DPOiggSMnb+iwvi3QKpHaEiaK9c="}],"description":"Scheduled roadwork on Nassau Expressway eastbound Exit ramp JFK Expressway (New York), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 10:00 PM thru 04:00 AM All lanes closed, Friday May 15th, 2026 thru Saturday May 16th, 2026, 10:00 PM thru 04:00 AM All lanes closed, Thursday May 14th, 2026 thru Saturday May 16th, 2026, Thursday/Friday, 10:00 PM thru 04:00 AM All lanes closed","update_date":"2026-05-10T13:54:35Z"},"road_event_id":"beXasHMlYVTmlEG4QsuVHLwOAOQ=","beginning_cross_street":"JFK Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.791521,40.664201]]}},{"id":"OcqsITLPJ8X2fThi5okBsjh/gco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Van Wyck Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bBHB1FRJSmFZWPq8ZqGllMFh8S8="}],"description":"Scheduled roadwork on Van Wyck Expressway southbound ramp to Terminal 1 Departures (New York), Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 01:30 AM thru 07:00 AM All lanes closed","update_date":"2026-05-10T13:47:47Z"},"road_event_id":"OcqsITLPJ8X2fThi5okBsjh/gco=","beginning_cross_street":"Terminal 1 Departures","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T07:00:00Z","end_date":"2026-05-14T12:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.791806,40.644433]]}},{"id":"bBHB1FRJSmFZWPq8ZqGllMFh8S8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Van Wyck Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OcqsITLPJ8X2fThi5okBsjh/gco="}],"description":"Scheduled roadwork on Van Wyck Expressway southbound ramp to Terminal 1 Departures (New York), Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 01:30 AM thru 07:00 AM All lanes closed","update_date":"2026-05-10T13:47:47Z"},"road_event_id":"bBHB1FRJSmFZWPq8ZqGllMFh8S8=","beginning_cross_street":"Terminal 1 Departures","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T07:00:00Z","end_date":"2026-05-15T12:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.791806,40.644433]]}},{"id":"Rtp7TDzPDXxB78MJW7sZmW7F5hU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt Parkway"],"direction":"unknown","related_road_events":[],"description":"Scheduled roadwork on Belt Parkway westbound ramp to JFK Expressway (New York), Thursday May 14th, 2026 thru Friday May 15th, 2026, 11:59 PM thru 04:00 AM All lanes closed","update_date":"2026-05-10T14:02:37Z"},"road_event_id":"Rtp7TDzPDXxB78MJW7sZmW7F5hU=","beginning_cross_street":"JFK Expressway ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:58:00Z","end_date":"2026-05-16T07:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786288,40.666994]]}},{"id":"unxUuQm0cbd0h2tmd/H6eZi/bsA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Van Wyck Expressway"],"direction":"unknown","related_road_events":[],"description":"Scheduled roadwork on Van Wyck Expressway southbound ramp to Terminal 4 Departures (New York), Thursday May 14th, 2026 thru Friday May 15th, 2026, 11:00 PM thru 04:00 AM All lanes closed","update_date":"2026-05-10T14:04:26Z"},"road_event_id":"unxUuQm0cbd0h2tmd/H6eZi/bsA=","beginning_cross_street":"Terminal 4 Departures ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.791114,40.644734]]}},{"id":"RgUm2Jyb3CRGyOn/NQYvQU2xwS8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9J"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CBZhhb8IJJDkHcufkoTIUHc7Q9U="}],"description":"Utility work on NY 9J southbound between Sharptown Road (Stuyvesant) and Ferry Road (Stuyvesant) 202408471068/32742509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-11T00:49:17Z"},"road_event_id":"RgUm2Jyb3CRGyOn/NQYvQU2xwS8=","beginning_cross_street":"Sharptown Road","ending_cross_street":"Ferry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.783066,42.36176]]}},{"id":"CBZhhb8IJJDkHcufkoTIUHc7Q9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9J"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RgUm2Jyb3CRGyOn/NQYvQU2xwS8="},{"type":"next-occurrence","id":"47L/JmyKE7YkvCqXivNfrANjqbw="}],"description":"Utility work on NY 9J southbound between Sharptown Road (Stuyvesant) and Ferry Road (Stuyvesant) 202408471068/32742509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-11T00:49:17Z"},"road_event_id":"CBZhhb8IJJDkHcufkoTIUHc7Q9U=","beginning_cross_street":"Sharptown Road","ending_cross_street":"Ferry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.783066,42.36176]]}},{"id":"47L/JmyKE7YkvCqXivNfrANjqbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9J"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RgUm2Jyb3CRGyOn/NQYvQU2xwS8="},{"type":"next-occurrence","id":"AEXT59pN5jaHM6WtdUzMtKN00l0="}],"description":"Utility work on NY 9J southbound between Sharptown Road (Stuyvesant) and Ferry Road (Stuyvesant) 202408471068/32742509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-11T00:49:17Z"},"road_event_id":"47L/JmyKE7YkvCqXivNfrANjqbw=","beginning_cross_street":"Sharptown Road","ending_cross_street":"Ferry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.783066,42.36176]]}},{"id":"AEXT59pN5jaHM6WtdUzMtKN00l0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9J"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RgUm2Jyb3CRGyOn/NQYvQU2xwS8="}],"description":"Utility work on NY 9J southbound between Sharptown Road (Stuyvesant) and Ferry Road (Stuyvesant) 202408471068/32742509 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-11T00:49:17Z"},"road_event_id":"AEXT59pN5jaHM6WtdUzMtKN00l0=","beginning_cross_street":"Sharptown Road","ending_cross_street":"Ferry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.783066,42.36176]]}},{"id":"zkd6J1K0e7XCecwuyotXnbYvzyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on I-84 westbound between Exit 15 - US 6 - NY 17M (Greenville) and Exit 4 - Mountain Road (Wawayanda) DOT BM/NIGHT/B1052471/32540909 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026, 07:00 PM thru 03:00 AM, right lane closure","update_date":"2026-05-11T00:58:18Z"},"road_event_id":"zkd6J1K0e7XCecwuyotXnbYvzyk=","beginning_cross_street":"Exit 15 - US 6 - NY 17M","ending_cross_street":"Exit 4 - Mountain Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.455443,41.40814]]}},{"id":"Rws4rHPLjk9vs1MEZhT8SGyMrw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Pothole repair on US 9 southbound between N Riverside Avenue - NY 9A (Croton on Hudson) and Croton Point Avenue (Croton on Hudson) Res 8-8 RW/32735409 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026, 08:00 PM thru 11:30 PM, right lane closure","update_date":"2026-05-11T01:24:17Z"},"road_event_id":"Rws4rHPLjk9vs1MEZhT8SGyMrw0=","beginning_cross_street":"N Riverside Avenue - NY 9A","ending_cross_street":"Croton Point Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-15T23:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899054,41.210721]]}},{"id":"mUl1KqDETLehEI7WWMK6QdH0vK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"L5SaNoL3NO+9a5i+aDZ2Lj2nmz0="}],"description":"Bridge rehabilitation and bridge work and repaving and roadwork on SUNRISE HWY westbound between CR-83 (Brookhaven) and GATEWAY BLVD (Brookhaven), Saturday May 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T01:25:52Z"},"road_event_id":"mUl1KqDETLehEI7WWMK6QdH0vK0=","beginning_cross_street":"CR-83","ending_cross_street":"GATEWAY BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.015969,40.779848]]}},{"id":"L5SaNoL3NO+9a5i+aDZ2Lj2nmz0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mUl1KqDETLehEI7WWMK6QdH0vK0="},{"type":"next-occurrence","id":"M9L2q5xNtfPbs6GHghtBNTwnW68="}],"description":"Bridge rehabilitation and bridge work and repaving and roadwork on SUNRISE HWY westbound between CR-83 (Brookhaven) and GATEWAY BLVD (Brookhaven), Saturday May 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T01:25:52Z"},"road_event_id":"L5SaNoL3NO+9a5i+aDZ2Lj2nmz0=","beginning_cross_street":"CR-83","ending_cross_street":"GATEWAY BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.015969,40.779848]]}},{"id":"M9L2q5xNtfPbs6GHghtBNTwnW68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mUl1KqDETLehEI7WWMK6QdH0vK0="}],"description":"Bridge rehabilitation and bridge work and repaving and roadwork on SUNRISE HWY westbound between CR-83 (Brookhaven) and GATEWAY BLVD (Brookhaven), Saturday May 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T01:25:52Z"},"road_event_id":"M9L2q5xNtfPbs6GHghtBNTwnW68=","beginning_cross_street":"CR-83","ending_cross_street":"GATEWAY BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.015969,40.779848]]}},{"id":"eAu4QQgqtYFsRUqozx6wfkE5Hk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TvRnZU/stxTyFTaLxYmLDLuqS7I="}],"description":"Bridge rehabilitation and bridge work and repaving and roadwork on SUNRISE HWY eastbound between 52 (Brookhaven) and CR-83 (Brookhaven), Saturday May 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T01:28:30Z"},"road_event_id":"eAu4QQgqtYFsRUqozx6wfkE5Hk8=","beginning_cross_street":"52","ending_cross_street":"CR-83","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.039722,40.774434]]}},{"id":"TvRnZU/stxTyFTaLxYmLDLuqS7I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eAu4QQgqtYFsRUqozx6wfkE5Hk8="},{"type":"next-occurrence","id":"2TzKXdyRG1wJFwlvgRtoMsTI/us="}],"description":"Bridge rehabilitation and bridge work and repaving and roadwork on SUNRISE HWY eastbound between 52 (Brookhaven) and CR-83 (Brookhaven), Saturday May 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T01:28:30Z"},"road_event_id":"TvRnZU/stxTyFTaLxYmLDLuqS7I=","beginning_cross_street":"52","ending_cross_street":"CR-83","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.039722,40.774434]]}},{"id":"2TzKXdyRG1wJFwlvgRtoMsTI/us=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eAu4QQgqtYFsRUqozx6wfkE5Hk8="}],"description":"Bridge rehabilitation and bridge work and repaving and roadwork on SUNRISE HWY eastbound between 52 (Brookhaven) and CR-83 (Brookhaven), Saturday May 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T01:28:30Z"},"road_event_id":"2TzKXdyRG1wJFwlvgRtoMsTI/us=","beginning_cross_street":"52","ending_cross_street":"CR-83","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.039722,40.774434]]}},{"id":"4iIxHEdNUCrvu/SwKllVk3hNNqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 347"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8WLkRFgkPjowy0o5sRSGSDOs4q8="}],"description":"Drainage improvements and repaving and survey work and utility work on NY 347 both directions between Nicolls Road; CR 97 (Brookhaven) and Hallock Road (Lake Grove), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T01:32:01Z"},"road_event_id":"4iIxHEdNUCrvu/SwKllVk3hNNqQ=","beginning_cross_street":"Nicolls Road; CR 97","ending_cross_street":"Hallock Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10681,40.883105]]}},{"id":"8WLkRFgkPjowy0o5sRSGSDOs4q8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 347"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4iIxHEdNUCrvu/SwKllVk3hNNqQ="},{"type":"next-occurrence","id":"+YMiRMrvmLEoySeTVtxbfOL5X+o="}],"description":"Drainage improvements and repaving and survey work and utility work on NY 347 both directions between Nicolls Road; CR 97 (Brookhaven) and Hallock Road (Lake Grove), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T01:32:01Z"},"road_event_id":"8WLkRFgkPjowy0o5sRSGSDOs4q8=","beginning_cross_street":"Nicolls Road; CR 97","ending_cross_street":"Hallock Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10681,40.883105]]}},{"id":"+YMiRMrvmLEoySeTVtxbfOL5X+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 347"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4iIxHEdNUCrvu/SwKllVk3hNNqQ="}],"description":"Drainage improvements and repaving and survey work and utility work on NY 347 both directions between Nicolls Road; CR 97 (Brookhaven) and Hallock Road (Lake Grove), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T01:32:01Z"},"road_event_id":"+YMiRMrvmLEoySeTVtxbfOL5X+o=","beginning_cross_street":"Nicolls Road; CR 97","ending_cross_street":"Hallock Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10681,40.883105]]}},{"id":"Hv9nE8eTkeDNfV4tauDBYQAyaUc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5Y0lqW2D4s9zLUFnBzLtVWaaRnQ="}],"description":"Mowing and roadwork on Long Island Expressway/I-495 HOV Lane both directions between Exit 49S - NY 110 (Huntington) and Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7 (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T01:35:05Z"},"road_event_id":"Hv9nE8eTkeDNfV4tauDBYQAyaUc=","beginning_cross_street":"Exit 49S - NY 110","ending_cross_street":"Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.433966,40.782574]]}},{"id":"5Y0lqW2D4s9zLUFnBzLtVWaaRnQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hv9nE8eTkeDNfV4tauDBYQAyaUc="},{"type":"next-occurrence","id":"ZtY2l7OpzJAeo7EYV8fRcuhVjzs="}],"description":"Mowing and roadwork on Long Island Expressway/I-495 HOV Lane both directions between Exit 49S - NY 110 (Huntington) and Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7 (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T01:35:05Z"},"road_event_id":"5Y0lqW2D4s9zLUFnBzLtVWaaRnQ=","beginning_cross_street":"Exit 49S - NY 110","ending_cross_street":"Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.433966,40.782574]]}},{"id":"ZtY2l7OpzJAeo7EYV8fRcuhVjzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hv9nE8eTkeDNfV4tauDBYQAyaUc="}],"description":"Mowing and roadwork on Long Island Expressway/I-495 HOV Lane both directions between Exit 49S - NY 110 (Huntington) and Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7 (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T01:35:05Z"},"road_event_id":"ZtY2l7OpzJAeo7EYV8fRcuhVjzs=","beginning_cross_street":"Exit 49S - NY 110","ending_cross_street":"Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.433966,40.782574]]}},{"id":"2Wh8VBGAtKnYEwOkezzEnsyRejE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FW12lurPZ8OTEZ3p68d+Um609dQ="}],"description":"Barrier repairs and mowing on Long Island Expressway/I-495 HOV Lane both directions between Exit 49S - NY 110 (Huntington) and Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7 (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed service road","update_date":"2026-05-11T01:37:44Z"},"road_event_id":"2Wh8VBGAtKnYEwOkezzEnsyRejE=","beginning_cross_street":"Exit 49S - NY 110","ending_cross_street":"Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.433966,40.782574]]}},{"id":"FW12lurPZ8OTEZ3p68d+Um609dQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wh8VBGAtKnYEwOkezzEnsyRejE="},{"type":"next-occurrence","id":"m2zsq4Qfl44abJblk6r97oWCMq4="}],"description":"Barrier repairs and mowing on Long Island Expressway/I-495 HOV Lane both directions between Exit 49S - NY 110 (Huntington) and Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7 (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed service road","update_date":"2026-05-11T01:37:44Z"},"road_event_id":"FW12lurPZ8OTEZ3p68d+Um609dQ=","beginning_cross_street":"Exit 49S - NY 110","ending_cross_street":"Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.433966,40.782574]]}},{"id":"m2zsq4Qfl44abJblk6r97oWCMq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wh8VBGAtKnYEwOkezzEnsyRejE="}],"description":"Barrier repairs and mowing on Long Island Expressway/I-495 HOV Lane both directions between Exit 49S - NY 110 (Huntington) and Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7 (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed service road","update_date":"2026-05-11T01:37:44Z"},"road_event_id":"m2zsq4Qfl44abJblk6r97oWCMq4=","beginning_cross_street":"Exit 49S - NY 110","ending_cross_street":"Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.433966,40.782574]]}},{"id":"BeYQRWJszv+YerAmjW2lV63qwXM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ViF+hjuqqQ0ZQpBMw+4ZQzJtyng="}],"description":"Drainage improvements and roadwork on NY 27 both directions between Atlantic Avenue (Hempstead) and Forest Avenue (Lynbrook), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T01:40:56Z"},"road_event_id":"BeYQRWJszv+YerAmjW2lV63qwXM=","beginning_cross_street":"Atlantic Avenue","ending_cross_street":"Forest Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.671666,40.654866]]}},{"id":"ViF+hjuqqQ0ZQpBMw+4ZQzJtyng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BeYQRWJszv+YerAmjW2lV63qwXM="},{"type":"next-occurrence","id":"Ay4vtrrKkGva3jHqZesaxfvhdA0="}],"description":"Drainage improvements and roadwork on NY 27 both directions between Atlantic Avenue (Hempstead) and Forest Avenue (Lynbrook), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T01:40:56Z"},"road_event_id":"ViF+hjuqqQ0ZQpBMw+4ZQzJtyng=","beginning_cross_street":"Atlantic Avenue","ending_cross_street":"Forest Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.671666,40.654866]]}},{"id":"Ay4vtrrKkGva3jHqZesaxfvhdA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BeYQRWJszv+YerAmjW2lV63qwXM="}],"description":"Drainage improvements and roadwork on NY 27 both directions between Atlantic Avenue (Hempstead) and Forest Avenue (Lynbrook), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T01:40:56Z"},"road_event_id":"Ay4vtrrKkGva3jHqZesaxfvhdA0=","beginning_cross_street":"Atlantic Avenue","ending_cross_street":"Forest Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.671666,40.654866]]}},{"id":"XEu5YgbwTNGY+DsqA99ClHM/r3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lihHFHeqls+OrvFhwinAyVJbD58="}],"description":"Bridge rehabilitation and bridge work on NY 27 both directions between Exit 65 - Hamptons Bay Road; NY 24 (Southampton) and Exit 66 - North Shore Highway; CR 39; North Shore Road (Southampton), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 03:59 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T01:44:32Z"},"road_event_id":"XEu5YgbwTNGY+DsqA99ClHM/r3k=","beginning_cross_street":"Exit 65 - Hamptons Bay Road; NY 24","ending_cross_street":"Exit 66 - North Shore Highway; CR 39; North Shore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.536688,40.879572]]}},{"id":"lihHFHeqls+OrvFhwinAyVJbD58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XEu5YgbwTNGY+DsqA99ClHM/r3k="},{"type":"next-occurrence","id":"EaWW2m6ECF8oMX3UEOHCr+e16T0="}],"description":"Bridge rehabilitation and bridge work on NY 27 both directions between Exit 65 - Hamptons Bay Road; NY 24 (Southampton) and Exit 66 - North Shore Highway; CR 39; North Shore Road (Southampton), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 03:59 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T01:44:32Z"},"road_event_id":"lihHFHeqls+OrvFhwinAyVJbD58=","beginning_cross_street":"Exit 65 - Hamptons Bay Road; NY 24","ending_cross_street":"Exit 66 - North Shore Highway; CR 39; North Shore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T19:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.536688,40.879572]]}},{"id":"EaWW2m6ECF8oMX3UEOHCr+e16T0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XEu5YgbwTNGY+DsqA99ClHM/r3k="}],"description":"Bridge rehabilitation and bridge work on NY 27 both directions between Exit 65 - Hamptons Bay Road; NY 24 (Southampton) and Exit 66 - North Shore Highway; CR 39; North Shore Road (Southampton), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 03:59 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T01:44:32Z"},"road_event_id":"EaWW2m6ECF8oMX3UEOHCr+e16T0=","beginning_cross_street":"Exit 65 - Hamptons Bay Road; NY 24","ending_cross_street":"Exit 66 - North Shore Highway; CR 39; North Shore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T19:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.536688,40.879572]]}},{"id":"m991t8omXe1fIiWJ6OLNRQcNJEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CSBpEeGZsiDnl/d30SpQQCg4jhc="}],"description":"Bridge maintenance operations on I-84 westbound between Exit 15A/B - US 6 - Rt 17M (Wawayanda) and Exit 4 (I-84) - Mountain Rd (Greenville) DOT BM/B1003082/32010009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-11T11:45:30Z"},"road_event_id":"m991t8omXe1fIiWJ6OLNRQcNJEc=","beginning_cross_street":"Exit 15A/B - US 6 - Rt 17M","ending_cross_street":"Exit 4 - Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.613899,41.3736]]}},{"id":"CSBpEeGZsiDnl/d30SpQQCg4jhc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m991t8omXe1fIiWJ6OLNRQcNJEc="},{"type":"next-occurrence","id":"oxFb9EvuwsI/wWBt+jbNgrXP+5g="}],"description":"Bridge maintenance operations on I-84 westbound between Exit 15A/B - US 6 - Rt 17M (Wawayanda) and Exit 4 (I-84) - Mountain Rd (Greenville) DOT BM/B1003082/32010009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-11T11:45:30Z"},"road_event_id":"CSBpEeGZsiDnl/d30SpQQCg4jhc=","beginning_cross_street":"Exit 15A/B - US 6 - Rt 17M","ending_cross_street":"Exit 4 - Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.613899,41.3736]]}},{"id":"oxFb9EvuwsI/wWBt+jbNgrXP+5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m991t8omXe1fIiWJ6OLNRQcNJEc="},{"type":"next-occurrence","id":"p3RKCedcsN0HBwGZdcwhrlsznTM="}],"description":"Bridge maintenance operations on I-84 westbound between Exit 15A/B - US 6 - Rt 17M (Wawayanda) and Exit 4 (I-84) - Mountain Rd (Greenville) DOT BM/B1003082/32010009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-11T11:45:30Z"},"road_event_id":"oxFb9EvuwsI/wWBt+jbNgrXP+5g=","beginning_cross_street":"Exit 15A/B - US 6 - Rt 17M","ending_cross_street":"Exit 4 - Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.613899,41.3736]]}},{"id":"p3RKCedcsN0HBwGZdcwhrlsznTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m991t8omXe1fIiWJ6OLNRQcNJEc="}],"description":"Bridge maintenance operations on I-84 westbound between Exit 15A/B - US 6 - Rt 17M (Wawayanda) and Exit 4 (I-84) - Mountain Rd (Greenville) DOT BM/B1003082/32010009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-11T11:45:30Z"},"road_event_id":"p3RKCedcsN0HBwGZdcwhrlsznTM=","beginning_cross_street":"Exit 15A/B - US 6 - Rt 17M","ending_cross_street":"Exit 4 - Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.613899,41.3736]]}},{"id":"hRobL01x9yku+88v8MGNkCO0qn0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Lincoln Tunnel"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rOwLA/KpBk5VkaSns4zwLUEQNsI="}],"description":"Construction on Lincoln Tunnel Center Tube both directions New York Side (New York) to New Jersey Side (Weehawken Twp), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed and detoured","update_date":"2026-05-13T02:34:44Z"},"road_event_id":"hRobL01x9yku+88v8MGNkCO0qn0=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00298,40.760114]]}},{"id":"rOwLA/KpBk5VkaSns4zwLUEQNsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Lincoln Tunnel"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hRobL01x9yku+88v8MGNkCO0qn0="}],"description":"Construction on Lincoln Tunnel Center Tube both directions New York Side (New York) to New Jersey Side (Weehawken Twp), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed and detoured","update_date":"2026-05-13T02:34:44Z"},"road_event_id":"rOwLA/KpBk5VkaSns4zwLUEQNsI=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00298,40.760114]]}},{"id":"xcd+CWJUPmpiwrTnTHt6AYM4qUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Holland Tunnel"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5GN91muGhjiniPAXrytjFxONXMQ="}],"description":"Construction on Holland Tunnel North Tube westbound New York Side (New York) to New Jersey Side (Jersey City), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:30 PM thru 05:30 AM 1 Left lane of 2 lanes closed","update_date":"2026-05-13T03:21:05Z"},"road_event_id":"xcd+CWJUPmpiwrTnTHt6AYM4qUU=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:30:00Z","end_date":"2026-05-14T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.011041,40.726204]]}},{"id":"5GN91muGhjiniPAXrytjFxONXMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Holland Tunnel"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xcd+CWJUPmpiwrTnTHt6AYM4qUU="}],"description":"Construction on Holland Tunnel North Tube westbound New York Side (New York) to New Jersey Side (Jersey City), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:30 PM thru 05:30 AM 1 Left lane of 2 lanes closed","update_date":"2026-05-13T03:21:05Z"},"road_event_id":"5GN91muGhjiniPAXrytjFxONXMQ=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:30:00Z","end_date":"2026-05-15T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.011041,40.726204]]}},{"id":"gw3B4KbkWkjWukkoD031Gt3lepI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hyJL46Uu8i08N+QsnW0jWdohpsk="}],"description":"Bridge painting and roadwork on Wantagh State Parkway both directions between Exit W6 - Merrick Road (Hempstead) and START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 2 Right lanes of 3 lanes closed","update_date":"2026-05-11T01:47:15Z"},"road_event_id":"gw3B4KbkWkjWukkoD031Gt3lepI=","beginning_cross_street":"Exit W6 - Merrick Road","ending_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.510382,40.662053]]}},{"id":"hyJL46Uu8i08N+QsnW0jWdohpsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gw3B4KbkWkjWukkoD031Gt3lepI="},{"type":"next-occurrence","id":"5y6Fc3ECF0FIBHLIJYixgHFNSKc="}],"description":"Bridge painting and roadwork on Wantagh State Parkway both directions between Exit W6 - Merrick Road (Hempstead) and START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 2 Right lanes of 3 lanes closed","update_date":"2026-05-11T01:47:15Z"},"road_event_id":"hyJL46Uu8i08N+QsnW0jWdohpsk=","beginning_cross_street":"Exit W6 - Merrick Road","ending_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.510382,40.662053]]}},{"id":"5y6Fc3ECF0FIBHLIJYixgHFNSKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gw3B4KbkWkjWukkoD031Gt3lepI="}],"description":"Bridge painting and roadwork on Wantagh State Parkway both directions between Exit W6 - Merrick Road (Hempstead) and START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 2 Right lanes of 3 lanes closed","update_date":"2026-05-11T01:47:15Z"},"road_event_id":"5y6Fc3ECF0FIBHLIJYixgHFNSKc=","beginning_cross_street":"Exit W6 - Merrick Road","ending_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.510382,40.662053]]}},{"id":"FaCguF1EYp7mblaUOa7Ko+dUPF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Holland Tunnel"],"direction":"unknown","related_road_events":[],"description":"Construction on Holland Tunnel South Tube eastbound New Jersey Side (Jersey City) to New York Side (Manhattan), Monday May 11th, 2026 thru Thursday May 14th, 2026, Monday/Wednesday, 11:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T01:47:55Z"},"road_event_id":"FaCguF1EYp7mblaUOa7Ko+dUPF4=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.031504,40.728713]]}},{"id":"vTR5lNrCdHQqRiWQSjKVn7mplJg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pr8umATYjsQdMerwBrdnUkmj7bM="}],"description":"Bridge painting and roadwork on Meadowbrook State Parkway both directions between START ROUTE Meadowbrook State Parkway at Ocean Parkway (Hempstead) and Exit M10 - Loop Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 2 Right lanes of 3 lanes closed","update_date":"2026-05-11T01:48:54Z"},"road_event_id":"vTR5lNrCdHQqRiWQSjKVn7mplJg=","beginning_cross_street":"START ROUTE Meadowbrook State Parkway at Ocean Parkway","ending_cross_street":"Exit M10 - Loop Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.537101,40.593613]]}},{"id":"pr8umATYjsQdMerwBrdnUkmj7bM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vTR5lNrCdHQqRiWQSjKVn7mplJg="},{"type":"next-occurrence","id":"lVImKyRCNh7QOeaF9oqXrIyraYE="}],"description":"Bridge painting and roadwork on Meadowbrook State Parkway both directions between START ROUTE Meadowbrook State Parkway at Ocean Parkway (Hempstead) and Exit M10 - Loop Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 2 Right lanes of 3 lanes closed","update_date":"2026-05-11T01:48:54Z"},"road_event_id":"pr8umATYjsQdMerwBrdnUkmj7bM=","beginning_cross_street":"START ROUTE Meadowbrook State Parkway at Ocean Parkway","ending_cross_street":"Exit M10 - Loop Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.537101,40.593613]]}},{"id":"lVImKyRCNh7QOeaF9oqXrIyraYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vTR5lNrCdHQqRiWQSjKVn7mplJg="}],"description":"Bridge painting and roadwork on Meadowbrook State Parkway both directions between START ROUTE Meadowbrook State Parkway at Ocean Parkway (Hempstead) and Exit M10 - Loop Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 2 Right lanes of 3 lanes closed","update_date":"2026-05-11T01:48:54Z"},"road_event_id":"lVImKyRCNh7QOeaF9oqXrIyraYE=","beginning_cross_street":"START ROUTE Meadowbrook State Parkway at Ocean Parkway","ending_cross_street":"Exit M10 - Loop Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.537101,40.593613]]}},{"id":"+1kYCROVWLiSRmLhdj4gJHIxnKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Holland Tunnel"],"direction":"unknown","related_road_events":[],"description":"Construction on Holland Tunnel South Tube eastbound New Jersey Side (Jersey City) to New York Side (Manhattan), Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Thursday, 11:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T01:49:09Z"},"road_event_id":"+1kYCROVWLiSRmLhdj4gJHIxnKU=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.031591,40.728722]]}},{"id":"nD0xRHtEIRO9cAll0f6pv9zzkuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NiSiWNFL1ou9hIKILjy+x8YhkEI="}],"description":"Bridge painting and overnight roadwork on Wantagh State Parkway both directions between START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead) and Exit W6 - Merrick Road (Hempstead), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T01:52:07Z"},"road_event_id":"nD0xRHtEIRO9cAll0f6pv9zzkuU=","beginning_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","ending_cross_street":"Exit W6 - Merrick Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.508534,40.600226]]}},{"id":"NiSiWNFL1ou9hIKILjy+x8YhkEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nD0xRHtEIRO9cAll0f6pv9zzkuU="},{"type":"next-occurrence","id":"CThOhWZeCDhwAp/vplJJ+JleTVQ="}],"description":"Bridge painting and overnight roadwork on Wantagh State Parkway both directions between START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead) and Exit W6 - Merrick Road (Hempstead), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T01:52:07Z"},"road_event_id":"NiSiWNFL1ou9hIKILjy+x8YhkEI=","beginning_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","ending_cross_street":"Exit W6 - Merrick Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.508534,40.600226]]}},{"id":"CThOhWZeCDhwAp/vplJJ+JleTVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nD0xRHtEIRO9cAll0f6pv9zzkuU="}],"description":"Bridge painting and overnight roadwork on Wantagh State Parkway both directions between START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead) and Exit W6 - Merrick Road (Hempstead), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T01:52:07Z"},"road_event_id":"CThOhWZeCDhwAp/vplJJ+JleTVQ=","beginning_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","ending_cross_street":"Exit W6 - Merrick Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.508534,40.600226]]}},{"id":"obpNZ94U9rAYBEUjVioE/E9g1RQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Outerbridge Crossing"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6aWEuXxI/dV+18X/WZVVBlL+ZU0="}],"description":"Bridge construction on Outerbridge Crossing westbound New York Side (Staten Island) to New Jersey Side (Perth Amboy), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed, Friday May 15th, 2026 thru Sunday May 17th, 2026, Friday/Saturday, 10:00 PM thru 08:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T01:53:30Z"},"road_event_id":"obpNZ94U9rAYBEUjVioE/E9g1RQ=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.239842,40.525229]]}},{"id":"6aWEuXxI/dV+18X/WZVVBlL+ZU0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Outerbridge Crossing"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"obpNZ94U9rAYBEUjVioE/E9g1RQ="},{"type":"next-occurrence","id":"cBGxkUBpXKq+knOCF2uZPko9Fl8="}],"description":"Bridge construction on Outerbridge Crossing westbound New York Side (Staten Island) to New Jersey Side (Perth Amboy), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed, Friday May 15th, 2026 thru Sunday May 17th, 2026, Friday/Saturday, 10:00 PM thru 08:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T01:53:30Z"},"road_event_id":"6aWEuXxI/dV+18X/WZVVBlL+ZU0=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.239842,40.525229]]}},{"id":"cBGxkUBpXKq+knOCF2uZPko9Fl8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Outerbridge Crossing"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"obpNZ94U9rAYBEUjVioE/E9g1RQ="},{"type":"next-occurrence","id":"ooOpPiDFIqP+pW0q7FQxBma8r6o="}],"description":"Bridge construction on Outerbridge Crossing westbound New York Side (Staten Island) to New Jersey Side (Perth Amboy), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed, Friday May 15th, 2026 thru Sunday May 17th, 2026, Friday/Saturday, 10:00 PM thru 08:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T01:53:30Z"},"road_event_id":"cBGxkUBpXKq+knOCF2uZPko9Fl8=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.239842,40.525229]]}},{"id":"ooOpPiDFIqP+pW0q7FQxBma8r6o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Outerbridge Crossing"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"obpNZ94U9rAYBEUjVioE/E9g1RQ="}],"description":"Bridge construction on Outerbridge Crossing westbound New York Side (Staten Island) to New Jersey Side (Perth Amboy), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed, Friday May 15th, 2026 thru Sunday May 17th, 2026, Friday/Saturday, 10:00 PM thru 08:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T01:53:30Z"},"road_event_id":"ooOpPiDFIqP+pW0q7FQxBma8r6o=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.239842,40.525229]]}},{"id":"ujDBvR0eY50WlTAM3b1VEfA00G8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OaO1nsnY2oVwlkxEtUp4aaF/QP4="}],"description":"Bridge painting and overnight roadwork on Meadowbrook State Parkway both directions between START ROUTE Meadowbrook State Parkway at Ocean Parkway (Hempstead) and Exit M10 - Loop Parkway (Hempstead), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T01:53:43Z"},"road_event_id":"ujDBvR0eY50WlTAM3b1VEfA00G8=","beginning_cross_street":"START ROUTE Meadowbrook State Parkway at Ocean Parkway","ending_cross_street":"Exit M10 - Loop Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.537101,40.593613]]}},{"id":"OaO1nsnY2oVwlkxEtUp4aaF/QP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ujDBvR0eY50WlTAM3b1VEfA00G8="},{"type":"next-occurrence","id":"1l4dK/JJ1+CyGAS7W3WSIkuwJy0="}],"description":"Bridge painting and overnight roadwork on Meadowbrook State Parkway both directions between START ROUTE Meadowbrook State Parkway at Ocean Parkway (Hempstead) and Exit M10 - Loop Parkway (Hempstead), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T01:53:43Z"},"road_event_id":"OaO1nsnY2oVwlkxEtUp4aaF/QP4=","beginning_cross_street":"START ROUTE Meadowbrook State Parkway at Ocean Parkway","ending_cross_street":"Exit M10 - Loop Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T01:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.537101,40.593613]]}},{"id":"1l4dK/JJ1+CyGAS7W3WSIkuwJy0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ujDBvR0eY50WlTAM3b1VEfA00G8="}],"description":"Bridge painting and overnight roadwork on Meadowbrook State Parkway both directions between START ROUTE Meadowbrook State Parkway at Ocean Parkway (Hempstead) and Exit M10 - Loop Parkway (Hempstead), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T01:53:43Z"},"road_event_id":"1l4dK/JJ1+CyGAS7W3WSIkuwJy0=","beginning_cross_street":"START ROUTE Meadowbrook State Parkway at Ocean Parkway","ending_cross_street":"Exit M10 - Loop Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T01:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.537101,40.593613]]}},{"id":"i4M98fihFFPFGNSPjd1P6vbSVJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WAufW85Hx+doVjhAq+k/x06YhPE="}],"description":"Bridge rehabilitation and bridge work and overnight roadwork and steel repairs on NY 27 westbound between Exit 41 - Robert Moses Causeway (Islip) and Exit 40 - NY 231; Babylon Northport Expressway (Babylon), Sunday May 10th, 2026 thru Friday May 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-11T01:56:11Z"},"road_event_id":"i4M98fihFFPFGNSPjd1P6vbSVJw=","beginning_cross_street":"Exit 41 - Robert Moses Causeway","ending_cross_street":"Exit 40 - NY 231; Babylon Northport Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.286455,40.726437]]}},{"id":"WAufW85Hx+doVjhAq+k/x06YhPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i4M98fihFFPFGNSPjd1P6vbSVJw="}],"description":"Bridge rehabilitation and bridge work and overnight roadwork and steel repairs on NY 27 westbound between Exit 41 - Robert Moses Causeway (Islip) and Exit 40 - NY 231; Babylon Northport Expressway (Babylon), Sunday May 10th, 2026 thru Friday May 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-11T01:56:11Z"},"road_event_id":"WAufW85Hx+doVjhAq+k/x06YhPE=","beginning_cross_street":"Exit 41 - Robert Moses Causeway","ending_cross_street":"Exit 40 - NY 231; Babylon Northport Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.286455,40.726437]]}},{"id":"A3tc4rpDiGq+trX5NQ1eBF9lm4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Northern State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uo+K476cQnIaIIyryGZnC6MA9SQ="}],"description":"Overnight roadwork and repaving on Northern State Parkway both directions between Exit 25 - Lakeville Road; Marcus Avenue (North Hempstead) and Exit 39 - Round Swamp Road (Huntington), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 05:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T01:58:38Z"},"road_event_id":"A3tc4rpDiGq+trX5NQ1eBF9lm4o=","beginning_cross_street":"Exit 25 - Lakeville Road; Marcus Avenue","ending_cross_street":"Exit 39 - Round Swamp Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.701692,40.760376]]}},{"id":"uo+K476cQnIaIIyryGZnC6MA9SQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Northern State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A3tc4rpDiGq+trX5NQ1eBF9lm4o="},{"type":"next-occurrence","id":"dj0dIh9nMswyHB3aQEOmHI+zGlE="}],"description":"Overnight roadwork and repaving on Northern State Parkway both directions between Exit 25 - Lakeville Road; Marcus Avenue (North Hempstead) and Exit 39 - Round Swamp Road (Huntington), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 05:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T01:58:38Z"},"road_event_id":"uo+K476cQnIaIIyryGZnC6MA9SQ=","beginning_cross_street":"Exit 25 - Lakeville Road; Marcus Avenue","ending_cross_street":"Exit 39 - Round Swamp Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.701692,40.760376]]}},{"id":"dj0dIh9nMswyHB3aQEOmHI+zGlE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Northern State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A3tc4rpDiGq+trX5NQ1eBF9lm4o="},{"type":"next-occurrence","id":"7DcvJYqkytX2LsdlqZumo7uQYjQ="}],"description":"Overnight roadwork and repaving on Northern State Parkway both directions between Exit 25 - Lakeville Road; Marcus Avenue (North Hempstead) and Exit 39 - Round Swamp Road (Huntington), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 05:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T01:58:38Z"},"road_event_id":"dj0dIh9nMswyHB3aQEOmHI+zGlE=","beginning_cross_street":"Exit 25 - Lakeville Road; Marcus Avenue","ending_cross_street":"Exit 39 - Round Swamp Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.701692,40.760376]]}},{"id":"7DcvJYqkytX2LsdlqZumo7uQYjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Northern State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A3tc4rpDiGq+trX5NQ1eBF9lm4o="}],"description":"Overnight roadwork and repaving on Northern State Parkway both directions between Exit 25 - Lakeville Road; Marcus Avenue (North Hempstead) and Exit 39 - Round Swamp Road (Huntington), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 05:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T01:58:38Z"},"road_event_id":"7DcvJYqkytX2LsdlqZumo7uQYjQ=","beginning_cross_street":"Exit 25 - Lakeville Road; Marcus Avenue","ending_cross_street":"Exit 39 - Round Swamp Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T14:00:00Z","end_date":"2026-05-16T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.701692,40.760376]]}},{"id":"5N1JCOHP+tl8cS3apGppBIZLB0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UCAJaQe0MjwQD/4g8biqDm+hfVs="}],"description":"Overnight roadwork and repaving on NY 25A both directions between Lawrence Hill Road; NY 108 (Huntington) and NY 25 at West Main Street (Smithtown), Wednesday May 13th, 2026 thru Saturday May 16th, 2026, Wednesday/Thursday/Friday, 10:00 PM thru 05:30 AM All lanes closed","update_date":"2026-05-11T02:03:21Z"},"road_event_id":"5N1JCOHP+tl8cS3apGppBIZLB0A=","beginning_cross_street":"Lawrence Hill Road; NY 108","ending_cross_street":"West Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.46192,40.858391]]}},{"id":"UCAJaQe0MjwQD/4g8biqDm+hfVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5N1JCOHP+tl8cS3apGppBIZLB0A="},{"type":"next-occurrence","id":"WYEdCFWbfVuRl/Zsz7taoBAgiho="}],"description":"Overnight roadwork and repaving on NY 25A both directions between Lawrence Hill Road; NY 108 (Huntington) and NY 25 at West Main Street (Smithtown), Wednesday May 13th, 2026 thru Saturday May 16th, 2026, Wednesday/Thursday/Friday, 10:00 PM thru 05:30 AM All lanes closed","update_date":"2026-05-11T02:03:21Z"},"road_event_id":"UCAJaQe0MjwQD/4g8biqDm+hfVs=","beginning_cross_street":"Lawrence Hill Road; NY 108","ending_cross_street":"West Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.46192,40.858391]]}},{"id":"WYEdCFWbfVuRl/Zsz7taoBAgiho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5N1JCOHP+tl8cS3apGppBIZLB0A="}],"description":"Overnight roadwork and repaving on NY 25A both directions between Lawrence Hill Road; NY 108 (Huntington) and NY 25 at West Main Street (Smithtown), Wednesday May 13th, 2026 thru Saturday May 16th, 2026, Wednesday/Thursday/Friday, 10:00 PM thru 05:30 AM All lanes closed","update_date":"2026-05-11T02:03:21Z"},"road_event_id":"WYEdCFWbfVuRl/Zsz7taoBAgiho=","beginning_cross_street":"Lawrence Hill Road; NY 108","ending_cross_street":"West Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.46192,40.858391]]}},{"id":"dLoMPHdKbl3UqA+qccA1GJ+l3/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27A"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs and drainage improvements and roadwork and utility work on NY 27A both directions between Riverside Avenue (Amityville) and Grand Central Avenue (Amityville), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes closed","update_date":"2026-05-11T02:10:17Z"},"road_event_id":"dLoMPHdKbl3UqA+qccA1GJ+l3/0=","beginning_cross_street":"Riverside Avenue","ending_cross_street":"Grand Central Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.413009,40.670005]]}},{"id":"5i5Pr4nDqzQBPBnHecCqjXhPA5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25A"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements and overnight roadwork and repaving on NY 25A eastbound between Logan Drive (Huntington) and Greenlawn Road (Huntington), Monday May 11th, 2026 thru Thursday May 14th, 2026, Monday/Tuesday/Wednesday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-11T02:14:17Z"},"road_event_id":"5i5Pr4nDqzQBPBnHecCqjXhPA5c=","beginning_cross_street":"Logan Drive","ending_cross_street":"Greenlawn Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.40793,40.878935]]}},{"id":"wMgLMX8YJOV/NdDI41t/VxFaUCI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Loop Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LfLsTjUG5Aan6S2S6Az8SL045XE="}],"description":"Barrier repairs and guard rail repairs and roadwork on Loop Parkway both directions between START ROUTE Loop Parkway at Lido Boulevard (Hempstead) and Meadowbrook State Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T02:16:23Z"},"road_event_id":"wMgLMX8YJOV/NdDI41t/VxFaUCI=","beginning_cross_street":"START ROUTE Loop Parkway at Lido Boulevard","ending_cross_street":"Meadowbrook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.587004,40.5921]]}},{"id":"LfLsTjUG5Aan6S2S6Az8SL045XE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Loop Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wMgLMX8YJOV/NdDI41t/VxFaUCI="},{"type":"next-occurrence","id":"GgxH0HMyll/sThwSHiHBL7R0vpM="}],"description":"Barrier repairs and guard rail repairs and roadwork on Loop Parkway both directions between START ROUTE Loop Parkway at Lido Boulevard (Hempstead) and Meadowbrook State Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T02:16:23Z"},"road_event_id":"LfLsTjUG5Aan6S2S6Az8SL045XE=","beginning_cross_street":"START ROUTE Loop Parkway at Lido Boulevard","ending_cross_street":"Meadowbrook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.587004,40.5921]]}},{"id":"GgxH0HMyll/sThwSHiHBL7R0vpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Loop Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wMgLMX8YJOV/NdDI41t/VxFaUCI="}],"description":"Barrier repairs and guard rail repairs and roadwork on Loop Parkway both directions between START ROUTE Loop Parkway at Lido Boulevard (Hempstead) and Meadowbrook State Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T02:16:23Z"},"road_event_id":"GgxH0HMyll/sThwSHiHBL7R0vpM=","beginning_cross_street":"START ROUTE Loop Parkway at Lido Boulevard","ending_cross_street":"Meadowbrook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.587004,40.5921]]}},{"id":"Efn9yvU1Q7Os8nE/Zhnb3hPNO8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[],"description":"Bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Monday May 11th, 2026 thru Wednesday May 13th, 2026, Monday/Tuesday/Wednesday, 08:30 AM thru 02:30 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T02:17:49Z"},"road_event_id":"Efn9yvU1Q7Os8nE/Zhnb3hPNO8Q=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:30:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944918,40.850261]]}},{"id":"a4IIPupxu1GOw3VZzFSUJQX4OKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YCv4xU8Zn+szGXQMRRpWSqaDZYY="}],"description":"Barrier repairs and guard rail repairs and roadwork on Meadowbrook State Parkway both directions between Exit M6W - Southern State Parkway (Hempstead) and Exit M8W (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T02:18:51Z"},"road_event_id":"a4IIPupxu1GOw3VZzFSUJQX4OKw=","beginning_cross_street":"Exit M6W - Southern State Parkway","ending_cross_street":"Exit M8W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.572229,40.679922]]}},{"id":"YCv4xU8Zn+szGXQMRRpWSqaDZYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a4IIPupxu1GOw3VZzFSUJQX4OKw="},{"type":"next-occurrence","id":"zShxMpv300/q1WoRVMcnloALGDQ="}],"description":"Barrier repairs and guard rail repairs and roadwork on Meadowbrook State Parkway both directions between Exit M6W - Southern State Parkway (Hempstead) and Exit M8W (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T02:18:51Z"},"road_event_id":"YCv4xU8Zn+szGXQMRRpWSqaDZYY=","beginning_cross_street":"Exit M6W - Southern State Parkway","ending_cross_street":"Exit M8W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.572229,40.679922]]}},{"id":"zShxMpv300/q1WoRVMcnloALGDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a4IIPupxu1GOw3VZzFSUJQX4OKw="}],"description":"Barrier repairs and guard rail repairs and roadwork on Meadowbrook State Parkway both directions between Exit M6W - Southern State Parkway (Hempstead) and Exit M8W (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T02:18:51Z"},"road_event_id":"zShxMpv300/q1WoRVMcnloALGDQ=","beginning_cross_street":"Exit M6W - Southern State Parkway","ending_cross_street":"Exit M8W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.572229,40.679922]]}},{"id":"UZ6JLufWp2ED8RmI34pgx58mAUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bo5LzhtcsTRiOZeMrsFiFg77LmI="}],"description":"Bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 08:30 AM thru 02:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T02:18:57Z"},"road_event_id":"UZ6JLufWp2ED8RmI34pgx58mAUA=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T21:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945167,40.850313]]}},{"id":"bo5LzhtcsTRiOZeMrsFiFg77LmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UZ6JLufWp2ED8RmI34pgx58mAUA="}],"description":"Bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 08:30 AM thru 02:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T02:18:57Z"},"road_event_id":"bo5LzhtcsTRiOZeMrsFiFg77LmI=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T21:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945167,40.850313]]}},{"id":"VYHdE2KAIQUWGWtVI9ttpbHCbr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 231"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ecwkO5G3EEmd8e0RyQV8xEP+wnc="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on NY 231 southbound at Ellsworth Avenue (Babylon), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T02:20:39Z"},"road_event_id":"VYHdE2KAIQUWGWtVI9ttpbHCbr0=","beginning_cross_street":"Ellsworth Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.320597,40.728795]]}},{"id":"ecwkO5G3EEmd8e0RyQV8xEP+wnc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 231"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VYHdE2KAIQUWGWtVI9ttpbHCbr0="},{"type":"next-occurrence","id":"VIkywhg2s1cKi00maLUrGc4+PQM="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on NY 231 southbound at Ellsworth Avenue (Babylon), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T02:20:39Z"},"road_event_id":"ecwkO5G3EEmd8e0RyQV8xEP+wnc=","beginning_cross_street":"Ellsworth Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.320597,40.728795]]}},{"id":"VIkywhg2s1cKi00maLUrGc4+PQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 231"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VYHdE2KAIQUWGWtVI9ttpbHCbr0="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on NY 231 southbound at Ellsworth Avenue (Babylon), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T02:20:39Z"},"road_event_id":"VIkywhg2s1cKi00maLUrGc4+PQM=","beginning_cross_street":"Ellsworth Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.320597,40.728795]]}},{"id":"+gpknKhBX2E30CwvkReeRt35hGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JFVh/S3DaOdHoy8hQof2y7I0bMg="}],"description":"Construction on George Washington Bridge Lower Level westbound Lower Trans Manhattan Expressway (Manhattan) to Exit 1A - Henry Hudson Parkway (New York), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:30 AM thru 02:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T02:20:48Z"},"road_event_id":"+gpknKhBX2E30CwvkReeRt35hGM=","beginning_cross_street":"Lower Trans Manhattan Expressway","ending_cross_street":"Exit 1A - Henry Hudson Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:30:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939998,40.849356]]}},{"id":"JFVh/S3DaOdHoy8hQof2y7I0bMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+gpknKhBX2E30CwvkReeRt35hGM="},{"type":"next-occurrence","id":"4e2Wzv7FSiChPLdJhTanTp5iwuE="}],"description":"Construction on George Washington Bridge Lower Level westbound Lower Trans Manhattan Expressway (Manhattan) to Exit 1A - Henry Hudson Parkway (New York), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:30 AM thru 02:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T02:20:48Z"},"road_event_id":"JFVh/S3DaOdHoy8hQof2y7I0bMg=","beginning_cross_street":"Lower Trans Manhattan Expressway","ending_cross_street":"Exit 1A - Henry Hudson Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:30:00Z","end_date":"2026-05-14T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939998,40.849356]]}},{"id":"4e2Wzv7FSiChPLdJhTanTp5iwuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+gpknKhBX2E30CwvkReeRt35hGM="}],"description":"Construction on George Washington Bridge Lower Level westbound Lower Trans Manhattan Expressway (Manhattan) to Exit 1A - Henry Hudson Parkway (New York), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:30 AM thru 02:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T02:20:48Z"},"road_event_id":"4e2Wzv7FSiChPLdJhTanTp5iwuE=","beginning_cross_street":"Lower Trans Manhattan Expressway","ending_cross_street":"Exit 1A - Henry Hudson Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:30:00Z","end_date":"2026-05-15T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939998,40.849356]]}},{"id":"61zfPZEMdhV6buMjHWvj+GAbxgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mnFUQdkypUoQSM6EVYB5DffPQCA="}],"description":"Bridge construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 04:30 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T02:21:50Z"},"road_event_id":"61zfPZEMdhV6buMjHWvj+GAbxgA=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960984,40.85325]]}},{"id":"mnFUQdkypUoQSM6EVYB5DffPQCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"61zfPZEMdhV6buMjHWvj+GAbxgA="},{"type":"next-occurrence","id":"gps237rFsOelpbMoakJRzygwDGI="}],"description":"Bridge construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 04:30 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T02:21:50Z"},"road_event_id":"mnFUQdkypUoQSM6EVYB5DffPQCA=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960984,40.85325]]}},{"id":"gps237rFsOelpbMoakJRzygwDGI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"61zfPZEMdhV6buMjHWvj+GAbxgA="},{"type":"next-occurrence","id":"x3yY5r8UNZQ8zf+TWmy7DqDjHVA="}],"description":"Bridge construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 04:30 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T02:21:50Z"},"road_event_id":"gps237rFsOelpbMoakJRzygwDGI=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960984,40.85325]]}},{"id":"x3yY5r8UNZQ8zf+TWmy7DqDjHVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"61zfPZEMdhV6buMjHWvj+GAbxgA="}],"description":"Bridge construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 04:30 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T02:21:50Z"},"road_event_id":"x3yY5r8UNZQ8zf+TWmy7DqDjHVA=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T14:00:00Z","end_date":"2026-05-16T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960984,40.85325]]}},{"id":"uiDBCTblneXxFkWT3GEV7/96jAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 111"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GQ7qkCN/db5eJi6wFVF1PMoNRRY="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on NY 111 northbound at Smithtown Bypass; NY 347 (Smithtown), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T02:22:12Z"},"road_event_id":"uiDBCTblneXxFkWT3GEV7/96jAw=","beginning_cross_street":"Smithtown Bypass; NY 347","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.198311,40.830265]]}},{"id":"GQ7qkCN/db5eJi6wFVF1PMoNRRY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 111"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uiDBCTblneXxFkWT3GEV7/96jAw="},{"type":"next-occurrence","id":"HlDS/8XTS24j37JSBpMGczB72N4="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on NY 111 northbound at Smithtown Bypass; NY 347 (Smithtown), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T02:22:12Z"},"road_event_id":"GQ7qkCN/db5eJi6wFVF1PMoNRRY=","beginning_cross_street":"Smithtown Bypass; NY 347","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.198311,40.830265]]}},{"id":"HlDS/8XTS24j37JSBpMGczB72N4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 111"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uiDBCTblneXxFkWT3GEV7/96jAw="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on NY 111 northbound at Smithtown Bypass; NY 347 (Smithtown), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T02:22:12Z"},"road_event_id":"HlDS/8XTS24j37JSBpMGczB72N4=","beginning_cross_street":"Smithtown Bypass; NY 347","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.198311,40.830265]]}},{"id":"uXWxF48Lw9BiUnTsH5dlhYgaUkQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/V9RqswAf0jNwevC+yIoj+ETh1Q="}],"description":"Bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Wednesday/Thursday/Friday, 10:30 AM thru 03:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T02:22:57Z"},"road_event_id":"uXWxF48Lw9BiUnTsH5dlhYgaUkQ=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960469,40.853084]]}},{"id":"/V9RqswAf0jNwevC+yIoj+ETh1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uXWxF48Lw9BiUnTsH5dlhYgaUkQ="},{"type":"next-occurrence","id":"HhXbp0wkaZwj5zvCvj/nJqs/fBg="}],"description":"Bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Wednesday/Thursday/Friday, 10:30 AM thru 03:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T02:22:57Z"},"road_event_id":"/V9RqswAf0jNwevC+yIoj+ETh1Q=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960469,40.853084]]}},{"id":"HhXbp0wkaZwj5zvCvj/nJqs/fBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uXWxF48Lw9BiUnTsH5dlhYgaUkQ="}],"description":"Bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Wednesday/Thursday/Friday, 10:30 AM thru 03:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T02:22:57Z"},"road_event_id":"HhXbp0wkaZwj5zvCvj/nJqs/fBg=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960469,40.853084]]}},{"id":"mK/6vlDbJzywk8pBwL/wonn8B1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Loop Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xuZIwiOPYCkJl0+Ld/yCCvCd6Os="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on Loop Parkway southbound between Meadowbrook State Parkway (Hempstead) and START ROUTE Loop Parkway at Lido Boulevard (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T02:24:10Z"},"road_event_id":"mK/6vlDbJzywk8pBwL/wonn8B1k=","beginning_cross_street":"Meadowbrook State Parkway","ending_cross_street":"START ROUTE Loop Parkway at Lido Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.548944,40.610681]]}},{"id":"xuZIwiOPYCkJl0+Ld/yCCvCd6Os=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Loop Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mK/6vlDbJzywk8pBwL/wonn8B1k="},{"type":"next-occurrence","id":"c5a3iOYd2K5I8wpUmIhEglk4Iww="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on Loop Parkway southbound between Meadowbrook State Parkway (Hempstead) and START ROUTE Loop Parkway at Lido Boulevard (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T02:24:10Z"},"road_event_id":"xuZIwiOPYCkJl0+Ld/yCCvCd6Os=","beginning_cross_street":"Meadowbrook State Parkway","ending_cross_street":"START ROUTE Loop Parkway at Lido Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.548944,40.610681]]}},{"id":"c5a3iOYd2K5I8wpUmIhEglk4Iww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Loop Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mK/6vlDbJzywk8pBwL/wonn8B1k="}],"description":"Installation of traffic management systems and roadwork and traffic signal repairs on Loop Parkway southbound between Meadowbrook State Parkway (Hempstead) and START ROUTE Loop Parkway at Lido Boulevard (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T02:24:10Z"},"road_event_id":"c5a3iOYd2K5I8wpUmIhEglk4Iww=","beginning_cross_street":"Meadowbrook State Parkway","ending_cross_street":"START ROUTE Loop Parkway at Lido Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.548944,40.610681]]}},{"id":"LTBw9LJfv/zxd9dsvPe66gClcnU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZDCkEtoGe8jfBNLJWopAbUDmhB0="}],"description":"Construction on George Washington Bridge Upper Level eastbound ramp to Exit 1A - Henry Hudson Parkway (New York), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:30 AM thru 04:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T02:25:13Z"},"road_event_id":"LTBw9LJfv/zxd9dsvPe66gClcnU=","beginning_cross_street":"Exit 1A - Henry Hudson Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:30:00Z","end_date":"2026-05-13T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.943506,40.849724]]}},{"id":"ZDCkEtoGe8jfBNLJWopAbUDmhB0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LTBw9LJfv/zxd9dsvPe66gClcnU="},{"type":"next-occurrence","id":"2uku4lGEKMBTcsb9ghhSbirPgCo="}],"description":"Construction on George Washington Bridge Upper Level eastbound ramp to Exit 1A - Henry Hudson Parkway (New York), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:30 AM thru 04:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T02:25:13Z"},"road_event_id":"ZDCkEtoGe8jfBNLJWopAbUDmhB0=","beginning_cross_street":"Exit 1A - Henry Hudson Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:30:00Z","end_date":"2026-05-14T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.943506,40.849724]]}},{"id":"2uku4lGEKMBTcsb9ghhSbirPgCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LTBw9LJfv/zxd9dsvPe66gClcnU="}],"description":"Construction on George Washington Bridge Upper Level eastbound ramp to Exit 1A - Henry Hudson Parkway (New York), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:30 AM thru 04:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T02:25:13Z"},"road_event_id":"2uku4lGEKMBTcsb9ghhSbirPgCo=","beginning_cross_street":"Exit 1A - Henry Hudson Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:30:00Z","end_date":"2026-05-15T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.943506,40.849724]]}},{"id":"WcmRXnK7yMAxZitAwqCw7VHGEAg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RrfHbRvTmZbzG2b8N7L0hZ8fmy8="}],"description":"Construction on George Washington Bridge Lower Level eastbound ramp from Exit 1A - Henry Hudson Parkway (New York), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T02:27:14Z"},"road_event_id":"WcmRXnK7yMAxZitAwqCw7VHGEAg=","beginning_cross_street":"Exit 1A - Henry Hudson Parkway","ending_cross_street":"Exit 1A - Henry Hudson Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.942943,40.84736]]}},{"id":"RrfHbRvTmZbzG2b8N7L0hZ8fmy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WcmRXnK7yMAxZitAwqCw7VHGEAg="},{"type":"next-occurrence","id":"DQwIoSK9lkiQD/5bluxnnbTiGvA="}],"description":"Construction on George Washington Bridge Lower Level eastbound ramp from Exit 1A - Henry Hudson Parkway (New York), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T02:27:14Z"},"road_event_id":"RrfHbRvTmZbzG2b8N7L0hZ8fmy8=","beginning_cross_street":"Exit 1A - Henry Hudson Parkway","ending_cross_street":"Exit 1A - Henry Hudson Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:30:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.942943,40.84736]]}},{"id":"DQwIoSK9lkiQD/5bluxnnbTiGvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WcmRXnK7yMAxZitAwqCw7VHGEAg="}],"description":"Construction on George Washington Bridge Lower Level eastbound ramp from Exit 1A - Henry Hudson Parkway (New York), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T02:27:14Z"},"road_event_id":"DQwIoSK9lkiQD/5bluxnnbTiGvA=","beginning_cross_street":"Exit 1A - Henry Hudson Parkway","ending_cross_street":"Exit 1A - Henry Hudson Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:30:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.942943,40.84736]]}},{"id":"oChqgC6TnjB/VPoD2wnwErNEuEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"N/BaHGvxhglAyZyZ4OOPOLQH2To="}],"description":"Drainage improvements and roadwork on Wantagh State Parkway northbound between START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 2 Right lanes of 3 lanes closed","update_date":"2026-05-11T02:32:45Z"},"road_event_id":"oChqgC6TnjB/VPoD2wnwErNEuEE=","beginning_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","ending_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.507925,40.59709]]}},{"id":"N/BaHGvxhglAyZyZ4OOPOLQH2To=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oChqgC6TnjB/VPoD2wnwErNEuEE="},{"type":"next-occurrence","id":"y+bwFFDnZRzeTUwWn4KbfT9xnyY="}],"description":"Drainage improvements and roadwork on Wantagh State Parkway northbound between START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 2 Right lanes of 3 lanes closed","update_date":"2026-05-11T02:32:45Z"},"road_event_id":"N/BaHGvxhglAyZyZ4OOPOLQH2To=","beginning_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","ending_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.507925,40.59709]]}},{"id":"y+bwFFDnZRzeTUwWn4KbfT9xnyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oChqgC6TnjB/VPoD2wnwErNEuEE="}],"description":"Drainage improvements and roadwork on Wantagh State Parkway northbound between START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 2 Right lanes of 3 lanes closed","update_date":"2026-05-11T02:32:45Z"},"road_event_id":"y+bwFFDnZRzeTUwWn4KbfT9xnyY=","beginning_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","ending_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.507925,40.59709]]}},{"id":"Im5KNTLn4UhzxETGYI6wnCoDSLE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Robert Moses Causeway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Iwz50nUWTQ5cNS0oXVBsGNdCJDg="}],"description":"Barrier repairs and bridge rehabilitation and guard rail repairs and roadwork on Robert Moses Causeway both directions between Exit RM1E - Sunrise Highway (Islip) and Ocean Parkway; Captree State Park (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T02:37:17Z"},"road_event_id":"Im5KNTLn4UhzxETGYI6wnCoDSLE=","beginning_cross_street":"Exit RM1E - Sunrise Highway","ending_cross_street":"Ocean Parkway; Captree State Park","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.287135,40.724219]]}},{"id":"Iwz50nUWTQ5cNS0oXVBsGNdCJDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Robert Moses Causeway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Im5KNTLn4UhzxETGYI6wnCoDSLE="},{"type":"next-occurrence","id":"eFk8k+1OEyrGq4v8Y8LLNmhWlMg="}],"description":"Barrier repairs and bridge rehabilitation and guard rail repairs and roadwork on Robert Moses Causeway both directions between Exit RM1E - Sunrise Highway (Islip) and Ocean Parkway; Captree State Park (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T02:37:17Z"},"road_event_id":"Iwz50nUWTQ5cNS0oXVBsGNdCJDg=","beginning_cross_street":"Exit RM1E - Sunrise Highway","ending_cross_street":"Ocean Parkway; Captree State Park","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.287135,40.724219]]}},{"id":"eFk8k+1OEyrGq4v8Y8LLNmhWlMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Robert Moses Causeway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Im5KNTLn4UhzxETGYI6wnCoDSLE="}],"description":"Barrier repairs and bridge rehabilitation and guard rail repairs and roadwork on Robert Moses Causeway both directions between Exit RM1E - Sunrise Highway (Islip) and Ocean Parkway; Captree State Park (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T02:37:17Z"},"road_event_id":"eFk8k+1OEyrGq4v8Y8LLNmhWlMg=","beginning_cross_street":"Exit RM1E - Sunrise Highway","ending_cross_street":"Ocean Parkway; Captree State Park","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.287135,40.724219]]}},{"id":"LCeHKoIeOs808QI4B+ol35rwFqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Robert Moses Causeway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ECT7/12eCdrZKHxIxkvNHzExKbw="}],"description":"Barrier repairs and guard rail repairs and roadwork on Robert Moses Causeway both directions between Southern State Parkway (Islip) and Exit RM1W - Sunrise Highway; NY 27 (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T02:41:30Z"},"road_event_id":"LCeHKoIeOs808QI4B+ol35rwFqA=","beginning_cross_street":"Southern State Parkway","ending_cross_street":"Exit RM1W - Sunrise Highway; NY 27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.285917,40.732428]]}},{"id":"ECT7/12eCdrZKHxIxkvNHzExKbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Robert Moses Causeway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LCeHKoIeOs808QI4B+ol35rwFqA="},{"type":"next-occurrence","id":"58Y/SI9xhs/jN7irPWth37K5ZTU="}],"description":"Barrier repairs and guard rail repairs and roadwork on Robert Moses Causeway both directions between Southern State Parkway (Islip) and Exit RM1W - Sunrise Highway; NY 27 (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T02:41:30Z"},"road_event_id":"ECT7/12eCdrZKHxIxkvNHzExKbw=","beginning_cross_street":"Southern State Parkway","ending_cross_street":"Exit RM1W - Sunrise Highway; NY 27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.285917,40.732428]]}},{"id":"58Y/SI9xhs/jN7irPWth37K5ZTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Robert Moses Causeway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LCeHKoIeOs808QI4B+ol35rwFqA="}],"description":"Barrier repairs and guard rail repairs and roadwork on Robert Moses Causeway both directions between Southern State Parkway (Islip) and Exit RM1W - Sunrise Highway; NY 27 (Islip), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T02:41:30Z"},"road_event_id":"58Y/SI9xhs/jN7irPWth37K5ZTU=","beginning_cross_street":"Southern State Parkway","ending_cross_street":"Exit RM1W - Sunrise Highway; NY 27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.285917,40.732428]]}},{"id":"DoC9h1Cfc28mq2vqmZeEL1Nd+fU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"E+m06JkOAboFvQMKDHXzaueB5dY="}],"description":"Barrier repairs and guard rail repairs and mowing and roadwork on Wantagh State Parkway both directions between Exit W6 - Merrick Road (Hempstead) and START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 2 Left lanes of 3 lanes closed southbound; 1 Left lane of 3 lanes closed northbound","update_date":"2026-05-11T02:44:20Z"},"road_event_id":"DoC9h1Cfc28mq2vqmZeEL1Nd+fU=","beginning_cross_street":"Exit W6 - Merrick Road","ending_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.510382,40.662053]]}},{"id":"E+m06JkOAboFvQMKDHXzaueB5dY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DoC9h1Cfc28mq2vqmZeEL1Nd+fU="},{"type":"next-occurrence","id":"RpzdETK4RQ8CO9CG/+u7gX2flJo="}],"description":"Barrier repairs and guard rail repairs and mowing and roadwork on Wantagh State Parkway both directions between Exit W6 - Merrick Road (Hempstead) and START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 2 Left lanes of 3 lanes closed southbound; 1 Left lane of 3 lanes closed northbound","update_date":"2026-05-11T02:44:20Z"},"road_event_id":"E+m06JkOAboFvQMKDHXzaueB5dY=","beginning_cross_street":"Exit W6 - Merrick Road","ending_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.510382,40.662053]]}},{"id":"RpzdETK4RQ8CO9CG/+u7gX2flJo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DoC9h1Cfc28mq2vqmZeEL1Nd+fU="}],"description":"Barrier repairs and guard rail repairs and mowing and roadwork on Wantagh State Parkway both directions between Exit W6 - Merrick Road (Hempstead) and START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 2 Left lanes of 3 lanes closed southbound; 1 Left lane of 3 lanes closed northbound","update_date":"2026-05-11T02:44:20Z"},"road_event_id":"RpzdETK4RQ8CO9CG/+u7gX2flJo=","beginning_cross_street":"Exit W6 - Merrick Road","ending_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.510382,40.662053]]}},{"id":"HgfQ36BwPXOT1rApFwqKoWAgI7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Xe4mY9f3CrNpTmtAkagXtuhVFgo="}],"description":"Barrier repairs and mowing and repaving and utility work on NY 25 both directions at DIX Hills Road (Huntington), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T02:49:08Z"},"road_event_id":"HgfQ36BwPXOT1rApFwqKoWAgI7M=","beginning_cross_street":"DIX Hills Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.370597,40.835398]]}},{"id":"Xe4mY9f3CrNpTmtAkagXtuhVFgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HgfQ36BwPXOT1rApFwqKoWAgI7M="},{"type":"next-occurrence","id":"5MLlMKU6mMyaAghmBx3xCGmCasc="}],"description":"Barrier repairs and mowing and repaving and utility work on NY 25 both directions at DIX Hills Road (Huntington), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T02:49:08Z"},"road_event_id":"Xe4mY9f3CrNpTmtAkagXtuhVFgo=","beginning_cross_street":"DIX Hills Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.370597,40.835398]]}},{"id":"5MLlMKU6mMyaAghmBx3xCGmCasc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HgfQ36BwPXOT1rApFwqKoWAgI7M="}],"description":"Barrier repairs and mowing and repaving and utility work on NY 25 both directions at DIX Hills Road (Huntington), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T02:49:08Z"},"road_event_id":"5MLlMKU6mMyaAghmBx3xCGmCasc=","beginning_cross_street":"DIX Hills Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.370597,40.835398]]}},{"id":"gV8B4gqbcwBT9Df98jgCbGOhniY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[],"description":"Bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Friday May 15th, 2026 thru Saturday May 16th, 2026, 10:00 PM thru 08:00 AM All lanes closed and detoured","update_date":"2026-05-11T02:49:08Z"},"road_event_id":"gV8B4gqbcwBT9Df98jgCbGOhniY=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944867,40.85025]]}},{"id":"J0qKFsSuTY6jh28st/fF6PQfkas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[],"description":"Bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Friday May 15th, 2026 thru Saturday May 16th, 2026, 10:00 PM thru 08:00 AM All lanes closed and detoured","update_date":"2026-05-11T02:50:23Z"},"road_event_id":"J0qKFsSuTY6jh28st/fF6PQfkas=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960477,40.853086]]}},{"id":"Etq53mJloaw1Tfi3JRWdNAwWYjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mGaYPBD0YVkjrE+G/n0QSAjdvvw="}],"description":"Barrier repairs and mowing and overnight roadwork and utility work on NY 25 both directions at DIX Hills Road (Huntington), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T02:51:29Z"},"road_event_id":"Etq53mJloaw1Tfi3JRWdNAwWYjU=","beginning_cross_street":"DIX Hills Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.370597,40.835398]]}},{"id":"mGaYPBD0YVkjrE+G/n0QSAjdvvw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Etq53mJloaw1Tfi3JRWdNAwWYjU="},{"type":"next-occurrence","id":"Zq7fwM/ny9fSJUrWjLmNj5/uGhA="}],"description":"Barrier repairs and mowing and overnight roadwork and utility work on NY 25 both directions at DIX Hills Road (Huntington), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T02:51:29Z"},"road_event_id":"mGaYPBD0YVkjrE+G/n0QSAjdvvw=","beginning_cross_street":"DIX Hills Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.370597,40.835398]]}},{"id":"Zq7fwM/ny9fSJUrWjLmNj5/uGhA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Etq53mJloaw1Tfi3JRWdNAwWYjU="}],"description":"Barrier repairs and mowing and overnight roadwork and utility work on NY 25 both directions at DIX Hills Road (Huntington), Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T02:51:29Z"},"road_event_id":"Zq7fwM/ny9fSJUrWjLmNj5/uGhA=","beginning_cross_street":"DIX Hills Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.370597,40.835398]]}},{"id":"wQnxkYjiIe5XQlsDpCEGJ8Fwg3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Southern State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kUbAzhvaNHjB8kW49+qLolBArEQ="}],"description":"Barrier repairs and mowing and overnight roadwork and utility work on Southern State Parkway both directions between Exit 18 - Eagle Avenue (Hempstead) and Exit 13S - Central Avenue (Hempstead), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 10:00 PM thru 05:00 PM 3 Left lanes of 4 lanes closed westbound; All lanes of 4 lanes closed eastbound","update_date":"2026-05-11T02:54:33Z"},"road_event_id":"wQnxkYjiIe5XQlsDpCEGJ8Fwg3Y=","beginning_cross_street":"Exit 18 - Eagle Avenue","ending_cross_street":"Exit 13S - Central Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.644097,40.684019]]}},{"id":"kUbAzhvaNHjB8kW49+qLolBArEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Southern State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wQnxkYjiIe5XQlsDpCEGJ8Fwg3Y="}],"description":"Barrier repairs and mowing and overnight roadwork and utility work on Southern State Parkway both directions between Exit 18 - Eagle Avenue (Hempstead) and Exit 13S - Central Avenue (Hempstead), Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday, 10:00 PM thru 05:00 PM 3 Left lanes of 4 lanes closed westbound; All lanes of 4 lanes closed eastbound","update_date":"2026-05-11T02:54:33Z"},"road_event_id":"kUbAzhvaNHjB8kW49+qLolBArEQ=","beginning_cross_street":"Exit 18 - Eagle Avenue","ending_cross_street":"Exit 13S - Central Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.644097,40.684019]]}},{"id":"YtePuby9aRLxMj2M+g8tsrJ937o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MH0t7Ue8iymZ4MYAexOWe4iAeyA="}],"description":"Gas main repairs on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/","update_date":"2026-05-11T02:55:05Z"},"road_event_id":"YtePuby9aRLxMj2M+g8tsrJ937o=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"MH0t7Ue8iymZ4MYAexOWe4iAeyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YtePuby9aRLxMj2M+g8tsrJ937o="},{"type":"next-occurrence","id":"3FNrjnBcl3kEXLIn/iBJ8XgdVtY="}],"description":"Gas main repairs on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/","update_date":"2026-05-11T02:55:05Z"},"road_event_id":"MH0t7Ue8iymZ4MYAexOWe4iAeyA=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"3FNrjnBcl3kEXLIn/iBJ8XgdVtY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YtePuby9aRLxMj2M+g8tsrJ937o="},{"type":"next-occurrence","id":"wA2ENPCsyAzhUFp0p3z8ccbXD7Y="}],"description":"Gas main repairs on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/","update_date":"2026-05-11T02:55:05Z"},"road_event_id":"3FNrjnBcl3kEXLIn/iBJ8XgdVtY=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"wA2ENPCsyAzhUFp0p3z8ccbXD7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YtePuby9aRLxMj2M+g8tsrJ937o="},{"type":"next-occurrence","id":"FMGXwL/cqoYfkOOygerQ2fUFPy0="}],"description":"Gas main repairs on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/","update_date":"2026-05-11T02:55:05Z"},"road_event_id":"wA2ENPCsyAzhUFp0p3z8ccbXD7Y=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"FMGXwL/cqoYfkOOygerQ2fUFPy0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YtePuby9aRLxMj2M+g8tsrJ937o="},{"type":"next-occurrence","id":"JDrVMz5aO2fXtlo/dxz6La+vIbM="}],"description":"Gas main repairs on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/","update_date":"2026-05-11T02:55:05Z"},"road_event_id":"FMGXwL/cqoYfkOOygerQ2fUFPy0=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"JDrVMz5aO2fXtlo/dxz6La+vIbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YtePuby9aRLxMj2M+g8tsrJ937o="},{"type":"next-occurrence","id":"YLmO/ZQrMLWGY5GQBNq+Hlm+Fxw="}],"description":"Gas main repairs on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/","update_date":"2026-05-11T02:55:05Z"},"road_event_id":"JDrVMz5aO2fXtlo/dxz6La+vIbM=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"YLmO/ZQrMLWGY5GQBNq+Hlm+Fxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YtePuby9aRLxMj2M+g8tsrJ937o="},{"type":"next-occurrence","id":"c1ivCJsQvH4VJ5dOaePcw9Tx2T8="}],"description":"Gas main repairs on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/","update_date":"2026-05-11T02:55:05Z"},"road_event_id":"YLmO/ZQrMLWGY5GQBNq+Hlm+Fxw=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"c1ivCJsQvH4VJ5dOaePcw9Tx2T8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YtePuby9aRLxMj2M+g8tsrJ937o="},{"type":"next-occurrence","id":"MTYmsRUrD0apqfJGtlBcM6mnBD4="}],"description":"Gas main repairs on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/","update_date":"2026-05-11T02:55:05Z"},"road_event_id":"c1ivCJsQvH4VJ5dOaePcw9Tx2T8=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"MTYmsRUrD0apqfJGtlBcM6mnBD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YtePuby9aRLxMj2M+g8tsrJ937o="}],"description":"Gas main repairs on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/","update_date":"2026-05-11T02:55:05Z"},"road_event_id":"MTYmsRUrD0apqfJGtlBcM6mnBD4=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"CyufN00FDY7+UgaviWkFO9CLZlM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair and roadwork on I-495 westbound in the vicinity of Exit 70 - CR 111 (Brookhaven), Wednesday May 13th, 2026, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T03:12:53Z"},"road_event_id":"CyufN00FDY7+UgaviWkFO9CLZlM=","beginning_cross_street":"Exit 70 - CR 111","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.804017,40.870971]]}},{"id":"JejVysHWM8c1kF7dPKUtItTACsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair and overnight roadwork on NY 27 eastbound between Exit 48 - Smithtown Avenue; Locust Avenue (Islip) and Exit 49 - Lakeland Avenue (Islip), Thursday May 14th, 2026 thru Friday May 15th, 2026, 10:00 PM thru 03:00 AM 2 Left lanes of 3 lanes closed","update_date":"2026-05-11T03:15:11Z"},"road_event_id":"JejVysHWM8c1kF7dPKUtItTACsU=","beginning_cross_street":"Exit 48 - Smithtown Avenue; Locust Avenue","ending_cross_street":"Exit 49 - Lakeland Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.106805,40.757412]]}},{"id":"teXyOsm7M8cgXLbpl+6X/ARoYes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair and overnight roadwork on Long Island Expressway/I-495 HOV Lane eastbound between Exit 58 - Old Nichols Road (Islip) and Exit 61 - Patchogue Holbrook Road; CR 19 (Brookhaven), Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 05:00 AM 3 Left lanes of 4 lanes closed","update_date":"2026-05-11T03:16:57Z"},"road_event_id":"teXyOsm7M8cgXLbpl+6X/ARoYes=","beginning_cross_street":"Exit 58 - Old Nichols Road","ending_cross_street":"Exit 61 - Patchogue Holbrook Road; CR 19","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.167401,40.80881]]}},{"id":"nTQLdVjxhfiwFI9qXj7lgvoAf/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound between South of Morgan Drawbridge (Old Bridge Twp) and Ernston Rd (Sayreville), Saturday May 16, 2026 08:00 PM thru Sunday May 17, 2026 06:00 AM, right lane closed","update_date":"2026-05-11T04:18:35Z"},"road_event_id":"nTQLdVjxhfiwFI9qXj7lgvoAf/k=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T20:00:00Z","end_date":"2026-05-18T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"g/J7rmud7gYS6Uj/e52HqUvB96U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound near North of Charlotte Circle (Jersey City), Saturday May 16, 2026 12:00 AM thru Sunday May 17, 2026 12:00 AM, left lane closed","update_date":"2026-05-11T04:18:26Z"},"road_event_id":"g/J7rmud7gYS6Uj/e52HqUvB96U=","beginning_cross_street":"North of Charlotte Circle","ending_cross_street":"Sip Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.074012,40.738357]]}},{"id":"BCyyc/OzpLMDT3Yrzux0y/QFvj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound at North of Sip Av (Jersey City) Sunday May 17, 2026 12:00 AM thru 03:00 PM, ramp, left partial lane","update_date":"2026-05-11T04:18:27Z"},"road_event_id":"BCyyc/OzpLMDT3Yrzux0y/QFvj0=","beginning_cross_street":"North of Sip Av","ending_cross_street":"North of Sip Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T04:00:00Z","end_date":"2026-05-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.079093,40.736366]]}},{"id":"vA1y7EO53ta4S4DLhCdD8LN9nJA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between West of Exit 49 - NJ 124/Springfield Ave (Springfield Twp) and East of Exit 45 - CR 527/Glenside Ave (Summit), Thursday May 14, 2026 09:00 AM thru 02:00 PM, right shoulder closed local lane","update_date":"2026-05-11T04:18:28Z"},"road_event_id":"vA1y7EO53ta4S4DLhCdD8LN9nJA=","beginning_cross_street":"West of Exit 49 - NJ 124/Springfield Ave","ending_cross_street":"East of Exit 45 - CR 527/Glenside Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.308952,40.713184]]}},{"id":"R18mdaxJcOgnlufPOMvkADDpBJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound at North of Sip Av (Jersey City) Saturday May 16, 2026 12:00 AM thru Sunday May 17, 2026 12:00 AM, ramp","update_date":"2026-05-11T04:18:30Z"},"road_event_id":"R18mdaxJcOgnlufPOMvkADDpBJ0=","beginning_cross_street":"North of Sip Av","ending_cross_street":"North of Sip Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.079093,40.736366]]}},{"id":"N/Q2HMgpDXPaJZjs6MiIL1F50O4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound near North of Charlotte Circle (Jersey City), Sunday May 17, 2026 12:00 AM thru 03:00 PM, left lane closed","update_date":"2026-05-11T04:18:31Z"},"road_event_id":"N/Q2HMgpDXPaJZjs6MiIL1F50O4=","beginning_cross_street":"North of Charlotte Circle","ending_cross_street":"Sip Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T04:00:00Z","end_date":"2026-05-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.074012,40.738357]]}},{"id":"KQ98t+VqfyzOefJgFRqz/HyYO9Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Sip Av (Jersey City), Sunday May 17, 2026 12:00 AM thru 03:00 PM, left lane closed","update_date":"2026-05-11T04:18:23Z"},"road_event_id":"KQ98t+VqfyzOefJgFRqz/HyYO9Q=","beginning_cross_street":"Sip Av","ending_cross_street":"North of Charlotte Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T04:00:00Z","end_date":"2026-05-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081649,40.734077]]}},{"id":"qJxZpAMR9kOqQyUyQsJHZ6S7yoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between North of Ernston Rd (Sayreville) and North of Birchwood Dr (Old Bridge Twp), Saturday May 16, 2026 08:00 PM thru Sunday May 17, 2026 06:00 AM, right lane closed","update_date":"2026-05-11T04:18:25Z"},"road_event_id":"qJxZpAMR9kOqQyUyQsJHZ6S7yoU=","beginning_cross_street":"North of Ernston Rd","ending_cross_street":"North of Birchwood Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T20:00:00Z","end_date":"2026-05-18T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.278411,40.465423]]}},{"id":"MJRyxOEH99AwN7Yu6SJlu8PvCHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound at North of Sip Av (Jersey City) Sunday May 17, 2026 12:00 AM thru 03:00 PM, ramp","update_date":"2026-05-11T04:18:46Z"},"road_event_id":"MJRyxOEH99AwN7Yu6SJlu8PvCHg=","beginning_cross_street":"North of Sip Av","ending_cross_street":"North of Sip Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T04:00:00Z","end_date":"2026-05-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.079093,40.736366]]}},{"id":"o6EV+Xoan0z6E2G8lbwEtyrKH+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between West of Exit 49 - NJ 124/Springfield Ave (Springfield Twp) and East of Exit 45 - CR 527/Glenside Ave (Summit), Friday May 15, 2026 09:00 AM thru 02:00 PM, right shoulder closed local lane","update_date":"2026-05-11T04:18:39Z"},"road_event_id":"o6EV+Xoan0z6E2G8lbwEtyrKH+M=","beginning_cross_street":"West of Exit 49 - NJ 124/Springfield Ave","ending_cross_street":"East of Exit 45 - CR 527/Glenside Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.308952,40.713184]]}},{"id":"zzikpJVCdS4uNwLaD3vcUrZCKDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between West of Exit 49 - NJ 124/Springfield Ave (Springfield Twp) and East of Exit 45 - CR 527/Glenside Ave (Summit), Wednesday May 13, 2026 09:00 AM thru 02:00 PM, right shoulder closed local lane","update_date":"2026-05-11T04:18:40Z"},"road_event_id":"zzikpJVCdS4uNwLaD3vcUrZCKDU=","beginning_cross_street":"West of Exit 49 - NJ 124/Springfield Ave","ending_cross_street":"East of Exit 45 - CR 527/Glenside Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.308952,40.713184]]}},{"id":"ii5sAE9iFDRJACyBsTS5UY2noPs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between North of Ernston Rd (Sayreville) and North of Morgan Drawbridge (Sayreville), Saturday May 16, 2026 08:00 PM thru Sunday May 17, 2026 06:00 AM, right lane closed","update_date":"2026-05-11T04:18:41Z"},"road_event_id":"ii5sAE9iFDRJACyBsTS5UY2noPs=","beginning_cross_street":"North of Ernston Rd","ending_cross_street":"North of Morgan Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T20:00:00Z","end_date":"2026-05-18T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.278411,40.465423]]}},{"id":"z44V9kZmjy9sfthk8jHKdwbMz/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound at North of Sip Av (Jersey City) Saturday May 16, 2026 12:00 AM thru Sunday May 17, 2026 12:00 AM, ramp, left partial lane","update_date":"2026-05-11T04:18:42Z"},"road_event_id":"z44V9kZmjy9sfthk8jHKdwbMz/U=","beginning_cross_street":"North of Sip Av","ending_cross_street":"North of Sip Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.079093,40.736366]]}},{"id":"W3HvmXjPbgcJ1FMMN6gBbP/Kruw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Sip Av (Jersey City), Saturday May 16, 2026 12:00 AM thru Sunday May 17, 2026 12:00 AM, left lane closed","update_date":"2026-05-11T04:18:43Z"},"road_event_id":"W3HvmXjPbgcJ1FMMN6gBbP/Kruw=","beginning_cross_street":"Sip Av","ending_cross_street":"North of Charlotte Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081649,40.734077]]}},{"id":"W+bO0KVGZvMCEWzVAj4yC/poiog=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-90"],"direction":"unknown","related_road_events":[],"description":"Repaving on I-90 eastbound between Exit 1 E; Exit 1W (Albany) and Exit 5; Everett Road (Albany), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 09:00 PM thru 06:00 AM 1 Right lane of 5 lanes closed","update_date":"2026-05-11T04:40:45Z"},"road_event_id":"W+bO0KVGZvMCEWzVAj4yC/poiog=","beginning_cross_street":"Exit 1 E; Exit 1W","ending_cross_street":"Exit 5; Everett Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.843017,42.697295]]}},{"id":"BvuFDcBG/tk9NO7WUHkFoldtSQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-90"],"direction":"unknown","related_road_events":[],"description":"Repaving on I-90 eastbound On-ramp Exit 3; State Office Campus (Albany) RAMP CLOSED, Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-11T04:33:21Z"},"road_event_id":"BvuFDcBG/tk9NO7WUHkFoldtSQg=","beginning_cross_street":"Exit 3; State Office Campus","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814413,42.688783]]}},{"id":"TcS+u8ulaL6d4+z9IJn5blbt4h0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-90"],"direction":"unknown","related_road_events":[],"description":"Repaving on I-90 eastbound Off-ramp Exit 4; NY 85 (Albany) RAMP CLOSED, Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-11T04:35:49Z"},"road_event_id":"TcS+u8ulaL6d4+z9IJn5blbt4h0=","beginning_cross_street":"Exit 4; NY 85","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.809059,42.687362]]}},{"id":"FRp6pu2Aada/tC8EWLrxo6n7NXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qymyoWiJ145prJjZ4smwscPGyuc="}],"description":"Drainage improvements on NY 22 both directions between Grandma Moses Road (White Creek) and BROWNELL HOLLOW RD (White Creek) alternating lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-11T09:34:45Z"},"road_event_id":"FRp6pu2Aada/tC8EWLrxo6n7NXA=","beginning_cross_street":"Grandma Moses Road","ending_cross_street":"BROWNELL HOLLOW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.370145,42.946123]]}},{"id":"qymyoWiJ145prJjZ4smwscPGyuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FRp6pu2Aada/tC8EWLrxo6n7NXA="},{"type":"next-occurrence","id":"7qzAYLbNZ4eTbmaZ1aFwcMfTbzs="}],"description":"Drainage improvements on NY 22 both directions between Grandma Moses Road (White Creek) and BROWNELL HOLLOW RD (White Creek) alternating lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-11T09:34:45Z"},"road_event_id":"qymyoWiJ145prJjZ4smwscPGyuc=","beginning_cross_street":"Grandma Moses Road","ending_cross_street":"BROWNELL HOLLOW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.370145,42.946123]]}},{"id":"7qzAYLbNZ4eTbmaZ1aFwcMfTbzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FRp6pu2Aada/tC8EWLrxo6n7NXA="}],"description":"Drainage improvements on NY 22 both directions between Grandma Moses Road (White Creek) and BROWNELL HOLLOW RD (White Creek) alternating lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-11T09:34:45Z"},"road_event_id":"7qzAYLbNZ4eTbmaZ1aFwcMfTbzs=","beginning_cross_street":"Grandma Moses Road","ending_cross_street":"BROWNELL HOLLOW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.370145,42.946123]]}},{"id":"hBLmHV5PDVLvD0mZuLw4Qyc0IfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bedj7dCM3cqvYlDD09hXyM99ZXI="}],"description":"Tree trimming on I-81 southbound between Exit 50 - US11; NY 41; McGraw (Cortlandville) and Exit 39 - US 11; NY 221; Marathon (Marathon), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 02:00 PM All lanes open","update_date":"2026-05-11T10:38:09Z"},"road_event_id":"hBLmHV5PDVLvD0mZuLw4Qyc0IfI=","beginning_cross_street":"Exit 50 - US11; NY 41; McGraw   ","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.132019,42.590727]]}},{"id":"bedj7dCM3cqvYlDD09hXyM99ZXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hBLmHV5PDVLvD0mZuLw4Qyc0IfI="},{"type":"next-occurrence","id":"81vTLqRuJPfyQEAlnPUkRNjd7ro="}],"description":"Tree trimming on I-81 southbound between Exit 50 - US11; NY 41; McGraw (Cortlandville) and Exit 39 - US 11; NY 221; Marathon (Marathon), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 02:00 PM All lanes open","update_date":"2026-05-11T10:38:09Z"},"road_event_id":"bedj7dCM3cqvYlDD09hXyM99ZXI=","beginning_cross_street":"Exit 50 - US11; NY 41; McGraw   ","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.132019,42.590727]]}},{"id":"81vTLqRuJPfyQEAlnPUkRNjd7ro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hBLmHV5PDVLvD0mZuLw4Qyc0IfI="}],"description":"Tree trimming on I-81 southbound between Exit 50 - US11; NY 41; McGraw (Cortlandville) and Exit 39 - US 11; NY 221; Marathon (Marathon), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 02:00 PM All lanes open","update_date":"2026-05-11T10:38:09Z"},"road_event_id":"81vTLqRuJPfyQEAlnPUkRNjd7ro=","beginning_cross_street":"Exit 50 - US11; NY 41; McGraw   ","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.132019,42.590727]]}},{"id":"cyg2ZqYUXcYIkaIkOCthHRZJrvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bZaLTGNxYQU/fuZ+CJvI8tOoSU8="}],"description":"Tree trimming on I-81 northbound between Exit 38 - US 11; NY 221; Marathon (Marathon) and Exit 50 - US11; NY 41; McGraw (Cortlandville), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 02:00 PM All lanes open","update_date":"2026-05-11T10:40:00Z"},"road_event_id":"cyg2ZqYUXcYIkaIkOCthHRZJrvE=","beginning_cross_street":"Exit 38 - US 11; NY 221; Marathon","ending_cross_street":"Exit 50 - US11; NY 41; McGraw   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.029492,42.439732]]}},{"id":"bZaLTGNxYQU/fuZ+CJvI8tOoSU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cyg2ZqYUXcYIkaIkOCthHRZJrvE="},{"type":"next-occurrence","id":"QExV6kAiUm1SWqAoNxfQZACejtI="}],"description":"Tree trimming on I-81 northbound between Exit 38 - US 11; NY 221; Marathon (Marathon) and Exit 50 - US11; NY 41; McGraw (Cortlandville), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 02:00 PM All lanes open","update_date":"2026-05-11T10:40:00Z"},"road_event_id":"bZaLTGNxYQU/fuZ+CJvI8tOoSU8=","beginning_cross_street":"Exit 38 - US 11; NY 221; Marathon","ending_cross_street":"Exit 50 - US11; NY 41; McGraw   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.029492,42.439732]]}},{"id":"QExV6kAiUm1SWqAoNxfQZACejtI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cyg2ZqYUXcYIkaIkOCthHRZJrvE="}],"description":"Tree trimming on I-81 northbound between Exit 38 - US 11; NY 221; Marathon (Marathon) and Exit 50 - US11; NY 41; McGraw (Cortlandville), Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 02:00 PM All lanes open","update_date":"2026-05-11T10:40:00Z"},"road_event_id":"QExV6kAiUm1SWqAoNxfQZACejtI=","beginning_cross_street":"Exit 38 - US 11; NY 221; Marathon","ending_cross_street":"Exit 50 - US11; NY 41; McGraw   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.029492,42.439732]]}},{"id":"mBH9YOd974XubXFQkLwMWyjQhj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Longterm construction on I-690 eastbound between I-81 Northbound (Syracuse) and Exit 17 - Teall Avenue (Syracuse), Continuous Monday May 11th, 2026 09:00 AM thru Tuesday June 30th, 2026 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T11:02:13Z"},"road_event_id":"mBH9YOd974XubXFQkLwMWyjQhj0=","beginning_cross_street":"I-81 Northbound","ending_cross_street":"Exit 17 - Teall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.139797,43.05149]]}},{"id":"NFocnfYiRBMlXokpCix8kWCRPuI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on NY 227 both directions Updike Road (Hector) 2 lanes reduced to 1, Monday May 11th, 2026 thru Wednesday May 13th, 2026, Monday/Tuesday/Wednesday, 07:30 AM thru 02:30 PM All lanes open","update_date":"2026-05-11T11:09:35Z"},"road_event_id":"NFocnfYiRBMlXokpCix8kWCRPuI=","beginning_cross_street":"Updike Road","ending_cross_street":"Updike Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:30:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.758791,42.469913]]}},{"id":"x4aDQBVT0rwUSlpmtZRlZmROI6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["River Street"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on River Street both directions Bridge over NY 49 (Marcy) Motorists will encounter lane closures in both directions, Friday May 15th, 2026, 09:00 AM thru 12:00 PM,","update_date":"2026-05-11T11:18:02Z"},"road_event_id":"x4aDQBVT0rwUSlpmtZRlZmROI6Y=","beginning_cross_street":"Bridge over NY 49","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.322402,43.169399]]}},{"id":"kV1kCG+fMGIiF8vOF88W+9685kc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between South of CR 617/Harbor Inn Rd (Berkeley Twp) and South of Bay Pkwy (Ocean Twp), Saturday May 16, 2026 10:00 PM thru Sunday May 17, 2026 05:00 AM, right shoulder closed, moving operation","update_date":"2026-05-11T11:18:23Z"},"road_event_id":"kV1kCG+fMGIiF8vOF88W+9685kc=","beginning_cross_street":"South of CR 617/Harbor Inn Rd","ending_cross_street":"South of Bay Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T00:00:00Z","end_date":"2026-05-18T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.168357,39.868789]]}},{"id":"shN51Kb/A3nbgY6B/u4OLK9JWSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near South of Georgetown Blvd (Stafford Twp), Monday May 18, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T11:18:27Z"},"road_event_id":"shN51Kb/A3nbgY6B/u4OLK9JWSI=","beginning_cross_street":"South of Georgetown Blvd","ending_cross_street":"South of Georgetown Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.245658,39.719409]]}},{"id":"TkTF5aDkULLoTVkeHon3/TPfAEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5B"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on NY 5B both directions over NY 840 (New Hartford) Motorists will encounter lane closures in both directions, Friday May 15th, 2026, 11:00 AM thru 02:00 PM,","update_date":"2026-05-11T11:20:22Z"},"road_event_id":"TkTF5aDkULLoTVkeHon3/TPfAEY=","beginning_cross_street":"NY 840","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.318548,43.093263]]}},{"id":"/RXpTlrCLQNKwKHyiYoH5K5ByiY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9L"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"o8UHBnC3Hq+lReMd2EKRlv5usXc="}],"description":"Utility work on NY 9L both directions between NY 149 (Queensbury) and FOX RD (Queensbury) alternating lane closures, Wednesday May 13th, 2026 thru Thursday May 14th, 2026, Wednesday/Thursday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-11T11:24:16Z"},"road_event_id":"/RXpTlrCLQNKwKHyiYoH5K5ByiY=","beginning_cross_street":"NY 149","ending_cross_street":"FOX RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.62313,43.397617]]}},{"id":"o8UHBnC3Hq+lReMd2EKRlv5usXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9L"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/RXpTlrCLQNKwKHyiYoH5K5ByiY="}],"description":"Utility work on NY 9L both directions between NY 149 (Queensbury) and FOX RD (Queensbury) alternating lane closures, Wednesday May 13th, 2026 thru Thursday May 14th, 2026, Wednesday/Thursday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-11T11:24:16Z"},"road_event_id":"o8UHBnC3Hq+lReMd2EKRlv5usXc=","beginning_cross_street":"NY 149","ending_cross_street":"FOX RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.62313,43.397617]]}},{"id":"tOzFCxVkYO8IawKxkyrBOUzo6SM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between Ericsson Dr/Lloyd Dr (Piscataway Twp) and I-287 (Piscataway Twp), Friday May 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T11:36:30Z"},"road_event_id":"tOzFCxVkYO8IawKxkyrBOUzo6SM=","beginning_cross_street":"Ericsson Dr/Lloyd Dr","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.474044,40.543891]]}},{"id":"+XLW0NukekmNoxdBNITW38CS2xQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between Ericsson Dr/Lloyd Dr (Piscataway Twp) and I-287 (Piscataway Twp), Friday May 15, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-11T11:36:31Z"},"road_event_id":"+XLW0NukekmNoxdBNITW38CS2xQ=","beginning_cross_street":"Ericsson Dr/Lloyd Dr","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.474044,40.543891]]}},{"id":"k/5C8/Tv+TzqlBHoV5W+KhNI51U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between Ericsson Dr/Lloyd Dr (Piscataway Twp) and I-287 (Piscataway Twp), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T11:36:33Z"},"road_event_id":"k/5C8/Tv+TzqlBHoV5W+KhNI51U=","beginning_cross_street":"Ericsson Dr/Lloyd Dr","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.474044,40.543891]]}},{"id":"7Dq8E8IDBNpT553Y2uQ1g7AVD8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between Ericsson Dr/Lloyd Dr (Piscataway Twp) and I-287 (Piscataway Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-11T11:36:24Z"},"road_event_id":"7Dq8E8IDBNpT553Y2uQ1g7AVD8U=","beginning_cross_street":"Ericsson Dr/Lloyd Dr","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.474044,40.543891]]}},{"id":"XxugIuH6zg/1OCHDiecRCo/KzqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between Ericsson Dr/Lloyd Dr (Piscataway Twp) and I-287 (Piscataway Twp), Thursday May 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T11:36:25Z"},"road_event_id":"XxugIuH6zg/1OCHDiecRCo/KzqE=","beginning_cross_street":"Ericsson Dr/Lloyd Dr","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.474044,40.543891]]}},{"id":"ge0f7PBhNkp8CDiiWazy8Vjkflo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between Ericsson Dr/Lloyd Dr (Piscataway Twp) and I-287 (Piscataway Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-11T11:36:26Z"},"road_event_id":"ge0f7PBhNkp8CDiiWazy8Vjkflo=","beginning_cross_street":"Ericsson Dr/Lloyd Dr","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.474044,40.543891]]}},{"id":"qY/oYYj1Ppp5G50l9hC9pdR5Jy4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Friday May 15, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-05-11T12:06:24Z"},"road_event_id":"qY/oYYj1Ppp5G50l9hC9pdR5Jy4=","beginning_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601997,40.678226]]}},{"id":"x9lHPrRtJKhJPSEMcvxv0qi4N+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 5 - CR 529/Stelton Rd (South Plainfield) and New Jersey Turnpike (Edison Twp), Friday May 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T12:06:25Z"},"road_event_id":"x9lHPrRtJKhJPSEMcvxv0qi4N+Y=","beginning_cross_street":"South of Exit 5 - CR 529/Stelton Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425453,40.557624]]}},{"id":"mY0M9QCzbjIRDdNH0BuCXEoRsN8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound between East of Exit 11 - CR 614/Pattenburg Rd (Union Twp) and West of Exit 20 - CR 639 (Clinton Twp), left shoulder","update_date":"2026-05-11T12:06:26Z"},"road_event_id":"mY0M9QCzbjIRDdNH0BuCXEoRsN8=","beginning_cross_street":"East of Exit 11 - CR 614/Pattenburg Rd","ending_cross_street":"West of Exit 20 - CR 639","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.994041,40.642799]]}},{"id":"JnJHwd1J7qNefsyskoo2+uG0Qjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound between East of Exit 11 - CR 614/Pattenburg Rd (Union Twp) and West of Exit 20 - CR 639 (Clinton Twp), left shoulder","update_date":"2026-05-11T12:06:37Z"},"road_event_id":"JnJHwd1J7qNefsyskoo2+uG0Qjk=","beginning_cross_street":"East of Exit 11 - CR 614/Pattenburg Rd","ending_cross_street":"West of Exit 20 - CR 639","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.994041,40.642799]]}},{"id":"CClB/mKdrtuRHn04a2Pp5EPXTH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound between East of Exit 11 - CR 614/Pattenburg Rd (Union Twp) and West of Exit 20 - CR 639 (Clinton Twp), left shoulder","update_date":"2026-05-11T12:06:28Z"},"road_event_id":"CClB/mKdrtuRHn04a2Pp5EPXTH8=","beginning_cross_street":"East of Exit 11 - CR 614/Pattenburg Rd","ending_cross_street":"West of Exit 20 - CR 639","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.994041,40.642799]]}},{"id":"0pF9ZJxp/wn6jinXQzw3NX3KItY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 17 - NJ 31 South (Clinton Twp) and West of Exit 13 - NJ 173 (Union Twp), left shoulder","update_date":"2026-05-11T12:06:29Z"},"road_event_id":"0pF9ZJxp/wn6jinXQzw3NX3KItY=","beginning_cross_street":"East of Exit 17 - NJ 31 South","ending_cross_street":"West of Exit 13 - NJ 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.885116,40.638065]]}},{"id":"gllnW+AlDWjWQ+hQ/UFuIqc7pCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Friday May 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T12:06:30Z"},"road_event_id":"gllnW+AlDWjWQ+hQ/UFuIqc7pCg=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"eWJVGrTXfF0oxl36nyvowvBWXbA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T12:06:31Z"},"road_event_id":"eWJVGrTXfF0oxl36nyvowvBWXbA=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"1xgFSn0a0lZwgWAg3pUZN1ix+/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Wednesday May 13, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-05-11T12:06:33Z"},"road_event_id":"1xgFSn0a0lZwgWAg3pUZN1ix+/E=","beginning_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601997,40.678226]]}},{"id":"JFUwT8NkvKrRlme8KMryQTkWM7w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) and North of Exit 14 - US 22 (Bridgewater Twp), left shoulder","update_date":"2026-05-11T12:06:34Z"},"road_event_id":"JFUwT8NkvKrRlme8KMryQTkWM7w=","beginning_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601997,40.678226]]}},{"id":"XAPjobOYtYOqS3K8nNwWz2/Avro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Thursday May 14, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-05-11T12:06:35Z"},"road_event_id":"XAPjobOYtYOqS3K8nNwWz2/Avro=","beginning_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601997,40.678226]]}},{"id":"KBFc+YhgbglI7fsQn33Azi/mwYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 5 - CR 529/Stelton Rd (South Plainfield) and New Jersey Turnpike (Edison Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T12:06:40Z"},"road_event_id":"KBFc+YhgbglI7fsQn33Azi/mwYM=","beginning_cross_street":"South of Exit 5 - CR 529/Stelton Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425453,40.557624]]}},{"id":"4P/Xrupfl2kvEDYF6cO5qzAtxtc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T12:06:42Z"},"road_event_id":"4P/Xrupfl2kvEDYF6cO5qzAtxtc=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"WlN3nd09UmsIYYSfmwOseRkCckE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 5 - CR 529/Stelton Rd (South Plainfield) and New Jersey Turnpike (Edison Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T12:06:43Z"},"road_event_id":"WlN3nd09UmsIYYSfmwOseRkCckE=","beginning_cross_street":"South of Exit 5 - CR 529/Stelton Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425453,40.557624]]}},{"id":"Qo4RCWlSpxEF56RO16TGg47Vi1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 17 - NJ 31 South (Clinton Twp) and West of Exit 13 - NJ 173 (Union Twp), left shoulder","update_date":"2026-05-11T12:06:45Z"},"road_event_id":"Qo4RCWlSpxEF56RO16TGg47Vi1Y=","beginning_cross_street":"East of Exit 17 - NJ 31 South","ending_cross_street":"West of Exit 13 - NJ 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.885116,40.638065]]}},{"id":"ovSCICWGygBx1+0F+utm8A4UdQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Friday May 15, 2026 07:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-11T12:06:46Z"},"road_event_id":"ovSCICWGygBx1+0F+utm8A4UdQQ=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"9HeyLTm62gi24bWUTpenNp28XLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) and North of Exit 14 - US 22 (Bridgewater Twp), left shoulder","update_date":"2026-05-11T12:06:38Z"},"road_event_id":"9HeyLTm62gi24bWUTpenNp28XLU=","beginning_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601997,40.678226]]}},{"id":"QS5WFhBgQjWLBWH5FMjGCu0E61U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Thursday May 14, 2026 07:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-13T11:36:12Z"},"road_event_id":"QS5WFhBgQjWLBWH5FMjGCu0E61U=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"pVcmmS2erfEOGi2JBONxjqDiJHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 76 - NJ 29 (Ewing Twp) and south of Exit 72 - NJ 31 (Hopewell Twp), Monday May 18, 2026 08:00 PM thru Tuesday May 19, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-05-11T12:09:28Z"},"road_event_id":"pVcmmS2erfEOGi2JBONxjqDiJHQ=","beginning_cross_street":"Exit 76 - NJ 29","ending_cross_street":"south of Exit 72 - NJ 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844207,40.260536]]}},{"id":"Bv8BpRu++3x8Yp79EvdLDsF6ArY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 76 - NJ 29 (Ewing Twp) and south of Exit 72 - NJ 31 (Hopewell Twp), Wednesday May 20, 2026 08:00 PM thru Thursday May 21, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-11T12:09:30Z"},"road_event_id":"Bv8BpRu++3x8Yp79EvdLDsF6ArY=","beginning_cross_street":"Exit 76 - NJ 29","ending_cross_street":"south of Exit 72 - NJ 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T20:00:00Z","end_date":"2026-05-22T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844207,40.260536]]}},{"id":"JSGejzc9LzPfai4K4KGpa8bDjUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 17 - NJ 31 South (Clinton Twp) and West of Exit 13 - NJ 173 (Union Twp), left shoulder","update_date":"2026-05-11T12:09:32Z"},"road_event_id":"JSGejzc9LzPfai4K4KGpa8bDjUQ=","beginning_cross_street":"East of Exit 17 - NJ 31 South","ending_cross_street":"West of Exit 13 - NJ 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.885116,40.638065]]}},{"id":"qUgFcMuS8vT4Li+IUEjJR/bBRKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) and North of Exit 14 - US 22 (Bridgewater Twp), left shoulder","update_date":"2026-05-11T12:09:33Z"},"road_event_id":"qUgFcMuS8vT4Li+IUEjJR/bBRKs=","beginning_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601997,40.678226]]}},{"id":"A8jCCfb86p5DZHBB3hoFtprk0Yw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between south of Exit 72 - NJ 31 (Hopewell Twp) and Exit 76 - NJ 29 (Ewing Twp), Monday May 18, 2026 08:00 PM thru Tuesday May 19, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-11T12:10:08Z"},"road_event_id":"A8jCCfb86p5DZHBB3hoFtprk0Yw=","beginning_cross_street":"south of Exit 72 - NJ 31","ending_cross_street":"Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T20:00:00Z","end_date":"2026-05-20T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.779342,40.291366]]}},{"id":"S1SD9iQXRFK85ZaP0DNJbzCRcCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 76 - NJ 29 (Ewing Twp) and south of Exit 72 - NJ 31 (Hopewell Twp), Thursday May 21, 2026 08:00 PM thru Friday May 22, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-05-11T12:10:10Z"},"road_event_id":"S1SD9iQXRFK85ZaP0DNJbzCRcCw=","beginning_cross_street":"Exit 76 - NJ 29","ending_cross_street":"south of Exit 72 - NJ 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844207,40.260536]]}},{"id":"Y4JXXBLV3teztpOwxnT8WqCjMiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between south of Exit 72 - NJ 31 (Hopewell Twp) and Exit 76 - NJ 29 (Ewing Twp), Wednesday May 20, 2026 08:00 PM thru Thursday May 21, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-11T12:10:11Z"},"road_event_id":"Y4JXXBLV3teztpOwxnT8WqCjMiM=","beginning_cross_street":"south of Exit 72 - NJ 31","ending_cross_street":"Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T20:00:00Z","end_date":"2026-05-22T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.779342,40.291366]]}},{"id":"zGHlPvqo0YLMKJUe4BahO40Nlz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between south of Exit 72 - NJ 31 (Hopewell Twp) and Exit 76 - NJ 29 (Ewing Twp), Tuesday May 19, 2026 08:00 PM thru Wednesday May 20, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-11T12:10:12Z"},"road_event_id":"zGHlPvqo0YLMKJUe4BahO40Nlz4=","beginning_cross_street":"south of Exit 72 - NJ 31","ending_cross_street":"Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T20:00:00Z","end_date":"2026-05-21T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.779342,40.291366]]}},{"id":"UyiiltgITvXxdbSFtS0QxBqdMKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near North of CR 14/Hillard Blvd (Stafford Twp), left shoulder","update_date":"2026-05-11T12:10:13Z"},"road_event_id":"UyiiltgITvXxdbSFtS0QxBqdMKw=","beginning_cross_street":"North of CR 14/Hillard Blvd","ending_cross_street":"South of Georgetown Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.248802,39.714134]]}},{"id":"7xpRl/ksGkooXuaGvwgxiLBzeMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between south of Exit 72 - NJ 31 (Hopewell Twp) and Exit 76 - NJ 29 (Ewing Twp), Tuesday May 19, 2026 08:00 PM thru Wednesday May 20, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-11T12:10:07Z"},"road_event_id":"7xpRl/ksGkooXuaGvwgxiLBzeMk=","beginning_cross_street":"south of Exit 72 - NJ 31","ending_cross_street":"Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.779342,40.291366]]}},{"id":"QNgbQWrAODk1+8DySlnDL4eLgu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound at CR 624/North Ave (Elizabeth) Thursday May 21, 2026 08:00 PM thru Friday May 22, 2026 12:00 AM, ramp local lane","update_date":"2026-05-11T12:10:06Z"},"road_event_id":"QNgbQWrAODk1+8DySlnDL4eLgu4=","beginning_cross_street":"CR 624/North Ave","ending_cross_street":"CR 624/North Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T20:00:00Z","end_date":"2026-05-23T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.19783,40.676666]]}},{"id":"3PIzampC51q01Jh4ZemNLaUh9pA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound at CR 624/North Ave (Elizabeth) Thursday May 21, 2026 11:00 PM thru Friday May 22, 2026 05:00 AM, ramp, right partial lane local lane","update_date":"2026-05-11T12:09:59Z"},"road_event_id":"3PIzampC51q01Jh4ZemNLaUh9pA=","beginning_cross_street":"CR 624/North Ave","ending_cross_street":"CR 624/North Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T02:00:00Z","end_date":"2026-05-23T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.19783,40.676666]]}},{"id":"dDsyTrFV8nk2SNlkS/VstYQ18tQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between south of Exit 72 - NJ 31 (Hopewell Twp) and Exit 76 - NJ 29 (Ewing Twp), Wednesday May 20, 2026 08:00 PM thru Thursday May 21, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-11T12:10:00Z"},"road_event_id":"dDsyTrFV8nk2SNlkS/VstYQ18tQ=","beginning_cross_street":"south of Exit 72 - NJ 31","ending_cross_street":"Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.779342,40.291366]]}},{"id":"o+KeLABpfDBgyYHtH7+aK8LATY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 76 - NJ 29 (Ewing Twp) and south of Exit 72 - NJ 31 (Hopewell Twp), Wednesday May 20, 2026 08:00 PM thru Thursday May 21, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-05-11T12:10:03Z"},"road_event_id":"o+KeLABpfDBgyYHtH7+aK8LATY4=","beginning_cross_street":"Exit 76 - NJ 29","ending_cross_street":"south of Exit 72 - NJ 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844207,40.260536]]}},{"id":"s7TzFN6+7fK3tz16Ut+cXiju04U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Southbound near North of CR 624/North Ave (Elizabeth), Tuesday May 19, 2026 08:00 PM thru Wednesday May 20, 2026 05:00 AM, right shoulder closed local lane","update_date":"2026-05-11T12:09:50Z"},"road_event_id":"s7TzFN6+7fK3tz16Ut+cXiju04U=","beginning_cross_street":"North of CR 624/North Ave","ending_cross_street":"CR 624/North Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T20:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.196426,40.677951]]}},{"id":"ck2swxZLqqBdK+X0ofAxH+1JHv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between south of Exit 72 - NJ 31 (Hopewell Twp) and Exit 76 - NJ 29 (Ewing Twp), Monday May 18, 2026 08:00 PM thru Tuesday May 19, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-11T12:09:51Z"},"road_event_id":"ck2swxZLqqBdK+X0ofAxH+1JHv4=","beginning_cross_street":"south of Exit 72 - NJ 31","ending_cross_street":"Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.779342,40.291366]]}},{"id":"cTMiSc8X0OME0nrPpppWpgUnKJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Southbound near North of CR 624/North Ave (Elizabeth), left shoulder local lane","update_date":"2026-05-11T12:09:43Z"},"road_event_id":"cTMiSc8X0OME0nrPpppWpgUnKJk=","beginning_cross_street":"North of CR 624/North Ave","ending_cross_street":"CR 624/North Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.196426,40.677951]]}},{"id":"ztmXGNPPOhqmDF6YWz4LhF2u/gU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 76 - NJ 29 (Ewing Twp) and south of Exit 72 - NJ 31 (Hopewell Twp), Monday May 18, 2026 08:00 PM thru Tuesday May 19, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-11T12:09:42Z"},"road_event_id":"ztmXGNPPOhqmDF6YWz4LhF2u/gU=","beginning_cross_street":"Exit 76 - NJ 29","ending_cross_street":"south of Exit 72 - NJ 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T20:00:00Z","end_date":"2026-05-20T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844207,40.260536]]}},{"id":"teruxyzlwheezWOZwRZoENcvbjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-11T12:09:36Z"},"road_event_id":"teruxyzlwheezWOZwRZoENcvbjU=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"vmULpao5NIkF+BSr9FIpxWc2Tvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 76 - NJ 29 (Ewing Twp) and south of Exit 72 - NJ 31 (Hopewell Twp), Thursday May 21, 2026 08:00 PM thru Friday May 22, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-11T12:09:37Z"},"road_event_id":"vmULpao5NIkF+BSr9FIpxWc2Tvo=","beginning_cross_street":"Exit 76 - NJ 29","ending_cross_street":"south of Exit 72 - NJ 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T20:00:00Z","end_date":"2026-05-23T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844207,40.260536]]}},{"id":"WrGCkdeQuwECP6Kh+ItLgt82Ij4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Atlantic City Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FIgfpQXcLQKXFhkxCEfOwV3x4xw="}],"description":"Scheduled roadwork on Atlantic City Expressway westbound West of Frank S. Farley Service Plaza (Hamilton Twp) CLOSURE WILL REMAIN IN PLACE OVERNIGHT UNTIL BEING PICKED UP ON FRIDAY 5-15. MOVE OVER FOR HIGHWAY WORKERS., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM left lane and shoulder closed","update_date":"2026-05-11T12:13:08Z"},"road_event_id":"WrGCkdeQuwECP6Kh+ItLgt82Ij4=","beginning_cross_street":"West of Frank S. Farley Service Plaza","ending_cross_street":"West of Frank S. Farley Service Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.765924,39.571976]]}},{"id":"FIgfpQXcLQKXFhkxCEfOwV3x4xw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Atlantic City Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WrGCkdeQuwECP6Kh+ItLgt82Ij4="},{"type":"next-occurrence","id":"ttZW1MiKfgnf1v9FiFnOTWPgP3U="}],"description":"Scheduled roadwork on Atlantic City Expressway westbound West of Frank S. Farley Service Plaza (Hamilton Twp) CLOSURE WILL REMAIN IN PLACE OVERNIGHT UNTIL BEING PICKED UP ON FRIDAY 5-15. MOVE OVER FOR HIGHWAY WORKERS., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM left lane and shoulder closed","update_date":"2026-05-11T12:13:08Z"},"road_event_id":"FIgfpQXcLQKXFhkxCEfOwV3x4xw=","beginning_cross_street":"West of Frank S. Farley Service Plaza","ending_cross_street":"West of Frank S. Farley Service Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.765924,39.571976]]}},{"id":"ttZW1MiKfgnf1v9FiFnOTWPgP3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Atlantic City Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WrGCkdeQuwECP6Kh+ItLgt82Ij4="}],"description":"Scheduled roadwork on Atlantic City Expressway westbound West of Frank S. Farley Service Plaza (Hamilton Twp) CLOSURE WILL REMAIN IN PLACE OVERNIGHT UNTIL BEING PICKED UP ON FRIDAY 5-15. MOVE OVER FOR HIGHWAY WORKERS., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM left lane and shoulder closed","update_date":"2026-05-11T12:13:08Z"},"road_event_id":"ttZW1MiKfgnf1v9FiFnOTWPgP3U=","beginning_cross_street":"West of Frank S. Farley Service Plaza","ending_cross_street":"West of Frank S. Farley Service Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.765924,39.571976]]}},{"id":"RsN0F4gMbINtxs8yyJ3gEM0p6Ns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Atlantic City Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SyYIWY1L25y+exxKS6ZpyZOnMbQ="}],"description":"Scheduled roadwork on Atlantic City Expressway eastbound West of Frank S. Farley Service Plaza (Hamilton Twp) CLOSURE WILL REMAIN IN PLACE OVERNIGHT UNTIL BEING PICKED UP ON FRIDAY 5-15. MOVE OVER FOR HIGHWAY WORKERS., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM left lane and shoulder closed","update_date":"2026-05-11T12:19:07Z"},"road_event_id":"RsN0F4gMbINtxs8yyJ3gEM0p6Ns=","beginning_cross_street":"West of Frank S. Farley Service Plaza","ending_cross_street":"West of Frank S. Farley Service Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.775899,39.578575]]}},{"id":"SyYIWY1L25y+exxKS6ZpyZOnMbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Atlantic City Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RsN0F4gMbINtxs8yyJ3gEM0p6Ns="},{"type":"next-occurrence","id":"21jTkL9tmjX55osFmLDn+KzXuuc="}],"description":"Scheduled roadwork on Atlantic City Expressway eastbound West of Frank S. Farley Service Plaza (Hamilton Twp) CLOSURE WILL REMAIN IN PLACE OVERNIGHT UNTIL BEING PICKED UP ON FRIDAY 5-15. MOVE OVER FOR HIGHWAY WORKERS., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM left lane and shoulder closed","update_date":"2026-05-11T12:19:07Z"},"road_event_id":"SyYIWY1L25y+exxKS6ZpyZOnMbQ=","beginning_cross_street":"West of Frank S. Farley Service Plaza","ending_cross_street":"West of Frank S. Farley Service Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.775899,39.578575]]}},{"id":"21jTkL9tmjX55osFmLDn+KzXuuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Atlantic City Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RsN0F4gMbINtxs8yyJ3gEM0p6Ns="}],"description":"Scheduled roadwork on Atlantic City Expressway eastbound West of Frank S. Farley Service Plaza (Hamilton Twp) CLOSURE WILL REMAIN IN PLACE OVERNIGHT UNTIL BEING PICKED UP ON FRIDAY 5-15. MOVE OVER FOR HIGHWAY WORKERS., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM left lane and shoulder closed","update_date":"2026-05-11T12:19:07Z"},"road_event_id":"21jTkL9tmjX55osFmLDn+KzXuuc=","beginning_cross_street":"West of Frank S. Farley Service Plaza","ending_cross_street":"West of Frank S. Farley Service Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.775899,39.578575]]}},{"id":"7M5B1T1mGdBqj0Oz4qRx8yaldu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on I-481 southbound between Ramp to Exit 95 - Northern Boulevard; CR 82 (Cicero) and Ramp from Exit 95 - Northern Boulevard (Cicero) ; Alternating lane closures, Tuesday May 12th, 2026 thru Wednesday May 13th, 2026, Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-11T12:25:55Z"},"road_event_id":"7M5B1T1mGdBqj0Oz4qRx8yaldu4=","beginning_cross_street":"Ramp to Exit 95 - Northern Boulevard; CR 82","ending_cross_street":"Ramp from Exit 95 - Northern Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.088465,43.137675]]}},{"id":"dVpt5pu5AOz+UrsHxtfCEEuHmQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"u4MO6caSqM6C97eQadbg9nkcLDA="}],"description":"Bridge work on I-81 southbound between Exit 8- US 11; Mattydale (Salina) and Exit 7 - I-90 (Salina) ; Alternating left and right lane closures, Monday May 18th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-11T12:44:04Z"},"road_event_id":"dVpt5pu5AOz+UrsHxtfCEEuHmQk=","beginning_cross_street":"Exit 8- US 11; Mattydale  ","ending_cross_street":"Exit 7 - I-90","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142627,43.113427]]}},{"id":"u4MO6caSqM6C97eQadbg9nkcLDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dVpt5pu5AOz+UrsHxtfCEEuHmQk="},{"type":"next-occurrence","id":"REWuEQobEbCOT4HK0pfqZc2IeBc="}],"description":"Bridge work on I-81 southbound between Exit 8- US 11; Mattydale (Salina) and Exit 7 - I-90 (Salina) ; Alternating left and right lane closures, Monday May 18th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-11T12:44:04Z"},"road_event_id":"u4MO6caSqM6C97eQadbg9nkcLDA=","beginning_cross_street":"Exit 8- US 11; Mattydale  ","ending_cross_street":"Exit 7 - I-90","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142627,43.113427]]}},{"id":"REWuEQobEbCOT4HK0pfqZc2IeBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dVpt5pu5AOz+UrsHxtfCEEuHmQk="},{"type":"next-occurrence","id":"l08nmwZiEZ/l8di8e44ShTpKqE8="}],"description":"Bridge work on I-81 southbound between Exit 8- US 11; Mattydale (Salina) and Exit 7 - I-90 (Salina) ; Alternating left and right lane closures, Monday May 18th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-11T12:44:04Z"},"road_event_id":"REWuEQobEbCOT4HK0pfqZc2IeBc=","beginning_cross_street":"Exit 8- US 11; Mattydale  ","ending_cross_street":"Exit 7 - I-90","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142627,43.113427]]}},{"id":"l08nmwZiEZ/l8di8e44ShTpKqE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dVpt5pu5AOz+UrsHxtfCEEuHmQk="},{"type":"next-occurrence","id":"0Gk1k173YzdUAHYcj5mpdX8Gg4o="}],"description":"Bridge work on I-81 southbound between Exit 8- US 11; Mattydale (Salina) and Exit 7 - I-90 (Salina) ; Alternating left and right lane closures, Monday May 18th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-11T12:44:04Z"},"road_event_id":"l08nmwZiEZ/l8di8e44ShTpKqE8=","beginning_cross_street":"Exit 8- US 11; Mattydale  ","ending_cross_street":"Exit 7 - I-90","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142627,43.113427]]}},{"id":"0Gk1k173YzdUAHYcj5mpdX8Gg4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dVpt5pu5AOz+UrsHxtfCEEuHmQk="},{"type":"next-occurrence","id":"HoJOdcdJQkaQFQo9y+2cl3iCkng="}],"description":"Bridge work on I-81 southbound between Exit 8- US 11; Mattydale (Salina) and Exit 7 - I-90 (Salina) ; Alternating left and right lane closures, Monday May 18th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-11T12:44:04Z"},"road_event_id":"0Gk1k173YzdUAHYcj5mpdX8Gg4o=","beginning_cross_street":"Exit 8- US 11; Mattydale  ","ending_cross_street":"Exit 7 - I-90","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142627,43.113427]]}},{"id":"HoJOdcdJQkaQFQo9y+2cl3iCkng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dVpt5pu5AOz+UrsHxtfCEEuHmQk="},{"type":"next-occurrence","id":"87IvxHUdfydCc4YkNtSBJlMEemI="}],"description":"Bridge work on I-81 southbound between Exit 8- US 11; Mattydale (Salina) and Exit 7 - I-90 (Salina) ; Alternating left and right lane closures, Monday May 18th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-11T12:44:04Z"},"road_event_id":"HoJOdcdJQkaQFQo9y+2cl3iCkng=","beginning_cross_street":"Exit 8- US 11; Mattydale  ","ending_cross_street":"Exit 7 - I-90","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T22:00:00Z","end_date":"2026-05-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142627,43.113427]]}},{"id":"87IvxHUdfydCc4YkNtSBJlMEemI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dVpt5pu5AOz+UrsHxtfCEEuHmQk="}],"description":"Bridge work on I-81 southbound between Exit 8- US 11; Mattydale (Salina) and Exit 7 - I-90 (Salina) ; Alternating left and right lane closures, Monday May 18th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-11T12:44:04Z"},"road_event_id":"87IvxHUdfydCc4YkNtSBJlMEemI=","beginning_cross_street":"Exit 8- US 11; Mattydale  ","ending_cross_street":"Exit 7 - I-90","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142627,43.113427]]}},{"id":"estde6Cp2l7Bubj7kBA1i5f4RFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tNTe+XggI88WoNEiOR3WiNR2nVc="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday Jul","update_date":"2026-05-11T12:50:40Z"},"road_event_id":"estde6Cp2l7Bubj7kBA1i5f4RFA=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"tNTe+XggI88WoNEiOR3WiNR2nVc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"estde6Cp2l7Bubj7kBA1i5f4RFA="},{"type":"next-occurrence","id":"QRmGtR3cRO4HLBQFiv04oF+Fby0="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday Jul","update_date":"2026-05-11T12:50:40Z"},"road_event_id":"tNTe+XggI88WoNEiOR3WiNR2nVc=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"QRmGtR3cRO4HLBQFiv04oF+Fby0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"estde6Cp2l7Bubj7kBA1i5f4RFA="},{"type":"next-occurrence","id":"wzyM3pi/pWsb3AJAnuAvJ8LtX7c="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday Jul","update_date":"2026-05-11T12:50:40Z"},"road_event_id":"QRmGtR3cRO4HLBQFiv04oF+Fby0=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"wzyM3pi/pWsb3AJAnuAvJ8LtX7c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"estde6Cp2l7Bubj7kBA1i5f4RFA="},{"type":"next-occurrence","id":"dMck91EocWpgaMRJMOMxOtgeVyA="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday Jul","update_date":"2026-05-11T12:50:40Z"},"road_event_id":"wzyM3pi/pWsb3AJAnuAvJ8LtX7c=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"dMck91EocWpgaMRJMOMxOtgeVyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"estde6Cp2l7Bubj7kBA1i5f4RFA="},{"type":"next-occurrence","id":"ioFm7lA4vMmx+xxGjIXdX7KxjuI="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday Jul","update_date":"2026-05-11T12:50:40Z"},"road_event_id":"dMck91EocWpgaMRJMOMxOtgeVyA=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"ioFm7lA4vMmx+xxGjIXdX7KxjuI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"estde6Cp2l7Bubj7kBA1i5f4RFA="},{"type":"next-occurrence","id":"54BJCkFgEg6mCGYI9BqkJCyHRJw="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday Jul","update_date":"2026-05-11T12:50:40Z"},"road_event_id":"ioFm7lA4vMmx+xxGjIXdX7KxjuI=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"54BJCkFgEg6mCGYI9BqkJCyHRJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"estde6Cp2l7Bubj7kBA1i5f4RFA="},{"type":"next-occurrence","id":"UkZgA3tvky5WX76NQrz2heb5q9c="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday Jul","update_date":"2026-05-11T12:50:40Z"},"road_event_id":"54BJCkFgEg6mCGYI9BqkJCyHRJw=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"UkZgA3tvky5WX76NQrz2heb5q9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"estde6Cp2l7Bubj7kBA1i5f4RFA="},{"type":"next-occurrence","id":"Jikh+UKEtyfBZEVFmNALoCwv9X8="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday Jul","update_date":"2026-05-11T12:50:40Z"},"road_event_id":"UkZgA3tvky5WX76NQrz2heb5q9c=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"Jikh+UKEtyfBZEVFmNALoCwv9X8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"estde6Cp2l7Bubj7kBA1i5f4RFA="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday Jul","update_date":"2026-05-11T12:50:40Z"},"road_event_id":"Jikh+UKEtyfBZEVFmNALoCwv9X8=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"aceohfwbpFs/ZRnfTdzppB+wylY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on I-481 northbound between Exit 96 (Cicero) and Exit 1B - Circle Dr (Cicero) ; Alternating lane closures, Thursday May 14th, 2026, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-11T12:57:08Z"},"road_event_id":"aceohfwbpFs/ZRnfTdzppB+wylY=","beginning_cross_street":"Exit 96","ending_cross_street":"Exit 1B - Circle Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.102258,43.140377]]}},{"id":"ORC32743109","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","description":"Guard rail repairs on Saw Mill River Parkway northbound between Exit 20 - I-87 (Greenburgh) and Exit 21W - NY 119 (Greenburgh) Res 8-9 RW/32743109 - Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-05-12T18:31:11Z"},"road_event_id":"ORC32743109","beginning_cross_street":"Exit 20 - I-87","ending_cross_street":"Exit 21W - Frontage Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-11T13:21:49Z","end_date":"2026-05-13T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.837325,41.041736]]}},{"id":"LSL4K3qBAJvh1DhXbMLfCny7Hso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5fomTx1FAil/2KKVxr6Sr3bzRYw="}],"description":"Drainage improvements on I-390 both directions between Scottsville Road; NY 383 (Chili) and Chili Avenue (Gates) Alternating Double Right/Double Left Lane closures as needed., alternating NB/SB, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 07:00 AM All lanes","update_date":"2026-05-11T13:38:36Z"},"road_event_id":"LSL4K3qBAJvh1DhXbMLfCny7Hso=","beginning_cross_street":"Scottsville Road; NY 383","ending_cross_street":"Chili Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.647661,43.122421]]}},{"id":"5fomTx1FAil/2KKVxr6Sr3bzRYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LSL4K3qBAJvh1DhXbMLfCny7Hso="}],"description":"Drainage improvements on I-390 both directions between Scottsville Road; NY 383 (Chili) and Chili Avenue (Gates) Alternating Double Right/Double Left Lane closures as needed., alternating NB/SB, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 07:00 AM All lanes","update_date":"2026-05-11T13:38:36Z"},"road_event_id":"5fomTx1FAil/2KKVxr6Sr3bzRYw=","beginning_cross_street":"Scottsville Road; NY 383","ending_cross_street":"Chili Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.647661,43.122421]]}},{"id":"tQmdpINNlus8efFjspSXH6wqoWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GofhIw365RC3Ndf7HHt7TLLrnnE="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"tQmdpINNlus8efFjspSXH6wqoWo=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"GofhIw365RC3Ndf7HHt7TLLrnnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tQmdpINNlus8efFjspSXH6wqoWo="},{"type":"next-occurrence","id":"2/QSj8v4UvOWwd8Q5mxQ1QHooCQ="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"GofhIw365RC3Ndf7HHt7TLLrnnE=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"2/QSj8v4UvOWwd8Q5mxQ1QHooCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tQmdpINNlus8efFjspSXH6wqoWo="},{"type":"next-occurrence","id":"k3O/O4nD6dSQ2rAuWv+RUFM3p8w="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"2/QSj8v4UvOWwd8Q5mxQ1QHooCQ=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"k3O/O4nD6dSQ2rAuWv+RUFM3p8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tQmdpINNlus8efFjspSXH6wqoWo="},{"type":"next-occurrence","id":"yPw0hptQWKQArOKK7djSInDs2tI="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"k3O/O4nD6dSQ2rAuWv+RUFM3p8w=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"yPw0hptQWKQArOKK7djSInDs2tI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tQmdpINNlus8efFjspSXH6wqoWo="},{"type":"next-occurrence","id":"tfsAmaOJyPzfQEOLxmOwOKYhyK8="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"yPw0hptQWKQArOKK7djSInDs2tI=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"tfsAmaOJyPzfQEOLxmOwOKYhyK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tQmdpINNlus8efFjspSXH6wqoWo="},{"type":"next-occurrence","id":"u4znJVqSsfiGzkexp6OT5JLkADs="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"tfsAmaOJyPzfQEOLxmOwOKYhyK8=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"u4znJVqSsfiGzkexp6OT5JLkADs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tQmdpINNlus8efFjspSXH6wqoWo="},{"type":"next-occurrence","id":"3va27tbBv62/5u6ptmgDhQcJRKA="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"u4znJVqSsfiGzkexp6OT5JLkADs=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"3va27tbBv62/5u6ptmgDhQcJRKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tQmdpINNlus8efFjspSXH6wqoWo="},{"type":"next-occurrence","id":"BgKx+Q81kF4j1lvZHRXPJiPBKwM="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"3va27tbBv62/5u6ptmgDhQcJRKA=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T11:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"BgKx+Q81kF4j1lvZHRXPJiPBKwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tQmdpINNlus8efFjspSXH6wqoWo="},{"type":"next-occurrence","id":"1nTJ9eWEe5R4+6b7nxNPxBP8/Y0="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"BgKx+Q81kF4j1lvZHRXPJiPBKwM=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T11:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"1nTJ9eWEe5R4+6b7nxNPxBP8/Y0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tQmdpINNlus8efFjspSXH6wqoWo="},{"type":"next-occurrence","id":"sm90DfLyY1AtLSS7mR8bqJFdogA="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"1nTJ9eWEe5R4+6b7nxNPxBP8/Y0=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T11:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"sm90DfLyY1AtLSS7mR8bqJFdogA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tQmdpINNlus8efFjspSXH6wqoWo="},{"type":"next-occurrence","id":"KafbXJto1EKzdz+su7k/GPKsYxM="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"sm90DfLyY1AtLSS7mR8bqJFdogA=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T11:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"KafbXJto1EKzdz+su7k/GPKsYxM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tQmdpINNlus8efFjspSXH6wqoWo="},{"type":"next-occurrence","id":"14AOK5AzRp2O+f3s8N13FmgYIp4="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"KafbXJto1EKzdz+su7k/GPKsYxM=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T11:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"14AOK5AzRp2O+f3s8N13FmgYIp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tQmdpINNlus8efFjspSXH6wqoWo="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"14AOK5AzRp2O+f3s8N13FmgYIp4=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T11:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"W6DpV6/Pe7LSvlldKB6Z2q68oTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bcHwdJSGVXYTpQ9qszQ7mynbH+s="}],"description":"Drainage improvements on I-390 both directions between Exit 17 - NY 383 (Chili) and East Henrietta Road; NY 15A (Brighton) Alternating Right/Left Lane closures as needed., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 07:00 AM All lanes","update_date":"2026-05-11T13:41:07Z"},"road_event_id":"W6DpV6/Pe7LSvlldKB6Z2q68oTk=","beginning_cross_street":"Exit 17 - NY 383","ending_cross_street":"East Henrietta Road; NY 15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T22:00:00Z","end_date":"2026-05-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.648109,43.122422]]}},{"id":"bcHwdJSGVXYTpQ9qszQ7mynbH+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W6DpV6/Pe7LSvlldKB6Z2q68oTk="}],"description":"Drainage improvements on I-390 both directions between Exit 17 - NY 383 (Chili) and East Henrietta Road; NY 15A (Brighton) Alternating Right/Left Lane closures as needed., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 07:00 AM All lanes","update_date":"2026-05-11T13:41:07Z"},"road_event_id":"bcHwdJSGVXYTpQ9qszQ7mynbH+s=","beginning_cross_street":"Exit 17 - NY 383","ending_cross_street":"East Henrietta Road; NY 15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.648109,43.122422]]}},{"id":"rWEIvsnBSyS+71WViVo9NtSgBvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QoCfe5gCD2/crPfYZcRBsD/d3ec="}],"description":"Road maintenance operations on NY 23 both directions between NY 22 (Hillsdale) and Taconic State Parkway (Claverack) D265522/32736709 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 14th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-11T14:07:46Z"},"road_event_id":"rWEIvsnBSyS+71WViVo9NtSgBvU=","beginning_cross_street":"NY 22","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.522183,42.179887]]}},{"id":"QoCfe5gCD2/crPfYZcRBsD/d3ec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rWEIvsnBSyS+71WViVo9NtSgBvU="}],"description":"Road maintenance operations on NY 23 both directions between NY 22 (Hillsdale) and Taconic State Parkway (Claverack) D265522/32736709 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 14th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-11T14:07:46Z"},"road_event_id":"QoCfe5gCD2/crPfYZcRBsD/d3ec=","beginning_cross_street":"NY 22","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.522183,42.179887]]}},{"id":"yzbYcTSUhlNvZw6awD/q3KXFSoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GyhLThEetGDg9WYXPbklw1Wwieo="}],"description":"Utility work on US 20A both directions between School St. (Leicester) and Pleasant St. (Leicester) Alternating lane closures with flaggers as needed, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T14:08:17Z"},"road_event_id":"yzbYcTSUhlNvZw6awD/q3KXFSoU=","beginning_cross_street":"School St.","ending_cross_street":"Pleasant St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.874579,42.773804]]}},{"id":"GyhLThEetGDg9WYXPbklw1Wwieo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzbYcTSUhlNvZw6awD/q3KXFSoU="},{"type":"next-occurrence","id":"yh3xDQB/Xv3TrBzxfaRTfZG0+wk="}],"description":"Utility work on US 20A both directions between School St. (Leicester) and Pleasant St. (Leicester) Alternating lane closures with flaggers as needed, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T14:08:17Z"},"road_event_id":"GyhLThEetGDg9WYXPbklw1Wwieo=","beginning_cross_street":"School St.","ending_cross_street":"Pleasant St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.874579,42.773804]]}},{"id":"yh3xDQB/Xv3TrBzxfaRTfZG0+wk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzbYcTSUhlNvZw6awD/q3KXFSoU="},{"type":"next-occurrence","id":"KReRFx8/QkXRiKXq+DZKy/gb6WI="}],"description":"Utility work on US 20A both directions between School St. (Leicester) and Pleasant St. (Leicester) Alternating lane closures with flaggers as needed, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T14:08:17Z"},"road_event_id":"yh3xDQB/Xv3TrBzxfaRTfZG0+wk=","beginning_cross_street":"School St.","ending_cross_street":"Pleasant St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.874579,42.773804]]}},{"id":"KReRFx8/QkXRiKXq+DZKy/gb6WI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzbYcTSUhlNvZw6awD/q3KXFSoU="},{"type":"next-occurrence","id":"UAuVypnsOam2IYh+5LoGzv6dqsU="}],"description":"Utility work on US 20A both directions between School St. (Leicester) and Pleasant St. (Leicester) Alternating lane closures with flaggers as needed, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T14:08:17Z"},"road_event_id":"KReRFx8/QkXRiKXq+DZKy/gb6WI=","beginning_cross_street":"School St.","ending_cross_street":"Pleasant St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T13:00:00Z","end_date":"2026-05-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.874579,42.773804]]}},{"id":"UAuVypnsOam2IYh+5LoGzv6dqsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzbYcTSUhlNvZw6awD/q3KXFSoU="},{"type":"next-occurrence","id":"W1FyCwL706VH/AkcD/j2Fi2Knts="}],"description":"Utility work on US 20A both directions between School St. (Leicester) and Pleasant St. (Leicester) Alternating lane closures with flaggers as needed, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T14:08:17Z"},"road_event_id":"UAuVypnsOam2IYh+5LoGzv6dqsU=","beginning_cross_street":"School St.","ending_cross_street":"Pleasant St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T13:00:00Z","end_date":"2026-05-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.874579,42.773804]]}},{"id":"W1FyCwL706VH/AkcD/j2Fi2Knts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzbYcTSUhlNvZw6awD/q3KXFSoU="},{"type":"next-occurrence","id":"PkJPUnxl79aER/DT6ZfXVZIE8yc="}],"description":"Utility work on US 20A both directions between School St. (Leicester) and Pleasant St. (Leicester) Alternating lane closures with flaggers as needed, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T14:08:17Z"},"road_event_id":"W1FyCwL706VH/AkcD/j2Fi2Knts=","beginning_cross_street":"School St.","ending_cross_street":"Pleasant St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.874579,42.773804]]}},{"id":"PkJPUnxl79aER/DT6ZfXVZIE8yc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzbYcTSUhlNvZw6awD/q3KXFSoU="},{"type":"next-occurrence","id":"sS3PF1vC9wX7hWeKn7W2MsAG2EU="}],"description":"Utility work on US 20A both directions between School St. (Leicester) and Pleasant St. (Leicester) Alternating lane closures with flaggers as needed, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T14:08:17Z"},"road_event_id":"PkJPUnxl79aER/DT6ZfXVZIE8yc=","beginning_cross_street":"School St.","ending_cross_street":"Pleasant St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.874579,42.773804]]}},{"id":"sS3PF1vC9wX7hWeKn7W2MsAG2EU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzbYcTSUhlNvZw6awD/q3KXFSoU="},{"type":"next-occurrence","id":"EuqE3Um+gD3vEEP1F4ZDPaTPRdY="}],"description":"Utility work on US 20A both directions between School St. (Leicester) and Pleasant St. (Leicester) Alternating lane closures with flaggers as needed, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T14:08:17Z"},"road_event_id":"sS3PF1vC9wX7hWeKn7W2MsAG2EU=","beginning_cross_street":"School St.","ending_cross_street":"Pleasant St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.874579,42.773804]]}},{"id":"EuqE3Um+gD3vEEP1F4ZDPaTPRdY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzbYcTSUhlNvZw6awD/q3KXFSoU="}],"description":"Utility work on US 20A both directions between School St. (Leicester) and Pleasant St. (Leicester) Alternating lane closures with flaggers as needed, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T14:08:17Z"},"road_event_id":"EuqE3Um+gD3vEEP1F4ZDPaTPRdY=","beginning_cross_street":"School St.","ending_cross_street":"Pleasant St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.874579,42.773804]]}},{"id":"5wllTr9nMsfqQO6eW5DnKrlwIkQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jtyHTVcCQN9RpVvADhvN/onHXII="}],"description":"Road maintenance operations on NY 32 both directions between Old Mill Road (Plattekill) and US 44/NY 55 (Plattekill) D265522/32736609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 14th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-11T14:19:11Z"},"road_event_id":"5wllTr9nMsfqQO6eW5DnKrlwIkQ=","beginning_cross_street":"Old Mill Road","ending_cross_street":"US 44/NY 55","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.074926,41.605986]]}},{"id":"jtyHTVcCQN9RpVvADhvN/onHXII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5wllTr9nMsfqQO6eW5DnKrlwIkQ="}],"description":"Road maintenance operations on NY 32 both directions between Old Mill Road (Plattekill) and US 44/NY 55 (Plattekill) D265522/32736609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Thursday May 14th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-11T14:19:11Z"},"road_event_id":"jtyHTVcCQN9RpVvADhvN/onHXII=","beginning_cross_street":"Old Mill Road","ending_cross_street":"US 44/NY 55","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.074926,41.605986]]}},{"id":"gBhwEJv8xFJJnpMqtQbBL8S0lZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 65 - CR 649/Sloan Ave (Hamilton Twp) and South of Exit 67 - US 1 (Lawrence Twp), Thursday May 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T14:36:38Z"},"road_event_id":"gBhwEJv8xFJJnpMqtQbBL8S0lZM=","beginning_cross_street":"North of Exit 65 - CR 649/Sloan Ave","ending_cross_street":"South of Exit 67 - US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.692962,40.262321]]}},{"id":"0C4IOqr1SXfMiBzyTbke4YkHJvQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between North of I-195 (Hamilton Twp) and North of US 130/US 206 (Bordentown Twp), Thursday May 14, 2026 01:00 PM thru 08:00 PM, right shoulder closed","update_date":"2026-05-11T14:36:39Z"},"road_event_id":"0C4IOqr1SXfMiBzyTbke4YkHJvQ=","beginning_cross_street":"North of I-195","ending_cross_street":"North of US 130/US 206","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T06:00:00Z","end_date":"2026-05-15T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.704757,40.187137]]}},{"id":"9gGBFeINABV4WfcsHO4zZ/W1Rnk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between South of Exit 61 - Arena Dr (Hamilton Twp) and North of Exit 62 - Olden Ave (Hamilton Twp), Friday May 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T14:36:31Z"},"road_event_id":"9gGBFeINABV4WfcsHO4zZ/W1Rnk=","beginning_cross_street":"South of Exit 61 - Arena Dr","ending_cross_street":"North of Exit 62 - Olden Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.71392,40.197544]]}},{"id":"S+ncyhi5t+MA9qhS14vdX+sUy9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 65 - CR 649/Sloan Ave (Hamilton Twp) and South of Exit 67 - US 1 (Lawrence Twp), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T14:36:32Z"},"road_event_id":"S+ncyhi5t+MA9qhS14vdX+sUy9c=","beginning_cross_street":"North of Exit 65 - CR 649/Sloan Ave","ending_cross_street":"South of Exit 67 - US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.692962,40.262321]]}},{"id":"Mlu81GpJRE71FqEr7YyyR1OUKvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between South of Exit 6 - NJ 138 (Wall Twp) and Exit 15 - Wayside Rd (Tinton Falls), Thursday May 14, 2026 12:00 AM thru 06:00 AM, left lane closed, moving operation","update_date":"2026-05-11T14:36:35Z"},"road_event_id":"Mlu81GpJRE71FqEr7YyyR1OUKvI=","beginning_cross_street":"South of Exit 6 - NJ 138","ending_cross_street":"Exit 15 - Wayside Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070411,40.1688]]}},{"id":"8Y4sSbATOiTWQ717xva5t/37QPs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 322"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 322 Westbound near East of CR 655/Fries Mill Rd (Monroe Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, right shoulder closed, moving operation","update_date":"2026-05-11T14:36:25Z"},"road_event_id":"8Y4sSbATOiTWQ717xva5t/37QPs=","beginning_cross_street":"East of CR 655/Fries Mill Rd","ending_cross_street":"West of CR 655/Fries Mill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.043792,39.693527]]}},{"id":"o+9Sxd5Dg+I+uUf77Qu5iy44cL4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 near West of NJ 41 (Maple Shade Twp), Wednesday May 13, 2026 02:00 PM thru 08:00 PM, right shoulder closed, moving operation","update_date":"2026-05-11T14:36:27Z"},"road_event_id":"o+9Sxd5Dg+I+uUf77Qu5iy44cL4=","beginning_cross_street":"West of NJ 41","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T08:00:00Z","end_date":"2026-05-14T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.986999,39.942539]]}},{"id":"0lCuvzbCQe8+cjzfQCwdJlv1YWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 322"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 322 Eastbound between West of CR 655/Fries Mill Rd (Monroe Twp) and East of CR 655/Fries Mill Rd (Monroe Twp), Wednesday May 13, 2026 08:00 AM thru 05:00 PM, right shoulder closed, moving operation","update_date":"2026-05-11T14:36:48Z"},"road_event_id":"0lCuvzbCQe8+cjzfQCwdJlv1YWQ=","beginning_cross_street":"West of CR 655/Fries Mill Rd","ending_cross_street":"East of CR 655/Fries Mill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.062171,39.696563]]}},{"id":"SMit/sUvd/cezIAPUWcAlu8vVcU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound at Exit 43 - CR 838/Creek Rd (Mount Laurel Twp) Saturday May 16, 2026 06:00 AM thru 03:00 PM, ramp","update_date":"2026-05-11T14:36:46Z"},"road_event_id":"SMit/sUvd/cezIAPUWcAlu8vVcU=","beginning_cross_street":"Exit 43 - CR 838/Creek Rd","ending_cross_street":"Exit 43 - CR 838/Creek Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T16:00:00Z","end_date":"2026-05-17T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.87754,39.991912]]}},{"id":"NGutevGYIYiMLKN90MSgfiUkutQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between South of CR 669/Juliustown Rd (Springfield Twp) and US 130/US 206 (Bordentown Twp), Thursday May 14, 2026 01:00 PM thru 08:00 PM, right shoulder closed, moving operation","update_date":"2026-05-11T14:36:47Z"},"road_event_id":"NGutevGYIYiMLKN90MSgfiUkutQ=","beginning_cross_street":"South of CR 669/Juliustown Rd","ending_cross_street":"US 130/US 206","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T06:00:00Z","end_date":"2026-05-15T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.733192,40.01073]]}},{"id":"ORC32743309","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","description":"Pothole repair on Saw Mill River Parkway southbound ramps to Exit 22 - I-287 (Greenburgh) Res 8-9 RW/32743309 - This is a moving operation. Use caution when travelling through the work zone Not currently scheduled","update_date":"2026-05-12T18:31:12Z"},"road_event_id":"ORC32743309","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-11T14:41:08Z","end_date":"2026-05-13T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.822683,41.060602]]}},{"id":"/nfAuG1WeIxRxHZBI23jqgaW2xU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Dkhnt+U58mDu72IIwFclPJlDh3s="}],"description":"Roadwork on NY 19 both directions Genesee Street; NY 244 (Amity) 1 Lane, 2 Way, Flagger Control, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-11T14:50:47Z"},"road_event_id":"/nfAuG1WeIxRxHZBI23jqgaW2xU=","beginning_cross_street":"Genesee Street; NY 244","ending_cross_street":"Genesee Street; NY 244","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.022451,42.217868]]}},{"id":"Dkhnt+U58mDu72IIwFclPJlDh3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/nfAuG1WeIxRxHZBI23jqgaW2xU="},{"type":"next-occurrence","id":"NkSONICTQBAiHxihnzgNH7Dia1U="}],"description":"Roadwork on NY 19 both directions Genesee Street; NY 244 (Amity) 1 Lane, 2 Way, Flagger Control, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-11T14:50:47Z"},"road_event_id":"Dkhnt+U58mDu72IIwFclPJlDh3s=","beginning_cross_street":"Genesee Street; NY 244","ending_cross_street":"Genesee Street; NY 244","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.022451,42.217868]]}},{"id":"NkSONICTQBAiHxihnzgNH7Dia1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/nfAuG1WeIxRxHZBI23jqgaW2xU="}],"description":"Roadwork on NY 19 both directions Genesee Street; NY 244 (Amity) 1 Lane, 2 Way, Flagger Control, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-11T14:50:47Z"},"road_event_id":"NkSONICTQBAiHxihnzgNH7Dia1U=","beginning_cross_street":"Genesee Street; NY 244","ending_cross_street":"Genesee Street; NY 244","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.022451,42.217868]]}},{"id":"Dor/NPC7Pw7riE2xd4KyTHi3AiI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KbnWuGZxpg3Y4gE+QQiRVVJs6HE="}],"description":"Roadwork on NY 19 both directions CR 9 (Scio) to Town of Scio; Town of Amity Line (Amity) 1 Lane, 2 Way, Flagger Control, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-11T14:52:16Z"},"road_event_id":"Dor/NPC7Pw7riE2xd4KyTHi3AiI=","beginning_cross_street":"CR 9","ending_cross_street":"Town of Scio; Town of Amity Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.977772,42.166552]]}},{"id":"KbnWuGZxpg3Y4gE+QQiRVVJs6HE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Dor/NPC7Pw7riE2xd4KyTHi3AiI="},{"type":"next-occurrence","id":"aqIbD8e+BspDfgUXEOpl35Xip3s="}],"description":"Roadwork on NY 19 both directions CR 9 (Scio) to Town of Scio; Town of Amity Line (Amity) 1 Lane, 2 Way, Flagger Control, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-11T14:52:16Z"},"road_event_id":"KbnWuGZxpg3Y4gE+QQiRVVJs6HE=","beginning_cross_street":"CR 9","ending_cross_street":"Town of Scio; Town of Amity Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.977772,42.166552]]}},{"id":"aqIbD8e+BspDfgUXEOpl35Xip3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Dor/NPC7Pw7riE2xd4KyTHi3AiI="}],"description":"Roadwork on NY 19 both directions CR 9 (Scio) to Town of Scio; Town of Amity Line (Amity) 1 Lane, 2 Way, Flagger Control, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-11T14:52:16Z"},"road_event_id":"aqIbD8e+BspDfgUXEOpl35Xip3s=","beginning_cross_street":"CR 9","ending_cross_street":"Town of Scio; Town of Amity Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.977772,42.166552]]}},{"id":"281lb8gy7ZDUdbk1fTst+o7wkQE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-76"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-76 Eastbound near West of Exit 1B - I-295 (Gloucester City), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T14:57:44Z"},"road_event_id":"281lb8gy7ZDUdbk1fTst+o7wkQE=","beginning_cross_street":"West of Exit 1B - I-295","ending_cross_street":"West of Exit 1C - CR 634/Market St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.102783,39.878128]]}},{"id":"lfNBxBTLJXc4h+PB6SIlSGvai4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between US 40/Black Horse Pike/US 322 (Pleasantville) and US 30/White Horse Pike (Absecon City), Thursday May 14, 2026 04:00 PM thru 11:00 PM, right shoulder closed, moving operation","update_date":"2026-05-11T14:57:37Z"},"road_event_id":"lfNBxBTLJXc4h+PB6SIlSGvai4k=","beginning_cross_street":"US 40/Black Horse Pike/US 322","ending_cross_street":"US 30/White Horse Pike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.5316,39.390758]]}},{"id":"/S8O3vPgsutw+Na3NEupHlSCS+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between CR 614/Water St (Independence Twp) and West of CR 620/Water St (White Twp), Thursday May 14, 2026 08:00 AM thru 04:00 PM, right shoulder closed, moving operation","update_date":"2026-05-11T14:57:40Z"},"road_event_id":"/S8O3vPgsutw+Na3NEupHlSCS+o=","beginning_cross_street":"CR 614/Water St","ending_cross_street":"West of CR 620/Water St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.895729,40.871017]]}},{"id":"8mxHeAMxFUSXRbwU3AkaopQOh1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near South of Bergen Av (Mantoloking), Tuesday May 19, 2026 12:00 AM thru 04:00 AM, right shoulder closed","update_date":"2026-05-11T14:57:42Z"},"road_event_id":"8mxHeAMxFUSXRbwU3AkaopQOh1c=","beginning_cross_street":"South of Bergen Av","ending_cross_street":"South of Bergen Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T04:00:00Z","end_date":"2026-05-19T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047859,40.051872]]}},{"id":"yLCHI2+jJ/5KtEHcf1UW0du4QIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between US 30/White Horse Pike (Absecon City) and US 40/Black Horse Pike/US 322 (Pleasantville), Thursday May 14, 2026 04:00 PM thru 11:00 PM, right shoulder closed, moving operation","update_date":"2026-05-11T14:57:43Z"},"road_event_id":"yLCHI2+jJ/5KtEHcf1UW0du4QIk=","beginning_cross_street":"US 30/White Horse Pike","ending_cross_street":"US 40/Black Horse Pike/US 322","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T12:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.505973,39.427127]]}},{"id":"q5+lQaRrs/tX0B/F/tp8seY3B6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound near Jacobus Avenue (Kearny), Thursday May 14, 2026 09:00 PM thru Friday May 15, 2026 05:00 AM, right lane closed","update_date":"2026-05-11T14:57:27Z"},"road_event_id":"q5+lQaRrs/tX0B/F/tp8seY3B6s=","beginning_cross_street":"Jacobus Avenue","ending_cross_street":"Passaic River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.118919,40.732639]]}},{"id":"/ALRz5NHeRXQYcTvGdDcrvnwYfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of CR 620/Water St (White Twp) and CR 614/Water St (Independence Twp), Saturday May 16, 2026 08:00 AM thru 04:00 PM, right shoulder closed, moving operation","update_date":"2026-05-11T14:57:26Z"},"road_event_id":"/ALRz5NHeRXQYcTvGdDcrvnwYfk=","beginning_cross_street":"West of CR 620/Water St","ending_cross_street":"CR 614/Water St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.05339,40.843223]]}},{"id":"6NQkTXzLe15xd0ce+1F/NF4HEs4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound near West of CR 508 (Kearny), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-11T15:00:28Z"},"road_event_id":"6NQkTXzLe15xd0ce+1F/NF4HEs4=","beginning_cross_street":"West of CR 508","ending_cross_street":"West of CR 508","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.130691,40.747028]]}},{"id":"gJVITPn8lfwUH2uT43P3EESIzCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound near CR 508 (Kearny), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, at least one lane closed","update_date":"2026-05-11T15:00:32Z"},"road_event_id":"gJVITPn8lfwUH2uT43P3EESIzCU=","beginning_cross_street":"CR 508","ending_cross_street":"West of CR 508","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.127944,40.750896]]}},{"id":"tNC3J6t10KWvLsX8sB8E6Ua96Es=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound between North of Newark Liberty International Airport (Newark) and North of I-78 (Newark), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 04:00 AM, right lane closed local lane","update_date":"2026-05-11T15:33:28Z"},"road_event_id":"tNC3J6t10KWvLsX8sB8E6Ua96Es=","beginning_cross_street":"North of Newark Liberty International Airport","ending_cross_street":"North of I-78","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.18605,40.697387]]}},{"id":"CJvUWPqXcTODXht/D4o1OIwPC4I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound between Exit 59 - Market St (Paterson) and East of Exit 60 - NJ 20 (Paterson), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 04:00 AM, at least one lane closed","update_date":"2026-05-11T15:33:29Z"},"road_event_id":"CJvUWPqXcTODXht/D4o1OIwPC4I=","beginning_cross_street":"Exit 59 - Market St","ending_cross_street":"East of Exit 60 - NJ 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.14434,40.90055]]}},{"id":"FlDBUMAi7HtzWGtpQkqQ48f/FFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound between North of Newark Liberty International Airport (Newark) and North of I-78 (Newark), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 04:00 AM, right lane closed local lane","update_date":"2026-05-11T15:33:31Z"},"road_event_id":"FlDBUMAi7HtzWGtpQkqQ48f/FFA=","beginning_cross_street":"North of Newark Liberty International Airport","ending_cross_street":"North of I-78","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.18605,40.697387]]}},{"id":"reoU6ADdXTuQhgotV2yLv9EMDYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound at Exit 16E - Essex St (Harrison) Thursday May 14, 2026 11:00 PM thru Friday May 15, 2026 04:00 AM, ramp","update_date":"2026-05-11T15:33:34Z"},"road_event_id":"reoU6ADdXTuQhgotV2yLv9EMDYw=","beginning_cross_street":"Exit 16E - Essex St","ending_cross_street":"Exit 16E - Essex St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.156005,40.742782]]}},{"id":"jz+Tr3C7Nnn6szW2V1EREcauBPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near Exit 59 - Market St (Paterson),","update_date":"2026-05-11T15:33:36Z"},"road_event_id":"jz+Tr3C7Nnn6szW2V1EREcauBPU=","beginning_cross_street":"Exit 59 - Market St","ending_cross_street":"East of Exit 60 - NJ 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T04:00:00Z","end_date":"2026-05-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.14434,40.90055]]}},{"id":"DIFpskRiTIe1nO8mzvvxQ+jRfP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound between North of Newark Liberty International Airport (Newark) and North of I-78 (Newark), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 04:00 AM, right lane closed local lane","update_date":"2026-05-11T15:33:26Z"},"road_event_id":"DIFpskRiTIe1nO8mzvvxQ+jRfP4=","beginning_cross_street":"North of Newark Liberty International Airport","ending_cross_street":"North of I-78","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.18605,40.697387]]}},{"id":"uxbt2BsBI7nCOY7e1Sv6Q2MCvAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hu7kBQKw05Qc/QKvZmUCsLxsWoA="}],"description":"Construction on I-95 both directions between East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed southbound, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T15:44:45Z"},"road_event_id":"uxbt2BsBI7nCOY7e1Sv6Q2MCvAs=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830541,40.831672]]}},{"id":"hu7kBQKw05Qc/QKvZmUCsLxsWoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uxbt2BsBI7nCOY7e1Sv6Q2MCvAs="},{"type":"next-occurrence","id":"TrBBRTjZtB85TsNwM16qcF0OxnU="}],"description":"Construction on I-95 both directions between East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed southbound, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T15:44:45Z"},"road_event_id":"hu7kBQKw05Qc/QKvZmUCsLxsWoA=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830541,40.831672]]}},{"id":"TrBBRTjZtB85TsNwM16qcF0OxnU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uxbt2BsBI7nCOY7e1Sv6Q2MCvAs="},{"type":"next-occurrence","id":"iRGmggZ93SpO4Oqn/fQQWxdg3fA="}],"description":"Construction on I-95 both directions between East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed southbound, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T15:44:45Z"},"road_event_id":"TrBBRTjZtB85TsNwM16qcF0OxnU=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830541,40.831672]]}},{"id":"iRGmggZ93SpO4Oqn/fQQWxdg3fA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uxbt2BsBI7nCOY7e1Sv6Q2MCvAs="},{"type":"next-occurrence","id":"e5kVZT4x15z5mY0OjloyyUZWddo="}],"description":"Construction on I-95 both directions between East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed southbound, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T15:44:45Z"},"road_event_id":"iRGmggZ93SpO4Oqn/fQQWxdg3fA=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830541,40.831672]]}},{"id":"e5kVZT4x15z5mY0OjloyyUZWddo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uxbt2BsBI7nCOY7e1Sv6Q2MCvAs="},{"type":"next-occurrence","id":"r1edbqPiH0Qs+avZD/EVAJFQQqA="}],"description":"Construction on I-95 both directions between East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed southbound, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T15:44:45Z"},"road_event_id":"e5kVZT4x15z5mY0OjloyyUZWddo=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830541,40.831672]]}},{"id":"r1edbqPiH0Qs+avZD/EVAJFQQqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uxbt2BsBI7nCOY7e1Sv6Q2MCvAs="}],"description":"Construction on I-95 both directions between East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed southbound, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T15:44:45Z"},"road_event_id":"r1edbqPiH0Qs+avZD/EVAJFQQqA=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830541,40.831672]]}},{"id":"ojzGJZglTW+vvxldc0LseMmAXi4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FvKfKrcZF/rDGa+Q5lQc41wTQJo="}],"description":"Construction on I-278 westbound from END ROUTE; I-95 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T15:46:28Z"},"road_event_id":"ojzGJZglTW+vvxldc0LseMmAXi4=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"END ROUTE; I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.833829,40.829896]]}},{"id":"FvKfKrcZF/rDGa+Q5lQc41wTQJo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojzGJZglTW+vvxldc0LseMmAXi4="},{"type":"next-occurrence","id":"bgoKwj4Cm5vvhiQQJHiimVFZ9HM="}],"description":"Construction on I-278 westbound from END ROUTE; I-95 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T15:46:28Z"},"road_event_id":"FvKfKrcZF/rDGa+Q5lQc41wTQJo=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"END ROUTE; I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.833829,40.829896]]}},{"id":"bgoKwj4Cm5vvhiQQJHiimVFZ9HM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojzGJZglTW+vvxldc0LseMmAXi4="}],"description":"Construction on I-278 westbound from END ROUTE; I-95 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T15:46:28Z"},"road_event_id":"bgoKwj4Cm5vvhiQQJHiimVFZ9HM=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"END ROUTE; I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.833829,40.829896]]}},{"id":"fSgb8awbMFNKQVie4xgTmLxlC38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MEEKER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"E9pW7i288XwS/yp9yZyVmIkUQpI="}],"description":"Construction on MEEKER AVE westbound from MORGAN AVE (New York) to SUTTON ST (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T15:50:47Z"},"road_event_id":"fSgb8awbMFNKQVie4xgTmLxlC38=","beginning_cross_street":"MORGAN AVE","ending_cross_street":"SUTTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939362,40.723316]]}},{"id":"E9pW7i288XwS/yp9yZyVmIkUQpI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MEEKER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fSgb8awbMFNKQVie4xgTmLxlC38="},{"type":"next-occurrence","id":"QCSuYN1PumzigLjcCQ2a9S+3dzg="}],"description":"Construction on MEEKER AVE westbound from MORGAN AVE (New York) to SUTTON ST (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T15:50:47Z"},"road_event_id":"E9pW7i288XwS/yp9yZyVmIkUQpI=","beginning_cross_street":"MORGAN AVE","ending_cross_street":"SUTTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939362,40.723316]]}},{"id":"QCSuYN1PumzigLjcCQ2a9S+3dzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MEEKER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fSgb8awbMFNKQVie4xgTmLxlC38="}],"description":"Construction on MEEKER AVE westbound from MORGAN AVE (New York) to SUTTON ST (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T15:50:47Z"},"road_event_id":"QCSuYN1PumzigLjcCQ2a9S+3dzg=","beginning_cross_street":"MORGAN AVE","ending_cross_street":"SUTTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939362,40.723316]]}},{"id":"x2sZv4c9qxdlpN/G0zqatIHQIUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"h0LXnY1mczkHS6oxE1JTYDJZppU="}],"description":"Traffic signal repairs on NY 119 westbound between County Center Road (Greenburgh) and Old Kensico Road (Greenburgh) 202508112825/32743409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, shoulder closures, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, shoulder closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, shoulder closures, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-05-11T15:59:53Z"},"road_event_id":"x2sZv4c9qxdlpN/G0zqatIHQIUo=","beginning_cross_street":"County Center Road","ending_cross_street":"Old Kensico Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.780551,41.037541]]}},{"id":"h0LXnY1mczkHS6oxE1JTYDJZppU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x2sZv4c9qxdlpN/G0zqatIHQIUo="},{"type":"next-occurrence","id":"QyzdHyNj3ndO4yaz4p/jJZFFW+Y="}],"description":"Traffic signal repairs on NY 119 westbound between County Center Road (Greenburgh) and Old Kensico Road (Greenburgh) 202508112825/32743409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, shoulder closures, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, shoulder closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, shoulder closures, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-05-11T15:59:53Z"},"road_event_id":"h0LXnY1mczkHS6oxE1JTYDJZppU=","beginning_cross_street":"County Center Road","ending_cross_street":"Old Kensico Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.780551,41.037541]]}},{"id":"QyzdHyNj3ndO4yaz4p/jJZFFW+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x2sZv4c9qxdlpN/G0zqatIHQIUo="},{"type":"next-occurrence","id":"wx9Bl6aJYiv6+glKAwnTSfNbZTM="}],"description":"Traffic signal repairs on NY 119 westbound between County Center Road (Greenburgh) and Old Kensico Road (Greenburgh) 202508112825/32743409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, shoulder closures, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, shoulder closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, shoulder closures, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-05-11T15:59:53Z"},"road_event_id":"QyzdHyNj3ndO4yaz4p/jJZFFW+Y=","beginning_cross_street":"County Center Road","ending_cross_street":"Old Kensico Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.780551,41.037541]]}},{"id":"wx9Bl6aJYiv6+glKAwnTSfNbZTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x2sZv4c9qxdlpN/G0zqatIHQIUo="},{"type":"next-occurrence","id":"6SPq11bhHDPyzn4GjR3RqeNaBFs="}],"description":"Traffic signal repairs on NY 119 westbound between County Center Road (Greenburgh) and Old Kensico Road (Greenburgh) 202508112825/32743409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, shoulder closures, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, shoulder closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, shoulder closures, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-05-11T15:59:53Z"},"road_event_id":"wx9Bl6aJYiv6+glKAwnTSfNbZTM=","beginning_cross_street":"County Center Road","ending_cross_street":"Old Kensico Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.780551,41.037541]]}},{"id":"6SPq11bhHDPyzn4GjR3RqeNaBFs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x2sZv4c9qxdlpN/G0zqatIHQIUo="},{"type":"next-occurrence","id":"9XF/d/5GNuG2lTYUi5fyQO3ikz8="}],"description":"Traffic signal repairs on NY 119 westbound between County Center Road (Greenburgh) and Old Kensico Road (Greenburgh) 202508112825/32743409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, shoulder closures, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, shoulder closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, shoulder closures, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-05-11T15:59:53Z"},"road_event_id":"6SPq11bhHDPyzn4GjR3RqeNaBFs=","beginning_cross_street":"County Center Road","ending_cross_street":"Old Kensico Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.780551,41.037541]]}},{"id":"9XF/d/5GNuG2lTYUi5fyQO3ikz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x2sZv4c9qxdlpN/G0zqatIHQIUo="}],"description":"Traffic signal repairs on NY 119 westbound between County Center Road (Greenburgh) and Old Kensico Road (Greenburgh) 202508112825/32743409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, shoulder closures, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, shoulder closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, shoulder closures, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-05-11T15:59:53Z"},"road_event_id":"9XF/d/5GNuG2lTYUi5fyQO3ikz8=","beginning_cross_street":"County Center Road","ending_cross_street":"Old Kensico Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.780551,41.037541]]}},{"id":"OZvI33dwq/1fudg0Bpbs5+oYKTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["86TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"M3VePu2mnn1mxKurKP5KhXBB88E="}],"description":"Construction on 86TH ST westbound between BATTERY AVE (New York) and DAHLGREN PL (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T15:53:28Z"},"road_event_id":"OZvI33dwq/1fudg0Bpbs5+oYKTU=","beginning_cross_street":"BATTERY AVE","ending_cross_street":"DAHLGREN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.022075,40.619005]]}},{"id":"M3VePu2mnn1mxKurKP5KhXBB88E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["86TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OZvI33dwq/1fudg0Bpbs5+oYKTU="},{"type":"next-occurrence","id":"3m6DJtghrizMbXL6HmPZ3VGUKh8="}],"description":"Construction on 86TH ST westbound between BATTERY AVE (New York) and DAHLGREN PL (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T15:53:28Z"},"road_event_id":"M3VePu2mnn1mxKurKP5KhXBB88E=","beginning_cross_street":"BATTERY AVE","ending_cross_street":"DAHLGREN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.022075,40.619005]]}},{"id":"3m6DJtghrizMbXL6HmPZ3VGUKh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["86TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OZvI33dwq/1fudg0Bpbs5+oYKTU="}],"description":"Construction on 86TH ST westbound between BATTERY AVE (New York) and DAHLGREN PL (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T15:53:28Z"},"road_event_id":"3m6DJtghrizMbXL6HmPZ3VGUKh8=","beginning_cross_street":"BATTERY AVE","ending_cross_street":"DAHLGREN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.022075,40.619005]]}},{"id":"uPfZo0eabkiwsMbbSHMkFAFxyJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XvbSmCYohvVYkX8/sQ5pPsuXE3k="}],"description":"Construction on I-495 westbound between 80th Street; I-495 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T15:55:03Z"},"road_event_id":"uPfZo0eabkiwsMbbSHMkFAFxyJc=","beginning_cross_street":"80th Street; I-495","ending_cross_street":"80th Street; I-495","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.880293,40.728937]]}},{"id":"XvbSmCYohvVYkX8/sQ5pPsuXE3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uPfZo0eabkiwsMbbSHMkFAFxyJc="},{"type":"next-occurrence","id":"eHJ7Cc0OPSxBS7i7SJJ8HWNTjhk="}],"description":"Construction on I-495 westbound between 80th Street; I-495 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T15:55:03Z"},"road_event_id":"XvbSmCYohvVYkX8/sQ5pPsuXE3k=","beginning_cross_street":"80th Street; I-495","ending_cross_street":"80th Street; I-495","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.880293,40.728937]]}},{"id":"eHJ7Cc0OPSxBS7i7SJJ8HWNTjhk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uPfZo0eabkiwsMbbSHMkFAFxyJc="}],"description":"Construction on I-495 westbound between 80th Street; I-495 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T15:55:03Z"},"road_event_id":"eHJ7Cc0OPSxBS7i7SJJ8HWNTjhk=","beginning_cross_street":"80th Street; I-495","ending_cross_street":"80th Street; I-495","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.880293,40.728937]]}},{"id":"vh8zdyv64/a0WYTg0FTibL/xkKE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Nassau Expressway / NY 878"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7O9KLcSIfRgdkHRtXz1x5pojgHo="}],"description":"Construction on Nassau Expressway / NY 878 both directions between Rockaway Boulevard (New York) and ROCKAWAY BLVD at FARMERS BLVD (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T15:56:52Z"},"road_event_id":"vh8zdyv64/a0WYTg0FTibL/xkKE=","beginning_cross_street":"Rockaway Boulevard","ending_cross_street":"FARMERS BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775413,40.660241]]}},{"id":"7O9KLcSIfRgdkHRtXz1x5pojgHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Nassau Expressway / NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vh8zdyv64/a0WYTg0FTibL/xkKE="},{"type":"next-occurrence","id":"Z9ACT4M0VfJoBDyngOrwRaS7npo="}],"description":"Construction on Nassau Expressway / NY 878 both directions between Rockaway Boulevard (New York) and ROCKAWAY BLVD at FARMERS BLVD (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T15:56:52Z"},"road_event_id":"7O9KLcSIfRgdkHRtXz1x5pojgHo=","beginning_cross_street":"Rockaway Boulevard","ending_cross_street":"FARMERS BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775413,40.660241]]}},{"id":"Z9ACT4M0VfJoBDyngOrwRaS7npo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Nassau Expressway / NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vh8zdyv64/a0WYTg0FTibL/xkKE="}],"description":"Construction on Nassau Expressway / NY 878 both directions between Rockaway Boulevard (New York) and ROCKAWAY BLVD at FARMERS BLVD (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T15:56:52Z"},"road_event_id":"Z9ACT4M0VfJoBDyngOrwRaS7npo=","beginning_cross_street":"Rockaway Boulevard","ending_cross_street":"FARMERS BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775413,40.660241]]}},{"id":"BFskiBhEu/F9CxowQr37awPxkzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VUvNkbFwVKJbvinfj7/pa3DGHhU="}],"description":"Construction on NY 878 eastbound ramp to I-678 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T15:58:22Z"},"road_event_id":"BFskiBhEu/F9CxowQr37awPxkzs=","beginning_cross_street":"I-678","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801497,40.665269]]}},{"id":"VUvNkbFwVKJbvinfj7/pa3DGHhU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BFskiBhEu/F9CxowQr37awPxkzs="},{"type":"next-occurrence","id":"woruGVHAc1dlMIqEEkQgreTKSq8="}],"description":"Construction on NY 878 eastbound ramp to I-678 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T15:58:22Z"},"road_event_id":"VUvNkbFwVKJbvinfj7/pa3DGHhU=","beginning_cross_street":"I-678","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801497,40.665269]]}},{"id":"woruGVHAc1dlMIqEEkQgreTKSq8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BFskiBhEu/F9CxowQr37awPxkzs="}],"description":"Construction on NY 878 eastbound ramp to I-678 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T15:58:22Z"},"road_event_id":"woruGVHAc1dlMIqEEkQgreTKSq8=","beginning_cross_street":"I-678","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801497,40.665269]]}},{"id":"NCXqIoWWVCLr0bSOKFDEp/2MvDk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Korean Veterans Memorial Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vomVwJ8bsTQYs44BDSbVZwzWjuI="}],"description":"Construction on Korean Veterans Memorial Parkway both directions between Arden Avenue (Staten Island) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane and shoulder of 2 lanes closed","update_date":"2026-05-11T16:01:20Z"},"road_event_id":"NCXqIoWWVCLr0bSOKFDEp/2MvDk=","beginning_cross_street":"Arden Avenue","ending_cross_street":"Arden Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.177547,40.551856]]}},{"id":"vomVwJ8bsTQYs44BDSbVZwzWjuI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Korean Veterans Memorial Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NCXqIoWWVCLr0bSOKFDEp/2MvDk="},{"type":"next-occurrence","id":"YLNY1a9qTHGfYrA3HAJnBFBv6M8="}],"description":"Construction on Korean Veterans Memorial Parkway both directions between Arden Avenue (Staten Island) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane and shoulder of 2 lanes closed","update_date":"2026-05-11T16:01:20Z"},"road_event_id":"vomVwJ8bsTQYs44BDSbVZwzWjuI=","beginning_cross_street":"Arden Avenue","ending_cross_street":"Arden Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.177547,40.551856]]}},{"id":"YLNY1a9qTHGfYrA3HAJnBFBv6M8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Korean Veterans Memorial Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NCXqIoWWVCLr0bSOKFDEp/2MvDk="}],"description":"Construction on Korean Veterans Memorial Parkway both directions between Arden Avenue (Staten Island) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane and shoulder of 2 lanes closed","update_date":"2026-05-11T16:01:20Z"},"road_event_id":"YLNY1a9qTHGfYrA3HAJnBFBv6M8=","beginning_cross_street":"Arden Avenue","ending_cross_street":"Arden Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.177547,40.551856]]}},{"id":"MwM5w98zEyXyci8Cl08S7xtsnrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 20 both directions at Oran-Delphi Road (Pompey) ; Alternating one-way traffic with flaggers, Friday May 15th, 2026, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-05-11T16:02:29Z"},"road_event_id":"MwM5w98zEyXyci8Cl08S7xtsnrk=","beginning_cross_street":"Oran-Delphi Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.91632,42.912466]]}},{"id":"sEyYgaX16DUE99ATN+x7tjuyAjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Korean Veterans Memorial Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NCfTaWekKJGvvAJq4apNKpP2m2k="}],"description":"Construction on Korean Veterans Memorial Parkway eastbound between Boscombe Avenue entrance ramp (Staten Island) and NY 440 (Staten Island) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-05-11T16:04:59Z"},"road_event_id":"sEyYgaX16DUE99ATN+x7tjuyAjk=","beginning_cross_street":"Boscombe Avenue entrance ramp","ending_cross_street":"NY 440","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.233248,40.525395]]}},{"id":"NCfTaWekKJGvvAJq4apNKpP2m2k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Korean Veterans Memorial Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEyYgaX16DUE99ATN+x7tjuyAjk="},{"type":"next-occurrence","id":"LqwnViXiR/vOdVqV48wkccJ7igI="}],"description":"Construction on Korean Veterans Memorial Parkway eastbound between Boscombe Avenue entrance ramp (Staten Island) and NY 440 (Staten Island) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-05-11T16:04:59Z"},"road_event_id":"NCfTaWekKJGvvAJq4apNKpP2m2k=","beginning_cross_street":"Boscombe Avenue entrance ramp","ending_cross_street":"NY 440","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.233248,40.525395]]}},{"id":"LqwnViXiR/vOdVqV48wkccJ7igI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Korean Veterans Memorial Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sEyYgaX16DUE99ATN+x7tjuyAjk="}],"description":"Construction on Korean Veterans Memorial Parkway eastbound between Boscombe Avenue entrance ramp (Staten Island) and NY 440 (Staten Island) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-05-11T16:04:59Z"},"road_event_id":"LqwnViXiR/vOdVqV48wkccJ7igI=","beginning_cross_street":"Boscombe Avenue entrance ramp","ending_cross_street":"NY 440","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.233248,40.525395]]}},{"id":"J/oJlQXTzBZseZxQ77ewOaZx2Zc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 376"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+605KURuar2u5M+rk5vZ9bFng0U="}],"description":"Utility work on NY 376 both directions between Main Street (East Fishkill) and NY 52 (East Fishkill) 2025083592928/32743509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-11T16:08:14Z"},"road_event_id":"J/oJlQXTzBZseZxQ77ewOaZx2Zc=","beginning_cross_street":"Main Street","ending_cross_street":"NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806398,41.571074]]}},{"id":"+605KURuar2u5M+rk5vZ9bFng0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 376"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J/oJlQXTzBZseZxQ77ewOaZx2Zc="},{"type":"next-occurrence","id":"WFwvv9FJ1gyUHKpBCXF50+UnMuM="}],"description":"Utility work on NY 376 both directions between Main Street (East Fishkill) and NY 52 (East Fishkill) 2025083592928/32743509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-11T16:08:14Z"},"road_event_id":"+605KURuar2u5M+rk5vZ9bFng0U=","beginning_cross_street":"Main Street","ending_cross_street":"NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806398,41.571074]]}},{"id":"WFwvv9FJ1gyUHKpBCXF50+UnMuM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 376"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J/oJlQXTzBZseZxQ77ewOaZx2Zc="}],"description":"Utility work on NY 376 both directions between Main Street (East Fishkill) and NY 52 (East Fishkill) 2025083592928/32743509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-11T16:08:14Z"},"road_event_id":"WFwvv9FJ1gyUHKpBCXF50+UnMuM=","beginning_cross_street":"Main Street","ending_cross_street":"NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806398,41.571074]]}},{"id":"s0me6JpeAgtzrzlNqtUzfDQ7sP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Korean Veterans Memorial Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uWxWm+pQs9e0qDHG0fIqVINrMAI="}],"description":"Construction on Korean Veterans Memorial Parkway westbound between NY 440 (Staten Island) and Boscombe Avenue ramp (Staten Island) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-05-11T16:06:42Z"},"road_event_id":"s0me6JpeAgtzrzlNqtUzfDQ7sP0=","beginning_cross_street":"NY 440","ending_cross_street":"Boscombe Avenue ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.230457,40.525851]]}},{"id":"uWxWm+pQs9e0qDHG0fIqVINrMAI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Korean Veterans Memorial Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s0me6JpeAgtzrzlNqtUzfDQ7sP0="},{"type":"next-occurrence","id":"HGQ2pwxKiJHIx3jpmutVAYFdjDs="}],"description":"Construction on Korean Veterans Memorial Parkway westbound between NY 440 (Staten Island) and Boscombe Avenue ramp (Staten Island) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-05-11T16:06:42Z"},"road_event_id":"uWxWm+pQs9e0qDHG0fIqVINrMAI=","beginning_cross_street":"NY 440","ending_cross_street":"Boscombe Avenue ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.230457,40.525851]]}},{"id":"HGQ2pwxKiJHIx3jpmutVAYFdjDs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Korean Veterans Memorial Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s0me6JpeAgtzrzlNqtUzfDQ7sP0="}],"description":"Construction on Korean Veterans Memorial Parkway westbound between NY 440 (Staten Island) and Boscombe Avenue ramp (Staten Island) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-05-11T16:06:42Z"},"road_event_id":"HGQ2pwxKiJHIx3jpmutVAYFdjDs=","beginning_cross_street":"NY 440","ending_cross_street":"Boscombe Avenue ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.230457,40.525851]]}},{"id":"j8Ey2PUz7EfVRaHIZOKyDzFiDls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound near Casino Parking (Atlantic City), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-05-11T16:09:32Z"},"road_event_id":"j8Ey2PUz7EfVRaHIZOKyDzFiDls=","beginning_cross_street":"Casino Parking","ending_cross_street":"West of Atlantic City Expressway/Indiana Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.456809,39.378936]]}},{"id":"3rmpLtSfaSUbC8Z5GzT83OFHLAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Westbound near East of Casino Parking (Atlantic City), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-05-11T16:09:25Z"},"road_event_id":"3rmpLtSfaSUbC8Z5GzT83OFHLAM=","beginning_cross_street":"East of Casino Parking","ending_cross_street":"Casino Parking","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.455162,39.378253]]}},{"id":"9Lmwf9Gi8snaD2mgyuhrZYE4uNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound near West of Casino Parking (Atlantic City), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 05:00 AM, at least one lane closed","update_date":"2026-05-11T16:09:27Z"},"road_event_id":"9Lmwf9Gi8snaD2mgyuhrZYE4uNg=","beginning_cross_street":"West of Casino Parking","ending_cross_street":"West of Atlantic City Expressway/Indiana Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.458763,39.381359]]}},{"id":"hVLDHP0oBFf+oyfKDl/daZppohM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound near West of Casino Parking (Atlantic City), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, at least one lane closed","update_date":"2026-05-11T16:09:29Z"},"road_event_id":"hVLDHP0oBFf+oyfKDl/daZppohM=","beginning_cross_street":"West of Casino Parking","ending_cross_street":"West of Atlantic City Expressway/Indiana Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.458763,39.381359]]}},{"id":"c3sgxR+rSYuvNmbzMzRjVJGFACk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound near Casino Parking (Atlantic City), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-05-11T16:09:45Z"},"road_event_id":"c3sgxR+rSYuvNmbzMzRjVJGFACk=","beginning_cross_street":"Casino Parking","ending_cross_street":"West of Atlantic City Expressway/Indiana Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.456809,39.378936]]}},{"id":"2GOG/+EPATZR6YAIC5aKG9VFtSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Westbound near East of Casino Parking (Atlantic City), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, at least one lane closed","update_date":"2026-05-11T16:09:46Z"},"road_event_id":"2GOG/+EPATZR6YAIC5aKG9VFtSA=","beginning_cross_street":"East of Casino Parking","ending_cross_street":"West of Casino Parking","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.455162,39.378253]]}},{"id":"p0NM7PspbCCVu7UUJcNYJrwGPNE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near North of Duncan Av (Jersey City), Friday May 15, 2026 10:00 AM thru 02:00 PM, right lane closed","update_date":"2026-05-11T16:09:44Z"},"road_event_id":"p0NM7PspbCCVu7UUJcNYJrwGPNE=","beginning_cross_street":"North of Duncan Av","ending_cross_street":"South of Sip Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.084098,40.731792]]}},{"id":"54sH01iIXF3HYm6NzHU7gfVSqPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Westbound near East of Casino Parking (Atlantic City), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, at least one lane closed","update_date":"2026-05-11T16:09:35Z"},"road_event_id":"54sH01iIXF3HYm6NzHU7gfVSqPw=","beginning_cross_street":"East of Casino Parking","ending_cross_street":"West of Casino Parking","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.455162,39.378253]]}},{"id":"K/rhqbhbfl7QBDPt3Mp20uX8F4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound near West of Casino Parking (Atlantic City), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, at least one lane closed","update_date":"2026-05-11T16:09:36Z"},"road_event_id":"K/rhqbhbfl7QBDPt3Mp20uX8F4Q=","beginning_cross_street":"West of Casino Parking","ending_cross_street":"West of Atlantic City Expressway/Indiana Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.458763,39.381359]]}},{"id":"QpSlis3N9lOiKzL0gj/VNQv2Uro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Westbound near East of Casino Parking (Atlantic City), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-05-11T16:09:37Z"},"road_event_id":"QpSlis3N9lOiKzL0gj/VNQv2Uro=","beginning_cross_street":"East of Casino Parking","ending_cross_street":"Casino Parking","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.455162,39.378253]]}},{"id":"I2JqPYe3nwRCNMg/joSWLBozTBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Westbound near East of Casino Parking (Atlantic City), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-05-11T16:09:34Z"},"road_event_id":"I2JqPYe3nwRCNMg/joSWLBozTBA=","beginning_cross_street":"East of Casino Parking","ending_cross_street":"Casino Parking","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.455162,39.378253]]}},{"id":"PYuWlb8gaDjs3td7JlP7/nXHQjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound near Casino Parking (Atlantic City), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-05-11T16:09:49Z"},"road_event_id":"PYuWlb8gaDjs3td7JlP7/nXHQjU=","beginning_cross_street":"Casino Parking","ending_cross_street":"West of Atlantic City Expressway/Indiana Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.456809,39.378936]]}},{"id":"1VhJwChMw0XD9yyFo59zTiw2vC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Westbound near East of Casino Parking (Atlantic City), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 05:00 AM, at least one lane closed","update_date":"2026-05-11T16:09:51Z"},"road_event_id":"1VhJwChMw0XD9yyFo59zTiw2vC4=","beginning_cross_street":"East of Casino Parking","ending_cross_street":"West of Casino Parking","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.455162,39.378253]]}},{"id":"VNjbIkkCxaOS+InvYz4HZw59WZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"noFIo3PoOgVRMVXJpmZunwrXMbQ="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T16:10:11Z"},"road_event_id":"VNjbIkkCxaOS+InvYz4HZw59WZM=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901372,40.880944]]}},{"id":"noFIo3PoOgVRMVXJpmZunwrXMbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VNjbIkkCxaOS+InvYz4HZw59WZM="},{"type":"next-occurrence","id":"UKyVBjtxasKOc3sPxV7jhB5WAhQ="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T16:10:11Z"},"road_event_id":"noFIo3PoOgVRMVXJpmZunwrXMbQ=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901372,40.880944]]}},{"id":"UKyVBjtxasKOc3sPxV7jhB5WAhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VNjbIkkCxaOS+InvYz4HZw59WZM="},{"type":"next-occurrence","id":"sG5Qwdlq907WCdyYjrRfcoHHPEs="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T16:10:11Z"},"road_event_id":"UKyVBjtxasKOc3sPxV7jhB5WAhQ=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901372,40.880944]]}},{"id":"sG5Qwdlq907WCdyYjrRfcoHHPEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VNjbIkkCxaOS+InvYz4HZw59WZM="},{"type":"next-occurrence","id":"t5vN+dOGP1VPMez+jA3ofM0jRKs="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T16:10:11Z"},"road_event_id":"sG5Qwdlq907WCdyYjrRfcoHHPEs=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901372,40.880944]]}},{"id":"t5vN+dOGP1VPMez+jA3ofM0jRKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VNjbIkkCxaOS+InvYz4HZw59WZM="},{"type":"next-occurrence","id":"MKtFTD/08DD6nji4sGvLBpggxy4="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T16:10:11Z"},"road_event_id":"t5vN+dOGP1VPMez+jA3ofM0jRKs=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901372,40.880944]]}},{"id":"MKtFTD/08DD6nji4sGvLBpggxy4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VNjbIkkCxaOS+InvYz4HZw59WZM="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T16:10:11Z"},"road_event_id":"MKtFTD/08DD6nji4sGvLBpggxy4=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901372,40.880944]]}},{"id":"5n/73ounb9qlDX+MvVmhX3WmhQE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mUK0xwmJp2BeuxtfYHNzjEaOxtw="}],"description":"Construction on I-678 northbound ramp to Exit 1A - NY 878 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T16:13:56Z"},"road_event_id":"5n/73ounb9qlDX+MvVmhX3WmhQE=","beginning_cross_street":"Exit 1A - NY 878","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803402,40.661895]]}},{"id":"mUK0xwmJp2BeuxtfYHNzjEaOxtw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5n/73ounb9qlDX+MvVmhX3WmhQE="},{"type":"next-occurrence","id":"oWIiw7ZUWSk6UIsLmiO+h3v2+pk="}],"description":"Construction on I-678 northbound ramp to Exit 1A - NY 878 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T16:13:56Z"},"road_event_id":"mUK0xwmJp2BeuxtfYHNzjEaOxtw=","beginning_cross_street":"Exit 1A - NY 878","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803402,40.661895]]}},{"id":"oWIiw7ZUWSk6UIsLmiO+h3v2+pk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5n/73ounb9qlDX+MvVmhX3WmhQE="}],"description":"Construction on I-678 northbound ramp to Exit 1A - NY 878 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T16:13:56Z"},"road_event_id":"oWIiw7ZUWSk6UIsLmiO+h3v2+pk=","beginning_cross_street":"Exit 1A - NY 878","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803402,40.661895]]}},{"id":"Kqfllk0FBP61FbtZAJ756kT+77I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jakSJE/XYfpYsosisPnGVgMWS3s="}],"description":"Construction on I-495 eastbound between 80th Street; I-495 (New York) Subject to change without notice., Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T16:15:25Z"},"road_event_id":"Kqfllk0FBP61FbtZAJ756kT+77I=","beginning_cross_street":"80th Street; I-495","ending_cross_street":"80th Street; I-495","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.881971,40.728554]]}},{"id":"jakSJE/XYfpYsosisPnGVgMWS3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Kqfllk0FBP61FbtZAJ756kT+77I="},{"type":"next-occurrence","id":"gIWlod6ZUWePJaash7Ok/CTf1O0="}],"description":"Construction on I-495 eastbound between 80th Street; I-495 (New York) Subject to change without notice., Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T16:15:25Z"},"road_event_id":"jakSJE/XYfpYsosisPnGVgMWS3s=","beginning_cross_street":"80th Street; I-495","ending_cross_street":"80th Street; I-495","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T03:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.881971,40.728554]]}},{"id":"gIWlod6ZUWePJaash7Ok/CTf1O0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Kqfllk0FBP61FbtZAJ756kT+77I="}],"description":"Construction on I-495 eastbound between 80th Street; I-495 (New York) Subject to change without notice., Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-11T16:15:25Z"},"road_event_id":"gIWlod6ZUWePJaash7Ok/CTf1O0=","beginning_cross_street":"80th Street; I-495","ending_cross_street":"80th Street; I-495","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T03:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.881971,40.728554]]}},{"id":"NxLj33RAZ3NAFvTHAZfFwDhK4FM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Jackie Robinson Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LoYY1DOeW59m4K+Vdnd4oMY1Vis="}],"description":"Construction on Jackie Robinson Parkway westbound between Queens-Kings County Line (New York) and Highland Boulevard; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T16:20:01Z"},"road_event_id":"NxLj33RAZ3NAFvTHAZfFwDhK4FM=","beginning_cross_street":"Queens-Kings County Line","ending_cross_street":"Highland Boulevard; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894931,40.684586]]}},{"id":"LoYY1DOeW59m4K+Vdnd4oMY1Vis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Jackie Robinson Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NxLj33RAZ3NAFvTHAZfFwDhK4FM="},{"type":"next-occurrence","id":"xQa2N5reelIvdXxASx4ue1yKxhU="}],"description":"Construction on Jackie Robinson Parkway westbound between Queens-Kings County Line (New York) and Highland Boulevard; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T16:20:01Z"},"road_event_id":"LoYY1DOeW59m4K+Vdnd4oMY1Vis=","beginning_cross_street":"Queens-Kings County Line","ending_cross_street":"Highland Boulevard; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894931,40.684586]]}},{"id":"xQa2N5reelIvdXxASx4ue1yKxhU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Jackie Robinson Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NxLj33RAZ3NAFvTHAZfFwDhK4FM="}],"description":"Construction on Jackie Robinson Parkway westbound between Queens-Kings County Line (New York) and Highland Boulevard; Ramp (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T16:20:01Z"},"road_event_id":"xQa2N5reelIvdXxASx4ue1yKxhU=","beginning_cross_street":"Queens-Kings County Line","ending_cross_street":"Highland Boulevard; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894931,40.684586]]}},{"id":"UHssTlgd3zr8nSHBY25Ia0SGbPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 5 eastbound between NB NY-695 (Camillus) and West Genesee Street (Geddes), Continuous Tuesday May 12th, 2026 07:00 AM thru Friday June 12th, 2026 04:00 PM right shoulder closed","update_date":"2026-05-11T16:20:23Z"},"road_event_id":"UHssTlgd3zr8nSHBY25Ia0SGbPc=","beginning_cross_street":"NB NY-695","ending_cross_street":"West Genesee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.239736,43.054198]]}},{"id":"g8EsHYn61u4FGlCjOOBuP2lyzVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ebpu3ApUwZpnJpSdegiBbQrOWBs="}],"description":"Construction on Bronx River Parkway both directions between Exit 2 - Bruckner Expressway (New York) and Exit 2W - Bruckner Boulevard (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T16:21:30Z"},"road_event_id":"g8EsHYn61u4FGlCjOOBuP2lyzVg=","beginning_cross_street":"Exit 2 - Bruckner Expressway","ending_cross_street":"Exit 2W - Bruckner Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87237,40.823955]]}},{"id":"ebpu3ApUwZpnJpSdegiBbQrOWBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g8EsHYn61u4FGlCjOOBuP2lyzVg="},{"type":"next-occurrence","id":"3RTI+C3BRDgccnfjBkccQPC3x1k="}],"description":"Construction on Bronx River Parkway both directions between Exit 2 - Bruckner Expressway (New York) and Exit 2W - Bruckner Boulevard (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T16:21:30Z"},"road_event_id":"ebpu3ApUwZpnJpSdegiBbQrOWBs=","beginning_cross_street":"Exit 2 - Bruckner Expressway","ending_cross_street":"Exit 2W - Bruckner Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87237,40.823955]]}},{"id":"3RTI+C3BRDgccnfjBkccQPC3x1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g8EsHYn61u4FGlCjOOBuP2lyzVg="}],"description":"Construction on Bronx River Parkway both directions between Exit 2 - Bruckner Expressway (New York) and Exit 2W - Bruckner Boulevard (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T16:21:30Z"},"road_event_id":"3RTI+C3BRDgccnfjBkccQPC3x1k=","beginning_cross_street":"Exit 2 - Bruckner Expressway","ending_cross_street":"Exit 2W - Bruckner Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87237,40.823955]]}},{"id":"Y5wsZPnPwyBGdITZjhSm81PiA9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 440"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uGGP9KWggPV00AUxPMTLhEJEw6U="}],"description":"Construction on NY 440 northbound between Exit 7 - Glen Street; Ramp (Staten Island) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane and left shoulder of 2 lanes closed","update_date":"2026-05-11T16:24:26Z"},"road_event_id":"Y5wsZPnPwyBGdITZjhSm81PiA9o=","beginning_cross_street":"Exit 7 - Glen Street; Ramp","ending_cross_street":"Exit 7 - Glen Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192292,40.585368]]}},{"id":"uGGP9KWggPV00AUxPMTLhEJEw6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 440"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y5wsZPnPwyBGdITZjhSm81PiA9o="},{"type":"next-occurrence","id":"JvcftJUBwaCRdE30g6ivoWC+eCY="}],"description":"Construction on NY 440 northbound between Exit 7 - Glen Street; Ramp (Staten Island) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane and left shoulder of 2 lanes closed","update_date":"2026-05-11T16:24:26Z"},"road_event_id":"uGGP9KWggPV00AUxPMTLhEJEw6U=","beginning_cross_street":"Exit 7 - Glen Street; Ramp","ending_cross_street":"Exit 7 - Glen Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192292,40.585368]]}},{"id":"JvcftJUBwaCRdE30g6ivoWC+eCY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 440"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y5wsZPnPwyBGdITZjhSm81PiA9o="}],"description":"Construction on NY 440 northbound between Exit 7 - Glen Street; Ramp (Staten Island) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane and left shoulder of 2 lanes closed","update_date":"2026-05-11T16:24:26Z"},"road_event_id":"JvcftJUBwaCRdE30g6ivoWC+eCY=","beginning_cross_street":"Exit 7 - Glen Street; Ramp","ending_cross_street":"Exit 7 - Glen Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192292,40.585368]]}},{"id":"igSqatolehvSN0jeu6Twqor6VUc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5TggTIzTVMTslxozFsxAi+ebLr8="}],"description":"Construction on Hutchinson River Parkway [NYC] both directions between START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T16:26:18Z"},"road_event_id":"igSqatolehvSN0jeu6Twqor6VUc=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822406]]}},{"id":"5TggTIzTVMTslxozFsxAi+ebLr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igSqatolehvSN0jeu6Twqor6VUc="},{"type":"next-occurrence","id":"kfLJLlXvjQF8GNUpP+siXItxBuM="}],"description":"Construction on Hutchinson River Parkway [NYC] both directions between START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T16:26:18Z"},"road_event_id":"5TggTIzTVMTslxozFsxAi+ebLr8=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T02:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822406]]}},{"id":"kfLJLlXvjQF8GNUpP+siXItxBuM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igSqatolehvSN0jeu6Twqor6VUc="},{"type":"next-occurrence","id":"3PXQu3P111SAO+OD1334cugVJ3w="}],"description":"Construction on Hutchinson River Parkway [NYC] both directions between START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T16:26:18Z"},"road_event_id":"kfLJLlXvjQF8GNUpP+siXItxBuM=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T14:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822406]]}},{"id":"3PXQu3P111SAO+OD1334cugVJ3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igSqatolehvSN0jeu6Twqor6VUc="},{"type":"next-occurrence","id":"6iiteDTPBWk27cjV0EF3Q60TR6Y="}],"description":"Construction on Hutchinson River Parkway [NYC] both directions between START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T16:26:18Z"},"road_event_id":"3PXQu3P111SAO+OD1334cugVJ3w=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822406]]}},{"id":"6iiteDTPBWk27cjV0EF3Q60TR6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igSqatolehvSN0jeu6Twqor6VUc="},{"type":"next-occurrence","id":"yJR1BHV8HCT8X47bmdf3LwlsllY="}],"description":"Construction on Hutchinson River Parkway [NYC] both directions between START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T16:26:18Z"},"road_event_id":"6iiteDTPBWk27cjV0EF3Q60TR6Y=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T14:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822406]]}},{"id":"yJR1BHV8HCT8X47bmdf3LwlsllY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igSqatolehvSN0jeu6Twqor6VUc="}],"description":"Construction on Hutchinson River Parkway [NYC] both directions between START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday May 11th, 2026 thru Saturday May 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-05-11T16:26:18Z"},"road_event_id":"yJR1BHV8HCT8X47bmdf3LwlsllY=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822406]]}},{"id":"saOC7R/TwIj6hPqVf73KD2ZLqCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 185"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 185 Both Directions At In the vicinity of NJ 440 (Jersey City) Wednesday May 13, 2026 09:00 AM thru Friday May 15, 2026 03:00 PM, 1 left lane of 2 lanes closed northbound; 1 left lane of 2 lanes closed southbound","update_date":"2026-05-11T16:38:24Z"},"road_event_id":"saOC7R/TwIj6hPqVf73KD2ZLqCo=","beginning_cross_street":"In the vicinity of NJ 440","ending_cross_street":"In the vicinity of NJ 440","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.094482,40.683666]]}},{"id":"PbEHZriB+b2n6j76Wl/1noK+7eg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements and mowing on US 9W both directions between Hickey Street (Orangetown) and Shadyside Avenue (Orangetown) Res 8-6 RW/32716609 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Saturday May 16th, 2026, 07:00 AM thru 12:00 PM, all lanes closed and detoured","update_date":"2026-05-11T16:57:06Z"},"road_event_id":"PbEHZriB+b2n6j76Wl/1noK+7eg=","beginning_cross_street":"Hickey Street","ending_cross_street":"Shadyside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T18:00:00Z","end_date":"2026-05-16T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925733,41.033917]]}},{"id":"CL2Bb2+K863sMyTT5lE8PP6i2jo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 213"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cWM/yxuNfETZ2+L5hLR8x2plcIQ="}],"description":"Utility work on NY 213 eastbound between Mountain Road (Kingston) and Maple Street (Kingston) 2025081215136/32668509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 04:00 AM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-11T17:14:20Z"},"road_event_id":"CL2Bb2+K863sMyTT5lE8PP6i2jo=","beginning_cross_street":"Mountain Road","ending_cross_street":"Maple Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T17:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.020256,41.899284]]}},{"id":"cWM/yxuNfETZ2+L5hLR8x2plcIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CL2Bb2+K863sMyTT5lE8PP6i2jo="},{"type":"next-occurrence","id":"QKwYEiDv2xjUzl2oxMJytZACExA="}],"description":"Utility work on NY 213 eastbound between Mountain Road (Kingston) and Maple Street (Kingston) 2025081215136/32668509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 04:00 AM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-11T17:14:20Z"},"road_event_id":"cWM/yxuNfETZ2+L5hLR8x2plcIQ=","beginning_cross_street":"Mountain Road","ending_cross_street":"Maple Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T17:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.020256,41.899284]]}},{"id":"QKwYEiDv2xjUzl2oxMJytZACExA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CL2Bb2+K863sMyTT5lE8PP6i2jo="},{"type":"next-occurrence","id":"XfgybBCJ76xPkszdcsFTcc9/Lz0="}],"description":"Utility work on NY 213 eastbound between Mountain Road (Kingston) and Maple Street (Kingston) 2025081215136/32668509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 04:00 AM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-11T17:14:20Z"},"road_event_id":"QKwYEiDv2xjUzl2oxMJytZACExA=","beginning_cross_street":"Mountain Road","ending_cross_street":"Maple Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T17:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.020256,41.899284]]}},{"id":"XfgybBCJ76xPkszdcsFTcc9/Lz0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CL2Bb2+K863sMyTT5lE8PP6i2jo="},{"type":"next-occurrence","id":"7NEKxs+USv0a/lr9gFCptr6f52o="}],"description":"Utility work on NY 213 eastbound between Mountain Road (Kingston) and Maple Street (Kingston) 2025081215136/32668509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 04:00 AM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-11T17:14:20Z"},"road_event_id":"XfgybBCJ76xPkszdcsFTcc9/Lz0=","beginning_cross_street":"Mountain Road","ending_cross_street":"Maple Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.020256,41.899284]]}},{"id":"7NEKxs+USv0a/lr9gFCptr6f52o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CL2Bb2+K863sMyTT5lE8PP6i2jo="}],"description":"Utility work on NY 213 eastbound between Mountain Road (Kingston) and Maple Street (Kingston) 2025081215136/32668509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 04:00 AM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-11T17:14:20Z"},"road_event_id":"7NEKxs+USv0a/lr9gFCptr6f52o=","beginning_cross_street":"Mountain Road","ending_cross_street":"Maple Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T23:00:00Z","end_date":"2026-05-28T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.020256,41.899284]]}},{"id":"U4pr3p3XjvchKnCVGs/jNM7WEJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XMevsJVyH4hnv03dkirEtkIXOrY="}],"description":"Culvert repairs and drainage improvements on NY 13 both directions at High Bridge Rd (Cuyler) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-11T17:27:20Z"},"road_event_id":"U4pr3p3XjvchKnCVGs/jNM7WEJ8=","beginning_cross_street":"High Bridge Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.921331,42.750214]]}},{"id":"XMevsJVyH4hnv03dkirEtkIXOrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U4pr3p3XjvchKnCVGs/jNM7WEJ8="},{"type":"next-occurrence","id":"34cp7jtu9TMmGhUZY3ZTT65Mq+I="}],"description":"Culvert repairs and drainage improvements on NY 13 both directions at High Bridge Rd (Cuyler) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-11T17:27:20Z"},"road_event_id":"XMevsJVyH4hnv03dkirEtkIXOrY=","beginning_cross_street":"High Bridge Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.921331,42.750214]]}},{"id":"34cp7jtu9TMmGhUZY3ZTT65Mq+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U4pr3p3XjvchKnCVGs/jNM7WEJ8="},{"type":"next-occurrence","id":"xn3TSY+DifZx1O09ZfzGimi0U7s="}],"description":"Culvert repairs and drainage improvements on NY 13 both directions at High Bridge Rd (Cuyler) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-11T17:27:20Z"},"road_event_id":"34cp7jtu9TMmGhUZY3ZTT65Mq+I=","beginning_cross_street":"High Bridge Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.921331,42.750214]]}},{"id":"xn3TSY+DifZx1O09ZfzGimi0U7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U4pr3p3XjvchKnCVGs/jNM7WEJ8="},{"type":"next-occurrence","id":"ddvmuTTNrEfgq8za96reRu0iEsU="}],"description":"Culvert repairs and drainage improvements on NY 13 both directions at High Bridge Rd (Cuyler) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-11T17:27:20Z"},"road_event_id":"xn3TSY+DifZx1O09ZfzGimi0U7s=","beginning_cross_street":"High Bridge Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.921331,42.750214]]}},{"id":"ddvmuTTNrEfgq8za96reRu0iEsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U4pr3p3XjvchKnCVGs/jNM7WEJ8="},{"type":"next-occurrence","id":"oA+QWENn66BKH9flzWp/VUn5d3o="}],"description":"Culvert repairs and drainage improvements on NY 13 both directions at High Bridge Rd (Cuyler) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-11T17:27:20Z"},"road_event_id":"ddvmuTTNrEfgq8za96reRu0iEsU=","beginning_cross_street":"High Bridge Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.921331,42.750214]]}},{"id":"oA+QWENn66BKH9flzWp/VUn5d3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U4pr3p3XjvchKnCVGs/jNM7WEJ8="},{"type":"next-occurrence","id":"+q3todpp8o0S6xQ66ZLR+QCP5Xw="}],"description":"Culvert repairs and drainage improvements on NY 13 both directions at High Bridge Rd (Cuyler) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-11T17:27:20Z"},"road_event_id":"oA+QWENn66BKH9flzWp/VUn5d3o=","beginning_cross_street":"High Bridge Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.921331,42.750214]]}},{"id":"+q3todpp8o0S6xQ66ZLR+QCP5Xw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U4pr3p3XjvchKnCVGs/jNM7WEJ8="},{"type":"next-occurrence","id":"ZagLDT0q0TNabn3lN971ydaCBTk="}],"description":"Culvert repairs and drainage improvements on NY 13 both directions at High Bridge Rd (Cuyler) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-11T17:27:20Z"},"road_event_id":"+q3todpp8o0S6xQ66ZLR+QCP5Xw=","beginning_cross_street":"High Bridge Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.921331,42.750214]]}},{"id":"ZagLDT0q0TNabn3lN971ydaCBTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U4pr3p3XjvchKnCVGs/jNM7WEJ8="},{"type":"next-occurrence","id":"HcCiXyQlFg92RQJW/lLUJSt1zLk="}],"description":"Culvert repairs and drainage improvements on NY 13 both directions at High Bridge Rd (Cuyler) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-11T17:27:20Z"},"road_event_id":"ZagLDT0q0TNabn3lN971ydaCBTk=","beginning_cross_street":"High Bridge Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.921331,42.750214]]}},{"id":"HcCiXyQlFg92RQJW/lLUJSt1zLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U4pr3p3XjvchKnCVGs/jNM7WEJ8="},{"type":"next-occurrence","id":"XHCvxkyWcnxF4dVU2lNGXplNTCI="}],"description":"Culvert repairs and drainage improvements on NY 13 both directions at High Bridge Rd (Cuyler) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-11T17:27:20Z"},"road_event_id":"HcCiXyQlFg92RQJW/lLUJSt1zLk=","beginning_cross_street":"High Bridge Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.921331,42.750214]]}},{"id":"XHCvxkyWcnxF4dVU2lNGXplNTCI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U4pr3p3XjvchKnCVGs/jNM7WEJ8="},{"type":"next-occurrence","id":"c68WGnqvmoGcMZ3qNEGFZcrnQgk="}],"description":"Culvert repairs and drainage improvements on NY 13 both directions at High Bridge Rd (Cuyler) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-11T17:27:20Z"},"road_event_id":"XHCvxkyWcnxF4dVU2lNGXplNTCI=","beginning_cross_street":"High Bridge Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.921331,42.750214]]}},{"id":"c68WGnqvmoGcMZ3qNEGFZcrnQgk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U4pr3p3XjvchKnCVGs/jNM7WEJ8="}],"description":"Culvert repairs and drainage improvements on NY 13 both directions at High Bridge Rd (Cuyler) ; Alternating one-way traffic with flaggers, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-11T17:27:20Z"},"road_event_id":"c68WGnqvmoGcMZ3qNEGFZcrnQgk=","beginning_cross_street":"High Bridge Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.921331,42.750214]]}},{"id":"Qyc9QWj0JI5y8BG9uAYTsgdeWxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Eastbound At CR 627/Cooper Landing Rd (Cherry Hill Twp) Wednesday May 13, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-11T17:27:11Z"},"road_event_id":"Qyc9QWj0JI5y8BG9uAYTsgdeWxc=","beginning_cross_street":"CR 627/Cooper Landing Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.024192,39.916488]]}},{"id":"vq7ANguHVyHQRtufZM1JFyGo7pE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 90"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs and drainage improvements on NY 90 both directions between GULLY RD (Ledyard) and Levanna Rd (Ledyard) ; Alternating one-way traffic with temporary signals, Continuous Monday May 11th, 2026 06:00 AM thru Friday June 12th, 2026 06:00 PM All lanes open","update_date":"2026-05-11T17:41:17Z"},"road_event_id":"vq7ANguHVyHQRtufZM1JFyGo7pE=","beginning_cross_street":"GULLY RD","ending_cross_street":"Levanna Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.710342,42.772411]]}},{"id":"cABm2ii73MleJwOJOmWA5s+Cp/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound between East of Exit 16 - CR 537/Great Adventure (Jackson Twp) and Exit 22 - CR 638 (Jackson Twp), Thursday May 14, 2026 09:00 AM thru 01:00 PM, left lane closed, moving operation","update_date":"2026-05-11T17:42:27Z"},"road_event_id":"cABm2ii73MleJwOJOmWA5s+Cp/Y=","beginning_cross_street":"East of Exit 16 - CR 537/Great Adventure","ending_cross_street":"Exit 22 - CR 638","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.408782,40.157524]]}},{"id":"8d2OKyG3Zx4IWsyWPRMGLZ81T9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near West of Exit 67 - River Rd (Hackensack), Friday May 15, 2026 09:00 PM thru Saturday May 16, 2026 04:00 AM, closed express lane","update_date":"2026-05-11T17:42:28Z"},"road_event_id":"8d2OKyG3Zx4IWsyWPRMGLZ81T9s=","beginning_cross_street":"West of Exit 67 - River Rd","ending_cross_street":"East of Exit 67 - River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.036415,40.867073]]}},{"id":"MzPJ8QNsCqBl4EFtLOwdQje3pLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound at Exit 37 - CR 513/Hibernia Ave (Rockaway Twp) Friday May 15, 2026 11:00 PM thru Saturday May 16, 2026 05:00 AM, ramp","update_date":"2026-05-11T17:42:29Z"},"road_event_id":"MzPJ8QNsCqBl4EFtLOwdQje3pLc=","beginning_cross_street":"Exit 37 - CR 513/Hibernia Ave","ending_cross_street":"Exit 37 - CR 513/Hibernia Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.50605,40.910175]]}},{"id":"9kCCLZ7s4HWU+QylT2U1cBCmEHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound between West of Exit 11 - CR 524 (Upper Freehold Twp) and East of Exit 16 - CR 537/Great Adventure (Jackson Twp), Thursday May 14, 2026 09:00 AM thru 01:00 PM, left lane closed, moving operation","update_date":"2026-05-11T17:42:30Z"},"road_event_id":"9kCCLZ7s4HWU+QylT2U1cBCmEHo=","beginning_cross_street":"West of Exit 11 - CR 524","ending_cross_street":"East of Exit 16 - CR 537/Great Adventure","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.542442,40.177127]]}},{"id":"MsOt33ho6fkSLQsdINoOP9OQTRA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound between West of Exit 1 - US 206 (Hamilton Twp) and West of Exit 11 - CR 524 (Upper Freehold Twp), Friday May 15, 2026 09:00 AM thru 02:00 PM, left lane closed, moving operation","update_date":"2026-05-11T17:42:25Z"},"road_event_id":"MsOt33ho6fkSLQsdINoOP9OQTRA=","beginning_cross_street":"West of Exit 1 - US 206","ending_cross_street":"West of Exit 11 - CR 524","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.708503,40.185089]]}},{"id":"YkNF33Cx73evsjeYp2cz5SV3qAU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound between East of Exit 16 - CR 537/Great Adventure (Jackson Twp) and Exit 22 - CR 638 (Jackson Twp), Wednesday May 13, 2026 09:00 AM thru 01:00 PM, left lane closed, moving operation","update_date":"2026-05-11T17:42:34Z"},"road_event_id":"YkNF33Cx73evsjeYp2cz5SV3qAU=","beginning_cross_street":"East of Exit 16 - CR 537/Great Adventure","ending_cross_street":"Exit 22 - CR 638","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.408782,40.157524]]}},{"id":"QY9DsBEs7D8RDwvVNX3UtPAWDpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between Exit 22 - CR 638 (Jackson Twp) and East of Exit 16 - CR 537/Great Adventure (Jackson Twp), Wednesday May 13, 2026 09:00 AM thru 02:00 PM, left lane closed, moving operation","update_date":"2026-05-11T17:42:35Z"},"road_event_id":"QY9DsBEs7D8RDwvVNX3UtPAWDpw=","beginning_cross_street":"Exit 22 - CR 638","ending_cross_street":"East of Exit 16 - CR 537/Great Adventure","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.310241,40.156532]]}},{"id":"v2V0Ho5r9Qu5Ysiagw9sYZajFQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound near North of Bergen Blvd (Fort Lee), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 04:00 AM, right lane closed","update_date":"2026-05-11T17:42:37Z"},"road_event_id":"v2V0Ho5r9Qu5Ysiagw9sYZajFQo=","beginning_cross_street":"North of Bergen Blvd","ending_cross_street":"South of US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982048,40.856914]]}},{"id":"jVZgYjN0XC6DPTx7KrCf3yo4URg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between East of Exit 16 - CR 537/Great Adventure (Jackson Twp) and West of Exit 11 - CR 524 (Upper Freehold Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 02:00 AM, left lane closed, moving operation","update_date":"2026-05-11T17:42:38Z"},"road_event_id":"jVZgYjN0XC6DPTx7KrCf3yo4URg=","beginning_cross_street":"East of Exit 16 - CR 537/Great Adventure","ending_cross_street":"West of Exit 11 - CR 524","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.423416,40.159954]]}},{"id":"4H1eQhFaY7KAdS5ZRitqgviUtF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 120/Paterson Plank Road"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 120/Paterson Plank Road Northbound near In the vicinity of CR 503 (East Rutherford), Thursday May 14, 2026 06:00 AM thru 02:00 PM, right lane closed","update_date":"2026-05-11T17:42:39Z"},"road_event_id":"4H1eQhFaY7KAdS5ZRitqgviUtF0=","beginning_cross_street":"In the vicinity of CR 503","ending_cross_street":"In the vicinity of Gotham Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T16:00:00Z","end_date":"2026-05-15T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.069641,40.821018]]}},{"id":"GOF5TNG8z2pZU/7a31PAbcXpaqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound near I-195 (Howell Twp), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, left lane closed","update_date":"2026-05-11T17:43:12Z"},"road_event_id":"GOF5TNG8z2pZU/7a31PAbcXpaqQ=","beginning_cross_street":"I-195","ending_cross_street":"North of Aldrich Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.235427,40.164615]]}},{"id":"CIW6rYEmw7l98q3ibYI1QzSOyQ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between South of NJ 88 (Point Pleasant Beach) and North of Johnson St (Bay Head), Friday May 15, 2026 12:00 AM thru 05:00 AM, right shoulder closed","update_date":"2026-05-11T17:43:09Z"},"road_event_id":"CIW6rYEmw7l98q3ibYI1QzSOyQ8=","beginning_cross_street":"South of NJ 88","ending_cross_street":"North of Johnson St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T04:00:00Z","end_date":"2026-05-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.045326,40.079338]]}},{"id":"jmNMB8oSMPmGcx9heCsd3A4lq3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 120/Paterson Plank Road"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 120/Paterson Plank Road Northbound near In the vicinity of CR 503 (East Rutherford), Friday May 15, 2026 06:00 AM thru 02:00 PM, right lane closed","update_date":"2026-05-11T17:43:11Z"},"road_event_id":"jmNMB8oSMPmGcx9heCsd3A4lq3w=","beginning_cross_street":"In the vicinity of CR 503","ending_cross_street":"In the vicinity of Gotham Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T16:00:00Z","end_date":"2026-05-16T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.069641,40.821018]]}},{"id":"cIySkYFw4bsu5Jr3yFkVbetTlOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound at In the vicinity of Garden State Parkway (Paramus) Wednesday May 13, 2026 11:00 PM thru Thursday May 14, 2026 04:00 AM, ramp local lane","update_date":"2026-05-11T17:42:58Z"},"road_event_id":"cIySkYFw4bsu5Jr3yFkVbetTlOs=","beginning_cross_street":"In the vicinity of Garden State Parkway","ending_cross_street":"In the vicinity of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078071,40.922229]]}},{"id":"LKiNdZiGC5uML09hrIpFQDo3qZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound between East of Exit 16 - CR 537/Great Adventure (Jackson Twp) and Exit 22 - CR 638 (Jackson Twp), Friday May 15, 2026 09:00 AM thru 01:00 PM, left lane closed, moving operation","update_date":"2026-05-11T17:42:59Z"},"road_event_id":"LKiNdZiGC5uML09hrIpFQDo3qZg=","beginning_cross_street":"East of Exit 16 - CR 537/Great Adventure","ending_cross_street":"Exit 22 - CR 638","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.408782,40.157524]]}},{"id":"aanyeeu+SaJ9qjonDKL2fmlyfhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between East of Exit 16 - CR 537/Great Adventure (Jackson Twp) and West of Exit 11 - CR 524 (Upper Freehold Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 02:00 AM, left lane closed, moving operation","update_date":"2026-05-11T17:43:01Z"},"road_event_id":"aanyeeu+SaJ9qjonDKL2fmlyfhw=","beginning_cross_street":"East of Exit 16 - CR 537/Great Adventure","ending_cross_street":"West of Exit 11 - CR 524","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.423416,40.159954]]}},{"id":"caknDjfG+ziVWphPpHGORkaA5mA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between East of Exit 16 - CR 537/Great Adventure (Jackson Twp) and West of Exit 11 - CR 524 (Upper Freehold Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 02:00 AM, left lane closed, moving operation","update_date":"2026-05-11T17:43:04Z"},"road_event_id":"caknDjfG+ziVWphPpHGORkaA5mA=","beginning_cross_street":"East of Exit 16 - CR 537/Great Adventure","ending_cross_street":"West of Exit 11 - CR 524","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.423416,40.159954]]}},{"id":"wGcs7taRLjac0Ilb8QVcfizEVg0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 120/Paterson Plank Road"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 120/Paterson Plank Road Northbound near In the vicinity of CR 503 (East Rutherford), Wednesday May 13, 2026 06:00 AM thru 02:00 PM, right lane closed","update_date":"2026-05-11T17:43:07Z"},"road_event_id":"wGcs7taRLjac0Ilb8QVcfizEVg0=","beginning_cross_street":"In the vicinity of CR 503","ending_cross_street":"In the vicinity of Gotham Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.069641,40.821018]]}},{"id":"9K4cMCHbkgIjT9sgVoT9tFYdL1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between West of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 1 - US 206 (Hamilton Twp), Thursday May 14, 2026 10:00 AM thru 03:00 PM, left lane closed, moving operation","update_date":"2026-05-11T17:42:54Z"},"road_event_id":"9K4cMCHbkgIjT9sgVoT9tFYdL1M=","beginning_cross_street":"West of Exit 11 - CR 524","ending_cross_street":"West of Exit 1 - US 206","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.540557,40.177005]]}},{"id":"SX0XmrqQIcHfx76uT27QSiSYdxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between South of NJ 88 (Point Pleasant Beach) and North of Johnson St (Bay Head), Thursday May 14, 2026 09:00 PM thru Friday May 15, 2026 12:00 AM, right shoulder closed","update_date":"2026-05-11T17:42:57Z"},"road_event_id":"SX0XmrqQIcHfx76uT27QSiSYdxo=","beginning_cross_street":"South of NJ 88","ending_cross_street":"North of Johnson St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.045326,40.079338]]}},{"id":"5BjldkKVbrPh72LYdX87lAChwx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between Exit 22 - CR 638 (Jackson Twp) and East of Exit 16 - CR 537/Great Adventure (Jackson Twp), Thursday May 14, 2026 09:00 AM thru 02:00 PM, left lane closed, moving operation","update_date":"2026-05-11T17:42:46Z"},"road_event_id":"5BjldkKVbrPh72LYdX87lAChwx0=","beginning_cross_street":"Exit 22 - CR 638","ending_cross_street":"East of Exit 16 - CR 537/Great Adventure","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.310241,40.156532]]}},{"id":"MBM7cVzLnGcdjktZQDCRwvlmhqU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between Exit 22 - CR 638 (Jackson Twp) and East of Exit 16 - CR 537/Great Adventure (Jackson Twp), Friday May 15, 2026 09:00 AM thru 02:00 PM, left lane closed, moving operation","update_date":"2026-05-11T17:42:47Z"},"road_event_id":"MBM7cVzLnGcdjktZQDCRwvlmhqU=","beginning_cross_street":"Exit 22 - CR 638","ending_cross_street":"East of Exit 16 - CR 537/Great Adventure","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.310241,40.156532]]}},{"id":"hXG7O1H34gDuSBQARqzxNPwpPNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound between West of Exit 1 - US 206 (Hamilton Twp) and West of Exit 11 - CR 524 (Upper Freehold Twp), Wednesday May 13, 2026 09:00 AM thru 02:00 PM, left lane closed, moving operation","update_date":"2026-05-11T17:42:48Z"},"road_event_id":"hXG7O1H34gDuSBQARqzxNPwpPNY=","beginning_cross_street":"West of Exit 1 - US 206","ending_cross_street":"West of Exit 11 - CR 524","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.708503,40.185089]]}},{"id":"POpanYd9OHJ7H92kcbFcAkJPfj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near East of Exit 67 - River Rd (Ridgefield Park), Friday May 15, 2026 09:00 PM thru Saturday May 16, 2026 04:00 AM, closed express lane","update_date":"2026-05-11T17:42:51Z"},"road_event_id":"POpanYd9OHJ7H92kcbFcAkJPfj8=","beginning_cross_street":"East of Exit 67 - River Rd","ending_cross_street":"East of Exit 67 - River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.028808,40.866924]]}},{"id":"Y2dsEZHhikk61chbaTUHKaZlf5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between West of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 1 - US 206 (Hamilton Twp), Wednesday May 13, 2026 10:00 AM thru 03:00 PM, left lane closed, moving operation","update_date":"2026-05-11T17:42:52Z"},"road_event_id":"Y2dsEZHhikk61chbaTUHKaZlf5I=","beginning_cross_street":"West of Exit 11 - CR 524","ending_cross_street":"West of Exit 1 - US 206","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.540557,40.177005]]}},{"id":"q29BeQ/fyWNTF9jzr7bYrV5NY9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound between West of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 1 - US 206 (Hamilton Twp), Friday May 15, 2026 10:00 AM thru 03:00 PM, left lane closed, moving operation","update_date":"2026-05-11T17:42:40Z"},"road_event_id":"q29BeQ/fyWNTF9jzr7bYrV5NY9M=","beginning_cross_street":"West of Exit 11 - CR 524","ending_cross_street":"West of Exit 1 - US 206","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.540557,40.177005]]}},{"id":"ZdolKDGKcBjjfWb6WeQZTy1goXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound between West of Exit 11 - CR 524 (Upper Freehold Twp) and East of Exit 16 - CR 537/Great Adventure (Jackson Twp), Wednesday May 13, 2026 09:00 AM thru 01:00 PM, left lane closed, moving operation","update_date":"2026-05-11T17:42:41Z"},"road_event_id":"ZdolKDGKcBjjfWb6WeQZTy1goXA=","beginning_cross_street":"West of Exit 11 - CR 524","ending_cross_street":"East of Exit 16 - CR 537/Great Adventure","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.542442,40.177127]]}},{"id":"lkKvNHNdq39Qtg4y/tr5kL+LXF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound between West of Exit 1 - US 206 (Hamilton Twp) and West of Exit 11 - CR 524 (Upper Freehold Twp), Thursday May 14, 2026 09:00 AM thru 02:00 PM, left lane closed, moving operation","update_date":"2026-05-11T17:42:43Z"},"road_event_id":"lkKvNHNdq39Qtg4y/tr5kL+LXF0=","beginning_cross_street":"West of Exit 1 - US 206","ending_cross_street":"West of Exit 11 - CR 524","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.708503,40.185089]]}},{"id":"Q1C2j6eiGynNShpAJC2MvzwKrKE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound between West of Exit 11 - CR 524 (Upper Freehold Twp) and East of Exit 16 - CR 537/Great Adventure (Jackson Twp), Friday May 15, 2026 09:00 AM thru 01:00 PM, left lane closed, moving operation","update_date":"2026-05-11T17:42:44Z"},"road_event_id":"Q1C2j6eiGynNShpAJC2MvzwKrKE=","beginning_cross_street":"West of Exit 11 - CR 524","ending_cross_street":"East of Exit 16 - CR 537/Great Adventure","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.542442,40.177127]]}},{"id":"MU+LUAkoY7VmKsV01Q8SlVcODfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound near In the vicinity of Garden State Parkway (Paramus), Wednesday May 13, 2026 09:00 PM thru Thursday May 14, 2026 04:00 AM, right lane closed local lane","update_date":"2026-05-11T17:42:45Z"},"road_event_id":"MU+LUAkoY7VmKsV01Q8SlVcODfk=","beginning_cross_street":"In the vicinity of Garden State Parkway","ending_cross_street":"Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078071,40.922229]]}},{"id":"S12BmXvNESt8Xf7gDhk5lyiy5EE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VhFDjCGxDdr4EPL+U/pVdGmSQrU="}],"description":"Roadwork on NY 33A both directions area of Exit - Buell Road; CR 162 (Gates) Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T17:52:54Z"},"road_event_id":"S12BmXvNESt8Xf7gDhk5lyiy5EE=","beginning_cross_street":"Exit   - Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666926,43.139907]]}},{"id":"VhFDjCGxDdr4EPL+U/pVdGmSQrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S12BmXvNESt8Xf7gDhk5lyiy5EE="},{"type":"next-occurrence","id":"toZ5KVpehvYDs02baIEge7K8hWc="}],"description":"Roadwork on NY 33A both directions area of Exit - Buell Road; CR 162 (Gates) Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T17:52:54Z"},"road_event_id":"VhFDjCGxDdr4EPL+U/pVdGmSQrU=","beginning_cross_street":"Exit   - Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666926,43.139907]]}},{"id":"toZ5KVpehvYDs02baIEge7K8hWc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S12BmXvNESt8Xf7gDhk5lyiy5EE="},{"type":"next-occurrence","id":"c6SNCLsqsiBeyFW9C09txzzM0EM="}],"description":"Roadwork on NY 33A both directions area of Exit - Buell Road; CR 162 (Gates) Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T17:52:54Z"},"road_event_id":"toZ5KVpehvYDs02baIEge7K8hWc=","beginning_cross_street":"Exit   - Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666926,43.139907]]}},{"id":"c6SNCLsqsiBeyFW9C09txzzM0EM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S12BmXvNESt8Xf7gDhk5lyiy5EE="},{"type":"next-occurrence","id":"3h8GTOiBbbc0Cf9gHFu/lAbfYEc="}],"description":"Roadwork on NY 33A both directions area of Exit - Buell Road; CR 162 (Gates) Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T17:52:54Z"},"road_event_id":"c6SNCLsqsiBeyFW9C09txzzM0EM=","beginning_cross_street":"Exit   - Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666926,43.139907]]}},{"id":"3h8GTOiBbbc0Cf9gHFu/lAbfYEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S12BmXvNESt8Xf7gDhk5lyiy5EE="},{"type":"next-occurrence","id":"OtK03ZQ3BliOutvSWl99Q1xUuWE="}],"description":"Roadwork on NY 33A both directions area of Exit - Buell Road; CR 162 (Gates) Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T17:52:54Z"},"road_event_id":"3h8GTOiBbbc0Cf9gHFu/lAbfYEc=","beginning_cross_street":"Exit   - Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666926,43.139907]]}},{"id":"OtK03ZQ3BliOutvSWl99Q1xUuWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S12BmXvNESt8Xf7gDhk5lyiy5EE="},{"type":"next-occurrence","id":"uGjYUmuVj7FxJdAQ5TZC1Q9KQ1w="}],"description":"Roadwork on NY 33A both directions area of Exit - Buell Road; CR 162 (Gates) Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T17:52:54Z"},"road_event_id":"OtK03ZQ3BliOutvSWl99Q1xUuWE=","beginning_cross_street":"Exit   - Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T13:00:00Z","end_date":"2026-05-20T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666926,43.139907]]}},{"id":"uGjYUmuVj7FxJdAQ5TZC1Q9KQ1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S12BmXvNESt8Xf7gDhk5lyiy5EE="}],"description":"Roadwork on NY 33A both directions area of Exit - Buell Road; CR 162 (Gates) Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T17:52:54Z"},"road_event_id":"uGjYUmuVj7FxJdAQ5TZC1Q9KQ1w=","beginning_cross_street":"Exit   - Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T13:00:00Z","end_date":"2026-05-21T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666926,43.139907]]}},{"id":"4giPzZxwA/wKQhrqfaIQStE+/M4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8MZYCFuNuRw+zWogQHe5KDvIsZk="}],"description":"Utility work on NY 5 both directions between Cannan Rd (West Bloomfield) and US 20A (East Bloomfield) Alternating lane closures with flaggers as needed, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T18:03:54Z"},"road_event_id":"4giPzZxwA/wKQhrqfaIQStE+/M4=","beginning_cross_street":"Cannan Rd","ending_cross_street":"US 20A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.467496,42.901957]]}},{"id":"8MZYCFuNuRw+zWogQHe5KDvIsZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4giPzZxwA/wKQhrqfaIQStE+/M4="},{"type":"next-occurrence","id":"J+9k9PVNY1tA58Pnj+PRcUdcIcw="}],"description":"Utility work on NY 5 both directions between Cannan Rd (West Bloomfield) and US 20A (East Bloomfield) Alternating lane closures with flaggers as needed, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T18:03:54Z"},"road_event_id":"8MZYCFuNuRw+zWogQHe5KDvIsZk=","beginning_cross_street":"Cannan Rd","ending_cross_street":"US 20A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.467496,42.901957]]}},{"id":"J+9k9PVNY1tA58Pnj+PRcUdcIcw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4giPzZxwA/wKQhrqfaIQStE+/M4="}],"description":"Utility work on NY 5 both directions between Cannan Rd (West Bloomfield) and US 20A (East Bloomfield) Alternating lane closures with flaggers as needed, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-11T18:03:54Z"},"road_event_id":"J+9k9PVNY1tA58Pnj+PRcUdcIcw=","beginning_cross_street":"Cannan Rd","ending_cross_street":"US 20A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.467496,42.901957]]}},{"id":"9CRLQWvAmQGzeIiylNsOh4Jr5mI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 383"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 383 northbound area of 232-208 Scottsville Rd (Rochester) We are doing underground/aerial work for a DOT road move. Right lane/shoulder closure needed. , Wednesday May 20th, 2026 thru Thursday May 21st, 2026, 11:00 PM thru 06:00 AM All lanes","update_date":"2026-05-11T18:54:56Z"},"road_event_id":"9CRLQWvAmQGzeIiylNsOh4Jr5mI=","beginning_cross_street":"232-208 Scottsville Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T02:00:00Z","end_date":"2026-05-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.644532,43.123603]]}},{"id":"g2PBHkCSzphtp6k0wOwfCTmKGOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike/I-95"],"direction":"unknown","related_road_events":[],"description":"Guard rail repairs on New Jersey Turnpike/I-95 Express Lanes northbound between North of Exit 69 - I-80 (Teaneck Twp) and Exit 72 (NB) - US 9W/US 1&9/US 46 (Leonia), Tuesday May 12th, 2026 thru Thursday May 14th, 2026, Tuesday/Wednesday, 09:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-12T19:25:39Z"},"road_event_id":"g2PBHkCSzphtp6k0wOwfCTmKGOU=","beginning_cross_street":"North of Exit 69 - I-80","ending_cross_street":"Exit 72 (NB) - US 9W/US 1&9/US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002781,40.868992]]}},{"id":"79aXs6g4ilEHt4LYV2G/RlDBdPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike/I-95"],"direction":"unknown","related_road_events":[],"description":"Guard rail repairs on New Jersey Turnpike/I-95 Local Lanes northbound between Exit 70B - Teaneck (Teaneck Twp) and In the vicinity of Exit 72 (NB) - US 9W/US 1&9/US 46 (Leonia), Tuesday May 12th, 2026 thru Thursday May 14th, 2026, Tuesday/Wednesday, 09:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-12T19:24:24Z"},"road_event_id":"79aXs6g4ilEHt4LYV2G/RlDBdPw=","beginning_cross_street":"Exit 70B - Teaneck","ending_cross_street":"In the vicinity of Exit 72 (NB) - US 9W/US 1&9/US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T01:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008486,40.865103]]}},{"id":"2/9cFdREFgsFzaAIDQ0yo2bwE8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E HIGH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zr7Ca4ypPqTkKwg4nEeRgEnSBcA="}],"description":"Roadwork on E HIGH ST both directions RT-50 (Ballston Spa) to RT-9P (Malta) ALTERNATING LANES, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-11T20:31:34Z"},"road_event_id":"2/9cFdREFgsFzaAIDQ0yo2bwE8Q=","beginning_cross_street":"RT-50 ","ending_cross_street":"RT-9P","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848675,43.000815]]}},{"id":"zr7Ca4ypPqTkKwg4nEeRgEnSBcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E HIGH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2/9cFdREFgsFzaAIDQ0yo2bwE8Q="},{"type":"next-occurrence","id":"5R8De8HW2EU5OQFA8tkJjBJhnPA="}],"description":"Roadwork on E HIGH ST both directions RT-50 (Ballston Spa) to RT-9P (Malta) ALTERNATING LANES, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-11T20:31:34Z"},"road_event_id":"zr7Ca4ypPqTkKwg4nEeRgEnSBcA=","beginning_cross_street":"RT-50 ","ending_cross_street":"RT-9P","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848675,43.000815]]}},{"id":"5R8De8HW2EU5OQFA8tkJjBJhnPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E HIGH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2/9cFdREFgsFzaAIDQ0yo2bwE8Q="}],"description":"Roadwork on E HIGH ST both directions RT-50 (Ballston Spa) to RT-9P (Malta) ALTERNATING LANES, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-11T20:31:34Z"},"road_event_id":"5R8De8HW2EU5OQFA8tkJjBJhnPA=","beginning_cross_street":"RT-50 ","ending_cross_street":"RT-9P","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848675,43.000815]]}},{"id":"ld7cTHSCwW5tfmPbujkq15xoDQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ezzQudAACo4TYsBnwY40JtTIvWs="}],"description":"Line striping on NY 49 both directions between NY 264 (Palermo) and Water Tower Dr (Hastings) ; Mobile lane closure, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-11T22:36:56Z"},"road_event_id":"ld7cTHSCwW5tfmPbujkq15xoDQM=","beginning_cross_street":"NY 264","ending_cross_street":"Water Tower Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.287664,43.324213]]}},{"id":"ezzQudAACo4TYsBnwY40JtTIvWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ld7cTHSCwW5tfmPbujkq15xoDQM="},{"type":"next-occurrence","id":"WDWvgcDNtLZM+8HlkJSmQeus6A8="}],"description":"Line striping on NY 49 both directions between NY 264 (Palermo) and Water Tower Dr (Hastings) ; Mobile lane closure, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-11T22:36:56Z"},"road_event_id":"ezzQudAACo4TYsBnwY40JtTIvWs=","beginning_cross_street":"NY 264","ending_cross_street":"Water Tower Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.287664,43.324213]]}},{"id":"WDWvgcDNtLZM+8HlkJSmQeus6A8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ld7cTHSCwW5tfmPbujkq15xoDQM="}],"description":"Line striping on NY 49 both directions between NY 264 (Palermo) and Water Tower Dr (Hastings) ; Mobile lane closure, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-11T22:36:56Z"},"road_event_id":"WDWvgcDNtLZM+8HlkJSmQeus6A8=","beginning_cross_street":"NY 264","ending_cross_street":"Water Tower Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.287664,43.324213]]}},{"id":"adgmYC9SOX/3unZups1M/Z1HALo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound near West of Exit 18 - US 22 (Clinton Twp), Thursday May 14, 2026 09:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-05-11T22:39:42Z"},"road_event_id":"adgmYC9SOX/3unZups1M/Z1HALo=","beginning_cross_street":"West of Exit 18 - US 22","ending_cross_street":"West of Exit 18 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.878181,40.640304]]}},{"id":"iPUhYRxKEA6XM9D3aSAwWTOdVxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Friday May 15, 2026 09:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-11T22:39:41Z"},"road_event_id":"iPUhYRxKEA6XM9D3aSAwWTOdVxY=","beginning_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.560539,40.706226]]}},{"id":"1zh8jLVTJSplDSURSLJIYPfFHFs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound near East of Exit 11 - Freeway Drive East/West (East Orange), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T22:39:39Z"},"road_event_id":"1zh8jLVTJSplDSURSLJIYPfFHFs=","beginning_cross_street":"East of Exit 11 - Freeway Drive East/West","ending_cross_street":"East of Exit 11 - Freeway Drive East/West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.219535,40.76511]]}},{"id":"CwxUaX6pk3JUeAJwzu7f2KQbIHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 30 - North Maple Ave (Bernards Twp), Wednesday May 13, 2026 09:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-11T22:39:29Z"},"road_event_id":"CwxUaX6pk3JUeAJwzu7f2KQbIHo=","beginning_cross_street":"South of Exit 30 - North Maple Ave","ending_cross_street":"South of Exit 30 - North Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.557929,40.71009]]}},{"id":"yXnOGJdmsyvrbB6D54jPPzM00i0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound near East of Exit 5 - CR 527 (Roseland), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T22:39:32Z"},"road_event_id":"yXnOGJdmsyvrbB6D54jPPzM00i0=","beginning_cross_street":"East of Exit 5 - CR 527","ending_cross_street":"East of Exit 5 - CR 527","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.306907,40.812]]}},{"id":"sUSxovF4J8w5CfQvhzWf3vrNDTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound near Berrys Creek Bridge (East Rutherford), Friday May 15, 2026 09:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 06:00 AM), (3rd lane closed from 11:00 PM to 05:00 AM)","update_date":"2026-05-11T22:39:34Z"},"road_event_id":"sUSxovF4J8w5CfQvhzWf3vrNDTs=","beginning_cross_street":"Berrys Creek Bridge","ending_cross_street":"NJ 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.092384,40.81081]]}},{"id":"pMgiET/3vRTFt8zPH0BitFged5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound near East of Exit 5 - CR 527 (Roseland), Friday May 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T22:39:35Z"},"road_event_id":"pMgiET/3vRTFt8zPH0BitFged5Y=","beginning_cross_street":"East of Exit 5 - CR 527","ending_cross_street":"East of Exit 5 - CR 527","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.306907,40.812]]}},{"id":"GvOKhwuOY9qpcfIGFTISRewXZNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Wednesday May 13, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-05-11T22:39:37Z"},"road_event_id":"GvOKhwuOY9qpcfIGFTISRewXZNI=","beginning_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.560539,40.706226]]}},{"id":"Q2FYtlnSIuT642XoFtzMJuiu5PU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound near East of Exit 13 - Orange St/1st St (Newark), Wednesday May 13, 2026 10:00 AM thru 02:00 PM, right shoulder closed","update_date":"2026-05-11T22:39:26Z"},"road_event_id":"Q2FYtlnSIuT642XoFtzMJuiu5PU=","beginning_cross_street":"East of Exit 13 - Orange St/1st St","ending_cross_street":"Exit 14W - Clifton Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.182106,40.750347]]}},{"id":"nK1goT2e0wCG6oQw7XnNHJF/HZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Friday May 15, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-05-11T22:39:27Z"},"road_event_id":"nK1goT2e0wCG6oQw7XnNHJF/HZU=","beginning_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.560539,40.706226]]}},{"id":"I1Zx0iBqz4B3m+13O49iiUT+8HU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 30 - North Maple Ave (Bernards Twp), Friday May 15, 2026 09:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-11T22:39:43Z"},"road_event_id":"I1Zx0iBqz4B3m+13O49iiUT+8HU=","beginning_cross_street":"South of Exit 30 - North Maple Ave","ending_cross_street":"South of Exit 30 - North Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.547073,40.721817]]}},{"id":"de0vGbxVrNC9kurTVe0WEX7Muus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound near West of Exit 18 - US 22 (Clinton Twp), Thursday May 14, 2026 09:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-11T22:39:44Z"},"road_event_id":"de0vGbxVrNC9kurTVe0WEX7Muus=","beginning_cross_street":"West of Exit 18 - US 22","ending_cross_street":"West of Exit 18 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.876487,40.640972]]}},{"id":"v55Dh6uxTFczP6raye1LP+rMwhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound between Berrys Creek Bridge (East Rutherford) and West of NJ 17 (Rutherford), Friday May 15, 2026 09:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-11T22:39:46Z"},"road_event_id":"v55Dh6uxTFczP6raye1LP+rMwhw=","beginning_cross_street":"Berrys Creek Bridge","ending_cross_street":"West of NJ 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.092384,40.81081]]}},{"id":"AiCN24/b8or5eKHSZyRh/qRrY+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound between Berrys Creek Bridge (East Rutherford) and West of NJ 17 (Rutherford), Friday May 15, 2026 09:00 PM thru Saturday May 16, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 06:00 AM)","update_date":"2026-05-11T22:39:47Z"},"road_event_id":"AiCN24/b8or5eKHSZyRh/qRrY+4=","beginning_cross_street":"Berrys Creek Bridge","ending_cross_street":"West of NJ 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.092384,40.81081]]}},{"id":"MXcewi1q4uVkqdL8T9UDuNAdmD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fEXPK4fGo5cwYLphVeGiIBgiLB0="}],"description":"Line striping on NY 49 both directions between County Route 37 (West Monroe) and Hallenbeck Rd (Vienna) ; Mobile lane closure, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-11T22:40:05Z"},"road_event_id":"MXcewi1q4uVkqdL8T9UDuNAdmD4=","beginning_cross_street":"County Route 37","ending_cross_street":"Hallenbeck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.113959,43.283518]]}},{"id":"fEXPK4fGo5cwYLphVeGiIBgiLB0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MXcewi1q4uVkqdL8T9UDuNAdmD4="},{"type":"next-occurrence","id":"rOxMOmNLrEHCmlmGlb4U6x8dExg="}],"description":"Line striping on NY 49 both directions between County Route 37 (West Monroe) and Hallenbeck Rd (Vienna) ; Mobile lane closure, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-11T22:40:05Z"},"road_event_id":"fEXPK4fGo5cwYLphVeGiIBgiLB0=","beginning_cross_street":"County Route 37","ending_cross_street":"Hallenbeck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.113959,43.283518]]}},{"id":"rOxMOmNLrEHCmlmGlb4U6x8dExg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MXcewi1q4uVkqdL8T9UDuNAdmD4="}],"description":"Line striping on NY 49 both directions between County Route 37 (West Monroe) and Hallenbeck Rd (Vienna) ; Mobile lane closure, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-11T22:40:05Z"},"road_event_id":"rOxMOmNLrEHCmlmGlb4U6x8dExg=","beginning_cross_street":"County Route 37","ending_cross_street":"Hallenbeck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.113959,43.283518]]}},{"id":"xHMySAJFkOCBGaReGX4WpVLX9uA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound near East of Exit 11 - Freeway Drive East/West (East Orange), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T22:42:33Z"},"road_event_id":"xHMySAJFkOCBGaReGX4WpVLX9uA=","beginning_cross_street":"East of Exit 11 - Freeway Drive East/West","ending_cross_street":"East of Exit 11 - Freeway Drive East/West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.219535,40.76511]]}},{"id":"0vaMAKvW0CNJIKwcGhZq8SpFWdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near South of CR 47/Warren Av (Wall Twp), Wednesday May 13, 2026 09:00 PM thru Thursday May 14, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-11T22:42:34Z"},"road_event_id":"0vaMAKvW0CNJIKwcGhZq8SpFWdA=","beginning_cross_street":"South of CR 47/Warren Av","ending_cross_street":"South of CR 47/Warren Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.059288,40.144908]]}},{"id":"g1TfA5zgxEI615SOXKlSSXTZkrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound near West of Exit 1W - New Rd (Parsippany-Troy Hills Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T22:42:36Z"},"road_event_id":"g1TfA5zgxEI615SOXKlSSXTZkrM=","beginning_cross_street":"West of Exit 1W - New Rd","ending_cross_street":"West of Exit 1W - New Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.358169,40.854694]]}},{"id":"wkuda3x+RNuf1mBOTO3a6y9iiC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near South of CR 47/Warren Av (Wall Twp), Thursday May 14, 2026 09:00 PM thru Friday May 15, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-11T22:42:37Z"},"road_event_id":"wkuda3x+RNuf1mBOTO3a6y9iiC4=","beginning_cross_street":"South of CR 47/Warren Av","ending_cross_street":"South of CR 47/Warren Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.059288,40.144908]]}},{"id":"Oay+Fa13VHWceaBgiW7HCVtQOfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound near East of Exit 5 - CR 527 (Roseland), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-11T22:42:38Z"},"road_event_id":"Oay+Fa13VHWceaBgiW7HCVtQOfw=","beginning_cross_street":"East of Exit 5 - CR 527","ending_cross_street":"East of Exit 5 - CR 527","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.306907,40.812]]}},{"id":"zW89uGWRDNoE7RyZHJZdJTyN3e0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Wednesday May 13, 2026 09:00 AM thru 03:59 PM, right shoulder closed","update_date":"2026-05-11T22:42:29Z"},"road_event_id":"zW89uGWRDNoE7RyZHJZdJTyN3e0=","beginning_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.560539,40.706226]]}},{"id":"rGcLUorujc4AHhQdCXfzuVU4VOM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dnByff7hzbdVJVhlllaPTQWa3gI="}],"description":"Culvert repairs on I-81 southbound past Exit 50 - US11; NY 41; McGraw (Cortlandville), Wednesday May 13th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T23:02:36Z"},"road_event_id":"rGcLUorujc4AHhQdCXfzuVU4VOM=","beginning_cross_street":"Exit 50 - US11; NY 41; McGraw","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.118054,42.567259]]}},{"id":"dnByff7hzbdVJVhlllaPTQWa3gI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rGcLUorujc4AHhQdCXfzuVU4VOM="},{"type":"next-occurrence","id":"3clMxyT5YQ3JVX1PZeLssImiyxk="}],"description":"Culvert repairs on I-81 southbound past Exit 50 - US11; NY 41; McGraw (Cortlandville), Wednesday May 13th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T23:02:36Z"},"road_event_id":"dnByff7hzbdVJVhlllaPTQWa3gI=","beginning_cross_street":"Exit 50 - US11; NY 41; McGraw","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.118054,42.567259]]}},{"id":"3clMxyT5YQ3JVX1PZeLssImiyxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rGcLUorujc4AHhQdCXfzuVU4VOM="},{"type":"next-occurrence","id":"kL9L6/fLxduVnrqkuIDslnfNATQ="}],"description":"Culvert repairs on I-81 southbound past Exit 50 - US11; NY 41; McGraw (Cortlandville), Wednesday May 13th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T23:02:36Z"},"road_event_id":"3clMxyT5YQ3JVX1PZeLssImiyxk=","beginning_cross_street":"Exit 50 - US11; NY 41; McGraw","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.118054,42.567259]]}},{"id":"kL9L6/fLxduVnrqkuIDslnfNATQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rGcLUorujc4AHhQdCXfzuVU4VOM="},{"type":"next-occurrence","id":"hxb1YUqhwAB/Iw5x7X3Rx5UQzUk="}],"description":"Culvert repairs on I-81 southbound past Exit 50 - US11; NY 41; McGraw (Cortlandville), Wednesday May 13th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T23:02:36Z"},"road_event_id":"kL9L6/fLxduVnrqkuIDslnfNATQ=","beginning_cross_street":"Exit 50 - US11; NY 41; McGraw","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.118054,42.567259]]}},{"id":"hxb1YUqhwAB/Iw5x7X3Rx5UQzUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rGcLUorujc4AHhQdCXfzuVU4VOM="},{"type":"next-occurrence","id":"l0R8KaytveeIS6Y7PPKOhY2FK9c="}],"description":"Culvert repairs on I-81 southbound past Exit 50 - US11; NY 41; McGraw (Cortlandville), Wednesday May 13th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T23:02:36Z"},"road_event_id":"hxb1YUqhwAB/Iw5x7X3Rx5UQzUk=","beginning_cross_street":"Exit 50 - US11; NY 41; McGraw","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.118054,42.567259]]}},{"id":"l0R8KaytveeIS6Y7PPKOhY2FK9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rGcLUorujc4AHhQdCXfzuVU4VOM="}],"description":"Culvert repairs on I-81 southbound past Exit 50 - US11; NY 41; McGraw (Cortlandville), Wednesday May 13th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-11T23:02:36Z"},"road_event_id":"l0R8KaytveeIS6Y7PPKOhY2FK9c=","beginning_cross_street":"Exit 50 - US11; NY 41; McGraw","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.118054,42.567259]]}},{"id":"b9DqTkEmIl2B1gaF/4/eHfW1va4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QKj6/eSBGmgT2p9lhATORgoaO8Q="}],"description":"Milling and overnight roadwork and repaving on US 11 northbound between Watson Rd (Cicero) and East Circle Drive (Cicero) ; Alternating lane closures, Tuesday May 12th, 2026 thru Saturday May 16th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-11T23:59:19Z"},"road_event_id":"b9DqTkEmIl2B1gaF/4/eHfW1va4=","beginning_cross_street":"Watson Rd","ending_cross_street":"East Circle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128004,43.14059]]}},{"id":"QKj6/eSBGmgT2p9lhATORgoaO8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"b9DqTkEmIl2B1gaF/4/eHfW1va4="},{"type":"next-occurrence","id":"UkZ18gMm7yEskXuIgcfB0Kegsf8="}],"description":"Milling and overnight roadwork and repaving on US 11 northbound between Watson Rd (Cicero) and East Circle Drive (Cicero) ; Alternating lane closures, Tuesday May 12th, 2026 thru Saturday May 16th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-11T23:59:19Z"},"road_event_id":"QKj6/eSBGmgT2p9lhATORgoaO8Q=","beginning_cross_street":"Watson Rd","ending_cross_street":"East Circle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128004,43.14059]]}},{"id":"UkZ18gMm7yEskXuIgcfB0Kegsf8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"b9DqTkEmIl2B1gaF/4/eHfW1va4="}],"description":"Milling and overnight roadwork and repaving on US 11 northbound between Watson Rd (Cicero) and East Circle Drive (Cicero) ; Alternating lane closures, Tuesday May 12th, 2026 thru Saturday May 16th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-11T23:59:19Z"},"road_event_id":"UkZ18gMm7yEskXuIgcfB0Kegsf8=","beginning_cross_street":"Watson Rd","ending_cross_street":"East Circle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128004,43.14059]]}},{"id":"O3cWEBLMhucQv2rhP8PIPooygdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fEaAM/125D+YSYb25I8ZGpPldYU="}],"description":"Milling and overnight roadwork and repaving on US 11 southbound between East Circle Drive (Cicero) and Watson Rd (Cicero) ; Alternating lane closures, Tuesday May 12th, 2026 thru Saturday May 16th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-11T23:58:56Z"},"road_event_id":"O3cWEBLMhucQv2rhP8PIPooygdc=","beginning_cross_street":"East Circle Drive","ending_cross_street":"Watson Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125616,43.149535]]}},{"id":"fEaAM/125D+YSYb25I8ZGpPldYU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3cWEBLMhucQv2rhP8PIPooygdc="},{"type":"next-occurrence","id":"7tocRdpamKJcfmzs3OA55ZmWU/w="}],"description":"Milling and overnight roadwork and repaving on US 11 southbound between East Circle Drive (Cicero) and Watson Rd (Cicero) ; Alternating lane closures, Tuesday May 12th, 2026 thru Saturday May 16th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-11T23:58:56Z"},"road_event_id":"fEaAM/125D+YSYb25I8ZGpPldYU=","beginning_cross_street":"East Circle Drive","ending_cross_street":"Watson Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125616,43.149535]]}},{"id":"7tocRdpamKJcfmzs3OA55ZmWU/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3cWEBLMhucQv2rhP8PIPooygdc="}],"description":"Milling and overnight roadwork and repaving on US 11 southbound between East Circle Drive (Cicero) and Watson Rd (Cicero) ; Alternating lane closures, Tuesday May 12th, 2026 thru Saturday May 16th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-11T23:58:56Z"},"road_event_id":"7tocRdpamKJcfmzs3OA55ZmWU/w=","beginning_cross_street":"East Circle Drive","ending_cross_street":"Watson Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125616,43.149535]]}},{"id":"t8QzPbmPgVNgzfI5jSIeRrOXL5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEAR RD; NY-930J"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xffl9yODqJ7nc/lO/zczHxvUXdk="}],"description":"Milling and overnight roadwork and repaving on BEAR RD; NY-930J eastbound between US-11 (North Syracuse) and South Bay Road; CR-208 (North Syracuse) ; Alternating lane closures, Tuesday May 12th, 2026 thru Saturday May 16th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-12T00:08:31Z"},"road_event_id":"t8QzPbmPgVNgzfI5jSIeRrOXL5I=","beginning_cross_street":" US-11","ending_cross_street":"South Bay Road; CR-208 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.126779,43.144955]]}},{"id":"xffl9yODqJ7nc/lO/zczHxvUXdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEAR RD; NY-930J"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t8QzPbmPgVNgzfI5jSIeRrOXL5I="},{"type":"next-occurrence","id":"XQTivy5+wYC90WM5oeeizYMZrFs="}],"description":"Milling and overnight roadwork and repaving on BEAR RD; NY-930J eastbound between US-11 (North Syracuse) and South Bay Road; CR-208 (North Syracuse) ; Alternating lane closures, Tuesday May 12th, 2026 thru Saturday May 16th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-12T00:08:31Z"},"road_event_id":"xffl9yODqJ7nc/lO/zczHxvUXdk=","beginning_cross_street":" US-11","ending_cross_street":"South Bay Road; CR-208 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.126779,43.144955]]}},{"id":"XQTivy5+wYC90WM5oeeizYMZrFs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEAR RD; NY-930J"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t8QzPbmPgVNgzfI5jSIeRrOXL5I="}],"description":"Milling and overnight roadwork and repaving on BEAR RD; NY-930J eastbound between US-11 (North Syracuse) and South Bay Road; CR-208 (North Syracuse) ; Alternating lane closures, Tuesday May 12th, 2026 thru Saturday May 16th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-12T00:08:31Z"},"road_event_id":"XQTivy5+wYC90WM5oeeizYMZrFs=","beginning_cross_street":" US-11","ending_cross_street":"South Bay Road; CR-208 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.126779,43.144955]]}},{"id":"6a011NVRDoXKXuiWc+MGgGDNTW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEAR RD; NY 930J"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8VKtaWneYaMS2jJmBhRQU4OaFME="}],"description":"Milling and overnight roadwork and repaving on BEAR RD; NY 930J westbound between South Bay Road; CR-208 (North Syracuse) and US-11 (North Syracuse) ; Alternating lane closures, Tuesday May 12th, 2026 thru Saturday May 16th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-12T00:09:13Z"},"road_event_id":"6a011NVRDoXKXuiWc+MGgGDNTW4=","beginning_cross_street":"South Bay Road; CR-208 ","ending_cross_street":" US-11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T23:00:00Z","end_date":"2026-05-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.119654,43.141172]]}},{"id":"8VKtaWneYaMS2jJmBhRQU4OaFME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEAR RD; NY 930J"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6a011NVRDoXKXuiWc+MGgGDNTW4="},{"type":"next-occurrence","id":"SjotbdNuOwGV4OReLowhDJPmEIA="}],"description":"Milling and overnight roadwork and repaving on BEAR RD; NY 930J westbound between South Bay Road; CR-208 (North Syracuse) and US-11 (North Syracuse) ; Alternating lane closures, Tuesday May 12th, 2026 thru Saturday May 16th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-12T00:09:13Z"},"road_event_id":"8VKtaWneYaMS2jJmBhRQU4OaFME=","beginning_cross_street":"South Bay Road; CR-208 ","ending_cross_street":" US-11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T23:00:00Z","end_date":"2026-05-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.119654,43.141172]]}},{"id":"SjotbdNuOwGV4OReLowhDJPmEIA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEAR RD; NY 930J"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6a011NVRDoXKXuiWc+MGgGDNTW4="}],"description":"Milling and overnight roadwork and repaving on BEAR RD; NY 930J westbound between South Bay Road; CR-208 (North Syracuse) and US-11 (North Syracuse) ; Alternating lane closures, Tuesday May 12th, 2026 thru Saturday May 16th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-12T00:09:13Z"},"road_event_id":"SjotbdNuOwGV4OReLowhDJPmEIA=","beginning_cross_street":"South Bay Road; CR-208 ","ending_cross_street":" US-11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.119654,43.141172]]}},{"id":"aQR6z4BLOQOJmMyj8nQsAWIYjq8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near South of I-195 (Hamilton Twp), Monday May 18, 2026 09:00 PM thru Tuesday May 19, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-12T03:42:27Z"},"road_event_id":"aQR6z4BLOQOJmMyj8nQsAWIYjq8=","beginning_cross_street":"South of I-195","ending_cross_street":"South of I-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.639686,40.198165]]}},{"id":"CCanqonCLFcyljqOWYP9S/E9fCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near South of I-195 (Hamilton Twp), Monday May 18, 2026 09:00 PM thru Tuesday May 19, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-12T03:42:28Z"},"road_event_id":"CCanqonCLFcyljqOWYP9S/E9fCs=","beginning_cross_street":"South of I-195","ending_cross_street":"South of I-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.653556,40.188476]]}},{"id":"z02JKwqR0jNv8804XKPWRrNuRjg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on Taconic State Parkway northbound between Ferris Lane (Milan) and Exit 72 - Jackson Corners Road (Gallatin) DOT BM/B5502479/32628909 - Plan travel accordingly; delays may exist, Wednesday May 20th, 2026, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T09:58:09Z"},"road_event_id":"z02JKwqR0jNv8804XKPWRrNuRjg=","beginning_cross_street":"","ending_cross_street":"Exit 72 - Jackson Corners Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.739168,42.012299]]}},{"id":"8CDlQhELq9ANMmjkEmXuP9TLEms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on Taconic State Parkway southbound between Exit 72 - Jackson Corners Road (Gallatin) and Ferris Lane (Milan) DOT BM/B5502479/32476009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 19th, 2026, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T10:04:22Z"},"road_event_id":"8CDlQhELq9ANMmjkEmXuP9TLEms=","beginning_cross_street":"Exit 72 - Jackson Corners Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.568069,42.333013]]}},{"id":"ORC32187809","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","description":"Bridge maintenance operations on I-684 northbound between Exit 9E - I-84 (Southeast) and Exit 9W - I-84 (Southeast) DOT BM/B1032592/32186209 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-05-12T19:01:20Z"},"road_event_id":"ORC32187809","beginning_cross_street":"Exit 9E - I-84","ending_cross_street":"Exit 9W - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2024-11-05T13:56:52Z","end_date":"2026-05-13T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.597828,41.39056]]}},{"id":"WpNfHUywfRNWJ+oDsoZbtI+OsFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BapX3yXyl/9aw9BTZRiU4GDq9rA="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and I-287 (Harrison) D265424/32743609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 10:00 AM thru 03:00 PM, shoulder closure, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-13T14:50:27Z"},"road_event_id":"WpNfHUywfRNWJ+oDsoZbtI+OsFQ=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.717854,41.081885]]}},{"id":"BapX3yXyl/9aw9BTZRiU4GDq9rA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WpNfHUywfRNWJ+oDsoZbtI+OsFQ="},{"type":"next-occurrence","id":"7dwUp7XoeOc1LM7Ot8OpLXzglhw="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and I-287 (Harrison) D265424/32743609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 10:00 AM thru 03:00 PM, shoulder closure, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-13T14:50:27Z"},"road_event_id":"BapX3yXyl/9aw9BTZRiU4GDq9rA=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.717854,41.081885]]}},{"id":"7dwUp7XoeOc1LM7Ot8OpLXzglhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WpNfHUywfRNWJ+oDsoZbtI+OsFQ="},{"type":"next-occurrence","id":"MANYUuHxJjPaGnAcGYBkxFWOGqc="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and I-287 (Harrison) D265424/32743609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 10:00 AM thru 03:00 PM, shoulder closure, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-13T14:50:27Z"},"road_event_id":"7dwUp7XoeOc1LM7Ot8OpLXzglhw=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T00:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.717854,41.081885]]}},{"id":"MANYUuHxJjPaGnAcGYBkxFWOGqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WpNfHUywfRNWJ+oDsoZbtI+OsFQ="},{"type":"next-occurrence","id":"rML1Tzb70WHIq9EJNA+Y3MkXXh8="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and I-287 (Harrison) D265424/32743609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 10:00 AM thru 03:00 PM, shoulder closure, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-13T14:50:27Z"},"road_event_id":"MANYUuHxJjPaGnAcGYBkxFWOGqc=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.717854,41.081885]]}},{"id":"rML1Tzb70WHIq9EJNA+Y3MkXXh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WpNfHUywfRNWJ+oDsoZbtI+OsFQ="},{"type":"next-occurrence","id":"NFwwajRQvtZW0WmyZ4gIs2sXUcY="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and I-287 (Harrison) D265424/32743609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 10:00 AM thru 03:00 PM, shoulder closure, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-13T14:50:27Z"},"road_event_id":"rML1Tzb70WHIq9EJNA+Y3MkXXh8=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.717854,41.081885]]}},{"id":"NFwwajRQvtZW0WmyZ4gIs2sXUcY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WpNfHUywfRNWJ+oDsoZbtI+OsFQ="},{"type":"next-occurrence","id":"kW6EL1GwsqzE7eQ+lN4oSnrzjR0="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and I-287 (Harrison) D265424/32743609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 10:00 AM thru 03:00 PM, shoulder closure, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-13T14:50:27Z"},"road_event_id":"NFwwajRQvtZW0WmyZ4gIs2sXUcY=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.717854,41.081885]]}},{"id":"kW6EL1GwsqzE7eQ+lN4oSnrzjR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WpNfHUywfRNWJ+oDsoZbtI+OsFQ="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and I-287 (Harrison) D265424/32743609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 10:00 AM thru 03:00 PM, shoulder closure, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-13T14:50:27Z"},"road_event_id":"kW6EL1GwsqzE7eQ+lN4oSnrzjR0=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.717854,41.081885]]}},{"id":"+YlD656DMpRVI36Eex5k2479MGo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uvc9c4anT2R8n/CPVyN4GwPtlAM="}],"description":"Sign work on I-684 northbound between I-287 (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265424/32743709 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 07:00 AM thru 03:00 PM, shoulder closure, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-13T14:51:26Z"},"road_event_id":"+YlD656DMpRVI36Eex5k2479MGo=","beginning_cross_street":"I-287","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.716911,41.022126]]}},{"id":"uvc9c4anT2R8n/CPVyN4GwPtlAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+YlD656DMpRVI36Eex5k2479MGo="},{"type":"next-occurrence","id":"Z1ILdJwX4xXK8dEp8C9kTnAjoM8="}],"description":"Sign work on I-684 northbound between I-287 (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265424/32743709 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 07:00 AM thru 03:00 PM, shoulder closure, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-13T14:51:26Z"},"road_event_id":"uvc9c4anT2R8n/CPVyN4GwPtlAM=","beginning_cross_street":"I-287","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.716911,41.022126]]}},{"id":"Z1ILdJwX4xXK8dEp8C9kTnAjoM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+YlD656DMpRVI36Eex5k2479MGo="},{"type":"next-occurrence","id":"HKTSPvZYSHDGbFoByQOxBMjitcY="}],"description":"Sign work on I-684 northbound between I-287 (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265424/32743709 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 07:00 AM thru 03:00 PM, shoulder closure, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-13T14:51:26Z"},"road_event_id":"Z1ILdJwX4xXK8dEp8C9kTnAjoM8=","beginning_cross_street":"I-287","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T18:00:00Z","end_date":"2026-05-19T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.716911,41.022126]]}},{"id":"HKTSPvZYSHDGbFoByQOxBMjitcY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+YlD656DMpRVI36Eex5k2479MGo="},{"type":"next-occurrence","id":"zIggFb9rmXgLZ46qYS+MbMXe3fs="}],"description":"Sign work on I-684 northbound between I-287 (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265424/32743709 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 07:00 AM thru 03:00 PM, shoulder closure, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-13T14:51:26Z"},"road_event_id":"HKTSPvZYSHDGbFoByQOxBMjitcY=","beginning_cross_street":"I-287","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T18:00:00Z","end_date":"2026-05-20T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.716911,41.022126]]}},{"id":"zIggFb9rmXgLZ46qYS+MbMXe3fs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+YlD656DMpRVI36Eex5k2479MGo="},{"type":"next-occurrence","id":"UeKTFsPVsyea7ujV3kP5VJGVGJc="}],"description":"Sign work on I-684 northbound between I-287 (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265424/32743709 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 07:00 AM thru 03:00 PM, shoulder closure, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-13T14:51:26Z"},"road_event_id":"zIggFb9rmXgLZ46qYS+MbMXe3fs=","beginning_cross_street":"I-287","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T18:00:00Z","end_date":"2026-05-21T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.716911,41.022126]]}},{"id":"UeKTFsPVsyea7ujV3kP5VJGVGJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+YlD656DMpRVI36Eex5k2479MGo="},{"type":"next-occurrence","id":"v5aFzS/r/kGeJ2I+LXyQiAdvZGk="}],"description":"Sign work on I-684 northbound between I-287 (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265424/32743709 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 07:00 AM thru 03:00 PM, shoulder closure, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-13T14:51:26Z"},"road_event_id":"UeKTFsPVsyea7ujV3kP5VJGVGJc=","beginning_cross_street":"I-287","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T18:00:00Z","end_date":"2026-05-22T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.716911,41.022126]]}},{"id":"v5aFzS/r/kGeJ2I+LXyQiAdvZGk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+YlD656DMpRVI36Eex5k2479MGo="}],"description":"Sign work on I-684 northbound between I-287 (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265424/32743709 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 07:00 AM thru 03:00 PM, shoulder closure, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-13T14:51:26Z"},"road_event_id":"v5aFzS/r/kGeJ2I+LXyQiAdvZGk=","beginning_cross_street":"I-287","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T18:00:00Z","end_date":"2026-05-23T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.716911,41.022126]]}},{"id":"hfyz7N3neM1ElC7CHDexIMhYlhc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"b7P1hkOVUGpDyUkCuHficFT4tWY="}],"description":"Bridge maintenance operations on Hutchinson River Parkway [Westchester] southbound at Exit 13 - Mamaroneck Avenue - CR 8C (White Plains) DOT BM/B5523361/32182709 - This work is weather permitting, Tuesday May 12th, 2026 thru Friday May 15th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T11:00:49Z"},"road_event_id":"hfyz7N3neM1ElC7CHDexIMhYlhc=","beginning_cross_street":"Exit 13 - Mamaroneck Avenue - CR 8C","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.744101,40.983299]]}},{"id":"b7P1hkOVUGpDyUkCuHficFT4tWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hfyz7N3neM1ElC7CHDexIMhYlhc="},{"type":"next-occurrence","id":"66nAvfI3qnd+H89Vb2ERj5mblV4="}],"description":"Bridge maintenance operations on Hutchinson River Parkway [Westchester] southbound at Exit 13 - Mamaroneck Avenue - CR 8C (White Plains) DOT BM/B5523361/32182709 - This work is weather permitting, Tuesday May 12th, 2026 thru Friday May 15th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T11:00:49Z"},"road_event_id":"b7P1hkOVUGpDyUkCuHficFT4tWY=","beginning_cross_street":"Exit 13 - Mamaroneck Avenue - CR 8C","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.744101,40.983299]]}},{"id":"66nAvfI3qnd+H89Vb2ERj5mblV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hfyz7N3neM1ElC7CHDexIMhYlhc="}],"description":"Bridge maintenance operations on Hutchinson River Parkway [Westchester] southbound at Exit 13 - Mamaroneck Avenue - CR 8C (White Plains) DOT BM/B5523361/32182709 - This work is weather permitting, Tuesday May 12th, 2026 thru Friday May 15th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T11:00:49Z"},"road_event_id":"66nAvfI3qnd+H89Vb2ERj5mblV4=","beginning_cross_street":"Exit 13 - Mamaroneck Avenue - CR 8C","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.744101,40.983299]]}},{"id":"BhPRPp93JQ5kbSLpFshZuGGFBVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 160"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fYZVyAYHOCVtTCDgc46iOQGs6tM="}],"description":"Roadwork on NY 160 both directions between Sulphur Springs Rd (Duanesburg) and Main Street; NY 5S (Rotterdam) alternating lane closures, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 02:00 PM All lanes open","update_date":"2026-05-12T11:12:08Z"},"road_event_id":"BhPRPp93JQ5kbSLpFshZuGGFBVY=","beginning_cross_street":"Sulphur Springs Rd","ending_cross_street":"Main Street; NY 5S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.141791,42.868679]]}},{"id":"fYZVyAYHOCVtTCDgc46iOQGs6tM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 160"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BhPRPp93JQ5kbSLpFshZuGGFBVY="},{"type":"next-occurrence","id":"4KjL9yF3sYHvVvfbFWmq/qM34ow="}],"description":"Roadwork on NY 160 both directions between Sulphur Springs Rd (Duanesburg) and Main Street; NY 5S (Rotterdam) alternating lane closures, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 02:00 PM All lanes open","update_date":"2026-05-12T11:12:08Z"},"road_event_id":"fYZVyAYHOCVtTCDgc46iOQGs6tM=","beginning_cross_street":"Sulphur Springs Rd","ending_cross_street":"Main Street; NY 5S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.141791,42.868679]]}},{"id":"4KjL9yF3sYHvVvfbFWmq/qM34ow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 160"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BhPRPp93JQ5kbSLpFshZuGGFBVY="}],"description":"Roadwork on NY 160 both directions between Sulphur Springs Rd (Duanesburg) and Main Street; NY 5S (Rotterdam) alternating lane closures, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 02:00 PM All lanes open","update_date":"2026-05-12T11:12:08Z"},"road_event_id":"4KjL9yF3sYHvVvfbFWmq/qM34ow=","beginning_cross_street":"Sulphur Springs Rd","ending_cross_street":"Main Street; NY 5S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.141791,42.868679]]}},{"id":"20Ys/n5vbQOsNN9GmW6BZTrmt9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BOQDcA9+ZGvSrC3tUkLkeOunEbo="}],"description":"Bridge painting on I-86 eastbound END ROUTE I-86; NY 17 (Horseheads) to Exit 54 (Horseheads) 2 lanes reduced to 1, Tuesday May 12th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-12T11:12:29Z"},"road_event_id":"20Ys/n5vbQOsNN9GmW6BZTrmt9s=","beginning_cross_street":"END ROUTE I-86; NY 17","ending_cross_street":"Exit 54","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.812417,42.154867]]}},{"id":"BOQDcA9+ZGvSrC3tUkLkeOunEbo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"20Ys/n5vbQOsNN9GmW6BZTrmt9s="},{"type":"next-occurrence","id":"anlrr1t95drvo3egJRmlS/vUkM4="}],"description":"Bridge painting on I-86 eastbound END ROUTE I-86; NY 17 (Horseheads) to Exit 54 (Horseheads) 2 lanes reduced to 1, Tuesday May 12th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-12T11:12:29Z"},"road_event_id":"BOQDcA9+ZGvSrC3tUkLkeOunEbo=","beginning_cross_street":"END ROUTE I-86; NY 17","ending_cross_street":"Exit 54","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:00:00Z","end_date":"2026-05-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.812417,42.154867]]}},{"id":"anlrr1t95drvo3egJRmlS/vUkM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"20Ys/n5vbQOsNN9GmW6BZTrmt9s="},{"type":"next-occurrence","id":"lC4lWBzBl0NTmDUWXMr6gZpXvJc="}],"description":"Bridge painting on I-86 eastbound END ROUTE I-86; NY 17 (Horseheads) to Exit 54 (Horseheads) 2 lanes reduced to 1, Tuesday May 12th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-12T11:12:29Z"},"road_event_id":"anlrr1t95drvo3egJRmlS/vUkM4=","beginning_cross_street":"END ROUTE I-86; NY 17","ending_cross_street":"Exit 54","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T11:00:00Z","end_date":"2026-05-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.812417,42.154867]]}},{"id":"lC4lWBzBl0NTmDUWXMr6gZpXvJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"20Ys/n5vbQOsNN9GmW6BZTrmt9s="},{"type":"next-occurrence","id":"OSC+Ix3d+mzlcqjLa8udCJvJXbI="}],"description":"Bridge painting on I-86 eastbound END ROUTE I-86; NY 17 (Horseheads) to Exit 54 (Horseheads) 2 lanes reduced to 1, Tuesday May 12th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-12T11:12:29Z"},"road_event_id":"lC4lWBzBl0NTmDUWXMr6gZpXvJc=","beginning_cross_street":"END ROUTE I-86; NY 17","ending_cross_street":"Exit 54","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T11:00:00Z","end_date":"2026-05-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.812417,42.154867]]}},{"id":"OSC+Ix3d+mzlcqjLa8udCJvJXbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"20Ys/n5vbQOsNN9GmW6BZTrmt9s="},{"type":"next-occurrence","id":"AgsUY4VqoKq7g1akM9sYkWspSZM="}],"description":"Bridge painting on I-86 eastbound END ROUTE I-86; NY 17 (Horseheads) to Exit 54 (Horseheads) 2 lanes reduced to 1, Tuesday May 12th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-12T11:12:29Z"},"road_event_id":"OSC+Ix3d+mzlcqjLa8udCJvJXbI=","beginning_cross_street":"END ROUTE I-86; NY 17","ending_cross_street":"Exit 54","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T11:00:00Z","end_date":"2026-05-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.812417,42.154867]]}},{"id":"AgsUY4VqoKq7g1akM9sYkWspSZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"20Ys/n5vbQOsNN9GmW6BZTrmt9s="},{"type":"next-occurrence","id":"JB625iJn1gKo/sFOmONpA6WdR9o="}],"description":"Bridge painting on I-86 eastbound END ROUTE I-86; NY 17 (Horseheads) to Exit 54 (Horseheads) 2 lanes reduced to 1, Tuesday May 12th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-12T11:12:29Z"},"road_event_id":"AgsUY4VqoKq7g1akM9sYkWspSZM=","beginning_cross_street":"END ROUTE I-86; NY 17","ending_cross_street":"Exit 54","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T11:00:00Z","end_date":"2026-05-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.812417,42.154867]]}},{"id":"JB625iJn1gKo/sFOmONpA6WdR9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"20Ys/n5vbQOsNN9GmW6BZTrmt9s="},{"type":"next-occurrence","id":"ns0TT1+pgRf9AF2X/Vj0lNVMWWo="}],"description":"Bridge painting on I-86 eastbound END ROUTE I-86; NY 17 (Horseheads) to Exit 54 (Horseheads) 2 lanes reduced to 1, Tuesday May 12th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-12T11:12:29Z"},"road_event_id":"JB625iJn1gKo/sFOmONpA6WdR9o=","beginning_cross_street":"END ROUTE I-86; NY 17","ending_cross_street":"Exit 54","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T11:00:00Z","end_date":"2026-05-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.812417,42.154867]]}},{"id":"ns0TT1+pgRf9AF2X/Vj0lNVMWWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"20Ys/n5vbQOsNN9GmW6BZTrmt9s="}],"description":"Bridge painting on I-86 eastbound END ROUTE I-86; NY 17 (Horseheads) to Exit 54 (Horseheads) 2 lanes reduced to 1, Tuesday May 12th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-12T11:12:29Z"},"road_event_id":"ns0TT1+pgRf9AF2X/Vj0lNVMWWo=","beginning_cross_street":"END ROUTE I-86; NY 17","ending_cross_street":"Exit 54","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T11:00:00Z","end_date":"2026-05-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.812417,42.154867]]}},{"id":"YckGC59qho5gU55XWHCiOY1Y4t8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[],"description":"Pothole repair on NY 17M eastbound between Maples Lane (Wallkill) and Van Burenville Road (Wallkill) 20250882988325/32743809 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday May 15th, 2026, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-12T11:36:00Z"},"road_event_id":"YckGC59qho5gU55XWHCiOY1Y4t8=","beginning_cross_street":"Maples Lane","ending_cross_street":"Van Burenville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.415151,41.484408]]}},{"id":"03whU7QHw+TXaweg6Q9Tzh5KDJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on I-390 northbound Exit 3 - NY 21; NY 15 (Wayland) 2 lanes reduced to 1, Tuesday May 12th, 2026 thru Wednesday May 13th, 2026, Tuesday/Wednesday, 08:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-12T11:56:26Z"},"road_event_id":"03whU7QHw+TXaweg6Q9Tzh5KDJY=","beginning_cross_street":"Exit 3 - NY 21; NY 15","ending_cross_street":"Exit 3 - NY 21; NY 15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.563263,42.537228]]}},{"id":"vXumJyqGCSGF/wEJjlOKwP4L2Yw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 52 eastbound between Blue Hill Road (East Fishkill) and NY 376 (East Fishkill) 2025083592928/32722609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-12T12:17:50Z"},"road_event_id":"vXumJyqGCSGF/wEJjlOKwP4L2Yw=","beginning_cross_street":"Blue Hill Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796765,41.552967]]}},{"id":"5td5F0CB8FB9OGDm5YESLpicWFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"R42BxsUANr2Em37sAHUlf0MB++Q="}],"description":"Road maintenance operations and survey work on US 209 both directions between Hamilton Street (Port Jervis) and NY 211 (Port Jervis) D265751/32743909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T12:34:00Z"},"road_event_id":"5td5F0CB8FB9OGDm5YESLpicWFI=","beginning_cross_street":"Hamilton Street","ending_cross_street":"NY 211","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.672489,41.382809]]}},{"id":"R42BxsUANr2Em37sAHUlf0MB++Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5td5F0CB8FB9OGDm5YESLpicWFI="},{"type":"next-occurrence","id":"kJy4+YS7lBLkqJpsRWezaKXfIXc="}],"description":"Road maintenance operations and survey work on US 209 both directions between Hamilton Street (Port Jervis) and NY 211 (Port Jervis) D265751/32743909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T12:34:00Z"},"road_event_id":"R42BxsUANr2Em37sAHUlf0MB++Q=","beginning_cross_street":"Hamilton Street","ending_cross_street":"NY 211","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.672489,41.382809]]}},{"id":"kJy4+YS7lBLkqJpsRWezaKXfIXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5td5F0CB8FB9OGDm5YESLpicWFI="},{"type":"next-occurrence","id":"/fjsLW66/UptZcrurMm6Trx6m4I="}],"description":"Road maintenance operations and survey work on US 209 both directions between Hamilton Street (Port Jervis) and NY 211 (Port Jervis) D265751/32743909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T12:34:00Z"},"road_event_id":"kJy4+YS7lBLkqJpsRWezaKXfIXc=","beginning_cross_street":"Hamilton Street","ending_cross_street":"NY 211","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.672489,41.382809]]}},{"id":"/fjsLW66/UptZcrurMm6Trx6m4I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5td5F0CB8FB9OGDm5YESLpicWFI="},{"type":"next-occurrence","id":"L3z2dtgbtee6nDlFkOLdBzc/73U="}],"description":"Road maintenance operations and survey work on US 209 both directions between Hamilton Street (Port Jervis) and NY 211 (Port Jervis) D265751/32743909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T12:34:00Z"},"road_event_id":"/fjsLW66/UptZcrurMm6Trx6m4I=","beginning_cross_street":"Hamilton Street","ending_cross_street":"NY 211","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.672489,41.382809]]}},{"id":"L3z2dtgbtee6nDlFkOLdBzc/73U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5td5F0CB8FB9OGDm5YESLpicWFI="},{"type":"next-occurrence","id":"GlGXuUfJLJDz1BK+DN/3o6C/lP0="}],"description":"Road maintenance operations and survey work on US 209 both directions between Hamilton Street (Port Jervis) and NY 211 (Port Jervis) D265751/32743909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T12:34:00Z"},"road_event_id":"L3z2dtgbtee6nDlFkOLdBzc/73U=","beginning_cross_street":"Hamilton Street","ending_cross_street":"NY 211","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.672489,41.382809]]}},{"id":"GlGXuUfJLJDz1BK+DN/3o6C/lP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5td5F0CB8FB9OGDm5YESLpicWFI="}],"description":"Road maintenance operations and survey work on US 209 both directions between Hamilton Street (Port Jervis) and NY 211 (Port Jervis) D265751/32743909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T12:34:00Z"},"road_event_id":"GlGXuUfJLJDz1BK+DN/3o6C/lP0=","beginning_cross_street":"Hamilton Street","ending_cross_street":"NY 211","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.672489,41.382809]]}},{"id":"iPqkYEugYdKogItcu0m/5BzTxTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"33qkTiX/dIGonyVOQZ/u+4JeO6k="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 7 - NY-116 (North Salem) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:03:35Z"},"road_event_id":"iPqkYEugYdKogItcu0m/5BzTxTo=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 7 - NY-116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"33qkTiX/dIGonyVOQZ/u+4JeO6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iPqkYEugYdKogItcu0m/5BzTxTo="},{"type":"next-occurrence","id":"v2BgZpaYzkFa7m8S9lIFKCvSt8k="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 7 - NY-116 (North Salem) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:03:35Z"},"road_event_id":"33qkTiX/dIGonyVOQZ/u+4JeO6k=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 7 - NY-116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"v2BgZpaYzkFa7m8S9lIFKCvSt8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iPqkYEugYdKogItcu0m/5BzTxTo="},{"type":"next-occurrence","id":"xQ4CKqtgnOi4nGfql9WXjuRYE/0="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 7 - NY-116 (North Salem) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:03:35Z"},"road_event_id":"v2BgZpaYzkFa7m8S9lIFKCvSt8k=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 7 - NY-116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"xQ4CKqtgnOi4nGfql9WXjuRYE/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iPqkYEugYdKogItcu0m/5BzTxTo="},{"type":"next-occurrence","id":"fFUXi6g1iM59hWAuvu6MBIOvuzc="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 7 - NY-116 (North Salem) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:03:35Z"},"road_event_id":"xQ4CKqtgnOi4nGfql9WXjuRYE/0=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 7 - NY-116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"fFUXi6g1iM59hWAuvu6MBIOvuzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iPqkYEugYdKogItcu0m/5BzTxTo="},{"type":"next-occurrence","id":"RHJ2eB80LDwcqWEs9j+3p7yzSlc="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 7 - NY-116 (North Salem) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:03:35Z"},"road_event_id":"fFUXi6g1iM59hWAuvu6MBIOvuzc=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 7 - NY-116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"RHJ2eB80LDwcqWEs9j+3p7yzSlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iPqkYEugYdKogItcu0m/5BzTxTo="},{"type":"next-occurrence","id":"cfj+ksHOcIcGZkE4XwCOoZLZ+SM="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 7 - NY-116 (North Salem) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:03:35Z"},"road_event_id":"RHJ2eB80LDwcqWEs9j+3p7yzSlc=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 7 - NY-116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"cfj+ksHOcIcGZkE4XwCOoZLZ+SM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iPqkYEugYdKogItcu0m/5BzTxTo="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 7 - NY-116 (North Salem) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:03:35Z"},"road_event_id":"cfj+ksHOcIcGZkE4XwCOoZLZ+SM=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 7 - NY-116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"TyGpANz1SFOnZ56D98yQ87b3dkE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"oOFf2i7r5jhLYZfZhwV2hhV+mSw="}],"description":"Repaving on I-490 eastbound between Exit 3 - I-490 (Riga) and Exit 6 - NY 204 (Gates) Alternating Right/Left Lane or shoulder closures as needed., Wednesday May 13th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 06:00 AM thru 07:00 PM All lanes","update_date":"2026-05-12T13:08:45Z"},"road_event_id":"TyGpANz1SFOnZ56D98yQ87b3dkE=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.884188,43.093132]]}},{"id":"oOFf2i7r5jhLYZfZhwV2hhV+mSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TyGpANz1SFOnZ56D98yQ87b3dkE="},{"type":"next-occurrence","id":"udsBKS1J62HDYb+ClInweZwyKvI="}],"description":"Repaving on I-490 eastbound between Exit 3 - I-490 (Riga) and Exit 6 - NY 204 (Gates) Alternating Right/Left Lane or shoulder closures as needed., Wednesday May 13th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 06:00 AM thru 07:00 PM All lanes","update_date":"2026-05-12T13:08:45Z"},"road_event_id":"oOFf2i7r5jhLYZfZhwV2hhV+mSw=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.884188,43.093132]]}},{"id":"udsBKS1J62HDYb+ClInweZwyKvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TyGpANz1SFOnZ56D98yQ87b3dkE="},{"type":"next-occurrence","id":"9o3XGnjMIWWcTU5zOcMlkeojswE="}],"description":"Repaving on I-490 eastbound between Exit 3 - I-490 (Riga) and Exit 6 - NY 204 (Gates) Alternating Right/Left Lane or shoulder closures as needed., Wednesday May 13th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 06:00 AM thru 07:00 PM All lanes","update_date":"2026-05-12T13:08:45Z"},"road_event_id":"udsBKS1J62HDYb+ClInweZwyKvI=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.884188,43.093132]]}},{"id":"9o3XGnjMIWWcTU5zOcMlkeojswE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TyGpANz1SFOnZ56D98yQ87b3dkE="},{"type":"next-occurrence","id":"WyB72ko3f5FCVx04aG5sTVdolho="}],"description":"Repaving on I-490 eastbound between Exit 3 - I-490 (Riga) and Exit 6 - NY 204 (Gates) Alternating Right/Left Lane or shoulder closures as needed., Wednesday May 13th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 06:00 AM thru 07:00 PM All lanes","update_date":"2026-05-12T13:08:45Z"},"road_event_id":"9o3XGnjMIWWcTU5zOcMlkeojswE=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.884188,43.093132]]}},{"id":"WyB72ko3f5FCVx04aG5sTVdolho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TyGpANz1SFOnZ56D98yQ87b3dkE="}],"description":"Repaving on I-490 eastbound between Exit 3 - I-490 (Riga) and Exit 6 - NY 204 (Gates) Alternating Right/Left Lane or shoulder closures as needed., Wednesday May 13th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 06:00 AM thru 07:00 PM All lanes","update_date":"2026-05-12T13:08:45Z"},"road_event_id":"WyB72ko3f5FCVx04aG5sTVdolho=","beginning_cross_street":"Exit 3 - I-490","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.884188,43.093132]]}},{"id":"o/w0WSgcGYlts3aLCIgE/Ev1IVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[],"description":"Installation of sign structure on I-86 eastbound I-86/NY 17 (Exit 47) connector to NY 352 (Corning) to Exit 48 - NY 352; Ramp (Corning) Right Shoulder Closure, Friday May 15th, 2026, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-12T13:34:05Z"},"road_event_id":"o/w0WSgcGYlts3aLCIgE/Ev1IVE=","beginning_cross_street":"I-86/NY 17 (Exit 47) connector to NY 352","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.007854,42.118406]]}},{"id":"/eGOCqwO5SIMOLLqVjducpIUN5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[],"description":"Installation of sign structure on NY 17 westbound (Chemung) Right shoulder closure, Thursday May 14th, 2026, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-12T13:38:40Z"},"road_event_id":"/eGOCqwO5SIMOLLqVjducpIUN5c=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.716376,42.027132]]}},{"id":"WGGnAiy+IZ/cCU7XJLSn/NYkDLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"c1aQddNl46zqZ1M8qTmQ+JhJHjo="}],"description":"Utility work on NY 33 both directions between South Main Street; NY 36 (Riga) and Town of Riga and Town of Chili Line (Riga) Alternating lane closures with flaggers as needed, Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T13:55:04Z"},"road_event_id":"WGGnAiy+IZ/cCU7XJLSn/NYkDLU=","beginning_cross_street":"South Main Street; NY 36","ending_cross_street":"Town of Riga and Town of Chili Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.884502,43.104368]]}},{"id":"c1aQddNl46zqZ1M8qTmQ+JhJHjo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WGGnAiy+IZ/cCU7XJLSn/NYkDLU="},{"type":"next-occurrence","id":"Q3dNSdVWZTqufKakueHOXuvdXY0="}],"description":"Utility work on NY 33 both directions between South Main Street; NY 36 (Riga) and Town of Riga and Town of Chili Line (Riga) Alternating lane closures with flaggers as needed, Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T13:55:04Z"},"road_event_id":"c1aQddNl46zqZ1M8qTmQ+JhJHjo=","beginning_cross_street":"South Main Street; NY 36","ending_cross_street":"Town of Riga and Town of Chili Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.884502,43.104368]]}},{"id":"Q3dNSdVWZTqufKakueHOXuvdXY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WGGnAiy+IZ/cCU7XJLSn/NYkDLU="}],"description":"Utility work on NY 33 both directions between South Main Street; NY 36 (Riga) and Town of Riga and Town of Chili Line (Riga) Alternating lane closures with flaggers as needed, Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T13:55:04Z"},"road_event_id":"Q3dNSdVWZTqufKakueHOXuvdXY0=","beginning_cross_street":"South Main Street; NY 36","ending_cross_street":"Town of Riga and Town of Chili Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.884502,43.104368]]}},{"id":"rwJ1BVdJfhaa/eWEKDQ/npkPP+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Barrier repairs on New Jersey Turnpike Inner Roadway northbound Entrance ramp Interchange 13A - Newark Liberty International Airport/US 1&9 (Elizabeth), Tuesday May 12th, 2026 thru Thursday May 14th, 2026, Tuesday/Wednesday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-12T19:19:25Z"},"road_event_id":"rwJ1BVdJfhaa/eWEKDQ/npkPP+A=","beginning_cross_street":"Interchange 13A - Newark Liberty International Airport/US 1&9","ending_cross_street":"Interchange 13A - Newark Liberty International Airport/US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T00:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.176499,40.669971]]}},{"id":"Gf2K6gaU8+Jv8NlhQduJ5HhCZ7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 173"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Bhu955RulXtOrsA04Amna0qfaGQ="}],"description":"Roadwork on NY 173 both directions between Military Dr (Manlius) and Clinton St (Manlius) ; Alternating one-way traffic with flaggers, Wednesday May 13th, 2026 thru Thursday May 14th, 2026, Wednesday/Thursday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T14:13:41Z"},"road_event_id":"Gf2K6gaU8+Jv8NlhQduJ5HhCZ7A=","beginning_cross_street":"Military Dr","ending_cross_street":"Clinton St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.969262,43.003844]]}},{"id":"Bhu955RulXtOrsA04Amna0qfaGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 173"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Gf2K6gaU8+Jv8NlhQduJ5HhCZ7A="}],"description":"Roadwork on NY 173 both directions between Military Dr (Manlius) and Clinton St (Manlius) ; Alternating one-way traffic with flaggers, Wednesday May 13th, 2026 thru Thursday May 14th, 2026, Wednesday/Thursday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T14:13:41Z"},"road_event_id":"Bhu955RulXtOrsA04Amna0qfaGQ=","beginning_cross_street":"Military Dr","ending_cross_street":"Clinton St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.969262,43.003844]]}},{"id":"GgFcTsCiyOdtHWMy/uK5FSvL2W4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Bup4PyWkdnnu/dwZuxR7UkXBtEs="}],"description":"Guard rail repairs on I-84 eastbound between Exit 36A/B - NY 300 (Newburgh) and Exit 39A/B - US 9W - NY 32 (Balmville) Res 8-4 RW/32074209 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-12T14:26:19Z"},"road_event_id":"GgFcTsCiyOdtHWMy/uK5FSvL2W4=","beginning_cross_street":"Exit 36A/B - NY 300","ending_cross_street":"Exit 39A/B - US 9W - NY 32","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.072899,41.514615]]}},{"id":"Bup4PyWkdnnu/dwZuxR7UkXBtEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GgFcTsCiyOdtHWMy/uK5FSvL2W4="}],"description":"Guard rail repairs on I-84 eastbound between Exit 36A/B - NY 300 (Newburgh) and Exit 39A/B - US 9W - NY 32 (Balmville) Res 8-4 RW/32074209 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday May 14th, 2026 thru Friday May 15th, 2026 Thursday/ Friday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-12T14:26:19Z"},"road_event_id":"Bup4PyWkdnnu/dwZuxR7UkXBtEs=","beginning_cross_street":"Exit 36A/B - NY 300","ending_cross_street":"Exit 39A/B - US 9W - NY 32","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.072899,41.514615]]}},{"id":"ORC32744109","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","description":"Road maintenance operations on NY 100 northbound between NY 100A/100C (Mount Pleasant) and Serrano Avenue (Mount Pleasant) Res 8-9 RW/32744109 - This is a moving operation. Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-05-12T18:31:13Z"},"road_event_id":"ORC32744109","beginning_cross_street":"NY 100A/100C","ending_cross_street":"Serrano Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-12T14:22:29Z","end_date":"2026-05-13T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.799767,41.072897]]}},{"id":"qzB9hi+ptS5qfmA8grTTGqw6KWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-690 eastbound between Exit 10 - NY 695 (Geddes) and Exit 11 - ROUTE 297; Solvay-Fairgrounds (Geddes), Wednesday May 20th, 2026, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-12T15:13:12Z"},"road_event_id":"qzB9hi+ptS5qfmA8grTTGqw6KWI=","beginning_cross_street":"Exit 10 - NY 695","ending_cross_street":"Exit 11 - ROUTE 297; Solvay-Fairgrounds","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.228858,43.0849]]}},{"id":"xnH3z/DPiB6x0YvtWPK9yHgvylQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near CR 620/Center Square Rd (Logan Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, left lane closed, moving operation","update_date":"2026-05-12T15:15:05Z"},"road_event_id":"xnH3z/DPiB6x0YvtWPK9yHgvylQ=","beginning_cross_street":"CR 620/Center Square Rd","ending_cross_street":"North of CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.397491,39.787948]]}},{"id":"J93TEG2/bIUjc1/1MaSPBHsIUxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound near West of Exit 1W - New Rd (Parsippany-Troy Hills Twp), Continuous Friday May 15, 2026 04:00 PM thru Friday May 15, 2026 11:00 PM, right lane closed","update_date":"2026-05-12T15:15:27Z"},"road_event_id":"J93TEG2/bIUjc1/1MaSPBHsIUxk=","beginning_cross_street":"West of Exit 1W - New Rd","ending_cross_street":"Exit 1W - New Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.353935,40.849781]]}},{"id":"r63bFzM9wne3GAxj9rdrIsn536c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound between West of CR 677/Morris St (Phillipsburg) and I-78/NJ 173 (Greenwich Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-12T15:15:28Z"},"road_event_id":"r63bFzM9wne3GAxj9rdrIsn536c=","beginning_cross_street":"West of CR 677/Morris St","ending_cross_street":"I-78/NJ 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.194557,40.696632]]}},{"id":"hHczyO7i3zcjz0ED6bJDjQVZ3X0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near South of I-195 (Hamilton Twp), Tuesday May 19, 2026 09:00 PM thru Wednesday May 20, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-12T15:15:18Z"},"road_event_id":"hHczyO7i3zcjz0ED6bJDjQVZ3X0=","beginning_cross_street":"South of I-195","ending_cross_street":"South of I-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.653556,40.188476]]}},{"id":"vKE4qicS1/rBr/+juhmUzBwwQuw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near East of Exit 66 - Hudson St (Hackensack), Wednesday May 20, 2026 09:00 AM thru 12:00 PM, right lane closed local lane","update_date":"2026-05-12T15:15:19Z"},"road_event_id":"vKE4qicS1/rBr/+juhmUzBwwQuw=","beginning_cross_street":"East of Exit 66 - Hudson St","ending_cross_street":"Exit 67 - River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.040222,40.866977]]}},{"id":"bVHTMz4jSUqak3AR5r374OCaCNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 2 - NJ 27 (Edison Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, at least one lane closed","update_date":"2026-05-12T15:15:21Z"},"road_event_id":"bVHTMz4jSUqak3AR5r374OCaCNo=","beginning_cross_street":"South of Exit 2 - NJ 27","ending_cross_street":"South of Exit 2 - NJ 27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.37178,40.530635]]}},{"id":"KUJGOYv8+X0O7Gln01B+fUidqgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of Naughright Rd (Mount Olive Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-05-12T15:15:22Z"},"road_event_id":"KUJGOYv8+X0O7Gln01B+fUidqgA=","beginning_cross_street":"West of Naughright Rd","ending_cross_street":"West of Naughright Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.788757,40.852127]]}},{"id":"FAZlN4Ej3uaEUAxWXUF/K9+wp0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 2 - NJ 27 (Edison Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 08:00 PM to 05:00 AM)","update_date":"2026-05-12T15:15:24Z"},"road_event_id":"FAZlN4Ej3uaEUAxWXUF/K9+wp0I=","beginning_cross_street":"South of Exit 2 - NJ 27","ending_cross_street":"South of Exit 2 - NJ 27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.37178,40.530635]]}},{"id":"MGVJO1Ts0kllT8jrhBbEQc/1tBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Westbound near West of CR 639/North Bridge St (Bridgewater Twp), Wednesday May 13, 2026 10:00 AM thru 02:00 PM, left lane closed","update_date":"2026-05-12T15:15:25Z"},"road_event_id":"MGVJO1Ts0kllT8jrhBbEQc/1tBc=","beginning_cross_street":"West of CR 639/North Bridge St","ending_cross_street":"East of CR 643/Mountain Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.610771,40.581104]]}},{"id":"BxLx3Uqn0SR8iDgXFoS8cr8fNI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near South of I-195 (Hamilton Twp), Tuesday May 19, 2026 09:00 PM thru Wednesday May 20, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-12T15:15:26Z"},"road_event_id":"BxLx3Uqn0SR8iDgXFoS8cr8fNI0=","beginning_cross_street":"South of I-195","ending_cross_street":"South of I-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.639686,40.198165]]}},{"id":"SPL5mEqJoq3+wh0JpOWjk+bdh+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between East of Allamuchy Rest Area (Allamuchy Twp) and West of Exit 19 - CR 517 (Allamuchy Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-05-12T15:15:15Z"},"road_event_id":"SPL5mEqJoq3+wh0JpOWjk+bdh+g=","beginning_cross_street":"East of Allamuchy Rest Area","ending_cross_street":"West of Exit 19 - CR 517","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.77803,40.917533]]}},{"id":"MpvK6Wi2p9e8cTh2vLFG2KTZv04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of Naughright Rd (Mount Olive Twp), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-12T15:15:16Z"},"road_event_id":"MpvK6Wi2p9e8cTh2vLFG2KTZv04=","beginning_cross_street":"West of Naughright Rd","ending_cross_street":"West of Naughright Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.797996,40.854007]]}},{"id":"PPPK/qUsrKzauzOiqiz0xYgmUMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound between West of CR 677/Morris St (Phillipsburg) and I-78/NJ 173 (Greenwich Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-12T15:15:17Z"},"road_event_id":"PPPK/qUsrKzauzOiqiz0xYgmUMQ=","beginning_cross_street":"West of CR 677/Morris St","ending_cross_street":"I-78/NJ 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.194557,40.696632]]}},{"id":"YCpIW3Fl40TkmEgshgIaJU9ksAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Southbound between Carnegie Center Blvd (West Windsor Twp) and North of I-295 (Lawrence Twp), Tuesday May 19, 2026 09:00 PM thru Wednesday May 20, 2026 05:00 AM, right lane closed","update_date":"2026-05-12T15:15:07Z"},"road_event_id":"YCpIW3Fl40TkmEgshgIaJU9ksAc=","beginning_cross_street":"Carnegie Center Blvd","ending_cross_street":"North of I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.654441,40.317913]]}},{"id":"ahdTFQawvNw1gBP2+U0Sm19PyGk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Southbound between Carnegie Center Blvd (West Windsor Twp) and North of I-295 (Lawrence Twp), Thursday May 21, 2026 09:00 PM thru Friday May 22, 2026 05:00 AM, right lane closed","update_date":"2026-05-12T15:15:08Z"},"road_event_id":"ahdTFQawvNw1gBP2+U0Sm19PyGk=","beginning_cross_street":"Carnegie Center Blvd","ending_cross_street":"North of I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T22:00:00Z","end_date":"2026-05-23T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.654441,40.317913]]}},{"id":"Eb7Mxy46d65uyxOrxhaA3704fPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound between West of CR 677/Morris St (Phillipsburg) and I-78/NJ 173 (Greenwich Twp), Friday May 15, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-12T15:15:10Z"},"road_event_id":"Eb7Mxy46d65uyxOrxhaA3704fPo=","beginning_cross_street":"West of CR 677/Morris St","ending_cross_street":"I-78/NJ 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.194557,40.696632]]}},{"id":"2VheqoBy/G5HinRsuWLPIwkxqME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near North of CR 620/Center Square Rd (Logan Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, left lane closed, moving operation","update_date":"2026-05-12T15:15:11Z"},"road_event_id":"2VheqoBy/G5HinRsuWLPIwkxqME=","beginning_cross_street":"North of CR 620/Center Square Rd","ending_cross_street":"CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.393928,39.788829]]}},{"id":"X5Ro4ZGBloBbJAb00gRx+aapuvg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound near West of I-80 (Mount Olive Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-12T15:15:13Z"},"road_event_id":"X5Ro4ZGBloBbJAb00gRx+aapuvg=","beginning_cross_street":"West of I-80","ending_cross_street":"West of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.717048,40.892086]]}},{"id":"66OULe3UOfatzvmJnIObwx8Sga0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Southbound between Carnegie Center Blvd (West Windsor Twp) and North of I-295 (Lawrence Twp), Wednesday May 20, 2026 09:00 PM thru Thursday May 21, 2026 05:00 AM, right lane closed","update_date":"2026-05-12T15:15:14Z"},"road_event_id":"66OULe3UOfatzvmJnIObwx8Sga0=","beginning_cross_street":"Carnegie Center Blvd","ending_cross_street":"North of I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.654441,40.317913]]}},{"id":"iUy/7jI/P2CcvVMsJkR3t8UZW9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-690 westbound ramp to/from Exit 12A - NY 695 (Geddes), Wednesday May 20th, 2026, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-12T15:17:10Z"},"road_event_id":"iUy/7jI/P2CcvVMsJkR3t8UZW9o=","beginning_cross_street":"Exit 12A - NY 695  ","ending_cross_street":"Exit 12A - NY 695  ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.209975,43.073711]]}},{"id":"5GJC+srng7p7abjT2UjM2CK5S70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound between NJ 47 South (Maurice River Twp) and North of Schooner Landing Rd (Millville), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:16Z"},"road_event_id":"5GJC+srng7p7abjT2UjM2CK5S70=","beginning_cross_street":"NJ 47 South","ending_cross_street":"North of Schooner Landing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.971206,39.293914]]}},{"id":"1pxJVMOSkL1J43k4XqalzmvL+IM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Southbound between South of NJ 49 (Millville) and South of Orange St (Millville), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:18Z"},"road_event_id":"1pxJVMOSkL1J43k4XqalzmvL+IM=","beginning_cross_street":"South of NJ 49","ending_cross_street":"South of Orange St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.030929,39.384384]]}},{"id":"PGA6kxiKNAxLWKVmrfH3YCXKQMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Southbound between South of NJ 49 (Millville) and South of Orange St (Millville), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:21Z"},"road_event_id":"PGA6kxiKNAxLWKVmrfH3YCXKQMs=","beginning_cross_street":"South of NJ 49","ending_cross_street":"South of Orange St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.030929,39.384384]]}},{"id":"1UmSIbyw7DYG25C/WjJiFupEATk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound between CR 655/Fries Mill Rd (Franklin Twp) and North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:22Z"},"road_event_id":"1UmSIbyw7DYG25C/WjJiFupEATk=","beginning_cross_street":"CR 655/Fries Mill Rd","ending_cross_street":"North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.067581,39.601791]]}},{"id":"iO3n4lnpmbKQEZo99CBeIXhxciM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Southbound between North of Schooner Landing Rd (Millville) and NJ 47 South (Maurice River Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:23Z"},"road_event_id":"iO3n4lnpmbKQEZo99CBeIXhxciM=","beginning_cross_street":"North of Schooner Landing Rd","ending_cross_street":"NJ 47 South","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.007652,39.343353]]}},{"id":"YmYsMRgFkOrEks18zCw8Ly1QFSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near North of CR 620/Center Square Rd (Logan Twp), Monday May 18, 2026 07:00 AM thru 05:00 PM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:24Z"},"road_event_id":"YmYsMRgFkOrEks18zCw8Ly1QFSw=","beginning_cross_street":"North of CR 620/Center Square Rd","ending_cross_street":"CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T18:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.393928,39.788829]]}},{"id":"ryqMR2S9SqChQzW8WqJ65NXh7Fg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound at CR 606/Park Ave (Collingswood) Wednesday May 13, 2026 09:00 AM thru 03:00 PM, intersection","update_date":"2026-05-12T15:39:14Z"},"road_event_id":"ryqMR2S9SqChQzW8WqJ65NXh7Fg=","beginning_cross_street":"CR 606/Park Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.088462,39.919231]]}},{"id":"hq1GjfwD1WKk0+WodxMW7KexgoY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Southbound between North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp) and CR 655/Fries Mill Rd (Franklin Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:15Z"},"road_event_id":"hq1GjfwD1WKk0+WodxMW7KexgoY=","beginning_cross_street":"North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd","ending_cross_street":"CR 655/Fries Mill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.08197,39.621765]]}},{"id":"Qxwfo7jX/+IEx7pnkhaRzAH+F2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near North of CR 620/Center Square Rd (Logan Twp), Tuesday May 19, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-05-12T15:39:13Z"},"road_event_id":"Qxwfo7jX/+IEx7pnkhaRzAH+F2g=","beginning_cross_street":"North of CR 620/Center Square Rd","ending_cross_street":"CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.393928,39.788829]]}},{"id":"vQakAdb87WRmnuMZ5BPAmPmY2h8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound between NJ 47 South (Maurice River Twp) and North of Schooner Landing Rd (Millville), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:04Z"},"road_event_id":"vQakAdb87WRmnuMZ5BPAmPmY2h8=","beginning_cross_street":"NJ 47 South","ending_cross_street":"North of Schooner Landing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.971206,39.293914]]}},{"id":"lV5dj1HOUmxw1MJ7E4pd+gWqmkg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Southbound between South of CR 690/Lake Rd/Weymouth Rd (Vineland) and South of NJ 56/Landis Av (Vineland), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, , moving operation","update_date":"2026-05-12T15:39:06Z"},"road_event_id":"lV5dj1HOUmxw1MJ7E4pd+gWqmkg=","beginning_cross_street":"South of CR 690/Lake Rd/Weymouth Rd","ending_cross_street":"South of NJ 56/Landis Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.048164,39.542655]]}},{"id":"DZn20quSS5JgXmIl1gtFzi3RlxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound between South of Orange St (Millville) and South of NJ 49 (Millville), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:07Z"},"road_event_id":"DZn20quSS5JgXmIl1gtFzi3RlxA=","beginning_cross_street":"South of Orange St","ending_cross_street":"South of NJ 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.021919,39.368503]]}},{"id":"3eYsH7y6zpeXLIoHiYmCxPUDQOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound between South of Orange St (Millville) and South of NJ 49 (Millville), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:10Z"},"road_event_id":"3eYsH7y6zpeXLIoHiYmCxPUDQOU=","beginning_cross_street":"South of Orange St","ending_cross_street":"South of NJ 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.021919,39.368503]]}},{"id":"MtrAfE82fDuFkOJS73igSscm5nw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Southbound between South of CR 690/Lake Rd/Weymouth Rd (Vineland) and South of NJ 56/Landis Av (Vineland), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, , moving operation","update_date":"2026-05-12T15:39:11Z"},"road_event_id":"MtrAfE82fDuFkOJS73igSscm5nw=","beginning_cross_street":"South of CR 690/Lake Rd/Weymouth Rd","ending_cross_street":"South of NJ 56/Landis Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.048164,39.542655]]}},{"id":"bwJ6NQvKXaQSu0TPqtzxAeahq9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound between NJ 47 South (Maurice River Twp) and North of Schooner Landing Rd (Millville), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:12Z"},"road_event_id":"bwJ6NQvKXaQSu0TPqtzxAeahq9U=","beginning_cross_street":"NJ 47 South","ending_cross_street":"North of Schooner Landing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.971206,39.293914]]}},{"id":"MQbOeW9/3WPlvbdK72Av4gT8DrE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Southbound between North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp) and CR 655/Fries Mill Rd (Franklin Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:40Z"},"road_event_id":"MQbOeW9/3WPlvbdK72Av4gT8DrE=","beginning_cross_street":"North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd","ending_cross_street":"CR 655/Fries Mill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.08197,39.621765]]}},{"id":"JgY+Q8aA+TvudtMmdix5w3fUHLE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound between South of NJ 56/Landis Av (Vineland) and South of CR 690/Lake Rd/Weymouth Rd (Vineland), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:43Z"},"road_event_id":"JgY+Q8aA+TvudtMmdix5w3fUHLE=","beginning_cross_street":"South of NJ 56/Landis Av","ending_cross_street":"South of CR 690/Lake Rd/Weymouth Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.04306,39.48706]]}},{"id":"o4h8HYhMBUlE/y36q/EYct5w5+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Southbound between South of CR 690/Lake Rd/Weymouth Rd (Vineland) and South of NJ 56/Landis Av (Vineland), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, , moving operation","update_date":"2026-05-12T15:39:44Z"},"road_event_id":"o4h8HYhMBUlE/y36q/EYct5w5+A=","beginning_cross_street":"South of CR 690/Lake Rd/Weymouth Rd","ending_cross_street":"South of NJ 56/Landis Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.048164,39.542655]]}},{"id":"xh9n1ZEsYLYh2Ch6pJ2Rx6B2ACk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near North of CR 620/Center Square Rd (Logan Twp), Monday May 18, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-05-12T15:39:45Z"},"road_event_id":"xh9n1ZEsYLYh2Ch6pJ2Rx6B2ACk=","beginning_cross_street":"North of CR 620/Center Square Rd","ending_cross_street":"CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.393928,39.788829]]}},{"id":"XASADLVVBltwUg75e8S+ZcAvfz0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound between CR 655/Fries Mill Rd (Franklin Twp) and North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:46Z"},"road_event_id":"XASADLVVBltwUg75e8S+ZcAvfz0=","beginning_cross_street":"CR 655/Fries Mill Rd","ending_cross_street":"North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.067581,39.601791]]}},{"id":"wWK0+R7bPI6dGS7hUXAm1QapFdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near North of CR 620/Center Square Rd (Logan Twp), Tuesday May 19, 2026 07:00 AM thru 05:00 PM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:36Z"},"road_event_id":"wWK0+R7bPI6dGS7hUXAm1QapFdA=","beginning_cross_street":"North of CR 620/Center Square Rd","ending_cross_street":"CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T18:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.393928,39.788829]]}},{"id":"F7P1tCUF5mkQk/xgaRCNl4+Tq78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound between CR 655/Fries Mill Rd (Franklin Twp) and North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:37Z"},"road_event_id":"F7P1tCUF5mkQk/xgaRCNl4+Tq78=","beginning_cross_street":"CR 655/Fries Mill Rd","ending_cross_street":"North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.067581,39.601791]]}},{"id":"lU/D0PNKe/PEgAbNib26sXpRKw4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Southbound between North of Schooner Landing Rd (Millville) and NJ 47 South (Maurice River Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:38Z"},"road_event_id":"lU/D0PNKe/PEgAbNib26sXpRKw4=","beginning_cross_street":"North of Schooner Landing Rd","ending_cross_street":"NJ 47 South","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.007652,39.343353]]}},{"id":"wbtPp1mfBgEpl8ByB4con5Qy8SA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound between South of Orange St (Millville) and South of NJ 49 (Millville), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:39Z"},"road_event_id":"wbtPp1mfBgEpl8ByB4con5Qy8SA=","beginning_cross_street":"South of Orange St","ending_cross_street":"South of NJ 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.021919,39.368503]]}},{"id":"i+9dVgjzdQTkrX6S3dI9zwsMqiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near North of CR 522/Throckmorton St (Freehold Twp), Monday May 18, 2026 08:00 PM thru Tuesday May 19, 2026 05:00 AM, right lane closed","update_date":"2026-05-12T15:39:30Z"},"road_event_id":"i+9dVgjzdQTkrX6S3dI9zwsMqiQ=","beginning_cross_street":"North of CR 522/Throckmorton St","ending_cross_street":"South of Schibanoff Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T20:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.293937,40.268573]]}},{"id":"kZriAvUwbz1B3qEh5m1Q23293Q4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Southbound between North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp) and CR 655/Fries Mill Rd (Franklin Twp), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:31Z"},"road_event_id":"kZriAvUwbz1B3qEh5m1Q23293Q4=","beginning_cross_street":"North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd","ending_cross_street":"CR 655/Fries Mill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.08197,39.621765]]}},{"id":"K/xNAHbBpzqnVioQyPjwCwMT/ZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound between South of NJ 56/Landis Av (Vineland) and South of CR 690/Lake Rd/Weymouth Rd (Vineland), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:32Z"},"road_event_id":"K/xNAHbBpzqnVioQyPjwCwMT/ZU=","beginning_cross_street":"South of NJ 56/Landis Av","ending_cross_street":"South of CR 690/Lake Rd/Weymouth Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.04306,39.48706]]}},{"id":"hWiaKXDPqpFVrdFa21Yc1Gwd6MU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Southbound between North of Schooner Landing Rd (Millville) and NJ 47 South (Maurice River Twp), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:33Z"},"road_event_id":"hWiaKXDPqpFVrdFa21Yc1Gwd6MU=","beginning_cross_street":"North of Schooner Landing Rd","ending_cross_street":"NJ 47 South","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.007652,39.343353]]}},{"id":"mqESdETigXxFb9+hBgVjDQXeCLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound between South of NJ 56/Landis Av (Vineland) and South of CR 690/Lake Rd/Weymouth Rd (Vineland), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:34Z"},"road_event_id":"mqESdETigXxFb9+hBgVjDQXeCLQ=","beginning_cross_street":"South of NJ 56/Landis Av","ending_cross_street":"South of CR 690/Lake Rd/Weymouth Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.04306,39.48706]]}},{"id":"sa8iGMqiokaOCJ2HQuS2USEurCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Southbound between South of NJ 49 (Millville) and South of Orange St (Millville), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-05-12T15:39:35Z"},"road_event_id":"sa8iGMqiokaOCJ2HQuS2USEurCU=","beginning_cross_street":"South of NJ 49","ending_cross_street":"South of Orange St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.030929,39.384384]]}},{"id":"YUyuS3/AHFVz0YfMWmqyUZcuogc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound near North of Kings Highway/Harmony Rd (Middletown Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-12T15:39:26Z"},"road_event_id":"YUyuS3/AHFVz0YfMWmqyUZcuogc=","beginning_cross_street":"North of Kings Highway/Harmony Rd","ending_cross_street":"South of Kings Highway/Harmony Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.127456,40.405254]]}},{"id":"rVZyc8uarDEJgu2FLEmakQFok8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near North of CR 620/Center Square Rd (Logan Twp), Wednesday May 20, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-05-12T15:45:23Z"},"road_event_id":"rVZyc8uarDEJgu2FLEmakQFok8Q=","beginning_cross_street":"North of CR 620/Center Square Rd","ending_cross_street":"CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.393928,39.788829]]}},{"id":"z2zk0AaNv+BNQklAP7bQJ2OOM+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near North of CR 620/Center Square Rd (Logan Twp), Wednesday May 20, 2026 07:00 AM thru 05:00 PM, right shoulder closed, moving operation","update_date":"2026-05-12T15:45:17Z"},"road_event_id":"z2zk0AaNv+BNQklAP7bQJ2OOM+M=","beginning_cross_street":"North of CR 620/Center Square Rd","ending_cross_street":"CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T18:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.393928,39.788829]]}},{"id":"vynPmO5X8kb+NLKVacVih8Tb4YY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near North of CR 522/Throckmorton St (Freehold Twp), Wednesday May 20, 2026 08:00 PM thru Thursday May 21, 2026 05:00 AM, right lane closed","update_date":"2026-05-12T15:45:18Z"},"road_event_id":"vynPmO5X8kb+NLKVacVih8Tb4YY=","beginning_cross_street":"North of CR 522/Throckmorton St","ending_cross_street":"South of Schibanoff Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T20:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.293937,40.268573]]}},{"id":"ADXCBQ38M1tcvTEE1WDXmdPKtUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Southbound near Wittpenn Bridge (Jersey City), Wednesday May 13, 2026 10:00 AM thru 02:00 PM, right lane closed","update_date":"2026-05-12T15:45:21Z"},"road_event_id":"ADXCBQ38M1tcvTEE1WDXmdPKtUY=","beginning_cross_street":"Wittpenn Bridge","ending_cross_street":"Charlotte Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.08184,40.741405]]}},{"id":"7Dy3AT862E0FbEEvrFgTXye3CtA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near North of CR 522/Throckmorton St (Freehold Twp), Tuesday May 19, 2026 08:00 PM thru Wednesday May 20, 2026 05:00 AM, right lane closed","update_date":"2026-05-12T15:45:22Z"},"road_event_id":"7Dy3AT862E0FbEEvrFgTXye3CtA=","beginning_cross_street":"North of CR 522/Throckmorton St","ending_cross_street":"South of Schibanoff Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T20:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.293937,40.268573]]}},{"id":"ncu7mEIlXSOLHUOs8tVm2M1KYBk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 66"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 66 Westbound near West of Jumping Brook Rd (Neptune Twp), Wednesday May 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-12T15:45:11Z"},"road_event_id":"ncu7mEIlXSOLHUOs8tVm2M1KYBk=","beginning_cross_street":"West of Jumping Brook Rd","ending_cross_street":"West of Jumping Brook Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.087348,40.222415]]}},{"id":"ofQaNrDchNAk6TdyxEopW8otF/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Southbound near Wittpenn Bridge (Jersey City), Thursday May 14, 2026 10:00 AM thru 02:00 PM, right lane closed","update_date":"2026-05-12T15:45:12Z"},"road_event_id":"ofQaNrDchNAk6TdyxEopW8otF/g=","beginning_cross_street":"Wittpenn Bridge","ending_cross_street":"Charlotte Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.08184,40.741405]]}},{"id":"YZfIH05tm322wuT4hl8d8KTYT8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 66"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 66 Westbound near East of Green Grove Rd (Neptune Twp), Wednesday May 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-12T15:45:13Z"},"road_event_id":"YZfIH05tm322wuT4hl8d8KTYT8s=","beginning_cross_street":"East of Green Grove Rd","ending_cross_street":"Green Grove Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.071708,40.227054]]}},{"id":"xiHb0r7kKllac/hEUyQkymESluI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near North of CR 620/Center Square Rd (Logan Twp), Thursday May 21, 2026 07:00 AM thru 05:00 PM, right shoulder closed, moving operation","update_date":"2026-05-12T15:45:14Z"},"road_event_id":"xiHb0r7kKllac/hEUyQkymESluI=","beginning_cross_street":"North of CR 620/Center Square Rd","ending_cross_street":"CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T18:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.393928,39.788829]]}},{"id":"Gp22tUrj8gfpvdrpRpE8Q8Hlmms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Southbound near Wittpenn Bridge (Jersey City), Friday May 15, 2026 10:00 AM thru 02:00 PM, right lane closed","update_date":"2026-05-12T15:45:04Z"},"road_event_id":"Gp22tUrj8gfpvdrpRpE8Q8Hlmms=","beginning_cross_street":"Wittpenn Bridge","ending_cross_street":"Charlotte Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.08184,40.741405]]}},{"id":"+zubb0Q//+o4XGbDbgO3DnJCdUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near North of CR 522/Throckmorton St (Freehold Twp), Thursday May 21, 2026 08:00 PM thru Friday May 22, 2026 05:00 AM, right lane closed","update_date":"2026-05-12T15:45:06Z"},"road_event_id":"+zubb0Q//+o4XGbDbgO3DnJCdUI=","beginning_cross_street":"North of CR 522/Throckmorton St","ending_cross_street":"South of Schibanoff Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T20:00:00Z","end_date":"2026-05-23T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.293937,40.268573]]}},{"id":"lvmo2WL8dWdW6In46MDrmFMxJ0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 2 - NJ 27 (Edison Twp), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 05:00 AM, right lane closed","update_date":"2026-05-12T15:45:07Z"},"road_event_id":"lvmo2WL8dWdW6In46MDrmFMxJ0k=","beginning_cross_street":"South of Exit 2 - NJ 27","ending_cross_street":"South of Exit 2 - NJ 27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.37178,40.530635]]}},{"id":"lSjEDxOT4A9bXPLBB6NSKYdDVoQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near North of CR 620/Center Square Rd (Logan Twp), Thursday May 21, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-05-12T15:45:08Z"},"road_event_id":"lSjEDxOT4A9bXPLBB6NSKYdDVoQ=","beginning_cross_street":"North of CR 620/Center Square Rd","ending_cross_street":"CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.393928,39.788829]]}},{"id":"/XUfEZHLs8Sb+Qv3ftLC/EaEPGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound near East of Exit 44 - CR 527/Glenside Ave (Berkeley Heights Twp), Wednesday May 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-12T15:45:09Z"},"road_event_id":"/XUfEZHLs8Sb+Qv3ftLC/EaEPGE=","beginning_cross_street":"East of Exit 44 - CR 527/Glenside Ave","ending_cross_street":"East of Exit 44 - CR 527/Glenside Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.387413,40.684841]]}},{"id":"2s4Eq4zxkhEmpeylKyLYBlZtHbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-81 southbound between S Hill RD (Virgil) and Exit 39 - US 11; NY 221; Marathon (Marathon), Thursday May 21st, 2026, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-12T15:55:50Z"},"road_event_id":"2s4Eq4zxkhEmpeylKyLYBlZtHbk=","beginning_cross_street":"S Hill RD","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon  ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098172,42.551521]]}},{"id":"1wlQmJJIKzWdCyrGUE1O9CYdzOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-81 southbound between S Hill Rd (Virgil) and Steve Russell Hill Rd (Virgil), Tuesday May 26th, 2026, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-12T16:03:39Z"},"road_event_id":"1wlQmJJIKzWdCyrGUE1O9CYdzOA=","beginning_cross_street":"S Hill Rd ","ending_cross_street":"Steve Russell Hill Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098095,42.551462]]}},{"id":"Nsq88zEfqaHFX0BFXs6LM9yMeJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-81 northbound between Exit 38 - US 11; NY 221; Marathon (Marathon) and Exit 50 - US11; NY 41; McGraw (Cortlandville), Tuesday May 26th, 2026, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-12T16:10:04Z"},"road_event_id":"Nsq88zEfqaHFX0BFXs6LM9yMeJI=","beginning_cross_street":"Exit 38 - US 11; NY 221; Marathon","ending_cross_street":"Exit 50 - US11; NY 41; McGraw","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T22:00:00Z","end_date":"2026-05-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.029399,42.439604]]}},{"id":"JY8aUqj6pmh4LVmBglrYcXr0K34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Line striping and milling and paving operations on Garden State Parkway southbound between South of Exit 168 - NJ 502/Washington Ave (Washington Twp) and South of Exit 163 - NJ 17 (Paramus), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 08:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed, Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 10:00 PM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-12T16:21:37Z"},"road_event_id":"JY8aUqj6pmh4LVmBglrYcXr0K34=","beginning_cross_street":"South of Exit 168 - NJ 502/Washington Ave","ending_cross_street":"South of Exit 163 - NJ 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.072754,40.995443]]}},{"id":"JdEPbQaRLlrXNKFtaGR9tjOSD4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on Garden State Parkway Local Lanes northbound between North of Exit 116 - PNC Arts Center (Holmdel Twp) and North of Exit 120 - Laurence Harbor (Old Bridge Twp), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 07:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 08:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-12T16:27:02Z"},"road_event_id":"JdEPbQaRLlrXNKFtaGR9tjOSD4Y=","beginning_cross_street":"North of Exit 116 - PNC Arts Center","ending_cross_street":"North of Exit 120 - Laurence Harbor","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.193659,40.403799]]}},{"id":"W2JPhkD+vabuMEbaq2qqBJzxa38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZQLySh9CQhozkyT+u6ekeWWCOSI="}],"description":"Utility work on NY 19 both directions between Dillon Rd. (Pavilion) and Stubb Rd. (Pavilion) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T16:29:42Z"},"road_event_id":"W2JPhkD+vabuMEbaq2qqBJzxa38=","beginning_cross_street":"Dillon Rd.","ending_cross_street":"Stubb Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.019549,42.884621]]}},{"id":"ZQLySh9CQhozkyT+u6ekeWWCOSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W2JPhkD+vabuMEbaq2qqBJzxa38="},{"type":"next-occurrence","id":"x1NfO97gktgaY0fnYqk8RtI0gzU="}],"description":"Utility work on NY 19 both directions between Dillon Rd. (Pavilion) and Stubb Rd. (Pavilion) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T16:29:42Z"},"road_event_id":"ZQLySh9CQhozkyT+u6ekeWWCOSI=","beginning_cross_street":"Dillon Rd.","ending_cross_street":"Stubb Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.019549,42.884621]]}},{"id":"x1NfO97gktgaY0fnYqk8RtI0gzU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W2JPhkD+vabuMEbaq2qqBJzxa38="},{"type":"next-occurrence","id":"7ajuZ9vpJ9sOv2Y3RGZkFP0hCW4="}],"description":"Utility work on NY 19 both directions between Dillon Rd. (Pavilion) and Stubb Rd. (Pavilion) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T16:29:42Z"},"road_event_id":"x1NfO97gktgaY0fnYqk8RtI0gzU=","beginning_cross_street":"Dillon Rd.","ending_cross_street":"Stubb Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.019549,42.884621]]}},{"id":"7ajuZ9vpJ9sOv2Y3RGZkFP0hCW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W2JPhkD+vabuMEbaq2qqBJzxa38="},{"type":"next-occurrence","id":"QTqyh9Gy/sUhi1Lgo9An+Wax6ms="}],"description":"Utility work on NY 19 both directions between Dillon Rd. (Pavilion) and Stubb Rd. (Pavilion) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T16:29:42Z"},"road_event_id":"7ajuZ9vpJ9sOv2Y3RGZkFP0hCW4=","beginning_cross_street":"Dillon Rd.","ending_cross_street":"Stubb Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.019549,42.884621]]}},{"id":"QTqyh9Gy/sUhi1Lgo9An+Wax6ms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W2JPhkD+vabuMEbaq2qqBJzxa38="},{"type":"next-occurrence","id":"wkoehEMk3k8y25qRh+OMphqd2rk="}],"description":"Utility work on NY 19 both directions between Dillon Rd. (Pavilion) and Stubb Rd. (Pavilion) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T16:29:42Z"},"road_event_id":"QTqyh9Gy/sUhi1Lgo9An+Wax6ms=","beginning_cross_street":"Dillon Rd.","ending_cross_street":"Stubb Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.019549,42.884621]]}},{"id":"wkoehEMk3k8y25qRh+OMphqd2rk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W2JPhkD+vabuMEbaq2qqBJzxa38="}],"description":"Utility work on NY 19 both directions between Dillon Rd. (Pavilion) and Stubb Rd. (Pavilion) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T16:29:42Z"},"road_event_id":"wkoehEMk3k8y25qRh+OMphqd2rk=","beginning_cross_street":"Dillon Rd.","ending_cross_street":"Stubb Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.019549,42.884621]]}},{"id":"gYyosHnxO7U+wQ8xMIxsVoueIHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Line striping on Garden State Parkway northbound at South of Asbury Toll Plaza (Tinton Falls), Thursday May 14th, 2026 thru Thursday May 14th, 2026, 12:00 AM thru 06:00 AM 5 Left toll lanes of 12 lanes closed","update_date":"2026-05-12T16:30:23Z"},"road_event_id":"gYyosHnxO7U+wQ8xMIxsVoueIHc=","beginning_cross_street":"South of Asbury Toll Plaza","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:00:00Z","end_date":"2026-05-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.082075,40.250008]]}},{"id":"smTqCF5VRcTPoPXvJ7w2+TeqAKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 5 both directions City of Dunkirk (Dunkirk), Continuous Friday May 15th, 2026 12:00 AM thru Monday September 7th, 2026 11:59 PM All lanes closed","update_date":"2026-05-12T16:41:25Z"},"road_event_id":"smTqCF5VRcTPoPXvJ7w2+TeqAKw=","beginning_cross_street":"City of Dunkirk","ending_cross_street":"City of Dunkirk","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.364855,42.475934]]}},{"id":"U0VV3zYotSG6GMJIHxAiQGfYzaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"x/41QzyK34vwJeCO5dwMRTrrZ94="}],"description":"Utility work on NY 31 eastbound east of Elmwood Avenue; CR 87 (Brighton), Monday May 18th, 2026 thru Tuesday May 19th, 2026, Monday/Tuesday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-12T16:47:59Z"},"road_event_id":"U0VV3zYotSG6GMJIHxAiQGfYzaY=","beginning_cross_street":"Elmwood Avenue; CR 87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T20:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.56292,43.124925]]}},{"id":"x/41QzyK34vwJeCO5dwMRTrrZ94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U0VV3zYotSG6GMJIHxAiQGfYzaY="}],"description":"Utility work on NY 31 eastbound east of Elmwood Avenue; CR 87 (Brighton), Monday May 18th, 2026 thru Tuesday May 19th, 2026, Monday/Tuesday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-12T16:47:59Z"},"road_event_id":"x/41QzyK34vwJeCO5dwMRTrrZ94=","beginning_cross_street":"Elmwood Avenue; CR 87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T20:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.56292,43.124925]]}},{"id":"nja/Ir/isk2shFRfAhOKEp4X9tw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DimrNRRhvnL7/ZRuIlozLiP4g/Q="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 7 - NY 116 (North Salem) D265186/B1077550/32688309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:11:04Z"},"road_event_id":"nja/Ir/isk2shFRfAhOKEp4X9tw=","beginning_cross_street":"Exit 6 - NY 35","ending_cross_street":"Exit 7 - NY 116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T18:00:00Z","end_date":"2026-05-19T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.681396,41.279701]]}},{"id":"DimrNRRhvnL7/ZRuIlozLiP4g/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nja/Ir/isk2shFRfAhOKEp4X9tw="},{"type":"next-occurrence","id":"obuNxq6UEmIsIwVaO/4Jg3ufyMs="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 7 - NY 116 (North Salem) D265186/B1077550/32688309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:11:04Z"},"road_event_id":"DimrNRRhvnL7/ZRuIlozLiP4g/Q=","beginning_cross_street":"Exit 6 - NY 35","ending_cross_street":"Exit 7 - NY 116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T18:00:00Z","end_date":"2026-05-20T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.681396,41.279701]]}},{"id":"obuNxq6UEmIsIwVaO/4Jg3ufyMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nja/Ir/isk2shFRfAhOKEp4X9tw="},{"type":"next-occurrence","id":"jHqJHeK2KmPCgliDzgcQqXcWyyM="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 7 - NY 116 (North Salem) D265186/B1077550/32688309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:11:04Z"},"road_event_id":"obuNxq6UEmIsIwVaO/4Jg3ufyMs=","beginning_cross_street":"Exit 6 - NY 35","ending_cross_street":"Exit 7 - NY 116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T18:00:00Z","end_date":"2026-05-21T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.681396,41.279701]]}},{"id":"jHqJHeK2KmPCgliDzgcQqXcWyyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nja/Ir/isk2shFRfAhOKEp4X9tw="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 7 - NY 116 (North Salem) D265186/B1077550/32688309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:11:04Z"},"road_event_id":"jHqJHeK2KmPCgliDzgcQqXcWyyM=","beginning_cross_street":"Exit 6 - NY 35","ending_cross_street":"Exit 7 - NY 116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T18:00:00Z","end_date":"2026-05-22T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.681396,41.279701]]}},{"id":"993AwTg/Kxa/t7Z2fLd76rjP/oQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"S6UBMO2IyDIhrWpgsj/D33mtrLQ="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 (Bedford) D265186/B1077550/32650909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 04:00 PM, right lane closure","update_date":"2026-05-12T17:07:11Z"},"road_event_id":"993AwTg/Kxa/t7Z2fLd76rjP/oQ=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T23:00:00Z","end_date":"2026-05-19T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674846,41.303209]]}},{"id":"S6UBMO2IyDIhrWpgsj/D33mtrLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"993AwTg/Kxa/t7Z2fLd76rjP/oQ="},{"type":"next-occurrence","id":"cfGJCSBFwUxT1AV49sU5E8L2XxM="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 (Bedford) D265186/B1077550/32650909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 04:00 PM, right lane closure","update_date":"2026-05-12T17:07:11Z"},"road_event_id":"S6UBMO2IyDIhrWpgsj/D33mtrLQ=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T23:00:00Z","end_date":"2026-05-20T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674846,41.303209]]}},{"id":"cfGJCSBFwUxT1AV49sU5E8L2XxM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"993AwTg/Kxa/t7Z2fLd76rjP/oQ="},{"type":"next-occurrence","id":"dC2r0CYeKtHzlvqVWGfaGd0Wkew="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 (Bedford) D265186/B1077550/32650909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 04:00 PM, right lane closure","update_date":"2026-05-12T17:07:11Z"},"road_event_id":"cfGJCSBFwUxT1AV49sU5E8L2XxM=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T23:00:00Z","end_date":"2026-05-21T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674846,41.303209]]}},{"id":"dC2r0CYeKtHzlvqVWGfaGd0Wkew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"993AwTg/Kxa/t7Z2fLd76rjP/oQ="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 (Bedford) D265186/B1077550/32650909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 04:00 PM, right lane closure","update_date":"2026-05-12T17:07:11Z"},"road_event_id":"dC2r0CYeKtHzlvqVWGfaGd0Wkew=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T23:00:00Z","end_date":"2026-05-22T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674846,41.303209]]}},{"id":"NINxe05004U5/mFtJ9jteVUrBFU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"svpbEo+8E1bI8PkzmAQK3NFqxMc="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:19:42Z"},"road_event_id":"NINxe05004U5/mFtJ9jteVUrBFU=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"svpbEo+8E1bI8PkzmAQK3NFqxMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NINxe05004U5/mFtJ9jteVUrBFU="},{"type":"next-occurrence","id":"Deek8wN2z+/ifLqCn7KP6WLbJyk="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:19:42Z"},"road_event_id":"svpbEo+8E1bI8PkzmAQK3NFqxMc=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"Deek8wN2z+/ifLqCn7KP6WLbJyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NINxe05004U5/mFtJ9jteVUrBFU="},{"type":"next-occurrence","id":"BrAn3djIyq+hCkftyW+iYC1CuGY="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:19:42Z"},"road_event_id":"Deek8wN2z+/ifLqCn7KP6WLbJyk=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"BrAn3djIyq+hCkftyW+iYC1CuGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NINxe05004U5/mFtJ9jteVUrBFU="},{"type":"next-occurrence","id":"oqbM1zhygRnnm/Mqe/oLvTRo8cU="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:19:42Z"},"road_event_id":"BrAn3djIyq+hCkftyW+iYC1CuGY=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"oqbM1zhygRnnm/Mqe/oLvTRo8cU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NINxe05004U5/mFtJ9jteVUrBFU="},{"type":"next-occurrence","id":"9GZQWEGi1+O1h+KBqkZexvhYeXY="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:19:42Z"},"road_event_id":"oqbM1zhygRnnm/Mqe/oLvTRo8cU=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"9GZQWEGi1+O1h+KBqkZexvhYeXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NINxe05004U5/mFtJ9jteVUrBFU="},{"type":"next-occurrence","id":"0RrJAF2GV0GbEF3XLMoqeQnEG+U="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:19:42Z"},"road_event_id":"9GZQWEGi1+O1h+KBqkZexvhYeXY=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"0RrJAF2GV0GbEF3XLMoqeQnEG+U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NINxe05004U5/mFtJ9jteVUrBFU="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-12T17:19:42Z"},"road_event_id":"0RrJAF2GV0GbEF3XLMoqeQnEG+U=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"Go9dZTtVrOtAJHS+yX5MxxGfzrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[],"description":"Installation of fiber optics on NY 371 northbound CR-35 (Cohocton) to Naples Street; NY 21; END ROUTE (Cohocton) 1 Lane, 2 Way, Flagger Control, Thursday May 14th, 2026 thru Friday May 15th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-12T17:16:07Z"},"road_event_id":"Go9dZTtVrOtAJHS+yX5MxxGfzrA=","beginning_cross_street":"CR-35","ending_cross_street":"Naples Street; NY 21; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.46958,42.525149]]}},{"id":"R9So83N4igAJtLn2xeqzYeCNgeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TFfx03XbfdsoVkLjxv4YW0AyIeA="}],"description":"Utility work on US 20A both directions west of Simmons Rd. (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:24:06Z"},"road_event_id":"R9So83N4igAJtLn2xeqzYeCNgeE=","beginning_cross_street":"Simmons Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993175,42.74954]]}},{"id":"TFfx03XbfdsoVkLjxv4YW0AyIeA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R9So83N4igAJtLn2xeqzYeCNgeE="},{"type":"next-occurrence","id":"sWEYK8znpb5S4JuAvq98gc2Hmo4="}],"description":"Utility work on US 20A both directions west of Simmons Rd. (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:24:06Z"},"road_event_id":"TFfx03XbfdsoVkLjxv4YW0AyIeA=","beginning_cross_street":"Simmons Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993175,42.74954]]}},{"id":"sWEYK8znpb5S4JuAvq98gc2Hmo4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R9So83N4igAJtLn2xeqzYeCNgeE="},{"type":"next-occurrence","id":"Vzasn5G4J/tsL2wzXgsS3FmANFM="}],"description":"Utility work on US 20A both directions west of Simmons Rd. (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:24:06Z"},"road_event_id":"sWEYK8znpb5S4JuAvq98gc2Hmo4=","beginning_cross_street":"Simmons Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993175,42.74954]]}},{"id":"Vzasn5G4J/tsL2wzXgsS3FmANFM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R9So83N4igAJtLn2xeqzYeCNgeE="},{"type":"next-occurrence","id":"YfVPQNnlh43ktyBe/RPbVWHZ5rk="}],"description":"Utility work on US 20A both directions west of Simmons Rd. (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:24:06Z"},"road_event_id":"Vzasn5G4J/tsL2wzXgsS3FmANFM=","beginning_cross_street":"Simmons Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993175,42.74954]]}},{"id":"YfVPQNnlh43ktyBe/RPbVWHZ5rk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R9So83N4igAJtLn2xeqzYeCNgeE="},{"type":"next-occurrence","id":"vJWqMeIdxOsE0WG7zBxzKWE+lCY="}],"description":"Utility work on US 20A both directions west of Simmons Rd. (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:24:06Z"},"road_event_id":"YfVPQNnlh43ktyBe/RPbVWHZ5rk=","beginning_cross_street":"Simmons Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993175,42.74954]]}},{"id":"vJWqMeIdxOsE0WG7zBxzKWE+lCY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R9So83N4igAJtLn2xeqzYeCNgeE="}],"description":"Utility work on US 20A both directions west of Simmons Rd. (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:24:06Z"},"road_event_id":"vJWqMeIdxOsE0WG7zBxzKWE+lCY=","beginning_cross_street":"Simmons Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993175,42.74954]]}},{"id":"1ol5YaASqHVJg7jIqt4gAWkrMDk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cn+SFicS8vtwlo1ct0XRLdZF6ZI="}],"description":"Utility work on NY 39 both directions between Standpipe Rd (Castile) and Elm St. (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:35:38Z"},"road_event_id":"1ol5YaASqHVJg7jIqt4gAWkrMDk=","beginning_cross_street":"Standpipe Rd","ending_cross_street":"Elm St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.010889,42.71042]]}},{"id":"cn+SFicS8vtwlo1ct0XRLdZF6ZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1ol5YaASqHVJg7jIqt4gAWkrMDk="},{"type":"next-occurrence","id":"9zXAKg1e84s74x3Cm3c4k85zDnw="}],"description":"Utility work on NY 39 both directions between Standpipe Rd (Castile) and Elm St. (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:35:38Z"},"road_event_id":"cn+SFicS8vtwlo1ct0XRLdZF6ZI=","beginning_cross_street":"Standpipe Rd","ending_cross_street":"Elm St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.010889,42.71042]]}},{"id":"9zXAKg1e84s74x3Cm3c4k85zDnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1ol5YaASqHVJg7jIqt4gAWkrMDk="},{"type":"next-occurrence","id":"pMHzd3S+1JfV9jYhLPyyqk5WlfY="}],"description":"Utility work on NY 39 both directions between Standpipe Rd (Castile) and Elm St. (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:35:38Z"},"road_event_id":"9zXAKg1e84s74x3Cm3c4k85zDnw=","beginning_cross_street":"Standpipe Rd","ending_cross_street":"Elm St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.010889,42.71042]]}},{"id":"pMHzd3S+1JfV9jYhLPyyqk5WlfY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1ol5YaASqHVJg7jIqt4gAWkrMDk="},{"type":"next-occurrence","id":"bTvZucUQBxsJiwoXKLGIPKQklRU="}],"description":"Utility work on NY 39 both directions between Standpipe Rd (Castile) and Elm St. (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:35:38Z"},"road_event_id":"pMHzd3S+1JfV9jYhLPyyqk5WlfY=","beginning_cross_street":"Standpipe Rd","ending_cross_street":"Elm St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.010889,42.71042]]}},{"id":"bTvZucUQBxsJiwoXKLGIPKQklRU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1ol5YaASqHVJg7jIqt4gAWkrMDk="},{"type":"next-occurrence","id":"0dvfsVTU7iUdMoaIPxnX6gSg2O8="}],"description":"Utility work on NY 39 both directions between Standpipe Rd (Castile) and Elm St. (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:35:38Z"},"road_event_id":"bTvZucUQBxsJiwoXKLGIPKQklRU=","beginning_cross_street":"Standpipe Rd","ending_cross_street":"Elm St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.010889,42.71042]]}},{"id":"0dvfsVTU7iUdMoaIPxnX6gSg2O8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1ol5YaASqHVJg7jIqt4gAWkrMDk="}],"description":"Utility work on NY 39 both directions between Standpipe Rd (Castile) and Elm St. (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:35:38Z"},"road_event_id":"0dvfsVTU7iUdMoaIPxnX6gSg2O8=","beginning_cross_street":"Standpipe Rd","ending_cross_street":"Elm St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.010889,42.71042]]}},{"id":"dIfd6iHC/i1sm7jN3rtlCSR5V6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 246"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MxGif9qz0rGVUXfg1BBhllYSupw="}],"description":"Utility work on NY 246 both directions between Main Street South; NY 39; START ROUTE; NY 246 (Perry) and Parker Lane (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:38:13Z"},"road_event_id":"dIfd6iHC/i1sm7jN3rtlCSR5V6s=","beginning_cross_street":"Main Street  South; NY 39; START ROUTE; NY 246","ending_cross_street":"Parker Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.00554,42.715925]]}},{"id":"MxGif9qz0rGVUXfg1BBhllYSupw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 246"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIfd6iHC/i1sm7jN3rtlCSR5V6s="},{"type":"next-occurrence","id":"e8H8EpVDEPdvBvXEMyVG2FfZqAk="}],"description":"Utility work on NY 246 both directions between Main Street South; NY 39; START ROUTE; NY 246 (Perry) and Parker Lane (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:38:13Z"},"road_event_id":"MxGif9qz0rGVUXfg1BBhllYSupw=","beginning_cross_street":"Main Street  South; NY 39; START ROUTE; NY 246","ending_cross_street":"Parker Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.00554,42.715925]]}},{"id":"e8H8EpVDEPdvBvXEMyVG2FfZqAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 246"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIfd6iHC/i1sm7jN3rtlCSR5V6s="},{"type":"next-occurrence","id":"lRpNheOFEvoSea4nJg+vGUD+7bg="}],"description":"Utility work on NY 246 both directions between Main Street South; NY 39; START ROUTE; NY 246 (Perry) and Parker Lane (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:38:13Z"},"road_event_id":"e8H8EpVDEPdvBvXEMyVG2FfZqAk=","beginning_cross_street":"Main Street  South; NY 39; START ROUTE; NY 246","ending_cross_street":"Parker Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.00554,42.715925]]}},{"id":"lRpNheOFEvoSea4nJg+vGUD+7bg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 246"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIfd6iHC/i1sm7jN3rtlCSR5V6s="},{"type":"next-occurrence","id":"tDZ8SXjLwSyZnz5XUgQfMVFaMKg="}],"description":"Utility work on NY 246 both directions between Main Street South; NY 39; START ROUTE; NY 246 (Perry) and Parker Lane (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:38:13Z"},"road_event_id":"lRpNheOFEvoSea4nJg+vGUD+7bg=","beginning_cross_street":"Main Street  South; NY 39; START ROUTE; NY 246","ending_cross_street":"Parker Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.00554,42.715925]]}},{"id":"tDZ8SXjLwSyZnz5XUgQfMVFaMKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 246"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIfd6iHC/i1sm7jN3rtlCSR5V6s="},{"type":"next-occurrence","id":"Mk8G5AWG7gyVkI11f3FK6E1Gxwg="}],"description":"Utility work on NY 246 both directions between Main Street South; NY 39; START ROUTE; NY 246 (Perry) and Parker Lane (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:38:13Z"},"road_event_id":"tDZ8SXjLwSyZnz5XUgQfMVFaMKg=","beginning_cross_street":"Main Street  South; NY 39; START ROUTE; NY 246","ending_cross_street":"Parker Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.00554,42.715925]]}},{"id":"Mk8G5AWG7gyVkI11f3FK6E1Gxwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 246"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dIfd6iHC/i1sm7jN3rtlCSR5V6s="}],"description":"Utility work on NY 246 both directions between Main Street South; NY 39; START ROUTE; NY 246 (Perry) and Parker Lane (Perry) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:38:13Z"},"road_event_id":"Mk8G5AWG7gyVkI11f3FK6E1Gxwg=","beginning_cross_street":"Main Street  South; NY 39; START ROUTE; NY 246","ending_cross_street":"Parker Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.00554,42.715925]]}},{"id":"7hQNawJGW5IIqd+nCunPzvXirlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Qo2abUvUtpxEFFNbNyIHpgDFd74="}],"description":"Utility work on US 20A both directions west of NY 39; Pine Tavern (Leicester) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:42:36Z"},"road_event_id":"7hQNawJGW5IIqd+nCunPzvXirlc=","beginning_cross_street":"NY 39; Pine Tavern","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.931113,42.753581]]}},{"id":"Qo2abUvUtpxEFFNbNyIHpgDFd74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7hQNawJGW5IIqd+nCunPzvXirlc="},{"type":"next-occurrence","id":"hOjO70HsS53W8iV1di22A8Ke01E="}],"description":"Utility work on US 20A both directions west of NY 39; Pine Tavern (Leicester) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:42:36Z"},"road_event_id":"Qo2abUvUtpxEFFNbNyIHpgDFd74=","beginning_cross_street":"NY 39; Pine Tavern","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.931113,42.753581]]}},{"id":"hOjO70HsS53W8iV1di22A8Ke01E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7hQNawJGW5IIqd+nCunPzvXirlc="},{"type":"next-occurrence","id":"hykvVhuMQkFqyYac8SuBzDwtatc="}],"description":"Utility work on US 20A both directions west of NY 39; Pine Tavern (Leicester) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:42:36Z"},"road_event_id":"hOjO70HsS53W8iV1di22A8Ke01E=","beginning_cross_street":"NY 39; Pine Tavern","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.931113,42.753581]]}},{"id":"hykvVhuMQkFqyYac8SuBzDwtatc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7hQNawJGW5IIqd+nCunPzvXirlc="},{"type":"next-occurrence","id":"qCBhBW1ULw48qzPfNnfnQmWA0RE="}],"description":"Utility work on US 20A both directions west of NY 39; Pine Tavern (Leicester) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:42:36Z"},"road_event_id":"hykvVhuMQkFqyYac8SuBzDwtatc=","beginning_cross_street":"NY 39; Pine Tavern","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T22:00:00Z","end_date":"2026-05-18T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.931113,42.753581]]}},{"id":"qCBhBW1ULw48qzPfNnfnQmWA0RE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7hQNawJGW5IIqd+nCunPzvXirlc="},{"type":"next-occurrence","id":"AgekPkTjFBiNNho9BKO+1jPj1WU="}],"description":"Utility work on US 20A both directions west of NY 39; Pine Tavern (Leicester) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:42:36Z"},"road_event_id":"qCBhBW1ULw48qzPfNnfnQmWA0RE=","beginning_cross_street":"NY 39; Pine Tavern","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.931113,42.753581]]}},{"id":"AgekPkTjFBiNNho9BKO+1jPj1WU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7hQNawJGW5IIqd+nCunPzvXirlc="},{"type":"next-occurrence","id":"pj/f8VMrWICAIeFn2YSE9NFzzNg="}],"description":"Utility work on US 20A both directions west of NY 39; Pine Tavern (Leicester) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:42:36Z"},"road_event_id":"AgekPkTjFBiNNho9BKO+1jPj1WU=","beginning_cross_street":"NY 39; Pine Tavern","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.931113,42.753581]]}},{"id":"pj/f8VMrWICAIeFn2YSE9NFzzNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7hQNawJGW5IIqd+nCunPzvXirlc="},{"type":"next-occurrence","id":"mi41PpV+zKgrKGsnXJVJtK8aRC0="}],"description":"Utility work on US 20A both directions west of NY 39; Pine Tavern (Leicester) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:42:36Z"},"road_event_id":"pj/f8VMrWICAIeFn2YSE9NFzzNg=","beginning_cross_street":"NY 39; Pine Tavern","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.931113,42.753581]]}},{"id":"mi41PpV+zKgrKGsnXJVJtK8aRC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7hQNawJGW5IIqd+nCunPzvXirlc="}],"description":"Utility work on US 20A both directions west of NY 39; Pine Tavern (Leicester) Alternating lane closures with flaggers as needed, Thursday May 14th, 2026 thru Thursday May 21st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T17:42:36Z"},"road_event_id":"mi41PpV+zKgrKGsnXJVJtK8aRC0=","beginning_cross_street":"NY 39; Pine Tavern","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.931113,42.753581]]}},{"id":"epflTMSotLmVOJk00Qdnu0YQeOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UdLE4/J2LD/8hzPBVgWK2dMAqaE="}],"description":"Utility work on NY 65 northbound at French Rd (Brighton), Wednesday May 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-12T17:50:27Z"},"road_event_id":"epflTMSotLmVOJk00Qdnu0YQeOc=","beginning_cross_street":"French Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T20:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.546961,43.100015]]}},{"id":"UdLE4/J2LD/8hzPBVgWK2dMAqaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epflTMSotLmVOJk00Qdnu0YQeOc="},{"type":"next-occurrence","id":"glZcdVHquRR9NOy/w91vzVxky6w="}],"description":"Utility work on NY 65 northbound at French Rd (Brighton), Wednesday May 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-12T17:50:27Z"},"road_event_id":"UdLE4/J2LD/8hzPBVgWK2dMAqaE=","beginning_cross_street":"French Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T20:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.546961,43.100015]]}},{"id":"glZcdVHquRR9NOy/w91vzVxky6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epflTMSotLmVOJk00Qdnu0YQeOc="},{"type":"next-occurrence","id":"skQDVQWqjRiXAp/XqoKYtfUw+8k="}],"description":"Utility work on NY 65 northbound at French Rd (Brighton), Wednesday May 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-12T17:50:27Z"},"road_event_id":"glZcdVHquRR9NOy/w91vzVxky6w=","beginning_cross_street":"French Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T20:00:00Z","end_date":"2026-05-23T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.546961,43.100015]]}},{"id":"skQDVQWqjRiXAp/XqoKYtfUw+8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epflTMSotLmVOJk00Qdnu0YQeOc="},{"type":"next-occurrence","id":"2ce+zv9i/yWfU33oCSAGGSEBYSk="}],"description":"Utility work on NY 65 northbound at French Rd (Brighton), Wednesday May 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-12T17:50:27Z"},"road_event_id":"skQDVQWqjRiXAp/XqoKYtfUw+8k=","beginning_cross_street":"French Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T20:00:00Z","end_date":"2026-05-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.546961,43.100015]]}},{"id":"2ce+zv9i/yWfU33oCSAGGSEBYSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epflTMSotLmVOJk00Qdnu0YQeOc="},{"type":"next-occurrence","id":"mesLlwbLgJtgyR31uxb2c6KUC2I="}],"description":"Utility work on NY 65 northbound at French Rd (Brighton), Wednesday May 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-12T17:50:27Z"},"road_event_id":"2ce+zv9i/yWfU33oCSAGGSEBYSk=","beginning_cross_street":"French Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T20:00:00Z","end_date":"2026-05-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.546961,43.100015]]}},{"id":"mesLlwbLgJtgyR31uxb2c6KUC2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epflTMSotLmVOJk00Qdnu0YQeOc="}],"description":"Utility work on NY 65 northbound at French Rd (Brighton), Wednesday May 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-12T17:50:27Z"},"road_event_id":"mesLlwbLgJtgyR31uxb2c6KUC2I=","beginning_cross_street":"French Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T20:00:00Z","end_date":"2026-05-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.546961,43.100015]]}},{"id":"lAcd10gaH8lbzFFNHrTJTuxgSV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[],"description":"Line striping on NY 50 both directions between Ballard Road; CR 33 (Wilton) and NY 32 (Northumberland) various short term closures, Wednesday May 13th, 2026, 06:30 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T17:55:00Z"},"road_event_id":"lAcd10gaH8lbzFFNHrTJTuxgSV0=","beginning_cross_street":"Ballard Road; CR 33","ending_cross_street":"NY 32","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:30:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.6814,43.15318]]}},{"id":"MPuyJc35+qJUhC4ZCHp4Ju5EsxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 197"],"direction":"unknown","related_road_events":[],"description":"Line striping on NY 197 both directions between Saratoga Road; US 9 (Moreau) and Town of Moreau; Town of Fort Edward Line (Moreau) various short term closures, Wednesday May 13th, 2026, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-12T17:57:29Z"},"road_event_id":"MPuyJc35+qJUhC4ZCHp4Ju5EsxA=","beginning_cross_street":"Saratoga Road; US 9","ending_cross_street":"Town of Moreau; Town of Fort Edward Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.670635,43.250058]]}},{"id":"pKgPSiIxXnQ7tBvgd6KRCDBxPAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ShcgkaC2O5Y2IyfQ9qVx7BtfAWw="}],"description":"Construction on NY 63 northbound approaching Alleghany Road (Alabama), Friday May 15th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:30 PM right shoulder closed","update_date":"2026-05-12T18:00:40Z"},"road_event_id":"pKgPSiIxXnQ7tBvgd6KRCDBxPAk=","beginning_cross_street":"Alleghany Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.384376,43.074414]]}},{"id":"ShcgkaC2O5Y2IyfQ9qVx7BtfAWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pKgPSiIxXnQ7tBvgd6KRCDBxPAk="},{"type":"next-occurrence","id":"iN2FU3OrTENmxGlkJOEMClrhpSU="}],"description":"Construction on NY 63 northbound approaching Alleghany Road (Alabama), Friday May 15th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:30 PM right shoulder closed","update_date":"2026-05-12T18:00:40Z"},"road_event_id":"ShcgkaC2O5Y2IyfQ9qVx7BtfAWw=","beginning_cross_street":"Alleghany Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T20:00:00Z","end_date":"2026-05-19T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.384376,43.074414]]}},{"id":"iN2FU3OrTENmxGlkJOEMClrhpSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pKgPSiIxXnQ7tBvgd6KRCDBxPAk="},{"type":"next-occurrence","id":"utBGGctXtd5uGed+ehgZxXmU2Qw="}],"description":"Construction on NY 63 northbound approaching Alleghany Road (Alabama), Friday May 15th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:30 PM right shoulder closed","update_date":"2026-05-12T18:00:40Z"},"road_event_id":"iN2FU3OrTENmxGlkJOEMClrhpSU=","beginning_cross_street":"Alleghany Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T20:00:00Z","end_date":"2026-05-20T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.384376,43.074414]]}},{"id":"utBGGctXtd5uGed+ehgZxXmU2Qw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pKgPSiIxXnQ7tBvgd6KRCDBxPAk="},{"type":"next-occurrence","id":"uNiZvSEqQ+qKgQ+HMlJHjtzmLLI="}],"description":"Construction on NY 63 northbound approaching Alleghany Road (Alabama), Friday May 15th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:30 PM right shoulder closed","update_date":"2026-05-12T18:00:40Z"},"road_event_id":"utBGGctXtd5uGed+ehgZxXmU2Qw=","beginning_cross_street":"Alleghany Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T20:00:00Z","end_date":"2026-05-21T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.384376,43.074414]]}},{"id":"uNiZvSEqQ+qKgQ+HMlJHjtzmLLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pKgPSiIxXnQ7tBvgd6KRCDBxPAk="}],"description":"Construction on NY 63 northbound approaching Alleghany Road (Alabama), Friday May 15th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:30 PM right shoulder closed","update_date":"2026-05-12T18:00:40Z"},"road_event_id":"uNiZvSEqQ+qKgQ+HMlJHjtzmLLI=","beginning_cross_street":"Alleghany Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T20:00:00Z","end_date":"2026-05-22T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.384376,43.074414]]}},{"id":"agKXV0RnK4IbSBawiOe8gl2YiK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 66"],"direction":"unknown","related_road_events":[],"description":"Street sweeping on NY 66 both directions between Evergreen Dr (North Greenbush) and Victoria Ave (Brunswick) lane encroachment, Wednesday May 13th, 2026, 08:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-12T18:01:50Z"},"road_event_id":"agKXV0RnK4IbSBawiOe8gl2YiK8=","beginning_cross_street":"Evergreen Dr","ending_cross_street":"Victoria Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.623607,42.691141]]}},{"id":"QdFQnwDHJ6ST/BmTQ9yRlcZUK9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near North of CR 607/Lackawanna Dr (Byram Twp), Friday May 15, 2026 09:00 AM thru 03:30 PM, right shoulder closed, moving operation","update_date":"2026-05-12T18:21:24Z"},"road_event_id":"QdFQnwDHJ6ST/BmTQ9yRlcZUK9M=","beginning_cross_street":"North of CR 607/Lackawanna Dr","ending_cross_street":"North of CR 607/Lackawanna Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.72084,40.934932]]}},{"id":"o5wKn20ptKWLrjYnVRP6HuI7Uhk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound near West of Hackensack Av (Hackensack), Friday May 15, 2026 11:00 PM thru Saturday May 16, 2026 03:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 03:00 AM)","update_date":"2026-05-12T18:21:25Z"},"road_event_id":"o5wKn20ptKWLrjYnVRP6HuI7Uhk=","beginning_cross_street":"West of Hackensack Av","ending_cross_street":"East of River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033966,40.906692]]}},{"id":"hBy6ZSUiMOjARErOuZi0Lys5PXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between Racetrack Rd (East Brunswick Twp) and West Prospect St (East Brunswick Twp), Friday May 15, 2026 10:00 PM thru Saturday May 16, 2026 05:00 AM, at least one lane closed","update_date":"2026-05-12T18:21:26Z"},"road_event_id":"hBy6ZSUiMOjARErOuZi0Lys5PXo=","beginning_cross_street":"Racetrack Rd","ending_cross_street":"West Prospect St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.383468,40.428588]]}},{"id":"08fXjFcLFSYJhx369VBHZZYLIJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between Racetrack Rd (East Brunswick Twp) and West Prospect St (East Brunswick Twp), Thursday May 14, 2026 10:00 PM thru Friday May 15, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-12T18:21:16Z"},"road_event_id":"08fXjFcLFSYJhx369VBHZZYLIJ4=","beginning_cross_street":"Racetrack Rd","ending_cross_street":"West Prospect St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.383468,40.428588]]}},{"id":"C9hBR96nO4A14C3IxWTm98iVKxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between Racetrack Rd (East Brunswick Twp) and West Prospect St (East Brunswick Twp), Friday May 15, 2026 10:00 PM thru Saturday May 16, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-12T18:21:17Z"},"road_event_id":"C9hBR96nO4A14C3IxWTm98iVKxA=","beginning_cross_street":"Racetrack Rd","ending_cross_street":"West Prospect St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T00:00:00Z","end_date":"2026-05-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.383468,40.428588]]}},{"id":"pGnKc0y6/08E//vj2miy3Mjg/3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between Racetrack Rd (East Brunswick Twp) and West Prospect St (East Brunswick Twp), Thursday May 14, 2026 10:00 PM thru Friday May 15, 2026 05:00 AM, at least one lane closed","update_date":"2026-05-12T18:21:18Z"},"road_event_id":"pGnKc0y6/08E//vj2miy3Mjg/3M=","beginning_cross_street":"Racetrack Rd","ending_cross_street":"West Prospect St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.383468,40.428588]]}},{"id":"De+83ZA91+8M54+0Su7g91PplE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound near West of Hackensack Av (Hackensack), Friday May 15, 2026 03:00 AM thru 06:00 AM, at least one lane closed, (2nd lane closed from 03:00 AM to 05:00 AM)","update_date":"2026-05-12T18:21:20Z"},"road_event_id":"De+83ZA91+8M54+0Su7g91PplE4=","beginning_cross_street":"West of Hackensack Av","ending_cross_street":"East of River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033966,40.906692]]}},{"id":"7yET6EEgzpW6gJ2Ukh+f2d/9f8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound between North of Wantage School Rd (Wantage Twp) and South of Brink Rd (Wantage Twp), Thursday May 14, 2026 09:00 AM thru 03:30 PM, right shoulder closed, moving operation","update_date":"2026-05-12T18:21:21Z"},"road_event_id":"7yET6EEgzpW6gJ2Ukh+f2d/9f8E=","beginning_cross_street":"North of Wantage School Rd","ending_cross_street":"South of Brink Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.618453,41.234889]]}},{"id":"2jzC8fsZfXgaDK2H0fBKZG8dSYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound near South of US 46 (White Twp), Tuesday May 19, 2026 09:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-12T18:21:11Z"},"road_event_id":"2jzC8fsZfXgaDK2H0fBKZG8dSYw=","beginning_cross_street":"South of US 46","ending_cross_street":"South of US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.999511,40.829406]]}},{"id":"VqEnmyP82r5ddcyKcPlh8jkPWyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound between South of Birchwood Dr (Old Bridge Twp) and CR 689/Lawrence Pkwy (Old Bridge Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-12T18:21:12Z"},"road_event_id":"VqEnmyP82r5ddcyKcPlh8jkPWyY=","beginning_cross_street":"South of Birchwood Dr","ending_cross_street":"CR 689/Lawrence Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.234275,40.446685]]}},{"id":"xShQPkUDfcNJ+4qqEtOH2jx2bOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between West of Exit 36 - CR 651 (Warren Twp) and East of Exit 33 - CR 525/Liberty Corner Rd/Martinsville (Warren Twp), Wednesday May 13, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-05-12T18:21:13Z"},"road_event_id":"xShQPkUDfcNJ+4qqEtOH2jx2bOs=","beginning_cross_street":"West of Exit 36 - CR 651","ending_cross_street":"East of Exit 33 - CR 525/Liberty Corner Rd/Martinsville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.533447,40.647079]]}},{"id":"HfQEU9w4wydQpZyTconQOLBMVgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound near South of CR 631/Franklin Av (Franklin Twp), Friday May 15, 2026 09:00 AM thru 03:30 PM, right shoulder closed, moving operation","update_date":"2026-05-12T18:21:14Z"},"road_event_id":"HfQEU9w4wydQpZyTconQOLBMVgE=","beginning_cross_street":"South of CR 631/Franklin Av","ending_cross_street":"North of CR 631/Franklin Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.581222,41.106716]]}},{"id":"klWhOPHN8bZ6sZg0ddATQxImAmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between Racetrack Rd (East Brunswick Twp) and West Prospect St (East Brunswick Twp), Wednesday May 13, 2026 10:00 PM thru Thursday May 14, 2026 05:00 AM, at least one lane closed","update_date":"2026-05-12T18:21:05Z"},"road_event_id":"klWhOPHN8bZ6sZg0ddATQxImAmg=","beginning_cross_street":"Racetrack Rd","ending_cross_street":"West Prospect St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.383468,40.428588]]}},{"id":"Ff3XgQqz2dUnZq1dzL/DfczFlT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between West of Hackensack Av (Hackensack) and East of River Rd (Teaneck Twp), Friday May 15, 2026 11:00 PM thru Saturday May 16, 2026 03:00 AM, at least one lane closed","update_date":"2026-05-12T18:21:06Z"},"road_event_id":"Ff3XgQqz2dUnZq1dzL/DfczFlT4=","beginning_cross_street":"West of Hackensack Av","ending_cross_street":"East of River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033966,40.906692]]}},{"id":"w6BcuvyaA/Fu0l9GcU2Mwfut0LI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between Racetrack Rd (East Brunswick Twp) and West Prospect St (East Brunswick Twp), Wednesday May 13, 2026 10:00 PM thru Thursday May 14, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-12T18:21:08Z"},"road_event_id":"w6BcuvyaA/Fu0l9GcU2Mwfut0LI=","beginning_cross_street":"Racetrack Rd","ending_cross_street":"West Prospect St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.383468,40.428588]]}},{"id":"H2ahr5G/6ZFnVFbNOLvcS0rwHqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between West of Hackensack Av (Hackensack) and East of River Rd (Teaneck Twp), Friday May 15, 2026 03:00 AM thru 06:00 AM, at least one lane closed","update_date":"2026-05-12T18:21:09Z"},"road_event_id":"H2ahr5G/6ZFnVFbNOLvcS0rwHqc=","beginning_cross_street":"West of Hackensack Av","ending_cross_street":"East of River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033966,40.906692]]}},{"id":"acGN0LFQlAl+17b5COgKXYcpBp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound near South of College Farm Rd (North Brunswick Twp), Wednesday May 13, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-12T18:21:10Z"},"road_event_id":"acGN0LFQlAl+17b5COgKXYcpBp4=","beginning_cross_street":"South of College Farm Rd","ending_cross_street":"North of College Farm Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.435821,40.468242]]}},{"id":"Xu99/Zj8M2/PHHWLbyHm96+IZ10=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 15"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 15 Northbound between North of NJ 181/Espanong Rd/Weldon Rd (Jefferson Twp) and South of Blue Heron Dr (Sparta Twp), Wednesday May 13, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-12T18:21:27Z"},"road_event_id":"Xu99/Zj8M2/PHHWLbyHm96+IZ10=","beginning_cross_street":"North of NJ 181/Espanong Rd/Weldon Rd","ending_cross_street":"South of Blue Heron Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.602378,40.987091]]}},{"id":"U+3ljNKGeN4ybaxl/1iic7RJ/EQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-787"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yjBz4uoZbaqIjszxqluqylDgyqk="}],"description":"Bridge painting on I-787 northbound ramp from NYS Thruway (Albany), Wednesday May 13th, 2026, 04:00 PM thru 06:00 PM right shoulder closed, Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 06:00 PM thru 12:00 AM 1 Right lane of 2 lanes closed, Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 12:00 AM thru 06:00 PM right shoulder closed","update_date":"2026-05-12T18:45:01Z"},"road_event_id":"U+3ljNKGeN4ybaxl/1iic7RJ/EQ=","beginning_cross_street":"ramp from NYS Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.77344,42.63254]]}},{"id":"yjBz4uoZbaqIjszxqluqylDgyqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-787"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+3ljNKGeN4ybaxl/1iic7RJ/EQ="},{"type":"next-occurrence","id":"3hlNrPoAo+Yw1JecbkQZ1xjgTH8="}],"description":"Bridge painting on I-787 northbound ramp from NYS Thruway (Albany), Wednesday May 13th, 2026, 04:00 PM thru 06:00 PM right shoulder closed, Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 06:00 PM thru 12:00 AM 1 Right lane of 2 lanes closed, Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 12:00 AM thru 06:00 PM right shoulder closed","update_date":"2026-05-12T18:45:01Z"},"road_event_id":"yjBz4uoZbaqIjszxqluqylDgyqk=","beginning_cross_street":"ramp from NYS Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T16:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.77344,42.63254]]}},{"id":"3hlNrPoAo+Yw1JecbkQZ1xjgTH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-787"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+3ljNKGeN4ybaxl/1iic7RJ/EQ="}],"description":"Bridge painting on I-787 northbound ramp from NYS Thruway (Albany), Wednesday May 13th, 2026, 04:00 PM thru 06:00 PM right shoulder closed, Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 06:00 PM thru 12:00 AM 1 Right lane of 2 lanes closed, Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 12:00 AM thru 06:00 PM right shoulder closed","update_date":"2026-05-12T18:45:01Z"},"road_event_id":"3hlNrPoAo+Yw1JecbkQZ1xjgTH8=","beginning_cross_street":"ramp from NYS Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T04:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.77344,42.63254]]}},{"id":"3d2c43RUN+Df3Sby1KXTW6BDucg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 15 westbound at 6245 VanZandt Rd (Livonia) Moving road set up for cable repair on Rt.15 in Livonia, Wednesday May 13th, 2026, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T18:48:47Z"},"road_event_id":"3d2c43RUN+Df3Sby1KXTW6BDucg=","beginning_cross_street":"6245 VanZandt Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.684008,42.806886]]}},{"id":"WalN0ruAjfB+aLSyYIc/VawbhIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 228"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Q5gI9et6KQJp6z5X0vrONuFERoQ="}],"description":"Drainage improvements on NY 228 both directions START NY 79 overlap (Hector) 2 lanes reduced to 1, Wednesday May 13th, 2026 thru Thursday May 14th, 2026, Wednesday/Thursday, 07:30 AM thru 02:30 PM All lanes open","update_date":"2026-05-12T19:00:48Z"},"road_event_id":"WalN0ruAjfB+aLSyYIc/VawbhIU=","beginning_cross_street":"START NY 79 overlap","ending_cross_street":"START NY 79 overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:30:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.716053,42.450863]]}},{"id":"Q5gI9et6KQJp6z5X0vrONuFERoQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 228"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WalN0ruAjfB+aLSyYIc/VawbhIU="}],"description":"Drainage improvements on NY 228 both directions START NY 79 overlap (Hector) 2 lanes reduced to 1, Wednesday May 13th, 2026 thru Thursday May 14th, 2026, Wednesday/Thursday, 07:30 AM thru 02:30 PM All lanes open","update_date":"2026-05-12T19:00:48Z"},"road_event_id":"Q5gI9et6KQJp6z5X0vrONuFERoQ=","beginning_cross_street":"START NY 79 overlap","ending_cross_street":"START NY 79 overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T11:30:00Z","end_date":"2026-05-14T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.716053,42.450863]]}},{"id":"CpYntDqdHqh+Cqj744WvtFcUFBY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[],"description":"Guard rail repairs on NY 9N both directions between Porter Mill Road (Crown Point) and Goodrich Road (Crown Point) alternating lanes with flaggers, Wednesday May 13th, 2026, 07:00 AM thru 11:00 PM All lanes open","update_date":"2026-05-12T19:01:11Z"},"road_event_id":"CpYntDqdHqh+Cqj744WvtFcUFBY=","beginning_cross_street":"Porter Mill Road","ending_cross_street":"Goodrich Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-14T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.432967,43.954612]]}},{"id":"DEFFxvPqP7sSIn/4d0vEbuqWIKo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 185"],"direction":"unknown","related_road_events":[],"description":"Guard rail repairs on NY 185 both directions between Route 9N (Crown Point) and Long Acres lane (Crown Point) alternating lanes with flaggers , Wednesday May 13th, 2026 thru Wednesday May 13th, 2026, 12:00 PM thru 02:30 PM All lanes open","update_date":"2026-05-12T19:09:39Z"},"road_event_id":"DEFFxvPqP7sSIn/4d0vEbuqWIKo=","beginning_cross_street":"Route 9N","ending_cross_street":"Long Acres lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:00:00Z","end_date":"2026-05-14T06:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.454842,43.996855]]}},{"id":"qapUvGfRKywYfj6pyz3nkoedDqU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 73"],"direction":"unknown","related_road_events":[],"description":"Tree trimming on NY 73 both directions between Rooster Comb (Keene) and US 9 at I-87 Exit 30 (North Hudson) Alternating lanes with flaggers , Wednesday May 13th, 2026 thru Wednesday May 13th, 2026, 12:00 PM thru 02:30 PM All lanes open","update_date":"2026-05-12T19:21:18Z"},"road_event_id":"qapUvGfRKywYfj6pyz3nkoedDqU=","beginning_cross_street":"Rooster Comb ","ending_cross_street":"I-87 Exit 30","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:00:00Z","end_date":"2026-05-14T06:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.782604,44.17547]]}},{"id":"9S3KdX1oKJMDTxoj6YdJ2PRB+Ik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Repaving on New Jersey Turnpike Inner Roadway southbound between South of Interchange 8A - NJ 32 (Monroe Twp) and North of Interchange 8 - NJ 33 (Cranbury Twp), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 07:00 PM thru 05:45 AM 1 Left lane of 3 lanes closed, Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 09:00 PM thru 05:45 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-12T19:13:58Z"},"road_event_id":"9S3KdX1oKJMDTxoj6YdJ2PRB+Ik=","beginning_cross_street":"South of Interchange 8A - NJ 32","ending_cross_street":"North of Interchange 8 - NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.476716,40.343607]]}},{"id":"XBZt8HNOIajJr+bhQ4YCXGuMPD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike Outer Roadway northbound Entrance ramp Interchange 8A - NJ 32 (Monroe Twp), Wednesday May 13th, 2026 thru Thursday May 14th, 2026, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-12T19:16:08Z"},"road_event_id":"XBZt8HNOIajJr+bhQ4YCXGuMPD0=","beginning_cross_street":"Interchange 8A - NJ 32","ending_cross_street":"Interchange 8A - NJ 32","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.4712,40.350384]]}},{"id":"RwzIC6pTFsAhOPaJr2ZPJI7haFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Bridge painting on New Jersey Turnpike Outer Roadway southbound Entrance ramp Interchange 11 - Garden State Parkway (Woodbridge Twp), Wednesday May 13th, 2026, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T19:18:14Z"},"road_event_id":"RwzIC6pTFsAhOPaJr2ZPJI7haFg=","beginning_cross_street":"Interchange 11 - Garden State Parkway","ending_cross_street":"Interchange 11 - Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.294215,40.541682]]}},{"id":"eOfvKCyY3hRElzDxLkJA/8uv2ck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 eastbound between 45th Street (New York) and I-478 at Woodhull Street (Brooklyn) Subject to change without notice., Friday May 15th, 2026 thru Saturday May 16th, 2026, 11:00 PM thru 09:00 AM 1 Left lane of 3 lanes closed HOV lanes","update_date":"2026-05-12T19:19:46Z"},"road_event_id":"eOfvKCyY3hRElzDxLkJA/8uv2ck=","beginning_cross_street":"45th Street","ending_cross_street":"Woodhull Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T02:00:00Z","end_date":"2026-05-17T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.012117,40.649939]]}},{"id":"SU0lgsLeDIdceNCkRJCjiFUseaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 73 both directions between Mountain lane (North Elba) and Timber lane (North Elba) (Ditching) alternating lanes with flaggers , Wednesday May 13th, 2026 thru Wednesday May 13th, 2026, 12:00 PM thru 02:30 PM All lanes open","update_date":"2026-05-12T19:20:13Z"},"road_event_id":"SU0lgsLeDIdceNCkRJCjiFUseaU=","beginning_cross_street":"Mountain lane","ending_cross_street":"Timber lane ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:00:00Z","end_date":"2026-05-14T06:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912779,44.236879]]}},{"id":"cO0pm1XwopGErasUAE2lZSiL60g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Hudson County Extension"],"direction":"unknown","related_road_events":[],"description":"Emergency repairs and pothole repair on New Jersey Turnpike - Hudson County Extension eastbound between East of Interchange 14C - Toll Plaza (Jersey City) and Jersey Ave/Holland Tunnel (Jersey City), Wednesday May 13th, 2026, 10:00 AM thru 03:00 PM 1 Left lane of 7 lanes closed","update_date":"2026-05-12T19:21:16Z"},"road_event_id":"cO0pm1XwopGErasUAE2lZSiL60g=","beginning_cross_street":"East of Interchange 14C - Toll Plaza","ending_cross_street":"Jersey Ave/Holland Tunnel","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.061761,40.706263]]}},{"id":"fiNy9JwTwgzdxRjrPc79+JUzQNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 86"],"direction":"unknown","related_road_events":[],"description":"Tree trimming on NY 86 both directions between Cobble Hill Road (North Elba) and NY 9N (Jay) alternating lanes , Wednesday May 13th, 2026, 07:00 AM thru 12:00 PM All lanes open","update_date":"2026-05-12T19:23:19Z"},"road_event_id":"fiNy9JwTwgzdxRjrPc79+JUzQNA=","beginning_cross_street":"Cobble Hill Road","ending_cross_street":"NY 9N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.963326,44.287729]]}},{"id":"YAJ+ztEccUJ6UqWVr3OVJpIk9Ao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[],"description":"Road rehabilitation on Bronx River Parkway both directions City of Yonkers; City of New York Line (Yonkers) to Palmer Avenue (Yonkers) There will be single lane closures within the above limits, Continuous Tuesday May 5th, 2026 12:00 AM thru Monday April 19th, 2027 11:59 PM All lanes open","update_date":"2026-05-12T19:52:49Z"},"road_event_id":"YAJ+ztEccUJ6UqWVr3OVJpIk9Ao=","beginning_cross_street":"City of Yonkers; City of New York Line","ending_cross_street":"Palmer Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860711,40.900907]]}},{"id":"VQek+5JEqC31ifwpBmFVVKuP2T0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CENTRAL PARK AVE"],"direction":"unknown","related_road_events":[],"description":"Road rehabilitation on CENTRAL PARK AVE both directions between PARKWAY N (Yonkers) and NY 100 at Palmer Road (Yonkers) There will be single lane closures within the above limits, Continuous Tuesday May 5th, 2026 12:00 AM thru Monday April 19th, 2027 11:59 PM All lanes open","update_date":"2026-05-12T19:59:21Z"},"road_event_id":"VQek+5JEqC31ifwpBmFVVKuP2T0=","beginning_cross_street":"PARKWAY N","ending_cross_street":"Palmer Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87786,40.905977]]}},{"id":"zVBx4gu18wkCa9ImmAJY+T+njfo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 124"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 124 Westbound near CR 527/Morris Av (Millburn Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-12T20:06:13Z"},"road_event_id":"zVBx4gu18wkCa9ImmAJY+T+njfo=","beginning_cross_street":"CR 527/Morris Av","ending_cross_street":"Cleveland Pl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.327774,40.718101]]}},{"id":"hd9g62bgU1s9KK94b2NznhEZZ7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound between West of New Jersey Turnpike - Western Spur (East Rutherford) and East of NJ 17 (Rutherford), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 06:00 AM, right lane closed","update_date":"2026-05-12T20:06:14Z"},"road_event_id":"hd9g62bgU1s9KK94b2NznhEZZ7U=","beginning_cross_street":"West of New Jersey Turnpike - Western Spur","ending_cross_street":"East of NJ 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.082901,40.810001]]}},{"id":"zRAwNTD0JuPalK6YjkQUFRNIQHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound near North of Eggers St/South Woodland Av (East Brunswick Twp), Wednesday May 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-12T20:06:15Z"},"road_event_id":"zRAwNTD0JuPalK6YjkQUFRNIQHQ=","beginning_cross_street":"North of Eggers St/South Woodland Av","ending_cross_street":"South of New Jersey Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.408668,40.470127]]}},{"id":"mopJSIXMxcLwk413wKCqjMLuDjw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound near East of Berrys Creek Bridge (East Rutherford), Friday May 15, 2026 08:00 PM thru Saturday May 16, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-12T20:06:16Z"},"road_event_id":"mopJSIXMxcLwk413wKCqjMLuDjw=","beginning_cross_street":"East of Berrys Creek Bridge","ending_cross_street":"West of New Jersey Turnpike - Western Spur","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T20:00:00Z","end_date":"2026-05-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.090339,40.811038]]}},{"id":"AsPKEKsu/W+/DvNaLv9PcaVtom8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Southbound near North of US 9/Garden State Parkway (Woodbridge Twp), Thursday May 14, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-12T20:06:18Z"},"road_event_id":"AsPKEKsu/W+/DvNaLv9PcaVtom8=","beginning_cross_street":"North of US 9/Garden State Parkway","ending_cross_street":"North of US 9/Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.299438,40.519279]]}},{"id":"gumv41rx683XyFn8/7ODw0MJeoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Southbound near North of US 9/Garden State Parkway (Woodbridge Twp), Friday May 15, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-12T20:06:19Z"},"road_event_id":"gumv41rx683XyFn8/7ODw0MJeoU=","beginning_cross_street":"North of US 9/Garden State Parkway","ending_cross_street":"North of US 9/Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.299438,40.519279]]}},{"id":"Uudno3HoMD6ysnQPwCNWliDTPPg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Southbound near North of US 9/Garden State Parkway (Woodbridge Twp), Wednesday May 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-12T20:06:20Z"},"road_event_id":"Uudno3HoMD6ysnQPwCNWliDTPPg=","beginning_cross_street":"North of US 9/Garden State Parkway","ending_cross_street":"North of US 9/Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.299438,40.519279]]}},{"id":"9XvyO2DlDlrWTvsv570FOna7B5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near CR 656/Smith St (Woodbridge Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, left lane closed local lane","update_date":"2026-05-12T20:06:22Z"},"road_event_id":"9XvyO2DlDlrWTvsv570FOna7B5g=","beginning_cross_street":"CR 656/Smith St","ending_cross_street":"South of CR 616/New Brunswick Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.299865,40.516532]]}},{"id":"G31UZ+nuWS0m02ujt8NF26Wh2M8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Southbound near North of Maple Ave (Glen Rock), Wednesday May 13, 2026 10:00 PM thru Thursday May 14, 2026 06:00 AM,","update_date":"2026-05-12T20:06:10Z"},"road_event_id":"G31UZ+nuWS0m02ujt8NF26Wh2M8=","beginning_cross_street":"North of Maple Ave","ending_cross_street":"South of Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.138366,40.951374]]}},{"id":"QjwWPTC6uj+HJ4twU19nbkwFDsY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound between West of New Jersey Turnpike - Western Spur (East Rutherford) and East of NJ 17 (Rutherford), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 06:00 AM, right lane closed","update_date":"2026-05-12T20:06:09Z"},"road_event_id":"QjwWPTC6uj+HJ4twU19nbkwFDsY=","beginning_cross_street":"West of New Jersey Turnpike - Western Spur","ending_cross_street":"East of NJ 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.082901,40.810001]]}},{"id":"awrkUJijooLg+7ppwT+onx5LhqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound near North of Eggers St/South Woodland Av (East Brunswick Twp), Thursday May 14, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-12T20:06:06Z"},"road_event_id":"awrkUJijooLg+7ppwT+onx5LhqM=","beginning_cross_street":"North of Eggers St/South Woodland Av","ending_cross_street":"South of New Jersey Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.408668,40.470127]]}},{"id":"T9TRJXv8lSTKSr7MzvHMS72r7VQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound near North of Eggers St/South Woodland Av (East Brunswick Twp), Friday May 15, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-12T20:06:07Z"},"road_event_id":"T9TRJXv8lSTKSr7MzvHMS72r7VQ=","beginning_cross_street":"North of Eggers St/South Woodland Av","ending_cross_street":"South of New Jersey Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.408668,40.470127]]}},{"id":"sm81bJ5NxcBLWB43Tz75uTVjxLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2aDQ5TwqsAHmYjfF1xwbUZEaHes="}],"description":"Utility work on NY 36 northbound between Hessler Ct (North Dansville) and Flats Rd (West Sparta) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T20:26:16Z"},"road_event_id":"sm81bJ5NxcBLWB43Tz75uTVjxLA=","beginning_cross_street":"Hessler Ct","ending_cross_street":"Flats Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.709285,42.563168]]}},{"id":"2aDQ5TwqsAHmYjfF1xwbUZEaHes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sm81bJ5NxcBLWB43Tz75uTVjxLA="},{"type":"next-occurrence","id":"1ZJ/okEMXIPh4rY7DBaEpjawYFw="}],"description":"Utility work on NY 36 northbound between Hessler Ct (North Dansville) and Flats Rd (West Sparta) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T20:26:16Z"},"road_event_id":"2aDQ5TwqsAHmYjfF1xwbUZEaHes=","beginning_cross_street":"Hessler Ct","ending_cross_street":"Flats Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.709285,42.563168]]}},{"id":"1ZJ/okEMXIPh4rY7DBaEpjawYFw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sm81bJ5NxcBLWB43Tz75uTVjxLA="}],"description":"Utility work on NY 36 northbound between Hessler Ct (North Dansville) and Flats Rd (West Sparta) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings., Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T20:26:16Z"},"road_event_id":"1ZJ/okEMXIPh4rY7DBaEpjawYFw=","beginning_cross_street":"Hessler Ct","ending_cross_street":"Flats Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.709285,42.563168]]}},{"id":"3RA/AaWGIrqnFd+mHF5YpXO7PuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VBQhpjTfJFjiIpDuxZCRJPMWuuM="}],"description":"Utility work on NY 31 eastbound at 2035 Monroe Ave (Brighton) We need to repair RG+E hand hole located in tree lawn in front of address. Single Lane swing will be for worker protection to make repairs. , Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 08:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T20:32:00Z"},"road_event_id":"3RA/AaWGIrqnFd+mHF5YpXO7PuQ=","beginning_cross_street":"2035 Monroe Ave ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.56267,43.1247]]}},{"id":"VBQhpjTfJFjiIpDuxZCRJPMWuuM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3RA/AaWGIrqnFd+mHF5YpXO7PuQ="}],"description":"Utility work on NY 31 eastbound at 2035 Monroe Ave (Brighton) We need to repair RG+E hand hole located in tree lawn in front of address. Single Lane swing will be for worker protection to make repairs. , Thursday May 14th, 2026 thru Friday May 15th, 2026, Thursday/Friday, 08:00 AM thru 03:00 PM All lanes","update_date":"2026-05-12T20:32:00Z"},"road_event_id":"VBQhpjTfJFjiIpDuxZCRJPMWuuM=","beginning_cross_street":"2035 Monroe Ave ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.56267,43.1247]]}},{"id":"Ac17OKgtEU/7CJ8mlJa5rqp8twk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fXORfdk0DL+MnhTEjfe+eWSVVxI="}],"description":"Utility work on NY 441 westbound at Brentwood Dr (Penfield) REPLACE (4) POLES AND INSTALL (2) NEW POLES IN ROW NEAR 2002 PENFIELD RD (NYS 441) AND BRENTWOOD DR AT MM 441 43011044 , Thursday May 14th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Tuesday/Thursday/Friday/Saturday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-12T20:35:28Z"},"road_event_id":"Ac17OKgtEU/7CJ8mlJa5rqp8twk=","beginning_cross_street":"Brentwood Dr","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.45723,43.131099]]}},{"id":"fXORfdk0DL+MnhTEjfe+eWSVVxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ac17OKgtEU/7CJ8mlJa5rqp8twk="},{"type":"next-occurrence","id":"ZxIR6G5UFGxd7Ez9TLkwR3pu0Ps="}],"description":"Utility work on NY 441 westbound at Brentwood Dr (Penfield) REPLACE (4) POLES AND INSTALL (2) NEW POLES IN ROW NEAR 2002 PENFIELD RD (NYS 441) AND BRENTWOOD DR AT MM 441 43011044 , Thursday May 14th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Tuesday/Thursday/Friday/Saturday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-12T20:35:28Z"},"road_event_id":"fXORfdk0DL+MnhTEjfe+eWSVVxI=","beginning_cross_street":"Brentwood Dr","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.45723,43.131099]]}},{"id":"ZxIR6G5UFGxd7Ez9TLkwR3pu0Ps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ac17OKgtEU/7CJ8mlJa5rqp8twk="},{"type":"next-occurrence","id":"Z0smAuxFNmYsvo5TnhL5hIe9mr4="}],"description":"Utility work on NY 441 westbound at Brentwood Dr (Penfield) REPLACE (4) POLES AND INSTALL (2) NEW POLES IN ROW NEAR 2002 PENFIELD RD (NYS 441) AND BRENTWOOD DR AT MM 441 43011044 , Thursday May 14th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Tuesday/Thursday/Friday/Saturday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-12T20:35:28Z"},"road_event_id":"ZxIR6G5UFGxd7Ez9TLkwR3pu0Ps=","beginning_cross_street":"Brentwood Dr","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T22:00:00Z","end_date":"2026-05-17T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.45723,43.131099]]}},{"id":"Z0smAuxFNmYsvo5TnhL5hIe9mr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ac17OKgtEU/7CJ8mlJa5rqp8twk="},{"type":"next-occurrence","id":"nxjZlAqrMtN6wZ4xS+HbTCVvJ9U="}],"description":"Utility work on NY 441 westbound at Brentwood Dr (Penfield) REPLACE (4) POLES AND INSTALL (2) NEW POLES IN ROW NEAR 2002 PENFIELD RD (NYS 441) AND BRENTWOOD DR AT MM 441 43011044 , Thursday May 14th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Tuesday/Thursday/Friday/Saturday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-12T20:35:28Z"},"road_event_id":"Z0smAuxFNmYsvo5TnhL5hIe9mr4=","beginning_cross_street":"Brentwood Dr","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T22:00:00Z","end_date":"2026-05-18T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.45723,43.131099]]}},{"id":"nxjZlAqrMtN6wZ4xS+HbTCVvJ9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ac17OKgtEU/7CJ8mlJa5rqp8twk="},{"type":"next-occurrence","id":"pgJ3vTxdfSgyCB4LxZ4CDVebbBU="}],"description":"Utility work on NY 441 westbound at Brentwood Dr (Penfield) REPLACE (4) POLES AND INSTALL (2) NEW POLES IN ROW NEAR 2002 PENFIELD RD (NYS 441) AND BRENTWOOD DR AT MM 441 43011044 , Thursday May 14th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Tuesday/Thursday/Friday/Saturday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-12T20:35:28Z"},"road_event_id":"nxjZlAqrMtN6wZ4xS+HbTCVvJ9U=","beginning_cross_street":"Brentwood Dr","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.45723,43.131099]]}},{"id":"pgJ3vTxdfSgyCB4LxZ4CDVebbBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ac17OKgtEU/7CJ8mlJa5rqp8twk="}],"description":"Utility work on NY 441 westbound at Brentwood Dr (Penfield) REPLACE (4) POLES AND INSTALL (2) NEW POLES IN ROW NEAR 2002 PENFIELD RD (NYS 441) AND BRENTWOOD DR AT MM 441 43011044 , Thursday May 14th, 2026 thru Tuesday May 19th, 2026, Sunday/Monday/Tuesday/Thursday/Friday/Saturday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-12T20:35:28Z"},"road_event_id":"pgJ3vTxdfSgyCB4LxZ4CDVebbBU=","beginning_cross_street":"Brentwood Dr","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.45723,43.131099]]}},{"id":"3nl81qMT8VE8gMpmAQj4XdPR4cw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SOsTDccHHA72U+JDN9mspcIu/l8="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:38:30Z"},"road_event_id":"3nl81qMT8VE8gMpmAQj4XdPR4cw=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"SOsTDccHHA72U+JDN9mspcIu/l8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3nl81qMT8VE8gMpmAQj4XdPR4cw="},{"type":"next-occurrence","id":"00gbwFFIKXSuDdNm2TA+1bhCTsY="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:38:30Z"},"road_event_id":"SOsTDccHHA72U+JDN9mspcIu/l8=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"00gbwFFIKXSuDdNm2TA+1bhCTsY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3nl81qMT8VE8gMpmAQj4XdPR4cw="},{"type":"next-occurrence","id":"VqDJES45xsGmUSQBSzcAg+ogP24="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:38:30Z"},"road_event_id":"00gbwFFIKXSuDdNm2TA+1bhCTsY=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"VqDJES45xsGmUSQBSzcAg+ogP24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3nl81qMT8VE8gMpmAQj4XdPR4cw="},{"type":"next-occurrence","id":"fkhaVSqRNFxClXGW/TB0GG4IuJ0="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:38:30Z"},"road_event_id":"VqDJES45xsGmUSQBSzcAg+ogP24=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"fkhaVSqRNFxClXGW/TB0GG4IuJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3nl81qMT8VE8gMpmAQj4XdPR4cw="},{"type":"next-occurrence","id":"5fa58+H4VOPCU8WSyyxed690YjA="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:38:30Z"},"road_event_id":"fkhaVSqRNFxClXGW/TB0GG4IuJ0=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"5fa58+H4VOPCU8WSyyxed690YjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3nl81qMT8VE8gMpmAQj4XdPR4cw="},{"type":"next-occurrence","id":"98Z4ADuSPG1N/7sUH3ObrVNX/eQ="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:38:30Z"},"road_event_id":"5fa58+H4VOPCU8WSyyxed690YjA=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"98Z4ADuSPG1N/7sUH3ObrVNX/eQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3nl81qMT8VE8gMpmAQj4XdPR4cw="},{"type":"next-occurrence","id":"gMAA75cJlOafJxZr5tFHNRp3qiY="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:38:30Z"},"road_event_id":"98Z4ADuSPG1N/7sUH3ObrVNX/eQ=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"gMAA75cJlOafJxZr5tFHNRp3qiY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3nl81qMT8VE8gMpmAQj4XdPR4cw="},{"type":"next-occurrence","id":"q60VxH/ENc+6vGLA7XrhD8DOBu4="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:38:30Z"},"road_event_id":"gMAA75cJlOafJxZr5tFHNRp3qiY=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T16:00:00Z","end_date":"2026-05-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"q60VxH/ENc+6vGLA7XrhD8DOBu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3nl81qMT8VE8gMpmAQj4XdPR4cw="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:38:30Z"},"road_event_id":"q60VxH/ENc+6vGLA7XrhD8DOBu4=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T16:00:00Z","end_date":"2026-05-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"D5L/+0TnuflA74hNZf4jheA3mqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JDs/qGI8mMYgYm65nqB6oQ/xwlg="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Orion Dr (Dryden) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:42:48Z"},"road_event_id":"D5L/+0TnuflA74hNZf4jheA3mqo=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Orion Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29765,42.490571]]}},{"id":"JDs/qGI8mMYgYm65nqB6oQ/xwlg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D5L/+0TnuflA74hNZf4jheA3mqo="},{"type":"next-occurrence","id":"y6As1yLwEz/qKtbmOf9wYdGC820="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Orion Dr (Dryden) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:42:48Z"},"road_event_id":"JDs/qGI8mMYgYm65nqB6oQ/xwlg=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Orion Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29765,42.490571]]}},{"id":"y6As1yLwEz/qKtbmOf9wYdGC820=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D5L/+0TnuflA74hNZf4jheA3mqo="},{"type":"next-occurrence","id":"EOSNLGKTHX8RpiSOUM0Qoz/VPlg="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Orion Dr (Dryden) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:42:48Z"},"road_event_id":"y6As1yLwEz/qKtbmOf9wYdGC820=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Orion Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29765,42.490571]]}},{"id":"EOSNLGKTHX8RpiSOUM0Qoz/VPlg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D5L/+0TnuflA74hNZf4jheA3mqo="},{"type":"next-occurrence","id":"LRyph9TuBzMN1awMRu7WZzIp0Q4="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Orion Dr (Dryden) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:42:48Z"},"road_event_id":"EOSNLGKTHX8RpiSOUM0Qoz/VPlg=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Orion Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29765,42.490571]]}},{"id":"LRyph9TuBzMN1awMRu7WZzIp0Q4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D5L/+0TnuflA74hNZf4jheA3mqo="},{"type":"next-occurrence","id":"ULBAwS2u5Jd8g+s9dW22cIACiI4="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Orion Dr (Dryden) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:42:48Z"},"road_event_id":"LRyph9TuBzMN1awMRu7WZzIp0Q4=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Orion Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29765,42.490571]]}},{"id":"ULBAwS2u5Jd8g+s9dW22cIACiI4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D5L/+0TnuflA74hNZf4jheA3mqo="},{"type":"next-occurrence","id":"ldeEzZdEcJfRCFUPC2TOw97EXnM="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Orion Dr (Dryden) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:42:48Z"},"road_event_id":"ULBAwS2u5Jd8g+s9dW22cIACiI4=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Orion Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29765,42.490571]]}},{"id":"ldeEzZdEcJfRCFUPC2TOw97EXnM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D5L/+0TnuflA74hNZf4jheA3mqo="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Orion Dr (Dryden) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:42:48Z"},"road_event_id":"ldeEzZdEcJfRCFUPC2TOw97EXnM=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Orion Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29765,42.490571]]}},{"id":"pYZH/yy+PLKuvZsPx1PN8V1PgaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"x0mUOTjzCgcjoOiIoW6gvK6J6g8="}],"description":"Line striping on NY 34B both directions between NY-34 (Lansing) and Lake Ridge Rd (Lansing) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:50:46Z"},"road_event_id":"pYZH/yy+PLKuvZsPx1PN8V1PgaY=","beginning_cross_street":"NY-34","ending_cross_street":"Lake Ridge Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.49414,42.538375]]}},{"id":"x0mUOTjzCgcjoOiIoW6gvK6J6g8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pYZH/yy+PLKuvZsPx1PN8V1PgaY="},{"type":"next-occurrence","id":"Javr1BB+S8kwSdpog/g5XLsykls="}],"description":"Line striping on NY 34B both directions between NY-34 (Lansing) and Lake Ridge Rd (Lansing) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:50:46Z"},"road_event_id":"x0mUOTjzCgcjoOiIoW6gvK6J6g8=","beginning_cross_street":"NY-34","ending_cross_street":"Lake Ridge Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.49414,42.538375]]}},{"id":"Javr1BB+S8kwSdpog/g5XLsykls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pYZH/yy+PLKuvZsPx1PN8V1PgaY="},{"type":"next-occurrence","id":"pVnnPwxLz4nWPngeqcfeaxiJxvA="}],"description":"Line striping on NY 34B both directions between NY-34 (Lansing) and Lake Ridge Rd (Lansing) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:50:46Z"},"road_event_id":"Javr1BB+S8kwSdpog/g5XLsykls=","beginning_cross_street":"NY-34","ending_cross_street":"Lake Ridge Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.49414,42.538375]]}},{"id":"pVnnPwxLz4nWPngeqcfeaxiJxvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pYZH/yy+PLKuvZsPx1PN8V1PgaY="},{"type":"next-occurrence","id":"LdBZFbT0slm+wxWTN8PS3zmgyP4="}],"description":"Line striping on NY 34B both directions between NY-34 (Lansing) and Lake Ridge Rd (Lansing) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:50:46Z"},"road_event_id":"pVnnPwxLz4nWPngeqcfeaxiJxvA=","beginning_cross_street":"NY-34","ending_cross_street":"Lake Ridge Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.49414,42.538375]]}},{"id":"LdBZFbT0slm+wxWTN8PS3zmgyP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pYZH/yy+PLKuvZsPx1PN8V1PgaY="},{"type":"next-occurrence","id":"UkjxjowC/fXtakRBmaQJvMLTF/0="}],"description":"Line striping on NY 34B both directions between NY-34 (Lansing) and Lake Ridge Rd (Lansing) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:50:46Z"},"road_event_id":"LdBZFbT0slm+wxWTN8PS3zmgyP4=","beginning_cross_street":"NY-34","ending_cross_street":"Lake Ridge Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.49414,42.538375]]}},{"id":"UkjxjowC/fXtakRBmaQJvMLTF/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pYZH/yy+PLKuvZsPx1PN8V1PgaY="},{"type":"next-occurrence","id":"zYQaqd07l3ZEVPn2mv9RtcI9tUM="}],"description":"Line striping on NY 34B both directions between NY-34 (Lansing) and Lake Ridge Rd (Lansing) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:50:46Z"},"road_event_id":"UkjxjowC/fXtakRBmaQJvMLTF/0=","beginning_cross_street":"NY-34","ending_cross_street":"Lake Ridge Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.49414,42.538375]]}},{"id":"zYQaqd07l3ZEVPn2mv9RtcI9tUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pYZH/yy+PLKuvZsPx1PN8V1PgaY="},{"type":"next-occurrence","id":"XN0iIvFor5ayiwaNYKBTS0hvJBk="}],"description":"Line striping on NY 34B both directions between NY-34 (Lansing) and Lake Ridge Rd (Lansing) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:50:46Z"},"road_event_id":"zYQaqd07l3ZEVPn2mv9RtcI9tUM=","beginning_cross_street":"NY-34","ending_cross_street":"Lake Ridge Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.49414,42.538375]]}},{"id":"XN0iIvFor5ayiwaNYKBTS0hvJBk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pYZH/yy+PLKuvZsPx1PN8V1PgaY="},{"type":"next-occurrence","id":"DYP35hQMClKZ1znCINTcd9OxAEc="}],"description":"Line striping on NY 34B both directions between NY-34 (Lansing) and Lake Ridge Rd (Lansing) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:50:46Z"},"road_event_id":"XN0iIvFor5ayiwaNYKBTS0hvJBk=","beginning_cross_street":"NY-34","ending_cross_street":"Lake Ridge Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T16:00:00Z","end_date":"2026-05-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.49414,42.538375]]}},{"id":"DYP35hQMClKZ1znCINTcd9OxAEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pYZH/yy+PLKuvZsPx1PN8V1PgaY="}],"description":"Line striping on NY 34B both directions between NY-34 (Lansing) and Lake Ridge Rd (Lansing) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open, Tuesday May 26th, 2026 thru Friday May 29th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:50:46Z"},"road_event_id":"DYP35hQMClKZ1znCINTcd9OxAEc=","beginning_cross_street":"NY-34","ending_cross_street":"Lake Ridge Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T16:00:00Z","end_date":"2026-05-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.49414,42.538375]]}},{"id":"4n03CD/YOAnoB1iCa2hzQxR1TZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 38"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jKEtzUYC8EQfwW6tGJJZP2nicbE="}],"description":"Line striping on NY 38 both directions between CHAFFEE RD (Dryden) and Chipman Corners Rd (Groton) ; Mobile lane closure, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:54:43Z"},"road_event_id":"4n03CD/YOAnoB1iCa2hzQxR1TZA=","beginning_cross_street":"CHAFFEE RD","ending_cross_street":"Chipman Corners Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.28486,42.462655]]}},{"id":"jKEtzUYC8EQfwW6tGJJZP2nicbE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 38"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4n03CD/YOAnoB1iCa2hzQxR1TZA="},{"type":"next-occurrence","id":"B0X2eSfCejH1Eu0h+qO8rTb3fMc="}],"description":"Line striping on NY 38 both directions between CHAFFEE RD (Dryden) and Chipman Corners Rd (Groton) ; Mobile lane closure, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:54:43Z"},"road_event_id":"jKEtzUYC8EQfwW6tGJJZP2nicbE=","beginning_cross_street":"CHAFFEE RD","ending_cross_street":"Chipman Corners Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.28486,42.462655]]}},{"id":"B0X2eSfCejH1Eu0h+qO8rTb3fMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 38"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4n03CD/YOAnoB1iCa2hzQxR1TZA="}],"description":"Line striping on NY 38 both directions between CHAFFEE RD (Dryden) and Chipman Corners Rd (Groton) ; Mobile lane closure, Tuesday May 12th, 2026 thru Friday May 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:54:43Z"},"road_event_id":"B0X2eSfCejH1Eu0h+qO8rTb3fMc=","beginning_cross_street":"CHAFFEE RD","ending_cross_street":"Chipman Corners Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.28486,42.462655]]}},{"id":"7G4PbjtfyrV3U/IfMf7GbpQeGEw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"oBblYirduEF+wDrNauB6uafBID4="}],"description":"Line striping on NY 79 both directions between Honness Ln (Ithaca) and Flat Iron Rd (Caroline) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:58:02Z"},"road_event_id":"7G4PbjtfyrV3U/IfMf7GbpQeGEw=","beginning_cross_street":"Honness Ln","ending_cross_street":"Flat Iron Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.472154,42.429349]]}},{"id":"oBblYirduEF+wDrNauB6uafBID4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7G4PbjtfyrV3U/IfMf7GbpQeGEw="},{"type":"next-occurrence","id":"/OQ77zbYtF+moRsrp4iOAtvnyMk="}],"description":"Line striping on NY 79 both directions between Honness Ln (Ithaca) and Flat Iron Rd (Caroline) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:58:02Z"},"road_event_id":"oBblYirduEF+wDrNauB6uafBID4=","beginning_cross_street":"Honness Ln","ending_cross_street":"Flat Iron Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.472154,42.429349]]}},{"id":"/OQ77zbYtF+moRsrp4iOAtvnyMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7G4PbjtfyrV3U/IfMf7GbpQeGEw="},{"type":"next-occurrence","id":"HDnr0/EI6UPJoaVHgFcR90sOmLU="}],"description":"Line striping on NY 79 both directions between Honness Ln (Ithaca) and Flat Iron Rd (Caroline) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:58:02Z"},"road_event_id":"/OQ77zbYtF+moRsrp4iOAtvnyMk=","beginning_cross_street":"Honness Ln","ending_cross_street":"Flat Iron Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.472154,42.429349]]}},{"id":"HDnr0/EI6UPJoaVHgFcR90sOmLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7G4PbjtfyrV3U/IfMf7GbpQeGEw="},{"type":"next-occurrence","id":"Db0Okj6xnMJ0ABM128qcJZsQ/AM="}],"description":"Line striping on NY 79 both directions between Honness Ln (Ithaca) and Flat Iron Rd (Caroline) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:58:02Z"},"road_event_id":"HDnr0/EI6UPJoaVHgFcR90sOmLU=","beginning_cross_street":"Honness Ln","ending_cross_street":"Flat Iron Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.472154,42.429349]]}},{"id":"Db0Okj6xnMJ0ABM128qcJZsQ/AM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7G4PbjtfyrV3U/IfMf7GbpQeGEw="},{"type":"next-occurrence","id":"NRyq0mn9w3Hbx0D7gbDza980K8E="}],"description":"Line striping on NY 79 both directions between Honness Ln (Ithaca) and Flat Iron Rd (Caroline) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:58:02Z"},"road_event_id":"Db0Okj6xnMJ0ABM128qcJZsQ/AM=","beginning_cross_street":"Honness Ln","ending_cross_street":"Flat Iron Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.472154,42.429349]]}},{"id":"NRyq0mn9w3Hbx0D7gbDza980K8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7G4PbjtfyrV3U/IfMf7GbpQeGEw="},{"type":"next-occurrence","id":"/slPzOl+E+TMMAgbfp5RBCFkXyA="}],"description":"Line striping on NY 79 both directions between Honness Ln (Ithaca) and Flat Iron Rd (Caroline) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:58:02Z"},"road_event_id":"NRyq0mn9w3Hbx0D7gbDza980K8E=","beginning_cross_street":"Honness Ln","ending_cross_street":"Flat Iron Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.472154,42.429349]]}},{"id":"/slPzOl+E+TMMAgbfp5RBCFkXyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7G4PbjtfyrV3U/IfMf7GbpQeGEw="}],"description":"Line striping on NY 79 both directions between Honness Ln (Ithaca) and Flat Iron Rd (Caroline) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T20:58:02Z"},"road_event_id":"/slPzOl+E+TMMAgbfp5RBCFkXyA=","beginning_cross_street":"Honness Ln","ending_cross_street":"Flat Iron Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.472154,42.429349]]}},{"id":"GoUEy1PW2Nb/af0/5pb5IMQqANY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"omJPFsAb4pkwRIhbW+nnLl9pAIo="}],"description":"Line striping on NY 79 both directions between Warren Pl (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:02:40Z"},"road_event_id":"GoUEy1PW2Nb/af0/5pb5IMQqANY=","beginning_cross_street":"Warren Pl","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526514,42.448765]]}},{"id":"omJPFsAb4pkwRIhbW+nnLl9pAIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GoUEy1PW2Nb/af0/5pb5IMQqANY="},{"type":"next-occurrence","id":"gj95hhgD/vPjWYnJcohdXDoFw8I="}],"description":"Line striping on NY 79 both directions between Warren Pl (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:02:40Z"},"road_event_id":"omJPFsAb4pkwRIhbW+nnLl9pAIo=","beginning_cross_street":"Warren Pl","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526514,42.448765]]}},{"id":"gj95hhgD/vPjWYnJcohdXDoFw8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GoUEy1PW2Nb/af0/5pb5IMQqANY="},{"type":"next-occurrence","id":"nKLXVhCqzUxz9Lsk8IeK8CpAuC8="}],"description":"Line striping on NY 79 both directions between Warren Pl (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:02:40Z"},"road_event_id":"gj95hhgD/vPjWYnJcohdXDoFw8I=","beginning_cross_street":"Warren Pl","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526514,42.448765]]}},{"id":"nKLXVhCqzUxz9Lsk8IeK8CpAuC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GoUEy1PW2Nb/af0/5pb5IMQqANY="},{"type":"next-occurrence","id":"/y3nJpn0RzoQgA3tHPGgY65SZgM="}],"description":"Line striping on NY 79 both directions between Warren Pl (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:02:40Z"},"road_event_id":"nKLXVhCqzUxz9Lsk8IeK8CpAuC8=","beginning_cross_street":"Warren Pl","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526514,42.448765]]}},{"id":"/y3nJpn0RzoQgA3tHPGgY65SZgM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GoUEy1PW2Nb/af0/5pb5IMQqANY="},{"type":"next-occurrence","id":"BtHCXT8oU97CkjpuulPD/mQZEg8="}],"description":"Line striping on NY 79 both directions between Warren Pl (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:02:40Z"},"road_event_id":"/y3nJpn0RzoQgA3tHPGgY65SZgM=","beginning_cross_street":"Warren Pl","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526514,42.448765]]}},{"id":"BtHCXT8oU97CkjpuulPD/mQZEg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GoUEy1PW2Nb/af0/5pb5IMQqANY="},{"type":"next-occurrence","id":"Ek0/aQaCe5B4wbh2CrAV2v2A3uw="}],"description":"Line striping on NY 79 both directions between Warren Pl (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:02:40Z"},"road_event_id":"BtHCXT8oU97CkjpuulPD/mQZEg8=","beginning_cross_street":"Warren Pl","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526514,42.448765]]}},{"id":"Ek0/aQaCe5B4wbh2CrAV2v2A3uw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GoUEy1PW2Nb/af0/5pb5IMQqANY="}],"description":"Line striping on NY 79 both directions between Warren Pl (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:02:40Z"},"road_event_id":"Ek0/aQaCe5B4wbh2CrAV2v2A3uw=","beginning_cross_street":"Warren Pl","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526514,42.448765]]}},{"id":"OuK2nWDL5ANidIvAL5I6bmKhGec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BWTcjfrLbAWxhzjU+56EuTnMxYM="}],"description":"Line striping on NY 96 both directions between Hopkins Pl (Ithaca) and West Seneca Rd (Ulysses) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:06:49Z"},"road_event_id":"OuK2nWDL5ANidIvAL5I6bmKhGec=","beginning_cross_street":"Hopkins Pl","ending_cross_street":"West Seneca Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.524176,42.456847]]}},{"id":"BWTcjfrLbAWxhzjU+56EuTnMxYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OuK2nWDL5ANidIvAL5I6bmKhGec="},{"type":"next-occurrence","id":"7zyBENxKvu2RlonwDSI2m8nByWQ="}],"description":"Line striping on NY 96 both directions between Hopkins Pl (Ithaca) and West Seneca Rd (Ulysses) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:06:49Z"},"road_event_id":"BWTcjfrLbAWxhzjU+56EuTnMxYM=","beginning_cross_street":"Hopkins Pl","ending_cross_street":"West Seneca Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.524176,42.456847]]}},{"id":"7zyBENxKvu2RlonwDSI2m8nByWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OuK2nWDL5ANidIvAL5I6bmKhGec="},{"type":"next-occurrence","id":"u4OvAwOv7ulOYXDEPvkaieMkJOA="}],"description":"Line striping on NY 96 both directions between Hopkins Pl (Ithaca) and West Seneca Rd (Ulysses) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:06:49Z"},"road_event_id":"7zyBENxKvu2RlonwDSI2m8nByWQ=","beginning_cross_street":"Hopkins Pl","ending_cross_street":"West Seneca Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.524176,42.456847]]}},{"id":"u4OvAwOv7ulOYXDEPvkaieMkJOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OuK2nWDL5ANidIvAL5I6bmKhGec="},{"type":"next-occurrence","id":"+QKjPvMf9xQ3yyvLElbNgUF/DjQ="}],"description":"Line striping on NY 96 both directions between Hopkins Pl (Ithaca) and West Seneca Rd (Ulysses) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:06:49Z"},"road_event_id":"u4OvAwOv7ulOYXDEPvkaieMkJOA=","beginning_cross_street":"Hopkins Pl","ending_cross_street":"West Seneca Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.524176,42.456847]]}},{"id":"+QKjPvMf9xQ3yyvLElbNgUF/DjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OuK2nWDL5ANidIvAL5I6bmKhGec="},{"type":"next-occurrence","id":"GnNKQHfzhmsPFCzlGGAsl/DXfts="}],"description":"Line striping on NY 96 both directions between Hopkins Pl (Ithaca) and West Seneca Rd (Ulysses) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:06:49Z"},"road_event_id":"+QKjPvMf9xQ3yyvLElbNgUF/DjQ=","beginning_cross_street":"Hopkins Pl","ending_cross_street":"West Seneca Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.524176,42.456847]]}},{"id":"GnNKQHfzhmsPFCzlGGAsl/DXfts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OuK2nWDL5ANidIvAL5I6bmKhGec="},{"type":"next-occurrence","id":"Kh60NhrRPfOZjPORf9m9SZrpQDs="}],"description":"Line striping on NY 96 both directions between Hopkins Pl (Ithaca) and West Seneca Rd (Ulysses) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:06:49Z"},"road_event_id":"GnNKQHfzhmsPFCzlGGAsl/DXfts=","beginning_cross_street":"Hopkins Pl","ending_cross_street":"West Seneca Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.524176,42.456847]]}},{"id":"Kh60NhrRPfOZjPORf9m9SZrpQDs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OuK2nWDL5ANidIvAL5I6bmKhGec="}],"description":"Line striping on NY 96 both directions between Hopkins Pl (Ithaca) and West Seneca Rd (Ulysses) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:06:49Z"},"road_event_id":"Kh60NhrRPfOZjPORf9m9SZrpQDs=","beginning_cross_street":"Hopkins Pl","ending_cross_street":"West Seneca Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.524176,42.456847]]}},{"id":"2hy4v8VoCiu/wmL/IEcCfTcty1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nZOpDsOGjbdUktfGsbuApHL/4H0="}],"description":"Line striping on NY 96B both directions between Bald Hill Rd (Danby) and S Coddington Rd (Ithaca) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:10:21Z"},"road_event_id":"2hy4v8VoCiu/wmL/IEcCfTcty1g=","beginning_cross_street":"Bald Hill Rd","ending_cross_street":"S Coddington Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.480828,42.352416]]}},{"id":"nZOpDsOGjbdUktfGsbuApHL/4H0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2hy4v8VoCiu/wmL/IEcCfTcty1g="},{"type":"next-occurrence","id":"K/vGyouBCAarGDJUzKEWKPe5+90="}],"description":"Line striping on NY 96B both directions between Bald Hill Rd (Danby) and S Coddington Rd (Ithaca) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:10:21Z"},"road_event_id":"nZOpDsOGjbdUktfGsbuApHL/4H0=","beginning_cross_street":"Bald Hill Rd","ending_cross_street":"S Coddington Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.480828,42.352416]]}},{"id":"K/vGyouBCAarGDJUzKEWKPe5+90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2hy4v8VoCiu/wmL/IEcCfTcty1g="},{"type":"next-occurrence","id":"qtrQIGQxvdo6YnsO70arWPmaBrI="}],"description":"Line striping on NY 96B both directions between Bald Hill Rd (Danby) and S Coddington Rd (Ithaca) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:10:21Z"},"road_event_id":"K/vGyouBCAarGDJUzKEWKPe5+90=","beginning_cross_street":"Bald Hill Rd","ending_cross_street":"S Coddington Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.480828,42.352416]]}},{"id":"qtrQIGQxvdo6YnsO70arWPmaBrI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2hy4v8VoCiu/wmL/IEcCfTcty1g="},{"type":"next-occurrence","id":"69s0x3fB1MTqD5lS7omb55kZxKA="}],"description":"Line striping on NY 96B both directions between Bald Hill Rd (Danby) and S Coddington Rd (Ithaca) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:10:21Z"},"road_event_id":"qtrQIGQxvdo6YnsO70arWPmaBrI=","beginning_cross_street":"Bald Hill Rd","ending_cross_street":"S Coddington Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.480828,42.352416]]}},{"id":"69s0x3fB1MTqD5lS7omb55kZxKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2hy4v8VoCiu/wmL/IEcCfTcty1g="},{"type":"next-occurrence","id":"1P4vGGvDPLsN9J0kHGTV+3trPV4="}],"description":"Line striping on NY 96B both directions between Bald Hill Rd (Danby) and S Coddington Rd (Ithaca) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:10:21Z"},"road_event_id":"69s0x3fB1MTqD5lS7omb55kZxKA=","beginning_cross_street":"Bald Hill Rd","ending_cross_street":"S Coddington Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.480828,42.352416]]}},{"id":"1P4vGGvDPLsN9J0kHGTV+3trPV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2hy4v8VoCiu/wmL/IEcCfTcty1g="},{"type":"next-occurrence","id":"gxfGBFpKbmR/Uno5aTVpvSD49Nw="}],"description":"Line striping on NY 96B both directions between Bald Hill Rd (Danby) and S Coddington Rd (Ithaca) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:10:21Z"},"road_event_id":"1P4vGGvDPLsN9J0kHGTV+3trPV4=","beginning_cross_street":"Bald Hill Rd","ending_cross_street":"S Coddington Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.480828,42.352416]]}},{"id":"gxfGBFpKbmR/Uno5aTVpvSD49Nw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2hy4v8VoCiu/wmL/IEcCfTcty1g="}],"description":"Line striping on NY 96B both directions between Bald Hill Rd (Danby) and S Coddington Rd (Ithaca) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:10:21Z"},"road_event_id":"gxfGBFpKbmR/Uno5aTVpvSD49Nw=","beginning_cross_street":"Bald Hill Rd","ending_cross_street":"S Coddington Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.480828,42.352416]]}},{"id":"UxOIuxUlKVdb5p8yetEwMdSs1Rg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"grc5aOkFRbXEXCA9laDLR5yfdVg="}],"description":"Line striping on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Old Groton Rd (Cortlandville) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:13:29Z"},"road_event_id":"UxOIuxUlKVdb5p8yetEwMdSs1Rg=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Old Groton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367872,42.590719]]}},{"id":"grc5aOkFRbXEXCA9laDLR5yfdVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UxOIuxUlKVdb5p8yetEwMdSs1Rg="},{"type":"next-occurrence","id":"QpKnDLE6SSdyrzVegQEp3dGWb9U="}],"description":"Line striping on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Old Groton Rd (Cortlandville) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:13:29Z"},"road_event_id":"grc5aOkFRbXEXCA9laDLR5yfdVg=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Old Groton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367872,42.590719]]}},{"id":"QpKnDLE6SSdyrzVegQEp3dGWb9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UxOIuxUlKVdb5p8yetEwMdSs1Rg="},{"type":"next-occurrence","id":"odj3noVe4yGcDqZ/h1sqXXw0i4Q="}],"description":"Line striping on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Old Groton Rd (Cortlandville) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:13:29Z"},"road_event_id":"QpKnDLE6SSdyrzVegQEp3dGWb9U=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Old Groton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367872,42.590719]]}},{"id":"odj3noVe4yGcDqZ/h1sqXXw0i4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UxOIuxUlKVdb5p8yetEwMdSs1Rg="},{"type":"next-occurrence","id":"nwWMOHgKgMRd3clN8faiHir5JuY="}],"description":"Line striping on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Old Groton Rd (Cortlandville) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:13:29Z"},"road_event_id":"odj3noVe4yGcDqZ/h1sqXXw0i4Q=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Old Groton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367872,42.590719]]}},{"id":"nwWMOHgKgMRd3clN8faiHir5JuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UxOIuxUlKVdb5p8yetEwMdSs1Rg="},{"type":"next-occurrence","id":"tOjxfrCNOcnBADwDVci//n9ZEgc="}],"description":"Line striping on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Old Groton Rd (Cortlandville) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:13:29Z"},"road_event_id":"nwWMOHgKgMRd3clN8faiHir5JuY=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Old Groton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367872,42.590719]]}},{"id":"tOjxfrCNOcnBADwDVci//n9ZEgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UxOIuxUlKVdb5p8yetEwMdSs1Rg="},{"type":"next-occurrence","id":"C8CBSpcP3itBPFi8vYnMDP3fUfw="}],"description":"Line striping on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Old Groton Rd (Cortlandville) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:13:29Z"},"road_event_id":"tOjxfrCNOcnBADwDVci//n9ZEgc=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Old Groton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367872,42.590719]]}},{"id":"C8CBSpcP3itBPFi8vYnMDP3fUfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UxOIuxUlKVdb5p8yetEwMdSs1Rg="}],"description":"Line striping on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Old Groton Rd (Cortlandville) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:13:29Z"},"road_event_id":"C8CBSpcP3itBPFi8vYnMDP3fUfw=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Old Groton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367872,42.590719]]}},{"id":"k/YXsaxQCpyPVgGtYVQzd2k2b6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EGYXJDlAZAmCOZgfURblglqGlsg="}],"description":"Line striping on NY 227 both directions between Indian Fort Rd (Ulysses) and West Main Street; NY 96; END ROUTE (Ulysses) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:19:33Z"},"road_event_id":"k/YXsaxQCpyPVgGtYVQzd2k2b6s=","beginning_cross_street":"Indian Fort Rd","ending_cross_street":"West Main Street; NY 96; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.694071,42.507151]]}},{"id":"EGYXJDlAZAmCOZgfURblglqGlsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k/YXsaxQCpyPVgGtYVQzd2k2b6s="},{"type":"next-occurrence","id":"m/a9B638I1FWB5piUTrd8fBtP5c="}],"description":"Line striping on NY 227 both directions between Indian Fort Rd (Ulysses) and West Main Street; NY 96; END ROUTE (Ulysses) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:19:33Z"},"road_event_id":"EGYXJDlAZAmCOZgfURblglqGlsg=","beginning_cross_street":"Indian Fort Rd","ending_cross_street":"West Main Street; NY 96; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.694071,42.507151]]}},{"id":"m/a9B638I1FWB5piUTrd8fBtP5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k/YXsaxQCpyPVgGtYVQzd2k2b6s="},{"type":"next-occurrence","id":"xLRkyxbhjxt09T4AEy1KgQaSS80="}],"description":"Line striping on NY 227 both directions between Indian Fort Rd (Ulysses) and West Main Street; NY 96; END ROUTE (Ulysses) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:19:33Z"},"road_event_id":"m/a9B638I1FWB5piUTrd8fBtP5c=","beginning_cross_street":"Indian Fort Rd","ending_cross_street":"West Main Street; NY 96; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.694071,42.507151]]}},{"id":"xLRkyxbhjxt09T4AEy1KgQaSS80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k/YXsaxQCpyPVgGtYVQzd2k2b6s="},{"type":"next-occurrence","id":"N9ifgNhxwLuaIOg/MZfnFi8+OuI="}],"description":"Line striping on NY 227 both directions between Indian Fort Rd (Ulysses) and West Main Street; NY 96; END ROUTE (Ulysses) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:19:33Z"},"road_event_id":"xLRkyxbhjxt09T4AEy1KgQaSS80=","beginning_cross_street":"Indian Fort Rd","ending_cross_street":"West Main Street; NY 96; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.694071,42.507151]]}},{"id":"N9ifgNhxwLuaIOg/MZfnFi8+OuI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k/YXsaxQCpyPVgGtYVQzd2k2b6s="},{"type":"next-occurrence","id":"GQwmhC9FrqcNQZugTk+AJs86Yto="}],"description":"Line striping on NY 227 both directions between Indian Fort Rd (Ulysses) and West Main Street; NY 96; END ROUTE (Ulysses) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:19:33Z"},"road_event_id":"N9ifgNhxwLuaIOg/MZfnFi8+OuI=","beginning_cross_street":"Indian Fort Rd","ending_cross_street":"West Main Street; NY 96; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.694071,42.507151]]}},{"id":"GQwmhC9FrqcNQZugTk+AJs86Yto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k/YXsaxQCpyPVgGtYVQzd2k2b6s="},{"type":"next-occurrence","id":"5HPohuyaEQdagKNA2lc9FMyf58k="}],"description":"Line striping on NY 227 both directions between Indian Fort Rd (Ulysses) and West Main Street; NY 96; END ROUTE (Ulysses) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:19:33Z"},"road_event_id":"GQwmhC9FrqcNQZugTk+AJs86Yto=","beginning_cross_street":"Indian Fort Rd","ending_cross_street":"West Main Street; NY 96; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.694071,42.507151]]}},{"id":"5HPohuyaEQdagKNA2lc9FMyf58k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k/YXsaxQCpyPVgGtYVQzd2k2b6s="}],"description":"Line striping on NY 227 both directions between Indian Fort Rd (Ulysses) and West Main Street; NY 96; END ROUTE (Ulysses) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:19:33Z"},"road_event_id":"5HPohuyaEQdagKNA2lc9FMyf58k=","beginning_cross_street":"Indian Fort Rd","ending_cross_street":"West Main Street; NY 96; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.694071,42.507151]]}},{"id":"Zpt8INzebt8i8U0EEdAkQ/ByMHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 327"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"p4YdtC0OtOOO/nHGidOf7mUVGCM="}],"description":"Line striping on NY 327 both directions between Elmira Road; NY 13; START ROUTE NY 327 (Ithaca) and RT-327 at Mecklenburg Road; NY 79; END ROUTE (Enfield) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:22:25Z"},"road_event_id":"Zpt8INzebt8i8U0EEdAkQ/ByMHU=","beginning_cross_street":"Elmira Road; NY 13; START ROUTE NY 327","ending_cross_street":"Mecklenburg Road; NY 79; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.546218,42.404287]]}},{"id":"p4YdtC0OtOOO/nHGidOf7mUVGCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 327"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zpt8INzebt8i8U0EEdAkQ/ByMHU="},{"type":"next-occurrence","id":"0DHgK/5r37RmXWLoyIsC/OrOroQ="}],"description":"Line striping on NY 327 both directions between Elmira Road; NY 13; START ROUTE NY 327 (Ithaca) and RT-327 at Mecklenburg Road; NY 79; END ROUTE (Enfield) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:22:25Z"},"road_event_id":"p4YdtC0OtOOO/nHGidOf7mUVGCM=","beginning_cross_street":"Elmira Road; NY 13; START ROUTE NY 327","ending_cross_street":"Mecklenburg Road; NY 79; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.546218,42.404287]]}},{"id":"0DHgK/5r37RmXWLoyIsC/OrOroQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 327"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zpt8INzebt8i8U0EEdAkQ/ByMHU="},{"type":"next-occurrence","id":"O2JWgOA/1CRXhY/VmaXoAGRrF/0="}],"description":"Line striping on NY 327 both directions between Elmira Road; NY 13; START ROUTE NY 327 (Ithaca) and RT-327 at Mecklenburg Road; NY 79; END ROUTE (Enfield) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:22:25Z"},"road_event_id":"0DHgK/5r37RmXWLoyIsC/OrOroQ=","beginning_cross_street":"Elmira Road; NY 13; START ROUTE NY 327","ending_cross_street":"Mecklenburg Road; NY 79; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.546218,42.404287]]}},{"id":"O2JWgOA/1CRXhY/VmaXoAGRrF/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 327"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zpt8INzebt8i8U0EEdAkQ/ByMHU="},{"type":"next-occurrence","id":"3OUU/BckqBNXN5613+JsoOhkRpU="}],"description":"Line striping on NY 327 both directions between Elmira Road; NY 13; START ROUTE NY 327 (Ithaca) and RT-327 at Mecklenburg Road; NY 79; END ROUTE (Enfield) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:22:25Z"},"road_event_id":"O2JWgOA/1CRXhY/VmaXoAGRrF/0=","beginning_cross_street":"Elmira Road; NY 13; START ROUTE NY 327","ending_cross_street":"Mecklenburg Road; NY 79; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.546218,42.404287]]}},{"id":"3OUU/BckqBNXN5613+JsoOhkRpU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 327"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zpt8INzebt8i8U0EEdAkQ/ByMHU="},{"type":"next-occurrence","id":"qCuA90mZ48CVXh19N+DVn5UzwO4="}],"description":"Line striping on NY 327 both directions between Elmira Road; NY 13; START ROUTE NY 327 (Ithaca) and RT-327 at Mecklenburg Road; NY 79; END ROUTE (Enfield) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:22:25Z"},"road_event_id":"3OUU/BckqBNXN5613+JsoOhkRpU=","beginning_cross_street":"Elmira Road; NY 13; START ROUTE NY 327","ending_cross_street":"Mecklenburg Road; NY 79; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.546218,42.404287]]}},{"id":"qCuA90mZ48CVXh19N+DVn5UzwO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 327"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zpt8INzebt8i8U0EEdAkQ/ByMHU="},{"type":"next-occurrence","id":"7dyFWeIhwaMBJyBU9Qjzt1B2Qn8="}],"description":"Line striping on NY 327 both directions between Elmira Road; NY 13; START ROUTE NY 327 (Ithaca) and RT-327 at Mecklenburg Road; NY 79; END ROUTE (Enfield) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:22:25Z"},"road_event_id":"qCuA90mZ48CVXh19N+DVn5UzwO4=","beginning_cross_street":"Elmira Road; NY 13; START ROUTE NY 327","ending_cross_street":"Mecklenburg Road; NY 79; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.546218,42.404287]]}},{"id":"7dyFWeIhwaMBJyBU9Qjzt1B2Qn8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 327"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zpt8INzebt8i8U0EEdAkQ/ByMHU="}],"description":"Line striping on NY 327 both directions between Elmira Road; NY 13; START ROUTE NY 327 (Ithaca) and RT-327 at Mecklenburg Road; NY 79; END ROUTE (Enfield) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:22:25Z"},"road_event_id":"7dyFWeIhwaMBJyBU9Qjzt1B2Qn8=","beginning_cross_street":"Elmira Road; NY 13; START ROUTE NY 327","ending_cross_street":"Mecklenburg Road; NY 79; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.546218,42.404287]]}},{"id":"ohK/nOMJYW4CyMikj376SICsdA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uI0aslDfHLLavfPNWJMRhr6dYCc="}],"description":"Line striping on NY 366 both directions between Pine Tree Rd (Ithaca) and NY 38 (Dryden) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:25:56Z"},"road_event_id":"ohK/nOMJYW4CyMikj376SICsdA8=","beginning_cross_street":"Pine Tree Rd","ending_cross_street":"NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.470386,42.44372]]}},{"id":"uI0aslDfHLLavfPNWJMRhr6dYCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ohK/nOMJYW4CyMikj376SICsdA8="},{"type":"next-occurrence","id":"Sdenq3oTvVA2GI1qpZt7rV8tTRs="}],"description":"Line striping on NY 366 both directions between Pine Tree Rd (Ithaca) and NY 38 (Dryden) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:25:56Z"},"road_event_id":"uI0aslDfHLLavfPNWJMRhr6dYCc=","beginning_cross_street":"Pine Tree Rd","ending_cross_street":"NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.470386,42.44372]]}},{"id":"Sdenq3oTvVA2GI1qpZt7rV8tTRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ohK/nOMJYW4CyMikj376SICsdA8="},{"type":"next-occurrence","id":"7qCnXrxgv1mELRCzOaoredgVXBY="}],"description":"Line striping on NY 366 both directions between Pine Tree Rd (Ithaca) and NY 38 (Dryden) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:25:56Z"},"road_event_id":"Sdenq3oTvVA2GI1qpZt7rV8tTRs=","beginning_cross_street":"Pine Tree Rd","ending_cross_street":"NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.470386,42.44372]]}},{"id":"7qCnXrxgv1mELRCzOaoredgVXBY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ohK/nOMJYW4CyMikj376SICsdA8="},{"type":"next-occurrence","id":"g2cFTkMOgi50+J0nRSOqdgeRiY4="}],"description":"Line striping on NY 366 both directions between Pine Tree Rd (Ithaca) and NY 38 (Dryden) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:25:56Z"},"road_event_id":"7qCnXrxgv1mELRCzOaoredgVXBY=","beginning_cross_street":"Pine Tree Rd","ending_cross_street":"NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.470386,42.44372]]}},{"id":"g2cFTkMOgi50+J0nRSOqdgeRiY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ohK/nOMJYW4CyMikj376SICsdA8="},{"type":"next-occurrence","id":"mrFo8BxEYyPOxx3orv/+YhHr1pE="}],"description":"Line striping on NY 366 both directions between Pine Tree Rd (Ithaca) and NY 38 (Dryden) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:25:56Z"},"road_event_id":"g2cFTkMOgi50+J0nRSOqdgeRiY4=","beginning_cross_street":"Pine Tree Rd","ending_cross_street":"NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.470386,42.44372]]}},{"id":"mrFo8BxEYyPOxx3orv/+YhHr1pE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ohK/nOMJYW4CyMikj376SICsdA8="},{"type":"next-occurrence","id":"EVA1KGV4u+Hjy4G6AUnZb7bY/fY="}],"description":"Line striping on NY 366 both directions between Pine Tree Rd (Ithaca) and NY 38 (Dryden) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:25:56Z"},"road_event_id":"mrFo8BxEYyPOxx3orv/+YhHr1pE=","beginning_cross_street":"Pine Tree Rd","ending_cross_street":"NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.470386,42.44372]]}},{"id":"EVA1KGV4u+Hjy4G6AUnZb7bY/fY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ohK/nOMJYW4CyMikj376SICsdA8="}],"description":"Line striping on NY 366 both directions between Pine Tree Rd (Ithaca) and NY 38 (Dryden) ; Mobile lane closure, Tuesday May 12th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T21:25:56Z"},"road_event_id":"EVA1KGV4u+Hjy4G6AUnZb7bY/fY=","beginning_cross_street":"Pine Tree Rd","ending_cross_street":"NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.470386,42.44372]]}},{"id":"6rfZnCfFkViIJgw5bMjZ18P67xo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound near CR 692/Franklin Av (Berlin), Monday May 18, 2026 08:00 PM thru Tuesday May 19, 2026 05:00 AM, right lane closed, moving operation","update_date":"2026-05-12T21:33:11Z"},"road_event_id":"6rfZnCfFkViIJgw5bMjZ18P67xo=","beginning_cross_street":"CR 692/Franklin Av","ending_cross_street":"South of CR 693/Lafayette Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T20:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.930572,39.81142]]}},{"id":"Ju40Jj8sFf8OooGwS7fMmDQXBQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Westbound near West of Dorset Av (Atlantic City), Wednesday May 13, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-05-12T21:33:05Z"},"road_event_id":"Ju40Jj8sFf8OooGwS7fMmDQXBQA=","beginning_cross_street":"West of Dorset Av","ending_cross_street":"East of Atlantic City Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.474006,39.368247]]}},{"id":"oE10zwYzooOaFi4ZgRbwU9FO0Zk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-76"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-76 Eastbound near Exit 1B - I-295 (Bellmawr), Wednesday May 13, 2026 09:00 AM thru 02:00 PM, right shoulder closed","update_date":"2026-05-12T21:33:06Z"},"road_event_id":"oE10zwYzooOaFi4ZgRbwU9FO0Zk=","beginning_cross_street":"Exit 1B - I-295","ending_cross_street":"West of Exit 1C - CR 634/Market St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.102401,39.875343]]}},{"id":"Jlwt/9RfBVDMvvSnm6ujdNctYQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound near South of CR 693/Lafayette Av (Berlin), Monday May 18, 2026 08:00 PM thru Tuesday May 19, 2026 06:00 AM, right lane closed, moving operation","update_date":"2026-05-12T21:33:07Z"},"road_event_id":"Jlwt/9RfBVDMvvSnm6ujdNctYQc=","beginning_cross_street":"South of CR 693/Lafayette Av","ending_cross_street":"CR 692/Franklin Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T20:00:00Z","end_date":"2026-05-20T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.929039,39.820056]]}},{"id":"uhWdVqCv63FtDZuATuB4cHfgcuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Westbound near Lafayette Av (Stratford), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-12T21:33:09Z"},"road_event_id":"uhWdVqCv63FtDZuATuB4cHfgcuY=","beginning_cross_street":"Lafayette Av","ending_cross_street":"West of Lafayette Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.008041,39.836185]]}},{"id":"lBhBHEkJTQnEvm7qW1ORDU9ULik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between CR 628/Courses Landing Rd (Carneys Point Twp) and East of NJ 48 (Carneys Point Twp), Wednesday May 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-12T21:33:10Z"},"road_event_id":"lBhBHEkJTQnEvm7qW1ORDU9ULik=","beginning_cross_street":"CR 628/Courses Landing Rd","ending_cross_street":"East of NJ 48","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.432754,39.68341]]}},{"id":"uZmrw/fnXCKpQ6y5wvPIg2kF25k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 49"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 49 Southbound At S Burden Hill Rd (Quinton Twp) Monday May 18, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed","update_date":"2026-05-12T23:16:01Z"},"road_event_id":"uZmrw/fnXCKpQ6y5wvPIg2kF25k=","beginning_cross_street":"S Burden Hill Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.376876,39.530097]]}},{"id":"SfLtkcnsTkcpMmt9lPRWYsoDXzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"myYNkvgtWnkqxZV69LW1yCz+hJI="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"SfLtkcnsTkcpMmt9lPRWYsoDXzY=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"myYNkvgtWnkqxZV69LW1yCz+hJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SfLtkcnsTkcpMmt9lPRWYsoDXzY="},{"type":"next-occurrence","id":"wJA00usy+IxZ8vv1TntUpu2AsAM="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"myYNkvgtWnkqxZV69LW1yCz+hJI=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"wJA00usy+IxZ8vv1TntUpu2AsAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SfLtkcnsTkcpMmt9lPRWYsoDXzY="},{"type":"next-occurrence","id":"sN0xOczxD4EaHoDvdLHMfKx+P1I="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"wJA00usy+IxZ8vv1TntUpu2AsAM=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"sN0xOczxD4EaHoDvdLHMfKx+P1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SfLtkcnsTkcpMmt9lPRWYsoDXzY="},{"type":"next-occurrence","id":"GHei1FQIAA4h6fqw5up4cnsBCSQ="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"sN0xOczxD4EaHoDvdLHMfKx+P1I=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"GHei1FQIAA4h6fqw5up4cnsBCSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SfLtkcnsTkcpMmt9lPRWYsoDXzY="},{"type":"next-occurrence","id":"BbFROKulnISxjLkfCqG7jCyrX+w="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"GHei1FQIAA4h6fqw5up4cnsBCSQ=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"BbFROKulnISxjLkfCqG7jCyrX+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SfLtkcnsTkcpMmt9lPRWYsoDXzY="},{"type":"next-occurrence","id":"UOA5KnjTOa6/HQyqLgdmy5+ZXbs="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"BbFROKulnISxjLkfCqG7jCyrX+w=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"UOA5KnjTOa6/HQyqLgdmy5+ZXbs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SfLtkcnsTkcpMmt9lPRWYsoDXzY="},{"type":"next-occurrence","id":"jw9h9DE2ZUVQZmGy0qy4jqf0TVE="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"UOA5KnjTOa6/HQyqLgdmy5+ZXbs=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"jw9h9DE2ZUVQZmGy0qy4jqf0TVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SfLtkcnsTkcpMmt9lPRWYsoDXzY="},{"type":"next-occurrence","id":"lOOKbvTz4Rd1Mo9VelkbC9UThb0="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"jw9h9DE2ZUVQZmGy0qy4jqf0TVE=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"lOOKbvTz4Rd1Mo9VelkbC9UThb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SfLtkcnsTkcpMmt9lPRWYsoDXzY="},{"type":"next-occurrence","id":"ityYHdQL4RpjlpLKdVqW18KwtuQ="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"lOOKbvTz4Rd1Mo9VelkbC9UThb0=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"ityYHdQL4RpjlpLKdVqW18KwtuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SfLtkcnsTkcpMmt9lPRWYsoDXzY="},{"type":"next-occurrence","id":"be6eFzdEB5fAvpe9JwVtDKtgfFc="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"ityYHdQL4RpjlpLKdVqW18KwtuQ=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"be6eFzdEB5fAvpe9JwVtDKtgfFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SfLtkcnsTkcpMmt9lPRWYsoDXzY="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"be6eFzdEB5fAvpe9JwVtDKtgfFc=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"rWpyTb5N05d8VPcrL0gAOPSqMV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 49"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 49 Both Directions East of CR 658/Keasbey St/Yorke St (Salem) Wednesday May 13, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed eastbound; 1 right lane of 2 lanes closed westbound","update_date":"2026-05-12T23:24:43Z"},"road_event_id":"rWpyTb5N05d8VPcrL0gAOPSqMV4=","beginning_cross_street":"East of CR 658/Keasbey St/Yorke St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.455146,39.562259]]}},{"id":"qR7qdz/GGGTR+YgR7jnS4hZG+/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SoGZi4Q/3OA6YFI1CuPuJesqTbE="}],"description":"Line striping on NY 34B both directions between START ROUTE NY 34B; Peru Road; NY 38; Groton Road (Dryden) and NY 34 at Ridge Road; NY 34B (Lansing) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:29:31Z"},"road_event_id":"qR7qdz/GGGTR+YgR7jnS4hZG+/w=","beginning_cross_street":"START ROUTE NY 34B; Peru Road; NY 38; Groton Road","ending_cross_street":"Ridge Road; NY 34B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.361862,42.548213]]}},{"id":"SoGZi4Q/3OA6YFI1CuPuJesqTbE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qR7qdz/GGGTR+YgR7jnS4hZG+/w="},{"type":"next-occurrence","id":"9WVPleEj7XbP0hgZEvjJxZmJTPc="}],"description":"Line striping on NY 34B both directions between START ROUTE NY 34B; Peru Road; NY 38; Groton Road (Dryden) and NY 34 at Ridge Road; NY 34B (Lansing) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:29:31Z"},"road_event_id":"SoGZi4Q/3OA6YFI1CuPuJesqTbE=","beginning_cross_street":"START ROUTE NY 34B; Peru Road; NY 38; Groton Road","ending_cross_street":"Ridge Road; NY 34B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.361862,42.548213]]}},{"id":"9WVPleEj7XbP0hgZEvjJxZmJTPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qR7qdz/GGGTR+YgR7jnS4hZG+/w="}],"description":"Line striping on NY 34B both directions between START ROUTE NY 34B; Peru Road; NY 38; Groton Road (Dryden) and NY 34 at Ridge Road; NY 34B (Lansing) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:29:31Z"},"road_event_id":"9WVPleEj7XbP0hgZEvjJxZmJTPc=","beginning_cross_street":"START ROUTE NY 34B; Peru Road; NY 38; Groton Road","ending_cross_street":"Ridge Road; NY 34B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.361862,42.548213]]}},{"id":"MJqERfqXFwVwqBqVEGc7YfMExFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Eastbound from NJ 38 (Pennsauken Twp) to West of CR 636/Cuthbert Blvd (Cherry Hill Twp) Wednesday May 13, 2026 07:00 AM thru 03:30 PM, 1 left lane of 3 lanes closed","update_date":"2026-05-12T23:28:55Z"},"road_event_id":"MJqERfqXFwVwqBqVEGc7YfMExFA=","beginning_cross_street":"NJ 38","ending_cross_street":"West of CR 636/Cuthbert Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.072837,39.934337]]}},{"id":"fAKTG3xfR90bOq3aebNjV29Tjz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Eastbound At Penn Av (Cherry Hill Twp) Wednesday May 13, 2026 07:00 AM thru 03:30 PM, 1 right lane of 3 lanes closed","update_date":"2026-05-12T23:30:17Z"},"road_event_id":"fAKTG3xfR90bOq3aebNjV29Tjz8=","beginning_cross_street":"Penn Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.040252,39.92184]]}},{"id":"fyiaupE0uBPSUyh89P69G+rzoPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Eastbound West of CR 627/Cooper Landing Rd (Cherry Hill Twp) Thursday May 14, 2026 08:00 AM thru 04:00 PM, 1 right lane of 3 lanes closed","update_date":"2026-05-12T23:31:04Z"},"road_event_id":"fyiaupE0uBPSUyh89P69G+rzoPQ=","beginning_cross_street":"West of CR 627/Cooper Landing Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T12:00:00Z","end_date":"2026-05-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.027847,39.91714]]}},{"id":"Rk7ZPnLrcQiW/eH3phXnYEx4XsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Eastbound from West of NJ 41/CR 154 (Cherry Hill Twp) to East of NJ 41/CR 154 (Cherry Hill Twp) Monday May 18, 2026 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes closed","update_date":"2026-05-12T23:31:08Z"},"road_event_id":"Rk7ZPnLrcQiW/eH3phXnYEx4XsI=","beginning_cross_street":"West of NJ 41/CR 154","ending_cross_street":"East of NJ 41/CR 154","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.015068,39.914779]]}},{"id":"yoy+5s+PEkrkhBSahWqR/NYwsrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Eastbound from West of NJ 41/CR 154 (Cherry Hill Twp) to East of NJ 41/CR 154 (Cherry Hill Twp) Tuesday May 19, 2026 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes closed","update_date":"2026-05-12T23:31:12Z"},"road_event_id":"yoy+5s+PEkrkhBSahWqR/NYwsrU=","beginning_cross_street":"West of NJ 41/CR 154","ending_cross_street":"East of NJ 41/CR 154","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T13:00:00Z","end_date":"2026-05-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.015068,39.914779]]}},{"id":"HYOp3jpLCiSFG685ZkCZhrEjrc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"70XXlcpmZKA0L5l+rVfBrKXrKN4="}],"description":"Line striping on NY 34B both directions between Cayuga; Tompkins County Line; Lansing Genoa Townline Road (Lansing) and CR-184 (Lansing) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:32:21Z"},"road_event_id":"HYOp3jpLCiSFG685ZkCZhrEjrc4=","beginning_cross_street":"Cayuga; Tompkins County Line; Lansing Genoa Townline Road","ending_cross_street":"CR-184","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.614287,42.622034]]}},{"id":"70XXlcpmZKA0L5l+rVfBrKXrKN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HYOp3jpLCiSFG685ZkCZhrEjrc4="},{"type":"next-occurrence","id":"jLsu1YPzsIad55P8wPx/o/qQbI8="}],"description":"Line striping on NY 34B both directions between Cayuga; Tompkins County Line; Lansing Genoa Townline Road (Lansing) and CR-184 (Lansing) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:32:21Z"},"road_event_id":"70XXlcpmZKA0L5l+rVfBrKXrKN4=","beginning_cross_street":"Cayuga; Tompkins County Line; Lansing Genoa Townline Road","ending_cross_street":"CR-184","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.614287,42.622034]]}},{"id":"jLsu1YPzsIad55P8wPx/o/qQbI8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HYOp3jpLCiSFG685ZkCZhrEjrc4="}],"description":"Line striping on NY 34B both directions between Cayuga; Tompkins County Line; Lansing Genoa Townline Road (Lansing) and CR-184 (Lansing) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:32:21Z"},"road_event_id":"jLsu1YPzsIad55P8wPx/o/qQbI8=","beginning_cross_street":"Cayuga; Tompkins County Line; Lansing Genoa Townline Road","ending_cross_street":"CR-184","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.614287,42.622034]]}},{"id":"RlelmR7oinv6Prq1pENIaxaF7lo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 38"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pb/uWDJOsJLhzlQoDHvLMGiObXQ="}],"description":"Line striping on NY 38 both directions between Town of Locke; Town of Groton Line (Groton) and East Cortland Street; NY 222 (Groton) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:48:05Z"},"road_event_id":"RlelmR7oinv6Prq1pENIaxaF7lo=","beginning_cross_street":"Town of Locke; Town of Groton Line","ending_cross_street":"East Cortland Street; NY 222","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.386511,42.620478]]}},{"id":"pb/uWDJOsJLhzlQoDHvLMGiObXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 38"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RlelmR7oinv6Prq1pENIaxaF7lo="},{"type":"next-occurrence","id":"wfcud4jaUmEDBY01a3UO4zKXVN4="}],"description":"Line striping on NY 38 both directions between Town of Locke; Town of Groton Line (Groton) and East Cortland Street; NY 222 (Groton) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:48:05Z"},"road_event_id":"pb/uWDJOsJLhzlQoDHvLMGiObXQ=","beginning_cross_street":"Town of Locke; Town of Groton Line","ending_cross_street":"East Cortland Street; NY 222","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.386511,42.620478]]}},{"id":"wfcud4jaUmEDBY01a3UO4zKXVN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 38"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RlelmR7oinv6Prq1pENIaxaF7lo="}],"description":"Line striping on NY 38 both directions between Town of Locke; Town of Groton Line (Groton) and East Cortland Street; NY 222 (Groton) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:48:05Z"},"road_event_id":"wfcud4jaUmEDBY01a3UO4zKXVN4=","beginning_cross_street":"Town of Locke; Town of Groton Line","ending_cross_street":"East Cortland Street; NY 222","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.386511,42.620478]]}},{"id":"U1tkysmPEv2enXejoo78rWJuidY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 38"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LyGahkLuIOQXI3DiKtqGoyZt4l0="}],"description":"Line striping on NY 38 both directions between Town of Dryden; Town of Harford Line (Harford) and North Street; NY 13 (Dryden) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:54:19Z"},"road_event_id":"U1tkysmPEv2enXejoo78rWJuidY=","beginning_cross_street":"Town of Dryden; Town of Harford Line","ending_cross_street":"North Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.258325,42.438879]]}},{"id":"LyGahkLuIOQXI3DiKtqGoyZt4l0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 38"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U1tkysmPEv2enXejoo78rWJuidY="},{"type":"next-occurrence","id":"8pbOXRAFtygyo3ULvgmF2F0KuZ0="}],"description":"Line striping on NY 38 both directions between Town of Dryden; Town of Harford Line (Harford) and North Street; NY 13 (Dryden) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:54:19Z"},"road_event_id":"LyGahkLuIOQXI3DiKtqGoyZt4l0=","beginning_cross_street":"Town of Dryden; Town of Harford Line","ending_cross_street":"North Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.258325,42.438879]]}},{"id":"8pbOXRAFtygyo3ULvgmF2F0KuZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 38"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U1tkysmPEv2enXejoo78rWJuidY="}],"description":"Line striping on NY 38 both directions between Town of Dryden; Town of Harford Line (Harford) and North Street; NY 13 (Dryden) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:54:19Z"},"road_event_id":"8pbOXRAFtygyo3ULvgmF2F0KuZ0=","beginning_cross_street":"Town of Dryden; Town of Harford Line","ending_cross_street":"North Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.258325,42.438879]]}},{"id":"Bm/lcmjXSasOCd+cHGyLtDmCGXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2AFcdSWGu6igMNYECByGivMxjv8="}],"description":"Line striping on NY 79 both directions between Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line (Caroline) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:02:08Z"},"road_event_id":"Bm/lcmjXSasOCd+cHGyLtDmCGXo=","beginning_cross_street":"Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.278645,42.378024]]}},{"id":"2AFcdSWGu6igMNYECByGivMxjv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bm/lcmjXSasOCd+cHGyLtDmCGXo="},{"type":"next-occurrence","id":"Zz8/exPSql4ssmeMLQSIKltD2gM="}],"description":"Line striping on NY 79 both directions between Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line (Caroline) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:02:08Z"},"road_event_id":"2AFcdSWGu6igMNYECByGivMxjv8=","beginning_cross_street":"Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.278645,42.378024]]}},{"id":"Zz8/exPSql4ssmeMLQSIKltD2gM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bm/lcmjXSasOCd+cHGyLtDmCGXo="},{"type":"next-occurrence","id":"VV80R3+gk0FwMqplor2ONct0Vz4="}],"description":"Line striping on NY 79 both directions between Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line (Caroline) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:02:08Z"},"road_event_id":"Zz8/exPSql4ssmeMLQSIKltD2gM=","beginning_cross_street":"Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.278645,42.378024]]}},{"id":"VV80R3+gk0FwMqplor2ONct0Vz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bm/lcmjXSasOCd+cHGyLtDmCGXo="},{"type":"next-occurrence","id":"V7F+oZ0qzv2Q/aKymvQJ9fYFczo="}],"description":"Line striping on NY 79 both directions between Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line (Caroline) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:02:08Z"},"road_event_id":"VV80R3+gk0FwMqplor2ONct0Vz4=","beginning_cross_street":"Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.278645,42.378024]]}},{"id":"V7F+oZ0qzv2Q/aKymvQJ9fYFczo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bm/lcmjXSasOCd+cHGyLtDmCGXo="},{"type":"next-occurrence","id":"BCxRLPAFQXgdBW8kB+hdmOKACvM="}],"description":"Line striping on NY 79 both directions between Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line (Caroline) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:02:08Z"},"road_event_id":"V7F+oZ0qzv2Q/aKymvQJ9fYFczo=","beginning_cross_street":"Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.278645,42.378024]]}},{"id":"BCxRLPAFQXgdBW8kB+hdmOKACvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bm/lcmjXSasOCd+cHGyLtDmCGXo="},{"type":"next-occurrence","id":"pnQ5NsNFknrEFGnd8ruCBTQcv/k="}],"description":"Line striping on NY 79 both directions between Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line (Caroline) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:02:08Z"},"road_event_id":"BCxRLPAFQXgdBW8kB+hdmOKACvM=","beginning_cross_street":"Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.278645,42.378024]]}},{"id":"pnQ5NsNFknrEFGnd8ruCBTQcv/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bm/lcmjXSasOCd+cHGyLtDmCGXo="},{"type":"next-occurrence","id":"QzPVOAmsp/LPU9AJZEOhJAyV5Us="}],"description":"Line striping on NY 79 both directions between Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line (Caroline) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:02:08Z"},"road_event_id":"pnQ5NsNFknrEFGnd8ruCBTQcv/k=","beginning_cross_street":"Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.278645,42.378024]]}},{"id":"QzPVOAmsp/LPU9AJZEOhJAyV5Us=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bm/lcmjXSasOCd+cHGyLtDmCGXo="},{"type":"next-occurrence","id":"oBc+oiTS5sP2hd1TZaITGZB/+7U="}],"description":"Line striping on NY 79 both directions between Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line (Caroline) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:02:08Z"},"road_event_id":"QzPVOAmsp/LPU9AJZEOhJAyV5Us=","beginning_cross_street":"Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.278645,42.378024]]}},{"id":"oBc+oiTS5sP2hd1TZaITGZB/+7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bm/lcmjXSasOCd+cHGyLtDmCGXo="},{"type":"next-occurrence","id":"3IUhe+aEAR9NMks/sNt5uPyHU8w="}],"description":"Line striping on NY 79 both directions between Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line (Caroline) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:02:08Z"},"road_event_id":"oBc+oiTS5sP2hd1TZaITGZB/+7U=","beginning_cross_street":"Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.278645,42.378024]]}},{"id":"3IUhe+aEAR9NMks/sNt5uPyHU8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bm/lcmjXSasOCd+cHGyLtDmCGXo="},{"type":"next-occurrence","id":"OfAJ6p0Iqgj4bTjwRcNJ5xr46X4="}],"description":"Line striping on NY 79 both directions between Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line (Caroline) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:02:08Z"},"road_event_id":"3IUhe+aEAR9NMks/sNt5uPyHU8w=","beginning_cross_street":"Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.278645,42.378024]]}},{"id":"OfAJ6p0Iqgj4bTjwRcNJ5xr46X4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bm/lcmjXSasOCd+cHGyLtDmCGXo="}],"description":"Line striping on NY 79 both directions between Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line (Caroline) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:02:08Z"},"road_event_id":"OfAJ6p0Iqgj4bTjwRcNJ5xr46X4=","beginning_cross_street":"Town of Caroline; Town of Richford Line; Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.278645,42.378024]]}},{"id":"uF/yD5MawXImzJI2XPGTF7aqOko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VjaXZYjdRKLRcJlZ0uK9b7cSBGk="}],"description":"Line striping on NY 79 both directions between City of Ithaca; Town of Ithaca Line (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:05:09Z"},"road_event_id":"uF/yD5MawXImzJI2XPGTF7aqOko=","beginning_cross_street":"City of Ithaca; Town of Ithaca Line","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526742,42.448679]]}},{"id":"VjaXZYjdRKLRcJlZ0uK9b7cSBGk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uF/yD5MawXImzJI2XPGTF7aqOko="},{"type":"next-occurrence","id":"t4B5f6dvZ3oTrRWqAO1G/CC2jNI="}],"description":"Line striping on NY 79 both directions between City of Ithaca; Town of Ithaca Line (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:05:09Z"},"road_event_id":"VjaXZYjdRKLRcJlZ0uK9b7cSBGk=","beginning_cross_street":"City of Ithaca; Town of Ithaca Line","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526742,42.448679]]}},{"id":"t4B5f6dvZ3oTrRWqAO1G/CC2jNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uF/yD5MawXImzJI2XPGTF7aqOko="},{"type":"next-occurrence","id":"KoY+jPTq8In7LhKkWAHATJSpgfI="}],"description":"Line striping on NY 79 both directions between City of Ithaca; Town of Ithaca Line (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:05:09Z"},"road_event_id":"t4B5f6dvZ3oTrRWqAO1G/CC2jNI=","beginning_cross_street":"City of Ithaca; Town of Ithaca Line","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526742,42.448679]]}},{"id":"KoY+jPTq8In7LhKkWAHATJSpgfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uF/yD5MawXImzJI2XPGTF7aqOko="},{"type":"next-occurrence","id":"eqGlOabon1lcJaS+e8ZPrc1XLX4="}],"description":"Line striping on NY 79 both directions between City of Ithaca; Town of Ithaca Line (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:05:09Z"},"road_event_id":"KoY+jPTq8In7LhKkWAHATJSpgfI=","beginning_cross_street":"City of Ithaca; Town of Ithaca Line","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526742,42.448679]]}},{"id":"eqGlOabon1lcJaS+e8ZPrc1XLX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uF/yD5MawXImzJI2XPGTF7aqOko="},{"type":"next-occurrence","id":"PVEJU4STLtFXKPwaVoclNaiEnXE="}],"description":"Line striping on NY 79 both directions between City of Ithaca; Town of Ithaca Line (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:05:09Z"},"road_event_id":"eqGlOabon1lcJaS+e8ZPrc1XLX4=","beginning_cross_street":"City of Ithaca; Town of Ithaca Line","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526742,42.448679]]}},{"id":"PVEJU4STLtFXKPwaVoclNaiEnXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uF/yD5MawXImzJI2XPGTF7aqOko="},{"type":"next-occurrence","id":"Oo85ITzxChhMNOcBYZ7UbXJSBtQ="}],"description":"Line striping on NY 79 both directions between City of Ithaca; Town of Ithaca Line (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:05:09Z"},"road_event_id":"PVEJU4STLtFXKPwaVoclNaiEnXE=","beginning_cross_street":"City of Ithaca; Town of Ithaca Line","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526742,42.448679]]}},{"id":"Oo85ITzxChhMNOcBYZ7UbXJSBtQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uF/yD5MawXImzJI2XPGTF7aqOko="},{"type":"next-occurrence","id":"Xt4cT6EABCBILTsgctEtzsl0wqI="}],"description":"Line striping on NY 79 both directions between City of Ithaca; Town of Ithaca Line (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:05:09Z"},"road_event_id":"Oo85ITzxChhMNOcBYZ7UbXJSBtQ=","beginning_cross_street":"City of Ithaca; Town of Ithaca Line","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526742,42.448679]]}},{"id":"Xt4cT6EABCBILTsgctEtzsl0wqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uF/yD5MawXImzJI2XPGTF7aqOko="},{"type":"next-occurrence","id":"zxTpNeQjYnM8UQOdqz+Z4SZCOJc="}],"description":"Line striping on NY 79 both directions between City of Ithaca; Town of Ithaca Line (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:05:09Z"},"road_event_id":"Xt4cT6EABCBILTsgctEtzsl0wqI=","beginning_cross_street":"City of Ithaca; Town of Ithaca Line","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526742,42.448679]]}},{"id":"zxTpNeQjYnM8UQOdqz+Z4SZCOJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uF/yD5MawXImzJI2XPGTF7aqOko="},{"type":"next-occurrence","id":"Y3600FnEqPIuBthfvTFTs8bTtbk="}],"description":"Line striping on NY 79 both directions between City of Ithaca; Town of Ithaca Line (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:05:09Z"},"road_event_id":"zxTpNeQjYnM8UQOdqz+Z4SZCOJc=","beginning_cross_street":"City of Ithaca; Town of Ithaca Line","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526742,42.448679]]}},{"id":"Y3600FnEqPIuBthfvTFTs8bTtbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uF/yD5MawXImzJI2XPGTF7aqOko="},{"type":"next-occurrence","id":"cypizxNOSzhlsQwl8At9rvkKZ00="}],"description":"Line striping on NY 79 both directions between City of Ithaca; Town of Ithaca Line (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:05:09Z"},"road_event_id":"Y3600FnEqPIuBthfvTFTs8bTtbk=","beginning_cross_street":"City of Ithaca; Town of Ithaca Line","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526742,42.448679]]}},{"id":"cypizxNOSzhlsQwl8At9rvkKZ00=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uF/yD5MawXImzJI2XPGTF7aqOko="}],"description":"Line striping on NY 79 both directions between City of Ithaca; Town of Ithaca Line (Ithaca) and Buck Hill Road South; Buck Hill Road North (Enfield) ; Alternating mobile lane closures, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T00:05:09Z"},"road_event_id":"cypizxNOSzhlsQwl8At9rvkKZ00=","beginning_cross_street":"City of Ithaca; Town of Ithaca Line","ending_cross_street":"Buck Hill Road  South; Buck Hill Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.526742,42.448679]]}},{"id":"xzIR3r0lz3mAV2KC9S6wimrExeg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"stxjoIgT0k1f6vCzVao0fwbi2MQ="}],"description":"Overnight roadwork on I-81 southbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and East Seneca Turnpike; NY 173 (Syracuse) ; Alternating lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-13T00:33:18Z"},"road_event_id":"xzIR3r0lz3mAV2KC9S6wimrExeg=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"East Seneca Turnpike; NY 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T16:00:00Z","end_date":"2026-05-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138851,43.013848]]}},{"id":"stxjoIgT0k1f6vCzVao0fwbi2MQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xzIR3r0lz3mAV2KC9S6wimrExeg="},{"type":"next-occurrence","id":"N076mnEdZmLPECfSo1zQU+sQh3g="}],"description":"Overnight roadwork on I-81 southbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and East Seneca Turnpike; NY 173 (Syracuse) ; Alternating lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-13T00:33:18Z"},"road_event_id":"stxjoIgT0k1f6vCzVao0fwbi2MQ=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"East Seneca Turnpike; NY 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T16:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138851,43.013848]]}},{"id":"N076mnEdZmLPECfSo1zQU+sQh3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xzIR3r0lz3mAV2KC9S6wimrExeg="},{"type":"next-occurrence","id":"wRgt2JGQOB4NZKpLMpKrQ43flf4="}],"description":"Overnight roadwork on I-81 southbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and East Seneca Turnpike; NY 173 (Syracuse) ; Alternating lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-13T00:33:18Z"},"road_event_id":"N076mnEdZmLPECfSo1zQU+sQh3g=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"East Seneca Turnpike; NY 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T16:00:00Z","end_date":"2026-05-21T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138851,43.013848]]}},{"id":"wRgt2JGQOB4NZKpLMpKrQ43flf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xzIR3r0lz3mAV2KC9S6wimrExeg="},{"type":"next-occurrence","id":"Jqfw+Dp+EmZusV+K+BAIpbGh9cc="}],"description":"Overnight roadwork on I-81 southbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and East Seneca Turnpike; NY 173 (Syracuse) ; Alternating lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-13T00:33:18Z"},"road_event_id":"wRgt2JGQOB4NZKpLMpKrQ43flf4=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"East Seneca Turnpike; NY 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T16:00:00Z","end_date":"2026-05-22T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138851,43.013848]]}},{"id":"Jqfw+Dp+EmZusV+K+BAIpbGh9cc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xzIR3r0lz3mAV2KC9S6wimrExeg="}],"description":"Overnight roadwork on I-81 southbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and East Seneca Turnpike; NY 173 (Syracuse) ; Alternating lane closures, Sunday May 17th, 2026 thru Friday May 22nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-13T00:33:18Z"},"road_event_id":"Jqfw+Dp+EmZusV+K+BAIpbGh9cc=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"East Seneca Turnpike; NY 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T16:00:00Z","end_date":"2026-05-23T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138851,43.013848]]}},{"id":"QL2xnKKkFJRqoHQuhFuveba0lzo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Overnight roadwork on I-81 northbound between Exit 16A - I-481 (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse), Tuesday May 26th, 2026 thru Wednesday June 3rd, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-13T00:36:55Z"},"road_event_id":"QL2xnKKkFJRqoHQuhFuveba0lzo=","beginning_cross_street":"Exit 16A - I-481","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T16:00:00Z","end_date":"2026-05-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13367,43.003632]]}},{"id":"iVpSuLt6fOxwzgJxvA0gQkx0jHY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XXtGRlEdX99PDo9tdSExXmQeKPw="}],"description":"Utility work on NY 21 northbound at Clark St (Naples) We have a customer out of service, need to splice aerial fiber. Right/Left lane/shoulder closure needed. , Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-13T00:50:05Z"},"road_event_id":"iVpSuLt6fOxwzgJxvA0gQkx0jHY=","beginning_cross_street":"Clark St ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.4067,42.61042]]}},{"id":"XXtGRlEdX99PDo9tdSExXmQeKPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iVpSuLt6fOxwzgJxvA0gQkx0jHY="},{"type":"next-occurrence","id":"lUO1MxuFnwOLWEKw1ZA2107TKUw="}],"description":"Utility work on NY 21 northbound at Clark St (Naples) We have a customer out of service, need to splice aerial fiber. Right/Left lane/shoulder closure needed. , Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-13T00:50:05Z"},"road_event_id":"XXtGRlEdX99PDo9tdSExXmQeKPw=","beginning_cross_street":"Clark St ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T13:00:00Z","end_date":"2026-05-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.4067,42.61042]]}},{"id":"lUO1MxuFnwOLWEKw1ZA2107TKUw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iVpSuLt6fOxwzgJxvA0gQkx0jHY="}],"description":"Utility work on NY 21 northbound at Clark St (Naples) We have a customer out of service, need to splice aerial fiber. Right/Left lane/shoulder closure needed. , Wednesday May 13th, 2026 thru Friday May 15th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-13T00:50:05Z"},"road_event_id":"lUO1MxuFnwOLWEKw1ZA2107TKUw=","beginning_cross_street":"Clark St ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T13:00:00Z","end_date":"2026-05-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.4067,42.61042]]}},{"id":"09wy649TlZ/D3ZbSYg60dMWlieg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"i1Jh3NVZzDo+TDCpfVQPdRj+s4M="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:17:09Z"},"road_event_id":"09wy649TlZ/D3ZbSYg60dMWlieg=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29755,42.490574]]}},{"id":"i1Jh3NVZzDo+TDCpfVQPdRj+s4M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"09wy649TlZ/D3ZbSYg60dMWlieg="},{"type":"next-occurrence","id":"1r1LjXKaFUTweycs2LOLOVclBOU="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:17:09Z"},"road_event_id":"i1Jh3NVZzDo+TDCpfVQPdRj+s4M=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29755,42.490574]]}},{"id":"1r1LjXKaFUTweycs2LOLOVclBOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"09wy649TlZ/D3ZbSYg60dMWlieg="},{"type":"next-occurrence","id":"4fKVJK4w+rTzVDl3Gyp2sGY08ss="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:17:09Z"},"road_event_id":"1r1LjXKaFUTweycs2LOLOVclBOU=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29755,42.490574]]}},{"id":"4fKVJK4w+rTzVDl3Gyp2sGY08ss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"09wy649TlZ/D3ZbSYg60dMWlieg="},{"type":"next-occurrence","id":"Hbsq6Nuio4OS8TuF2cW1seCZ9FI="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:17:09Z"},"road_event_id":"4fKVJK4w+rTzVDl3Gyp2sGY08ss=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29755,42.490574]]}},{"id":"Hbsq6Nuio4OS8TuF2cW1seCZ9FI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"09wy649TlZ/D3ZbSYg60dMWlieg="},{"type":"next-occurrence","id":"MnUTUWMyQoaJ1A8GvmuhJZReZ5c="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:17:09Z"},"road_event_id":"Hbsq6Nuio4OS8TuF2cW1seCZ9FI=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29755,42.490574]]}},{"id":"MnUTUWMyQoaJ1A8GvmuhJZReZ5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"09wy649TlZ/D3ZbSYg60dMWlieg="},{"type":"next-occurrence","id":"B0RW6+t8Yq/Gx0kSdMsmic0Y6fo="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:17:09Z"},"road_event_id":"MnUTUWMyQoaJ1A8GvmuhJZReZ5c=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29755,42.490574]]}},{"id":"B0RW6+t8Yq/Gx0kSdMsmic0Y6fo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"09wy649TlZ/D3ZbSYg60dMWlieg="},{"type":"next-occurrence","id":"YHfnWuuGVdvw9JRT4iH2uz6N9a4="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:17:09Z"},"road_event_id":"B0RW6+t8Yq/Gx0kSdMsmic0Y6fo=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29755,42.490574]]}},{"id":"YHfnWuuGVdvw9JRT4iH2uz6N9a4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"09wy649TlZ/D3ZbSYg60dMWlieg="},{"type":"next-occurrence","id":"6pNocnItR2meOXq31CqiEhA7X+8="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:17:09Z"},"road_event_id":"YHfnWuuGVdvw9JRT4iH2uz6N9a4=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29755,42.490574]]}},{"id":"6pNocnItR2meOXq31CqiEhA7X+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"09wy649TlZ/D3ZbSYg60dMWlieg="},{"type":"next-occurrence","id":"/6ESIGZopRygbZNIwDvGLHP1iRI="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:17:09Z"},"road_event_id":"6pNocnItR2meOXq31CqiEhA7X+8=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29755,42.490574]]}},{"id":"/6ESIGZopRygbZNIwDvGLHP1iRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"09wy649TlZ/D3ZbSYg60dMWlieg="},{"type":"next-occurrence","id":"iDUM4pvZx5HYf7Htie0/BNvPM0s="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:17:09Z"},"road_event_id":"/6ESIGZopRygbZNIwDvGLHP1iRI=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29755,42.490574]]}},{"id":"iDUM4pvZx5HYf7Htie0/BNvPM0s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"09wy649TlZ/D3ZbSYg60dMWlieg="}],"description":"Line striping on NY 392 both directions between West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street (Dryden) and Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:17:09Z"},"road_event_id":"iDUM4pvZx5HYf7Htie0/BNvPM0s=","beginning_cross_street":"West Main Street; NY 13; START ROUTE NY 392; South Street; NY 38; North Street","ending_cross_street":"Town of Dryden; Town of Virgil Line; Tompkins-Cortland County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.29755,42.490574]]}},{"id":"kZph6rssNW4FfZQekUscGv/dEPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wILXBprW0tmaMeTJRX3jem9lVFQ="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"kZph6rssNW4FfZQekUscGv/dEPY=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"wILXBprW0tmaMeTJRX3jem9lVFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kZph6rssNW4FfZQekUscGv/dEPY="},{"type":"next-occurrence","id":"rbX7vXIt1TurLEY6XqzQ4aSswSA="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"wILXBprW0tmaMeTJRX3jem9lVFQ=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"rbX7vXIt1TurLEY6XqzQ4aSswSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kZph6rssNW4FfZQekUscGv/dEPY="},{"type":"next-occurrence","id":"SaeW59VrLe80mVwmI24ERCDCt5o="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"rbX7vXIt1TurLEY6XqzQ4aSswSA=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"SaeW59VrLe80mVwmI24ERCDCt5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kZph6rssNW4FfZQekUscGv/dEPY="},{"type":"next-occurrence","id":"BgPMStcmcfkOAF56/PL2+sednSQ="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"SaeW59VrLe80mVwmI24ERCDCt5o=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"BgPMStcmcfkOAF56/PL2+sednSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kZph6rssNW4FfZQekUscGv/dEPY="},{"type":"next-occurrence","id":"L9tQTCgE51MK8PzjdoAhLwyrD1g="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"BgPMStcmcfkOAF56/PL2+sednSQ=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"L9tQTCgE51MK8PzjdoAhLwyrD1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kZph6rssNW4FfZQekUscGv/dEPY="},{"type":"next-occurrence","id":"nJBvftEBbTQJo59E80PSBvydAts="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"L9tQTCgE51MK8PzjdoAhLwyrD1g=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"nJBvftEBbTQJo59E80PSBvydAts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kZph6rssNW4FfZQekUscGv/dEPY="},{"type":"next-occurrence","id":"cdv1me4+GHO/+/Spj2LC0C5SF90="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"nJBvftEBbTQJo59E80PSBvydAts=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"cdv1me4+GHO/+/Spj2LC0C5SF90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kZph6rssNW4FfZQekUscGv/dEPY="},{"type":"next-occurrence","id":"hS0eDxqcDjNTcuxm+9Fg8mOwPHc="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"cdv1me4+GHO/+/Spj2LC0C5SF90=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"hS0eDxqcDjNTcuxm+9Fg8mOwPHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kZph6rssNW4FfZQekUscGv/dEPY="},{"type":"next-occurrence","id":"f7J9QooCfEodm/sI9yiXWJqGEHs="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"hS0eDxqcDjNTcuxm+9Fg8mOwPHc=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"f7J9QooCfEodm/sI9yiXWJqGEHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kZph6rssNW4FfZQekUscGv/dEPY="},{"type":"next-occurrence","id":"vgnuEOBwRjj4/KKm8Gch8q42b1M="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"f7J9QooCfEodm/sI9yiXWJqGEHs=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"vgnuEOBwRjj4/KKm8Gch8q42b1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kZph6rssNW4FfZQekUscGv/dEPY="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"vgnuEOBwRjj4/KKm8Gch8q42b1M=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"S1Auo80IMhzlaQwJjCkNO/r76EE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8BNS29yqqNbjYWE9SO8Vd5fVZr4="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"S1Auo80IMhzlaQwJjCkNO/r76EE=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"8BNS29yqqNbjYWE9SO8Vd5fVZr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S1Auo80IMhzlaQwJjCkNO/r76EE="},{"type":"next-occurrence","id":"q61fMmgdYj1CF4n3lOP0jeasrQE="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"8BNS29yqqNbjYWE9SO8Vd5fVZr4=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"q61fMmgdYj1CF4n3lOP0jeasrQE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S1Auo80IMhzlaQwJjCkNO/r76EE="},{"type":"next-occurrence","id":"V7r9yhSJkl9kquJ8AJ4uaDrOq08="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"q61fMmgdYj1CF4n3lOP0jeasrQE=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"V7r9yhSJkl9kquJ8AJ4uaDrOq08=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S1Auo80IMhzlaQwJjCkNO/r76EE="},{"type":"next-occurrence","id":"Y42w34TNZ5BFug8dEnUCgzm9N4M="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"V7r9yhSJkl9kquJ8AJ4uaDrOq08=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"Y42w34TNZ5BFug8dEnUCgzm9N4M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S1Auo80IMhzlaQwJjCkNO/r76EE="},{"type":"next-occurrence","id":"VSXYGN2GXrxqGkGzi64wsWRSMqw="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"Y42w34TNZ5BFug8dEnUCgzm9N4M=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"VSXYGN2GXrxqGkGzi64wsWRSMqw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S1Auo80IMhzlaQwJjCkNO/r76EE="},{"type":"next-occurrence","id":"3/lwcu4WLSDhSE/j2Wo/7LG51O4="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"VSXYGN2GXrxqGkGzi64wsWRSMqw=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"3/lwcu4WLSDhSE/j2Wo/7LG51O4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S1Auo80IMhzlaQwJjCkNO/r76EE="},{"type":"next-occurrence","id":"p0jNrnpmIteB9McW4zpQ9b6oyog="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"3/lwcu4WLSDhSE/j2Wo/7LG51O4=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"p0jNrnpmIteB9McW4zpQ9b6oyog=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S1Auo80IMhzlaQwJjCkNO/r76EE="},{"type":"next-occurrence","id":"Ddgn+leCBCi48C9Rc0qjQPKO8b4="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"p0jNrnpmIteB9McW4zpQ9b6oyog=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"Ddgn+leCBCi48C9Rc0qjQPKO8b4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S1Auo80IMhzlaQwJjCkNO/r76EE="},{"type":"next-occurrence","id":"kO8+9oNY7HH5I4O+u+x8zMbDODQ="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"Ddgn+leCBCi48C9Rc0qjQPKO8b4=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"kO8+9oNY7HH5I4O+u+x8zMbDODQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S1Auo80IMhzlaQwJjCkNO/r76EE="},{"type":"next-occurrence","id":"HEOqLqlI3JIMLUytrNGLQqOMqw0="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"kO8+9oNY7HH5I4O+u+x8zMbDODQ=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"HEOqLqlI3JIMLUytrNGLQqOMqw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S1Auo80IMhzlaQwJjCkNO/r76EE="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"HEOqLqlI3JIMLUytrNGLQqOMqw0=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"8SDm9vSowb3r5uuRczRP96gJfQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lL3g9qxJKA9SKtziLZCD+AZJhUw="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"8SDm9vSowb3r5uuRczRP96gJfQA=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"lL3g9qxJKA9SKtziLZCD+AZJhUw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8SDm9vSowb3r5uuRczRP96gJfQA="},{"type":"next-occurrence","id":"wpgTvKCuBk7bbHfLnA8JcaOp3rM="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"lL3g9qxJKA9SKtziLZCD+AZJhUw=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"wpgTvKCuBk7bbHfLnA8JcaOp3rM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8SDm9vSowb3r5uuRczRP96gJfQA="},{"type":"next-occurrence","id":"7a1krcDRv6bQ/uyGNV8nfFvZ30I="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"wpgTvKCuBk7bbHfLnA8JcaOp3rM=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"7a1krcDRv6bQ/uyGNV8nfFvZ30I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8SDm9vSowb3r5uuRczRP96gJfQA="},{"type":"next-occurrence","id":"1ybXEYOLOaCU/lZxhA4/4RnhwyI="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"7a1krcDRv6bQ/uyGNV8nfFvZ30I=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T10:00:00Z","end_date":"2026-05-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"1ybXEYOLOaCU/lZxhA4/4RnhwyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8SDm9vSowb3r5uuRczRP96gJfQA="},{"type":"next-occurrence","id":"wME/DzeeExzVo/iCZoQd8V0X5Dw="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"1ybXEYOLOaCU/lZxhA4/4RnhwyI=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-17T10:00:00Z","end_date":"2026-05-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"wME/DzeeExzVo/iCZoQd8V0X5Dw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8SDm9vSowb3r5uuRczRP96gJfQA="},{"type":"next-occurrence","id":"Uah1201dW6FoOYoZHSyDs4V/Rh4="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"wME/DzeeExzVo/iCZoQd8V0X5Dw=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"Uah1201dW6FoOYoZHSyDs4V/Rh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8SDm9vSowb3r5uuRczRP96gJfQA="},{"type":"next-occurrence","id":"TUeDPnALZ9TYQGerEQCs1v1PRvE="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"Uah1201dW6FoOYoZHSyDs4V/Rh4=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"TUeDPnALZ9TYQGerEQCs1v1PRvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8SDm9vSowb3r5uuRczRP96gJfQA="},{"type":"next-occurrence","id":"RkIBymeGukoScRwTYRWitDk0X9E="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"TUeDPnALZ9TYQGerEQCs1v1PRvE=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"RkIBymeGukoScRwTYRWitDk0X9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8SDm9vSowb3r5uuRczRP96gJfQA="},{"type":"next-occurrence","id":"GqW0BS4LmaUv0l9jf6UqyI8WdIY="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"RkIBymeGukoScRwTYRWitDk0X9E=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"GqW0BS4LmaUv0l9jf6UqyI8WdIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8SDm9vSowb3r5uuRczRP96gJfQA="},{"type":"next-occurrence","id":"x1lA+sEA0LR0WMD+l4sMVESzDVs="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"GqW0BS4LmaUv0l9jf6UqyI8WdIY=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"x1lA+sEA0LR0WMD+l4sMVESzDVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8SDm9vSowb3r5uuRczRP96gJfQA="},{"type":"next-occurrence","id":"xIu6m4Co8Aoz5NtqH3OxL+ekTLQ="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"x1lA+sEA0LR0WMD+l4sMVESzDVs=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T10:00:00Z","end_date":"2026-05-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"xIu6m4Co8Aoz5NtqH3OxL+ekTLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8SDm9vSowb3r5uuRczRP96gJfQA="},{"type":"next-occurrence","id":"/nCyNEoB1raihQotntdFjZbwNMY="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"xIu6m4Co8Aoz5NtqH3OxL+ekTLQ=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-24T10:00:00Z","end_date":"2026-05-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"/nCyNEoB1raihQotntdFjZbwNMY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8SDm9vSowb3r5uuRczRP96gJfQA="},{"type":"next-occurrence","id":"neTfZ7xPQEG5Dew0y6tAYAVQHF4="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"/nCyNEoB1raihQotntdFjZbwNMY=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"neTfZ7xPQEG5Dew0y6tAYAVQHF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8SDm9vSowb3r5uuRczRP96gJfQA="},{"type":"next-occurrence","id":"mJPgzSV/QvJadZc1M/4VjM8UrAQ="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"neTfZ7xPQEG5Dew0y6tAYAVQHF4=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"mJPgzSV/QvJadZc1M/4VjM8UrAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8SDm9vSowb3r5uuRczRP96gJfQA="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"mJPgzSV/QvJadZc1M/4VjM8UrAQ=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"A8G0z8cImOp6RHPI0nJt7XXCUhU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Utility work on US 9 westbound between Sherwood Drive (East Greenbush) and Lakeview Drive (East Greenbush), Wednesday May 13th, 2026, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-13T01:36:02Z"},"road_event_id":"A8G0z8cImOp6RHPI0nJt7XXCUhU=","beginning_cross_street":"Sherwood Drive","ending_cross_street":"Lakeview Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.734596,42.619613]]}},{"id":"NMMk0Nysos/9yYDbOxA/iMCVrM0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wJqvpaZYtLwPg1n2DqgOopavjnk="}],"description":"Roadwork on NY 96 both directions between Seneca County Line (Ulysses) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:00Z"},"road_event_id":"NMMk0Nysos/9yYDbOxA/iMCVrM0=","beginning_cross_street":"Seneca County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.672982,42.547306]]}},{"id":"wJqvpaZYtLwPg1n2DqgOopavjnk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NMMk0Nysos/9yYDbOxA/iMCVrM0="},{"type":"next-occurrence","id":"B8L502Jz8QjXc70mY8ZF/GMKaFE="}],"description":"Roadwork on NY 96 both directions between Seneca County Line (Ulysses) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:00Z"},"road_event_id":"wJqvpaZYtLwPg1n2DqgOopavjnk=","beginning_cross_street":"Seneca County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.672982,42.547306]]}},{"id":"B8L502Jz8QjXc70mY8ZF/GMKaFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NMMk0Nysos/9yYDbOxA/iMCVrM0="},{"type":"next-occurrence","id":"KjgTFahF9nUFH9qNA2EodAObxSk="}],"description":"Roadwork on NY 96 both directions between Seneca County Line (Ulysses) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:00Z"},"road_event_id":"B8L502Jz8QjXc70mY8ZF/GMKaFE=","beginning_cross_street":"Seneca County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.672982,42.547306]]}},{"id":"KjgTFahF9nUFH9qNA2EodAObxSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NMMk0Nysos/9yYDbOxA/iMCVrM0="},{"type":"next-occurrence","id":"ObX9NHKQZ4H/8fcnsdCjr71Eo18="}],"description":"Roadwork on NY 96 both directions between Seneca County Line (Ulysses) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:00Z"},"road_event_id":"KjgTFahF9nUFH9qNA2EodAObxSk=","beginning_cross_street":"Seneca County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.672982,42.547306]]}},{"id":"ObX9NHKQZ4H/8fcnsdCjr71Eo18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NMMk0Nysos/9yYDbOxA/iMCVrM0="},{"type":"next-occurrence","id":"Wm4jaGGGDkEybF5H1wpNsflHLKM="}],"description":"Roadwork on NY 96 both directions between Seneca County Line (Ulysses) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:00Z"},"road_event_id":"ObX9NHKQZ4H/8fcnsdCjr71Eo18=","beginning_cross_street":"Seneca County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.672982,42.547306]]}},{"id":"Wm4jaGGGDkEybF5H1wpNsflHLKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NMMk0Nysos/9yYDbOxA/iMCVrM0="},{"type":"next-occurrence","id":"4zolnSWDnSzuJen0JjA1lpqle8I="}],"description":"Roadwork on NY 96 both directions between Seneca County Line (Ulysses) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:00Z"},"road_event_id":"Wm4jaGGGDkEybF5H1wpNsflHLKM=","beginning_cross_street":"Seneca County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.672982,42.547306]]}},{"id":"4zolnSWDnSzuJen0JjA1lpqle8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NMMk0Nysos/9yYDbOxA/iMCVrM0="},{"type":"next-occurrence","id":"e4Cbq5hPggHigVHgaHHt3sKDYOg="}],"description":"Roadwork on NY 96 both directions between Seneca County Line (Ulysses) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:00Z"},"road_event_id":"4zolnSWDnSzuJen0JjA1lpqle8I=","beginning_cross_street":"Seneca County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.672982,42.547306]]}},{"id":"e4Cbq5hPggHigVHgaHHt3sKDYOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NMMk0Nysos/9yYDbOxA/iMCVrM0="},{"type":"next-occurrence","id":"lhLM907QPYaGbAa7oiIddnMN1Tw="}],"description":"Roadwork on NY 96 both directions between Seneca County Line (Ulysses) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:00Z"},"road_event_id":"e4Cbq5hPggHigVHgaHHt3sKDYOg=","beginning_cross_street":"Seneca County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.672982,42.547306]]}},{"id":"lhLM907QPYaGbAa7oiIddnMN1Tw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NMMk0Nysos/9yYDbOxA/iMCVrM0="},{"type":"next-occurrence","id":"YbwGHPVn9fNgSI/kX1n5kfd+R5k="}],"description":"Roadwork on NY 96 both directions between Seneca County Line (Ulysses) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:00Z"},"road_event_id":"lhLM907QPYaGbAa7oiIddnMN1Tw=","beginning_cross_street":"Seneca County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.672982,42.547306]]}},{"id":"YbwGHPVn9fNgSI/kX1n5kfd+R5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NMMk0Nysos/9yYDbOxA/iMCVrM0="},{"type":"next-occurrence","id":"xAcqYDtsAm65/XcnS9CZ3UVQfjg="}],"description":"Roadwork on NY 96 both directions between Seneca County Line (Ulysses) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:00Z"},"road_event_id":"YbwGHPVn9fNgSI/kX1n5kfd+R5k=","beginning_cross_street":"Seneca County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.672982,42.547306]]}},{"id":"xAcqYDtsAm65/XcnS9CZ3UVQfjg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NMMk0Nysos/9yYDbOxA/iMCVrM0="}],"description":"Roadwork on NY 96 both directions between Seneca County Line (Ulysses) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:00Z"},"road_event_id":"xAcqYDtsAm65/XcnS9CZ3UVQfjg=","beginning_cross_street":"Seneca County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.672982,42.547306]]}},{"id":"WVWIEVgJD0qBHkhcG4I0q3ZcW1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zze7gfIyexzifaN7wAdnLgUl7TY="}],"description":"Roadwork on NY 96B both directions between Tompkins; Tioga County Line (Danby) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:29Z"},"road_event_id":"WVWIEVgJD0qBHkhcG4I0q3ZcW1s=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.439291,42.330062]]}},{"id":"zze7gfIyexzifaN7wAdnLgUl7TY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WVWIEVgJD0qBHkhcG4I0q3ZcW1s="},{"type":"next-occurrence","id":"93nnOd+OGcc85QXK664myL2m7vk="}],"description":"Roadwork on NY 96B both directions between Tompkins; Tioga County Line (Danby) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:29Z"},"road_event_id":"zze7gfIyexzifaN7wAdnLgUl7TY=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.439291,42.330062]]}},{"id":"93nnOd+OGcc85QXK664myL2m7vk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WVWIEVgJD0qBHkhcG4I0q3ZcW1s="},{"type":"next-occurrence","id":"uvSE0toljGN5XCl3z/QE5zzi2ow="}],"description":"Roadwork on NY 96B both directions between Tompkins; Tioga County Line (Danby) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:29Z"},"road_event_id":"93nnOd+OGcc85QXK664myL2m7vk=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.439291,42.330062]]}},{"id":"uvSE0toljGN5XCl3z/QE5zzi2ow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WVWIEVgJD0qBHkhcG4I0q3ZcW1s="},{"type":"next-occurrence","id":"LnLHEmUtCxchrDfE7k0QSVw1PBU="}],"description":"Roadwork on NY 96B both directions between Tompkins; Tioga County Line (Danby) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:29Z"},"road_event_id":"uvSE0toljGN5XCl3z/QE5zzi2ow=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.439291,42.330062]]}},{"id":"LnLHEmUtCxchrDfE7k0QSVw1PBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WVWIEVgJD0qBHkhcG4I0q3ZcW1s="},{"type":"next-occurrence","id":"Ywbw+GQdgtuTurMh2efHKYDfD+A="}],"description":"Roadwork on NY 96B both directions between Tompkins; Tioga County Line (Danby) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:29Z"},"road_event_id":"LnLHEmUtCxchrDfE7k0QSVw1PBU=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.439291,42.330062]]}},{"id":"Ywbw+GQdgtuTurMh2efHKYDfD+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WVWIEVgJD0qBHkhcG4I0q3ZcW1s="},{"type":"next-occurrence","id":"uBVM6ovCLM9cYZrIHZu9ptshFo8="}],"description":"Roadwork on NY 96B both directions between Tompkins; Tioga County Line (Danby) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:29Z"},"road_event_id":"Ywbw+GQdgtuTurMh2efHKYDfD+A=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.439291,42.330062]]}},{"id":"uBVM6ovCLM9cYZrIHZu9ptshFo8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WVWIEVgJD0qBHkhcG4I0q3ZcW1s="},{"type":"next-occurrence","id":"/7N/KUFadpz5FI7SVXEPyGVkvcM="}],"description":"Roadwork on NY 96B both directions between Tompkins; Tioga County Line (Danby) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:29Z"},"road_event_id":"uBVM6ovCLM9cYZrIHZu9ptshFo8=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.439291,42.330062]]}},{"id":"/7N/KUFadpz5FI7SVXEPyGVkvcM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WVWIEVgJD0qBHkhcG4I0q3ZcW1s="},{"type":"next-occurrence","id":"fqIQk+5F5J9dBrRgEvdyBaQR7uE="}],"description":"Roadwork on NY 96B both directions between Tompkins; Tioga County Line (Danby) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:29Z"},"road_event_id":"/7N/KUFadpz5FI7SVXEPyGVkvcM=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.439291,42.330062]]}},{"id":"fqIQk+5F5J9dBrRgEvdyBaQR7uE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WVWIEVgJD0qBHkhcG4I0q3ZcW1s="},{"type":"next-occurrence","id":"o70VvD6buH84YjyiFOUx0XiW508="}],"description":"Roadwork on NY 96B both directions between Tompkins; Tioga County Line (Danby) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:29Z"},"road_event_id":"fqIQk+5F5J9dBrRgEvdyBaQR7uE=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.439291,42.330062]]}},{"id":"o70VvD6buH84YjyiFOUx0XiW508=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WVWIEVgJD0qBHkhcG4I0q3ZcW1s="},{"type":"next-occurrence","id":"6za8eoamAAZGz5patZWLpxI3KEc="}],"description":"Roadwork on NY 96B both directions between Tompkins; Tioga County Line (Danby) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:29Z"},"road_event_id":"o70VvD6buH84YjyiFOUx0XiW508=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.439291,42.330062]]}},{"id":"6za8eoamAAZGz5patZWLpxI3KEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WVWIEVgJD0qBHkhcG4I0q3ZcW1s="}],"description":"Roadwork on NY 96B both directions between Tompkins; Tioga County Line (Danby) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:29Z"},"road_event_id":"6za8eoamAAZGz5patZWLpxI3KEc=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.439291,42.330062]]}},{"id":"nZGxg72dxZrUiz8MmkZW7uNy4Gc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RZ11lYig7pHsoDyVV5O8tf289OQ="}],"description":"Roadwork on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Cortland; Tompkins County Line (Groton) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:59Z"},"road_event_id":"nZGxg72dxZrUiz8MmkZW7uNy4Gc=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Cortland; Tompkins County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367849,42.590719]]}},{"id":"RZ11lYig7pHsoDyVV5O8tf289OQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nZGxg72dxZrUiz8MmkZW7uNy4Gc="},{"type":"next-occurrence","id":"bWmi8+x0GlPN5kZBurhmTBAYcvI="}],"description":"Roadwork on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Cortland; Tompkins County Line (Groton) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:59Z"},"road_event_id":"RZ11lYig7pHsoDyVV5O8tf289OQ=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Cortland; Tompkins County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367849,42.590719]]}},{"id":"bWmi8+x0GlPN5kZBurhmTBAYcvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nZGxg72dxZrUiz8MmkZW7uNy4Gc="},{"type":"next-occurrence","id":"plOp6VPQ9nMNuftr5vqlwFyMrVM="}],"description":"Roadwork on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Cortland; Tompkins County Line (Groton) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:59Z"},"road_event_id":"bWmi8+x0GlPN5kZBurhmTBAYcvI=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Cortland; Tompkins County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367849,42.590719]]}},{"id":"plOp6VPQ9nMNuftr5vqlwFyMrVM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nZGxg72dxZrUiz8MmkZW7uNy4Gc="},{"type":"next-occurrence","id":"oNSB4AUydRTl9xr1yIinPAIZ72U="}],"description":"Roadwork on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Cortland; Tompkins County Line (Groton) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:59Z"},"road_event_id":"plOp6VPQ9nMNuftr5vqlwFyMrVM=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Cortland; Tompkins County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367849,42.590719]]}},{"id":"oNSB4AUydRTl9xr1yIinPAIZ72U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nZGxg72dxZrUiz8MmkZW7uNy4Gc="},{"type":"next-occurrence","id":"T0ZGbmK9K6GFPnaaC9ETmP8ERgo="}],"description":"Roadwork on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Cortland; Tompkins County Line (Groton) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:59Z"},"road_event_id":"oNSB4AUydRTl9xr1yIinPAIZ72U=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Cortland; Tompkins County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367849,42.590719]]}},{"id":"T0ZGbmK9K6GFPnaaC9ETmP8ERgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nZGxg72dxZrUiz8MmkZW7uNy4Gc="},{"type":"next-occurrence","id":"MKMDufgurBUwXvKQfZkQPTlGCt4="}],"description":"Roadwork on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Cortland; Tompkins County Line (Groton) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:59Z"},"road_event_id":"T0ZGbmK9K6GFPnaaC9ETmP8ERgo=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Cortland; Tompkins County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367849,42.590719]]}},{"id":"MKMDufgurBUwXvKQfZkQPTlGCt4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nZGxg72dxZrUiz8MmkZW7uNy4Gc="},{"type":"next-occurrence","id":"zpnzEWp3wcbhad/6Ls/cgHlzDmg="}],"description":"Roadwork on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Cortland; Tompkins County Line (Groton) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:59Z"},"road_event_id":"MKMDufgurBUwXvKQfZkQPTlGCt4=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Cortland; Tompkins County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367849,42.590719]]}},{"id":"zpnzEWp3wcbhad/6Ls/cgHlzDmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nZGxg72dxZrUiz8MmkZW7uNy4Gc="},{"type":"next-occurrence","id":"FlpCJvfLskJx12T7CgoLOMUEr9Y="}],"description":"Roadwork on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Cortland; Tompkins County Line (Groton) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:59Z"},"road_event_id":"zpnzEWp3wcbhad/6Ls/cgHlzDmg=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Cortland; Tompkins County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367849,42.590719]]}},{"id":"FlpCJvfLskJx12T7CgoLOMUEr9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nZGxg72dxZrUiz8MmkZW7uNy4Gc="},{"type":"next-occurrence","id":"87iCjxfyhWQ+dZmi6leN4nnwWNY="}],"description":"Roadwork on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Cortland; Tompkins County Line (Groton) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:59Z"},"road_event_id":"FlpCJvfLskJx12T7CgoLOMUEr9Y=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Cortland; Tompkins County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367849,42.590719]]}},{"id":"87iCjxfyhWQ+dZmi6leN4nnwWNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nZGxg72dxZrUiz8MmkZW7uNy4Gc="},{"type":"next-occurrence","id":"Vob88tnVwygYJyk1m/h7U5avjyI="}],"description":"Roadwork on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Cortland; Tompkins County Line (Groton) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:59Z"},"road_event_id":"87iCjxfyhWQ+dZmi6leN4nnwWNY=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Cortland; Tompkins County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367849,42.590719]]}},{"id":"Vob88tnVwygYJyk1m/h7U5avjyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nZGxg72dxZrUiz8MmkZW7uNy4Gc="}],"description":"Roadwork on NY 222 both directions between Cayuga Street; NY 38; START ROUTE NY 222; Main Street (Groton) and Cortland; Tompkins County Line (Groton) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:40:59Z"},"road_event_id":"Vob88tnVwygYJyk1m/h7U5avjyI=","beginning_cross_street":"Cayuga Street; NY 38; START ROUTE NY 222; Main Street","ending_cross_street":"Cortland; Tompkins County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.367849,42.590719]]}},{"id":"/XfBeeajBH8M6KNBTA8ZDLDvX+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"meyFYurzfqc694v+MTOPOKEKHUo="}],"description":"Line striping on NY 227 both directions between Tompkins-Schuyler County Line (Hector) and West Main Street; NY 96 (Ulysses) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:03:03Z"},"road_event_id":"/XfBeeajBH8M6KNBTA8ZDLDvX+w=","beginning_cross_street":"Tompkins-Schuyler County Line","ending_cross_street":"West Main Street; NY 96","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.693481,42.497096]]}},{"id":"meyFYurzfqc694v+MTOPOKEKHUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/XfBeeajBH8M6KNBTA8ZDLDvX+w="},{"type":"next-occurrence","id":"0iYnSr4Egjpc6w937IqzQrDcTXE="}],"description":"Line striping on NY 227 both directions between Tompkins-Schuyler County Line (Hector) and West Main Street; NY 96 (Ulysses) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:03:03Z"},"road_event_id":"meyFYurzfqc694v+MTOPOKEKHUo=","beginning_cross_street":"Tompkins-Schuyler County Line","ending_cross_street":"West Main Street; NY 96","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.693481,42.497096]]}},{"id":"0iYnSr4Egjpc6w937IqzQrDcTXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/XfBeeajBH8M6KNBTA8ZDLDvX+w="},{"type":"next-occurrence","id":"21z43Sty+GpBAYiX1EvvkRsN8ok="}],"description":"Line striping on NY 227 both directions between Tompkins-Schuyler County Line (Hector) and West Main Street; NY 96 (Ulysses) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:03:03Z"},"road_event_id":"0iYnSr4Egjpc6w937IqzQrDcTXE=","beginning_cross_street":"Tompkins-Schuyler County Line","ending_cross_street":"West Main Street; NY 96","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.693481,42.497096]]}},{"id":"21z43Sty+GpBAYiX1EvvkRsN8ok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/XfBeeajBH8M6KNBTA8ZDLDvX+w="},{"type":"next-occurrence","id":"pR2qAulPrmGJ0xK+J4RxSwSoaEM="}],"description":"Line striping on NY 227 both directions between Tompkins-Schuyler County Line (Hector) and West Main Street; NY 96 (Ulysses) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:03:03Z"},"road_event_id":"21z43Sty+GpBAYiX1EvvkRsN8ok=","beginning_cross_street":"Tompkins-Schuyler County Line","ending_cross_street":"West Main Street; NY 96","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.693481,42.497096]]}},{"id":"pR2qAulPrmGJ0xK+J4RxSwSoaEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/XfBeeajBH8M6KNBTA8ZDLDvX+w="},{"type":"next-occurrence","id":"uW7tAZsvcbCsnre4gxgmxW1qeYc="}],"description":"Line striping on NY 227 both directions between Tompkins-Schuyler County Line (Hector) and West Main Street; NY 96 (Ulysses) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:03:03Z"},"road_event_id":"pR2qAulPrmGJ0xK+J4RxSwSoaEM=","beginning_cross_street":"Tompkins-Schuyler County Line","ending_cross_street":"West Main Street; NY 96","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.693481,42.497096]]}},{"id":"uW7tAZsvcbCsnre4gxgmxW1qeYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/XfBeeajBH8M6KNBTA8ZDLDvX+w="},{"type":"next-occurrence","id":"BhN5kAWLjhTr77LMk1L43+HjF0U="}],"description":"Line striping on NY 227 both directions between Tompkins-Schuyler County Line (Hector) and West Main Street; NY 96 (Ulysses) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:03:03Z"},"road_event_id":"uW7tAZsvcbCsnre4gxgmxW1qeYc=","beginning_cross_street":"Tompkins-Schuyler County Line","ending_cross_street":"West Main Street; NY 96","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.693481,42.497096]]}},{"id":"BhN5kAWLjhTr77LMk1L43+HjF0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/XfBeeajBH8M6KNBTA8ZDLDvX+w="},{"type":"next-occurrence","id":"/36PeFOL/odJ7VbsMBMQuT9mkB0="}],"description":"Line striping on NY 227 both directions between Tompkins-Schuyler County Line (Hector) and West Main Street; NY 96 (Ulysses) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:03:03Z"},"road_event_id":"BhN5kAWLjhTr77LMk1L43+HjF0U=","beginning_cross_street":"Tompkins-Schuyler County Line","ending_cross_street":"West Main Street; NY 96","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.693481,42.497096]]}},{"id":"/36PeFOL/odJ7VbsMBMQuT9mkB0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/XfBeeajBH8M6KNBTA8ZDLDvX+w="},{"type":"next-occurrence","id":"OCeyp22xS7Kzni0xD5R19XBwQ88="}],"description":"Line striping on NY 227 both directions between Tompkins-Schuyler County Line (Hector) and West Main Street; NY 96 (Ulysses) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:03:03Z"},"road_event_id":"/36PeFOL/odJ7VbsMBMQuT9mkB0=","beginning_cross_street":"Tompkins-Schuyler County Line","ending_cross_street":"West Main Street; NY 96","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.693481,42.497096]]}},{"id":"OCeyp22xS7Kzni0xD5R19XBwQ88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/XfBeeajBH8M6KNBTA8ZDLDvX+w="},{"type":"next-occurrence","id":"GDXF/vTNYTM2Irwu1NgNY/YneIU="}],"description":"Line striping on NY 227 both directions between Tompkins-Schuyler County Line (Hector) and West Main Street; NY 96 (Ulysses) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:03:03Z"},"road_event_id":"OCeyp22xS7Kzni0xD5R19XBwQ88=","beginning_cross_street":"Tompkins-Schuyler County Line","ending_cross_street":"West Main Street; NY 96","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.693481,42.497096]]}},{"id":"GDXF/vTNYTM2Irwu1NgNY/YneIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/XfBeeajBH8M6KNBTA8ZDLDvX+w="},{"type":"next-occurrence","id":"1BXn2TtG187OP/0GIsnBfawpcDU="}],"description":"Line striping on NY 227 both directions between Tompkins-Schuyler County Line (Hector) and West Main Street; NY 96 (Ulysses) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:03:03Z"},"road_event_id":"GDXF/vTNYTM2Irwu1NgNY/YneIU=","beginning_cross_street":"Tompkins-Schuyler County Line","ending_cross_street":"West Main Street; NY 96","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.693481,42.497096]]}},{"id":"1BXn2TtG187OP/0GIsnBfawpcDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 227"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/XfBeeajBH8M6KNBTA8ZDLDvX+w="}],"description":"Line striping on NY 227 both directions between Tompkins-Schuyler County Line (Hector) and West Main Street; NY 96 (Ulysses) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:03:03Z"},"road_event_id":"1BXn2TtG187OP/0GIsnBfawpcDU=","beginning_cross_street":"Tompkins-Schuyler County Line","ending_cross_street":"West Main Street; NY 96","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.693481,42.497096]]}},{"id":"Xp9XLnqAqrupnQ2AacpRp466dyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-327"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"n0VWqaaFS+hvcKZFjgeEEYYYdHs="}],"description":"Line striping on RT-327 both directions between NY-79 (Enfield) and NY 327 at Elmira Road; NY-13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:18:15Z"},"road_event_id":"Xp9XLnqAqrupnQ2AacpRp466dyw=","beginning_cross_street":"NY-79","ending_cross_street":"Elmira Road; NY-13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.63111,42.450763]]}},{"id":"n0VWqaaFS+hvcKZFjgeEEYYYdHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-327"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xp9XLnqAqrupnQ2AacpRp466dyw="},{"type":"next-occurrence","id":"+SQZf1IZyn9ZLazHk5ufNDj2YsA="}],"description":"Line striping on RT-327 both directions between NY-79 (Enfield) and NY 327 at Elmira Road; NY-13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:18:15Z"},"road_event_id":"n0VWqaaFS+hvcKZFjgeEEYYYdHs=","beginning_cross_street":"NY-79","ending_cross_street":"Elmira Road; NY-13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.63111,42.450763]]}},{"id":"+SQZf1IZyn9ZLazHk5ufNDj2YsA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-327"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xp9XLnqAqrupnQ2AacpRp466dyw="},{"type":"next-occurrence","id":"UgaqmLzbCcvCeEOakpLOlmDEFi0="}],"description":"Line striping on RT-327 both directions between NY-79 (Enfield) and NY 327 at Elmira Road; NY-13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:18:15Z"},"road_event_id":"+SQZf1IZyn9ZLazHk5ufNDj2YsA=","beginning_cross_street":"NY-79","ending_cross_street":"Elmira Road; NY-13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.63111,42.450763]]}},{"id":"UgaqmLzbCcvCeEOakpLOlmDEFi0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-327"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xp9XLnqAqrupnQ2AacpRp466dyw="},{"type":"next-occurrence","id":"g5Je0AaJqPs6WR8FGn8PADqiT0U="}],"description":"Line striping on RT-327 both directions between NY-79 (Enfield) and NY 327 at Elmira Road; NY-13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:18:15Z"},"road_event_id":"UgaqmLzbCcvCeEOakpLOlmDEFi0=","beginning_cross_street":"NY-79","ending_cross_street":"Elmira Road; NY-13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.63111,42.450763]]}},{"id":"g5Je0AaJqPs6WR8FGn8PADqiT0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-327"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xp9XLnqAqrupnQ2AacpRp466dyw="},{"type":"next-occurrence","id":"ADXY6DLwjFK8Fid268qAaI/JkjA="}],"description":"Line striping on RT-327 both directions between NY-79 (Enfield) and NY 327 at Elmira Road; NY-13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:18:15Z"},"road_event_id":"g5Je0AaJqPs6WR8FGn8PADqiT0U=","beginning_cross_street":"NY-79","ending_cross_street":"Elmira Road; NY-13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.63111,42.450763]]}},{"id":"ADXY6DLwjFK8Fid268qAaI/JkjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-327"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xp9XLnqAqrupnQ2AacpRp466dyw="},{"type":"next-occurrence","id":"dyJCCfPWxDncGcoI3sQplzBncgk="}],"description":"Line striping on RT-327 both directions between NY-79 (Enfield) and NY 327 at Elmira Road; NY-13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:18:15Z"},"road_event_id":"ADXY6DLwjFK8Fid268qAaI/JkjA=","beginning_cross_street":"NY-79","ending_cross_street":"Elmira Road; NY-13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.63111,42.450763]]}},{"id":"dyJCCfPWxDncGcoI3sQplzBncgk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-327"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xp9XLnqAqrupnQ2AacpRp466dyw="},{"type":"next-occurrence","id":"bLGyZurnVTNI+i1vErUQ8fLRacE="}],"description":"Line striping on RT-327 both directions between NY-79 (Enfield) and NY 327 at Elmira Road; NY-13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:18:15Z"},"road_event_id":"dyJCCfPWxDncGcoI3sQplzBncgk=","beginning_cross_street":"NY-79","ending_cross_street":"Elmira Road; NY-13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.63111,42.450763]]}},{"id":"bLGyZurnVTNI+i1vErUQ8fLRacE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-327"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xp9XLnqAqrupnQ2AacpRp466dyw="},{"type":"next-occurrence","id":"t5Xi3nWZYkpFMcgMNrHGafM97Lc="}],"description":"Line striping on RT-327 both directions between NY-79 (Enfield) and NY 327 at Elmira Road; NY-13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:18:15Z"},"road_event_id":"bLGyZurnVTNI+i1vErUQ8fLRacE=","beginning_cross_street":"NY-79","ending_cross_street":"Elmira Road; NY-13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.63111,42.450763]]}},{"id":"t5Xi3nWZYkpFMcgMNrHGafM97Lc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-327"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xp9XLnqAqrupnQ2AacpRp466dyw="},{"type":"next-occurrence","id":"aIwWjb8VWHF+rEHQL22u0a0H/Iw="}],"description":"Line striping on RT-327 both directions between NY-79 (Enfield) and NY 327 at Elmira Road; NY-13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:18:15Z"},"road_event_id":"t5Xi3nWZYkpFMcgMNrHGafM97Lc=","beginning_cross_street":"NY-79","ending_cross_street":"Elmira Road; NY-13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.63111,42.450763]]}},{"id":"aIwWjb8VWHF+rEHQL22u0a0H/Iw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-327"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xp9XLnqAqrupnQ2AacpRp466dyw="},{"type":"next-occurrence","id":"5bbEqUNQabtoVcwEQ7K7li0zVNc="}],"description":"Line striping on RT-327 both directions between NY-79 (Enfield) and NY 327 at Elmira Road; NY-13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:18:15Z"},"road_event_id":"aIwWjb8VWHF+rEHQL22u0a0H/Iw=","beginning_cross_street":"NY-79","ending_cross_street":"Elmira Road; NY-13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.63111,42.450763]]}},{"id":"5bbEqUNQabtoVcwEQ7K7li0zVNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-327"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xp9XLnqAqrupnQ2AacpRp466dyw="}],"description":"Line striping on RT-327 both directions between NY-79 (Enfield) and NY 327 at Elmira Road; NY-13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:18:15Z"},"road_event_id":"5bbEqUNQabtoVcwEQ7K7li0zVNc=","beginning_cross_street":"NY-79","ending_cross_street":"Elmira Road; NY-13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.63111,42.450763]]}},{"id":"uhsYI0jny5+PCcFTxd/oBot+eDo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9b38kGL2kXgS2PtE2VNu3lrbtdo="}],"description":"Line striping on NY 366 both directions between Hoy Rd; City of Ithaca; Town of Ithaca Line (Ithaca) and Railroad Street; NY 38 (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:35:30Z"},"road_event_id":"uhsYI0jny5+PCcFTxd/oBot+eDo=","beginning_cross_street":"Hoy Rd; City of Ithaca; Town of Ithaca Line","ending_cross_street":"Railroad Street; NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T10:00:00Z","end_date":"2026-05-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.475627,42.443356]]}},{"id":"9b38kGL2kXgS2PtE2VNu3lrbtdo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhsYI0jny5+PCcFTxd/oBot+eDo="},{"type":"next-occurrence","id":"QxfwdNQnalf5WI5y9YsNcZrOpps="}],"description":"Line striping on NY 366 both directions between Hoy Rd; City of Ithaca; Town of Ithaca Line (Ithaca) and Railroad Street; NY 38 (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:35:30Z"},"road_event_id":"9b38kGL2kXgS2PtE2VNu3lrbtdo=","beginning_cross_street":"Hoy Rd; City of Ithaca; Town of Ithaca Line","ending_cross_street":"Railroad Street; NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T10:00:00Z","end_date":"2026-05-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.475627,42.443356]]}},{"id":"QxfwdNQnalf5WI5y9YsNcZrOpps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhsYI0jny5+PCcFTxd/oBot+eDo="},{"type":"next-occurrence","id":"G2d2iXF1afQHZV5l9lnXR0GyZyQ="}],"description":"Line striping on NY 366 both directions between Hoy Rd; City of Ithaca; Town of Ithaca Line (Ithaca) and Railroad Street; NY 38 (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:35:30Z"},"road_event_id":"QxfwdNQnalf5WI5y9YsNcZrOpps=","beginning_cross_street":"Hoy Rd; City of Ithaca; Town of Ithaca Line","ending_cross_street":"Railroad Street; NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T10:00:00Z","end_date":"2026-05-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.475627,42.443356]]}},{"id":"G2d2iXF1afQHZV5l9lnXR0GyZyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhsYI0jny5+PCcFTxd/oBot+eDo="},{"type":"next-occurrence","id":"K65EpdXn1S60zL7O8n4K6rNPXC4="}],"description":"Line striping on NY 366 both directions between Hoy Rd; City of Ithaca; Town of Ithaca Line (Ithaca) and Railroad Street; NY 38 (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:35:30Z"},"road_event_id":"G2d2iXF1afQHZV5l9lnXR0GyZyQ=","beginning_cross_street":"Hoy Rd; City of Ithaca; Town of Ithaca Line","ending_cross_street":"Railroad Street; NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T10:00:00Z","end_date":"2026-05-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.475627,42.443356]]}},{"id":"K65EpdXn1S60zL7O8n4K6rNPXC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhsYI0jny5+PCcFTxd/oBot+eDo="},{"type":"next-occurrence","id":"C6BwQhuX84cxqISAbuhkzjQU0aI="}],"description":"Line striping on NY 366 both directions between Hoy Rd; City of Ithaca; Town of Ithaca Line (Ithaca) and Railroad Street; NY 38 (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:35:30Z"},"road_event_id":"K65EpdXn1S60zL7O8n4K6rNPXC4=","beginning_cross_street":"Hoy Rd; City of Ithaca; Town of Ithaca Line","ending_cross_street":"Railroad Street; NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T10:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.475627,42.443356]]}},{"id":"C6BwQhuX84cxqISAbuhkzjQU0aI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhsYI0jny5+PCcFTxd/oBot+eDo="},{"type":"next-occurrence","id":"3ulPrHweLg4d+acpvDUk1Di1HYM="}],"description":"Line striping on NY 366 both directions between Hoy Rd; City of Ithaca; Town of Ithaca Line (Ithaca) and Railroad Street; NY 38 (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:35:30Z"},"road_event_id":"C6BwQhuX84cxqISAbuhkzjQU0aI=","beginning_cross_street":"Hoy Rd; City of Ithaca; Town of Ithaca Line","ending_cross_street":"Railroad Street; NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T10:00:00Z","end_date":"2026-05-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.475627,42.443356]]}},{"id":"3ulPrHweLg4d+acpvDUk1Di1HYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhsYI0jny5+PCcFTxd/oBot+eDo="},{"type":"next-occurrence","id":"WOfh3aIoe6ppTfNThwKkxI1LLPY="}],"description":"Line striping on NY 366 both directions between Hoy Rd; City of Ithaca; Town of Ithaca Line (Ithaca) and Railroad Street; NY 38 (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:35:30Z"},"road_event_id":"3ulPrHweLg4d+acpvDUk1Di1HYM=","beginning_cross_street":"Hoy Rd; City of Ithaca; Town of Ithaca Line","ending_cross_street":"Railroad Street; NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T10:00:00Z","end_date":"2026-05-21T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.475627,42.443356]]}},{"id":"WOfh3aIoe6ppTfNThwKkxI1LLPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhsYI0jny5+PCcFTxd/oBot+eDo="},{"type":"next-occurrence","id":"gIHVIx7YLsitgJCPPb7gkdB1JfU="}],"description":"Line striping on NY 366 both directions between Hoy Rd; City of Ithaca; Town of Ithaca Line (Ithaca) and Railroad Street; NY 38 (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:35:30Z"},"road_event_id":"WOfh3aIoe6ppTfNThwKkxI1LLPY=","beginning_cross_street":"Hoy Rd; City of Ithaca; Town of Ithaca Line","ending_cross_street":"Railroad Street; NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T10:00:00Z","end_date":"2026-05-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.475627,42.443356]]}},{"id":"gIHVIx7YLsitgJCPPb7gkdB1JfU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhsYI0jny5+PCcFTxd/oBot+eDo="},{"type":"next-occurrence","id":"/2Pqa2EhecGVu9mEZVYbezU2LQI="}],"description":"Line striping on NY 366 both directions between Hoy Rd; City of Ithaca; Town of Ithaca Line (Ithaca) and Railroad Street; NY 38 (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:35:30Z"},"road_event_id":"gIHVIx7YLsitgJCPPb7gkdB1JfU=","beginning_cross_street":"Hoy Rd; City of Ithaca; Town of Ithaca Line","ending_cross_street":"Railroad Street; NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-25T10:00:00Z","end_date":"2026-05-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.475627,42.443356]]}},{"id":"/2Pqa2EhecGVu9mEZVYbezU2LQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhsYI0jny5+PCcFTxd/oBot+eDo="},{"type":"next-occurrence","id":"Zy6jFqdKDd+jIitZ7yjGyuKNe9k="}],"description":"Line striping on NY 366 both directions between Hoy Rd; City of Ithaca; Town of Ithaca Line (Ithaca) and Railroad Street; NY 38 (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:35:30Z"},"road_event_id":"/2Pqa2EhecGVu9mEZVYbezU2LQI=","beginning_cross_street":"Hoy Rd; City of Ithaca; Town of Ithaca Line","ending_cross_street":"Railroad Street; NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T10:00:00Z","end_date":"2026-05-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.475627,42.443356]]}},{"id":"Zy6jFqdKDd+jIitZ7yjGyuKNe9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 366"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhsYI0jny5+PCcFTxd/oBot+eDo="}],"description":"Line striping on NY 366 both directions between Hoy Rd; City of Ithaca; Town of Ithaca Line (Ithaca) and Railroad Street; NY 38 (Dryden) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T04:35:30Z"},"road_event_id":"Zy6jFqdKDd+jIitZ7yjGyuKNe9k=","beginning_cross_street":"Hoy Rd; City of Ithaca; Town of Ithaca Line","ending_cross_street":"Railroad Street; NY 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T10:00:00Z","end_date":"2026-05-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.475627,42.443356]]}},{"id":"h0xpC9WrT0ZOmPM1SD9Vs2QnVvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound near South of CR 693/Lafayette Av (Berlin), Tuesday May 19, 2026 08:00 PM thru Wednesday May 20, 2026 06:00 AM, right lane closed, moving operation","update_date":"2026-05-13T08:45:04Z"},"road_event_id":"h0xpC9WrT0ZOmPM1SD9Vs2QnVvo=","beginning_cross_street":"South of CR 693/Lafayette Av","ending_cross_street":"CR 692/Franklin Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T20:00:00Z","end_date":"2026-05-21T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.929039,39.820056]]}},{"id":"zdOu8vC7FEBeqI26/ioVMs5xPqg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near Alexander Av (Howell Twp), Wednesday May 13, 2026 09:00 AM thru 02:00 PM, right shoulder closed","update_date":"2026-05-13T08:45:05Z"},"road_event_id":"zdOu8vC7FEBeqI26/ioVMs5xPqg=","beginning_cross_street":"Alexander Av","ending_cross_street":"North of Alexander Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.21878,40.114505]]}},{"id":"KjUdchAlABmy5lwgq5169HyujCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near Alexander Av (Howell Twp), Thursday May 14, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-13T08:45:06Z"},"road_event_id":"KjUdchAlABmy5lwgq5169HyujCA=","beginning_cross_street":"Alexander Av","ending_cross_street":"North of Alexander Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.21878,40.114505]]}},{"id":"nKslpiIU+DSIJreSS2M6DO3G1OM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound near CR 692/Franklin Av (Berlin), Tuesday May 19, 2026 08:00 PM thru Wednesday May 20, 2026 05:00 AM, right lane closed, moving operation","update_date":"2026-05-13T08:45:07Z"},"road_event_id":"nKslpiIU+DSIJreSS2M6DO3G1OM=","beginning_cross_street":"CR 692/Franklin Av","ending_cross_street":"South of CR 693/Lafayette Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T20:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.930572,39.81142]]}},{"id":"TdpNw5ipkde7211EKIOMwUyBoh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 168"],"direction":"unknown","related_road_events":[],"description":"Long Term Road Construction on NJ 168 Southbound Ramp To NJ 42 (Gloucester Twp) Wednesday May 13, 2026 04:49 AM thru Friday May 22, 2026 06:00 AM, ramp lane closed","update_date":"2026-05-13T14:44:10Z"},"road_event_id":"TdpNw5ipkde7211EKIOMwUyBoh8=","beginning_cross_street":"NJ 42","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.068145,39.814392]]}},{"id":"uYcUJfwKYkRddcQB/aGaUBj6Fxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 74"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on NY 74 westbound over Schroon River (Schroon) alternating lane closures, Tuesday May 19th, 2026, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-13T10:21:39Z"},"road_event_id":"uYcUJfwKYkRddcQB/aGaUBj6Fxw=","beginning_cross_street":"Schroon River","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.741179,43.874446]]}},{"id":"Bbc1QhFyM7FIYqxqpXBwKNfqS/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 146"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on NY 146 eastbound over Normans Kill (Guilderland) alternating lane closures, Wednesday May 20th, 2026, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-05-13T10:24:53Z"},"road_event_id":"Bbc1QhFyM7FIYqxqpXBwKNfqS/M=","beginning_cross_street":"Normans Kill","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937669,42.703056]]}},{"id":"S0pTziJn9S8349rPreVdfJOlZYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 311"],"direction":"unknown","related_road_events":[],"description":"Sign work on NY 311 northbound between I-84 (Patterson) and Fair Street (Patterson) D265509/32744309 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 13th, 2026, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-13T10:32:05Z"},"road_event_id":"S0pTziJn9S8349rPreVdfJOlZYM=","beginning_cross_street":"I-84","ending_cross_street":"Fair Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.647752,41.474276]]}},{"id":"hubPEsPae42KWUHfw7GpK9zlaks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-90"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-90 westbound Off-ramp to Route 9 SB (Albany) RAMP CLOSURE W DETOUR, Thursday May 21st, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T10:39:18Z"},"road_event_id":"hubPEsPae42KWUHfw7GpK9zlaks=","beginning_cross_street":" to Route 9 SB","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.750527,42.668792]]}},{"id":"f/di0LcEApTch5uQA/krZQhobVw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 160"],"direction":"unknown","related_road_events":[],"description":"Mowing on NY 160 both directions between Mariaville Road; NY 159 (Duanesburg) and Main Street; NY 5S (Rotterdam), Wednesday May 13th, 2026, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-13T10:57:39Z"},"road_event_id":"f/di0LcEApTch5uQA/krZQhobVw=","beginning_cross_street":"Mariaville Road; NY 159","ending_cross_street":"Main Street; NY 5S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.136917,42.831114]]}},{"id":"hCWZCy7DkQkK2SmMv+yFuCI/h1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 159"],"direction":"unknown","related_road_events":[],"description":"Mowing on NY 159 both directions between Mariaville Scotch Church Road; NY 160 (Duanesburg) and NY 30 (Duanesburg), Wednesday May 13th, 2026, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-13T10:58:56Z"},"road_event_id":"hCWZCy7DkQkK2SmMv+yFuCI/h1c=","beginning_cross_street":"Mariaville Scotch Church Road; NY 160","ending_cross_street":"NY 30","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.135136,42.828558]]}},{"id":"Vb/J345oSIyFFlrHCbBehKkj8bw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[],"description":"Utility work on I-84 eastbound between Exit 37 - Route 52 (Gardnertown) and Exit 39A/B - US 9W - NY 32 (Balmville) PD67645/NIGHT/32744409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 20th, 2026 thru Thursday May 21st, 2026, 10:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-13T10:59:30Z"},"road_event_id":"Vb/J345oSIyFFlrHCbBehKkj8bw=","beginning_cross_street":"Exit 37 - Route 52","ending_cross_street":"Exit 39A/B - US 9W - NY 32","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.050664,41.513395]]}},{"id":"gDo1OUB3bAK4xfO51CcfUsRq6ms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 67"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 67 both directions between Cottrell Rd (Hoosick) and Vermont State Line (Hoosick) litter removal, Wednesday May 13th, 2026, 07:00 AM thru 01:00 PM right shoulder closed","update_date":"2026-05-13T11:01:05Z"},"road_event_id":"gDo1OUB3bAK4xfO51CcfUsRq6ms=","beginning_cross_street":"Cottrell Rd","ending_cross_street":"Vermont State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.323325,42.924708]]}},{"id":"o6REs84iMsJYVOVjfq5mX+Sk2bs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 22 both directions between NY 346; North Petersburg (Petersburgh) and NY 7 (Hoosick) litter removal, Wednesday May 13th, 2026, 01:00 PM thru 04:00 PM right shoulder closed","update_date":"2026-05-13T11:02:33Z"},"road_event_id":"o6REs84iMsJYVOVjfq5mX+Sk2bs=","beginning_cross_street":"NY 346; North Petersburg","ending_cross_street":"NY 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T06:00:00Z","end_date":"2026-05-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.332416,42.823046]]}},{"id":"XCkw2wsYKCPlfAGl3QaDIbdKZWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 346"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 346 both directions between NY 22 (Petersburgh) and Vermont State Line (Petersburgh) litter removal, Wednesday May 13th, 2026, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-05-13T11:04:02Z"},"road_event_id":"XCkw2wsYKCPlfAGl3QaDIbdKZWE=","beginning_cross_street":"NY 22","ending_cross_street":"Vermont State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T11:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.332072,42.822926]]}},{"id":"K8+553Kwj5thdI5Wq0ySVv6wFdU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[],"description":"Utility work on I-84 westbound between Exit 28 - NY 208 (Montgomery) and Exit 19A/B - NY17 (Wallkill) PD67645/NIGHT/32744509 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday May 19th, 2026 thru Wednesday May 20th, 2026, 10:00 PM thru 05:00 AM, right lane closure","update_date":"2026-05-13T11:13:03Z"},"road_event_id":"K8+553Kwj5thdI5Wq0ySVv6wFdU=","beginning_cross_street":"Exit 28 - NY 208","ending_cross_street":"Exit 19A/B - NY17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.208528,41.510759]]}},{"id":"8GPUsnoyupjnOe+VYsggdLf5x2k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-81 northbound before Exit 50 - US 11; NY 41: McGraw, over South Hill Rd. (Marathon), Thursday May 14th, 2026, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-13T12:49:39Z"},"road_event_id":"8GPUsnoyupjnOe+VYsggdLf5x2k=","beginning_cross_street":"Exit 50 - US 11; NY 41: McGraw, over South Hill Rd. ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.029441,42.439661]]}},{"id":"FBf0mCvvv6iyvU+sI4do9KBLLm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"R0u7v0lhWZH+yqb44g0zceQ7w9A="}],"description":"Drainage improvements on Palisades Interstate Parkway southbound between Exit 16 - Lake Welch Parkway (Stony Point) and Exit 15 - Old Gate Hill Road (Stony Point) D265386/32744609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, left lane closure","update_date":"2026-05-13T11:27:04Z"},"road_event_id":"FBf0mCvvv6iyvU+sI4do9KBLLm0=","beginning_cross_street":"Exit 16 - Lake Welch Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042323,41.250318]]}},{"id":"R0u7v0lhWZH+yqb44g0zceQ7w9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FBf0mCvvv6iyvU+sI4do9KBLLm0="},{"type":"next-occurrence","id":"2qtuapBYVRKWWRGr0ZB3Zv+iQo0="}],"description":"Drainage improvements on Palisades Interstate Parkway southbound between Exit 16 - Lake Welch Parkway (Stony Point) and Exit 15 - Old Gate Hill Road (Stony Point) D265386/32744609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, left lane closure","update_date":"2026-05-13T11:27:04Z"},"road_event_id":"R0u7v0lhWZH+yqb44g0zceQ7w9A=","beginning_cross_street":"Exit 16 - Lake Welch Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042323,41.250318]]}},{"id":"2qtuapBYVRKWWRGr0ZB3Zv+iQo0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FBf0mCvvv6iyvU+sI4do9KBLLm0="},{"type":"next-occurrence","id":"UrL3vqmhr2Ku+8RPtm74GaoAvlo="}],"description":"Drainage improvements on Palisades Interstate Parkway southbound between Exit 16 - Lake Welch Parkway (Stony Point) and Exit 15 - Old Gate Hill Road (Stony Point) D265386/32744609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, left lane closure","update_date":"2026-05-13T11:27:04Z"},"road_event_id":"2qtuapBYVRKWWRGr0ZB3Zv+iQo0=","beginning_cross_street":"Exit 16 - Lake Welch Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042323,41.250318]]}},{"id":"UrL3vqmhr2Ku+8RPtm74GaoAvlo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FBf0mCvvv6iyvU+sI4do9KBLLm0="}],"description":"Drainage improvements on Palisades Interstate Parkway southbound between Exit 16 - Lake Welch Parkway (Stony Point) and Exit 15 - Old Gate Hill Road (Stony Point) D265386/32744609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, left lane closure","update_date":"2026-05-13T11:27:04Z"},"road_event_id":"UrL3vqmhr2Ku+8RPtm74GaoAvlo=","beginning_cross_street":"Exit 16 - Lake Welch Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042323,41.250318]]}},{"id":"aTF0/xQm5ijcVIFe6xXjV+Yt0Eg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-81 northbound at Exit 52 - NY 13; Clinton Avenue; Cortland (Cortland), Friday May 15th, 2026, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-13T11:38:24Z"},"road_event_id":"aTF0/xQm5ijcVIFe6xXjV+Yt0Eg=","beginning_cross_street":"Exit 52 - NY 13; Clinton Avenue; Cortland","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.161941,42.609398]]}},{"id":"LAwdHzAYc+5AcqrUZf1ZUAl2HrI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound near South of US 46 (White Twp), Wednesday May 20, 2026 09:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-05-13T11:36:05Z"},"road_event_id":"LAwdHzAYc+5AcqrUZf1ZUAl2HrI=","beginning_cross_street":"South of US 46","ending_cross_street":"South of US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.999511,40.829406]]}},{"id":"PE2h5GXKwvuWYr8hiOj270CJFKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near North of Exit 59 - NJ 208 (Franklin Lakes), Wednesday May 13, 2026 09:00 PM thru Thursday May 14, 2026 05:00 AM, right lane closed","update_date":"2026-05-13T11:36:06Z"},"road_event_id":"PE2h5GXKwvuWYr8hiOj270CJFKM=","beginning_cross_street":"North of Exit 59 - NJ 208","ending_cross_street":"North of Exit 59 - NJ 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192436,41.039291]]}},{"id":"3lNW+fpqbtFmPwPpOxbWWLSCbJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 12 - CR 623 (Bridgewater Twp), Wednesday May 13, 2026 09:00 PM thru Thursday May 14, 2026 05:00 AM, at least one lane closed","update_date":"2026-05-13T11:36:07Z"},"road_event_id":"3lNW+fpqbtFmPwPpOxbWWLSCbJw=","beginning_cross_street":"North of Exit 12 - CR 623","ending_cross_street":"North of Exit 12 - CR 623","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.549797,40.561157]]}},{"id":"omRTdAhRyZ/2p66fqD3Za1S9PUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 12 - CR 623 (Bridgewater Twp), Wednesday May 13, 2026 09:00 PM thru Thursday May 14, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM)","update_date":"2026-05-13T11:36:09Z"},"road_event_id":"omRTdAhRyZ/2p66fqD3Za1S9PUE=","beginning_cross_street":"North of Exit 12 - CR 623","ending_cross_street":"North of Exit 12 - CR 623","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.549797,40.561157]]}},{"id":"dVGRw3t4N+E4EIuqhvttEVJBawY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near North of Exit 59 - NJ 208 (Franklin Lakes), Thursday May 14, 2026 08:00 PM thru Friday May 15, 2026 05:00 AM, right lane closed","update_date":"2026-05-13T11:36:11Z"},"road_event_id":"dVGRw3t4N+E4EIuqhvttEVJBawY=","beginning_cross_street":"North of Exit 59 - NJ 208","ending_cross_street":"North of Exit 59 - NJ 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192436,41.039291]]}},{"id":"z5qpNsTzGLmpboQTmtWTlFRQe24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9wxPElMGeVyPB2bhE8FIOfpDGlo="}],"description":"Drainage improvements on Palisades Interstate Parkway northbound between Exit 14 -Willow Grove Road (Haverstraw) and Exit 15 - Old Gate Hill Road (Stony Point) D265386/32744709 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-13T11:38:10Z"},"road_event_id":"z5qpNsTzGLmpboQTmtWTlFRQe24=","beginning_cross_street":"","ending_cross_street":"Exit 15 - Old Gate Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T16:00:00Z","end_date":"2026-05-19T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033922,41.221437]]}},{"id":"9wxPElMGeVyPB2bhE8FIOfpDGlo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z5qpNsTzGLmpboQTmtWTlFRQe24="},{"type":"next-occurrence","id":"HOZjGeKYhVWcG6ROQ42DOreZgvM="}],"description":"Drainage improvements on Palisades Interstate Parkway northbound between Exit 14 -Willow Grove Road (Haverstraw) and Exit 15 - Old Gate Hill Road (Stony Point) D265386/32744709 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-13T11:38:10Z"},"road_event_id":"9wxPElMGeVyPB2bhE8FIOfpDGlo=","beginning_cross_street":"","ending_cross_street":"Exit 15 - Old Gate Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T16:00:00Z","end_date":"2026-05-20T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033922,41.221437]]}},{"id":"HOZjGeKYhVWcG6ROQ42DOreZgvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z5qpNsTzGLmpboQTmtWTlFRQe24="},{"type":"next-occurrence","id":"SeBguDrS26nDcAEUBMHNMANxYIQ="}],"description":"Drainage improvements on Palisades Interstate Parkway northbound between Exit 14 -Willow Grove Road (Haverstraw) and Exit 15 - Old Gate Hill Road (Stony Point) D265386/32744709 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-13T11:38:10Z"},"road_event_id":"HOZjGeKYhVWcG6ROQ42DOreZgvM=","beginning_cross_street":"","ending_cross_street":"Exit 15 - Old Gate Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T16:00:00Z","end_date":"2026-05-21T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033922,41.221437]]}},{"id":"SeBguDrS26nDcAEUBMHNMANxYIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z5qpNsTzGLmpboQTmtWTlFRQe24="},{"type":"next-occurrence","id":"8aMXbcAY6tqc7X8F6WvmH0wuMl0="}],"description":"Drainage improvements on Palisades Interstate Parkway northbound between Exit 14 -Willow Grove Road (Haverstraw) and Exit 15 - Old Gate Hill Road (Stony Point) D265386/32744709 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-13T11:38:10Z"},"road_event_id":"SeBguDrS26nDcAEUBMHNMANxYIQ=","beginning_cross_street":"","ending_cross_street":"Exit 15 - Old Gate Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T16:00:00Z","end_date":"2026-05-22T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033922,41.221437]]}},{"id":"8aMXbcAY6tqc7X8F6WvmH0wuMl0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z5qpNsTzGLmpboQTmtWTlFRQe24="}],"description":"Drainage improvements on Palisades Interstate Parkway northbound between Exit 14 -Willow Grove Road (Haverstraw) and Exit 15 - Old Gate Hill Road (Stony Point) D265386/32744709 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-13T11:38:10Z"},"road_event_id":"8aMXbcAY6tqc7X8F6WvmH0wuMl0=","beginning_cross_street":"","ending_cross_street":"Exit 15 - Old Gate Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T16:00:00Z","end_date":"2026-05-23T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033922,41.221437]]}},{"id":"WpELsgY/2Cxk1TnFkqjYVT2jrZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound near Grand St (Elizabeth), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-13T11:42:08Z"},"road_event_id":"WpELsgY/2Cxk1TnFkqjYVT2jrZQ=","beginning_cross_street":"Grand St","ending_cross_street":"North of Grand St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.205406,40.664848]]}},{"id":"AWjwzAE4yNc2T7LpFplDw81j8ew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Southbound near North of CR 624/North Ave (Elizabeth), Thursday May 14, 2026 09:00 AM thru 03:00 PM, left lane closed local lane","update_date":"2026-05-13T11:42:12Z"},"road_event_id":"AWjwzAE4yNc2T7LpFplDw81j8ew=","beginning_cross_street":"North of CR 624/North Ave","ending_cross_street":"South of CR 624/North Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.196426,40.677951]]}},{"id":"eRSA5VPadhJT1OoaPoRjEi79AeA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound at US 22 (Newark) left shoulder local lane","update_date":"2026-05-13T11:42:15Z"},"road_event_id":"eRSA5VPadhJT1OoaPoRjEi79AeA=","beginning_cross_street":"US 22","ending_cross_street":"US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.182472,40.705677]]}},{"id":"3VU1+2LYqYY+KGgkYaM++qPv0wk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound near South of CR 513/Halstead St (Clinton Twp), Wednesday May 13, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-05-13T11:42:05Z"},"road_event_id":"3VU1+2LYqYY+KGgkYaM++qPv0wk=","beginning_cross_street":"South of CR 513/Halstead St","ending_cross_street":"North of CR 626/Beaver St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.909561,40.644798]]}},{"id":"ct04R/c8ROdDCf5cW+bRMnuxxMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound near South of CR 624/North Ave (Elizabeth), Thursday May 14, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-05-13T11:42:06Z"},"road_event_id":"ct04R/c8ROdDCf5cW+bRMnuxxMg=","beginning_cross_street":"South of CR 624/North Ave","ending_cross_street":"North of CR 624/North Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.200462,40.672912]]}},{"id":"ovggRMmL8Ex1a2V4OBaQCmocSzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 22 southbound between Girdle Ridge Drive (Bedford) and Mattews Mill Road (Bedford) 2025082502725/32274809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-13T11:47:51Z"},"road_event_id":"ovggRMmL8Ex1a2V4OBaQCmocSzI=","beginning_cross_street":"Girdle Ridge Drive","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653768,41.240423]]}},{"id":"oVjjVA52i9ET8qNonjfmQi7ZGFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 125 both directions between Orchard Road (Mamaroneck) and Harmon Drive (Mamaroneck) 2025082502725/29968609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-13T12:01:58Z"},"road_event_id":"oVjjVA52i9ET8qNonjfmQi7ZGFQ=","beginning_cross_street":"Orchard Road","ending_cross_street":"Harmon Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T23:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758522,40.943255]]}},{"id":"GCdJhoD6qZjI5lsqk2nnFbsVDP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-90"],"direction":"unknown","related_road_events":[],"description":"Street sweeping on I-90 both directions between Exit 6; US 9 (Albany) and Exit 7; Washington Avenue (Rensselaer), Wednesday May 13th, 2026, 10:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-05-13T12:12:03Z"},"road_event_id":"GCdJhoD6qZjI5lsqk2nnFbsVDP4=","beginning_cross_street":"Exit 6; US 9","ending_cross_street":"Exit 7; Washington Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.756478,42.672231]]}},{"id":"eHqgzRXBrWcFqZ0Qv2+k8sKqj2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 254"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 254 both directions at I-87 Exit 19 (Queensbury), Wednesday May 13th, 2026, 09:00 AM thru 03:00 PM 1 Right lane and shoulder of 2 lanes closed","update_date":"2026-05-13T12:13:21Z"},"road_event_id":"eHqgzRXBrWcFqZ0Qv2+k8sKqj2I=","beginning_cross_street":"I-87 Exit 19","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684793,43.329718]]}},{"id":"KZyfHsKEqeBdzQrI90BGbcl/qEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound between North of US 202 (Pequannock Twp) and Paterson Hamburg Tpke (West Milford Twp), Wednesday May 13, 2026 10:00 AM thru 02:00 PM, left lane closed, moving operation","update_date":"2026-05-13T12:18:05Z"},"road_event_id":"KZyfHsKEqeBdzQrI90BGbcl/qEI=","beginning_cross_street":"North of US 202","ending_cross_street":"Paterson Hamburg Tpke","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.278816,40.95195]]}},{"id":"9002/7jdLS+92mSrWmvzWgOlCdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Westbound near I-78/NJ 173 (Greenwich Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-05-13T12:21:04Z"},"road_event_id":"9002/7jdLS+92mSrWmvzWgOlCdE=","beginning_cross_street":"I-78/NJ 173","ending_cross_street":"West of CR 122/New Brunswick Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.131591,40.670028]]}},{"id":"CDct4srI0sEf41XMoYnGH/MDMqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Westbound near I-78/NJ 173 (Greenwich Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-05-13T12:21:05Z"},"road_event_id":"CDct4srI0sEf41XMoYnGH/MDMqQ=","beginning_cross_street":"I-78/NJ 173","ending_cross_street":"West of CR 122/New Brunswick Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.131591,40.670028]]}},{"id":"mZH6b0pgMoyu75frZq4eY9JuxRU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Westbound near I-78/NJ 173 (Greenwich Twp), Friday May 15, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-05-13T12:21:06Z"},"road_event_id":"mZH6b0pgMoyu75frZq4eY9JuxRU=","beginning_cross_street":"I-78/NJ 173","ending_cross_street":"West of CR 122/New Brunswick Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.131591,40.670028]]}},{"id":"cnl2IrWA9HLBYCkOPgP2socP/d4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound near East of Wilson Av (North Plainfield), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-05-13T12:21:08Z"},"road_event_id":"cnl2IrWA9HLBYCkOPgP2socP/d4=","beginning_cross_street":"East of Wilson Av","ending_cross_street":"East of CR 531/Somerset Av/Watchung Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T00:00:00Z","end_date":"2026-05-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.439826,40.625797]]}},{"id":"DYcIb3gnYW9Konb4KbUuIj6/0iI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound near East of Wilson Av (North Plainfield), Wednesday May 13, 2026 08:00 PM thru Thursday May 14, 2026 05:00 AM, at least one lane closed","update_date":"2026-05-13T12:21:09Z"},"road_event_id":"DYcIb3gnYW9Konb4KbUuIj6/0iI=","beginning_cross_street":"East of Wilson Av","ending_cross_street":"East of CR 531/Somerset Av/Watchung Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.439826,40.625797]]}},{"id":"uFFGRV2MJEKjlIxTWcmEXfLoakk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jm4QbbnfTgmpGXs8CvzQXG5i/u4="}],"description":"Roadwork on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508112007/32563909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-13T12:56:51Z"},"road_event_id":"uFFGRV2MJEKjlIxTWcmEXfLoakk=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T22:00:00Z","end_date":"2026-05-16T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081814,41.760209]]}},{"id":"jm4QbbnfTgmpGXs8CvzQXG5i/u4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uFFGRV2MJEKjlIxTWcmEXfLoakk="},{"type":"next-occurrence","id":"Umdrswuc6rP0kRbprwMYKoWiQmg="}],"description":"Roadwork on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508112007/32563909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-13T12:56:51Z"},"road_event_id":"jm4QbbnfTgmpGXs8CvzQXG5i/u4=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081814,41.760209]]}},{"id":"Umdrswuc6rP0kRbprwMYKoWiQmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uFFGRV2MJEKjlIxTWcmEXfLoakk="},{"type":"next-occurrence","id":"YBCyMYN+8YvK1SJcengKZabChjM="}],"description":"Roadwork on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508112007/32563909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-13T12:56:51Z"},"road_event_id":"Umdrswuc6rP0kRbprwMYKoWiQmg=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081814,41.760209]]}},{"id":"YBCyMYN+8YvK1SJcengKZabChjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uFFGRV2MJEKjlIxTWcmEXfLoakk="},{"type":"next-occurrence","id":"4MQs0vYJ2ydsXFFNzzkqGk98wZg="}],"description":"Roadwork on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508112007/32563909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-13T12:56:51Z"},"road_event_id":"YBCyMYN+8YvK1SJcengKZabChjM=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081814,41.760209]]}},{"id":"4MQs0vYJ2ydsXFFNzzkqGk98wZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uFFGRV2MJEKjlIxTWcmEXfLoakk="},{"type":"next-occurrence","id":"oey0+IDiWk8/I5hoPyvJOeXaEPA="}],"description":"Roadwork on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508112007/32563909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-13T12:56:51Z"},"road_event_id":"4MQs0vYJ2ydsXFFNzzkqGk98wZg=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-22T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081814,41.760209]]}},{"id":"oey0+IDiWk8/I5hoPyvJOeXaEPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uFFGRV2MJEKjlIxTWcmEXfLoakk="},{"type":"next-occurrence","id":"qnVZNZk2ufhtWILaLj4DgW8KVK8="}],"description":"Roadwork on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508112007/32563909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-13T12:56:51Z"},"road_event_id":"oey0+IDiWk8/I5hoPyvJOeXaEPA=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T00:00:00Z","end_date":"2026-05-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081814,41.760209]]}},{"id":"qnVZNZk2ufhtWILaLj4DgW8KVK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uFFGRV2MJEKjlIxTWcmEXfLoakk="}],"description":"Roadwork on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508112007/32563909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday May 15th, 2026, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-13T12:56:51Z"},"road_event_id":"qnVZNZk2ufhtWILaLj4DgW8KVK8=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-27T22:00:00Z","end_date":"2026-05-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081814,41.760209]]}},{"id":"ORC300546967","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 85"],"direction":"unknown","description":"Guard rail repairs on NY 85 both directions between Blessing Road (Bethlehem) and NYS Thruway overpass (Bethlehem) Not currently Scheduled","update_date":"2026-05-13T15:00:01Z"},"road_event_id":"ORC300546967","beginning_cross_street":"Blessing Road","ending_cross_street":"NYS Thruway overpass","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:40:53Z","end_date":"2026-05-14T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.847289,42.649536]]}},{"id":"y5CXTVqPeRLiz2NPmNd4Vgymc+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Atlantic City Expressway"],"direction":"unknown","related_road_events":[],"description":"Sign work on Atlantic City Expressway westbound East of Frank S. Farley Service Plaza (Hamilton Twp) to West of Frank S. Farley Service Plaza (Hamilton Twp) MOVE OVER FOR HIGHWAY WORKERS, Wednesday May 13th, 2026, 08:45 AM thru 02:30 PM 1 Left lane and shoulder of 3 lanes closed","update_date":"2026-05-13T12:56:46Z"},"road_event_id":"y5CXTVqPeRLiz2NPmNd4Vgymc+M=","beginning_cross_street":"East of Frank S. Farley Service Plaza","ending_cross_street":"West of Frank S. Farley Service Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T12:45:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.72204,39.542256]]}},{"id":"OIR6PRZx705WwCBNWx/sI4NUg20=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound At NJ 34 (Old Bridge Twp) Wednesday May 13, 2026 09:07 AM thru 03:30 PM, 1 right lane of 3 lanes closed","update_date":"2026-05-13T13:08:13Z"},"road_event_id":"OIR6PRZx705WwCBNWx/sI4NUg20=","beginning_cross_street":"NJ 34","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T04:00:00Z","end_date":"2026-05-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.301292,40.435283]]}},{"id":"vCDwNoSDenzQu9MlgCOjqmV2jdo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[],"description":"Gas main repairs on NY 984E - Yonkers Avenue between Seminary Avenue (Yonkers) and Wilbur Street (Yonkers) SIMCO RW/32196809 - Plan travel accordingly; delays may exist, Wednesday May 13th, 2026, 09:00 AM thru 04:00 PM, right lane closure","update_date":"2026-05-13T13:17:56Z"},"road_event_id":"vCDwNoSDenzQu9MlgCOjqmV2jdo=","beginning_cross_street":"Seminary Avenue","ending_cross_street":"Wilbur Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.863699,40.922399]]}},{"id":"5pQblkGkkaY5PNA26CgXw2rLK94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZTVHc1oKv7BJ4IAN8jRu73hbXCk="}],"description":"Guard rail repairs on Saw Mill River Parkway southbound between Exit 33 - Roaring Brook Road (New Castle) and Exit 3 - McLean Avenue (Yonkers) D265183/NIGHT/32670709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 05:00 AM, right lane closure","update_date":"2026-05-13T13:27:42Z"},"road_event_id":"5pQblkGkkaY5PNA26CgXw2rLK94=","beginning_cross_street":"Exit 33 - Roaring Brook Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T00:00:00Z","end_date":"2026-05-20T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.759109,41.180174]]}},{"id":"ZTVHc1oKv7BJ4IAN8jRu73hbXCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5pQblkGkkaY5PNA26CgXw2rLK94="},{"type":"next-occurrence","id":"PygRtKIho7/8K+jqAZCExzNnJA8="}],"description":"Guard rail repairs on Saw Mill River Parkway southbound between Exit 33 - Roaring Brook Road (New Castle) and Exit 3 - McLean Avenue (Yonkers) D265183/NIGHT/32670709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 05:00 AM, right lane closure","update_date":"2026-05-13T13:27:42Z"},"road_event_id":"ZTVHc1oKv7BJ4IAN8jRu73hbXCk=","beginning_cross_street":"Exit 33 - Roaring Brook Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T00:00:00Z","end_date":"2026-05-21T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.759109,41.180174]]}},{"id":"PygRtKIho7/8K+jqAZCExzNnJA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5pQblkGkkaY5PNA26CgXw2rLK94="},{"type":"next-occurrence","id":"S7sZLbSFWDbD/7BX9FnV/U5iRYg="}],"description":"Guard rail repairs on Saw Mill River Parkway southbound between Exit 33 - Roaring Brook Road (New Castle) and Exit 3 - McLean Avenue (Yonkers) D265183/NIGHT/32670709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 05:00 AM, right lane closure","update_date":"2026-05-13T13:27:42Z"},"road_event_id":"PygRtKIho7/8K+jqAZCExzNnJA8=","beginning_cross_street":"Exit 33 - Roaring Brook Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T00:00:00Z","end_date":"2026-05-22T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.759109,41.180174]]}},{"id":"S7sZLbSFWDbD/7BX9FnV/U5iRYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5pQblkGkkaY5PNA26CgXw2rLK94="}],"description":"Guard rail repairs on Saw Mill River Parkway southbound between Exit 33 - Roaring Brook Road (New Castle) and Exit 3 - McLean Avenue (Yonkers) D265183/NIGHT/32670709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 05:00 AM, right lane closure","update_date":"2026-05-13T13:27:42Z"},"road_event_id":"S7sZLbSFWDbD/7BX9FnV/U5iRYg=","beginning_cross_street":"Exit 33 - Roaring Brook Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T00:00:00Z","end_date":"2026-05-23T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.759109,41.180174]]}},{"id":"2nhinXVNIsZxOl+bdPVQTkwh1/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Atlantic City Expressway"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on Atlantic City Expressway westbound Atlantic City Convention Center/Eastern Terminus (Atlantic City) to West of Atlantic City Convention Center/Eastern Terminus (Atlantic City) MOVE OVER FOR HIGHWAY WORKERS, Wednesday May 13th, 2026, 09:30 AM thru 02:30 PM 1 Right lane and shoulder of 4 lanes closed","update_date":"2026-05-13T13:29:49Z"},"road_event_id":"2nhinXVNIsZxOl+bdPVQTkwh1/Y=","beginning_cross_street":"Atlantic City Convention Center/Eastern Terminus","ending_cross_street":"West of Atlantic City Convention Center/Eastern Terminus","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:30:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.43835,39.359934]]}},{"id":"ORC300546971","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23A"],"direction":"unknown","description":"Bridge work on NY 23A both directions over Allen Brook (Tannersville) alternating lane closures Not currently Scheduled","update_date":"2026-05-13T15:00:01Z"},"road_event_id":"ORC300546971","beginning_cross_street":"Allen Brook","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:35:06Z","end_date":"2026-05-14T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.146041,42.19599]]}},{"id":"np7Q93YoLWs3xwFsCXCDidy4UyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 124"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 124 Westbound near Cleveland Pl (Springfield Twp), Thursday May 14, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-13T13:36:05Z"},"road_event_id":"np7Q93YoLWs3xwFsCXCDidy4UyY=","beginning_cross_street":"Cleveland Pl","ending_cross_street":"CR 512","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T22:00:00Z","end_date":"2026-05-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.329399,40.718868]]}},{"id":"PmQxT2hQM+f8LnKXJ0ZfYhQ6Kj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Northbound near Pulaski St (Bayonne), Tuesday May 19, 2026 05:00 AM thru 06:00 AM, left lane closed","update_date":"2026-05-13T13:36:06Z"},"road_event_id":"PmQxT2hQM+f8LnKXJ0ZfYhQ6Kj0=","beginning_cross_street":"Pulaski St","ending_cross_street":"New Jersey Turnpike Hudson County Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T14:00:00Z","end_date":"2026-05-19T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.099037,40.680759]]}},{"id":"GSea0+A65idNGVA3/gnIP8s3Qhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound at East of Berrys Creek Bridge (East Rutherford) Wednesday May 13, 2026 11:00 PM thru Thursday May 14, 2026 05:00 AM, ramp","update_date":"2026-05-13T13:36:08Z"},"road_event_id":"GSea0+A65idNGVA3/gnIP8s3Qhw=","beginning_cross_street":"East of Berrys Creek Bridge","ending_cross_street":"East of Berrys Creek Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T02:00:00Z","end_date":"2026-05-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.08654,40.810871]]}},{"id":"9+Aa7ifRx+MDyQLd3PVzJm/tJKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23A"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 23A both directions over Sawmill Creek (Hunter) alternating lane closures, Wednesday May 13th, 2026, 11:00 AM thru 11:30 AM All lanes open","update_date":"2026-05-13T13:36:24Z"},"road_event_id":"9+Aa7ifRx+MDyQLd3PVzJm/tJKA=","beginning_cross_street":"Sawmill Creek","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T15:00:00Z","end_date":"2026-05-13T15:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.134242,42.195694]]}},{"id":"LEgo2DuhvNCbrXZbVNgqkbskw/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23A"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 23A both directions over Kaaterskill Creek (Hunter) alternating lane closures, Wednesday May 13th, 2026, 11:30 AM thru 12:00 PM All lanes open","update_date":"2026-05-13T13:37:35Z"},"road_event_id":"LEgo2DuhvNCbrXZbVNgqkbskw/s=","beginning_cross_street":"Kaaterskill Creek","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T03:00:00Z","end_date":"2026-05-14T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.096839,42.195777]]}},{"id":"+zCXnYEzuk/8cHlpji10fHeeQ0Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23A"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 23A both directions area of Whites Rd (Catskill) alternating lane closures, Wednesday May 13th, 2026 thru Wednesday May 13th, 2026, 12:30 PM thru 01:00 PM All lanes open","update_date":"2026-05-13T13:40:07Z"},"road_event_id":"+zCXnYEzuk/8cHlpji10fHeeQ0Q=","beginning_cross_street":"Whites Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T05:00:00Z","end_date":"2026-05-14T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.026545,42.175371]]}},{"id":"/Pm40tM3IQJcMDxWx33AXrkupQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23A"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 23A both directions over Kaaterskill Creek (Catskill), Wednesday May 13th, 2026 thru Wednesday May 13th, 2026, 12:00 PM thru 12:30 PM All lanes open","update_date":"2026-05-13T13:42:06Z"},"road_event_id":"/Pm40tM3IQJcMDxWx33AXrkupQc=","beginning_cross_street":"Kaaterskill Creek ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T04:00:00Z","end_date":"2026-05-14T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.054745,42.177035]]}},{"id":"3h8+w4pOQ4khna/z0kPe3T7LazE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+SH4DyTEROYiSQ/mD+xUM5A2OC4="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] southbound ramps to/from Exit 9A/B - Mill Road (New Rochelle) D265183/NIGHT/32597909 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, ramp closed and detoured","update_date":"2026-05-13T13:54:19Z"},"road_event_id":"3h8+w4pOQ4khna/z0kPe3T7LazE=","beginning_cross_street":"Exit 9A/B - Mill Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T02:00:00Z","end_date":"2026-05-20T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.799478,40.954083]]}},{"id":"+SH4DyTEROYiSQ/mD+xUM5A2OC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3h8+w4pOQ4khna/z0kPe3T7LazE="},{"type":"next-occurrence","id":"6NG3iczniE8misj+8SxgSMlQ8PI="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] southbound ramps to/from Exit 9A/B - Mill Road (New Rochelle) D265183/NIGHT/32597909 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, ramp closed and detoured","update_date":"2026-05-13T13:54:19Z"},"road_event_id":"+SH4DyTEROYiSQ/mD+xUM5A2OC4=","beginning_cross_street":"Exit 9A/B - Mill Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T02:00:00Z","end_date":"2026-05-21T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.799478,40.954083]]}},{"id":"6NG3iczniE8misj+8SxgSMlQ8PI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3h8+w4pOQ4khna/z0kPe3T7LazE="},{"type":"next-occurrence","id":"sGa1QFKds9Ks+Si6l6ID9KwDSxE="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] southbound ramps to/from Exit 9A/B - Mill Road (New Rochelle) D265183/NIGHT/32597909 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, ramp closed and detoured","update_date":"2026-05-13T13:54:19Z"},"road_event_id":"6NG3iczniE8misj+8SxgSMlQ8PI=","beginning_cross_street":"Exit 9A/B - Mill Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T02:00:00Z","end_date":"2026-05-22T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.799478,40.954083]]}},{"id":"sGa1QFKds9Ks+Si6l6ID9KwDSxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3h8+w4pOQ4khna/z0kPe3T7LazE="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] southbound ramps to/from Exit 9A/B - Mill Road (New Rochelle) D265183/NIGHT/32597909 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday May 18th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, ramp closed and detoured","update_date":"2026-05-13T13:54:19Z"},"road_event_id":"sGa1QFKds9Ks+Si6l6ID9KwDSxE=","beginning_cross_street":"Exit 9A/B - Mill Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-23T02:00:00Z","end_date":"2026-05-23T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.799478,40.954083]]}},{"id":"zosobiZ0T/G9ZEURbCR5y6BAGvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-87 Northway southbound Exit 7/6 off-ramp under Sparrowbush Rd (Colonie), Monday May 18th, 2026, 09:00 AM thru 09:30 AM right shoulder closed","update_date":"2026-05-13T13:55:49Z"},"road_event_id":"zosobiZ0T/G9ZEURbCR5y6BAGvM=","beginning_cross_street":"Exit 7/6 off-ramp under Sparrowbush Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-18T22:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764459,42.759557]]}},{"id":"eDrkVempi6KfHpF5hp705oIoqaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on NY 7 eastbound under Old Loudon Rd (Colonie), Monday May 18th, 2026, 11:30 AM thru 12:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-13T13:57:06Z"},"road_event_id":"eDrkVempi6KfHpF5hp705oIoqaI=","beginning_cross_street":"Old Loudon Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T03:00:00Z","end_date":"2026-05-19T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.754133,42.759881]]}},{"id":"3W/d3I9+5Q9o9MEIpJc+KC9KTjw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["914C; State Campus to Washington Avenue Connectors"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on 914C; State Campus to Washington Avenue Connectors northbound under Washington Avenue (Albany), Monday May 18th, 2026, 02:00 PM thru 02:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-05-13T13:59:06Z"},"road_event_id":"3W/d3I9+5Q9o9MEIpJc+KC9KTjw=","beginning_cross_street":"Washington Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T08:00:00Z","end_date":"2026-05-19T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812342,42.684445]]}},{"id":"NYujl0a1Ik5rhZv41DsjwLZBpGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Round Lake Rd"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on Round Lake Rd both directions under I-87 Exit 11 (Malta) alternating lane closures, Tuesday May 19th, 2026, 08:30 AM thru 09:30 AM All lanes open","update_date":"2026-05-13T14:01:57Z"},"road_event_id":"NYujl0a1Ik5rhZv41DsjwLZBpGY=","beginning_cross_street":"I-87 Exit 11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T21:00:00Z","end_date":"2026-05-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.804307,42.936953]]}},{"id":"+28xvISELv/GwU1msAz+zNLH5xA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/4nKcLi+Jo4ijxx8ARXlop9eYlw="}],"description":"Bridge inspection on I-87 Northway both directions under Malta Ave (Malta), Wednesday May 20th, 2026, 09:00 AM thru 09:30 AM 1 Right lane of 3 lanes closed northbound, Wednesday May 20th, 2026, 10:30 AM thru 11:00 AM 1 Left lane of 3 lanes closed northbound, Wednesday May 20th, 2026, 01:00 PM thru 01:30 PM 1 Left lane of 3 lanes closed southbound, Wednesday May 20th, 2026, 02:30 PM thru 03:00 PM 1 Right lane of 3 lanes closed southbound","update_date":"2026-05-13T14:05:04Z"},"road_event_id":"+28xvISELv/GwU1msAz+zNLH5xA=","beginning_cross_street":"Malta Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-20T22:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79939,43.013926]]}},{"id":"/4nKcLi+Jo4ijxx8ARXlop9eYlw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+28xvISELv/GwU1msAz+zNLH5xA="},{"type":"next-occurrence","id":"fDOfpvM0kXhqNTtm7H0/rJ8xveM="}],"description":"Bridge inspection on I-87 Northway both directions under Malta Ave (Malta), Wednesday May 20th, 2026, 09:00 AM thru 09:30 AM 1 Right lane of 3 lanes closed northbound, Wednesday May 20th, 2026, 10:30 AM thru 11:00 AM 1 Left lane of 3 lanes closed northbound, Wednesday May 20th, 2026, 01:00 PM thru 01:30 PM 1 Left lane of 3 lanes closed southbound, Wednesday May 20th, 2026, 02:30 PM thru 03:00 PM 1 Right lane of 3 lanes closed southbound","update_date":"2026-05-13T14:05:04Z"},"road_event_id":"/4nKcLi+Jo4ijxx8ARXlop9eYlw=","beginning_cross_street":"Malta Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T01:00:00Z","end_date":"2026-05-21T01:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79939,43.013926]]}},{"id":"fDOfpvM0kXhqNTtm7H0/rJ8xveM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+28xvISELv/GwU1msAz+zNLH5xA="},{"type":"next-occurrence","id":"AxmX3F1p1/FpsncCif1k4NzELuE="}],"description":"Bridge inspection on I-87 Northway both directions under Malta Ave (Malta), Wednesday May 20th, 2026, 09:00 AM thru 09:30 AM 1 Right lane of 3 lanes closed northbound, Wednesday May 20th, 2026, 10:30 AM thru 11:00 AM 1 Left lane of 3 lanes closed northbound, Wednesday May 20th, 2026, 01:00 PM thru 01:30 PM 1 Left lane of 3 lanes closed southbound, Wednesday May 20th, 2026, 02:30 PM thru 03:00 PM 1 Right lane of 3 lanes closed southbound","update_date":"2026-05-13T14:05:04Z"},"road_event_id":"fDOfpvM0kXhqNTtm7H0/rJ8xveM=","beginning_cross_street":"Malta Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T06:00:00Z","end_date":"2026-05-21T06:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79939,43.013926]]}},{"id":"AxmX3F1p1/FpsncCif1k4NzELuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+28xvISELv/GwU1msAz+zNLH5xA="}],"description":"Bridge inspection on I-87 Northway both directions under Malta Ave (Malta), Wednesday May 20th, 2026, 09:00 AM thru 09:30 AM 1 Right lane of 3 lanes closed northbound, Wednesday May 20th, 2026, 10:30 AM thru 11:00 AM 1 Left lane of 3 lanes closed northbound, Wednesday May 20th, 2026, 01:00 PM thru 01:30 PM 1 Left lane of 3 lanes closed southbound, Wednesday May 20th, 2026, 02:30 PM thru 03:00 PM 1 Right lane of 3 lanes closed southbound","update_date":"2026-05-13T14:05:04Z"},"road_event_id":"AxmX3F1p1/FpsncCif1k4NzELuE=","beginning_cross_street":"Malta Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T09:00:00Z","end_date":"2026-05-21T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79939,43.013926]]}},{"id":"z89+44v85esW2Pkr0/zErL35gOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qRmuVPSsGk6Bi2VH2Nb2196va60="}],"description":"Bridge inspection on I-87 Northway both directions at Exit 13 under US Route 9 (Malta), Thursday May 21st, 2026, 09:00 AM thru 10:00 AM 1 Right lane of 4 lanes closed northbound, Thursday May 21st, 2026, 11:00 AM thru 12:00 PM 1 Left lane of 4 lanes closed northbound, Thursday May 21st, 2026, 02:00 PM thru 02:30 PM 1 Left lane of 4 lanes closed southbound","update_date":"2026-05-13T14:07:41Z"},"road_event_id":"z89+44v85esW2Pkr0/zErL35gOU=","beginning_cross_street":"Exit 13 under US Route 9","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T22:00:00Z","end_date":"2026-05-21T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.791651,43.021269]]}},{"id":"qRmuVPSsGk6Bi2VH2Nb2196va60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z89+44v85esW2Pkr0/zErL35gOU="},{"type":"next-occurrence","id":"Kh8bv6scvoIyPe2/9iRaU5EeJFE="}],"description":"Bridge inspection on I-87 Northway both directions at Exit 13 under US Route 9 (Malta), Thursday May 21st, 2026, 09:00 AM thru 10:00 AM 1 Right lane of 4 lanes closed northbound, Thursday May 21st, 2026, 11:00 AM thru 12:00 PM 1 Left lane of 4 lanes closed northbound, Thursday May 21st, 2026, 02:00 PM thru 02:30 PM 1 Left lane of 4 lanes closed southbound","update_date":"2026-05-13T14:07:41Z"},"road_event_id":"qRmuVPSsGk6Bi2VH2Nb2196va60=","beginning_cross_street":"Exit 13 under US Route 9","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T02:00:00Z","end_date":"2026-05-22T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.791651,43.021269]]}},{"id":"Kh8bv6scvoIyPe2/9iRaU5EeJFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z89+44v85esW2Pkr0/zErL35gOU="}],"description":"Bridge inspection on I-87 Northway both directions at Exit 13 under US Route 9 (Malta), Thursday May 21st, 2026, 09:00 AM thru 10:00 AM 1 Right lane of 4 lanes closed northbound, Thursday May 21st, 2026, 11:00 AM thru 12:00 PM 1 Left lane of 4 lanes closed northbound, Thursday May 21st, 2026, 02:00 PM thru 02:30 PM 1 Left lane of 4 lanes closed southbound","update_date":"2026-05-13T14:07:41Z"},"road_event_id":"Kh8bv6scvoIyPe2/9iRaU5EeJFE=","beginning_cross_street":"Exit 13 under US Route 9","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T08:00:00Z","end_date":"2026-05-22T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.791651,43.021269]]}},{"id":"4HFsJMqcNNxzKt9oMybvYhfnxuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 141"],"direction":"unknown","related_road_events":[],"description":"Road maintenance operations on NY 141 both directions between Church Street (Mount Pleasant) and Manville Road - NY 117 - Bedford Road (Mount Pleasant) 202408111275/32425309 - This work is weather permitting. Delays may exist; plan travel accordingly, Monday May 18th, 2026, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-13T14:23:48Z"},"road_event_id":"4HFsJMqcNNxzKt9oMybvYhfnxuA=","beginning_cross_street":"Church Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777995,41.139161]]}},{"id":"UvncYu3Q87PJ9NHRBK+EjqXaUCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Montclair-Boonton Line, Morris & Essex Line, North Jersey Coast Line and Northeast Corridor Line"],"direction":"unknown","related_road_events":[],"description":"Due to Escalator Work both directions, Montclair-Boonton Line, Morris & Essex Line, North Jersey Coast Line and Northeast Corridor Line at New York Penn Station (New York) Escalator 4B, which serves Tracks 7 and 8, will be out of service overnight from approximately 11:00 PM to 6:00 AM due to repairs. Customers can use the escalators located in the 8th Avenue concourse or the alternate elevator in the elevator concourse. Please allow for extra travel time., Thursday May 14th, 2026 thru Friday May 15th, 2026, 11:00 PM thru 06:00 AM","update_date":"2026-05-13T14:30:36Z"},"road_event_id":"UvncYu3Q87PJ9NHRBK+EjqXaUCQ=","beginning_cross_street":"New York Penn Station","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T02:00:00Z","end_date":"2026-05-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992358,40.750046]]}},{"id":"KowWzjrRZeN8uaYO1A550B7yd10=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[],"description":"Pothole repair on Hutchinson River Parkway [Westchester] northbound between Exit 9C - Wilmot Road (New Rochelle) and Exit 13A/B - Mamaroneck Avenue (White Plains) Res 8-9 RW/32743209 - This is a moving operation. Plan travel accordingly; delays may exist, Wednesday May 13th, 2026, 10:00 AM thru 02:00 PM, mobile right lane closure","update_date":"2026-05-13T14:40:00Z"},"road_event_id":"KowWzjrRZeN8uaYO1A550B7yd10=","beginning_cross_street":"Exit 9C - Wilmot Road","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T14:00:00Z","end_date":"2026-05-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79796,40.951308]]}},{"id":"/yTsRbjMMY4qyxqTt4plpVy7PVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 29"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 29 Southbound near South of Lalor St (Trenton), Monday May 18, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-05-13T14:42:18Z"},"road_event_id":"/yTsRbjMMY4qyxqTt4plpVy7PVg=","beginning_cross_street":"South of Lalor St","ending_cross_street":"South of Lalor St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T22:00:00Z","end_date":"2026-05-19T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.75856,40.200199]]}},{"id":"IZiFpiJcByFG5rJud6lhypdCuGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound near South of Exit 64 - CR 535/East State Street Extension (Hamilton Twp), Friday May 15, 2026 10:00 AM thru 12:00 PM, left lane closed","update_date":"2026-05-13T14:42:20Z"},"road_event_id":"IZiFpiJcByFG5rJud6lhypdCuGQ=","beginning_cross_street":"South of Exit 64 - CR 535/East State Street Extension","ending_cross_street":"North of Exit 64 - CR 535/East State Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-16T00:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.701484,40.241683]]}},{"id":"YCXfmoft4RfNcplxxvtZz6fs8oM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 between West of NJ 41 (Maple Shade Twp) and East of CR 640/Creek Rd/Bullshead Rd (Hainesport Twp), Thursday May 14, 2026 08:00 AM thru 03:00 PM, left lane closed, moving operation","update_date":"2026-05-13T14:42:21Z"},"road_event_id":"YCXfmoft4RfNcplxxvtZz6fs8oM=","beginning_cross_street":"West of NJ 41","ending_cross_street":"East of CR 640/Creek Rd/Bullshead Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T20:00:00Z","end_date":"2026-05-15T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.986999,39.942539]]}},{"id":"7tdCK5O06OX9n8oMQtcQYySN+yc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Southbound near North of CR 654/Hurfville-Crosskeys Rd (Washington Twp), Thursday May 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-13T14:42:22Z"},"road_event_id":"7tdCK5O06OX9n8oMQtcQYySN+yc=","beginning_cross_street":"North of CR 654/Hurfville-Crosskeys Rd","ending_cross_street":"CR 654/Hurfville-Crosskeys Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-14T18:00:00Z","end_date":"2026-05-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.106925,39.76725]]}},{"id":"nK35omrIT/DsZmaeY3UPeJ5DZxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 29"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 29 Southbound near South of Lalor St (Trenton), Wednesday May 20, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-05-13T14:42:05Z"},"road_event_id":"nK35omrIT/DsZmaeY3UPeJ5DZxY=","beginning_cross_street":"South of Lalor St","ending_cross_street":"South of Lalor St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T22:00:00Z","end_date":"2026-05-21T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.75856,40.200199]]}},{"id":"I8h/yNqhD7nXXpsWNdVGz972PHA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 between West of NJ 41 (Maple Shade Twp) and East of CR 640/Creek Rd/Bullshead Rd (Hainesport Twp), Friday May 15, 2026 08:00 AM thru 03:00 PM, left lane closed, moving operation","update_date":"2026-05-13T14:42:06Z"},"road_event_id":"I8h/yNqhD7nXXpsWNdVGz972PHA=","beginning_cross_street":"West of NJ 41","ending_cross_street":"East of CR 640/Creek Rd/Bullshead Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T20:00:00Z","end_date":"2026-05-16T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.986999,39.942539]]}},{"id":"vrgvCHceIr1+5P6U6TrKdOSX0s0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 between West of NJ 41 (Maple Shade Twp) and East of CR 640/Creek Rd/Bullshead Rd (Hainesport Twp), Wednesday May 13, 2026 09:00 AM thru 03:00 PM, left lane closed, moving operation","update_date":"2026-05-13T14:42:08Z"},"road_event_id":"vrgvCHceIr1+5P6U6TrKdOSX0s0=","beginning_cross_street":"West of NJ 41","ending_cross_street":"East of CR 640/Creek Rd/Bullshead Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T13:00:00Z","end_date":"2026-05-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.986999,39.942539]]}},{"id":"21bASMqGeTfztV2WFGA+/6vgNTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Southbound near North of CR 654/Hurfville-Crosskeys Rd (Washington Twp), Friday May 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-13T14:42:12Z"},"road_event_id":"21bASMqGeTfztV2WFGA+/6vgNTQ=","beginning_cross_street":"North of CR 654/Hurfville-Crosskeys Rd","ending_cross_street":"CR 654/Hurfville-Crosskeys Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-15T18:00:00Z","end_date":"2026-05-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.106925,39.76725]]}},{"id":"F4VD7Xr9Z5qzO0B1H5+Fc6MUZxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 29"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 29 Southbound near South of Lalor St (Trenton), Tuesday May 19, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-05-13T14:42:17Z"},"road_event_id":"F4VD7Xr9Z5qzO0B1H5+Fc6MUZxA=","beginning_cross_street":"South of Lalor St","ending_cross_street":"South of Lalor St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-19T22:00:00Z","end_date":"2026-05-20T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.75856,40.200199]]}},{"id":"rR1RVeYa+p0wNcLRf+dFA5v9DTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COONS CROSSING RD"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on COONS CROSSING RD both directions between Cary Rd/Ushers Rd (Halfmoon) and RT-67 (Stillwater) Follow Posted Detour, Continuous Monday May 18th, 2026 09:00 AM thru Friday September 4th, 2026 04:00 PM All lanes closed","update_date":"2026-05-13T14:53:16Z"},"road_event_id":"rR1RVeYa+p0wNcLRf+dFA5v9DTE=","beginning_cross_street":"Cary Rd/Ushers Rd","ending_cross_street":"RT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-18T13:00:00Z","end_date":"2026-05-28T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.746028,42.918735]]}},{"id":"OlP/BQ+5VUohdqfQJegDGiJTJto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[],"description":"Tree trimming on Sprain Brook State Pkwy northbound between I-287 (Greenburgh) and Taconic State Parkway (Mount Pleasant) Res 8-9 RW/32726409 - Plan travel accordingly; delays may exist, Wednesday May 13th, 2026, 11:00 AM thru 02:30 PM, mobile left lane closure","update_date":"2026-05-13T15:03:00Z"},"road_event_id":"OlP/BQ+5VUohdqfQJegDGiJTJto=","beginning_cross_street":"I-287","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T15:00:00Z","end_date":"2026-05-13T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.842818,40.986222]]}}]}